Anda di halaman 1dari 20

Data Perencanaan

A Beban Mati
Berat sendiri beton bertulang =
Adukan finishing lantai (1 cm) =
Tegel (1 cm) =
Tembok 1/2 Bata =
Plafond + penggantung =
Pipa + ducting AC =
B Beban Hidup
Lantai atap =
Lantai gedung (perkantoran) =
Reduksi beban hidup (30%) =
C Data Bangunan
Lokasi gedung =
Jenis Tanah =
Ukuran Kolom =
Ukuran Balok =
Tinggi Perlantai =
Panjang Arah X =
Panjang Arah Y =
Tebal plat lantai =

D Perhitungan Pembebanan
Beban Mati
Jenis Struktur P (m) L (m) t (m)
Kolom 0.4 0.2 3.6
Balok Arah X 20 0.2 0.35
Balok Arah Y 8 0.2 0.35
Plat Lantai 20 8 0.12
Spesi (1 cm) 20 8
Tegel (1 cm) 20 8
Plafond + Penggantung 20 8
Pipa + Ducting AC 20 8
Dinding 1/2 Bata (X) 20 3.6
Dinding 1/2 Bata (Y) 8 3.6
Dinding 1/2 Bata (Y) 3 3.6

Beban Hidup
Jenis Struktur P (m) L (m) t (m)
Plat Lantai Gedung 20 8

Berat Kombinasi = 1,2 D + 1,6 L


Berat
Lantai Kombinasi
Lantai Kombinasi
Mati Hidup
1 208652.8 12000 269583.36
2 208652.8 12000 269583.36
3 208652.8 12000 269583.36
808750.08

Ta (min) = 0.3967 detik


Ta (max) = 0.5554 detik
T pakai = Ta <
= 0.396704655 <

Menghitung CS
R (Faktor Modifikasi Respon) = 8 Pemikul Momen Biasa
Ie (Faktor Keutamaan Gedung) = 1 Perkantoran
SDS = 0.607
SD1 = 0.56
Cs (hitung) = SDS / (R/Ie)
Cs (max) = SD1 / T*(R/Ie)
Cs (min) = 0,044 * SSD * Ie

Cs pakai = Cs min <


= 0.026708 <

Menghitung Gaya Dasar Seismik (V)


Gaya Dasar (V) = Cs x Wt
= 61363.91232 Kg

Menghitung Gaya Gempa Perlantai

k (eksponen terkait) pakai = 1

Lantai Tinggi (hi) (m) Berat Perlantai (Wx) Tinggi (hx)

3 10.8 269583.36 10.8


2 7.2 269583.36 7.2
1 3.6 269583.36 3.6
2400 kg/m3
21 kg/m2
24 kg/m2
250 kg/m2
18 kg/m2
40 kg/m2

100 kg/m2
250 kg/m2
175 kg/m2

Jakarta
Lunak
40 20 cm
35 20 cm
3.6 m
20 m
8 m
12 cm

n Mati
Jumlah Banyak Lantai Massa/Satuan Total Beban Beban / Lantai
24 3 2400 49766.4 16589
4 3 2400 40320 13440
6 3 2400 24192 8064
1 3 2400 138240 46080
1 3 21 10080 3360
1 3 24 11520 3840
1 3 18 8640 2880
1 3 40 19200 6400
4 3 250 216000 72000
2 3 250 43200 14400
8 3 250 64800 21600
625958.4 208653
Hidup
Jumlah Banyak Lantai Massa/Satuan Total Beban Beban / Lantai
1 3 250 120000 12000
120000 12000

Input
Ct = 0.0466
x = 0.9
t = 10.8
Cu = 1.4
Kg

tc 0

T max
0.555386517

Momen Biasa

= 0.075875
= 0.1764536894
= 0.026708

Cs Hitung < Cs max


0.075875 < 0.1764536894

Pembagian Gaya Gempa


Wx * hx Gaya Dasar (V) Fx = Cvx * V
1/6 Fx 1/4 Fy
2911500.288 61363.91232 30682.0 5113.7 7670.5
1941000.192 61363.91232 20454.6 3409.1 5113.7
970500.096 61363.91232 10227.3 1704.6 2556.8
5823000.576
0 -

0 -

Plat 1 Plat 2
Spesi 252 168
Tegel 288 192
Ducting 480 320
Plafon 216 144 kg
1236 824

P (m) L (m) T (m) BJ


4 3.6 0 250
3 3.6 0 250
2 3.6 0 250
Kg

Kg
Story Item Load Point X Y Z DriftX
STORY3 Max Drift X COMB1 6 20 8 10.8 0.000005
STORY3 Max Drift Y COMB1 1 0 8 10.8
STORY3 Max Drift X COMB2 6 20 8 10.8 0.000005
STORY3 Max Drift Y COMB2 1 0 8 10.8
STORY3 Max Drift X COMB3 1 0 8 10.8 0.001574
STORY3 Max Drift Y COMB3 19 20 0 10.8
STORY3 Max Drift X COMB4 1 0 8 10.8 0.001572
STORY3 Max Drift Y COMB4 19 20 0 10.8
STORY2 Max Drift X COMB1 1 0 8 7.2 0
STORY2 Max Drift Y COMB1 1 0 8 7.2
STORY2 Max Drift X COMB2 1 0 8 7.2 0
STORY2 Max Drift Y COMB2 1 0 8 7.2
STORY2 Max Drift X COMB3 1 0 8 7.2 0.002404
STORY2 Max Drift Y COMB3 19 20 0 7.2
STORY2 Max Drift X COMB4 1 0 8 7.2 0.002404
STORY2 Max Drift Y COMB4 19 20 0 7.2
STORY1 Max Drift X COMB1 1 0 8 3.6 0.000001
STORY1 Max Drift Y COMB1 24 0 0 3.6
STORY1 Max Drift X COMB2 1 0 8 3.6 0.000001
STORY1 Max Drift Y COMB2 24 0 0 3.6
STORY1 Max Drift X COMB3 1 0 8 3.6 0.001891
STORY1 Max Drift Y COMB3 19 20 0 3.6
STORY1 Max Drift X COMB4 1 0 8 3.6 0.001891
STORY1 Max Drift Y COMB4 19 20 0 3.6

Story Max. Drift X Max. Drift Y di


3 0.001574 0.002993 0.002993
2 0.002404 0.004935 0.004935
1 0.001891 0.004979 0.004979

Kontrol T alami terhadap T Rayleigh

T alami = 0,54 detik

Lantai Wi Fi di Wi x di 2 Fi x di
3 269583.36 30,682.0 0.002993 2.41 91.83
2 269583.36 20,454.6 0.004935 6.57 100.94
1 269583.36 10,227.3 0.004979 6.68 50.92
Jumlah 15.66 243.70

T rayleigh = 0.51
T reduksi = 0.31 < 0.54 (OK)
DriftY

0.002993

0.002993

0.004935

0.004935

0.004979

0.004979
METODE PERFORMANCE POINT ATC 40

Tabel 1. Hasil Push Over

Step Displacement Base Force A-B B - IO IO - LS LS - CP CP - C C-D

0 0.0000 0.0000 360 12 0 0 0 0


1 0.0098 40095.5859 260 88 24 0 0 0
2 0.0169 68210.7656 220 80 60 12 0 0
3 0.0212 76632.2188 184 116 0 60 0 12
4 0.0404 95705.4375 184 80 0 0 0 0
5 0.0404 95708.3359 144 112 8 0 0 0
6 0.0522 106346.4219 128 88 48 0 0 0
7 0.0583 108578.8672 120 64 80 0 0 0
8 0.0633 109780.6641 120 24 72 48 0 0
9 0.1065 112054.2969 120 0 24 120 0 0
10 0.1497 114327.9297 120 0 0 144 0 0
11 0.1929 116601.5703 120 0 0 136 0 8
12 0.1959 116757.8203 120 0 0 136 0 0
13 0.1959 109310.9141 120 0 0 136 0 0
14 0.1973 111563.5625 120 0 0 128 0 8
15 0.1980 111983.6719 120 0 0 128 0 0
16 0.1837 57161.5820 372 0 0 0 0 0
MAX 0.1980 116757.8203

Tabel 2. Demand Curve Tabel 3. Capacity Curve

T C (Sa) Sd Catatan : T → dijadikan Sd W 808750.08


0 0.243 0.0000 Sd = (T / 2π )2 x Sa Sa Sd
0.184514003 0.607 0.0005 C = Sa → Tetap 0.00000 0
0.396704655 0.607 0.0024 0.04958 0.0098
0.555386517 0.607 0.0047 0.08434 0.0169
0.922570016 0.607 0.0131 0.09475 0.0212
0.95 0.589473684 0.0135 0.11834 0.0404
1 0.56 0.0142 0.11834 0.0404
1.1 0.5090909091 0.0156 0.13149 0.0522
1.2 0.4666666667 0.0170 0.13426 0.0583
1.3 0.4307692308 0.0185 0.13574 0.0633
1.4 0.4 0.0199 0.13855 0.1065
1.5 0.3733333333 0.0213 0.14136 0.1497
1.6 0.35 0.0227 0.14418 0.1929
1.7 0.3294117647 0.0241 0.14437 0.1959
1.8 0.3111111111 0.0256 0.13516 0.1959
1.9 0.2947368421 0.0270 0.13795 0.1973
2 0.28 0.0284 0.13847 0.198
2.2 0.2545454545 0.0312 0.07068 0.1837
2.4 0.2333333333 0.0341
2.6 0.2153846154 0.0369
2.8 0.2 0.0398
3 0.1866666667 0.0426
3.2 0.175 0.0454
3.4 0.1647058824 0.0483
3.6 0.1555555556 0.0511
3.8 0.1473684211 0.0540
4 0.14 0.0568
4.2 0.1333333333 0.0596
4.4 0.1272727273 0.0625
4.6 0.1217391304 0.0653
4.8 0.1166666667 0.0682
5 0.112 0.0710
5.2 0.1076923077 0.0738
5.4 0.1037037037 0.0767
5.6 0.1 0.0795
5.8 0.0965517241 0.0824
6 0.0933333333 0.0852
Performance Point
0.7

0.6

0.5

0.4
Sa

0.3

0.2

0.1

0
0.0000 0.0500 0.1000 0.1500 0.2000 0.2500

Sd

Sd = 0.058
Sa = 0.138
Tinggi Bangunan = 10.8 m
MPF = 1.6 Struktur Ragam 1
ϕRoof = 1 Struktur Ragam 2
Xroof = 0.0928
Rasio Kinerja = 0.009 Immediate Occupency
D-E >E Total

0 0 372
0 0 372
0 0 372
0 0 372
0 108 372
0 108 372
0 108 372
0 108 372
0 108 372
0 108 372
0 108 372
0 108 372
8 108 372
8 108 372
8 108 372
16 108 372
0 0 372

Catatan : Base Force ( V ) → Kg


Sa = V / Wt → (m/s2)
Displacement = Sd → Tetap
0.719 1.043
70054.69218
Respon Spectrum
Push Over

000 0.2500
Menentukan Target Displacement (FEMA 356)

Ti Reylaigh = 0.31 Ki = Vnominal / Δmaks Hbangunan 10.8


Vnominal = 61363.9 Ki = 20502476.6 Kg/m
Δmaks = 0.002993

Vy = 116757.82 Ke = 0,6.Vy / δ
0,6. Vy = 70054.69218 Ke = 3687089.06 Kg/m `
δ = 0.019

Te = Ti x √ Ki /Ke
Te = 0.719 detik → Sa = 1.043 m/det2 dari Te (Respon Spectrum)

140000.0000 → Ditemukan nilai 0,6. Vy = 70054,69218


120000.0000
Maka dicari perpotongannya
dan didapat nilai δ = 0,019
100000.0000
Base Reacton

80000.0000

60000.0000
Push Over
40000.0000

20000.0000

0.0000
0.0000 0.0500 0.1000 0.1500 0.2000 0.2500
Displacement

CO = 1.3 Any Load Pattern


C1 = 1
C2 = 1 Life Safety - Framing Type
C3 = 1 Bangunan dengan Kekakuan Efektif Positif Pasca Leleh
δt = Co x C1 x C2 x C3 x Sa x ((Te2 / 4. π2) x g) dimana g = 9.81
δt = 0.17

Rasio Kinerja = δt / Hbangunan


= 0.016 Damage Control
m
Lantai Wi g Rotasi (Wi*di)/g Wi / g Wi * di^2 (Wi * di^2)/g
3 269583.36 9.81 1 27480.4648 27480.46 269583.36 27480.464832
2 269583.36 9.81 1 27480.4648 27480.46 269583.36 27480.464832
1 269583.36 9.81 1 27480.4648 27480.46 269583.36 27480.464832
82441.3945 82441.39 808750.08 82441.394495

(Wi*di)/g)^2 6796583526 a= 1
2
 
N

  wifi1  / g 
a1  N  i1 
  N 
 wi / g   wifi1 / g 
2
 
 i1   i1 
dimana:
PF1 faktor partisipasi ragam (modal participation factor) untuk ragam ke-1
a1 koefisien massa ragam untuk ragam ke-1
wi/g massa lantai i
fi1 perpindahan pada lantai i ragam ke-1
N jumlah lantai
V gaya geser dasar
W berat struktur (akibat beban mati dan beban hidup tereduksi)
Datap perpindahan atap (yang digunakan pada kurva kapasitas)
Sa spektrum percepatan
Sd spektrum perpindahan

Anda mungkin juga menyukai