KECAMATAN REMBANG
PEMERINTAH KABUPATEN REMBANG
GAMBAR PERENCANAAN
NAMA PEKERJAAN :
REHABILITASI GEDUNG
KANTOR KECAMATAN
LOKASI PEKERJAAN :
KECAMATAN REMBANG
KONSULTAN PERENCANA & PENGAWASAN TEKNIK
KABUPATEN REMBANG
CV. UTAMA KARYA
E-mail : fatchurroehman@gmail.com
JOGOLYO WONOSALAM DEMAK
PERUM BINTORO ASRI M 16-17
Telp. ----
PENDOPO
KECAMATAN
LAY OUT
Not Scale
BANGUNAN LAMA
TIDAK DIKERJAKAN
300
R. TUNGGU
± 0.00
R. PELAYANAN 500
± 0.00
R. STAFF
± 0.00
250
200
150
100
R. CAMAT
400 ± 0.00
DENAH EXISTING
Skala 1 : 100
500 900 400
TAMPAK DEPAN EXISTING
Skala 1 : 100
H
PANTRI GUDANG KM/WC
150
- 0.10 - 0.10 - 0.05
G
Naik II
250
300 Dinding partisi
R. STAFF
Dinding partisi ± 0.00 R. PELAYANAN R. TUNGGU
Naik ± 0.00 ± 0.00
F
850
E
PANTRI
D 125
- 0.03
B
SELASAR 108
- 0.05
100
R. CAMAT
400 ± 0.00
A
250 250 300 300 300 400
500 1300
Skala 1 : 100
KETERANGAN
Dinding Partisi tidak dikerjakan
BANGUNAN
EXISTING
± 0.00
Turun
300
Turun
400
AULA RAPAT
+ 4.00
150
400
TAMPAK BELAKANG
Skala 1 : 100
TAMPAK SAMPING KANAN
Skala 1 : 100
POTONGAN I - I
Skala 1 : 100
POTONGAN II - II
Skala 1 : 100
sloof 13x20
pondasi bt. belah
footplat 60x60
kolom 15x15
H
150 25 150
60
250
300
F
850
125 250
E pondasi exsiting
sloof existing
D 125 kolom praktis
B
100
100
400
A
250 250 300 300 300 125 175 100
500 1300
1 2 3 4 5 6 7 8 9
Skala 1 : 100
60 25 : Pondasi Existing
285 300 425 175 100
Kp
150
250 250
400
125
Kp Kp Kp
350
1100 Kp
F.1/K.1 F.2/K.2 F.2/K.2 F.2/K.2 F.2/K.2 200
K.2 K.2 150 Kp
F.1/K.1 F.1/K.1
250 250
250 250 300 300 300 400
500
NOTASI :
F.1 = Footplat 80x80
F.2 = Footplat 60x60
K.1 = Kolom 30x30
K.2 = Kolom 15x15
Kp = Kolom Praktis
H
S.3 S.2 S.1 S.2 S.1 S.2 S.2 S.2
G
S.1 S.1 S.3 S.3 S.3 S.3
S.3
300 S.1 S.1
F
S.1 S.1 S.3
E S.3
S.1
D 400 S.1 S.3 S.1
C
S.3 S.3
S.3 S.3 S.3 S.3 S.3
B
S.1 S.1
S.1 S.1
A
250 250 300 300 300 400
500 1300
1 2 3 4 5 6 7 8 9
NOTASI :
S.1 = Sloof 20x30
DENAH SLOOF S.2 = Sloof 13x20
S.3 = Sloof Existing
Skala 1 : 100
BANGUNAN
300 300 425 175 100
EXISTING
± 0.00
Keramik Lantai Motif
20x20
± 0.10 150
Naik
250
300 300
Keramik Lantai
Naik 40x40
Turun
± 0.00 850
Keramik Lantai
Keramik Lantai Motif 40x40
700 125 20x20 Keramik Lantai
± 0.00 250
- 0.10 40x40
± 0.00
Keramik Lantai Motif
125 20x20
400
- 0.05
Keramik Lantai
Keramik Lantai Motif 40x40 Keramik Lantai 200
Keramik Lantai 150 20x20 ± 0.00 40x40
40x40 - 0.10 - 0.05
± 0.00
Keramik Lantai
40x40 108
- 0.05
Keramik Lantai
40x40 100
150
400 400 ± 0.00
S.3 RB RB RB RB RB RB 150
RB RB BG RB
300 B.1
B.1
500
RB
RB
RB
400
1100 RB RB 1100 B.1 B.1 B.1
RB 200
BG B.1 RB BG
400 B.1
RB B.1
D D B B B B C
D D B B B B B
D D D D D
D D B B
B D
C B
D
B B
D D D D D C
B A
C B B B B B B
A D
B B A A A A
D D D D D B
B A
D D B B
NOTASI :
A = Finishing acian dan Cat Dinding Exterior (
Ex. Dulux. Mowilex, Jotun setara )
D D A A
B = Finishing acian dan Cat Dinding Interior
C = Finishing acian dan Cat Dinding Interior &
Keramik Dinding 20x25 tinggi 150 cm
D = Finishing Plesteran & Acian
BANGUNAN
EXISTING
± 0.00
tanpa plafond
60 60
60 60
tanpa plafond
gypsumboard 9 mm
finishing cat gypsumboard 9 mm
gypsumboard 9 mm
+ 3.60 finishing cat
+ 3.60
finishing cat
+ 3.60
tanpa plafond
tanpa plafond
gypsumboard 9 mm
finishing cat gypsumboard 9 mm
+ 7.60 gypsumboard 9 mm
finishing cat finishing cat
+ 3.60 + 3.60
tanpa plafond
gypsumboard 9 mm 100
finishing cat
+ 3.60
tanpa plafond
Skala 1 : 100
Naik
300
Naik
400
400
250 250
30°
30°
30°
30° 30°
30°
plat dak
tebal 12 cm
30° 100
plat leufel
tebal 8 cm 50
150
konsul beton 13x20
120
120
120
120
120
120
100
plat leufel
tebal 8 cm 50
: T/C bracing
: ikatan angin
P.4
Turun
300
Naik
BV.1
P.Existing
P.5
400 J.2 BV.1 P.4
P.2
BV.1 J.2 J.2
250 250
POTONGAN C - C POTONGAN C - C
balok latei 13/13 balok latei 13/13
A A
5 5
C C
30 30
5 5
210 210
B B
10 10
POTONGAN A - A POTONGAN A - A
5 10 50 10 10 50 10 5 5 10 70 10 5
10 10
150 100
POTONGAN B - B POTONGAN B - B
BAHAN
Spesifikasi Rangka Alluminium, Kaca Rayband 5 mm Spesifikasi Rangka Alluminium, Kaca Rayband 5 mm
BOVEN BOVEN Rambuncis/Pengunci (2 set), Casement (2 bh),
Accessoris Rambuncis/Pengunci (2 set), Casement (2 bh), Engsel (4 bh) Accessoris
Engsel (2 bh)
5 70 5
5 50 5 50 5 50 5
10
10
POTONGAN C - C POTONGAN C - C
balok latei 13/13 balok latei 13/13
A A
5 5
C C
30 30
5 5
B 105
120 118
B 210 + 100 cm 5
10
POTONGAN A - A
170
10
55 40 55 50 55 40 55
POTONGAN B - B
10
5 10 60 10
10
POTONGAN A - A
5 10 50 10 5
10
80
POTONGAN B - B
BAHAN
BAHAN
Spesifikasi Rangka Alluminium, Kaca Rayband 5 mm Spesifikasi --- Spesifikasi Rangka Alluminium, Kaca Rayband 5 mm
BOVEN Rambuncis/Pengunci (2 set), Casement (2 bh), BOVEN BOVEN Rambuncis/Pengunci (2 set), Casement (2 bh),
Accessoris Accessoris --- Accessoris
Engsel (2 bh) Engsel (2 bh)
balok latei 13/13
A
5
B
30
+ 210 cm 5
POTONGAN A - A
10
5 50 5 50 5
BAHAN
Spesifikasi ---
JENDELA
Accessoris ---
+ 210 cm 5
POTONGAN A - A
10
5 50 5
POTONGAN B - B
Spesifikasi ---
JENDELA
Accessoris ---
10
20
+ 3.75
E 30
+ 3.60
20
+ 3.40
+ 3.20
+ 3.00 DETAIL B
+ 2.80
+ 2.60 20 Skala 1 : 25
+ 2.40
D
+ 2.20
+ 2.00 DETAIL A
+ 1.80
+ 1.60
Skala 1 : 25
C
+ 1.40
+ 1.20
+ 1.00
+ 0.80
+ 0.60
B
+ 0.40
+ 0.20
± 0.00
A
30
10
POTONGAN A - A 20
10
Skala 1 : 50 10
13
15
250 250
DETAIL C DETAIL D
Skala 1 : 25 Skala 1 : 25
14
15
16
10
12
13
17
11
Bordes
9
8
300 7
12
A 30
Bordes
1
4
0
5
20
10
DETAIL E
250 Skala 1 : 25
DENAH TANGGA
Skala 1 : 50
30
15
115 115
25 25
10 10
5 5
80 60
80
60
30 15
60 15
80 30
60
8
DETAIL PONDASI
KEYPLAN PEMBESIAN Skala 1 : 25
Skala 1 : 20
25
60
80 865 80
DETAIL KUDA-KUDA 1
Skala 1 : 50
80 515 80
DETAIL KUDA-KUDA 2
Skala 1 : 50