Anda di halaman 1dari 6

PRAKTIKUM MODEL TERAIN DIGITAL

21 FEBRUARI 2018

1. Pembuatan Profil dari Permukaan Peta Situasi dengan Metode Gridding


KRINGING

INVERSE DISTANCE SCALE

NEAREST NEIGHBOUR

KRIGING – INVERSE DISTANCE

120
110
100

0 50 100 150 200 250 300 350

KRIGING – NEAREST NEIGHBOUR

120
110
100
90
0 50 100 150 200 250 300 350
HASIL DIGITIZE

1350

1300

1250

1200

1150

1100

1000 1050 1100 1150 1200 1250

1350

1300

1250

1200

1150

1100

1000 1050 1100 1150 1200 1250


KRIGING DAN INVERSE DISTANCE SCALE

PERBANDINGAN PROFIL
KRIGING DAN INVERSE DISTANCE

1350

1300

1250

1200

1150

1100

1000 1050 1100 1150 1200 1250

120
110
100

0 50 100 150 200 250 300 350

U SKALA
0 50 100 150 200

DIBUAT OLEH:
SARIPUTRI RAMADHANI
16/401717/SV/12221
KRIGING DAN NEAREST NEIGHBOUR

PERBANDINGAN PROFIL
KRIGING DAN NEAREST NEIGHBOUR

1350

1300

1250

1200

1150

1100

1000 1050 1100 1150 1200 1250

120
110
100
90
0 50 100 150 200 250 300 350

U SKALA
0 50 100 150 200

DIBUAT OLEH:
SARIPUTRI RAMADHANI
16/401717/SV/12221
2. Perhitungan Cut and Fill antara permukaan bor bulan Februari dan September.
a. Berapa m3 volume Cut and Fill yang dihasilkan?
- Volume cut yang dihasilkan adalah 765848.08415178 m3.
- Volume fill yang dihasilkan adalah 784069.57921165 m3.

b. Berapa luas area yang digali (Cut) dan ditimbun (Fill)?


- Luas area yang digali (cut) adalah:
Planar areas : 1971700.8863776 m2.
Surface areas: 1972151.999155 m2.
- Luas area yang ditimbun (fill) adalah:
Planar areas : 1108163.1136224 m2.
Surface areas: 1111828.6488051 m2.

Anda mungkin juga menyukai