VALUE STREAM MAPPING

1. CYCLE TIME PENGUKURAN PRODUKTIVITAS


2. TAKE TIME AWAL
OUTPUT PRODUKTIVITAS
3. MP INPUT WAKTU
4. ALIRAN MATERIAL
5. ALIRAN INFORMASI

PROSES ASSY
ALAT KERJA

FINALISASI
DESAIN

UJI COBA ALAT


KERJA

MEMBUAT
STANDAR
OPERASIONAL
ALAT KERJA ANALISA UJI COBA /
HASIL UJI COBA

PENGUKURAN
PRODUKTIVITAS AKHIR
OUTPUT PRODUKTIVITAS
INPUT WAKTU
MEMBUAT DESAIN
ALAT KERJA ATAU
RODUKTIVITAS MESIN
AL ( CAD )
DUKTIVITAS
WAKTU

MELAKUKAN
SIMULASI ALAT
KERJA

LANGKAH KERJA
PROSES
MANUFACTURE PEMILIHAN MATERIAL
( APLIKASI MESIN ALAT KERJA ( BOM )
CNC MILLING )

MELAKUKAN
SIMULASI PROSES
MANUFACTURE

MEMBUAT DESAIN
MANUFACTURE
( CAM )

1. CYCLE TIME
2. TAKT TIME
3. MP
4. ALIRAN MATERIAL
5. ALIRAN INFORMASI

1. PROSES MAPPI
2. TAKT TIME
3. MP
4. ALIRAN MATERIAL
5. ALIRAN INFORMASI

1. PROSES MAPPI

2. CAD

1. DESAIN ALAT KERJA


2. DIMESI ALAT KERJA
3.PEMILIHAN MATERIAL
4. DETAIL DRAWING ( 2D )
PENGUKURAN
PRODUKTIVITAS AWAL
OUTPUT PRODUKTIVITAS
INPUT WAKTU

1. PROSES MAPPING VSM


1. AXIZ PARAMETER
2. CUTTING TOOL PARAMETER
3. CAM
3. SIMULASI PROGRAM
4. PROGRAM CONTROL SHEET
1. PROSES MAPPING VSM
1. AXIZ PARAMETER
2. CUTTING TOOL PARAMETER
3. CAM
3. SIMULASI PROGRAM
4. PROGRAM CONTROL SHEET
2. CAD

PERANCANGAN ALAT
KERJA

PENGUKURAN PRODUKTIVITAS
AKHIR
OUTPUT PRODUKTIVITAS
INPUT WAKTU
METER
PARAMETER
ROGRAM
TROL SHEET
METER
PARAMETER
ROGRAM
TROL SHEET