LAPORAN KEUANGAN

Pekerjaan Sprinkle Tugu Pahlawan


2018
REKAPITULASI
JUMLAH (Rp)
NO RINCIAN
Masuk Keluar SALDO
1 Kontrak 90,000,000
2 Material 0
3 Upah Sipil 0
4 Upah Arif 0
5 Transport 0
6 DLL 0
7 Tidak jelas 0
8 Hutang 0

TOTAL 90,000,000 0 90,000,000


LAPORAN KEUANGAN
Pekerjaan Sprinkle Tugu Pahlawan
2018
PEMASUKAN

TGL RINCIAN JUMLAH KETERANGAN

Nilai Kontrak 90,000,000

TOTAL 90,000,000
`
LAPORAN KEUANGAN
Pekerjaan Sprinkle Tugu Pahlawan
2018
PENGELUARAN
Harga Satuan
Diskon (-) JUMLAH (Rp)
TGL RINCIAN Vol Sat KLASIFIKASI
(Rp.) PPn (+) Material Upah Sipil Upah Arif Transport DLL
5-Jul-18 pasir 1 colt 275,000
5-Jul-18 triplek 12mm 1 lbr 165,000
5-Jul-18 semen tiga roda 40kg 10 sak 415,000
9-Jul-18 besi polos 6mm 30 btg 780,000
besi polos 10mm 30 btg 2,025,000
kayu meranti 4*6 3 btg 142,500
kayu MC 4/6 * 6 2 pak 350,000
pasir 2 colt 550,000
triplek 9mm 10 lbr 1,200,000
paku 2" 2 kg 40,000
paku 2 1/2 1 kg 20,000
coral 1 colt 385,000
2-Jul-18 besi 10mm 12 btg 810,000
besi 8mm 5 btg 237,500
Kayu usuk 4/6 meranti 18 btg 540,000
Kayu usuk 5/7 meranti 8 btg 360,000
Kayu usuk 3/5 meranti 5 btg 180,000
obat cor 2 kg 84,000
pasir 1 engkel 650,000
tenslah 1 colt 475,000
28-Jun-18 semen tiga roda 40kg 20 sak 820,000
30-Jun-18 Batu belah 1 truk 1,350,000
3-Jul-18 pipa vin-vin 4" type D 7 btg 689,000
pipa vin-vin 3" type D 19 btg 1,282,500
keni 4" 4 btg 60,000
sok 4" 4 btg 48,000
lem isarplas 1 ls 40,000
besi 12 mm 47 btg 4,465,000
besi 10 mm 42 btg 2,835,000
besi 8 mm 38 btg 1,710,000
bendrat 10 kg 180,000
4-Jul-18 pasir 1 truk 1,250,000
tenslah 1 truk 1,750,000
4-Jul-18 batu belah 1 truk 1,350,000
28-Jun-18 bata ringan citicion 11 m3 6,804,000
2-Jul-18 pasir 1 colt 275,000
semen tiga roda 40kg 10 sak 415,000
tenslah 1 coltl 385,000
3-Jul-18 triplek 4mm semi 5 lbr 600,000
paku 2" 1 kg 16,500
paku 2 1/2 1 kg 16,500
3-Jul-18 besi beton 8mm 20 btg 890,000
besi beton 6mm 25 btg 637,500
besi beton 12mm 20 btg 1,900,000
besi beton 13mm 40 btg 4,600,000
Harga Satuan
Diskon (-) JUMLAH (Rp)
TGL RINCIAN Vol Sat KLASIFIKASI
(Rp.) PPn (+) Material Upah Sipil Upah Arif Transport DLL
ongkir 200,000
4-Jul-18 pasir 1 colt 275,000
tenslah 1 colt 385,000
semen tiga roda 40kg 10 sak 415,000
7-Jul-18 batu belah 1 truk 1,350,000
10-Jul-18 batu belah 2 truk 2,700,000

TOTAL 0 0 0 0 0
ORAN KEUANGAN
prinkle Tugu Pahlawan
2018

JUMLAH (Rp)
KETERANGAN
Tidak jelas Hutang
JUMLAH (Rp)
KETERANGAN
Tidak jelas Hutang

0 0
165,000
415,000