PROGRESS PEKERJAAN KONSTRUKSI JALAN COR JALAN

PEKERJAAN STRUKTUR
PEKERJAAN LANTAI BELAKANG JALAN BETON GRAND KENARI HOTEL
KARAWANG - JAWA BARAT

VOLUME HARGA SATUAN JUMLAH HARGA


No. URAIAN PEKERJAAN SAT. KONTRAK (Rp) KONTRAK (Rp) KETERANGAN
(A) (D) F= (A X D)

PEKERJAAN LANTAI BETON GRAND KENARI HOTEL

A PEKERJAAN GALIAN TANAH

1 Perataan Tanah m2 103,80 5.000,00 519.000,00


2 Pasir Urug 5cm m2 103,80 14.000,00 1.453.200,00

SUB TOTAL PEKERJAAN GALIAN TANAH (A) 1.972.200,00


B PEK. LANTAI BETON K-225
1 ADD JALAN BELAKANG (12,85x12x0,2)m
- Readymix K-225 m3 20,76 820.000,00 17.023.200,00
- Besi Wiremesh M8 kg 565,59 13.000,00 7.352.683,07
- Bekisting Cor m' 36,85 110.000,00 4.053.500,00
- Plastik Cor m2 103,80 3.000,00 311.400,00
JUMLAH 28.740.783,07
2 PEK. SLOOF BETON BERTULANG
SLOOF (20x20)cm
- Readymix K-225 m3 1,47 820.000,00 1.208.680,00
- Besi beton terpasang 8D12 mm kg 263,44 14.000,00 3.688.160,00
- Besi beton terpasang D8-150mm kg 68,57 13.000,00 891.436,00
- Bekisting Multiplek 12 mm m2 14,80 95.000,00 1.406.000,00
- Stek Besi D12 pjg 35cm kg 77,56 14.000,00 1.085.889,00
JUMLAH 8.280.165,00
SUB TOTAL PEKERJAAN BETON (B) 37.020.948,07

3 PEK. GUTTER SALURAN PEMBUANGAN


- Pekerjaan Pengadaan dan pemasangan stainless steel m' 36,85 -
gutter, sesuai dengan spesifikasi

- Pemasangan Pipa Floor Drain 4-6" m' 2,00


- Floor Drain bh 2,00
SUB TOTAL PEKERJAAN BETON (C) -

TOTAL JUMLAH PEKERJAAN ADD LANTAI BELAKANG DAN SLOOF 38.993.148,07