JULI JULI
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 16
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 31
AGUSTUS AGUSTUS
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 16
K 31
O SEPTEMBER
N K
S 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 O SEPTEMBER
U N
18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 T 1
L 16
T R
A OKTOBER A
N K
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 T OKTOBER
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 O 1
R 16
NOVEMBER 31
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 NOVEMBER
1
DESEMBER 16
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
18 19 20 21 22 23 24 25 26 27 28 29 30 31 DESEMBER
1
16
31
1 2
1 16 17
2 23 24
3 1 2
4 8 9
5 15 16
6 22 23
7 1 2
8 8 9
9 15 16
10 22 23
11 1 2
12 8 9
13 15 16
14 22 23
15 1 2
16 8 9
17 15 16
18 22 23
19 1 2
20 8 9
JUMLAH
2 3 4 5 6 7 8 9 10 11 12 13 14 15 MINGGU
17 18 19 20 21 22 23 24 25 26 27 28 29 30 1
AGUSTUS
2 3 4 5 6 7 8 9 10 11 12 13 14 15 2
17 18 19 20 21 22 23 24 25 26 27 28 29 30 3
SEPTEMBER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 4
17 18 19 20 21 22 23 24 25 26 27 28 29 30 5
OKTOBER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 6
17 18 19 20 21 22 23 24 25 26 27 28 29 30 7
NOVEMBER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 8
17 18 19 20 21 22 23 24 25 26 27 28 29 30 9
DESEMBER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 10
17 18 19 20 21 22 23 24 25 26 27 28 29 30 11
3 4 5 6 7 8 1 2 3 4 5 6 7
8-14 15-21 22-30 1-7 8-14 15-21 22-31 1-7 8-14 15-21
18 19 20
Diketahui Oleh :
Kuasa Pengguna Anggaran/Kuasa Pengguna Barang
UPTD Pelayanan Jalan dan Jembatan Wilayah IV
Dinas Pekerjaan Umum dan Penataan Ruang Aceh
Ir. Adriansyah, MT
Pembina Tingkat I
NIP. 19630815 199203 1 006
KONTRAK
Disetujui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)-2 UPTD IV (Aceh Barat )
A N W A R, ST
NIP. 19730307 200701 1 004
REKAP
Disetujui Oleh :
ADM TEKNIS PPTK-2 UPTD IV
(ACEH BARAT)
ZAILANI, ST
NIP. 19750813 200701 004
BACK-UP
Disetujui Oleh :
STAFF TEKNIS
PENGAWAS LAPANGAN III
MAHZUR
NIP. 19700305 200701 1 005
COVER
NOMOR KONTRAK : 14-AC/UPTD IV/PUPR/APBA/2018
TANGGAL KONTRAK : 16 JULI 2018
NILAI KONTRAK : Rp. 1.885.929.000,-
SUMBER DANA : APBA - OTSUS KAB/KOTA (DOKA)
TAHUN ANGGARAN : 2018
LOKASI : KABUPATEN ACEH BARAT
BACK-UP
MUHAMMAD YUNUS
Direktur
PUPR/APBA/2018
KAB/KOTA (DOKA)
PUPR/APBA/2018
KAB/KOTA (DOKA)
CEH BARAT
EKNIS JALAN DAN JEMBATAN WILAYAH KABUPATEN ACEH BARAT (DOKA) (PW-JLJB/35/2018)
UPR/APBA/2018
B/KOTA (DOKA)
BARAT (OTSUS KAB/KOTA)
J
KONTRAK AWAL
S
A
NOMOR
T
MATA URAIAN PEKERJAAN HARGA
U
PEMBAYARAN VOLUME SATUAN
A
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Galian Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH HARGA
RENCANA KEMAJUAN PEKERJAAN BULANAN
RENCANA KEMAJUAN PEKERJAAN KOMULATIF
REALISASI KEMAJUAN PEKERJAAN BULANAN
REALISASI KEMAJUAN PEKERJAAN KOMULATIF
DEVIASI
Disetujui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)-2 UPTD IV (Aceh Barat )
A N W A R, ST
NIP. 19730307 200701 1 004
JADWAL PELAKSANAAN PEKERJAAN
(KURVA S)
50,000,000.00 5.62 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
104,620,000.00 11.76
39,159,849.06 4.40
40,522,504.00 4.56
130,928,200.00 14.72
18,982,672.00 2.13 1.07
60,665,756.00 6.82
234,193,260.00 26.33 8.78 8.78 8.78
9,343,200.00 1.05
9,200,000.00 1.03 1.03
6,252,960.00 0.70
594,600.00 0.07 0.07
745,723,316.20 83.84
889,503,165.26 100.00
1.54 0.97 0.99 0.42 0.77 2.31 6.83 6.83 6.83 6.83 9.11 10.64 11.65
- 1.54 2.50 3.50 3.92 4.69 7.00 13.82 20.65 27.48 34.30 43.41 54.05 65.70
- - - - - - - - - - - - -
- - - - - - - - - - - - - -
- 1.54 - 2.50 - 3.50 - 3.92 - 4.69 - 7.00 - 13.82 - 20.65 - 27.48 - 34.30 - 43.41 - 54.05 - 65.70
Diperiksa Oleh:
KONSULTAN SUPERVISI
PT. GARIS PUTIH SEJAJAR
DASRIL, ST
Site Engineer
KTU PEKERJAAN 150 HARI KALENDER
4 1 2 3 4 1 2 KET.
1.54
RENCANA
KEMAJUAN
PEKERJAAN
RENCANA
KEMAJUAN
PEKERJAAN 1.10 1.10
H
2.28 2.28
O
3.68 3.68 3.68 3.68
1.07
1.05
0.70
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Direktur
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH IV
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulaboh 2361
PEKERJAAN :
PEMBANGUNAN JEMBATAN PADA RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB.
ACEH BARAT (OTSUS KAB/KOTA)
PENYEDIA :
CV. JR. FARISI
Dsn. Sepakat Desa Labuhan Keude Kec. Sungai Mas
KONSULTAN SUPERVISI
PT. GARIS PUTIH SEJAJAR
Planning And Design Consultants
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jln. Jenderal Sudirman No. 1 Telp. (0651) 46767, 47009 Fax 47009
BANDA ACEH 23239
PHOTO (MC 0)
PEKERJAAN :
NO.
URAIAN
DIVISI
1 UMUM
2 DRAINASE
##
3 PEKERJAAN TANAH
5 PERKERASAN BERBUTIR
##
6 PERKERASAN ASPAL
7 STRUKTUR
9 PEKERJAAN HARIAN
##
10 PEKERJAAN PEMELIHARAAN RUTIN
TERBILANG : Satu Milyar Tiga Ratus Dua Puluh Dua Juta Enam Ratus Empat Puluh Em
Diketahui Oleh :
Kuasa Pengguna Anggaran/Kuasa Pengguna Barang
UPTD Pelayanan Jalan dan Jembatan Wilayah IV
Dinas Pekerjaan Umum dan Penataan Ruang Aceh
Ir. Adriansyah, MT
Pembina Tingkat I
NIP. 19630815 199203 1 006
PITULASI
S DAN HARGA
104,620,000.00 -
- -
39,159,849.06 -
- -
- -
- -
745,723,316.20 -
- -
- -
- -
889,503,165.26 -
88,950,316.53 -
978,453,481.79 -
978,453,000.00 -
Diajukan Oleh:
Kontraktor Pelaksana
CV. JR. FARISI
MUHAMMAD YUNUS
Direktur
DAFTAR KUANTITAS
MUTUAL C
KONTRAK AWA
S
NOMOR A
MATA T
URAIAN PEKERJAAN HARGA
PEMBAYARAN U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
Disetujui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)-2 UPTD IV (Aceh Barat )
A N W A R, ST
NIP. 19730307 200701 1 004
ANTITAS DAN HARGA PEKERJAAN
MUTUAL CHECK (MC - 0)
54,620,000.00 6.14 - - - - - - -
50,000,000.00 5.62 - - - - - - -
104,620,000.00 11.76 - - -
10,167,500.00 1.14 - - - - - - -
1,604,749.06 0.18 - - - - - - -
19,521,600.00 2.19 - - - - - - -
7,866,000.00 0.88 - - - - - - -
39,159,849.06 4.40 - - -
40,522,504.00 4.556 - - - - - -
130,928,200.00 14.719 - - - - - -
18,982,672.00 2.134 - -
3,914,625.00 0.440 - - - - - -
60,665,756.00 6.820 - - - - - -
234,193,260.00 26.329 - - -
231,125,539.20 25.984 - - -
9,343,200.00 1.050 - - - - - - - -
9,200,000.00 1.034 - - -
6,252,960.00 0.703 - - -
594,600.00 0.067 - - - - - - - -
745,723,316.20 83.836 - - -
889,503,165.26 100.00 - - - -
88,950,316.53 -
978,453,481.79 -
978,453,000.00 -
BOBOT
(%)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
WEEKLY PRO
(LAPORAN KEMAJUAN FIS
KONTRAK AWAL
S
NOMOR A
MATA T
URAIAN PEKERJAAN HARGA
PEMBAYARAN U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
KONTRAK AWAL
S
A
NOMOR T
URAIAN PEKERJAAN HARGA
DIVISI U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
KONTRAK AWAL
S
A
NOMOR T
URAIAN PEKERJAAN HARGA
DIVISI U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
KONTRAK AWAL
S
A
NOMOR T
URAIAN PEKERJAAN HARGA
DIVISI U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
KONTRAK AWAL
S
A
NOMOR T
URAIAN PEKERJAAN HARGA
DIVISI U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
KONTRAK AWAL
S
A
NOMOR T
URAIAN PEKERJAAN HARGA
DIVISI U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
KONTRAK AWAL
S
A
NOMOR T
URAIAN PEKERJAAN HARGA
DIVISI U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
KONTRAK AWAL
S
A
NOMOR T
URAIAN PEKERJAAN HARGA
DIVISI U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
KONTRAK AWAL
S
A
NOMOR T
URAIAN PEKERJAAN HARGA
DIVISI U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
KONTRAK AWAL
S
A
NOMOR T
URAIAN PEKERJAAN HARGA
DIVISI U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
KONTRAK AWAL
S
A
NOMOR T
URAIAN PEKERJAAN HARGA
DIVISI U
A VOLUME SATUAN
N (Rp)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 54,620,000.00
1.8.(2) Jembatan Sementara Ls 1.00 50,000,000.00
SUB TOTAL
III DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 175.00 58,100.00
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M3 14.33 111,985.28
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 98.00 199,200.00
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 45.00 174,800.00
SUB TOTAL
VII DIVISI 7. STRUKTUR
7.1.(5) a Beton Mutu sedang fc' = 30 Mpa Lantai Jembatan M3 20.24 2,002,100.00
7.1.(7) a Beton Mutu sedang fc' = 20 Mpa M3 68.05 1,924,000.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 15.58 1,218,400.00
7.1.(10) Beton Mutu sedang fc' = 10 Mpa M3 3.75 1,043,900.00
7.3.(1) Baja Tulangan U 24 Polos Kg 3,079.48 19,700.00
7.3.(3) Baja Tulangan U 32 Ulir Kg 11,152.06 21,000.00
7.6.(19)b Tiang Bor Beton, diameter 400 mm M1 240.00 963,023.08
7.11.(5) Expansion Joint Tipe Baja Bersudut M1 24.00 389,300.00
7.12.(3) Perletakkan Elastomerik Jenis 1 Ukuran 300 mm x 350 mm x 36 mm Buah 8.00 1,150,000.00
7.13.(1) Sandaran (Railing) M1 33.60 186,100.00
7.15.(2) Pembongkaran Beton Ls 1.00 594,600.00
SUB TOTAL
JUMLAH TOTAL
PPN 10 %
JUMLAH + PPN
DIBULATKAN
SUS KAB/KOTA)
MINGGU : 1
PERIODE : 16 Juli 2018
S/D : 31 Juli 2018
REALISASI VOLUME
JUMLAH KETERANGAN
BOBOT JUMLAH HARGA BOBOT
HARGA
(%) S/D S/D (Rp.) (%)
(Rp.) MINGGU INI
MINGGU LALU MINGGU INI
10,167,500.00 1.14 - - - - -
1,604,749.06 0.18 - - - - -
19,521,600.00 2.19 - - - - -
7,866,000.00 0.88 - - - - -
39,159,849.06 4.40 - -
40,522,504.00 4.556 - - - - -
130,928,200.00 14.719 - - - - -
18,982,672.00 2.134 - - - - -
3,914,625.00 0.440 - - - - -
60,665,756.00 6.820 - - - - -
234,193,260.00 26.329 - - - - -
231,125,539.20 25.984 - - - - -
9,343,200.00 1.050 - - - - -
9,200,000.00 1.034 - - - - -
6,252,960.00 0.703 - - - - -
594,600.00 0.067 - - - - -
745,723,316.20 83.836 -
SUS KAB/KOTA)
MINGGU : 2
PERIODE : 01 Agustus 2018
S/D : 15 Agustus 2018
REALISASI VOLUME
JUMLAH KETERANGAN
BOBOT JUMLAH HARGA BOBOT
HARGA
(%) S/D S/D (Rp.) (%)
(Rp.) MINGGU INI
MINGGU LALU MINGGU INI
10,167,500.00 1.14 - - - - -
1,604,749.06 0.18 - - - - -
19,521,600.00 2.19 - - - - -
7,866,000.00 0.88 - - - - -
39,159,849.06 4.40 - - -
40,522,504.00 4.556 - - - - -
130,928,200.00 14.719 - - - - -
18,982,672.00 2.134 - - - - -
3,914,625.00 0.440 - - - - -
60,665,756.00 6.820 - - - - -
234,193,260.00 26.329 - - - - -
231,125,539.20 25.984 - - - - -
9,343,200.00 1.050 - - - - -
9,200,000.00 1.034 - - - - -
6,252,960.00 0.703 - - - - -
594,600.00 0.067 - - - - -
745,723,316.20 83.836 - - -
SUS KAB/KOTA)
MINGGU : 3
PERIODE : 16 Agustus 2018
S/D : 31 Agustus 2018
REALISASI VOLUME
JUMLAH KETERANGAN
BOBOT JUMLAH HARGA BOBOT
HARGA
(%) S/D S/D (Rp.) (%)
(Rp.) MINGGU INI
MINGGU LALU MINGGU INI
10,167,500.00 1.14 - - - - -
1,604,749.06 0.18 - - - - -
19,521,600.00 2.19 - - - - -
7,866,000.00 0.88 - - - - -
39,159,849.06 4.40 - - -
40,522,504.00 4.556 - - - - -
130,928,200.00 14.719 - - - - -
18,982,672.00 2.134 - - - - -
3,914,625.00 0.440 - - - - -
60,665,756.00 6.820 - - - - -
234,193,260.00 26.329 - - - - -
231,125,539.20 25.984 - - - - -
9,343,200.00 1.050 - - - - -
9,200,000.00 1.034 - - - - -
6,252,960.00 0.703 - - - - -
594,600.00 0.067 - - - - -
745,723,316.20 83.836 - - -
SUS KAB/KOTA)
MINGGU : 4
PERIODE : 01 September 2018
S/D : 15 September 2018
REALISASI VOLUME
JUMLAH KETERANGAN
BOBOT JUMLAH HARGA BOBOT
HARGA
(%) S/D S/D (Rp.) (%)
(Rp.) MINGGU INI
MINGGU LALU MINGGU INI
10,167,500.00 1.14 - - - - -
1,604,749.06 0.18 - - - - -
19,521,600.00 2.19 - - - - -
7,866,000.00 0.88 - - - - -
39,159,849.06 4.40 - - -
40,522,504.00 4.556 - - - - -
130,928,200.00 14.719 - - - - -
18,982,672.00 2.134 - - - - -
3,914,625.00 0.440 - - - - -
60,665,756.00 6.820 - - - - -
234,193,260.00 26.329 - - - - -
231,125,539.20 25.984 - - - - -
9,343,200.00 1.050 - - - - -
9,200,000.00 1.034 - - - - -
6,252,960.00 0.703 - - - - -
594,600.00 0.067 - - - - -
745,723,316.20 83.836 - - -
SUS KAB/KOTA)
MINGGU : 5
PERIODE : 16 September 2018
S/D : 30 September 2018
REALISASI VOLUME
JUMLAH KETERANGAN
BOBOT JUMLAH HARGA BOBOT
HARGA
(%) S/D S/D (Rp.) (%)
(Rp.) MINGGU INI
MINGGU LALU MINGGU INI
10,167,500.00 1.14 - - - - -
1,604,749.06 0.18 - - - - -
19,521,600.00 2.19 - - - - -
7,866,000.00 0.88 - - - - -
39,159,849.06 4.40 - - -
40,522,504.00 4.556 - - - - -
130,928,200.00 14.719 - - - - -
18,982,672.00 2.134 - - - - -
3,914,625.00 0.440 - - - - -
60,665,756.00 6.820 - - - - -
234,193,260.00 26.329 - - - - -
231,125,539.20 25.984 - - - - -
9,343,200.00 1.050 - - - - -
9,200,000.00 1.034 - - - - -
6,252,960.00 0.703 - - - - -
594,600.00 0.067 - - - - -
745,723,316.20 83.836 - - -
SUS KAB/KOTA)
MINGGU : 6
PERIODE : 01 Oktober 2018
S/D : 15 Oktober 2018
REALISASI VOLUME
JUMLAH KETERANGAN
BOBOT JUMLAH HARGA BOBOT
HARGA
(%) S/D S/D (Rp.) (%)
(Rp.) MINGGU INI
MINGGU LALU MINGGU INI
10,167,500.00 1.14 - - - - -
1,604,749.06 0.18 - - - - -
19,521,600.00 2.19 - - - - -
7,866,000.00 0.88 - - - - -
39,159,849.06 4.40 - - -
40,522,504.00 4.556 - - - - -
130,928,200.00 14.719 - - - - -
18,982,672.00 2.134 - - - - -
3,914,625.00 0.440 - - - - -
60,665,756.00 6.820 - - - - -
234,193,260.00 26.329 - - - - -
231,125,539.20 25.984 - - - - -
9,343,200.00 1.050 - - - - -
9,200,000.00 1.034 - - - - -
6,252,960.00 0.703 - - - - -
594,600.00 0.067 - - - - -
745,723,316.20 83.836 - - -
SUS KAB/KOTA)
MINGGU : 7
PERIODE : 16 Oktober 2018
S/D : 31 Oktober 2018
REALISASI VOLUME
JUMLAH KETERANGAN
BOBOT JUMLAH HARGA BOBOT
HARGA
(%) S/D S/D (Rp.) (%)
(Rp.) MINGGU INI
MINGGU LALU MINGGU INI
10,167,500.00 1.14 - - - - -
1,604,749.06 0.18 - - - - -
19,521,600.00 2.19 - - - - -
7,866,000.00 0.88 - - - - -
39,159,849.06 4.40 - - -
40,522,504.00 4.556 - - - - -
130,928,200.00 14.719 - - - - -
18,982,672.00 2.134 - - - - -
3,914,625.00 0.440 - - - - -
60,665,756.00 6.820 - - - - -
234,193,260.00 26.329 - - - - -
231,125,539.20 25.984 - - - - -
9,343,200.00 1.050 - - - - -
9,200,000.00 1.034 - - - - -
6,252,960.00 0.703 - - - - -
594,600.00 0.067 - - - - -
745,723,316.20 83.836 - - -
SUS KAB/KOTA)
MINGGU : 8
PERIODE : 01 November 2018
S/D : 15 November 2018
REALISASI VOLUME
JUMLAH KETERANGAN
BOBOT JUMLAH HARGA BOBOT
HARGA
(%) S/D S/D (Rp.) (%)
(Rp.) MINGGU INI
MINGGU LALU MINGGU INI
10,167,500.00 1.14 - - - - -
1,604,749.06 0.18 - - - - -
19,521,600.00 2.19 - - - - -
7,866,000.00 0.88 - - - - -
39,159,849.06 4.40 - - -
40,522,504.00 4.556 - - - - -
130,928,200.00 14.719 - - - - -
18,982,672.00 2.134 - - - - -
3,914,625.00 0.440 - - - - -
60,665,756.00 6.820 - - - - -
234,193,260.00 26.329 - - - - -
231,125,539.20 25.984 - - - - -
9,343,200.00 1.050 - - - - -
9,200,000.00 1.034 - - - - -
6,252,960.00 0.703 - - - - -
594,600.00 0.067 - - - - -
745,723,316.20 83.836 - - -
SUS KAB/KOTA)
MINGGU : 9
PERIODE : 16 November 2018
S/D : 30 November 2018
REALISASI VOLUME
JUMLAH KETERANGAN
BOBOT JUMLAH HARGA BOBOT
HARGA
(%) S/D S/D (Rp.) (%)
(Rp.) MINGGU INI
MINGGU LALU MINGGU INI
10,167,500.00 1.14 - - - - -
1,604,749.06 0.18 - - - - -
19,521,600.00 2.19 - - - - -
7,866,000.00 0.88 - - - - -
39,159,849.06 4.40 - - -
40,522,504.00 4.556 - - - - -
130,928,200.00 14.719 - - - - -
18,982,672.00 2.134 - - - - -
3,914,625.00 0.440 - - - - -
60,665,756.00 6.820 - - - - -
234,193,260.00 26.329 - - - - -
231,125,539.20 25.984 - - - - -
9,343,200.00 1.050 - - - - -
9,200,000.00 1.034 - - - - -
6,252,960.00 0.703 - - - - -
594,600.00 0.067 - - - - -
745,723,316.20 83.836 - - -
SUS KAB/KOTA)
MINGGU : 10
PERIODE : 01 Desember 2018
S/D : 15 Desember 2018
REALISASI VOLUME
JUMLAH KETERANGAN
BOBOT JUMLAH HARGA BOBOT
HARGA
(%) S/D S/D (Rp.) (%)
(Rp.) MINGGU INI
MINGGU LALU MINGGU INI
10,167,500.00 1.14 - - - - -
1,604,749.06 0.18 - - - - -
19,521,600.00 2.19 - - - - -
7,866,000.00 0.88 - - - - -
39,159,849.06 4.40 - - -
40,522,504.00 4.556 - - - - -
130,928,200.00 14.719 - - - - -
18,982,672.00 2.134 - - - - -
3,914,625.00 0.440 - - - - -
60,665,756.00 6.820 - - - - -
234,193,260.00 26.329 - - - - -
231,125,539.20 25.984 - - - - -
9,343,200.00 1.050 - - - - -
9,200,000.00 1.034 - - - - -
6,252,960.00 0.703 - - - - -
594,600.00 0.067 - - - - -
745,723,316.20 83.836 - - -
SUS KAB/KOTA)
MINGGU : 11
PERIODE : 16 Desember 2018
S/D : 31 Desember 2018
REALISASI VOLUME
JUMLAH KETERANGAN
BOBOT JUMLAH HARGA BOBOT
HARGA
(%) S/D S/D (Rp.) (%)
(Rp.) MINGGU INI
MINGGU LALU MINGGU INI
10,167,500.00 1.14 - - - - -
1,604,749.06 0.18 - - - - -
19,521,600.00 2.19 - - - - -
7,866,000.00 0.88 - - - - -
39,159,849.06 4.40 - - -
40,522,504.00 4.556 - - - - -
130,928,200.00 14.719 - - - - -
18,982,672.00 2.134 - - - - -
3,914,625.00 0.440 - - - - -
60,665,756.00 6.820 - - - - -
234,193,260.00 26.329 - - - - -
231,125,539.20 25.984 - - - - -
9,343,200.00 1.050 - - - - -
9,200,000.00 1.034 - - - - -
6,252,960.00 0.703 - - - - -
594,600.00 0.067 - - - - -
745,723,316.20 83.836 - - -
NO URAIAN VOLUM
1
Mobilisasi
TOTAL
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
Jembatan Sementara
TOTAL
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
Galian Biasa
TOTAL
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
1 Sandaran (Railing)
TOTAL
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH
DINAS PEKERJAAN UMUM D
UNIT PELAKSANA TEKN
PELAYANAN JALAN DAN JEM
Jln. Merdeka No. 24, Email : pupr.uptd
NO URAIAN VOLUM
1
2 Pembongkaran Beton
TOTAL
ZAILANI, ST IMRAN, ST
NIP. 19750813 200701 004 Chief Inspector
PEMERINTAH ACEH
EKERJAAN UMUM DAN PENATAAN RUANG
NIT PELAKSANA TEKNIS DINAS (UPTD)
YANAN JALAN DAN JEMBATAN WILAYAH IV
deka No. 24, Email : pupr.uptd4gmail.com Meulaboh 23611
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( LS ) KETERANGAN
1.00
1.00
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
113.54
113.54 M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
116.60 M'
116.60 M'
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
184.00
184.00 M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
144.00
144.00 M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
120.00
120.00 M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
116.46
116.46 M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
-
- M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
-
- M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
-
- M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
-
- M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
-
- M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
-
- M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
-
- M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
-
- M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
-
- M3
RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
VOLUME ( M3 ) KETERANGAN
-
- M3
BACK - UP DATA
HARGA
No. URAIAN SATUAN VOLUME SATUAN
(Rp.)
A. Sewa Tanah M2 0 0
B. PERALATAN
Periksa lembar 1.2-2
C. FASILITAS KONTRAKTOR
1 Base Camp M2 100 75,000
2 Gudang, dan lain-lain M2 0 0
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2
2 Soil & Aggregate Testing
Compaction Test Set
3 Bituminous Testing
Marshall Asphalt Test Set
4 Concrete Testing
Slump Cone Set
Cylinder/Cube Mould for Compressive Strength Set
Beam Mould for Flexural Strength (RIGID) Set
Crushing Machine Set
5 Pendukung (Periksa Fasilitas Laboratorium)
6 Operasional (Periksa Fasilitas Laboratorium)
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Perkuatan Jembatan Lama LS
2 Pemeliharaan Jalan Kerja / Samping LS
E.II. LAIN-LAIN
1 Papan Nama Proyek Bh 1 500,000
F. DEMOBILISASI LS 1 9,300,000
Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH IV
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulaboh 23611
BACK - UP DATA
HARGA
KODE
No. JENIS ALAT SATUAN VOLUME SATUAN
ALAT
(Rp.)
B. PERALATAN
S JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
CK - UP DATA
sasi
Lembar 1.2-1
JUMLAH
HARGA
(Rp.)
0
31,000,000
7,500,000
0
500,000
9,300,000
48,300,000
PEMERINTAH ACEH
KERJAAN UMUM DAN PENATAAN RUANG
NIT PELAKSANA TEKNIS DINAS (UPTD)
ANAN JALAN DAN JEMBATAN WILAYAH IV
No. 24, Email : pupr.uptd4gmail.com Meulaboh 23611
S JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
CK - UP DATA
sasi
Lembar 1.2-2
JUMLAH
HARGA
(Rp.)
3,000,000
1,000,000
1,000,000
2,000,000
0
3,000,000
2,000,000
3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
500,000
1,000,000
2,500,000
31,000,000
KONTRAKTOR PELAKSANA
MUHAMMAD YUNUS
DIN
No Station KOORDINAT
0 1 2 3 4 5 6 7
X 0.000 0.200 1.800 1.800 3.650 7.200 7.200
1 0
Y 26.300 23.300 23.300 23.361 23.355 23.347 23.300
X 52.600 46.400 44.800 44.922 43.060 39.493 39.400
2 1
Y 78.900 69.500 66.300 66.483 62.765 55.640 55.500
X 105.200 92.600 87.800 88.044 82.470 71.787 71.600
3 2
Y 131.500 115.700 109.300 109.605 102.175 87.934 87.700
X 157.800 138.800 130.800 131.165 121.880 104.080 103.800
4 3
Y 184.100 161.900 152.300 152.726 141.585 120.227 119.900
X 0.000 0.200 1.800 1.800 3.650 7.200 7.200
5 4
Y 51.300 48.300 48.300 48.361 48.355 48.347 48.300
102.600 96.400 94.800 94.922 93.060 89.493 89.400
6 5
153.900 144.500 141.300 141.483 137.765 130.640 130.500
X 205.200 192.600 187.800 188.044 182.470 171.787 171.600
7 23.00
Y 256.500 240.700 234.300 234.605 227.175 212.934 212.700
Disetujui Oleh : Dipe
STAFF TEKNIS KONSULT
PENGAWAS LAPANGAN III PT. GARIS
MAHZUR FADH
NIP. 19700305 200701 1 005
DIN
No Station KOORDINAT
R/L 0 1 2 3 4 5 6 7
X 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1 TP.O
Y 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4 CL.3
5 ABT
MAHZUR FADH
NIP. 19700305 200701 1 005
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH IV
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulaboh 23611
BACK-UP DATA
Lembar 3.1(1a) - 1
Jarak Kuantitas
(M 1)
(M3)
391.65
15.00
16.00
17.00
18.00
135.79
19.00
20.00
105.00 527.44
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
ANG
Lembar 3.1(1a) - 2
Jarak Kuantitas
(M 1)
(M3)
20.00 115.20
20.00 -
20.00 -
20.00 -
20.00 -
80.00 115.20
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RU
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH IV
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulaboh 23611
BACK - UP DATA
GAMBAR/SKETSA : GALIAN STRUKTUR
8,92
PANJANG GALIAN 10 M
I 1,55
6,10
II
1,50
2,60
4,63
III
1,00
0,87
SUB TOTAL -
1,00
-4 meter
KETERANGAN
Abt Kanan
Abt Kiri
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH IV
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulaboh
BACK - UP DATA
GAMBAR/SKETSA : TIMBUNAN BIASA
BACK - UP DATA
GAMBAR/SKETSA : TIMBUNAN PILIHAN
DA RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
BACK - UP DATA
28.12
31.00
39.83
98.95
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
EKERJAAN UMUM DAN PENATAAN RUANG
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH IV
Merdeka No. 24, Email : pupr.uptd4gmail.com Meulaboh 23611
DA RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
BACK - UP DATA
52.65
24.68
77.33
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMER
DINAS PEKERJAAN UM
UNIT PELAKSANA
PELAYANAN JALAN D
Jln. Merdeka No. 24, Email : p
BACK-UP DATA
GAMBAR / SKETSA :
PANJANG L1 L2 L T1
NO URAIAN ( M' )
PANJANG
NO URAIAN ( M' ) ( M1 ) ( M1 ) Rata2 (M1) ( M1 )
1 0 + 000.00
25.00 10.50 10.50 10.50
2 0 + 025.00
25.00 10.60 10.60 10.60
3 0 + 050.00
30.00 13.00 14.80 13.90
4 0 + 080.00
1 0 + 000.00
32.80 9.60 9.60 9.60
2 0 + 032.80
15.93 10.50 10.50 10.50
3 0 + 048.73
14.93 12.30 14.10 13.20
3 0 + 063.66
BACK-UP DATA
GAMBAR / SKETSA :
1 0 + 000.00
40.00 3.00 3.00 3.00 2.65
2 0 + 040.00
ACK-UP DATA
T2 T LUAS VOLUME
JUMLAH KETERANGAN
JUMLAH KETERANGAN
( M1 ) Rata2 (M1) ( M2 ) ( M3 )
ACK-UP DATA
BACK - UP DATA
GAMBAR/SKETSA PLAT LANTAI
AS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
ACK - UP DATA
116.46
116.46
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN R
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH IV
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulaboh 23611
BACK - UP DATA
GAMBAR/SKETSA : PLAT INJAK
PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
CK - UP DATA
0.80
0.80
1.60
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RU
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH IV
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulaboh 23611
BACK - UP DATA
GAMBAR/SKETSA : WING WALL
SUB TOTAL
N PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
ACK - UP DATA
4.19
5.90
1.24
0.54
0.48
1.82
14.17
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATA
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulabo
BACK - UP DATA
GAMBAR/SKETSA : ABUTMEN
SUB TOTAL
JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
BACK - UP DATA
23.50
23.50
36.39
9.03
9.03
101.45
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
1.00 3.35
0.90 3.722
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAA
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulabo
BACK - UP DATA
GAMBAR/SKETSA : ISI SUMURAN 250
LAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
BACK - UP DATA
4.00 36.30
B TOTAL 36.30
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAA
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH I
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulaboh
BACK - UP DATA
GAMBAR/SKETSA : TROTOAR K-175
JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
BACK - UP DATA
18.15
18.15
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN
UNIT PELAKSANA TEKNIS DINAS (UPTD)
PELAYANAN JALAN DAN JEMBATAN WILAYAH IV
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulaboh 2
BACK - UP DATA
GAMBAR/SKETSA : LANTAI KERJA K-175
SUB TOTAL
A RUAS JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
BACK - UP DATA
7.20
-1.38
6.00
11.82
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENA
UNIT PELAKSANA TEKNIS DINAS (UP
PELAYANAN JALAN DAN JEMBATAN WILA
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Me
BACK - UP DATA
GAMBAR/SKETSA : BESI WINGWALL
JALAN PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
BACK - UP DATA
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENA
UNIT PELAKSANA TEKNIS DINAS (UPT
PELAYANAN JALAN DAN JEMBATAN WILA
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meu
BACK - UP DATA
D 16-200 (1)
D 16-200 (2)
D 16-400 (3) D 16-400 (3) D 16-400 (3) D 16-400 (3) D 16-400 (3)
Ø 10 -200/400 (10)
D 16-400 (6)
D 13 -200 (8)
D 13 -200 (7)
125 700
DET A IL PEM BESIA N LA N T A I J EM BA T A N
D 16-400 (4) D 16-400 (4) D 16-400 (4) D 16-400 (4)
D 16-400 (6)
D 13 -200 (8)
D 13 -200 (7)
125 700
DET A IL PEM BESIA N LA N T A I J EM BA T A N
SKALA 1 : 50
IBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
BACK - UP DATA
CL Bearing
D 16-200 (1)
D 16-400 (6)
D 13 -200 (8)
D 13 -200 (7)
700 125
M BESIA N LA N T A I J EM BA T A N
D 16-400 (4) D 16-400 (4) D 16-400 (4)
D 16-400 (6)
D 13 -200 (8)
D 13 -200 (7)
700 125
M BESIA N LA N T A I J EM BA T A N
0
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENAT
UNIT PELAKSANA TEKNIS DINAS (UPT
PELAYANAN JALAN DAN JEMBATAN WILAY
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meu
BACK - UP DATA
GAMBAR/SKETSA : BESI ABUTMEN
PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
BACK - UP DATA
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENA
UNIT PELAKSANA TEKNIS DINAS (UP
PELAYANAN JALAN DAN JEMBATAN WIL
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com M
BACK - UP DATA
GAMBAR/SKETSA : PLAT INJAK
N PRIBU - KARAK KEC. WOYLA BARAT KAB. ACEH BARAT (OTSUS KAB/KOTA)
BACK - UP DATA
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. JR. FARISI
MUHAMMAD YUNUS
Quantity Engineer