EXTERNAL WORKS
HARGA
JUMLAH HARGA
No. URAIAN PEKERJAAN Qty Unit SATUAN Remarks
(Rp)
(Rp)
RUANG CHILLER
D Kolom Pedestal
1 Beton K-300 2.20 m3 1,000,000 2,200,000
2 Tul. Utama D13 Pedestal 288.39 kg 12,500 3,604,922
3 Cincin Sengkang D8-150 mm Pedestal 51.01 kg 12,500 637,609
E Pek.Sloof
1 Beton K-300 1.66 m3 1,000,000 1,662,750
2 Tul. Utama D19 175.02 kg 12,500 2,187,730
3 Tul. Utama D10 9.56 kg 12,500 119,447
4 Tul. Extra D10 14.80 kg 12,500 184,950
5 Cincin Sengkang D10-150 mm 28.44 kg 12,500 355,451
F Angkur
1 Angkur D16 16.00 Bh 150,000 2,400,000
I PEKERJAAN TANGGA
- Galian Tanah Pondasi m3
- Urugan Tanah Kembali m3
- Pembesian Pondasi Tangga
- Besi kg
- Besi kg
- kg
-
- Coran K-300 m3