PERHUBUNGAN
REPUBLIK INDONESIA
PERCEPA
12 / 51
DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN
PERCEPATAN PENYELENGGARAN KERETA API RINGAN / LIGHT RAIL TRANSIT TERINTEGRASI JAKARTA, BOGOR
Minggu Ke - : 14
6 3 7.2 9 5 3 3
76 36
28.5 14
1173
12 / 51
PIAN
PIAN
Minggu Ke - : 15 Minggu ke : 15
KETERANG
Senin Selasa Rabu Kamis Jumat
12/21/2015 12/22/2015 12/23/2015 12/24/2015 12/25/2015 19-25 DESEMBER 2015
261309.8 261309.8
144 252
55 46 55 100 301
5 11
40 76 40 268
28 28
59.2 32 91.2
1173
12 / 51
PT ADHI KARYA (Persero)
Tbk
KETERANGAN
12 / 51
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
1 2 3 4
CAWANG - CIBUBUR
4.1.0 Spun Pile 1.00
Pengadaan Precast Concrete Spun Pile dia 1000mm
4.1.1 m' 54,420.00
(type C)
4.1.2 Pemancangan Spun Pile dia 1000mm m' 54,510.00
4.1.3 Axial Static Loading Test Spun Pile titik 1.00
4.1.4 Lateral Static Loading Test Spun Pile titik 1.00
4.1.5 Pile Dynamic Analysis (PDA) Test Spun Pile no 89.00
4.1.6 Pembesian Isian Spun Pile kg 286,224.75
4.1.7 Beton Isian Spun Pile m3 2,933.25
1 2 3 4
4.2.1 Bore Pile dia 1500mm m' -
4.2.2 Axial Static Loading Test Bored Pile titik -
4.2.3 Lateral Loading Test Bored Pile titik -
4.2.4 Pile Integrity Test titik -
1 2 3 4
4.3.6 Timbunan Kembali m3 35,818.51
4.3.7 Pilecap Formwork m2 -
1 2 3 4
1 2 3 4
1 2 3 4
4.12.1 Bored Pile Diameter 1200mm m' -
4.12.2 Pile Integrity Test titik -
1 2 3 4
4.14.0 Lower Pier 1.00
4.14.1 Reinforcing Steel, fy = 400 Mpa kg 680,012.59
4.14.2 Pier Column Formwork m2 1,881.60
4.14.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 1,278.16
1 2 3 4
4.16.0 Upper Pier 1.00
4.16.1 Reinforcing Steel, fy = 400 Mpa kg 165,545.91
4.16.2 Pier Column Formwork m2 843.78
4.16.3 Beton Readymix fc' 33.2 Mpa ( K.400 ) m3 332.73
1 2 3 4
TOTAL
LAPORAN KEMAJUAN PEKERJAAN
N/
Hari
Tanggal
………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat
- - 0.00 - -
LAPORAN KEMAJUAN PEKERJAAN
N/
Hari
Tanggal
………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat
550,000,000.00 - 0.00 - - -
79,300,000.00 - 0.00 - - -
295,454.55 - 0.00 - - -
N/
Hari
Tanggal
………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat
N/
Hari
Tanggal
………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat
N/
Hari
Tanggal
………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat
- - 0.00 - -
LAPORAN KEMAJUAN PEKERJAAN
N/
Hari
Tanggal
………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat
N/
Hari
Tanggal
………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat
N/
Hari
Tanggal
………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat
N/
Hari
Tanggal
………….. Progress
………….. 02 September 2015 Rencana
Cepat / Lambat
1,654,124,063,440.08 100.00
PT ADHI KARYA (Persero) Tbk
MINGGU KE :
19
KEMAJUAN :
: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %
REALISASI
- - - - -
PT ADHI KARYA (Persero) Tbk
MINGGU KE :
19
KEMAJUAN :
: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %
REALISASI
MINGGU KE :
19
KEMAJUAN :
: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %
REALISASI
- - - -
- - - -
PT ADHI KARYA (Persero) Tbk
MINGGU KE :
19
KEMAJUAN :
: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %
REALISASI
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
PT ADHI KARYA (Persero) Tbk
MINGGU KE :
19
KEMAJUAN :
: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %
REALISASI
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
PT ADHI KARYA (Persero) Tbk
MINGGU KE :
19
KEMAJUAN :
: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %
REALISASI
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
PT ADHI KARYA (Persero) Tbk
MINGGU KE :
19
KEMAJUAN :
: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %
REALISASI
- - - -
- - - -
- - - -
- - - -
- - - -
PT ADHI KARYA (Persero) Tbk
MINGGU KE :
19
KEMAJUAN :
: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %
REALISASI
- - - -
- - - -
- - - -
- - - -
- - - -
PT ADHI KARYA (Persero) Tbk
MINGGU KE :
19
KEMAJUAN :
: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %
REALISASI
MINGGU KE :
19
KEMAJUAN :
: 9.24 9.2365 %
: #REF! %
Cepat / Lambat : #REF! %
REALISASI
Sudaryono Setyo NM
Project Engineering Manager
KEMENTERIAN PERHUBUNGAN PT ADHI KARYA (Persero) Tbk
DIREKTORAT JENDERAL PERKERETAAPIAN
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn …………….. 02 September 2015 Rencana : #REF! %
REALI SASI
HARGA SATUAN SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT BOBOT
BOBOT THD
THD THD THD
(Rp) HARGA JENIS
(%) TOTAL TOTAL TOTAL
VOLUME VOLUME VOLUME PEKERJAAN
(Rp)
(%)
(%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12
Preliminary
Basic Design
TOTAL -
Catatan :
Bahwa harga satuan yang tercantum dalam laporan progres adalah harga satuan yang disubmit oleh PT Adhi Karya (Persero), Tbk. dan belum mengikat karena belum ditetapkan secara
resmi oleh Menteri Perhubungan.
KEMENTERIAN PERHUBUNGAN PT ADHI KARYA (Persero) Tbk
DIREKTORAT JENDERAL PERKERETAAPIAN
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn …………….. 02 September 2015 Rencana : #REF! %
REALISASI
HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT BOBOT
BOBOT THD
THD THD THD
(Rp) (Rp) HARGA JENIS
(%) TOTAL TOTAL TOTAL
VOLUME VOLUME VOLUME PEKERJAAN
(Rp)
(%)
(%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12
CAWANG - DUKUH ATAS
4.1.0 Spun Pile 1.00 72,995,739,933.90 72,995,739,933.90 5.35 - - - -
Pengadaan Precast Concrete Spun Pile dia 1000mm
4.1.1 m' 10,590.00 36,054,136,363.64 2.64
(type C) 3,404,545.45 - - - -
4.1.2 Pemancangan Spun Pile dia 1000mm m' 10,590.00 1,274,577.29 13,497,773,501.26 0.99 - - - -
4.1.3 Axial Static Loading Test Spun Pile titik 31.00 550,000,000.00 17,050,000,000.00 1.25 - - - -
4.1.4 Lateral Static Loading Test Spun Pile titik 31.00 79,300,000.00 2,458,300,000.00 0.18 - - - -
4.1.5 Pile Dynamic Analysis (PDA) Test Spun Pile no 31.00 85,600,000.00 2,653,600,000.00 0.19 - - - -
4.1.6 Pembesian Isian Spun Pile kg 56,069.55 12,024.20 674,191,598.28 0.05 - - - -
4.1.7 Beton Isian Spun Pile m3 287.30 2,115,326.34 607,738,470.72 0.04 - - - -
4.19 Pekerjaan Sipil, Struktur, Tiang ex Monorail (52%) ls 1.00 70,797,299,819.48 70,797,299,819.48 5.19 1.00 70,797,299,819.48 5.19 -
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn …………….. 02 September 2015 Rencana : #REF! %
REALISASI
HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT
BOBOT BOBOT THD
THD THD
(Rp) (Rp) THD HARGA JENIS
(%) TOTAL TOTAL
VOLUME VOLUME TOTAL VOLUME PEKERJAAN
(Rp)
(%) (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12
3.1 Pekerjaan Sementara 1.00 15,791,663,021.04 15,791,663,021.04 19.57 0.32 6.19 0.04 0.84 0.36 5,675,021,860.00 7.03 35.94
3.1.1 Perawatan Jalan Existing m2 3,750.00 128,853.27 483,199,771.47 0.60 - - - - - - - -
3.1.2 Jembatan Sementara m2 0.50 154,286,202.14 77,143,101.07 0.10 - - - - - - - -
3.1.3 Pengalihan Jalan m2 0.50 962,277.00 481,138.50 0.00 - - - - - - - -
3.1.4 Kantor Sementara PJR ls 0.50 743,825,860.00 371,912,930.00 0.46 1.00 0.92 - - 1.00 743,825,860.00 0.92 200.00
3.1.5 Jalan Sementara m3 55,773.60 227,800.00 12,705,226,080.00 15.74 7,706.93 2.18 2,973.07 0.84 10,680.00 2,432,904,000.00 3.01 19.15
3.1.7 Mobilisasi Peralatan ls 0.50 4,307,400,000.00 2,153,700,000.00 2.67 0.58 3.10 - - 0.58 2,498,292,000.00 3.10 116.00
- -
3.2 Pembongkaran 1.00 8,090,817,094.92 8,090,817,094.92 10.03 0.08 0.82 0.12 1.19 0.20 1,625,346,516.90 2.01 20.09
3.2.1 Pembongkaran Rigid & Asphalt m3 3,425.00 378,125.00 1,295,078,125.00 1.60 250.88 0.12 - - 250.88 94,864,000.00 0.12 7.32
3.2.2 Pembongkaran Median m2 585.00 32,916.67 19,256,250.00 0.02 - - - - - - - -
3.2.3 Pembongkaran Billboard unit 5.00 100,000,000.00 500,000,000.00 0.62 - - - - - - - -
3.2.4 Pembongkaran Saluran m2 1,712.50 114,687.50 196,402,343.75 0.24 - - 126.00 0.02 126.00 14,450,625.00 0.02 7.36
3.2.5 Pembongkaran Guard Rail m 2,397.50 105,833.33 253,735,416.67 0.31 - - 108.00 0.01 108.00 11,430,000.00 0.01 4.50
3.2.6 Pembongkaran Pagar m2 9,247.50 115,000.00 1,063,462,500.00 1.32 - - 90.00 0.01 90.00 10,350,000.00 0.01 0.97
3.2.7 Pembongkaran High Mast Ligthing titik 1.00 40,000,000.00 40,000,000.00 0.05 - - 1.00 0.05 1.00 40,000,000.00 0.05 100.00
3.2.8 Relokasi Rumah ls 0.50 8,879,458,919.00 4,439,729,459.50 5.50 - - 0.10 1.10 0.10 887,945,891.90 1.10 20.00
3.2.9 Relokasi Lahan PJR ls 0.50 566,306,000.00 283,153,000.00 0.35 1.00 0.70 - - 1.00 566,306,000.00 0.70 200.00
- -
3.3 Site Clearing 1.00 1,036,908,489.85 1,036,908,489.85 1.28 0.88 1.13 - - 0.88 915,176,219.45 1.13 88.26
3.3.1 Site Clearing m2 56,968.00 18,201.60 1,036,908,489.85 1.28 50,280.00 1.13 - - 50,280.00 915,176,219.45 1.13 88.26
- -
3.4 Pemotongan & Penanaman Pohon 1.00 6,460,900,000.00 6,460,900,000.00 8.01 0.67 5.36 - - 0.67 4,323,600,000.00 5.36 66.92
3.4.1 Pemotongan Pohon (Area Tol) no 1,570.00 300,000.00 471,000,000.00 0.58 1,768.00 0.66 - - 1,768.00 530,400,000.00 0.66 112.61
3.4.2 Penanaman Pohon (Area Tol) no 4,710.00 1,250,000.00 5,887,500,000.00 7.30 3,000.00 4.65 - - 3,000.00 3,750,000,000.00 4.65 63.69
3.4.3 Pemotongan Pohon (Jalan Arteri) no 8.00 300,000.00 2,400,000.00 0.00 94.00 0.03 - - 94.00 28,200,000.00 0.03 1,175.00
3.4.4 Penanaman Pohon (Jalan Arteri) no 80.00 1,250,000.00 100,000,000.00 0.12 12.00 0.02 - - 12.00 15,000,000.00 0.02 15.00
- -
3.5 Pemindahan Utilitas Fasilitas Umum 1.00 16,308,649,740.69 16,308,649,740.69 20.21 0.00 0.06 0.01 0.18 0.01 194,951,185.54 0.24 1.20
3.5.1 Pemindahan Tiang Listrik no - - - - - - - - - - -
3.5.2 Pemindahan Tiang Telpon no - - - - - - - - - - -
3.5.3 Relokasi Tower SUTET no 3.00 5,000,000,000.00 15,000,000,000.00 18.59 - - - - - - -
3.5.4 Pemindahan Jaringan FO (underground) ls 0.50 1,490,000,000.00 745,000,000.00 0.92 0.03 0.06 0.10 0.18 0.13 194,951,185.54 0.24 26.17
3.5.5 Pemindahan Jaringan Gas (underground) ls - - - - - - - - - - -
3.5.6 Pemindahan Jaringan Listrik (underground) ls - - - - - - - - - - -
3.5.7 Pemindahan Jaringan Telepon (underground) ls - - - - - - - - - - -
3.5.8 Pemindahan Rumah Warga ls 0.50 1,127,299,481.38 563,649,740.69 0.70 - - - - - - -
- -
3.6 Pekerjaan Tanah 1.00 13,525,990,814.59 13,525,990,814.59 16.76 0.00 0.02 0.00 0.01 0.00 18,546,450.00 0.02 0.14
3.6.1 Galian Tanah Biasa 2-4 m m3 28,023.00 116,182.54 3,255,783,356.63 4.03 - - - - - - -
3.6.2 Urugan Kembali Galian Biasa m3 18,006.38 19,302.68 347,571,377.96 0.43 - - - - - - -
3.6.3 Turap Sementara untuk Galian Pondasi m 10,432.80 951,100.00 9,922,636,080.00 12.30 13.00 0.02 6.50 0.01 19.50 18,546,450.00 0.02 0.19
- -
3.7 Pekerjaan Struktur untuk Pekerjaan Sementara dan Pengembalia 1.00 - - - - - - - - - -
3.7.1 Lean Concrete, fc= 15 Mpa (5cm) m2 - 121,322.04 - - - - - - - - -
3.7.2 Structural Concrete, fc= 21 Mpa, untuk Saluran terbuka, P m3 - 2,051,593.44 - - - - - - - - -
3.7.3 Structural Concrete, fc= 24 Mpa, Saluran Pipe Culvert m3 - 2,084,689.20 - - - - - - - - -
3.7.4 Structural Concrete, fc= 24 Mpa, Box Culvert m3 - 2,084,689.20 - - - - - - - - -
3.7.5 Reinforcing Steel Bar, fy= 240 Mpa kg - 11,361.34 - - - - - - - - -
3.7.6 Reinforcing Steel Bar, fy= 400 Mpa kg - 12,024.20 - - - - - - - - -
- -
3.8 Drainase 1.00 3,227,462,173.23 3,227,462,173.23 4.00 - - - - - - -
3.8.1 Concrete Pipe Drainage dia 600 mm m - 1,007,149.67 - - - - - - - - -
3.8.3 Box Culvert m - 176,540.18 - - - - - - - - -
3.8.4 Saluran U-Ditch m 2,055.00 1,377,244.23 2,830,236,885.80 3.51 - - - - - - -
3.8.5 Pembuatan man hole dengan beton K250 set 137.00 2,899,454.65 397,225,287.43 0.49 - - - - - - -
- -
3.9 Proteksi Lereng 1.00 - - - - - - - - - -
3.9.1 Pasangan Batu m3 - 3,633,734.77 - - - - - - - - -
3.9.2 Rumput m2 - 4,246,013.36 - - - - - - - - -
3.9.3 Proteksi Pondasi Pile Cap ls - 542,401.62 - - - - - - - - -
- -
3.10 Jalan & Fasilitas 1.00 2,829,537,170.74 2,829,537,170.74 3.51 0.02 0.06 - - 0.02 48,938,750.00 0.06 1.73
3.10.1 Guard Rail m - 632,185.99 - - - - - - - - -
3.10.2 Steel Post no - 1,219,733.44 - - - - - - - - -
3.10.3 Asphalt Treated Base Course m3 - 435,298.77 - - - - - - - - -
3.10.4 Asphalt Concrete Binder Course m3 - 2,225,173.92 - - - - - - - - -
3.10.5 Asphalt Concrete Surface Course m3 - 2,225,173.92 - - - - - - - - -
3.10.6 Remarking m' - 2,339,784.82 - - - - - - - - -
3.10.7 Kansteen / Curb Reinstatement m 780.00 173,333.33 135,200,000.00 0.17 - - - - - - -
KEMENTERIAN PERHUBUNGAN PT ADHI KARYA (Persero) Tbk
DIREKTORAT JENDERAL PERKERETAAPIAN
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn …………….. 02 September 2015 Rencana : #REF! %
REALISASI
HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT
BOBOT BOBOT THD
THD THD
(Rp) (Rp) THD HARGA JENIS
(%) TOTAL TOTAL
VOLUME VOLUME TOTAL VOLUME PEKERJAAN
(Rp)
(%) (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12
3.10.8 Pemasangan paving block existing m2 200.00 171,000.00 34,200,000.00 0.04 200.00 0.04 - - 200.00 34,200,000.00 0.04 100.00
3.10.9 Pengecoran jalur median dengan beton K 125 m2 685.00 118,664.77 81,285,369.32 0.10 - - - - - - -
3.10.10 Perbaikan sub base jalan dengan beton K250 m3 342.50 893,858.75 306,146,621.88 0.38 - - - - - - -
3.10.11 Perbaikan rigid pavement existing m3 202.50 726,295.45 147,074,829.55 0.18 - - - - - - -
3.10.12 Pekerjaan pengaspalan kembali jalan existing m2 3,425.00 283,122.00 969,692,850.00 1.20 - - - - - - -
3.10.13 Perbaikan pagar ROW m2 9,247.50 125,000.00 1,155,937,500.00 1.43 117.91 0.02 - - 117.91 14,738,750.00 0.02 1.28
- -
KEMENTERIAN PERHUBUNGAN PT ADHI KARYA (Persero) Tbk
DIREKTORAT JENDERAL PERKERETAAPIAN
No. SPMK : PerPres no 98 / 2015 Tgl/Bln/Thn …………….. 02 September 2015 Rencana : #REF! %
REALISASI
HARGA SATUAN JUMLAH HARGA SAMPAI DENGAN
BOBOT MINGGU INI SAMPAI DENGAN MINGGU INI
THD MINGGU LALU
NO URAIAN SATUAN VOLUME TOTAL BOBOT BOBOT
BOBOT BOBOT THD
THD THD
(Rp) (Rp) THD HARGA JENIS
(%) TOTAL TOTAL
VOLUME VOLUME TOTAL VOLUME PEKERJAAN
(Rp)
(%) (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12
- -
3.11 Traffic Management & HSE 1.00 13,427,300,000.00 13,427,300,000.00 16.64 0.20 3.36 0.03 0.58 0.24 3,178,414,963.93 3.94 23.67
3.11.1 Temporary Fence m - - - - - - - - - - -
3.11.2 Traffic Coordination & Management ls 0.50 24,325,300,000.00 12,162,650,000.00 15.07 0.11 3.23 0.02 0.52 0.12 3,033,703,769.90 3.76 24.94
3.11.3 Health, Safety & Environment Management ls 0.50 2,529,300,000.00 1,264,650,000.00 1.57 0.04 0.12 0.02 0.05 0.06 144,711,194.03 0.18 11.44
- - -
Total 80,699,228,505.06 100.00 2.81 15,979,995,945.82 19.80
Sudaryono Setyo NM
Project Engineering Manager
C
Proyek Prasarana Light Rail Transit A
W
Jabodetabek A
N
LAPORAN MINGGUAN G
-
LINTAS PELAYANAN 1 LINTAS PELAYAN
R
NOMOR EB
URAIAN CAWANG - CIBUBUR E
A
ITEM
LK
SUBMIT REALISASI BOBOT A
I
SS
IA
1 Fasilitas Kontraktor, Asuransi, Tes dan Sertifikasi 18,601,927,900 - ###
- S
2 Design (Preliminary Design, BED, DED) & Project Management IT
- - ###
- I
3 Pekerjaan Sementara, Pembongkaran dan Pengembalian Kondisi M
80,699,228,505 15,979,995,946 0.69
### U
4 Jalur Layang 1,654,124,063,440 152,783,668,244 ### R
6.60
5 Jalur Layang Bentang Panjang 169,748,878,802 - ###
-
6 Jalan Layang Khusus (Turn Out, Stabling Track) 38,030,799,246 - ###
-
7 Pekerjaan Stasiun (Struktur Baja, Arsitektur, MEP & JPO) 354,089,000,000 - ###
-
8 Track Work - - ###
-
9 Power Supply - - ###
-
10 Telecommunication System - - ###
-
11 Signalling System - - ###
-
12 Bangunan Substation - - ###
-
13 Bangunan OCC - ###
-
HARGA
SATUAN BOBOT SAMPAI DENGAN
THD MINGGU LALU
TOTAL
NO URAIAN SATUAN VOLUME BOBOT
(Rp) THD
(%) TOTAL
VOLUME
(%)
1 2 3 4 5 7 8 9
1 Engineering
2 Procurement
3 Construction
Total
PT ADHI KARYA (Persero) Tbk
N PEKERJAAN MINGGUAN
MINGGU KE :
#REF!
KEMAJUAN :
Progress : - %
Rencana : #REF! %
Cepat / Lambat : #REF! %
REALISASI
BOBOT BOBOT
BOBOT THD
THD HARGA THD
JENIS
TOTAL TOTAL
VOLUME VOLUME PEKERJAAN
(Rp)
(%)
(%) (%)
10 11 12 13 14 15
#REF!
#REF!
152,783,668,244
#REF!
KEMENTERIAN
PERHUBUNGAN REPUBLIK
INDONESIA
Rencana 0.00
A.15.2 Mobilization, Demobilization & Moving of Equipment Ls
Realisasi 0.44
Rencana
Mob & Demob Excavator alat
Realisasi
Rencana
Mob & Demob Service Crane alat
Realisasi
Rencana
Mob & Demob Crawler Crane alat
Realisasi
Rencana
Mob & Demob Trailler alat
Realisasi
Rencana
Mob & Demob Trailler alat
Realisasi
Rencana
Mob & Demob Dumptruck alat
Realisasi
Rencana
Mob & Demob Vibro Roller alat
Realisasi
Rencana
Mob & Demob Buldozer alat
Realisasi
Rencana
Mob & Demob Genset alat
Realisasi
Rencana
Mob & Demob Bar Bender alat
Realisasi
Rencana
Mob & Demob Bar Cutter alat
Realisasi
Rencana
Mob & Demob Gantry Crane 150t alat
Realisasi
Rencana
Mob & Demob Peralatan Kecil Lainnya alat
Realisasi
Rencana
Mob demob peralatan pancang Ls
Realisasi
Rencana
Mobilisasi Lokal Excavator alat
Realisasi
Rencana
Mob & Demob Launching Gantry alat
14 / 51
Mob & Demob Launching Gantry alat
Realisasi
Rencana
Mobilisasi antar pilar launching gantry & peralatan alat
Realisasi
Rencana
Mobilisasi lokal Launcher Gantry alat
Realisasi
Rencana
Mobilisation & demobilisation Equipment alat
Realisasi
Rencana m2 200.00
A.1.1 Site Office
Realisasi 280.00
Rencana 350.00
A.4.1 Concrete barrier + cover procurement buah
Realisasi 413.00
Rencana 130.00
A.3.1 Pemotongan pohon pohon
Realisasi 114.00
Rencana 130.00
Penanaman pohon pohon
Realisasi 114.00
14 / 51
B.2.3.1. Rencana 0.00
Urugan tanah kembali m3
4.2 Realisasi 17.51
Rencana 0.00
D.1.3 Rebar for pier structure kg
Realisasi 1,817.66
Rencana 0.00
Bekisting for Pier Structure m2
Realisasi 7.04
Rencana 0.00
Precast Concrete Pier Cover m2
Realisasi 7.04
Rencana 0.00
D.1.2 Readymix for pier structure m3
Realisasi 7.04
Rencana 0.00
A.8.4 Building Removal m2
Realisasi 170.00
Rencana m2 0.00
Pekerjaan lahan pengganti parkir PJR
Realisasi 90.00
Rencana m2 0.00
Galian Aspal Eksisting
Realisasi 90.00
Rencana m3 0.00
Pembuatan jalan kerja
Realisasi
Rencana m3 0.00
Galian biasa (pemindahan kabel FO)
Realisasi
Rencana m3 0.00
Identifikasi Kabel FO
Realisasi
Rencana no 0.00
Pile Dynamic Analysis (PDA) Test Spun Pile
Realisasi
Persiapan area kerja pemancangan (Clearing Rencana m3 0.00
Grubing) Realisasi
14 / 51
Minggu Ke - : 1
s/d Sabtu Minggu Senin Selasa Rabu Kamis Jumat Sabtu
9/11/2015 9/12/2015 9/13/2015 9/14/2015 9/15/2015 9/16/2015 9/17/2015 9/18/2015 9/19/2015
0.44
1.00
1.00
1.00
1.00
1.00
1.00
2.00
14 / 51
200.00
5.00
62.00
5.00
62.00
30.00
240.00 60.00 30.00 30.00 30.00 30.00 30.00
58.01
11.25
4,826.60
40.50
14 / 51
17.51
1,817.66
7.04
7.04
7.04
14 / 51
PERCEPATAN PENYELENGGARAN KERETA API RINGAN / LIGHT RA
LAPORAN RENCANA vs RE
Minggu Ke - : 2 Minggu Ke
14 / 51
44.00
5.00 5.00 10.00 10.00 10.00 10.00
3,619.95 1,206.65
40.50
14 / 51
14 / 51
RINGAN / LIGHT RAIL TRANSIT TERINTEGRASI JAKARTA, BOGOR, DEPOK DAN BEKASI
Minggu Ke - : 3 Minggu Ke - : 4
14 / 51
50.00 50.00 50.00 50.00 50.00
72.00 225.00 72.00
5.00 5.00 5.00 5.00 5.00 5.00
4.05 4.05
81.00
14 / 51
50.00 50.00 50.00
14 / 51
Minggu Ke - : 5
14 / 51
30.00 30.00 30.00 30.00
50.00 50.00
40.50 17.51
75.00
14 / 51
30.00
30.00
14 / 51
Minggu Ke - : 6
14 / 51
20.00 20.00 20.00 20.00
676.00
52.00
52.00
48.00 48.00
14 / 51
20.00
14 / 51
DIREKTORAT JENDERAL PERKERETAAPIAN
DIREKTORAT PRASARANA PERKERETAAPIAN
Minggu Ke - : 7 Minggu Ke - :
14 / 51
257,58+251
508.58 508.58 508.58 508.58
75% 75% 77% 83%
445.83 445.83 450.85 465.91
64.00 64 64 76.5
14 / 51
7.75 7.75 8.41
14 / 51
ETAAPIAN
RETAAPIAN
UR
8 Minggu Ke - : 9
3.00 1.00
14 / 51
508.58
85% 87% 93% 95% 97% 98% 98% 98% 99%
470.93 475.95 491.01 496.03 501.05 503.56 503.56 503.56 506.07
13 15 12 18 26 19
13 15 12 18 26 19
96
72 72
18996.984
19.016 1901.6 4754 2852.4 597.7 4196.8 4196.8
64 64 64 40.5 40.5
14 / 51
7.75 7.75 2.84
37.93
75 105 105
14 / 51
Minggu Ke - : 10
1.00
1.00
2.00
14 / 51
100% 100% 100% 100% 100% 100% 100% 100% 100%
508.58 508.58 508.58 508.58 508.58 508.58 508.58 508.58 508.58
23 22 19 257 134 87 52 43 18
23 22 19 257 134 87 52 43 18
72 40
14 / 51
5.67 2.84
14 / 51
Minggu Ke - : 11 Minggu Ke
1.00
1.00
1.00
1.00
2.00
14 / 51
100% 100% 100% 100% 100% 100%
508.58 508.58 508.58 508.58 508.58 508.58
19 27 34
19 27 34
24.04 135.11
40 58
14 / 51
20711.24 5087.47 13524.09 15262.42 8578.32 6762.04
111
14 / 51
Minggu Ke - : 12 Minggu Ke - : 13
1.00
1.00
1.00
1.00
2.00
14 / 51
6.51 3.26 9.77 6.51 3.26 3.26 3.26 6.52 3.26
42.55 116.99
18.17 9.08
14 / 51
10174.94 8720.03 15262.42 13665.79 6291.88 18172.06 34571.24 12410.18
780
14 / 51
3 Minggu Ke - : 14
14 / 51
3.26 3.26 9.78 3.26 9.78 3.26 6.52 13.04
184 40 36 152
14 / 51
17728.84 3295.14 4142.25 2761.5
148 59.2
29.6 29.6
270 240
14 / 51
Minggu Ke - : 15
14 / 51
18
76 36 40 76 40
14 / 51
9665.26 4142.26
59.2 32
27.38
540
4500 11250
14 / 51
PT ADHI KARYA (Persero)
Tbk
Minggu ke : 14
KETERANGAN
14 / 51
0
18
1000
0
19.56
3,586.20
1176
1,011.92
0
458.17
0
561.15
0
10.22
0
0.00
0
268.00
0
35,442.92
0
271.50
14 / 51
0
0.00
0
13,807.52
0
0.00
0
91.20
0
27.38
0
584.40
0
0.00
0
0.00
0
540.00
0
0.00
0
0.00
0
3.00
0
15,750.00
14 / 51
MONITORING KEDATANGGAN MATERIAL
s/d tanggal 27 Desember 2015
Realisasi Up Progress
No. Uaian Satuan Deviasi
Sub Kon Sub Kon
APB WK APB Wijaya
i ii iii btg m' btg m' btg m' btg m' m'
20/12/15 3 9
21/12/15 2 5
24/12/15 2 6
25/12/15 3 9 18,687
26/12/15 2 6 850 9,902.5 9,894 0
27/12/15 3 9
28/12/15 6 18 1,910,000 324.00
62 699 80% 1,528,000 9,477.00
8388 2,020,000 9,153.00
18,696 1,616,000
1,910,000
1,528,000.0
57