JUMLAH HARGA
TOTAL (Rp)
ALANTAI 01
IPEKERJAAN PERSIAPAN
2Bongkaran Kuda-Kuda1.000Ls1,200,000.00
Jumlah A.I5,000,000.00
IIPEKERJAAN TANAH
Jumlah A.II2,461,696.56
IIIPEKERJAAN STRUKTUR
5Beton Tangga1.858m34,700,000.008,732,600.00
Jumlah A.III538,335,577.70
IVPEKERJAAN DINDING
5Pek. Acian568.000m214,355.008,153,640.00
6Pek. Sponengan359.180m'4,707.451,690,821.89
Jumlah A.IV35,199,543.24
VPEKERJAAN KUSEN
Jumlah A.V30,245,318.70
Jumlah A.VI83,175,621.55
VIIPEKERJAAN ELEKTRIKAL
Jumlah A.VII11,335,000.00
VIIIPEKERJAAN PENGECATAN
Jumlah A.VIII17,911,711.60
NOURAIAN PEKERJAANVOLUME
BLANTAI 02
IPEKERJAAN STUKTUR
Jumlah B.I102,509,794.08
IIPEKERJAAN PASANGAN
2Pek. Plesteran1067.021m224,875.4026,542,574.18
3Pek. Acian1067.021m214,355.0015,317,086.46
4Pek. Sponengan718.360m'4,707.453,381,643.78
Jumlah B.II79,252,865.55
Jumlah B.III29,548,464.70
Jumlah B.IV105,288,069.30
VPEKERJAAN ATAP
Jumlah B.V193,420,690.76
VIPEKERJAAN ELEKTRIKAL
Jumlah B.VI14,830,000.00
VIIPEKERJAAN PENGECATAN
Jumlah B.VII20,829,570.34
JUMLAH LANTAI 02
JUMLAH TOTAL
Terbilang : Satu milyar dua ratus enam puluh sembilan juta rupiah
JUMLAH LANTAI 01