08 ALAT-ALAT BESAR

08.01. Alat-Alat Besar Darat

08.01.01 Tractor

08.01.01.02. Wheel Tractor

Wheel Tractor ISEKI


08.01.01.02.01 Iseki 223.190.000 234.349.500 234.349.500 246.624.950 247.740.900 249.972.800 249.972.800
NT540F

08.01.01.02.02 Wheel Tractor QUICK A 360 QUICK 219.265.200 230.228.460 230.228.460 242.288.046 243.384.372 245.577.024 245.577.024

Wheel Tractor Tractor 40HP


08.01.01.02.03 Maxxi 225.500.000 236.775.000 236.775.000 249.177.500 250.305.000 252.560.000 252.560.000
Maxxi WD404

Wheel Tractor QUICK A 360


08.01.01.02.04 QUICK 243.843.600 256.035.780 256.035.780 269.447.178 270.666.396 273.104.832 273.104.832
+ DISC PLOUG 3 X 22 inch

Wheel Tractor 4 Roda


08.01.01.02.05 Iseki 272.800.000 286.440.000 286.440.000 301.444.000 302.808.000 305.536.000 305.536.000
NT-548F

Wheel Tractor Roda 4


08.01.01.02.06 Yanmar 352.000.000 369.600.000 369.600.000 388.960.000 390.720.000 394.240.000 394.240.000
Model EF 393 T (39 Hp)

Wheel Tractor Roda 4


08.01.01.02.07 Yanmar 443.300.000 465.465.000 465.465.000 489.846.500 492.063.000 496.496.000 496.496.000
Model EF 494 T (49 Hp)

08.01.02 Grader

08.01.02.02. Grader Towed Type

Motor Grader Model


08.01.02.02.01 Komatsu 2.432.100.000 2.553.705.000 2.553.705.000 2.687.470.500 2.699.631.000 2.723.952.000 2.723.952.000
GD511A-1

08.01.02.02.02 Grader 20K Caterpilar 2.432.100.000 2.553.705.000 2.553.705.000 2.687.470.500 2.699.631.000 2.723.952.000 2.723.952.000

08.01.02.03. Buldouzer

Buldozer Caterpilar

08.01.02.03.01 D3KXL/ROPSCAN/VPATBL Catepillar 1.588.972.000 1.668.420.600 1.668.420.600 1.755.814.060 1.763.758.920 1.779.648.640 1.779.648.640

ADE

08.01.02.03.02 Buldozer Model D31EX-22 Komatsu 1.653.828.000 1.736.519.400 1.736.519.400 1.827.479.940 1.835.749.080 1.852.287.360 1.852.287.360

Bulldozer Model
08.01.02.03.03 Catepillar 1.729.193.620 1.815.653.301 1.815.653.301 1.910.758.950 1.919.404.918 1.936.696.854 1.936.696.854
D3KLGP/ROPSCANOPY

08.01.02.03.04 Bulldozer Model D31PX-22 Komatsu 1.767.326.000 1.855.692.300 1.855.692.300 1.952.895.230 1.961.731.860 1.979.405.120 1.979.405.120

08.01.03 Excavator

08.01.03.01. Crawler Excavator

Mini Hydraulic Excavator

08.01.03.01.01 304E2 CR/CANOPY/STEEL Cartepillar 814.915.640 855.661.422 855.661.422 900.481.782 904.556.360 912.705.517 912.705.517

TRACK

Mini Hydraulic Excavator


08.01.03.01.02 Komatsu 1.029.589.000 1.081.068.450 1.081.068.450 1.137.695.845 1.142.843.790 1.153.139.680 1.153.139.680
Model PC55MR-3

Excavator

08.01.03.01.03 307E/CAB/BlADE/BKT 0,31 Cartepillar 1.059.806.000 1.112.796.300 1.112.796.300 1.171.085.630 1.176.384.660 1.186.982.720 1.186.982.720

CUM

Hydraulic Excavator Model


08.01.03.01.04 Komatsu 1.378.190.000 1.447.099.500 1.447.099.500 1.522.899.950 1.529.790.900 1.543.572.800 1.543.572.800
PC130F-7

08.01.03.01.05 CAT 313D Cartepillar 1.432.728.000 1.504.364.400 1.504.364.400 1.583.164.440 1.590.328.080 1.604.655.360 1.604.655.360

08.01.03.01.06 CAT 320D2SLR Cartepillar 2.065.074.000 2.168.327.700 2.168.327.700 2.281.906.770 2.292.232.140 2.312.882.880 2.312.882.880

Hydraulic Excavator Long


08.01.03.01.07 Komatsu 2.237.532.000 2.349.408.600 2.349.408.600 2.472.472.860 2.483.660.520 2.506.035.840 2.506.035.840
Arm Model PC200-8M0 SLF

08.01.03.02. Wheel Excavator

WHEEL EXCAVATOR MINI


08.01.03.02.01 Hyundai 906.510.000 951.835.500 951.835.500 1.001.693.550 1.006.226.100 1.015.291.200 1.015.291.200
R60W-9S

WHEEL EXCAVATOR
08.01.03.02.02 Hyundai 1.565.388.000 1.643.657.400 1.643.657.400 1.729.753.740 1.737.580.680 1.753.234.560 1.753.234.560
R140W-9S

WHEEL EXCAVATOR
08.01.03.02.03 Hyundai 2.184.468.000 2.293.691.400 2.293.691.400 2.413.837.140 2.424.759.480 2.446.604.160 2.446.604.160
R210W-9S

08.01.05 Hauler

Page 1
HARGA (Rp.)
KODE
NAMA BARANG MEREK SATUAN TANJUNG
BATAM BINTAN KARIMUN LINGGA NATUNA ANAMBAS
BARANG
PINANG

08.01.05.03. Dump Truck

08.01.05.03.01 Dump Truck Hino Dutro 300 Hino 235.730.000 247.516.500 247.516.500 260.481.650 261.660.300 264.017.600 264.017.600

08.01.05.03.02 Fuso FM517 (4x2) HS Mitsubishi 676.500.000 710.325.000 710.325.000 747.532.500 750.915.000 757.680.000 757.680.000

08.01.05.03.03 Fuso FNS27 (6x4) MS Mitsubishi 940.500.000 987.525.000 987.525.000 1.039.252.500 1.043.955.000 1.053.360.000 1.053.360.000

08.01.05.03.04 Fuso FNS27 (6x4) ML Mitsubishi 957.000.000 1.004.850.000 1.004.850.000 1.057.485.000 1.062.270.000 1.071.840.000 1.071.840.000

Dump Truck Sampah 8 m3


08.01.05.03.05 Unit 350.000.000 367.500.000 367.500.000 386.750.000 388.500.000 392.000.000 392.000.000
Hino

08.01.05.06. Lain-lain

08.01.05.06.01 Mesin ULV+ Mobil Angkut - Unit 681.120.000 715.176.000 715.176.000 752.637.600 756.043.200 762.854.400 762.854.400

Water Tanker 3000-4500 L


08.01.05.06.02 - Unit 189.909.200 199.404.660 199.404.660 209.849.666 210.799.212 212.698.304 212.698.304
HP.100 Kap. 5000 Liter

Truck Mixer (Agitator)


08.01.05.06.03 - Unit 907.652.200 953.034.810 953.034.810 1.002.955.681 1.007.493.942 1.016.570.464 1.016.570.464
HP.220 Kap. 5 M3

Tronton 150 HP Kap. 15


08.01.05.06.04 - Unit 1.039.383.800 1.091.352.990 1.091.352.990 1.148.519.099 1.153.716.018 1.164.109.856 1.164.109.856
Ton

08.01.05.06.05 Trailer 250 HP Kap. 20 Ton - Unit 1.042.124.200 1.094.230.410 1.094.230.410 1.151.547.241 1.156.757.862 1.167.179.104 1.167.179.104

Flad Bed Truck 3-4 M3


08.01.05.06.06 - Unit 436.656.000 458.488.800 458.488.800 482.504.880 484.688.160 489.054.720 489.054.720
HP.190 Kap.10 Ton

New Fuso fj 2528 (6x4)


08.01.05.06.07 Mitsubishi Unit 1.089.000.000 1.143.450.000 1.143.450.000 1.203.345.000 1.208.790.000 1.219.680.000 1.219.680.000
Chassis Mixer

New Fuso FZ 4028 (4x2)


08.01.05.06.08 Mitsubishi Unit 957.000.000 1.004.850.000 1.004.850.000 1.057.485.000 1.062.270.000 1.071.840.000 1.071.840.000
tractor Head

New Fuso FZ 4928 (6x4)


08.01.05.06.09 Mitsubishi Unit 1.232.000.000 1.293.600.000 1.293.600.000 1.361.360.000 1.367.520.000 1.379.840.000 1.379.840.000
tractor Head

Bak Kontainer Sampah 8 m3


08.01.05.06.10 Unit 41.300.000 43.365.000 43.365.000 45.636.500 45.843.000 46.256.000 46.256.000

08.01.06 Asphalt Equipment

08.01.06.06. Asphalt Sprayer

Asphalt Sprayer Kap. 1000


08.01.06.06.01 110.500.000 116.025.000 116.025.000 122.102.500 122.655.000 123.760.000 123.760.000
Liter

Asphalt Mixing Plant (AMP)


08.01.06.06.02 - Unit 6.706.107.000 7.041.412.350 7.041.412.350 7.410.248.235 7.443.778.770 7.510.839.840 7.510.839.840
HP 250 Kap. 60 T/jam

Asphalt Finisher Model

08.01.06.06.03 BF300C (Track Model) Lebar Bomag Unit 2.945.812.760 3.093.103.398 3.093.103.398 3.255.123.100 3.269.852.164 3.299.310.291 3.299.310.291

Kerja 1,7 m - 5 m

Asphalt Finisher Model


08.01.06.06.04 Bomag Unit 1.969.790.460 2.068.279.983 2.068.279.983 2.176.618.458 2.186.467.411 2.206.165.315 2.206.165.315
BF223C

08.01.06.06.05 CAT AP255 Caterpilar Unit 1.964.842.000 2.063.084.100 2.063.084.100 2.171.150.410 2.180.974.620 2.200.623.040 2.200.623.040

08.01.06.06.06 CAT AP555E/MTS Caterpilar 5.159.000.000 5.416.950.000 5.416.950.000 5.700.695.000 5.726.490.000 5.778.080.000 5.778.080.000

Asphalt Liquid Mixer HP.248


08.01.06.06.07 366.723.000 385.059.150 385.059.150 405.228.915 407.062.530 410.729.760 410.729.760
Kap. 1000 Liter

08.01.07 Compacting Equipment

08.01.07.01. Macadam Roller/Three Wheel Roller

SAKAI R2H-2K Static Three


08.01.07.01.01 Sakai 1.059.300.000 1.112.265.000 1.112.265.000 1.170.526.500 1.175.823.000 1.186.416.000 1.186.416.000
Wheel Roller

08.01.07.01.02 Tire Roller KT30 (3 Ton) Sakai 622.600.000 653.730.000 653.730.000 687.973.000 691.086.000 697.312.000 697.312.000

08.01.07.01.03 TS205 Pneumatic Tire Roller Sakai 869.000.000 912.450.000 912.450.000 960.245.000 964.590.000 973.280.000 973.280.000

Pneumatic Tyre Roller Model


08.01.07.01.04 Bomag 1.499.795.000 1.574.784.750 1.574.784.750 1.657.273.475 1.664.772.450 1.679.770.400 1.679.770.400
BW25RH (8 Ton Class)

08.01.07.02. Thandam Roller

08.01.07.02.01 Mini Tandem Roller BW65H Bomag 235.103.000 246.858.150 246.858.150 259.788.815 260.964.330 263.315.360 263.315.360

Tandem Roller Model


08.01.07.02.02 Bomag 453.992.000 476.691.600 476.691.600 501.661.160 503.931.120 508.471.040 508.471.040
BW100AD-5 (2,5 Ton Class)

Tandem Roller Model


08.01.07.02.03 Bomag 680.988.000 715.037.400 715.037.400 752.491.740 755.896.680 762.706.560 762.706.560
BW131AD-5 (4 Ton Class)

08.01.07.04. Vibration Roller

SW300 Double Drum

08.01.07.04.01 Vibrating Roller (Tandem Sakai 560.120.000 588.126.000 588.126.000 618.932.600 621.733.200 627.334.400 627.334.400

Roller)

SV525D Drum Vibrating


08.01.07.04.02 Sakai 1.053.910.000 1.106.605.500 1.106.605.500 1.164.570.550 1.169.840.100 1.180.379.200 1.180.379.200
Roller (Smoth Drum)

Page 2
HARGA (Rp.)
KODE
NAMA BARANG MEREK SATUAN TANJUNG
BATAM BINTAN KARIMUN LINGGA NATUNA ANAMBAS
BARANG
PINANG

SV525TF Drum Vibrating


08.01.07.04.03 Sakai 1.201.310.000 1.261.375.500 1.261.375.500 1.327.447.550 1.333.454.100 1.345.467.200 1.345.467.200
Roller (Pad Foot)

Tandem Drum Vibratory


08.01.07.04.04 Bomag 1.313.334.000 1.379.000.700 1.379.000.700 1.451.234.070 1.457.800.740 1.470.934.080 1.470.934.080
Roller BW141AD-50

Tandem Drum Vibratory


08.01.07.04.05 Bomag 1.337.655.000 1.404.537.750 1.404.537.750 1.478.108.775 1.484.797.050 1.498.173.600 1.498.173.600
Roller BW151AC-50

08.01.08 Aggregate & Concrete Equipment

08.01.08.03. Stone Chuser

08.01.08.03.01 Crusher/SCR 30 TH Volvo Unit 415.800.000 436.590.000 436.590.000 459.459.000 461.538.000 465.696.000 465.696.000

Stone Chuser HP.220


08.01.08.03.02 - Unit 1.320.000.000 1.386.000.000 1.386.000.000 1.458.600.000 1.465.200.000 1.478.400.000 1.478.400.000
Kap.50 Ton/jam

Aggregat (Chip) Spreader


08.01.08.03.03 - Unit 521.400.000 547.470.000 547.470.000 576.147.000 578.754.000 583.968.000 583.968.000
HP.115 Kap. 3.50 M

08.01.08.11. Concrete Mixer

Concrate Mixer 0.3-0.6 M3


08.01.08.11.01 - Unit 9.240.000 9.702.000 9.702.000 10.210.200 10.256.400 10.348.800 10.348.800
HP.18 Kap. 500 Liter

Concrate Pan Mixer HP.134


08.01.08.11.02 - Unit 1.320.000.000 1.386.000.000 1.386.000.000 1.458.600.000 1.465.200.000 1.478.400.000 1.478.400.000
Kap. 600 L

Concrate Breaker HP.290


08.01.08.11.03 - Unit 622.497.200 653.622.060 653.622.060 687.859.406 690.971.892 697.196.864 697.196.864
Kap. 20 M3/jam

Concrate Pump HP.100


08.01.08.11.04 - Unit 415.800.000 436.590.000 436.590.000 459.459.000 461.538.000 465.696.000 465.696.000
Kap. 8 M3

08.01.08.11.05 Concrate Vibrator 5 HP - Unit 4.950.000 5.197.500 5.197.500 5.469.750 5.494.500 5.544.000 5.544.000

Condrete Mixer (350) HP.20


08.01.08.11.06 - Unit 46.200.000 48.510.000 48.510.000 51.051.000 51.282.000 51.744.000 51.744.000
Kap. 350 Liter

Cement Tanker HP.190


08.01.08.11.07 - Unit 660.000.000 693.000.000 693.000.000 729.300.000 732.600.000 739.200.000 739.200.000
Kap.4000 Liter

Slip Form Paver Hp.105


08.01.08.11.08 - Unit 1.764.840.000 1.853.082.000 1.853.082.000 1.950.148.200 1.958.972.400 1.976.620.800 1.976.620.800
Kap. 2.50 M

08.01.08.25. Container

Container Office Standard 20


08.01.08.25.01 38.400.000 40.320.000 40.320.000 42.432.000 42.624.000 43.008.000 43.008.000
feet non AC

Container Office Standard 20


08.01.08.25.02 42.000.000 44.100.000 44.100.000 46.410.000 46.620.000 47.040.000 47.040.000
feet AC

Container Office Standard 40


08.01.08.25.03 70.800.000 74.340.000 74.340.000 78.234.000 78.588.000 79.296.000 79.296.000
feet non AC

Container Office Standard 40


08.01.08.25.04 78.000.000 81.900.000 81.900.000 86.190.000 86.580.000 87.360.000 87.360.000
feet AC

Container 40 inch (Hight


08.01.08.25.05 99.600.000 104.580.000 104.580.000 110.058.000 110.556.000 111.552.000 111.552.000
Cube) reefer

08.01.08.25.06 Container 20 inch RF 85.800.000 90.090.000 90.090.000 94.809.000 95.238.000 96.096.000 96.096.000

08.01.09 Loader

08.01.09.02. Wheel Loader + Attachment

Wheel Loader CAT


08.01.09.02.01 Cartepillar Unit 1.149.720.000 1.207.206.000 1.207.206.000 1.270.440.600 1.276.189.200 1.287.686.400 1.287.686.400
908H2/CAN/GPB1.0CUM

WHEEL LOADER CAT


08.01.09.02.02 Cartepillar Unit 1.370.820.000 1.439.361.000 1.439.361.000 1.514.756.100 1.521.610.200 1.535.318.400 1.535.318.400
908H2/CAB/GPB1.0CUM

08.01.09.02.03 WHEEL LOADER HL740-9S Hitachi Unit 1.604.449.000 1.684.671.450 1.684.671.450 1.772.916.145 1.780.938.390 1.796.982.880 1.796.982.880

Wheel Loader Model


08.01.09.02.04 Komatsu Unit 1.913.252.000 2.008.914.600 2.008.914.600 2.114.143.460 2.123.709.720 2.142.842.240 2.142.842.240
WA150-5

08.01.09.02.05 Wheel Loader ZW140 Hitachi Unit 2.063.600.000 2.166.780.000 2.166.780.000 2.280.278.000 2.290.596.000 2.311.232.000 2.311.232.000

Wheel Loader Model


08.01.09.02.06 Komatsu Unit 2.213.211.000 2.323.871.550 2.323.871.550 2.445.598.155 2.456.664.210 2.478.796.320 2.478.796.320
WA200-5

08.01.09.02.07 CAT 924K Cartepillar Unit 2.538.228.000 2.665.139.400 2.665.139.400 2.804.741.940 2.817.433.080 2.842.815.360 2.842.815.360

08.01.09.03. Lain-lain

08.01.09.03.01 Rock Drill Breaker 3.0 HP - Unit 1.320.000.000 1.386.000.000 1.386.000.000 1.458.600.000 1.465.200.000 1.478.400.000 1.478.400.000

Fulvi Mixer HP.345


08.01.09.03.02 - Unit 2.029.566.000 2.131.044.300 2.131.044.300 2.242.670.430 2.252.818.260 2.273.113.920 2.273.113.920
Kap.2005

Compressor 4000-6500 L/M


08.01.09.03.03 - Unit 234.703.000 246.438.150 246.438.150 259.346.815 260.520.330 262.867.360 262.867.360
Hp.80 Kap.5000 Liter

Bor Pile Machine HP.150


08.01.09.03.04 - Unit 4.468.200.000 4.691.610.000 4.691.610.000 4.937.361.000 4.959.702.000 5.004.384.000 5.004.384.000
Kap.20 Meter

Page 3
HARGA (Rp.)
KODE
NAMA BARANG MEREK SATUAN TANJUNG
BATAM BINTAN KARIMUN LINGGA NATUNA ANAMBAS
BARANG
PINANG

Welding Set HP.100


08.01.09.03.05 - Unit 110.000.000 115.500.000 115.500.000 121.550.000 122.100.000 123.200.000 123.200.000
Kap.250 Amp

08.01.09.03.06 BACKHOE LOADER H940S Hyundai 1.112.133.000 1.167.739.650 1.167.739.650 1.228.906.965 1.234.467.630 1.245.588.960 1.245.588.960

Rigid Backhoe Loader


08.01.09.03.07 Komatsu 1.223.420.000 1.284.591.000 1.284.591.000 1.351.879.100 1.357.996.200 1.370.230.400 1.370.230.400
WB93R-5

08.01.09.03.08 Backhoe Loader CAT 416F2 Cartepillar 1.332.496.000 1.399.120.800 1.399.120.800 1.472.408.080 1.479.070.560 1.492.395.520 1.492.395.520

PNEUMATIC JACK Atlas


08.01.09.03.09 27.150.200 28.507.710 28.507.710 30.000.971 30.136.722 30.408.224 30.408.224
HAMMER TEX 220 PS Copco

HYDRAULIC JACK Atlas


08.01.09.03.10 37.400.000 39.270.000 39.270.000 41.327.000 41.514.000 41.888.000 41.888.000
HAMMER LH 220 Copco

08.01.10 Alat Pengangkat

08.01.10.08. Crane

08.01.10.08.01 Overhead Crane - Unit 10.000.000 10.500.000 10.500.000 11.050.000 11.100.000 11.200.000 11.200.000

08.01.10.08.02 KATO NK-300VR Kato 9.999.999.999 9.999.999.999 9.999.999.999 9.999.999.999 9.999.999.999 9.999.999.999 9.999.999.999

Rough Terrain Crane Model


08.01.10.08.03 Todano 5.729.955.000 6.016.452.750 6.016.452.750 6.331.600.275 6.360.250.050 6.417.549.600 6.417.549.600
GR300EX

08.01.11 Mesin Proses

08.01.11.02. Mesin Pembuat Es

08.01.11.02.01 Alat Es Puter - Unit 1.069.200 1.122.660 1.122.660 1.181.466 1.186.812 1.197.504 1.197.504

08.01.11.04. Water Treatment

Mesin Penyulingan Air


08.01.11.04.01 - Unit 23.100.000 24.255.000 24.255.000 25.525.500 25.641.000 25.872.000 25.872.000
Portable

Mesin Penyulingan Air


08.01.11.04.02 - Unit 34.729.200 36.465.660 36.465.660 38.375.766 38.549.412 38.896.704 38.896.704
Permanen

08.01.11.07. Mesin Diesel Lampu

Mesin Diesel RD 65 DIH-1S


08.01.11.07.01 Kubota Unit 13.917.600 14.613.480 14.613.480 15.378.948 15.448.536 15.587.712 15.587.712
6.5 PK/2200 Rpm

Mesin Diesel RD 85 DIH-1S


08.01.11.07.02 Kubota Unit 16.401.600 17.221.680 17.221.680 18.123.768 18.205.776 18.369.792 18.369.792
8.5 PK/2200 Rpm

Mesin Diesel RD 110 DIH-2


08.01.11.07.03 Kubota Unit 19.768.800 20.757.240 20.757.240 21.844.524 21.943.368 22.141.056 22.141.056
11 PK/2400 Rpm

Mesin Diesel RD 65 DI-1S


08.01.11.07.04 Kubota Unit 14.788.800 15.528.240 15.528.240 16.341.624 16.415.568 16.563.456 16.563.456
6.5 PK/2200 Rpm

Mesin Diesel RD 65 DI-2S


08.01.11.07.05 Kubota Unit 15.362.400 16.130.520 16.130.520 16.975.452 17.052.264 17.205.888 17.205.888
6.5 PK/2200 Rpm

Mesin Diesel RD 85 DI-1S


08.01.11.07.06 Kubota Unit 16.947.600 17.794.980 17.794.980 18.727.098 18.811.836 18.981.312 18.981.312
8.5 PK/2200 Rpm

Mesin Diesel RD 85 DI-2S


08.01.11.07.07 Kubota Unit 17.499.600 18.374.580 18.374.580 19.337.058 19.424.556 19.599.552 19.599.552
8.5 PK/2200 Rpm

Mesin Diesel RD 110 DI-2T


08.01.11.07.08 Kubota Unit 21.226.800 22.288.140 22.288.140 23.455.614 23.561.748 23.774.016 23.774.016
11 PK/2400 Rpm

Mesin Diesel RD 140 DI-2T


08.01.11.07.09 Kubota Unit 31.012.800 32.563.440 32.563.440 34.269.144 34.424.208 34.734.336 34.734.336
14 PK/2400 Rpm

Mesin Diesel RD 65 DI-N 6.5


08.01.11.07.10 Kubota Unit 14.473.200 15.196.860 15.196.860 15.992.886 16.065.252 16.209.984 16.209.984
PK/2200 Rpm

Mesin Diesel RD 85 DI-N 8.5


08.01.11.07.11 Kubota Unit 16.587.600 17.416.980 17.416.980 18.329.298 18.412.236 18.578.112 18.578.112
PK/2200 Rpm

Mesin Diesel RD 110 DI-N


08.01.11.07.12 Kubota Unit 20.674.800 21.708.540 21.708.540 22.845.654 22.949.028 23.155.776 23.155.776
11 PK/2400 Rpm

Mesin Diesel Electrik Starter

08.01.11.07.13 RD 65 DI-NB 6.5 PK/2200 Kubota Unit 17.817.600 18.708.480 18.708.480 19.688.448 19.777.536 19.955.712 19.955.712

Rpm

Mesin Diesel Electrik Starter

08.01.11.07.14 RD 85 DI-1B 8.5 PK/2200 Kubota Unit 19.932.000 20.928.600 20.928.600 22.024.860 22.124.520 22.323.840 22.323.840

Rpm

Mesin Diesel Electrik Starter

08.01.11.07.15 RD 85 DI-2B/NB 8.5 Kubota Unit 20.298.000 21.312.900 21.312.900 22.429.290 22.530.780 22.733.760 22.733.760

PK/2200 Rpm

Mesin Diesel Electrik Starter

08.01.11.07.16 RD 110 DI-NB 811 PK/2400 Kubota Unit 27.961.200 29.359.260 29.359.260 30.897.126 31.036.932 31.316.544 31.316.544

Rpm

08.01.11.08. Mesin Penggerak Mesin Diesel

Page 4
HARGA (Rp.)
KODE
NAMA BARANG MEREK SATUAN TANJUNG
BATAM BINTAN KARIMUN LINGGA NATUNA ANAMBAS
BARANG
PINANG

YANMAR TF 300 H-di Power


08.01.11.08.01 Yanmar Unit 40.113.700 42.119.385 42.119.385 44.325.639 44.526.207 44.927.344 44.927.344
30 PK

YANMAR TS 230 RE-di


08.01.11.08.02 Yanmar Unit 37.846.600 39.738.930 39.738.930 41.820.493 42.009.726 42.388.192 42.388.192
Power 23 PK

08.01.11.08.03 TS 190 RE-di Power 19 PK Yanmar Unit 34.082.400 35.786.520 35.786.520 37.661.052 37.831.464 38.172.288 38.172.288

YANMAR TF 155 RE-di


08.01.11.08.04 Yanmar Unit 29.406.300 30.876.615 30.876.615 32.493.962 32.640.993 32.935.056 32.935.056
Power 155 PK

YANMAR TS 230 H-di


08.01.11.08.05 Yanmar Unit 28.934.400 30.381.120 30.381.120 31.972.512 32.117.184 32.406.528 32.406.528
Power 23 PK

YANMAR TS 190 R-di


08.01.11.08.06 Yanmar Unit 28.021.400 29.422.470 29.422.470 30.963.647 31.103.754 31.383.968 31.383.968
Power 19 PK

YANMAR TS 190 H-di


08.01.11.08.07 Yanmar Unit 26.526.500 27.852.825 27.852.825 29.311.783 29.444.415 29.709.680 29.709.680
Power 19 PK

YANMAR TF 155 R-di Power


08.01.11.08.08 Yanmar Unit 24.322.100 25.538.205 25.538.205 26.875.921 26.997.531 27.240.752 27.240.752
155 PK

YANMAR TF 115 RE-di


08.01.11.08.09 Yanmar Unit 23.629.100 24.810.555 24.810.555 26.110.156 26.228.301 26.464.592 26.464.592
Power 115 PK

YANMAR TF 155 H-di Power


08.01.11.08.10 Yanmar Unit 23.102.200 24.257.310 24.257.310 25.527.931 25.643.442 25.874.464 25.874.464
155 PK

YANMAR TF 105 RE-di


08.01.11.08.11 Yanmar Unit 20.724.000 21.760.200 21.760.200 22.900.020 23.003.640 23.210.880 23.210.880
Power 105 PK

YANMAR TF 115 MR-di


08.01.11.08.12 Yanmar Unit 18.576.800 19.505.640 19.505.640 20.527.364 20.620.248 20.806.016 20.806.016
Power 115 PK

YANMAR TF 115 MH-di


08.01.11.08.13 Yanmar Unit 17.686.900 18.571.245 18.571.245 19.544.025 19.632.459 19.809.328 19.809.328
Power 115 PK

YANMAR TF 85 RE-di
08.01.11.08.14 Yanmar Unit 17.503.200 18.378.360 18.378.360 19.341.036 19.428.552 19.603.584 19.603.584
Power 85 PK

YANMAR TF 65 RE-di
08.01.11.08.15 Yanmar Unit 15.732.200 16.518.810 16.518.810 17.384.081 17.462.742 17.620.064 17.620.064
Power 65 PK

08.01.11.08.16 TF 105 ML-di Power 105 PK Yanmar Unit 15.693.700 16.478.385 16.478.385 17.341.539 17.420.007 17.576.944 17.576.944

YANMAR TF 105 MR-di


08.01.11.08.17 Yanmar Unit 15.651.900 16.434.495 16.434.495 17.295.350 17.373.609 17.530.128 17.530.128
Power 105 PK

08.01.11.08.18 Mesin Diesel RD 110 DI-2B Kubota Unit 26.840.000 28.182.000 28.182.000 29.658.200 29.792.400 30.060.800 30.060.800

DAFENG R 175 A Power 64


08.01.11.08.19 Dafeng Unit 2.601.500 2.731.575 2.731.575 2.874.658 2.887.665 2.913.680 2.913.680
PK

DAFENG R 175 AN Power


08.01.11.08.20 Dafeng Unit 3.146.000 3.303.300 3.303.300 3.476.330 3.492.060 3.523.520 3.523.520
64 PK

Dafeng R 185 - Hoper Body


08.01.11.08.21 Dafeng Unit 3.751.000 3.938.550 3.938.550 4.144.855 4.163.610 4.201.120 4.201.120
Besar Power 88 PK

Dafeng R 185 A - Hoper


08.01.11.08.22 Dafeng Unit 2.783.000 2.922.150 2.922.150 3.075.215 3.089.130 3.116.960 3.116.960
Body Kecil Power 88 PK

Dafeng R 185 AN Power 88


08.01.11.08.23 Dafeng Unit 3.690.500 3.875.025 3.875.025 4.078.003 4.096.455 4.133.360 4.133.360
PK

Dafeng R 185 N Power 88


08.01.11.08.24 Dafeng Unit 4.477.000 4.700.850 4.700.850 4.947.085 4.969.470 5.014.240 5.014.240
PK

08.01.11.08.25 Dafeng R180 Power 76 PK Dafeng Unit 2.752.750 2.890.388 2.890.388 3.041.789 3.055.553 3.083.080 3.083.080

Dafeng R180 N Power 76


08.01.11.08.26 Dafeng Unit 3.327.500 3.493.875 3.493.875 3.676.888 3.693.525 3.726.800 3.726.800
PK

DAFENG S 1100 Power 15


08.01.11.08.27 Dafeng Unit 4.719.000 4.954.950 4.954.950 5.214.495 5.238.090 5.285.280 5.285.280
PK

08.01.11.09. Mesin Penggerak Mesin Potong Rumput

Makita HTR4901 Mesin


08.01.11.09.01 Makita Unit 9.281.250 9.745.313 9.745.313 10.255.781 10.302.188 10.395.000 10.395.000
Pangkas Tanaman

Makita EBH340R Mesin


08.01.11.09.02 Makita Unit 6.311.250 6.626.813 6.626.813 6.973.931 7.005.488 7.068.600 7.068.600
Potong Rumput

Makita PLM4110 Mesin

08.01.11.09.03 Potong Rumput Dorong Makita Unit 7.225.863 7.587.156 7.587.156 7.984.578 8.020.707 8.092.966 8.092.966

Engine

Tasco TAC368E Mesin


08.01.11.09.04 Tasco Unit 2.177.255 2.286.118 2.286.118 2.405.867 2.416.753 2.438.526 2.438.526
Potong Rumput

Tasco TAC328 Mesin


08.01.11.09.05 Tasco Unit 1.869.604 1.963.084 1.963.084 2.065.912 2.075.260 2.093.956 2.093.956
Potong Rumput

Page 5
HARGA (Rp.)
KODE
NAMA BARANG MEREK SATUAN TANJUNG
BATAM BINTAN KARIMUN LINGGA NATUNA ANAMBAS
BARANG
PINANG

Tasco TAC221 Mesin potong


08.01.11.09.06 Tasco Unit 1.705.000 1.790.250 1.790.250 1.884.025 1.892.550 1.909.600 1.909.600
Rumput

Tasco TLM18 Mesin Potong


08.01.11.09.07 Tasco Unit 3.850.000 4.042.500 4.042.500 4.254.250 4.273.500 4.312.000 4.312.000
Rumput Dorong

Tasco TLM20 Mesin Potong


08.01.11.09.08 Tasco Unit 3.190.000 3.349.500 3.349.500 3.524.950 3.540.900 3.572.800 3.572.800
Rumput Dorong

Tasco TLM22 Mesin Potong


08.01.11.09.09 Tasco Unit 3.520.000 3.696.000 3.696.000 3.889.600 3.907.200 3.942.400 3.942.400
Rumput Dorong

Rover Mini Rider Mesin

08.01.11.09.10 Potong Rumput Mobil Rover Unit 48.011.279 50.411.843 50.411.843 53.052.463 53.292.519 53.772.632 53.772.632

13B226JD333

Tasco TLM340 Mesin


08.01.11.09.11 Tasco Unit 2.592.207 2.721.818 2.721.818 2.864.389 2.877.350 2.903.272 2.903.272
Potong Rumput Dorong

Tasco TLM328 Mesin


08.01.11.09.12 Tasco Unit 3.755.172 3.942.931 3.942.931 4.149.465 4.168.241 4.205.793 4.205.793
Potong Rumput Dorong

Honda UMR435T Mesin


08.01.11.09.13 Honda Unit 4.551.724 4.779.310 4.779.310 5.029.655 5.052.414 5.097.931 5.097.931
Potong Rumput Gendong

Honda UMK435T Mesin


08.01.11.09.14 Honda Unit 4.128.368 4.334.787 4.334.787 4.561.847 4.582.489 4.623.772 4.623.772
Potong Rumput Gendong

Honda HRU196M Mesin


08.01.11.09.15 Honda Unit 13.200.000 13.860.000 13.860.000 14.586.000 14.652.000 14.784.000 14.784.000
Potong rumput Dorong

Krisbow KW2001168

08.01.11.09.16 Flexible Mesin Potong Krisbow Unit 3.287.483 3.451.857 3.451.857 3.632.669 3.649.106 3.681.981 3.681.981

Rumput Gendong

Krisbow KW2001355 125KW

08.01.11.09.17 Mesin Potong Rumput Krisbow Unit 2.679.699 2.813.684 2.813.684 2.961.067 2.974.466 3.001.263 3.001.263

Gendong

Firman FGB338i/388i Mesin


08.01.11.09.18 Firman Unit 1.813.862 1.904.555 1.904.555 2.004.317 2.013.386 2.031.525 2.031.525
Potong Rumput Gendong

Krisbow KW2001357 60CM

08.01.11.09.19 075KW Mesin Pangkas Krisbo Unit 3.172.985 3.331.634 3.331.634 3.506.149 3.522.014 3.553.743 3.553.743

Tanaman

Firman FGB338Mi Mesin


08.01.11.09.20 Firman Unit 2.035.000 2.136.750 2.136.750 2.248.675 2.258.850 2.279.200 2.279.200
Potong Rumput Gendong

Bosch ARM 34 Mesin


08.01.11.09.21 Bosch Unit 3.205.036 3.365.288 3.365.288 3.541.565 3.557.590 3.589.640 3.589.640
Rumput Dorong Listrik

Bosch ART 37 Grass

08.01.11.09.22 Trimmer Pemotong Rumput Bosch Unit 1.885.552 1.979.829 1.979.829 2.083.535 2.092.962 2.111.818 2.111.818

Listrik

08.01.11.10. Mesin Berat Lainnya

Lathe Machine Centre KW


08.01.11.10.01 Krisbow Unit 93.180.000 97.839.000 97.839.000 102.963.900 103.429.800 104.361.600 104.361.600
24-30

08.01.11.10.02 Saving Machine B6090 Krisbow Unit 343.800.000 360.990.000 360.990.000 379.899.000 381.618.000 385.056.000 385.056.000

Hidrolical Positonning Press


08.01.11.10.03 YSD Unit 339.000.000 355.950.000 355.950.000 374.595.000 376.290.000 379.680.000 379.680.000
Brakes YSD PPT 100/36

08.01.11.10.04 Las TIG Krisbow KW 14-714 Krisbow Unit 27.600.000 28.980.000 28.980.000 30.498.000 30.636.000 30.912.000 30.912.000

Las MIG Krisbow KW


08.01.11.10.05 Krisbow Unit 17.600.000 18.480.000 18.480.000 19.448.000 19.536.000 19.712.000 19.712.000
14-1060/NBC-350 R

MITUTUY
08.01.11.10.06 Rockwell HR - 210 MR Unit 91.700.000 96.285.000 96.285.000 101.328.500 101.787.000 102.704.000 102.704.000
O

Uji Tarik Gotech GT


08.01.11.10.07 GOTECH Unit 353.000.000 370.650.000 370.650.000 390.065.000 391.830.000 395.360.000 395.360.000
7001-LC 30

08.01.11.11. Mesin Bordir

Mesin Bordir Komputer


08.01.11.11.01 Singer Unit 26.875.000 28.218.750 28.218.750 29.696.875 29.831.250 30.100.000 30.100.000
Singer Futura XL 580

Mesin Jahit Bordir Janome


08.01.11.11.02 Janome Unit 21.875.000 22.968.750 22.968.750 24.171.875 24.281.250 24.500.000 24.500.000
MC 500E Portable Komputer

Mesin tekstil - Mesin Bordir


08.01.11.11.03 Singer Unit 15.937.500 16.734.375 16.734.375 17.610.938 17.690.625 17.850.000 17.850.000
Komputer Singer EM 20

Singer Mesin Jahit Bordir


08.01.11.11.04 Singer Unit 15.937.500 16.734.375 16.734.375 17.610.938 17.690.625 17.850.000 17.850.000
Computer Singer em 200

Page 6
HARGA (Rp.)
KODE
NAMA BARANG MEREK SATUAN TANJUNG
BATAM BINTAN KARIMUN LINGGA NATUNA ANAMBAS
BARANG
PINANG

Mesin Bordir Brother NV95E


08.01.11.11.05 Brother Unit 12.375.000 12.993.750 12.993.750 13.674.375 13.736.250 13.860.000 13.860.000
Innov-is 95E Portable

Mesin Bordir Brother


08.01.11.11.06 Brother Unit 12.125.000 12.731.250 12.731.250 13.398.125 13.458.750 13.580.000 13.580.000
Portable Otomatis Komputer

Mesin Bordir Murah Portable


08.01.11.11.07 CNY Unit 11.875.000 12.468.750 12.468.750 13.121.875 13.181.250 13.300.000 13.300.000
CNY E900 Komputer Otom

08.01.11.12. Alat Pengolahan Sampah

08.01.11.12.01 Alat Deteksi Urug - Unit 475.200 498.960 498.960 525.096 527.472 532.224 532.224

08.01.11.12.02 Hot Print Cap Sepatu - Unit 1.900.800 1.995.840 1.995.840 2.100.384 2.109.888 2.128.896 2.128.896

08.01.11.12.03 Open Sepatu - Unit 4.923.600 5.169.780 5.169.780 5.440.578 5.465.196 5.514.432 5.514.432

08.01.11.12.04 Alat Pon Tangan - Unit 3.498.000 3.672.900 3.672.900 3.865.290 3.882.780 3.917.760 3.917.760

08.01.11.12.05 Pengepres Plastik - Buah 475.200 498.960 498.960 525.096 527.472 532.224 532.224

08.01.11.12.06 Mesin Pengupas Kedelai - Buah 6.045.600 6.347.880 6.347.880 6.680.388 6.710.616 6.771.072 6.771.072

08.01.11.13. Alat Mesin Home Industri Lainnya

08.01.11.13.01 Alat Pemanggang Ikan - Unit 1.584.000 1.663.200 1.663.200 1.750.320 1.758.240 1.774.080 1.774.080

08.01.11.13.02 Alat Pemanggang Ikan - Unit 1.425.600 1.496.880 1.496.880 1.575.288 1.582.416 1.596.672 1.596.672

Alat Pemanggang Ikan


08.01.11.13.03 - Unit 15.114.000 15.869.700 15.869.700 16.700.970 16.776.540 16.927.680 16.927.680
(Pemantapan pangan)

08.01.11.13.04 Alat pengepres plastik - Unit 528.000 554.400 554.400 583.440 586.080 591.360 591.360

08.01.11.13.05 Blender Potong Yamato Unit 6.996.000 7.345.800 7.345.800 7.730.580 7.765.560 7.835.520 7.835.520

08.01.11.13.06 Brinell Proceq Unit 147.655.200 155.037.960 155.037.960 163.158.996 163.897.272 165.373.824 165.373.824

08.01.11.13.07 Mesin Fogging - Unit 55.215.600 57.976.380 57.976.380 61.013.238 61.289.316 61.841.472 61.841.472

Mesin Jahit BM-2600 (25


08.01.11.13.08 Brother Buah 3.339.600 3.506.580 3.506.580 3.690.258 3.706.956 3.740.352 3.740.352
Jenis Jahitan)

Mesin Jahit BM-3500 (35


08.01.11.13.09 Brother Buah 7.154.400 7.512.120 7.512.120 7.905.612 7.941.384 8.012.928 8.012.928
Jenis Jahitan)

Mesin Jahit XL-5500 (35


08.01.11.13.10 Brother Buah 6.520.800 6.846.840 6.846.840 7.205.484 7.238.088 7.303.296 7.303.296
Jenis Jahitan)

08.01.11.13.11 Mesin Obras - Unit 1.584.000 1.663.200 1.663.200 1.750.320 1.758.240 1.774.080 1.774.080

08.01.11.13.12 Mesin Obras (Bisa Nechi) Brother Buah 8.580.000 9.009.000 9.009.000 9.480.900 9.523.800 9.609.600 9.609.600

Mesin Pemarut Serbaguna


08.01.11.13.13 - Unit 6.362.400 6.680.520 6.680.520 7.030.452 7.062.264 7.125.888 7.125.888
3.5 pk

Mesin Pembuat Tepung 4


08.01.11.13.14 - Unit 7.471.200 7.844.760 7.844.760 8.255.676 8.293.032 8.367.744 8.367.744
inch 3.5 pk

Mesin Pemroses Tahu


08.01.11.13.15 - set 14.955.600 15.703.380 15.703.380 16.525.938 16.600.716 16.750.272 16.750.272
Lengkap 6 inch 3.5 pk

Mesin Pencabut Bulu Ayam


08.01.11.13.16 - Unit 13.833.600 14.525.280 14.525.280 15.286.128 15.355.296 15.493.632 15.493.632
& Generator

Mesin Pencabut Bulu Ayam


08.01.11.13.17 - Unit 14.467.200 15.190.560 15.190.560 15.986.256 16.058.592 16.203.264 16.203.264
(Berikut Generator)

Mesin Penetas Telor 50 x 70


08.01.11.13.18 - Unit 1.900.800 1.995.840 1.995.840 2.100.384 2.109.888 2.128.896 2.128.896
x 80 cm 50 w

Mesin Penghalus Bumbu 2


08.01.11.13.19 - Unit 7.471.200 7.844.760 7.844.760 8.255.676 8.293.032 8.367.744 8.367.744
inch 450 w

Mesin Perontok Multi Guna

08.01.11.13.20 (padi Jagung Kedelai Dll) 6.5 - Unit 12.249.600 12.862.080 12.862.080 13.535.808 13.597.056 13.719.552 13.719.552

pk

08.01.11.13.21 Mesin Potong Kain - Unit 5.240.400 5.502.420 5.502.420 5.790.642 5.816.844 5.869.248 5.869.248

08.01.11.13.22 Mesin Potong Kain - Buah 4.224.000 4.435.200 4.435.200 4.667.520 4.688.640 4.730.880 4.730.880

08.01.11.13.23 Mesin Potong Kripik - Unit 10.969.200 11.517.660 11.517.660 12.120.966 12.175.812 12.285.504 12.285.504

08.01.11.13.24 Mesin Press Kaleng - Unit 2.059.200 2.162.160 2.162.160 2.275.416 2.285.712 2.306.304 2.306.304

08.01.11.13.25 Mesin Press Sepatu - Unit 12.249.600 12.862.080 12.862.080 13.535.808 13.597.056 13.719.552 13.719.552

08.01.11.13.26 Mesin Rol - Unit 6.045.600 6.347.880 6.347.880 6.680.388 6.710.616 6.771.072 6.771.072

08.01.11.13.27 Mesin Selep Duduk - Unit 3.814.800 4.005.540 4.005.540 4.215.354 4.234.428 4.272.576 4.272.576

Mesn Jahit Innov-is 50 (>100


08.01.11.13.28 Brother Buah 12.566.400 13.194.720 13.194.720 13.885.872 13.948.704 14.074.368 14.074.368
Jenis Jahitan)

Pengupas Kedelai Membuat

08.01.11.13.29 Tempe 8 inch 5.5 pk 100 - Unit 10.652.400 11.185.020 11.185.020 11.770.902 11.824.164 11.930.688 11.930.688

kg/jam

08.01.11.13.30 Peralatan Kerajinan Logam - set 1.742.400 1.829.520 1.829.520 1.925.352 1.934.064 1.951.488 1.951.488

08.01.11.13.31 Peralatan Kerajinan Logam - set 1.584.000 1.663.200 1.663.200 1.750.320 1.758.240 1.774.080 1.774.080

Page 7
HARGA (Rp.)
KODE
NAMA BARANG MEREK SATUAN TANJUNG
BATAM BINTAN KARIMUN LINGGA NATUNA ANAMBAS
BARANG
PINANG

Press Machine 80x40 cm,


08.01.11.13.32 - Unit 5.240.400 5.502.420 5.502.420 5.790.642 5.816.844 5.869.248 5.869.248
merk SUBARU

08.01.11.13.33 Rel Penggantung Ayam - Unit 16.222.800 17.033.940 17.033.940 17.926.194 18.007.308 18.169.536 18.169.536

08.01.11.13.34 Rel Penggantung Ayam - Unit 15.430.800 16.202.340 16.202.340 17.051.034 17.128.188 17.282.496 17.282.496

08.01.11.13.35 Roll Tangan - Unit 2.059.200 2.162.160 2.162.160 2.275.416 2.285.712 2.306.304 2.306.304

08.01.11.13.36 Roll Tangan - Buah 1.900.800 1.995.840 1.995.840 2.100.384 2.109.888 2.128.896 2.128.896

Steam Iron with Water Tank, Silver Star


08.01.11.13.37 Unit 1.425.600 1.496.880 1.496.880 1.575.288 1.582.416 1.596.672 1.596.672
tipe ES-300

08.01.11.13.38 Vickers Proceq Unit 140.500.800 147.525.840 147.525.840 155.253.384 155.955.888 157.360.896 157.360.896

Alat Pengelolaan Kerupuk


08.01.11.13.39 Set 4.000.000 4.200.000 4.200.000 4.420.000 4.440.000 4.480.000 4.480.000
Ikan

Alat Pengelolaan Hasil


08.01.11.13.40 Set 5.000.000 5.250.000 5.250.000 5.525.000 5.550.000 5.600.000 5.600.000
Perikanan

08.03. Alat Bantu

08.03.04 Electric Generating Set

08.03.04.05. Generator

08.03.04.05.01 ET 1 63 cc Yamaha Unit 2.915.000 3.060.750 3.060.750 3.221.075 3.235.650 3.264.800 3.264.800

08.03.04.05.02 EF 1000 FW 50 cc Yamaha Unit 5.775.000 6.063.750 6.063.750 6.381.375 6.410.250 6.468.000 6.468.000

08.03.04.05.03 EF 2600 171 cc Yamaha Unit 7.040.000 7.392.000 7.392.000 7.779.200 7.814.400 7.884.800 7.884.800

08.03.04.05.04 EF 2600 FW 171 cc Yamaha Unit 7.480.000 7.854.000 7.854.000 8.265.400 8.302.800 8.377.600 8.377.600

08.03.04.05.05 EF 4000 FW 358 cc Yamaha Unit 12.540.000 13.167.000 13.167.000 13.856.700 13.919.400 14.044.800 14.044.800

08.03.04.05.06 EF 5500 FW 358 cc Yamaha Unit 14.520.000 15.246.000 15.246.000 16.044.600 16.117.200 16.262.400 16.262.400

08.03.04.05.07 EF 6600 E 357 cc Yamaha Unit 15.125.000 15.881.250 15.881.250 16.713.125 16.788.750 16.940.000 16.940.000

08.03.04.05.08 EF 7200 E 358 cc Yamaha Unit 15.840.000 16.632.000 16.632.000 17.503.200 17.582.400 17.740.800 17.740.800

08.03.04.05.09 EF 12000 E Yamaha Unit 69.300.000 72.765.000 72.765.000 76.576.500 76.923.000 77.616.000 77.616.000

08.03.04.05.10 EF 14000 E 720 cc Yamaha Unit 75.350.000 79.117.500 79.117.500 83.261.750 83.638.500 84.392.000 84.392.000

08.03.04.05.11 EF 17000 TE 720 cc Yamaha Unit 78.100.000 82.005.000 82.005.000 86.300.500 86.691.000 87.472.000 87.472.000

08.03.04.06. Genset

GENERATOR SILENT 100 ATLAS


08.03.04.06.01 Unit 637.041.224 668.893.285 668.893.285 703.930.552 707.115.758 713.486.170 713.486.170
kVA TYPE QAS 100 COPCO

GENERATOR SILENT 150 ATLAS


08.03.04.06.02 Unit 926.605.416 972.935.687 972.935.687 1.023.898.985 1.028.532.012 1.037.798.066 1.037.798.066
kVA TYPE QAS 150 COPCO

GENERATOR SILENT 200 ATLAS


08.03.04.06.03 Unit 1.196.865.329 1.256.708.595 1.256.708.595 1.322.536.189 1.328.520.515 1.340.489.168 1.340.489.168
kVA TYPE QAS 200 COPCO

GENERATOR SILENT 325 ATLAS


08.03.04.06.04 Unit 1.351.299.565 1.418.864.543 1.418.864.543 1.493.186.019 1.499.942.517 1.513.455.513 1.513.455.513
KVA TYPE QAS 325 COPCO

GENERATOR SILENT 400 ATLAS


08.03.04.06.05 Unit 1.891.819.391 1.986.410.361 1.986.410.361 2.090.460.427 2.099.919.524 2.118.837.718 2.118.837.718
KVA TYPE QAS 400 COPCO

GENERATOR SILENT 58 ATLAS


08.03.04.06.06 Unit 540.519.826 567.545.817 567.545.817 597.274.408 599.977.007 605.382.205 605.382.205
KVA TYPE QAS 60 COPCO

LIGHTING TOWER TYPE ATLAS


08.03.04.06.07 Unit 241.303.494 253.368.669 253.368.669 266.640.361 267.846.879 270.259.914 270.259.914
QLT-M10 COPCO

LIGHTING TOWER TYPE ATLAS


08.03.04.06.08 Unit 337.824.892 354.716.136 354.716.136 373.296.505 374.985.630 378.363.879 378.363.879
QLTS-8 COPCO

POWER GENERATION
CUMMINS
Generator Set Kapasitas
08.03.04.06.09 Unit 153.670.000 161.353.500 161.353.500 169.805.350 170.573.700 172.110.400 172.110.400
Prime Rating 50 kVA / 40kW

model C 55 D5 / S 3.8 G6

POWER GENERATION
CUMMINS
Genset Model C 110 D5 / 6
08.03.04.06.10 Unit 218.570.000 229.498.500 229.498.500 241.519.850 242.612.700 244.798.400 244.798.400
BTA 5.9 G5 Kapasitas 80

kW / 100 kVA Prime Rating

POWER GENERATION
CUMMINS
Genset Model C 1100 D5B /
08.03.04.06.11 Unit 2.107.820.000 2.213.211.000 2.213.211.000 2.329.141.100 2.339.680.200 2.360.758.400 2.360.758.400
KTA 38 G14 Kapasitas 823

kW / 1029 kVA Prime Rating

POWER GENERATION
CUMMINS
Genset Model C 1400 D5 /
08.03.04.06.12 Unit 3.096.500.000 3.251.325.000 3.251.325.000 3.421.632.500 3.437.115.000 3.468.080.000 3.468.080.000
KTA 50 G3 Kapasitas 1000

kW / 1250 kVA Prime Rating

Page 8
HARGA (Rp.)
KODE
NAMA BARANG MEREK SATUAN TANJUNG
BATAM BINTAN KARIMUN LINGGA NATUNA ANAMBAS
BARANG
PINANG

POWER GENERATION
CUMMINS
Genset Model C 1675 D5A /
08.03.04.06.13 Unit 4.347.052.600 4.564.405.230 4.564.405.230 4.803.493.123 4.825.228.386 4.868.698.912 4.868.698.912
KTA 50 GS8 Kapasitas 1200

kW / 1500 kVA Prime Rating

POWER GENERATION
CUMMINS
Genset Model C 220 D5 /
08.03.04.06.14 Unit 437.778.000 459.666.900 459.666.900 483.744.690 485.933.580 490.311.360 490.311.360
QSB 7 G5 Kapasitas 160 kW

/ 200 kVA Prime Rating

POWER GENERATION
CUMMINS
Genset Model C 2250 D5 /
08.03.04.06.15 Unit 4.937.319.200 5.184.185.160 5.184.185.160 5.455.737.716 5.480.424.312 5.529.797.504 5.529.797.504
QSK 60 G4 Kapasitas 1600

kW / 2000 kVA Prime Rating

POWER GENERATION
CUMMINS
Genset Model C 275 D5 /
08.03.04.06.16 Unit 547.800.000 575.190.000 575.190.000 605.319.000 608.058.000 613.536.000 613.536.000
QSL 9 G5 Kapasitas 200 kW

/ 250 kVA Prime Rating

POWER GENERATION
CUMMINS
Genset Model C 550 D5e /
08.03.04.06.17 Unit 972.840.000 1.021.482.000 1.021.482.000 1.074.988.200 1.079.852.400 1.089.580.800 1.089.580.800
QSX 15 G8 Kapasitas 400

kW / 500 kVA Prime Rating

Generator WPG110F9 / 100


08.03.04.06.18 WEICHAI Unit 161.150.000 169.207.500 169.207.500 178.070.750 178.876.500 180.488.000 180.488.000
kVA Open

Generator WPG88L9 / 80
08.03.04.06.19 WEICHAI Unit 194.150.000 203.857.500 203.857.500 214.535.750 215.506.500 217.448.000 217.448.000
Kva Silent

08.03.04.06.20 Genset 16 Kva Unit - 115.500.000 121.275.000 121.275.000 127.627.500 128.205.000 129.360.000 129.360.000

08.03.04.06.21 Genset 20 Kva Unit - 430.542.750 452.069.888 452.069.888 475.749.739 477.902.453 482.207.880 482.207.880

08.03.04.06.22 Genset 25 Kva Unit - 440.000.000 462.000.000 462.000.000 486.200.000 488.400.000 492.800.000 492.800.000

08.03.04.06.23 Genset 26 Kva Unit - 417.450.000 438.322.500 438.322.500 461.282.250 463.369.500 467.544.000 467.544.000

08.03.04.06.24 Genset 27 Kva Unit - 387.500.000 406.875.000 406.875.000 428.187.500 430.125.000 434.000.000 434.000.000

08.03.04.06.25 Genset 30 Kva Unit - 413.655.000 434.337.750 434.337.750 457.088.775 459.157.050 463.293.600 463.293.600

08.03.04.06.26 Genset 35 Kva Unit - 550.000.000 577.500.000 577.500.000 607.750.000 610.500.000 616.000.000 616.000.000

08.03.04.06.27 Genset 37 Kva Unit - 580.800.000 609.840.000 609.840.000 641.784.000 644.688.000 650.496.000 650.496.000

08.03.05 Pompa

08.03.05.04. Pompa Lumpur

Pompa Lumpur Kap 0.5


08.03.05.04.01 - Unit 423.152.400 444.310.020 444.310.020 467.583.402 469.699.164 473.930.688 473.930.688
M3/dtk Head 10m

08.03.05.04.02 Mesin Pompa dan Kincir Air - Unit 20.130.000 21.136.500 21.136.500 22.243.650 22.344.300 22.545.600 22.545.600

Mesin (Jumbo) Penyedot


08.03.05.04.03 Ebhara Unit 70.831.200 74.372.760 74.372.760 78.268.476 78.622.632 79.330.944 79.330.944
Lumpur 5 pk

08.03.05.07. Lain-lain

Pompa Banjir Kap 1.5


08.03.05.07.01 - Unit 928.118.400 974.524.320 974.524.320 1.025.570.832 1.030.211.424 1.039.492.608 1.039.492.608
M3/dtk

08.03.05.07.03 Mesin Pompa Air - Buah 5.913.600 6.209.280 6.209.280 6.534.528 6.564.096 6.623.232 6.623.232

08.03.05.07.04 Suction Pump - Buah 8.302.800 8.717.940 8.717.940 9.174.594 9.216.108 9.299.136 9.299.136

08.03.05.07.05 Pompa Air System Hydrant - Set 12.526.800 13.153.140 13.153.140 13.842.114 13.904.748 14.030.016 14.030.016

Pompa SERO GAE Type :


08.03.05.07.06 - Unit 19.008.000 19.958.400 19.958.400 21.003.840 21.098.880 21.288.960 21.288.960
SRN 551

08.03.05.08. Alat Pompa Air

Pompa Centrifugal Kap. 5

08.03.05.08.01 Ltr/Det, Head 40 M¹ Unit - 73.108.000 76.763.400 76.763.400 80.784.340 81.149.880 81.880.960 81.880.960

(Grundfos)

Pompa Centrifugal Kap. 2.5


08.03.05.08.02 Unit - 34.125.000 35.831.250 35.831.250 37.708.125 37.878.750 38.220.000 38.220.000
L/dtk head 20 m (Ebara)

Pompa Centrifugal Kap. 5


08.03.05.08.03 Unit - 57.750.000 60.637.500 60.637.500 63.813.750 64.102.500 64.680.000 64.680.000
Ltr/dtk head 50 m (Ebara)

Pompa Centrifugal Kap. 7.5


08.03.05.08.04 Unit - 61.250.000 64.312.500 64.312.500 67.681.250 67.987.500 68.600.000 68.600.000
Ltr/dtk head 20 m (Ebara)

Pompa Centrifugal Kap. 10


08.03.05.08.05 Unit - 64.750.000 67.987.500 67.987.500 71.548.750 71.872.500 72.520.000 72.520.000
Ltr/dtk head 20 m (Ebara)

Pompa Centrifugal Kap. 2.5


08.03.05.08.06 Unit - 87.608.640 91.989.072 91.989.072 96.807.547 97.245.590 98.121.677 98.121.677
L/dtk head 20 m (Grundfos)

Page 9
HARGA (Rp.)
KODE
NAMA BARANG MEREK SATUAN TANJUNG
BATAM BINTAN KARIMUN LINGGA NATUNA ANAMBAS
BARANG
PINANG

Pompa Centrifugal Kap. 5


08.03.05.08.07 Unit - 111.231.120 116.792.676 116.792.676 122.910.388 123.466.543 124.578.854 124.578.854
Ltr/dtk head 50 m (Grundfos)

Pompa Centrifugal Kap. 7.5


08.03.05.08.08 Unit - 109.089.120 114.543.576 114.543.576 120.543.478 121.088.923 122.179.814 122.179.814
Ltr/dtk head 20 m (Grundfos)

Pompa Centrifugal Kap. 10


08.03.05.08.09 Unit - 100.358.160 105.376.068 105.376.068 110.895.767 111.397.558 112.401.139 112.401.139
Ltr/dtk head 20 m (Grundfos)

Submersible Non Clogging

08.03.05.08.10 Kap. 10 L/dt head 15 m Unit - 61.950.000 65.047.500 65.047.500 68.454.750 68.764.500 69.384.000 69.384.000

(Ebara)

Submersible Non Clogging

08.03.05.08.11 Kap. 15 L/dt head 16 m Unit - 131.250.000 137.812.500 137.812.500 145.031.250 145.687.500 147.000.000 147.000.000

(Ebara)

Submersible Pump Kap. 2.5


08.03.05.08.12 Unit - 30.800.000 32.340.000 32.340.000 34.034.000 34.188.000 34.496.000 34.496.000
L/dt head 15 m (Ebara)

Submersible Pump Kap. 2.5


08.03.05.08.13 Unit - 22.750.000 23.887.500 23.887.500 25.138.750 25.252.500 25.480.000 25.480.000
L/dt head 15 m (Ebara)

Submersible Pump Kap. 5


08.03.05.08.14 Unit - 32.550.000 34.177.500 34.177.500 35.967.750 36.130.500 36.456.000 36.456.000
L/dt head 12 m (Ebara)

Submersible Pump Kap. 5


08.03.05.08.15 Unit - 30.625.000 32.156.250 32.156.250 33.840.625 33.993.750 34.300.000 34.300.000
L/dt head 15 m (Ebara)

Submersible Pump Kap. 5


08.03.05.08.16 Unit - 64.750.000 67.987.500 67.987.500 71.548.750 71.872.500 72.520.000 72.520.000
L/dt head 20 m (Ebara)

Submersible Pump Kap. 7.5


08.03.05.08.17 Unit - 52.850.000 55.492.500 55.492.500 58.399.250 58.663.500 59.192.000 59.192.000
L/dt head 15 m (Ebara)

Submersible Pump Kap. 10


08.03.05.08.18 Unit - 55.475.000 58.248.750 58.248.750 61.299.875 61.577.250 62.132.000 62.132.000
L/dt head 15 m (Ebara)

Submersible Pump Kap. 2

08.03.05.08.19 L/dt head 20 m (Grundfos Unit - 70.309.120 73.824.576 73.824.576 77.691.578 78.043.123 78.746.214 78.746.214

SP)

Submersible Pump Kap. 2

08.03.05.08.20 L/dt head 20 m (Grundfos Unit - 53.436.208 56.108.018 56.108.018 59.047.010 59.314.191 59.848.553 59.848.553

DPK)

Submersible Pump Kap. 2.5

08.03.05.08.21 L/dt head 15 m (Grundfos Unit - 35.303.520 37.068.696 37.068.696 39.010.390 39.186.907 39.539.942 39.539.942

SP)

Submersible Pump Kap. 2.5

08.03.05.08.22 L/dt head 15 m (Grundfos Unit - 34.357.120 36.074.976 36.074.976 37.964.618 38.136.403 38.479.974 38.479.974

DPK)

Submersible Pump Kap. 5

08.03.05.08.23 L/dt head 12 m (Grundfos Unit - 41.783.280 43.872.444 43.872.444 46.170.524 46.379.441 46.797.274 46.797.274

SP)

Submersible Pump Kap. 5

08.03.05.08.24 L/dt head 12 m (Grundfos Unit - 34.357.120 36.074.976 36.074.976 37.964.618 38.136.403 38.479.974 38.479.974

DPK)

Submersible Pump Kap. 5

08.03.05.08.25 L/dt head 15 m (Grundfos Unit - 49.791.840 52.281.432 52.281.432 55.019.983 55.268.942 55.766.861 55.766.861

SP)

Submersible Pump Kap. 5

08.03.05.08.26 L/dt head 15 m (Grundfos Unit - 32.404.680 34.024.914 34.024.914 35.807.171 35.969.195 36.293.242 36.293.242

DPK)

Submersible Pump Kap. 5

08.03.05.08.27 L/dt head 20 m (Grundfos Unit - 72.211.104 75.821.659 75.821.659 79.793.270 80.154.325 80.876.436 80.876.436

SP)

Submersible Pump Kap. 5

08.03.05.08.28 L/dt head 20 m (Grundfos Unit - 70.310.800 73.826.340 73.826.340 77.693.434 78.044.988 78.748.096 78.748.096

DPK)

Submersible Pump Kap. 7.5

08.03.05.08.29 L/dt head 15 m (Grundfos Unit - 58.090.480 60.995.004 60.995.004 64.189.980 64.480.433 65.061.338 65.061.338

SP)

Submersible Pump Kap. 7.5

08.03.05.08.30 L/dt head 15 m (Grundfos Unit - 56.248.640 59.061.072 59.061.072 62.154.747 62.435.990 62.998.477 62.998.477

DPK)

Page 10
HARGA (Rp.)
KODE
NAMA BARANG MEREK SATUAN TANJUNG
BATAM BINTAN KARIMUN LINGGA NATUNA ANAMBAS
BARANG
PINANG

Submersible Pump Kap. 10

08.03.05.08.31 L/dt head 15 m (Grundfos Unit - 70.371.840 73.890.432 73.890.432 77.760.883 78.112.742 78.816.461 78.816.461

SP)

Submersible Pump Kap. 10

08.03.05.08.32 L/dt head 15 m (Grundfos Unit - 70.310.800 73.826.340 73.826.340 77.693.434 78.044.988 78.748.096 78.748.096

DPK)

Submersible Pump Kap. 15

08.03.05.08.33 L/dt head 16 m (Grundfos Unit - 150.237.360 157.749.228 157.749.228 166.012.283 166.763.470 168.265.843 168.265.843

SP)

Submersible Pump Kap. 15

08.03.05.08.34 L/dt head 16 m (Grundfos Unit - 143.032.288 150.183.902 150.183.902 158.050.678 158.765.840 160.196.163 160.196.163

DPK)

08.03.05.09. Elektrik Well Pump

08.03.05.09.01 BVP MAX 1000 watt Leader 4.565.000 4.793.250 4.793.250 5.044.325 5.067.150 5.112.800 5.112.800

Pompa Satelit 4 inch 1.5 HP


08.03.05.09.02 DAB 7.315.000 7.680.750 7.680.750 8.083.075 8.119.650 8.192.800 8.192.800
CS4C_19M

08.03.05.09.03 Ecosub 410 A SW 280 Watt Leader 2.310.000 2.425.500 2.425.500 2.552.550 2.564.100 2.587.200 2.587.200

08.03.08 Alat Pengolahan Air Kotor

08.03.08.01. Unit Pengolahan Air Kotor

08.03.08.01.01 Kincir Air S218 ACTEC Set 7.500.000 7.875.000 7.875.000 8.287.500 8.325.000 8.400.000 8.400.000

08.03.08.01.02 Van Belt Panel Lumpur - Set 2.244.000 2.356.200 2.356.200 2.479.620 2.490.840 2.513.280 2.513.280

08.03.08.01.03 Blower Panel Lumpur - Set 6.758.400 7.096.320 7.096.320 7.468.032 7.501.824 7.569.408 7.569.408

08.03.08.01.04 Gear Box Panel Lumpur - Unit 14.216.400 14.927.220 14.927.220 15.709.122 15.780.204 15.922.368 15.922.368

08.03.08.01.05 Mammoth Motor - Unit 5.346.000 5.613.300 5.613.300 5.907.330 5.934.060 5.987.520 5.987.520

08.03.08.02. Lain-lain

08.03.08.02.01 Mesin Pencacah Sampah - unit 54.067.200 56.770.560 56.770.560 59.744.256 60.014.592 60.555.264 60.555.264

08.03.08.02.02 Solar Home System (SHS) - Unit 9.002.400 9.452.520 9.452.520 9.947.652 9.992.664 10.082.688 10.082.688

08.03.08.03 Trash Rack

Trash Rack (2510 x 2000 x


08.03.08.03.01 Unit - 3.294.950.000 3.459.697.500 3.459.697.500 3.640.919.750 3.657.394.500 3.690.344.000 3.690.344.000
2072 x 30 mm )

Trash Rack 3010 x 2000 x


08.03.08.03.02 Unit - 3.876.200.000 4.070.010.000 4.070.010.000 4.283.201.000 4.302.582.000 4.341.344.000 4.341.344.000
2272 x 30 mm

Trash Rack 3260 x 2000 x


08.03.08.03.03 Unit - 3.931.200.000 4.127.760.000 4.127.760.000 4.343.976.000 4.363.632.000 4.402.944.000 4.402.944.000
3672 x 30 mm

08.03.08.03.04 Trash Rack Panel Control Unit - 419.700.000 440.685.000 440.685.000 463.768.500 465.867.000 470.064.000 470.064.000

08.03.09 Pembangkit Uap Air Panas/Steam Generator

08.03.09.03. Lain-lain

Ketel Uap Tekanan Tinggi 40


08.03.09.03.01 - Unit 3.088.800 3.243.240 3.243.240 3.413.124 3.428.568 3.459.456 3.459.456
x 40 x 40 x 50 cm tk. 2 kg

08.03.10 Alat Bantu Kapal Perahu

08.03.10.01. Alat Bantu Kapal Perahu

08.03.10.01.01 Dermaga Perahu - Unit 99.409.200 104.379.660 104.379.660 109.847.166 110.344.212 111.338.304 111.338.304

08.03.10.01.02 Tenda Panggung - Unit 6.890.400 7.234.920 7.234.920 7.613.892 7.648.344 7.717.248 7.717.248

08.03.10.01.03 Dok dan Garasi Perahu - Unit 7.035.600 7.387.380 7.387.380 7.774.338 7.809.516 7.879.872 7.879.872

Page 11

Anda mungkin juga menyukai