Rab Taman Gowa Pake Analisa
Rab Taman Gowa Pake Analisa
Terbilang : satu milyar empat ratus delapan puluh sembilan juta sembilan belas ribu em
Mengetahui,
Kepala Badan Lingkungan Hidup Gowa
403,700,000.00
235,950,000.00
328,616,200.00
498,753,200.00
22,000,000.00
1,489,019,400.00
tus delapan puluh sembilan juta sembilan belas ribu empat ratus rupiah,-
Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST
Direktur
Mengetahui,
ala Badan Lingkungan Hidup Gowa
Dibulatkan Rp.
Terbilang : EMPAT RATUS SEMBILAN PULUH DELAPAN JUTA TUJUH RATUS LIMA PULUH TIGA
Dibuat
Konsultan
CV. CIPTA HIRAR
AMIRUDDIN
Dire
RENCANA ANGGARAN BIAYA (RAB)
VI.Pekerjaan Mekanikal
1. Pipa 3/4 Maspion (turun disumur) G6.26 4.000 M'
2. Selang Air 3/4 Serat - 50.000 M'
3. Kran Air 3/4" G6.35 1.000 Bh
4. Saringan Katup Otomatis - 1.000 Bh
5. Pipa 4" Maspion G6.32 23.000 M'
6. Pompa Air (setara Zhimizu tipe PS. 130 Bit) - 1.000 Bh
7. Bak Kontrol 1m x 1m ( 2 Buah )
Galian Tanah A6.1 1.600 M3
Pasangan Batu Bata 1 : 3 C6.2 8.000 M2
Pleteran 1 : 3 D6.3 8.000 M2
8. Pek. Penutup Saluran Lama t. 10 cm
- Beton K. 175 E6.5 1.300 M3
- Besi Polos E6.17 110.500 Kg
- Bekisting 2 x Pakai E6.25 10.790 M2
9. Pek. Penutup Saluran (grill besi diameter 12 jarak 8 cm) - 2.000 M2
3,250,000.00
###
29,842,514.47
45,379,215.88
255,878,717.00
9,775,041.44
2,623,254.80
453,412,048.65
45,341,204.86
498,753,253.51
498,753,200.00
H DELAPAN JUTA TUJUH RATUS LIMA PULUH TIGA RIBU DUA RATUS RUPIA
Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST
Direktur
CANA ANGGARAN BIAYA (RAB) -
250,000.00 250,000.00
250,000.00 250,000.00
500,000.00 500,000.00
750,000.00 750,000.00
1,500,000.00 1,500,000.00
Jumlah (I) 3,250,000.00
43,750.00 2,358,549.38
2,175.00 39,084.53
113,500.00 887,002.50
275,730.00 4,309,659.90
571,590.00 22,513,558.28
741,970.00 2,609,323.00
16,095.00 8,490,313.69
106,830.00 3,756,944.03
80,657.00 6,081,537.80
95,953.00 14,997,453.90
86,885.00 16,191,888.60
40,621.20 10,158,549.70
21,022.50 5,257,306.80
36,037.00 9,012,132.96
Jumlah (II) ###
43,750.00 221,287.50
2,175.00 2,750.29
113,500.00 215,281.13
741,970.00 12,384,518.06
97,925.00 14,865,015.00
113,500.00 2,153,662.50
Jumlah (III) ###
43,750.00 759,500.00
2,175.00 12,586.00
113,500.00 279,664.00
275,730.00 1,358,797.44
571,590.00 12,803,616.00
741,970.00 409,567.44
212,050.00 21,989,585.00
HARGA SAT. JML. HARGA
141,650.00 6,515,900.00
1,250,000.00 1,250,000.00
Jumlah (IV) ###
HARGA SAT. JML. HARGA
118,300.00 82,572,217.00
45,000.00 74,056,500.00
5,000,000.00 10,000,000.00
7,000,000.00 7,000,000.00
100,000.00 1,500,000.00
65,000.00 1,950,000.00
450,000.00 900,000.00
1,500,000.00 3,000,000.00
15,000.00 10,500,000.00
10,000.00 7,000,000.00
15,000.00 7,500,000.00
150,000.00 7,500,000.00
350,000.00 1,750,000.00
15,000.00 6,750,000.00
2,500.00 1,250,000.00
2,500.00 1,250,000.00
2,500.00 1,250,000.00
75,000.00 2,250,000.00
50,000.00 2,500,000.00
7,500.00 3,750,000
25,000.00 3,750,000.00
30,000.00 9,000,000.00
75,000.00 1,500,000.00
750,000.00 3,000,000.00
25,000.00 1,250,000.00
450,000.00 1,800,000.00
450,000.00 1,350,000.00
Jumlah (VI) ###
21,865.00 87,460.00
10,000.00 500,000.00
29,475.00 29,475.00
15,000.00 15,000.00
90,470.00 2,080,810.00
650,000.00 650,000.00
43,750.00 70,000.00
89,738.10 717,904.80
42,226.88 337,815.04
741,970.00 964,561.00
16,095.00 1,778,497.50
189,390.00 2,043,518.10
250,000.00 500,000.00
9,775,041.44
741,970.00 623,254.80
HARGA SAT. JML. HARGA
2,000,000.00 2,000,000.00
JumlahI (VII) 2,623,254.80
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
Dibulatkan Rp.
Terbilang : DUA RATUS TIGA PULUH LIMA JUTA SEMBILAN RATUS LIMA PULUH RIBU RUPIAH
Dibuat
Konsultan
CV. CIPTA HIRAR
AMIRUDDIN
Dire
RENCANA ANGGARAN BIAYA (RAB)
YAYASAN : BADAN LINGKUNGAN HIDUP DAERAH
PEKERJAAN : PERENCANAAN TAMAN KOTA
SUB PEKERJAA : B. PENATAAN TAMAN KOTA PATUNG PEMUDA
ANGGARAN : TAHUN 2013
LOKASI : KABUPATEN GOWA PROVINSI SULAWESI SELATAN
ANALISA
I. Pekerjaan Persiapan
1. Pengukuran & Pas. Bowplank - 1.000 ls
2. P3K (Pertolongan Pertama Pada Kecelakaan) - 1.000 ls
3. Administrasi, Dokumentasi Dan Quality Kontrol - 1.000 ls
4. Alat Bantu Kerja (tracle) - 1.000 ls
5. Pek. Pembersihan Lokasi - 1.000 ls
6. Pek. Subur Bor - 1.000 ls
4,740,000.00
7,885,315.20
57,583,502.72
21,034,209.20
28,131,159.65
92,926,926.05
2,201,340.00
214,502,452.83
21,450,245.28
235,952,698.11
235,950,000.00
Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST
Direktur
CANA ANGGARAN BIAYA (RAB) -
250,000.00 250,000.00
250,000.00 250,000.00
500,000.00 500,000.00
2,000,000.00 2,000,000.00
240,000.00 240,000.00
1,500,000.00 1,500,000.00
Jumlah (I) 4,740,000.00
15,000.00 777,007.20
12,000.00 500,808.00
250,000.00 250,000.00
25,000.00 3,307,500.00
50,000.00 50,000.00
2,000,000.00 2,000,000.00
1,000,000.00 1,000,000.00
Jumlah (II) 7,885,315.20
58,200.00 1,018,878.30
2,175.00 9,519.16
113,500.00 292,830.00
275,730.00 1,422,766.80
571,590.00 16,716,149.55
42,226.88 2,303,476.30
21,022.50 987,006.38
609,013.13 1,949,999.12
314,977.50 5,787,837.55
314,977.50 4,409,685.00
270,977.50 4,742,106.25
193,977.50 1,697,303.13
193,977.50 2,579,900.75
270,977.50 3,153,525.04
193,977.50 1,833,087.38
20,000.00 4,538,000.00
36,037.00 1,255,168.71
741,970.00 2,886,263.30
Jumlah (III) ###
741,970.00 267,109.20
212,050.00 15,267,600.00
141,650.00 4,249,500.00
HARGA SAT. JML. HARGA
1,250,000.00 1,250,000.00
Jumlah (IV) ###
43,750.00 133,875.00
2,175.00 1,663.88
113,500.00 115,770.00
275,730.00 562,489.20
571,590.00 8,542,355.39
741,970.00 500,829.75
16,095.00 923,450.63
144,280.00 243,472.50
HARGA SAT. JML. HARGA
741,970.00 835,013.04
16,095.00 2,444,428.13
289,390.00 2,604,510.00
741,970.00 445,182.00
16,095.00 1,110,555.00
369,390.00 1,839,562.20
270,977.50 5,202,768.00
193,977.50 2,153,150.25
36,037.00 472,084.70
Jumlah (V) ###
118,300.00 7,883,926.05
45,000.00 5,512,500.00
2,500.00 750,000.00
400,000.00 3,600,000.00
100,000.00 1,500,000.00
5,000,000.00 25,000,000.00
25,000.00 3,750,000.00
30,000.00 6,000,000.00
100,000.00 1,200,000.00
75,000.00 9,000,000.00
10,000.00 12,000,000.00
150,000.00 2,400,000.00
75,000.00 1,875,000.00
75,000.00 1,875,000.00
125,000.00 7,500,000.00
125,000.00 2,500,000.00
135,000.00 580,500.00
Jumlah (VI) ###
1,000,000.00 1,000,000.00
650,000.00 650,000.00
10,000.00 500,000.00
21,865.00 21,865.00
29,475.00 29,475.00
JumlahI (VII) 2,201,340.00
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
Terbilang :TIGA RATUS DUA PULUH DELAPAN JUTA ENAM RATUS ENAM BELAS RIBU DUA RAT
Dibuat
Konsultan
CV. CIPTA HIRAR
AMIRUDDIN
Dire
RENCANA ANGGARAN BIAYA (RAB)
V. Pekerjaan Taman
1. Pek. Timbunan Tanah Humus A6.16 38.800 m3
2. Rumput Gajah Mini - 40.000 m2
NO. URAIAN PEKERJAAN KODE VOL. SAT.
3. Siklot - 14.000 Pbg
4. Agave Sedang - 25.000 Pbg
5. Sambang Dara - 200.000 Pbg
6. Karambosa Kuning - 500.000 Pbg
7. Karambosa Hijau - 500.000 Pbg
8. Lily Paris Putih - 300.000 Pbg
9. Sikas 1,00 -1,25 Cm - 5.000 Phn
NO. URAIAN PEKERJAAN KODE VOL. SAT.
VI Pek. Sclupture Perahu
1. Pekerjaan Galian A6.1 6.400 m3
2. Pek. Urug Kembali A6.9 2.133 m3
Pek. Pondasi Batu Kosong B6.9 1.620 m3
Pek. Pondasi Batu Kali B6.2 7.375 m3
3. Pek. Poer Pondasi
- Beton K. 175 E6.5 3.136 m3
- Besi E6.17 376.320 Kg
- Bekisting E6.20 14.112 m2
4. Pek. Kolom 0,4 x 2,00
- Beton K. 175 E6.5 2.160 m2
- Besi E6.17 172.800 Kg
- Bekisting E6.22 12.960 m2
5. Perahu Pinisi Ukuran Panjang 5,00 m x lebar 120 cm 1.000 ls
- Kayu Terbuat dari kayu Jati
- layar Dari Kulit Sapi Ukuran Tinggi 6 m x 3 lebar
- Tinggi Badan Perahu 115 cm
- Finishin Clear
6. Relief Ombak 1.000 ls
Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST
Direktur
CANA ANGGARAN BIAYA (RAB)
-
220,000.00 220,000.00
250,000.00 250,000.00
500,000.00 500,000.00
500,000.00 500,000.00
250,000.00 250,000.00
1,500,000.00 1,500,000.00
Jumlah (I) 3,220,000.00
1,500,000.00 1,500,000.00
15,000.00 1,818,000.00
200,000.00 1,200,000.00
25,000.00 1,520,000.00
1,000,000.00 1,000,000.00
Jumlah (II) 7,038,000.00
43,750.00 714,476.88
275,730.00 1,396,627.60
571,590.00 13,419,447.07
317,177.50 5,756,771.63
193,977.50 4,219,010.63
314,977.50 4,433,308.31
20,000.00 3,391,600.00
36,037.00 2,219,879.20
85,000.00 5,937,250.00
Jumlah (III) ###
741,970.00 222,591.00
212,050.00 13,289,173.50
141,650.00 3,541,250.00
1,250,000.00 1,250,000.00
Jumlah (IV) ###
118,300.00 4,590,040.00
45,000.00 1,800,000.00
HARGA SAT. JML. HARGA
150,000.00 2,100,000.00
100,000.00 2,500,000.00
75,000.00 15,000,000.00
45,000.00 22,500,000.00
45,000.00 22,500,000.00
15,000.00 4,500,000.00
10,000,000.00 50,000,000.00
Jumlah (V) ###
HARGA SAT. JML. HARGA
43,750.00 280,000.00
2,175.00 4,640.00
275,730.00 446,682.60
571,590.00 4,215,756.33
741,970.00 2,326,892.12
16,095.00 6,056,870.40
144,280.00 2,036,079.36
741,970.00 1,602,655.20
16,095.00 2,781,216.00
289,390.00 3,750,494.40
65,000,000.00 65,000,000.00
12,000,000.00 12,000,000.00
Jumlah (VI) ###
650,000.00 650,000.00
10,000.00 500,000.00
21,865.00 21,865.00
29,475.00 29,475.00
1,500,000.00 1,500,000.00
JumlahI (VII) 2,701,340.00
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
Dibulatkan Rp.
Mengetahui, Dibuat
Pejabat Pembuat Komitmen (PPK) Konsultan
Badan Lingkungan Hidup Daerah Gowa CV. CIPTA HIRAR
Mengetahui,
Kepala Badan Lingkungan Hidup Gowa
1,100,000.00
3,727,087.16
7,111,015.53
7,063,493.39
1,072,956.03
20,074,552.11
2,007,455.21
22,082,007.33
22,000,000.00
Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST
Direktur
Mengetahui,
ala Badan Lingkungan Hidup Gowa
250,000.00 250,000.00
200,000.00 200,000.00
250,000.00 250,000.00
400,000.00 400,000.00
Jumlah (I) 1,100,000.00
43,750.00 294,525.00
2,175.00 4,880.70
113,500.00 102,150.00
275,730.00 496,314.00
571,590.00 1,882,817.46
118,300.00 946,400.00
Jumlah (II) 3,727,087.16
741,970.00 304,207.70
16,095.00 989,842.50
106,830.00 363,542.49
5,111,924.00 2,375,204.37
89,738.10 1,296,715.55
40,621.20 1,173,952.68
21,022.50 607,550.25
Jumlah (III) 7,111,015.53
5,111,924.00 743,784.94
4,617,095.00 1,939,179.90
4,617,095.00 415,538.55
48,480.00 2,375,520.00
27,090.00 189,630.00
67,300.00 1,399,840.00
Jumlah (IV) 7,063,493.39
35,555.00 822,956.03
250,000.00 250,000.00
JumlahI (V) 1,072,956.03
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
Dibulatkan Rp.
Mengetahui, Dibuat
Pejabat Pembuat Komitmen (PPK) Konsultan
Badan Lingkungan Hidup Daerah Gowa CV. CIPTA HIRARC
Mengetahui,
Kepala Badan Lingkungan Hidup Gowa
ANALISA
I. Pekerjaan Persiapan
1. Pengukuran & Pas. Bowplank - 1.00 ls
2. P3K (Pertolongan Pertama Pada Kecelakaan) - 1.00 ls
3. Administrasi, Dokumentasi Dan Quality Kontrol - 1.00 ls
4. Alat Bantu Kerja - 1.00 ls
5. Pek. Pembersihan Lokasi - 1.00 ls
6. Pek. Subur Bor - 1.00 ls
3,800,000.00
13,547,280.91
74,479,049.31
32,904,734.72
21,099,035.01
162,836,130.00
55,178,797.98
3,201,340.00
367,046,367.92
36,704,636.79
403,751,004.72
403,700,000.00
Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST
Direktur
Mengetahui,
ala Badan Lingkungan Hidup Gowa
350,000.00 350,000.00
200,000.00 200,000.00
500,000.00 500,000.00
750,000.00 750,000.00
500,000.00 500,000.00
1,500,000.00 1,500,000.00
Jumlah (I) 3,800,000.00
1,000,000.00 1,000,000.00
325,000.00 325,000.00
15,000.00 1,818,000.00
12,000.00 889,200.00
25,000.00 705,250.00
15,000.00 415,500.00
3,500,000.00 3,500,000.00
741,970.00 4,894,330.91
Jumlah (II) ###
43,750.00 667,625.00
2,175.00 8,297.63
113,500.00 608,927.50
113,500.00 1,106,454.75
275,730.00 2,958,582.90
571,590.00 21,039,084.72
42,226.88 1,705,965.95
609,013.13 1,978,988.15
314,977.50 9,909,979.59
317,177.50 5,062,152.90
270,977.50 5,045,601.05
193,977.50 331,701.53
193,977.50 1,326,806.10
270,977.50 3,446,833.80
193,977.50 3,817,477.20
270,977.50 5,332,837.20
20,000.00 7,976,000.00
36,037.00 2,155,733.34
Jumlah (III) ###
HARGA SAT. JML. HARGA
741,970.00 427,374.72
212,050.00 24,428,160.00
141,650.00 6,799,200.00
1,250,000.00 1,250,000.00
Jumlah (IV) ###
317,177.50 13,854,313.20
316,077.50 3,638,052.03
609,013.13 2,198,537.38
36,037.00 908,132.40
500,000.00 500,000.00
Jumlah (V) ###
HARGA SAT. JML. HARGA
118,300.00 26,156,130.00
45,000.00 2,430,000.00
15,000,000.00 30,000,000.00
10,000,000.00 10,000,000.00
7,500,000.00 7,500,000.00
5,000,000.00 15,000,000.00
10,000,000.00 20,000,000.00
15,000.00 7,500,000.00
10,000.00 5,000,000.00
30,000.00 3,000,000.00
75,000.00 7,500,000.00
150,000.00 4,500,000.00
100,000.00 2,500,000.00
2,500.00 625,000.00
2,500.00 625,000.00
25,000.00 3,750,000.00
45,000.00 4,500,000.00
2,500.00 750,000.00
10,000.00 10,000,000.00
50,000.00 1,500,000.00
Jumlah (VI) ###
118,300.00 845,845.00
275,730.00 634,179.00
571,590.00 4,401,243.00
113,500.00 130,525.00
741,970.00 185,492.50
16,095.00 321,900.00
144,280.00 108,210.00
741,970.00 225,558.88
16,095.00 587,145.60
289,390.00 879,745.60
741,970.00 284,916.48
16,095.00 927,072.00
154,980.00 493,952.26
270,978 2,086,526.75
317,177.50 2,616,714.38
97,925.00 479,832.50
2,000,000.00 2,000,000.00
18,500,000.00 18,500,000.00
HARGA SAT. JML. HARGA
43,750.00 337,750.00
275,730.00 871,306.80
571,590.00 3,206,619.90
2,000,000.00 8,000,000.00
270,977.50 4,812,560.40
609,013.13 554,201.94
125,000.00 1,687,500.00
Jumlah (VII) ###
650,000.00 650,000.00
10,000.00 500,000.00
21,865.00 21,865.00
29,475.00 29,475.00
2,000,000.00 2,000,000.00
JumlahI (VIII) 3,201,340.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
B PEKERJAAN PONDASI
B6.2 Memasang 1 M3 pondasi batu kali, campuran 1PC : 4PP
1.200 M3 Batu Kali @ Rp 135,000.00
163.000 Kg Semen Portland @ Rp 1,130.00
0.520 M3 Pasir pasang @ Rp 130,000.00
1.500 Oh Tukang batu @ Rp 75,000.00
0.600 Oh Pekerja @ Rp 55,000.00
0.060 Oh Kepala Tukang Batu @ Rp 80,000.00
0.075 Oh Mandor @ Rp 100,000.00
C PEKERJAAN DINDING
C6.2 Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC
70.000 Bh Batu merah @ Rp 600.00
14.370 Kg Semen Portland @ Rp 1,130.00
0.040 M3 Pasir pasang @ Rp 130,000.00
0.300 Oh Pekerja @ Rp 55,000.00
0.100 Oh Tukang batu @ Rp 75,000.00
0.010 Oh Kepala Tukang Batu @ Rp 80,000.00
0.015 Oh Mandor @ Rp 100,000.00
C6.3 Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC
70.000 Bh Batu merah @ Rp 600.00
11.500 Kg Semen Portland @ Rp 1,130.00
0.043 M3 Pasir pasang @ Rp 130,000.00
0.300 Oh Pekerja @ Rp 55,000.00
0.100 Oh Tukang batu @ Rp 75,000.00
0.010 Oh Kepala Tukang Batu @ Rp 80,000.00
0.015 Oh Mandor @ Rp 100,000.00
D PEKERJAAN PLESTERAN
D6.2 Memasang 1 M2 plesteran 1PC : 2PP, tebal 15 mm
10.224 Kg Semen Portland @ Rp 1,130.00
0.020 M3 Pasir pasang @ Rp 130,000.00
0.300 Oh Pekerja @ Rp 55,000.00
0.150 Oh Tukang batu @ Rp 75,000.00
0.015 Oh Kepala Tukang Batu @ Rp 80,000.00
0.015 Oh Mandor @ Rp 100,000.00
E PEKERJAAN BETON
E6.1 Membuat 1 M3 lantai kerja beton mutu f'c=7,4 Mpa (K 100), slump (3-6) cm, w
230.000 Kg Semen Portland @ Rp 1,130.00
893.000 Kg Pasir beton (Kg) @ Rp 85.63
1,027.000 Kg split/chipping 2-3 cm(Kg) @ Rp 150.00
200.000 Ltr Air @ Rp 150.00
1.200 Oh Pekerja @ Rp 55,000.00
0.200 Oh Tukang batu @ Rp 75,000.00
0.020 Oh Kepala Tukang Batu @ Rp 80,000.00
0.060 Oh Mandor @ Rp 100,000.00
E6.5 Membuat 1 M3 beton mutu f'c=14,5 Mpa (K 175), slump (12 ± 2) cm, w/c=0,66
326.000 Kg Semen Portland @ Rp 1,130.00
760.000 Kg Pasir beton (Kg) @ Rp 85.63
1,029.000 Kg split/chipping 2-3 cm(Kg) @ Rp 150.00
215.000 Ltr Air @ Rp 150.00
1.650 Oh Pekerja @ Rp 55,000.00
0.275 Oh Tukang batu @ Rp 75,000.00
0.028 Oh Kepala Tukang Batu @ Rp 80,000.00
0.083 Oh Mandor @ Rp 100,000.00
H6.8 Mengecat 1 M2 bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat
0.200 Kg Cat meni @ Rp 21,000.00
0.150 Kg Dempul @ Rp 25,000.00
0.170 Kg Cat dasar @ Rp 55,000.00
0.260 Kg Cat kayu @ Rp 50,000.00
0.070 Oh Pekerja @ Rp 55,000.00
0.009 Oh Tukang cat @ Rp 75,000.00
0.006 Oh Kepala Tukang Cat @ Rp 80,000.00
0.0025 Oh Mandor @ Rp 100,000.00
SPL.4 Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat p
0.100 Kg Plamur tembok @ Rp 21,000.00
0.100 Kg Cat dasar @ Rp 12,000.00
0.260 Kg Cat tembok Kw. 1 (Interior) @ Rp 50,000.00
0.060 Oh Pekerja @ Rp 55,000.00
0.189 Oh Tukang cat @ Rp 75,000.00
0.0189 Oh Kepala Tukang Cat @ Rp 80,000.00
0.0075 Oh Mandor @ Rp 100,000.00
SPL.4 Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat p
0.100 Kg Plamur tembok @ Rp 21,000.00
0.100 Kg Cat dasar @ Rp 12,000.00
0.260 Kg Cat tembok Kw. 1 (Exterior) @ Rp 12,000.00
0.060 Oh Pekerja @ Rp 55,000.00
0.189 Oh Tukang cat @ Rp 75,000.00
0.0189 Oh Kepala Tukang Cat @ Rp 80,000.00
0.0075 Oh Mandor @ Rp 100,000.00
H6.22 Mengecat 1 M2 permukaan baja lapis seng (galbani) secara manual sistem 1 la
cat mutakhir dengan tebal 200 µm
0.300 Kg Cat meni @ Rp 21,000.00
0.006 Oh Pekerja @ Rp 55,000.00
0.060 Oh Tukang cat @ Rp 75,000.00
0.012 Oh Kepala Tukang Cat @ Rp 80,000.00
0.006 Oh Mandor @ Rp 100,000.00
I PEKERJAAN SALURAN
SPL.5 Mengerjakan 1 M2 Pasangan Paving Block
50.000 Bh Paving Block K300, Uk. 10 x 20 Tb@ Rp 1,400.00
0.250 Oh Tukang Batu @ Rp 75,000.00
0.025 Oh Kepala Tukang Batu @ Rp 80,000.00
0.125 Oh Pekerja @ Rp 55,000.00
0.003 Oh Mandor @ Rp 100,000.00
SPL.7 1 BH TIANG PAGAR PAGAR BRC 1,5" (termasuk baut, u-clip, angkur dan cup
1.2000 m' Pipa BRC 1,5" @ Rp 108,000.00
0.100 Bh Pekerja @ Rp 55,000.00
0.020 Bh Mandor @ Rp 80,000.00
0.050 Oh Tukang Batu @ Rp 75,000.00
0.010 Oh Kepala Tukang Batu @ Rp 80,000.00
Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTA
AMIRUDDIN ACHMAD, ST
Direktur
KERJAAN
JUMLAH
HARGA
Rp 41,250.00
Rp 2,500.00
Rp 43,750.00
Rp 55,000.00
Rp 3,200.00
Rp 58,200.00
Rp 1,375.00
Rp 800.00
Rp 2,175.00
Rp 96,000.00
Rp 16,500.00
Rp 1,000.00
Rp 113,500.00
Rp 100,800.00
Rp 16,500.00
Rp 1,000.00
Rp 118,300.00
Rp 162,000.00
Rp 184,190.00
Rp 67,600.00
Rp 112,500.00
Rp 33,000.00
Rp 4,800.00
Rp 7,500.00
Rp 571,590.00
Rp 162,000.00
Rp 34,560.00
Rp 42,900.00
Rp 29,250.00
Rp 3,120.00
Rp 3,900.00
Rp 275,730.00
Rp 8,786.88
Rp 2,990.00
Rp 16,500.00
Rp 11,250.00
Rp 1,200.00
Rp 1,500.00
Rp 42,226.88
Rp 7,051.20
Rp 3,120.00
Rp 16,500.00
Rp 11,250.00
Rp 1,200.00
Rp 1,500.00
Rp 40,621.20
Rp 3,672.50
Rp 8,250.00
Rp 7,500.00
Rp 800.00
Rp 800.00
Rp 21,022.50
Rp 147,000.00
Rp 3,540.00
Rp 3,850.00
Rp 5,600.00
Rp 560.00
Rp 400.00
Rp 160,950.00
Rp 16,095.00
Rp 4,280.00
Rp 175.00
Rp 42,000.00
Rp 10,620.00
Rp 4,520.00
Rp 822.00
Rp 2,160.00
Rp 9,900.00
Rp 1,600.00
Rp 1,600.00
Rp 1,600.00
Rp 480.00
Rp 900.00
Rp 80,657.00
Rp 6,420.00
Rp 350.00
Rp 50,400.00
Rp 1,180.00
Rp 6,215.00
Rp 1,233.00
Rp 3,600.00
Rp 16,335.00
Rp 2,640.00
Rp 2,640.00
Rp 2,640.00
Rp 800.00
Rp 1,500.00
Rp 95,953.00
Rp 85,600.00
Rp 5,250.00
Rp 650.00
Rp 28,600.00
Rp 19,500.00
Rp 2,080.00
Rp 2,600.00
Rp 144,280.00
Rp 42,800.00
Rp 5,250.00
Rp 650.00
Rp 28,600.00
Rp 19,500.00
Rp 2,080.00
Rp 2,600.00
Rp 101,480.00
Rp 96,300.00
Rp 5,250.00
Rp 650.00
Rp 28,600.00
Rp 19,500.00
Rp 2,080.00
Rp 2,600.00
Rp 154,980.00
Rp 48,150.00
Rp 5,250.00
Rp 650.00
Rp 28,600.00
Rp 19,500.00
Rp 2,080.00
Rp 2,600.00
Rp 106,830.00
Rp 85,600.00
Rp 7,000.00
Rp 1,300.00
Rp 46,500.00
Rp 42,000.00
Rp 40,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 289,390.00
Rp 42,800.00
Rp 7,000.00
Rp 1,300.00
Rp 23,250.00
Rp 21,000.00
Rp 20,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 182,340.00
Rp 85,600.00
Rp 7,000.00
Rp 1,300.00
Rp 55,800.00
Rp 42,000.00
Rp 40,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 298,690.00
Rp 42,800.00
Rp 7,000.00
Rp 1,300.00
Rp 27,900.00
Rp 21,000.00
Rp 20,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 186,990.00
Rp 85,600.00
Rp 7,000.00
Rp 1,300.00
Rp 46,500.00
Rp 42,000.00
Rp 120,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 369,390.00
Rp 42,800.00
Rp 7,000.00
Rp 1,300.00
Rp 23,250.00
Rp 21,000.00
Rp 60,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 222,340.00
Rp 64,200.00
Rp 7,000.00
Rp 1,300.00
Rp 62,000.00
Rp 42,000.00
Rp 60,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 303,490.00
Rp 32,100.00
Rp 7,000.00
Rp 1,300.00
Rp 31,000.00
Rp 21,000.00
Rp 30,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 189,390.00
Rp 3,410,000.00
Rp 465,000.00
Rp 924.00
Rp 220,000.00
Rp 900,000.00
Rp 96,000.00
Rp 20,000.00
Rp 5,111,924.00
Rp 3,410,000.00
Rp 465,000.00
Rp 495.00
Rp 132,000.00
Rp 540,000.00
Rp 57,600.00
Rp 12,000.00
Rp 4,617,095.00
Rp 35,000.00
Rp 1,300.00
Rp 6,600.00
Rp 4,500.00
Rp 480.00
Rp 600.00
Rp 48,480.00
Rp 10,500.00
Rp 2,600.00
Rp 8,250.00
Rp 4,500.00
Rp 640.00
Rp 600.00
Rp 27,090.00
Rp 33,000.00
Rp 7,500.00
Rp 6,000.00
Rp 9,600.00
Rp 1,200.00
Rp 5,000.00
Rp 5,000.00
Rp 67,300.00
Rp 11,400.00
Rp 3,325.00
Rp 1,980.00
Rp 4,500.00
Rp 480.00
Rp 180.00
Rp 21,865.00
Rp 57,600.00
Rp 16,800.00
Rp 4,455.00
Rp 10,125.00
Rp 1,080.00
Rp 410.00
Rp 90,470.00
Rp 20,000.00
Rp 125.00
Rp 550.00
Rp 7,500.00
Rp 800.00
Rp 500.00
Rp 29,475.00
Rp 231,000.00
Rp 232,100.00
Rp 233,200.00
Rp 187,000.00
Rp 110,000.00
Rp 13,277.50
Rp 4,550.00
Rp 34,100.00
Rp 26,250.00
Rp 2,800.00
Rp 3,000.00
Rp 314,977.50
Rp 316,077.50
Rp 317,177.50
Rp 270,977.50
Rp 193,977.50
Rp 18,000.00
Rp 2,200.00
Rp 4,725.00
Rp 5,040.00
Rp 250.00
Rp 30,215.00
Rp 6,300.00
Rp 330.00
Rp 4,500.00
Rp 960.00
Rp 600.00
Rp 12,690.00
Rp 70,000.00
Rp 18,750.00
Rp 2,000.00
Rp 6,875.00
Rp 300.00
Rp 97,925.00
Rp. 200,000.00
Rp. 5,500.00
Rp. 2,000.00
Rp. 3,750.00
Rp. 800.00
Rp 212,050.00
clip, angkur dan cup
Rp. 129,600.00
Rp. 5,500.00
Rp. 2,000.00
Rp. 3,750.00
Rp. 800.00
Rp 141,650.00
leh,
n Perencana
TA HIRARCHY KONSULTAN
DDIN ACHMAD, ST
DAFTAR HARGA BAHAN DAN UPAH
Tahun Anggaran 2013
I. HARGA BAHAN
Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KON
AMIRUDDIN ACHMAD, ST
Direktur
AN UPAH
13
HARGA
135,000.00
130,000.00
137,000.00
85.63
80,000.00
240,000.00
150.00
84,000.00
600.00
1,400.00
150.00
56,500.00
1,130.00
14,000.00
23,600.00
17,500.00
16,500.00
65,000.00
30,000.00
150,000.00
120,000.00
50,000.00
35,000.00
210,000.00
211,000.00
212,000.00
170,000.00
100,000.00
3,100,000.00
3,780,000.00
2,085,000.00
2,140,000.00
20,000.00
20,000.00
45,000.00
50,000.00
20,000.00
50,000.00
51,000.00
6,500.00
21,000.00
21,000.00
25,000.00
4,000.00
25,000.00
30,000.00
12,000.00
55,000.00
50,000.00
650,000.00
7,800.00
12,000.00
11,000.00
9,500.00
13,000.00
37,000.00
48,000.00
10,000.00
75,000.00
20,000.00
5,000.00
100,000.00
2,500.00
10,000.00
10,000.00
5,000,000.00
10,000,000.00
7,500,000.00
15,000.00
7,500.00
65,000.00
2,500.00
2,500.00
150,000.00
45,000.00
450,000.00
1,500,000.00
15,000.00
350,000.00
25,000.00
75,000.00
25,000.00
25,000.00
750,000.00
15,000.00
30,000.00
8,500,000.00
45,000.00
7,000,000.00
15,000,000.00
150,000.00
5,000,000.00
10,000,000.00
30,000.00
75,000.00
50,000.00
75,000.00
75,000.00
100,000.00
450,000.00
450,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
80,000.00
75,000.00
90,000.00
80,000.00
80,000.00
80,000.00
80,000.00
80,000.00
80,000.00
100,000.00
55,000.00
Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST
Direktur
25 #REF!