HARGAJUMLAH HARGASUB JUMLAH

JUMLAH HARGA

SATUAN (Rp)(Rp)HARGA (Rp)

TOTAL (Rp)

ALANTAI 01

IPEKERJAAN PERSIAPAN

1Bongkaran Genteng Lama1.000Ls300,000.00

2Bongkaran Kuda-Kuda1.000Ls1,200,000.00

3Pek. Bongkaran Bangunan Lama1.000Ls1,500,000.00

4Pek. Buangan Bongkaran1.000Ls2,000,000.002,000,000.00

Jumlah A.I5,000,000.00

IIPEKERJAAN TANAH

1Galian Pondasi Footplat77.295m329,205.002,257,400.48

2Urugan Tanah Kembali25.765m37,929.17204,296.09

Jumlah A.II2,461,696.56

IIIPEKERJAAN STRUKTUR

1Beton Foot Plat K-25016.891m33,915,000.0066,128,343.30

2Beton Kolom K-25016.748m35,976,000.00100,088,438.40

3Beton Balok K-25028.748m35,976,000.00171,795,060.00

4Beton Plat Lantai K-22545.144m34,244,000.00191,591,136.00

5Beton Tangga1.858m34,700,000.008,732,600.00

Jumlah A.III538,335,577.70

IVPEKERJAAN DINDING

1Pek. Pasangan Batu Bata 1 Batu75.200m2132,011.009,927,227.20


2Pek. Pasangan Batu Bata 1/2 Batu3.900m263,750.50248,626.95

3Pek. Pasangan Roster Kotak 0.3x0.6 cm42.000bh25,000.001,050,000.00

4Pek. Plesteran Dinding568.000m224,875.4014,129,227.20

5Pek. Acian568.000m214,355.008,153,640.00

6Pek. Sponengan359.180m'4,707.451,690,821.89

Jumlah A.IV35,199,543.24

VPEKERJAAN KUSEN

1Pek. Pembuatan Kusen Aluminium107.400m'117,813.0012,653,116.20

2Pek. Pembuatan DaunJendela Aluminium45.000bh285,925.0012,866,625.00

3Pek. Pembuatan Daun Pintu Panil Jati3.000bh342,830.001,028,490.00

4Pek. Kaca bening 5 mm10.238m265,000.00665,437.50

5Pek. Pasang Selot Pintu3.000bh150,550.00451,650.00

6Pek. Pasang Engsel Pintu3.000ps35,000.00105,000.00

7Pek. Pasang engsel Jendela45.000ps25,000.001,125,000.00

8Pek. Pasang Hak Angin45.000ps20,000.00900,000.00

9Pek. Pasang Grendel Tanam Jendela45.000bh10,000.00450,000.00

Jumlah A.V30,245,318.70

VIPEKERJAAN LANTAI DAN PLAFOND

1Pek. Pasangan Keramik Lantai282.150m2118,817.0033,524,216.55

2Pek. Pasangan Keramik Dinding111.419m295,000.0010,584,805.00

3Pek. Pasangan Langit-langit Gypsum rangka hollow 0.4mm376.200m295,000.0035,739,000.00

4Pek. Pasang List Plafond t:12 cm gypsum225.600m'14,750.003,327,600.00

Jumlah A.VI83,175,621.55

VIIPEKERJAAN ELEKTRIKAL

1Pek. Instalasi Titik Lampu47.000ttk130,000.006,110,000.00


2Pek. Pasang Lampu Neon 1x20 W inbox23.000bh175,000.004,025,000.00

3Pek. Pasang Lampu XL 18 W Capp6.000bh125,000.00750,000.00

4Pek. Pasang Saklar Single3.000bh25,000.0075,000.00

5Pek. Pasang Saklar Double9.000bh25,000.00225,000.00

6Pek. Stop Kontak6.000bh25,000.00150,000.00

Jumlah A.VII11,335,000.00

VIIIPEKERJAAN PENGECATAN

1Pek. Cat Dinding dan plafond944.200m213,778.0013,009,187.60

2Pek. Pelitur Kayu268.000m218,293.004,902,524.00

Jumlah A.VIII17,911,711.60

RENCANA ANGGARAN BIAYA (RAB)

NOURAIAN PEKERJAANVOLUME

PEMBANGUNAN RUANG KELAS SMA NEGERI 1 SALATIGA

BLANTAI 02

IPEKERJAAN STUKTUR

1Beton Kolom K-25010.824m35,976,000.0064,681,714.08

2Beton Ring Balok K-2506.330m35,976,000.0037,828,080.00

Jumlah B.I102,509,794.08

IIPEKERJAAN PASANGAN

1Pek. Pasangan Batu Bata 1/2 Batu 533.511m263,750.5034,011,561.13

2Pek. Plesteran1067.021m224,875.4026,542,574.18

3Pek. Acian1067.021m214,355.0015,317,086.46

4Pek. Sponengan718.360m'4,707.453,381,643.78
Jumlah B.II79,252,865.55

IIIPEKERJAAN KUSEN DAN KACA

1Pek. Pembuatan Kusen Aluminium2.244m3117,813.00264,315.82

2Pek. Daun Jendela Kaca 5 mm Rangka Aluminium50.074m2323,925.0016,220,090.88

3Pek. Pembuatan Daun Pintu Panil Jati12.600m2342,830.004,319,658.00

4Pek. Pasang Selot Pintu8.000bh150,550.001,204,400.00

5Pek. Pasang Engsel Pintu8.000psg35,000.00280,000.00

6Pek. Pasang engsel Jendela132.000psg25,000.003,300,000.00

7Pek. Pasang Hak Angin132.000psg20,000.002,640,000.00

8Pek. Pasang Grendel Tanam Jendela132.000bh10,000.001,320,000.00

Jumlah B.III29,548,464.70

IVPEKERJAAN LANTAI DAN PLAFOND

1Pek. Pasangan Keramik Lantai402.900m2118,817.0047,871,369.30

2Pek. Pasangan Keramik Dinding118.100m295,000.0011,219,500.00

3Pek. Pasangan Langit-langit Gypsum rangka hollow 0.4mm438.900m295,000.0041,695,500.00

4Pek. Pasang List Plafond t:12 cm gypsum305.200m'14,750.004,501,700.00

Jumlah B.IV105,288,069.30

VPEKERJAAN ATAP

1Pek. Rangka Atap Baja Ringan t:0.75 lapis alumunium foil651.200m2250,000.00162,800,000.00

2Pek. Pasangan Genteng Vlampress Sokka651.200m242,504.0027,678,604.80

3Pek. Pasangan Bubungan Genteng Sejenis43.000m'58,014.002,494,602.00

4Pek. Pasangan Talang BJLS 0.212.600m235,514.60447,483.96

Jumlah B.V193,420,690.76

VIPEKERJAAN ELEKTRIKAL

1Pek. Instalasi Titik Lampu51.000ttk130,000.006,630,000.00


2Pek. Pasang Lampu Neon 1x20 W inbox43.000bh175,000.007,525,000.00

3Pek. Pasang Saklar Single4.000bh25,000.00100,000.00

4Pek. Pasang Saklar Double15.000bh25,000.00375,000.00

5Pek. Stop Kontak8.000bh25,000.00200,000.00

Jumlah B.VI14,830,000.00

VIIPEKERJAAN PENGECATAN

1Pek. Cat Dinding dan plafond1067.021m213,778.0014,701,415.34

2Pek. Pelitur Kayu335.000m218,293.006,128,155.00

Jumlah B.VII20,829,570.34

JUMLAH LANTAI 02

JUMLAH TOTAL

Terbilang : Satu milyar dua ratus enam puluh sembilan juta rupiah

JUMLAH LANTAI 01