Anda di halaman 1dari 1

PT PLN (PERSERO) WILAYAH KALTIMRA

AP2B SISTEM KALTIM

Hasil Pengujian Injeksi Primer CT


Kopler P2 PLTD Petung

Merk : TRAFINDO
Rasio : 200/5 | 400/5
VA : 10 | 10
Class : 0.2 | 5P10

Phasa Arus Injeksi (A) Arus KWH Terbaca Arus Rele Terbaca (A)
(A)
% 12.5 37.5 100 12.5 37.5 100 12.5 37.5 100
R 50 150 400 0.625 1.88 5 48 147 398
S 50 150 400 0.626 1.88 5 49.2 149 400
T 50 150 400 0.626 1.88 5 47.5 147 398

Petung, 29 November 2017

Penguji :

1. Muhammad Dian Saputra Alam

2. Ali Imron

Anda mungkin juga menyukai