No. Komponen Biaya Satuan Jumlah Fisik/Tahun Harga/Satuan (Rp) Total Harga (Rp)
Bangunan Gudang
1 m2 15 2,000,000 30,000,000
(3x5m)
2 Kendaraan
(Sepeda Motor) Unit 1 5,000,000 5,000,000
3 Peralatan
Timbangan Unit 1 500,000 500,000
Kalkulator Unit 2 50,000 100,000
Keranjang Unit 2 50,000 100,000
4 Lain - lain
Tenaga Kerja Orang 2 2,500,000 5,000,000
Listrik KWh 600 1,500 900,000
Transportasi Km 24000 1,000 24,000,000
Pulsa Telepon Rp. 300 20,000 6,000,000
TOTAL 71,600,000
TPC
3
3
3
0
0
DEPRESIASI
ANALISA KELAYAKAN USAHA DISTRIBUTOR PEPAYA
Nama Pemil
: Musi Utama Muham
Jenis Usah : Distributor Pepaya
Umur
No Komponen Biaya Nilai Awal (Rp) Residu (10%) (Rp) Nilai Akhir (Rp) Ekonomis Tahun 1
(Tahunan)
Bangunan Gudang
1 30,000,000 10% 3,000,000 27,000,000 10 2,700,000
(3x5m)
2 Kendaraan
(Sepeda Motor) 5,000,000 10% 500,000 4,500,000 5 900,000
3 Peralatan
Timbangan 500,000 10% 50,000 450,000 3 150,000
Kalkulator 100,000 10% 10,000 90,000 3
Keranjang 100,000 10% 10,000 90,000 3
ANALISA KELAYAKAN USAHA DISTRIBUTOR PEPAYA
Biaya Pengurangan
4 kg 4,500 8 36,000
Kualitas / Busuk (2%)
TOTAL 2,054,000
PEPAYA
54,100,000 649,200,000
ANALISA KELAYAKAN USAHA DISTRIBUTOR PEPAYA
Pepaya
Production Plan/Hari Total Satuan
Kapasitas Maksimum 400 kg
Harga Jual 6000 Rp
Total Total
Projected Production/ Production/Tahun
Production Plan/Hari Production/Bulan
Sales (kg)
Hari (kg) (kg)
Plastik
Production Plan/Hari Total Satuan
Kapasitas Maksimum 100 pcs
Total Total Total
Projected
Kebutuhan Plastik/Hari Kebutuhan/ Kebutuhan/Bulan Kebutuhan/Tahun
Sales Hari (pcs) (pcs) (pcs)
Tahun 1 70% 70 1750 21000
Tahun 2 80% 80 2000 24000
Tahun 3 90% 90 2250 27000
Tahun 4 95% 95 2375 28500
Tahun 5 100% 100 2500 30000
Transportasi
Production Plan/Hari Total Satuan
Kapasitas Maksimum 80 km
Total Total Total
Projected Kebutuhan/
Kebutuhan Plastik/Hari Kebutuhan/Bulan Kebutuhan/Tahun
Sales Hari (km) (km) (km)
Tahun 1 70% 56 1400 16800
Tahun 2 80% 64 1600 19200
Tahun 3 90% 72 1800 21600
Tahun 4 95% 76 1900 22800
Tahun 5 100% 80 2000 24000
PROD PLAN
Pepaya
Production Plan/Hari Total Satuan
Kapasitas Maksimum 400 kg
Inflasi 3.20% %
Harga Jual Tahun 1 6000 Rp
Harga Jual Tahun 2 6192
Harga Jual Tahun 3 6390.14
Harga Jual Tahun 4 6594.63
Harga Jual Tahun 5 6805.66
Total Total
Projecte Producti
Production Plan/Hari d Sales on/Hari Sales/Hari (Rp) Production/ Sales/Bulan (Rp)
Bulan (kg)
(kg)
Tahun 1 70% 280 1,680,000 7,000 42,000,000
Tahun 2 80% 320 1,981,440 8,000 49,536,000
Tahun 3 90% 360 2,300,452 9,000 57,511,296
Tahun 4 95% 380 2,505,959 9,500 62,648,972
Tahun 5 100% 400 2,722,263 10,000 68,056,567
Production/Tahun Sales/Tahun(
(kg) Rp)
84,000 504,000,000
96,000 594,432,000
108,000 690,135,552
114,000 751,787,661
120,000 816,678,807
Nama Pemilik : Musi Utama Muham
Jenis Usaha : Distributor Pepaya
Fixed Cost
No. Komponen Biaya Satuan Jumlah Fisik/Tahun Harga/Satuan (Rp)
Bangunan Gudang
1 m2 15 2,000,000
(3x5m)
2 Kendaraan
(Sepeda Motor) Unit 1 5,000,000
3 Peralatan
Timbangan Unit 1 500,000
Kalkulator Unit 2 50,000
Keranjang Unit 2 50,000
4 Tenaga Kerja Orang 2 2,500,000
TOTAL FIX COST
Variable Cost
Raw Material
1 Pepaya kg 84,000 4,500
2 Kantong plastik pcs 21,000 250
Lain-Lain
1 Listrik KWh 600 1,500
2 Transportasi Km 16800 1,000
3 Pulsa Telepon Rp. 300 20,000
Biaya Pengurangan
4 kg 2,400 4,500
Kualitas / Busuk (2%)
5,000,000
500,000
100,000
100,000
5,000,000
40,700,000
378,000,000
5,250,000
900,000
16,800,000
6,000,000
10,800,000
417,750,000
458,450,000
CASH FLOW TAHUN 2
Inflasi 3,2%
Fixed Cost
Bangunan
1 m2 15 2,000,000 64,000
Gudang (3x5m)
2 Kendaraan
(Sepeda Motor) Unit 1 5,000,000
3 Peralatan
Timbangan Unit 1 500,000
Kalkulator Unit 2 50,000
Keranjang Unit 2 50,000
4 Tenaga Kerja Orang 2 2,500,000 80,000
TOTAL FIX COST
Variable Cost
Raw Material
1 Pepaya kg 96,000 4,500 144
2 Kantong plastik pcs 24,000 250 8
Lain-Lain
1 Listrik KWh 600 1,500 48
2 Transportasi Km 19200 1,000 32
3 Pulsa Telepon Rp. 300 20,000 640
Biaya
Pengurangan
4 kg 2,400 4,500 144
Kualitas / Busuk
(2%)
TOTAL VARIABLE COST
2,064,000 30,960,000
5,000,000 5,000,000
500,000 500,000
50,000 100,000
50,000 100,000
2,580,000 5,160,000
41,820,000
4,644 445,824,000
258 6,192,000
1,548 928,800
1,032 19,814,400
20,640 6,192,000
4,644 11,145,600
490,096,800
531,916,800
CASH FLOW TAHUN 3
Inflasi 3,2%
Fixed Cost
Bangunan
1 m2 15 2,064,000 66,048
Gudang (3x5m)
2 Kendaraan
(Sepeda Motor) Unit 1 5,000,000
3 Peralatan
Timbangan Unit 1 500,000
Kalkulator Unit 2 50,000
Keranjang Unit 2 50,000
4 Tenaga Kerja Orang 2 2,580,000 82,560
TOTAL FIX COST
Variable Cost
Raw Material
1 Pepaya kg 108,000 4,644 149
2 Kantong plastik pcs 27,000 258 8
Lain-Lain
1 Listrik KWh 600 1,548 50
2 Transportasi Km 21600 1,032 33
3 Pulsa Telepon Rp. 300 20,640 660
Biaya
Pengurangan
4 kg 2,400 4,644 149
Kualitas / Busuk
(2%)
TOTAL VARIABLE COST
2,130,048 31,950,720
5,000,000 5,000,000
500,000 500,000
50,000 100,000
50,000 100,000
2,662,560 5,325,120
42,975,840
4,793 517,601,664
266 7,188,912
1,598 958,522
1,065 23,004,518
21,300 6,390,144
4,793 11,502,259
566,646,019
609,621,859
CASH FLOW TAHUN 4
Inflasi 3,2%
Fixed Cost
Bangunan
1 m2 15 2,130,048 68,162
Gudang (3x5m)
2 Kendaraan
(Sepeda Motor) Unit 1 5,000,000
3 Peralatan
Timbangan Unit 1 500,000
Kalkulator Unit 2 50,000
Keranjang Unit 2 50,000
4 Tenaga Kerja Orang 2 2,662,560 85,202
TOTAL FIX COST
Variable Cost
Raw Material
1 Pepaya kg 114,000 4,793 153
2 Kantong plastik pcs 28,500 266 9
Lain-Lain
1 Listrik KWh 600 1,598 51
2 Transportasi Km 22800 1,065 34
3 Pulsa Telepon Rp. 300 21,300 682
Biaya
Pengurangan
4 kg 2,400 4,793 153
Kualitas / Busuk
(2%)
TOTAL VARIABLE COST
2,198,210 32,973,143
5,000,000 5,000,000
500,000 500,000
50,000 100,000
50,000 100,000
2,747,762 5,495,524
44,168,667
4,946 563,840,746
275 7,831,121
1,649 989,194
1,099 25,059,589
21,982 6,594,629
4,946 11,870,331
616,185,611
660,354,277
CASH FLOW TAHUN 5
Inflasi 3,2%
Fixed Cost
Bangunan
1 m2 15 2,198,210 70,343
Gudang (3x5m)
2 Kendaraan
(Sepeda Motor) Unit 1 5,000,000
3 Peralatan
Timbangan Unit 1 500,000
Kalkulator Unit 2 50,000
Keranjang Unit 2 50,000
4 Tenaga Kerja Orang 2 2,747,762 87,928
TOTAL FIX COST
Variable Cost
Raw Material
1 Pepaya kg 120,000 4,946 158
2 Kantong plastik pcs 30,000 275 9
Lain-Lain
1 Listrik KWh 600 1,649 53
2 Transportasi Km 24000 1,099 35
3 Pulsa Telepon Rp. 300 21,982 703
Biaya
Pengurangan
4 kg 2,400 4,946 158
Kualitas / Busuk
(2%)
TOTAL VARIABLE COST
2,268,552 34,028,284
5,000,000 5,000,000
500,000 500,000
50,000 100,000
50,000 100,000
2,835,690 5,671,381
45,399,664
5,104 612,509,105
284 8,507,071
1,701 1,020,849
1,134 27,222,627
22,686 6,805,657
5,104 12,250,182
668,315,490
713,715,154