KEMENTERIAN

PERHUBUNGAN
REPUBLIK INDONESIA

PERCEPA

PRESTASI PEKERJAAN MINGGUAN : - s/d 30/12/1899


s/d
No. PEKERJAAN SATUAN VOLUME
10/23/2015
Rencana kg 147,705.00
1 Besi
Realisasi 147705.0000 124,854.00
Rencana buah 2,145.00
1 Moveable Concrete Barrier (MCB)
Realisasi buah 1134.0000 1,062.00
Rencana m 4,320.00
2 Tiang Pancang D 1000 mm
Realisasi m 1696.0000 646.00
Rencana m3 320.00
3 Readymix fc 29 Fa
Realisasi m3 40.5
Rencana m3
4 Readymix fc 10 Fa
Realisasi m3 18.4500
Rencana
5 Precast Concrete Pilecap Cover
Realisasi
Rencana
6 Readymix fc 33,2 Fa
Realisasi
Rencana
7 Precast Concrete Column Cover
Realisasi

12 / 51
DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

PERCEPATAN PENYELENGGARAN KERETA API RINGAN / LIGHT RAIL TRANSIT TERINTEGRASI JAKARTA, BOGOR

LAPORAN RENCANA vs REALISASI ( PROCUREMENT )


LINTAS PELAYANAN 1 : CAWANG - CIBUBUR

Minggu Ke - : 14

Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu


12/12/2015 12/13/2015 12/14/2015 12/15/2015 12/16/2015 12/17/2015 12/18/2015 12/19/2015 12/20/2015

324 612 468 108

133 45 134.5 45.3 88.5 145 45

6 3 7.2 9 5 3 3

76 36

28.5 14

1173

12 / 51
PIAN
PIAN

AKARTA, BOGOR, DEPOK DAN BEKASI

Minggu Ke - : 15 Minggu ke : 15
KETERANG
Senin Selasa Rabu Kamis Jumat
12/21/2015 12/22/2015 12/23/2015 12/24/2015 12/25/2015 19-25 DESEMBER 2015

261309.8 261309.8

144 252

55 46 55 100 301

5 11

40 76 40 268

28 28

59.2 32 91.2

1173

12 / 51
PT ADHI KARYA (Persero)
Tbk

KETERANGAN

12 / 51
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN

PEMBERI : KEMENTERIAN PERHUBUNGAN


TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN /


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk.

KONSULTAN : PT. …………………………………..

Tahun Anggaran : Th. ........


No. DIPA : 0 30-Dec-99
No. Kontrak : …………………………… Tgl/Bln/Thn ……………..
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn ……………..
Waktu Pelaksana : ……..(………………………..) Hari Kalender

NO URAIAN SATUAN VOLUME

1 2 3 4
CAWANG - CIBUBUR
4.1.0 Spun Pile 1.00
Pengadaan Precast Concrete Spun Pile dia 1000mm
4.1.1 m' 54,420.00
(type C)
4.1.2 Pemancangan Spun Pile dia 1000mm m' 54,510.00
4.1.3 Axial Static Loading Test Spun Pile titik 1.00
4.1.4 Lateral Static Loading Test Spun Pile titik 1.00
4.1.5 Pile Dynamic Analysis (PDA) Test Spun Pile no 89.00
4.1.6 Pembesian Isian Spun Pile kg 286,224.75
4.1.7 Beton Isian Spun Pile m3 2,933.25

4.2.0 Bored Pile -


KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN

PEMBERI : KEMENTERIAN PERHUBUNGAN


TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN /


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk.

KONSULTAN : PT. …………………………………..

Tahun Anggaran : Th. ........


No. DIPA : 0 30-Dec-99
No. Kontrak : …………………………… Tgl/Bln/Thn ……………..
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn ……………..
Waktu Pelaksana : ……..(………………………..) Hari Kalender

NO URAIAN SATUAN VOLUME

1 2 3 4
4.2.1 Bore Pile dia 1500mm m' -
4.2.2 Axial Static Loading Test Bored Pile titik -
4.2.3 Lateral Loading Test Bored Pile titik -
4.2.4 Pile Integrity Test titik -

4.3.0 Pile Cap Structure 1.00


4.3.1 Galian m3 36,546.61
4.3.2 Lean Concrete, fc' = 10 Mpa m2 5,413.76
4.3.3 Pembesian PileCap kg 3,842,461.45
4.3.4 Precast Concrete Pilecap Cover m2 19,176.00
4.3.5 Beton Readymix fc' 29 Mpa ( K.350 ) m3 20,239.54
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN

PEMBERI : KEMENTERIAN PERHUBUNGAN


TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN /


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk.

KONSULTAN : PT. …………………………………..

Tahun Anggaran : Th. ........


No. DIPA : 0 30-Dec-99
No. Kontrak : …………………………… Tgl/Bln/Thn ……………..
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn ……………..
Waktu Pelaksana : ……..(………………………..) Hari Kalender

NO URAIAN SATUAN VOLUME

1 2 3 4
4.3.6 Timbunan Kembali m3 35,818.51
4.3.7 Pilecap Formwork m2 -

4.4.0 Pier Structure 1.00


4.4.1 Pembesian, fy = 400 Mpa kg 7,183,668.88
4.4.2 Precast Concrete Pier Cover m2 54,531.13
4.4.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 22,990.01
4.4.4 Pier Formwork m2

4.5.0 Pier Head Structure 1.00


Precast Concrete Pier Head (termasuk Material,
4.5.1 unit 444.00
Pengiriman & Pemasangan)
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN

PEMBERI : KEMENTERIAN PERHUBUNGAN


TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN /


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk.

KONSULTAN : PT. …………………………………..

Tahun Anggaran : Th. ........


No. DIPA : 0 30-Dec-99
No. Kontrak : …………………………… Tgl/Bln/Thn ……………..
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn ……………..
Waktu Pelaksana : ……..(………………………..) Hari Kalender

NO URAIAN SATUAN VOLUME

1 2 3 4

4.6.0 U Shaped Girder 1.00


Pekerjaan U Shaped Girder (termasuk Material,
4.6.1 m' 26,984.00
Pengiriman dan Pemasangan)

4.10.0 Miscellaneous 1.00


4.10.1 Bearing Pad set 3,552.00
4.10.2 Pot bearing set
4.10.3 Drainase m 27,584.00
4.10.4 Handrail m 27,584.00
4.10.5 Noise Barier m2 2,136.30
4.10.6 Sumur Resapan titik 448.00
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN

PEMBERI : KEMENTERIAN PERHUBUNGAN


TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN /


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk.

KONSULTAN : PT. …………………………………..

Tahun Anggaran : Th. ........


No. DIPA : 0 30-Dec-99
No. Kontrak : …………………………… Tgl/Bln/Thn ……………..
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn ……………..
Waktu Pelaksana : ……..(………………………..) Hari Kalender

NO URAIAN SATUAN VOLUME

1 2 3 4

B JALUR LAYANG AREA STASIUN

4.11.0 Spun Pile 1.00


Pengadaan Precast Concrete Spun Pile dia 1000mm
4.11.1 m' 5,635.00
(type C)
4.11.2 Pemancangan Spun Pile dia 1000mm m' 5,635.00
4.11.3 Pile Dynamic Analysis (PDA) Test Spun Pile no 13.00
4.11.4 Pembesian Isian Spun Pile kg 9,666.00
4.11.5 Beton Isian Spun Pile m3 28.90

4.12.0 Bored Pile -


KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN

PEMBERI : KEMENTERIAN PERHUBUNGAN


TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN /


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk.

KONSULTAN : PT. …………………………………..

Tahun Anggaran : Th. ........


No. DIPA : 0 30-Dec-99
No. Kontrak : …………………………… Tgl/Bln/Thn ……………..
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn ……………..
Waktu Pelaksana : ……..(………………………..) Hari Kalender

NO URAIAN SATUAN VOLUME

1 2 3 4
4.12.1 Bored Pile Diameter 1200mm m' -
4.12.2 Pile Integrity Test titik -

4.13.0 Pile Cap Structure 1.00


4.13.1 Galian m3 5,675.43
4.13.2 Lean Concrete, fc' = 10 Mpa m2 85.75
4.13.3 Reinforcing Steel, fy = 400 Mpa kg 324,034.71
4.13.4 Pilecap Formwork m2 1,680.00
4.13.5 Beton Readymix fc' 29 Mpa ( K.350 ) m3 3,260.62
4.13.6 Timbunan m3 1,715.00
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN

PEMBERI : KEMENTERIAN PERHUBUNGAN


TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN /


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk.

KONSULTAN : PT. …………………………………..

Tahun Anggaran : Th. ........


No. DIPA : 0 30-Dec-99
No. Kontrak : …………………………… Tgl/Bln/Thn ……………..
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn ……………..
Waktu Pelaksana : ……..(………………………..) Hari Kalender

NO URAIAN SATUAN VOLUME

1 2 3 4
4.14.0 Lower Pier 1.00
4.14.1 Reinforcing Steel, fy = 400 Mpa kg 680,012.59
4.14.2 Pier Column Formwork m2 1,881.60
4.14.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 1,278.16

4.15.0 Lower Pier Head 1.00


4.15.1 Reinforcing Steel, fy = 400 Mpa kg 1,228,604.27
4.15.2 Pier Head Formwork m2 5,152.88
4.15.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 3,421.72
4.15.4 Post Tensioning kg 102,651.58
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN

PEMBERI : KEMENTERIAN PERHUBUNGAN


TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN /


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk.

KONSULTAN : PT. …………………………………..

Tahun Anggaran : Th. ........


No. DIPA : 0 30-Dec-99
No. Kontrak : …………………………… Tgl/Bln/Thn ……………..
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn ……………..
Waktu Pelaksana : ……..(………………………..) Hari Kalender

NO URAIAN SATUAN VOLUME

1 2 3 4
4.16.0 Upper Pier 1.00
4.16.1 Reinforcing Steel, fy = 400 Mpa kg 165,545.91
4.16.2 Pier Column Formwork m2 843.78
4.16.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 332.73

4.17.0 Upper Pier Head 1.00


4.17.1 Reinforcing Steel, fy = 400 Mpa kg 869,568.25
4.17.2 Pier Head Formwork m2 2,171.75
4.17.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 2,132.54
4.17.4 Post Tensioning kg 74,638.85
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN

PEMBERI : KEMENTERIAN PERHUBUNGAN


TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN /


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk.

KONSULTAN : PT. …………………………………..

Tahun Anggaran : Th. ........


No. DIPA : 0 30-Dec-99
No. Kontrak : …………………………… Tgl/Bln/Thn ……………..
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn ……………..
Waktu Pelaksana : ……..(………………………..) Hari Kalender

NO URAIAN SATUAN VOLUME

1 2 3 4

4.18.0 Girder 1.00


4.18.1 Pekerjaan Precast Girder untuk Concourse span 390.00
4.18.3 Pekerjaan U Shaped Girder m' 1,194.00
4.18.4 Bearing Pad set 240.00

TOTAL
LAPORAN KEMAJUAN PEKERJAAN

N/

Hari

Tanggal

………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat

HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN MINGGU


BOBOT MINGGU
THD LALU
TOTAL
BOBOT THD
(Rp) (Rp) TOTAL
(%) VOLUME VOLUME
(%)
5 6 7 8

272,646,681,654.44 272,646,681,654.44 16.48 0.35 5.71 0.01

3,404,545.45 185,275,363,636.36 11.20 20,882.50 4.30 -

1,274,577.29 69,477,208,078.75 4.20 16,610.67 1.28 95.23

550,000,000.00 550,000,000.00 0.03 - -


79,300,000.00 79,300,000.00 0.00 - -
85,600,000.00 7,618,400,000.00 0.46 5.00 0.03 -

12,024.20 3,441,623,966.29 0.21 72,261.63 0.05 5,977.00

2,115,326.34 6,204,785,973.04 0.38 410.53 0.05 55.35

- - 0.00 - -
LAPORAN KEMAJUAN PEKERJAAN

N/

Hari

Tanggal

………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat

HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN MINGGU


BOBOT MINGGU
THD LALU
TOTAL
BOBOT THD
(Rp) (Rp) TOTAL
(%) VOLUME VOLUME
(%)
5 6 7 8
5,214,766.42 - 0.00 - - -

550,000,000.00 - 0.00 - - -

79,300,000.00 - 0.00 - - -

295,454.55 - 0.00 - - -

122,928,193,114.15 122,928,193,114.15 7.43 0.27 1.99 0.04

116,182.54 4,246,078,318.48 0.26 12,538.72 0.09 11,525.80

121,322.04 656,808,423.27 0.04 358.10 0.00 12.10

12,024.20 46,202,529,846.45 2.79 998,704.85 0.73 102,644.82

1,476,750.00 28,318,158,000.00 1.71 3,938.00 0.35 656.00

2,115,326.34 42,813,225,287.68 2.59 5,385.80 0.69 793.00


LAPORAN KEMAJUAN PEKERJAAN

N/

Hari

Tanggal

………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat

HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN MINGGU


BOBOT MINGGU
THD LALU
TOTAL
BOBOT THD
(Rp) (Rp) TOTAL
(%) VOLUME VOLUME
(%)
5 6 7 8
19,302.68 691,393,238.26 0.04 78.27 0.00 -

435,232.00 - 0.00 4,924.60 - -

221,041,574,125.70 221,041,574,125.70 13.36 0.05 0.69 0.01

12,024.20 86,377,880,502.88 5.22 648,503.64 0.47 640,443.33

1,523,834.08 83,096,392,708.20 5.02 754.58 0.07 177.60

2,243,031.00 51,567,300,914.63 3.12 862.45 0.12 184.90

435,232.00 - 0.00 1,400.32 - 184.80

158,617,898,922.03 158,617,898,922.03 9.59 - -

357,247,520.09 158,617,898,922.03 9.59 - -


LAPORAN KEMAJUAN PEKERJAAN

N/

Hari

Tanggal

………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat

HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN MINGGU


BOBOT MINGGU
THD LALU
TOTAL
BOBOT THD
(Rp) (Rp) TOTAL
(%) VOLUME VOLUME
(%)
5 6 7 8

585,474,411,480.00 585,474,411,480.00 35.39 - -


585,474,411,480.00 35.39 -
21,697,095.00 -

116,197,294,749.46 116,197,294,749.46 7.02 - -


3,322,459.67 11,801,376,749.45 0.71 - -
65,822,459.67 - 0.00 - -
1,500,000.00 41,376,000,000.00 2.50 - -
2,100,000.00 57,926,400,000.00 3.50 - -
1,860,000.00 3,973,518,000.00 0.24 - -
2,500,000.00 1,120,000,000.00 0.07 - -
LAPORAN KEMAJUAN PEKERJAAN

N/

Hari

Tanggal

………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat

HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN MINGGU


BOBOT MINGGU
THD LALU
TOTAL
BOBOT THD
(Rp) (Rp) TOTAL
(%) VOLUME VOLUME
(%)
5 6 7 8

27,657,015,526.44 27,657,015,526.44 1.67 - -


3,404,545.45 19,184,613,636.36 1.16 - -
1,274,577.29 7,182,243,029.24 0.43 - -
85,600,000.00 1,112,800,000.00 0.07 - -
12,024.20 116,225,929.50 0.01 - -
2,115,326.34 61,132,931.33 0.00 - -

- - 0.00 - -
LAPORAN KEMAJUAN PEKERJAAN

N/

Hari

Tanggal

………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat

HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN MINGGU


BOBOT MINGGU
THD LALU
TOTAL
BOBOT THD
(Rp) (Rp) TOTAL
(%) VOLUME VOLUME
(%)
5 6 7 8
3,518,858.47 - 0.00 - -
295,454.55 - 0.00 - -

12,227,625,633.54 12,227,625,633.54 0.74 - -


116,182.54 659,385,299.82 0.04 - -
121,322.04 10,403,365.18 0.00 - -
12,024.20 3,896,258,584.41 0.24 - -
435,232.39 731,190,409.85 0.04 - -
2,115,326.34 6,897,283,874.95 0.42 - -
19,302.68 33,104,099.32 0.00 - -
LAPORAN KEMAJUAN PEKERJAAN

N/

Hari

Tanggal

………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat

HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN MINGGU


BOBOT MINGGU
THD LALU
TOTAL
BOBOT THD
(Rp) (Rp) TOTAL
(%) VOLUME VOLUME
(%)
5 6 7 8
11,862,504,215.24 11,862,504,215.24 0.72 - -
12,024.20 8,176,608,304.32 0.49 - -
435,232.39 818,933,259.04 0.05 - -
2,243,030.84 2,866,962,651.89 0.17 - -

28,944,329,624.99 28,944,329,624.99 1.75 - -


12,024.20 14,772,985,086.25 0.89 - -
435,232.39 2,242,698,085.23 0.14 - -
2,243,030.84 7,675,021,748.49 0.46 - -

41,437.50 4,253,624,705.03 0.26 - -


LAPORAN KEMAJUAN PEKERJAAN

N/

Hari

Tanggal

………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat

HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN MINGGU


BOBOT MINGGU
THD LALU
TOTAL
BOBOT THD
(Rp) (Rp) TOTAL
(%) VOLUME VOLUME
(%)
5 6 7 8
3,104,118,134.89 3,104,118,134.89 0.19 - -
12,024.20 1,990,557,315.17 0.12 - -
435,232.39 367,240,383.35 0.02 - -
2,243,030.84 746,320,436.36 0.05 - -

19,277,277,114.98 19,277,277,114.98 1.17 - -


12,024.20 10,455,863,645.84 0.63 - -
435,232.39 945,215,936.07 0.06 - -
2,243,030.84 4,783,350,031.09 0.29 - -
41,437.50 3,092,847,501.99 0.19 - -
LAPORAN KEMAJUAN PEKERJAAN

N/

Hari

Tanggal

………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat

HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN MINGGU


BOBOT MINGGU
THD LALU
TOTAL
BOBOT THD
(Rp) (Rp) TOTAL
(%) VOLUME VOLUME
(%)
5 6 7 8
-
74,145,139,144.23 74,145,139,144.23 4.48 - -
121,644,659.98 47,441,417,393.32 2.87 - -
21,697,095.00 25,906,331,430.00 1.57 - -
3,322,459.67 797,390,320.91 0.05 - -

1,654,124,063,440.08 100.00
PT ADHI KARYA (Persero) Tbk

MINGGU KE :

19

Sabtu s/d Jum'at

9-Jan-15 s/d 15-Jan-15

KEMAJUAN :

: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %

REALISASI

MINGGU INI SAMPAI DENGAN MINGGU INI


BOBOT
BOBOT THD
BOBOT THD THD
HARGA JENIS
TOTAL TOTAL
VOLUME PEKERJAAN
(%) (Rp)
(%)
(%)
9 10 11 12

0.08 0.35 94,742,626,475.26 5.73 34.75

- 20,882.50 71,095,420,454.55 4.30 38.37

0.01 16,705.90 21,292,960,749.27 1.29 30.65


- - - - -
- - - - -
- 5.00 428,000,000.00 0.03 5.62
0.00 78,238.63 940,757,034.42 0.06 27.33
0.01 465.88 985,488,237.02 0.06 15.88

- - - - -
PT ADHI KARYA (Persero) Tbk

MINGGU KE :

19

Sabtu s/d Jum'at

9-Jan-15 s/d 15-Jan-15

KEMAJUAN :

: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %

REALISASI

MINGGU INI SAMPAI DENGAN MINGGU INI


BOBOT
BOBOT THD
BOBOT THD THD
HARGA JENIS
TOTAL TOTAL
VOLUME PEKERJAAN
(%) (Rp)
(%)
(%)
9 10 11 12
- - - - -
- - - -
- - - - -
- - - - -

0.30 0.27 38,082,862,855.09 2.30 30.98


0.08 24,064.52 2,795,877,090.30 0.17 65.85
0.00 370.20 44,913,420.22 0.00 6.84
0.07 1,101,349.67 13,242,850,103.73 0.80 28.66
0.06 4,594.00 6,784,189,500.00 0.41 23.96
0.10 6,178.80 13,070,178,412.73 0.79 30.53
PT ADHI KARYA (Persero) Tbk

MINGGU KE :

19

Sabtu s/d Jum'at

9-Jan-15 s/d 15-Jan-15

KEMAJUAN :

: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %

REALISASI

MINGGU INI SAMPAI DENGAN MINGGU INI


BOBOT
BOBOT THD
BOBOT THD THD
HARGA JENIS
TOTAL TOTAL
VOLUME PEKERJAAN
(%) (Rp)
(%)
(%)
9 10 11 12
- 78.27 1,510,820.91 0.00 0.22
- 4,924.60 2,143,343,507.20 0.13 -

0.05 19,958,178,914.12 1.21 9.03


0.47 1,288,946.97 15,498,557,797.15 0.94 17.94
0.02 932.18 1,420,487,651.28 0.09 1.71
0.03 1,047.35 2,349,238,517.85 0.14 4.56
- 1,585.12 689,894,947.84 0.04 -

- - - -

- - - -
PT ADHI KARYA (Persero) Tbk

MINGGU KE :

19

Sabtu s/d Jum'at

9-Jan-15 s/d 15-Jan-15

KEMAJUAN :

: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %

REALISASI

MINGGU INI SAMPAI DENGAN MINGGU INI


BOBOT
BOBOT THD
BOBOT THD THD
HARGA JENIS
TOTAL TOTAL
VOLUME PEKERJAAN
(%) (Rp)
(%)
(%)
9 10 11 12

- - - -

- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
PT ADHI KARYA (Persero) Tbk

MINGGU KE :

19

Sabtu s/d Jum'at

9-Jan-15 s/d 15-Jan-15

KEMAJUAN :

: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %

REALISASI

MINGGU INI SAMPAI DENGAN MINGGU INI


BOBOT
BOBOT THD
BOBOT THD THD
HARGA JENIS
TOTAL TOTAL
VOLUME PEKERJAAN
(%) (Rp)
(%)
(%)
9 10 11 12

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
PT ADHI KARYA (Persero) Tbk

MINGGU KE :

19

Sabtu s/d Jum'at

9-Jan-15 s/d 15-Jan-15

KEMAJUAN :

: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %

REALISASI

MINGGU INI SAMPAI DENGAN MINGGU INI


BOBOT
BOBOT THD
BOBOT THD THD
HARGA JENIS
TOTAL TOTAL
VOLUME PEKERJAAN
(%) (Rp)
(%)
(%)
9 10 11 12
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
PT ADHI KARYA (Persero) Tbk

MINGGU KE :

19

Sabtu s/d Jum'at

9-Jan-15 s/d 15-Jan-15

KEMAJUAN :

: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %

REALISASI

MINGGU INI SAMPAI DENGAN MINGGU INI


BOBOT
BOBOT THD
BOBOT THD THD
HARGA JENIS
TOTAL TOTAL
VOLUME PEKERJAAN
(%) (Rp)
(%)
(%)
9 10 11 12
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -

- - - -
PT ADHI KARYA (Persero) Tbk

MINGGU KE :

19

Sabtu s/d Jum'at

9-Jan-15 s/d 15-Jan-15

KEMAJUAN :

: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %

REALISASI

MINGGU INI SAMPAI DENGAN MINGGU INI


BOBOT
BOBOT THD
BOBOT THD THD
HARGA JENIS
TOTAL TOTAL
VOLUME PEKERJAAN
(%) (Rp)
(%)
(%)
9 10 11 12
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
PT ADHI KARYA (Persero) Tbk

MINGGU KE :

19

Sabtu s/d Jum'at

9-Jan-15 s/d 15-Jan-15

KEMAJUAN :

: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %

REALISASI

MINGGU INI SAMPAI DENGAN MINGGU INI


BOBOT
BOBOT THD
BOBOT THD THD
HARGA JENIS
TOTAL TOTAL
VOLUME PEKERJAAN
(%) (Rp)
(%)
(%)
9 10 11 12
-
- - - -
- - - -
- - - -
- - - -

0.61 152,783,668,244.47 9.24

Jakarta, 29 Januari 2016


Dibuat oleh :
PT ADHI KARYA (Persero) Tbk

MINGGU KE :

19

Sabtu s/d Jum'at

9-Jan-15 s/d 15-Jan-15

KEMAJUAN :

: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %

REALISASI

MINGGU INI SAMPAI DENGAN MINGGU INI


BOBOT
BOBOT THD
BOBOT THD THD
HARGA JENIS
TOTAL TOTAL
VOLUME PEKERJAAN
(%) (Rp)
(%)
(%)
9 10 11 12

Sudaryono Setyo NM
Project Engineering Manager
KEMENTERIAN PERHUBUNGAN PT ADHI KARYA (Persero) Tbk
DIREKTORAT JENDERAL PERKERETAAPIAN

PEMBERI : KEMENTERIAN PERHUBUNGAN


TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN MINGGU KE :
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN / #REF!


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk. Hari Sabtu s/d Senin

KONSULTAN : PT. ………………………………….. Tanggal s/d 12/28/2015

Tahun Anggaran : Th. ........


KEMAJUAN :
No. DIPA : 0 30-Dec-99

No. Kontrak : …………………………… Tgl/Bln/Thn …………….. Progress : - %

No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn …………….. 02 September 2015 Rencana : #REF! %

Waktu Pelaksanaan: ……..(………………………..) Hari Kalender Cepat / Lambat : #REF! %

REALI SASI
HARGA SATUAN SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT BOBOT
BOBOT THD
THD THD THD
(Rp) HARGA JENIS
(%) TOTAL TOTAL TOTAL
VOLUME VOLUME VOLUME PEKERJAAN
(Rp)
(%)
(%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12
Preliminary

Basic Design

Detail Engineering Design

Design Management & System Integrator


REALI SASI
HARGA SATUAN SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT BOBOT
BOBOT THD
THD THD THD
(Rp) HARGA JENIS
(%) TOTAL TOTAL TOTAL
VOLUME VOLUME VOLUME PEKERJAAN
(Rp)
(%)
(%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12

TOTAL -
Catatan :
Bahwa harga satuan yang tercantum dalam laporan progres adalah harga satuan yang disubmit oleh PT Adhi Karya (Persero), Tbk. dan belum mengikat karena belum ditetapkan secara
resmi oleh Menteri Perhubungan.
KEMENTERIAN PERHUBUNGAN PT ADHI KARYA (Persero) Tbk
DIREKTORAT JENDERAL PERKERETAAPIAN

LAPORAN KEMAJUAN PEKERJAAN


PEMBERI : KEMENTERIAN PERHUBUNGAN
TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN MINGGU KE :
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN / 18


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk. Hari Selasa s/d Jum'at

KONSULTAN : PT. ………………………………….. Tanggal 29-Dec-2015 s/d 1-Jan-2016

Tahun Anggaran : Th. ........


KEMAJUAN :
No. DIPA : 0 30-Dec-99

No. Kontrak : …………………………… Tgl/Bln/Thn …………….. Progress : 5.1862 5.1862 %

No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn …………….. 02 September 2015 Rencana : #REF! %

Waktu Pelaksanaan: ……..(………………………..) Hari Kalender Cepat / Lambat : #REF! %

REALISASI
HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT BOBOT
BOBOT THD
THD THD THD
(Rp) (Rp) HARGA JENIS
(%) TOTAL TOTAL TOTAL
VOLUME VOLUME VOLUME PEKERJAAN
(Rp)
(%)
(%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12
CAWANG - DUKUH ATAS
4.1.0 Spun Pile 1.00 72,995,739,933.90 72,995,739,933.90 5.35 - - - -
Pengadaan Precast Concrete Spun Pile dia 1000mm
4.1.1 m' 10,590.00 36,054,136,363.64 2.64
(type C) 3,404,545.45 - - - -
4.1.2 Pemancangan Spun Pile dia 1000mm m' 10,590.00 1,274,577.29 13,497,773,501.26 0.99 - - - -
4.1.3 Axial Static Loading Test Spun Pile titik 31.00 550,000,000.00 17,050,000,000.00 1.25 - - - -
4.1.4 Lateral Static Loading Test Spun Pile titik 31.00 79,300,000.00 2,458,300,000.00 0.18 - - - -
4.1.5 Pile Dynamic Analysis (PDA) Test Spun Pile no 31.00 85,600,000.00 2,653,600,000.00 0.19 - - - -
4.1.6 Pembesian Isian Spun Pile kg 56,069.55 12,024.20 674,191,598.28 0.05 - - - -
4.1.7 Beton Isian Spun Pile m3 287.30 2,115,326.34 607,738,470.72 0.04 - - - -

4.2.0 Bored Pile 1.00 190,099,185,940.20 190,099,185,940.20 13.93 - - - -


4.2.1 Bore Pile dia 1500mm m' 32,636.00 5,214,766.42 170,189,117,000.81 12.47 - - - -
4.2.2 Axial Static Loading Test Bored Pile titik 31.00 550,000,000.00 17,050,000,000.00 1.25 - - - -
4.2.3 Lateral Loading Test Bored Pile titik 31.00 79,300,000.00 2,458,300,000.00 0.18 - - - -
4.2.4 Pile Integrity Test titik 1,359.83 295,454.55 401,768,939.39 0.03 - - - -
0.00
4.3.0 Pile Cap Structure 1.00 82,625,569,961.79 82,625,569,961.79 6.05 - - - -
4.3.1 Galian m3 35,666.63 116,182.54 4,143,839,134.36 0.30 - - - -
4.3.2 Lean Concrete, fc' = 10 Mpa m2 15,802.69 121,322.04 1,917,214,331.67 0.14 - - - -
4.3.3 Pembesian PileCap kg 1,580,268.75 12,024.20 19,001,469,515.00 1.39 - - - -
4.3.4 Precast Concrete Pilecap Cover m2 16,166.00 1,476,750.00 23,873,140,500.00 1.75 - - - -
4.3.5 Beton Readymix fc' 29 Mpa ( K.350 ) m3 15,750.30 2,115,326.34 33,317,024,511.89 2.44 - - - -
4.3.6 Timbunan Kembali m3 19,317.63 19,302.68 372,881,968.86 0.03 - - - -
4.3.7 Pilecap Formwork m2 - 435,232.00 - 0.00 - - - -

4.4.0 Pier Structure 1.00 128,412,271,397.75 128,412,271,397.75 9.41 - - - -


4.4.1 Pembesian, fy = 400 Mpa kg 4,808,384.49 12,024.20 57,816,982,871.49 4.24 - - - -
4.4.2 Precast Concrete Pier Cover m2 29,175.50 1,523,834.08 44,458,621,156.70 3.26 - - - -
4.4.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 11,652.39 2,243,030.84 26,136,667,369.56 1.91 - - - -
4.4.4 Pier Formwork m2 435,232.00 - 0.00 - - - -

4.5.0 Pier Head Structure 1.00 115,748,196,510.67 115,748,196,510.67 8.48 - - - -


Precast Concrete Pier Head (termasuk Material,
4.5.1 unit 324.00 357,247,520.09 115,748,196,510.67 8.48 - - - -
Pengiriman & Pemasangan)

4.6.0 U Shaped Girder 1.00 374,578,648,080.00 374,578,648,080.00 27.44 - - - -


Pekerjaan U Shaped Girder (termasuk Material,
4.6.1 m' 17,264.00 374,578,648,080.00 27.44
Pengiriman dan Pemasangan) 21,697,095.00 - - - -

4.10.0 Miscellaneous 1.00 141,716,703,465.82 141,716,703,465.82 10.38 - - - -


4.10.1 Bearing Pad set 2,592.00 3,322,459.67 8,611,815,465.82 0.63 - - - -
4.10.2 Pot bearing set 65,822,459.67 - 0.00 - - - -
4.10.3 Drainase m 35,968.00 1,500,000.00 53,952,000,000.00 3.95 - - - -
4.10.4 Handrail m 35,968.00 2,100,000.00 75,532,800,000.00 5.53 - - - -
4.10.5 Noise Barier m2 1,510.80 1,860,000.00 2,810,088,000.00 0.21 - - - -
4.10.6 Sumur Resapan titik 324.00 2,500,000.00 810,000,000.00 0.06 - - - -

B JALUR LAYANG AREA STASIUN

4.11.0 Spun Pile - - - 0.00 - - - -


Pengadaan Precast Concrete Spun Pile dia 1000mm
4.11.1 m' - - 0.00 - - - -
(type C)
4.11.2 Pemancangan Spun Pile dia 1000mm m' - - 0.00 - - - -
4.11.3 Pile Dynamic Analysis (PDA) Test Spun Pile no - - 0.00 - - - -
4.11.4 Pembesian Isian Spun Pile kg - - 0.00 - - - -
4.11.5 Beton Isian Spun Pile m3 - - 0.00 - - - -

4.12.0 Bored Pile 1.00 16,969,655,718.26 16,969,655,718.26 1.24 - - - -


4.12.1 Bored Pile Diameter 1200mm m' 4,704.00 3,518,858.47 16,552,710,263.71 1.21 - - - -
4.12.2 Pile Integrity Test titik 1,411.20 295,454.55 416,945,454.55 0.03 - - - -

4.13.0 Pile Cap Structure 1.00 11,348,809,035.28 11,348,809,035.28 0.83 - - - -


REALISASI
HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT BOBOT
BOBOT THD
THD THD THD
(Rp) (Rp) HARGA JENIS
(%) TOTAL TOTAL TOTAL
VOLUME VOLUME VOLUME PEKERJAAN
(Rp)
(%)
(%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12
4.13.1 Galian m3 5,675.43 116,182.54 659,385,299.82 0.05 - - - -
4.13.2 Lean Concrete, fc' = 10 Mpa m2 1,774.50 121,322.04 215,285,965.22 0.02 - - - -
4.13.3 Reinforcing Steel, fy = 400 Mpa kg 263,373.69 12,024.20 3,166,858,315.60 0.23 - - - -
4.13.4 Pilecap Formwork m2 2,016.00 435,232.39 877,428,491.83 0.06 - - - -
4.13.5 Beton Readymix fc' 29 Mpa ( K.350 ) m3 3,024.00 2,115,326.34 6,396,746,863.49 0.47 - - - -
4.13.6 Timbunan m3 1,715.00 19,302.68 33,104,099.32 0.00 - - - -

4.14.0 Lower Pier 1.00 12,340,991,489.16 12,340,991,489.16 0.90 - - - -


4.14.1 Reinforcing Steel, fy = 400 Mpa kg 725,854.04 12,024.20 8,727,815,079.84 0.64 - - - -
4.14.2 Pier Column Formwork m2 2,240.28 435,232.39 975,042,411.54 0.07 - - - -
4.14.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 1,176.15 2,243,030.84 2,638,133,997.78 0.19 - - - -

4.15.0 Lower Pier Head 1.00 29,420,330,642.32 29,420,330,642.32 2.16 - - - -


4.15.1 Reinforcing Steel, fy = 400 Mpa kg 1,344,917.48 12,024.20 16,171,558,464.45 1.18 - - - -
4.15.2 Pier Head Formwork m2 5,022.12 435,232.39 2,185,789,535.63 0.16 - - - -
4.15.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 3,173.40 2,243,030.84 7,118,044,173.18 0.52 - - - -
4.15.4 Post Tensioning kg 95,202.14 41,437.50 3,944,938,469.06 0.29 - - - -

4.16.0 Upper Pier 1.00 1,358,693,684.16 1,358,693,684.16 0.10 - - - -


4.16.1 Reinforcing Steel, fy = 400 Mpa kg 25,270.98 12,024.20 303,863,399.84 0.02 - - - -
4.16.2 Pier Column Formwork m2 833.28 435,232.39 362,670,443.29 0.03 - - - -
4.16.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 308.58 2,243,030.84 692,159,841.04 0.05 - - - -

4.17.0 Upper Pier Head 1.00 37,311,098,740.39 37,311,098,740.39 2.73 - - - -


4.17.1 Reinforcing Steel, fy = 400 Mpa kg 1,768,153.35 12,024.20 21,260,631,800.10 1.56 - - - -
4.17.2 Pier Head Formwork m2 5,656.56 435,232.39 2,461,918,109.98 0.18 - - - -
4.17.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 3,679.20 2,243,030.84 8,252,559,080.31 0.60 - - - -
4.17.4 Post Tensioning kg 128,772.00 41,437.50 5,335,989,750.00 0.39 - - - -

4.18.0 Girder 1.00 79,381,687,936.91 79,381,687,936.91 5.82 - - - -


4.18.1 Pekerjaan Precast Girder untuk Concourse span 390.00 121,786,410.00 47,496,699,900.00 3.48 - - - -
4.18.3 Pekerjaan U Shaped Girder m' 1,432.80 21,697,095.00 31,087,597,716.00 2.28 - - - -
4.18.4 Bearing Pad set 240.00 3,322,459.67 797,390,320.91 0.06 - - - -

4.19 Pekerjaan Sipil, Struktur, Tiang ex Monorail (52%) ls 1.00 70,797,299,819.48 70,797,299,819.48 5.19 1.00 70,797,299,819.48 5.19 -

TOTAL 1,365,104,882,356.08 94.81 70,797,299,819.48 5.19


Catatan :
Bahwa harga satuan yang tercantum dalam laporan progres adalah harga satuan yang disubmit oleh PT Adhi Karya (Persero), Tbk. pada tanggal 2 Desember 2015 dan belum mengikat karena belum ditetapkan
secara resmi oleh Menteri Perhubungan.
KEMENTERIAN PERHUBUNGAN PT ADHI KARYA (Persero) Tbk
DIREKTORAT JENDERAL PERKERETAAPIAN

LAPORAN KEMAJUAN PEKERJAAN


PEMBERI : KEMENTERIAN PERHUBUNGAN
TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN MINGGU KE :
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN / 19


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk. Hari Sabtu s/d Jum'at

KONSULTAN : PT. ………………………………….. Tanggal 9-Jan-2015 s/d 15-Jan-2015

Tahun Anggaran : Th. ........


KEMAJUAN :
No. DIPA : 0 30-Dec-99

No. Kontrak : …………………………… Tgl/Bln/Thn …………….. Progress : 19.80 19.8019 %

No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn …………….. 02 September 2015 Rencana : #REF! %

Waktu Pelaksanaan: ……..(………………………..) Hari Kalender Cepat / Lambat : #REF! %

REALISASI
HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT
BOBOT BOBOT THD
THD THD
(Rp) (Rp) THD HARGA JENIS
(%) TOTAL TOTAL
VOLUME VOLUME TOTAL VOLUME PEKERJAAN
(Rp)
(%) (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12
3.1 Pekerjaan Sementara 1.00 15,791,663,021.04 15,791,663,021.04 19.57 0.32 6.19 0.04 0.84 0.36 5,675,021,860.00 7.03 35.94
3.1.1 Perawatan Jalan Existing m2 3,750.00 128,853.27 483,199,771.47 0.60 - - - - - - - -
3.1.2 Jembatan Sementara m2 0.50 154,286,202.14 77,143,101.07 0.10 - - - - - - - -
3.1.3 Pengalihan Jalan m2 0.50 962,277.00 481,138.50 0.00 - - - - - - - -
3.1.4 Kantor Sementara PJR ls 0.50 743,825,860.00 371,912,930.00 0.46 1.00 0.92 - - 1.00 743,825,860.00 0.92 200.00
3.1.5 Jalan Sementara m3 55,773.60 227,800.00 12,705,226,080.00 15.74 7,706.93 2.18 2,973.07 0.84 10,680.00 2,432,904,000.00 3.01 19.15
3.1.7 Mobilisasi Peralatan ls 0.50 4,307,400,000.00 2,153,700,000.00 2.67 0.58 3.10 - - 0.58 2,498,292,000.00 3.10 116.00
- -
3.2 Pembongkaran 1.00 8,090,817,094.92 8,090,817,094.92 10.03 0.08 0.82 0.12 1.19 0.20 1,625,346,516.90 2.01 20.09
3.2.1 Pembongkaran Rigid & Asphalt m3 3,425.00 378,125.00 1,295,078,125.00 1.60 250.88 0.12 - - 250.88 94,864,000.00 0.12 7.32
3.2.2 Pembongkaran Median m2 585.00 32,916.67 19,256,250.00 0.02 - - - - - - - -
3.2.3 Pembongkaran Billboard unit 5.00 100,000,000.00 500,000,000.00 0.62 - - - - - - - -
3.2.4 Pembongkaran Saluran m2 1,712.50 114,687.50 196,402,343.75 0.24 - - 126.00 0.02 126.00 14,450,625.00 0.02 7.36
3.2.5 Pembongkaran Guard Rail m 2,397.50 105,833.33 253,735,416.67 0.31 - - 108.00 0.01 108.00 11,430,000.00 0.01 4.50
3.2.6 Pembongkaran Pagar m2 9,247.50 115,000.00 1,063,462,500.00 1.32 - - 90.00 0.01 90.00 10,350,000.00 0.01 0.97
3.2.7 Pembongkaran High Mast Ligthing titik 1.00 40,000,000.00 40,000,000.00 0.05 - - 1.00 0.05 1.00 40,000,000.00 0.05 100.00
3.2.8 Relokasi Rumah ls 0.50 8,879,458,919.00 4,439,729,459.50 5.50 - - 0.10 1.10 0.10 887,945,891.90 1.10 20.00
3.2.9 Relokasi Lahan PJR ls 0.50 566,306,000.00 283,153,000.00 0.35 1.00 0.70 - - 1.00 566,306,000.00 0.70 200.00
- -
3.3 Site Clearing 1.00 1,036,908,489.85 1,036,908,489.85 1.28 0.88 1.13 - - 0.88 915,176,219.45 1.13 88.26
3.3.1 Site Clearing m2 56,968.00 18,201.60 1,036,908,489.85 1.28 50,280.00 1.13 - - 50,280.00 915,176,219.45 1.13 88.26
- -
3.4 Pemotongan & Penanaman Pohon 1.00 6,460,900,000.00 6,460,900,000.00 8.01 0.67 5.36 - - 0.67 4,323,600,000.00 5.36 66.92
3.4.1 Pemotongan Pohon (Area Tol) no 1,570.00 300,000.00 471,000,000.00 0.58 1,768.00 0.66 - - 1,768.00 530,400,000.00 0.66 112.61
3.4.2 Penanaman Pohon (Area Tol) no 4,710.00 1,250,000.00 5,887,500,000.00 7.30 3,000.00 4.65 - - 3,000.00 3,750,000,000.00 4.65 63.69
3.4.3 Pemotongan Pohon (Jalan Arteri) no 8.00 300,000.00 2,400,000.00 0.00 94.00 0.03 - - 94.00 28,200,000.00 0.03 1,175.00
3.4.4 Penanaman Pohon (Jalan Arteri) no 80.00 1,250,000.00 100,000,000.00 0.12 12.00 0.02 - - 12.00 15,000,000.00 0.02 15.00
- -
3.5 Pemindahan Utilitas Fasilitas Umum 1.00 16,308,649,740.69 16,308,649,740.69 20.21 0.00 0.06 0.01 0.18 0.01 194,951,185.54 0.24 1.20
3.5.1 Pemindahan Tiang Listrik no - - - - - - - - - - -
3.5.2 Pemindahan Tiang Telpon no - - - - - - - - - - -
3.5.3 Relokasi Tower SUTET no 3.00 5,000,000,000.00 15,000,000,000.00 18.59 - - - - - - -
3.5.4 Pemindahan Jaringan FO (underground) ls 0.50 1,490,000,000.00 745,000,000.00 0.92 0.03 0.06 0.10 0.18 0.13 194,951,185.54 0.24 26.17
3.5.5 Pemindahan Jaringan Gas (underground) ls - - - - - - - - - - -
3.5.6 Pemindahan Jaringan Listrik (underground) ls - - - - - - - - - - -
3.5.7 Pemindahan Jaringan Telepon (underground) ls - - - - - - - - - - -
3.5.8 Pemindahan Rumah Warga ls 0.50 1,127,299,481.38 563,649,740.69 0.70 - - - - - - -
- -
3.6 Pekerjaan Tanah 1.00 13,525,990,814.59 13,525,990,814.59 16.76 0.00 0.02 0.00 0.01 0.00 18,546,450.00 0.02 0.14
3.6.1 Galian Tanah Biasa 2-4 m m3 28,023.00 116,182.54 3,255,783,356.63 4.03 - - - - - - -
3.6.2 Urugan Kembali Galian Biasa m3 18,006.38 19,302.68 347,571,377.96 0.43 - - - - - - -
3.6.3 Turap Sementara untuk Galian Pondasi m 10,432.80 951,100.00 9,922,636,080.00 12.30 13.00 0.02 6.50 0.01 19.50 18,546,450.00 0.02 0.19
- -
3.7 Pekerjaan Struktur untuk Pekerjaan Sementara dan Pengembalia 1.00 - - - - - - - - - -
3.7.1 Lean Concrete, fc= 15 Mpa (5cm) m2 - 121,322.04 - - - - - - - - -
3.7.2 Structural Concrete, fc= 21 Mpa, untuk Saluran terbuka, P m3 - 2,051,593.44 - - - - - - - - -
3.7.3 Structural Concrete, fc= 24 Mpa, Saluran Pipe Culvert m3 - 2,084,689.20 - - - - - - - - -
3.7.4 Structural Concrete, fc= 24 Mpa, Box Culvert m3 - 2,084,689.20 - - - - - - - - -
3.7.5 Reinforcing Steel Bar, fy= 240 Mpa kg - 11,361.34 - - - - - - - - -
3.7.6 Reinforcing Steel Bar, fy= 400 Mpa kg - 12,024.20 - - - - - - - - -
- -
3.8 Drainase 1.00 3,227,462,173.23 3,227,462,173.23 4.00 - - - - - - -
3.8.1 Concrete Pipe Drainage dia 600 mm m - 1,007,149.67 - - - - - - - - -
3.8.3 Box Culvert m - 176,540.18 - - - - - - - - -
3.8.4 Saluran U-Ditch m 2,055.00 1,377,244.23 2,830,236,885.80 3.51 - - - - - - -
3.8.5 Pembuatan man hole dengan beton K250 set 137.00 2,899,454.65 397,225,287.43 0.49 - - - - - - -
- -
3.9 Proteksi Lereng 1.00 - - - - - - - - - -
3.9.1 Pasangan Batu m3 - 3,633,734.77 - - - - - - - - -
3.9.2 Rumput m2 - 4,246,013.36 - - - - - - - - -
3.9.3 Proteksi Pondasi Pile Cap ls - 542,401.62 - - - - - - - - -
- -
3.10 Jalan & Fasilitas 1.00 2,829,537,170.74 2,829,537,170.74 3.51 0.02 0.06 - - 0.02 48,938,750.00 0.06 1.73
3.10.1 Guard Rail m - 632,185.99 - - - - - - - - -
3.10.2 Steel Post no - 1,219,733.44 - - - - - - - - -
3.10.3 Asphalt Treated Base Course m3 - 435,298.77 - - - - - - - - -
3.10.4 Asphalt Concrete Binder Course m3 - 2,225,173.92 - - - - - - - - -
3.10.5 Asphalt Concrete Surface Course m3 - 2,225,173.92 - - - - - - - - -
3.10.6 Remarking m' - 2,339,784.82 - - - - - - - - -
3.10.7 Kansteen / Curb Reinstatement m 780.00 173,333.33 135,200,000.00 0.17 - - - - - - -
KEMENTERIAN PERHUBUNGAN PT ADHI KARYA (Persero) Tbk
DIREKTORAT JENDERAL PERKERETAAPIAN

LAPORAN KEMAJUAN PEKERJAAN


PEMBERI : KEMENTERIAN PERHUBUNGAN
TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN MINGGU KE :
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN / 19


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk. Hari Sabtu s/d Jum'at

KONSULTAN : PT. ………………………………….. Tanggal 9-Jan-2015 s/d 15-Jan-2015

Tahun Anggaran : Th. ........


KEMAJUAN :
No. DIPA : 0 30-Dec-99

No. Kontrak : …………………………… Tgl/Bln/Thn …………….. Progress : 19.80 19.8019 %

No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn …………….. 02 September 2015 Rencana : #REF! %

Waktu Pelaksanaan: ……..(………………………..) Hari Kalender Cepat / Lambat : #REF! %

REALISASI
HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT
BOBOT BOBOT THD
THD THD
(Rp) (Rp) THD HARGA JENIS
(%) TOTAL TOTAL
VOLUME VOLUME TOTAL VOLUME PEKERJAAN
(Rp)
(%) (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12
3.10.8 Pemasangan paving block existing m2 200.00 171,000.00 34,200,000.00 0.04 200.00 0.04 - - 200.00 34,200,000.00 0.04 100.00
3.10.9 Pengecoran jalur median dengan beton K 125 m2 685.00 118,664.77 81,285,369.32 0.10 - - - - - - -
3.10.10 Perbaikan sub base jalan dengan beton K250 m3 342.50 893,858.75 306,146,621.88 0.38 - - - - - - -
3.10.11 Perbaikan rigid pavement existing m3 202.50 726,295.45 147,074,829.55 0.18 - - - - - - -
3.10.12 Pekerjaan pengaspalan kembali jalan existing m2 3,425.00 283,122.00 969,692,850.00 1.20 - - - - - - -
3.10.13 Perbaikan pagar ROW m2 9,247.50 125,000.00 1,155,937,500.00 1.43 117.91 0.02 - - 117.91 14,738,750.00 0.02 1.28
- -
KEMENTERIAN PERHUBUNGAN PT ADHI KARYA (Persero) Tbk
DIREKTORAT JENDERAL PERKERETAAPIAN

LAPORAN KEMAJUAN PEKERJAAN


PEMBERI : KEMENTERIAN PERHUBUNGAN
TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN MINGGU KE :
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN / 19


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk. Hari Sabtu s/d Jum'at

KONSULTAN : PT. ………………………………….. Tanggal 9-Jan-2015 s/d 15-Jan-2015

Tahun Anggaran : Th. ........


KEMAJUAN :
No. DIPA : 0 30-Dec-99

No. Kontrak : …………………………… Tgl/Bln/Thn …………….. Progress : 19.80 19.8019 %

No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn …………….. 02 September 2015 Rencana : #REF! %

Waktu Pelaksanaan: ……..(………………………..) Hari Kalender Cepat / Lambat : #REF! %

REALISASI
HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT
BOBOT BOBOT THD
THD THD
(Rp) (Rp) THD HARGA JENIS
(%) TOTAL TOTAL
VOLUME VOLUME TOTAL VOLUME PEKERJAAN
(Rp)
(%) (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12
- -
3.11 Traffic Management & HSE 1.00 13,427,300,000.00 13,427,300,000.00 16.64 0.20 3.36 0.03 0.58 0.24 3,178,414,963.93 3.94 23.67
3.11.1 Temporary Fence m - - - - - - - - - - -
3.11.2 Traffic Coordination & Management ls 0.50 24,325,300,000.00 12,162,650,000.00 15.07 0.11 3.23 0.02 0.52 0.12 3,033,703,769.90 3.76 24.94
3.11.3 Health, Safety & Environment Management ls 0.50 2,529,300,000.00 1,264,650,000.00 1.57 0.04 0.12 0.02 0.05 0.06 144,711,194.03 0.18 11.44
- - -
Total 80,699,228,505.06 100.00 2.81 15,979,995,945.82 19.80

Jakarta, 29 Januari 2016


Dibuat oleh :

Sudaryono Setyo NM
Project Engineering Manager
C
Proyek Prasarana Light Rail Transit A
W
Jabodetabek A
N
LAPORAN MINGGUAN G
-
LINTAS PELAYANAN 1 LINTAS PELAYAN
R
NOMOR EB
URAIAN CAWANG - CIBUBUR E
A
ITEM
LK
SUBMIT REALISASI BOBOT A
I
SS
IA
1 Fasilitas Kontraktor, Asuransi, Tes dan Sertifikasi 18,601,927,900 - ###
- S
2 Design (Preliminary Design, BED, DED) & Project Management IT
- - ###
- I
3 Pekerjaan Sementara, Pembongkaran dan Pengembalian Kondisi M
80,699,228,505 15,979,995,946 0.69
### U
4 Jalur Layang 1,654,124,063,440 152,783,668,244 ### R
6.60
5 Jalur Layang Bentang Panjang 169,748,878,802 - ###
-
6 Jalan Layang Khusus (Turn Out, Stabling Track) 38,030,799,246 - ###
-
7 Pekerjaan Stasiun (Struktur Baja, Arsitektur, MEP & JPO) 354,089,000,000 - ###
-
8 Track Work - - ###
-
9 Power Supply - - ###
-
10 Telecommunication System - - ###
-
11 Signalling System - - ###
-
12 Bangunan Substation - - ###
-
13 Bangunan OCC - ###
-

TOTAL 2,315,293,897,893 168,763,664,190 7.29


###

s/d Minggu Lalu Minggu ini s/d Minggu ini

Realisasi 6.68 0.60 7.29


Rencana 2.63 0.53 3.16
Deviasi (+/-) 4.05 0.08 4.13

Jakarta, 29 Januari 2016

Diketahui oleh : Dibuat oleh :

Roni Kusumanegara Sudaryono Setyo NM


Project Manager Project Engineering Manager
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN

REKAPITULASI LAPORAN KEMAJUAN PEK


PEMBERI : KEMENTERIAN PERHUBUNGAN
TUGAS DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

PAKET : PERCEPATAN PENYELENGGARAAN KERETA API RINGAN /


PEKERJAAN LIGHT RAIL TRANSIT TERINTEGRASI DI
WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASI
No. PAKET :
KONTRAKTOR : PT. ADHI KARYA (Persero) Tbk.

KONSULTAN : PT. …………………………………..

Tahun Anggaran : Th. ........


No. DIPA : 0 30-Dec-99

No. Kontrak : …………………………


Tgl/Bln/Thn ……………..

No. SPMK : PerPres no 98 / 2015Tgl/Bln/Thn …………… 9/2/2015

Waktu Pelaksanaan : ……..(………………………..) Hari Kalender

HARGA
SATUAN BOBOT SAMPAI DENGAN
THD MINGGU LALU
TOTAL
NO URAIAN SATUAN VOLUME BOBOT
(Rp) THD
(%) TOTAL
VOLUME

(%)
1 2 3 4 5 7 8 9
1 Engineering

2 Procurement

3 Construction
Total
PT ADHI KARYA (Persero) Tbk

N PEKERJAAN MINGGUAN

MINGGU KE :

#REF!

Hari Sabtu s/d Senin

Tanggal #REF! s/d #REF!

KEMAJUAN :

Progress : - %
Rencana : #REF! %
Cepat / Lambat : #REF! %

REALISASI

MINGGU INI SAMPAI DENGAN MINGGU INI

BOBOT BOBOT
BOBOT THD
THD HARGA THD
JENIS
TOTAL TOTAL
VOLUME VOLUME PEKERJAAN
(Rp)
(%)
(%) (%)
10 11 12 13 14 15
#REF!

#REF!

152,783,668,244
#REF!
KEMENTERIAN
PERHUBUNGAN REPUBLIK
INDONESIA

PRESTASI PEKERJAAN MINGGUAN :


Jumlah sd minggu 6
No. PEKERJAAN SATUAN VOLUME

Rencana 0.00
A.15.2 Mobilization, Demobilization & Moving of Equipment Ls
Realisasi 0.44
Rencana
Mob & Demob Excavator alat
Realisasi
Rencana
Mob & Demob Service Crane alat
Realisasi
Rencana
Mob & Demob Crawler Crane alat
Realisasi
Rencana
Mob & Demob Trailler alat
Realisasi
Rencana
Mob & Demob Trailler alat
Realisasi
Rencana
Mob & Demob Dumptruck alat
Realisasi
Rencana
Mob & Demob Vibro Roller alat
Realisasi
Rencana
Mob & Demob Buldozer alat
Realisasi
Rencana
Mob & Demob Genset alat
Realisasi
Rencana
Mob & Demob Bar Bender alat
Realisasi
Rencana
Mob & Demob Bar Cutter alat
Realisasi
Rencana
Mob & Demob Gantry Crane 150t alat
Realisasi
Rencana
Mob & Demob Peralatan Kecil Lainnya alat
Realisasi
Rencana
Mob demob peralatan pancang Ls
Realisasi
Rencana
Mobilisasi Lokal Excavator alat
Realisasi
Rencana
Mob & Demob Launching Gantry alat

14 / 51
Mob & Demob Launching Gantry alat
Realisasi
Rencana
Mobilisasi antar pilar launching gantry & peralatan alat
Realisasi
Rencana
Mobilisasi lokal Launcher Gantry alat
Realisasi
Rencana
Mobilisation & demobilisation Equipment alat
Realisasi
Rencana m2 200.00
A.1.1 Site Office
Realisasi 280.00

Rencana 350.00
A.4.1 Concrete barrier + cover procurement buah
Realisasi 413.00
Rencana 130.00
A.3.1 Pemotongan pohon pohon
Realisasi 114.00
Rencana 130.00
Penanaman pohon pohon
Realisasi 114.00

C.1 Spun Pile Dia 100 cm


Rencana m3 0.00
C.1.3 Spun Pile Readymix Filling
Realisasi m3 0.00
Rencana kg 0.00
C.1.4 Rebar for Spun Pile Readymix Filling
Realisasi kg 0.00
Rencana m 3,900.00
C.1.2 Pemancangan pile dia. 100 cm
Realisasi m 1,320.00
Rencana m
Pembobokan tiang pancang
Realisasi m
Rencana m3 360.09
C.2.1 Galian tanah
Realisasi 0 m3 289.53 545.53
Rencana m2 8.10
C.2.3 Lantai kerja mutu K 125
Realisasi m3 18.45
Rencana m2 0.00
C.2.4 Bekisting Pile Cap
Realisasi m2 0.00
Rencana m2 0.00
C.2.4 Precast Concrete Pilecap Cover
Realisasi m2 0.00
Rencana kg 211,253.48
C.2.6 Pembesian Pilecap
Realisasi kg 4,826.60
Rencana m3 906.50
C.2.7 Readymix for pilecap
Realisasi m3 40.50

14 / 51
B.2.3.1. Rencana 0.00
Urugan tanah kembali m3
4.2 Realisasi 17.51
Rencana 0.00
D.1.3 Rebar for pier structure kg
Realisasi 1,817.66
Rencana 0.00
Bekisting for Pier Structure m2
Realisasi 7.04
Rencana 0.00
Precast Concrete Pier Cover m2
Realisasi 7.04
Rencana 0.00
D.1.2 Readymix for pier structure m3
Realisasi 7.04
Rencana 0.00
A.8.4 Building Removal m2
Realisasi 170.00
Rencana m2 0.00
Pekerjaan lahan pengganti parkir PJR
Realisasi 90.00

Rencana m2 0.00
Galian Aspal Eksisting
Realisasi 90.00
Rencana m3 0.00
Pembuatan jalan kerja
Realisasi
Rencana m3 0.00
Galian biasa (pemindahan kabel FO)
Realisasi
Rencana m3 0.00
Identifikasi Kabel FO
Realisasi
Rencana no 0.00
Pile Dynamic Analysis (PDA) Test Spun Pile
Realisasi
Persiapan area kerja pemancangan (Clearing Rencana m3 0.00
Grubing) Realisasi

14 / 51
Minggu Ke - : 1
s/d Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu
9/11/2015 9/12/2015 9/13/2015 9/14/2015 9/15/2015 9/16/2015 9/17/2015 9/18/2015 9/19/2015

0.44

1.00

1.00

1.00

1.00

1.00

1.00

2.00

14 / 51
200.00

5.00
62.00
5.00
62.00

30.00
240.00 60.00 30.00 30.00 30.00 30.00 30.00

58.01

11.25

4,826.60

40.50

14 / 51
17.51

1,817.66

7.04

7.04

7.04

14 / 51
PERCEPATAN PENYELENGGARAN KERETA API RINGAN / LIGHT RA

LAPORAN RENCANA vs RE

Minggu Ke - : 2 Minggu Ke

Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin


9/20/2015 9/21/2015 9/22/2015 9/23/2015 9/24/2015 9/25/2015 9/26/2015 9/27/2015 9/28/2015

14 / 51
44.00
5.00 5.00 10.00 10.00 10.00 10.00

5.00 5.00 10.00 10.00 10.00 10.00

30.00 60.00 90.00 90.00 90.00 90.00


30.00 60.00 30.00 30.00

58.01 17.51 17.51 40.50


81.00 35.02 40.50

3,619.95 1,206.65

40.50

14 / 51
14 / 51
RINGAN / LIGHT RAIL TRANSIT TERINTEGRASI JAKARTA, BOGOR, DEPOK DAN BEKASI

RAN RENCANA vs REALISASI ( CONSTRUCTION )

Minggu Ke - : 3 Minggu Ke - : 4

Selasa Rabu Kamis Jumat Sabtu Minggu Senin Selasa Rabu


9/29/2015 9/30/2015 10/1/2015 10/2/2015 10/3/2015 10/4/2015 10/5/2015 10/6/2015 10/7/2015

14 / 51
50.00 50.00 50.00 50.00 50.00
72.00 225.00 72.00
5.00 5.00 5.00 5.00 5.00 5.00

5.00 5.00 5.00 5.00 5.00 5.00

30.00 60.00 60.00 60.00 30.00 60.00


30.00 60.00 30.00 30.00 30.00 30.00

17.51 40.50 17.51 17.51 17.51 40.50 17.51

4.05 4.05

1,608.87 3,217.73 3,217.73 1,608.87 1,608.87 3,217.73

81.00

14 / 51
50.00 50.00 50.00

14 / 51
Minggu Ke - : 5

Kamis Jumat Sabtu Minggu Senin Selasa Rabu Kamis Jumat


10/8/2015 10/9/2015 10/10/2015 10/11/2015 10/12/2015 10/13/2015 10/14/2015 10/15/2015 10/16/2015

14 / 51
30.00 30.00 30.00 30.00

80.00 30.00 30.00 30.00 30.00

50.00 50.00

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

60.00 60.00 60.00 60.00 60.00 60.00 60.00 180.00 180.00


60.00 60.00 60.00 30.00

40.50 17.51
75.00

3,217.73 1,608.87 15,014.10 5,004.70 5,004.70 5,004.70

81.00 96.00 32.00 32.00

14 / 51
30.00

30.00

14 / 51
Minggu Ke - : 6

Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu


10/17/2015 10/18/2015 10/19/2015 10/20/2015 10/21/2015 10/22/2015 10/23/2015 10/24/2015 10/25/2015

14 / 51
20.00 20.00 20.00 20.00

20.00 20.00 20.00 20.00

676.00

52.00

52.00

180.00 360.00 360.00 360.00 360.00 360.00 360.00 72.00 72.00


60.00 60.00 60.00 30.00 90.00 48.00 96.00

256.00 114.80 219.60


36.00 36.00
3.60 3.60 3.50

48.00 48.00

5,004.70 46,015.44 15,014.40 25,347.88 15,014.10 25,347.88 25,347.88 10,000.00


3,214.20
32.00 32.00 96.00 96.00 96.00 96.00 96.00

14 / 51
20.00

15.00 15.00 15.00 15.00

15.00 15.00 15.00 15.00

14 / 51
DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN

LINTAS PELAYANAN 1 : CAWANG - CIBUBUR

Minggu Ke - : 7 Minggu Ke - :

Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin Selasa


10/26/2015 10/27/2015 10/28/2015 10/29/2015 10/30/2015 10/31/2015 11/1/2015 11/2/2015 11/3/2015

14 / 51
257,58+251
508.58 508.58 508.58 508.58
75% 75% 77% 83%
445.83 445.83 450.85 465.91

5.00 4.88 4.88 4.88

897.00 236.00 1793.11 896.55 896.55


144.00 144.00 144.00 144.00 144.00
96.00 72.00 72.00 48.00 120.00 168 120 216 96

33.97 20.29 5.48 20.44

124.80 2.50 202.50 75.00 32.18 32.18


36.00 36.00 36.00 36.00 36.00
3.50 3.50 3.50 6.50

18.70 96.00 48.00 72.50 28.8 48 19.2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00


4,350.70 1,943.10 1,784.50 2,300.00 1,230.50 9780.7 8557.2 4754 1901

64.00 64 64 76.5

14 / 51
7.75 7.75 8.41

3938.69 3938.69 3938.69

256 256 256 256


85% 85% 86% 90%

14 / 51
ETAAPIAN
RETAAPIAN

UR

8 Minggu Ke - : 9

Rabu Kamis Jumat Sabtu Minggu Senin Selasa Rabu Kamis


11/4/2015 11/5/2015 11/6/2015 11/7/2015 11/8/2015 11/9/2015 11/10/2015 11/11/2015 11/12/2015

3.00 1.00

14 / 51
508.58
85% 87% 93% 95% 97% 98% 98% 98% 99%
470.93 475.95 491.01 496.03 501.05 503.56 503.56 503.56 506.07

13 15 12 18 26 19

13 15 12 18 26 19

4.88 4.88 4.88 3.26 3.26

1793.11 896.55 597.7

144 264 288 240 216 312 240 264 216

26.64 54.15 59.65 35.61 58.06

14.11 50.57 165.96 57.6 175.58 94.43

2.16 4.7 2.81 2.81

96

72 72
18996.984
19.016 1901.6 4754 2852.4 597.7 4196.8 4196.8

64 64 64 40.5 40.5

14 / 51
7.75 7.75 2.84

7877.38 3938.69 5047.58 5047.58

248.32 248.32 250.88 250.88 250.88 250.88


92% 95% 97% 97% 97% 98% 98% 98% 98%

37.93

75 105 105

14 / 51
Minggu Ke - : 10

Jumat Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu


11/13/2015 11/14/2015 11/15/2015 11/16/2015 11/17/2015 11/18/2015 11/19/2015 11/20/2015 11/21/2015

1.00

1.00

2.00

14 / 51
100% 100% 100% 100% 100% 100% 100% 100% 100%
508.58 508.58 508.58 508.58 508.58 508.58 508.58 508.58 508.58

23 22 19 257 134 87 52 43 18

23 22 19 257 134 87 52 43 18

3.26 3.26 6.52 3.26

597.7 597.7 1196 598 597.7


96
264 192 144 264 120 24 48 24 91.96

140.095 102.06 75.59 53.36

123.19 582.85 154.04

4.7 9.22 4.32 8.43 2.3

72 40

2098.4 6557.5 1836.1 6133 5265 4306.4 1845.6 3409.9

40.5 40.5 90.5 50

14 / 51
5.67 2.84

5047.58 5544.65 11991.22 1816.28 8720.03 8720.03 6863.86

29.6 29.6 59.2 29.6 59.2

29.6 29.6 59.2 29.6

13.69 13.69 27.38 41.07

250.88 250.88 250.88 253.44 253.44 253.44 253.44 253.44 253.44


98% 98% 98% 99% 99% 99% 99% 99% 99%

14 / 51
Minggu Ke - : 11 Minggu Ke

Minggu Senin Selasa Rabu Kamis Jumat Sabtu Minggu Senin


11/22/2015 11/23/2015 11/24/2015 11/25/2015 11/26/2015 11/27/2015 11/28/2015 11/29/2015 11/30/2015

1.00

1.00

1.00

1.00

2.00

14 / 51
100% 100% 100% 100% 100% 100%
508.58 508.58 508.58 508.58 508.58 508.58

19 27 34

19 27 34

3.26 6.52 3.26 3.26 3.26 9.77 3.26 6.51

597.7 597.7 597.7 1196 1196 597.7 597.7 1195.4


144 264 288 384 384 336 312 72 144
117.9 218.65 246.36 319.77 307.09 273.68 255.22 67.04 122.92

24.04 135.11

193.82 363.2 82.4

7.92 9.22 2.3 5.11 2.3 2.81

40 58

3934.5 5789.6 7444.5 5087.47 7997.6 10773.3 4306.4 5517.8 9879

40.5 90.5 40.5 50 50 121.5 50 81

14 / 51
20711.24 5087.47 13524.09 15262.42 8578.32 6762.04

88.8 29.6 59.2

41.07 41.07 41.07

253.44 253.44 253.44 253.44 253.44 253.44 256


99% 99% 99% 99% 99% 99% 100%

435 630 396 356.4 534.6 297

999 499.5 666

111

14 / 51
Minggu Ke - : 12 Minggu Ke - : 13

Selasa Rabu Kamis Jumat Sabtu Minggu Senin Selasa Rabu


12/1/2015 12/2/2015 12/3/2015 12/4/2015 12/5/2015 12/6/2015 12/7/2015 12/8/2015 12/9/2015

1.00

1.00

1.00

1.00

2.00

14 / 51
6.51 3.26 9.77 6.51 3.26 3.26 3.26 6.52 3.26

597.7 1793.11 1195.4 1195.4 597.7 597.7 597.7


432 336 528 360 24 144 144 240 72
349 266.5 390.46 320.79 20.45 122.5 125.06 216.79 52.93

42.55 116.99

1049.2 50.56 258.65 108.9

18.17 9.08

6793.5 12677.61 14079.39 7910.35 11134.29 12590.07 13549.53 15066.22 8016.85

90.5 40.5 131 90.5 50 40.5 40.5 100 40.5

14 / 51
10174.94 8720.03 15262.42 13665.79 6291.88 18172.06 34571.24 12410.18

88.32 59.2 88.8 59.2

41.07 13.69 27.38 41.07 27.38

832.5 333 499.5 499.5

780

14 / 51
3 Minggu Ke - : 14

Kamis Jumat Sabtu Minggu Senin Selasa Rabu Kamis Jumat


12/10/2015 12/11/2015 12/12/2015 12/13/2015 12/14/2015 12/15/2015 12/16/2015 12/17/2015 12/18/2015

14 / 51
3.26 3.26 9.78 3.26 9.78 3.26 6.52 13.04

2390.8 1793.1 597.7 2390.8


456 432 456 264 288 168 288 96 72
442.77 388.41 392.74 208.09 244.73 155.01 250.26 80.12 61.24

31.64 66.23 433.17 198.83

149.16 120.96 445.78 961.54 80.64

12.12 6.05 5.62 2.81 6.9 8.43 4.6

184 40 36 152

8393.38 5245.86 20694.82 13477.17 10483.14 8937.31 18636.1 8816.26

40.5 40.5 121.5 40.5 121.5 40.5 81 181

14 / 51
17728.84 3295.14 4142.25 2761.5

148 59.2

29.6 29.6

68.45 27.38 13.69

270 240

780 390 21600 3600

14 / 51
Minggu Ke - : 15

Sabtu Minggu Senin Selasa Rabu Kamis Jumat Vol minggu


12/19/2015 12/20/2015 12/21/2015 12/22/2015 12/23/2015 12/24/2015 12/25/2015 ini

14 / 51
18

143 143 143 143 143 143 142

3.26 3.26 3.26 3.26 6.52

597.7 1195.4 597.7 1195.4


360 120 120 192 192 192
253.17 99.26 125.81 202.48 188.74 142.46

128.79 37.57 268.55 23.26

178.96 333.03 49.16

2.81 2.81 4.6

76 36 40 76 40

5462.5 5811.89 4636.79 3906.35 12125.56 3499.83

40.5 50 40.5 50 90.5

14 / 51
9665.26 4142.26

59.2 32

27.38

97.4 97.4 97.4 97.4 97.4 97.4

540

4500 11250

14 / 51
PT ADHI KARYA (Persero)
Tbk

Minggu ke : 14
KETERANGAN

12-18 Oktober 2015

14 / 51
0

18

1000

0
19.56

3,586.20
1176
1,011.92
0
458.17
0
561.15
0
10.22
0
0.00
0
268.00
0
35,442.92
0
271.50

14 / 51
0
0.00
0
13,807.52
0
0.00
0
91.20
0
27.38
0
584.40
0
0.00

0
0.00
0
540.00
0
0.00
0
0.00
0
3.00
0
15,750.00

14 / 51
MONITORING KEDATANGGAN MATERIAL
s/d tanggal 27 Desember 2015

Realisasi Up Progress
No. Uaian Satuan Deviasi
Sub Kon Sub Kon
APB WK APB Wijaya
i ii iii btg m' btg m' btg m' btg m' m'

1 Pengadaan Tiang Pancang dia. 1000 mm


- Panjang 10 m 142 1,420 - - 142 1,420 - - -
- Panjang 10,5 m 9 95 - - 9 95 - - -
- Panjang 12 m 637 7,644 699 8,388 1,431 17,172 - - 1,140.00
- Panjang 15 m - - 27 405 - - - (405.00)
JUMLAH 788 9,158.5 726 8,793 1,582 18,686.5 - - 735.00
Total m' 17,951.5 18,686.5 735.0
18,686.50
95.00
10 142 1,420 724.00 2,060.00
10.5 9 95 2,155.00 25,860.00 20,882.50 144
12 637 7,644 788 27,374.50 2,931.00 8937
- - 244.25 8793 -
699 12 62 744
142

20/12/15 3 9
21/12/15 2 5
24/12/15 2 6
25/12/15 3 9 18,687
26/12/15 2 6 850 9,902.5 9,894 0
27/12/15 3 9
28/12/15 6 18 1,910,000 324.00
62 699 80% 1,528,000 9,477.00
8388 2,020,000 9,153.00
18,696 1,616,000
1,910,000
1,528,000.0
57