Anda di halaman 1dari 13

KEGIATAN PENAMBANGAN BIJIH NIKEL LATERIT

PADA PT. ANTAM (PERSERO) TBK. UBPN SULTRA


KECAMATAN POMALAA KABUPATEN
KOLAKA PROVINSI SULAWESI TENGGARA

LAPORAN KERJA PRAKTEK

OLEH :

RIO NANDO SIRAIT


NIM. DBD 113 126

MUHAMMAD GOFUR LUBIS


NIM. DBD 113 189

KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI


UNIVERSITAS PALANGKA RAYA
FAKULTAS TEKNIK
JURUSAN TEKNIK PERTAMBANGAN
2017

i
HALAMAN PENGESAHAN LAPORAN KERJA PRAKTEK

KEGIATAN PENAMBANGAN BIJIH NIKEL LATERIT


DI PT. ANTAM (PERSERO) TBK. UBPN SULTRA
KECAMATAN POMALAA KABUPATEN
KOLAKA PROVINSI SULAWESI TENGGARA

OLEH :

RIO NANDO SIRAIT


NIM. DBD 113 126

MUHAMMAD GOFUR LUBIS


NIM. DBD 113 189

Palangka Raya, Juli 2017

Mengetahui,

Dosen Pembimbing Koordinator Kerja Praktek

YUSTINUS H. W,S.Si.,MT.,M.Sc YUSTINUS H. W,S.Si.,MT.,M.Sc


NIP. 19700813200003 1 007 NIP. 19700813200003 1 007

ii
KATA PENGANTAR

Puji dan Syukur penulis panjatkan kehadirat Tuhan Yang Maha Esa,
karena atas berkat dan karunia-Nya maka penulis dapat menyelesaikan Laporan
Kerja Praktek ini tepat pada waktunya.

Laporan Kerja Praktek ini berjudul “Kegiatan Penambangan Bijih Nikel


Laterit Pada PT.ANTAM (Persero) Tbk. UBPN SULTRA di Kecamatan Pomalaa
Kabupaten Kolaka Provinsi Sulawesi Tenggara”. Laporan ini merupakan hasil
Kerja Praktek yang disusun sebagai salah satu syarat yang harus dipenuhi untuk
menyelesaikan pendidikan pada Jurusan Teknik Pertambangan Universitas
Palangka Raya.

Pada kesempatan ini perkenankanlah penulis mengucapkan terima kasih


yang sebesar-besarnya kepada :

1. Keluarga penulis atas doa dan dukungannya.


2. Bapak Ir. Yulian Taruna, M.Si. selaku Ketua Jurusan Program Studi Teknik
Pertambangan, Fakultas Teknik Universitas Palangka Raya.
3. Bapak Yustinus H. W,S.Si.,MT.,M.Sc selaku Dosen Kordinator Kerja Praktek
Lapangan dan Dosen Pembimbing Kerja Praktek Jurusan Teknik
Pertambangan Universitas Palangka Raya
4. Seluruh Bapak dan Ibu Dosen Jurusan Teknik Pertambangan Fakultas Teknik
Universitas Palangka Raya
5. Staff/Karyawan Jurusan Teknik Pertambangan Fakultas Teknik Universitas
Palangka Raya
6. Bapak La Ode Muhammad Mustakin S.T selaku Mining Manager PT. Aneka
Tambang Pomalaa (Persero) Tbk. UBPN Sultra.
7. Bapak Djumanuddin Balha A.Md selaku Mining Engineering PT. Aneka
Tambang Pomalaa (Persero) Tbk. UBPN Sultra dan pembimbing lapangan
selama melaksanakan Kerja Praktek.
8. Seluruh staff dan Karyawan PT. ANTAM (Persero) Tbk. UBPN SULTRA.

iii
9. Rekan-rekan Mahasiswa Jurusan Teknik Pertambangan, serta semua pihak
yang memberikan bantuan sehingga tersusunnya Laporan Kerja Praktek ini.
Penulis menyadari sepenuhnya bahwa terdapat Laporan Kerja Praktek ini
masih jauh dari kesempurnaan karena keterbatasan literatur dan buku dan literatur
yang penulis miliki. Akhir kata dengan segala kerendahan hati, penulis sangat
mengharapkan saran, masukan, dan kritik yang membangun untuk
penyempurnaan Laporan Kerja Praktek ini nantinya.

Palangka Raya, Juli 2017

Penulis

iv
DAFTAR ISI

HALAMAN JUDUL ...................................................................................... i


HALAMAN PENGESAHAN ........................................................................ ii
KATA PENGANTAR .................................................................................... iii
DAFTAR ISI ................................................................................................... v
DAFTAR GAMBAR ..................................................................................... ix
DAFTAR TABEL .......................................................................................... xii
DAFTAR LAMPIRAN .................................................................................. xiii

BAB I PENDAHULUAN
1.1 Latar Belakang ................................................................ .. 1
1.2 Rumusan Masalah .............................................................. 2
1.3 Tujuan Kerja Praktek ...................................................... .. 2
1.4 Batasan Masalah................................................................. 3
1.5 Manfaat Kerja Praktek ...................................................... 3

BAB II TINJAUAN PUSTAKA


2.1 Pengertian Nikel Laterit.................................................... 4
2.2 Genesa Nikel Laterit ......................................................... 4
2.3 Proses Pembentukan Endapan Nikel Laterit .................... 7
2.4 Faktor-faktor yang mempengaruhui terbentuknya endapan
nikel laterit......................................................................... 9
2.5 Profil Endapan Nikel Laterit............................................. 12
2.6 Tahapan Kegiatan Pertambangan ..................................... 16
2.6.1 Penyelidikan Umum ............................................ 17
2.6.2 Eksplorasi ............................................................ 17
2.6.3 Studi Kelayakan .................................................. 18
2.6.4 Persiapan/Konstruksi ........................................... 18
2.6.5 Penambangan ...................................................... 18

v
2.6.6 Procesing Plant .................................................... 19
2.6.7 Pemasaran ........................................................... 19
2.6.8 Reklamasi ............................................................ 20
2.7 Sistem dan Metode Penambangan .................................... 20
2.8 Faktor-Faktor Pemilihan Metode Penambangan .............. 21
2.8.1 Karakteristik Endapan ......................................... 21
2.8.2 Kondisi Geologi dan Hidrologi ........................... 21
2.8.4 Konsiderasi Ekonomi .......................................... 21
2.8.5 Faktor Teknologi ................................................. 22
2.8.6 Faktor Lingkungan .............................................. 22
2.9 Mine Surveying ................................................................. 22
2.10 Pemboran Geomin dan In-Pit Drill .................................. 23
2.11 Produktivitas Alat Muat dan Angkut ................................ 25
2.11.1 Tipe Pemuatan ..................................................... 26
2.11.4 Waktu Edar (Cycle Time) .................................... 26
2.11.5 Produktivitas Alat Mekanis ................................. 27
2.11.6 Keserasian Kerja (MF) ........................................ 28
2.11.7 Efisiensi Kerja ..................................................... 30
2.12 Preparasi Sampel .............................................................. 31
2.13 Reklamasi Tambang ......................................................... 33
2.13.1 Peraturan Perundang-Undangan.......................... 33
2.13.2 Pengolahan Lingkungan Hidup ........................... 33
2.13.3 Reklamasi Lahan Tambang ................................. 34

BAB III METODELOGI PENELITIAN


3.1 Gambaran Umum Wilayah Penelitian .............................. 35
3.1.1 Sejarah PT. ANTAM (Persero) Tbk. UBPN
SULTTRA .......................................................... 35
3.1.2 Lokasi dan Kesampaian Daerah .......................... 38
3.1.3 Keadaan Iklim dan Curah Hujan ......................... 38
3.1.4 Flora dan Fauna ................................................... 39

vi
3.1.5 Sosial dan Kependudukan ................................... 40
3.2 Keadaan Topografi dan Geologi Daerah Penelitian ......... 40
3.2.1 Keadaan Topografi .............................................. 40
3.2.2 Geologi Daerah Penelitian .................................. 41
3.2.3 Batuan Penyusun Pomala .................................... 43
3.2.4 Karakteristik Endapan Nikel Lateri Pomalaa ...... 43
3.3 Alat dan Bahan ................................................................. 44
3.4 Tata Laksana ..................................................................... 44
3.4.1 Lahkah Kerja ....................................................... 44
3.4.2 Metodelogi Penelitian ......................................... 45
3.5 Bagan Alir......................................................................... 46
3.6 Waktu Penelitian............................................................... 47

BAB IV HASIL DAN PEMBAHASAN


4.1 Mine Surveying ................................................................. 48
4.1.1 Alat-Alat .............................................................. 48
4.1.2 Metode Surveying................................................ 50
4.1.3 Pengolahan Data dengan Surpac ......................... 51
4.2 Pemboran Unit Geomin .................................................... 54
4.2.1 Bagan Alir Pemboran .......................................... 55
4.2.2 Komponen Alat Bor Geomin .............................. 56
4.2.3 Perhitungan Data Pemboran Geomin .................. 64
4.3 Pemboran In-Pit Drill ....................................................... 68
4.3.1 Mekanisme Pemboran ......................................... 68
4.3.2 Bagan Alir Pemboran .......................................... 69
4.3.3 Komponen Alat Bor In-Pit Drill ......................... 69
4.3.4 Perhitungan Data Pemboran In-Pit Drill............. 77
4.4 Mine Production ............................................................... 82
4.4.1 Kondisi Ore ......................................................... 82
4.4.2 Bagan Alir Kegiatan Penambangan .................... 83
4.4.3 Alat Muat, Alat Angkut dan Alat pendukung ..... 84

vii
4.4.4 Pola Pemuatan ..................................................... 85
4.4.5 Perhitungan Data Mine Production .................... 86
4.5 Quality Control ................................................................. 98
4.5.1 Sample Preparation ............................................ 99
4.5.2 Laboratorium Instrument .................................... 104
4.6 Mine Environment ............................................................ 107
4.6.1 Tahapan Kegiatan Reklamasi.............................. 109
4.6.2 Faktor Yang Mempengaruhi Reklamasi ............. 116

BAB V PENUTUP
5.1 Kesimpulan ....................................................................... 118
5.2 Saran ................................................................................. 120

DAFTAR PUSTAKA
DAFTAR LAMPIRAN

viii
DAFTAR GAMBAR

Gambar 2.5.1 Profil Endapan Nikel Laterit ........................................... 13


Gambar 2.5.5 Litologi Lapisan Zona Nikel ........................................... 16
Gambar 2.7.1a Tambang Terbuka Open pit ............................................ 20
Gambar 3.2.2 Peta Geologi Pomala ....................................................... 42
Gambar 4.1.1a. Total Station .................................................................... 49
Gambar 4.1.1b. Tripod .............................................................................. 49
Gambar 4.1.1c. Prisma.............................................................................. 50
Gambar 4.1.1d. Stick ................................................................................ 50
Gambar 4.1.2.1. Metode Survey Resection ................................................ 51
Gambar 4.1.3.1. Data hasil Survey ............................................................. 51
Gambar 4.1.3.2. Proses pengolah data pada software surpac .................... 52
Gambar 4.1.3.3. Proses pengolah data pada software surpac .................... 52
Gambar 4.1.3.4. Proses pengolah data pada software surpac .................... 53
Gambar 4.1.3..5 Proses pengolah data pada software surpac .................... 53
Gambar 4.1.3..6 Proses pengolah data pada software surpac .................... 54
Gambar 4.1.3..7. Proses pengolah data pada software surpac .................... 54
Gambar 4.2.1. Mesin pengebor YBM ...................................................... 55
Gambar : 4.2.1 Bagan alir pemboran ......................................................... 55
Gambar 4.2.2.a Mesin penggerak Yanmar 8.5 YP..................................... 56
Gambar 4.2.2b Mesin YBM ...................................................................... 57
Gambar 4.2.2c Gear Box ........................................................................... 57
Gambar 4.2.2d Spindel .............................................................................. 58
Gambar 4.2.2e Steer .................................................................................. 58
Gambar 4.2.2f Jaw Chuck......................................................................... 59
Gambar 4.2.2g Kunci Chuck ..................................................................... 59
Gambar 4.2.2h Batang Bor ........................................................................ 60
Gambar 4.2.2h Pin ..................................................................................... 60
Gambar 4.3.2j Mata Bor ........................................................................... 61

ix
Gambar 4.2.2k Tube .................................................................................. 61
Gambar 4.2.2l Sub .................................................................................... 62
Gambar 4.2.2m Kunci Pipa ........................................................................ 62
Gambar 4.2.2n Body Protektor .................................................................. 63
Gambar 4.2.2o Core Box ........................................................................... 63
Gambar 4.2.2p Plastik Sampel .................................................................. 64
Gambar 4.2.2q Meteran ............................................................................. 64
Gambar 4.3.2 Alir Kegiatan Pemboran In-Pit Dril .................................. 69
Gambar 4.3.3a Mesin Penggerak Yanmar 8.5 YP .................................... 70
Gambar 4.3.3b Koken YH 01 .................................................................... 70
Gambar 4.3.3c Gear Box ........................................................................... 71
Gambar 4.3.3d Spindel .............................................................................. 71
Gambar 4.3.3e Steer .................................................................................. 72
Gambar 4.3.3f Jaw Chuck......................................................................... 72
Gambar 4.3.3g Kunci Chuck ..................................................................... 73
Gambar 4.3.3h Batang Bor ........................................................................ 73
Gambar 4.3.3i Pin ..................................................................................... 74
Gambar 4.3.3j Mata Bor ........................................................................... 74
Gambar 4.3.3k Tube Core ......................................................................... 75
Gambar 4.3.3l Sub .................................................................................... 75
Gambar 4.3.3m Kunci Pipa ........................................................................ 76
Gambar 4.3.3n Body Protector .................................................................. 76
Gambar 4.3.3o Core Box ........................................................................... 77
Gambar 4.3.3p Meteran ............................................................................. 77
Gambar 4.4.2 Bagan Alir Kegiatan Penambangan .................................. 84
Gambar 4.4.3 Alat-alat Berat Mine Production ...................................... 85
Gambar 4.4.3a Pola Pemuatan .................................................................. 86
Gambar 4.5.1 Proses Sampling Re-check ................................................ 100
Gambar 4.5.2 Increntment ....................................................................... 100
Gambar 4.5.2 Peralatan Pengambilan Sample Preparation .................... 101
Gambar 4.5.3.1 Alur Pengolahan Sample Preparation .............................. 101

x
Gambar 4.5.3.2 Alur Pengolahan Sample Preparation .............................. 102
Gambar 4.5.3.3 Alur Pengolahan Sample Preparation .............................. 102
Gambar 4.5.4 Bagan Tahapan Analisis Kadar Lab Instrumen ............... 105
Gambar 4.5.4.1 Pemisahan Sampel Sesuai Nama ...................................... 105
Gambar 4.5.4.2 Wadah untuk sampel ........................................................ 106
Gambar 4.5.4.3 Mesin Press ...................................................................... 106
Gambar 4.5.4.4 Mesin XRF Magic Fast..................................................... 107
Gambar 4.6.1.1 Regreading........................................................................ 110
Gambar 4.6.1.2 Top Soiling........................................................................ 111
Gambar 4.6.1.3 Pengajiran ......................................................................... 111
Gambar 4.6.1.4 Cover Crop ....................................................................... 112
Gambar 4.6.5. Penanaman Gamal ............................................................ 113
Gambar 4.6.1.6 Bibit Pohon Mangga – mangga ........................................ 113
Gambar 4.6.1.7 Bibit Pohon Bitti ............................................................... 114
Gambar 4.5.1.8 Bibit Pohon Trambesi ....................................................... 114
Gambar 4.5.1.9 Bibit Pohon Johar ............................................................ 114
Gambar 4.5.1.10 Bibit Pohon Trambesi ....................................................... 115
Gambar 4.5.1.11 Bibit Pohon Sengon Laut .................................................. 115

xi
DAFTAR TABEL
Tabel 3.6 Waktu Penelitian .................................................................... 42
Tabel 4.2.3a Hasil Perhitungan Data Cycle Time ........................................ 65
Tabel 4.2.3b Hasil Perhitungan Kecepatan Pemboran ................................ 66
Tabel 4.2.3c Hasil Perhitungan Efektivitas Pemboran ................................ 66
Tabel 4.2.3d Hasil Perhitunga Produktivitas Pemboran .............................. 67
Tabel 4.2.3e Hasil Perhitungan Core Recovery.......................................... 68
Tabel 4.3.4.a Hasil Perhitungan Data Cycle Time Titik Bor 238 dan 226 di
Bukit Everest .......................................................................... 78
Tabel 4.3.4.b Hasil Perhitungan Kecepatan Pemboran ................................ 79
Tabel 4.3.3.c Hasil Perhitungan Efektivitas Pemboran ................................ 80
Tabel 4.3.4.d. Hasil Perhitunga Produktivitas Pemboran .............................. 80
Tabel 4.3.4.e Hasil Perhitungan Core Recovery.......................................... 81
Tabel 4.4.4 Hasil Perhitungan Cycle Time PC dan DT ............................. 87
Tabel 4.4.7 Hasil perhitungan MF di Bukit Everest, Bukit Fortuner dan
Bukit land Cruiser ................................................................... 98

xii
DAFTAR LAMPIRAN
Lampiran A Lampiran peta kesampaian daerah
Lampiran B Lampiran curah hujan
Lampiran C Lampiran survey kemajuan tambang
Lampiran D Lampiran produksi

xiii

Anda mungkin juga menyukai