Rab MC 0 OKE EDIT
Rab MC 0 OKE EDIT
a b c d e f = (d x e)
DIVISI 1. UMUM
DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 589.92 47,040.13 27,749,913.49 0.37 0.00 0.00 0.00
2.2 Pasangan Batu dengan Mortar M3 397.64 473,456.95 188,265,421.60 2.53 0.00 0.00 0.00
3.1.1 Galian Biasa M3 75,703.97 32,575.21 2,466,072,720.58 33.15 138838.70 4522699929.90 60.80
3.1.2 Galian Batu M3 264.50 124,742.79 32,994,467.96 0.44 0.00 0.00
3.2.1.a Timbunan Biasa dari Galian Sumber Bahan M3 2,945.00 89,817.23 264,511,742.35 3.56 10289.98 924217363.89 12.42
3.2.2 Timbunan Pilihan M3 990.00 217,495.00 215,320,050.00 2.89 675.54 146926572.30 1.98
3.3 Penyiapan Badan Jalan M2 5,530.51 10,305.55 56,994,947.33 0.77 2430.00 25042486.50 0.34
4.2.2 Lapis Pondasi Agregat Kelas B M3 285.00 395,059.19 112,591,869.15 1.51 0.00 0.00 0.00
a b c d e f = (d x e)
5.1 (1) Lapis Pondasi Agregat Kelas A M3 393.75 403,827.23 159,006,971.81 2.14 255.15 103036517.73 1.39
5.1 (2) Lapis Pondasi Agregat Kelas B M3 653.13 347,515.39 226,972,726.67 3.05 340.20 118224735.68 1.59
6.1 (1) Lapis Resap Pengikat Liter 2,600.00 147,076.87 382,399,862.00 5.14 1701.00 250177755.87 3.36
6.3 (6) Laston Lapis Antara (AC-BC) (Gradasi Halus / Kasar) Ton 287.50 319,989.54 91,996,992.75 1.24 218.78 70005972.72 0.94
6.3.8.a Aspal Minyak Ton 14.95 11,660,000.00 174,317,000.00 2.34 13.61 158748614.64 2.13
6.3.10 Bahan Pengisi (Filler) Tambahan Kg 2,875.00 1,760.00 5,060,000.00 0.07 2347.38 4131388.80 0.06
DIVISI 7. STRUKTUR
7.1 (5) Beton K-250 M3 184.00 1,298,027.16 238,836,997.44 3.21 256.23 332593499.21 4.47
7.3 (1) Baja Tulangan U24 Polos Kg 23,000.00 22,026.13 506,600,990.00 6.81 15512.53 341680997.98 4.59
7.9 Pasangan Batu M3 2,768.67 480,993.12 1,331,711,221.55 17.90 3232.02 1554579864.70 20.90
7.10 (3) Bronjong (Gabions) M 3
806.50 709,706.25 572,378,090.63 7.69 875.00 620992968.75 8.35
8.4 (6) Patok Kilometer Buah 3.00 607,286.15 1,821,858.45 0.02 0.00 0.00 0.00
8.4 (7) Rel Pengaman M' 300.00 1,016,783.82 305,035,146.00 4.10 0.00 0.00 0.00
- - - -
- - 216,015,335.09 2.90
- - 112,591,869.15 1.51
Pekerjaan Tambah Pekerjaan Kurang
Keterangan
Kuantitas Total Harga Bobot (%) Kuantitas Total Harga Bobot (%)
- - 164,718,445.07 2.21
- - 170,710,122.72 2.29
- - 306,857,004.45 4.13
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
ILHAM IRAWADI, ST
General Superintendent
NO. MATA KONTRAK AWAL PEK
URAIAN PEKERJAAN SATUAN HARGA SATUAN
PMBYRN. KUANTITAS JUMLAH HARGA BOBOT KUANTITAS
1 2 3 4
DIVISI 1. UMUM
DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 Rp. 47,040.13 589.920 Rp. 27,749,913.49 0.37 % 589.920
2.2 Pasangan Batu dengan Mortar M3 Rp. 473,456.95 397.640 Rp. 188,265,421.60 2.53 % 397.640
4.2.2 Lapis Pondasi Agregat Kelas B M3 Rp. 395,059.19 285.000 Rp. 112,591,869.15 1.51 % 285.000
6.1 (1) Lapis Resap Pengikat Liter Rp. 147,076.87 2,600.000 Rp. 382,399,862.00 5.14 % 899.000
6.3 (6) Laston Lapis Antara (AC-BC) (Gradasi Halus / Kasar) Ton Rp. 319,989.54 287.500 Rp. 91,996,992.75 1.24 % 68.724
6.3.8.a Aspal Minyak Ton Rp. 11,660,000.00 14.950 Rp. 174,317,000.00 2.34 % 1.335
6.3.9 Aditif Anti Pengelupasan Kg Rp. - - Rp. - 0.00 % -
6.3.10 Bahan Pengisi (Filler) Tambahan Kg Rp. 1,760.00 2,875.000 Rp. 5,060,000.00 0.07 % 527.620
DIVISI 7. STRUKTUR
7.1 (5) Beton K-250 M3 Rp. 1,298,027.16 184.000 Rp. 238,836,997.44 3.21 % -
7.3 (1) Baja Tulangan U24 Polos Kg Rp. 22,026.13 23,000.000 Rp. 506,600,990.00 6.81 % 7,487.470
7.9 Pasangan Batu M3 Rp. 480,993.12 2,768.670 Rp. 1,331,711,221.55 17.90 % -
7.10 (3) Bronjong (Gabions) M3 Rp. 709,706.25 806.500 Rp. 572,378,090.63 7.69 % -
8.4 (6) Patok Kilometer Buah Rp. 607,286.15 3.000 Rp. 1,821,858.45 0.02 % 3.000
8.4 (7) Rel Pengaman M' Rp. 1,016,783.82 300.000 Rp. 305,035,146.00 4.10 % 300.000
Rp. - 0.00 % 63,134.734 Rp. 2,056,627,209.31 27.65 % 138,838.704 Rp. 4,522,699,929.90 60.80 % 138,838.704
Rp. 32,994,467.96 0.44 % - Rp. - 0.00 % - Rp. - 0.00 % -
Rp. - 0.00 % 7,344.978 Rp. 659,705,621.54 8.87 % 10,289.978 Rp. 924,217,363.89 12.42 % 10,289.978
Rp. 68,393,477.70 0.92 % - Rp. - 0.00 % 675.540 Rp. 146,926,572.30 1.98 % 675.540
Rp. 31,952,460.83 0.43 % - Rp. - 0.00 % 2,430.000 Rp. 25,042,486.50 0.34 % 2,430.000
Rp. 132,222,106.13 1.78 % - Rp. - 0.00 % 1,701.000 Rp. 250,177,755.87 3.36 % 1,701.000
Rp. 21,991,020.03 0.30 % - Rp. - 0.00 % 218.776 Rp. 70,005,972.72 0.94 % 218.776
Rp. 15,568,385.36 0.21 % - Rp. - 0.00 % 13.615 Rp. 158,748,614.64 2.13 % 13.615
Rp. - 0.00 % - Rp. - 0.00 % - Rp. - 0.00 % -
Rp. 928,611.20 0.01 % - Rp. - 0.00 % 2,347.380 Rp. 4,131,388.80 0.06 % 2,347.380
Rp. - 0.00 % 72.230 Rp. 93,756,501.77 1.26 % 256.230 Rp. 332,593,499.21 4.47 % 256.230
Rp. 164,919,992.02 2.22 % - Rp. - 0.00 % 15,512.530 Rp. 341,680,997.98 4.59 % 15,512.530
Rp. - 0.00 % 463.351 Rp. 222,868,643.15 3.00 % 3,232.021 Rp. 1,554,579,864.70 20.90 % 3,232.021
Rp. - 0.00 % 68.500 Rp. 48,614,878.13 0.65 % 875.000 Rp. 620,992,968.75 8.35 % 875.000
Rp. 1,821,858.45 0.02 % - Rp. - 0.00 % - Rp. - 0.00 % -
Rp. 305,035,146.00 4.10 % - Rp. - 0.00 % - Rp. - 0.00 % -
Constant width 0
area 58.2313
length 45.9873
Constant width 0
area 19.0569
length 30.5021
Constant width 0
area 37.3669
length 34.0407
0+290 at point X= 0.000 Y= 0.000 Z=
at point X= -2.458 Y= 7.216 Z=
at point X= 0.982 Y= 5.094 Z=
at point X= 2.735 Y= 4.173 Z=
at point X= 6.711 Y= 2.083 Z=
at point X= 8.735 Y= 1.100 Z=
at point X= 11.072 Y= 0.000 Z=
at point X= 0.000 Y= 0.000 Z=
Constant width 0
area 37.8794
length 33.4103
Constant width 0
area 9.9398
length 26.6123
Constant width 0
area 102.3397
length 45.5092
Constant width 0
area 19.0569
length 30.5021
Constant width 0
area 143.2562
length 50.0391
Constant width 0
area 147.8132
length 56.0631
Constant width 0
area 113.549
length 50.8682
Constant width 0
area 138.445
length 47.6249
Constant width 0
area 145.5024
length 53.141
Constant width 0
area 141.6497
length 51.3108
Constant width 0
area 72.2061
length 42.9634
Constant width 0
area 19.2498
length 27.9259
Constant width 0
area 46.6421
length 34.5234
Constant width 0
area 56.1915
length 40.7228
Constant width 0
area 125.916
length 51.2751
Constant width 0
area 97.0228
length 43.1238
Constant width 0
area 73.3978
length 40.1278
Constant width 0
area 54.4418
length 35.65
Constant width 0
area 54.4546
length 36.3548
Constant width 0
area 85.0119
length 41.3901
Constant width 0
area 134.2477
length 49.0312
Constant width 0
area 107.3968
length 45.6918
0+750 at point X= 0.000 Y= 85.855 Z=
at point X= 2.408 Y= 87.539 Z=
at point X= 4.301 Y= 87.132 Z=
at point X= 8.434 Y= 86.938 Z=
at point X= 10.242 Y= 88.683 Z=
at point X= 16.422 Y= 89.698 Z=
at point X= 12.962 Y= 80.170 Z=
at point X= 6.962 Y= 80.270 Z=
at point X= 0.962 Y= 80.170 Z=
at point X= 0.000 Y= 85.855 Z=
Constant width 0
area 81.7729
length 55.1455
Constant width 0
area 18.2843
length 25.2142
Constant width 0
area 55.7055
length 43.0344
0+825 at point X= 0.000 Y= 0.000 Z=
at point X= -2.056 Y= -6.854 Z=
at point X= -17.912 Y= -6.854 Z=
at point X= -15.568 Y= -4.663 Z=
at point X= -14.989 Y= -4.122 Z=
at point X= -10.259 Y= -3.751 Z=
at point X= -6.895 Y= -2.895 Z=
at point X= -4.171 Y= -2.569 Z=
at point X= -2.846 Y= -2.410 Z=
at point X= 0.000 Y= 0.000 Z=
Constant width 0
area 19.0026
length 37.0135
Constant width 0
area 28.1012
length 35.7807
Constant width 0
area 77.6768
length 44.6738
0+900 at point X= 0.000 Y= 0.000 Z=
at point X= -1.803 Y= -6.011 Z=
at point X= -19.284 Y= -6.011 Z=
at point X= -15.284 Y= -3.011 Z=
at point X= -14.163 Y= -1.964 Z=
at point X= -10.063 Y= -0.829 Z=
at point X= -5.267 Y= -0.848 Z=
at point X= -2.873 Y= -0.462 Z=
at point X= 0.000 Y= 0.000 Z=
Constant width 0
area 67.2339
length 42.835
Constant width 0
area 90.4569
length 57.9714
Constant width 0
area 40.3881
length 42.6994
Constant width 0
area 124.4272
length 55.089
Constant width 0
area 42.3547
length 38.6076
Constant width 0
area 23.6309
length 39.3486
Constant width 0
area 15.369
length 37.7631
Constant width 0
area 32.7996
length 41.0313
Constant width 0
area 40.9962
length 34.0577
Constant width 0
area 17.8818
length 39.809
Constant width 0
area 25.3672
length 31.1443
Constant width 0
area 34.6222
length 38.6521
Constant width 0
area 30.2593
length 44.0815
Constant width 0
area 15.6739
length 61.7668
Constant width 0
area 110.9712
length 52.6565
Constant width 0
area 124.6116
length 55.1152
Constant width 0
area 57.569
length 40.5496
Constant width 0
area 45.4648
length 57.8522
Constant width 0
area 172.9008
length 77.4896
Constant width 0
area 184.3205
length 86.7133
0 KOORDINAT 1 2 3 4 5
0 X 0.000 3.657 9.393 12.585 20.300
0+270
0 Y 0.000 -0.821 -2.614 -3.355 -5.456
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 3.051 6.883 8.880 11.271
0+275
0 Y 0.000 0.842 1.263 1.363 3.188
0
0
0
0
0
0
0
KOORDINAT 1 2 3 4 5
0 X 0.000 0.000 -2.458 0.982 2.735
0+290
0 Y 0.000 0.000 7.216 5.094 4.173
0
0
0
0
0
0
KOORDINAT 1 2 3 4 5
0 X 0.000 0.000 4.782 7.984 9.992
0+300
0 Y 0.000 0.000 1.047 1.275 1.192
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 -1.099 3.901 5.994 8.901
0+323
0 Y 0.000 1.686 1.186 0.767 0.186
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 8.682 10.359 12.500 14.673
0+325
0 Y 0.000 -0.874 -1.520 -1.631 -1.740
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 3.051 6.883 8.880 11.271
0+329
0 Y 0.000 0.842 1.263 1.363 3.188
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 8.778 9.785 12.485 15.485
0+350
0 Y 0.000 -0.718 -1.487 -1.733 -1.792
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 4.119 7.963 10.244 12.137
0+375
0 Y 56.711 54.816 53.048 50.717 51.007
0
0
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 2.707 7.306 7.683 10.451
0+400
0 Y 57.942 56.539 54.154 52.164 52.173
0
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 5.000 8.037 10.720 13.082
0+418
0 Y 58.905 58.237 56.690 56.309 55.450
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 1.131 8.107 10.366 12.492
0+425
0 Y 64.079 66.172 66.572 67.045 67.593
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 2.715 4.129 5.933 7.838
0+450
0 Y 55.100 57.815 58.062 58.296 58.518
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 2.867 5.409 6.967 8.517
0+475
0 Y 54.948 56.271 57.460 57.398 57.305
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 0.762 2.842 6.721 8.948
0+500
0 Y 55.154 56.154 56.485 56.329 58.037
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 0.374 2.116 3.739 6.529
0+525
0 Y 58.619 59.017 60.575 60.735 60.908
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 1.887 3.734 5.993 8.306
0+550
0 Y 60.150 62.947 64.273 64.534 64.558
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 9.265 11.012 12.477 14.546
0+575
0 Y 74.979 71.391 70.259 69.181 69.296
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 4.434 6.202 11.129 16.379
0+600
0 Y 74.049 73.050 72.116 71.964 69.261
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 5.084 6.897 10.115 12.021
0+625
0 Y 75.308 73.612 72.676 72.976 72.198
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 4.018 7.073 10.062 11.868
0+650
0 Y 76.003 75.304 73.860 73.919 73.566
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 5.869 6.351 8.685 12.172
0+675
0 Y 80.349 78.160 76.483 76.723 74.811
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 5.079 7.995 11.963 12.350
0+700
0 Y 83.984 82.430 80.585 80.948 80.651
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 7.559 9.318 11.405 12.663
0+725
0 Y 89.079 88.115 85.927 86.389 86.107
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 2.408 4.301 8.434 10.242
0+750
0 Y 85.855 87.539 87.132 86.938 88.683
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 3.221 5.076 7.673 9.366
0+775
0 Y 0.000 2.134 3.399 3.684 3.719
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 2.762 4.649 5.396 9.438
0+800
0 Y 0.000 2.127 2.547 2.864 6.497
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 -2.056 -17.912 -15.568 -14.989
0+825
0 Y 0.000 -6.854 -6.854 -4.663 -4.122
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 -0.977 -17.768 -15.032 -10.273
0+850
0 Y 0.000 -1.953 -1.953 -1.012 -1.007
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 -1.142 -16.142 -16.514 -13.646
0+875
0 Y 0.000 -2.716 -2.716 -1.672 -1.519
0
0
0
0
0
0
0
0
KOORDINAT 1 2 3 4 5
0 X 0.000 0.000 -1.803 -19.284 -15.284
0+000
0 Y 0.000 0.000 -6.011 -6.011 -3.011
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 2.101 6.980 9.833 13.581
0+925
0 Y 0.000 3.152 3.881 4.121 4.487
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 3.000 4.758 7.918 9.599
0+950
0 Y 0.000 -6.000 -6.106 -5.873 -6.254
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 -0.723 -14.000 -14.720 -13.117
0+975
0 Y 0.000 -3.000 -3.000 5.035 2.631
0
0
0
0
0
0
0
0
0
KOORDINAT 1 2 3 4 5
0 X 0.000 0.000 -2.000 -13.969 -15.965
1+000
0 Y 0.000 0.000 -11.704 -11.704 0.158
0
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 -0.500 -13.000 -14.402 -12.921
1+025
0 Y 0.000 -1.000 -1.000 6.175 3.213
0
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 -0.465 0.598 3.913 12.383
1+050
0 Y 0.000 1.451 1.584 2.000 1.711
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 -1.834 -14.350 -13.330 -8.998
1+075
0 Y 0.000 -6.507 -6.507 -5.517 -5.188
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 -0.734 2.819 5.997 8.744
1+100
0 Y 0.000 1.468 1.704 2.311 2.037
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 -1.500 -14.000 -15.284 -10.193
1+125
0 Y 0.000 -3.000 -3.000 -0.432 -0.276
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 -1.000 -15.500 -15.773 -14.023
1+150
0 Y 0.000 -6.000 -6.000 -5.454 -5.373
0
0
0
0
0
0
KOORDINAT 1 2 3 4 5
0 X 0.000 0.000 -1.331 -13.831 -14.555
0+000
0 Y 0.000 0.000 -2.000 -2.000 -0.553
0
0
0
0
0
0
KOORDINAT 1 2 3 4 5
0 X 15.439 0.000 0.000 1.190 4.649
1+200
0 Y 0.000 0.000 1.000 1.207 1.809
0
0
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 13.118 13.118 0.000 0.000 1.118
1+225
0 Y 1.689 0.000 0.000 0.960 1.005
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 3.000 6.092 8.861 11.529
1+250
0 Y 7.000 1.000 1.248 1.692 1.721
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 2.000 6.040 8.796 9.903
1+275
0 Y 4.116 0.116 0.507 0.995 0.507
0
0
0
0
0
0
0
KOORDINAT 1 2 3 4 5
0 X 0.000 0.000 -0.610 -9.358 -9.358
0+000
0 Y 0.000 0.000 -1.220 -1.220 -1.118
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 4.000 6.738 7.603 9.879
0+975
0 Y 112.508 106.508 106.633 107.033 106.594
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 2.000 5.827 7.996 10.143
1+000
0 Y 113.802 110.802 111.093 110.872 110.912
0
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 2.000 4.882 7.481 10.549
1+025
0 Y 119.624 115.624 115.624 115.892 115.574
0
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 26.209 26.612 25.868 13.868
P
0 Y 118.067 115.084 115.038 113.270 113.270
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 8.687 17.627 24.304 32.098
Q
0 Y 129.306 125.560 122.112 118.759 116.747
0
0
0
0
0
0
0 KOORDINAT 1 2 3 4 5
0 X 0.000 7.761 15.870 24.920 29.286
R
R
0 Y 129.831 125.761 121.611 117.675 115.500
0
0
0
0
0
0
0
0
6 7 8 9 10 11
1.620 0.000 0.000 0.000 0.000
-27.196
-1.618 0.000 0.000 0.000 0.000
6 7 8 9 10 11
20.620 3.085 0.000 0.000 0.000
-239.804
-6.025 -6.025 0.000 0.000 0.000
6 7 8 9 10 11
12.951 10.916 4.916 0.233 0.000
120.563
4.469 -0.368 -0.268 -0.361 0.000
6 7 8 9 10 11
6.711 8.735 11.072 0.000 0.000
79.389
2.083 1.100 0.000 0.000 0.000
6 7 8 9 10 11
14.544 12.749 6.749 0.749 0.000
56.840
2.485 -1.781 -1.681 -1.781 0.000
6 7 8 9 10 11
11.685 0.000 0.000 0.000 0.000
22.684
0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11
17.842 15.258 9.258 3.258 0.000
-206.968
-1.602 -7.976 -7.876 -7.976 0.000
6 7 8 9 10 11
12.951 10.916 4.916 0.233 0.000
120.563
4.469 -0.368 -0.268 -0.361 0.000
6 7 8 9 10 11 12 13
18.574 16.077 10.077 4.077 0.000
-295.383
-3.758 -10.573 -10.473 -10.573 0.000
6 7 8 9 10 11 12 13
14.459 17.154 18.898 20.259 18.137 12.137 6.137 0.000
6909.887
50.898 48.544 46.993 45.783 42.120 42.220 42.120 56.711
6 7 8 9 10 11 12 13
13.398 15.100 17.927 16.451 10.451 4.451 0.000 0.000
5379.349
52.262 50.480 47.521 45.150 45.250 45.150 57.942 0.000
6 7 8 9 10 11 12 13
14.789 14.037 8.037 2.037 0.000 0.000 0.000 0.000
4150.344
53.665 46.650 46.750 46.650 58.905 0.000 0.000 0.000
6 7 8 9 10 11 12 13
15.114 18.854 14.107 8.107 2.107 0.000 0.000 0.000
6038.172
68.872 70.356 57.650 57.750 57.650 64.079 0.000 0.000
6 7 8 9 10 11 12 13
9.673 18.552 13.838 7.838 1.838 0.000 0.000 0.000
4227.298
60.413 62.534 50.150 50.250 50.150 55.100 0.000 0.000
6 7 8 9 10 11 12 13
12.912 16.898 12.967 0.967 0.000 0.000 0.000 0.000
3948.721
59.548 61.746 52.650 52.650 54.948 0.000 0.000 0.000
6 7 8 9 10 11 12 13
11.595 10.782 4.782 0.000 0.000 0.000 0.000 0.000
2660.737
59.249 55.150 55.250 55.154 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
7.794 14.086 11.134 5.134 0.405 0.000 0.000 0.000
3151.831
62.050 64.118 57.650 57.750 57.655 58.619 0.000 0.000
6 7 8 9 10 11 12 13
9.870 11.418 13.418 11.993 5.993 0.000 0.000 0.000
4768.384
65.945 67.213 70.558 60.150 60.250 60.150 0.000 0.000
6 7 8 9 10 11 12 13
16.492 18.918 17.012 11.012 5.012 0.000 0.000 0.000
7965.418
68.955 67.596 62.650 62.750 62.650 74.979 0.000 0.000
6 7 8 9 10 11 12 13
14.666 8.666 2.666 0.000 0.000 0.000 0.000 0.000
4516.883
65.150 65.250 65.150 74.049 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
15.486 14.557 2.557 0.000 0.000 0.000 0.000 0.000
4832.146
71.326 67.650 67.650 75.308 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
14.042 13.570 7.570 1.570 0.000 0.000 0.000 0.000
5126.267
73.213 70.150 70.250 70.150 76.003 0.000 0.000 0.000
6 7 8 9 10 11 12 13
13.624 12.792 8.124 2.124 0.000 0.000 0.000 0.000
5280.199
74.271 72.657 72.750 72.650 80.349 0.000 0.000 0.000
6 7 8 9 10 11 12 13
15.077 13.995 7.995 1.995 0.000 0.000 0.000 0.000
6119.042
78.788 75.150 75.250 75.150 83.984 0.000 0.000 0.000
6 7 8 9 10 11 12 13
15.228 16.683 15.318 9.318 3.318 0.000 0.000 0.000
8573.291
85.040 84.435 77.650 77.750 77.650 89.079 0.000 0.000
6 7 8 9 10 11 12 13
16.422 12.962 6.962 0.962 0.000 0.000 0.000 0.000
5462.894
89.698 80.170 80.270 80.170 85.855 0.000 0.000 0.000
6 7 8 9 10 11 12 13
10.030 11.030 18.030 13.449 0.000 0.000 0.000 0.000
512.686
3.733 8.733 15.269 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
6.359 0.000 0.000 0.000 0.000 0.000 0.000 0.000
91.976
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
-10.259 -6.895 -4.171 -2.846 0.000 0.000 0.000 0.000
386.863
-3.751 -2.895 -2.569 -2.410 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
-5.886 -4.273 -3.714 -3.055 0.000 0.000 0.000 0.000
86.480
-0.472 -0.585 -0.625 -0.671 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
-13.142 -11.466 -7.142 -2.825 -1.142 0.000 0.000 0.000
160.536
-1.493 -1.403 -0.406 -0.687 -0.278 0.000 0.000 0.000
6 7 8 9 10 11 12 13
-14.163 -10.063 -5.267 -2.873 0.000 0.000 0.000 0.000
276.986
-1.964 -0.829 -0.848 -0.462 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
18.440 15.833 0.000 0.000 0.000 0.000 0.000 0.000
291.900
5.876 -0.185 0.000 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
12.084 17.084 14.799 2.799 0.000 0.000 0.000 0.000
-360.590
-6.048 -1.048 -11.762 -11.762 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
-10.720 -7.981 -7.117 -4.841 -3.244 -1.117 0.000 0.000
11.823
-0.965 -0.840 -0.440 -0.879 -1.119 -0.385 0.000 0.000
6 7 8 9 10 11 12 13
-13.965 -10.138 -7.969 -5.821 -4.696 -2.000 0.000 0.000
432.129
-2.842 -2.551 -2.772 -2.732 -2.938 -3.000 0.000 0.000
6 7 8 9 10 11 12 13
-12.402 -9.520 -6.921 -3.853 -2.149 -0.921 0.000 0.000
-143.773
2.175 2.175 2.442 2.124 1.973 0.846 0.000 0.000
6 7 8 9 10 11 12 13
14.217 12.133 0.000 0.000 0.000 0.000 0.000 0.000
140.473
6.949 0.000 0.000 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
-5.356 -1.834 0.000 0.000 0.000 0.000 0.000 0.000
267.392
-5.373 -5.238 0.000 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
10.596 14.596 12.500 0.000 0.000 0.000 0.000 0.000
185.337
2.000 8.000 0.000 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
-6.533 -3.019 0.000 0.000 0.000 0.000 0.000 0.000
93.249
0.268 0.120 0.000 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
-9.396 -5.745 -3.000 0.000 0.000 0.000 0.000 0.000
359.199
-5.103 -5.095 -5.000 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
-12.730 -10.594 -5.595 0.000 0.000 0.000 0.000 0.000
68.983
-0.505 0.031 -0.094 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
5.840 7.190 10.411 13.190 13.611 15.439 15.439
242.519
2.066 2.502 2.366 2.499 2.519 5.192 0.000
6 7 8 9 10 11 12 13
4.166 6.629 9.725 12.295 13.118 0.000 0.000 0.000
79.026
1.127 1.651 1.218 1.000 1.689 0.000 0.000 0.000
6 7 8 9 10 11 12 13
13.452 15.147 15.147 0.000 0.000 0.000 0.000 0.000
139.176
1.291 2.563 0.000 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
15.140 20.140 15.140 0.000 0.000 0.000 0.000 0.000
234.043
1.164 11.869 0.000 0.000 4.116 0.000 0.000 0.000
6 7 8 9 10 11 12 13
-6.261 -3.687 -1.531 0.000 0.000 0.000 0.000 0.000
34.602
-0.806 -1.173 -1.206 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
11.475 14.720 13.603 1.603 0.000 0.000 0.000 0.000
7444.901
106.354 107.473 98.880 98.880 112.508 0.000 0.000 0.000
6 7 8 9 10 11 12 13
11.269 13.965 15.965 13.996 1.996 0.000 0.000 0.000
9242.528
110.706 110.644 113.644 101.940 101.940 113.802 0.000 0.000
6 7 8 9 10 11 12 13
12.253 14.402 13.481 1.481 0.000 0.000 0.000 0.000
7663.704
115.423 113.450 111.260 111.260 119.624 0.000 0.000 0.000
6 7 8 9 10 11 12 13
12.572 0.572 0.000 0.000 0.000 0.000 0.000 0.000
12194.074
116.351 116.351 118.067 0.000 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
33.236 32.887 7.281 0.000 0.000 0.000 0.000 0.000
18639.279
115.739 114.910 116.351 129.306 0.000 0.000 0.000 0.000
6 7 8 9 10 11 12 13
33.637 35.777 21.614 19.013 6.013 0.000 0.000 0.000
22690.992
22690.992
113.644 112.220 112.220 116.530 116.530 129.831 0.000 0.000
LUAS
0+250 9.662
-46.520 9.662 M2
14.359
0+275 19.057
28.212
0+290 37.367
#REF!
0+000 0.000
#VALUE!
KOORDINALUAS
#VALUE!
LUAS 0+000 0.000
#VALUE!
-356.266 58.231 M2
KOORDINALUAS
#VALUE!
KOORDINALUAS
#VALUE!
0+000 0.000
0.000
0+000 0.000
#REF!
0+300 37.879
23.910
0+323 9.940
14.499
LUAS 0+329 19.057
81.157
82.449 19.057 M2
0+350 143.256
145.535
0+375 147.813
130.681
0+400 113.549
125.997
0+418 138.445
141.974
0+425 145.503
143.576
0+450 141.650
LUAS 106.928
0+475 72.206
4.655 37.367 M2
45.728
0+500 19.250
32.946
0+525 46.642
51.417
0+550 56.191
91.053
0+575 125.916
111.469
0+600 97.023
LUAS 85.210
0+625 73.398
-18.919 37.879 M2
63.920
0+650 54.442
54.448
0+675 54.454
69.733
0+700 85.012
109.630
0+725 134.248
120.822
0+750 107.397
0+775 81.773
50.029
LUAS 0+800 18.284
36.995
2.803 9.940 M2
0+825 55.705
37.353
0+850 19.002
23.552
0+875 28.102
52.889
KOORDINALUAS
#VALUE!
0+000 0.000
#VALUE!
LUAS KOORDINALUAS
#VALUE!
-411.647 102.340 M2
0+000 0.000
62.214
1+000 124.427
83.391
1+025 42.355
32.993
1+050 23.631
50.654
0+000 77.677
72.455
0+925 67.234
78.845
0+950 90.456
65.422
LUAS 0+975 40.388
82.408
82.449 19.057 M2
1+000 124.427
83.391
1+025 42.355
32.993
1+050 23.631
19.500
1+075 15.369
24.085
1+100 32.800
16.400
1+318 0.000
LUAS
-581.896 143.256 M2
LUAS
6614.260 147.813 M2
LUAS
5152.250 113.549 M2
LUAS
3873.453 138.445 M2
LUAS
5747.166 145.503 M2
LUAS
3943.999 141.650 M2
LUAS
3804.308 72.206 M2
LUAS
2622.238 19.250 M2
LUAS
3058.546 46.642 M2
LUAS
4656.002 56.191 M2
LUAS
7713.587 125.916 M2
LUAS
4322.837 97.023 M2
LUAS
4685.350 73.398 M2
LUAS
5017.384 54.442 M2
LUAS
5171.290 54.454 M2
LUAS
5949.018 85.012 M2
LUAS
8304.796 134.248 M2
LUAS
5248.100 107.397 M2
LUAS
349.141 81.773 M2
LUAS
55.407 18.284 M2
LUAS
275.453 55.705 M2
LUAS
48.477 19.002 M2
LUAS
104.332 28.102 M2
LUAS
121.631 77.677 M2
LUAS
157.433 67.234 M2
LUAS
-541.503 90.456 M2
LUAS
-68.953 40.388 M2
LUAS
183.274 124.427 M2
LUAS
-228.483 42.355 M2
LUAS
93.211 23.631 M2
LUAS
236.653 15.369 M2
LUAS
119.737 32.800 M2
LUAS
11.257 40.996 M2
LUAS
323.435 17.882 M2
LUAS
18.249 25.367 M2
LUAS
173.275 34.622 M2
LUAS
46.698 16.164 M2
LUAS
78.657 30.259 M2
LUAS
202.695 15.674 M2
LUAS
30.534 2.034 M2
LUAS
7222.958 110.971 M2
LUAS
8993.304 124.612 M2
LUAS
7548.566 57.569 M2
LUAS
12103.144 45.465 M2
LUAS
18293.475 172.902 M2
LUAS
22322.350 184.321 M2
22322.350 184.321 M2
25.000 358.986
15.000 423.181
33.000 #REF!
25.000 #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
0.000 0.000
#REF! #REF!
25.000 597.742
6.000 86.991
21.000 1704.290
25.000 3638.374
25.000 3267.035
18.000 2267.952
7.000 993.818
25.000 3589.405
25.000 2673.199
#REF!
25.000 1143.198
25.000 823.651
25.000 1285.419
25.000 2276.337
25.000 2786.735
25.000 2130.262
25.000 1597.995
25.000 1361.200
25.000 1743.330
25.000 2740.744
25.000 3020.555
25.000 1250.714
25.000 924.869
25.000 933.833
25.000 588.790
-875.000 -46278.202
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
1000.000 62213.685
25.000 2084.776
25.000 824.822
-1050.000 -53186.728
925.000 67021.282
25.000 1971.125
25.000 1635.551
25.000 2060.192
25.000 2084.776
25.000 824.822
25.000 487.504
25.000 602.115
218.000 3575.189
#VALUE!
Kegiatan : BADAN PENG
Nama Paket : PEMBANGUN
BADAN PENGUSAHAAN KAWASAN - IE MEULEE
PERDAGANGAN BEBAS DAN No. Kontrak : 18/PKPBS-SPJ
PELABUHAN BEBAS SABANG
Tanggal Kontrak : 26 Agustus 20
Nilai Kontrak : Rp. 8.182.326
Prop./Kab./Kota : PEMERINTAH
KONSULTAN PENGAWAS :
PT. INDAH KARYA BACK UP DATA
( PERSERO )
NO. MATA PEMBAYARAN : 3.1.1 GALIAN BIASA PEM
GAMBAR / SKET :
Sta 0+250
20
15
Bidang persamaan
13.00
19.544
19.562
18.790
18.347
17.883
ELEVASI TANAH ASLI
0.20
JARAK (m) 1.99 5.14 5.99 5.10
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 4.678 4.875 9.971 13.000 1.620 0.000 0.000
0+250
Y 0.000 -0.345 -0.810 -1.140 -1.618 -1.618 0.000 0.000
24
Sta 0+270
20
24
Sta 0+270
20
Bidang persamaan
14.00
22.912
21.118
23.733
20.378
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 3.051 6.883 8.880 11.271 12.951 10.916 4.916
0+270
Y 0.000 0.842 1.263 1.363 3.188 4.469 -0.368 -0.268
GAMBAR / SKET :
30
Sta 0+290
25
20
Bidang persamaan
14.00
29.729
27.608
23.613
24.596
JARAK (m)
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 -2.458 0.982 2.735 6.711 8.735
0+290
Y 0.000 0.000 7.216 5.094 4.173 2.083 1.100
33
Sta 0+329 = St
33
Sta 0+329 = St
30
Bidang persamaan
26.00
28.824
29.689
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 4.782 7.984 9.992 14.544 12.749 6.749 0.749
0+300
Y 0.000 0.000 1.047 1.275 1.192 2.485 -1.781 -1.681 -1.781
GAMBAR / SKET :
37
35
Bidang persamaan
29.00
35.089
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 -1.099 3.901 5.994 8.901 11.685 0.000 0.000 0.000
0+323
Y 0.000 1.686 1.186 0.767 0.186 0.000 0.000 0.000 0.000
Sta 0+3
43
40
Sta 0+3
43
40
35
Bidang persamaan
32.00
42.911
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 3.051 6.883 8.880 11.271 12.951 10.916 4.916 0.233
0+329
Y 0.000 0.842 1.263 1.363 3.188 4.469 -0.368 -0.268 -0.361
GAMBAR / SKET :
Sta 0+350
49
45
40
Bidang persamaan
35.00
48.047
48.815
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 8.778 9.785 12.485 15.485 18.574 16.077 10.077 4.077
0+350
Y 0.000 -0.718 -1.487 -1.733 -1.792 -3.758 -10.573 -10.473 -10.573
55
Sta 0+3
50
55
Sta 0+3
50
45
40
Bidang persamaan
38.00
54.816
50.717
51.006
53.048
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 4.119 7.963 10.244 12.137 14.459 17.154 18.898 20.259
0+375
Y 56.711 54.816 53.048 50.717 51.007 50.898 48.544 46.993 45.783
GAMBAR / SKET :
57
55
Sta 0+400
50
Bidang persamaan
45
44.00
56.539
54.154
52.164
52.173
ELEVASI TANAH ASLI
0.38
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 2.707 7.306 7.683 10.451 13.398 15.100 17.927 16.451
0+400
Y 57.942 56.539 54.154 52.164 52.173 52.262 50.480 47.521 45.150
59
Sta 0+418
55
59
Sta 0+418
55
50
Bidang persamaan
46.00
56.690
56.309
58.237
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 5.000 8.037 10.720 13.082 14.789 14.037 8.037 2.037
0+418
Y 58.905 58.237 56.690 56.309 55.450 53.665 46.650 46.750 46.650
GAMBAR / SKET :
59
Sta 0+425
Galian Biasa
55
50
Bidang persamaan
57.00
56.172
56.572
57.045
57.593
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 1.131 8.107 10.366 12.492 15.114 18.854 14.107 8.107
0+425
Y 64.079 66.172 66.572 67.045 67.593 68.872 70.356 57.650 57.750
61
60
Sta 0+450
G
61
60
Sta 0+450
55
50
Bidang persamaan
48.00
58.518
60.413
57.815
58.062
58.296
54,35
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 2.715 4.129 5.933 7.838 9.673 18.552 13.838 7.838
0+450
Y 55.100 57.815 58.062 58.296 58.518 60.413 62.534 50.150 50.250
TOTAL
GAMBAR / SKET :
60
Sta 0+475
55
Bidang persamaan
52.00
56.271
57.398
57.460
57.305
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 2.867 5.409 6.967 8.517 12.912 16.898 12.967 0.967
0+475
Y 54.948 56.271 57.460 57.398 57.305 59.548 61.746 52.650 52.650
60
Sta 0+500
60
Sta 0+500
55
Bidang persamaan
53.00
56.154
55.145
56.485
56.329
ELEVASI TANAH ASLI
0.77
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.762 2.842 6.721 8.948 11.595 10.782 4.782 0.000
0+500
Y 55.154 56.154 56.485 56.329 58.037 59.249 55.150 55.250 55.154
GAMBAR / SKET :
63
Sta 0+525
60
Bidang persamaan
56.00
59.017
60.735
60.575
60.907
62.050
56.00
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.374 2.116 3.739 6.529 7.794 14.086 11.134 5.134
0+525
Y 58.619 59.017 60.575 60.735 60.908 62.050 64.118 57.650 57.750
71
68
71
68
Bidang persamaan
60
59.00
60.020
62.947
64.534
64.558
64.273
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 1.887 3.734 5.993 8.306 9.870 11.418 13.418 11.993
0+550
Y 60.150 62.947 64.273 64.534 64.558 65.945 67.213 70.558 60.150
GAMBAR / SKET :
Galian Biasa
72
70 Sta 0+57
65
Bidang persamaan
60.00
69.278
74.980
71.487
70.355
69.392
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 9.265 11.012 12.477 14.546 16.492 18.918 17.012 11.012
0+575
Y 74.979 71.391 70.259 69.181 69.296 68.955 67.596 62.650 62.750
75
Galian Biasa
Sta 0+600
70
75
Galian Biasa
Sta 0+600
70
Bidang persamaan
64.00
72.116
74.049
73.050
71.964
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 4.434 6.202 11.129 16.379 14.666 8.666 2.666 0.000
0+600
Y 74.049 73.050 72.116 71.964 69.261 65.150 65.250 65.150 74.049
GAMBAR / SKET :
74
Sta
Bidang persamaan
67.00
72.676
73.612
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 5.084 6.897 10.115 12.021 15.486 14.557 2.557 0.000
0+625
Y 75.308 73.612 72.676 72.976 72.198 71.326 67.650 67.650 75.308
76
75
76
75
Bidang persamaan
69.00
76.001
75.304
73.860
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 4.018 7.073 10.062 11.868 14.042 13.570 7.570 1.570
0+650
Y 76.003 75.304 73.860 73.919 73.566 73.213 70.150 70.250 70.150
GAMBAR / SKET :
Galian Biasa
79
Sta
75
Bidang persamaan
72.00
78.160
76.483
80.350
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 5.869 6.351 8.685 12.172 13.624 12.792 8.124 2.124
0+675
Y 80.349 78.160 76.483 76.723 74.811 74.271 72.657 72.750 72.650
84 Galian Biasa
St
80
84 Galian Biasa
St
80
Bidang persamaan
74.00
83.984
82.430
80.585
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 5.079 7.995 11.963 12.350 15.077 13.995 7.995 1.995
0+700
Y 83.984 82.430 80.585 80.948 80.651 78.788 75.150 75.250 75.150
GAMBAR / SKET :
Galian Biasa
89
Sta 0+725
85
80
Bidang persamaan
77.00
90.080
88.115
85.927
86.389
86.107
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 7.559 9.318 11.405 12.663 15.228 16.683 15.318 9.318
0+725
Y 89.079 88.115 85.927 86.389 86.107 85.040 84.435 77.650 77.750
90
Sta 0+750
90
Sta 0+750
85
Bidang persamaan
80
79.00
85.855
87.539
87.132
86.938
88.683
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 2.408 4.301 8.434 10.242 16.422 12.962 6.962 0.962
0+750
Y 85.855 87.539 87.132 86.938 88.683 89.698 80.170 80.270 80.170
GAMBAR / SKET :
84
Tim. Biasa
Bidang persamaan
79.00
81.672
79.400
79.400
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 -1.500 -14.000 -15.284 -10.193 -6.533 -3.019
1+125
Y 0.000 -3.000 -3.000 -0.432 -0.276 0.268 0.120
89
Sta 0+800
Galian Biasa
85
89
Sta 0+800
Galian Biasa
85
Tim. Biasa
Bidang persamaan
79.00
81.976
84.104
84.523
84.840
79.400
0.75
JARAK (m) 5.06 2.76 1.89
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 -1.000 -15.500 -15.773 -14.023 -9.396 -5.745
1+150
Y 0.000 -6.000 -6.000 -5.454 -5.373 -5.103 -5.095
GAMBAR / SKET :
89
Sta 0+825
Galian Biasa
85
Bidang persamaan
79.00
81.851
84.583
84.953
85.810
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 -1.331 -13.831 -14.555 -12.730 -10.594
0+000
Y 0.000 0.000 -2.000 -2.000 -0.553 -0.505 0.031
88
Sta 0+850
85
88
Sta 0+850
85
Bidang persamaan
82.00
84.623
86.281
86.286
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 15.439 0.000 0.000 1.190 4.649 5.840 7.190
1+200
Y 0.000 0.000 1.000 1.207 1.809 2.066 2.502
GAMBAR / SKET :
90
Bidang persamaan
85.00
87.694
87.285
87.963
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 13.118 13.118 0.000 0.000 1.118 4.166 6.629 9.725
1+225
Y 1.689 0.000 0.000 0.960 1.005 1.127 1.651 1.218
93
90
93
90
85
Bidang persamaan
80.00
89.371
90.417
91.552
91.534
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 3.000 6.092 8.861 11.529 13.452 15.147 15.147
1+250
Y 7.000 1.000 1.248 1.692 1.721 1.291 2.563 0.000
GAMBAR / SKET :
98
95
95
Bidang persamaan
90.00
90.120
95.606
94.877
95.846
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 2.000 6.040 8.796 9.903 15.140 20.140 15.140
1+275
Y 4.116 0.116 0.507 0.995 0.507 1.164 11.869 0.000
108
105
Galian Biasa
Sta 0+950
108
105
Galian Biasa
Sta 0+950
102
100
Bidang persamaan
95.00
101.582
101.709
101.329
107.582
101.476
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 -0.610 -9.358 -9.358 -6.261 -3.687 -1.531 0.000
0+000
Y 0.000 0.000 -1.220 -1.220 -1.118 -0.806 -1.173 -1.206 0.000
GAMBAR / SKET :
113
Galian Biasa
110
Sta 0+975
105
100
Bidang persamaan
98.00
112.510
106.508
106.633
106.354
107.033
106.594
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 4.000 6.738 7.603 9.879 11.475 14.720 13.603 1.603
0+975
Y 112.508 106.508 106.633 107.033 106.594 106.354 107.473 98.880 98.880
114
Galian Biasa
Sta 1+000
110
114
Galian Biasa
Sta 1+000
110
105
Bidang persamaan
101.00
113.800
110.802
111.093
110.872
110.912
110.706
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 2.000 5.827 7.996 10.143 11.269 13.965 15.965 13.996
1+000
Y 113.802 110.802 111.093 110.872 110.912 110.706 110.644 113.644 101.940
TOTAL
Sta 0+250
18.347
17.883
17.553
16.303
15.944
15.617
0.20
9 10 11 12 13 LUAS (M2)
-46.520
9.662
-27.196
Sta 0+270
Sta 0+270
21.118
17.265
20.378
18.276
17.596
16.896
0.38
0.67
3.19 7.72 8.86
9 10 11 12 13 LUAS (M2)
84.226
18.200
120.625
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+290
23.613
19.783
18.603
17.266
16.981
24.596
9 10 11 12 13 LUAS (M2)
4.655
31.277
67.209
30.210
29.689
30.111
32.035
9 10 11 12 13 LUAS (M2)
0.749 0.000 -18.919
37.879
-1.781 0.000 56.840
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+300
35.089
36.744
35.316
35.233
9 10 11 12 13 LUAS (M2)
0.000 2.803
9.940
0.000 22.684
Sta 0+325
Sta 0+325
42.911
42.266
42.154
42.045
42.188
9 10 11 12 13 LUAS (M2)
0.233 0.000 82.449
19.057
-0.361 0.000 120.563
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+350
48.047
47.741
48.815
47.800
45.391
9 10 11 12 13 LUAS (M2)
4.077 0.000 -581.896
143.256
-10.573 0.000 -295.383
Sta 0+375
Sta 0+375
54.816
50.717
51.006
50.898
46.993
53.048
48.544
9 10 11 12 13 LUAS (M2)
20.259 18.137 12.137 6.137 0.000 6614.260
147.813
45.783 42.120 42.220 42.120 56.711 6909.887
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+400
56.539
54.154
52.164
52.173
52.262
50.480
0.38
9 10 11 12 13 LUAS (M2)
16.451 10.451 4.451 0.000 5152.250
113.549
45.150 45.250 45.150 57.942 5379.349
Sta 0+418
Galian Biasa
Sta 0+418
Galian Biasa
56.690
56.309
55.450
53.665
58.237
9 10 11 12 13 LUAS (M2)
2.037 0.000 3873.453
138.445
46.650 58.905 4150.344
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+425
Galian Biasa
56.572
57.045
57.593
58.872
9 10 11 12 13 LUAS (M2)
8.107 2.107 0.000 5747.166
145.503
57.750 57.650 64.079 6038.172
Galian Biasa
Sta 0+450
Galian Biasa
Sta 0+450
58.518
60.413
58.296
62,8
9 10 11 12 13 LUAS (M2)
7.838 1.838 0.000 3943.999
141.650
50.250 50.150 55.100 4227.298
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
20.00 278.617
20.00 494.765
20.00 691.559
25.00 597.742
6.00 86.991
21.00 1,704.290
25.00 3,638.374
25.00 3,267.035
18.00 2,267.952
7.00 993.818
25.00 3,589.405
25.00 2,673.199
25.00 1,143.198
25.00 823.651
25.00 1,285.419
25.00 2,276.337
25.00 2,786.735
25.00 2,130.262
25.00 1,597.995
25.00 1,361.200
25.00 1,743.330
25.00 2,740.744
25.00 3,020.555
375.00 27,823.719
25.00 819.974
912.00 69,836.866
Galian Biasa
Sta 0+475
56.271
57.398
57.460
57.305
59.548
9 10 11 12 13 LUAS (M2)
0.967 0.000 3804.308
72.206
52.650 54.948 3948.721
Sta 0+500
Sta 0+500
59.249
56.485
56.329
58.037
9 10 11 12 13 LUAS (M2)
0.000 2622.238
19.250
55.154 2660.737
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+525
60.735
60.907
62.050
63.12
9 10 11 12 13 LUAS (M2)
5.134 0.405 0.000 3058.546
46.642
57.750 57.655 58.619 3151.831
alian Biasa Sta 0+550
62.947
64.534
64.558
65.944
67.213
70.560
64.273
9 10 11 12 13 LUAS (M2)
11.993 5.993 0.000 4656.002
56.191
60.150 60.250 60.150 4768.384
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Galian Biasa
Sta 0+575
69.278
71.487
70.355
69.392
69.051
67.678
9 10 11 12 13 LUAS (M2)
11.012 5.012 0.000 7713.587
125.916
62.750 62.650 74.979 7965.418
Biasa
Sta 0+600
Biasa
Sta 0+600
71.964
69.261
69.236
9 10 11 12 13 LUAS (M2)
0.000 4322.837
97.023
74.049 4516.883
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+625
72.676
72.198
73.612
72.976
71.326
9 10 11 12 13 LUAS (M2)
0.000 4685.350
73.398
75.308 4832.146
Sta 0+650
Sta 0+650
75.304
73.860
73.919
73.566
73.213
9 10 11 12 13 LUAS (M2)
1.570 0.000 5017.384
54.442
70.150 76.003 5126.267
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Galian Biasa
Sta 0+675
78.160
76.483
76.723
74.811
74.271
0.48
9 10 11 12 13 LUAS (M2)
2.124 0.000 5171.290
54.454
72.650 80.349 5280.199
alian Biasa
Sta 0+700
alian Biasa
Sta 0+700
82.430
80.651
78.788
80.585
80.948
0.39
9 10 11 12 13 LUAS (M2)
1.995 0.000 5949.018
85.012
75.150 83.984 6119.042
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
n Biasa
Sta 0+725
88.115
85.927
86.389
86.107
85.040
9 10 11 12 13 LUAS (M2)
9.318 3.318 0.000 8304.796
134.248
77.750 77.650 89.079 8573.291
Galian Biasa
a 0+750
Galian Biasa
a 0+750
86.938
88.683
89.698
9 10 11 12 13 LUAS (M2)
0.962 0.000 5248.100
107.397
80.170 85.855 5462.894
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Tim. Biasa
83.222
81.672
82.938
83.271
9 10 11 12 13 LUAS (M2)
11.257
40.996
93.249
Sta 0+800
Galian Biasa
Sta 0+800
Galian Biasa
Tim. Biasa
81.976
84.104
84.523
84.840
88.474
0.75
9 10 11 12 13 LUAS (M2)
294.710
24.601
343.913
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+825
Galian Biasa
88.704
84.953
85.810
86.294
9 10 11 12 13 LUAS (M2)
17.257
25.951
69.159
86.821
86.622
87.293
86.286
9 10 11 12 13 LUAS (M2)
26.366
2.926
32.218
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
89.844
87.963
88.960
9 10 11 12 13 LUAS (M2)
16.210
17.361
50.932
91.534
92.382
9 10 11 12 13 LUAS (M2)
78.657
30.259
139.176
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
96.212
97.601
95.846
9 10 11 12 13 LUAS (M2)
202.695
15.674
234.043
Galian Biasa
Sta 0+950
Galian Biasa
Sta 0+950
101.709
101.329
106.530
101.476
101.534
9 10 11 12 13 LUAS (M2)
0.000 0.000 30.534
2.034
0.000 0.000 34.602
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Galian Biasa
Sta 0+975
106.508
106.633
106.354
107.473
107.033
106.594
0.86
9 10 11 12 13 LUAS (M2)
1.603 0.000 7222.958
110.971
98.880 112.508 7444.901
Sta 1+000
Sta 1+000
110.872
110.912
110.706
110.644
113.64
9 10 11 12 13 LUAS (M2)
13.996 1.996 0.000 8993.304
124.612
101.940 101.940 113.802 9242.528
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
1,200.00 17,326.231
20.00 202.874
25.00 595.255
25.00 574.167
-1,275.00 -11,288.998
975.00 55,090.128
25.00 2,944.787
-175.00 -15,777.724
25.00 933.833
10.00 322.333
38.60 4,214.485
14.70 2,625.588
62.50 6,638.206
-875.00 -46,278.211
925.00 67,021.282
925.00 67,021.282
25.00 1,971.125
25.00 1,651.572
25.00 2,076.213
25.00 2,084.776
25.00 824.822
25.00 487.504
25.00 602.115
218.00 3,575.189
-348
263.80 138,838.704
Constant
Constant
Constant
Constant
Constant
Constant
Constant
0+170 0.000 6.794 KOORDINAT 1 2
0.000 10.930 X 0.000 0.000
0+170
5.000 11.030 Y 6.794 10.930
10.000 10.930
10.000 6.450
5.000 6.517
1.455 6.797
0.000 6.797
Constant
Constant
Constant
Constant
0+323 0.000 27.472 KOORDINAT 1 2
2.907 27.530 X 0.000 2.907
0+323
7.907 27.430 Y 27.472 27.530
7.907 26.188
5.701 26.704
2.907 26.890
0.000 27.472
Constant
Constant
Constant
Constant
0+850 0.000 85.167 KOORDINAT 1 2
3.000 90.970 X 0.000 3.000
0+850
8.000 91.070 Y 85.167 90.970
13.000 90.970
15.218 86.622
12.387 86.821
8.000 86.286
3.241 86.281
0.000 85.167
Constant
Constant
Constant
Constant
Constant
Constant
3 4 5 6 7 8 9 10 11
5.000 10.000 10.000 5.000 0.000 0.000 0.000 0.000
4.430 4.330 2.051 2.687 2.212 0.000 0.000 0.000
3 4 5 6 7 8 9 10 11
5.000 10.000 10.000 5.000 0.000 0.000 0.000 0.000
5.570 5.470 1.919 2.262 2.079 0.000 0.000 0.000
3 4 5 6 7 8 9 10 11
5.000 10.000 10.000 5.000 0.000 0.000 0.000 0.000
6.700 6.600 2.030 2.179 2.145 0.000 0.000 0.000
3 4 5 6 7 8 9 10 11
5.000 10.000 10.000 5.000 0.000 0.000 0.000 0.000
7.840 7.740 2.470 2.678 2.599 0.000 0.000 0.000
3 4 5 6 7 8 9 10 11
5.000 10.000 10.000 9.336 7.948 5.000 0.000 0.000
8.980 8.880 5.113 5.107 4.369 4.339 4.757 0.000
3 4 5 6 7 8 9 10 11
5.000 10.000 10.000 6.999 5.000 0.403 0.000 0.000
10.120 10.020 5.962 5.476 5.599 5.320 5.313 0.000
3 4 5 6 7 8 9 10 11
5.000 10.000 10.000 5.000 1.455 0.000 0.000 0.000
11.030 10.930 6.450 6.517 6.797 6.797 0.000 0.000
3 4 5 6 7 8 9 10 11
7.200 14.400 14.400 0.000 0.000 0.000 0.000 0.000
12.230 12.086 9.940 9.940 0.000 0.000 0.000 0.000
3 4 5 6 7 8 9 10 11
5.000 10.000 10.000 5.000 0.110 0.000 0.000 0.000
14.120 14.020 11.824 12.925 12.938 12.930 0.000 0.000
3 4 5 6 7 8 9 10 11
2.663 0.000 0.000 0.000 0.000 0.000 0.000
21.260 22.513 0.000 0.000 0.000 0.000 0.000
3 4 5 6 7 8 9 10 11
7.907 7.907 5.701 2.907 0.000 0.000 0.000
27.430 26.188 26.704 26.890 27.472 0.000 0.000
3 4 5 6 7 8 9 10 11
7.250 7.514 5.942 0.098 0.000 0.000 0.000
84.750 84.745 83.672 79.800 79.800 0.000 0.000
3 4 5 6 7 8 9 10 11
7.500 9.449 8.959 8.212 6.325 3.563 0.000
85.320 85.281 84.840 84.523 84.104 81.976 80.192
3 4 5 6 7 8 9 10 11
5.000 10.000 10.000 6.842 3.477 0.000 0.000
88.190 88.090 86.188 85.810 84.954 84.681 0.000
3 4 5 6 7 8 9 10 11
8.000 13.000 15.218 12.387 8.000 3.241 0.000
91.070 90.970 86.622 86.821 86.286 86.281 85.167
3 4 5 6 7 8 9 10 11
8.250 13.250 15.611 12.276 7.958 3.635 0.000
93.940 93.840 89.490 88.679 88.960 87.963 87.769
3 4 5 6 7 8 9 10 11
10.250 15.250 18.250 13.875 9.079 4.979 3.858 0.000 0.000
97.820 97.720 92.238 91.534 91.553 90.417 89.371 87.541 0.000
3 4 5 6 7 8 9 10 11
7.250 12.250 12.250 10.998 7.250 4.397 0.000 0.000 0.000
99.730 99.630 96.570 96.212 95.846 95.606 94.949 0.000 0.000
3 4 5 6 7 8 9 10 11
10.010 9.403 6.918 5.237 2.078 0.319 0.000 0.000 0.000
102.545 101.534 101.329 101.709 101.476 101.582 102.540 0.000 0.000
3 4 5 6 7 8 9 10 11
7.074 1.031 0.000 0.000 0.000 0.000 0.000 0.000 0.000
83.408 79.404 79.404 0.000 0.000 0.000 0.000 0.000 0.000
3 4 5 6 7 8 9 10 11
6.027 5.063 0.000 0.000 0.000 0.000 0.000 0.000 0.000
82.719 81.976 79.440 0.000 0.000 0.000 0.000 0.000 0.000
LUAS
LUAS
LUAS
LUAS
LUAS
LUAS
LUAS
LUAS
LUAS
LUAS
LUAS
LUAS
LUAS
12 13 LUAS
0.000 0.000
7651.882 7466.220 92.831 M2
0.000 0.000
12 13 LUAS
0.000 0.000
5559.150 5473.021 43.065 M2
5559.150 5473.021 43.065 M2
0.000 0.000
12 13 LUAS
0.000 0.000
4005.418 3984.998 10.210 M2
0.000 0.000
12 13 LUAS
0.000 1.719
991.211 831.223 79.994 M2
79.440 82.715
12 13 LUAS
0.000 0.000
1053.851 1038.437 7.707 M2
0.000 0.000
Kegiatan : BADAN PENG
Nama Paket : PEMBANGUN
BADAN PENGUSAHAAN KAWASAN - IE MEULEE
PERDAGANGAN BEBAS DAN No. Kontrak : 18/PKPBS-SP
PELABUHAN BEBAS SABANG
Tanggal Kontrak : 26 Agustus 2
Nilai Kontrak : Rp. 8.182.32
Prop./Kab./Kota : PEMERINTAH
KONSULTAN PENGAWAS :
PT. INDAH KARYA BACK UP DATA
( PERSERO )
NO. MATA PEMBAYARAN : 3.1.1 GALIAN BIASA PEMB.
GAMBAR / SKET :
Sta 1+025
116
115
Bidang persamaan
110.00
115.892
115.624
115.624
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 -2.056 -17.912 -15.568 -14.989 -10.259 -6.895 -4.171 -2.846
0+825
Y 0.000 -6.854 -6.854 -4.663 -4.122 -3.751 -2.895 -2.569 -2.410
Sta 1+050
119
Sta 1+050
119
Bidang persamaan
113.00 117.713
118.262
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 -0.977 -17.768 -15.032 -10.273 -5.886 -4.273 -3.714 -3.055
0+850
Y 0.000 -1.953 -1.953 -1.012 -1.007 -0.472 -0.585 -0.625 -0.671
GAMBAR / SKET :
Sta 1+
122
120
Bidang persamaan
114.00
116.169
120.927
121.255
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 -1.142 -16.142 -16.514 -13.646 -13.142 -11.466 -7.142 -2.825
0+875
Y 0.000 -2.716 -2.716 -1.672 -1.519 -1.493 -1.403 -0.406 -0.687
Sta 1+100
Sta 1+100
126
125
Bidang persamaan
121.00 124.404
124.647
125.254
124.980
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 -1.803 -19.284 -15.284 -14.163 -10.063 -5.267 -2.873
0+000
Y 0.000 0.000 -6.011 -6.011 -3.011 -1.964 -0.829 -0.848 -0.462
GAMBAR / SKET :
Sta 1+12
129
Bidang persamaan
124.00
128.056
128.256
128.800
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 2.101 6.980 9.833 13.581 18.440 15.833 0.000 0.000
0+925
Y 0.000 3.152 3.881 4.121 4.487 5.876 -0.185 0.000 0.000
Sta 1+150
Sta 1+150
132
Bidang persamaan
127.00
131.279
131.454
131.724
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 3.000 4.758 7.918 9.599 12.084 17.084 14.799 2.799
0+950
Y 0.000 -6.000 -6.106 -5.873 -6.254 -6.048 -1.048 -11.762 -11.762
GAMBAR / SKET :
Sta 1+175
135
Bidang persamaan
130.00
134.147
134.203
134.739
134.614
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 -0.723 -14.000 -14.720 -13.117 -10.720 -7.981 -7.117 -4.841
0+975
Y 0.000 -3.000 -3.000 5.035 2.631 -0.965 -0.840 -0.440 -0.879
Sta 1+200
Sta 1+200
138
Bidang persamaan
132.00
137.425
137.860
137.725
137.168
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 -2.000 -13.969 -15.965 -13.965 -10.138 -7.969 -5.821
1+000
Y 0.000 0.000 -11.704 -11.704 0.158 -2.842 -2.551 -2.772 -2.732
GAMBAR / SKET :
143
Sta 1+225
140
Bidang persamaan
135.00
139.429
139.551
140.075
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 -0.500 -13.000 -14.402 -12.921 -12.402 -9.520 -6.921 -3.853
1+025
Y 0.000 -1.000 -1.000 6.175 3.213 2.175 2.175 2.442 2.124
143
Sta 1+250
143
Sta 1+250
140
Bidang persamaan
138.00
140.934
140.686
141.378
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 -0.465 0.598 3.913 12.383 14.217 12.133 0.000 0.000
1+050
Y 0.000 1.451 1.584 2.000 1.711 6.949 0.000 0.000 0.000
GAMBAR / SKET :
Sta 1+2
144
Bidang persamaan
139.00
141.995
142.385
142.874
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 -1.834 -14.350 -13.330 -8.998 -5.356 -1.834 0.000
1+075
Y 0.000 -6.507 -6.507 -5.517 -5.188 -5.373 -5.238 0.000
Sta 1+300
145
Sta 1+300
145
Bidang persamaan
141.00
143.133
143.188
143.500
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 -0.734 2.819 5.997 8.744 10.596 14.596 12.500 0.000
1+100
Y 0.000 1.468 1.704 2.311 2.037 2.000 8.000 0.000 0.000
GAMBAR / SKET :
129
125
120
115
Bidang persamaan
110.00
128.784
124.770
123.580
119.272
118.202
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 26.209 26.612 25.868 13.868 12.572 0.572 0.000
P
Y 118.067 115.084 115.038 113.270 113.270 116.351 116.351 118.067
131
130
Galian Biasa
125
Galian Biasa
125
120 Q
115
Bidang persamaan
110.00
130.309
125.560
122.112
118.759
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 8.687 17.627 24.304 32.098 33.236 32.887 7.281 0.000
Q
Y 129.306 125.560 122.112 118.759 116.747 115.739 114.910 116.351 129.306
GAMBAR / SKET :
130
130
Galian Biasa
125
120
115
110
Bidang persamaan
105.00
105
129.831
121.611
117.675
115.500
125.761
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 7.761 15.870 24.920 29.286 33.637 35.777 21.614 19.013
R
Y 129.831 125.761 121.611 117.675 115.500 113.644 112.220 112.220 116.530
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0+000
Y 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Sta 1+025
115.892
115.624
115.574
115.423
9 10 11 12 13 LUAS (M2)
-2.846 0.000 0.000 275.453
55.705
-2.410 0.000 0.000 386.863
Sta 1+050
Sta 1+050
118.262
117.973
8.47
9 10 11 12 13 LUAS (M2)
-3.055 48.48
19.002
-0.671 86.48
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 1+075
120.927
121.255
121.205
121.071
9 10 11 12 13 LUAS (M2)
-2.825 103.547
28.102
-0.687 159.751
Sta 1+100
Sta 1+100
124.647
125.254
124.980
124.943
9 10 11 12 13 LUAS (M2)
-2.873 0.000 121.631
77.677
-0.462 0.000 276.986
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 1+125
128.256
128.652
128.800
128.532
9 10 11 12 13 LUAS (M2)
0.000 157.433
67.234
0.000 291.900
Sta 1+150
Sta 1+150
131.724
131.732
131.827
131.827
9 10 11 12 13 LUAS (M2)
2.799 -541.503
90.456
-11.762 -360.590
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 1+175
134.707
134.614
5.00 5.59
9 10 11 12 13 LUAS (M2)
-4.841 -75.619
41.670
-0.879 7.720
Sta 1+200
Sta 1+200
137.425
137.860
137.725
137.168
137.878
9 10 11 12 13 LUAS (M2)
-5.821 -4.696 -2.000 183.274
124.427
-2.732 -2.938 -3.000 432.129
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 1+225
139.424
142.964
140.075
139.642
9 10 11 12 13 LUAS (M2)
-3.853 -2.149 -0.921 -228.483
42.355
2.124 1.973 0.846 -143.773
Sta 1+250
Sta 1+250
140.934
141.378
141.407
140.977
142.249
2.77 2.67 1.92 1.69
9 10 11 12 13 LUAS (M2)
0.000 0.000 0.000 93.211
23.631
0.000 0.000 0.000 140.473
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 1+275
142.385
142.874
142.386
143.043
9 10 11 12 13 LUAS (M2)
236.653
15.369
267.392
Sta 1+300
Sta 1+300
143.133
144.306
143.500
143.100
9 10 11 12 13 LUAS (M2)
0.000 119.737
32.800
0.000 185.337
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Galian Biasa
P
115.084
27.40
9 10 11 12 13 LUAS (M2)
12103.144
45.465
12194.074
ian Biasa
ian Biasa
116.747
122.112
118.759
112.929
111.271
8.94 6.68 7.79 4.31 2.42
9 10 11 12 13 LUAS (M2)
0.000 18293.475
172.902
129.306 18639.279
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
115.500
113.644
107.680
111.246
9 10 11 12 13 LUAS (M2)
19.013 6.013 0.000 22322.350
184.321
116.530 116.530 129.831 22690.992
9 10 11 12 13 LUAS (M2)
0.000 0.000
0.000
0.000 0.000
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
Kegiatan : BADAN PENGU
Nama Paket : PEMBANGUNA
BADAN PENGUSAHAAN KAWASAN
PERDAGANGAN BEBAS DAN No. Kontrak : 18/PKPBS-SPJ/
PELABUHAN BEBAS SABANG
Tanggal Kontrak : 26 Agustus 20
Nilai Kontrak : Rp. 8.182.326.
Prop./Kab./Kota : PEMERINTAH A
KONSULTAN PENGAWAS :
PT. INDAH KARYA BACK UP DATA
( PERSERO )
Timbunan Biasa dari Galian Sumber
NO. MATA PEMBAYARAN : 3.2.1.a PEMB.
Bahan
GAMBAR / SKET :
Sta 0+000
0,4 1,5 7
CL
1,89
Timbunan Biasa
Bidang persamaan
-1.00
2.546
1.839
2.890
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 5.000 10.000 10.000 5.000 0.000
0+000
Y 1.945 3.190 3.290 3.190 2.257 2.890 1.945
Sta 0+025
0,4 1,5 7
Sta 0+025
0,4 1,5 7
2,77
3
Bidang persamaan
0.00
2.127
2.087
2.687
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 5.000 10.000 10.000 5.000 0.000
0+025
Y 2.212 4.330 4.430 4.330 2.051 2.687 2.212
GAMBAR / SKET :
Sta 0+050
Bidang persamaan
0.00
2.837
2.076
2.262
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 5.000 10.000 10.000 5.000 0.000
0+050
Y 2.079 5.470 5.570 5.470 1.919 2.262 2.079
Sta 0+075
5,22
5,1
3
Bidang persamaan
0.00
2.597
2.138
2.179
2.026
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 5.000 10.000 10.000 5.000 0.000
0+075
Y 2.145 6.600 6.700 6.600 2.030 2.179 2.145
GAMBAR / SKET :
Sta 0+100
0,4 1,5 7
5,79
Bidang persamaan
0.00
2.678
4.363
3.213
2.574
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 5.000 10.000 10.000 5.000 0.000
0+100
Y 2.599 7.740 7.840 7.740 2.470 2.678 2.599
Sta 0+125
0,4 1,5 7
Sta 0+125
0,4 1,5 7
4,65
7
Bidang persamaan
2.00
5.091
4.339
6.225
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 5.000 10.000 10.000 9.336 7.948 5.000 0.000
0+125
Y 4.757 8.880 8.980 8.880 5.113 5.107 4.369 4.339 4.757
GAMBAR / SKET :
Sta 0+150
0,4 1,5 7
5,36
Bidang persamaan
3.00
5.272
5.194
5.320
5.599
5.476
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 5.000 10.000 10.000 6.999 5.000 0.403 0.000
0+150
Y 5.313 10.020 10.120 10.020 5.962 5.476 5.599 5.320 5.313
Sta 0+170
4,79
5,13
8
Bidang persamaan
2.00
7.303
6.784
6.517
6.429
6.797
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 5.000 10.000 10.000 5.000 1.455 0.000
0+170
Y 6.794 10.930 11.030 10.930 6.450 6.517 6.797 6.797
GAMBAR / SKET :
Sta 0+200
1,5 7 1,5
Bidang persamaan
4.00
8.152
7.521
7.340
8.546
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 7.200 14.400 14.400 0.000
0+200
Y 9.940 12.086 12.230 12.086 9.940 9.940
Sta 0+220
0,4 1,5 7
1,74
Sta 0+220
0,4 1,5 7
1,74
13
10
Bidang persamaan
8.00
12.937
12.610
12.925
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 0.000 5.000 10.000 10.000 5.000 0.110 0.000
0+220
Y 12.930 14.020 14.120 14.020 11.824 12.925 12.938 12.930
GAMBAR / SKET :
30
0,4
Sta 0+290
25
2,39
2,29
20
Bidang persamaan
14.00
29.729
27.608
24.596
23.613
19.783
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 2.663 2.663 0.000
0+290
Y 22.513 22.460 21.260 22.513
Sta 0+3
1,5 7
Sta 0+3
1,5 7
28
25
Bidang persamaan
23.00
26.890
ELEVASI TANAH ASLI
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 2.907 7.907 7.907 5.701 2.907 0.000
0+323
Y 27.472 27.530 27.430 26.188 26.704 26.890 27.472
GAMBAR / SKET :
84
Tim. Biasa
Bidang persamaan
79.00
81.672
79.400
79.400
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 2.250 7.074 1.031 0.000 0.000 0.000 0.000
0+775
Y 79.404 83.404 83.408 79.404 79.404 0.000 0.000 0.000
89
Sta 0+800
85
89
Sta 0+800
85
Tim. Biasa
Bidang persamaan
79.00
81.976
84.104
84.840
84.523
79.400
0.75
JARAK (m) 5.06 2.76 1.89
KOORDINAT 1 2 3 4 5 6 7 8 9
X 0.000 1.719 6.027 5.063 0.000
0+800
Y 79.440 82.715 82.719 81.976 79.440
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+000
Timbunan Biasa
2.890
2.139
2.063
9 10 11 12 13 LUAS (M2)
77.145
7.445
92.034
Sta 0+025
7 1,5 0,4
Sta 0+025
7 1,5 0,4
2,93
2.687
1.884
1.474
6.32 6.32 8.92
9 10 11 12 13 LUAS (M2)
80.088
19.709
119.505
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+050
1.645
1.507
9 10 11 12 13 LUAS (M2)
79.553
33.896
147.346
Sta 0+075
5 7 1,5 0,4
Sta 0+075
5 7 1,5 0,4
5,22
1.940
1.888
2.179
2.026
9 10 11 12 13 LUAS (M2)
85.811
45.168
176.148
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+100
2.279
2.090
9 10 11 12 13 LUAS (M2)
103.180
51.836
206.852
Sta 0+125
4,42
4,65
4.339
4.369
5.107
5.220
8.99 2.95 1.39 12.42
9 10 11 12 13 LUAS (M2)
0.000 245.667
43.755
4.757 333.177
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+150
5.320
5.599
5.880
5.476
6.293
9 10 11 12 13 LUAS (M2)
0.000 232.408
45.229
5.313 322.865
Sta 0+170
6.429
4.946
6.797
9 10 11 12 13 LUAS (M2)
228.200
43.893
315.987
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+200
1,5 7 1,5
7.340
6.734
6.394
9 10 11 12 13 LUAS (M2)
373.283
31.944
437.170
Sta 0+220
7 1,5 0,4
85
Sta 0+220
7 1,5 0,4
2,85
12.925
11.539
10.610
9 10 11 12 13 LUAS (M2)
383.691
14.172
412.035
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+290
7 1,5 0,4
2,29
17.266
24.596
23.613
19.783
18.603
16.981
9 10 11 12 13 LUAS (M2)
116.571
1.599
119.768
Sta 0+323
1,89
26.890
26.704
25.646
9 10 11 12 13 LUAS (M2)
731.137
5.118
741.374
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN - ANOI ITAM - IE MEULEE
Sta 0+775
Tim. Biasa
81.672
82.938
83.222
83.271
9 10 11 12 13 LUAS (M2)
831.223
11.707
854.638
Sta 0+800
Sta 0+800
Tim. Biasa
81.976
84.104
84.840
88.474
84.523
0.75
9 10 11 12 13 LUAS (M2)
1038.437
7.707
1053.851
MUTAZAM MUSLIANDA. FK
Surveyor Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAW
BADAN PENGUSAHAAN Nama Paket : PEMBANGUNAN JALAN BALO
KAWASAN PERDAGANGAN - IE MEULEE
BEBAS DAN PELABUHAN No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
BEBAS SABANG Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA S
KONSULTAN PENGAWAS :
KONTRAKTOR P
PT. INDAH KARYA BACK UP DATA
( PERSERO )
PEMB
NO. MATA PEMBAYARAN : 3.2.2 Timbunan Pilihan
- ANO
GAMBAR / SKET :
1,5 7 1,5
10
0.20
GAMBAR / SKET :
1,5 7 1,5
10
0.20
GAMBAR / SKET :
1,5 7 1,5
10
0.20
GAMBAR / SKET :
1,5 7 1,5
10
0.20
0.2
VOLUME LAP.TIMBUNAN PILIHAN
LEBAR
TEBAL PANJANG
NO. STA. POSISI (M)
OPSIONAL RATA" (M) (M')
1 1 + 075 KANAN 1.500
1.500 0.260 25.00
2 1 + 100 KANAN 1.500
1.500 0.260 25.00
3 1 + 125 KANAN 1.500
1.500 0.260 25.00
4 1 + 150 KANAN 1.500
1.500 0.260 25.00
5 1 + 175 KANAN 1.500
1.500 0.260 25.00
6 1 + 200 KANAN 1.500
1.500 0.260 25.00
7 1 + 225 KANAN 1.500
1.500 0.260 25.00
8 1 + 250 KANAN 1.500
1.500 0.260 25.00
9 1 + 275 KANAN 1.500
1.500 0.260 25.00
10 1 + 300 KANAN 1.500
GAMBAR / SKET :
1,5 7 1,5
10
0.20
GAMBAR / SKET :
1,5 7 1,5
10
0.20
GAMBAR / SKET :
1,5 7 1,5
10
0.20
7 1,5
10
0,26
LAP.TIMBUNAN PILIHAN
PANJANG VOLUME
KET.
(M') (M3)
25.00 50.000
25.00 50.000
25.00 50.000
25.00 50.000
25.00 50.000
25.00 50.000
25.00 50.000
25.00 50.000
25.00 50.000
25.00 50.000
225.00 450.000
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
7 1,5
10
0,26
LAP.TIMBUNAN PILIHAN
PANJANG VOLUME
KET.
(M') (M3)
18.00 36.000
18.00 36.000
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
7 1,5
10
0,26
18.00 36.000
87.750
7.020
87.750
7.020
243.00 675.540
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUNAZAR, ST
Quantity Engineer
7 1,5
10
0,26
0,
LAP.TIMBUNAN PILIHAN
PANJANG VOLUME
KET.
(M') (M3)
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
225.00 87.750
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
7 1,5
10
0,26
LAP.TIMBUNAN PILIHAN
PANJANG VOLUME
KET.
(M') (M3)
18.00 7.020
18.00 7.020
18.00 7.020
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
7 1,5
10
0,26
LAP.TIMBUNAN PILIHAN
PANJANG VOLUME
KET.
KET.
(M') (M3)
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
25.00 9.750
225.00 87.750
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
10
0,26
LAP.TIMBUNAN PILIHAN
PANJANG VOLUME
KET.
(M') (M3)
18.00 7.020
18.00 7.020
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAW
BADAN PENGUSAHAAN Nama Paket : PEMBANGUNAN JALAN BALO
KAWASAN PERDAGANGAN - IE MEULEE
BEBAS DAN PELABUHAN No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
BEBAS SABANG Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SA
KONSULTAN PENGAWAS :
KONTRAKTOR P
PT. INDAH KARYA BACK UP DATA
( PERSERO )
PEMB
NO. MATA PEMBAYARAN : 3.3 PENYIAPAN BADAN JALAN
- ANOI
GAMBAR / SKET :
L L
GAMBAR / SKET :
L L
GAMBAR / SKET :
L L
L L
250.000
250.000
250.000
250.000
250.000
250.000
250.000
250.000
250.000
250.000
2,250.000
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
L L
180.000
180.000
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
L L
18.00 180.000
243.00 2,430.000
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUNAZAR, ST
Quantity Engineer
Kegiatan : BADAN PENGUSAHAAN KAW
BADAN PENGUSAHAAN Nama Paket : PEMBANGUNAN JALAN BALO
KAWASAN PERDAGANGAN - - IE MEULEE
BEBAS DAN PELABUHAN No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
BEBAS SABANG Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA S
KONSULTAN PENGAWAS :
KONTRAKTOR P
PT. INDAH KARYA BACK UP DATA
( PERSERO )
PEMB
NO. MATA PEMBAYARAN : 5.1 (1) LAPIS PONDASI AGREGAT KELAS A
- ANOI
GAMBAR / SKET :
1,5 7 1,5
GAMBAR / SKET :
1,5 7 1,5
GAMBAR / SKET :
1,5 7 1,5
7 1,5
25.00 26.250
25.00 26.250
25.00 26.250
25.00 26.250
25.00 26.250
25.00 26.250
25.00 26.250
25.00 26.250
25.00 26.250
25.00 26.250
225.00 236.250
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
7 1,5
18.00 18.900
18.00 18.900
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
7 1,5
18.00 18.900
243.00 255.150
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUNAZAR, ST
Quantity Engineer
Kegiatan : BADAN PENGUSAHAAN KAW
BADAN PENGUSAHAAN Nama Paket : PEMBANGUNAN JALAN BALO
KAWASAN PERDAGANGAN - - IE MEULEE
BEBAS DAN PELABUHAN No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
BEBAS SABANG
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SA
KONSULTAN PENGAWAS :
KONTRAKTOR P
PT. INDAH KARYA BACK UP DATA
( PERSERO )
PEMB.
NO. MATA PEMBAYARAN : 5.1 (2) LAPIS PONDASI AGREGAT KELAS B
- ANOI
GAMBAR / SKET :
1,5 7 1,5
GAMBAR / SKET :
1,5 7 1,
GAMBAR / SKET :
1,5 7 1,5
7 1,5
25.00 35.000
25.00 35.000
25.00 35.000
25.00 35.000
25.00 35.000
25.00 35.000
25.00 35.000
25.00 35.000
25.00 35.000
25.00 35.000
225.00 315.000
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
7 1,5
18.00 25.200
18.00 25.200
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
7 1,5
18.00 25.200
243.00 340.200
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUNAZAR, ST
Quantity Engineer
Kegiatan : BADAN PENGUSAHAAN KAWA
BADAN PENGUSAHAAN Nama Paket : PEMBANGUNAN JALAN BALO
KAWASAN PERDAGANGAN - IE MEULEE
BEBAS DAN PELABUHAN No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
BEBAS SABANG Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SA
KONSULTAN PENGAWAS :
KONTRAKTOR PE
PT. INDAH KARYA BACK UP DATA
( PERSERO )
PEMB.
NO. MATA PEMBAYARAN : 6.1 (1) RESAP PENGIKAT - ASPAL CAIR
- ANOI
GAMBAR / SKET :
1,5 7 1
GAMBAR / SKET :
1,5 7 1
GAMBAR / SKET :
1,5 7 1
7 1,5
25.00 175.000
25.00 175.000
25.00 175.000
25.00 175.000
25.00 175.000
25.00 175.000
25.00 175.000
25.00 175.000
25.00 175.000
25.00 175.000
225.00 1,575.000
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA
BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
7 1,5
18.00 126.000
18.00 126.000
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
7 1,5
18.00 126.000
243.00 1,701.000
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUNAZAR, ST
Quantity Engineer
Kegiatan : BADAN PENGUSAHAAN KAW
BADAN PENGUSAHAAN Nama Paket : PEMBANGUNAN JALAN BALO
KAWASAN PERDAGANGAN - IE MEULEE
BEBAS DAN PELABUHAN No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
BEBAS SABANG Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA S
KONSULTAN PENGAWAS :
KONTRAKTOR P
PT. INDAH KARYA BACK UP DATA
( PERSERO )
LASTON LAPIS ANTARA (AC-BC) PEMB
NO. MATA PEMBAYARAN : 6.3 (6)
(GRADASI HALUS/KASAR) - ANOI
CATATAN :
= (( LEBAR RATA" x TEBAL x PAN
CATATAN :
= (( LEBAR RATA" x TEBAL x PAN
PANJANG
NO. STA. POSISI
(M')
1 SUB TOTAL - 1 FULL 225.00
CATATAN :
(( LEBAR RATA" x TEBAL x PANJANG ) x E ) x A %
25.00 22.508
25.00 22.508
25.00 22.508
25.00 22.508
25.00 22.508
25.00 22.508
25.00 22.508
25.00 22.508
25.00 22.508
225.00 202.570
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
CATATAN :
(( LEBAR RATA" x TEBAL x PANJANG ) x E ) x A %
18.00 16.206
18.00 16.206
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
CATATAN :
(( LEBAR RATA" x TEBAL x PANJANG ) x E ) x A %
PANJANG VOLUME
KET.
(M') (TON)
225.00 202.570
18.00 16.206
243.00 218.776
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUNAZAR, ST
Quantity Engineer
Kegiatan : BADAN PENGUSAHAAN KAW
BADAN PENGUSAHAAN Nama Paket : PEMBANGUNAN JALAN BALO
KAWASAN PERDAGANGAN - : - IE MEULEE
BEBAS DAN PELABUHAN No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
BEBAS SABANG Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SA
KONSULTAN PENGAWAS :
KONTRAKTOR P
PT. INDAH KARYA BACK UP DATA
( PERSERO )
PEMB.
NO. MATA PEMBAYARAN : 6.3.8.a ASPAL MINYAK
- ANOI
CATATAN :
= (( LEBAR RATA" x TEBAL x PAN
CATATAN :
(( LEBAR RATA" x TEBAL x PANJANG ) x E ) x B %
25.00 1.401
25.00 1.401
25.00 1.401
25.00 1.401
25.00 1.401
25.00 1.401
25.00 1.401
25.00 1.401
25.00 1.401
225.00 12.606
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
CATATAN :
(( LEBAR RATA" x TEBAL x PANJANG ) x E ) x B %
18.00 1.009
18.00 1.009
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
CATATAN :
(( LEBAR RATA" x TEBAL x PANJANG ) x E ) x B %
18.00 1.009
243.00 13.615
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUNAZAR, ST
Quantity Engineer
Kegiatan : BADAN PENGUSAHAAN KAW
BADAN PENGUSAHAAN Nama Paket : PEMBANGUNAN JALAN BALO
KAWASAN PERDAGANGAN - IE MEULEE
BEBAS DAN PELABUHAN No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
BEBAS SABANG Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SA
KONSULTAN PENGAWAS :
KONTRAKTOR PE
PT. INDAH KARYA BACK UP DATA
( PERSERO )
PEMB
NO. MATA PEMBAYARAN : 6.3.10 BAHAN PENGISI (FILLER) TAMBAHAN
- ANOI
CATATAN :
= ((( LEBAR RATA" x TEBAL x PAN
CATATAN :
((( LEBAR RATA" x TEBAL x PANJANG ) x E ) x D % ) x F
25.00 241.500
25.00 241.500
25.00 241.500
25.00 241.500
25.00 241.500
25.00 241.500
25.00 241.500
25.00 241.500
25.00 241.500
225.00 2,173.500
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
CATATAN :
((( LEBAR RATA" x TEBAL x PANJANG ) x E ) x D % ) x F
18.00 173.880
18.00 173.880
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUSLIANDA. FK
Quantity Surveyor
BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
18/PKPBS-SPJ/SPK/VIII/2011
26 Agustus 2011
Rp. 8.182.326.000,00,-
PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
- ANOI ITAM - IE MEULEE
CATATAN :
((( LEBAR RATA" x TEBAL x PANJANG ) x E ) x D % ) x F
18.00 173.880
243.00 2,347.380
DIAJUKAN OLEH :
Kontraktor Pelaksana
PT. ARENA BUDAYA
MUNAZAR, ST
Quantity Engineer
Kegiatan : BADAN PENGUSAHAAN KAWA
BADAN PENGUSAHAAN Nama Paket : PEMBANGUNAN JALAN BALO
KAWASAN PERDAGANGAN - IE MEULEE
BEBAS DAN PELABUHAN No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
BEBAS SABANG Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SA
KONSULTAN PENGAWAS :
KONTRAKTOR PE
PT. INDAH KARYA BACK UP DATA
( PERSERO )
PEMB.
NO. MATA PEMBAYARAN : 7.1 (5) BETON K-250
- ANOI
GAMBAR / SKET :
1,5 1,5
GAMBAR / SKET :
1,5 1,5
GAMBAR / SKET :
1,5 1,5
GAMBAR / SKET :
1,5 1,5
GAMBAR / SKET :
0,30 0,30 0,30 0,30
0,30
c c c c
0,30
b b b
2,40
3,00
c c c c
0,30
0,30
6,90
7.00
GAMBAR / SKET :
LANTAI
1,5 1,5
0,15
GAMBAR / SKET :
LANTAI
1,5 1,5
0,15
GAMBAR / SKET :
KEPALA
0,15
1,5
0,4
0,25
GAMBAR / SKET :
KEPALA
0,15
1,5
0,4
0,25
GAMBAR / SKET :
0,30 3,00
0,30
0,30
1,5 1,5
2,40
K-250 ( Bahu Jalan ) K-250 ( Bahu Jalan )
0,15
0,30
ULVERT REKAPITULASI VOLUME BE
JUMLAH VOLUME
KET. NO. STA.
(BH) (M3)
1 SUB TOTAL - 1
5 SUB TOTAL - 5
6 SUB TOTAL - 6
7 SUB TOTAL - 7
8 SUB TOTAL - 8
9 SUB TOTAL - 9
10
108.000 TOTAL
LANTAI
1,5 1,5
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
BETON K-250
- ANOI ITAM - IE MEULEE
LANTAI
1,5 1,5
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
BETON K-250
- ANOI ITAM - IE MEULEE
KEPALA
0,15
1,5
0,4
K-250 ( Bahu Jalan )
0,25
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
BETON K-250
- ANOI ITAM - IE MEULEE
KEPALA
0,15
1,5
0,4
0,25
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
BACK UP DATA PT. ARENA BUDAYA
PEMB. JALAN BALOHAN
BETON K-250
- ANOI ITAM - IE MEULEE
CATATAN :
0,30 3,00 0,30 3,00 0,30
0,30 0,30 0,30 0,30
a
0,30
c c c c
0,30
b b b
2,40
3,00
c c c c
0,30
a
0,30
6,90
7.00
KANAN 50.625
KANAN 4.050
KIRI 18.000
KIRI 1.440
KANAN 18.000
KANAN 1.440
BOX 108.000
TOTAL 243.00 256.230
0,30
Ø 12 - 150 e
c2 Ø 12 - 150
Ø 10 - 100
b4
Ø 12 - 150
b2
Ø 10 - 100
d3
Ø 12 - 150 Ø 12 - 150
2,40
d1 d1
Ø 10 - 100 d3
Ø 12 - 150 Ø 12 - 100
c1 b3
Ø 12 - 150
b1
6,90
SUB TOTAL - 1
GAMBAR / SKET :
0,30 3,00 0,30 3,00 0,30
0,30
Ø 12 - 150 e
c2 Ø 12 - 150
Ø 10 - 100
b4
Ø 12 - 150
b2
Ø 10 - 100 d3
Ø 12 - 150 Ø 12 - 150
2,40
d1 d1
Ø 10 - 100 d3
Ø 12 - 150 Ø 12 - 100
c1 b3
Ø 12 - 150
b1
6,90
SUB TOTAL - 2
GAMBAR / SKET :
0,30 3,00 0,30 3,00 0,
0,30
Ø 12 - 150 e
c2 Ø 12 - 150
Ø 10 - 100
b4
Ø 12 - 150
b2
Ø 10 - 100 d3
Ø 12 - 150 Ø 12 - 150
2,40
d1 d1
Ø 10 - 100 d3
Ø 12 - 150 Ø 12 - 100
c1 b3
Ø 12 - 150
b1
6,90
SUB TOTAL - 3
GAMBAR / SKET :
0,30 SKET : 06
0,
s2 s17 0,24
s23
Ø 12 - 200 s3 s4 3,10
3 Ø 12 s1 s5 s6 s7
A s1 0,24 s8 s9 06
06 0,
Ø 12 - 200 Ø 12 - 200
s26 4 06 0, 06 06 s18 0,24
s22 3,6 0, 0, 0, 06
Ø 12 - 200 0, 06 06 06 2,80
Ø 12 - 200 s25 0, 0, 0, 06 06
0,
Ø 12 - 200
s21 Ø 12 - 200 0,
s24 4,78 s19 0,24
Ø 12 - 200 4,64
s20 3 Ø 12
4,48 4,34 4,20 2,52
Ø 12 - 200 2,70 4,06 3,92 3,78
s19
0,30 06 06
s18 Ø 12 - 200 0, 06 06 06 06 06 06 06 06 0,
0, 0, 0, 0, 0, 0, 0, 0,
Ø 12 - 200
3,22 0,24 0,24 0,24 0,24 0,24 0,24 0,24 0,24 s20 0,24 0
s17 Ø 12 - 200 2,24
s2
Ø 12 - 200 06
s16 Ø 12 - 200 s10 0, 06
s3 s11 s12 06 s21 0,
s13 s14 0, 06 0,24
4,26 Ø 12 - 200 s15 s16 s23 0,24 0, 1,96
s15 06
Ø 12 - 200
s4 06 06
1,40 0, 06
0, 0, 06 06 s22 0,24 0,
Ø 12 - 200 0, 0, 06 06 06 06
s14 0, 0, 0, 0, 06 1,68
Ø 12 - 200
s24 0,24 0,
s5 3,00 3,64 3,50 2,94 2,80 06
Ø 12 - 200 3,36 3,22 3,08 1,10 0, 06 s28
s13 s26 0,24 0,
Ø 12 - 200 0
s6 06 06 06 06 06 06 06 06 0,54 0,
2,14
Ø 12 - 200 0, 0, 0, 0, 0, 0, 0, 0, 06
s12 0,24 0,24 0,24 0,24 0,24 0,24 0,24 0,
s25 0,24 06
Ø 12 - 200
s7 0,82 0,
Ø 12 - 200 s27 0,24
s11 3,22
Ø 12 - 200
Ø 12 - 200 s8
s10
0,30
0,60
Ø 12 - 200 0,10
s9
Ø 12 - 200
s27 Lantai Kerja
0,10 3,00 0,30 ( Beton K. 125 )
teb = 10 cm
SUB TOTAL - 4
GAMBAR / SKET :
0,30 SKET : 06
0,
s2 s17 0,24
s23
Ø 12 - 200 s3 s4 3,10
3 Ø 12 s1 s5 s6 s7
A s1 0,24 s8 s9 06
06 0,
Ø 12 - 200 Ø 12 - 200
s26 4 06 0, 06 06 s18 0,24
s22 3,6 0, 0, 0, 06
Ø 12 - 200 0, 06 06 06 2,80
Ø 12 - 200 s25 0, 0, 0, 06 06
0,
Ø 12 - 200
s21 Ø 12 - 200 0,
s24 4,78 s19 0,24
Ø 12 - 200 4,64
s20 3 Ø 12
4,48 4,34 4,20 2,52
Ø 12 - 200 2,70 4,06 3,92 3,78
s19
0,30 06 06
s18 Ø 12 - 200 0, 06 06 06 06 06 06 06 06 0,
0, 0, 0, 0, 0, 0, 0, 0,
Ø 12 - 200
3,22 0,24 0,24 0,24 0,24 0,24 0,24 0,24 0,24 s20 0,24 0
s17 Ø 12 - 200 2,24
s2
Ø 12 - 200 06
s16 Ø 12 - 200 s10 0, 06
s3 s11 s12 06 s21 0,
s13 s14 0, 06 0,24
4,26 Ø 12 - 200 s15 s16 s23 0,24 0, 1,96
s15 06
Ø 12 - 200
s4 06 06
1,40 0, 06
0, 0, 06 06 s22 0,24 0,
Ø 12 - 200 0, 0, 06 06 06 06
s14 0, 0, 0, 0, 06 1,68
Ø 12 - 200 s24 0,24 0,
s5 3,00 3,64 3,50 2,94 2,80 06
Ø 12 - 200 3,36 3,22 3,08 1,10 0, 06 s28
s13 s26 0,24 0,
Ø 12 - 200 0
s6 06 06 06 06 06 06 06 06 0,54 0,
2,14
Ø 12 - 200 0, 0, 0, 0, 0, 0, 0, 0, 06
s12 0,24 0,24 0,24 0,24 0,24 0,24 0,24 0,
s25 0,24 06
Ø 12 - 200
s7 0,82 0,
Ø 12 - 200 s27 0,24
s11 3,22
Ø 12 - 200
Ø 12 - 200 s8
s10
0,30
0,60
Ø 12 - 200 0,10
s9
Ø 12 - 200
s27 Lantai Kerja
0,10 3,00 0,30 ( Beton K. 125 )
teb = 10 cm
SUB TOTAL - 5
GAMBAR / SKET :
0,30 SKET : 06
0,
s2 s17 0,24
s23
Ø 12 - 200 s3 s4 3,10
3 Ø 12 s1 s5 s6 s7
A s1 0,24 s8 s9 06
06 0,
Ø 12 - 200 Ø 12 - 200
s26 4 06 0, 06 06 s18 0,24
s22 3,6 0, 0, 0, 06
Ø 12 - 200 0, 06 06 06 2,80
Ø 12 - 200 s25 0, 0, 0, 06 06
0,
Ø 12 - 200
s21 Ø 12 - 200 0,
s24 4,78 s19 0,24
Ø 12 - 200 4,64
s20 3 Ø 12
4,48 4,34 4,20 2,52
Ø 12 - 200 2,70 4,06 3,92 3,78
s19
0,30 06 06
s18
Ø 12 - 200 0, 06 06 06 06 06 06 06 06 0,
0, 0, 0, 0, 0, 0, 0, 0,
Ø 12 - 200
3,22 0,24 0,24 0,24 0,24 0,24 0,24 0,24 0,24 s20 0,24 0
s17 Ø 12 - 200 2,24
s2
Ø 12 - 200 06
s16 Ø 12 - 200 s10 0, 06
s3 s11 s12 06 s21 0,
s13 s14 0, 06 0,24
4,26 Ø 12 - 200 s15 s16 s23 0,24 0, 1,96
s15 06
Ø 12 - 200
s4 06 06
1,40 0, 06
0, 0, 06 06 s22 0,24 0,
Ø 12 - 200 0, 0, 06 06 06 06
s14 0, 0, 0, 0, 06 1,68
Ø 12 - 200 s24 0,24 0,
s5 3,00 3,64 3,50 2,94 2,80 06
Ø 12 - 200 3,36 3,22 3,08 1,10 0, 06 s28
s13 s26 0,24 0,
Ø 12 - 200 0
s6 06 06 06 06 06 06 06 06 0,54 0,
2,14
Ø 12 - 200 0, 0, 0, 0, 0, 0, 0, 0, 06
s12 0,24 0,24 0,24 0,24 0,24 0,24 0,24 0,
s25 0,24 06
Ø 12 - 200
s7 0,82 0,
Ø 12 - 200 s27 0,24
s11 3,22
Ø 12 - 200
Ø 12 - 200 s8
s10
0,30
0,60
Ø 12 - 200 0,10
s9
Ø 12 - 200
s27 Lantai Kerja
0,10 3,00 0,30 ( Beton K. 125 )
teb = 10 cm
29
30
31
32
33
SUB TOTAL - 6
0,30 SKET :
6
0 ,0
s17
0,0
s2 0,24
s23 Ø 12 - 200 s3 s4 3,10
3 Ø 12 s1 s5 s6 s7
A s1 0,24 s8 s9
GAMBAR / SKET :
6
0,0
6
6
Ø 12 - 200 s18
0 ,0
Ø 12 - 200
0 ,0
s26 0,24
6
s22 4
0 ,0
3,6
6
0 ,0
0 ,0
Ø 12 - 200 2,80
0 ,0
6
s25
0 ,0
6
0,0
Ø 12 - 200
6
0,0
Ø 12 - 200
s21
0,0
6
Ø 12 - 200
0,0
s24
6
s19
0,0
4,78 0,24
Ø 12 - 200 4,64
s20 3 Ø 12
4,48 4,34 4,20 2,52
Ø 12 - 200 2,70 4,06 3,92 3,78
s19
6
Ø 12 - 200 0,30
0 ,0
6
s18
6
6
6
6
0,0
6
0 ,0
0 ,0
0 ,0
0 ,0
0,0
0,0
0,0
0,0
0 ,0
Ø 12 - 200
3,22 0,24 0,24 0,24 0,24 0,24 0,24 0,24 0,24 s20 0,24
s17 Ø 12 - 200 2,24
s2
Ø 12 - 200
s16
6
Ø 12 - 200 s10
0,0
s11
6
s3 s12 s21
0,0
s13 0,24
0 ,0
s14
6
s23
0 ,0
4,26 Ø 12 - 200 s15 s16 0,24 1,96
s15
6
Ø 12 - 200 1,40
0,0
s4
6
s22
6
0,0
0 ,0
0,24
6
0,0
0 ,0
6
Ø 12 - 200
6
6
0,0
s14
6
1,68
0,0
0,0
0,0
0,0
6
Ø 12 - 200
0,0
s5 3,00 s24 0,24
2,94 2,80 0,24
6
3,64 3,50 1,10 s28
0 ,0
Ø 12 - 200 3,36 3,22 3,08
6
s13
0,0
s26 0,24
Ø 12 - 200
0,0
5
s6
0,0
0,54
6
6
6
2,14
0 ,0
0 ,0
0 ,0
0 ,0
5
0,0
0,0
0,0
6
0 ,0
Ø 12 - 200
6
s12 0,24 0,24 0,24 0,24 0,24 0,24 0,24
s25
0,0
0,24
6
Ø 12 - 200
0 ,0
0,82
s7
6
0 ,0
Ø 12 - 200 s27 0,24
s11 3,22
Ø 12 - 200
Ø 12 - 200 s8
s10
0,30
0,60
Ø 12 - 200 0,10
s9
Ø 12 - 200
s27 Lantai Kerja
0,10 3,00 0,30 ( Beton K. 125 )
teb = 10 cm
0,30
Ø 12 - 150 e Ø 12 - 150
Ø 10 - 100 c2
b4
Ø 12 - 150
b2
Ø 10 - 100 Ø 10 - 100
d3
Ø 10 - 600/1000
Ø 12 - 150
a1 Ø 12 - 100 a3 e Ø 12 - 150
0,30
Ø 12 - 150 Ø 12 - 100
c1 b3
Ø 12 - 150
b1
6,90
NO. STA.
1 SUB TOTAL - 1
2 SUB TOTAL - 2
3 SUB TOTAL - 3
4 SUB TOTAL - 4
5 SUB TOTAL - 5
6 SUB TOTAL - 6
TOTAL
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
3,00 0,30
0,30
Ø 10 - 100
a4
SKET :
a2 6,84
0,30 0,24 Ø 12 - 150 0,24
0,06 Ø 12 - 150 0,06 0,06
0,06 b2 6,84
e e e
e
0,06
0 - 100 Ø 10 - 100
d3 d3
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
3,54
3,54
3,54
3,54 3,54
d2 d1 d1 d1 d1 d2
Ø 12 - 150 Ø 12 - 150
d1 d2
3,00
e
e e e
0,30
a3 11,64 a3' 7,78
0,24 Ø 12 - 100
0,24
Ø 12 - 100
b3
b3 Ø 12 - 100
b3'
11,88
7,54
k1 0.16
0,42 k3 Ø 12 - 100
Ø 12 - 150
0,54 0.20
0,56
k2 7 Ø 12
0,24 10,40
a4 b4 Ø 10 - 100
11,66
a4' 11,90 b4' 0,24
0,42 Ø 10 - 100
3,68 3,44 f1 0,58 0,06 f2 12 Ø 12 0,06
0,42
1,46
Ø 12 - 200 0,92 6,84
d3 Ø 10 - 100 0,06
0,24
0,06 0,25
11,90 d3' d4
3,44
6194.321
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
3,00 0,30
0,30
Ø 10 - 100
a4
SKET :
a2 6,84
0,30 0,24 Ø 12 - 150 0,24
0,06 Ø 12 - 150 0,06
0,06 b2 6,84 0,06
e e e
e
0,06
100 d3 Ø 10 - 100 d3
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
3,54
3,54
3,54
3,54 3,54
d2 d1 d1 d1 d1 d2
Ø 12 - 150 Ø 12 - 150
d1 d2
3,00
e
e e e
0,30
a3 11,64 a3' 7,78
0,24 Ø 12 - 100
0,24
Ø 12 - 100
b3
b3 Ø 12 - 100
b3'
11,88
7,54
k1 0.16
0,42 k3 Ø 12 - 100
Ø 12 - 150
0,54 0.20
0,56
k2 7 Ø 12
0,24 10,40
a4 b4 Ø 10 - 100
11,66
a4' 11,90 b4' 0,24
0,42 Ø 10 - 100
3,68 3,44 f1 0,58 0,06 f2 12 Ø 12 0,06
0,42 1,46
Ø 12 - 200 0,92 6,84
d3 Ø 10 - 100 0,06
0,24 0,06 0,25
11,90 d3' d4
3,44
7973.843
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
3,00 0,30
0,30
Ø 10 - 100
a4
SKET :
a2 6,84
0,30 0,24 Ø 12 - 150 0,24
0,06 Ø 12 - 150 0,06
0,06 b2 6,84 0,06
e e e
e
0,06
- 100 d3 Ø 10 - 100 d3
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
3,54
3,54
3,54
3,54 3,54
d2 d1 d1 d1 d1 d2
Ø 12 - 150 Ø 12 - 150
d1 d2
3,00
e
e e e
0,30
a3 11,64 a3' 7,78
0,24 Ø 12 - 100
0,24
Ø 12 - 100
b3
b3 Ø 12 - 100
b3'
11,88
7,54
k1 0.16
0,42 k3 Ø 12 - 100
Ø 12 - 150
0,54 0.20
0,56
k2 7 Ø 12
0,24 10,40
a4 b4 Ø 10 - 100
11,66
a4' 11,90 b4' 0,24
0,42 Ø 10 - 100
3,68 3,44 f1 0,58 0,06 f2 12 Ø 12 0,06
0,42 1,46
Ø 12 - 200 0,92 6,84
d3 Ø 10 - 100 0,06
0,24
0,06 0,25
11,90 d3' d4
3,44
496.979
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
3 Ø 12
s1
06
0, 06
s17 0,24 0,
3,10
s6 s7 s8 s9 06
0, 06
s18 0,24 0, Ø 12 - 200
06 06 06 2,80
0, 0, 0, 06 06
Ø 12 - 200
0, 0, 06
s19 0,24 0, A
4 4,20 2,52 variasi
4,06 3,92 3,78
06 06 06 06 06 Ø 12 - 200
0, 0, 0, 0, 0, 06
0,24 0,24 0,24 0,24 s20 0,24 0, Ø 12 - 600/1000
2,24
s28
0,30
06
06 0, 06 Ø 12 - 200
0, 06 s21 0,24 0,
s16 s23 0,24 0, 1,96
06
1,40 0, 06
s22 0,24 0,
06 06 3,00
0, 0, 06 1,68 0,60
s24 0,24 0,
2,80 06 0,24
1,10 0, 06 s28
s26 0,24 0, 0,
05 05 0,10
06 06 0,54 0,
0, 0, 06
0,24 0,
s25 0,24 06
0,82 0, 06 0,30
s27 0,24 0,
3,22
0,50
DENAH POT. A
396.267
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
3 Ø 12
s1
06
0, 06
s17 0,24 0,
3,10
s6 s7 s8 s9 06
0, 06
s18 0,24 0, Ø 12 - 200
06 06 06 2,80
0, 0, 0, 06 06
Ø 12 - 200
0, 0, 06
s19 0,24 0, A
4 4,20 2,52 variasi
4,06 3,92 3,78
06 06 06 06 06 Ø 12 - 200
0, 0, 0, 0, 0, 06
0,24 0,24 0,24 0,24 s20 0,24 0, Ø 12 - 600/1000
2,24
s28
0,30
06
06 0, 06 Ø 12 - 200
0, 06 s21 0,24 0,
s16 s23 0,24 0, 1,96
06
1,40 0, 06
s22 0,24 0,
06 06 3,00
0, 0, 06 1,68 0,60
s24 0,24 0,
2,80 06 0,24
1,10 0, 06 s28
s26 0,24 0, 0,
05 05 0,10
06 06 0,54 0,
0, 0, 06
0,24 0,
s25 0,24 06
0,82 0, 06 0,30
s27 0,24 0,
3,22
0,50
DENAH POT. A
239.167
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
3 Ø 12
s1
06
0, 06
s17 0,24 0,
3,10
s6 s7 s8 s9 06
0, 06
s18 0,24 0, Ø 12 - 200
06 06 06 2,80
0, 0, 0, 06 06
Ø 12 - 200
0, 0, 06
s19 0,24 0, A
4 4,20 2,52 variasi
4,06 3,92 3,78
06 06 06 06 06 Ø 12 - 200
0, 0, 0, 0, 0, 06
0,24 0,24 0,24 0,24 s20 0,24 0, Ø 12 - 600/1000
2,24
s28
0,30
06
06 0, 06 Ø 12 - 200
0, 06
s21 0,24 0,
s16 s23 0,24 0, 1,96
06
1,40 0, 06
s22 0,24 0,
06 06 3,00
0, 0, 06 1,68
0,60
s24 0,24 0,
2,80 06 0,24
1,10 0, 06 s28
s26 0,24 0, 0,
05 05 0,10
06 06 0,54 0,
0, 0, 06
0,24 0,
s25 0,24 06
0,82 0, 06 0,30
s27 0,24 0,
3,22
0,50
DENAH POT. A
211.953
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
s17
0,0
s2 0,24
s3 s4 3,10
1 s5 s6 s7
0,24 s8 s9
6
0,0
6
s18
0 ,0
0 ,0
0,24
6
4 Ø 12 - 200
0 ,0
3,6
6
6
0 ,0
0 ,0
2,80
0 ,0
Ø 12 - 200
0 ,0
6
0,0
6
0,0
Ø 12 - 200
0,0
6
0,0
A
6
s19
0,0
4,78 0,24
4,64 4,48 4,34 4,20 2,52 variasi
3 Ø 12 4,06 3,92 3,78
6
Ø 12 - 200
0 ,0
6
6
6
6
6
6
0,0
6
0 ,0
0 ,0
0 ,0
0 ,0
0,0
0,0
0,0
0,0
0 ,0
3,22 0,24 0,24 0,24 0,24 0,24 0,24 0,24 0,24 s20 0,24 Ø 12 - 600/1000
2,24
s28
0,30
6
0 Ø 12 - 200
0,0
s11
6
s12 s21
6
0,0
s13 0,24
0 ,0
s14
6
s23
0 ,0
1,40
0,0
s22
6
0 ,0
0,24
6
0,0
0 ,0
3,00
6
6
6
0,0
1,68
0,0
0,0
0,0
0,0
0,60
6
0,0
s24 0,24
2,94 2,80 0,24
6
0,54
6
6
6
6
0 ,0
0 ,0
0 ,0
0 ,0
5
0,0
0,0
6
0 ,0
0,24
6
0 ,0
0,82 0,30
6
0 ,0
s27 0,24
3,22
0,50
DENAH POT. A
0,3
0,24 2,06
0,3
e 1,04
2
Ø 12 - 150 0,06
c2 0,06 1,04
0 ,0
0 ,0
6
1 ,1
6
50
1 2 ,10
e e
0
e
-1
1
e
Ø
0,06
Ø 10 - 100 Ø 10 - 100
d3 d3
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
Ø 12 - 150
3,54
3,54
3,54
3,54 3,54
d2 d1 d1 d1 d1 d2
2 - 150 Ø 12 - 150 Ø 12 - 150
d1 d2
3,00
6
0 ,0
e
0 50
e e e
1,1 - 1
12
Ø
6
6
0 ,0
0,0
6
0,0
d4
1,04
6
0,0
c1
6
0 ,3
0 ,3
0,24 1,04
2
0 ,3
1,02
2
0 ,3
1,02 2,06
a1 6,84
Ø 12 - 100 e Ø 12 - 150
a3
0 ,0
b1
0 ,0
6,84
0,30
a3 11,64 a3' 7,78
0,24 Ø 12 - 100
0,24
6
6
0 ,0
0 ,0
Ø 12 - 100
b3
6
0 ,0
6
b3
0 ,0
Ø 12 - 100
6
b3'
0 ,0
6
0,0
11,88
6,90 7,54
k1 0.16
0,42 k3 Ø 12 - 100
Ø 12 - 150
0,54 0.20 2
0,56 0.1
k2
6
6
7 Ø 12
0 ,0
0 ,0
2
0,24 10,40 0.1
a4
5
b4 Ø 10 - 100
0,0
0 ,0
11,66
b4' 0,24
0,0
a4' 11,90
5
Ø 10 - 100
0,0
0,42
0 ,0
1,46
0,0
0 ,0
6,84
5
Ø 12 - 200 0,92
0 ,0
d3 Ø 10 - 100 0,06
5
0,24
0,0
0,06 0,25
0,0
11,90 d3' d4
0 ,0
5
5
0 ,0
0,0
3,44
5
VOLUME
POSISI KET.
(KG)
BOX 6,194.321
BOX 7,973.843
BOX 496.979
SAYAP 396.267
SAYAP 239.167
SAYAP 211.953
15,512.530
GAMBAR / SKET :
A
40.0
Timbunan
0.4 h
DIMENSI (M)
NO. STA. POSISI
h A B C
SUB TOTAL - 1
GAMBAR / SKET :
A
40.0
Timbunan
0.4 h
TOTAL
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
A
40.0
h
Pipa PVC Ø 2"
0.3 h C
0.900 3.480
0.900 3.480
3.480 25.00 87.000
0.900 3.480
3.480 25.00 87.000
0.900 3.480
1 50.00 174.000
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
A
40.0
h
Pipa PVC Ø 2"
0.3 h C
4h
PANJANG VOLUME
POSISI KET.
(M') (M3)
KIRI 50.00 174.000
555.00 3,232.021
GAMBAR / SKET :
A
40.0
Timbunan
Pasangan Batu
0.4 h
DIMENSI (M)
NO. STA. POSISI
h A B C
SUB TOTAL - 2
GAMBAR / SKET :
A
40.0
Timbunan
Pasangan Batu
0.4 h
DIMENSI (M)
NO. STA. POSISI
h A B C
1 0 + 000 KANAN 1.580 0.400 0.632 0.474
SUB TOTAL - 3
Kegiatan
Nama Paket
BADAN PENGUSAHAAN KAWASAN
PERDAGANGAN BEBAS DAN PELABUHAN
BEBAS SABANG No. Kontrak
Tanggal Kontrak
Nilai Kontrak
Prop./Kab./Kota
KONSULTAN PENGAWAS :
PT. INDAH KARYA BACK UP DATA
( PERSERO )
GAMBAR / SKET :
A
40.0
Timbunan
Pasangan Batu
0.4 h
DIMENSI (M)
NO. STA. POSISI
h A B C
SUB TOTAL - 4
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
A
40.0
h
Pipa PVC Ø 2"
0.3 h C
0.4 h
0.900 3.480
0.900 3.480
0.900 3.480
3.480 25.00 87.000
0.900 3.480
3.480 25.00 87.000
0.900 3.480
3.480 25.00 87.000
0.900 3.480
3.480 25.00 87.000
0.900 3.480
3.480 25.00 87.000
0.900 3.480
3.480 25.00 87.000
0.900 3.480
3.480 25.00 87.000
0.900 3.480
2 175.00 609.000
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
A
40.0
h
Pipa PVC Ø 2"
0.3 h C
0.4 h
3 165.00 1,209.489
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
A
40.0
h
Pipa PVC Ø 2"
0.3 h C
0.4 h
0.567 1.521
2.265 25.00 56.630
0.831 3.009
0.831 3.009
4.520 25.00 113.003
1.212 6.031
7.687 25.00 192.176
1.530 9.343
10.614 25.00 265.361
1.737 11.886
9.867 25.00 246.686
1.395 7.849
9.057 25.00 226.433
1.608 10.265
9.283 15.00 139.242
1.437 8.300
4 165.00 1,239.532
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan
Nama Paket
BADAN PENGUSAHAAN KAWASAN
PERDAGANGAN BEBAS DAN PELABUHAN
BEBAS SABANG No. Kontrak
Tanggal Kontrak
Nilai Kontrak
Prop./Kab./Kota
KONSULTAN PENGAWAS :
PT. INDAH KARYA BACK UP DATA
( PERSERO )
GAMBAR / SKET :
DIMENSI (M)
NO. STA. POSISI
Lebar Panjang Tinggi Jumlah
SUB TOTAL - 1
GAMBAR / SKET :
TOTAL
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
E BRONJONG ( GABION )
Luas
PANJANG VOLUME
(M2) KET.
OPSIONAL RATA" (M') (M3)
10.000
10.000
10.000 25.00 250.000
10.000
10.000 25.00 250.000
10.000
15.000
15.000 25.00 375.000
15.000
1 75.00 875.000
JUFRI MUSLIANDA. FK
Inspector Quantity Surveyor
Kegiatan : BADAN PENGUSAHAAN KAWASAN BEBAS SABANG
Nama Paket : PEMBANGUNAN JALAN BALOHAN - ANOI ITAM
- IE MEULEE
No. Kontrak : 18/PKPBS-SPJ/SPK/VIII/2011
Tanggal Kontrak : 26 Agustus 2011
Nilai Kontrak : Rp. 8.182.326.000,00,-
Prop./Kab./Kota : PEMERINTAH ACEH / KOTA SABANG
KONTRAKTOR PELAKSANA :
K UP DATA PT. ARENA BUDAYA
PANJANG VOLUME
POSISI KET.
(M') (M3)
KIRI 75.00 875.000
75.00 875.000