Jl. Tengkawang No. 1 Telp. ( 0541 ) 274489 ; Fax. ( 0541 ) 274489 Samarinda
PAKET PEKERJAAN :
#REF!
LOKASI PEKERJAAN :
samarinda SEBERANG
NILAI HPS / OE
#REF!
SUMBER DANA :
APBD PROPINSI KALIMANTAN TIMUR
TAHUN ANGGARAN :
2012
DRAF ADDENDUM 01
Kegiatan : Pembangunan Sarana Dan Prasarana Rumah Sederhana Sehat
Pekerjaan : Pembangunan PSD Perum. Pinang Bahari Sungai Keledang
2 1 M3 URUGAN PASIR
Bahan
1.200 M3 Pasir Urug 100,000.00 120,000.00
Upah
0.300 OH Pekerja 65,000.00 19,500.00
0.010 OH Mandor 100,000.00 1,000.00
120,000.00 20,500.00 140,500.00
Upah
1.650 OH Pekerja 65,000.00 107,250.00
0.275 OH Tukang Batu 75,000.00 20,625.00
0.028 OH Kepala Tukang Batu 85,000.00 2,380.00
0.083 OH Mandor 100,000.00 8,300.00
1,229,000.00 138,555.00 1,367,555.00
HARGA SATUAN JUMLAH HARGA SATUAN TOTAL
NO KODE SAT URAIAN BAHAN UPAH BAHAN UPAH HARGA SATUAN
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7 8 9
7 1 M2 BEKISTING
Bahan
0.045 M3 Kayu bekisting 2,100,000.00 94,500.00
0.300 Kg Paku 5 Cm - 12 Cm 25,000.00 7,500.00
0.100 Liter Minyak bekisting 22,650.00 2,265.00
Upah
0.520 OH Pekerja 65,000.00 33,800.00
0.260 OH Tukang Kayu 75,000.00 19,500.00
0.026 OH Kepala Tukang Kayu 85,000.00 2,210.00
0.026 OH Mandor 100,000.00 2,600.00
104,265.00 58,110.00 162,375.00
8 10 Kg BESI POLOS
Bahan
10.500 Kg Besi beton 12,500.00 131,250.00
0.100 Kg Kawat Bendrat 25,000.00 2,500.00
Upah
0.070 OH Pekerja 65,000.00 4,550.00
0.070 OH Tukang Besi 75,000.00 5,250.00
0.007 OH Kepala Tukang Besi 85,000.00 595.00
0.004 OH Mandor 100,000.00 400.00
133,750.00 10,795.00 144,545.00
1 Kg Besi = 14,454.50
10 1 M1 Joint Sealent
Bahan
0.001 Kg Diamond Blade 1,300,000.00 1,690.00
0.224 Kg Sealent 50,000.00 11,200.00
Upah
0.015 OH Pekerja 65,000.00 975.00
0.005 OH Tukang Batu 75,000.00 375.00
0.005 OH Mandor 100,000.00 500.00
11 1 M1 Kereb Pracetak
Bahan
0.079 M3 Beton K250 1,215,000.00 95,681.25
1.000 Ls Cetakan Besi 1,500.00 1,500.00
1.000 Ls Alat bantu 1,500.00 1,500.00
Upah
0.389 OH Pekerja 65,000.00 25,290.00
0.156 OH Tukang Batu 75,000.00 11,672.31
0.078 OH Mandor 100,000.00 7,781.54
Upah
0.357 OH Pekerja 65,000.00 23,214.29
0.071 OH Tukang Batu 75,000.00 5,357.14
0.036 OH Mandor 100,000.00 3,571.43
Upah
0.260 OH Pekerja 65,000.00 16,900.00
0.200 OH Tukang Batu 75,000.00 15,000.00
0.020 OH Kepala Tukang Batu 85,000.00 1,700.00
0.013 OH Mandor 100,000.00 1,300.00
390,000.00 34,900.00 424,900.00
DAFTAR HARGA UPAH DAN BAHAN
HARGA
NO. URAIAN SAT
( Rp )
1 2 3 4
UPAH TENAGA
1 Pekerja OH 65,000.00
2 Tukang Batu OH 75,000.00
3 Tukang Kayu OH 75,000.00
4 Tukang Besi OH 75,000.00
5 Kepala Tukang OH 85,000.00
6 Mandor OH 100,000.00
HARGA BAHAN
1 Tanah Urug M3 90,000.00
2 Aggregat B M3 255,000.00
3 Pasir Pasang M3 195,000.00
4 Pasir Urug M3 100,000.00
5 Batu Gunung M3 325,000.00
6 Koral M3 375,000.00
7 Kayu Bekisting M3 2,100,000.00
8 Kayu Ulin Balok M3 3,500,000.00
9 Besi Beton KG 12,500.00
10 Kawat baja dilas/Wiremash KG 13,000.00
11 Kawat Bendrat KG 25,000.00
12 Paku 2 - 5 " KG 25,000.00
13 Plastik Cor M2 3,500.00
14 Semen Portland KG 1,350.00
15 Minyak Begesting LTR 22,650.00
16 Beton Ready Mix K-175 M3 900,000.00
17 Beton Ready Mix K-200 M3 1,000,000.00
18 Beton Ready Mix K-225 M3 1,150,000.00
19 Beton Ready Mix K-250 M3 1,215,000.00
20 Diamond Blade KG 1,300,000.00
21 Sealeng KG 50,000.00
22 Air Kerja LTR 50.00
DRAF ADDENDUM 01
Kegiatan : Pembangunan Sarana Dan Prasarana Rumah Sederhana Sehat
Pekerjaan : Pembangunan PSD Perum. Pinang Bahari Sungai Keledang
Lokasi : Samarinda Seberang
Sumber Dana : APBD - P Propinsi Kalimantan Timur
Tahun Anggaran : 2012
KONTRAK MC 01
NO URAIAN SATUAN KETERANGAN
KUANTITAS KUANTITAS
I PEKERJAAN PENDAHULUAN
1 Papan Nama Proyek Ls 1.00 1.00 Tetap
2 Mobilisasi dan Demobilisasi Ls 1.00 1.00 Tetap
3 Administrasi dan Dokumentasi Proyek Ls 1.00 1.00 Tetap
4 Pekerjaan Pembongkaran Paving (hrg nego) Ls 1.00 Item Baru
II PEKERJAAN TANAH
1 Aggregat B (Leveling) M3 200.00 152.00 Berkurang
Dibuat : Samarinda
Site Engineer
4. Alek Widodo, ST. CV. Citra Kalimantan
4. ………………………………
Koordinator Lapangan
5. Tirtana, ST. CV. ANUGERAH ZANI
5. …………………………..
BACKUP KUANTITAS
Satuan : M3
Satuan : M3
Satuan : M2
0 + 0 0.400
25.000 10.000
0 + 25 0.400
25.000 10.000
0 + 50 0.400
25.000 10.000
0 + 75 0.400
25.000 10.000
0 + 100 0.400
25.000 10.000
0 + 125 0.400
25.000 10.000
0 + 150 0.400
10.000 4.000
0 + 160 0.400
0 + 160 0.400
15.000 6.000
0 + 175 0.400
25.000 10.000
0 + 200 0.400
25.000 10.000
0 + 225 0.400
25.000 10.000
0 + 250 0.400
0 + 250 0.400
25.000 10.000
0 + 275 0.400
25.000 10.000
0 + 300 0.400
25.000 10.000
0 + 325 0.400
25.000 10.000
0 + 350 0.400
4.000 1.600
0 + 354 0.400
0 + 354 0.400
21.000 8.400
0 + 375 0.400
25.000 10.000
0 + 400 0.400
25.000 10.000
0 + 425 0.400
15.000 6.000
0 + 440 0.400
Satuan : M1
STA Posisi Kn/Kr Labar (M) Panjang (M) Jarak Segmen/4M' Volume (M1)
0 + 0 4.000
0 + 160 4.000
0 + 160 8.000
0 + 250 8.000
0 + 250 5.000
0 + 354 5.000
0 + 354 5.000
0 + 440 5.000
Satuan : M3