PEKERJAAN STRUKTUR
1 Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
10 Plate, t = 10 mm kg
11 Gussat Plate, t = 8 mm kg
12 Angkur Baut D19, HTB bh
13 Mur+Ring D19, HTB bh
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate bh
15 Baja Profil Siku 90.90.7 kg
16 Baja Profil Siku 75.75.6 kg
17 Baut+Mur+Ring D16 bh
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 kg
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 kg
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 kg
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 kg
22 Plat Stepner, t = 8 mm kg
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 kg
• Bekisting Plat m2
• Cor Beton, Ready Mix K-300 m3
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) kg
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet m2
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 m3
25 Pek. Pasang Stud Shear Connector bh
Prestasi Minggu Lalu Prestasi Minggu ini
VOL. BOBOT Progress Bobot Progress
(%) (%) (%) (%)
95.58 -
Prestasi Minggu ini Prestasi s/d Minggu Ini
Bobot Progress Bobot
(%) (%) (%)
0.181 65 0.181
0.047 65 0.047
0.000 0.000
0.000 0.000
0.709 65 0.709
0.192 65 0.192
0.000 0.000
0.000 0.000
1.654 40 1.654
0.409 40 0.409
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
3.19 3.19
-
-
-
NO. URAIAN PEKERJAAN SAT.
PEKERJAAN STRUKTUR
1 Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
10 Plate, t = 10 mm kg
11 Gussat Plate, t = 8 mm kg
12 Angkur Baut D19, HTB bh
13 Mur+Ring D19, HTB bh
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate bh
15 Baja Profil Siku 90.90.7 kg
16 Baja Profil Siku 75.75.6 kg
17 Baut+Mur+Ring D16 bh
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 kg
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 kg
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 kg
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 kg
22 Plat Stepner, t = 8 mm kg
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 kg
• Bekisting Plat m2
• Cor Beton, Ready Mix K-300 m3
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) kg
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet m2
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 m3
25 Pek. Pasang Stud Shear Connector bh
Prestasi Minggu Lalu Prestasi Minggu ini
VOL. BOBOT Progress Bobot Progress
(%) (%) (%) (%)
95.58 3.19
Prestasi Minggu ini Prestasi s/d Minggu Ini
Bobot Progress Bobot
(%) (%) (%)
0.000 65 0.181
0.000 65 0.047
0.000 0.000
0.000 0.000
0.000 65 0.709
0.000 65 0.192
0.000 0.000
0.000 0.000
1.034 65 2.688
0.256 65 0.665
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
1.415 50 1.415
0.798 50 0.798
0.079 50 0.079
0.913 50 0.913
0.236 50 0.236
7.383 35 7.383
1.448 15 1.448
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
13.56 16.75
NO. URAIAN PEKERJAAN SAT.
PEKERJAAN STRUKTUR
1 Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
10 Plate, t = 10 mm kg
11 Gussat Plate, t = 8 mm kg
12 Angkur Baut D19, HTB bh
13 Mur+Ring D19, HTB bh
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate bh
15 Baja Profil Siku 90.90.7 kg
16 Baja Profil Siku 75.75.6 kg
17 Baut+Mur+Ring D16 bh
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 kg
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 kg
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 kg
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 kg
22 Plat Stepner, t = 8 mm kg
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 kg
• Bekisting Plat m2
• Cor Beton, Ready Mix K-300 m3
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) kg
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet m2
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 m3
25 Pek. Pasang Stud Shear Connector bh
Prestasi Minggu Lalu Prestasi Minggu ini
VOL. BOBOT Progress Bobot Progress
(%) (%) (%) (%)
95.58 16.75
Prestasi Minggu ini Prestasi s/d Minggu Ini
Bobot Progress Bobot
(%) (%) (%)
0.083 95 0.264
0.022 95 0.069
0.210 95 0.210
0.124 95 0.124
0.327 95 1.036
0.088 95 0.280
0.722 95 0.722
0.488 95 0.488
1.241 95 3.929
0.307 95 0.972
2.526 95 2.526
1.518 95 1.518
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.283 60 1.698
0.160 60 0.957
0.016 60 0.095
0.183 60 1.096
0.047 60 0.284
5.273 60 12.656
4.343 60 5.790
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
17.96 34.71
NO. URAIAN PEKERJAAN SAT.
PEKERJAAN STRUKTUR
1 Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
10 Plate, t = 10 mm kg
11 Gussat Plate, t = 8 mm kg
12 Angkur Baut D19, HTB bh
13 Mur+Ring D19, HTB bh
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate bh
15 Baja Profil Siku 90.90.7 kg
16 Baja Profil Siku 75.75.6 kg
17 Baut+Mur+Ring D16 bh
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 kg
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 kg
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 kg
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 kg
22 Plat Stepner, t = 8 mm kg
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 kg
• Bekisting Plat m2
• Cor Beton, Ready Mix K-300 m3
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) kg
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet m2
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 m3
25 Pek. Pasang Stud Shear Connector bh
Prestasi Minggu Lalu Prestasi Minggu ini
VOL. BOBOT Progress Bobot Progress
(%) (%) (%) (%)
95.58 34.71
Prestasi Minggu ini Prestasi s/d Minggu Ini
Bobot Progress Bobot
(%) (%) (%)
0.000 95 0.264
0.000 95 0.069
0.000 95 0.210
0.000 95 0.124
0.000 95 1.036
0.000 95 0.280
0.000 95 0.722
0.000 95 0.488
0.000 95 3.929
0.000 95 0.972
0.000 95 2.526
0.000 95 1.518
1.036 65 1.036
0.489 65 0.489
0.000 0.000
0.000 0.000
0.933 65 0.933
0.413 65 0.413
0.000 0.000
0.000 0.000
1.174 65 1.174
0.524 65 0.524
0.000 0.000
0.000 0.000
0.243 65 0.243
0.153 65 0.153
0.000 0.000
0.000 0.000
0.324 65 0.324
0.262 65 0.262
0.000 0.000
0.000 0.000
0.514 65 0.514
0.624 65 0.624
0.000 0.000
0.000 0.000
0.090 50 0.090
0.009 50 0.009
1.108 50 1.108
0.348 50 0.348
0.139 50 0.139
0.025 50 0.025
0.016 50 0.016
0.252 50 0.252
0.141 65 1.839
0.080 65 1.037
0.008 65 0.103
0.091 65 1.187
0.024 65 0.307
1.055 65 13.711
0.483 65 6.273
0.000 0.000
1.945 65 1.945
3.319 65 3.319
0.000 0.000
0.000 0.000
15.82 50.54
NO. URAIAN PEKERJAAN SAT.
PEKERJAAN STRUKTUR
1 Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Kolom m2
• Cor Beton, Ready Mix K-300 m3
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 kg
• Baja Tulangan, BJTD fy 400MPa, D10 kg
• Bekisting Balok m2
• Cor Beton, Ready Mix K-300 m3
10 Plate, t = 10 mm kg
11 Gussat Plate, t = 8 mm kg
12 Angkur Baut D19, HTB bh
13 Mur+Ring D19, HTB bh
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate bh
15 Baja Profil Siku 90.90.7 kg
16 Baja Profil Siku 75.75.6 kg
17 Baut+Mur+Ring D16 bh
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 kg
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 kg
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 kg
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 kg
22 Plat Stepner, t = 8 mm kg
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 kg
• Bekisting Plat m2
• Cor Beton, Ready Mix K-300 m3
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) kg
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet m2
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 m3
25 Pek. Pasang Stud Shear Connector bh
Prestasi Minggu Lalu Prestasi Minggu ini
VOL. BOBOT Progress Bobot Progress
(%) (%) (%) (%)
95.58 34.71
Prestasi Minggu ini Prestasi s/d Minggu Ini
Bobot Progress Bobot
(%) (%) (%)
60.02 94.73
Rencana Biaya Pelaksanaan
No Uraian Simbol
A BIAYA LANGSUNG
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D16 A
2 • Baja Tulangan, BJTD fy 400MPa, D10 B
3 • Bekisting Kolom C
4 • Cor Beton, Ready Mix K-300 D
II Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 E
2 • Baja Tulangan, BJTD fy 400MPa, D10 F
3 • Bekisting Kolom G
4 • Cor Beton, Ready Mix K-300 H
III Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 I
2 • Baja Tulangan, BJTD fy 400MPa, D10 J
3 • Bekisting Kolom K
4 • Cor Beton, Ready Mix K-300 L
IV Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 M
2 • Baja Tulangan, BJTD fy 400MPa, D10 N
3 • Bekisting Balok O
4 • Cor Beton, Ready Mix K-300 P
V Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 Q
2 • Baja Tulangan, BJTD fy 400MPa, D10 R
3 • Bekisting Balok S
4 • Cor Beton, Ready Mix K-300 T
VI Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D16 U
2 • Baja Tulangan, BJTD fy 400MPa, D10 V
3 • Bekisting Balok W
4 • Cor Beton, Ready Mix K-300 X
VII Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D16 Y
2 • Baja Tulangan, BJTD fy 400MPa, D10 Z
3 • Bekisting Balok AA
4 • Cor Beton, Ready Mix K-300 AB
VIII Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
1 • Baja Tulangan, BJTD fy 400MPa, D13 AC
2 • Baja Tulangan, BJTD fy 400MPa, D10 AD
3 • Bekisting Balok AE
4 • Cor Beton, Ready Mix K-300 AF
IX Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
1 • Baja Tulangan, BJTD fy 400MPa, D13 AG
2 • Baja Tulangan, BJTD fy 400MPa, D10 AH
3 • Bekisting Balok AI
4 • Cor Beton, Ready Mix K-300 AJ
X Plate, t = 10 mm AK
XI Gussat Plate, t = 8 mm AL
XII Angkur Baut D19, HTB AM
XIII Mur+Ring D19, HTB AN
XIV Baut+Mur+Ring D19, HTB untuk Gussat Plate AO
XV Baja Profil Siku 90.90.7 AP
XVI Baja Profil Siku 75.75.6 AQ
XVII Baut+Mur+Ring D16 AR
XVIII Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 AS
XIX Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 AT
XX Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 AU
XXI Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 AV
XXII Plat Stepner, t = 8 mm AW
XXIII Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
1 • Baja Tulangan, BJTP fy 240MPa, d10 AX
2 • Bekisting Plat AY
3 • Cor Beton, Ready Mix K-300 AZ
XXIV Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
1 • Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) BA
2 Mutu Baja U50 (Double Layer)
3 • Begisting Plat, Metal Sheet BB
4 • Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 BC
XXV Pek. Pasang Stud Shear Connector BD
TOTAL BIAYA LANGSUNG
BIAYA TIDAK LANGSUNG
1 Biaya Penyelesaian dan Persiapan
2 Biaya Umum Proyek
3 Biaya Tidak Langsung di Kantor
4 Biaya Pemasaran
TOTAL BIAYA TIDAK LANGSUNG
TOTAL BIAYA A + B
Satuan Volume Harga Satuan Jumlah Rp Bobot %
A BIAYA LANGSUNG
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D16 A kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 B kg
3 • Bekisting Kolom C m2
4 • Cor Beton, Ready Mix K-300 D m3
II Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 E kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 F kg
3 • Bekisting Kolom G m2
4 • Cor Beton, Ready Mix K-300 H m3
III Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 I kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 J kg
3 • Bekisting Kolom K m2
4 • Cor Beton, Ready Mix K-300 L m3
IV Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 M kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 N kg
3 • Bekisting Balok O m2
4 • Cor Beton, Ready Mix K-300 P m3
V Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 Q kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 R kg
3 • Bekisting Balok S m2
4 • Cor Beton, Ready Mix K-300 T m3
VI Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D16 U kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 V kg
3 • Bekisting Balok W m2
4 • Cor Beton, Ready Mix K-300 X m3
VII Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D16 Y kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 Z kg
3 • Bekisting Balok AA m2
4 • Cor Beton, Ready Mix K-300 AB m3
VIII Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
1 • Baja Tulangan, BJTD fy 400MPa, D13 AC kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 AD kg
3 • Bekisting Balok AE m2
4 • Cor Beton, Ready Mix K-300 AF m3
IX Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
1 • Baja Tulangan, BJTD fy 400MPa, D13 AG kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 AH kg
3 • Bekisting Balok AI m2
4 • Cor Beton, Ready Mix K-300 AJ m3
X Plate, t = 10 mm AK kg
XI Gussat Plate, t = 8 mm AL kg
XII Angkur Baut D19, HTB AM bh
XIII Mur+Ring D19, HTB AN bh
XIV Baut+Mur+Ring D19, HTB untuk Gussat Plate AO bh
XV Baja Profil Siku 90.90.7 AP kg
XVI Baja Profil Siku 75.75.6 AQ kg
XVII Baut+Mur+Ring D16 AR bh
XVIII Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 AS kg
XIX Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 AT kg
XX Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 AU kg
XXI Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 AV kg
XXII Plat Stepner, t = 8 mm AW kg
XXIII Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
1 • Baja Tulangan, BJTP fy 240MPa, d10 AX kg
2 • Bekisting Plat AY m2
3 • Cor Beton, Ready Mix K-300 AZ m3
XXIV Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
1 • Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) BA kg
2 Mutu Baja U50 (Double Layer)
3 • Begisting Plat, Metal Sheet BB m2
4 • Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 BC m3
XXV Pek. Pasang Stud Shear Connector BD bh
JUMLAH REAL COST
PPN 10% X REAL COST
RENCANA ANGGARAN BIAYA
Volume Harga Satuan Jumlah Rp Bobot %
784,656,864.43 100.00
Daftar Analisa
3 • Bekisting Kolom
Pekerja 0.66 60,000.00
Tukang 0.33 81,000.00
Kepala Tukang 0.033 88,000.00
Mandor 0.033 94,000.00
Kayu Kelas Kuat III 0.013 1,150,000.00
Paku 5cm - 12cm 0.4 15,400.00
Balok Kayu Kuat II 0.005 3,000,000.00
Plywood Phenolic Film tebal 15mm 0.117 265,000.00
Pipe Support 0.666 22,500.00
3 • Bekisting Kolom
Pekerja 0.66 60,000.00
Tukang 0.33 81,000.00
Kepala Tukang 0.033 88,000.00
Mandor 0.033 94,000.00
Kayu Kelas Kuat III 0.013 1,150,000.00
Paku 5cm - 12cm 0.4 15,400.00
Balok Kayu Kuat II 0.005 3,000,000.00
Plywood Phenolic Film tebal 15mm 0.117 265,000.00
Pipe Support 0.666 22,500.00
3 • Bekisting Kolom
Pekerja 0.66 60,000.00
Tukang 0.33 81,000.00
Kepala Tukang 0.033 88,000.00
Mandor 0.033 94,000.00
Kayu Kelas Kuat III 0.013 1,150,000.00
Paku 5cm - 12cm 0.4 15,400.00
Balok Kayu Kuat II 0.005 3,000,000.00
Plywood Phenolic Film tebal 15mm 0.117 265,000.00
Pipe Support 0.666 22,500.00
3 • Bekisting Kolom
Pekerja 0.66 60,000.00
Tukang 0.33 81,000.00
Kepala Tukang 0.033 88,000.00
Mandor 0.033 94,000.00
Kayu Kelas Kuat III 0.013 1,150,000.00
Paku 5cm - 12cm 0.4 15,400.00
Balok Kayu Kuat II 0.005 3,000,000.00
Plywood Phenolic Film tebal 15mm 0.117 265,000.00
Pipe Support 0.666 22,500.00
3 • Bekisting Kolom
Pekerja 0.66 60,000.00
Tukang 0.33 81,000.00
Kepala Tukang 0.033 88,000.00
Mandor 0.033 94,000.00
Kayu Kelas Kuat III 0.013 1,150,000.00
Paku 5cm - 12cm 0.4 15,400.00
Balok Kayu Kuat II 0.005 3,000,000.00
Plywood Phenolic Film tebal 15mm 0.117 265,000.00
Pipe Support 0.666 22,500.00
3 • Bekisting Kolom
Pekerja 0.66 60,000.00
Tukang 0.33 81,000.00
Kepala Tukang 0.033 88,000.00
Mandor 0.033 94,000.00
Kayu Kelas Kuat III 0.013 1,150,000.00
Paku 5cm - 12cm 0.4 15,400.00
Balok Kayu Kuat II 0.005 3,000,000.00
Plywood Phenolic Film tebal 15mm 0.117 265,000.00
Pipe Support 0.666 22,500.00
3 • Bekisting Kolom
Pekerja 0.66 60,000.00
Tukang 0.33 81,000.00
Kepala Tukang 0.033 88,000.00
Mandor 0.033 94,000.00
Kayu Kelas Kuat III 0.013 1,150,000.00
Paku 5cm - 12cm 0.4 15,400.00
Balok Kayu Kuat II 0.005 3,000,000.00
Plywood Phenolic Film tebal 15mm 0.117 265,000.00
Pipe Support 0.666 22,500.00
3 • Bekisting Kolom
Pekerja 0.66 60,000.00
Tukang 0.33 81,000.00
Kepala Tukang 0.033 88,000.00
Mandor 0.033 94,000.00
Kayu Kelas Kuat III 0.013 1,150,000.00
Paku 5cm - 12cm 0.4 15,400.00
Balok Kayu Kuat II 0.005 3,000,000.00
Plywood Phenolic Film tebal 15mm 0.117 265,000.00
Pipe Support 0.666 22,500.00
3 • Bekisting Kolom
Pekerja 0.66 60,000.00
Tukang 0.33 81,000.00
Kepala Tukang 0.033 88,000.00
Mandor 0.033 94,000.00
Kayu Kelas Kuat III 0.013 1,150,000.00
Paku 5cm - 12cm 0.4 15,400.00
Balok Kayu Kuat II 0.005 3,000,000.00
Plywood Phenolic Film tebal 15mm 0.117 265,000.00
Pipe Support 0.666 22,500.00
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 39,600.00
oh 26,730.00
oh 2,904.00
oh 3,102.00
m3 14,950.00
kg 6,160.00
m3 15,000.00
lbr 31,005.00
set 14,985.00
72,336.00 82,100.00 154,436.00
oh
oh
oh
oh
m3
m3
ls
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 39,600.00
oh 26,730.00
oh 2,904.00
oh 3,102.00
m3 14,950.00
kg 6,160.00
m3 15,000.00
lbr 31,005.00
set 14,985.00
72,336.00 82,100.00 154,436.00
oh 99,000.00
oh 21,725.00
oh 2,464.00
oh 7,802.00
m3 892,500.00
m3 25,000.00
ls 13,762.50
130,991.00 931,262.50 1,062,253.50
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 39,600.00
oh 26,730.00
oh 2,904.00
oh 3,102.00
m3 14,950.00
kg 6,160.00
m3 15,000.00
lbr 31,005.00
set 14,985.00
72,336.00 82,100.00 154,436.00
oh 99,000.00
oh 21,725.00
oh 2,464.00
oh 7,802.00
m3 892,500.00
m3 25,000.00
ls 13,762.50
130,991.00 931,262.50 1,062,253.50
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 39,600.00
oh 26,730.00
oh 2,904.00
oh 3,102.00
m3 14,950.00
kg 6,160.00
m3 15,000.00
lbr 31,005.00
set 14,985.00
72,336.00 82,100.00 154,436.00
oh 99,000.00
oh 21,725.00
oh 2,464.00
oh 7,802.00
m3 892,500.00
m3 25,000.00
ls 13,762.50
130,991.00 931,262.50 1,062,253.50
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 39,600.00
oh 26,730.00
oh 2,904.00
oh 3,102.00
m3 14,950.00
kg 6,160.00
m3 15,000.00
lbr 31,005.00
set 14,985.00
72,336.00 82,100.00 154,436.00
oh 99,000.00
oh 21,725.00
oh 2,464.00
oh 7,802.00
m3 892,500.00
m3 25,000.00
ls 13,762.50
130,991.00 931,262.50 1,062,253.50
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 39,600.00
oh 26,730.00
oh 2,904.00
oh 3,102.00
m3 14,950.00
kg 6,160.00
m3 15,000.00
lbr 31,005.00
set 14,985.00
72,336.00 82,100.00 154,436.00
oh 99,000.00
oh 21,725.00
oh 2,464.00
oh 7,802.00
m3 892,500.00
m3 25,000.00
ls 13,762.50
130,991.00 931,262.50 1,062,253.50
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 39,600.00
oh 26,730.00
oh 2,904.00
oh 3,102.00
m3 14,950.00
kg 6,160.00
m3 15,000.00
lbr 31,005.00
set 14,985.00
72,336.00 82,100.00 154,436.00
oh 99,000.00
oh 21,725.00
oh 2,464.00
oh 7,802.00
m3 892,500.00
m3 25,000.00
ls 13,762.50
130,991.00 931,262.50 1,062,253.50
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 39,600.00
oh 26,730.00
oh 2,904.00
oh 3,102.00
m3 14,950.00
kg 6,160.00
m3 15,000.00
lbr 31,005.00
set 14,985.00
72,336.00 82,100.00 154,436.00
oh 99,000.00
oh 21,725.00
oh 2,464.00
oh 7,802.00
m3 892,500.00
m3 25,000.00
ls 13,762.50
130,991.00 931,262.50 1,062,253.50
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 420.00
oh 532.00
oh 61.60
oh 37.60
kg 8,925.00
kg 225.00
1,051.20 9,150.00 10,201.20
oh 39,600.00
oh 26,730.00
oh 2,904.00
oh 3,102.00
m3 14,950.00
kg 6,160.00
m3 15,000.00
lbr 31,005.00
set 14,985.00
72,336.00 82,100.00 154,436.00
oh 99,000.00
oh 21,725.00
oh 2,464.00
oh 7,802.00
m3 892,500.00
m3 25,000.00
ls 13,762.50
130,991.00 931,262.50 1,062,253.50
kg 1,479,500.00
kg 146,300.00
bh 18,200,000.00
bh 5,720,000.00
bh 2,280,000.00
kg 405,020.00
kg 265,980.00
bh 4,140,000.00
kg 23,232,000.00
kg 13,094,400.00
kg 1,302,400.00
kg 14,995,200.00
kg 3,881,900.00
oh 420
oh 532
oh 61.6
oh 37.6
kg 8400
kg 225
1051.2 8625 9676.2
oh 39600
oh 26730
oh 2904
oh 3102
m3 23000
kg 6160
m3 24000
lbr 37625
set 76000
72336 90785 76000 239121
oh
oh
oh
oh
m3
m3
ls
oh 1500
oh 1900
oh 176
oh 94
kg 9129
kg 750
3670 9879 13549
oh 39600
oh 26730
oh 2904
oh 3102
m3 46000
kg 6160
m3 45000
lbr 35000
set 152000
72336 132160 152000 356496
oh 99,000.00
oh 21,725.00
oh 2,464.00
oh 7,802.00
m3 892,500.00
m3 25,000.00
ls 13,762.50
130,991.00 931,262.50 1,062,253.50
bh 6955000
Rekapitulasi Rencana Biaya Pelaksanaan (RBP)
Proyek : Pembangunan Gedung Kantor Sat Brimob
Pekerjaan : Struktur Atas (Lantai 2, Elevasi +5.00 s. d. +9,00)
Lokasi : Jl. WR Supratman Denpasar
Jumlah
No. Uraian
Rp %
I PENDAPATAN
1 Biaya Sesuai dengan RAB 247,497,518.00
2 Pajak PPN 10 % 22,499,774.00
Total I 224,997,744.00 100.0
II BIAYA DIPEKERJAAN (BDP)
A. Biaya Langsung
1 Biaya bahan 163,278,116.00
2 Biaya tenaga kerja 25,363,850.00
Total II - A 188,641,966.00 83.9
B. Biaya Tidak Langsung di Proyek
a Biaya Penyelesaian dan Persiapan
1. Biaya mobilisasi & demobilisasi tenaga dan alat 200,000.00
2. Biaya gudang, kantor penerangan, dll 3,500,000.00
3. Biaya perlengkapan K3 960,000.00
4. Biaya kontrol kwalitas, seperti tes kubus, dll 300,000.00
5. Biaya ijin bangunan 1,340,000.00
6. Biaya upacara pembukaan dan peresmian 2,400,000.00
Total II - Ba 8,700,000.00 3.9
b Biaya Umum Proyek
1. Biaya operasional kantor proyek 960,000.00
2. Biaya personil ( gaji karyawan proyek )
Kepala proyek 4,000,000.00
Pelaksana 2,400,000.00
Asisten pelaksana 2,000,000.00
Mekanik 1,760,000.00
Tenaga administrasi 1,280,000.00
Penjaga gudang 640,000.00
Tenaga harian lepas ( proyek ) 1,344,000.00
3. Biaya rapat - rapat lapangan dan jamuan tamu 32,000.00
4. Biaya kendaraan umum proyek, dll 880,000.00
5. Biaya asuransi 720,000.00
6. Biaya bank 800,000.00
7. Biaya foto dan gambar jadi 252,800.00
8. Biaya pajak dan sebagainya 2,080,000.00
9. Biaya peralatan kecil - kecil yang habis dipakai dbuang 1,200,000.00
Total II - Bb 20,348,800.00 9.0
c Biaya Umum Kantor
1. Biaya operasional kantor untuk keperluan administrasi,
telpon, internet, listrik, air. 1,120,000.00
2. Biaya personil ( gaji karyawan ) kantor 144,000.00
3. Biaya sewa kantor 720,000.00
4. Biaya rapat - rapat lapangan dan jamuan tamu 96,000.00
5. Biaya kendaraan umum kantor dll 104,000.00
6. Biaya ijin usaha dan frakwalifikasi 256,000.00
7. Biaya referensi bank 728,000.00
8. Biaya anggota asosiasi 308,000.00
9. Biaya pajak 2,560,000.00
Total II - Bc 6,036,000.00 2.7
d Biaya Pemasaran 1,203,200.00
Total II - Bd 1,203,200.00 0.5
Total II - B 36,288,000.00
Jumlah II-A+II-B 224,929,966.00 100.00
Ket.
RENCANA BIAYA TIDAK LANGSUNG
Proyek : Pembangunan Gedung Kantor Sat Brimob
Pekerjaan : Struktur Atas (Lantai 2, Elevasi +5.00 s. d. +9,00)
Lokasi : Jl. WR Supratman Denpasar
1 2 3 4 5
I RINCIAN BIAYA TIDAK LANGSUNG
a Biaya Penyelesaian dan Persiapan
1. Biaya mobilisasi & demobilisasi tenaga dan alat 2 hari 5
2. Biaya gudang, kantor penerangan, dll 1 Ls 1
3. Biaya perlengkapan K3 30 hari 1
4. Biaya kontrol kwalitas, seperti tes kubus, dll 3 kali 1
5. Biaya ijin bangunan 1 Ls 1
6. Biaya upacara pembukaan dan peresmian 2 kali 1
Total I-a
b Biaya Umum Proyek
1. Biaya operasional kantor proyek 30 hari 1
2. Biaya personil ( gaji karyawan proyek )
Kepala proyek 1 bulan 1
Pelaksana 1 bulan 2
Asisten pelaksana 1 bulan 1
Mekanik 1 bulan 1
Tenaga administrasi 1 bulan 1
Penjaga gudang 1 bulan 1
Tenaga harian lepas ( proyek ) 30 hari 6
3. Biaya rapat - rapat lapangan dan jamuan tamu 1 kali 1
4. Biaya kendaraan umum proyek, dll 1 bulan 1
5. Biaya asuransi 1 bulan 1
6. Biaya bank 1 bulan 1
7. Biaya foto dan gambar jadi 1 bulan 1
8. Biaya pajak dan sebagainya 1 bulan 1
9. Biaya peralatan kecil - kecil yang habis dipakai dbuang 30 hari 1
Total I-b
c Biaya Umum Kantor
1. Biaya operasional kantor untuk keperluan administrasi,
telpon, internet, listrik, air. 1 bulan 1
2. Biaya personil ( gaji karyawan ) kantor 1 bulan 1
3. Biaya sewa kantor 1 bulan 1
4. Biaya rapat - rapat lapangan dan jamuan tamu 1 kali 1
5. Biaya kendaraan umum kantor dll 1 bulan 1
6. Biaya ijin usaha dan frakwalifikasi 1 bulan 1
7. Biaya referensi bank 1 bulan 1
8. Biaya anggota asosiasi 1 bulan 1
9. Biaya pajak 1 bulan 1
Total I-c
d. Biaya Pemasaran 1 bulan 1
Total I-d
JUMLAH I-a - I-d
Harga Satuan Total Harga
Satuan
Rp Rp
6 7 8 = 3*5*7
Or 20,000.00 200,000.00
Ls 3,500,000.00 3,500,000.00
unit 20,000.00 600,000.00
unit 100,000.00 300,000.00
Ls 1,340,000.00 1,340,000.00
Ls 1,200,000.00 2,400,000.00
8,340,000.00
Or 2,500,000.00 2,500,000.00
Or 1,500,000.00 3,000,000.00
Or 1,250,000.00 1,250,000.00
Or 1,100,000.00 1,100,000.00
Or 800,000.00 800,000.00
Or 400,000.00 400,000.00
Or 28,000.00 5,040,000.00
Ls 20,000.00 20,000.00
Or 550,000.00 550,000.00
Or 450,000.00 450,000.00
Or 500,000.00 500,000.00
Or 158,000.00 158,000.00
Or 1,300,000.00 1,300,000.00
Is 25,000.00 750,000.00
18,418,000.00
Ls 700,000.00 700,000.00
Ls 90,000.00 90,000.00
Ls 450,000.00 450,000.00
Ls 60,000.00 60,000.00
Ls 65,000.00 65,000.00
Ls 160,000.00 160,000.00
Ls 455,000.00 455,000.00
Ls 192,500.00 192,500.00
Ls 1,600,000.00 1,600,000.00
3,772,500.00
Or 752000 752,000.00
752,000.00
31,282,500.00
Rencana Predecessor
A BIAYA LANGSUNG
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D16 A kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 B kg
3 • Bekisting Kolom C m2
4 • Cor Beton, Ready Mix K-300 D m3
II Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 E kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 F kg
3 • Bekisting Kolom G m2
4 • Cor Beton, Ready Mix K-300 H m3
III Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 I kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 J kg
3 • Bekisting Kolom K m2
4 • Cor Beton, Ready Mix K-300 L m3
IV Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 M kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 N kg
3 • Bekisting Balok O m2
4 • Cor Beton, Ready Mix K-300 P m3
V Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 Q kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 R kg
3 • Bekisting Balok S m2
4 • Cor Beton, Ready Mix K-300 T m3
VI Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D16 U kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 V kg
3 • Bekisting Balok W m2
4 • Cor Beton, Ready Mix K-300 X m3
VII Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D16 Y kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 Z kg
3 • Bekisting Balok AA m2
4 • Cor Beton, Ready Mix K-300 AB m3
VIII Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
1 • Baja Tulangan, BJTD fy 400MPa, D13 AC kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 AD kg
3 • Bekisting Balok AE m2
4 • Cor Beton, Ready Mix K-300 AF m3
IX Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
1 • Baja Tulangan, BJTD fy 400MPa, D13 AG kg
2 • Baja Tulangan, BJTD fy 400MPa, D10 AH kg
3 • Bekisting Balok AI m2
4 • Cor Beton, Ready Mix K-300 AJ m3
X Plate, t = 10 mm AK kg
XI Gussat Plate, t = 8 mm AL kg
XII Angkur Baut D19, HTB AM bh
XIII Mur+Ring D19, HTB AN bh
XIV Baut+Mur+Ring D19, HTB untuk Gussat Plate AO bh
XV Baja Profil Siku 90.90.7 AP kg
XVI Baja Profil Siku 75.75.6 AQ kg
XVII Baut+Mur+Ring D16 AR bh
XVIII Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 AS kg
XIX Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 AT kg
XX Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 AU kg
XXI Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 AV kg
XXII Plat Stepner, t = 8 mm AW kg
XXIII Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
1 • Baja Tulangan, BJTP fy 240MPa, d10 AX kg
2 • Bekisting Plat AY m2
3 • Cor Beton, Ready Mix K-300 AZ m3
XXIV Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
1 • Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) BA kg
Mutu Baja U50 (Double Layer)
2 • Begisting Plat, Metal Sheet BB m2
3 • Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 BC m3
XXV Pek. Pasang Stud Shear Connector BD bh
Volume Durasi (d) / hari Predecessor Ket.
213.08
55.66 A, SS
11.20 A, B, FS
0.96 C, FS
836.45 A, SS
226.28 A, SS
38.40 E, F, FS
3.78 G, FS
3,173.18 A, SS
785.38 A, SS
134.40 I, J, FS
11.76 K, FS
1,222.48 A, SS
576.62 A, SS
72.17 M, N, FS
8.21 O, FS
1,101.79 A, SS
487.20 A, SS
56.99 Q, R, FS
6.08 S, FS
1,385.53 A, SS
618.42 A, SS
89.50 U, V, FS
8.36 W, FS
287.38 A, SS
180.63 A, SS
23.68 Y,Z FS
1.73 AA, FS
382.50 A, SS
308.85 A, SS
36.50 AC, AD, FS
2.30 AE, FS
606.49 A, SS
736.65 A, SS
66.98 AG, AH, FS
3.49 AI, FS
67.25 D, H, L, P, T, X, AB, AF, AJ, FS
6.65 AK, FS
104.00 AL, FS
104.00 AM, FS
24.00 AN, FS
18.41 AO, FS
12.09 AP, FS
46.00 AQ, FS
1,056.00 AR, FS
595.20 AS, SS
59.20 AS, SS
681.60 AS, SS
176.45 AS, AT, AU, AV, FS
17,145.00 AW, FS
317.52 AY, FS
51.63 AZ, FS
1,730.12 AX, SS
112.00 BA, FS
13.44 BB, FS
107.00 AZ, BC, FS
No Uraian Pekerjaan BAC Rp.
1 2 3
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 2,279,995.95
• Baja Tulangan, BJTD fy 400MPa, D10 595,553.25
• Bekisting Kolom 1,818,880.00
• Cor Beton, Ready Mix K-300 1,070,688.00
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 8,950,051.12
• Baja Tulangan, BJTD fy 400MPa, D10 2,421,161.29
• Bekisting Kolom 6,236,160.00
• Cor Beton, Ready Mix K-300 4,215,834.00
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 33,953,019.49
• Baja Tulangan, BJTD fy 400MPa, D10 8,403,514.34
• Bekisting Kolom 21,826,560.00
• Cor Beton, Ready Mix K-300 13,115,928.00
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 13,080,539.12
2 • Baja Tulangan, BJTD fy 400MPa, D10 6,169,867.13
3 • Bekisting Balok 15,465,602.40
4 • Cor Beton, Ready Mix K-300 9,152,374.86
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 11,789,166.52
• Baja Tulangan, BJTD fy 400MPa, D10 5,213,023.81
• Bekisting Balok 12,213,385.60
• Cor Beton, Ready Mix K-300 6,784,146.84
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 14,825,178.13
• Baja Tulangan, BJTD fy 400MPa, D10 6,617,055.00
• Bekisting Balok 19,178,992.80
• Cor Beton, Ready Mix K-300 9,326,138.60
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 3,074,980.27
• Baja Tulangan, BJTD fy 400MPa, D10 1,932,780.28
• Bekisting Balok 5,074,624.00
• Cor Beton, Ready Mix K-300 1,927,238.40
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 4,092,785.67
• Baja Tulangan, BJTD fy 400MPa, D10 3,304,675.48
• Bekisting Balok 7,822,807.20
• Cor Beton, Ready Mix K-300 2,563,405.52
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 6,489,467.97
• Baja Tulangan, BJTD fy 400MPa, D10 7,882,148.75
• Bekisting Balok 14,354,456.90
• Cor Beton, Ready Mix K-300 3,887,768.51
10 Plate, t = 10 mm 1,479,420.56
11 Gussat Plate, t = 8 mm 146,275.56
12 Angkur Baut D19, HTB 18,200,000.00
13 Mur+Ring D19, HTB 5,720,000.00
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate 2,280,000.00
15 Baja Profil Siku 90.90.7 405,081.60
16 Baja Profil Siku 75.75.6 266,006.40
17 Baut+Mur+Ring D16 4,140,000.00
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 23,232,000.00
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 13,094,400.00
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 1,302,400.00
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 14,995,200.00
22 Plat Stepner, t = 8 mm 3,881,873.26
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 173,164,490.24
• Bekisting Plat 79,222,175.63
• Cor Beton, Ready Mix K-300 57,583,650.00
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) 24,567,704.00
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet 41,921,600.00
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 14,989,632.00
25 Pek. Pasangan Stud Shear Connector 6,955,000.00
TOTAL BIAYA LANGSUNG 784,656,864.43
BIAYA TIDAK LANGSUNG
1 Biaya Penyelesaian dan Persiapan 8,700,000.00
2 Biaya Umum Proyek 20,348,800.00
3 Biaya Tidak Langsung di Kantor 6,036,000.00
4 Biaya Pemasaran 1,203,200.00
TOTAL BIAYA TIDAK LANGSUNG 36,288,000.00
TOTAL BIAYA A + B 820,944,864.43
PROGRES NILAI UANG
BOBOT % RENC. REALS. BCWS BCWP ACWP KET
% % Rp. Rp. Rp.
4 5 6 7=5/4*3 8=6/4*3 9 10
1 2 3
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 2,279,995.95
• Baja Tulangan, BJTD fy 400MPa, D10 595,553.25
• Bekisting Kolom 1,818,880.00
• Cor Beton, Ready Mix K-300 1,070,688.00
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 8,950,051.12
• Baja Tulangan, BJTD fy 400MPa, D10 2,421,161.29
• Bekisting Kolom 6,236,160.00
• Cor Beton, Ready Mix K-300 4,215,834.00
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 33,953,019.49
• Baja Tulangan, BJTD fy 400MPa, D10 8,403,514.34
• Bekisting Kolom 21,826,560.00
• Cor Beton, Ready Mix K-300 13,115,928.00
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 13,080,539.12
2 • Baja Tulangan, BJTD fy 400MPa, D10 6,169,867.13
3 • Bekisting Balok 15,465,602.40
4 • Cor Beton, Ready Mix K-300 9,152,374.86
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 11,789,166.52
• Baja Tulangan, BJTD fy 400MPa, D10 5,213,023.81
• Bekisting Balok 12,213,385.60
• Cor Beton, Ready Mix K-300 6,784,146.84
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 14,825,178.13
• Baja Tulangan, BJTD fy 400MPa, D10 6,617,055.00
• Bekisting Balok 19,178,992.80
• Cor Beton, Ready Mix K-300 9,326,138.60
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 3,074,980.27
• Baja Tulangan, BJTD fy 400MPa, D10 1,932,780.28
• Bekisting Balok 5,074,624.00
• Cor Beton, Ready Mix K-300 1,927,238.40
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 4,092,785.67
• Baja Tulangan, BJTD fy 400MPa, D10 3,304,675.48
• Bekisting Balok 7,822,807.20
• Cor Beton, Ready Mix K-300 2,563,405.52
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 6,489,467.97
• Baja Tulangan, BJTD fy 400MPa, D10 7,882,148.75
• Bekisting Balok 14,354,456.90
• Cor Beton, Ready Mix K-300 3,887,768.51
10 Plate, t = 10 mm 1,479,420.56
11 Gussat Plate, t = 8 mm 146,275.56
12 Angkur Baut D19, HTB 18,200,000.00
13 Mur+Ring D19, HTB 5,720,000.00
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate 2,280,000.00
15 Baja Profil Siku 90.90.7 405,081.60
16 Baja Profil Siku 75.75.6 266,006.40
17 Baut+Mur+Ring D16 4,140,000.00
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 23,232,000.00
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 13,094,400.00
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 1,302,400.00
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 14,995,200.00
22 Plat Stepner, t = 8 mm 3,881,873.26
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 173,164,490.24
• Bekisting Plat 79,222,175.63
• Cor Beton, Ready Mix K-300 57,583,650.00
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) 24,567,704.00
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet 41,921,600.00
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 14,989,632.00
25 Pek. Pasangan Stud Shear Connector 6,955,000.00
TOTAL BIAYA LANGSUNG 784,656,864.43
BIAYA TIDAK LANGSUNG
1 Biaya Penyelesaian dan Persiapan 8,700,000.00
2 Biaya Umum Proyek 20,348,800.00
3 Biaya Tidak Langsung di Kantor 6,036,000.00
4 Biaya Pemasaran 1,203,200.00
TOTAL BIAYA TIDAK LANGSUNG 36,288,000.00
TOTAL BIAYA A + B 820,944,864.43
PROGRES NILAI UANG
BOBOT % RENC. REALS. BCWS BCWP ACWP KET
% % Rp. Rp. Rp.
4 5 6 7=5/4*3 8=6/4*3 9 10
1 2 3 4
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 2,279,995.95 0.28
• Baja Tulangan, BJTD fy 400MPa, D10 595,553.25 0.07
• Bekisting Kolom 1,818,880.00 0.22
• Cor Beton, Ready Mix K-300 1,070,688.00 0.13
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 8,950,051.12 1.09
• Baja Tulangan, BJTD fy 400MPa, D10 2,421,161.29 0.29
• Bekisting Kolom 6,236,160.00 0.76
• Cor Beton, Ready Mix K-300 4,215,834.00 0.51
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 33,953,019.49 4.14
• Baja Tulangan, BJTD fy 400MPa, D10 8,403,514.34 1.02
• Bekisting Kolom 21,826,560.00 2.66
• Cor Beton, Ready Mix K-300 13,115,928.00 1.60
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 13,080,539.12 1.59
2 • Baja Tulangan, BJTD fy 400MPa, D10 6,169,867.13 0.75
3 • Bekisting Balok 15,465,602.40 1.88
4 • Cor Beton, Ready Mix K-300 9,152,374.86 1.11
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 11,789,166.52 1.44
• Baja Tulangan, BJTD fy 400MPa, D10 5,213,023.81 0.64
• Bekisting Balok 12,213,385.60 1.49
• Cor Beton, Ready Mix K-300 6,784,146.84 0.83
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 14,825,178.13 1.81
• Baja Tulangan, BJTD fy 400MPa, D10 6,617,055.00 0.81
• Bekisting Balok 19,178,992.80 2.34
• Cor Beton, Ready Mix K-300 9,326,138.60 1.14
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 3,074,980.27 0.37
• Baja Tulangan, BJTD fy 400MPa, D10 1,932,780.28 0.24
• Bekisting Balok 5,074,624.00 0.62
• Cor Beton, Ready Mix K-300 1,927,238.40 0.23
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 4,092,785.67 0.50
• Baja Tulangan, BJTD fy 400MPa, D10 3,304,675.48 0.40
• Bekisting Balok 7,822,807.20 0.95
• Cor Beton, Ready Mix K-300 2,563,405.52 0.31
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 6,489,467.97 0.79
• Baja Tulangan, BJTD fy 400MPa, D10 7,882,148.75 0.96
• Bekisting Balok 14,354,456.90 1.75
• Cor Beton, Ready Mix K-300 3,887,768.51 0.47
10 Plate, t = 10 mm 1,479,420.56 0.18
11 Gussat Plate, t = 8 mm 146,275.56 0.02
12 Angkur Baut D19, HTB 18,200,000.00 2.22
13 Mur+Ring D19, HTB 5,720,000.00 0.70
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate 2,280,000.00 0.28
15 Baja Profil Siku 90.90.7 405,081.60 0.05
16 Baja Profil Siku 75.75.6 266,006.40 0.03
17 Baut+Mur+Ring D16 4,140,000.00 0.50
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 23,232,000.00 2.83
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 13,094,400.00 1.60
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 1,302,400.00 0.16
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 14,995,200.00 1.83
22 Plat Stepner, t = 8 mm 3,881,873.26 0.47
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 173,164,490.24 21.09
• Bekisting Plat 79,222,175.63 9.65
• Cor Beton, Ready Mix K-300 57,583,650.00 7.01
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) 24,567,704.00 2.99
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet 41,921,600.00 5.11
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 14,989,632.00 1.83
25 Pek. Pasangan Stud Shear Connector 6,955,000.00 0.85
TOTAL BIAYA LANGSUNG 784,656,864.43 95.58
BIAYA TIDAK LANGSUNG
1 Biaya Penyelesaian dan Persiapan 8,700,000.00 1.06
2 Biaya Umum Proyek 20,348,800.00 2.48
3 Biaya Tidak Langsung di Kantor 6,036,000.00 0.74
4 Biaya Pemasaran 1,203,200.00 0.15
TOTAL BIAYA TIDAK LANGSUNG 36,288,000.00 4.42
TOTAL BIAYA A + B 820,944,864.43 100.00
PROGRES NILAI UANG
RENC. REALS. BCWS BCWP ACWP KET
% % Rp. Rp. Rp.
5 6 7=5/4*3 8=6/4*3 9 10
791,930,435.93 292,252,073.15
No Uraian Pekerjaan BAC Rp.
1 2 3
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 2,279,995.95
• Baja Tulangan, BJTD fy 400MPa, D10 595,553.25
• Bekisting Kolom 1,818,880.00
• Cor Beton, Ready Mix K-300 1,070,688.00
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 8,950,051.12
• Baja Tulangan, BJTD fy 400MPa, D10 2,421,161.29
• Bekisting Kolom 6,236,160.00
• Cor Beton, Ready Mix K-300 4,215,834.00
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 33,953,019.49
• Baja Tulangan, BJTD fy 400MPa, D10 8,403,514.34
• Bekisting Kolom 21,826,560.00
• Cor Beton, Ready Mix K-300 13,115,928.00
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 13,080,539.12
2 • Baja Tulangan, BJTD fy 400MPa, D10 6,169,867.13
3 • Bekisting Balok 15,465,602.40
4 • Cor Beton, Ready Mix K-300 9,152,374.86
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 11,789,166.52
• Baja Tulangan, BJTD fy 400MPa, D10 5,213,023.81
• Bekisting Balok 12,213,385.60
• Cor Beton, Ready Mix K-300 6,784,146.84
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 14,825,178.13
• Baja Tulangan, BJTD fy 400MPa, D10 6,617,055.00
• Bekisting Balok 19,178,992.80
• Cor Beton, Ready Mix K-300 9,326,138.60
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 3,074,980.27
• Baja Tulangan, BJTD fy 400MPa, D10 1,932,780.28
• Bekisting Balok 5,074,624.00
• Cor Beton, Ready Mix K-300 1,927,238.40
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 4,092,785.67
• Baja Tulangan, BJTD fy 400MPa, D10 3,304,675.48
• Bekisting Balok 7,822,807.20
• Cor Beton, Ready Mix K-300 2,563,405.52
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 6,489,467.97
• Baja Tulangan, BJTD fy 400MPa, D10 7,882,148.75
• Bekisting Balok 14,354,456.90
• Cor Beton, Ready Mix K-300 3,887,768.51
10 Plate, t = 10 mm 1,479,420.56
11 Gussat Plate, t = 8 mm 146,275.56
12 Angkur Baut D19, HTB 18,200,000.00
13 Mur+Ring D19, HTB 5,720,000.00
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate 2,280,000.00
15 Baja Profil Siku 90.90.7 405,081.60
16 Baja Profil Siku 75.75.6 266,006.40
17 Baut+Mur+Ring D16 4,140,000.00
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 23,232,000.00
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 13,094,400.00
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 1,302,400.00
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 14,995,200.00
22 Plat Stepner, t = 8 mm 3,881,873.26
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 173,164,490.24
• Bekisting Plat 79,222,175.63
• Cor Beton, Ready Mix K-300 57,583,650.00
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) 24,567,704.00
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet 41,921,600.00
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 14,989,632.00
25 Pek. Pasangan Stud Shear Connector 6,955,000.00
TOTAL BIAYA LANGSUNG 784,656,864.43
BIAYA TIDAK LANGSUNG
1 Biaya Penyelesaian dan Persiapan 8,700,000.00
2 Biaya Umum Proyek 20,348,800.00
3 Biaya Tidak Langsung di Kantor 6,036,000.00
4 Biaya Pemasaran 1,203,200.00
TOTAL BIAYA TIDAK LANGSUNG 36,288,000.00
TOTAL BIAYA A + B 820,944,864.43
PROGRES NILAI UANG
BOBOT % RENC. REALS. BCWS BCWP ACWP KET
% % Rp. Rp. Rp.
4 5 6 7=5/4*3 8=6/4*3 9 10
1 2 3
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 2,279,995.95
• Baja Tulangan, BJTD fy 400MPa, D10 595,553.25
• Bekisting Kolom 1,818,880.00
• Cor Beton, Ready Mix K-300 1,070,688.00
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 8,950,051.12
• Baja Tulangan, BJTD fy 400MPa, D10 2,421,161.29
• Bekisting Kolom 6,236,160.00
• Cor Beton, Ready Mix K-300 4,215,834.00
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 33,953,019.49
• Baja Tulangan, BJTD fy 400MPa, D10 8,403,514.34
• Bekisting Kolom 21,826,560.00
• Cor Beton, Ready Mix K-300 13,115,928.00
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 13,080,539.12
2 • Baja Tulangan, BJTD fy 400MPa, D10 6,169,867.13
3 • Bekisting Balok 15,465,602.40
4 • Cor Beton, Ready Mix K-300 9,152,374.86
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 11,789,166.52
• Baja Tulangan, BJTD fy 400MPa, D10 5,213,023.81
• Bekisting Balok 12,213,385.60
• Cor Beton, Ready Mix K-300 6,784,146.84
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 14,825,178.13
• Baja Tulangan, BJTD fy 400MPa, D10 6,617,055.00
• Bekisting Balok 19,178,992.80
• Cor Beton, Ready Mix K-300 9,326,138.60
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 3,074,980.27
• Baja Tulangan, BJTD fy 400MPa, D10 1,932,780.28
• Bekisting Balok 5,074,624.00
• Cor Beton, Ready Mix K-300 1,927,238.40
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 4,092,785.67
• Baja Tulangan, BJTD fy 400MPa, D10 3,304,675.48
• Bekisting Balok 7,822,807.20
• Cor Beton, Ready Mix K-300 2,563,405.52
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 6,489,467.97
• Baja Tulangan, BJTD fy 400MPa, D10 7,882,148.75
• Bekisting Balok 14,354,456.90
• Cor Beton, Ready Mix K-300 3,887,768.51
10 Plate, t = 10 mm 1,479,420.56
11 Gussat Plate, t = 8 mm 146,275.56
12 Angkur Baut D19, HTB 18,200,000.00
13 Mur+Ring D19, HTB 5,720,000.00
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate 2,280,000.00
15 Baja Profil Siku 90.90.7 405,081.60
16 Baja Profil Siku 75.75.6 266,006.40
17 Baut+Mur+Ring D16 4,140,000.00
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 23,232,000.00
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 13,094,400.00
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 1,302,400.00
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 14,995,200.00
22 Plat Stepner, t = 8 mm 3,881,873.26
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 173,164,490.24
• Bekisting Plat 79,222,175.63
• Cor Beton, Ready Mix K-300 57,583,650.00
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) 24,567,704.00
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet 41,921,600.00
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 14,989,632.00
25 Pek. Pasangan Stud Shear Connector 6,955,000.00
TOTAL BIAYA LANGSUNG 784,656,864.43
BIAYA TIDAK LANGSUNG
1 Biaya Penyelesaian dan Persiapan 8,700,000.00
2 Biaya Umum Proyek 20,348,800.00
3 Biaya Tidak Langsung di Kantor 6,036,000.00
4 Biaya Pemasaran 1,203,200.00
TOTAL BIAYA TIDAK LANGSUNG 36,288,000.00
TOTAL BIAYA A + B 820,944,864.43
PROGRES NILAI UANG
BOBOT % RENC. REALS. BCWS BCWP ACWP KET
% % Rp. Rp. Rp.
4 5 6 7=5/4*3 8=6/4*3 9 10
1 2 3 4 5 6
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 2,279,995.95 0.28 0.28 0.28
• Baja Tulangan, BJTD fy 400MPa, D10 595,553.25 0.07 0.07 0.07
• Bekisting Kolom 1,818,880.00 0.22 0.22 0.22
• Cor Beton, Ready Mix K-300 1,070,688.00 0.13 0.13 0.13
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 8,950,051.12 1.09 1.09 1.09
• Baja Tulangan, BJTD fy 400MPa, D10 2,421,161.29 0.29 0.29 0.29
• Bekisting Kolom 6,236,160.00 0.76 0.76 0.76
• Cor Beton, Ready Mix K-300 4,215,834.00 0.51 0.51 0.51
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00 0.00
• Baja Tulangan, BJTD fy 400MPa, D19 33,953,019.49 4.14 4.14 4.14
• Baja Tulangan, BJTD fy 400MPa, D10 8,403,514.34 1.02 1.02 1.02
• Bekisting Kolom 21,826,560.00 2.66 2.66 2.66
• Cor Beton, Ready Mix K-300 13,115,928.00 1.60 1.60 1.60
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 13,080,539.12 1.59 1.59 1.59
2 • Baja Tulangan, BJTD fy 400MPa, D10 6,169,867.13 0.75 0.75 0.75
3 • Bekisting Balok 15,465,602.40 1.88 1.88 1.88
4 • Cor Beton, Ready Mix K-300 9,152,374.86 1.11 1.11 1.11
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 11,789,166.52 1.44 1.44 1.44
• Baja Tulangan, BJTD fy 400MPa, D10 5,213,023.81 0.64 0.64 0.64
• Bekisting Balok 12,213,385.60 1.49 1.49 1.49
• Cor Beton, Ready Mix K-300 6,784,146.84 0.83 0.83 0.83
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 14,825,178.13 1.81 1.81 1.81
• Baja Tulangan, BJTD fy 400MPa, D10 6,617,055.00 0.81 0.81 0.81
• Bekisting Balok 19,178,992.80 2.34 2.34 2.34
• Cor Beton, Ready Mix K-300 9,326,138.60 1.14 1.14 1.14
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 3,074,980.27 0.37 0.37 0.37
• Baja Tulangan, BJTD fy 400MPa, D10 1,932,780.28 0.24 0.24 0.24
• Bekisting Balok 5,074,624.00 0.62 0.62 0.62
• Cor Beton, Ready Mix K-300 1,927,238.40 0.23 0.23 0.23
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 4,092,785.67 0.50 0.50 0.50
• Baja Tulangan, BJTD fy 400MPa, D10 3,304,675.48 0.40 0.40 0.40
• Bekisting Balok 7,822,807.20 0.95 0.95 0.95
• Cor Beton, Ready Mix K-300 2,563,405.52 0.31 0.31 0.31
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 6,489,467.97 0.79 0.79 0.79
• Baja Tulangan, BJTD fy 400MPa, D10 7,882,148.75 0.96 0.96 0.96
• Bekisting Balok 14,354,456.90 1.75 1.75 1.75
• Cor Beton, Ready Mix K-300 3,887,768.51 0.47 0.47 0.47
10 Plate, t = 10 mm 1,479,420.56 0.18 0.18 0.18
11 Gussat Plate, t = 8 mm 146,275.56 0.02 0.02 0.02
12 Angkur Baut D19, HTB 18,200,000.00 2.22 2.22 2.22
13 Mur+Ring D19, HTB 5,720,000.00 0.70 0.70 0.70
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate 2,280,000.00 0.28 0.28 0.28
15 Baja Profil Siku 90.90.7 405,081.60 0.05 0.05 0.05
16 Baja Profil Siku 75.75.6 266,006.40 0.03 0.03 0.03
17 Baut+Mur+Ring D16 4,140,000.00 0.50 0.50 0.50
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 23,232,000.00 2.83 2.83 2.83
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 13,094,400.00 1.60 1.60 1.60
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 1,302,400.00 0.16 0.16 0.16
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 14,995,200.00 1.83 1.83 1.83
22 Plat Stepner, t = 8 mm 3,881,873.26 0.47 0.47 0.47
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 173,164,490.24 21.09 21.09 21.09
• Bekisting Plat 79,222,175.63 9.65 9.65 9.65
• Cor Beton, Ready Mix K-300 57,583,650.00 7.01 7.01 7.01
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) 24,567,704.00 2.99 2.99 2.99
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet 41,921,600.00 5.11 5.11 5.11
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 14,989,632.00 1.83 1.83 1.83
25 Pek. Pasangan Stud Shear Connector 6,955,000.00 0.85 0.85 0.00
TOTAL BIAYA LANGSUNG 784,656,864.43 95.58
BIAYA TIDAK LANGSUNG
1 Biaya Penyelesaian dan Persiapan 8,700,000.00 1.06 0.212 0.212
2 Biaya Umum Proyek 20,348,800.00 2.48 0.496 0.496
3 Biaya Tidak Langsung di Kantor 6,036,000.00 0.74 0.148 0.148
4 Biaya Pemasaran 1,203,200.00 0.15 0.030 0.030
TOTAL BIAYA TIDAK LANGSUNG 36,288,000.00 4.42
TOTAL BIAYA A + B 820,944,864.43 100.00
NILAI UANG
SPI =
SP = BCWP-BCES BCWP/B KET
BCWP Rp. BCWS Rp. CWS
Rp.
784,975,435.93 791,930,435.93
PROGRES
BOBOT
NO URAIAN PEKERJAAN BAC
(%)
RENC. % REALS. %
1 2 3 4 5 6
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate 2,280,000.00 0.28 0.28 0.28
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 23,232,000.00 2.83 2.83 2.83
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 13,094,400.00 1.60 1.60 1.60
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 1,302,400.00 0.16 0.16 0.16
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 14,995,200.00 1.83 1.83 1.83
CPI =
BCWP/B KET
BCWP Rp. ACWP CV = BCWP-BCES Rp. CWS
784,975,435.93 784,975,435.93
DURASI (hari)
NO URAIAN PEKERJAAN BAC BCWP Rp. CPI
1 2 3 4 5 6
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 2,279,995.95 2,279,995.95 1.00
• Baja Tulangan, BJTD fy 400MPa, D10 595,553.25 595,553.25 1.00
• Bekisting Kolom 1,818,880.00 1,818,880.00 1.00
• Cor Beton, Ready Mix K-300 1,070,688.00 1,070,688.00 1.00
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 8,950,051.12 8,950,051.12 1.00
• Baja Tulangan, BJTD fy 400MPa, D10 2,421,161.29 2,421,161.29 1.00
• Bekisting Kolom 6,236,160.00 6,236,160.00 1.00
• Cor Beton, Ready Mix K-300 4,215,834.00 4,215,834.00 1.00
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 33,953,019.49 33,953,019.49 1.00
• Baja Tulangan, BJTD fy 400MPa, D10 8,403,514.34 8,403,514.34 1.00
• Bekisting Kolom 21,826,560.00 21,826,560.00 1.00
• Cor Beton, Ready Mix K-300 13,115,928.00 13,115,928.00 1.00
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 13,080,539.12 13,080,539.12 1.00
2 • Baja Tulangan, BJTD fy 400MPa, D10 6,169,867.13 6,169,867.13 1.00
3 • Bekisting Balok 15,465,602.40 15,465,602.40 1.00
4 • Cor Beton, Ready Mix K-300 9,152,374.86 9,152,374.86 1.00
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 11,789,166.52 11,789,166.52 1.00
• Baja Tulangan, BJTD fy 400MPa, D10 5,213,023.81 5,213,023.81 1.00
• Bekisting Balok 12,213,385.60 12,213,385.60 1.00
• Cor Beton, Ready Mix K-300 6,784,146.84 6,784,146.84 1.00
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 14,825,178.13 14,825,178.13 1.00
• Baja Tulangan, BJTD fy 400MPa, D10 6,617,055.00 6,617,055.00 1.00
• Bekisting Balok 19,178,992.80 19,178,992.80 1.00
• Cor Beton, Ready Mix K-300 9,326,138.60 9,326,138.60 1.00
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 3,074,980.27 3,074,980.27 1.00
• Baja Tulangan, BJTD fy 400MPa, D10 1,932,780.28 1,932,780.28 1.00
• Bekisting Balok 5,074,624.00 5,074,624.00 1.00
• Cor Beton, Ready Mix K-300 1,927,238.40 1,927,238.40 1.00
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 4,092,785.67 4,092,785.67 1.00
• Baja Tulangan, BJTD fy 400MPa, D10 3,304,675.48 3,304,675.48 1.00
• Bekisting Balok 7,822,807.20 7,822,807.20 1.00
• Cor Beton, Ready Mix K-300 2,563,405.52 2,563,405.52 1.00
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 6,489,467.97 6,489,467.97 1.00
• Baja Tulangan, BJTD fy 400MPa, D10 7,882,148.75 7,882,148.75 1.00
• Bekisting Balok 14,354,456.90 14,354,456.90 1.00
• Cor Beton, Ready Mix K-300 3,887,768.51 3,887,768.51 1.00
10 Plate, t = 10 mm 1,479,420.56 1,479,420.56 1.00
11 Gussat Plate, t = 8 mm 146,275.56 146,275.56 1.00
12 Angkur Baut D19, HTB 18,200,000.00 18,200,000.00 1.00
13 Mur+Ring D19, HTB 5,720,000.00 5,720,000.00 1.00
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate 2,280,000.00 2,280,000.00 1.00
15 Baja Profil Siku 90.90.7 405,081.60 405,081.60 1.00
16 Baja Profil Siku 75.75.6 266,006.40 266,006.40 1.00
17 Baut+Mur+Ring D16 4,140,000.00 4,140,000.00 1.00
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 23,232,000.00 23,232,000.00 1.00
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 13,094,400.00 13,094,400.00 1.00
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 1,302,400.00 1,302,400.00 1.00
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 14,995,200.00 14,995,200.00 1.00
22 Plat Stepner, t = 8 mm 3,881,873.26 3,881,873.26 1.00
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 173,164,490.24 173,164,490.24 1.00
• Bekisting Plat 79,222,175.63 79,222,175.63 1.00
• Cor Beton, Ready Mix K-300 57,583,650.00 57,583,650.00 1.00
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) 24,567,704.00 24,567,704.00 1.00
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet 41,921,600.00 41,921,600.00 1.00
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 14,989,632.00 14,989,632.00 1.00
25 Pek. Pasangan Stud Shear Connector 6,955,000.00 -
TOTAL BIAYA LANGSUNG 784,656,864.43
BIAYA TIDAK LANGSUNG
1 Biaya Penyelesaian dan Persiapan 8,700,000.00 1,740,403.11 1.00
2 Biaya Umum Proyek 20,348,800.00 4,071,886.53 1.00
3 Biaya Tidak Langsung di Kantor 6,036,000.00 1,214,998.40 1.00
4 Biaya Pemasaran 1,203,200.00 246,283.46 1.00
TOTAL BIAYA TIDAK LANGSUNG 36,288,000.00
TOTAL BIAYA A + B 820,944,864.43 784,975,435.93 59.00
SISA BIAYA = ETC = SISA EAC =
ACWP Rp. KET
BAC-BCWP BIAYA/CPI ETC+ACWP
2,279,995.95 - - 2,279,995.95
595,553.25 - - 595,553.25
1,818,880.00 - - 1,818,880.00
1,070,688.00 - - 1,070,688.00
8,950,051.12 - - 8,950,051.12
2,421,161.29 - - 2,421,161.29
6,236,160.00 - - 6,236,160.00
4,215,834.00 - - 4,215,834.00
33,953,019.49 - - 33,953,019.49
8,403,514.34 - - 8,403,514.34
21,826,560.00 - - 21,826,560.00
13,115,928.00 - - 13,115,928.00
13,080,539.12 - - 13,080,539.12
6,169,867.13 - - 6,169,867.13
15,465,602.40 - - 15,465,602.40
9,152,374.86 - - 9,152,374.86
11,789,166.52 - - 11,789,166.52
5,213,023.81 - - 5,213,023.81
12,213,385.60 - - 12,213,385.60
6,784,146.84 - - 6,784,146.84
14,825,178.13 - - 14,825,178.13
6,617,055.00 - - 6,617,055.00
19,178,992.80 - - 19,178,992.80
9,326,138.60 - - 9,326,138.60
3,074,980.27 - - 3,074,980.27
1,932,780.28 - - 1,932,780.28
5,074,624.00 - - 5,074,624.00
1,927,238.40 - - 1,927,238.40
4,092,785.67 - - 4,092,785.67
3,304,675.48 - - 3,304,675.48
7,822,807.20 - - 7,822,807.20
2,563,405.52 - - 2,563,405.52
6,489,467.97 - - 6,489,467.97
7,882,148.75 - - 7,882,148.75
14,354,456.90 - - 14,354,456.90
3,887,768.51 - - 3,887,768.51
1,479,420.56 - - 1,479,420.56
146,275.56 - - 146,275.56
18,200,000.00 - - 18,200,000.00
5,720,000.00 - - 5,720,000.00
2,280,000.00 - - 2,280,000.00
405,081.60 - - 405,081.60
266,006.40 - - 266,006.40
4,140,000.00 - - 4,140,000.00
23,232,000.00 - - 23,232,000.00
13,094,400.00 - - 13,094,400.00
1,302,400.00 - - 1,302,400.00
14,995,200.00 - - 14,995,200.00
3,881,873.26 - - 3,881,873.26
173,164,490.24 - - 173,164,490.24
79,222,175.63 - - 79,222,175.63
57,583,650.00 - - 57,583,650.00
24,567,704.00 - - 24,567,704.00
-
41,921,600.00 - - 41,921,600.00
14,989,632.00 - - 14,989,632.00
- 6,955,000.00
784,656,864.43
1 2 3 4
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 2,279,995.95 7.00
• Baja Tulangan, BJTD fy 400MPa, D10 595,553.25 7.00
• Bekisting Kolom 1,818,880.00 7.00
• Cor Beton, Ready Mix K-300 1,070,688.00 7.00
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 8,950,051.12 7.00
• Baja Tulangan, BJTD fy 400MPa, D10 2,421,161.29 7.00
• Bekisting Kolom 6,236,160.00 7.00
• Cor Beton, Ready Mix K-300 4,215,834.00 7.00
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 33,953,019.49 7.00
• Baja Tulangan, BJTD fy 400MPa, D10 8,403,514.34 7.00
• Bekisting Kolom 21,826,560.00 7.00
• Cor Beton, Ready Mix K-300 13,115,928.00 7.00
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19 13,080,539.12 7.00
2 • Baja Tulangan, BJTD fy 400MPa, D10 6,169,867.13 7.00
3 • Bekisting Balok 15,465,602.40 7.00
4 • Cor Beton, Ready Mix K-300 9,152,374.86 7.00
5 Pek. Balok Struktur Type B2 30x50, Elevasi +6,72 dan +9,00
• Baja Tulangan, BJTD fy 400MPa, D19 11,789,166.52 7.00
• Baja Tulangan, BJTD fy 400MPa, D10 5,213,023.81 7.00
• Bekisting Balok 12,213,385.60 7.00
• Cor Beton, Ready Mix K-300 6,784,146.84 7.00
6 Pek. Balok Struktur Type B3 25x50, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 14,825,178.13 7.00
• Baja Tulangan, BJTD fy 400MPa, D10 6,617,055.00 7.00
• Bekisting Balok 19,178,992.80 7.00
• Cor Beton, Ready Mix K-300 9,326,138.60 7.00
7 Pek. Balok Struktur Type B4 20x40, Elevasi +9,00
• Baja Tulangan, BJTD fy 400MPa, D16 3,074,980.27 7.00
• Baja Tulangan, BJTD fy 400MPa, D10 1,932,780.28 7.00
• Bekisting Balok 5,074,624.00 7.00
• Cor Beton, Ready Mix K-300 1,927,238.40 7.00
8 Pek. Balok Struktur Type B5 20x30 Elevasi +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 4,092,785.67 7.00
• Baja Tulangan, BJTD fy 400MPa, D10 3,304,675.48 7.00
• Bekisting Balok 7,822,807.20 7.00
• Cor Beton, Ready Mix K-300 2,563,405.52 7.00
9 Pek. Balok Struktur Type B6 15x30 Elevasi +6,72 dan +9.00
• Baja Tulangan, BJTD fy 400MPa, D13 6,489,467.97 7.00
• Baja Tulangan, BJTD fy 400MPa, D10 7,882,148.75 7.00
• Bekisting Balok 14,354,456.90 7.00
• Cor Beton, Ready Mix K-300 3,887,768.51 7.00
10 Plate, t = 10 mm 1,479,420.56 7.00
11 Gussat Plate, t = 8 mm 146,275.56 7.00
12 Angkur Baut D19, HTB 18,200,000.00 7.00
13 Mur+Ring D19, HTB 5,720,000.00 7.00
14 Baut+Mur+Ring D19, HTB untuk Gussat Plate 2,280,000.00 7.00
15 Baja Profil Siku 90.90.7 405,081.60 7.00
16 Baja Profil Siku 75.75.6 266,006.40 7.00
17 Baut+Mur+Ring D16 4,140,000.00 7.00
18 Pek. Balok Baja Profil WF 400.200.8.13 Elevasi +5,00 23,232,000.00 7.00
19 Pek. Balok Baja Profil WF 350.175.7.11 Elevasi +5,00 13,094,400.00 7.00
20 Pek. Balok Baja Profil WF 250.125.6.9 Elevasi +5,00 1,302,400.00 7.00
21 Pek. Balok Baja Profil WF 200.100.5,5.8 Elevasi +5,00 14,995,200.00 7.00
22 Plat Stepner, t = 8 mm 3,881,873.26 7.00
23 Pek. Plat Lantai, t = 13 cm Elevasi, +9.00
• Baja Tulangan, BJTP fy 240MPa, d10 173,164,490.24 14.00
• Bekisting Plat 79,222,175.63 7.00
• Cor Beton, Ready Mix K-300 57,583,650.00 7.00
24 Pek. Plat Lantai, t = 12 cm Elevasi, +9.00
• Tulangan Wiremesh M8, 2,1 x 5,4 meter (61,79 kg/lbr) 24,567,704.00 7.00
Mutu Baja U50 (Double Layer)
• Begisting Plat, Metal Sheet 41,921,600.00 7.00
• Cor Beton, Ready Mix fc' 26,4 Mpa, K-300 14,989,632.00 7.00
25 Pek. Pasangan Stud Shear Connector 6,955,000.00
TOTAL BIAYA LANGSUNG 784,656,864.43
BIAYA TIDAK LANGSUNG
1 Biaya Penyelesaian dan Persiapan 8,700,000.00
2 Biaya Umum Proyek 20,348,800.00
3 Biaya Tidak Langsung di Kantor 6,036,000.00
4 Biaya Pemasaran 1,203,200.00
TOTAL BIAYA TIDAK LANGSUNG 36,288,000.00
TOTAL BIAYA A + B 820,944,864.43
DURASI RENC. DURASI REAL. DURASI SISA ETS = DURASI EAS = ETS +
SPI KET
s/d Ming-5 hari s/d Ming-5 hari s/d Ming-5 hari SISA/SPI D.REAL
1.00
1.00
1.00
1.00
Simbol
NO URAIAN PEKERJAAN
1 2 3
I Pek. Kolom Struktur Type K1 40x30, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D16
• Baja Tulangan, BJTD fy 400MPa, D10
• Bekisting Kolom
• Cor Beton, Ready Mix K-300
2 Pek. Kolom Struktur Type K2 35x45, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19
• Baja Tulangan, BJTD fy 400MPa, D10
• Bekisting Kolom
• Cor Beton, Ready Mix K-300
3 Pek. Kolom Struktur Type K3 35x35, Elevasi +5,00 s. d. +9,00
• Baja Tulangan, BJTD fy 400MPa, D19
• Baja Tulangan, BJTD fy 400MPa, D10
• Bekisting Kolom
• Cor Beton, Ready Mix K-300
4 Pek. Balok Struktur Type B1 30x60, Elevasi +9,00
1 • Baja Tulangan, BJTD fy 400MPa, D19
2 • Baja Tulangan, BJTD fy 400MPa, D10
3 • Bekisting Balok
4 5 6 7
kg 213.08 213.08
kg 55.66 55.66
m2 11.20 11.20
m3 0.96 0.96
kg 836.45 836.45
kg 226.28 226.28
m2 38.40 38.40
m3 3.78 3.78
kg 3,173.18 3,173.18
kg 785.38 785.38
m2 134.40 134.40
m3 11.76 11.76
kg 1,222.48 1,222.48
kg 576.62 576.62
m2 72.17 72.17
m3 8.21 8.21
kg 1,101.79 1,101.79
kg 487.20 487.20
m2 56.99 56.99
m3 6.08 6.08
kg 1,385.53 1,385.53
kg 618.42 618.42
m2 89.50 89.50
m3 8.36 8.36
kg 287.38 287.38
kg 180.63 180.63
m2 23.68 23.68
m3 1.73 1.73
kg 382.50 382.50
kg 308.85 308.85
m2 36.50 36.50
m3 2.30 2.30
kg 606.49 606.49
kg 736.65 736.65
m2 66.98 66.98
m3 3.49 3.49
kg 67.25 67.25
kg 6.65 6.65
bh 104.00 104.00
bh 104.00 104.00
bh 24.00 24.00
kg 18.41 18.41
kg 12.09 12.09
bh 46.00 46.00
kg 1,056.00 1,056.00
kg 595.20 595.20
kg 59.20 59.20
kg 681.60 681.60
kg 176.45 176.45
kg 17,145.00 17,145.00
m2 317.52 317.52
m3 51.63 51.63
kg 1,730.12 1,730.12
m2 112.00 112.00
m3
13.44 13.44
bh 107.00 107.00
hr
hr
hr
hr
BIAYA
EAC BCWP TERSEDIA
KET
Rp. Rp. Rp.
3 4 5= 3-4 10