PHOTO DI BANGUNAN SHOW ROOM AREA, SERVICE & BODY PAINT AREA
PEK. PENGUKURAN & BOUWPLANK SEMUA AREA BANGUNAN.
PEKERJAAN PEMBESIAN, BEKISTING PILE CAP & ICON TOWER.
PEK. URUGAN PASIR / MACADAM + PEMADATAN BAWAH JALAN PAVING.
PHOTO KEMAJUAN PROGRESS PER MINGGU
MINGGU KE-3 (TGL. 13 S/D 19 JUNI 2011), Progress 3 - 7%
PHOTO DI BANGUNAN SHOW ROOM AREA, SERVICE & BODY PAINT AREA
PEK. COR BETON PILE CAP AREA SHOW ROOM, SERVICE & BODY PAINT.
PEK. PEMBESIAN, BEKISTING, COR KOLOM PEDESTAL BAWAH SLOOF (SHOW ROOM).
PEK. GALIAN, URUGAN PASIR, PASANGAN BATU KALI (SHOW ROOM)
PEK. PEMBESIAN, BEKISTING, COR PILE CAP & DINDING S/D BAWAH BALOK ICON TOWER.
PEK. PEMBESIAN SLOOF (AREA SHOW ROOM & BODY PAINT).
PHOTO KEMAJUAN PROGRESS PER MINGGU
MINGGU KE-4 (TGL. 20 S/D 26 JUNI 2011), Progress 7 - 12%
PHOTO DI BANGUNAN SHOW ROOM AREA, SERVICE & BODY PAINT AREA
PEK. PEMBESIAN, BEKISTING KOLOM PEDESTAL DIATAS SLOOF (SEMUA AREA).
PEK. BEKISTING, LANJUT PEMBESIAN + COR BETON SLOOF (SHOW ROOM & BODY PAINT AREA).
PEK. GALIAN, URUGAN PASIR, PASANGAN BATU KALI (BODY PAINT & SERVICE AREA)
PEK. BONGKAR BEKISTING SLOOF.
PEK. FABRIKASI STRUKTUR BAJA KOLOM, RAFTER, BALOK (SHOW ROOM).
PHOTO KEMAJUAN PROGRESS PER MINGGU
MINGGU KE-5 (TGL. 27 JUNI S/D 03 JULI 2011), Progress 12 - 17%
PHOTO DI BANGUNAN SHOW ROOM AREA, SERVICE & BODY PAINT AREA
PEK. PASANG ANGKUR KOLOM PEDESTAL SHOW ROOM & BODY PAINT.
PEK. COR BETON KOLOM PEDESTAL (SHOW ROOM & BODY PAINT AREA).
PEK. URUG TANAH KEMBALI PONDASI, SLOOF & PENINGGIAN URUGAN LANTAI SHOW ROOM
PEK. COR BETON SLOOF DI TEPI AS 10, SHOW ROOM & SERVICE AREA.
PEK. FABRIKASI STRUKTUR BAJA KOLOM, RAFTER, BALOK (SHOW ROOM).
HOW ROOM
PHOTO KEMAJUAN PROGRESS PER MINGGU
MINGGU KE-6 (TGL. 04 S/D 10 JULI 2011) Progress 17-21%
PHOTO DI BANGUNAN SHOW ROOM AREA, SERVICE & BODY PAINT AREA
PEK. PENINGGIAN TANAH & PEMADATAN LANTAI DASAR SHOW ROOM & BODY PAINT
PEK. COR BETON KOLOM PEDESTAL (SERVICE & BODY PAINT AREA)
PEK. PEMBESIAN, BEKISTING COR LANTAI & DINDING SEPTICTANK
PEK. GALIAN, URUG PASIR & PASANG PIPA SALURAN PVC, PIPA BETON
♦BOBOT PRESTASI PROGRESS MINGGUAN (10)♦
CIVIL & ARCHITECT WORKS
Kepada Yth.
PT. PERKONSUMA - JAKARTA
Gedung ARVA lantai 4,
Jln. R. P. Soeroso No. 38,
Gondangdia, Menteng, Jakarta Pusat 10350.
Up. Bapak Dody Setyawan
Dengan hormat,
Berdasar hasil prestasi pekerjaan progress sampai dengan minggu ini, bersama ini kami
sampaikan tagihan progress, untuk pekerjaan Sipil Gedung Show Room FORD di Tange-
rang, mencapai bobot 14,8024 %, sesuai perincian pekerjaan, dengan total biaya sebesar :
Civil Works Rp. 2,233,699,098.55
Potongan Uang muka Rp. (33,064,107.54)
Potongan PPh 3% Rp. (67,010,972.96)
Total Rp. 2,133,624,018.06
Total (Dibulatkan) Rp. 2,133,600,000.00
PPN 10% Rp. 213,360,000.00
Grand Total Rp. 2,346,960,000.00
Terbilang : (#Tujuh ratus delapan belas juta enam ratus tiga puluh ribu rupiah#)
Catatan
- BQ progress pakai volume kontrak awal, jika ada perbedaan volume ada revisi kontrak.
- Progress kemajuan proyek dibuat tiap 2 mingguan atau 4 mingguan.
- Terlampir masing-masing perincian dan sudah diperiksa oleh pengawas lapangan.
Demikian tagihan progress prestasi pekerjaan ini kami sampaikan, atas segala perhatian
dan kerja samanya kami ucapkan terima kasih.
Hormat kami,
PT. SETIA RESAMITRA
Fredy Yudianto, SH.
Direktur
File : Arsip
BOBOT PROGRESS PRESTASI MINGGUAN KE-10 4,620,939,064
SUBJECT : BQ CIVIL & ARCHITECT, FORD SHOWROOM & SERVICE AREA
PROJECT LOCATION : FORD TANGERANG - BANTEN
PERIODE : 01 S/D 07 AGUSTUS 2011
A PRELIMINARY
1 Site Office / Direksi kit ( office, Meeting room, toilet ) incld Ls 1.00 By other excluded excluded excluded
Site Storage
2 Water & Electrical Work, expenses during project Ls 1.00 By other excluded excluded excluded
3 Setting Out Bowplank m' 230.00 28,000 Rp 6,440,000 0.1394 100 - 100 0.1394
4 Temporary Fence min 1.8 m high, surrounding for front area m' 80.00 By other excluded excluded excluded
w/ Weave zinc metal 0.35mm thick and finish coat, frame use
standard wood 5/7
5 Mobilization and Demobilization Ls 1.00 Done Fase I excluded excluded excluded
6 Security Ls 1.00 By other excluded excluded excluded
7 Soil filling for building level , incld. Soil compacted every 50 m3 4,989.51 Done Fase I excluded excluded excluded
cm high (include leveling elevation Body Repair and Stock Car)
1 Pilling , concrete Mini pile K450, 25 cmx25 cm square, until point 41.00 Done Fase I excluded excluded excluded
15 m depth, incld cutting pile (jack in pile methode)
2 Excavation and Back Filling
- Pile cap F1, F2, F3 m3 55.30 33,000 Rp 1,824,900 0.0395 100 - 100 0.0395
- Stairs Foundation m3 6.40 33,000 Rp 211,200 0.0046 - -
- Rivers stone Foundation ( L = 133 m' ) m3 106.62 33,000 Rp 3,518,460 0.0761 100 - 100 0.0761
- Beam floor 20/40 ( ground beam ) ( L = 102 m' ) m3 36.72 33,000 Rp 1,211,760 0.0262 100 - 100 0.0262
- Back Filling & Compacted soil m3 67.66 12,000 Rp 811,920 0.0176 100 - 100 0.0176
3 Sand Layer 10 cm Thick under floor, and Foundation ( Incld m3 55.19 196,600 Rp 10,850,354 0.2348 100 - 100 0.2348
compacted sand )
4 Mortar base 5 cm thick under floor, and Foundation m3 19.80 604,000 Rp 11,959,200 0.2588 100 - 100 0.2588
5 Foundation : Concrete K300 w/ reinforcement steel ( see the
detail drawing )
- Footing Foundation : 140 cm x140 cm x 25 cm high m3 1.47 2,915,000 Rp 4,285,050 0.0927 100 - 100 0.0927
for Beam foundation ( Location at showroom )
- Pile cap ;
1. F C1 for three ponit pile m3 2.17 2,208,000 Rp 4,791,360 0.1037 100 - 100 0.1037
2. F C2 for Two point pile m3 7.92 2,208,000 Rp 17,487,360 0.3784 100 - 100 0.3784
II Steel Structure ( SR )
1 Base plate 12 mm thick Kg 170.00 14,000 Rp 2,380,000 0.0515 100 - 100 0.0515
2 Anchor bolt dia 20 mm , 70 cm high Pcs 92.00 50,900 Rp 4,682,800 0.1013 100 - 100 0.1013
3 Nut & Bolt HTB M16, ASTM 325 Pcs 890.00 6,800 Rp 6,052,000 0.1310 100 - 100 0.1310
Nut & Bolt HTB M 12, ASTM 325 Pcs 346.00 4,000 Rp 1,384,000 0.0300 100 - 100 0.0300
4 Showroom and Mezzanine column ;
-Column ( C1') WF350x175x7x11 Kg 2,976.00 13,800 Rp 41,068,800 0.8888 100 - 100 0.8888
-Column ( C1) WF300x150x6.5x9 Kg 660.60 13,800 Rp 9,116,280 0.1973 100 - 100 0.1973
-Column ( C2 ) WF 250X125X6X9 Kg 1,243.20 13,800 Rp 17,156,160 0.3713 100 - 100 0.3713
5 Showroom , Mezzanine Beam and Icon Tower beam ;
-Beam ( STB1) WF 300x150x6.5x9 Kg 3,082.80 13,800 Rp 42,542,640 0.9207 100 - 100 0.9207
-Beam ( STB2 ) WF 250x125x6x9 Kg 2,901.00 13,800 Rp 40,033,800 0.8664 100 - 100 0.8664
-Beam ( STB 3 ) WF 200x100x5.5x8 Kg 2,432.00 13,800 Rp 33,561,600 0.7263 100 - 100 0.7263
-Beam ( STB4 ) WF 150x75x5x7 Kg 252.00 13,800 Rp 3,477,600 0.0753 100 - 100 0.0753
6 -Rafter WF 250x125x6x9 ( STB 2) Kg 3,374.40 13,800 Rp 46,566,720 1.0077 100 - 100 1.0077
-Rafter ( Consul ) WF 150x75x5x7 ( STB 4 ) Kg 195.00 13,800 Rp 2,691,000 0.0582 100 - 100 0.0582
7 End Plate 10 mm thick Kg 585.00 14,000 Rp 8,190,000 0.1772 100 - 100 0.1772
8 Haunch ex :
- WF 300x175x6.5x9 Kg 820.00 13,800 Rp 11,316,000 0.2449 100 - 100 0.2449
- WF 250x125x6x9 Kg 496.00 13,800 Rp 6,844,800 0.1481 100 - 100 0.1481
- WF.200x100x5.5x8 Kg 365.00 13,800 Rp 5,037,000 0.1090 100 - 100 0.1090
- WF.150x75x5x7 Kg 365.00 13,800 Rp 5,037,000 0.1090 100 - 100 0.1090
9 Stiffener Plate 8 mm thick Kg 385.00 14,000 Rp 5,390,000 0.1166 100 - 100 0.1166
10 Cop Plate 8 mm thick Kg 190.00 14,000 Rp 2,660,000 0.0576 100 - 100 0.0576
11 Top lock 0.5 mm thick ex jaindo for roof finish, including m2 504.00 135,600 Rp 68,342,400 1.4790 40 40 0.5916
Top lock 0.5 mm thick ex jaindo for covering back side
on alucobond Façade
12 Cap nok Flashing ex jaindo m' 32.00 47,500 Rp 1,520,000 0.0329 -
13 Purlin 125x50x20x3.2 , ex jaindo Kg 3,520.00 13,800 Rp 48,576,000 1.0512 90 - 90 0.9461
14 Façade and wall frame for surrounding showroom w/ Angel kg 5,125.00 13,800 Rp 70,725,000 1.5305 50 - 50 0.7653
Bar 70x70x7 and Angel Bar 50x50x5 incld. Base Plat 10 mm
thick and Plat joint 6 mm thick, Refer to Drawing Nr FTG-C-29
15 Oversteck for alucobond and top lock frame kg 298.00 13,800 Rp 4,112,400 0.0890 40 - 40 0.0356
( Double angel bar 50x50x5, incld plat joint 6mm thick )
III Architecture ( SR )
Ground floor
a Floor Finish
1 Niro granite tile type Regal Grey 60x60 cm polish, m2 298.00 260,400 Rp 77,599,200 1.6793 -
nat w/ am grout color same with ceramic color
2 Niro granite tile type Light Grey 60x60 cm polish, nat w/ am grout m2 217.00 260,400 Rp 56,506,800 1.2228 -
color same with ceramic color ( Including Stairs from interactive to
showroom finish floor )
3 Niro granite tile type Regal Grey 60x60 cm, nat w/ am grout color m2 7.00 260,400 Rp 1,822,800 0.0395 -
same with ceramic color ( Bathroom floor ceramic finish )
4 Icon tower finish floor, Andesit stone 30/30 w/ coating ex m2 47.00 200,200 Rp 9,409,400 0.2036 -
Mowilex doff color, incld nat w/ am grout color grey
5 Main stairs Floor ; Niro granite tile type Light Grey 60x60 cm polish,
- Step stairs ( 30 cm width ) finish on top , Niro granite tile type Lig m' 26.00 114,800 Rp 2,984,800 0.0646 -
Grey 60x60 polish w/ step nossing 7 cm width, nat w/ am
grout color same with ceramic color
- Bordes and step stairs side finish w/ Niro granite tile type Light Gr m2 9.00 260,400 Rp 2,343,600 0.0507 -
60x60 cm polish, nat w/ am grout color same with ceramic color
6 Interactive finish floor w/ epoxy self leveling finish floor tot m2 77.67 197,800 Rp 15,363,126 0.3325 -
4 mm thick w/ Preatreatment Substrate Cleaning .Spec ;
- Epoxy Cement ; Polyfloor Epoxy Cement PFC-225
- Primer Coat ; Polyfloor Epoxy Primer PFP - 261
- Intermediate Coat ; Polyfloor Epoxy, Topping PFT - 233
- Finish Coat ; Polyfloor Epoxy, Topping PFT - 213
b Wall type
1 Bathroom general wal finish w/ Niro granite type Light Grey 30x60 m2 28.00 260,400 Rp 7,291,200 0.1578 -
1,8 m high, nat w/ AM grout
2 Mozaik Ceramic 30x30 ( modul 2 cm x 2 cm ) ex Venus, nat w/
Am grout
- For Bathroom Border wall 30 cm high m' 4.00 395,500 Rp 1,582,000 0.0342 -
- For Monoblock back area finish 90 cm high m2 3.60 1,073,500 Rp 3,864,600 0.0836 -
3 Full Gypsum Partition Double Facing, Finish Catylac Snow m2 50.00 169,500 Rp 8,475,000 0.1834 -
Flake 44503 , incld
4 Full glass Partition ( clear glass10 mm thick, frame less ) incld , m2 11.50 847,500 Rp 9,746,250 0.2109 -
U profile for coneccting to floor and top
5 Special wall w/ formica finish nr 9905 M ; ( Refer to detail
drawing Nr FTG-A-09i )
a Floor Finish
1 Niro granite tile type Light Grey 60x60 cm polish, nat w/ am grout m2 224.00 260,400 Rp 58,329,600 1.2623 - -
color same with ceramic color
2 Niro granite tile type Regal Grey 60x60 cm polish, nat w/ am grout m2 7.00 260,400 Rp 1,822,800 0.0395 - -
color same with ceramic color ( Bathroom floor ceramic finish )
b Wall type
1 Bathroom general wal finish w/ Niro granite type Light Grey 30x60 m2 28.00 260,400 Rp 7,291,200 0.1578 - -
1,8 m high, nat w/ AM grout
2 Mozaik Ceramic 30x30 ( modul 2 cm x 2 cm ) ex Venus, nat w/
Am grout
- For Bathroom Border wall 30 cm high m' 6.00 395,500 Rp 2,373,000 0.0514 - -
- For Monoblock back area finish 90 cm high m2 3.60 1,073,500 Rp 3,864,600 0.0836 - -
3 Full Gypsum Partition Double Facing, Finish Catylac super m2 72.00 169,500 Rp 12,204,000 0.2641 - -
white, w/aluminum frame natural clr.
4 Full glass Partition ( clear glass 8 mm thick ) incld ,Aluminium m2 33.00 508,500 Rp 16,780,500 0.3631 - -
Frame natural color ex Aluxindo or similar
5 Floor trimming for gypsum & Plywood partition Brickwall, 10 m' 150.00 64,400 Rp 9,660,000 0.2091 - -
cm high aluminum list natural color
6 Void Railling 45 cm high 2 Row, vertical railling every 2 m m' 13.00 621,500 Rp 8,079,500 0.1749 - -
width, stainless steel Pipe dia 2" and 2 mm thick
7 Oil Paint finish on Pantry wall 1.5 m high w/ Dullux ICI color m2 17.20 33,900 Rp 583,080 0.0126 - -
White
8 Mezzanine void Glass Partition ( 1.720 m high ) ;
- Flat glass partition ; Semi frameless type , clear glass 10 mm m2 7.20 904,000 Rp 6,508,800 0.1409 - -
thick , aluminium frame natural color
- Curve Glass Partition ( Bending Glass , R= 4.28 m ), Semi m2 7.76 1,017,000 Rp 7,891,920 0.1708 - -
frameless , clear glass 10 mm thick tempered, Aluminium
Frame Natural color
1 Accouisting ceiling Jaya Akuistik type Sopran Square Edge m2 177.00 169,500 Rp 30,001,500 0.6493 - -
ex Jayaboard
2 Showroom ceiling, Gypsum Ceiling 9 mm thick ex jaya board m2 296.38 92,700 Rp 27,474,426 0.5946 - -
incld hollow frame, incld Icon tower ceiling area, finish
Danabrite 5130 wgite
Total Architecture show room ground floor & second floor Rp 741,416,983 16.0448 -
II Steel Structure
III Architecture ( SB , SS )
GROUND FLOOR
a Floor Finish
1 Workshop area finish floor, Roman Ceramic tile 30/30, 337104 m2 360.00 120,600 Rp 43,416,000 0.9396 - -
grey clr, w/ am grout nr. 125
2 Service bay finish floor w/ epoxy self leveling finish floor total m2 186.83 169,500 Rp 31,667,685 0.6853 - -
4 mm thick w/ Preatreatment Substrate Cleaning .Spec ;
- Epoxy Cement ; Polyfloor Epoxy Cement PFC-225
- Primer Coat ; Polyfloor Epoxy Primer PFP - 261
- Intermediate Coat ; Polyfloor Epoxy, Topping PFT - 233
- Finish Coat ; Polyfloor Epoxy, Topping PFT - 213
3 Marking Line for bays line 10 cm width clr yellow m' 105.80 33,900 Rp 3,586,620 0.0776 - -
ex propan
4 Wash Machine ( Over houl ) finish wall and floor w/ Roman m2 8.00 120,600 Rp 964,800 0.0209 - -
ceramic tile 30/30 nr 337104
b Wall finish
1 Full Glass Partition , Clear Glass 8 mm thick , w/ Aluminium m2 508,500 Excluded
frame natural color
2 Half Glass Partition , 1.3 m high , Clear Glass 6 mm thick , w/ m2 5.73 395,500 Rp 2,264,633 0.0490 - -
Aluminium Frame Natural color
3 Hollow Partition 20x40x1.2 at service area, frame w/ hollow m2 35.00 395,500 Rp 13,842,500 0.2996 - -
40x40x1.2 ducco finish nippe silver
4 Workshop Bathroom wall finish w/ Roman Ceramic tile 30/30, m2 37.00 120,600 Rp 4,462,200 0.0966 - -
339196 white clr, w/ am grout nr 125
5 Workshop Bathroom wall Border finish, w/ Roman Ceramic G m' 22.00 120,600 Rp 2,653,200 0.0574 - -
337104 , w/ am grout nr 125
6 Floor trimming for brick wall, 10 cm high, w/ Roman ceramic m' 132.00 30,200 Rp 3,986,400 0.0863 - -
tile 30/30, 337104, grey, w/ am grout nr 125
7 Oil Paint finish 1.5 m high, white color ex dullux ICI m2 270.00 33,900 Rp 9,153,000 0.1981 - -
c Ceiling
1 Bathroom and Training room ceiling + Manhole 60x60, w/ m2 114.00 92,700 Rp 10,567,800 0.2287 - -
Gypsum 9 mm thick incld frame Catylac finished color white
d Doors
1 D2 ( 85 cm width ), swing door type ,6 mm thick clear glass unit 2.00 2,486,000 Rp 4,972,000 0.1076 - -
Aluminium Frame Natural color,
Sanitairs
1 Hand shower set TX 402 ex Toto Unit 3.00 308,500 Rp 925,500 0.0200 - -
2 Shower Curtain 2.1 m high, w/ Plastic standart for curtain , m' 5.70 141,300 Rp 805,410 0.0174 - -
incld Frame for hanging w/ stainless steel pipe dia 3/4"
3 Tap T23B 13 ex Toto Unit 3.00 173,100 Rp 519,300 0.0112 - -
4 Floor drain TX 1BN ex Toto Unit 3.00 263,300 Rp 789,900 0.0171 - -
5 Squatting Closet CE 7 ex Toto, clr white Unit 2.00 271,200 Rp 542,400 0.0117 - -
D BODY REPAIR
II Steel Structure
1 Base plate 12 mm thick Kg 152.44 14,000 Rp 2,134,160 0.0462 100 - 100 0.0462
2 Anchor bolt dia 19 mm , 80 cm high Pcs 80.00 50,900 Rp 4,072,000 0.0881 100 - 100 0.0881
3 - Steel Pipe dia 10", 9.3 mm thick ( schedule 40 ) Kg 3,725.80 17,300 Rp 64,456,340 1.3949 100 - 100 1.3949
4 - Steel Pipe dia 4" , 6 mm thick ( schedule 40 ) Kg 576.00 17,300 Rp 9,964,800 0.2156 100 - 100 0.2156
5 Nut & Bolt HTB M 12, ASTM 325 Pcs 360.00 4,000 Rp 1,440,000 0.0312 100 - 100 0.0312
6 Canopy rafter, Steel pipe dia 6" ; 7.1mm thick kg 3,143.88 17,300 Rp 54,389,124 1.1770 90 - 90 1.0593
7 Purlin CNP 125x50x20x3.2 ex Jaindo Kg 2,113.80 13,800 Rp 29,170,440 0.6313 90 - 90 0.5681
8 Rafter Canopy support, steel pipe dia 4" , 6 mm thick schd 40 Kg 768.00 17,300 Rp 13,286,400 0.2875 90 - 90 0.2588
Rafter Canopy Hanging , w/ steel pipe dia 3" , 5.5 mm thick Kg 1,152.60 17,300 Rp 19,939,980 0.4315 90 - 90 0.3884
(Pipe schd 40)
9 Bracket plate at canopy rafter construction ;
- Steel plate 10 mm thick Kg 320.00 14,000 Rp 4,480,000 0.0970 90 - 90 0.0873
- Cop plate for rafter and column , steel plate 6 mm thick Kg 33.05 14,000 Rp 462,700 0.0100 90 - 90 0.0090
- Steel plate 8 mm thick Kg 136.35 14,000 Rp 1,908,942 0.0413 90 - 90 0.0372
10 Canopy Trimming Frame 2 m high w/ Angel bar 40x40x4, Kg 1,464.50 13,800 Rp 20,210,100 0.4374 40 - 40 0.1749
11 Wind Bracing roundbar 16 mm kg 227.52 13,800 Rp 3,139,776 0.0680 40 - 40 0.0272
12 Toplock 0.5 mm thick, m2 530.81 141,300 Rp 75,003,312 1.6231 40 40 0.6492
13 Toplock Trimming 1.9 m high surrounding Canopy roof at m2 197.98 141,300 Rp 27,974,574 0.6054 40 40 0.2422
service bay area , w/ Toplock ex Jaindo
a Floor Finish
1 Mixing Paint, Storage and Warranty area finish floor, Roman m2 93.00 120,600 Rp 11,215,800 0.2427 - -
Ceramic tile 30/30, 337104 grey clr, w/ am grout nr. 125
2 Body repair finish floor w/ epoxy self leveling finish floor total m2 234.36 141,300 Rp 33,115,068 0.7166 - -
4 mm thick w/ Preatreatment Substrate Cleaning .Spec ;
- Epoxy Cement ; Polyfloor Epoxy Cement PFC-225
- Primer Coat ; Polyfloor Epoxy Primer PFP - 261
- Intermediate Coat ; Polyfloor Epoxy, Topping PFT - 233
- Finish Coat ; Polyfloor Epoxy, Topping PFT - 213
3 Paint booth area finish with floor hardener ex. Sika grey color m2 110.40 39,600 Rp 4,371,840 0.0946 - -
4 Marking Line for bays line 10 cm width clr yellow m' 126.60 33,900 Rp 4,291,740 0.0929 - -
ex propan
b Wall finish
1 Hollow Partition 20x40x1.2 at service area, frame w/ hollow m2 9.834 395,500 Rp 3,889,347 0.0842 - -
40x40x1.2 ducco finish nippe silver
2 Floor trimming for brick wall, 10 cm high, w/ Roman ceramic m' 55.91 30,200 Rp 1,688,482 0.0365 - -
tile 30/30, 337104, grey, w/ am grout nr 125
3 Oil Paint finish 1.5 m high, white color ex dullux ICI m2 83.87 33,900 Rp 2,843,024 0.0615 - -
c Ceiling
1 Bathroom and Training room ceiling + Manhole 60x60, w/ m2 53.60 92,700 Rp 4,968,720 0.1075 - -
Gypsum 9 mm thick incld frame Catylac finished color white
d Doors
1 D2 ( 85 cm width ), swing door type ,6 mm thick clear glass unit 1.00 2,486,000 Rp 2,486,000 0.0538 - -
Aluminium Frame Natural color,
Handel ; LHTR DKS 84030 Oval SN ( Complete set ) ex Dekson
Hinge ; ES S/S 316 ex Dekson
2 SW 1 single door type, Hollow door 0.85m x 2.2 m high, , Frame unit 2.00 1,808,000 Rp 3,616,000 0.0783 - -
w/ St Hollow frame 40x40x4, row w/ St Hollow 20x40 every 10
cm Ducco finish nippe silver
3 W1 ( 2.725 m width and 1.3 m high ), Glass Window w/ set 1.00 2,056,100 Rp 2,056,100 0.0445 - -
opening , clear glass 5 mm thick Aluminium frame Natural
color
- Casement ; FS DKS HD S 250 22" ex Dekson
- Handle : CH 400 ( NA )
( 3 row window and 2 opening )
E EXTERIOR
1 Paving Block ex Local, Concrete K350; 8 cm thick, Hexagon m2 1,410.00 106,800 Rp 150,588,000 3.2588 - -
type
2 Sand layer Under Paving block 10 cm thick m3 141.00 196,600 Rp 27,720,600 0.5999 50 - 50 0.2999
3 Cansteen ex Local L= 60 cm, 15 width and 28 cm high m' 168.00 101,700 Rp 17,085,600 0.3697 - -
Concrete K225
4 Pylon Foundation, Ls 1.00 6,700,000 Rp 6,700,000 0.1450 - -
- Excavation and back filling
- Foot plate concrete Foundation incld pedestal
- Anchor Bolt 8 dia 16 mm, 80 CM length + Installment
( refer to drawing nr FTG - EX - 02 )
F DRAINAGE
BOBOT JUNE ' 2011 JULY' 2011 AUGUST' 2011 SEPTEMBER' 2011 OCTOBER' 2011
NO WORKS ITEM % M-I M-II M-III M-IV M-I M-II M-III M-IV M-V M-I M-II M-III M-IV M-I M-II M-III M-IV M-I M-II M-III M-IV
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
5-11 12-18 13-19 20-26 27-3 4-10 11-17 18-24 25-31 1-7 8-14 15-21 22-28 29-4 5-11 12-18 19-25 26-2 3-9 10-16
I. PRELIMINARY WORK 0.1405 0.035 0.035 0.035 0.035
II C. BODY REPAIR
- Civil Work & Steel Structure 16.6660 1.515 1.515 1.515 1.515 1.515 1.515 1.515 1.515 1.515 1.515 1.515
- Architecture 1.6138 0.161 0.161 0.161 0.161 0.161 0.161 0.161 0.161 0.161 0.161
II D. EXTERIOR 6.0382 0.549 0.549 0.549 0.549 0.549 0.549 0.549 0.549 0.549 0.549 0.549
II E. DRAINAGE 3.3549 0.335 0.335 0.335 0.335 0.335 0.335 0.335 0.335 0.335 0.335
WEEKLY PROGRESS PLAN 100.0000 0.035 0.035 2.520 5.656 6.959 7.412 7.412 8.296 8.850 8.850 8.850 8.850 0.000 0.000 8.850 8.850 3.229 3.067 1.730 0.549 0.000
KUMUL WEEKLY PROGRESS PLAN 0.035 0.070 2.590 8.246 15.205 22.617 30.029 38.325 47.175 56.025 64.875 73.725 73.725 73.725 82.575 91.425 94.654 97.72 99.45 100.00 100.00
ACTUAL WEEKLY PROGRESS 0.1789 1.9373 5.1762 4.9133 4.508 6.1446 11.125 4.716 1.259 8.407
KUMUL ACTUAL WEEKLY PROGRESS 0.1789 2.1162 7.2924 12.206 16.714 22.858 33.984 38.700 39.959 48.366
LEBARAN HOLIDAY
2 WEEKS
29.8151
16.0511
4.9831
17.8368
3.5006
16.6660
1.6138
6.0382
3.3549
REKAP BOBOT PRESTASI PROGRESS MINGGUAN Ke-10
SUBJECT : FORD SHOWROOM & SERVICE AREA
PROJECT LOCATION : FORD TANGERANG - BANTEN
PERIOD : 01 - 07 AGUSTUS 2011
15.8027
14.0006
7.12739
2.9299
2.14338
2.67196
1.17209
4.98116
10.05113
7.81923
3.49918
8.0303
8.62912
1.61314
6.03581
3.35353
100.000
SUMMARY
SUBJECT : FORD SHOWROOM & SERVICE AREA
PROJECT LOCATION : FORD TANGERANG - BANTEN
DATE : 11 APRIL 2011
TERBILANG : # Lima milyar tiga ratus tiga puluh lima juta rupiah #
Fredy Yudianto, SH
Direktur