Anda di halaman 1dari 11

5.

1 Perencanaan perhitungan Volume tanki


1. Volume tanki bahan bakar HFO
a. Base Line

frame y fs y x fs
37 673 1 748
38 748 4 3336
39 834 1 834
4918 mm
total
4.918 m
L = (2/3) x h x Σ1 dimana h = 600 mm= 0,6 m
= (2/3) x 0,6 x 4,918
= 1,5572 m2

b. ½ Double Bottom

frame y fs y x fs
37 2521 1 2521
38 2660 4 10640
39 2805 1 2805
15966 mm
total
15.966 m
L = (2/3) x h x Σ1 dimana h = 600 mm= 0,6 m
= (2/3) x 0,6 x 15,966
= 4,3564 m2
c. Double Bottom

frame y fs y x fs
37 3140 1 3140
38 3264 4 13056
39 3390 1 3390
19586 mm
total
19.586 m
L = (2/3) x h x Σ1 dimana h = 600 mm= 0,6 m
= (2/3) x 0,6 x 19,586
= 5,5344 m2
d. Hasil Akhir Tanki HFO

frame y fs y x fs
1 1557.2 1 1557.2
2 4356.4 4 17425.6
3 5534.4 1 5534.4
22527.2 mm
total
22.5272 m
V = (2/3) x t x Σ1 dimana t = 1500 mm= 1,5 m
= (2/3) x 1,5 x 22,5272
= 22,5272 m3

2. Volume tanki bahan bakar MDO


a. Base Line

frame y fs y x fs
35 561 1 561
35.5 585 4 2340
36 612 1 612
3513 mm
total
3.513 m
L = (2/3) x h x Σ1 dimana h = 300 mm= 0,3 m
= (2/3) x 0,3 x 3,513
= 0,4026 m2
b. ½ Double Bottom

frame y fs y x fs
35 2262 1 2262
35.5 2324 4 9296
36 2388 1 2388
13946 mm
total
13.946 m
L = (2/3) x h x Σ1 dimana h = 300 mm= 0,3 m
= (2/3) x 0,3 x 13,946
= 1,5452 m2
c. Double Bottom

frame y fs y x fs
35 2892 1 2892
35.5 2954 4 11816
36 3016 1 3016
16724 mm
total
16.724 m
L = (2/3) x h x Σ1 dimana h = 300 mm= 0,3 m
= (2/3) x 0,3 x 16,724
= 2,0445 m2
d. Hasil Akhir MDO

frame y fs y x fs
1 402.6 1 402.6
2 1545.2 4 5110.5
3 2044.5 1 2044.5
7557.6 mm
total
7.5576 m
V = (2/3) x t x Σ1 dimana t = 1500 mm= 1,5 m
= (2/3) x 1,5 x 7,5576
= 7,5576m3

3. Volume tanki Lubricating oil (LO)

a. Base Line

frame y fs y x fs
33 485 1 485
33.5 501 4 2004
34 520 1 520
3009 mm
total
3.009 m
L = (2/3) x h x Σ1 dimana h = 300 mm= 0,3 m
= (2/3) x 0,3 x 3,009
= 0,3009 m2
b. ½ Double Bottom

frame y fs y x fs
33 2026 1 2026
33.5 2083 4 8332
34 2141 1 2141
11459 mm
total
11.459 m
L = (2/3) x h x Σ1 dimana h = 300 mm= 0,3 m
= (2/3) x 0,3 x 11.459
= 1,1455 m2
c. Double Bottom

frame y fs y x fs
33 2648 1 2648
33.5 2709 4 10836
34 2770 1 2770
15234 mm
total
15.234 m
L = (2/3) x h x Σ1 dimana h = 300 mm= 0,3 m
= (2/3) x 0,3 x 15.234
= 1,5234 m2
d. Hasil Akhir Lubricating Oil (LO)

frame y fs y x fs
1 300.9 1 300.9
2 1145.5 4 4582
3 1523.4 1 1523.4
6406.3 mm
total
6.4063 m
V = (2/3) x t x Σ1 dimana t = 1500 mm= 1,5 m
= (2/3) x 1,5 x 6.4063
= 6.4063 m3

4. Volume sludge tank

a. Base Line

frame y fs y x fs
31 431 1 431
31.5 443 4 1772
32 456 1 456
2859 mm
total
2.859 m
L = (2/3) x h x Σ1 dimana h = 300 mm= 0,3 m
= (2/3) x 0,3 x 2.859
= 0,5718 m2
b. ½ Double Bottom

frame y fs y x fs
31 1809 1 1809
31.5 1862 4 7448
32 1916 1 1916
12293 mm
total
12.293 m
L = (2/3) x h x Σ1 dimana h = 300 mm= 0,3 m
= (2/3) x 0,3 x 12.293
= 2,4586 m2
c. Double Bottom

frame y fs y x fs
31 2407 1 2407
31.5 2467 4 9868
32 2527 1 2527
16802 mm
total
16.802 m
L = (2/3) x h x Σ1 dimana h = 300 mm= 0,3 m
= (2/3) x 0,3 x 16.802
= 3,3604 m2
d. Hasil Akhir Sludge Tank

frame y fs y x fs
1 571.8 1 571.8
2 2458.6 4 9834.4
3 3360.4 1 3360.4
13766.6 mm
total
13.7666 m
V = (2/3) x t x Σ1 dimana t = 1500 mm= 1,5 m
= (2/3) x 1,5 x 13.7666
= 6.4063 m3
5. Volume tanki ballast

a. Tanki ballast 4

wl 0 wl 0.5 wl 1
frame A fs A x fs
1 4 1
40 927.28 927.28 2115.61 8462.44 2185.98 2185.98 1929.283 1 1929.283
44 1445.77 1445.77 2648.91 10595.64 3410.99 3410.99 2575.4 4 10301.6
48 2098.63 2098.63 3249.11 12996.44 4043.3 4043.3 3189.728 2 6379.457
52 2907.75 2907.75 4003.07 16012.28 4780.58 4780.58 3950.102 4 15800.41
56 3814.11 3814.11 4895.92 19583.68 5952.3 5952.3 4891.682 1 4891.682
60 4462.76 4462.76 5533.15 22132.6 6148.14 6148.14 5457.25 4 39302.43
64 4735.07 4735.07 5780.63 23122.52 6341.86 6341.86 5699.908 1 39.30243
78644.16 mm
TOTAL
78.64416 m
L = (2/3) x h x (Ax fs) dimana h = 5400 mm= 5,4 m

= (2/3) x 5,4 x 78,64416

= 283,1189 m2

V = (2/3) x t x (Ax fs) dimana t = 1100 mm=1,1 m

= (2/3) x 1,1 x 78,64416

= 141,559 m3

b. Volume tanki ballast 3

wl 0 wl 0.5 wl 1
frame A fs A x fs
1 4 1
64 4735.07 4735.07 5780.63 23122.52 6341.86 6341.86 5699.908 1 5699.908
68 4795 4795 5836.26 23345.04 6376.49 6376.49 5752.755 4 23011.02
72 4795 4795 5836.26 23345.04 6376.49 6376.49 5752.755 2 11505.51
76 4795 4795 5836.26 23345.04 6376.49 6376.49 5752.755 4 23011.02
80 4795 4795 5836.26 23345.04 6376.49 6376.49 5752.755 1 5752.755
84 4608.03 4608.03 5640.95 22563.8 6319.44 6319.44 5581.878 4 68980.21
86 6208 6208 5283.3 21133.2 6050.01 6050.01 5565.202 1 68.98021
138029.4 mm
TOTAL
138.0294 m
L = (2/3) x h x (Ax fs) dimana h = 5400 mm= 5,4 m

= (2/3) x 5,4 x 78,64416

= 141,559 m3

V = (2/3) x t x (Ax fs) dimana t = 1100 mm=1,1 m

= (2/3) x 1,1 x 78,64416


= 141,559 m3

Volume tanki ballast 2

wl 0 wl 0.5 wl 1
frame A fs A x fs
1 4 1
86 6208 6208 5283.3 21133.2 6050.01 6050.01 5565.202 1 5565.202
90 4594 4594 4689.78 18759.12 5424.25 5424.25 4796.228 4 19184.91
94 3046 3046 4039.58 16158.32 4740.06 4740.06 3990.73 2 7981.46
98 1570 1570 3447.44 13789.76 4105.32 4105.32 3244.18 4 12976.72
102 1510.95 1510.95 2871.81 11487.24 3649.18 3649.18 2774.562 1 2774.562
106 931.58 931.58 2309.37 9237.48 2839.44 2839.44 2168.083 4 48482.86
110 574.64 574.64 1794.28 7177.12 2265.83 2265.83 1669.598 1 48.48286
97014.2 mm
TOTAL
97.0142 m
L = (2/3) x h x (Ax fs) dimana h = 5400 mm= 5,4 m

= (2/3) x 5,4 x 78,64416

= 141,559 m3

V = (2/3) x t x (Ax fs) dimana t = 1100 mm=1,1 m

= (2/3) x 1,1 x 78,64416

= 141,559 m3

c. Volume tanki ballast 1

wl 0 wl 0.5 wl 1
frame A fs A x fs
1 4 1
110 574.64 574.64 1794.28 7177.12 2265.83 2265.83 1669.598 1 1669.598
114 388.46 388.46 1355.99 5423.96 1782.17 1782.17 1265.765 4 5063.06
118 272.68 272.68 1003.59 4014.36 1330.51 1330.51 936.2583 2 1872.517
122 205.05 205.05 690.41 2761.64 912.23 912.23 646.4867 4 2585.947
126 175.45 175.45 402.06 1608.24 536.5 536.5 386.6983 1 386.6983
130 159.44 159.44 224.34 897.36 294.61 294.61 225.235 4 11577.82
134 142.57 142.57 171 684 195.11 195.11 170.28 1 11.57782
23167.22 mm
TOTAL
23.16722 m
L = (2/3) x h x (Ax fs) dimana h = 5400 mm= 5,4 m

= (2/3) x 5,4 x 78,64416

= 141,559 m3
V = (2/3) x t x (Ax fs) dimana t = 1100 mm=1,1 m

= (2/3) x 1,1 x 78,64416

= 141,559 m3

5.3 Perhitungan Ruang Muat


Perhitungan volume ruang muat disesuaikan dengan jumlah ruang muat yang telah
direncanakan (terletak pada frame berapa sampai berapa). Perhitungan dilakukan
dengan menggunakan Metode Simpson.

a. Volume Ruang muat 4

wl 0 wl 0.5 wl 1
frame A fs A x fs
1 4 1
40 2185.98 2185.98 5630.17 22520.68 7242.22 7242.22 16995.88 1 16995.88
44 3410.99 7456356 6449.47 36311613 7249.7 52503922 19311.67 4 77246.67
48 4043.3 13791656 6924.35 44658388 7262.16 52648481 20575.38 2 41150.76
52 4780.58 19329319 7138.37 49428572 7274.59 52829237 21663.11 4 86652.44
56 5952.3 28455446 7224.88 51573867 7275.79 52928389 23084.59 1 23084.59
60 6148.14 36595574 7260.04 52452918 7278.16 52954364 23347.98 4 93391.93
64 6341.86 38990643 7287.85 52910083 7294.06 53087336 23615.96 1 338522.3
677044.5 mm
TOTAL
677.0445 m
L = (2/3) x h x (Ax fs) dimana h = 5400 mm= 5,4 m

= (2/3) x 5,4 x 78,64416

= 141,559 m3

V = (2/3) x t x (Ax fs) dimana t = 1100 mm=1,1 m

= (2/3) x 1,1 x 78,64416

= 141,559 m3

b. Volume Ruang muat 3

wl 0 wl 0.5 wl 1
frame A fs A x fs
1 4 1
64 6341.86 6341.86 7287.86 29151.44 6341.86 6341.86 47217.95 1 47217.95
68 6376.49 7300 7300 29200 7300 7300 49435.6 4 197742.4
72 6376.49 7300 7300 29200 7300 7300 49435.6 2 98871.2
76 6376.49 7300 7300 29200 7300 7300 49435.6 4 197742.4
80 6376.49 7300 7300 29200 7300 7300 49435.6 1 49435.6
84 6319.44 6319.44 7273.76 29095.04 7294.74 7294.74 48204.47 4 192817.89
86 6050.01 6050.01 7245 28980 7268.44 7268.44 47740.85 1 192.8179
784020.3 mm
TOTAL
784.0203 m
L = (2/3) x h x (Ax fs) dimana h = 5400 mm= 5,4 m

= (2/3) x 5,4 x 78,64416

= 141,559 m3

V = (2/3) x t x (Ax fs) dimana t = 1100 mm=1,1 m

= (2/3) x 1,1 x 78,64416

= 141,559 m3

c. Volume ruang muat 2

wl 0 wl 0.5 wl 1
frame A fs A x fs
1 4 1
86 6050.01 6050.01 7245 28980 7268.44 7268.44 47740.85 1 47740.85
90 5424.25 5424.25 7189.33 28757.32 7218.91 7218.91 49335.57 4 197342.3
94 4740.06 4740.06 7039.81 28159.24 7193.98 7193.98 47777.83 2 95555.65
98 4105.32 4105.32 6699.64 26798.56 7145.19 7145.19 45341.81 4 181367.2
102 3649.18 3649.18 6048 24192 6919.31 6919.31 41422.92 1 41422.92
106 2839.44 2839.44 5158.31 20633.24 6439.65 6439.65 35645.53 4 563428.9
110 2265.83 2265.83 4263.1 17052.4 5698.69 5698.69 29811.83 1 563.4289
1127421 mm
TOTAL
1127.421 m
L = (2/3) x h x (Ax fs) dimana h = 5400 mm= 5,4 m

= (2/3) x 5,4 x 78,64416

= 141,559 m3

V = (2/3) x t x (Ax fs) dimana t = 1100 mm=1,1 m

= (2/3) x 1,1 x 78,64416

= 141,559 m3

d. Volume ruang muat

wl 0 wl 0.5 wl 1
frame A fs A x fs
1 4 1
110 2265.83 2265.83 4263.1 17052.4 5698.69 5698.69 29811.83 1 29811.83
114 1782.17 1782.17 3495.19 13980.76 4873.09 4873.09 24591.26 4 98365.03
118 1330.51 1330.51 2786.01 11144.04 4031.63 4031.63 19669.86 2 39339.73
122 912.23 912.23 2126.12 8504.48 3196.75 3196.75 15031.04 4 60124.16
126 536.5 536.5 1494.82 5979.28 2361.91 2361.91 10579.25 1 10579.25
130 294.61 294.61 972.63 3890.52 1641.31 1641.31 6943.174 4 238220
134 195.11 195.11 569.34 2277.36 1075.95 1075.95 4228.534 1 238.22
476678.2 mm
TOTAL
476,6782 m
L = (2/3) x h x (Ax fs) dimana h = 5400 mm= 5,4 m

= (2/3) x 5,4 x 78,64416

= 141,559 m3

V = (2/3) x t x (Ax fs) dimana t = 1100 mm=1,1 m

= (2/3) x 1,1 x 78,64416

= 141,559 m3

Perhitungan volume ruang muat

Ruang muat I = volume ruang muat I – volume ballast I

= 1716,041 – 83,401

= 1632,64 m3

Ruang muat II = volume ruang muat II – volume ballast II

= 4058,715 - 352,851

=3705,864 m3

Ruang muat III = volume ruang muat III – volume ballast III

= 3136,0812- 276,058

= 2860,023 m3

Ruang muat III = volume ruang muat III – volume ballast III

= 2437,36- 283,118

= 2154,247 m3