Anda di halaman 1dari 16

REKAPITULASI LAPORAN MINGGUAN

PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DINAS PUPR, SELONG - LOMBOK TIMUR


LOKASI : JL. TGH. ZAINUDIN ABDUL MAJID, SELONG-LOMBOK TIMUR
TAHUN ANGGARAN : 2018
KONTRAKTOR : PT. MAYALIA
KONSULTAN PENGAWAS : CV. Danasady Consultant
MINGGU KE : 21
PERIODE : 12 - 18 OKTOBER 2018

BOBOT
NO. URAIAN PEKERJAAN
(%)

1 2 3
LANTAI 1.
I. PEK. PENDAHULUAN (PRA KONSTUKSI) 1.16
II. PEKERJAAN TANAH 1.32
III. PEKERJAAN PASANGAN DAN PLESTERAN 5.33
IV. PEKERJAAN BETON 26.86
V. PEKERJAAN KUSEN, PINTU DAN JENDELA 7.13
VI. PEKERJAAN PELAPIS LANTAI, DINDING DAN PLAFOND 17.03
VII. PEKERJAAN PENGECATAN 0.93
VIII. PEKERJAAN BESI DAN PENGUNCI LT. 1 DAN LT. 2 0.93
IX. PEKERJAAN INSTALASI LISTRIK 0.85
X. PEKERJAAN INSTALASI AIR DAN SANITAIR 1.45
LANTAI 2.
I. PEKERJAAN PASANGAN DAN PLESTERAN 2.71
II. PEKERJAAN BETON 16.43
III. PEKERJAAN KUSEN, PINTU DAN JENDELA 7.54
IV. PEKERJAAN PELAPIS LANTAI, DINDING DAN PLAFOND 7.01
V. PEKERJAAN PENGECATAN 0.94
VI. PEKERJAAN INSTALASI LISTRIK 0.90
VII. PEKERJAAN INSTALASI AIR DAN SANITAIR 1.50

100.00

Rencana : 87.99
Realisasi : 71.49
Deviasi : (16.50)

PPK Kegiatan Pengawas Utama Bid. Cipta Karya Konsultan Pengawas


DPU Kab. Lombok Timur DPU Kab. Lombok Timur CV. Danasady Consultant

Kontraktor Pelaksana
PT. MAYALIA
Kontraktor Pelaksana
PT. MAYALIA

Hj. Kartini, ST., MH. Akhmad Khaerul Munadi, ST Muhamad Sapardi, ST


NIP. 19631231 1991022 015 NIP. 19810427 201001 1 005 Team Leader

Hj. Sri Maryani


Direkris
OR DINAS PUPR, SELONG - LOMBOK TIMUR

S/D MINGGU LALU MINGGU INI S/D MINGGU INI

BOBOT (%) BOBOT (%) BOBOT (%)

4 5 6

1.13 - 1.13
1.32 - 1.32
5.33 - 5.33
26.86 - 26.86
1.08 2.97 4.05
2.94 4.04 6.97
- - -
- - -
0.55 0.18 0.73
0.96 - 0.96

2.16 0.38 2.54


15.51 - 15.51
1.13 3.15 4.28
- 0.63 0.63
- - -
0.26 - 0.26
0.91 - 0.91

60.16 11.33 71.49

Lombok Timur, 2018

Konsultan Pengawas
CV. Danasady Consultant

Kontraktor Pelaksana
PT. MAYALIA
Kontraktor Pelaksana
PT. MAYALIA

Muhamad Sapardi, ST
Team Leader

Hj. Sri Maryani


Direkris
LAPORAN MINGGUAN
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR DINAS PUPR, SELONG - LOMBOK TIMUR
LOKASI : JL. TGH. ZAINUDIN ABDUL MAJID, SELONG-LOMBOK TIMUR
TAHUN ANGGARAN : 2018
KONTRAKTOR : PT. MAYALIA
KONSULTAN PENGAWAS : CV. Danasady Consultant
MINGGU KE : 21
PERIODE : 12 - 18 OKTOBER 2018

S/D MINGGU LALU MINGGU INI


BOBOT
NO. URAIAN PEKERJAAN VOLUME SAT. BOBOT
(%) VOLUME VOLUME
(%)

1 2 3 4 5 6 7 8
LANTAI 1
I. PEK. PENDAHULUAN (PRA KONSTUKSI)
1 Papan Nama Proyek 1.00 Unit 0.016 1.00 0.02 -
2 Pengukuran dan Pemasangan Bowplank 169.00 M' 0.621 169.00 0.62 -
3 Pembongkaran Bangunan Lama + Membuang Sisa Bon 87.15 M3 0.399 87.15 0.40 -
5 Pembersihan Sisa Pekejaan 1.00 Unit 0.122 0.75 0.09 -
1.157 1.127
II. PEKERJAAN TANAH
1 Galian Tanah Pondasi 658.16 M3 0.660 658.16 0.66 -
2 Urugan Kembali Pondasi 219.39 M3 0.163 219.39 0.16 -
3 Urugan Pasir di Bawah Pondasi 69.47 M3 0.156 69.47 0.16 -
4 Urugan Pasir di Bawah Lantai 47.21 M3 0.106 47.21 0.11 -
5 Urugan Tanah Peninggian Lantai + Taman 124.45 M3 0.239 124.45 0.24 -
1.324 1.324
III. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan Batu Kosong (Anstamping) 68.57 M3 0.387 68.57 0.39 -
2 Pasangan Batu Belah 1Pc : 5Ps 235.86 M3 2.610 235.86 2.61 -
3 Pasangan dinding bata 1Pc : 5Ps 564.03 M2 0.860 564.03 0.86 -
4 Pasangan dinding bata 1Pc : 3Ps 24.58 M2 0.040 24.58 0.04 -
5 Plesteran 1 Pc : 3 Ps 49.16 M2 0.048 49.16 0.05 -
6 Plesteran 1 Pc : 5 Ps Beton K - 275 761.11 M2 0.706 761.11 0.71 -
7 Plesteran Beton 1 Pc : 5 Ps Tulangan 138.58 M2 0.129 138.58 0.13 -
8 Acian Bekisting 938.75 M2 0.545 938.75 0.54 -
5.325 5.325

IV. PEKERJAAN BETON Beton K - 275


1 Lantai Kerja Pondasi Footplate t = 5 cmTulangan 8.72 M3 0.122 8.72 0.12 -
9 Rabat Lantai t = 5 cm Bekisting 23.60 M3 0.359 23.60 0.36 -
2 Kolom Pedestal uk. 40x40 cm (K225) 2.02 M3 0.224 2.02 0.22 -
3 Kolom Pedestal uk. 30x30 cm (K225) Beton K - 275 1.89 M3 0.257 1.89 0.26 -
4 Kolom Pedestal uk. 30x40 cm (K225) Tulangan 11.59 M3 1.439 11.59 1.44 -
5 Pondasi Footplate 150 x 150 cm (K225)Bekisting 4.05 M3 0.291 4.05 0.29 -
6 Pondasi Footplate 150 x 180 cm (K225) 37.26 M3 2.679 37.26 2.68 -
7 Pondasi Footplate 180 x 180 cm (K225)Beton K - 275 3.89 M3 0.280 3.89 0.28 -
S/D MINGGU LALU MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SAT. BOBOT
(%) VOLUME VOLUME
(%)

1 2 3 4 5 6 7 8
8 Pondasi Footplate 180 x 330 cm (K225)Tulangan 7.13 M3 0.512 7.13 0.51 -
10 Balok Sloof Type I 20/30 cm Bekisting 18.81 M3 1.765 18.81 1.76 -
11 Balok Sloof Type II 15/20 cm 1.08 M3 0.089 1.08 0.09 -
12 Kolom Praktis 13/13 cm Beton K - 275 154.00 M 0.245 154.00 0.25 -
13 Kolom Type K1 ( 40/40 cm ) Tulangan 3.84 M3 0.426 3.84 0.43 -
14 Kolom Type K2 ( 30/40 cm ) Bekisting 23.04 M3 2.860 23.04 2.86 -
15 Kolom Type K3 ( 30/30 cm ) 3.60 M3 0.489 3.60 0.49 -
16 Balok Type B1 ( 25/60 cm ) Beton K - 275 3.36 M3 0.337 3.36 0.34
17 Balok Type B2 ( 25/50 cm ) Tulangan 20.71 M3 2.231 20.71 2.23
18 Balok Type B3 ( 25/40 cm ) Bekisting 12.00 M3 1.427 12.00 1.43
19 Balok Type B4 ( 20/35 cm ) 12.88 M3 1.665 12.88 1.67
20 Balok Latei 10/10 cm Beton K - 275 89.68 M 0.183 89.68 0.18 -
21 Plat Lantai 2 , t = 12 cm Tulangan 61.68 M3 7.531 61.68 7.53 -
22 Plat Beton Lisplank 7 cm Bekisting 3.61 M3 0.283 3.61 0.28 -
23 Beton Plat t=7 cm (Canopy) 0.95 M3 0.074 0.95 0.07 -
24 Balok Bordes 20X35 cm Beton K - 275 1.81 M3 0.234 1.81 0.23 -
25 Beton Tangga 7.56 M3 0.863 7.56 0.86 -
26.863 26.863
V. PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pintu Kaca tempered + ass. lengkap Type P1 5.00 Unit 1.013 1.00 0.20 1.50
2 Kusen Pintu Dan Kusen Jendela UPVC Lantai 1 531.87 M' 2.192 106.37 0.44 319.12
3 Daun Pintu Dan Daun Jendela Rangka UPVC Lantai 1 507.20 M' 2.091 101.44 0.42 304.32
4 Panel Pintu UVPC Lantai 1 12.47 M2 0.104 2.49 0.02 7.48
4 Kaca Polos 5 mm Lantai 1 268.88 M2 1.300 - -
5 Stikcer Sunblast (pada kaca pintu) 49.04 M2 0.234 -
6 Pasangan Granit Polish Frame Pintu Tempered 8.52 M2 0.051 - 5.11
7 Railing Tangga Besi 13.40 M 0.141 -
7.126 1.080
VI PEKERJAAN PELAPIS LANTAI, DINDING DAN PLAFOND
1 Granit 60/60 Unpolish (kamar Mandi+Tangga) 109.99 M2 0.601 -
2 Granit 60/60 Polish (ruangan) 459.69 M2 2.767 298.80 1.80 160.89
3 Plint Granit 253.80 M 0.264 - -
4 Granit Dinding 60/60 (Km/Wc) 60.00 M2 0.361 - -
5 Rangka Galvalum C.75 Dinding Partisi 216.41 M2 0.776 - 173.13
6 Dinding Partisi Gypsum 9 mm Fin.Cat 179.24 M2 0.479 - 116.51
7 Dinding Partisi Teak Block 37.17 M2 0.123 - -
8 ACP (Alumunium Composit Panil) 524.44 M2 10.071 - 104.89
11 Rangka Besi Hollow 40 x 40 cm Plafond 491.00 M2 1.139 491.00 1.14 -
12 Plafond Gypsum Board ukuran (1200x2400x9)MM 491.00 M2 0.401 - 147.30
13 List Shadow Line 462.30 M1 0.045 -
17.025 2.937
VII PEKERJAAN PENGECATAN
1 Cat Dinding Baru Mutu Tinggi 938.75 M2 0.625 -
S/D MINGGU LALU MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SAT. BOBOT
(%) VOLUME VOLUME
(%)

1 2 3 4 5 6 7 8
2 Cat Plafond Mutu Tinggi 489.71 M2 0.303 -
0.928 0.000
VIII PEKERJAAN BESI DAN PENGUNCI LT. 1 DAN LT. 2
1 Engsel Pintu 120.00 Bh 0.088 -
2 Handle + Lockset Pintu 38.00 Bh 0.462 -
3 Casment Jendela 8'' 26.00 Bh 0.018 -
4 Casment Jendela 12'' 73.00 Bh 0.054 -
5 Casment Jendela 16'' 220.00 Bh 0.196 -
6 Rambuncis/ Grendel 143.00 Bh 0.110 -
0.928 0.000
IX. PEKERJAAN INSTALASI LISTRIK
1 Instalasi Lampu TL Prismatic RMI 2 X 18 watt 40.00 BH 0.365 30.00 0.27 6.00
2 Instalasi Fitingan Tempel Plafond 38.00 BH 0.134 28.50 0.10 5.70
3 Titik Lampu BH
3 Instalasi Saklar Engkel Inbow 17.00 BH 0.044 - 15.30
4 Instalasi Saklar Seri Inbow 12.00 BH 0.033 - 10.80
5 Instalasi Stop Kontak AC 11.00 BH 0.047 8.25 0.04 1.65
6 Instalasi Stop Kontak Dinding Inbow 54.00 BH 0.190 40.50 0.14 8.10
7 Panel Daya Listrik 1.00 BH 0.032 - -
0.845 0.552
X. PEKERJAAN INSTALASI AIR DAN SANITAIR
1 Kloset Duduk + Accessories 7.00 Bh 0.320 -
2 Wastafel + Accessories 4.00 Bh 0.084 -
3 Bak Cuci Stainless Steel 1.00 Bh 0.007 -
4 Kran 1/2" 7.00 Bh 0.015 -
5 Floor Drain 7.00 Bh 0.010 -
6 Pipa Air Bersih Pipa Tipe AW 1/2" 104.74 M 0.036 78.55 0.03
7 Pipa Saluran Air Kotor Cair Tipe AW Dia. 4" 65.00 M 0.152 65.00 0.15 -
8 Pipa Saluran Air Buangan Tipe AW Dia. 3" 75.00 M 0.108 75.00 0.11 -
9 Septic tank 5.00 UNIT 0.361 5.00 0.36 -
10 Peresapan 5.00 UNIT 0.349 4.50 0.31
11 Pek. Pemasangan Exhaust Fan 1.00 UNIT 0.010 -
1.452 0.962
LANTAI 2

I PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan dinding bata 1Pc : 5Ps 751.99 M2 1.147 601.59 0.92 112.80
2 Plesteran 1 Pc : 5 Ps 932.63 M2 0.866 746.11 0.69 139.90
3 Plesteran Beton 1 Pc : 5 Ps 104.55 M2 0.097 83.64 0.08 15.68
4 Acian 1,027.08 M2 0.596 821.67 0.48 102.71
2.705 2.164
II PEKERJAAN BETON
1 BALOK RING LEVEL 8.5
S/D MINGGU LALU MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SAT. BOBOT
(%) VOLUME VOLUME
(%)

1 2 3 4 5 6 7 8
2 Balok Ring Type 1 20/40 cm 13.58 M3 1.480 13.58 1.48 -
3 Balok Ring Type 2 25/40 cm 8.96 M3 0.840 8.96 0.84 -
S/D MINGGU LALU MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SAT. BOBOT
(%) VOLUME VOLUME
(%)

1 2 3 4 5 6 7 8
4 BALOK RING LEVEL 9.5
6 Balok Ring Type 2 25/40 cm 9.52 M3 0.893 9.52 0.89 -
7 Balok Ring Type 2 20/40 cm 16.20 M3 1.765 16.20 1.76 -
8 Kolom Type K1 ( 40/40 cm ) 4.80 M3 0.532 4.80 0.53 -
9 Kolom Type K2 ( 30/40 cm ) 26.88 M3 3.336 26.88 3.34 -
10 Kolom Praktis 13/13 cm 254.10 M 0.405 254.10 0.40 -
11 Balok Latei 10/10 cm 108.14 M 0.220 108.14 0.22 -
12 Beton Plat t=7 cm (Canopy) 1.26 M3 0.099 1.26 0.10 -
13 Plat Dak Level 8,5 t=10 cm 21.73 M3 2.315 21.73 2.32 -
14 Plat Dak Level 9,5 t=10 cm 28.52 M3 3.039 28.52 3.04 -
15 Plat Beton Lisplank 7 cm 7.53 M3 0.590 7.53 0.59 -
16 Waterproof 705.23 M2 0.915 -
16.429 15.515
III PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Kusen Pintu Dan Kusen Jendela UPVC Lantai 2 783.47 M' 3.230 117.52 0.48 430.91
2 Daun Pintu Dan Daun Jendela Rangka UPVC Lantai 2 666.70 M' 2.748 100.01 0.41 333.35
3 Kaca Polos 5 mm Lantai 2 290.41 M2 1.404 43.56 0.21
4 Stikcer Sunblast (pada kaca pintu) 32.87 M2 0.157 4.93 0.02
7.539 1.131
IV PEKERJAAN PELAPIS LANTAI, DINDING DAN PLAFOND
1 Granit 60/60 Unpolish (kamar Mandi) 16.09 M2 0.088 -
2 Granit 60/60 Polish (ruangan) 519.91 M2 3.129 - 103.98
3 Plint Granit 329.53 M 0.342 -
4 Granit Dinding 60/60 (Km/Wc) 60.00 M2 0.361 -
5 Rangka Galvalum C.75 Dinding Partisi 194.37 M2 0.697 -
6 Dinding Partisi Gypsum Fin.Cat 139.51 M2 0.373 -
7 Dinding Partisi Teak Block t=12 mm 54.86 M2 0.091 -
8 Rangka Besi Hollow 40 x 40 cm Plafond 519.91 M2 1.206 -
9 Plafond Gypsum Board ukuran (1200x2400x9)MM 519.91 M2 0.425 -
10 List Shadow Line 416.86 M 0.041 -
11 Logo Dinas Pekerjaan Umum Kabupaten Lombok Timur B 1.00 Buah 0.122 -
12 Tulisan Dinas PUPR Kabupaten Lombok Timur 29.00 Buah 0.141 -
7.014 0.000
V PEKERJAAN PENGECATAN
1 Cat Dinding Baru Mutu Tinggi 1,027.08 M2 0.684 -
2 Cat Plafond 408.40 M2 0.252 -
0.936 0.000
VII PEKERJAAN INSTALASI LISTRIK
1 Instalasi Lampu TL Prismatic RMI 2 X 18 watt 45.00 BH 0.411 15.75 0.14
2 Instalasi Fitingan Tempel Plafond 19.00 BH 0.067 6.65 0.02
3 Instalasi Saklar Engkel Inbow 21.00 BH 0.054 - -
4 Instalasi Saklar Seri Inbow 8.00 BH 0.022 - -
5 Instalasi Stop Kontak AC 10.00 BH 0.042 - -
S/D MINGGU LALU MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SAT. BOBOT
(%) VOLUME VOLUME
(%)

1 2 3 4 5 6 7 8
6 Instalasi Stop Kontak Dinding Inbow 76.00 BH 0.268 26.60 0.09
7 Panel Daya Listrik 1.00 BH 0.032 - -
0.897 0.261
VIII PEKERJAAN INSTALASI AIR DAN SANITAIR
1 Kloset Duduk + Accessories 6.00 Bh 0.275 -
2 Wastafel + Accessories 5.00 Bh 0.105 -
3 Bak Cuci Stainlessteel 3.00 Bh 0.021 -
4 Kran 1/2" 6.00 Bh 0.013 -
5 Floor Drain 6.00 Bh 0.009 -
6 Roof Drain 34.00 Bh 0.048 -
7 Pipa Air Bersih Pipa Tipe AW 1/2" 105.00 M 0.036 94.50 0.03
8 Pipa Air Bersih Pipa Tipe AW 1" 40.00 M 0.042 36.00 0.04
9 Pipa Saluran Air Kotor Cair Tipe AW Dia. 4" 30.00 M 0.070 27.00 0.06
10 Pipa Saluran Air Buangan Tipe AW Dia. 3" 35.00 M 0.050 31.50 0.05
11 Pipa Drainase Air Hujan Type AW Dia. 3" 120.00 M 0.173 108.00 0.16
12 Pipa Drainase Air Hujan Type AW Dia. 4" 276.00 M 0.644 248.40 0.58
13 Pek. Pemasangan Exhaus Fan 2.00 Bh 0.019 -
1.505 0.914

100.00 59.70
NAS PUPR, SELONG - LOMBOK TIMUR

MINGGU INI S/D MINGGU INI


PROSENTASE
BOBOT BOBOT TERHADAP
VOLUME ITEM PEK.
(%) (%)

9 10 11 12

- 1.00 0.02 100.00


- 169.00 0.62 100.00
- 87.15 0.40 100.00
- 0.75 0.09 75.00
0.000 1.127

- 658.16 0.66 100.00


- 219.39 0.16 100.00
- 69.47 0.16 100.00
- 47.21 0.11 100.00
- 124.45 0.24 100.00
0.000 1.324

- 68.57 0.39 100.00


- 235.86 2.61 100.00
- 564.03 0.86 100.00
- 24.58 0.04 100.00
- 49.16 0.05 100.00
- 761.11 0.71 100.00
- 138.58 0.13 100.00
- 938.75 0.54 100.00
0.000 5.325

- 8.72 0.12 100.00


- 23.60 0.36 100.00
- 2.02 0.22 100.00
- 1.89 0.26 100.00
- 11.59 1.44 100.00
- 4.05 0.29 100.00
- 37.26 2.68 100.00
- 3.89 0.28 100.00
MINGGU INI S/D MINGGU INI
PROSENTASE
BOBOT BOBOT TERHADAP
VOLUME ITEM PEK.
(%) (%)

9 10 11 12
- 7.13 0.51 100.00
- 18.81 1.76 100.00
- 1.08 0.09 100.00
- 154.00 0.25 100.00
- 3.84 0.43 100.00
- 23.04 2.86 100.00
- 3.60 0.49 100.00
- 3.36 0.34 100.00
- 20.71 2.23 100.00
- 12.00 1.43 100.00
- 12.88 1.67 100.00
- 89.68 0.18 100.00
- 61.68 7.53 100.00
- 3.61 0.28 100.00
- 0.95 0.07 100.00
- 1.81 0.23 100.00
- 7.56 0.86 100.00
0.000 26.863

0.30 2.50 0.51 50.00


1.32 425.49 1.75 80.00
1.25 405.76 1.67 80.00
0.06 9.97 0.08 80.00
- - - -
- - - -
0.03 5.11 0.03 60.00
- - - -
2.967 4.047

- - - -
0.97 459.69 2.77 100.00
- - - -
- - - -
0.62 173.13 0.62 80.00
0.31 116.51 0.31 65.00
- - - -
2.01 104.89 2.01 20.00
- 491.00 1.14 100.00
0.12 147.30 0.12 30.00
- - - -
4.035 6.972

- - - -
MINGGU INI S/D MINGGU INI
PROSENTASE
BOBOT BOBOT TERHADAP
VOLUME ITEM PEK.
(%) (%)

9 10 11 12
- - - -
0.000 0.000

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.000 0.000

0.05 36.00 0.33 90.00


0.02 34.20 0.12 90.00

0.04 15.30 0.04 90.00


0.03 10.80 0.03 90.00
0.01 9.90 0.04 90.00
0.03 48.60 0.17 90.00
- - - -
0.179 0.732

- - - -
- - - -
- - - -
- - - -
- - - -
- 78.55 0.03 75.00
- 65.00 0.15 100.00
- 75.00 0.11 100.00
- 5.00 0.36 100.00
- 4.50 0.31 90.00
- - - -
0.000 0.962

0.17 714.39 1.09 95.00


0.13 886.00 0.82 95.00
0.01 99.32 0.09 95.00
0.06 924.38 0.54 90.00
0.376 2.540
MINGGU INI S/D MINGGU INI
PROSENTASE
BOBOT BOBOT TERHADAP
VOLUME ITEM PEK.
(%) (%)

9 10 11 12
- 13.58 1.48 100.00
- 8.96 0.84 100.00
MINGGU INI S/D MINGGU INI
PROSENTASE
BOBOT BOBOT TERHADAP
VOLUME ITEM PEK.
(%) (%)

9 10 11 12

- 9.52 0.89 100.00


- 16.20 1.76 100.00
- 4.80 0.53 100.00
- 26.88 3.34 100.00
- 254.10 0.40 100.00
- 108.14 0.22 100.00
- 1.26 0.10 100.00
- 21.73 2.32 100.00
- 28.52 3.04 100.00
- 7.53 0.59 100.00
- - - -
0.000 15.515

1.78 548.43 2.26 70.00


1.37 433.36 1.79 65.00
- 43.56 0.21 15.00
- 4.93 0.02 15.00
3.150 4.281

- - - -
0.63 103.98 0.63 20.00
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.626 0.626

- - - -
- - - -
0.000 0.000

- 15.75 0.14 35.00


- 6.65 0.02 35.00
- - - -
- - - -
- - - -
MINGGU INI S/D MINGGU INI
PROSENTASE
BOBOT BOBOT TERHADAP
VOLUME ITEM PEK.
(%) (%)

9 10 11 12
- 26.60 0.09 35.00
- - - -
0.000 0.261

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 94.50 0.03 90.00
- 36.00 0.04 90.00
- 27.00 0.06 90.00
- 31.50 0.05 90.00
- 108.00 0.16 90.00
- 248.40 0.58 90.00
- - - -
0.000 0.914