HARGA
NO URAIAN PEKERJAAN SATUAN
(Rp)
Rp 10,802.40
Rp 264.00
Rp 6,301.40
Rp 6,325.00
Rp 805.00
Rp 6,900.00
Rp 517.50
Rp 14,547.50 Rp 17,367.80 Rp 34,824.80
Rp 2,909.50
Rp 12,500.00
Rp 3,000.00
Rp 51,600.00
Rp 650.00
Rp 1,080.00
Rp 10,800.00
Rp 900.00
Rp 18,000.00
Rp 11,000.00
Rp 24,000.00
Rp 1,470.00
Rp 1,890.00
Rp 38,360.00 Rp 98,530.00 Rp 144,562.00
Rp 7,672.00
Rp 6,300.00
Rp 4,725.00
Rp 11,025.00 Rp 13,230.00
Rp 2,205.00
Rp 51,750.00
Rp 2,587.50
Rp 54,337.50 Rp 54,337.50
Rp 10,867.50
Rp 62,100.00
Rp 4,657.50
Rp 66,757.50 Rp 80,109.00
Rp 13,351.50
Rp 17,250.00
Rp 828.00
Rp 18,078.00 Rp 21,693.60
Rp 3,615.60
Rp 150,240.00
Rp 96,240.00
Rp 18,900.00
Rp 945.00
Rp 19,845.00 Rp 150,240.00 Rp 174,054.00
Rp 3,969.00
Rp 19,845.00 Rp 96,240.00 Rp 120,054.00
Rp 3,969.00
Rp 96,000.00
Rp 18,900.00
Rp 945.00
Rp 19,845.00 Rp 96,000.00 Rp 119,814.00
Rp 3,969.00
Rp 216,240.00
Rp 54,086.40
Rp 49,140.00
Rp 20,475.00
Rp 2,866.50
Rp 3,685.50
Rp 76,167.00 Rp 270,326.40 Rp 361,726.80
Rp 15,233.40
Rp 216,240.00
Rp 190,400.00
Rp 86,060.80
Rp 94,500.00
Rp 39,375.00
Rp 5,512.50
Rp 7,087.50
Rp 146,475.00 Rp 492,700.80 Rp 668,470.80
Rp 29,295.00
Rp 154,000.00
Rp 20,118.00
Rp 6,328.00
Rp 5,250.00
Rp 735.00
Rp 18,900.00
Rp 1,417.50
Rp 26,302.50 Rp 180,446.00 Rp 212,009.00
Rp 5,260.50
Rp 154,000.00
Rp 13,552.00
Rp 7,119.00
Rp 5,250.00
Rp 735.00
Rp 18,900.00
Rp 1,417.50
Rp 26,302.50 Rp 174,671.00 Rp 206,234.00
Rp 5,260.50
Rp 27,500.00
Rp 10,500.00
Rp 4,271.40
Rp 5,250.00
Rp 735.00
Rp 20,160.00
Rp 1,417.50
Rp 27,562.50 Rp 42,271.40 Rp 75,346.40
Rp 5,512.50
Rp 10,886.40
Rp 3,638.60
Rp 18,900.00
Rp 7,875.00
Rp 1,102.50
Rp 1,417.50
Rp 29,295.00 Rp 14,525.00 Rp 49,679.00
Rp 5,859.00
Rp 7,257.60
Rp 4,113.20
Rp 18,900.00
Rp 7,875.00
Rp 1,102.50
Rp 1,417.50
Rp 29,295.00 Rp 11,370.80 Rp 46,524.80
Rp 5,859.00
Rp 4,550.00
Rp 12,600.00
Rp 5,250.00
Rp 735.00
Rp 945.00
Rp 19,530.00 Rp 4,550.00 Rp 27,986.00
Rp 3,906.00
Rp 77,000.00
Rp 14,033.60
Rp 7,672.70
Rp 28,350.00
Rp 10,500.00
Rp 1,470.00
Rp 2,126.25
Rp 42,446.25 Rp 98,706.30 Rp 149,641.80
Rp 8,489.25
Rp 305,200.00
Rp 73,424.00
Rp 108,924.00
Rp 103,950.00
Rp 13,125.00
Rp 1,837.50
Rp 7,560.00
Rp 126,472.50 Rp 487,548.00 Rp 639,315.00
Rp 25,294.50
Rp 456,400.00
Rp 107,160.00
Rp 128,625.00
Rp 5,375.00
Rp 103,950.00
Rp 13,125.00
Rp 1,837.50
Rp 7,560.00
Rp 126,472.50 Rp 697,560.00 Rp 849,327.00
Rp 25,294.50
Rp 568,400.00
Rp 96,444.00
Rp 128,250.00
Rp 5,375.00
Rp 103,950.00
Rp 14,437.50
Rp 2,058.00
Rp 7,843.50
Rp 128,289.00 Rp 798,469.00 Rp 952,415.80
Rp 25,657.80
Rp 90,835.50
Rp 2,430.00
Rp 4,410.00
Rp 3,675.00
Rp 514.50
Rp 378.00
Rp 8,977.50 Rp 93,265.50 Rp 104,038.50
Rp 1,795.50
Rp 10,403.85
Rp 36,008.00
Rp 3,960.00
Rp 1,520.00
Rp 32,760.00
Rp 15,015.00
Rp 1,911.00
Rp 2,457.00
Rp 52,143.00 Rp 41,488.00 Rp 104,059.60
Rp 10,428.60
Rp 40,509.00
Rp 3,960.00
Rp 1,520.00
Rp 32,760.00
Rp 15,015.00
Rp 1,911.00
Rp 2,457.00
Rp 52,143.00 Rp 45,989.00 Rp 108,560.60
Rp 10,428.60
Rp 36,008.00
Rp 5,280.00
Rp 3,040.00
Rp 13,503.00
Rp 35,070.00
Rp 30,400.00
Rp 32,760.00
Rp 19,057.50
Rp 2,425.50
Rp 3,118.50
Rp 57,361.50 Rp 123,301.00 Rp 192,134.80
Rp 11,472.30
Rp 36,008.00
Rp 5,280.00
Rp 3,040.00
Rp 16,203.60
Rp 35,070.00
Rp 30,400.00
Rp 41,580.00
Rp 19,057.50
Rp 2,425.50
Rp 3,118.50
Rp 66,181.50 Rp 126,001.60 Rp 205,419.40
Rp 13,236.30
Rp 36,008.00
Rp 5,280.00
Rp 3,040.00
Rp 13,503.00
Rp 35,070.00
Rp 91,200.00
Rp 41,580.00
Rp 19,057.50
Rp 2,425.50
Rp 3,118.50
Rp 66,181.50 Rp 184,101.00 Rp 263,518.80
Rp 13,236.30
Rp 27,006.00
Rp 5,280.00
Rp 2,280.00
Rp 13,503.00
Rp 35,070.00
Rp 30,400.00
Rp 41,580.00
Rp 20,790.00
Rp 2,425.50
Rp 3,118.50
Rp 67,914.00 Rp 113,539.00 Rp 195,035.80
Rp 13,582.80
Rp 52,000.00
Rp 52,000.00
Rp 14,000.00
Rp 6,644.40
Rp 16,800.00
Rp 18,375.00
Rp 2,572.50
Rp 44,100.00
Rp 3,307.50
Rp 68,355.00 Rp 89,444.40 Rp 171,470.40
Rp 13,671.00
Rp 68,355.00 Rp 89,444.40 Rp 171,470.40
Rp 13,671.00
Rp 42,452.75
Rp 42,452.75
Rp 14,560.00
Rp 7,119.00
Rp 18,144.00
Rp 18,375.00
Rp 2,572.50
Rp 44,100.00
Rp 3,307.50
Rp 68,355.00 Rp 82,275.75 Rp 164,301.75
Rp 13,671.00
Rp 68,355.00 Rp 82,275.75 Rp 164,301.75
Rp 13,671.00
Rp 33,962.20
Rp 13,020.00
Rp 2,847.60
Rp 21,728.00
Rp 23,625.00
Rp 3,307.50
Rp 56,700.00
Rp 2,835.00
Rp 86,467.50 Rp 71,557.80 Rp 175,318.80
Rp 17,293.50
Rp 130,500.00
Rp 38,000.00
Rp 38,500.00
Rp 1,596.00
Rp 474.60
Rp 1,120.00
Rp 4,725.00
Rp 661.50
Rp 5,670.00
Rp 472.50
Rp 11,529.00 Rp 133,690.60 Rp 147,525.40
Rp 2,305.80
Rp 11,529.00 Rp 41,190.60 Rp 55,025.40
Rp 2,305.80
Rp 11,529.00 Rp 41,690.60 Rp 55,525.40
Rp 2,305.80
Rp 18,060.00
Rp 21,210.00
Rp 172.00
Rp 3,150.00
Rp 2,887.50
I. LANTAI 1
No Uraian Pekerjaan Sat. Harga Satuan
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lahan m² Rp 13,230.00
2 Pek. Pemasangan bouwplank + pengukuran m¹ Rp 34,824.80
3 Pek . Pagar keliling m² Rp 144,562.00
4 Pek. Gudang Bedeng m² Rp 300,000.00
Harga Pekerjaan
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian tanah biasa pondasi setempat m³ Rp 80,109.00
2 Pek. Galian tanah biasa pondasi menerus m³ Rp 54,337.50
3 Pek. Urugan pasir pondasi setempat m³ Rp 119,814.00
4 Pek. Urugan tanah pondasi setempat m³ Rp 120,054.00
5 Pek. Urugan pasir dibawah pondasi menerus m³ Rp 119,814.00
6 Pek.Urugan tanah kembali pondasi menerus m³ Rp 120,054.00
7 Pek. Galian Septictank & Peresapan m³ Rp 54,337.50
8 Pek. Urugan tanah kembali Septictank & Peresapan m³ Rp 120,054.00
Harga Pekerjaan
III PEKERJAAN PONDASI
1 Pek. Pondasi batu kali 1 : 5 m³ Rp 668,470.80
2 Pek. Pasangan batu kosong m³ Rp 361,726.80
Harga Pekerjaan
IV PEKERJAAN BETON BERTULANG
1 Pek.Rabat lantai m³ Rp 639,315.00
2 Pek. Rabat lantai kerja K 175 m³ Rp 849,327.00
3 Pek.Pondasi telapak K = 275
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 104,059.60
c Pengecoran m³ Rp 952,415.80
4 Pek. Sloof 30 x 15 K 275
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 108,560.60
c Pengecoran m³ Rp 952,415.80
5 Pek. Sloof Praktis (15/16)
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 108,560.60
c Pengecoran m³ Rp 952,415.80
6 Pek.Kolom Struktur (30/30)
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 192,134.80
c Pengecoran m³ Rp 952,415.80
7 Pek.Balok induk 30 x 60
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 205,419.40
c Pengecoran m³ Rp 952,415.80
8 Pek.Balok anak 25 x 40
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 205,419.40
c Pengecoran m³ Rp 952,415.80
9 Kolom Praktis 15 x 15
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 192,134.80
c Pengecoran m³ Rp 952,415.80
10 Pek.Plat lantai 12 cm
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 263,518.80
c Pengecoran m³ Rp 952,415.80
11 Pek.Beton tangga
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 195,035.80
c Pengecoran m³ Rp 952,415.80
Harga Pekerjaan
V PEKERJAAN DINDING
1 Pas. Dinding bata 1:5 m² Rp 206,234.00
2 Pek. Plesteran tembok m² Rp 46,524.80
3 Pek. Acian m² Rp 27,986.00
4 Pek. Pasangan bata septictank m² Rp 206,234.00
5 Pek.Plesteran septictank m² Rp 46,524.80
Harga Pekerjaan
VI PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen pintu P1 1 buah m³ Rp 11,368,830.00
Pek. Daun pintu P1 1 buah m² Rp 839,448.00
2 Pek. Kusen pintu P2 10 buah m³ Rp 11,368,830.00
Pek. Daun pintu P2 10 buah m² Rp 839,448.00
3 Pek. Kusen pintu P4 2 buah m³ Rp 11,368,830.00
Pek. Daun pintu P4 2 buah m² Rp 732,452.80
4 Pek. Pintu P3 PVC 2 buah bh Rp 510,000.00
5 Pek. Kusen jendela J1 3 buah m³ Rp 11,368,830.00
Pek. Daun jendela J1 3 buah m² Rp 732,452.80
6 Pek. Kusen jendela J2 6 buah m³ Rp 11,368,830.00
Pek. Daun jendela J2 6 buah m² Rp 732,452.80
7 Pek. Kusen jendela J3 1 buah m³ Rp 11,368,830.00
Pek. Daun jendela J3 1 buah m² Rp 732,452.80
8 Pek. Kusen jendela J4 6 buah m³ Rp 11,368,830.00
Pek. Daun jendela J4 6 buah m² Rp 732,452.80
9 Pek. Ventilasi 2 buah bh Rp 114,180.00
Harga Pekerjaan
VII PEKERJAAN PLAFOND
1 Pek. Pasangan plafond gypsum rangka kalsiboard m² Rp 36,307.80
2 Pek. List plafond m' Rp 26,086.20
Harga Pekerjaan
VIII PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Keramik lantai 40x40 m² Rp 171,470.40
2 Pek. Keramik lantai 20x20 m² Rp 164,301.75
3 Pek. Keramik tegel plin 10x40 m² Rp 147,525.40
4 Pas. Parket Jati lantai satu m² Rp 320,000.00
5 Pas. Keramik Dinding 20 X 25 m² Rp 175,318.80
Harga Pekerjaan
IX PEKERJAAN GANTUNGAN & KUNCI
1 Pek. Engsel pintu bh Rp 36,697.72
2 Pek. Engsel jendela bh Rp 21,694.70
3 Pek. Kunci pintu bh Rp 138,905.00
4 Pek. Kunci slot bh Rp 105,905.00
5 Pek. Grendel pintu bh Rp 23,694.70
6 Pek. Grendel jendela bh Rp 23,694.70
7 Pek.Kait angin bh Rp 34,197.72
Harga Pekerjaan
X PEKERJAAN KACA
1 Pek.Kaca jendela m² Rp 124,417.72
Harga Pekerjaan
XI PEKERJAAN SANITASI
1 Pas. Bak mandi fiberglass bh Rp 650,000.00
2 Pas. Wastafel bh Rp 776,846.00
3 Pas. Kloset duduk bh Rp 1,715,224.20
4 Pas. Bak cuci piring bh Rp 500,000.00
5 Pas. Kran cuci piring bh Rp 58,775.00
6 Pas. Kran wastafel bh Rp 183,775.00
7 Pas. Kran bh Rp 58,775.00
8 Pas. Flordrain Stenles bh Rp 318,705.00
9 Pek. Septiktank + peresapan bh Rp 6,630,154.39
10 Pas. Bath tup bh Rp 2,200,000.00
11 Tempat sabun bh Rp 43,705.00
12 Pas. Pipa air bersih m¹ Rp 39,177.80
13 Pas. Pipa air kotor m¹ Rp 50,616.80
14 Pas. Pipa tinja m¹ Rp 103,316.80
Harga Pekerjaan
XII PEKERJAAN LISTRIK
1 Instalasi Titik Lampu ttk Rp 204,850.00
2 Instalasi Stop Kontak ttk Rp 204,850.00
3 Lampu down light bh Rp 162,200.00
4 Lampu TL bh Rp 362,200.00
5 Lampu Hias bh Rp 110,000.00
6 Stop Kontak bh Rp 36,200.00
7 Saklar Ganda bh Rp 31,200.00
8 Saklar Tunggal bh Rp 26,200.00
9 Instalasi AC bh Rp 234,750.00
10 Kabel BC 70 mm m¹ Rp 129,960.00
11 Meteran bh Rp 400,000.00
Harga Pekerjaan
XIII PEKERJAAN RELING
1 Pas. Relling balkon depan m² Rp 375,450.00
Harga Pekerjaan
TOTAL BIAYA LANTAI 1
II. LANTAI 2
No Uraian Pekerjaan Sat. Harga Satuan
I PEKERJAAN BETON
1 Pek. Kolom 15x15 K 275
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 192,134.80
c Pengecoran m³ Rp 952,415.80
2 Pek. Ring balok 15x20 K275
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 205,419.40
c Pengecoran m³ Rp 952,415.80
3 Pek. Beton Plat Talang =100 mm
a Pembesian kg Rp 10,403.85
b Begesting m² Rp 263,518.80
c Pengecoran m³ Rp 952,415.80
Harga Pekerjaan
II. PEKERJAAN DINDING
1 Pas. Dinding bata m² Rp 206,234.00
2 Pek. Plesteran tembok m² Rp 46,524.80
3 Pek. Acian m² Rp 27,986.00
Harga Pekerjaan
III PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen pintu P2 5 buah m³ Rp 11,368,830.00
Pek. Daun pintu P2 5 buah m³ Rp 839,448.00
2 Pek. Kusen pintu P4 1 buah bh Rp 11,368,830.00
Pek. Daun pintu P4 1 buah m³ Rp 732,452.80
3 Pek. Pintu P3 PVC 1 buah m³ Rp 510,000.00
4 Pek. Kusen jendela J2 4 buah m³ Rp 11,368,830.00
Pek. Daun jendela J2 4 buah m³ Rp 732,452.80
5 Pek. Kusen jendela J4 2 buah m³ Rp 11,368,830.00
Pek. Daun jendela J4 2 buah m³ Rp 732,452.80
6 Pek. Ventilasi 2 buah bh Rp 114,180.00
Harga Pekerjaan
IV PEKERJAAN PLAFOND
1 Pek. Pasangan plafond gypsum rangka kalsiboard m² Rp 36,307.80
2 Pek. List plafond m' Rp 26,086.20
Harga Pekerjaan
V PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Keramik lantai 40x40 m² Rp 171,470.40
2 Pek. Keramik lantai 20x20 m² Rp 164,301.75
3 Pek. Keramik tegel plin 10x40 m² Rp 147,525.40
4 Pas. Keramik Dinding 20 X 25 m² Rp 175,318.80
Harga Pekerjaan
VI PEKERJAAN ATAP
1 Pek. Genteng kodok karang pilang m² Rp 80,934.40
2 Pek. Kuda - kuda kamper m³ Rp 11,365,337.00
3 Pek. Usuk 5/7 m² Rp 64,711.56
4 Pek. Reng m² Rp 47,800.32
5 Pek. List plank m¹ Rp 121,168.80
6 Pek. Bubungan Genteng m¹ Rp 98,053.20
7 Pek.Murda bh Rp 192,553.20
Harga Pekerjaan
VII PEKERJAAN GANTUNGAN & KUNCI
1 Pek. Engsel pintu bh Rp 36,697.72
2 Pek. Engsel jendela bh Rp 21,694.70
3 Pek. Kunci pintu bh Rp 138,905.00
4 Pek. Kunci slot bh Rp 105,905.00
5 Pek. Grendel pintu bh Rp 23,694.70
6 Pek. Grendel jendela bh Rp 23,694.70
7 Pek.Kait angin bh Rp 34,197.72
Harga Pekerjaan
VIII PEKERJAAN KACA
1 Pek.Kaca pintu bukaan dua m² Rp 140,917.72
2 Pek.Kaca jendela m² Rp 124,417.72
Harga Pekerjaan
IX PEKERJAAN SANITASI
1 Pas. Bak mandi fiberglass bh Rp 650,000.00
2 Pas. Wastafel bh Rp 776,846.00
3 Pas. Kloset duduk bh Rp 1,715,224.20
4 Pas. Kran wastafel bh Rp 183,775.00
5 Pas. Kran bh Rp 58,775.00
6 Pas. Flordrain Stenles bh Rp 318,705.00
7 Tempat sabun bh Rp 43,705.00
8 Pas. Pipa air bersih m¹ Rp 39,177.80
9 Pas. Pipa air kotor m¹ Rp 50,616.80
10 Pas. Pipa tinja m¹ Rp 103,316.80
Harga Pekerjaan
X PEKERJAAN LISTRIK
1 Instalasi Titik Lampu ttk Rp 204,850.00
2 Instalasi Stop Kontak ttk Rp 204,850.00
3 Lampu down light bh Rp 162,200.00
4 Lampu TL bh Rp 362,200.00
5 Stop Kontak bh Rp 36,200.00
6 Saklar Ganda bh Rp 31,200.00
7 Saklar Tunggal bh Rp 26,200.00
8 Penangkal Petir bh Rp 817,710.00
9 Kabel BC 70 mm m¹ Rp 129,960.00
Harga Pekerjaan
XI PEKERJAAN RELING
1 Pas. Relling balkon depan m² Rp 375,450.00
Harga Pekerjaan
XV PEKERJAAN PENGECATAN
1 Pek. Cat tembok luar m² Rp 13,832.16
2 Pek. Cat tembok dalam m² Rp 13,832.16
3 Pek. Cat plafond = cat dinding m² Rp 32,000.00
4 Pek. Politur list plank m¹ Rp 37,918.70
5 Pek. Politur kayu m² Rp 37,918.70
Harga Pekerjaan
XII PEKERJAAN BATU ALAM
1 Pek.Batu marmer m² Rp 900,000.00
2 Pek.Batu Bali green m² Rp 1,740,000.00
Harga Pekerjaan
TOTAL BIAYA LANTAI 2
pvc d 1/2 dan 1 aw
d4
RENCANA ANGGARAN BIAYA
PROYEK : PEMBANGUNAN RUMAH TINGGAL DUA LANTAI
LOKASI : Desa Jinengdalem, Singaraja Kab.Buleleng
TAHUN ANGGARAN : 2017-2018
I. LANTAI 1
No Uraian Pekerjaan Sat. Volume Koefiesien Harga Satuan Jumlah
IV PEKERJAAN STRUKTUR
1 Pek.Pondasi telapak K = 275
a Pembesian kg 154.34 0.07 Rp 10,403.85 Rp 1,605,709.40
b Begesting m² 18.00 0.52 Rp 104,059.60 Rp 1,873,072.80
c Pengecoran m³ 6.18 1.65 Rp 952,415.80 Rp 5,885,929.64
2 Pek. Sloof 30 x 15 K 275
a Pembesian kg 334.32 0.07 Rp 10,403.85 Rp 3,478,232.61
b Begesting m² 69.99 0.52 Rp 108,560.60 Rp 7,598,416.94
c Pengecoran m³ 4.63 1.65 Rp 952,415.80 Rp 4,411,447.12
3 Pek. Sloof Praktis (15/16)
a Pembesian kg 140.66 0.07 Rp 10,403.85 Rp 1,463,384.73
b Begesting m² 41.96 0.52 Rp 108,560.60 Rp 4,554,768.53
c Pengecoran m³ 2.52 1.65 Rp 952,415.80 Rp 2,397,573.44
4 Pek.Kolom Struktur (30/30)
a Pembesian kg 412.94 0.07 Rp 10,403.85 Rp 4,296,120.04
b Begesting m² 6.12 0.52 Rp 192,134.80 Rp 1,175,864.98
c Pengecoran m³ 5.40 1.65 Rp 952,415.80 Rp 5,143,045.32
5 Pek.Balok induk 30 x 60
a Pembesian kg 952.20 0.07 Rp 10,403.85 Rp 9,906,545.97
b Begesting m² 68.77 0.66 Rp 205,419.40 Rp 14,126,692.14
c Pengecoran m³ 19.04 1.65 Rp 952,415.80 Rp 18,137,806.50
6 Pek.Balok anak 25 x 40
a Pembesian kg 116.06 0.07 Rp 10,403.85 Rp 1,207,519.38
b Begesting m² 20.06 0.66 Rp 205,419.40 Rp 4,120,713.16
c Pengecoran m³ 2.36 1.65 Rp 952,415.80 Rp 2,247,701.29
7 Kolom Praktis 15 x 15
a Pembesian kg 185.63 0.07 Rp 10,403.85 Rp 1,931,283.32
b Begesting m² 31.20 0.52 Rp 192,134.80 Rp 5,994,605.76
c Pengecoran m³ 0.86 1.65 Rp 952,415.80 Rp 822,887.25
8 Pek.Plat lantai 12 cm
a Pembesian kg 2,245.38 0.07 Rp 10,403.85 Rp 23,360,549.27
b Begesting m² 11.62 0.66 Rp 263,518.80 Rp 3,062,088.46
c Pengecoran m³ 23.24 1.65 Rp 952,415.80 Rp 22,134,524.16
9 Pek.Beton tangga
a Pembesian kg 77.51 0.07 Rp 10,403.85 Rp 806,370.16
b Begesting m² 4.16 0.66 Rp 195,035.80 Rp 811,348.93
c Pengecoran m³ 4.94 1.65 Rp 952,415.80 Rp 4,708,743.72
NO Uraian Pekerjaan Volume Satuan Koefisien Produktifitas/orang
I PEMBESIAN
1 Pek.Pondasi telapak K = 275 154.34 kg 0.07 142.8571428571
2 Pek. Sloof 30 x 15 K 275 334.32 kg 0.07 142.8571428571
3 Pek. Sloof Praktis (15/16) 140.66 kg 0.07 142.8571428571
4 Pek.Kolom Struktur (30/30) 412.94 kg 0.07 142.8571428571
5 Pek.Balok induk 30 x 60 952.20 kg 0.07 142.8571428571
6 Pek.Balok anak 25 x 40 116.06 kg 0.07 142.8571428571
7 Kolom Praktis 15 x 15 185.63 kg 0.07 142.8571428571
8 Pek.Plat lantai 12 cm 2,245.38 kg 0.07 142.8571428571
9 Pek.Beton tangga 77.51 kg 0.07 142.8571428571
TOTAL
RAB Bobot (%) CEK Durasi Minggu 1
1 2 3 4
Rp 1,605,709.40 1.02 Rp 138,556.94 1 1.02
Rp 3,478,232.61 2.21 Rp 300,137.29 1
Rp 1,463,384.73 0.93 Rp 126,275.72 1
Rp 4,296,120.04 2.73 Rp 370,712.93 1
Rp 9,906,545.97 6.30 Rp 854,837.55 2
Rp 1,207,519.38 0.77 Rp 104,197.05 1
Rp 1,931,283.32 1.23 Rp 166,650.77 1
Rp 23,360,549.27 14.85 Rp 2,015,785.80 4
Rp 806,370.16 0.51 Rp 69,581.82 1
Rp 48,055,714.89 30.56 Rp 4,146,735.88
2.21
0.93
0.603958
0.5792551 0.5792551 0.5792551 0.5792551 0.5792551
1.4025704 1.4025704
0.7622817 0.7622817
0.603958 1.4025704 1.4025704 1.5092551 0.5792551 0.5792551 0.5792551 0.5792551 0.7622817 0.7622817
12.995441 14.398011 15.800581 17.309837 17.889092 18.468347 19.047602 19.626857 20.389139 21.151421
Minggu 4 Minggu 5
4 5 6 7 1 2 3 4 5 6
2.73
3.150 3.150
0.7477063
0.8982849 0.8982849 0.8982849 0.8982849 0.8982849
0.77
1.23
1.6476324 1.6476324
1.4292631
1.6476324 1.6476324 1.4229021 0.6550674 0.6550674 0.6550674 1.4292631 1.9904272 0.7623672 0.7623672
53.067469 54.715102 56.138004 56.793071 57.448139 58.103206 59.532469 61.522896 62.285264 63.047631
Minggu 9
6 7 1 2 3 4 5 6 7 1
0.7623672 0.7623672
0.9735569 0.9735569
0.5232557
1.7593563 1.7593563
0.7623672 0.7623672 0.5232557 3.7136131 3.7136131 3.7136131 4.68717 0.9735569 1.7593563 1.7593563
63.809998 64.572365 65.095621 68.809234 72.522847 76.23646 80.92363 81.897187 83.656543 85.4159
Minggu 10 Minggu 11
2 3 4 5 6 7 1 2 3 4
0.5127528
0.5159187
II. LANTAI 2
No Uraian Pekerjaan Sat. Volume Harga Satuan Jumlah
I PEKERJAAN BETON
1 Pek. Kolom 15x15 K 225
a Pembesian kg 408.39 Rp 10,403.85 Rp 4,248,823.31
b Begesting m² 68.64 Rp 192,134.80 Rp 13,188,132.67
c Pengecoran m³ 1.90 Rp 952,415.80 Rp 1,810,351.95
2 Pek. Ring balok 15x20 K225
a Pembesian kg 158.31 Rp 10,403.85 Rp 1,646,984.18
b Begesting m² 60.17 Rp 205,419.40 Rp 12,359,715.54
c Pengecoran m³ 3.06 Rp 952,415.80 Rp 2,913,820.90
3 Pek. Beton Plat Talang =100 mm
a Pembesian kg 74.29 Rp 10,403.85 Rp 772,922.82
b Begesting m² 60.40 Rp 263,518.80 Rp 15,916,535.52
0.6864
Upah pekerja total RAB UJI Upah 25%
CEK
756,000.00 Rp 1,873,072.80 Rp 938,574.00
2,457,000.00 Rp 7,598,416.94 Rp 3,649,613.71
1,512,000.00 Rp 4,554,768.53 Rp 2,187,711.71
252,000.00 Rp 1,175,864.98 Rp 351,052.38
3,150,000.00 Rp 14,126,692.14 Rp 4,551,301.76
1,008,000.00 Rp 4,120,713.16 Rp 1,327,600.89
1,260,000.00 Rp 5,994,605.76 Rp 1,789,678.80
630,000.00 Rp 3,062,088.46 Rp 769,029.03
252,000.00 Rp 811,348.93 Rp 282,522.24
11,277,000.00 Rp 43,317,571.70 Rp 15,847,084.52
REKAPITULASI RENCANA ANGGARAN BIAYA
NO URAIAN LANTAI I
I PEKERJAAN PERSIAPAN Rp 20,126,076.00
II PEKERJAAN TANAH Rp 12,411,880.39
III PEKERJAAN PONDASI Rp 51,444,331.51
IV PEKERJAAN BETON Rp 164,229,158.77
V PEKERJAAN DINDING Rp 112,228,796.60
VI PEKERJAAN PINTU & JENDELA Rp 34,373,467.36
VII PEKERJAAN PLAFOND Rp 11,816,709.44
VIII PEKERJAAN LANTAI & DINDING KERAMIK Rp 71,632,627.25
IX PEKERJAAN GANTUNGAN & KUNCI Rp 4,447,598.40
X PEKERJAAN KACA Rp 1,066,558.46
XI PEKERJAAN SANITASI Rp 23,131,563.99
XII PEKERJAAN LISTRIK Rp 9,192,700.00
XIII PEKERJAAN RELING Rp 140,606.03
XIV PEKERJAAN ATAP -
XV PEKERJAAN PENGECATAN -
XVI PEKERJAAN BATU ALAM -
TOTAL Rp 516,242,074.20
TOTAL KESELURUHAN Rp 922,966,580.70
LANTAI II
-
-
-
Rp 74,573,319.55
Rp 134,510,427.83
Rp 24,630,293.28
Rp 10,734,132.14
Rp 46,593,359.94
Rp 3,797,229.62
Rp 750,985.30
Rp 8,421,200.60
Rp 12,607,760.00
Rp 197,111.25
Rp 28,507,806.01
Rp 11,884,080.98
Rp 49,516,800.00
Rp 406,724,506.50
922,966,580.70
PLAN
SECOND FLOOR
-
-
-
Rp 74,573,319.55
Rp 134,510,427.83
Rp 24,630,293.28
Rp 10,734,132.14
Rp 46,593,359.94
Rp 3,797,229.62
Rp 750,985.30
Rp 8,421,200.60
Rp 12,607,760.00
Rp 197,111.25
Rp 28,507,806.01
Rp 11,884,080.98
Rp 49,516,800.00
Rp 406,724,506.50
922,966,580.70
DAFTAR HARGA SATUAN BAHAN BANGUNAN
5%
1 Amplas Lbr Rp 4,000.00 Rp 3,800.00 Rp 4,200.00
2 Aluminium lapis jeruk Lbr Rp 90,000.00 Rp 90,000.00 Rp 90,200.00
3 Batako Bh Rp 2,000.00 Rp 2,000.00 Rp 2,200.00
4 Batu Bata Pasangan Bh Rp 2,000.00 Rp 1,300.00 Rp 2,200.00
5 Batu Kali M3 Rp 180,000.00 Rp 180,000.00 Rp 180,200.00
6 Batu Palimanan M2 Rp 100,000.00 Rp 95,000.00 Rp 100,200.00
7 Besi Beton Kg Rp 8,451.00 Rp 8,451.00 Rp 8,651.00
8 Cat Meni Kg Rp 22,000.00 Rp 22,000.00 Rp 22,200.00
9 Cat Dasar Kg Rp 20,000.00 Rp 20,000.00 Rp 20,200.00
10 Cat Tembok setara vinilex Kg Rp 17,000.00 Rp 17,000.00 Rp 17,200.00
11 Cat Kayu setara Emcolux Kg Rp 55,000.00 Rp 55,000.00 Rp 55,200.00
12 Clear Gross Kg Rp 45,000.00 Rp 45,000.00 Rp 45,200.00
13 Dempul Kg Rp 29,000.00 Rp 29,000.00 Rp 29,200.00
14 Engsel pintu Bh Rp 24,500.00 Rp 24,500.00 Rp 24,700.00
15 Engsel jendela Bh Rp 13,500.00 Rp 13,500.00 Rp 13,700.00
16 Espagnoilet Bh Rp 100,000.00 Rp 100,000.00 Rp 100,200.00
17 Furing channel (MF-1) M1 Rp 9,500.00 Rp 9,500.00 Rp 9,700.00
18 Floor Drain 2" Toto TX 1 BN Bh Rp 310,000.00 Rp 310,000.00 Rp 310,200.00
19 Floor drain stainles Bh Rp 45,000.00 Rp 45,000.00 Rp 45,200.00
20 Genteng Kodok Karangpilang (Bambe) Bh Rp 3,000.00 Rp 3,000.00 Rp 3,200.00
21 Genteng Bubungan Karangpilang Bh Rp 10,000.00 Rp 10,000.00 Rp 10,200.00
22 Grendel jendela Bh Rp 15,500.00 Rp 15,500.00 Rp 15,700.00
23 Kalsiboard 4.5 mm Lbr Rp 62,500.00 Rp 62,500.00 Rp 62,700.00
24 Impra Kg Rp 38,000.00 Rp 38,000.00 Rp 38,200.00
25 Ikut Celedu Paras diukir bh Rp 120,000.00 Rp 120,000.00 Rp 120,200.00
26 Jetwasher Toto TGB 500AZRV24 bh Rp 550,000.00 Rp 550,000.00 Rp 550,200.00
27 Jetwasher setara ina bh Rp 250,000.00 Rp 250,000.00 Rp 250,200.00
28 Kabel NYM/ NYA 3 X 2.5 mm2 setara Supre M1 Rp 12,000.00 Rp 12,000.00 Rp 12,200.00
29 Kabel BC 70 mm M1 Rp 85,000.00 Rp 85,000.00 Rp 85,200.00
30 Kaca Bening 5 MM M2 Rp 102,000.00 Rp 102,000.00 Rp 102,200.00
31 Kaca Es / Kapur 5 MM M2 Rp 117,000.00 Rp 117,000.00 Rp 117,200.00
32 Kait Angin Bh Rp 22,000.00 Rp 22,000.00 Rp 22,200.00
33 Kayu Kamper Balok M3 Rp 8,300,000.00 Rp 8,300,000.00 Rp 8,300,200.00
34 Kayu Kamper Papan M3 Rp 9,000,000.00 Rp 9,000,000.00 Rp 9,000,200.00
35 Kayu Kamfer Usuk M3 Rp 6,500,000.00 Rp 6,500,000.00 Rp 6,500,200.00
36 Kayu Kamfer reng M3 Rp 6,500,000.00 Rp 6,500,000.00 Rp 6,500,200.00
37 Kayu Merbau Balok M3 Rp 13,000,000.00 Rp 13,000,000.00 Rp 13,000,200.00
38 Kayu Merbau Papan M3 Rp 13,000,000.00 Rp 13,000,000.00 Rp 13,000,200.00
39 Kayu terentang/Begesting M3 Rp 900,000.00 Rp 900,000.00 Rp 900,200.00
40 Kayu papan Begesting M3 Rp 900,000.00 Rp 900,000.00 Rp 900,200.00
41 Kayu Dolken 8' - 10' /4 m Btg Rp 15,000.00 Rp 15,000.00 Rp 15,200.00
42 Kawat beton Kg Rp 16,000.00 Rp 16,000.00 Rp 16,200.00
43 Keramik 40 x 40 cm setara Asia Tile Kls I M2 Rp 52,000.00 Rp 52,000.00 Rp 52,200.00
44 Keramik 40 x 40 cm setara Asia Tile anti slip M2 Rp 52,000.00 Rp 52,000.00 Rp 52,200.00
45 Keramik 20 x 20 cm setara Asia Tile M2 Rp 45,000.00 Rp 45,000.00 Rp 45,200.00
46 Keramik 20 x 20 cm setara Asia Tile anti slip M2 Rp 45,000.00 Rp 45,000.00 Rp 45,200.00
47 Keramik 20 x 25 cm setara Asia Tile M2 Rp 45,000.00 Rp 45,000.00 Rp 45,200.00
48 Keramik border 10 x 20 cm setara Asia Tile Bh Rp 7,500.00 Rp 7,500.00 Rp 7,700.00
49 Keramik step nossing tangga 8 x 40 cm setara Bh Rp 15,000.00 Rp 15,000.00 Rp 15,200.00
50 Kloset Duduk setara Toto CW 660J/SW660J ( Bh Rp 1,365,000.00 Rp 1,365,000.00 Rp 1,365,200.00
51 Kloset duduk setara ina Bh Rp 1,300,000.00 Rp 1,300,000.00 Rp 1,300,200.00
52 Kloset jongkok setara ina Bh Rp 140,000.00 Rp 140,000.00 Rp 140,200.00
53 Koral Beton M3 Rp 125,000.00 Rp 125,000.00 Rp 125,200.00
54 Kran Wastafel Toto TX 101LB Bh Rp 1,150,000.00 Rp 1,150,000.00 Rp 1,150,200.00
55 Kran Wastafel setara Sanei Bh Rp 175,000.00 Rp 175,000.00 Rp 175,200.00
56 Kran Air setara Onda Bh Rp 50,000.00 Rp 50,000.00 Rp 50,200.00
57 Kunci Tanam 1 Slaag Bh Rp 72,000.00 Rp 72,000.00 Rp 72,200.00
58 Kunci Tanam 2 Slaag Bh Rp 105,000.00 Rp 105,000.00 Rp 105,200.00
59 Kuas 4" Bh Rp 9,000.00 Rp 9,000.00 Rp 9,200.00
60 Lampu TL 2 x 18 Watt setara SAKA Bh Rp 350,000.00 Rp 350,000.00 Rp 350,200.00
61 Lampu TL 2 x 36 Watt setara SAKA Bh Rp 450,000.00 Rp 450,000.00 Rp 450,200.00
62 Lampu Down Light PL 14 watt, Philips Bh Rp 150,000.00 Rp 150,000.00 Rp 150,200.00
63 List Gypsum Stdr M' Rp 17,000.00 Rp 17,000.00 Rp 17,200.00
64 List profil 15/100 mm kayu kamfer M' Rp 20,000.00 Rp 20,000.00 Rp 20,200.00
65 Lem Kayu Kg Rp 12,500.00 Rp 12,500.00 Rp 12,700.00
66 Meter channel (MF-1) M' Rp 10,000.00 Rp 10,000.00 Rp 10,200.00
67 Minyak bekisting Ltr Rp 15,000.00 Rp 15,000.00 Rp 15,200.00
68 Murda paras diukir bh Rp 130,000.00 Rp 130,000.00 Rp 130,200.00
69 Paku List Kg Rp 17,000.00 Rp 17,000.00 Rp 17,200.00
70 Paku usuk Kg Rp 13,000.00 Rp 13,000.00 Rp 13,200.00
71 Paku Skrup 2 Kotak Rp 18,000.00 Rp 18,000.00 Rp 18,200.00
72 Paku reng Kg Rp 13,000.00 Rp 13,000.00 Rp 13,200.00
73 Paku Beton Kotak Rp 15,000.00 Rp 15,000.00 Rp 15,200.00
74 Paku gypsum Kg Rp 15,000.00 Rp 15,000.00 Rp 15,200.00
75 Paku anti karat Kg Rp 30,000.00 Rp 30,000.00 Rp 30,200.00
74 Pasir Beton M3 Rp 141,000.00 Rp 141,000.00 Rp 141,200.00
77 Pasir Pasang M3 Rp 158,000.00 Rp 158,000.00 Rp 158,200.00
78 Pasir Urug M3 Rp 125,000.00 Rp 125,000.00 Rp 125,200.00
79 Paras kelating M2 Rp 85,000.00 Rp 85,000.00 Rp 85,200.00
80 Paras silakarang M2 Rp 90,000.00 Rp 90,000.00 Rp 90,200.00
81 Penangkal Petir konvensional Bh Rp 750,000.00 Rp 750,000.00 Rp 750,200.00
82 Papan difrofil 3/5 kayu kamfer M' Rp 25,000.00 Rp 25,000.00 Rp 25,200.00
83 Pipa PVC TIPE AW Ø ½˝ ( Ø 15 mm ) M' Rp 5,500.00 Rp 5,500.00 Rp 5,700.00
84 Pipa PVC TIPE AW Ø ¾˝ ( Ø 20 mm ) M' Rp 6,250.00 Rp 6,250.00 Rp 6,450.00
85 Pipa PVC TIPE AW Ø 1˝ ( Ø 25 mm ) M' Rp 8,000.00 Rp 8,000.00 Rp 8,200.00
86 Pipa PVC TIPE AW Ø 1.5˝ ( Ø 40 mm ) M' Rp 14,870.00 Rp 14,870.00 Rp 15,070.00
87 Pipa PVC TIPE AW Ø 2˝ ( Ø 50 mm ) M' Rp 22,250.00 Rp 22,250.00 Rp 22,450.00
88 Pipa PVC TIPE AW Ø 4˝ ( Ø 100 mm ) M' Rp 56,250.00 Rp 56,250.00 Rp 56,450.00
89 Pipa PVC HI Conduit Ø 20 mm M' Rp 2,000.00 Rp 2,000.00 Rp 2,200.00
90 Pipa PVC HI Conduit Ø 25 mm M' Rp 2,500.00 Rp 2,500.00 Rp 2,700.00
91 Plamir Tembok Kg Rp 10,000.00 Rp 10,000.00 Rp 10,200.00
92 Plywood 9 MM Lbr Rp 100,000.00 Rp 100,000.00 Rp 100,200.00
93 Politur Ultra KG Rp 47,000.00 Rp 47,000.00 Rp 47,200.00
94 Saklar tunggal [1 way 1 gang] setara clipsal Bh Rp 20,000.00 Rp 20,000.00 Rp 20,200.00
95 Saklar double [1 way 2 gang] setara clipsal Bh Rp 25,000.00 Rp 25,000.00 Rp 25,200.00
96 Saklar Triple [1 way 3 gang] setara clipsal Bh Rp 55,000.00 Rp 55,000.00 Rp 55,200.00
97 Stop kontak setara clipsal Bh Rp 30,000.00 Rp 30,000.00 Rp 30,200.00
98 Semen PC 50 Kg setara Gresik Kg Rp 1,200.00 Rp 1,200.00 Rp 1,400.00
99 Semen warna/semen grouting Kg Rp 11,000.00 Rp 11,000.00 Rp 11,200.00
100 Single Lever shower Mixer setara Toto type unit Rp 1,220,000.00 Rp 1,220,000.00 Rp 1,220,200.00
101 Seal tape Bh Rp 2,600.00 Rp 2,600.00 Rp 2,800.00
102 Tanah Urug M3 Rp 80,000.00 Rp 80,000.00 Rp 80,200.00
103 Teakwood 3 MM Lbr Rp 62,000.00 Rp 62,000.00 Rp 62,200.00
104 Tempat Sabun setara ina Bh Rp 35,000.00 Rp 35,000.00 Rp 35,200.00
105 Tempat Sabun setara toto type S156NV1 Bh Rp 75,000.00 Rp 75,000.00 Rp 75,200.00
106 Tempat tissu setara toto Bh Rp 275,000.00 Rp 275,000.00 Rp 275,200.00
107 Tinner Ltr Rp 18,000.00 Rp 18,000.00 Rp 18,200.00
108 Urinoir Toto U 57 Komplit Bh Rp 1,052,000.00 Rp 1,052,000.00 Rp 1,052,200.00
109 Urinoir setara INA Bh Rp 1,750,000.00 Rp 1,750,000.00 Rp 1,750,200.00
110 Washtafel Toto L 521 V1A Bh Rp 1,850,000.00 Rp 1,850,000.00 Rp 1,850,200.00
111 Washtafel setara INA Bh Rp 500,000.00 Rp 500,000.00 Rp 500,200.00
112 Waterproofing Kg Rp 50,000.00 Rp 50,000.00 Rp 50,200.00
113 Imbowduss pcs Rp 4,000.00 Rp 4,000.00 Rp 4,200.00
114 Ω Clem Ø 20 mm pcs Rp 850.00 Rp 850.00 Rp 1,050.00
115 Ω Clem Ø 25 mm pcs Rp 1,000.00 Rp 1,000.00 Rp 1,200.00
116 Sock Ø 20 mm pcs Rp 850.00 Rp 850.00 Rp 1,050.00
117 Sock Ø 25 mm pcs Rp 1,000.00 Rp 1,000.00 Rp 1,200.00
118 Tee dos/JB pcs Rp 5,000.00 Rp 5,000.00 Rp 5,200.00
DAFTAR HARGA SATUAN UPAH
HARGA Kelompok 1
NO URAIAN TENAGA KERJA SATUAN
(Rp.) Denpasar
5%
1 Mandor Hari Rp 90,000.00 94,500.00
2 Kepala Tukang Besi Hari Rp 70,000.00 73,500.00
3 Kepala Tukang batu Hari Rp 70,000.00 73,500.00
4 Kepala Tukang kayu Hari Rp 70,000.00 73,500.00
5 Kepala Tukang Cat Hari Rp 70,000.00 73,500.00
6 Kepala Tukang Pipa Hari Rp 70,000.00 73,500.00
7 kepala Tukang Style Bali Hari Rp 70,000.00 73,500.00
8 Tukang Batu Hari Rp 50,000.00 52,500.00
9 Tukang kayu Hari Rp 55,000.00 57,750.00
10 Tukang Besi Hari Rp 50,000.00 52,500.00
11 Tukang cat Hari Rp 50,000.00 52,500.00
12 Tukang Pipa Hari Rp 50,000.00 52,500.00
13 Tukang Listrik Hari Rp 55,000.00 57,750.00
14 Pekerja Hari Rp 60,000.00 63,000.00
15 Tukang style Bali Hari Rp 70,000.00 73,500.00
VOLUME
PROYEK : PEMBANGUNAN RUMAH TINGGAL DUA LANTAI
LOKASI : Desa Jinengdalem, Singaraja Kab.Buleleng
TAHUN ANGGARAN : 2017-2018
I. LANTAI 1
NO URAIAN/GAMBAR SAT
I PEKERJAAN PERSIAPAN
Perbersihan lahan
1 m²
1 m³
2 m³
2 m³
a Galian Tanah m³
b Pas. Bata m²
c Pek. Plesteran m²
1 Pek.Rabatan lantai m³
a Begesting m²
b Pengecoran m³
b Pengecoran m³
c Pembesian kg
a Bekisting m²
a Bekisting m²
b Pengecoran m³
c Pembesian kg
a. Bekisting m²
b. Pengecoran m³
c. Pembesian kg
Pek.Kolom Struktur (30/30)
a Begesting m²
b Pengecoran m³
c. Pembesian kg
Pek.Balok induk 30 x 60
a Begesting m²
b Pengecoran m³
c Pembesian kg
Pek.Balok anak 25 x 40
a Begesting m²
b Pengecoran m³
c Pembesian kg
Kolom Praktis 15 x 15
a Begesting m²
b Pengecoran m³
c Pembesian kg
10 Pek.Plat lantai 12 cm
a Begesting m²
b Pengecoran m³
c. Pembesian
kg
kg
a Begesting m²
b Pengecoran m3
b Pengecoran m3
Pembesian
c kg
V PEKERJAAN DINDING
1 P1, 1 buah m³
2 P2, 5 buah m³
3 P4, 1 buah m³
4 P3, 2 buah m³
5 J1, 3 buah
6 J2, 1 buah
7 J3, 1 buah
8 J 4, 4 Buah m³
9 Ventilasi, 2 buah
bh
2 Pek.List plafond m¹
X PEKERJAAN KACA
1 Pek.Kaca jendela
1 Pek.Kaca jendela
XI PEKERJAAN SANITASI
1 Pas. Bak Mandi Fiberglass bh
2 Pas. Wastafel bh
3 Pas. Kloset Duduk bh
4 Pas. Bak Cuci Piring bh
5 Pas. Kran Cuci piring bh
6 Pas. Kran Wastafel bh
7 Pas. Kran bh
8 Bath tup bh
9 Pas. Flordrain Stenles bh
10 Pek. Septiktank + peresapan bh
11 Tempat sabun bh
12 Pas. Pipa Air Bersih m¹
13 Pas. Pipa Air Kotor m¹
14 Pas. Pipa Tinja m¹
XII PEK. INSTALASI LISTRIK
1 Instalasi Titik Lampu titik
2 Instalasi Stop Kontak titik
3 Lampu down light bh
4 Lampu TL bh
5 Lampu Hias bh
6 Stop Kontak bh
7 Saklar Ganda bh
8 Saklar Tunggal bh
9 Instalasi AC bh
10 Kabel BC 70 mm m¹
11 Meteran bh
XIII PEKERJAAN RELING
PERHITUNGAN Total
Keliling = 2 (panjang+lebar)
= 2 (20+15)
= 70 m¹ 70
Keliling = 2 (panjang+lebar)
= 2 (20+15)
= 70 m² 70
Luas = panjang x lebar
3 x 4 = 12 12
= 0,385 x 112,39
= 43,27 m³ 43.27
= 0,2275 x 77,92
= 17,73 m³ 17.73
Total = V1 + V2
= 61 m³ 61.00
V1 = L. penampang x panjang pondasi
= 0,2 x 112,39
= 22,48 m³ 22.48
= 0,09 x 77,92
= 7,0128 m³ 7.01
Total = V1 + V2
= 24,49 m³ 29.49
V = 2 x t. x p. total sloof
= 2 x 0,34 x 102,93
= 69,99 m² 69.99
V = t. x l. x p. total sloof
= 0,3 x 0,15 x 102,93
= 4,63 m³ 4.63
Panjang besi D16 = 6 x panjang sloof
= 6 x 102,93
= 617,58 m 617.58
Berat besi D16 = Berat besi/1m x panjang total
= 1,597 x617,58
= 986,28 kg 986.28
Jarak Begel rata- rata = (0,1 + 0,2) : 2
= 0.15 m 0.15
Jumlah Begel = (panjang sloof : jarak rata-rata
0.7
begel) + 1
= (102,93 : 0,15) + 1
= 687 buah 687
Panjang besi Begel = kll Begel x jml begel
=(2(0,11 + 0,26) + 0,05) x 687
= 542,73 m 542.73
Berat Besi Ø10 = Berat besi/1m x panjang total
= 0,616 x 542,73
= 334,32 kg 334.32
V = 2 x t. x p. total sloof
= 2 x 0,2 x 104,89
= 41,96 m² 41.96
V = tinggi x lebar x panjang total sloof
= 0,16 x 0,15 x 104,89
= 2,52 m³ 2.52
Panjang besi D12 = 4 x panjang sloof
= 4 x 104,89
= 419,56 m 419.56
Berat besi D12 = Berat besi/1m x panjang total
= 0,877 x 419,56
= 367,95 kg 367.95
Jarak Begel rata- rata = (0,1 + 0,2) : 2
= 0.15 m 0.15
Jumlah Begel = (panjang sloof : jarak rata-rata
begel) + 1
= (104,89 : 0,15) + 1
= 700 buah 700
Panjang besi Begel = kll Begel x jml begel
=(2(0,11 + 0,12) + 0,05) x 700
= 357 m 357.00
Berat Besi Ø8 = Berat besi/1m x panjang total
= 0,394 x 357
= 140,66 kg 140.66
L = 4 x p x l x banyak kolom
= 4 x 0,3 x 0.34 x 15
= 6.12 m² 6.12
V = p x l x t x jml. kolom
= (0,3 x 0,3 x 4) x 15
= 5,4 m³ 5.4
Panjang besi D16 = 8 x t. Kolom x jml. Kolom
= 8 x 4 x 15
= 480 m 480
Berat besi D16 = Berat besi/1m x panjang total
= 1,579 x 480
= 757,92 kg 757.92
= 41 buah 41
= 9,9 m² 9.9
V Kusen pintu = L.penampang kayu x panj. Kusen
x jml. Pintu
= 0,06 x 0,15 x 6,64 x 1
= 0,06 m³ 0.06
V Daun pintu = (Luas penampang kayu - l.
Kaca ) x jml. pintu
= (( 2,2 x 1,8 ) - 0,16) x 1
= 3,8 m² 3.8
2 2
= 5,29 m² 5.29984
2 bh 2
Pas. Plafond Lt 2
193.49
V =(3.5 x 4) + (3.5 x 4) + (3.5 x 2) + (3.5 x 2) +
(1.5 x 3) + (2.5 x 3) + (2 x 4 ) + (0.88 x 6) + (1.38 x
4) + (1.93 x 9.05) + (1.5 x 8.93) + (8 x 8) + (5.08 x
3.23) + (3.77 x 2.5)
Vol Total Plafond = 193.49
List Plafond Lt 1 = 183.68
List Plafond Total = 183.68
136.58
= 136,58 m²
L = panjang x lebar
= (2 x 3) + (2 x 3)
12
= 12 m²
L = panjang x lebar
= 2 x (5 + 3.5) + 2 x (3.5 + 5) + 2 x (5 + 5) + 7 +
12 + 7 + 6 + 9 + 3 + 4 + 11 + 2 x (5 + 5) + 6 + 3.93
+6
= 148 .93 m² 148.93
L = panjang x lebar
= (4 x 5) + (2 x 20 + (5 x 5) 49
= 49 m²
L = panjang x lebar
= (3 x 1.5) + (2 x 1.5) + (3 x 1.5) + (2 x 1.5)
= 15 x 2 buah 49
= 49 m²
2 x 7 = 14 bh 14
4 x1 = 4 bh 4
total = 4 18
2 x 10 = 20 bh 20
4 x 1 = 4 bh 4
total = 24 bh 24
1 x 7 = 7 bh 7
1 x 1 = 1 bh 1
total = 8 8
1 x 10 = 10 bh 10
2 x 1 = 2 bh 2
total = 12 12
1 x 7 = 7 bh 7
1 x 1 = 1 bh 1
total = 8 8
1 x 10 = 10 bh 10
2 x 1 = 2 bh 2
total = 12 12
1 x 10 = 10 bh 10
2 x 1 = 2 bh 2
total = 12 12
L1 = (0,54 x 1,84) x 3
= 3 m² 2.9808
L2 = (0,54 x 1,34) x 1
= 0.72 m² 0.7236
L3 = (0,82 x 1,32) x 1
= 1,082 m² 1.0824
L4 = (0,52 x 1,82) x 4
= 3.7856 m² 3.7856
Total = 8.5724
1 1
2 2
2 2
1 1
1 1
2 2
3 3
1 1
2 2
1 1
1 1
61 m¹ 61
39 m¹ 39
24 m¹ 24
19 titik 19
7 titik 7
11 buah 11
2 buah 2
8 buah 8
7 bh 7
3 bh 3
5 bh 5
1 bh 1
71 m¹ 71
1 bh 1
L1 = panjang x lebar
= 0.07 x 5,35
= 0,3745 m² 0.3745
PEK. TANGGA
Beton Tangga
= (luas 1 anak tangga x 17 + luas bordes x 2) x lebar tangga
= (0.0552 x 17 + 0.0711 x 2) x 0.72
= 0.738864 m3
pembesian
panjang besi ø8
besi a = 0.61 m x 5 bh x 17 anak tangga
= 51.85 m
besi b = 0.67 m x 17 anak tangga
= 11.39 m
besi c = 7 m x 5 bh x 2 lapis
= 70 m
besi d = 0.67 m x 47 bh x 2 lapis
= 62.98 m
panjang total
= 196.22 m
berat besi ø8/m = 0.395 kg/m
berat total besi
= 196.22 x 0.395
= 77.5069 kg
Balok tangga (Btr) (13/32) panjang 1.440 m (1bh)
Beton Balok
v = p x l x t
= 1.44 x 0.13 x 0.32
= 0.059904 m3
v total = 0.059904 x 1 bh
= 0.059904 m3
Pembesian
berat besi ø5 = 0.154 kg/m
jml begel= panjang balok/ jarak begel