RAB Bangunan Type 45
RAB Bangunan Type 45
BANGUNAN TYPE 45
Rencana Anggaran Biaya (RAB)
URAIAN PEKERJAAN VOLUME HARGA SATUAN
a. PEKERJAAN TANAH
1 Galian Pondasi 2 M3 55,000
2 Urugan Kembali 2 M3 30,000
3 Urugan Pasir Bawah Kembali 2 M3 200,000
4 Urugan Pasir Bawah Lantai 2 M3 200,000
B. PEKERJAAN PASANGAN & BETON
1 Pasangan Batu Kali 7 M3 550,000
2 Balok Sloof Beton 15/20 lt bwh 1 M3 2,500,000
3 Kolom praktis 10/15 0 M3 2,000,000
4 Pssangan Bata merah+plester+aci 100 M3 130,000
5 Balok Ring beton atas 10/10 0 M3 2,000,000
D. PEKERJAAN ATAP
1 Plafon Gibsun rangka holo 28 M2 135,000
2 Kap rangka Galvalum 35 M2 140,000
3 Asbes 2.5 20 Buah 70,000
F. PEKERJAAN LANTAI
1 Keramik Lantai 40 x 40 30 M2 90,000
2 Keramik Lantai KM/WC 5 M2 90,000
3 Keramik Dinding KM/WC 8 M2 110,000
4 RABAT LANTAI BAWAH 2 M3 650,000
G. PEKERJAAN CAT
1 Cat Dinding 100 M2 25,000
H. PEKERJAAN LISTRIK
1 Titik Lampu 4 Buah 75,000
2 SKLAR 4 Buah 25,000
3 Stop Kontak 2 Buah 25,000
I. PEKERJAAN SANITASI
1 Closed Duduk 1 Buah 300,000
2 Hand Shower 1 Buah 200,000
3 Kran Air 1 Buah 25,000
4 Floor Drain 1 Buah 25,000
6 Saluran Air Bersih 15 M 50,000
7 Saluran Air Bekas 10 M 50,000
8 Saluran Air Kotor 6 M 50,000
45
110,000
60,000
400,000
400,000 970,000
3,850,000
1,875,000
800,000
13,000,000
520,000 20,045,000
500,000
600,000
1,000,000
2,000,000
240,000 4,340,000
3,780,000
4,900,000
1,400,000 10,080,000
2,700,000
450,000
880,000
1,495,000 5,525,000
2,500,000 2,500,000
300,000
100,000
50,000 450,000
300,000
200,000
25,000
25,000
750,000
500,000
300,000 2,100,000