DAFTAR HARGA SATUAN UPAH DAN BAHAN

PEKERJAAN PEMBANGUNAN GEDUNG NEGARA


TAHUN ANGGARAN 2013
NO. URAIAN HARGA UPAH HARGA SATUAN
1 2 3 4
1 Pekerja @Rp. 75,000.00 Org/Hari
2 Mandor -"- 100,000.00 OH
3 Tukang Batu -"- 100,000.00 OH
4 Tukang Kayu -"- 100,000.00 OH
5 Tukang Besi -"- 100,000.00 OH
6 Tukang Keramik -"- 100,000.00 OH
7 Tukang Plafond -"- 100,000.00 OH
8 Tukang Pasang Pipa -"- 100,000.00 OH
9 Tukang Cat -"- 100,000.00 OH
10 Kepala Tukang -"- 110,000.00 OH
11 Jaga Malam -"- 70,000.00 OM
NO. URAIAN HARGA BAHAN-BAHAN HARGA SATUAN
1 2 3 4
A. TIMBUNAN / GALIAN
1 Tanah Timbun/Merah @Rp. 83,850.00 M3
2 Pasir Timbun / urug -"- 86,100.00 M3
3 Pasir Pasang -"- 101,000.00 M3
4 Pasir Beton -"- 101,000.00 M3
5 Sirtu -"- 119,700.00 M3
6 Tanah Humus -"- 150,000.00 M3
B. BAHAN PEREKAT
1 Portland Cement (PC) @Rp. 1,362.00 Kg
2 Cement Putih -"- 144,480.00 Zak
3 Lem Kayu -"- 15,750.00 Kg
4 Lem Vinyl / Karet -"- 25,000.00 Kg
5 Perekat Kaca -"- 76,500.00 Kg
6 Waterfroof -"- 52,300.00 Kg
C. BATU / BATU CETAKAN
1 Batu Kerikil/koral 3 - 5 cm @Rp. 160,500.00 M3
2 Batu Kerikil/koral 5 - 7 cm -"- 145,500.00 M3
3 Batu Kerikil/Koral 7 - 10 cm -"- 130,500.00 M3
4 Batu Belah/Kali 10 - 15 cm -"- 115,500.00 M3
5 Batu Belah/Kali 15 - 20 cm -"- 100,500.00 M3
6 Batu Pecah 1 - 2 cm -"- 217,400.00 M3
7 Batu Pecah 2 - 3 cm -"- 204,900.00 M3
8 Batu Pecah 3 - 5 cm -"- 192,400.00 M3
9 Batu Pecah 5 - 7 cm -"- 177,400.00 M3
10 Batu Kacang/jagung 0,5 - 1 cm -"- 229,900.00 M3
11 Batu Splyt -"- 239,900.00 M3
12 Batu Bata Biasa 5x10x20 cm -"- 625.00 Bh
13 Batu Bata Mesin 5x10x20 cm -"- 875.00 Bh
14 Batu Bataco 6x12x24 cm -"- 4,180.00 Bh
15 Batu Krawang 10x10x20 cm -"- 8,070.00 Bh
16 Batu Krawang 10x15x15 cm -"- 6,070.00 Bh
17 Batu Krawang 10x20x20 cm -"- 6,070.00 Bh
18 Concrete Block (CB) 10 -"- 740.00 Bh
19 Concrete Block (CB) 15 -"- 1,600.00 Bh
20 Concrete Block (CB) 20 -"- 2,920.00 Bh
21 Bondbeam 40x20x20 cm -"- 30,250.00 Bh
22 Con Block Warna type Hollan tbl 6 cm -"- 1,720.00 Bh
23 Con Block Warna type Uni Pave tbl 6 cm -"- 1,600.00 Bh
24 Con Block Warna type Dosex Six tbl 6 cm -"- 1,840.00 Bh
25 Con Block Warna type Hexagon tbl 6 cm -"- 1,710.00 Bh
26 Con Block K 125 -"- 2,000.00 Bh
27 Con Block K 175 -"- 2,200.00 Bh
1 2 3 4
D. KAYU / LANGIT-LANGIT
1 Balok Kayu Jati @Rp. 23,925,000.00 M3
2 Papan Kayu Jati -"- 24,104,440.00 M3
3 Balok Kayu Damar Laut -"- 11,414,250.00 M3
4 Papan Kayu Damar Laut -"- 12,615,750.00 M3
5 Balok Kayu Meranti Batu -"- 9,075,000.00 M3
6 Papan Kayu Meranti Batu -"- 9,729,000.00 M3
7 Balok Kayu Kapur -"- 6,490,000.00 M3
8 Papan Kayu Kapur -"- 6,790,000.00 M3
9 Balok Kayu Meranti Kls.II -"- 7,809,750.00 M3
10 Papan Kayu Meranti Kls.II -"- 8,410,500.00 M3
11 Kayu Sembarang/Bekisting -"- 4,500,000.00 M3
12 Kayu Bakar -"- 187,000.00 M3
13 Papan Lambsering/Rider -"- 225,000.00 M2
14 Kayu Lat Asbes 5x30x400 mm -"- 8,500.00 Btg
15 Kayu Kaso 5 - 7 / 400 cm -"- 87,780.00 Btg
16 Kayu Dolken / kayu laut Ø 4" / 4 m -"- 60,600.00 Btg
17 Bambu Ø 6 - 8 / 600 cm -"- 13,750.00 Btg
18 Bilik bambu -"- 16,340.00 M2
19 Kayu Profil 1" -"- 6,270.00 M'
20 Kayu Profil 2" -"- 12,540.00 M'
21 Kayu Profil 3" -"- 18,810.00 M'
22 Kayu Profil 4" -"- 25,080.00 M'
23 Profil Gypsum 2" -"- 4,600.00 M'
24 Profil Gypsum 3" -"- 5,450.00 M'
25 Profil Gypsum 4" -"- 6,660.00 M'
26 Profil Gypsum 6" -"- 10,450.00 M'
27 Playwood 120 x 240 tbl.18 mm -"- 243,200.00 Lbr
28 Playwood 120 x 240 tbl.12 mm -"- 207,860.00 Lbr
29 Playwood 120 x 240 tbl. 9 mm -"- 168,210.00 Lbr
30 Playwood 120 x 240 tbl. 6 mm -"- 127,700.00 Lbr
31 Playwood 120 x 240 tbl. 4 mm -"- 91,070.00 Lbr
32 Teakwood 120 x 240 tbl. 3 mm -"- 54,450.00 Lbr
33 Triplek Jati 120 x 240 tbl. 3 mm -"- 132,170.00 Lbr
34 TriplekSungkai 120 x 240 tbl.3 mm -"- 144,180.00 Lbr
35 Formica 120 x 240 cm -"- 74,250.00 Lbr
36 Soft Board 120 x 240 tbl. 4 mm -"- 55,990.00 Lbr
37 Soft Board 120 x 240 tbl. 6 mm -"- 84,150.00 Lbr
38 Soft Board 120 x 240 tbl. 9 mm -"- 126,230.00 Lbr
39 Soft Board 120 x 240 tbl.12 mm -"- 80,200.00 Lbr
40 Gypsum 120 x 240 tbl. 6 mm -"- 65,100.00 Lbr
41 Gypsum 120 x 240 tbl. 9 mm -"- 71,500.00 Lbr
42 Gypsum 120 x 240 tbl.12 mm -"- 93,500.00 Lbr
43 Asbes Lokal 100 x 100 cm -"- 13,400.00 Lbr
44 Asbes Atrisco 100 x 100 cm t= 4 mm -"- 11,550.00 Lbr
45 Asbes Atrisco 100 x 100 cm t= 5 mm -"- 15,200.00 Lbr
46 Asbes Atrisco 100 x 100 cm t= 6 mm -"- 17,330.00 Lbr
47 Akustik 30 x 30 cm -"- 8,540.00 Lbr
48 Akustik 30 x 60 cm -"- 17,070.00 Lbr
49 Akustik 60 x 120 cm -"- 68,290.00 Lbr
50 Rangka Furing Celling Gypsum -"- 52,250.00 M²
51 Rangka Furing Dinding Gypsum -"- 63,800.00 M²
52 Tepung Dempul -"- 10,450.00 Kg
53 Kain Kasa/Paper Tape -"- 57,750.00 Roll
1 2 3 4
E. BESI / ALLUMINIUM
1 Besi Beton Polos @Rp. 15,000.00 Kg
2 Besi Beton Ulir -"- 15,000.00 Kg
3 Besi Profil WF/INP -"- 23,500.00 Kg
4 Besi Siku -"- 11,990.00 Kg
5 Besi CNP -"- 13,090.00 Kg
6 Besi Plat Strip -"- 11,880.00 Kg
7 Besi Plat Polos -"- 13,630.00 Kg
8 Kawat Besi Beton -"- 22,000.00 Kg
9 Kawat Licin / seng polos -"- 16,140.00 Kg
10 Kawat Duri -"- 8,500.00 M'
11 Kawat Nyamuk -"- 18,200.00 M2
12 Kawat Kasa -"- 13,920.00 M2
13 Kawat Harmonika # 1" -"- 30,400.00 M2
14 Kawat Burung -"- 12,710.00 M2
15 Pagar Kawat BRC 120 polos -"- 235,950.00 Lbr
16 Pintu Besi -"- 590,000.00 M2
17 Pintu Gulung Besi -"- 500,000.00 M2
18 Pintu Lipat Besi -"- 940,000.00 M2
20 Pintu Rolling Door -"- 465,850.00 M2
21 Jerajak Besi Bermotif -"- 347,270.00 M2
22 Jerajak Besi Strip -"- 336,420.00 M2
23 Rangka Baja Ringan -"- 186,230.00 M2
24 Kosen Pintu Alluminium ( 80 x 210 ) Coklat -"- 405,350.00 Bh
25 Kosen Pintu Alluminium ( 80 x 210 ) putih -"- 371,470.00 Bh
26 Kosen Jendela Alluminium ( 120 x 60 ) coklat -"- 287,380.00 Bh
27 Kosen Jendela Alluminium ( 120 x 60 ) putih -"- 248,050.00 Bh
28 Pintu Alluminium ( 80 x 210 ) Coklat -"- 711,480.00 Bh
29 Pintu Alluminium ( 80 x 210 ) putih -"- 609,840.00 Bh
30 Jendela Alluminium + Kaca 5 mm ( 120 x 60 ) coklat -"- 304,920.00 Bh
31 Jendela Alluminium + Kaca 5 mm ( 120 x 60 ) putih -"- 261,360.00 Bh
32 Kosen Pintu / Jendela Alluminium Coklat -"- 78,650.00 M'
33 Kosen Pintu / Jendela Alluminium putih -"- 66,550.00 M'
34 Daun Jendela Alluminium coklat -"- 54,450.00 M'
35 Daun Jendela Alluminium putih -"- 48,400.00 M'
36 Profil Alluminium T -"- 8,470.00 M'
37 Vention Blinds -"- 163,350.00 M2
38 Verticals Blinds -"- 175,450.00 M2
39 Bingkai Naco Niki hitam -"- 201,660.00 M2
40 Bingkai Naco Niki putih -"- 168,060.00 M2
41 Paku Beton 0,5 - 2" -"- 310.00 Bh
42 Paku Beton 2" - 5" -"- 530.00 Bh
43 Paku Biasa 0,5 - 2" -"- 18,000.00 Kg
44 Paku Biasa 2 - 5" -"- 14,520.00 Kg
45 Sekrup macam Ukuran -"- 25,650.00 Kg
46 Sekrup 0,5 - 2" -"- 420.00 Bh
47 Sekrup fisher -"- 25,650.00 Bh
48 Bout Ø 5/8" - 8" -"- 19,970.00 Bh
49 Bout Angker Ø 3/4" - 10" -"- 45,380.00 Bh
50 Bout Ramset / Dina bolt -"- 720.00 Bh
51 Rangka Atap Twin light -"- 302,500.00 M²
1 2 3 4

F. PENUTUP LANTAI DAN DINDING


1 Ubin granito 30 x 30 cm @Rp. 26,260.00 Bh
2 Ubin granito 40 x 40 cm -"- 46,700.00 Bh
3 Ubin granito 60 x 60 cm -"- 104,670.00 Bh
4 Ubin Mosaik 30 x 30 cm -"- 13,920.00 Bh
5 Ubin Marmer Ex.DN -"- 261,970.00 M2
6 Ubin teralux marmer 30 x 30 cm -"- 27,230.00 Bh
7 Ubin teralux marmer 40 x 40 cm -"- 48,400.00 Bh
8 Ubin teralux marmer 60 x 60 cm -"- 109,510.00 Bh
9 Ubin keramik 10 x 20 cm -"- 900.00 Bh
10 Ubin keramik 15 x 15 cm -"- 1,400.00 Bh
11 Ubin keramik 20 x 20 cm -"- 2,200.00 Bh
12 Ubin keramik 20 x 25 cm -"- 2,500.00 Bh
13 Ubin keramik 25 x 25 cm -"- 3,870.00 Bh
14 Ubin keramik 30 x 30 cm -"- 5,500.00 Bh
15 Ubin keramik 30 x 30 cm anti slip -"- 6,290.00 Bh
16 Ubin keramik 40 x 40 cm -"- 9,900.00 Bh
17 Ubin keramik artistik 5 x 20 cm -"- 910.00 Bh
18 Ubin keramik artistik 10 x 10 cm -"- 910.00 Bh
19 Ubin keramik artistik 10 x 20 cm -"- 1,760.00 Bh
20 Ubin keramik Essenza 30 x 30 cm -"- 21,180.00 Bh
21 Ubin keramik Essenza 40 x 40 cm -"- 57,700.00 Bh
22 Porselin 11 x 11 cm putih -"- 1,210.00 Bh
23 Porselin 11 x 11 cm, warna -"- 1,450.00 Bh
24 Porselin 15 x 15 cm, putih -"- 2,300.00 Bh
25 Porselin 15 x 15 cm, warna -"- 2,540.00 Bh
26 Plint ubin teralux marmer 10 x 30 cm -"- 16,340.00 Bh
27 Plint ubin teralux marmer 10 x 40 cm -"- 29,040.00 Bh
28 Plint ubin teralux marmer 10 x 60 cm -"- 65,700.00 Bh
29 Plint ubin granito 10 x 30 cm -"- 2,400.00 Bh
30 Plint ubin granito 10 x 40 cm -"- 62,800.00 Bh
31 Plint ubin granito 10 x 60 cm -"- 157,180.00 Bh
32 Plint ubin keramik 10 x 30 cm -"- 2,400.00 Bh
33 Plint ubin keramik 10 x 40 cm -"- 4,200.00 Bh
34 Plint ubin keramik 10 x 60 cm -"- 8,110.00 Bh
35 Plint ubin keramik 15 x 30 cm -"- 3,400.00 Bh
36 Plint ubin keramik 15 x 40 cm -"- 7,740.00 Bh
37 Plint ubin keramik 15 x 60 cm -"- 11,620.00 Bh
38 Batu Lapis Dinding 7x3x24 -"- 2,040.00 Bh
39 Batu tempel hitam -"- 104,500.00 M2
40 Batu Poros -"- 114,680.00 M2
41 Carpet -"- 90,750.00 M2
42 Carpet 80 % wool, 20 % nylon -"- 87,450.00 M2
43 Feltex carpet 100 % wool-T-21 -"- 85,250.00 M2
44 Underlyer tebal 6 mm / rubber corrugated -"- 104,500.00 M2
45 Vynil asbes 30 x 30 cm -"- 8,230.00 Bh
46 Vynil karet 30 x 30 cm KL I -"- 9,800.00 Bh
47 Vynil karet 30 x 30 cm KL II -"- 9,080.00 Bh
48 Vynil motif kembang ex DN 30 x 30 cm -"- 9,440.00 Bh
49 Vynil wall covering lebar 50 cm -"- 63,250.00 M2
50 Perquet Jati -"- 368,500.00 M2
51 Gymfloor -"- 79,750.00 M2
52 Paku Pancing 60 - 230 -"- 720.00 Bh
53 Sekrup 3,5" -"- 410.00 Kg
54 Sekrup 3,5" -"- 20,350.00 Kg
1 2 3 4
G. PENUTUP ATAP
1 Atap Genteng Palentong @Rp. 1,670.00 Bh
2 Atap Genteng Palentong super -"- 3,980.00 Bh
3 Atap Genteng Kodok -"- 2,170.00 Bh
4 Atap Genteng Beton -"- 5,970.00 Bh
5 Atap Genteng Keramik -"- 10,400.00 Bh
6 Atap Genteng Aspal -"- 11,320.00 Lbr
7 Atap Sirap -"- 1,030.00 Bh
8 Atap Genteng Metal/Multi Roof 35 -"- 73,100.00 Lbr
9 Atap Genteng Asbes Cement 0,35 -"- 66,790.00 Lbr
10 Atap Aluminium gelombang tebal 0,55 -"- 98,180.00 Lbr
11 Atap Seng Alumi Zinc warna 0,35 -"- 62,040.00 Lbr
12 Atap Twin Light -"- 74,250.00 Lbr
13 Atap Seng gelombang 3' x 6' bjls 35 -"- 73,890.00 Lbr
14 Atap Seng Super Deck 3' x 6' tbl.0,30 -"- 68,750.00 Lbr
15 Roof light fibreglass gelombang 180 x 90 cm -"- 46,390.00 Lbr
16 Atap Asbes gelombang 1,8 x 1,05 tbl.4 mm -"- 28,840.00 Lbr
17 Atap Asbes gelombang 2,1 x 1,05 tbl.4 mm -"- 93,170.00 Lbr
18 Atap Asbes gelombang 2,4 x 1,05 tbl.4 mm -"- 108,130.00 Lbr
19 Atap Asbes gelombang 2,7 x 1,05 tbl.4 mm -"- 113,300.00 Lbr
20 Atap Asbes gelombang 1,8 x 0,92 tbl.5 mm -"- 70,950.00 Lbr
21 Atap Asbes gelombang 2,1 x 0,92 tbl.5 mm -"- 88,770.00 Lbr
22 Atap Asbes gelombang 2,4 x 0,92 tbl.5 mm -"- 97,020.00 Lbr
23 Atap Asbes gelombang 2,7 x 0,92 tbl.5 mm -"- 106,810.00 Lbr
24 Atap Asbes gelombang 1,8 x 1,08 tbl.6 mm -"- 103,620.00 Lbr
25 Atap Asbes gelombang 2,1 x 1,08 tbl.6 mm -"- 120,450.00 Lbr
26 Atap Asbes gelombang 2,4 x 1,08 tbl.6 mm -"- 128,370.00 Lbr
27 Atap Asbes gelombang 2,7 x 1,08 tbl.6 mm -"- 155,430.00 Lbr
28 Genteng bubung palentong -"- 9,350.00 Bh
29 Genteng bubung palentong super -"- 12,740.00 Bh
30 Genteng bubung kodok -"- 9,560.00 Bh
31 Nok genteng Beton -"- 8,410.00 Bh
32 Nok genteng Keramik -"- 16,220.00 Bh
33 Nok genteng Aspal -"- 29,350.00 Bh
34 Nok genteng Metal/Multi Roof (Decra bond) -"- 41,140.00 Bh
35 Nok genteng Asbes gelomang Cement 0,35 -"- 33,770.00 Lbr
36 Nok Alluminium standard 40 cm 18 swg 22 -"- 47,890.00 M2
37 Bubung/Nok Stel Gelombang 0,92 m' tbl.5 mm -"- 19,590.00 Lbr
38 Bubung/Nok Stel Gelombang 1,05 m' tbl.4 mm -"- 25,990.00 Lbr
39 Bubung/Nok Stel Gelombang 1,08 m' tbl.6 mm -"- 28,510.00 Lbr
40 Bubung/Nok Paten 0,92 m' tbl.5 mm -"- 36,810.00 Lbr
41 Bubung/Nok Paten 1,05 m' tbl.4 mm -"- 30,950.00 Lbr
42 Bubung/Nok Paten 1,08 m' tbl.6 mm -"- 42,960.00 Lbr
43 Bubung/Nok Stel Rata 0,92 m' tbl.5 mm -"- 36,080.00 Lbr
44 Bubung/Nok Stel Rata 1,05 m' tbl.4 mm -"- 30,250.00 Lbr
45 Bubung/Nok Stel Rata 1,08 m' tbl.6 mm -"- 40,600.00 Lbr
46 Seng plat 3" x 6" bjls 35 -"- 115,500.00 Lbr
47 Seng plat 3" x 6" bjls 30 -"- 103,950.00 Lbr
48 Plastic aerator -"- 27,500.00 Bh
49 Sisalation / aluminium foil -"- 77,200.00 M2
50 Paku Seng + Ring karet -"- 20,350.00 Kg
51 Paku Seng + Ring karet -"- 510.00 Bh
52 Paku hak panjang 15 cm -"- 30,530.00 Kg
1 2 3 4

H. KUNCI DAN KACA


1 Kunci tanam antik @Rp. 214,500.00 Bh
2 Kunci tanam biasa -"- 57,800.00 Bh
3 Kunci tanam kamar mandi -"- 35,300.00 Bh
4 Kunci silinder -"- 34,490.00 Bh
5 Kunci selot -"- 27,230.00 Bh
6 Kunci lemari -"- 12,340.00 Bh
7 Engsel pintu 4" -"- 12,020.00 Bh
8 Engsel jendela 3" -"- 11,250.00 Bh
9 Engsel angin -"- 25,050.00 Bh
10 Kait angin -"- 19,120.00 Bh
11 Rel pintu dorong -"- 160,330.00 Bh
12 Sealent -"- 39,330.00 Kg
13 Spring knip -"- 9,080.00 Bh
14 Door closer -"- 109,750.00 Bh
15 Door handle -"- 113,010.00 Bh
16 Door stop -"- 38,120.00 Bh
17 Espanyolet -"- 88,450.00 Bh
18 Kaca Block 20 x 20 cm -"- 26,020.00 Bh
19 Kaca Polos tbl. 3 mm -"- 87,120.00 M2
20 Kaca Polos tbl. 5 mm -"- 145,000.00 M2
21 Kaca Polos tbl. 8 mm -"- 232,000.00 M2
22 Kaca Reyben tbl. 5 mm -"- 176,900.00 M2
23 Kaca Reyben tbl. 8 mm -"- 308,980.00 M2
24 Kaca buram tbl.3 mm -"- 72,600.00 M2
25 Kaca buram tbl.5 mm -"- 111,320.00 M2
26 Kaca buram tbl.8 mm -"- 193,600.00 M2
27 Kaca cermin tebal 5 mm -"- 161,700.00 M2
28 Kaca cermin tebal 6 mm -"- 194,040.00 M2
29 Kaca cermin tebal 8 mm -"- 258,720.00 M2
30 Kaca patri -"- 169,400.00 M2
31 Kaca wireglass -"- 151,250.00 M2
32 Kaca Reyben Naco 30 x 60 cm tbl.5 mm -"- 13,590.00 Lbr
33 Kaca Bening Naco 30 x 60 cm tbl.5 mm -"- 10,730.00 Lbr
I. CAT / MINYAK
1 Cat Dasar @Rp. 21,400.00 Kg
2 Cat Tembok setara Vinilex -"- 21,400.00 Kg
3 Cat Minyak untuk Kayu -"- 48,600.00 Kg
4 Cat Minyak untuk Besi -"- 48,060.00 Kg
5 Cat Menie Kayu -"- 22,830.00 Kg
6 Cat Menie Besi -"- 22,830.00 Kg
7 Cat Sending -"- 54,450.00 Kg
8 Cat Melamix -"- 45,000.00 Kg
9 Cat Vernis Jadi -"- 37,850.00 Kg
10 Plamir -"- 23,230.00 Kg
11 Dempul Gypsum -"- 7,700.00 Kg
12 Dempul Cat -"- 17,000.00 Kg
13 Minyak Cat -"- 17,000.00 Kg
14 Minyak Bekisting -"- 6,290.00 Ltr
15 Residu / Kolter -"- 25,230.00 Ltr
16 Soda Api -"- 12,100.00 Kg
17 Sabun -"- 10,290.00 Kg
19 Kuas -"- 15,000.00 Bh
20 Ampelas/Kertas Pasir -"- 3,800.00 Lbr
22 Wall paper -"- 30,610.00 M2
1 2 3 4
J. SANITASI / PIPA
1 Kloset duduk / monoblok Lengkap tangki @Rp. 2,197,200.00 Bh
2 Kloset duduk / monoblok tanpa tangki -"- 1,391,500.00 Bh
3 Kloset jongkok porselin -"- 159,300.00 Bh
4 Bakkif Porselen -"- 3,025,000.00 Bh
5 Wastafel -"- 510,640.00 Bh
6 Urinoir -"- 557,480.00 Bh
7 Kran air Ø 1/2" - 3/4" -"- 15,000.00 Bh
8 Kran air leher angsa Ø 1/2" -"- 77,200.00 Bh
9 Kran Shower -"- 92,570.00 Bh
10 Kran Cebok -"- 72,240.00 Bh
11 Bak fibreglass 0,3 M3 -"- 181,500.00 Bh
12 Bak fibreglass 1 M3 -"- 522,720.00 Bh
13 Bak cuci piring steinless 2 Lobang -"- 466,700.00 Bh
14 Bak cuci piring teraso 2 Lobang -"- 272,250.00 Bh
15 Tempat sabun keramik -"- 56,270.00 Bh
16 Floor Drain Ø 4" steinlees -"- 15,000.00 Bh
17 Stop Kran Ø 3/4" -"- 27,500.00 Bh
18 Tutup Bak air Ø 1" Kuningan -"- 12,500.00 Bh
19 Instalasi air Bersih -"- 100,000.00 Ttk
20 Instalasi air Kotor/Limbah -"- 125,000.00 Ttk
21 Buis Beton 1/2 Ø 15 cm -"- 11,250.00 M'
22 Buis Beton 1/2 Ø 20 cm -"- 17,790.00 M'
23 Buis Beton 1/2 Ø 30 cm -"- 20,090.00 M'
24 Buis Beton Ø 15 cm -"- 19,240.00 M'
25 Buis Beton Ø 20 cm -"- 27,350.00 M'
26 Buis Beton Ø 30 cm -"- 56,270.00 M'
27 Buis Beton Ø 40 cm -"- 63,400.00 M'
28 Buis Beton Ø 50 cm -"- 95,950.00 M'
29 Buis Beton Ø 60 cm -"- 136,000.00 M'
30 Buis Beton Ø 80 cm -"- 201,100.00 M'
31 Buis Beton Ø 100 cm -"- 345,820.00 M'
32 Bodem 30 X 60 cm -"- 25,300.00 Bh
33 Pipa PVC Tipe AW Ø 1/2" -"- 5,540.00 M'
34 Pipa PVC Tipe AW Ø 3/4" -"- 7,440.00 M'
35 Pipa PVC Tipe AW Ø 1" -"- 13,620.00 M'
36 Pipa PVC Tipe AW Ø 11/2" -"- 19,670.00 M'
37 Pipa PVC Tipe AW Ø 2" -"- 23,190.00 M'
38 Pipa PVC Tipe AW Ø 21/2" -"- 26,620.00 M'
39 Pipa PVC Tipe AW Ø 3" -"- 29,840.00 M'
40 Pipa PVC Tipe AW Ø 4" -"- 49,920.00 M'
41 Pipa Besi Hitam Ø 1/2" -"- 14,770.00 M'
42 Pipa Besi Hitam Ø 3/4" -"- 20,140.00 M'
43 Pipa Besi Hitam Ø 1" -"- 29,520.00 M'
44 Pipa Besi Hitam Ø 11/2" -"- 37,580.00 M'
45 Pipa Besi Hitam Ø 2" -"- 47,600.00 M'
46 Pipa Besi Hitam Ø 21/2" -"- 50,220.00 M'
47 Pipa Galvanis Ø 1/2" -"- 14,770.00 M'
48 Pipa Galvanis Ø 3/4" -"- 20,520.00 M'
49 Pipa Galvanis Ø 1" -"- 29,520.00 M'
50 Pipa Galvanis Ø 11/4" -"- 33,560.00 M'
51 Pipa Galvanis Ø 11/2" -"- 37,580.00 M'
52 Pipa Galvanis Ø 2" -"- 47,600.00 M'
53 Pipa Galvanis Ø 21/2" -"- 52,440.00 M'
54 Fitting Pipa AW Ø 1" yang terdiri dari :
55 Fitting Knee AW 1" -"- 5,230.00 Bh
56 Fitting Tee AW 1" -"- 7,150.00 Bh
57 Fitting Socht AW 1" -"- 4,680.00 Bh
58 Bocht LL-D 1" -"- 24,750.00 Bh
59 Union Socht 1" -"- 7,430.00 Bh
60 D-Nipple 1" -"- 18,150.00 Bh
### 1 2 3 4
K. LISTRIK / ACSESORIES
1 Lampu TL 1 x 20 W Lengkap kotak @Rp. 54,450.00 Set
2 Lampu TL 1 x 40 W Lengkap kotak -"- 60,500.00 Set
3 Lampu TL 2 x 20 W Lengkap kotak -"- 163,350.00 Set
4 Lampu TL 2 x 40 W Lengkap kotak -"- 183,920.00 Set
5 Lampu TL Bambu 1 x 20 W Lengkap -"- 108,900.00 Set
6 Lampu TL Bambu 1 x 40 W Lengkap -"- 123,420.00 Set
7 Lampu XL 5 W + Fitting -"- 25,410.00 Set
8 Lampu XL 8 W + Fitting -"- 27,230.00 Set
9 Lampu XL10 W + Fitting -"- 29,040.00 Set
10 Lampu XL14 W + Fitting -"- 33,280.00 Set
11 Lampu XL18 W + Fitting -"- 33,880.00 Set
12 Lampu XL24 W + Fitting -"- 38,720.00 Set
13 Lampu Downlight 5 W Lengkap -"- 54,450.00 Set
14 Lampu Pijar 5 w + Fitting -"- 8,250.00 Set
15 Lampu Pijar 10 w + Fitting -"- 8,800.00 Set
16 Lampu Pijar 15 w + Fitting -"- 9,350.00 Set
17 Lampu Pijar 20 w + Fitting -"- 9,900.00 Set
18 Lampu Pijar 25 w + Fitting -"- 10,450.00 Set
19 Lampu Pijar 40 w + Fitting -"- 11,550.00 Set
20 Stop Kontak Tanam -"- 10,290.00 Bh
21 Saklar Tunggal -"- 14,520.00 Bh
22 Saklar Ganda -"- 15,730.00 Bh
23 Saklar Triple -"- 18,150.00 Bh
24 Zekring box 1 grup -"- 26,620.00 Unt
25 Zekring box 2 grup -"- 31,350.00 Unt
26 Zekring box 3 grup -"- 38,500.00 Unt
27 Zekring box 4 grup -"- 46,200.00 Unt
28 MCB 2 Ampere -"- 35,200.00 Unt
29 MCB 4 Ampere -"- 42,900.00 Unt
30 MCB 6 Ampere -"- 67,760.00 Unt
31 MCB 8 Ampere -"- 99,220.00 Unt
32 Kabel Listrik NYA Ø 1,5 mm -"- 1,120.00 M'
33 Kabel Listrik NYA Ø 2,5 mm -"- 1,930.00 M'
34 Kabel Listrik NYA Ø 4 mm -"- 8,250.00 M'
35 Kabel Listrik NYM 2 Ø 1,5 mm -"- 4,020.00 M'
36 Kabel Listrik NYM 2 Ø 2,5 mm -"- 9,990.00 M'
37 Kabel Listrik NYM 2 Ø 4 mm -"- 15,970.00 M'
38 Instalasi listrik titik api / Lampu Nyala -"- 101,750.00 Ttk

Medan, Maret 2008

DIKETAHUI OLEH : DIBUAT OLEH : TIM TEKNIS


Kepala Dinas Penataan Ruang dan 1. Ir. Jeremias Sinaga, MAP (……..….…….…)
Permukiman Prov. Sumatera Utara 2. Ir. Herimas (……..….…….…)
3. H. Sugiarto Bharata, ST (……..….…….…)
4. H. Ali Muhar, ST (……..….…….…)
Ir. H. Syafruddin Siregar, MSi 5. Sakula Karo karo, ST (……..….…….…)
Pembina Utama Muda 6. Ebenser Saragih, SE (……..….…….…)
NIP. 400025884 7. Sahat Hasudungan, ST (……..….…….…)
8. Ir. Tanogara Siahaan (……..….…….…)
9. Ali Fauzan, ST (……..….…….…)

10. Ir. Naimul Ahmad R. ST (……..….…….…)


11. Chandra, ST (……..….…….…)
DAFTAR HARGA SATUAN UPAH DAN BAHAN 2013

No. JENIS TENAGA KERJA Harga Satuan

1 Pekerja Rp. 75,000.00 Oh


2 Tukang Rp. 100,000.00 Oh
3 Mandor Rp. 100,000.00 Oh
4 Operator Rp. 120,000.00 Oh
5 Pembantu operator Rp. 80,000.00 Oh
6 Supir / Driver Rp. 110,000.00 Oh
7 Pembantu supir / driver Rp. 70,000.00 Oh
8 Mekanik Rp. 120,000.00 Oh
9 Pembantu mekanik Rp. 70,000.00 Oh
10 Kepala tukang Rp. 110,000.00 Oh

No. JENIS BAHAN BANGUNAN Harga Satuan

1 Atap asbes gelombang Rp. 35,260.00 Lbr


2 Atap zincalum gelombang # 0.35 mm Rp. 13,640.00 Kaki
3 Atap super dex Rp. 20,990.00 Kaki
4 Atap plastik gelbang fiber Rp. 62,970.00 Lbr
5 Atap genteng metal Rp. 90,250.00 m2
6 Amplas Rp. 3,140.00 Lbr
7 Asbes Rp. 17,630.00 Kpg
8 Batu gunung Rp. 158,150.00 m3
9 \ Rp. 153,640.00 m3
10 Batu koral Rp. 168,440.00 m3
11 Batu belah Rp. 228,160.00 m3
12 Batu pecah 5 - 7 cm Rp. 228,160.00 m3
13 Batu pecah 3 - 5 cm Rp. 228,160.00 m3
14 Batu pecah 2 - 3 cm Rp. 228,160.00 m3
15 Batu kelapa / belah Rp. 168,440.00 m3
16 Besi beton polos Rp. 15,740.00 Kg
17 Besi beton ulir Rp. 15,740.00 Kg
18 Besi profil Rp. 24,660.00 Kg
19 Besi baja IWF Rp. 24,660.00 Kg
20 Besi plat strip Rp. 24,660.00 Kg
21 Bak air fiberglass Rp. 438,160.00 Bh
22 Bak cuci piring 2 lobang komplet Rp. 816,510.00 Unt
23 Bensin Rp. 4,720.00 Ltr
24 Batu alam / Paras Rp. 209,900.00 m2
25 Batu templek Rp. 157,420.00 m2
26 Batu bata cetak mesin Rp. 910.00 Bh
27 Batu Terawang roster Rp. 8,460.00 Bh
28 Cat minyak kayu Rp. 51,000.00 Kg
29 Cat minyak besi Rp. 50,430.00 Kg
30 Cat tembok setara paragon Rp. 19,050.00 Kg
31 Cat tembok setara vinilex Rp. 24,840.00 Kg
32 Cat pernis Rp. 56,480.00 Kg
33 Cat meni besi Rp. 35,260.00 Kg
No. JENIS BAHAN BANGUNAN Harga Satuan
34 Cat meni kayu Rp. 35,260.00 Kg
35 Cat dasar Rp. 38,830.00 Kg
36 Conblock #6cm mutu K-125 Rp. 2,090.00 Bh
37 Conblock #8cm mutu K-175 Rp. 2,300.00 Bh
38 Door closer Rp. 209,900.00 Bh
39 Door holder Rp. 104,950.00 Bh
40 Dempul Rp. 8,180.00 Kg
41 Engsel pintu Rp. 14,110.00 Psg
42 Engsel jendela nylon 3 " Rp. 8,390.00 Psg
43 Filler Rp. 22,030.00 Kg
44 Filter plastik Rp. 15,740.00 m2
45 Floor drain Rp. 21,170.00 Bh
46 Floor hardener Rp. 4,090.00 Kg
47 Geotextille non woven Rp. 52,470.00 m2
48 Gebalan rumput Rp. 20,990.00 m2
49 Genteng keramik] Rp. 11,090.00 Kpg
50 Genteng PC warna Rp. 8,460.00 Kpg
51 Genteng rabung Rp. 8,390.00 Kpg
52 Gedek/ topas bambu Rp. 31,480.00 Lbr
53 Gedek/ topas kelapa sawit Rp. 31,480.00 Lbr
54 Gypsum 120 x 240 tbl. 9 mm Rp. 68,210.00 Lbr
55 Grendel besar 4" Rp. 5,240.00 Bh
56 Hak angin biasa Rp. 7,030.00 Psg
57 Handle jendela biasa Rp. 5,240.00 Bh
58 Hot roll sheet Rp. 933,000.00 Ton
59 Ijuk Rp. 31,480.00 m2
60 Jerjak besi Rp. 353,070.00 m2
61 Kayu dolken/bulat Ø 3" - 4" Rp. 20,990.00 Btg
62 List kayu profil (Rp. 5000,-\M') Rp. 20,990.00 Btg
63 Kayu kelas I Rp. 9,232,030.00 m3
64 Kayu kelas II Rp. 6,815,340.00 m3
65 Kayu kelas III Rp. 3,632,000.00 m3
66 Kayu setara dolken Rp. 20,990.00 Btg
67 Kerikil beton (Rp.190.000,00/m3) Rp. 140.00 Kg
68 Keramik polos 20 x 20 cm Rp. 1,800.00 Bh
69 Keramik polos 20 x 25 cm Rp. 2,250.00 Bh
70 Keramik polos 30 x 30 cm Rp. 5,750.00 Bh
71 Keramik polos 40 x 40 cm Rp. 11,590.00 Bh
72 Keramik 60 x 60 cm Rp. 52,470.00 Bh
73 Keramik 40 x 40 cm setara granito Rp. 54,040.00 Bh
74 Keramik 40 x 40 cm setara esensa Rp. 67,160.00 Bh
75 Keramik warna polos 20 x 20 cm Rp. 1,800.00 Bh
76 Keramik siku bon bon Rp. 9,880.00 m'
77 Karpet Rp. 41,980.00 m2
78 Kanstin 15 x 30 x 45 cm Rp. 26,230.00 Bh
79 Kanstin 15 x 30 x 60 cm Rp. 66,370.00 Bh
80 Kawat licin Rp. 16,930.00 Kg
81 Kawat beton Rp. 23,080.00 Kg
82 Kawat las Rp. 9,440.00 Dos
83 Kloset duduk Rp. 1,416,820.00 Bh
84 Kloset jongkok Rp. 167,710.00 Bh
85 Kran air lokal Rp. 6,820.00 Bh
86 Kran air bebek lokal Rp. 9,860.00 Bh
No. JENIS BAHAN BANGUNAN Harga Satuan
87 Kran air setara san ei Rp. 117,540.00 Bh
88 Kran air bebek setara san ei Rp. 146,930.00 Bh
89 Kunci tanam biasa Rp. 59,820.00 Bh
90 Kunci tanam antik Rp. 225,110.00 Bh
91 Kunci lock besar uk. 4 " Rp. 59,820.00 Bh
92 Kunci silinder Rp. 35,260.00 Bh
93 Kuas Rp. 15,740.00 Bh
94 Jendela nako (rangka + Kaca 5 mm) Rp. 190,480.00 m2
95 Kaca jendela naco + rangka Rp. 125,940.00 m2
96 Kaca block Rp. 22,560.00 Bh
97 Kipas angin stenlissstell lengkap Rp. 1,049,500.00 Bh
98 Kozen metal type PJ 1 Rp. 1,994,050.00 Unt
99 Kozen metal type P 1 Rp. 1,284,580.00 Unt
100 Kozen metal type P 2 Rp. 881,580.00 Unt
101 Kozen metal type P 3 Rp. 856,390.00 Unt
102 Kozen metal type P 4 Rp. 585,620.00 Unt
103 Kozen metal type J 1 Rp. 2,808,460.00 Unt
104 Kozen metal type J 2 Rp. 2,140,980.00 Unt
105 Kozen metal type J 3 Rp. 1,454,600.00 Unt
106 Kozen metal type J 4 Rp. 774,530.00 Unt
107 Kozen metal type V 1 Rp. 1,637,220.00 Unt
108 Kozen metal type V 2 Rp. 1,234,210.00 Unt
109 Kozen metal type V 3 Rp. 837,500.00 Unt
110 Kozen metal type V 4 Rp. 434,490.00 Unt
111 Kozen metal type PJ 1 K Rp. 1,977,250.00 Unt
112 Kozen metal type P 1 K Rp. 894,170.00 Unt
113 Kozen metal type P 2 K Rp. 686,370.00 Unt
114 Kozen metal type P 3 K Rp. 667,480.00 Unt
115 Kozen metal type J 1 K Rp. 2,033,930.00 Unt
116 Kozen metal type J 2 K Rp. 1,549,060.00 Unt
117 Kozen metal type J 3 K Rp. 1,064,190.00 Unt
118 Kozen metal type J 4 K Rp. 579,320.00 Unt
119 Kozen metal type V 1 K Rp. 862,680.00 Unt
120 Kozen metal type V 2 K Rp. 654,880.00 Unt
121 Kozen metal type V 3 K] Rp. 447,080.00 Unt
122 Kozen metal type V 4 K Rp. 239,280.00 Unt
123 Lantai kayu Rp. 209,900.00 m2
124 Lem kayu Rp. 15,740.00 Kg
125 Lem Rp. 20,990.00 Kg
126 Lisplank motif bunga Rp. 9,230.00 Bh
127 Minyak pelumas / silinder Rp. 40,930.00 Ltr
128 Minyak gemuk Rp. 21,090.00 Ltr
129 Minyak solar Rp. 4,720.00 Ltr
130 Minyak lampu / tanah Rp. 8,810.00 Ltr
131 Kerosene Rp. 8,810.00 Ltr
132 Minyak bekisting Rp. 26,230.00 Kg
133 Minyak gerdang Rp. 28,330.00 Ltr
134 Minyak cat Rp. 12,690.00 Ltr
135 Material pilihan Rp. 228,790.00 m3
136 Oxygen las Rp. 10,490.00 Kg
137 Pintu gulung besi Rp. 524,750.00 m2
138 Pintu besi Rp. 619,200.00 m2
139 Pintu besi lipat harmonika Rp. 986,530.00 m2
No. JENIS BAHAN BANGUNAN Harga Satuan
140 Pintu KM/ WC PVC Rp. 391,460.00 Set
141 Pintu alluminium Rp. 918,310.00 Set
142 Pipa poros Rp. 17,840.00 m'
143 Plat baja profil Rp. 24,660.00 Kg
144 Paku biasa Rp. 18,890.00 Kg
145 Paku skrup (Rp. 2500,- /buah) Rp. 26,230.00 Kg
146 Paku seng Rp. 42,360.00 Kg
147 Plamir Rp. 8,080.00 Kg
148 Porselin polos 30 x 30 cm Rp. 9,440.00 Bh
149 Parquit kayu solid Rp. 314,850.00 m2
150 Pipa PVC Tipe AW Ø 1/2" Rp. 5,810.00 m'
151 Pipa PVC Tipe AW Ø 3/4" Rp. 7,800.00 m'
152 Pipa PVC Tipe AW Ø 1" Rp. 14,290.00 m'
153 Pipa PVC Tipe AW Ø 11/2" Rp. 20,640.00 m'
154 Pipa PVC Tipe AW Ø 2" Rp. 24,330.00 m'
155 Pipa PVC Tipe AW Ø 21/2" Rp. 27,930.00 m'
156 Pipa PVC Tipe AW Ø 3" Rp. 31,310.00 m'
157 Pipa PVC Tipe AW Ø 4" Rp. 52,390.00 m'
158 Pipa Galvanis Ø 1/2" Rp. 15,500.00 m'
159 Pipa galvanis 6 m 3/4" Rp. 16,790.00 m'
160 Pipa galvanis 6 m 1" Rp. 20,990.00 m'
161 Pipa galvanis 6 m 1 1/2" Rp. 31,480.00 m'
162 Pipa galvanis 6 m 2" Rp. 43,020.00 m'
163 Pipa galvanis 6 m 2 1/2" Rp. 52,470.00 m'
164 Pasir pasang (Rp.101.000,00/m3) Rp. 70.00 Kg
165 Pasir urug Rp. 83,540.00 m3
166 Pagar besi strip Rp. 314,850.00 m2
167 List profil gypsum Rp. 14,110.00 m'
168 Rabung genteng metal #0,35 Rp. 43,020.00 m'
169 Rabung zinzcalum #0,35 Rp. 20,990.00 m'
170 Rabung seng lbr 30 cm Rp. 23,920.00 Lbr
171 Rabung genteng keramik Rp. 16,790.00 Kpg
172 Rangka furing plapon gypsum Rp. 79,760.00 m2
173 Rangka atap zincalum Rp. 226,900.00 m2
174 Rangka atap baja ringan atap seng Rp. 195,200.00 m2
175 Rangka atap baja ringan atap genteng metal Rp. 226,690.00 m2
176 Rangka atap baja ringan genteng keramik/beton Rp. 251,880.00 m2
177 Rabung asbes panjang 0,5m Rp. 11,540.00 Lbr
178 Riol uk. 1/2 Ø 150 mm panjang 1m Rp. 25,180.00 Bh
179 Riol uk. 1/2 Ø 200 mm panjang 1m Rp. 47,220.00 Bh
180 Riol uk. 1/2 Ø 300 mm panjang 1m Rp. 48,480.00 Bh
181 Riol uk. Ø 150 mm panjang 1m Rp. 44,070.00 Bh
182 Riol uk. Ø 200 mm panjang 1m Rp. 49,320.00 Bh
183 Riol uk. Ø 300 mm panjang 1m Rp. 74,510.00 Bh
184 Riol uk. Ø 400 mm panjang 1m Rp. 104,950.00 Bh
185 Riol uk. Ø 500 mm panjang 1m Rp. 141,680.00 Bh
186 Riol uk. Ø 600 mm panjang 1m Rp. 183,660.00 Bh
187 Riol uk. Ø 800 mm panjang 1m Rp. 272,870.00 Bh
188 Riol uk. Ø 1000 mm panjang 1m Rp. 498,510.00 Bh
189 Semen warna (Rp. 3440/kg) Rp. 144,410.00 Zak
190 Semen portland /andalas 40 kg Rp. 51,420.00 Zak
191 Semen portland Rp. 1,280.00 Kg
192 Sirtu /pasir batu Rp. 119,640.00 m3
No. JENIS BAHAN BANGUNAN Harga Satuan
193 Seng gelombang 7 kaki BJLS 20 Rp. 56,480.00 Lbr
194 Seng gelombang 7 kaki BJLS 35 Rp. 76,610.00 Lbr
195 Seng plat BJLS 30 Rp. 15,740.00 Kaki
196 Septictank kap. 3 M³ Rp. 3,830,670.00 Bh
197 Tanah timbun Rp. 83,540.00 m3
198 Talang kantong seng bjls Rp. 152,170.00 m'
199 Triplek 4 mm Rp. 70,310.00 Lbr
200 Triplek 6 mm Rp. 104,950.00 Lbr
201 Triplek 9 mm Rp. 129,080.00 Lbr
202 Tempat sabun keramik 10 x 20 cm Rp. 38,830.00 Bh
203 Tepas kelapa sawit Rp. 31,480.00 Lbr
204 Tepas bambu Rp. 31,480.00 Lbr
205 Urinoir Rp. 839,600.00 Bh
206 Urugan porus Rp. 86,050.00 m3
207 Wallpaper Rp. 104,950.00 m'
208 Wastafel biasa Rp. 524,750.00 Bh
209 Instalasi titik nyala Rp. 108,090.00 Ttk
210 Instalasi stop kontak Rp. 108,090.00 Ttk
211 Instalasi air bersih Rp. 42,290.00 Ttk
212 Lampu SL 23 watt komplet Rp. 35,680.00 Bh
213 Lampu SL 18 watt komplet Rp. 25,180.00 Bh
214 Bok sekering 1 group Rp. 4,090.00 Set
215 Bok sekering 2 group Rp. 6,500.00 Set
216 Residu/colter Rp. 8,080.00 Ltr
217 Saklar seri tanam Rp. 7,660.00 Bh
218 Paku skrup Rp. 26,230.00 Kg
219 Saklar Rp. 7,660.00 Bh
220 Air Rp. 6,820.00 Ltr
221 #REF! Rp. Lbr
222 Genteng Pelantong Rp. 1,750.00 Bh
223 Genteng kodok Rp. 2,270.00 Bh
224 Genteng pelantong super Rp. 4,170.00 Bh
225 Roof light fibreglass Rp. 48,680.00 Lbr
226 Atap Asbes gelombang 1,8 x 1,05 tbl.4 mm Rp. 30,260.00 Lbr
227 Atap Asbes gelombang 2,1 x 1,05 tbl.4 mm Rp. 97,780.00 Lbr
228 Atap Asbes gelombang 2,4 x 1,05 tbl.4 mm Rp. 113,480.00 Lbr
229 Atap Asbes gelombang 2,7 x 1,05 tbl.4 mm Rp. 118,900.00 Lbr
230 Atap Asbes gelombang 1,8 x 0,92 tbl.5 mm Rp. 74,460.00 Lbr
231 Atap Asbes gelombang 2,1 x 0,92 tbl.5 mm Rp. 93,160.00 Lbr
232 Atap Asbes gelombang 2,4 x 0,92 tbl.5 mm Rp. 101,820.00 Lbr
233 Atap Asbes gelombang 2,7 x 0,92 tbl.5 mm Rp. 112,090.00 Lbr
234 Atap Asbes gelombang 1,8 x 1,08 tbl.6 mm Rp. 108,740.00 Lbr
235 Atap Asbes gelombang 2,1 x 1,08 tbl.6 mm Rp. 126,410.00 Lbr
236 Atap Asbes gelombang 2,4 x 1,08 tbl.6 mm Rp. 134,720.00 Lbr
237 Atap Asbes gelombang 2,7 x 1,08 tbl.6 mm Rp. 163,120.00 Lbr
238 Bubung/Nok Stel Gelombang 0,92 m' tbl.5 mm Rp. 20,550.00 Lbr
239 Bubung/Nok Stel Gelombang 1,05 m' tbl.4 mm Rp. 27,270.00 Lbr
240 Bubung/Nok Stel Gelombang 1,08 m' tbl.6 mm Rp. 29,920.00 Lbr
241 Bubung/Nok Paten 0,92 m' tbl.5 mm Rp. 38,630.00 Lbr
242 Bubung/Nok Paten 1,05 m' tbl.4 mm Rp. 32,480.00 Lbr
243 Bubung/Nok Paten 1,08 m' tbl.6 mm Rp. 45,080.00 Lbr
244 Bubung/Nok Stel Rata 0,92 m' tbl.5 mm Rp. 37,860.00 Lbr
245 Bubung/Nok Stel Rata 1,05 m' tbl.4 mm Rp. 31,740.00 Lbr
No. JENIS BAHAN BANGUNAN Harga Satuan
246 Bubung/Nok Stel Rata 1,08 m' tbl.6 mm Rp. 42,600.00 Lbr
247 Atap Genteng Beton Rp. 6,260.00 Bh
248 Atap Genteng Aspal Rp. 11,880.00 Bh
249 Plastic aerator Rp. 28,860.00 Bh
250 Atap Sirap Rp. 1,080.00 Bh
251 Nok genteng Beton Rp. 8,820.00 Bh
252 Nok genteng Metal/Multi Roof (Decra bond) Rp. 43,170.00 Bh
253 Atap Aluminium gelombang tebal 0,55 Rp. 103,030.00 Lbr
254 Paku hak panjang 15 cm Rp. 32,040.00 Kg
255 Nok Alluminium standard 40 cm 18 swg 22 Rp. 50,260.00 Bh
256 Sisalation / aluminium foil Rp. 81,020.00 M2
257 Seng plat 3" x 6" bjls 35 Rp. 121,210.00 Lbr
258 Seng plat 3" x 6" bjls 30 Rp. 109,090.00 Lbr
259 Seng Gelombang 3"x 6" BJLS 35 Rp. 77,540.00 Lbr
260 Kunci tanam kamar mandi Rp. 37,040.00 Bh
261 Engsel angin Rp. 26,280.00 Bh
262 Kait angin Rp. 20,060.00 Bh
263 Kunci selot Rp. 28,570.00 Bh
264 Door stop Rp. 40,000.00 Bh
265 Rel pintu dorong Rp. 168,260.00 Bh
266 Kunci lemari Rp. 12,950.00 Bh
267 Kaca Polos tbl. 3 mm Rp. 91,430.00 M2
268 Kaca Polos tbl. 5 mm Rp. 152,170.00 M2
269 Kaca Polos tbl. 8 mm Rp. 243,480.00 M2
270 Kaca buram tbl.5 mm Rp. 116,830.00 M2
271 Kaca cermin tebal 5 mm Rp. 169,700.00 M2
272 Kaca cermin tebal 8 mm Rp. 271,520.00 M2
273 Kaca wireglass Rp. 158,730.00 M2
274 Kaca patri Rp. 177,780.00 M2
275 Kaca Reyben Rp. 185,650.00 M2
276 Ubin granito 30 x 30 cm Rp. 27,550.00 Bh
277 Ubin granito 40 x 40 cm Rp. 49,010.00 Bh
278 Ubin granito 60 x 60 cm Rp. 109,850.00 Bh
279 Ubin Mosaik 30 x 30 cm Rp. 14,600.00 Bh
280 Ubin Marmer Ex.DN Rp. 274,930.00 M2
281 Ubin teralux marmer 30 x 30 cm Rp. 28,570.00 Bh
282 Ubin teralux marmer 40 x 40 cm Rp. 50,790.00 Bh
283 Ubin teralux marmer 60 x 60 cm Rp. 114,930.00 Bh
284 Ubin keramik 10 x 20 cm Rp. 940.00 Bh
285 Ubin keramik 15 x 15 cm Rp. 1,460.00 Bh
286 Ubin keramik 20 x 20 cm Rp. 2,300.00 Bh
287 Ubin keramik 20 x 25 cm Rp. 2,620.00 Bh
288 Ubin keramik 25 x 25 cm Rp. 4,060.00 Bh
289 Ubin keramik 30 x 30 cm Rp. 5,770.00 Bh
290 Ubin keramik 30 x 30 cm anti slip Rp. 6,600.00 Bh
291 Ubin keramik 40 x 40 cm Rp. 10,390.00 Bh
292 Ubin keramik artistik 5 x 20 cm Rp. 950.00 Bh
293 Ubin keramik artistik 10 x 10 cm Rp. 950.00 Bh
294 Ubin keramik artistik 10 x 20 cm Rp. 1,840.00 Bh
295 Ubin keramik Essenza 30 x 30 cm Rp. 22,220.00 Bh
296 Ubin keramik Essenza 40 x 40 cm Rp. 60,550.00 Bh
297 Porselin 11 x 11 cm putih Rp. 1,260.00 Bh
298 Porselin 11 x 11 cm, warna Rp. 1,520.00 Bh
No. JENIS BAHAN BANGUNAN Harga Satuan
299 Porselin 15 x 15 cm, putih Rp. 2,410.00 Bh
300 Porselin 15 x 15 cm, warna Rp. 2,660.00 Bh
301 Plint ubin teralux marmer 10 x 30 cm Rp. 17,140.00 Bh
302 Plint ubin teralux marmer 10 x 40 cm Rp. 30,470.00 Bh
303 Plint ubin teralux marmer 10 x 60 cm Rp. 68,950.00 Bh
304 Plint ubin granito 10 x 30 cm Rp. 2,510.00 Bh
305 Plint ubin granito 10 x 40 cm Rp. 65,900.00 Bh
306 Plint ubin granito 10 x 60 cm Rp. 164,960.00 Bh
307 Plint ubin keramik 10 x 30 cm Rp. 2,510.00 Bh
308 Plint ubin keramik 10 x 40 cm Rp. 4,400.00 Bh
309 Plint ubin keramik 10 x 60 cm Rp. 8,510.00 Bh
310 Plint ubin keramik 15 x 30 cm Rp. 3,560.00 Bh
311 Plint ubin keramik 15 x 40 cm Rp. 8,120.00 Bh
312 Plint ubin keramik 15 x 60 cm Rp. 12,190.00 Bh
313 Batu Lapis Dinding 7x3x24 Rp. 2,140.00 Bh
314 Batu tempel hitam Rp. 109,670.00 M2
315 Batu Poros Rp. 120,350.00 M2
316 Carpet Rp. 95,240.00 M2
317 Carpet 80 % wool, 20 % nylon Rp. 91,770.00 M2
318 Feltex carpet 100 % wool-T-21 Rp. 89,460.00 M2
319 Underlyer tebal 6 mm / rubber corrugated Rp. 109,670.00 M2
320 Vynil asbes 30 x 30 cm Rp. 8,630.00 Bh
321 Vynil karet 30 x 30 cm KL I Rp. 10,280.00 Bh
322 Vynil karet 30 x 30 cm KL II Rp. 9,520.00 Bh
323 Vynil motif kembang ex DN 30 x 30 cm Rp. 9,900.00 Bh
324 Vynil wall covering lebar 50 cm Rp. 66,380.00 M2
325 Perquet Jati Rp. 386,740.00 M2
326 Gymfloor Rp. 83,690.00 M2
327 Paku Pancing 60 - 230 Rp. 750.00 Bh
328 Sekrup 3,5" Rp. 430.00 Kg
329 Sekrup 3,5" Rp. 21,350.00 Kg
330 Lem vinyl Rp. 26,230.00 Kg
331 Cat Vernis Jadi Rp. 39,720.00 Kg
332 Dempul Gypsum Rp. 8,080.00 Kg
333 Dempul Cat Rp. 17,840.00 Kg
334 Soda Api Rp. 12,690.00 Kg
335 Sabun Rp. 10,790.00 Kg
336 Cat Tembok setara Vinilex Rp. 22,450.00 Kg
337 Lem Vinyl / Karet Rp. 26,230.00 Kg
338 Kloset jongkok porselin Rp. 167,180.00 Bh
339 Bak fibreglass 0,3 M3 Rp. 190,480.00 Bh
340 Bak fibreglass 1 M3 Rp. 548,590.00 Bh
341 Bak cuci piring teraso 2 Lobang Rp. 285,720.00 Bh
342 Kran air Ø 1/2" - 3/4" Rp. 15,740.00 Bh
343 Besi Siku Rp. 12,580.00 Kg
344 Pintu Rolling Door Rp. 488,900.00 Bh
345 Kusen pintu aluminium/putih Rp. 389,850.00 Bh
346 Sekrup fisher Rp. 26,910.00 Bh
347 Vention Blinds Rp. 171,430.00 M2
348 Verticals Blinds Rp. 184,130.00 M2
349 Kawat Nyamuk Rp. 19,100.00 M2
350 Akustik 30 x 30 cm Rp. 8,960.00 Lbr
351 Akustik 30 x 60 cm Rp. 17,910.00 Lbr
No. JENIS BAHAN BANGUNAN Harga Satuan
352 Akustik 60 x 120 cm Rp. 71,670.00 Lbr
353 Tepung gypsum Rp. 10,960.00 Kg
354 Profil alluminium "T" Rp. 8,880.00 M'
PK 6.20.A 1 M² Pasang rangka langit2 uk. 60 x 60 cm, kayu kelas III Rp. 113,224.10

PK 6.21. 1 M' Pasang lisplank uk. 3 x 20 cm, kayu kelas I Rp. 131,794.92

PK 6.21.A 1 M' Pasang lisplank uk. 3 x 20 cm, kayu kelas II Rp. 105,694.67

PK 6.22. 1 M' Pasang lisplank uk. 3 x 30 cm, kayu kelas I Rp. 132,696.83

PK 6.22.A 1 M' Pasang lisplank uk. 3 x 30 cm, kayu kelas II Rp. 106,113.24

PK 6.23. 1 M² Pasang rangka dinding pemisah 60x120 cm,kayu kelas II Rp. 255,663.02

PK 6.23.A 1 M² Pasang rangka dinding pemisah 60x120 cm, kayu kelas III Rp. 166,529.50

PK 6.24. 1 M² Pasang dinding pemisah tripleks rangkap, Rp. 235,810.50


rangka kayu kelas III

PK 6.25. 1 M² Pasang dinding pemisah tripleks rangkap, Rp. 345,544.02


rangka kayu kelas II

PK 6.26. 1 M² Pasang dinding lambriziring dari papan kayu kelas I Rp. 318,247.71

PK 6.27. 1 M² Pasang dinding lambriziring dari tripleks uk. 120 x 140 cm Rp. 39,423.50

PK 6.28. 1 M² Pasang dinding bilik, rangka kayu kelas III Rp. 60,770.00

PK 6.27.a 1 M² Pasang dinding lambriziring dari tripleks sungkai 120x240 tebal 3mm Rp. 68,971.50

PK 6.27.b 1 M² Pasang dinding lambriziring dari double tripleks sungkai 120x240 tebal 3mm Rp. 127,588.00

PK 6.9.b 1 M² Buat pintu tripleks sungkai rangkap, rangka ekspose kayu kelas II Rp. 657,489.40
ANALISA BIAYA KONSTRUKSI
PEKERJAAN LANGIT - LANGIT

PLL 6.1 1 M² Pasang langit langit asbes semen, 5 mm


6.1.1 Bahan
Asbes 1.100 Kpg x Rp. 17,630 = Rp. 19,393.00
Paku biasa 0.010 Kg x Rp. 18,890 = Rp. 188.90
Jumlah (1) = Rp. 19,581.90
6.1.2 Tenaga
Pekerja 0.030 Oh x Rp. 75,000 = Rp. 2,250.00
Tukang kayu 0.070 Oh x Rp. 100,000 = Rp. 7,000.00
Kepala tukang 0.007 Oh x Rp. 110,000 = Rp. 770.00
Mandor 0.0040 Oh x Rp. 100,000 = Rp. 400.00
Jumlah (2) = Rp. 10,420.00
Jumlah (1) +(2) = Rp. 30,001.90

PLL 6.2 1 M² Pasang langi langit akustik uk. 30 x 30 cm


6.2.1 Bahan
Akustik uk. 30 x 30 cm 12.000 Lbr x Rp. 8,540 = Rp. 102,480.00
Paku biasa 0.050 Kg x Rp. 18,890 = Rp. 944.50
Jumlah (1) = Rp. 103,424.50
6.2.2 Tenaga
Pekerja 0.120 Oh x Rp. 75,000 = Rp. 9,000.00
Tukang kayu 0.120 Oh x Rp. 100,000 = Rp. 12,000.00
Kepala tukang 0.012 Oh x Rp. 110,000 = Rp. 1,320.00
Mandor 0.0060 Oh x Rp. 100,000 = Rp. 600.00
Jumlah (2) = Rp. 22,920.00
Jumlah (1) +(2) = Rp. 126,344.50

PLL 6.3 1 M² Pasang langi langit akustik uk. 30 x 60 cm


6.3.1 Bahan
Akustik uk. 30 x 60 cm 5.800 Lbr x Rp. 17,070 = Rp. 99,006.00
Paku biasa 0.050 Kg x Rp. 18,890 = Rp. 944.50
Jumlah (1) = Rp. 99,950.50
6.3.2 Tenaga
Pekerja 0.100 Oh x Rp. 75,000 = Rp. 7,500.00
Tukang kayu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.0050 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 19,100.00
Jumlah (1) +(2) = Rp. 119,050.50

PLL 6.4 1 M² Pasang langit langit akustik uk. 60 x 120 cm


6.4.1 Bahan
Akustik uk. 60 x 120 cm 1.500 Lbr x Rp. 68,290 = Rp. 102,435.00
Paku biasa 0.050 Kg x Rp. 18,890 = Rp. 944.50
Jumlah (1) = Rp. 103,379.50
6.4.2 Tenaga
Pekerja 0.100 Oh x Rp. 75,000 = Rp. 7,500.00
Tukang kayu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.0050 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 19,100.00
Jumlah (1) +(2) = Rp. 122,479.50

PLL 6.5 1 M² Pasang langit langit triplek uk. 120 x 240 cm, tebal 4 mm
6.5.1 Bahan
Triplek tebal 4 mm 0.375 Lbr x Rp. 70,310 = Rp. 26,366.25
Paku biasa 0.030 Kg x Rp. 18,890 = Rp. 566.70
Jumlah (1) = Rp. 26,932.95
6.5.2 Tenaga
Pekerja 0.100 Oh x Rp. 75,000 = Rp. 7,500.00
Tukang kayu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 19,100.00
Jumlah (1) +(2) = Rp. 46,032.95

PLL 6.6 1 M² Pasang langit langit lambriziring kayu tebal 9 mm


6.6.1 Bahan
Kayu papan kelas II 0.015 Lbr x Rp. 6,815,340 = Rp. 102,230.10
Paku biasa 0.010 Kg x Rp. 18,890 = Rp. 188.90
Jumlah (1) = Rp. 102,419.00
6.6.2 Tenaga
Pekerja 0.800 Oh x Rp. 75,000 = Rp. 60,000.00
Tukang kayu 0.800 Oh x Rp. 100,000 = Rp. 80,000.00
Kepala tukang 0.080 Oh x Rp. 110,000 = Rp. 8,800.00
Mandor 0.040 Oh x Rp. 100,000 = Rp. 4,000.00
Jumlah (2) = Rp. 152,800.00
Jumlah (1) +(2) = Rp. 255,219.00

PLL 6.7 1 M² Pasang langit langit gipsum board 1200 x 2400 x 9 mm


6.7.1 Bahan
Gypsum 120 x 240 tbl. 9 mm 0.364 Lbr x Rp. 68,210 = Rp. 24,828.44
Paku skrup 0.110 Kg x Rp. 26,230 = Rp. 2,885.30
Jumlah (1) = Rp. 27,713.74
6.7.2 Tenaga
Pekerja 0.100 Oh x Rp. 75,000 = Rp. 7,500.00
Tukang kayu 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
Kepala tukang 0.050 Oh x Rp. 110,000 = Rp. 5,500.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 18,500.00
Jumlah (1) +(2) = Rp. 46,213.74

PLL 6.8 1 M' Pasang list plapon gypsum profil


6.8.1 Bahan
List profil gypsum 1.050 m' x Rp. 14,110 = Rp. 14,815.50
Tepung gypsum 0.150 Kg x Rp. 10,450 = Rp. 1,567.50
Jumlah (1) = Rp. 16,383.00
6.8.2 Tenaga
Pekerja 0.060 Oh x Rp. 75,000 = Rp. 4,500.00
Tukang kayu 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.0030 Oh x Rp. 100,000 = Rp. 300.00
Jumlah (2) = Rp. 11,460.00
Jumlah (1) +(2) = Rp. 27,843.00
PLL 6.9 1 M² Pasang langit langit akustik uk. 60 x 120 cm + rangka aluminium
6.9.1 Bahan
Profil alluminium "T" 3.600 M' x Rp. 8,470 = Rp. 30,492.00
Kawat licin 0.150 Kg x Rp. 16,930 = Rp. 2,539.50
Akustik 60 x 120 cm 1.500 Lbr x Rp. 68,290 = Rp. 102,435.00
Jumlah (1) = Rp. 33,031.50
6.9.2 Tenaga
Pekerja 0.500 Oh x Rp. 75,000 = Rp. 37,500.00
Tukang kayu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala tukang 0.050 Oh x Rp. 110,000 = Rp. 5,500.00
Mandor 0.0250 Oh x Rp. 100,000 = Rp. 2,500.00
Jumlah (2) = Rp. 95,500.00
Jumlah (1) +(2) = Rp. 128,531.50

PLL 6.10 1 M' Pasang list langit langit kayu profil


6.10.1 Bahan
List kayu profil 1.050 Btg x Rp. 20,990 = Rp. 22,039.50
Paku biasa 0.010 Kg x Rp. 18,890 = Rp. 188.90
Jumlah (1) = Rp. 22,228.40
6.10.2 Tenaga
Pekerja 0.050 Oh x Rp. 75,000 = Rp. 3,750.00
Tukang kayu 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
Kepala tukang 0.005 Oh x Rp. 110,000 = Rp. 550.00
Mandor 0.0030 Oh x Rp. 100,000 = Rp. 300.00
Jumlah (2) = Rp. 9,600.00
Jumlah (1) +(2) = Rp. 31,828.40
ANALISA BIAYA KONSTRUKSI
PEKERJAAN BESI DAN ALUMINIUM

PBA 6.1 1 Kg Pasang besi profil


6.1.1 Bahan
Besi profil 1.150 Kg x Rp. 24,660 = Rp. 28,359.00
Jumlah (1) = Rp. 28,359.00
6.1.2. Tenaga
Pekerja 0.060 Oh x Rp. 75,000 = Rp. 4,500.00
Tukang las kontruksi 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.0003 Oh x Rp. 100,000 = Rp. 30.00
Jumlah (2) = Rp. 11,190.00
Jumlah (1) +(2) = Rp. 39,549.00

PBA 6.2 1 Kg Pasang rangka kuda kuda baja IWF


6.2.1 Bahan
Besi baja IWF 1.150 Kg x Rp. 24,660 = Rp. 28,359.00
Jumlah (1) = Rp. 28,359.00
6.2.2. Tenaga
Pekerja 0.060 Oh x Rp. 75,000 = Rp. 4,500.00
Tukang las Kontruksi 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.003 Oh x Rp. 100,000 = Rp. 300.00
Jumlah (2) = Rp. 11,460.00
Jumlah (1) +(2) = Rp. 39,819.00

PBA 6.3 100 Kg Pekerjaan perakitan


6.3.1 Bahan
Solar 1.000 Ltr x Rp. 4,720 = Rp. 4,720.00
Minyak pelumas 0.100 Ltr x Rp. 40,930 = Rp. 4,093.00
Jumlah (1) = Rp. 8,813.00
6.3.2. Tenaga
Pekerja 0.100 Oh x Rp. 75,000 = Rp. 7,500.00
Tukang las Kontruksi 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.001 Oh x Rp. 110,000 = Rp. 110.00
Mandor 0.00500 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 18,110.00
6.3.3. Alat
Sewa alat 0.800 Jam x Rp. 67,500 = Rp. 54,000.00
Jumlah (3) = Rp. 54,000.00
Jumlah (1)+(2)+(3) = Rp. 80,923.00

PBA 6.4. 1 M² Pasang pintu besi plat baja tebal 2 mm rangkap, rangkap baja siku
6.4.1 Bahan
Besi siku 15.000 Kg x Rp. 11,990 = Rp. 179,850.00
Besi plat strip 32.800 Kg x Rp. 24,660 = Rp. 808,848.00
Kawat las 0.050 Dos x Rp. 9,440 = Rp. 472.00
Jumlah (1) = Rp. 989,170.00
6.4.2 Tenaga
Pekerja 1.050 Oh x Rp. 75,000 = Rp. 78,750.00
Tukang las biasa 1.050 Oh x Rp. 100,000 = Rp. 105,000.00
Kepala tukang 0.105 Oh x Rp. 110,000 = Rp. 11,550.00
Mandor 0.052 Oh x Rp. 100,000 = Rp. 5,200.00
Jumlah (2) = Rp. 200,500.00
Jumlah (1) +(2) = Rp. 1,189,670.00

PBA 6.5. 10 Cm Pengelasan dengan las listrik


6.5.1 Bahan
Kawat las 0.400 Kg x Rp. 9,440 = Rp. 3,776.00
Solar 0.300 Ltr x Rp. 4,720 = Rp. 1,416.00
Minyak pelumas 0.040 Ltr x Rp. 40,930 = Rp. 1,637.20
Jumlah (1) = Rp. 6,829.20
6.5.2 Tenaga
Pekerja 0.040 Oh x Rp. 75,000 = Rp. 3,000.00
Tukang las Kontruksi 0.020 Oh x Rp. 100,000 = Rp. 2,000.00
Kepala tukang 0.002 Oh x Rp. 110,000 = Rp. 220.00
Mandor 0.00200 Oh x Rp. 100,000 = Rp. 200.00
Jumlah (2) = Rp. 5,420.00
6.5.3 Alat
Sewa alat 0.170 Jam x Rp. 67,500 = Rp. 11,475.00
Jumlah (3) = Rp. 11,475.00
Jumlah (1)+(2)+(3) = Rp. 23,724.20

PBA 6.7. 1 M² Pasang pintu rolling door besi


6.7.1 Bahan
Pintu gulung besi 1.000 M² x Rp. 524,750 = Rp. 524,750.00
Jumlah (1) = Rp. 524,750.00
6.7.2 Tenaga
Pekerja 1.200 Oh x Rp. 75,000 = Rp. 90,000.00
Tukang las biasa 1.200 Oh x Rp. 100,000 = Rp. 120,000.00
Kepala tukang 0.120 Oh x Rp. 110,000 = Rp. 13,200.00
Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
Jumlah (2) = Rp. 223,800.00
Jumlah (1) +(2) = Rp. 748,550.00

PBA 6.10. 1 M² Pasang rollingdoor alluminium


6.10.1 Bahan
Rolling door alluminium 1.000 M² x Rp. 465,850 = Rp. 465,850.00
Jumlah (1) = Rp. 465,850.00
6.10.2 Tenaga
Pekerja 1.000 Oh x Rp. 75,000 = Rp. 75,000.00
Tukang khusus alluminium 1.000 Oh x Rp. 100,000 = Rp. 100,000.00
Kepala tukang 0.100 Oh x Rp. 110,000 = Rp. 11,000.00
Mandor 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
Jumlah (2) = Rp. 191,000.00
Jumlah (1) +(2) = Rp. 656,850.00

PBA 6.11. 1 M' Pasang kusen pintu aluminium


6.11.1 Bahan
Kusen pintu aluminium/putih 1.100 Bh x Rp. 371,470 = Rp. 408,617.00
Skrup fixer 2.000 Bh x Rp. 25,650 = Rp. 51,300.00
Jumlah (1) = Rp. 459,917.00
6.11.2 Tenaga
Pekerja 0.043 Oh x Rp. 75,000 = Rp. 3,225.00
Tukang khusus alluminium 0.043 Oh x Rp. 100,000 = Rp. 4,300.00
Kepala tukang 0.004 Oh x Rp. 110,000 = Rp. 473.00
Mandor 0.002 Oh x Rp. 100,000 = Rp. 210.00
Jumlah (2) = Rp. 8,208.00
Jumlah (1) +(2) = Rp. 468,125.00

PBA 6.14. 1 M² Pasang venetions blinds dan vertical blinds


6.14.1 Bahan
Venetions/vertical blinds 1.000 M² x Rp. 355,560 = Rp. 355,560.00
Jumlah (1) = Rp. 355,560.00
6.14.2 Tenaga
Pekerja 0.350 Oh x Rp. 75,000 = Rp. 26,250.00
Tukang 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.018 Oh x Rp. 100,000 = Rp. 1,800.00
Jumlah (2) = Rp. 66,900.00
Jumlah (1) +(2) = Rp. 422,460.00

PBA 6.15. 1 M² Pasang terali besi strip 2 x 3 mm


6.15.1 Bahan
Besi plat strip 6.177 Kg x Rp. 24,660 = Rp. 152,324.82
Jumlah (1) = Rp. 152,324.82
6.15.2 Tenaga
Pekerja 1.670 Oh x Rp. 75,000 = Rp. 125,250.00
Tukang las 1.670 Oh x Rp. 100,000 = Rp. 167,000.00
Kepala tukang 0.167 Oh x Rp. 110,000 = Rp. 18,370.00
Mandor 0.083 Oh x Rp. 100,000 = Rp. 8,300.00
Jumlah (2) = Rp. 318,920.00
Jumlah (1) +(2) = Rp. 471,244.82

PBA 6.16. 1 M² Pasang kawat nyamuk


6.16.1 Bahan
Kawat nyamuk 1.100 M² x Rp. 18,200 = Rp. 20,020.00
Besi plat strip 1.716 Kg x Rp. 23,500 = Rp. 40,326.00
Jumlah (1) = Rp. 60,346.00
6.16.2 Tenaga
Pekerja 0.100 Oh x Rp. 75,000 = Rp. 7,500.00
Tukang 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 19,100.00
Jumlah (1) +(2) = Rp. 79,446.00

PBA 6.17. 1 M² Pasang Jendela nako dan teralis


6.17.1 Bahan
Jendela nako 1.100 M² x Rp. 190,480 = Rp. 209,528.00
Paku skrup 1 - 2,5 cm 10.000 Bh x Rp. 2,500 = Rp. 25,000.00
Besi strip 7.000 Kg x Rp. 24,660 = Rp. 172,620.00
Jumlah (1) = Rp. 407,148.00
6.17.2 Tenaga
Pekerja 0.200 Oh x Rp. 75,000 = Rp. 15,000.00
Tukang 0.200 Oh x Rp. 100,000 = Rp. 20,000.00
Kepala tukang 0.020 Oh x Rp. 110,000 = Rp. 2,200.00
Mandor 0.001 Oh x Rp. 100,000 = Rp. 100.00
Jumlah (2) = Rp. 37,300.00
Jumlah (1) +(2) = Rp. 444,448.00

*********LANJUT PEKERJAAN LANGIT LANGIT


ANALISA BIAYA KONSTRUKSI
PEKERJAAN BESI DAN ALUMINIUM

PBB 6.1 1 Kg Pasang besi profil


6.1.1 Bahan
Besi profil 1.150 Kg x Rp. 24,660 = Rp. 28,359.00
Minyak Pelumas 0.100 Ltr x Rp. 40,930 = Rp. 4,093.00
Kawat Las 0.005 Dos x Rp. 9,440 = Rp. 47.20
Jumlah (1) = Rp. 32,452.00
6.1.2. Tenaga
Pekerja 0.060 Oh x Rp. 75,000 = Rp. 4,500.00
Tukang las kontruksi 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.0003 Oh x Rp. 100,000 = Rp. 30.00
Jumlah (2) = Rp. 11,190.00
6.1.3. Alat
Sewa alat 0.500 Jam x Rp. 3,000 = Rp. 1,500.00
Jumlah (3) = Rp. 1,500.00
Jumlah (1)+(2)+(3) = Rp. 45,142.00
ANALISA BIAYA KONSTRUKSI
PEKERJAAN SANITASI

PS 6.1. Memasang 1 buah kloset duduk/monoblok


6.1.1. Bahan
Kloset duduk 1.000 Bh x Rp. 1,416,820 = Rp. 1,416,820.00
Perlengkapan 6% harga klosed x Rp. 1,416,820 = Rp. 85,009.20
Jumlah (1) = Rp. 1,501,829.20
6.1.2. Tenaga
Pekerja 3.300 Oh x Rp. 75,000 = Rp. 247,500.00
Tukang batu 1.500 Oh x Rp. 100,000 = Rp. 150,000.00
Kepala tukang 0.150 Oh x Rp. 110,000 = Rp. 16,500.00
Mandor 0.160 Oh x Rp. 100,000 = Rp. 16,000.00
Jumlah (2) = Rp. 430,000.00
Jumlah (1) = Rp. 1,931,829.20

PS 6.2. Memasang 1 buah kloset jongkok porselen


6.2.1. Bahan
Klosed jongkok porselin 1.000 Bh x Rp. 159,300 = Rp. 159,300.00
Semen portland 6.000 Kg x Rp. 1,362 = Rp. 8,172.00
Pasir pasang 0.010 M³ x Rp. 101,000 = Rp. 1,010.00
Jumlah (1) = Rp. 168,482.00
6.2.2. Tenaga
Pekerja 1.100 Oh x Rp. 75,000 = Rp. 82,500.00
Tukang batu 1.500 Oh x Rp. 100,000 = Rp. 150,000.00
Kepala tukang 0.150 Oh x Rp. 110,000 = Rp. 16,500.00
Mandor 0.110 Oh x Rp. 100,000 = Rp. 11,000.00
Jumlah (2) = Rp. 260,000.00
Jumlah (1) = Rp. 428,482.00

PS 6.4 Memasang 1 buah urinoir


6.4.1. Bahan
Urinoir 1.000 Bh x Rp. 839,600 = Rp. 839,600.00
Perlengkapan 15% harga urinoir x Rp. 839,600 = Rp. 125,940.00
Semen portland 6.000 Kg x Rp. 1,362 = Rp. 8,172.00
Pasir pasang 0.010 M³ x Rp. 101,000 = Rp. 1,010.00
Jumlah (1) = Rp. 974,722.00
6.4.2. Tenaga
Pekerja 1.000 Oh x Rp. 75,000 = Rp. 75,000.00
Tukang batu 1.000 Oh x Rp. 100,000 = Rp. 100,000.00
Kepala tukang 0.100 Oh x Rp. 110,000 = Rp. 11,000.00
Mandor 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Jumlah (2) = Rp. 196,000.00
Jumlah (1) = Rp. 1,170,722.00

PS 6.5 Memasang 1 buah wastafel


6.5.1. Bahan
Wastafel biasa 1.000 Bh x Rp. 524,750 = Rp. 524,750.00
Perlengkapan 12% harga wastafel x Rp. 524,750 = Rp. 62,970.00
Semen portland 6.000 Kg x Rp. 1,362 = Rp. 8,172.00
Pasir pasang 0.010 M³ x Rp. 101,000 = Rp. 1,010.00
Jumlah (1) = Rp. 596,902.00
6.5.2. Tenaga
Pekerja 1.200 Oh x Rp. 75,000 = Rp. 90,000.00
Tukang batu 1.450 Oh x Rp. 100,000 = Rp. 145,000.00
Kepala tukang 0.150 Oh x Rp. 110,000 = Rp. 16,500.00
Mandor 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Jumlah (2) = Rp. 261,500.00
Jumlah (1) = Rp. 858,402.00

PS 6.7. Memasang 1 buah bak mandi fibreglass volume 0,30 m³


6.7.1. Bahan
Bak fibreglass 0,3 M3 1.000 Bh x Rp. 181,500 = Rp. 181,500.00
Perlengkapan 18% Harga bak x Rp. 181,500 = Rp. 32,670.00
Jumlah (1) = Rp. 214,170.00
6.7.2. Tenaga
Pekerja 1.800 Oh x Rp. 75,000 = Rp. 135,000.00
Tukang batu 0.540 Oh x Rp. 100,000 = Rp. 54,000.00
Kepala tukang 0.054 Oh x Rp. 110,000 = Rp. 5,940.00
Mandor 0.110 Oh x Rp. 100,000 = Rp. 11,000.00
Jumlah (2) = Rp. 205,940.00
Jumlah (1) = Rp. 420,110.00

PS 6.8. Memasang 1 buah bak mandi batu bata volume 0,30 m³


6.8.1. Bahan
Batu bata cetak mesin 44.000 Bh x Rp. 910 = Rp. 40,040.00
Semen portland 120.000 Kg x Rp. 1,362 = Rp. 163,440.00
Pasir pasang 0.300 M³ x Rp. 101,000 = Rp. 30,300.00
Porselin 11 x 11 cm putih 360.000 Bh x Rp. 1,210 = Rp. 435,600.00
Semen warna 6.000 Kg x Rp. 3,440 = Rp. 20,640.00
Jumlah (1) = Rp. 690,020.00
6.8.2. Tenaga
Pekerja 3.000 Oh x Rp. 75,000 = Rp. 225,000.00
Tukang batu 3.000 Oh x Rp. 100,000 = Rp. 300,000.00
Kepala tukang 0.300 Oh x Rp. 110,000 = Rp. 33,000.00
Mandor 0.300 Oh x Rp. 100,000 = Rp. 30,000.00
Jumlah (2) = Rp. 588,000.00
Jumlah (1) = Rp. 1,278,020.00

PS 6.11. Memasang 1 buah bak fibreglass volume 1 m³ air


6.11.1. Bahan
Bak fibreglass 1 m3 1.000 Bh x Rp. 522,720 = Rp. 522,720.00
Perlengkapan 12% Harga bak x Rp. 522,720 = Rp. 62,726.40
Jumlah (1) = Rp. 585,446.40
6.11.2. Tenaga
Pekerja 3.000 Oh x Rp. 75,000 = Rp. 225,000.00
Tukang batu 4.500 Oh x Rp. 100,000 = Rp. 450,000.00
Kepala tukang 0.900 Oh x Rp. 110,000 = Rp. 99,000.00
Mandor 0.900 Oh x Rp. 100,000 = Rp. 90,000.00
Jumlah (2) = Rp. 864,000.00
Jumlah (1) = Rp. 1,449,446.40

PS 6.16. Memasang 1 buah Bak Kontrol pasangan batu bata uk.(30 x 30) cm tinggi 35 cm
6.16.1. Bahan
Batu bata 145.000 Bh x Rp. 875 = Rp. 126,875.00
Semen portland 44.000 Kg x Rp. 1,362 = Rp. 59,928.00
Pasir pasang 0.070 M³ x Rp. 101,000 = Rp. 7,070.00
Batu kerikil 0.070 M³ x Rp. 190,000 = Rp. 13,300.00
Besi beton 1.600 Kg x Rp. 15,740 = Rp. 25,184.00
Pasir beton 0.060 M³ x Rp. 101,000 = Rp. 6,060.00
Jumlah (1) = Rp. 238,417.00
6.16.2. Tenaga
Pekerja 3.200 Oh x Rp. 75,000 = Rp. 240,000.00
Tukang batu 1.015 Oh x Rp. 100,000 = Rp. 101,500.00
Kepala tukang 0.0015 Oh x Rp. 110,000 = Rp. 165.00
Mandor 0.016 Oh x Rp. 100,000 = Rp. 1,600.00
Jumlah (2) = Rp. 343,265.00
Jumlah (1) = Rp. 581,682.00

PS 6.17. Memasang 1 buah Bak Kontrol pasangan batu bata uk.(45 x 45) cm tinggi 50 cm
6.17.1. Bahan
Batu bata 250.000 Bh x Rp. 875 = Rp. 218,750.00
Semen portland 77.000 Kg x Rp. 1,362 = Rp. 104,874.00
Pasir pasang 0.130 M³ x Rp. 101,000 = Rp. 13,130.00
Batu kerikil 0.020 M³ x Rp. 190,000 = Rp. 3,800.00
Besi beton 2.600 Kg x Rp. 15,740 = Rp. 40,924.00
Pasir beton 0.090 M³ x Rp. 101,000 = Rp. 9,090.00
Jumlah (1) = Rp. 390,568.00
6.17.2. Tenaga
Pekerja 1.420 Oh x Rp. 75,000 = Rp. 106,500.00
Tukang batu 0.473 Oh x Rp. 100,000 = Rp. 47,300.00
Kepala tukang 0.047 Oh x Rp. 110,000 = Rp. 5,170.00
Mandor 0.071 Oh x Rp. 100,000 = Rp. 7,100.00
Jumlah (2) = Rp. 166,070.00
Jumlah (1) = Rp. 556,638.00

PS 6.18. Memasang 1 buah Bak Kontrol pasangan batu bata uk.(60 x 60) cm tinggi 65 cm
6.18.1. Bahan
Batu bata 371.000 Bh x Rp. 875 = Rp. 324,625.00
Semen portland 114.000 Kg x Rp. 1,362 = Rp. 155,268.00
Pasir pasang 0.184 M³ x Rp. 101,000 = Rp. 18,584.00
Batu koral 0.033 M³ x Rp. 168,440 = Rp. 5,558.52
Besi beton 4.850 Kg x Rp. 15,000 = Rp. 72,750.00
Pasir beton 0.120 M³ x Rp. 101,000 = Rp. 12,120.00
Jumlah (1) = Rp. 588,905.52
6.18.2. Tenaga
Pekerja 2.160 Oh x Rp. 75,000 = Rp. 162,000.00
Tukang batu 0.720 Oh x Rp. 100,000 = Rp. 72,000.00
Kepala tukang 0.072 Oh x Rp. 110,000 = Rp. 7,920.00
Mandor 0.108 Oh x Rp. 100,000 = Rp. 10,800.00
Tukang gali 0.100 Oh x Rp. 75,000 = Rp. 7,500.00
Jumlah (2) = Rp. 260,220.00
Jumlah (1) = Rp. 849,125.52

PS 6.19. Memasang 1 m' pipa galvanis diameter ½"


6.19.1. Bahan
Pipa Galvanis Ø 1/2" 1.200 M´ x Rp. 14,770 = Rp. 17,724.00
Perlengkapan 35% harga pipa x Rp. 14,770 = Rp. 5,169.50
Jumlah (1) = Rp. 22,893.50
6.19.2. Tenaga
Pekerja 0.054 Oh x Rp. 75,000 = Rp. 4,050.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.027 Oh x Rp. 100,000 = Rp. 2,700.00
Jumlah (2) = Rp. 16,740.00
Jumlah (1) = Rp. 39,633.50
PS 6.20. Memasang 1 m' pipa galvanis diameter 3/4"
6.20.1. Bahan
Pipa galvanis 6 m 3/4" 1.200 M´ x Rp. 16,790 = Rp. 20,148.00
Perlengkapan 35% harga pipa x Rp. 16,790 = Rp. 5,876.50
Jumlah (1) = Rp. 26,024.50
6.20.2. Tenaga
Pekerja 0.054 Oh x Rp. 75,000 = Rp. 4,050.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.027 Oh x Rp. 100,000 = Rp. 2,700.00
Jumlah (2) = Rp. 16,740.00
Jumlah (1) = Rp. 42,764.50

PS 6.21. Memasang 1 m' pipa galvanis diameter 1"


6.21.1. Bahan
Pipa galvanis 6 m 1" 1.200 M´ x Rp. 20,990 = Rp. 25,188.00
Perlengkapan 35% harga pipa x Rp. 20,990 = Rp. 7,346.50
Jumlah (1) = Rp. 32,534.50
6.21.2. Tenaga
Pekerja 0.054 Oh x Rp. 75,000 = Rp. 4,050.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.027 Oh x Rp. 100,000 = Rp. 2,700.00
Jumlah (2) = Rp. 16,740.00
Jumlah (1) = Rp. 49,274.50

PS 6.22. Memasang 1 m' pipa galvanis diameter 1 ½"


6.22.1. Bahan
Pipa galvanis 6 m 1 1/2" 1.200 M´ x Rp. 31,480 = Rp. 37,776.00
Perlengkapan 35% harga pipa x Rp. 31,480 = Rp. 11,018.00
Jumlah (1) = Rp. 48,794.00
6.22.2. Tenaga
Pekerja 0.108 Oh x Rp. 75,000 = Rp. 8,100.00
Tukang batu 0.180 Oh x Rp. 100,000 = Rp. 18,000.00
Kepala tukang 0.018 Oh x Rp. 110,000 = Rp. 1,980.00
Mandor 0.0054 Oh x Rp. 100,000 = Rp. 540.00
Jumlah (2) = Rp. 28,620.00
Jumlah (1) = Rp. 77,414.00
PS 6.23. Memasang 1 m' pipa galvanis diameter 2"
6.23.1. Bahan
Pipa galvanis 6 m 2" 1.200 M´ x Rp. 43,020 = Rp. 51,624.00
Perlengkapan 35% harga pipa x Rp. 43,020 = Rp. 15,057.00
Jumlah (1) = Rp. 66,681.00
6.23.2. Tenaga
Pekerja 0.108 Oh x Rp. 75,000 = Rp. 8,100.00
Tukang batu 0.180 Oh x Rp. 100,000 = Rp. 18,000.00
Kepala tukang 0.018 Oh x Rp. 110,000 = Rp. 1,980.00
Mandor 0.0054 Oh x Rp. 100,000 = Rp. 540.00
Jumlah (2) = Rp. 28,620.00
Jumlah (1) = Rp. 95,301.00

PS 6.25. Memasang 1 m' pipa PVC tipe AW diameter ½"


6.25.1. Bahan
Pipa PVC Tipe AW Ø 1/2" 1.200 M´ x Rp. 5,810 = Rp. 6,972.00
Perlengkapan 35% harga pipa x Rp. 5,810 = Rp. 2,033.50
Jumlah (1) = Rp. 9,005.50
6.25.2. Tenaga
Pekerja 0.036 Oh x Rp. 75,000 = Rp. 2,700.00
Tukang batu 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.0018 Oh x Rp. 100,000 = Rp. 180.00
Jumlah (2) = Rp. 9,540.00
Jumlah (1) = Rp. 18,545.50
PS 6.26. Memasang 1 m' pipa PVC tipe AW diameter ¾"
6.26.1. Bahan
Pipa PVC Tipe AW Ø 3/4" 1.200 M´ x Rp. 7,800 = Rp. 9,360.00
Perlengkapan 35% harga pipa x Rp. 7,800 = Rp. 2,730.00
Jumlah (1) = Rp. 12,090.00
6.26.2. Tenaga
Pekerja 0.036 Oh x Rp. 75,000 = Rp. 2,700.00
Tukang batu 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.0018 Oh x Rp. 100,000 = Rp. 180.00
Jumlah (2) = Rp. 9,540.00
Jumlah (1) = Rp. 21,630.00

PS 6.27. Memasang 1 m' pipa PVC tipe AW diameter 1"


6.27.1. Bahan
Pipa PVC Tipe AW Ø 1" 1.200 M´ x Rp. 14,290 = Rp. 17,148.00
Perlengkapan 35% harga pipa x Rp. 14,290 = Rp. 5,001.50
Jumlah (1) = Rp. 22,149.50
6.27.2. Tenaga
Pekerja 0.036 Oh x Rp. 75,000 = Rp. 2,700.00
Tukang batu 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.0018 Oh x Rp. 100,000 = Rp. 180.00
Jumlah (2) = Rp. 9,540.00
Jumlah (1) = Rp. 31,689.50

PS 6.28. Memasang 1 m' pipa PVC tipe AW diameter 1 ½"


6.28.1. Bahan
Pipa PVC Tipe AW Ø 11/2" 1.200 M´ x Rp. 20,640 = Rp. 24,768.00
Perlengkapan 35% harga pipa x Rp. 20,640 = Rp. 7,224.00
Jumlah (1) = Rp. 31,992.00
6.28.2. Tenaga
Pekerja 0.036 Oh x Rp. 75,000 = Rp. 2,700.00
Tukang batu 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.0018 Oh x Rp. 100,000 = Rp. 180.00
Jumlah (2) = Rp. 9,540.00
Jumlah (1) = Rp. 41,532.00

PS 6.29. Memasang 1 m' pipa PVC tipe AW diameter 2"


6.29.1. Bahan
Pipa PVC Tipe AW Ø 2" 1.200 M´ x Rp. 24,330 = Rp. 29,196.00
Perlengkapan 35% harga pipa x Rp. 24,330 = Rp. 8,515.50
Jumlah (1) = Rp. 37,711.50
6.29.2. Tenaga
Pekerja 0.054 Oh x Rp. 75,000 = Rp. 4,050.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.0027 Oh x Rp. 100,000 = Rp. 270.00
Jumlah (2) = Rp. 14,310.00
Jumlah (1) = Rp. 52,021.50
PS 6.30. Memasang 1 m' pipa PVC tipe AW diameter 2 ½"
6.30.1. Bahan
Pipa PVC Tipe AW Ø 21/2" 1.200 M´ x Rp. 27,930 = Rp. 33,516.00
Perlengkapan 35% harga pipa x Rp. 27,930 = Rp. 9,775.50
Jumlah (1) = Rp. 43,291.50
6.30.2. Tenaga
Pekerja 0.036 Oh x Rp. 75,000 = Rp. 2,700.00
Tukang batu 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.0018 Oh x Rp. 100,000 = Rp. 180.00
Jumlah (2) = Rp. 9,540.00
Jumlah (1) = Rp. 52,831.50

PS 6.31. Memasang 1 m' pipa PVC tipe AW diameter 3"


6.31.1. Bahan
Pipa PVC Tipe AW Ø 3" 1.200 M´ x Rp. 31,310 = Rp. 37,572.00
Perlengkapan 35% harga pipa x Rp. 31,310 = Rp. 10,958.50
Jumlah (1) = Rp. 48,530.50
6.31.2. Tenaga
Pekerja 0.081 Oh x Rp. 75,000 = Rp. 6,075.00
Tukang batu 0.135 Oh x Rp. 100,000 = Rp. 13,500.00
Kepala tukang 0.0135 Oh x Rp. 110,000 = Rp. 1,485.00
Mandor 0.0041 Oh x Rp. 100,000 = Rp. 410.00
Jumlah (2) = Rp. 21,470.00
Jumlah (1) = Rp. 70,000.50

PS 6.32. Memasang 1 m' pipa PVC tipe AW diameter 4"


6.32.1. Bahan
Pipa PVC Tipe AW Ø 4" 1.200 M´ x Rp. 52,390 = Rp. 62,868.00
Perlengkapan 35% harga pipa x Rp. 52,390 = Rp. 18,336.50
Jumlah (1) = Rp. 81,204.50
6.32.2. Tenaga
Pekerja 0.081 Oh x Rp. 75,000 = Rp. 6,075.00
Tukang batu 0.135 Oh x Rp. 100,000 = Rp. 13,500.00
Kepala tukang 0.0135 Oh x Rp. 110,000 = Rp. 1,485.00
Mandor 0.0041 Oh x Rp. 100,000 = Rp. 410.00
Jumlah (2) = Rp. 21,470.00
Jumlah (1) = Rp. 102,674.50

PS 6.33. Memasang 1 bh bak cuci piring stainles steel


6.33.1. Bahan
Bak cuci piring 2 lobang komplet 1.000 Bh x Rp. 816,510 = Rp. 816,510.00
Jumlah (1) = Rp. 816,510.00
6.33.2. Tenaga
Pekerja 0.030 Oh x Rp. 75,000 = Rp. 2,250.00
Tukang batu 0.300 Oh x Rp. 100,000 = Rp. 30,000.00
Kepala tukang 0.030 Oh x Rp. 110,000 = Rp. 3,300.00
Mandor 0.0015 Oh x Rp. 100,000 = Rp. 150.00
Jumlah (2) = Rp. 35,700.00
Jumlah (1) = Rp. 852,210.00

PS 6.34. Memasang 1 bh bak cuci piring teraso


6.34.1. Bahan
Bak cuci piring teraso 2 Lobang 1.000 Bh x Rp. 272,250 = Rp. 272,250.00
Semen portland 20.000 Kg x Rp. 1,362 = Rp. 27,240.00
Pasir pasang 0.050 M³ x Rp. 101,000 = Rp. 5,050.00
Jumlah (1) = Rp. 304,540.00
6.34.2. Tenaga
Pekerja 0.050 Oh x Rp. 75,000 = Rp. 3,750.00
Tukang batu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala tukang 0.050 Oh x Rp. 110,000 = Rp. 5,500.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 59,500.00
Jumlah (1) = Rp. 364,040.00

PS 6.35. Memasang 1 bh kran diameter ¾" atau ½"


6.35.1. Bahan
Kran air Ø 1/2" - 3/4" 1.000 Bh x Rp. 15,000 = Rp. 15,000.00
Jumlah (1) = Rp. 15,000.00
6.35.2. Tenaga
Pekerja 0.010 Oh x Rp. 75,000 = Rp. 750.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) 12,350.00
Jumlah (1) +(2) 27,350.00

PS 6.36. Memasang 1 bh Floor drain


6.36.1. Bahan
Floor drain 1.000 Bh x Rp. 21,170 = Rp. 21,170.00
Jumlah (1) = Rp. 21,170.00
6.36.2. Tenaga
Pekerja 0.010 Oh x Rp. 75,000 = Rp. 750.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) 12,350.00
Jumlah (1) +(2) 33,520.00

******LANJUT PEKERJAAN BESI ALUMINIUM


ANALISA BIAYA KONTRUKSI
PEKERJAAN PENGECATAN

PC 6.1 1M² Mengikis/ mengerok permukaan cat tembok lama


6.1.1 Bahan
Soda api 0.050 Kg x Rp. 12,100 = Rp. 605.00
Jumlah (1) = Rp. 605.00
6.1.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 11,500.00
Jumlah (1) + (2) = Rp. 12,105.00

PC 6.2. 1M² Mencuci bidang permukaan tembok yang pernah di cat


6.2.1 Bahan
Sabun 0.050 Kg x Rp. 10,290 = Rp. 514.50
Jumlah (1) = Rp. 514.50
6.2.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 11,500.00
Jumlah (1) + (2) = Rp. 12,014.50

PC 6.3. 1M² Mengerok karat cat lama permukaan baja dengan cara manual
6.3 .1 Bahan
Sabun 0.050 Kg x Rp. 10,290 = Rp. 514.50
Jumlah (1) = Rp. 514.50
6.3.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 11,500.00
Jumlah (1) + (2) = Rp. 12,014.50

PC 6.4 1M² Menyabun permukaan tembok lama


6.4 .1 Bahan
Sabun 0.050 Kg x Rp. 10,290 = Rp. 514.50
Jumlah (1) = Rp. 514.50
6.4.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 11,500.00
Jumlah (1) + (2) = Rp. 12,014.50

PC 6.6 1M² Mendempul dan menggosok kayu


6.4 .1 Bahan
Dempul 0.080 Kg x Rp. 8,180 = Rp. 654.40
Minyak cat 0.020 Kg x Rp. 12,690 = Rp. 253.80
Amplas 0.100 Lbr x Rp. 3,140 = Rp. 314.00
Jumlah (1) = Rp. 1,222.20
6.4.2 Tenaga
Pekerja 0.040 Oh x Rp. 75,000 = Rp. 3,000.00
Tukang cat 0.040 Oh x Rp. 100,000 = Rp. 4,000.00
Kepala tukang 0.040 Oh x Rp. 110,000 = Rp. 4,400.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 11,650.00
Jumlah (1) + (2) = Rp. 12,872.20
PC 6.7 1M² Pengecatan bidang kayu lama
6.7.1 Bahan
Plamir 0.150 Kg x Rp. 8,080 = Rp. 1,212.00
Minyak cat 0.170 Kg x Rp. 12,690 = Rp. 2,157.30
Cat Minyak untuk Kayu 0.170 Kg x Rp. 48,600 = Rp. 8,262.00
Jumlah (1) = Rp. 11,631.30
6.7.2 Tenaga
Pekerja 0.070 Oh x Rp. 75,000 = Rp. 5,250.00
Tukang cat 0.075 Oh x Rp. 100,000 = Rp. 7,500.00
Kepala tukang 0.0075 Oh x Rp. 110,000 = Rp. 825.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 13,825.00
Jumlah (1) + (2) = Rp. 25,456.30

PC 6.8 1M² Pengecatan bidang kayu baru 1 lps Plamir, 1 lps cat dasar, 2 lps cat minyak
6.8.1 Bahan
Cat menie kayu 0.200 Kg x Rp. 35,260 = Rp. 7,052.00
Plamir 0.150 Kg x Rp. 8,080 = Rp. 1,212.00
Cat dasar 0.170 Kg x Rp. 38,830 = Rp. 6,601.10
Cat Minyak untuk Kayu 0.260 Kg x Rp. 48,600 = Rp. 12,636.00
Jumlah (1) = Rp. 27,501.10
6.8.2 Tenaga
Pekerja 0.070 Oh x Rp. 75,000 = Rp. 5,250.00
Tukang cat 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.0090 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 15,490.00
Jumlah (1) + (2) = Rp. 42,991.10

PC 6.9 1M² Pengecatan bidang kayu baru 1 lps Plamir, 1 lps cat dasar, 3 lps cat minyak
6.9.1 Bahan
Cat menie kayu 0.200 Kg x Rp. 35,260 = Rp. 7,052.00
Plamir 0.150 Kg x Rp. 8,080 = Rp. 1,212.00
Cat dasar 0.170 Kg x Rp. 38,830 = Rp. 6,601.10
Cat Minyak untuk Kayu 0.350 Kg x Rp. 48,600 = Rp. 17,010.00
Jumlah (1) = Rp. 31,875.10
6.9.2 Tenaga
Pekerja 0.070 Oh x Rp. 75,000 = Rp. 5,250.00
Tukang cat 0.105 Oh x Rp. 100,000 = Rp. 10,500.00
Kepala tukang 0.0105 Oh x Rp. 110,000 = Rp. 1,155.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 17,155.00
Jumlah (1) + (2) = Rp. 49,030.10

PC 6.12 1M² Pelaburan kayu dengan Residu


6.12.1 Bahan
Residu / Kolter 0.350 Ltr x Rp. 25,230 = Rp. 8,830.50
Jumlah (1) = Rp. 8,830.50
6.12.2 Tenaga
Pekerja 0.100 Oh x Rp. 75,000 = Rp. 7,500.00
Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
Jumlah (2) = Rp. 8,100.00
Jumlah (1) + (2) = Rp. 16,930.50

PC 6.13 1M² Peleburan bidang kayu dan vernis


6.13.1 Bahan
Cat pernis 0.150 Kg x Rp. 56,480 = Rp. 8,472.00
Dempul 0.050 Kg x Rp. 8,180 = Rp. 409.00
Amplas 0.100 Lbr x Rp. 3,140 = Rp. 314.00
Kuas 0.010 bh x Rp. 15,740 = Rp. 157.40
Jumlah (1) = Rp. 9,352.40
6.13.2 Tenaga
Pekerja 0.160 Oh x Rp. 75,000 = Rp. 12,000.00
Tukang cat 0.160 Oh x Rp. 100,000 = Rp. 16,000.00
Kepala tukang 0.016 Oh x Rp. 110,000 = Rp. 1,760.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 30,010.00
Jumlah (1) + (2) = Rp. 39,362.40

PC 6.14 1M² Pengecatan tembok baru (1 lapis plamir,1 lapis cat dasar,2 lapis cat penutup)
6.14.1 Bahan
Plamir 0.120 Kg x Rp. 8,080 = Rp. 969.60
Cat dasar 0.120 Kg x Rp. 38,830 = Rp. 4,659.60
Cat Tembok setara Vinilex 0.260 Kg x Rp. 24,840 = Rp. 6,458.40
Jumlah (1) = Rp. 12,087.60
6.14.2 Tenaga
Pekerja 0.040 Oh x Rp. 75,000 = Rp. 3,000.00
Tukang cat 0.120 Oh x Rp. 100,000 = Rp. 12,000.00
Kepala tukang 0.0120 Oh x Rp. 110,000 = Rp. 1,320.00
Mandor 0.002 Oh x Rp. 100,000 = Rp. 200.00
Jumlah (2) = Rp. 16,520.00
Jumlah (1) + (2) = Rp. 28,607.60

PC 6.15 1M² Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )
6.15.1 Bahan
Cat dasar 0.120 Kg x Rp. 38,830 = Rp. 4,659.60
Cat Tembok setara Vinilex 0.260 Kg x Rp. 24,840 = Rp. 6,458.40
Jumlah (1) = Rp. 11,118.00
6.15.2 Tenaga
Pekerja 0.030 Oh x Rp. 75,000 = Rp. 2,250.00
Tukang cat 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.0090 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.0015 Oh x Rp. 100,000 = Rp. 150.00
Jumlah (2) = Rp. 12,390.00
Jumlah (1) + (2) = Rp. 23,508.00

PC 6.19 1M² Pemasangan wall paper


6.19.1 Bahan
Wallpaper 1.200 M³ x Rp. 104,950 = Rp. 125,940.00
Lem Vinyl / Karet 0.200 Kg x Rp. 20,990 = Rp. 4,198.00
Jumlah (1) = Rp. 130,138.00
6.19.2 Tenaga
Pekerja 0.020 Oh x Rp. 75,000 = Rp. 1,500.00
Tukang cat 0.200 Oh x Rp. 100,000 = Rp. 20,000.00
Kepala tukang 0.002 Oh x Rp. 110,000 = Rp. 220.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 21,970.00
Jumlah (1) + (2) = Rp. 152,108.00

PC 6.20 1M² Pengecatan permukaan baja dengan meni besi


6.20.1 Bahan
Cat meni besi 0.100 Kg x Rp. 35,260 = Rp. 3,526.00
Kuas 0.010 Bh x Rp. 15,740 = Rp. 157.40
Jumlah (1) = Rp. 3,683.40
6.20.2 Tenaga
Pekerja 0.020 Oh x Rp. 75,000 = Rp. 1,500.00
Tukang cat 0.020 Oh x Rp. 100,000 = Rp. 2,000.00
Kepala tukang 0.02 Oh x Rp. 110,000 = Rp. 2,200.00
Mandor 0.01 Oh x Rp. 100,000 = Rp. 1,000.00
Jumlah (2) = Rp. 6,700.00
Jumlah (1) + (2) = Rp. 10,383.40

PC 6.21. 1M² Pengecatan permukaan baja dengan meni besi dan perancah
6.21.1 Bahan
Cat meni besi 0.100 Kg x Rp. 35,260 = Rp. 3,526.00
Kuas 0.010 Bh x Rp. 15,740 = Rp. 157.40
Peranca kayu (kayu kelas II) 0.002 M³ x Rp. 6,815,340 = Rp. 13,630.68
Jumlah (1) = Rp. 17,314.08
6.21.2 Tenaga
Pekerja 0.250 Oh x Rp. 75,000 = Rp. 18,750.00
Tukang cat 0.225 Oh x Rp. 100,000 = Rp. 22,500.00
Kepala tukang 0.0225 Oh x Rp. 110,000 = Rp. 2,475.00
Mandor 0.0075 Oh x Rp. 100,000 = Rp. 750.00
Jumlah (2) = Rp. 44,475.00
Jumlah (1) + (2) = Rp. 61,789.08

PC 6.23. 1M² Pengecatan permukaan baja lapis seng (galbani) secara manual
sistem 1 lapis cat konvensional dengan tebal 200 um.
6.23.1 Bahan
Cat minyak besi 0.300 Kg x Rp. 48,060 = Rp. 14,418.00
Jumlah (1) = Rp. 14,418.00
6.23.2 Tenaga
Pekerja 0.060 Oh x Rp. 75,000 = Rp. 4,500.00
Tukang cat 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala tukang 0.1200 Oh x Rp. 110,000 = Rp. 13,200.00
Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
Jumlah (2) = Rp. 24,300.00
Jumlah (1) + (2) = Rp. 38,718.00
PC 6.24. 1M² Pengecatan permukaan baja lapis seng (galbani) secara manual
sistem 3 lapis cat konvensional dengan tebal 200 um.
6.24.1 Bahan
Cat dasar 0.110 Kg x Rp. 38,830 = Rp. 4,271.30
Cat Menie besi 0.170 Kg x Rp. 35,260 = Rp. 5,994.20
Cat minyak besi 0.080 Kg x Rp. 48,060 = Rp. 3,844.80
Jumlah (1) = Rp. 14,110.30
6.24.2 Tenaga
Pekerja 0.500 Oh x Rp. 75,000 = Rp. 37,500.00
Tukang cat 0.800 Oh x Rp. 100,000 = Rp. 80,000.00
Kepala tukang 0.300 Oh x Rp. 110,000 = Rp. 33,000.00
Mandor 0.200 Oh x Rp. 100,000 = Rp. 20,000.00
Jumlah (2) = Rp. 170,500.00
Jumlah (1) + (2) = Rp. 184,610.30

PC 6.25. 1M² Pengecatan permukaan baja lapis seng (galbani) secara semprot
(airless spray) dengan sistem 1 lapis cat konvensional dengan tebal 200 um.
6.25.1 Bahan
Cat dasar 0.300 Kg x Rp. 38,830 = Rp. 11,649.00
Jumlah (1) = Rp. 11,649.00
6.25.2 Tenaga
Pekerja 0.400 Oh x Rp. 75,000 = Rp. 30,000.00
Tukang cat 0.700 Oh x Rp. 100,000 = Rp. 70,000.00
Kepala tukang 0.200 Oh x Rp. 110,000 = Rp. 22,000.00
Mandor 0.200 Oh x Rp. 100,000 = Rp. 20,000.00
Jumlah (2) = Rp. 142,000.00
Jumlah (1) + (2) = Rp. 153,649.00
****LANJUT PEKERJAAN SANITASI
ANALISA BIAYA KONSTRUKSI
PEKERJAAN PENUTUP LANTAI DAN DINDING

PPL 6.1. 1 M² Pasang lantai ubin keramik ukuran 40 x 40 cm


6.1.1 Bahan
Ubin keramik 40 x 40 cm 6.630 Bh x Rp. 9,900 = Rp. 65,637.00
Semen portland 9.800 Kg x Rp. 1,280 = Rp. 12,544.00
Pasir pasang 0.0450 M³ x Rp. 101,000 = Rp. 4,545.00
Jumlah (1) = Rp. 82,726.00
6.1.2 Tenaga
Pekerja 0.250 Oh x Rp. 75,000 = Rp. 18,750.00
Tukang batu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.0130 Oh x Rp. 100,000 = Rp. 1,300.00
Jumlah (2) = Rp. 33,980.00
Jumlah (1) + (2) = Rp. 116,706.00

PPL 6.9. 1 M² Pasang lantai ubin granit ukuran 40 x 40 cm


6.9.1 Bahan
Ubin granito 40 x 40 cm 6.630 Bh x Rp. 46,700 = Rp. 309,621.00
Semen portland 9.800 Kg x Rp. 1,280 = Rp. 12,544.00
Pasir pasang 0.0450 M³ x Rp. 101,000 = Rp. 4,545.00
Semen warna 1.300 Kg x Rp. 3,440 = Rp. 4,472.00
Jumlah (1) = Rp. 331,182.00
6.9.2 Tenaga
Pekerja 0.250 Oh x Rp. 75,000 = Rp. 18,750.00
Tukang batu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.0130 Oh x Rp. 100,000 = Rp. 1,300.00
Jumlah (2) = Rp. 33,980.00
Jumlah (1) + (2) = Rp. 365,162.00

PPL 6.10. 1 M² Pasang lantai ubin granit ukuran 30 x 30 cm


6.10.1 Bahan
Ubin granito 30 x 30 cm 11.870 Bh x Rp. 26,260 = Rp. 311,706.20
Semen portland 10.000 Kg x Rp. 1,280 = Rp. 12,800.00
Pasir pasang 0.0450 M³ x Rp. 101,000 = Rp. 4,545.00
Semen warna 1.500 Kg x Rp. 3,440 = Rp. 5,160.00
Jumlah (1) = Rp. 334,211.20
6.10.2 Tenaga
Pekerja 0.260 Oh x Rp. 75,000 = Rp. 19,500.00
Tukang batu 0.130 Oh x Rp. 100,000 = Rp. 13,000.00
Kepala tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.0130 Oh x Rp. 100,000 = Rp. 1,300.00
Jumlah (2) = Rp. 35,230.00
Jumlah (1) + (2) = Rp. 369,441.20

PPL 6.13. 1 M² Pasang lantai ubin teralux marmer ukuran 60 x 60 cm


6.13.1 Bahan
Ubin teralux marmer 60 x 60 cm 3.100 Bh x Rp. 109,510 = Rp. 339,481.00
Semen portland 9.600 Kg x Rp. 1,280 = Rp. 12,288.00
Pasir pasang 0.045 M³ x Rp. 101,000 = Rp. 4,545.00
Semen warna 1.500 Kg x Rp. 3,440 = Rp. 5,160.00
Jumlah (1) = Rp. 361,474.00
6.13.2 Tenaga
Pekerja 0.240 Oh x Rp. 75,000 = Rp. 18,000.00
Tukang batu 0.120 Oh x Rp. 100,000 = Rp. 12,000.00
Kepala tukang 0.012 Oh x Rp. 110,000 = Rp. 1,320.00
Mandor 0.012 Oh x Rp. 100,000 = Rp. 1,200.00
Jumlah (2) = Rp. 32,520.00
Jumlah (1) + (2) = Rp. 393,994.00
PPL 6.14. 1 M² Pasang lantai ubin teralux marmer ukuran 40 x 40 cm
6.14.1 Bahan
Ubin teralux marmer 40 x 40 cm 6.630 Bh x Rp. 48,400 = Rp. 320,892.00
Semen portland 9.800 Kg x Rp. 1,280 = Rp. 12,544.00
Pasir pasang 0.0450 M³ x Rp. 101,000 = Rp. 4,545.00
Semen warna 1.300 Kg x Rp. 3,440 = Rp. 4,472.00
Jumlah (1) = Rp. 342,453.00
6.14.2 Tenaga
Pekerja 0.250 Oh x Rp. 75,000 = Rp. 18,750.00
Tukang batu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.0130 Oh x Rp. 100,000 = Rp. 1,300.00
Jumlah (2) = Rp. 33,980.00
Jumlah (1) + (2) = Rp. 376,433.00

PPL 6.15. 1 M² Pasang lantai ubin teralux marmer ukuran 30 x 30 cm


6.15.1 Bahan
Ubin teralux marmer 30 x 30 cm 11.870 Bh x Rp. 27,230 = Rp. 323,220.10
Semen portland 10.000 Kg x Rp. 1,280 = Rp. 12,800.00
Pasir pasang 0.0450 M³ x Rp. 101,000 = Rp. 4,545.00
Semen warna 1.500 Kg x Rp. 3,440 = Rp. 5,160.00
Jumlah (1) = Rp. 345,725.10
6.15.2 Tenaga
Pekerja 0.260 Oh x Rp. 75,000 = Rp. 19,500.00
Tukang batu 0.130 Oh x Rp. 100,000 = Rp. 13,000.00
Kepala tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.0130 Oh x Rp. 100,000 = Rp. 1,300.00
Jumlah (2) = Rp. 35,230.00
Jumlah (1) + (2) = Rp. 380,955.10

PPL 6.24. 1 M' Pasang plint ubin granit uk. 10 x 40 cm


6.24.1 Bahan
Plint ubin granito 10 x 40 cm 2.650 Bh x Rp. 65,900 = Rp. 174,635.00
Semen portland 1.140 Kg x Rp. 1,280 = Rp. 1,459.20
Pasir pasang 0.003 M³ x Rp. 101,000 = Rp. 303.00
Semen warna 0.100 Kg x Rp. 3,440 = Rp. 344.00
Jumlah (1) = Rp. 176,741.20
6.24.2 Tenaga
Pekerja 0.090 Oh x Rp. 75,000 = Rp. 6,750.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 17,240.00
Jumlah (1) + (2) = Rp. 193,981.20

PPL 6.25. 1 M' Pasang plint ubin granit uk. 10 x 30 cm


6.25.1 Bahan
Plint ubin granito 10 x 30 cm 3.530 Bh x Rp. 2,510 = Rp. 8,860.30
Semen portland 1.140 Kg x Rp. 1,280 = Rp. 1,459.20
Pasir pasang 0.003 M³ x Rp. 101,000 = Rp. 303.00
Semen warna 0.100 Kg x Rp. 3,440 = Rp. 344.00
Jumlah (1) = Rp. 10,966.50
6.25.2 Tenaga
Pekerja 0.090 Oh x Rp. 75,000 = Rp. 6,750.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 17,240.00
Jumlah (1) + (2) = Rp. 28,206.50
PPL 6.28. 1 M' Pasang plint ubin teralux marmer uk. 10 x 60 cm
6.28.1 Bahan
Plint ubin teralux marmer 10 x 60 cm 1.700 Bh x Rp. 65,700 = Rp. 111,690.00
Semen portland 1.140 Kg x Rp. 1,280 = Rp. 1,459.20
Pasir pasang 0.003 M³ x Rp. 101,000 = Rp. 303.00
Semen warna 0.100 Kg x Rp. 3,440 = Rp. 344.00
Jumlah (1) = Rp. 113,796.20
6.28.2 Tenaga
Pekerja 0.090 Oh x Rp. 75,000 = Rp. 6,750.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 17,240.00
Jumlah (1) + (2) = Rp. 131,036.20

PPL 6.29. 1 M' Pasang plint ubin teralux marmer uk. 10 x 40 cm


6.29.1 Bahan
Plint ubin teralux marmer 10 x 40 cm 2.650 Bh x Rp. 29,040 = Rp. 76,956.00
Semen portland 1.140 Kg x Rp. 1,280 = Rp. 1,459.20
Pasir pasang 0.003 M³ x Rp. 101,000 = Rp. 303.00
Semen warna 0.100 Kg x Rp. 3,440 = Rp. 344.00
Jumlah (1) = Rp. 79,062.20
6.29.2 Tenaga
Pekerja 0.090 Oh x Rp. 75,000 = Rp. 6,750.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 17,240.00
Jumlah (1) + (2) = Rp. 96,302.20

PPL 6.30. 1 M' Pasang plint ubin teralux marmer uk 10 x 30 cm


6.30.1 Bahan
Plint ubin teralux marmer 10 x 30 cm 3.530 Bh x Rp. 16,340 = Rp. 57,680.20
Semen portland 1.140 Kg x Rp. 1,280 = Rp. 1,459.20
Pasir pasang 0.003 M³ x Rp. 101,000 = Rp. 303.00
Semen warna 0.100 Kg x Rp. 3,440 = Rp. 344.00
Jumlah (1) = Rp. 59,786.40
6.30.2 Tenaga
Pekerja 0.090 Oh x Rp. 75,000 = Rp. 6,750.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 17,240.00
Jumlah (1) + (2) = Rp. 77,026.40

PPL 6.32. 1 M² Pasang lantai keramik artistik ukuran 10 x 20 cm


6.32.1 Bahan
Ubin keramik artistik 10 x 20 cm 53.000 Bh x Rp. 1,760 = Rp. 93,280.00
Semen portland 8.190 Kg x Rp. 1,280 = Rp. 10,483.20
Pasir pasang 0.045 M³ x Rp. 101,000 = Rp. 4,545.00
Semen warna 2.750 Kg x Rp. 3,440 = Rp. 9,460.00
Jumlah (1) = Rp. 14,005.00
6.32.2 Tenaga
Pekerja 0.700 Oh x Rp. 75,000 = Rp. 52,500.00
Tukang 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.0350 Oh x Rp. 100,000 = Rp. 3,500.00
Jumlah (2) = Rp. 94,850.00
Jumlah (1) + (2) = Rp. 108,855.00
PPL 6.33. 1 M² Pasang lantai keramik artistik uk. 5 x 20 cm
6.33.1 Bahan
Ubin keramik artistik 5 x 20 cm 106.000 Bh x Rp. 910 = Rp. 96,460.00
Semen portland 8.190 Kg x Rp. 1,280 = Rp. 10,483.20
Pasir pasang 0.045 M³ x Rp. 101,000 = Rp. 4,545.00
Semen warna 3.200 Kg x Rp. 3,440 = Rp. 11,008.00
Jumlah (1) = Rp. 15,553.00
6.33.2 Tenaga
Pekerja 0.700 Oh x Rp. 75,000 = Rp. 52,500.00
Tukang 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.0350 Oh x Rp. 100,000 = Rp. 3,500.00
Jumlah (2) = Rp. 94,850.00
Jumlah (1) + (2) = Rp. 110,403.00

PPL 6.35. 1 M² Pasang lantai keramik uk. 30 x 30 cm


6.35.1 Bahan
Ubin keramik 30 x 30 cm 11.870 Bh x Rp. 5,500 = Rp. 65,285.00
Semen portland 10.000 Kg x Rp. 1,280 = Rp. 12,800.00
Pasir pasang 0.045 M³ x Rp. 101,000 = Rp. 4,545.00
Semen warna 1.500 Kg x Rp. 3,440 = Rp. 5,160.00
Jumlah (1) = Rp. 87,790.00
6.35.2 Tenaga
Pekerja 0.700 Oh x Rp. 75,000 = Rp. 52,500.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.035 Oh x Rp. 100,000 = Rp. 3,500.00
Jumlah (2) = Rp. 94,850.00
Jumlah (1) + (2) = Rp. 182,640.00

PPL 6.36. 1 M² Pasang lantai keramik uk 20 x 20 cm


6.36.1 Bahan
Ubin keramik 20 x 20 cm 26.500 Bh x Rp. 2,200 = Rp. 58,300.00
Semen portland 10.400 Kg x Rp. 1,280 = Rp. 13,312.00
Pasir pasang 0.045 M³ x Rp. 101,000 = Rp. 4,545.00
Semen warna 1.620 Kg x Rp. 3,440 = Rp. 5,572.80
Jumlah (1) = Rp. 81,729.80
6.36.2 Tenaga
Pekerja 0.700 Oh x Rp. 75,000 = Rp. 52,500.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.035 Oh x Rp. 100,000 = Rp. 3,500.00
Jumlah (2) = Rp. 94,850.00
Jumlah (1) + (2) = Rp. 176,579.80

PPL 6.38. 1 M² Pasang Lantai mozaik uk. 30 x 30 cm, 1 PC : 3 PP


6.38.1 Bahan
Ubin Mosaik 30 x 30 cm 11.870 Bh x Rp. 13,920 = Rp. 165,230.40
Semen portland 14.150 Kg x Rp. 1,280 = Rp. 18,112.00
Pasir pasang 0.039 M³ x Rp. 101,000 = Rp. 3,939.00
Semen warna 2.000 Kg x Rp. 3,440 = Rp. 6,880.00
Jumlah (1) = Rp. 194,161.40
6.61.2 Tenaga
Pekerja 0.700 Oh x Rp. 75,000 = Rp. 52,500.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.035 Oh x Rp. 100,000 = Rp. 3,500.00
Jumlah (2) = Rp. 94,850.00
Jumlah (1) + (2) = Rp. 289,011.40
PPL 6.39. 1 M' Pasang Plint keramik uk. 10 x 30 cm
6.39.1 Bahan
Plint ubin keramik 10 x 30 cm 5.300 Bh x Rp. 2,510 = Rp. 13,303.00
Portland Cement 1.140 Kg x Rp. 1,280 = Rp. 1,459.20
Pasir pasang 0.003 M³ x Rp. 101,000 = Rp. 303.00
Semen warna 0.025 Kg x Rp. 3,440 = Rp. 86.00
Jumlah (1) = Rp. 15,151.20
6.39.2 Tenaga
Pekerja 0.090 Oh x Rp. 75,000 = Rp. 6,750.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 17,240.00
Jumlah (1) + (2) = Rp. 32,391.20

PPL 6.40. 1 M' Pasang plint keramik uk. 10 x 10 cm


6.40.1 Bahan
Ubin keramik artistik 10 x 10 cm 10.600 Bh x Rp. 910 = Rp. 9,646.00
Portland Cement 1.140 Kg x Rp. 1,280 = Rp. 1,459.20
Pasir pasang 0.003 M³ x Rp. 101,000 = Rp. 303.00
Semen warna 0.050 Kg x Rp. 3,440 = Rp. 172.00
Jumlah (1) = Rp. 11,580.20
6.40.2 Tenaga
Pekerja 0.090 Oh x Rp. 75,000 = Rp. 6,750.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 17,240.00
Jumlah (1) + (2) = Rp. 28,820.20

PPL 6.41. 1 M' Pasang plint keramik uk. 5 x 20 cm


6.41.1 Bahan
Ubin keramik artistik 5 x 20 cm 5.300 Bh x Rp. 910 = Rp. 4,823.00
Portland Cement 0.570 Kg x Rp. 1,280 = Rp. 729.60
Pasir pasang 0.002 M³ x Rp. 101,000 = Rp. 151.50
Semen warna 0.013 Kg x Rp. 3,440 = Rp. 44.72
Jumlah (1) = Rp. 5,748.82
6.41.2 Tenaga
Pekerja 0.090 Oh x Rp. 75,000 = Rp. 6,750.00
Tukang batu 0.090 Oh x Rp. 100,000 = Rp. 9,000.00
Kepala tukang 0.009 Oh x Rp. 110,000 = Rp. 990.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
. Jumlah (2) = Rp. 17,240.00
Jumlah (1) + (2) = Rp. 22,988.82

PPL 6.43. 1 M² Pasang lantai granito uk. 60 x 60 cm


6.43.1 Bahan
Ubin granito 60 x 60 cm 2.760 Bh x Rp. 104,670 = Rp. 288,889.20
Portland Cement 8.190 Kg x Rp. 1,280 = Rp. 10,483.20
Pasir pasang 0.045 M³ x Rp. 101,000 = Rp. 4,545.00
Semen warna 0.650 Kg x Rp. 3,440 = Rp. 2,236.00
Jumlah (1) = Rp. 306,153.40
6.43.2 Tenaga
Pekerja 0.700 Oh x Rp. 75,000 = Rp. 52,500.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.035 Oh x Rp. 100,000 = Rp. 3,500.00
. Jumlah (2) = Rp. 94,850.00
Jumlah (1) + (2) = Rp. 401,003.40
PPL 6.44. 1 M² Pasang lantai karpet
6.44.1 Bahan
Carpet 1.050 M² x Rp. 41,980 = Rp. 44,079.00
Lem 0.350 Kg x Rp. 20,990 = Rp. 7,346.50
Jumlah (1) = Rp. 51,425.50
6.44.2 Tenaga
Pekerja 0.170 Oh x Rp. 75,000 = Rp. 12,750.00
Tukang batu 0.170 Oh x Rp. 100,000 = Rp. 17,000.00
Kepala tukang 0.017 Oh x Rp. 110,000 = Rp. 1,870.00
Mandor 0.009 Oh x Rp. 100,000 = Rp. 900.00
. Jumlah (2) = Rp. 32,520.00
Jumlah (1) + (2) = Rp. 83,945.50

PPL 6.45. 1 M² Pasang underlayer/pelapis bawah karpet


6.45.1 Bahan
Underlyer tebal 6 mm / rubber corrugate 1.050 M² x Rp. 104,500 = Rp. 109,725.00
Lem 0.350 Kg x Rp. 20,990 = Rp. 7,346.50
Jumlah (1) = Rp. 117,071.50
6.45.2 Tenaga
Pekerja 0.120 Oh x Rp. 75,000 = Rp. 9,000.00
Tukang batu 0.120 Oh x Rp. 100,000 = Rp. 12,000.00
Kepala tukang 0.012 Oh x Rp. 110,000 = Rp. 1,320.00
Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
. Jumlah (2) = Rp. 22,920.00
Jumlah (1) + (2) = Rp. 139,991.50

PPL 6.46. 1 M² Pasang lantai parquit kayu


6.46.1 Bahan
Parquit 1.050 M² x Rp. 314,850 = Rp. 330,592.50
Lem 0.600 Kg x Rp. 20,990 = Rp. 12,594.00
Jumlah (1) = Rp. 343,186.50
6.46.2 Tenaga
Pekerja 0.700 Oh x Rp. 75,000 = Rp. 52,500.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.035 Oh x Rp. 100,000 = Rp. 3,500.00
. Jumlah (2) = Rp. 94,850.00
Jumlah (1) + (2) = Rp. 438,036.50

PPL 6.47. 1 M² Pasang lantai kayu (gymfloor)


6.47.1 Bahan
Gymfloor 1.050 M² x Rp. 79,750 = Rp. 83,737.50
Lem 0.600 Kg x Rp. 20,990 = Rp. 12,594.00
Jumlah (1) = Rp. 96,331.50
6.47.2 Tenaga
Pekerja 0.700 Oh x Rp. 75,000 = Rp. 52,500.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.035 Oh x Rp. 100,000 = Rp. 3,500.00
. Jumlah (2) = Rp. 94,850.00
Jumlah (1) + (2) = Rp. 191,181.50

PPL 6.48. 1 M² Pasang dinding porselen uk. 11 x 11 cm


6.48.1 Bahan
Porselin 11 x 11 cm putih 86.000 Bh x Rp. 1,210 = Rp. 104,060.00
Semen portland 9.300 Kg x Rp. 1,280 = Rp. 11,904.00
Pasir pasang 0.018 M³ x Rp. 101,000 = Rp. 1,818.00
Semen warna 1.500 Kg x Rp. 3,440 = Rp. 5,160.00
Jumlah (1) = Rp. 122,942.00
6.48.2 Tenaga
Pekerja 1.000 Oh x Rp. 75,000 = Rp. 75,000.00
Tukang batu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala tukang 0.050 Oh x Rp. 110,000 = Rp. 5,500.00
Mandor 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
. Jumlah (2) = Rp. 135,500.00
Jumlah (1) + (2) = Rp. 258,442.00

PPL 6.49. 1 M² Pasang dinding porselin uk. 15 x 15 cm


6.49.1 Bahan
Porselin 15 x 15 cm, putih 45.000 Bh x Rp. 2,300 = Rp. 103,500.00
Semen portland 9.300 Kg x Rp. 1,280 = Rp. 11,904.00
Pasir pasang 0.018 M³ x Rp. 101,000 = Rp. 1,818.00
Semen warna 2.750 Kg x Rp. 3,440 = Rp. 9,460.00
Jumlah (1) = Rp. 126,682.00
6.49.2 Tenaga
Pekerja 0.900 Oh x Rp. 75,000 = Rp. 67,500.00
Tukang batu 0.450 Oh x Rp. 100,000 = Rp. 45,000.00
Kepala tukang 0.045 Oh x Rp. 110,000 = Rp. 4,950.00
Mandor 0.045 Oh x Rp. 100,000 = Rp. 4,500.00
. Jumlah (2) = Rp. 121,950.00
Jumlah (1) + (2) = Rp. 248,632.00

PPL 6.51. 1 M² Pasang dinding keramik artistik uk. 10 x 20 cm


6.51.1 Bahan
Ubin keramik artistik 10 x 20 cm 53.000 Bh x Rp. 1,760 = Rp. 93,280.00
Semen portland 9.300 Kg x Rp. 1,280 = Rp. 11,904.00
Pasir pasang 0.018 M³ x Rp. 101,000 = Rp. 1,818.00
Semen warna 2.750 Kg x Rp. 3,440 = Rp. 9,460.00
Jumlah (1) = Rp. 116,462.00
6.51.2 Tenaga
Pekerja 0.900 Oh x Rp. 75,000 = Rp. 67,500.00
Tukang batu 0.450 Oh x Rp. 100,000 = Rp. 45,000.00
Kepala tukang 0.045 Oh x Rp. 110,000 = Rp. 4,950.00
Mandor 0.045 Oh x Rp. 100,000 = Rp. 4,500.00
. Jumlah (2) = Rp. 121,950.00
Jumlah (1) + (2) = Rp. 238,412.00

PPL 6.52. 1 M² Pasang dinding keramik artistik uk. 5 x 20 cm


6.52.1 Bahan
Ubin keramik artistik 5 x 20 cm 106.000 Bh x Rp. 910 = Rp. 96,460.00
Semen portland 9.300 Kg x Rp. 1,280 = Rp. 11,904.00
Pasir pasang 0.018 M³ x Rp. 101,000 = Rp. 1,818.00
Semen warna 2.900 Kg x Rp. 3,440 = Rp. 9,976.00
Jumlah (1) = Rp. 120,158.00
6.52.2 Tenaga
Pekerja 0.900 Oh x Rp. 75,000 = Rp. 67,500.00
Tukang batu 0.450 Oh x Rp. 100,000 = Rp. 45,000.00
Kepala tukang 0.045 Oh x Rp. 110,000 = Rp. 4,950.00
Mandor 0.045 Oh x Rp. 100,000 = Rp. 4,500.00
. Jumlah (2) = Rp. 121,950.00
Jumlah (1) + (2) = Rp. 242,108.00

PPL 6.53. 1 M² Pasang dinding keramik uk. 10 x 20 cm


6.53.1 Bahan
Ubin keramik 10 x 20 cm 53.000 Bh x Rp. 900 = Rp. 47,700.00
Semen portland 9.300 Kg x Rp. 1,280 = Rp. 11,904.00
Pasir pasang 0.018 M³ x Rp. 101,000 = Rp. 1,818.00
Semen warna 2.750 Kg x Rp. 3,440 = Rp. 9,460.00
Jumlah (1) = Rp. 70,882.00
6.53.2 Tenaga
Pekerja 0.900 Oh x Rp. 75,000 = Rp. 67,500.00
Tukang batu 0.450 Oh x Rp. 100,000 = Rp. 45,000.00
Kepala tukang 0.045 Oh x Rp. 110,000 = Rp. 4,950.00
Mandor 0.045 Oh x Rp. 100,000 = Rp. 4,500.00
. Jumlah (2) = Rp. 121,950.00
Jumlah (1) + (2) = Rp. 192,832.00
PPL 6.54. 1 M² Pasang dinding keramik uk. 20 x 20 cm
6.54.1 Bahan
Ubin keramik 20 x 20 cm 26.500 Bh x Rp. 1,800 = Rp. 47,700.00
Semen portland 9.300 Kg x Rp. 1,280 = Rp. 11,904.00
Pasir pasang 0.018 M³ x Rp. 101,000 = Rp. 1,818.00
Semen warna 1.940 Kg x Rp. 3,440 = Rp. 6,673.60
Jumlah (1) = Rp. 68,095.60
6.54.2 Tenaga
Pekerja 0.900 Oh x Rp. 75,000 = Rp. 67,500.00
Tukang batu 0.450 Oh x Rp. 100,000 = Rp. 45,000.00
Kepala tukang 0.045 Oh x Rp. 110,000 = Rp. 4,950.00
Mandor 0.045 Oh x Rp. 100,000 = Rp. 4,500.00
. Jumlah (2) = Rp. 121,950.00
Jumlah (1) + (2) = Rp. 190,045.60

PPL 6.55. 1 M² Pasang dinding marmer uk. 60 x 60 cm


6.55.1 Bahan
Ubin teralux marmer 60 x 60 cm 2.760 M² x Rp. 109,510 = Rp. 302,247.60
Paku 12 cm 3.003 Bh x Rp. 18,890 = Rp. 56,726.67
Semen portland 12.440 Kg x Rp. 1,280 = Rp. 15,923.20
Pasir pasang 0.025 M³ x Rp. 101,000 = Rp. 2,525.00
Semen warna 0.650 Kg x Rp. 3,440 = Rp. 2,236.00
Jumlah (1) = Rp. 379,658.47
6.55.2 Tenaga
Pekerja 1.300 Oh x Rp. 75,000 = Rp. 97,500.00
Tukang batu 0.650 Oh x Rp. 100,000 = Rp. 65,000.00
Kepala tukang 0.065 Oh x Rp. 110,000 = Rp. 7,150.00
Mandor 0.065 Oh x Rp. 100,000 = Rp. 6,500.00
. Jumlah (2) = Rp. 176,150.00
Jumlah (1) + (2) = Rp. 555,808.47

PPL 6.56. 1 M² Pasang dinding bata pelapis uk. 3 x 7 x 24 cm


6.56.1 Bahan
Batu Lapis Dinding 7x3x24 63.000 Bh x Rp. 2,040 = Rp. 128,520.00
Semen portland 12.440 Kg x Rp. 1,280 = Rp. 15,923.20
Pasir pasang 0.025 M³ x Rp. 101,000 = Rp. 2,525.00
Semen warna 2.750 Kg x Rp. 3,440 = Rp. 9,460.00
Jumlah (1) = Rp. 156,428.20
6.56.2 Tenaga
Pekerja 1.000 Oh x Rp. 75,000 = Rp. 75,000.00
Tukang batu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala tukang 0.050 Oh x Rp. 110,000 = Rp. 5,500.00
Mandor 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
. Jumlah (2) = Rp. 135,500.00
Jumlah (1) + (2) = Rp. 291,928.20

PPL 6.57. 1 M² Pasang dinding batu poros


6.57.1 Bahan
Batu Poros 1.100 M² x Rp. 114,680 = Rp. 126,148.00
Semen portland 11.750 Kg x Rp. 1,280 = Rp. 15,040.00
Pasir pasang 0.035 M³ x Rp. 101,000 = Rp. 3,535.00
Jumlah (1) = Rp. 144,723.00
6.57.2 Tenaga
Pekerja 0.700 Oh x Rp. 75,000 = Rp. 52,500.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.035 Oh x Rp. 100,000 = Rp. 3,500.00
. Jumlah (2) = Rp. 94,850.00
Jumlah (1) + (2) = Rp. 239,573.00
PPL 6.58. 1 M² Pasang dinding batu tempel hitam
6.58.1 Bahan
Batu tempel hitam 1.100 M² x Rp. 104,500 = Rp. 114,950.00
Semen portland 11.750 Kg x Rp. 1,280 = Rp. 15,040.00
Pasir pasang 0.035 M³ x Rp. 101,000 = Rp. 3,535.00
Jumlah (1) = Rp. 133,525.00
6.58.2 Tenaga
Pekerja 0.700 Oh x Rp. 75,000 = Rp. 52,500.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.035 Oh x Rp. 100,000 = Rp. 3,500.00
. Jumlah (2) = Rp. 94,850.00
Jumlah (1) + (2) = Rp. 228,375.00

PPL 6.59. 1 M² Pasang lantai vinyl uk. 30 x 30 cm


6.59.1 Bahan
Vynil karet 30 x 30 cm KL I 11.870 Bh x Rp. 10,280 = Rp. 122,023.60
Lem vinyl 0.350 Kg x Rp. 25,000 = Rp. 8,750.00
Jumlah (1) = Rp. 130,773.60
6.59.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Tukang batu 0.150 Oh x Rp. 100,000 = Rp. 15,000.00
Kepala tukang 0.015 Oh x Rp. 110,000 = Rp. 1,650.00
Mandor 0.008 Oh x Rp. 100,000 = Rp. 800.00
. Jumlah (2) = Rp. 28,700.00
Jumlah (1) + (2) = Rp. 159,473.60

PPL 6.60. 1 M² Pasang wallpaper, lebar 50 cm


6.60.1 Bahan
Wallpaper 2.200 M' x Rp. 104,950 = Rp. 230,890.00
Lem 0.250 Kg x Rp. 20,990 = Rp. 5,247.50
Jumlah (1) = Rp. 236,137.50
6.60.2 Tenaga
Pekerja 0.350 Oh x Rp. 75,000 = Rp. 26,250.00
Tukang batu 0.175 Oh x Rp. 100,000 = Rp. 17,500.00
Kepala tukang 0.017 Oh x Rp. 110,000 = Rp. 1,870.00
Mandor 0.002 Oh x Rp. 100,000 = Rp. 200.00
. Jumlah (2) = Rp. 45,820.00
Jumlah (1) + (2) = Rp. 281,957.50

PPL 6.61. 1 M² Pasang floor hardener


6.61.1 Bahan
Floor hardener 5.000 Kg x Rp. 4,090 = Rp. 20,450.00
Jumlah (1) = Rp. 20,450.00
6.61.2 Tenaga
Pekerja 0.120 Oh x Rp. 75,000 = Rp. 9,000.00
Tukang batu 0.120 Oh x Rp. 100,000 = Rp. 12,000.00
Kepala tukang 0.012 Oh x Rp. 110,000 = Rp. 1,320.00
Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
. Jumlah (2) = Rp. 22,920.00
Jumlah (1) + (2) = Rp. 43,370.00

PPL 6.62. 1 M' Pasang plint vinyl uk. 30 x 30 cm dengan perekat


6.62.1 Bahan
Vynil karet 30 x 30 cm KL II 1.760 Bh x Rp. 9,080 = Rp. 15,980.80
Lem vinyl 0.080 Kg x Rp. 25,000 = Rp. 2,000.00
Jumlah (1) = Rp. 17,980.80
6.62.2 Tenaga
Pekerja 0.080 Oh x Rp. 75,000 = Rp. 6,000.00
Tukang batu 0.080 Oh x Rp. 100,000 = Rp. 8,000.00
Kepala tukang 0.008 Oh x Rp. 110,000 = Rp. 880.00
Mandor 0.004 Oh x Rp. 100,000 = Rp. 400.00
. Jumlah (2) = Rp. 15,280.00
Jumlah (1) + (2) = Rp. 33,260.80
PPL 6.63. 1 M' Pasang plint kayu kelas II tebal 2 cm, lebar 10 cm
6.63.1 Bahan
Papan kayu kelas II 0.003 M³ x Rp. 6,815,340 = Rp. 20,446.02
Paku skrup 0.050 Kg x Rp. 26,230 = Rp. 1,311.50
Jumlah (1) = Rp. 21,757.52
6.63.2 Tenaga
Pekerja 0.120 Oh x Rp. 75,000 = Rp. 9,000.00
Tukang batu 0.120 Oh x Rp. 100,000 = Rp. 12,000.00
Kepala tukang 0.012 Oh x Rp. 110,000 = Rp. 1,320.00
Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
. Jumlah (2) = Rp. 22,920.00
Jumlah (1) + (2) = Rp. 44,677.52

PPL 6.35.a 1 M² Pasang lantai keramik uk. 40 x 40 cm


6.35.a.1 Bahan
Ubin keramik 40 x 40 cm 6.630 Bh x Rp. 10,390 = Rp. 68,885.70
Semen portland 10.000 Kg x Rp. 1,280 = Rp. 12,800.00
Pasir pasang 0.045 M³ x Rp. 101,000 = Rp. 4,545.00
Semen warna 1.500 Kg x Rp. 3,440 = Rp. 5,160.00
Jumlah (1) = Rp. 91,390.70
6.35.a.2 Tenaga
Pekerja 0.700 Oh x Rp. 75,000 = Rp. 52,500.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.035 Oh x Rp. 100,000 = Rp. 3,500.00
Jumlah (2) = Rp. 94,850.00
Jumlah (1) + (2) = Rp. 186,240.70

PPL 6.54.a 1 M² Pasang dinding keramik uk. 20 x 25 cm


6.54.a.1 Bahan
Keramik polos 20 x 25 cm 20.000 Bh x Rp. 2,250 = Rp. 45,000.00
Semen portland 9.300 Kg x Rp. 1,280 = Rp. 11,904.00
Pasir pasang 0.018 M³ x Rp. 101,000 = Rp. 1,818.00
Semen warna 1.940 Kg x Rp. 3,440 = Rp. 6,673.60
Jumlah (1) = Rp. 65,395.60
6.54.a.2 Tenaga
Pekerja 0.900 Oh x Rp. 75,000 = Rp. 67,500.00
Tukang batu 0.450 Oh x Rp. 100,000 = Rp. 45,000.00
Kepala tukang 0.045 Oh x Rp. 110,000 = Rp. 4,950.00
Mandor 0.045 Oh x Rp. 100,000 = Rp. 4,500.00
. Jumlah (2) = Rp. 121,950.00
Jumlah (1) + (2) = Rp. 187,345.60

***LANJUT PEKERJAAN CAT


ANALISA BIAYA KONSTRUKSI
PEKERJAAN KUNCI DAN KACA

PKK 6.1 1 buah pasang kunci tanam antik


6.1.1 Bahan
Kunci tanam antik 1.000 Bh x Rp. 214,500 = Rp. 214,500.00
Jumlah (1) = Rp. 214,500.00
6.1.2 Tenaga
Pekerja 0.060 Oh x Rp. 75,000 = Rp. 4,500.00
Tukang Kayu 0.600 Oh x Rp. 100,000 = Rp. 60,000.00
Kepala Tukang 0.060 Oh x Rp. 110,000 = Rp. 6,600.00
Mandor 0.003 Oh x Rp. 100,000 = Rp. 300.00
Jumlah (2) = Rp. 71,400.00
Jumlah (1) + (2) = Rp. 285,900.00

PKK 6.2 1 buah pasang kunci tanam biasa


6.2.1 Bahan
Kunci tanam biasa 1.000 Bh x Rp. 59,820 = Rp. 59,820.00
Jumlah (1) = Rp. 59,820.00
6.1.2 Tenaga
Pekerja 0.010 Oh x Rp. 75,000 = Rp. 750.00
Tukang Kayu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala Tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (2) = Rp. 52,350.00
Jumlah (1) + (2) = Rp. 112,170.00

PKK 6.3 1 buah pasang kunci tanam kamar mandi


6.3.1 Bahan
Kunci tanam kamar mandi 1.000 Bh x Rp. 35,300 = Rp. 35,300.00
Jumlah (1) = Rp. 35,300.00
6.3.2 Tenaga
Pekerja 0.005 Oh x Rp. 75,000 = Rp. 375.00
Tukang Kayu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala Tukang 0.005 Oh x Rp. 110,000 = Rp. 550.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 51,175.00
Jumlah (1) + (2) = Rp. 86,475.00
PKK 6.4 1 buah pasang kunci silinder
6.4.1 Bahan
Kunci silinder 1.000 Bh x Rp. 35,260 = Rp. 35,260.00
Jumlah (1) = Rp. 35,260.00
6.4.2 Tenaga
Pekerja 0.005 Oh x Rp. 75,000 = Rp. 375.00
Tukang Kayu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala Tukang 0.005 Oh x Rp. 110,000 = Rp. 550.00
Mandor 0.00025 Oh x Rp. 100,000 = Rp. 25.00
Jumlah (2) = Rp. 50,950.00
Jumlah (1) + (2) = Rp. 86,210.00

PKK 6.5 1 buah pasang engsel pintu


6.5.1 Bahan
engsel pintu 1.000 Bh x Rp. 14,110 = Rp. 14,110.00
Jumlah (1) = Rp. 14,110.00
6.5.2 Tenaga
Pekerja 0.015 Oh x Rp. 75,000 = Rp. 1,125.00
Tukang Kayu 0.150 Oh x Rp. 100,000 = Rp. 15,000.00
Kepala Tukang 0.015 Oh x Rp. 110,000 = Rp. 1,650.00
Mandor 0.00075 Oh x Rp. 100,000 = Rp. 75.00
Jumlah (2) = Rp. 17,850.00
Jumlah (1) + (2) = Rp. 31,960.00

PKK 6.6 1 buah pasang engsel jendela kupu-kupu


6.6.1 Bahan
Engsel jendela 1.000 Bh x Rp. 8,390 = Rp. 8,390.00
Jumlah (1) = Rp. 8,390.00
6.6.2 Tenaga
Pekerja 0.010 Oh x Rp. 75,000 = Rp. 750.00
Tukang Kayu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala Tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.0005 Oh x Rp. 100,000 = Rp. 50.00
Jumlah (2) = Rp. 11,900.00
Jumlah (1) + (2) = Rp. 20,290.00

PKK 6.7 1 buah pasang engsel angin


6.7.1 Bahan
Engsel angin 1.000 Bh x Rp. 25,050 = Rp. 25,050.00
Jumlah (1) = Rp. 25,050.00
6.7.2 Tenaga
Pekerja 0.020 Oh x Rp. 75,000 = Rp. 1,500.00
Tukang Kayu 0.200 Oh x Rp. 100,000 = Rp. 20,000.00
Kepala Tukang 0.020 Oh x Rp. 110,000 = Rp. 2,200.00
Mandor 0.010 Oh x Rp. 100,000 = Rp. 1,000.00
Jumlah (2) = Rp. 24,700.00
Jumlah (1) + (2) = Rp. 49,750.00

PKK 6.9 1 buah pasang kait angin


6.9.1 Bahan
Kait angin 1.000 Bh x Rp. 19,120 = Rp. 19,120.00
Jumlah (1) = Rp. 19,120.00
6.9.2 Tenaga
Pekerja 0.015 Oh x Rp. 75,000 = Rp. 1,125.00
Tukang Kayu 0.150 Oh x Rp. 100,000 = Rp. 15,000.00
Kepala Tukang 0.015 Oh x Rp. 110,000 = Rp. 1,650.00
Mandor 0.00075 Oh x Rp. 100,000 = Rp. 75.00
Jumlah (2) = Rp. 17,850.00
Jumlah (1) + (2) = Rp. 36,970.00

PKK 6.10 1 buah pasang door closer


6.10.1 Bahan
Door closer 1.000 Bh x Rp. 209,900 = Rp. 209,900.00
Jumlah (1) = Rp. 209,900.00
6.10.2 Tenaga
Pekerja 0.050 Oh x Rp. 75,000 = Rp. 3,750.00
Tukang Kayu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala Tukang 0.050 Oh x Rp. 110,000 = Rp. 5,500.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 59,500.00
Jumlah (1) + (2) = Rp. 269,400.00

PKK 6.11 1 buah pasang kunci selot


6.11.1 Bahan
Kunci selot 1.000 Bh x Rp. 27,230 = Rp. 27,230.00
Jumlah (1) = Rp. 27,230.00
6.11.2 Tenaga
Pekerja 0.020 Oh x Rp. 75,000 = Rp. 1,500.00
Tukang Kayu 0.200 Oh x Rp. 100,000 = Rp. 20,000.00
Kepala Tukang 0.020 Oh x Rp. 110,000 = Rp. 2,200.00
Mandor 0.001 Oh x Rp. 100,000 = Rp. 100.00
Jumlah (2) = Rp. 23,800.00
Jumlah (1) + (2) = Rp. 51,030.00

PKK 6.12 1 buah pasang pegangan pintu / door holder


6.12.1 Bahan
Pegangan pintu/door holder 1.000 Bh x Rp. 104,950 = Rp. 104,950.00
Jumlah (1) = Rp. 104,950.00
6.12.2 Tenaga
Pekerja 0.050 Oh x Rp. 75,000 = Rp. 3,750.00
Tukang Kayu 0.500 Oh x Rp. 100,000 = Rp. 50,000.00
Kepala Tukang 0.050 Oh x Rp. 110,000 = Rp. 5,500.00
Mandor 0.0025 Oh x Rp. 100,000 = Rp. 250.00
Jumlah (2) = Rp. 59,500.00
Jumlah (1) + (2) = Rp. 164,450.00

PKK 6.13 1 buah pasang door stop


6.13.1 Bahan
Door stop 1.000 Bh x Rp. 38,120 = Rp. 38,120.00
Jumlah (1) = Rp. 38,120.00
6.13.2 Tenaga
Pekerja 0.010 Oh x Rp. 75,000 = Rp. 750.00
Tukang Kayu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala Tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.0005 Oh x Rp. 100,000 = Rp. 50.00
Jumlah (2) = Rp. 11,900.00
Jumlah (1) + (2) = Rp. 50,020.00

PKK 6.14 1 buah pasang rel pintu dorong


6.14.1 Bahan
Rel pintu dorong 1.000 Bh x Rp. 160,330 = Rp. 160,330.00
Jumlah (1) = Rp. 160,330.00
6.14.2 Tenaga
Pekerja 0.060 Oh x Rp. 75,000 = Rp. 4,500.00
Tukang Kayu 0.600 Oh x Rp. 100,000 = Rp. 60,000.00
Kepala Tukang 0.060 Oh x Rp. 110,000 = Rp. 6,600.00
Mandor 0.003 Oh x Rp. 100,000 = Rp. 300.00
Jumlah (2) = Rp. 71,400.00
Jumlah (1) + (2) = Rp. 231,730.00

PKK 6.15 1 buah pasang kunci lemari


6.15.1 Bahan
Kunci lemari 1.000 Bh x Rp. 12,340 = Rp. 12,340.00
Jumlah (1) = Rp. 12,340.00
6.15.2 Tenaga
Pekerja 0.025 Oh x Rp. 75,000 = Rp. 1,875.00
Tukang Kayu 0.250 Oh x Rp. 100,000 = Rp. 25,000.00
Kepala Tukang 0.025 Oh x Rp. 110,000 = Rp. 2,750.00
Mandor 0.00125 Oh x Rp. 100,000 = Rp. 125.00
Jumlah (2) = Rp. 29,750.00
Jumlah (1) + (2) = Rp. 42,090.00

PKK 6.16 1 M² pasang kaca, tebal 3 mm


6.16.1 Bahan
Kaca Polos tbl. 3 mm 1.100 M² x Rp. 87,120 = Rp. 95,832.00
Jumlah (1) = Rp. 95,832.00
6.16.2 Tenaga
Pekerja 0.015 Oh x Rp. 75,000 = Rp. 1,125.00
Tukang Kayu 0.150 Oh x Rp. 100,000 = Rp. 15,000.00
Kepala Tukang 0.015 Oh x Rp. 110,000 = Rp. 1,650.00
Mandor 0.00075 Oh x Rp. 100,000 = Rp. 75.00
Jumlah (2) = Rp. 17,850.00
Jumlah (1) + (2) = Rp. 113,682.00

PKK 6.17 1 M² pasang kaca, tebal 5 mm


6.17.1 Bahan
Kaca Polos tbl. 5 mm 1.100 M² x Rp. 145,000 = Rp. 159,500.00
Jumlah (1) = Rp. 159,500.00
6.17.2 Tenaga
Pekerja 0.0155 Oh x Rp. 75,000 = Rp. 1,162.50
Tukang Kayu 0.1550 Oh x Rp. 100,000 = Rp. 15,500.00
Kepala Tukang 0.0155 Oh x Rp. 110,000 = Rp. 1,705.00
Mandor 0.00075 Oh x Rp. 100,000 = Rp. 75.00
Jumlah (2) = Rp. 18,442.50
Jumlah (1) + (2) = Rp. 177,942.50

PKK 6.18 1 M² pasang kaca, tebal 8 mm


6.18.1 Bahan
Kaca Polos tbl. 8 mm 1.100 M² x Rp. 232,000 = Rp. 255,200.00
Jumlah (1) = Rp. 255,200.00
6.18.2 Tenaga
Pekerja 0.0165 Oh x Rp. 75,000 = Rp. 1,237.50
Tukang Kayu 0.165 Oh x Rp. 100,000 = Rp. 16,500.00
Kepala Tukang 0.0165 Oh x Rp. 110,000 = Rp. 1,815.00
Mandor 0.0008 Oh x Rp. 100,000 = Rp. 80.00
Jumlah (2) = Rp. 19,632.50
Jumlah (1) + (2) = Rp. 274,832.50

PKK 6.19 1 M² pasang kaca buram, tebal 5 mm


6.19.1 Bahan
Kaca buram tbl.5 mm 1.100 M² x Rp. 111,320 = Rp. 122,452.00
Sealent 0.050 Kg x Rp. 39,330 = Rp. 1,966.50
Jumlah (1) = Rp. 124,418.50
6.19.2 Tenaga
Pekerja 0.0155 Oh x Rp. 75,000 = Rp. 1,162.50
Tukang Kayu 0.1550 Oh x Rp. 100,000 = Rp. 15,500.00
Kepala Tukang 0.0155 Oh x Rp. 110,000 = Rp. 1,705.00
Mandor 0.00075 Oh x Rp. 100,000 = Rp. 75.00
Jumlah (2) = Rp. 18,442.50
Jumlah (1) + (2) = Rp. 142,861.00

PKK 6.20 1 M² pasang kaca cermin, tebal 5 mm


6.20.1 Bahan
Kaca cermin tebal 5 mm 1.100 M² x Rp. 161,700 = Rp. 177,870.00
Jumlah (1) = Rp. 177,870.00
6.20.2 Tenaga
Pekerja 0.0155 Oh x Rp. 75,000 = Rp. 1,162.50
Tukang Kayu 0.1550 Oh x Rp. 100,000 = Rp. 15,500.00
Kepala Tukang 0.0155 Oh x Rp. 110,000 = Rp. 1,705.00
Mandor 0.00075 Oh x Rp. 100,000 = Rp. 75.00
Jumlah (2) = Rp. 18,442.50
Jumlah (1) + (2) = Rp. 196,312.50
PKK 6.21 1 M² pasang kaca cermin, tebal 8 mm
6.21.1 Bahan
Kaca cermin tebal 8 mm 1.100 M² x Rp. 258,720 = Rp. 284,592.00
Jumlah (1) = Rp. 284,592.00
6.21.2 Tenaga
Pekerja 0.0165 Oh x Rp. 75,000 = Rp. 1,237.50
Tukang Kayu 0.165 Oh x Rp. 100,000 = Rp. 16,500.00
Kepala Tukang 0.0165 Oh x Rp. 110,000 = Rp. 1,815.00
Mandor 0.0008 Oh x Rp. 100,000 = Rp. 80.00
Jumlah (2) = Rp. 19,632.50
Jumlah (1) + (2) = Rp. 304,224.50

PKK 6.23 1 M² pasang kaca "wireglass" , tebal 5 mm


6.23.1 Bahan
Kaca Wireglass 1.100 M² x Rp. 151,250 = Rp. 166,375.00
Jumlah (1) = Rp. 166,375.00
6.23.2 Tenaga
Pekerja 0.0155 Oh x Rp. 75,000 = Rp. 1,162.50
Tukang Kayu 0.1550 Oh x Rp. 100,000 = Rp. 15,500.00
Kepala Tukang 0.0155 Oh x Rp. 110,000 = Rp. 1,705.00
Mandor 0.00075 Oh x Rp. 100,000 = Rp. 75.00
Jumlah (2) = Rp. 18,442.50
Jumlah (1) + (2) = Rp. 184,817.50

PKK 6.24 1 M² pasang kaca patri, tebal 5 mm


6.24.1 Bahan
Kaca Patri 1.100 M² x Rp. 169,400 = Rp. 186,340.00
Jumlah (1) = Rp. 186,340.00
6.24.2 Tenaga
Pekerja 0.0250 Oh x Rp. 75,000 = Rp. 1,875.00
Tukang Kayu 0.2500 Oh x Rp. 100,000 = Rp. 25,000.00
Kepala Tukang 0.0250 Oh x Rp. 110,000 = Rp. 2,750.00
Mandor 0.00125 Oh x Rp. 100,000 = Rp. 125.00
Jumlah (2) = Rp. 29,750.00
Jumlah (1) + (2) = Rp. 216,090.00

PKK 6,24A 1 M² pasang kaca Reyben, tebal 5 mm


6.24.1 Bahan
Kaca Reyben 1.100 M² x Rp. 176,900 = Rp. 194,590.00
Jumlah (1) = Rp. 194,590.00
6.24.2 Tenaga
Pekerja 0.0155 Oh x Rp. 75,000 = Rp. 1,162.50
Tukang Kayu 0.1550 Oh x Rp. 100,000 = Rp. 15,500.00
Kepala Tukang 0.0155 Oh x Rp. 110,000 = Rp. 1,705.00
Mandor 0.00075 Oh x Rp. 100,000 = Rp. 75.00
Jumlah (2) = Rp. 18,442.50
Jumlah (1) + (2) = Rp. 213,032.50

******LANJUT PEKERJAAN LANTAI DAN DINDING


ANALISA BIAYA KONSTRUKSI
PEKERJAAN PENUTUP ATAP

PPA 6.1 1 M² Pasang atap genteng palentong kecil


6.1.1 Bahan
Genteng Pelantong 25.00 Buah x Rp. 1,670 = Rp. 41,750.00
Jumlah (1) = Rp. 41,750.00
6.1.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Tukang Kayu 0.075 Oh x Rp. 100,000 = Rp. 7,500.00
Kepala Tukang 0.008 Oh x Rp. 110,000 = Rp. 880.00
Mandor 0.008 Oh x Rp. 100,000 = Rp. 800.00
Jumlah (2) = Rp. 20,430.00
Jumlah (1) + (2) = Rp. 62,180.00

PPA 6.2 1 M² Pasang atap genteng kodok / glazzur


6.2.1 Bahan
Genteng kodok 25.00 Buah x Rp. 2,170 = Rp. 54,250.00
Jumlah (1) = Rp. 54,250.00
6.2.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Tukang Kayu 0.075 Oh x Rp. 100,000 = Rp. 7,500.00
Kepala Tukang 0.008 Oh x Rp. 110,000 = Rp. 880.00
Mandor 0.008 Oh x Rp. 100,000 = Rp. 800.00
Jumlah (2) = Rp. 20,430.00
Jumlah (1) + (2) = Rp. 74,680.00

PPA 6.3 1 M² Pasang atap genteng palentong super / besar


6.3.1 Bahan
Genteng pelantong super 12.00 Buah x Rp. 3,980 = Rp. 47,760.00
Jumlah (1) = Rp. 47,760.00
6.3.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Tukang Kayu 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala Tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.008 Oh x Rp. 100,000 = Rp. 800.00
Jumlah (2) = Rp. 18,710.00
Jumlah (1) + (2) = Rp. 66,470.00

PPA 6.7 1 M² Pasang roof light fiberglass ( 180 x 90 ) cm


6.7.1 Bahan
Roof light fibreglass 0.600 Lbr x Rp. 46,390 = Rp. 27,834.00
Paku biasa ½ " - 1" 0.050 Kg x Rp. 18,000 = Rp. 900.00
Jumlah (1) = Rp. 28,734.00
6.7.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.067 Oh x Rp. 100,000 = Rp. 6,700.00
Kepala Tukang 0.007 Oh x Rp. 110,000 = Rp. 770.00
Mandor 0.007 Oh x Rp. 100,000 = Rp. 700.00
Jumlah (2) = Rp. 18,670.00
Jumlah (1) + (2) = Rp. 47,404.00

PPA 6.8 1 M² Pasang atap asbes gelombang ( 2,70 x 0,92 m ) x 5 mm


6.8.1 Bahan
Atap Asbes gelombang 2,7 x 0,92 tbl.5 mm 0.450 Lbr x Rp. 106,810 = Rp. 48,064.50
Paku seng 0.120 Kg x Rp. 42,360 = Rp. 5,083.20
Jumlah (1) = Rp. 53,147.70
6.8.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.075 Oh x Rp. 100,000 = Rp. 7,500.00
Kepala Tukang 0.008 Oh x Rp. 110,000 = Rp. 880.00
Mandor 0.008 Oh x Rp. 100,000 = Rp. 800.00
Jumlah (2) = Rp. 19,680.00
Jumlah (1) + (2) = Rp. 72,827.70
PPA 6.9 1 M² Pasang atap asbes gelombang ( 2,40 x 0,92 m ) x 5 mm
6.9.1 Bahan
Atap Asbes gelombang 2,4 x 0,92 tbl.5 mm 0.500 Lbr x Rp. 97,020 = Rp. 48,510.00
Paku seng 0.120 Kg x Rp. 42,360 = Rp. 5,083.20
Jumlah (1) = Rp. 53,593.20
6.9.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.075 Oh x Rp. 100,000 = Rp. 7,500.00
Kepala Tukang 0.008 Oh x Rp. 110,000 = Rp. 880.00
Mandor 0.008 Oh x Rp. 100,000 = Rp. 800.00
Jumlah (2) = Rp. 19,680.00
Jumlah (1) + (2) = Rp. 73,273.20

PPA 6.10 1 M² Pasang atap asbes gelombang ( 2,1 x 0,92 m ) x 5 mm


6.10.1 Bahan
Atap Asbes gelombang 2,1 x 0,92 tbl.5 mm 0.600 Lbr x Rp. 88,770 = Rp. 53,262.00
Paku seng 0.120 Kg x Rp. 42,360 = Rp. 5,083.20
Jumlah (1) = Rp. 58,345.20
6.10.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.075 Oh x Rp. 100,000 = Rp. 7,500.00
Kepala Tukang 0.008 Oh x Rp. 110,000 = Rp. 880.00
Mandor 0.008 Oh x Rp. 100,000 = Rp. 800.00
Jumlah (2) = Rp. 19,680.00
Jumlah (1) + (2) = Rp. 78,025.20

PPA 6.11 1 M² Pasang atap asbes gelombang ( 1,80 x 0,92 m ) x 5 mm


6.11.1 Bahan
Atap Asbes gelombang 1,8 x 0,92 tbl.5 mm 0.750 Lbr x Rp. 70,950 = Rp. 53,212.50
Paku seng 0.120 Kg x Rp. 42,360 = Rp. 5,083.20
Jumlah (1) = Rp. 58,295.70
6.11.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.070 Oh x Rp. 100,000 = Rp. 7,000.00
Kepala Tukang 0.007 Oh x Rp. 110,000 = Rp. 770.00
Mandor 0.007 Oh x Rp. 100,000 = Rp. 700.00
Jumlah (2) = Rp. 18,970.00
Jumlah (1) + (2) = Rp. 77,265.70

PPA 6.12 1 M² Pasang atap asbes gelombang ( 2,40 x 1,05 m ) x 4 mm


6.12.1 Bahan
Atap Asbes gelombang 2,4 x 1,05 tbl.4 mm 0.450 Lbr x Rp. 108,130 = Rp. 48,658.50
Paku seng 0.120 Kg x Rp. 42,360 = Rp. 5,083.20
Jumlah (1) = Rp. 53,741.70
6.12.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.070 Oh x Rp. 100,000 = Rp. 7,000.00
Kepala Tukang 0.007 Oh x Rp. 110,000 = Rp. 770.00
Mandor 0.007 Oh x Rp. 100,000 = Rp. 700.00
Jumlah (2) = Rp. 18,970.00
Jumlah (1) + (2) = Rp. 72,711.70

PPA 6.13 1 M² Pasang atap asbes gelombang ( 2,10 x 1,05 m ) x 4 mm


6.13.1 Bahan
Atap Asbes gelombang 2,1 x 1,05 tbl.4 mm 0.500 Lbr x Rp. 93,170 = Rp. 46,585.00
Paku seng 0.120 Kg x Rp. 42,360 = Rp. 5,083.20
Jumlah (1) = Rp. 51,668.20
6.13.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.070 Oh x Rp. 100,000 = Rp. 7,000.00
Kepala Tukang 0.007 Oh x Rp. 110,000 = Rp. 770.00
Mandor 0.007 Oh x Rp. 100,000 = Rp. 700.00
Jumlah (2) = Rp. 18,970.00
Jumlah (1) + (2) = Rp. 70,638.20
PPA 6.14 1 M² Pasang atap asbes gelombang ( 1,80 x 1,05 m ) x 4 mm
6.14.1 Bahan
Atap Asbes gelombang 1,8 x 1,05 tbl.4 mm 0.600 Lbr x Rp. 28,840 = Rp. 17,304.00
Paku seng 0.120 Kg x Rp. 42,360 = Rp. 5,083.20
Jumlah (1) = Rp. 22,387.20
6.14.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.067 Oh x Rp. 100,000 = Rp. 6,700.00
Kepala Tukang 0.007 Oh x Rp. 110,000 = Rp. 770.00
Mandor 0.007 Oh x Rp. 100,000 = Rp. 700.00
Jumlah (2) = Rp. 18,670.00
Jumlah (1) + (2) = Rp. 41,057.20

PPA 6.18 1 M² Pasang atap asbes gelombang ( 2,70 x 1,08 m ) x 6 mm


6.18.1 Bahan
Atap Asbes gelombang 2,7 x 1,08 tbl.6 mm 0.380 Lbr x Rp. 155,430 = Rp. 59,063.40
Paku seng 0.120 Kg x Rp. 42,360 = Rp. 5,083.20
Jumlah (1) = Rp. 64,146.60
6.18.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.067 Oh x Rp. 100,000 = Rp. 6,700.00
Kepala Tukang 0.007 Oh x Rp. 110,000 = Rp. 770.00
Mandor 0.007 Oh x Rp. 100,000 = Rp. 700.00
Jumlah (2) = Rp. 18,670.00
Jumlah (1) + (2) = Rp. 82,816.60

PPA 6.19 1 M² Pasang atap asbes gelombang ( 2,4 x 1,08 m ) x 6 mm


6.19.1 Bahan
Atap Asbes gelombang 2,4 x 1,08 tbl.6 mm 0.450 Lbr x Rp. 128,370 = Rp. 57,766.50
Paku seng 0.120 Kg x Rp. 42,360 = Rp. 5,083.20
Jumlah (1) = Rp. 62,849.70
6.19.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.067 Oh x Rp. 100,000 = Rp. 6,700.00
Kepala Tukang 0.007 Oh x Rp. 110,000 = Rp. 770.00
Mandor 0.007 Oh x Rp. 100,000 = Rp. 700.00
Jumlah (2) = Rp. 18,670.00
Jumlah (1) + (2) = Rp. 81,519.70

PPA 6.20 1 M² Pasang atap asbes gelombang ( 2,1 x 1,08 m ) x 6 mm


6.20.1 Bahan
Atap Asbes gelombang 2,1 x 1,08 tbl.6 mm 0.490 Lbr x Rp. 120,450 = Rp. 59,020.50
Paku seng 0.120 Kg x Rp. 42,360 = Rp. 5,083.20
Jumlah (1) = Rp. 64,103.70
6.16.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.067 Oh x Rp. 100,000 = Rp. 6,700.00
Kepala Tukang 0.007 Oh x Rp. 110,000 = Rp. 770.00
Mandor 0.007 Oh x Rp. 100,000 = Rp. 700.00
Jumlah (2) = Rp. 18,670.00
Jumlah (1) + (2) = Rp. 82,773.70

PPA 6.21 1 M² Pasang atap asbes gelombang ( 1,80 x 1,08 m ) x 6 mm


6.21.1 Bahan
Atap Asbes gelombang 1,8 x 1,08 tbl.6 mm 0.570 Lbr x Rp. 103,620 = Rp. 59,063.40
Paku seng 0.120 Kg x Rp. 42,360 = Rp. 5,083.20
Jumlah (1) = Rp. 64,146.60
6.21.2 Tenaga
Pekerja 0.140 Oh x Rp. 75,000 = Rp. 10,500.00
Tukang Kayu 0.067 Oh x Rp. 100,000 = Rp. 6,700.00
Kepala Tukang 0.007 Oh x Rp. 110,000 = Rp. 770.00
Mandor 0.007 Oh x Rp. 100,000 = Rp. 700.00
Jumlah (2) = Rp. 18,670.00
Jumlah (1) + (2) = Rp. 82,816.60
PPA 6.22 1 M' Pasang bubung stel gelombang 0,92 m
6.22.1 Bahan
Bubung/Nok Stel Gelombang 0,92 m' t 2.40 Lbr x Rp. 19,590 = Rp. 47,016.00
Paku seng 6.00 Bh x Rp. 540 = Rp. 3,240.00
Jumlah (1) = Rp. 50,256.00
6.22.2 Tenaga
Pekerja 0.084 Oh x Rp. 75,000 = Rp. 6,300.00
Tukang Kayu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala Tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.004 Oh x Rp. 100,000 = Rp. 400.00
Jumlah (2) = Rp. 20,630.00
Jumlah (1) + (2) = Rp. 70,886.00

PPA 6.23 1 M' Pasang nok stel gelombang 1,05 m


6.23.1 Bahan
Bubung/Nok Stel Gelombang 1,05 m' t 2.10 Lbr x Rp. 25,990 = Rp. 54,579.00
Paku seng 6.00 Bh x Rp. 540 = Rp. 3,240.00
Jumlah (1) = Rp. 57,819.00
6.23.2 Tenaga
Pekerja 0.084 Oh x Rp. 75,000 = Rp. 6,300.00
Tukang Kayu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala Tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.004 Oh x Rp. 100,000 = Rp. 400.00
Jumlah (2) = Rp. 20,630.00
Jumlah (1) + (2) = Rp. 78,449.00

PPA 6.24 1 M' Pasang nok stel gelombang 1,08 m


6.24.1 Bahan
Bubung/Nok Stel Gelombang 1,08 m' t 2.05 Lbr x Rp. 28,510 = Rp. 58,445.50
Paku seng 6.00 Bh x Rp. 540 = Rp. 3,240.00
Jumlah (1) = Rp. 61,685.50
6.24.2 Tenaga
Pekerja 0.084 Oh x Rp. 75,000 = Rp. 6,300.00
Tukang Kayu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala Tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.004 Oh x Rp. 100,000 = Rp. 400.00
Jumlah (2) = Rp. 20,630.00
Jumlah (1) + (2) = Rp. 82,315.50
PPA 6.25 1 M' Pasang nok paten 0,92 m
6.25.1 Bahan
Bubung/Nok Paten 0,92 m' tbl.5 mm 1.20 Lbr x Rp. 36,810 = Rp. 44,172.00
Paku seng 6.00 Bh x Rp. 540 = Rp. 3,240.00
Jumlah (1) = Rp. 47,412.00
6.25.2 Tenaga
Pekerja 0.084 Oh x Rp. 75,000 = Rp. 6,300.00
Tukang Kayu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala Tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.004 Oh x Rp. 100,000 = Rp. 400.00
Jumlah (2) = Rp. 20,630.00
Jumlah (1) + (2) = Rp. 68,042.00

PPA 6.26 1 M' Pasang nok paten 1,05 m


6.26.1 Bahan
Bubung/Nok Paten 1,05 m' tbl.4 mm 1.20 Lbr x Rp. 30,250 = Rp. 36,300.00
Paku seng 6.00 Bh x Rp. 540 = Rp. 3,240.00
Jumlah (1) = Rp. 39,540.00
6.26.2 Tenaga
Pekerja 0.084 Oh x Rp. 75,000 = Rp. 6,300.00
Tukang Kayu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala Tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.004 Oh x Rp. 100,000 = Rp. 400.00
Jumlah (2) = Rp. 20,630.00
Jumlah (1) + (2) = Rp. 60,170.00
PPA 6.27 1 M' Pasang nok paten 1,08 m
6.27.1 Bahan
Bubung/Nok Paten 1,08 m' tbl.6 mm 1.20 Lbr x Rp. 40,600 = Rp. 48,720.00
Paku seng 6.00 Bh x Rp. 540 = Rp. 3,240.00
Jumlah (1) = Rp. 51,960.00
6.27.2 Tenaga
Pekerja 0.084 Oh x Rp. 75,000 = Rp. 6,300.00
Tukang Kayu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala Tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.004 Oh x Rp. 100,000 = Rp. 400.00
Jumlah (2) = Rp. 20,630.00
Jumlah (1) + (2) = Rp. 72,590.00
PPA 6.28 1 M' Pasang nok stel rata 0,92 m
6.28.1 Bahan
Bubung/Nok Stel Rata 0,92 m' tbl.5 mm 1.10 Lbr x Rp. 36,080 = Rp. 39,688.00
Paku seng 6.00 Bh x Rp. 540 = Rp. 3,240.00
Jumlah (1) = Rp. 42,928.00
6.28.2 Tenaga
Pekerja 0.100 Oh x Rp. 75,000 = Rp. 7,500.00
Tukang Kayu 0.150 Oh x Rp. 100,000 = Rp. 15,000.00
Kepala Tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.004 Oh x Rp. 100,000 = Rp. 400.00
Jumlah (2) = Rp. 24,330.00
Jumlah (1) + (2) = Rp. 67,258.00
PPA 6.29 1 M' Pasang nok stel rata 1,05 m
6.29.1 Bahan
Bubung/Nok Stel Rata 1,05 m' tbl.4 mm 1.10 Lbr x Rp. 30,250 = Rp. 33,275.00
Paku seng 6.00 Bh x Rp. 540 = Rp. 3,240.00
6.29.2 Tenaga Jumlah (1) = Rp. 36,515.00
Pekerja 0.084 Oh x Rp. 75,000 = Rp. 6,300.00
Tukang Kayu 0.125 Oh x Rp. 100,000 = Rp. 12,500.00
Kepala Tukang 0.013 Oh x Rp. 110,000 = Rp. 1,430.00
Mandor 0.004 Oh x Rp. 100,000 = Rp. 400.00
Jumlah (2) = Rp. 20,630.00
Jumlah (1) + (2) = Rp. 57,145.00
PPA 6.30 1 M² Pasang atap genteng beton
6.30.1 Bahan
Atap genteng beton 11.00 Bh x Rp. 5,970 = Rp. 65,670.00
Paku biasa 2" - 5" 0.03 Kg x Rp. 18,890 = Rp. 566.70
Jumlah (1) = Rp. 66,236.70
6.30.2 Tenaga
Pekerja 0.200 Oh x Rp. 75,000 = Rp. 15,000.00
Tukang Kayu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala Tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.010 Oh x Rp. 100,000 = Rp. 1,000.00
Jumlah (2) = Rp. 27,100.00
Jumlah (1) + (2) = Rp. 93,336.70
PPA 6.31 1 M² Pasang atap genteng aspal
6.31.1 Bahan
Nok genteng Aspal 6.900 Lbr x Rp. 29,350 = Rp. 202,515.00
Tripleks tebal 4 mm 0.350 Lbr x Rp. 70,310 = Rp. 24,608.50
Paku biasa ½" - 1" 0.030 Kg x Rp. 18,890 = Rp. 566.70
Plastic aerator 0.500 Bh x Rp. 27,500 = Rp. 13,750.00
Jumlah (1) = Rp. 241,440.20
6.31.2 Tenaga
Pekerja 0.200 Oh x Rp. 75,000 = Rp. 15,000.00
Tukang Kayu 0.300 Oh x Rp. 100,000 = Rp. 30,000.00
Kepala Tukang 0.003 Oh x Rp. 110,000 = Rp. 330.00
Mandor 0.010 Oh x Rp. 100,000 = Rp. 1,000.00
Jumlah (2) = Rp. 46,330.00
Jumlah (1) + (2) = Rp. 287,770.20
PPA 6.32 1 M² Pasang atap genteng metal / Multi Roof
6.32.1 Bahan
Atap genteng Metal 1.02 Lbr x Rp. 90,250 = Rp. 92,055.00
Paku biasa 2" - 5" 0.200 Kg x Rp. 18,890 = Rp. 3,778.00
Jumlah (1) = Rp. 95,833.00
6.32.2 Tenaga
Pekerja 0.200 Oh x Rp. 75,000 = Rp. 15,000.00
Tukang Kayu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala Tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.010 Oh x Rp. 100,000 = Rp. 1,000.00
Jumlah (2) = Rp. 27,100.00
Jumlah (1) + (2) = Rp. 122,933.00

PPA 6.33 1 M² Pasang atap sirap


6.33.1 Bahan
Atap Sirap 60.00 Bh x Rp. 1,030 = Rp. 61,800.00
Paku biasa ½" - 1" 0.200 Kg x Rp. 18,890 = Rp. 3,778.00
Jumlah (1) = Rp. 65,578.00
6.33.2 Tenaga
Pekerja 0.166 Oh x Rp. 75,000 = Rp. 12,450.00
Tukang Kayu 0.250 Oh x Rp. 100,000 = Rp. 25,000.00
Kepala Tukang 0.025 Oh x Rp. 110,000 = Rp. 2,750.00
Mandor 0.008 Oh x Rp. 100,000 = Rp. 800.00
Jumlah (2) = Rp. 41,000.00
Jumlah (1) + (2) = Rp. 106,578.00
PPA 6.34 1 M' Pasang nok genteng beton
6.34.1 Bahan
Nok atap Genteng beton 3.50 Bh x Rp. 8,410 = Rp. 29,435.00
Paku biasa 2" x 5" 0.050 Kg x Rp. 18,890 = Rp. 944.50
Semen PC 10.800 Kg x Rp. 1,362 = Rp. 14,709.60
Pasir pasang 0.032 M³ x Rp. 101,000 = Rp. 3,232.00
Semen warna 1.000 Kg x Rp. 3,440 = Rp. 3,440.00
Jumlah (1) = Rp. 51,761.10
6.34.2 Tenaga
Pekerja 0.400 Oh x Rp. 75,000 = Rp. 30,000.00
Tukang Kayu 0.200 Oh x Rp. 100,000 = Rp. 20,000.00
Kepala Tukang 0.020 Oh x Rp. 110,000 = Rp. 2,200.00
Mandor 0.020 Oh x Rp. 100,000 = Rp. 2,000.00
Jumlah (2) = Rp. 54,200.00
Jumlah (1) + (2) = Rp. 105,961.10

PPA 6.35 1 M' Pasang nok genteng aspal


6.35.1 Bahan
Nok genteng Aspal 2.00 Bh x Rp. 29,350 = Rp. 58,700.00
Paku biasa ½" - 1" 0.050 Kg x Rp. 18,890 = Rp. 944.50
Kayu Papan kelas II 0.0035 M³ x Rp. 6,815,340 = Rp. 23,853.69
Jumlah (1) = Rp. 83,498.19
6.35.2 Tenaga
Pekerja 0.125 Oh x Rp. 75,000 = Rp. 9,375.00
Tukang Kayu 0.250 Oh x Rp. 100,000 = Rp. 25,000.00
Kepala Tukang 0.025 Oh x Rp. 110,000 = Rp. 2,750.00
Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
Jumlah (2) = Rp. 37,725.00
Jumlah (1) + (2) = Rp. 121,223.19

PPA 6.36 1 M' Pasang nok genteng metal


6.36.1 Bahan
Nok genteng Metal/Multi Roof (Decra bond) 1.10 Bh x Rp. 41,140 = Rp. 45,254.00
Paku biasa ½" - 1" 0.050 Kg x Rp. 18,890 = Rp. 944.50
Jumlah (1) = Rp. 46,198.50
6.36.2 Tenaga
Pekerja 0.250 Oh x Rp. 75,000 = Rp. 18,750.00
Tukang Kayu 0.150 Oh x Rp. 100,000 = Rp. 15,000.00
Kepala Tukang 0.015 Oh x Rp. 110,000 = Rp. 1,650.00
Mandor 0.013 Oh x Rp. 100,000 = Rp. 1,300.00
Jumlah (2) = Rp. 36,700.00
Jumlah (1) + (2) = Rp. 82,898.50
PPA 6.37 1 M' Pasang nok sirap
6.37.1 Bahan
Seng plat 3" x 6" BJLS 35 0.400 Lbr x Rp. 115,500 = Rp. 46,200.00
Paku biasa ½" - 1" 0.060 Kg x Rp. 18,890 = Rp. 1,133.40
Paku biasa 2" - 5" 0.050 Kg x Rp. 18,890 = Rp. 944.50
Kayu Papan kelas II 0.004 M³ x Rp. 6,815,340 = Rp. 27,261.36
Jumlah (1) = Rp. 75,539.26
6.37.2 Tenaga
Pekerja 0.125 Oh x Rp. 75,000 = Rp. 9,375.00
Tukang Kayu 0.250 Oh x Rp. 100,000 = Rp. 25,000.00
Kepala Tukang 0.025 Oh x Rp. 110,000 = Rp. 2,750.00
Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
Jumlah (2) = Rp. 37,725.00
Jumlah (1) + (2) = Rp. 113,264.26

PPA 6.38 1 M2 Pasang atap seng gelombang


6.38.1 Bahan
Seng Gelombang 3"x 6" BJLS 35 0.700 Lbr x Rp. 73,890 = Rp. 51,723.00
Paku seng 0.040 Kg x Rp. 42,360 = Rp. 1,694.40
Jumlah (1) = Rp. 53,417.40
6.38.2 Tenaga
Pekerja 0.120 Oh x Rp. 75,000 = Rp. 9,000.00
Tukang Kayu 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Kepala Tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
Jumlah (2) = Rp. 16,260.00
Jumlah (1) + (2) = Rp. 69,677.40

PPA 6.39 1 M' Pasang atap nok seng


6.39.1 Bahan
Seng plat 3" x 6" BJLS 35 0.300 Lbr x Rp. 115,500 = Rp. 34,650.00
Paku Seng 0.020 Kg x Rp. 42,360 = Rp. 847.20
Jumlah (1) = Rp. 35,497.20
6.39.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Tukang Kayu 0.070 Oh x Rp. 100,000 = Rp. 7,000.00
Kepala Tukang 0.008 Oh x Rp. 110,000 = Rp. 880.00
Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
Jumlah (2) = Rp. 19,730.00
Jumlah (1) + (2) = Rp. 55,227.20

PPA 6.40 1 M2 Pasang atap aluminium


6.40.1 Bahan
Atap Aluminium gelombang tebal 0,55 1.050 M² x Rp. 98,180 = Rp. 103,089.00
Paku hak panjang 15 cm 0.020 Kg x Rp. 30,530 = Rp. 610.60
Jumlah (1) = Rp. 103,699.60
6.40.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Tukang Kayu 0.075 Oh x Rp. 100,000 = Rp. 7,500.00
Kepala Tukang 0.008 Oh x Rp. 110,000 = Rp. 880.00
Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
Jumlah (2) = Rp. 20,230.00
Jumlah (1) + (2) = Rp. 123,929.60

PPA 6.41 1 M2 Pasang nok aluminium


6.41.1 Bahan
Nok Alluminium standard 40 cm 18 swg 22 1.200 M² x Rp. 47,890 = Rp. 57,468.00
Paku hak panjang 15 cm 0.040 Kg x Rp. 30,530 = Rp. 1,221.20
Jumlah (1) = Rp. 58,689.20
6.41.2 Tenaga
Pekerja 0.100 Oh x Rp. 75,000 = Rp. 7,500.00
Tukang Kayu 0.100 Oh x Rp. 100,000 = Rp. 10,000.00
Kepala Tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.010 Oh x Rp. 100,000 = Rp. 1,000.00
Jumlah (2) = Rp. 19,600.00
Jumlah (1) + (2) = Rp. 78,289.20

PPA 6.42 1 M2 Pasang aluminium foil / sisalation


6.42.1 Bahan
Sisalation / Alluminium foil 1.050 M² x Rp. 77,200 = Rp. 81,060.00
Jumlah (1) = Rp. 81,060.00
6.42.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Tukang Kayu 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
Kepala Tukang 0.005 Oh x Rp. 110,000 = Rp. 550.00
Mandor 0.008 Oh x Rp. 100,000 = Rp. 800.00
Jumlah (2) = Rp. 17,600.00
Jumlah (1) + (2) = Rp. 98,660.00

*********LANJUT PEKERJAAN KUNCI KACA


ANALISA BIAYA KONSTRUKSI
PEKERJAAN BETON

PB 6.1. 1 M³ Membuat beton mutu f'c = 7.4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0.87 (1PC : 3,5PB : 4KR)
6.1.1 Bahan
Semen portland 247.000 Kg x Rp. 1,280 = Rp. 316,160.00
Pasir beton 869.000 Kg x Rp. 72.14 = Rp. 62,689.66
Kerikil beton 999.000 Kg x Rp. 140.74 = Rp. 140,599.26
Air 215.000 Ltr x Rp. 1.17 = Rp. 251.55
Jumlah (1) = Rp. 519,700.47
6.1.2. Tenaga
Pekerja 1.650 Oh x Rp. 75,000 = Rp. 123,750.00
Tukang batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Kepala tukang 0.028 Oh x Rp. 110,000 = Rp. 3,080.00
Mandor 0.083 Oh x Rp. 100,000 = Rp. 8,300.00
Jumlah (2) = Rp. 162,630.00
Jumlah (1) + (2) = Rp. 682,330.47

PB 6.2. 1 M³ Membuat beton mutu f'c = 9.8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0.78 (1PC : 3PB : 3,5KR)
6.2.1 Bahan
Semen portland 276.000 Kg x Rp. 1,280 = Rp. 353,280.00
Pasir beton 828.000 Kg x Rp. 72.14 = Rp. 59,731.92
Kerikil beton 1012.000 Kg x Rp. 140.74 = Rp. 142,428.88
Air 215.000 Ltr x Rp. 1.17 = Rp. 251.55
Jumlah (1) = Rp. 555,692.35
6.2.2 Tenaga
Pekerja 1.650 Oh x Rp. 75,000 = Rp. 123,750.00
Tukang batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Kepala tukang 0.028 Oh x Rp. 110,000 = Rp. 3,080.00
Mandor 0.083 Oh x Rp. 100,000 = Rp. 8,300.00
Jumlah (2) = Rp. 162,630.00
Jumlah (1) + (2) = Rp. 718,322.35

PB 6.3. 1 M³ Membuat beton mutu f'c = 12.2 Mpa (K 150), slump (12 ± 2) cm, w/c = 0.72 (1PC : 2,5PB : 3,5KR)
6.3.1 Bahan
Semen portland 299.000 Kg x Rp. 1,280 = Rp. 382,720.00
Pasir beton 799.000 Kg x Rp. 72.14 = Rp. 57,639.86
Kerikil beton 1017.000 Kg x Rp. 140.74 = Rp. 143,132.58
Air 215.000 Ltr x Rp. 1.17 = Rp. 251.55
Jumlah (1) = Rp. 583,743.99
6.3.2 Tenaga
Pekerja 1.650 Oh x Rp. 75,000 = Rp. 123,750.00
Tukang batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Kepala tukang 0.028 Oh x Rp. 110,000 = Rp. 3,080.00
Mandor 0.083 Oh x Rp. 100,000 = Rp. 8,300.00
Jumlah (2) = Rp. 162,630.00
Jumlah (1) + (2) = Rp. 746,373.99

PB 6.4. 1 M³ Membuat lantai kerja beton mutu f'c = 7.4 Mpa (K 100), slump (3 - 6) cm, w/c = 0.87 (1PC : 3PB : 5KR)
6.4.1 Bahan
Semen portland 230.000 Kg x Rp. 1,280 = Rp. 294,400.00
Pasir beton 893.000 Kg x Rp. 72.14 = Rp. 64,421.02
Kerikil beton 1027.000 Kg x Rp. 140.74 = Rp. 144,539.98
Air 200.000 Ltr x Rp. 1.17 = Rp. 234.00
Jumlah (1) = Rp. 503,595.00
6.4.2 Tenaga
Pekerja 1.200 Oh x Rp. 75,000 = Rp. 90,000.00
Tukang batu 0.200 Oh x Rp. 100,000 = Rp. 20,000.00
Kepala tukang 0.020 Oh x Rp. 110,000 = Rp. 2,200.00
Mandor 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Jumlah (2) = Rp. 118,200.00
Jumlah (1) + (2) = Rp. 621,795.00
PB 6.5. 1 M³ Membuat beton mutu f'c = 14.5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0.66 (1PC : 2,5PB : 3KR)
6.5.1 Bahan
Semen portland 326.000 Kg x Rp. 1,280 = Rp. 417,280.00
Pasir beton 760.000 Kg x Rp. 72.14 = Rp. 54,826.40
Kerikil beton 1029.000 Kg x Rp. 140.74 = Rp. 144,821.46
Air 215.000 Ltr x Rp. 1.17 = Rp. 251.55
Jumlah (1) = Rp. 617,179.41
6.5.2 Tenaga
Pekerja 1.650 Oh x Rp. 75,000 = Rp. 123,750.00
Tukang batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Kepala tukang 0.028 Oh x Rp. 110,000 = Rp. 3,080.00
Mandor 0.083 Oh x Rp. 100,000 = Rp. 8,300.00
Jumlah (2) = Rp. 162,630.00
Jumlah (1) + (2) = Rp. 779,809.41

PB 6.6. 1 M³ Membuat beton mutu f'c = 16.9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0.61 (1PC : 1PB : 3KR)
6.6.1 Bahan
Semen portland 352.000 Kg x Rp. 1,280 = Rp. 450,560.00
Pasir beton 731.000 Kg x Rp. 72.14 = Rp. 52,734.34
Kerikil beton 1031.000 Kg x Rp. 140.74 = Rp. 145,102.94
Air 215.000 Ltr x Rp. 1.17 = Rp. 251.55
Jumlah (1) = Rp. 648,648.83
6.6.2 Tenaga
Pekerja 1.650 Oh x Rp. 75,000 = Rp. 123,750.00
Tukang batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Kepala tukang 0.028 Oh x Rp. 110,000 = Rp. 3,080.00
Mandor 0.083 Oh x Rp. 100,000 = Rp. 8,300.00
Jumlah (2) = Rp. 162,630.00
Jumlah (1) + (2) = Rp. 811,278.83

PB 6.7. 1 M³ Membuat beton mutu f'c = 19.3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0.58 (1PC : 2PB : 3KR)
6.7.1 Bahan
Semen portland 371.000 Kg x Rp. 1,280 = Rp. 474,880.00
Pasir beton 698.000 Kg x Rp. 72.14 = Rp. 50,353.72
Kerikil beton 1047.000 Kg x Rp. 140.74 = Rp. 147,354.78
Air 215.000 Ltr x Rp. 1.17 = Rp. 251.55
Jumlah (1) = Rp. 672,840.05
6.7.2 Tenaga
Pekerja 1.650 Oh x Rp. 75,000 = Rp. 123,750.00
Tukang batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Kepala tukang 0.028 Oh x Rp. 110,000 = Rp. 3,080.00
Mandor 0.083 Oh x Rp. 100,000 = Rp. 8,300.00
Jumlah (2) = Rp. 162,630.00
Jumlah (1) + (2) = Rp. 835,470.05

PB 6.8. 1 M³ Membuat beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0.56 (1PC : 2PB : 2,7KR)
Dengan Wiremesh
6.8.1 Bahan
Semen portland 384.000 Kg x Rp. 1,280 = Rp. 491,520.00
Pasir beton 692.000 Kg x Rp. 72.14 = Rp. 49,920.88
Kerikil beton 1039.000 Kg x Rp. 140.74 = Rp. 146,228.86
Air 215.000 Ltr x Rp. 1.17 = Rp. 251.55
Jumlah (1) = Rp. 687,921.29
6.8.2 Tenaga
Pekerja 1.650 Oh x Rp. 75,000 = Rp. 123,750.00
Tukang batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Kepala tukang 0.028 Oh x Rp. 110,000 = Rp. 3,080.00
Mandor 0.083 Oh x Rp. 100,000 = Rp. 8,300.00
Jumlah (2) = Rp. 162,630.00
Jumlah (1) + (2) = Rp. 850,551.29
PB 6.9. 1 M³ Membuat beton mutu f'c = 24.0 Mpa (K 275), slump (12 ± 2) cm, w/c = 0.53 (1PC : 1,5PB : 2,5KR)
6.9.1 Bahan
Semen portland 406.000 Kg x Rp. 1,280 = Rp. 519,680.00
Pasir beton 684.000 Kg x Rp. 72.14 = Rp. 49,343.76
Kerikil beton 1026.000 Kg x Rp. 140.74 = Rp. 144,399.24
Air 215.000 Ltr x Rp. 1.17 = Rp. 251.55
Jumlah (1) = Rp. 713,674.55
6.9.2 Tenaga
Pekerja 1.650 Oh x Rp. 75,000 = Rp. 123,750.00
Tukang batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Kepala tukang 0.028 Oh x Rp. 110,000 = Rp. 3,080.00
Mandor 0.083 Oh x Rp. 100,000 = Rp. 8,300.00
Jumlah (2) = Rp. 162,630.00
Jumlah (1) + (2) = Rp. 876,304.55

PB 6.10. 1 M³ Membuat beton mutu f'c = 26.4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0.52 (1PC : 1,5PB : 2,5KR)
6.10.1 Bahan
Semen portland 413.000 Kg x Rp. 1,280 = Rp. 528,640.00
Pasir beton 681.000 Kg x Rp. 72.14 = Rp. 49,127.34
Kerikil beton 1021.000 Kg x Rp. 140.74 = Rp. 143,695.54
Air 215.000 Ltr x Rp. 1.17 = Rp. 251.55
Jumlah (1) = Rp. 721,714.43
6.10.2 Tenaga
Pekerja 1.650 Oh x Rp. 75,000 = Rp. 123,750.00
Tukang batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Kepala tukang 0.028 Oh x Rp. 110,000 = Rp. 3,080.00
Mandor 0.083 Oh x Rp. 100,000 = Rp. 8,300.00
Jumlah (2) = Rp. 162,630.00
Jumlah (1) + (2) = Rp. 884,344.43

PB 6.11. 1 M³ Membuat beton mutu f'c = 28.8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0.49 (1PC : 1,5PB : 2KR)
6.11.1 Bahan
Semen portland 439.000 Kg x Rp. 1,280 = Rp. 561,920.00
Pasir beton 670.000 Kg x Rp. 72.14 = Rp. 48,333.80
Kerikil beton 1006.000 Kg x Rp. 140.74 = Rp. 141,584.44
Air 215.000 Ltr x Rp. 1.17 = Rp. 251.55
Jumlah (1) = Rp. 752,089.79
6.11.2 Tenaga
Pekerja 2.100 Oh x Rp. 75,000 = Rp. 157,500.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.105 Oh x Rp. 100,000 = Rp. 10,500.00
Jumlah (2) = Rp. 206,850.00
Jumlah (1) + (2) = Rp. 958,939.79

PB 6.12. 1 M³ Membuat beton mutu f'c = 31.2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0.48 (1PC : 1,5PB : 2KR)
6.12.1 Bahan
Semen portland 448.000 Kg x Rp. 1,280 = Rp. 573,440.00
Pasir beton 667.000 Kg x Rp. 72.14 = Rp. 48,117.38
Kerikil beton 1000.000 Kg x Rp. 140.74 = Rp. 140,740.00
Air 215.000 Ltr x Rp. 1.17 = Rp. 251.55
Jumlah (1) = Rp. 762,548.93
6.12.2 Tenaga
Pekerja 2.100 Oh x Rp. 75,000 = Rp. 157,500.00
Tukang batu 0.350 Oh x Rp. 100,000 = Rp. 35,000.00
Kepala tukang 0.035 Oh x Rp. 110,000 = Rp. 3,850.00
Mandor 0.105 Oh x Rp. 100,000 = Rp. 10,500.00
Jumlah (2) = Rp. 206,850.00
Jumlah (1) + (2) = Rp. 969,398.93
PB 6.17. Pembesian 10 kg besi polos / besi ulir
6.17.1 Bahan
Besi beton (polos/ulir) 10.500 Kg x Rp. 15,740 = Rp. 165,270.00
Kawat beton 0.150 Kg x Rp. 23,080 = Rp. 3,462.00
Jumlah (1) = Rp. 168,732.00
6.17.2 Tenaga
Pekerja 0.070 Oh x Rp. 75,000 = Rp. 5,250.00
Tukang besi 0.070 Oh x Rp. 100,000 = Rp. 7,000.00
Kepala tukang 0.007 Oh x Rp. 110,000 = Rp. 770.00
Mandor 0.004 Oh x Rp. 100,000 = Rp. 400.00
Jumlah (2) = Rp. 13,420.00
Jumlah (1) + (2) = Rp. 182,152.00

PB 6.18. Pasang 10 kg kabel preetressed polos/strands


6.18.1 Bahan
Besi beton (polos/ulir) 10.500 Kg x Rp. 15,740 = Rp. 165,270.00
Kawat beton 0.100 Kg x Rp. 23,080 = Rp. 2,308.00
Jumlah (1) = Rp. 168,732.00
6.18.2 Tenaga
Pekerja 0.050 Oh x Rp. 75,000 = Rp. 3,750.00
Tukang besi 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
Kepala tukang 0.005 Oh x Rp. 110,000 = Rp. 550.00
Mandor 0.003 Oh x Rp. 100,000 = Rp. 300.00
Jumlah (2) = Rp. 9,600.00
Jumlah (1) + (2) = Rp. 178,332.00

PB 6.20. Pasang 1 M² bekisting untuk pondasi


6.20.1 Bahan
Kayu kelas III 0.040 M³ x Rp. 3,632,000 = Rp. 145,280.00
Paku biasa 0.300 Kg x Rp. 18,890 = Rp. 5,667.00
Minyak bekisting 0.100 Kg x Rp. 26,230 = Rp. 2,623.00
Jumlah (1) = Rp. 153,570.00
6.20.2 Tenaga
Pekerja 0.520 Oh x Rp. 75,000 = Rp. 39,000.00
Tukang kayu 0.260 Oh x Rp. 100,000 = Rp. 26,000.00
Kepala tukang 0.026 Oh x Rp. 110,000 = Rp. 2,860.00
Mandor 0.026 Oh x Rp. 100,000 = Rp. 2,600.00
Jumlah (2) = Rp. 70,460.00
Jumlah (1) + (2) = Rp. 224,030.00

PB 6.21. Pasang 1 M² bekisting untuk sloof


6.21.1 Bahan
Kayu kelas III 0.045 M³ x Rp. 3,632,000 = Rp. 163,440.00
Paku biasa 0.300 Kg x Rp. 18,890 = Rp. 5,667.00
Minyak bekisting 0.100 Kg x Rp. 26,230 = Rp. 2,623.00
Jumlah (1) = Rp. 163,440.00
6.21.2 Tenaga
Pekerja 0.520 Oh x Rp. 75,000 = Rp. 39,000.00
Tukang kayu 0.260 Oh x Rp. 100,000 = Rp. 26,000.00
Kepala tukang 0.026 Oh x Rp. 110,000 = Rp. 2,860.00
Mandor 0.026 Oh x Rp. 100,000 = Rp. 2,600.00
Jumlah (2) = Rp. 70,460.00
Jumlah (1) + (2) = Rp. 233,900.00

PB 6.22. Pasang 1 M² bekisting untuk kolom


6.22.1 Bahan
Kayu kelas III 0.040 M³ x Rp. 3,632,000 = Rp. 145,280.00
Paku biasa 0.400 Kg x Rp. 18,890 = Rp. 7,556.00
Minyak bekisting 0.200 Kg x Rp. 26,230 = Rp. 5,246.00
Balok (kayu kelas II) 0.015 M³ x Rp. 6,815,340 = Rp. 102,230.10
Tripleks tebal 9 mm 0.350 Lbr x Rp. 129,080 = Rp. 45,178.00
Kayu dolken/bulat Ø 3" - 4" 2.000 Btg x Rp. 20,990 = Rp. 41,980.00
Jumlah (1) = Rp. 347,470.10
6.22.2 Tenaga
Pekerja 0.660 Oh x Rp. 75,000 = Rp. 49,500.00
Tukang kayu 0.330 Oh x Rp. 100,000 = Rp. 33,000.00
Kepala tukang 0.033 Oh x Rp. 110,000 = Rp. 3,630.00
Mandor 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
Jumlah (2) = Rp. 89,430.00
Jumlah (1) + (2) = Rp. 436,900.10

PB 6.23. Pasang 1 M² bekisting untuk balok


6.23.1 Bahan
Kayu kelas III 0.040 M³ x Rp. 3,632,000 = Rp. 145,280.00
Paku biasa 0.400 Kg x Rp. 18,890 = Rp. 7,556.00
Minyak bekisting 0.200 Kg x Rp. 26,230 = Rp. 5,246.00
Balok (kayu kelas II) 0.018 M³ x Rp. 6,815,340 = Rp. 122,676.12
Tripleks tebal 9 mm 0.350 Lbr x Rp. 129,080 = Rp. 45,178.00
Kayu dolken/bulat Ø 3" - 4" 2.000 Btg x Rp. 20,990 = Rp. 41,980.00
Jumlah (1) = Rp. 367,916.12
6.23.2 Tenaga
Pekerja 0.660 Oh x Rp. 75,000 = Rp. 49,500.00
Tukang kayu 0.330 Oh x Rp. 100,000 = Rp. 33,000.00
Kepala tukang 0.033 Oh x Rp. 110,000 = Rp. 3,630.00
Mandor 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
Jumlah (2) = Rp. 89,430.00
Jumlah (1) + (2) = Rp. 457,346.12

PB 6.24. Pasang 1 M² bekisting untuk plat lantai


6.24.1 Bahan
Kayu kelas III 0.040 M³ x Rp. 3,632,000 = Rp. 145,280.00
Paku biasa 0.400 Kg x Rp. 18,890 = Rp. 7,556.00
Minyak bekisting 0.200 Kg x Rp. 26,230 = Rp. 5,246.00
Balok (kayu kelas II) 0.015 M³ x Rp. 6,815,340 = Rp. 102,230.10
Tripleks tebal 9 mm 0.350 Lbr x Rp. 129,080 = Rp. 45,178.00
Kayu dolken/bulat Ø 3" - 4" 6.000 Btg x Rp. 20,990 = Rp. 125,940.00
Jumlah (1) = Rp. 431,430.10
6.24.2 Tenaga
Pekerja 0.660 Oh x Rp. 75,000 = Rp. 49,500.00
Tukang kayu 0.330 Oh x Rp. 100,000 = Rp. 33,000.00
Kepala tukang 0.033 Oh x Rp. 110,000 = Rp. 3,630.00
Mandor 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
Jumlah (2) = Rp. 89,430.00
Jumlah (1) + (2) = Rp. 520,860.10

PB 6.25. Pasang 1 M² bekisting untuk dinding


6.25.1 Bahan
Kayu kelas III 0.030 M³ x Rp. 3,632,000 = Rp. 108,960.00
Paku biasa 0.400 Kg x Rp. 18,890 = Rp. 7,556.00
Minyak bekisting 0.200 Kg x Rp. 26,230 = Rp. 5,246.00
Balok (kayu kelas II) 0.020 M³ x Rp. 6,815,340 = Rp. 136,306.80
Tripleks tebal 9 mm 0.350 Lbr x Rp. 129,080 = Rp. 45,178.00
Kayu dolken/bulat Ø 3" - 4" 3.000 Btg x Rp. 20,990 = Rp. 62,970.00
Jumlah (1) = Rp. 366,216.80
6.25.2 Tenaga
Pekerja 0.660 Oh x Rp. 75,000 = Rp. 49,500.00
Tukang kayu 0.330 Oh x Rp. 100,000 = Rp. 33,000.00
Kepala tukang 0.033 Oh x Rp. 110,000 = Rp. 3,630.00
Mandor 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
Jumlah (2) = Rp. 89,430.00
Jumlah (1) + (2) = Rp. 455,646.80
PB 6.26. Pasang 1 M² bekisting untuk tangga
6.26.1 Bahan
. Kayu kelas III 0.030 M³ x Rp. 3,632,000 = Rp. 108,960.00
Paku biasa 0.400 Kg x Rp. 18,890 = Rp. 7,556.00
Minyak bekisting 0.150 Kg x Rp. 26,230 = Rp. 3,934.50
Balok (kayu kelas II) 0.015 M³ x Rp. 6,815,340 = Rp. 102,230.10
Tripleks tebal 9 mm 0.350 Lbr x Rp. 129,080 = Rp. 45,178.00
Kayu dolken/bulat Ø 3" - 4" 2.000 Btg x Rp. 20,990 = Rp. 41,980.00
Jumlah (1) = Rp. 309,838.60
6.26.2 Tenaga
Pekerja 0.660 Oh x Rp. 75,000 = Rp. 49,500.00
Tukang kayu 0.330 Oh x Rp. 100,000 = Rp. 33,000.00
Kepala tukang 0.033 Oh x Rp. 110,000 = Rp. 3,630.00
Mandor 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
Jumlah (2) = Rp. 89,430.00
Jumlah (1) + (2) = Rp. 399,268.60

PB 6.27. Pasang 1 M² jembatan untuk pengecoran beton


6.27.1 Bahan
. Kayu kelas III (papan) 0.026 M³ x Rp. 3,632,000 = Rp. 95,884.80
Paku biasa 0.600 Kg x Rp. 18,890 = Rp. 11,334.00
Kayu dolken/bulat Ø 3" - 4" 0.500 Btg x Rp. 20,990 = Rp. 10,495.00
Jumlah (1) = Rp. 117,713.80
6.27.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Tukang kayu 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
Kepala tukang 0.005 Oh x Rp. 110,000 = Rp. 550.00
Mandor 0.008 Oh x Rp. 100,000 = Rp. 800.00
Jumlah (2) = Rp. 17,600.00
Jumlah (1) + (2) = Rp. 135,313.80

PB 6.28. Pasang 1 M³ pondasi beton bertulang (150kg besi + bekisting)


6.28.1 Bahan
. Kayu kelas III 0.200 M³ x Rp. 3,632,000 = Rp. 726,400.00
Paku biasa 1.500 Kg x Rp. 18,890 = Rp. 28,335.00
Minyak bekisting 0.400 Kg x Rp. 26,230 = Rp. 10,492.00
Besi beton polos 157.500 Kg x Rp. 15,740 = Rp. 2,479,050.00
Kawat beton 2.250 Kg x Rp. 23,080 = Rp. 51,930.00
Semen Portland 336.000 Kg x Rp. 1,280 = Rp. 430,080.00
Pasir beton 0.540 M³ x Rp. 101,000 = Rp. 54,540.00
Kerikil beton 0.810 M³ x Rp. 190,000 = Rp. 153,900.00
Jumlah (1) = Rp. 3,934,727.00
6.28.2 Tenaga
Pekerja 5.300 Oh x Rp. 75,000 = Rp. 397,500.00
Tukang Batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Tukang Kayu 1.300 Oh x Rp. 100,000 = Rp. 130,000.00
Tukang besi 1.050 Oh x Rp. 100,000 = Rp. 105,000.00
Kepala tukang 0.262 Oh x Rp. 110,000 = Rp. 28,820.00
Mandor 0.265 Oh x Rp. 100,000 = Rp. 26,500.00
Jumlah (2) = Rp. 715,320.00
Jumlah (1) + (2) = Rp. 4,650,047.00

PB 6.29. Pasang 1 M³ sloof beton bertulang (200 kg besi + bekisting)


6.29.1 Bahan
. Kayu kelas III 0.270 M³ x Rp. 3,632,000 = Rp. 980,640.00
Paku biasa 2.000 Kg x Rp. 18,890 = Rp. 37,780.00
Minyak bekisting 0.600 Kg x Rp. 26,230 = Rp. 15,738.00
Besi beton polos 210.000 Kg x Rp. 15,740 = Rp. 3,305,400.00
kawat beton 3.000 Kg x Rp. 23,080 = Rp. 69,240.00
Semen Portland 336.000 Kg x Rp. 1,280 = Rp. 430,080.00
Pasir beton 0.540 M³ x Rp. 101,000 = Rp. 54,540.00
Kerikil beton 0.810 M³ x Rp. 190,000 = Rp. 153,900.00
Jumlah (1) = Rp. 5,047,318.00
6.29.2 Tenaga
Pekerja 5.650 Oh x Rp. 75,000 = Rp. 423,750.00
Tukang Batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Tukang Kayu 1.560 Oh x Rp. 100,000 = Rp. 156,000.00
Tukang besi 1.400 Oh x Rp. 100,000 = Rp. 140,000.00
Kepala tukang 0.323 Oh x Rp. 110,000 = Rp. 35,530.00
Mandor 0.283 Oh x Rp. 100,000 = Rp. 28,300.00
Jumlah (2) = Rp. 811,080.00
Jumlah (1) + (2) = Rp. 5,858,398.00

PB 6.30. Membuat 1 M³ kolom beton bertulang (300 kg besi + bekisting)


6.30.1 Bahan
. Kayu kelas III 0.400 M³ x Rp. 3,632,000 = Rp. 1,452,800.00
Paku biasa 4.000 Kg x Rp. 18,890 = Rp. 75,560.00
Minyak bekisting 2.000 Kg x Rp. 26,230 = Rp. 52,460.00
Besi beton polos 315.000 Kg x Rp. 15,740 = Rp. 4,958,100.00
kawat beton 4.500 Kg x Rp. 23,080 = Rp. 103,860.00
Semen Portland 336.000 Kg x Rp. 1,280 = Rp. 430,080.00
Pasir beton 0.540 M³ x Rp. 101,000 = Rp. 54,540.00
Kerikil beton 0.810 M³ x Rp. 190,000 = Rp. 153,900.00
Kayu kelas II (balok) 0.150 M³ x Rp. 6,815,340 = Rp. 1,022,301.00
Tripleks 9 mm 3.500 Lbr x Rp. 129,080 = Rp. 451,780.00
Kayu dolken/bulat Ø 3" - 4" 20.000 Btg x Rp. 20,990 = Rp. 419,800.00
Jumlah (1) = Rp. 9,175,181.00
6.30.2 Tenaga
Pekerja 7.050 Oh x Rp. 75,000 = Rp. 528,750.00
Tukang Batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Tukang Kayu 1.650 Oh x Rp. 100,000 = Rp. 165,000.00
Tukang besi 2.100 Oh x Rp. 100,000 = Rp. 210,000.00
Kepala tukang 0.403 Oh x Rp. 110,000 = Rp. 44,330.00
Mandor 0.353 Oh x Rp. 100,000 = Rp. 35,300.00
Jumlah (2) = Rp. 1,010,880.00
Jumlah (1) + (2) = Rp. 10,186,061.00

PB 6.31. Membuat 1 M³ balok beton bertulang (200 kg besi + bekisting)


6.31.1 Bahan
. Kayu kelas III 0.320 M³ x Rp. 3,632,000 = Rp. 1,162,240.00
Paku biasa 3.200 Kg x Rp. 18,890 = Rp. 60,448.00
Minyak bekisting 1.600 Kg x Rp. 26,230 = Rp. 41,968.00
Besi beton polos 210.000 Kg x Rp. 15,740 = Rp. 3,305,400.00
kawat beton 3.000 Kg x Rp. 23,080 = Rp. 69,240.00
Semen Portland 336.000 Kg x Rp. 1,280 = Rp. 430,080.00
Pasir beton 0.540 M³ x Rp. 101,000 = Rp. 54,540.00
Kerikil beton 0.810 M³ x Rp. 190,000 = Rp. 153,900.00
Kayu kelas II (balok) 0.140 M³ x Rp. 6,815,340 = Rp. 954,147.60
Tripleks 9 mm 2.800 Lbr x Rp. 129,080 = Rp. 361,424.00
Kayu dolken/bulat Ø 3" - 4" 16.000 Btg x Rp. 20,990 = Rp. 335,840.00
Jumlah (1) = Rp. 6,929,227.60
6.31.2 Tenaga
Pekerja 6.350 Oh x Rp. 75,000 = Rp. 476,250.00
Tukang Batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Tukang Kayu 1.650 Oh x Rp. 100,000 = Rp. 165,000.00
Tukang besi 1.400 Oh x Rp. 100,000 = Rp. 140,000.00
Kepala tukang 0.333 Oh x Rp. 110,000 = Rp. 36,630.00
Mandor 0.318 Oh x Rp. 100,000 = Rp. 31,800.00
Jumlah (2) = Rp. 877,180.00
Jumlah (1) + (2) = Rp. 7,806,407.60

PB 6.32. Membuat 1 M³ plat beton bertulang (150 kg besi + bekisting)


6.32.1 Bahan
. Kayu kelas III 0.320 M³ x Rp. 3,632,000 = Rp. 1,162,240.00
Paku biasa 3.200 Kg x Rp. 18,890 = Rp. 60,448.00
Minyak bekisting 1.600 Kg x Rp. 26,230 = Rp. 41,968.00
Besi beton polos 157.500 Kg x Rp. 15,740 = Rp. 2,479,050.00
kawat beton 2.250 Kg x Rp. 23,080 = Rp. 51,930.00
Semen Portland 336.000 Kg x Rp. 1,280 = Rp. 430,080.00
Pasir beton 0.540 M³ x Rp. 101,000 = Rp. 54,540.00
Kerikil beton 0.810 M³ x Rp. 190,000 = Rp. 153,900.00
Kayu kelas II (balok) 0.120 M³ x Rp. 6,815,340 = Rp. 817,840.80
Tripleks 9 mm 2.800 Lbr x Rp. 129,080 = Rp. 361,424.00
Kayu dolken/bulat Ø 3" - 4" 32.000 Btg x Rp. 20,990 = Rp. 671,680.00
Jumlah (1) = Rp. 6,285,100.80
6.32.2 Tenaga
Pekerja 5.300 Oh x Rp. 75,000 = Rp. 397,500.00
Tukang Batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Tukang Kayu 1.300 Oh x Rp. 100,000 = Rp. 130,000.00
Tukang besi 1.050 Oh x Rp. 100,000 = Rp. 105,000.00
Kepala tukang 0.265 Oh x Rp. 110,000 = Rp. 29,150.00
Mandor 0.265 Oh x Rp. 100,000 = Rp. 26,500.00
Jumlah (2) = Rp. 715,650.00
Jumlah (1) + (2) = Rp. 7,000,750.80

PB 6.33. Membuat 1 M³ dinding beton bertulang (150 kg besi + bekisting)


6.33.1 Bahan
. Kayu kelas III 0.240 M³ x Rp. 3,632,000 = Rp. 871,680.00
Paku biasa 3.200 Kg x Rp. 18,890 = Rp. 60,448.00
Minyak bekisting 1.600 Kg x Rp. 26,230 = Rp. 41,968.00
Besi beton polos 157.500 Kg x Rp. 15,740 = Rp. 2,479,050.00
kawat beton 2.250 Kg x Rp. 23,080 = Rp. 51,930.00
Semen Portland 336.000 Kg x Rp. 1,280 = Rp. 430,080.00
Pasir beton 0.540 M³ x Rp. 101,000 = Rp. 54,540.00
Kerikil beton 0.810 M³ x Rp. 190,000 = Rp. 153,900.00
Kayu kelas II (balok) 0.160 M³ x Rp. 6,815,340 = Rp. 1,090,454.40
Tripleks 9 mm 2.800 Lbr x Rp. 129,080 = Rp. 361,424.00
Kayu dolken/bulat Ø 3" - 4" 24.000 Btg x Rp. 20,990 = Rp. 503,760.00
Jumlah (1) = Rp. 6,099,234.40
6.33.2 Tenaga
Pekerja 5.300 Oh x Rp. 75,000 = Rp. 397,500.00
Tukang Batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Tukang Kayu 1.300 Oh x Rp. 100,000 = Rp. 130,000.00
Tukang besi 1.050 Oh x Rp. 100,000 = Rp. 105,000.00
Kepala tukang 0.262 Oh x Rp. 110,000 = Rp. 28,820.00
Mandor 0.265 Oh x Rp. 100,000 = Rp. 26,500.00
Jumlah (2) = Rp. 715,320.00
Jumlah (1) + (2) = Rp. 6,814,554.40

PB 6.34. Membuat 1 M³ dinding beton bertulang (200 kg besi + bekisting)


6.34.1 Bahan
. Kayu kelas III 0.250 M³ x Rp. 3,632,000 = Rp. 908,000.00
Paku biasa 3.000 Kg x Rp. 18,890 = Rp. 56,670.00
Minyak bekisting 1.200 Kg x Rp. 26,230 = Rp. 31,476.00
Besi beton polos 210.000 Kg x Rp. 15,740 = Rp. 3,305,400.00
kawat beton 3.000 Kg x Rp. 23,080 = Rp. 69,240.00
Semen Portland 336.000 Kg x Rp. 1,280 = Rp. 430,080.00
Pasir beton 0.540 M³ x Rp. 101,000 = Rp. 54,540.00
Kerikil beton 0.810 M³ x Rp. 190,000 = Rp. 153,900.00
Kayu kelas II (balok) 0.105 M³ x Rp. 6,815,340 = Rp. 715,610.70
Tripleks 9 mm 2.500 Lbr x Rp. 129,080 = Rp. 322,700.00
Kayu dolken/bulat Ø 3" - 4" 14.000 Btg x Rp. 20,990 = Rp. 293,860.00
Jumlah (1) = Rp. 6,341,476.70
6.34.2 Tenaga
Pekerja 5.650 Oh x Rp. 75,000 = Rp. 423,750.00
Tukang Batu 0.275 Oh x Rp. 100,000 = Rp. 27,500.00
Tukang Kayu 1.560 Oh x Rp. 100,000 = Rp. 156,000.00
Tukang besi 1.400 Oh x Rp. 100,000 = Rp. 140,000.00
Kepala tukang 0.323 Oh x Rp. 110,000 = Rp. 35,530.00
Mandor 0.283 Oh x Rp. 100,000 = Rp. 28,300.00
Jumlah (2) = Rp. 811,080.00
Jumlah (1) + (2) = Rp. 7,152,556.70
PB 6.35. Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm
6.35.1 Bahan
. Kayu kelas III 0.002 M³ x Rp. 3,632,000 = Rp. 7,264.00
Paku biasa 0.010 Kg x Rp. 18,890 = Rp. 188.90
Besi beton polos 3.000 Kg x Rp. 15,740 = Rp. 47,220.00
kawat beton 0.045 Kg x Rp. 23,080 = Rp. 1,038.60
Semen Portland 4.000 Kg x Rp. 1,280 = Rp. 5,120.00
Pasir beton 0.006 M³ x Rp. 101,000 = Rp. 606.00
Kerikil beton 0.009 M³ x Rp. 190,000 = Rp. 1,710.00
Jumlah (1) = Rp. 63,147.50
6.35.2 Tenaga
Pekerja 0.180 Oh x Rp. 75,000 = Rp. 13,500.00
Tukang Batu 0.020 Oh x Rp. 100,000 = Rp. 2,000.00
Tukang Kayu 0.020 Oh x Rp. 100,000 = Rp. 2,000.00
Tukang besi 0.020 Oh x Rp. 100,000 = Rp. 2,000.00
Kepala tukang 0.006 Oh x Rp. 110,000 = Rp. 660.00
Mandor 0.009 Oh x Rp. 100,000 = Rp. 900.00
Jumlah (2) = Rp. 21,060.00
Jumlah (1) + (2) = Rp. 84,207.50

PB 6.36. Membuat 1 m' balok beton bertulang (10 x 15) cm


6.36.1 Bahan
. Kayu kelas III 0.003 M³ x Rp. 3,632,000 = Rp. 10,896.00
Paku biasa 0.020 Kg x Rp. 18,890 = Rp. 377.80
Besi beton polos 3.600 Kg x Rp. 15,740 = Rp. 56,664.00
kawat beton 0.050 Kg x Rp. 23,080 = Rp. 1,154.00
Semen Portland 5.500 Kg x Rp. 1,280 = Rp. 7,040.00
Pasir beton 0.009 M³ x Rp. 101,000 = Rp. 909.00
Kerikil beton 0.015 M³ x Rp. 190,000 = Rp. 2,850.00
Jumlah (1) = Rp. 79,890.80
6.36.2 Tenaga
Pekerja 0.297 Oh x Rp. 75,000 = Rp. 22,275.00
Tukang Batu 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
Tukang Kayu 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
Tukang besi 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp. 1,100.00
Mandor 0.015 Oh x Rp. 100,000 = Rp. 1,500.00
Jumlah (2) = Rp. 34,775.00
Jumlah (1) + (2) = Rp. 114,665.80

*******LANJUT PEKERJAAN PENUTUP ATAP


PK 6.27.a 1 M² Pasang dinding lambriziring dari tripleks sungkai 120x240 tebal 3mm
6.27.a.1 Bahan
TriplekSungkai 120 x 240 tbl.3 mm 0.400 Lbr x Rp. 144,180.00 = Rp. 57,672.00
Paku biasa 0.050 Kg x Rp. 18,890.00 = Rp. 944.50
Jumlah (1) = Rp. 58,616.50
6.27.a.2 Tenaga
Pekerja 0.025 Oh x Rp. 75,000.00 = Rp. 1,875.00
Tukang kayu 0.075 Oh x Rp. 100,000.00 = Rp. 7,500.00
Kepala tukang 0.008 Oh x Rp. 110,000.00 = Rp. 880.00
Mandor 0.001 Oh x Rp. 100,000.00 = Rp. 100.00
Jumlah (2) = Rp. 10,355.00
Jumlah (1) +(2) = Rp. 68,971.50

PK 6.27.b 1 M² Pasang dinding lambriziring dari double tripleks sungkai 120x240 tebal 3mm
6.27.b.1 Bahan
TriplekSungkai 120 x 240 tbl.3 mm 0.800 Lbr x Rp. 144,180.00 = Rp. 115,344.00
Paku biasa 0.100 Kg x Rp. 18,890.00 = Rp. 1,889.00
Jumlah (1) = Rp. 117,233.00
6.27.b.2 Tenaga
Pekerja 0.025 Oh x Rp. 75,000.00 = Rp. 1,875.00
Tukang kayu 0.075 Oh x Rp. 100,000.00 = Rp. 7,500.00
Kepala tukang 0.008 Oh x Rp. 110,000.00 = Rp. 880.00
Mandor 0.001 Oh x Rp. 100,000.00 = Rp. 100.00
Jumlah (2) = Rp. 10,355.00
Jumlah (1) +(2) = Rp. 127,588.00

PK 6.9.b. 1 M² Buat pintu tripleks sungkai rangkap, rangka ekspose kayu kelas II
6.9.b.1 Bahan
Papan (kayu kelas II) 0.026 M³ x Rp. 6,815,340.00 = Rp. 174,472.70
Paku biasa 0.030 Kg x Rp. 18,890.00 = Rp. 566.70
Lem kayu 0.500 Kg x Rp. 15,740.00 = Rp. 7,870.00
TriplekSungkai 120 x 240 tbl.3 m 1.000 Lbr x Rp. 144,180.00 = Rp. 144,180.00
Jumlah (1) = Rp. 327,089.40
6.9.b.2 Tenaga
Pekerja 0.800 Oh x Rp. 75,000.00 = Rp. 60,000.00
Tukang kayu 2.400 Oh x Rp. 100,000.00 = Rp. 240,000.00
Kepala tukang 0.240 Oh x Rp. 110,000.00 = Rp. 26,400.00
Mandor 0.040 Oh x Rp. 100,000.00 = Rp. 4,000.00
Jumlah (2) = Rp. 330,400.00
Jumlah (1) +(2) = Rp. 657,489.40
ANALISA BIAYA KONSTRUKSI
PEKERJAAN PLESTERAN

PL 6.1. 1 M² Plesteran 1 Pc : 1 Pp, tebal 15 mm


6.1.1. Bahan
Semen portland 15.504 Kg x Rp. 1,280.00 = Rp. 19,845.12
Pasir pasang 0.016 M³ x Rp. 101,000.00 = Rp. 1,616.00
Jumlah (1) = Rp. 21,461.12
6.1.2. Tenaga
Pekerja 0.300 Oh x Rp. 75,000.00 = Rp. 22,500.00
Tukang batu 0.150 Oh x Rp. 100,000.00 = Rp. 15,000.00
Kepala tukang 0.015 Oh x Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.015 Oh x Rp. 100,000.00 = Rp. 1,500.00
Jumlah (2) = Rp. 40,650.00
Jumlah (1) + (2) = Rp. 62,111.12

PL 6.2. 1 M² Plesteran 1 Pc : 2 Pp, tebal 15 mm


6.2.1. Bahan
Semen portland 10.224 Kg x Rp. 1,280.00 = Rp. 13,086.72
Pasir pasang 0.020 M³ x Rp. 101,000.00 = Rp. 2,020.00
Jumlah (1) = Rp. 15,106.72
6.2.2. Tenaga
Pekerja 0.300 Oh x Rp. 75,000.00 = Rp. 22,500.00
Tukang batu 0.150 Oh x Rp. 100,000.00 = Rp. 15,000.00
Kepala tukang 0.015 Oh x Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.015 Oh x Rp. 100,000.00 = Rp. 1,500.00
Jumlah (2) = Rp. 40,650.00
Jumlah (1) + (2) = Rp. 55,756.72

PL 6.3. 1 M² Plesteran 1 Pc : 3 Pp, tebal 15 mm


6.3.1. Bahan
Semen portland 7.776 Kg x Rp. 1,280.00 = Rp. 9,953.28
Pasir pasang 0.023 M³ x Rp. 101,000.00 = Rp. 2,323.00
Jumlah (1) = Rp. 12,276.28
6.3.2. Tenaga
Pekerja 0.300 Oh x Rp. 75,000.00 = Rp. 22,500.00
Tukang batu 0.150 Oh x Rp. 100,000.00 = Rp. 15,000.00
Kepala tukang 0.015 Oh x Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.015 Oh x Rp. 100,000.00 = Rp. 1,500.00
Jumlah (2) = Rp. 40,650.00
Jumlah (1) + (2) = Rp. 52,926.28

PL 6.4. 1 M² Plesteran 1 Pc : 4 Pp, tebal 15 mm


6.4.1. Bahan
Semen portland 6.240 Kg x Rp. 1,280.00 = Rp. 7,987.20
Pasir pasang 0.024 M³ x Rp. 101,000.00 = Rp. 2,424.00
Jumlah (1) = Rp. 10,411.20
6.4.2. Tenaga
Pekerja 0.300 Oh x Rp. 75,000.00 = Rp. 22,500.00
Tukang batu 0.150 Oh x Rp. 100,000.00 = Rp. 15,000.00
Kepala tukang 0.015 Oh x Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.015 Oh x Rp. 100,000.00 = Rp. 1,500.00
Jumlah (2) = Rp. 40,650.00
Jumlah (1) + (2) = Rp. 51,061.20

PL 6.5. 1 M² Plesteran 1 Pc : 5 Pp, tebal 15 mm


6.5.1 Bahan
Semen Portland 5.184 Kg x Rp. 1,280.00 = Rp. 6,635.52
Pasir pasang 0.026 M³ x Rp. 101,000.00 = Rp. 2,626.00
Jumlah (1) = Rp. 9,261.52
6.5.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000.00 = Rp. 22,500.00
Tukang batu 0.150 Oh x Rp. 100,000.00 = Rp. 15,000.00
Kepala tukang 0.015 Oh x Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.0150 Oh x Rp. 100,000.00 = Rp. 1,500.00
Jumlah (2) = Rp. 40,650.00
Jumlah (1) + (2) = Rp. 49,911.52

PL 6.9. 1 M² Plesteran 1 Pc : 3 Pp, tebal 15 mm


6.9.1 Bahan
Semen Portland 5.760 Kg x Rp. 1,280.00 = Rp. 7,372.80
Pasir pasang 0.013 M³ x Rp. 101,000.00 = Rp. 1,313.00
Jumlah (1) = Rp. 8,685.80
6.9.2 Tenaga
Pekerja 0.360 Oh x Rp. 75,000.00 = Rp. 27,000.00
Tukang batu 0.120 Oh x Rp. 100,000.00 = Rp. 12,000.00
Kepala tukang 0.012 Oh x Rp. 110,000.00 = Rp. 1,320.00
Mandor 0.018 Oh x Rp. 100,000.00 = Rp. 1,800.00
Jumlah (2) = Rp. 42,120.00
Jumlah (1) + (2) = Rp. 50,805.80

PL 6.10. 1 M² Plesteran 1 Pc : 8 Pp, tebal 15 mm


6.10.1 Bahan
Semen Portland 3.000 Kg x Rp. 1,280.00 = Rp. 3,840.00
Pasir pasang 0.020 M³ x Rp. 101,000.00 = Rp. 2,020.00
Jumlah (1) = Rp. 5,860.00
6.10.2 Tenaga
Pekerja 0.360 Oh x Rp. 75,000.00 = Rp. 27,000.00
Tukang batu 0.120 Oh x Rp. 100,000.00 = Rp. 12,000.00
Kepala tukang 0.012 Oh x Rp. 110,000.00 = Rp. 1,320.00
Mandor 0.018 Oh x Rp. 100,000.00 = Rp. 1,800.00
Jumlah (2) = Rp. 42,120.00
Jumlah (1) + (2) = Rp. 47,980.00

PL 6.13. 1 M² Plesteran 1 Pc : 2 Pp, tebal 20 mm


6.13.1 Bahan
Semen Portland 13.632 Kg x Rp. 1,280.00 = Rp. 17,448.96
Pasir pasang 0.027 M³ x Rp. 101,000.00 = Rp. 2,727.00
Jumlah (1) = Rp. 20,175.96
6.13.2 Tenaga
Pekerja 0.400 Oh x Rp. 75,000.00 = Rp. 30,000.00
Tukang batu 0.200 Oh x Rp. 100,000.00 = Rp. 20,000.00
Kepala tukang 0.020 Oh x Rp. 110,000.00 = Rp. 2,200.00
Mandor 0.022 Oh x Rp. 100,000.00 = Rp. 2,200.00
Jumlah (2) = Rp. 54,400.00
Jumlah (1) + (2) = Rp. 74,575.96
PL 6.14. 1 M² Plesteran 1 Pc : 3 Pp, tebal 20 mm
6.14.1 Bahan
Semen Portland 10.368 Kg x Rp. 1,280.00 = Rp. 13,271.04
Pasir pasang 0.031 M³ x Rp. 101,000.00 = Rp. 3,131.00
Jumlah (1) = Rp. 16,402.04
6.14.2 Tenaga
Pekerja 0.260 Oh x Rp. 75,000.00 = Rp. 19,500.00
Tukang batu 0.200 Oh x Rp. 100,000.00 = Rp. 20,000.00
Kepala tukang 0.020 Oh x Rp. 110,000.00 = Rp. 2,200.00
Mandor 0.013 Oh x Rp. 100,000.00 = Rp. 1,300.00
Jumlah (2) = Rp. 43,000.00
Jumlah (1) + (2) = Rp. 59,402.04
PL 6.15. 1 M² Plesteran 1 Pc : 4 Pp, tebal 20 mm
6.15.1 Bahan
Semen Portland 8.320 Kg x Rp. 1,280.00 = Rp. 10,649.60
Pasir pasang 0.032 M³ x Rp. 101,000.00 = Rp. 3,232.00
Jumlah (1) = Rp. 13,881.60
6.15.2 Tenaga
Pekerja 0.400 Oh x Rp. 75,000.00 = Rp. 30,000.00
Tukang batu 0.200 Oh x Rp. 100,000.00 = Rp. 20,000.00
Kepala tukang 0.020 Oh x Rp. 110,000.00 = Rp. 2,200.00
Mandor 0.022 Oh x Rp. 100,000.00 = Rp. 2,200.00
Jumlah (2) = Rp. 54,400.00
Jumlah (1) + (2) = Rp. 68,281.60
PL 6.16. 1 M² Plesteran 1 Pc : 5 Pp, tebal 20 cm
6.16.1 Bahan
Semen Portland 6.912 Kg x Rp. 1,280.00 = Rp. 8,847.36
Pasir pasang 0.035 M³ x Rp. 101,000.00 = Rp. 3,535.00
Jumlah (1) = Rp. 12,382.36
6.16.2 Tenaga
Pekerja 0.400 Oh x Rp. 75,000.00 = Rp. 30,000.00
Tukang batu 0.200 Oh x Rp. 100,000.00 = Rp. 20,000.00
Kepala tukang 0.020 Oh x Rp. 110,000.00 = Rp. 2,200.00
Mandor 0.022 Oh x Rp. 100,000.00 = Rp. 2,200.00
Jumlah (2) = Rp. 54,400.00
Jumlah (1) + (2) = Rp. 66,782.36

PL 6.19. 1 M² Berapen 1 Pc : 5 Pp, tebal 15 mm


6.19.1 Bahan
Semen portland 5.184 Kg x Rp. 1,280.00 = Rp. 6,635.52
Pasir pasang 0.026 M³ x Rp. 101,000.00 = Rp. 2,626.00
Jumlah (1) = Rp. 9,261.52
6.19.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000.00 = Rp. 11,250.00
Tukang batu 0.075 Oh x Rp. 100,000.00 = Rp. 7,500.00
Kepala tukang 0.008 Oh x Rp. 110,000.00 = Rp. 880.00
Mandor 0.008 Oh x Rp. 100,000.00 = Rp. 800.00
Jumlah (2) = Rp. 20,430.00
Jumlah (1) + (2) = Rp. 29,691.52
PL 6.20. 1 M² Plesteran skoning 1 Pc : 2 Pp, tebal 10 mm
6.20.1 Bahan
Semen portland 0.500 Kg x Rp. 1,280.00 = Rp. 640.00
Pasir pasang 0.013 M³ x Rp. 101,000.00 = Rp. 1,313.00
Jumlah (1) = Rp. 1,953.00
6.20.2 Tenaga
Pekerja 0.080 Oh x Rp. 75,000.00 = Rp. 6,000.00
Tukang batu 0.400 Oh x Rp. 100,000.00 = Rp. 40,000.00
Kepala tukang 0.040 Oh x Rp. 110,000.00 = Rp. 4,400.00
Mandor 0.004 Oh x Rp. 100,000.00 = Rp. 400.00
Jumlah (2) = Rp. 50,800.00
Jumlah (1) + (2) = Rp. 52,753.00
PL 6.23. 1 M² Plesteran Ciprat 1 Pc : 2 Pp
6.23.1 Bahan
Semen portland 4.320 Kg x Rp. 1,280.00 = Rp. 5,529.60
Pasir pasang 0.006 M³ x Rp. 101,000.00 = Rp. 606.00
Jumlah (1) = Rp. 6,135.60
6.23.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000.00 = Rp. 22,500.00
Tukang batu 0.100 Oh x Rp. 100,000.00 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.015 Oh x Rp. 100,000.00 = Rp. 1,500.00
Jumlah (2) = Rp. 35,100.00
Jumlah (1) + (2) = Rp. 41,235.60
PL 6.24. 1 M² Finishing siar pasangan dinding bata merah (= 20 m')
6.24.1 Bahan
Semen portland 3.108 Kg x Rp. 1,280.00 = Rp. 3,978.24
Jumlah (1) = Rp. 3,978.24
6.24.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000.00 = Rp. 11,250.00
Tukang batu 0.075 Oh x Rp. 100,000.00 = Rp. 7,500.00
Kepala tukang 0.008 Oh x Rp. 110,000.00 = Rp. 880.00
Mandor 0.008 Oh x Rp. 100,000.00 = Rp. 800.00
Jumlah (2) = Rp. 20,430.00
Jumlah (1) + (2) = Rp. 24,408.24
PL 6.25. 1 M² Finishing siar pasangan dinding conblock ekspose (= 8 m')
6.25.1 Bahan
Semen portland 1.600 Kg x Rp. 1,280.00 = Rp. 2,048.00
Jumlah (1) = Rp. 2,048.00
6.25.2 Tenaga
Pekerja 0.070 Oh x Rp. 75,000.00 = Rp. 5,250.00
Tukang batu 0.035 Oh x Rp. 100,000.00 = Rp. 3,500.00
Kepala tukang 0.004 Oh x Rp. 110,000.00 = Rp. 440.00
Mandor 0.004 Oh x Rp. 100,000.00 = Rp. 400.00
Jumlah (2) = Rp. 9,590.00
Jumlah (1) + (2) = Rp. 11,638.00

PL 6.26. 1 M² finishing siar pasangan batu kali adukan 1 Pc : 2 Pp


6.26.1 Bahan
Semen portland 6.340 Kg x Rp. 1,280.00 = Rp. 8,115.20
Pasir pasang 0.012 M³ x Rp. 101,000.00 = Rp. 1,212.00
Jumlah (1) = Rp. 9,327.20
6.26.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000.00 = Rp. 22,500.00
Tukang batu 0.150 Oh x Rp. 100,000.00 = Rp. 15,000.00
Kepala tukang 0.015 Oh x Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.015 Oh x Rp. 100,000.00 = Rp. 1,500.00
Jumlah (2) = Rp. 40,650.00
Jumlah (1) + (2) = Rp. 49,977.20

PL 6.27. 1 M² Acian
6.27.1 Bahan
Semen portland 3.250 Kg x Rp. 1,280.00 = Rp. 4,160.00
Jumlah (1) = Rp. 4,160.00
6.27.2 Tenaga
Pekerja 0.200 Oh x Rp. 75,000.00 = Rp. 15,000.00
Tukang batu 0.100 Oh x Rp. 100,000.00 = Rp. 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.010 Oh x Rp. 100,000.00 = Rp. 1,000.00
Jumlah (2) = Rp. 27,100.00
Jumlah (1) + (2) = Rp. 31,260.00
*****LANJUT PEKERJAAN KAYU
ANALISA BIAYA KONSTRUKSI
PEKERJAAN DINDING

PD 6.1. 1 M² Pasang bata merah tebal 1 bata, 1 Pc : 2 Pp


6.1.1. Bahan
Batu bata cetak mesin 140.000 Bh x Rp. 910 = Rp 127,400.00
Semen portland 43.500 Kg x Rp. 1,280 = Rp 55,680.00
Pasir pasang 0.080 M³ x Rp. 101,000 = Rp 8,080.00
Jumlah (1) = Rp 191,160.00
6.1.2 Tenaga
Pekerja 0.600 Oh x Rp. 75,000 = Rp 45,000.00
Tukang batu 0.200 Oh x Rp. 100,000 = Rp 20,000.00
Kepala tukang 0.020 Oh x Rp. 110,000 = Rp 2,200.00
Mandor 0.030 Oh x Rp. 100,000 = Rp 3,000.00
Jumlah (2) = Rp 70,200.00
Jumlah (1) + (2) = Rp 261,360.00

PD 6.2 1M² Pasang bata merah tebal 1 bata, 1Pc : 3 Pp


6.2.1 Bahan
Batu bata cetak mesin 140.000 Bh x Rp. 910 = Rp 127,400.00
Semen portland 32.950 Kg x Rp. 1,280 = Rp 42,176.00
Pasir pasang 0.091 M³ x Rp. 101,000 = Rp 9,191.00
Jumlah (1) = Rp 178,767.00
6.2.2 Tenaga
Pekerja 0.600 Oh x Rp. 75,000 = Rp 45,000.00
Tukang batu 0.200 Oh x Rp. 100,000 = Rp 20,000.00
Kepala tukang 0.020 Oh x Rp. 110,000 = Rp 2,200.00
Mandor 0.030 Oh x Rp. 100,000 = Rp 3,000.00
Jumlah (2) = Rp 70,200.00
Jumlah (1) + (2) = Rp 248,967.00

PD 6.3 1 m² Pasang bata merah tebal 1 bata, 1Pc : 4 Pp


6.3.1 Bahan
Batu bata cetak mesin 140.000 Bh x Rp. 910 = Rp 127,400.00
Semen portland 26.550 Kg x Rp. 1,280 = Rp 33,984.00
Pasir pasang 0.093 M³ x Rp. 101,000 = Rp 9,393.00
Jumlah (1) = Rp 170,777.00
6.3.2 Tenaga
Pekerja 0.600 Oh x Rp. 75,000 = Rp 45,000.00
Tukang batu 0.200 Oh x Rp. 100,000 = Rp 20,000.00
Kepala tukang 0.020 Oh x Rp. 110,000 = Rp 2,200.00
Mandor 0.030 Oh x Rp. 100,000 = Rp 3,000.00
Jumlah (2) = Rp 70,200.00
Jumlah (1) + (2) = Rp 240,977.00

PD 6.6 1 m² Pasang bata merah tebal 1 bata, 1Pc : 3 Kp : 10 Pp


6.6.1 Bahan
Batu bata cetak mesin 140.000 Bh x Rp. 910 = Rp 127,400.00
Semen portland 10.080 Kg x Rp. 1,280 = Rp 12,902.40
Pasir pasang 0.093 M³ x Rp. 101,000 = Rp 9,342.50
Jumlah (1) = Rp 149,644.90
6.6.2 Tenaga
Pekerja 0.600 Oh x Rp. 75,000 = Rp 45,000.00
Tukang batu 0.200 Oh x Rp. 100,000 = Rp 20,000.00
Kepala tukang 0.020 Oh x Rp. 110,000 = Rp 2,200.00
Mandor 0.030 Oh x Rp. 100,000 = Rp 3,000.00
Jumlah (2) = Rp 70,200.00
Jumlah (1) + (2) = Rp 219,844.90
PD 6.7. 1 m² Pasang bata merah tebal 1/2 bata, 1Pc : 2 Pp
6.7.1 Bahan
Batu bata cetak mesin 70.000 Bh x Rp. 910 = Rp 63,700.00
Semen portland 18.950 Kg x Rp. 1,280 = Rp 24,256.00
Pasir pasang 0.038 M³ x Rp. 101,000 = Rp 3,838.00
Jumlah (1) = Rp 91,794.00
6.7.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000 = Rp 22,500.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp 1,100.00
Mandor 0.015 Oh x Rp. 100,000 = Rp 1,500.00
Jumlah (2) = Rp 35,100.00
Jumlah (1) + (2) = Rp 126,894.00

PD 6.8. 1 m² Pasang bata merah tebal 1/2 bata, 1Pc : 3 Pp


6.8.1 Bahan
. Batu bata cetak mesin 70.000 Bh x Rp. 910 = Rp 63,700.00
Semen portland 14.370 Kg x Rp. 1,280 = Rp 18,393.60
Pasir pasang 0.040 M³ x Rp. 101,000 = Rp 4,040.00
Jumlah (1) = Rp 86,133.60
6.8.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000 = Rp 22,500.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp 1,100.00
Mandor 0.015 Oh x Rp. 100,000 = Rp 1,500.00
Jumlah (2) = Rp 35,100.00
Jumlah (1) + (2) = Rp 121,233.60

PD 6.9. 1 m² Pasang bata merah tebal 1/2 bata, 1Pc : 4 Pp


6.9.1 Bahan
. Batu bata cetak mesin 70.000 Bh x Rp. 910 = Rp 63,700.00
Semen portland 11.500 Kg x Rp. 1,280 = Rp 14,720.00
Pasir pasang 0.043 M³ x Rp. 101,000 = Rp 4,343.00
Jumlah (1) = Rp 82,763.00
6.9.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000 = Rp 22,500.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp 1,100.00
Mandor 0.015 Oh x Rp. 100,000 = Rp 1,500.00
Jumlah (2) = Rp 35,100.00
Jumlah (1) + (2) = Rp 117,863.00

PD 6.10. 1 m² Pasang bata merah tebal 1/2 bata, 1Pc : 5 Pp


6.10.1 Bahan
. Batu bata cetak mesin 70.000 Bh x Rp. 910 = Rp 63,700.00
Semen portland 9.680 Kg x Rp. 1,280 = Rp 12,390.40
Pasir pasang 0.045 M³ x Rp. 101,000 = Rp 4,545.00
Jumlah (1) = Rp 80,635.40
6.10.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000 = Rp 22,500.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp 1,100.00
Mandor 0.015 Oh x Rp. 100,000 = Rp 1,500.00
Jumlah (2) = Rp 35,100.00
Jumlah (1) + (2) = Rp 115,735.40
PD 6.11. 1 m² Pasang bata merah tebal 1/2 bata, 1Pc : 6 Pp
6.11.1 Bahan
. Batu bata cetak mesin 70.000 Bh x Rp. 910 = Rp 63,700.00
Semen portland 8.320 Kg x Rp. 1,280 = Rp 10,649.60
Pasir pasang 0.049 M³ x Rp. 101,000 = Rp 4,949.00
Jumlah (1) = Rp 79,298.60
6.11.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000 = Rp 22,500.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp 1,100.00
Mandor 0.015 Oh x Rp. 100,000 = Rp 1,500.00
Jumlah (2) = Rp 35,100.00
Jumlah (1) + (2) = Rp 114,398.60

PD 6.14. 1 m² Pasang bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Pp


6.14.1 Bahan
. Batu bata cetak mesin 70.000 Bh x Rp. 910 = Rp 63,700.00
Semen portland 0.018 Kg x Rp. 1,280 = Rp 23.04
Pasir pasang 0.018 M³ x Rp. 101,000 = Rp 1,818.00
Jumlah (1) = Rp 65,541.04
6.14.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000 = Rp 22,500.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp 1,100.00
Mandor 0.015 Oh x Rp. 100,000 = Rp 1,500.00
Jumlah (2) = Rp 35,100.00
Jumlah (1) + (2) = Rp 100,641.04

PD 6.15. 1 m² Pasang bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Pp


6.15.1 Bahan
. Batu bata cetak mesin 70.000 Bh x Rp. 910 = Rp 63,700.00
Semen portland 0.014 M³ x Rp. 1,280 = Rp 17.92
Pasir pasang 0.028 M³ x Rp. 101,000 = Rp 2,828.00
Jumlah (1) = Rp 66,545.92
6.15.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000 = Rp 22,500.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp 1,100.00
Mandor 0.015 Oh x Rp. 100,000 = Rp 1,500.00
Jumlah (2) = Rp 35,100.00
Jumlah (1) + (2) = Rp 101,645.92

PD 6.22. 1 m² Pasang terawang (roster) 12 x 11 x 24 cm, 1 Pc : 3 Pp


6.22.1 Bahan
. Batu Terawang roster 30.000 Bh x Rp. 8,460 = Rp 253,800.00
Sement Portland 14.000 Kg x Rp. 1,280 = Rp 17,920.00
Pasir pasang 0.032 M³ x Rp. 101,000 = Rp 3,232.00
Jumlah (1) = Rp 274,952.00
6.22.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000 = Rp 22,500.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp 1,100.00
Mandor 0.015 Oh x Rp. 100,000 = Rp 1,500.00
Jumlah (2) = Rp 35,100.00
Jumlah (1) + (2) = Rp 310,052.00
PD 6.23. 1 m² Pasang terawang (roster) 12 x 11 x 24 cm, 1 Pc : 4 Pp
6.23.1 Bahan
. Batu Terawang roster 30.000 Bh x Rp. 8,460 = Rp 253,800.00
Sement Portland 11.000 Kg x Rp. 1,280 = Rp 14,080.00
Pasir pasang 0.035 M³ x Rp. 101,000 = Rp 3,535.00
Jumlah (1) = Rp 271,415.00
6.23.2 Tenaga
Pekerja 0.300 Oh x Rp. 75,000 = Rp 22,500.00
Tukang batu 0.100 Oh x Rp. 100,000 = Rp 10,000.00
Kepala tukang 0.010 Oh x Rp. 110,000 = Rp 1,100.00
Mandor 0.015 Oh x Rp. 100,000 = Rp 1,500.00
Jumlah (2) = Rp 35,100.00
Jumlah (1) + (2) = Rp 306,515.00

**********LANJUT PEKERJAAN PLESTERAN


ANALISA BIAYA KONSTRUKSI
PEKERJAAN PONDASI

PP 6.1. 1 M³ Pasang pondasi batu belah 1 Pc : 3 Pp


6.1.1. Bahan :
Batu belah 1.200 M³ x Rp. 228,160.00 = Rp. 273,792.00
Semen portland 202.000 Kg x Rp. 1,280.00 = Rp. 258,560.00
Pasir pasang 0.485 M³ x Rp. 101,000.00 = Rp. 48,985.00
Jumlah (1) = Rp. 581,337.00
6.1.2. Tenaga
Pekerja 1.500 Oh x Rp. 75,000.00 = Rp. 112,500.00
Tukang batu 0.750 Oh x Rp. 100,000.00 = Rp. 75,000.00
Kepala tukang 0.075 Oh x Rp. 110,000.00 = Rp. 8,250.00
Mandor 0.075 Oh x Rp. 100,000.00 = Rp. 7,500.00
Jumlah (2) = Rp. 203,250.00
Jumlah (1) + (2) = Rp. 784,587.00

PP 6.2. 1 M³ Pasang pondasi batu belah 1 Pc : 4 Pp


6.2.1. Bahan
Batu belah 1.200 M³ x Rp. 228,160.00 = Rp. 273,792.00
Semen portland 163.000 Kg x Rp. 1,280.00 = Rp. 208,640.00
Pasir Pasang 0.520 M³ x Rp. 101,000.00 = Rp. 52,520.00
Jumlah (1) = Rp. 534,952.00
6.2.2. Tenaga
Pekerja 1.500 Oh x Rp. 75,000.00 = Rp. 112,500.00
Tukang batu 0.750 Oh x Rp. 100,000.00 = Rp. 75,000.00
Kepala tukang 0.075 Oh x Rp. 110,000.00 = Rp. 8,250.00
Mandor 0.075 Oh x Rp. 100,000.00 = Rp. 7,500.00
Jumlah (2) = Rp. 203,250.00
Jumlah (1) +(2) = Rp. 738,202.00

PP 6.3. 1 M³ Pasang pondasi batu belah 1 Pc : 5 Pp


6.3.1. Bahan
Batu belah 1.200 M³ x Rp. 228,160.00 = Rp. 273,792.00
Semen portland 136.000 Kg x Rp. 1,280.00 = Rp. 174,080.00
Pasir Pasang 0.544 M³ x Rp. 101,000.00 = Rp. 54,944.00
Jumlah (1) = Rp. 502,816.00
6.3.2. Tenaga
Pekerja 1.500 Oh x Rp. 75,000.00 = Rp. 112,500.00
Tukang batu 0.750 Oh x Rp. 100,000.00 = Rp. 75,000.00
Kepala tukang 0.075 Oh x Rp. 110,000.00 = Rp. 8,250.00
Mandor 0.075 Oh x Rp. 100,000.00 = Rp. 7,500.00
Jumlah (2) = Rp. 203,250.00
Jumlah (1) +(2) = Rp. 706,066.00

PP 6.4. 1 M³ Pasang pondasi batu kosong


6.4.1 Bahan
Batu belah 1.200 M³ x Rp. 228,160.00 = Rp. 273,792.00
Pasir urug 0.300 M³ x Rp. 83,540.00 = Rp. 25,062.00
Jumlah (1) = Rp. 298,854.00
6.4.2 Tenaga
Pekerja 0.780 Oh x Rp. 75,000.00 = Rp. 58,500.00
Tukang batu 0.390 Oh x Rp. 100,000.00 = Rp. 39,000.00
Kepala tukang 0.039 Oh x Rp. 110,000.00 = Rp. 4,290.00
Mandor 0.039 Oh x Rp. 100,000.00 = Rp. 3,900.00
Jumlah (2) = Rp. 105,690.00
Jumlah (1) +(2) = Rp. 404,544.00
PP 6.5. 1 M³ Pasang pondasi siklop 40 % batu kali
6.5.1 Bahan
Besi beton polos 75.000 Kg x Rp. 15,740.00 = Rp. 1,180,500.00
Semen portland 202.000 Kg x Rp. 1,280.00 = Rp. 258,560.00
Pasir beton 0.320 Kg x Rp. 101,000.00 = Rp. 32,320.00
Koral beton 0.490 M³ x Rp. 168,440.00 = Rp. 82,535.60
Kawat beton 0.800 Kg x Rp. 23,080.00 = Rp. 18,464.00
Jumlah (1) = Rp. 1,572,379.60
6.5.2 Tenaga
Pekerja 3.000 Oh x Rp. 75,000.00 = Rp. 225,000.00
Tukang batu 0.850 Oh x Rp. 100,000.00 = Rp. 85,000.00
Kepala tukang 0.085 Oh x Rp. 110,000.00 = Rp. 9,350.00
Mandor 0.150 Oh x Rp. 100,000.00 = Rp. 15,000.00
Jumlah (2) = Rp. 334,350.00
Jumlah (1) +(2) = Rp. 1,906,729.60

PP 6.6. 1 M³ Pasang pondasi sumuran diameter 100 Cm


6.6.1 Bahan
Batu belah 0.450 M³ x Rp. 228,160.00 = Rp. 102,672.00
Semen portland 280.000 Kg x Rp. 1,280.00 = Rp. 358,400.00
Pasir Pasang 0.670 M³ x Rp. 101,000.00 = Rp. 67,670.00
Jumlah (1) = Rp. 528,742.00
6.6.2 Tenaga
Pekerja 2.380 Oh x Rp. 75,000.00 = Rp. 178,500.00
Tukang batu 0.300 Oh x Rp. 100,000.00 = Rp. 30,000.00
Kepala tukang 0.030 Oh x Rp. 110,000.00 = Rp. 3,300.00
Mandor 0.080 Oh x Rp. 100,000.00 = Rp. 8,000.00
Jumlah (2) = Rp. 219,800.00
Jumlah (1) +(2) = Rp. 748,542.00

**********LANJUT PEKERJAAN DINDING


ANALISA BIAYA KONSTRUKSI
PEKERJAAN TANAH

PT 6.1. 1 m³ Galian tanah biasa sedalam 1 meter


6.1.1. Tenaga
Pekerja 0.750 Oh x Rp. 75,000 = Rp. 56,250.00
Mandor 0.025 Oh x Rp. 100,000 = Rp. 2,500.00
Jumlah (1) = Rp. 58,750.00

PT 6.2. 1 m³ Galian tanah biasa sedalam 2 meter


6.2.1. Tenaga
Pekerja 0.900 Oh x Rp. 75,000 = Rp. 67,500.00
Mandor 0.0450 Oh x Rp. 100,000 = Rp. 4,500.00
Jumlah (1) = Rp. 72,000.00

PT 6.3. 1 m³ Galian tanah biasa sedalam 3 meter


6.3.1. Tenaga
Pekerja 1.050 Oh x Rp. 75,000 = Rp. 78,750.00
Mandor 0.0670 Oh x Rp. 100,000 = Rp. 6,700.00
Jumlah (1) = Rp. 85,450.00

PT 6.4. 1 m³ Galian tanah keras sedalam 1 meter


6.4. Tenaga
Pekerja 1.000 Oh x Rp. 75,000 = Rp. 75,000.00
Mandor 0.032 Oh x Rp. 100,000 = Rp. 3,200.00
Jumlah = Rp. 78,200.00

PT 6.5. 1 m³ Galian tanah cadas sedalam 1 meter


6.5.1. Tenaga
Pekerja 1.500 Oh x Rp. 75,000 = Rp. 112,500.00
Mandor 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
Jumlah = Rp. 118,500.00

PT 6.6. 1 m³ Galian tanah lumpur sedalam 1 meter


6.6.1. Tenaga
Pekerja 1.200 Oh x Rp. 75,000 = Rp. 90,000.00
Mandor 0.045 Oh x Rp. 100,000 = Rp. 4,500.00
Jumlah = Rp. 94,500.00

PT 6.7. 1 m² Pekerjaan stripping setinggi 1 meter


6.7.1. Tenaga
Pekerja 0.050 Oh x Rp. 75,000 = Rp. 3,750.00
Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
Jumlah (1) = Rp. 4,250.00

PT 6.8. 1 m³ Pembuangan tanah sejauh 15 meter


6.8.1. Tenaga
Pekerja 0.330 Oh x Rp. 75,000 = Rp. 24,750.00
Mandor 0.0100 Oh x Rp. 100,000 Rp. 1,000.00
Jumlah = Rp. 25,750.00

PT 6.9. 1 m³ Urugan kembali (1/3 dari koefisien galian)


6.9.1. Tenaga
Pekerja 0.250 Oh x Rp. 75,000 = Rp. 18,750.00
Mandor 0.008 Oh x Rp. 100,000 = Rp. 833.33
Jumlah = Rp. 19,583.33

PT 6.10. 1 m³ Pemadatan tanah


6.10.1.Tenaga
Pekerja 0.500 Oh x Rp. 75,000 = Rp. 37,500.00
Mandor 0.050 Oh x Rp. 100,000 = Rp. 5,000.00
Jumlah = Rp. 42,500.00
PT 6.11. 1 m³ Urugan pasir
6.11.1.Bahan
Pasir urug 1.200 M³ x Rp. 83,540 = Rp. 100,248.00
Jumlah (1) = Rp. 100,248.00
6.11.2.Tenaga
Pekerja 0.300 Oh x Rp. 75,000 = Rp. 22,500.00
Mandor 0.010 Oh x Rp. 100,000 = Rp. 1,000.00
Jumlah (2) = Rp. 23,500.00
Jumlah (1) + (2) = Rp. 123,748.00

PT 6.12. 1 m³ Memasang lapisan pudel campuran 1 : 3 : 7 untuk stabilisasi tanah


6.12.1 Bahan
Pasir pasang 0.400 M³ x Rp. 101,000 = Rp. 40,400.00
Pasir urug 0.948 M³ x Rp. 83,540 = Rp. 79,195.92
Jumlah (1) = Rp. 119,595.92
6.12.2 Tenaga
Pekerja 0.800 Oh x Rp. 75,000 = Rp. 60,000.00
Tukang batu 0.400 Oh x Rp. 100,000 = Rp. 40,000.00
Kepala tukang 0.040 Oh x Rp. 110,000 = Rp. 4,400.00
Mandor 0.080 Oh x Rp. 100,000 = Rp. 8,000.00
Jumlah (2) = Rp. 112,400.00
Jumlah (1) + (2) = Rp. 231,995.92

PT 6.13. 1 m³ Memasang lapisan pudel campuran 1 : 5 untuk stabilisasi tanah


6.13.1 Bahan
Pasir urug 1.240 M³ x Rp. 83,540 = Rp. 103,589.60
Jumlah (1) = Rp. 103,589.60
6.13.2 Tenaga
Pekerja 0.800 Oh x Rp. 75,000 = Rp. 60,000.00
Tukang batu 0.400 Oh x Rp. 100,000 = Rp. 40,000.00
Kepala tukang 0.040 Oh x Rp. 110,000 = Rp. 4,400.00
Mandor 0.080 Oh x Rp. 100,000 = Rp. 8,000.00
Jumlah (2) = Rp. 112,400.00
Jumlah (1) + (2) = Rp. 215,989.60

PT 6.14. 1 m³ Lapisan ijuk tebal 10 cm untuk bidang resapan


6.14.1 Bahan
Ijuk 6.000 M2 x Rp. 31,480 = Rp. 188,880.00
Jumlah (1) = Rp. 188,880.00
6.14.2 Tenaga
Pekerja 0.150 Oh x Rp. 75,000 = Rp. 11,250.00
Mandor 0.015 Oh x Rp. 100,000 = Rp. 1,500.00
Jumlah (2) = Rp. 12,750.00
Jumlah (1) + (2) = Rp. 201,630.00

PT 6.15. 1 m³ Mengurug sirtu padat untuk peninggian lantai bangunan


6.15.1 Bahan
Sirtu /pasir batu 1.200 M³ x Rp. 119,640 = Rp. 143,568.00
Jumlah (1) = Rp. 143,568.00
6.15.2 Tenaga
Pekerja 0.250 Oh x Rp. 75,000 = Rp. 18,750.00
Mandor 0.025 Oh x Rp. 100,000 = Rp. 2,500.00
Jumlah (2) = Rp. 21,250.00
Jumlah (1) + (2) = Rp. 164,818.00

*******LANJUT PEKERJAAN PONDASI


ANALISA BIAYA KONSTRUKSI
PEKERJAAN TANAH

PT 6.8. 1 m³ Pembuangan tanah sejauh 3 km


6.8.1. Tenaga
Pekerja 0.165 Oh x Rp. 75,000 = Rp. 12,375.00
Mandor 0.0050 Oh x Rp. 100,000 = Rp. 500.00
Jumlah = Rp. 12,875.00
6.8.2. Alat
Excavator 0.0317 jam x Rp. 428,600 = Rp. 13,586.62
Dump Truck 0.1397 jam x Rp. 285,700 = Rp. 39,912.29
Alat Bantu 0.5000 jam x Rp. 5,000 = Rp. 2,500.00
Jumlah = Rp. 55,998.91
Jumlah (1) + (2) = Rp. 68,873.91

*******LANJUT PEKERJAAN PONDASI


ANALISA BIAYA KONSTRUKSI
PEKERJAAN PERSIAPAN

PA 6.1. 1 m' Pagar Sementara dari kayu tinggi 2 meter


6.1.1. Bahan
Kayu dolken/bulat Ø 3" - 4" 1.250 Btg x Rp 20,990 = Rp 26,237.50
Semen Portland 2.500 Kg x Rp 1,280 = Rp 3,200.00
Pasir Beton 0.005 M3 x Rp 101,000 = Rp 505.00
Koral Beton 0.009 M3 x Rp 168,440 = Rp 1,515.96
Kayu Kelas III 0.038 M3 x Rp 3,632,000 = Rp 138,016.00
Paku biasa 0.060 Kg x Rp 18,890 = Rp 1,133.40
Residu/colter 0.400 Lt x Rp 8,080 = Rp 3,232.00
Jumlah (1) = Rp 173,839.86
6.1.2. Tenaga
Tukang kayu 0.200 Oh x Rp 100,000 = Rp 20,000.00
Pekerja 0.400 Oh x Rp 75,000 = Rp 30,000.00
Kepala tukang 0.020 Oh x Rp 110,000 = Rp 2,200.00
Mandor 0.020 Oh x Rp 100,000 = Rp 2,000.00
Jumlah (2) = Rp 54,200.00
Jumlah (1) + (2) = Rp 228,039.86

PA 6.2. 1 m' Pagar sementara dari seng gelombang tinggi 2 meter


6.2.1. Bahan
Kayu dolken/bulat Ø 3" - 4" 1.250 Btg x Rp 20,990 = Rp 26,237.50
Semen Portland 2.500 Kg x Rp 1,280 = Rp 3,200.00
Seng gelombang 7 kaki BJLS 20 1.200 Lbr x Rp 56,480 = Rp 67,776.00
Pasir beton 0.005 M3 x Rp 101,000 = Rp 505.00
Koral beton 0.009 M3 x Rp 168,440 = Rp 1,515.96
Kayu Kelas III 0.012 M3 x Rp 3,632,000 = Rp 43,584.00
Paku biasa 0.060 Kg x Rp 18,890 = Rp 1,133.40
Cat meni besi 0.450 Kg x Rp 35,260 = Rp 15,867.00
Jumlah (1) = Rp 159,818.86
6.2.2. Tenaga
Tukang kayu 0.200 Oh x Rp 100,000 = Rp 20,000.00
Pekerja 0.400 Oh x Rp 75,000 = Rp 30,000.00
Kepala tukang 0.020 Oh x Rp 110,000 = Rp 2,200.00
Mandor 0.020 Oh x Rp 100,000 = Rp 2,000.00
Jumlah (2) = Rp 54,200.00
Jumlah (1) + (2) = Rp 214,018.86

PA 6.4 1 M' Pengukuran dan Pemasangan bouplank


6.4.1. Bahan
Kayu Kelas III 0.012 M3 x Rp 3,632,000 = Rp 43,584.00
Paku biasa 0.020 Kg x Rp 18,890 = Rp 377.80
Kayu papan (Kayu Kelas III) 0.007 M3 x Rp 3,632,000 = Rp 25,424.00
Jumlah (1) = Rp 69,385.80
6.4.2. Tenaga
Tukang kayu 0.100 Oh x Rp 100,000 = Rp 10,000.00
Pekerja 0.100 Oh x Rp 75,000 = Rp 7,500.00
Kepala tukang 0.010 Oh x Rp 110,000 = Rp 1,100.00
Mandor 0.005 Oh x Rp 100,000 = Rp 500.00
Jumlah (2) = Rp 19,100.00
Jumlah (1) + (2) = Rp 88,485.80

PA 6.8 1 m² Membersihkan lapangan dan perataan


6.8.1 Tenaga
Pekerja 0.100 Oh x Rp 75,000 = Rp 7,500.00
Mandor 0.050 Oh x Rp 100,000 = Rp 5,000.00
Jumlah = Rp 12,500.00
PA 6.12 1 m² Pembuatan jalan sementara
6. 12.1 Bahan
Batu belah 0.150 M³ x Rp 228,160 = Rp 34,224.00
Batu pecah 5 - 7 cm 0.090 M³ x Rp 228,160 = Rp 20,534.40
Pasir pasang 0.010 M³ x Rp 101,000 = Rp 1,010.00
Jumlah (1) = Rp 55,768.40
6.12.2 Tenaga
Pekerja 1.000 Oh x Rp 75,000 = Rp 75,000.00
Mandor 0.050 Oh x Rp 100,000 = Rp 5,000.00
Jumlah (2) = Rp 80,000.00
Jumlah (1) + (2) = Rp 135,768.40

PA 6.13 1 m³ Bongkaran beton betulang


6.13.1 Tenaga
Pekerja 6.667 Oh x Rp 75,000 = Rp 500,025.00
Mandor 0.333 Oh x Rp 100,000 = Rp 33,300.00
Jumlah = Rp 533,325.00

PA 6.14 1m³ Bongkaran dinding tembok bata merah


6.14.1 Tenaga
Pekerja 5.000 Oh x Rp 75,000 = Rp 375,000.00
Mandor 0.250 Oh x Rp 100,000 = Rp 25,000.00
Jumlah = Rp 400,000.00

**************LANJUT KE PEKERJAAN TANAH


ANALISA BIAYA KONSTRUKSI ( ABK )
BANGUNAN GEDUNG DAN PERUMAHAN

HARGA HARGA JUMLAH


NO JENIS PEKERJAAN ANALISA VOLUME BAHAN UPAH HARGA
( Rp ) ( Rp ) ( Rp )

A. PEKERJAAN PERSIAPAN
1 Pagar Sementara dari kayu tinggi 2 m PA 6. 1 1 M' 173,839.86 54,200.00 228,039.86

Pagar Sementara dari Seng Gelombang


2 PA 6. 2 1 M' 159,818.86 54,200.00 214,018.86
tinggi 2 m
3 Pengukuran dan Pemasangan Bouwplank PA 6. 4 1 M' 69,385.80 19,100.00 88,485.80

4 Membersihkan Lapangan dan Perataan PA 6. 8 1 M² 0.00 12,500.00 12,500.00

5 Pembuatan Jalan Sementara PA 6. 12 1 M² 55,768.40 80,000.00 135,768.40

6 Bongkaran Beton Bertulang PA 6. 13 1 M³ 0.00 533,325.00 533,325.00

7 Bongkaran Dinding Tembok Bata PA 6. 14 1 M³ 0.00 400,000.00 400,000.00

8 Pas. Pagar Kawat Jaring Galvanis t = 1 m' PA 6. 15 1 M' #REF! #REF! #REF!

B. PEKERJAAN TANAH

1 Galian Tanah Biasa sedalam 1 m' PT 6. 1 1 M³ 0.00 58,750.00 58,750.00

2 Galian Tanah Biasa sedalam 2 m' PT 6. 2 1 M³ 0.00 72,000.00 72,000.00

3 Galian Tanah Biasa sedalam 3 m' PT 6. 3 1 M³ 0.00 85,450.00 85,450.00

4 Galian Tanah Keras sedalam 1 m' PT 6. 4 1 M³ 0.00 78,200.00 78,200.00

5 Galian Tanah Cadas sedalam 1 m' PT 6. 5 1 M³ 0.00 118,500.00 118,500.00

6 Galian Tanah Lumpur sedalam 1 m' PT 6. 6 1 M³ 0.00 94,500.00 94,500.00

7 Stripping setinggi 1 m' PT 6. 7 1 M³ 0.00 4,250.00 4,250.00

8 Pembuangan Tanah sejauh 150 m' PT 6. 8 1 M³ 0.00 25,750.00 25,750.00

9 Urugan Kembali PT 6. 9 1 M³ 0.00 19,583.33 19,583.33

10 Pemadatan Tanah PT 6. 10 1 M³ 0.00 42,500.00 42,500.00

11 Urugan Pasir PT 6. 11 1 M³ 100,248.00 23,500.00 123,748.00

12 Pembuatan jalan sementara tbl.25 cm PT 6. 16 1 M² #REF! #REF! #REF!

C. PEKERJAAN PONDASI

1 Pas. Pondasi Bt.Kali 1 Pc : 1 Ps PP 6. 1 1 M³ 581,337.00 203,250.00 784,587.00

2 Pas. Pondasi Bt.Kali 1 Pc : 2 Ps PP 6. 2 1 M³ 534,952.00 203,250.00 738,202.00

3 Pas. Pondasi Bt.Kali 1 Pc : 2½ Ps PP 6. 3 1 M³ 502,816.00 203,250.00 706,066.00

4 Pas. Pondasi Bt.Kali 1 Pc : 3 Ps PP 6. 4 1 M³ #REF! #REF! #REF!

5 Pas. Pondasi Bt.Kali 1 Pc : 4 Ps PP 6. 5 1 M³ #REF! #REF! #REF!

6 Pas. Pondasi Bt.Kali 1 Pc : 5 Ps PP 6. 6 1 M³ #REF! #REF! #REF!

7 Pas. Pondasi Bt.Kali 1 Pc : 6 Ps PP 6. 7 1 M³ #REF! #REF! #REF!

8 Pas. Pondasi Bato Kosong PP 6. 14 1 M³ #REF! #REF! #REF!

9 Pas. Pondasi Siklop 40% Bt.Kali PP 6. 15 1 M³ #REF! #REF! #REF!

10 Pas. Pondasi Sumuran Ø 100 cm PP 6. 16 1 M³ #REF! #REF! #REF!


Pembuatan tiang pancang 40 x 40 cm Beton
11 PP 6. 17 1 M³ #REF! #REF! #REF!
bertulang
Pembuatan tiang pancang 30 x 30 cm Beton
12 PP 6. 18 1 M³ #REF! #REF! #REF!
bertulang
1 2 3 4 5 6 7

D. PEKERJAAN DINDING

1 Pas. Bata Merah tbl.1 Bata, 1 Pc : 1 Ps PD 6. 1 1 M² 191,160.00 70,200.00 261,360.00

2 Pas. Bata Merah tbl.1 Bata, 1 Pc : 2 Ps PD 6. 2 1 M² 178,767.00 70,200.00 248,967.00

3 Pas. Bata Merah tbl.1 Bata, 1 Pc : 3 Ps PD 6. 3 1 M² 170,777.00 70,200.00 240,977.00

4 Pas. Bata Merah tbl.1 Bata, 1 Pc : 4 Ps PD 6. 4 1 M² #REF! #REF! #REF!

5 Pas. Bata Merah tbl.½ Bata, 1 Pc : 1 Ps PD 6. 8 1 M² #REF! #REF! #REF!

6 Pas. Bata Merah tbl.½ Bata, 1 Pc : 2 Ps PD 6. 9 1 M² 149,644.90 70,200.00 219,844.90

7 Pas. Bata Merah tbl.½ Bata, 1 Pc : 3 Ps PD 6. 10 1 M² 91,794.00 35,100.00 126,894.00

8 Pas. Bata Merah tbl.½ Bata, 1 Pc : 4 Ps PD 6. 11 1 M² 86,133.60 35,100.00 121,233.60

9 Pas. Dinding Conblock (HB.20) PD 6. 21 1 M² #REF! #REF! #REF!

10 Pas. Dinding Conblock (HB.15) PD 6. 22 1 M² #REF! #REF! #REF!

11 Pas. Dinding Conblock (HB.10) PD 6. 23 1 M² #REF! #REF! #REF!

12 Pas. Dinding Lantai PD 6. 24 1 M² #REF! #REF! #REF!

13 Pas. Dinding rooster / terawang PD 6. 25 1 M² #REF! #REF! #REF!

14 Pas. Bata berongga uk.5x10x20 cm PD 6. 26 1 M² #REF! #REF! #REF!

15 Pas. Dinding Anyaman Bambu, rangka kayu PD 6. 27 1 M² #REF! #REF! #REF!

E. PEKERJAAN PELESTERAN

1 Pas. Plesteran Tbl.15 mm, 1 Pc : 1 Ps PPL 6. 1 1 M² 21,461.12 40,650.00 62,111.12

2 Pas. Plesteran Tbl.15 mm, 1 Pc : 2 Ps PPL 6. 2 1 M² 15,106.72 40,650.00 55,756.72

3 Pas. Plesteran Tbl.15 mm, 1 Pc : 3 Ps PPL 6. 3 1 M² 12,276.28 40,650.00 52,926.28

4 Pas. Plesteran Tbl.15 mm, 1 Pc : 4 Ps PPL 6. 4 1 M² 10,411.20 40,650.00 51,061.20

5 Pas. Plesteran Tbl.20 mm, 1 Pc : 2 Ps PPL 6. 13 1 M² 9,261.52 40,650.00 49,911.52

6 Pas. Plesteran Tbl.20 mm, 1 Pc : 3 Ps PPL 6. 14 1 M² #REF! #REF! #REF!

7 Pas. Plesteran Tbl.20 mm, 1 Pc : 4 Ps PPL 6. 15 1 M² #REF! #REF! #REF!

8 Pas. Plesteran Tbl.25 mm, 1 Pc : 2 Ps PPL 6. 19 1 M² #REF! #REF! #REF!

9 Pas. Plesteran Tbl.25 mm, 1 Pc : 3 Ps PPL 6. 20 1 M² 8,685.80 42,120.00 50,805.80

10 Pas. Plesteran Tbl.25 mm, 1 Pc : 4 Ps PPL 6. 21 1 M² 5,860.00 42,120.00 47,980.00

11 Pas. Plesteran Tbl.30 mm, 1 Pc : 2 Ps PPL 6. 23 1 M² #REF! #REF! #REF!

12 Pas. Plesteran Tbl.30 mm, 1 Pc : 3 Ps PPL 6. 24 1 M² #REF! #REF! #REF!

13 Pas. Plesteran Tbl.30 mm, 1 Pc : 4 Ps PPL 6. 25 1 M² 20,175.96 54,400.00 74,575.96

14 Plesteran Beton T=15 mm, 1 Pc : 2 Ps PPL 6. 29 1 M² 16,402.04 43,000.00 59,402.04

15 Plesteran Beton T=15 mm, 1 Pc : 3 Ps PPL 6. 30 1 M² 13,881.60 54,400.00 68,281.60

16 Plesteran Skoning 1 Pc : 2 Ps PPL 6. 31 1 M² 12,382.36 54,400.00 66,782.36

17 Plesteran Ciprat tbl.10 mm, 1 Pc : 2 Ps PPL 6. 34 1 M² #REF! #REF! #REF!

18 Plesteran Siar adukan, 1 Pc : 2 Ps PPL 6. 35 1 M² #REF! #REF! #REF!


1 2 3 4 5 6 7
F. PEKERJAAN KAYU

1 Pas. Kosen Pintu dan Jendela, kayu Jati PK 6. 1 1 M³ 10,194,585.50 2,891,000.00 13,085,585.50

2 Pas. Kosen Pintu dan Jendela, kayu M.Batu PK 6. 2 1 M³ #REF! #REF! #REF!

3 Pas. Kosen Pintu dan Jendela, kayu Kapur PK 6. 3 1 M³ #REF! #REF! #REF!

4 Pas. Kosen Pintu dan Jendela, kayu D.Laut PK 6. 4 1 M³ #REF! #REF! #REF!

5 Pas.Pintu klamp, kayu Meranti Batu PK 6. 5 1 M² #REF! #REF! #REF!

6 Pas.Pintu klamp, kayu Jati PK 6. 6 1 M² #REF! #REF! #REF!

7 Pas.Pintu Panel, kayu Jati PK 6. 7 1 M² #REF! #REF! #REF!

8 Pas.Pintu Panel, kayu Meranti Batu PK 6. 8 1 M² #REF! #REF! #REF!


9 Pas.Pintu dan Jendela kaca panel, Rangka PK 6. 9 1 M² #REF! #REF! #REF!
kayu Jati
10 Pas.Pintu dan Jendela kaca panel, kayu PK 6. 10 1 M² #REF! #REF! #REF!
Meranti Batu
11 Pas.Pintu dan Jendela kaca panel, kayu PK 6. 11 1 M² #REF! #REF! #REF!
Meranti
12 Pas.Pintu dan Jendela Jalusi, kayu Jati PK 6. 12 1 M² #REF! #REF! #REF!

13 Pas.Pintu dan Jendela Jalusi, kayu M.Batu PK 6. 13 1 M² #REF! #REF! #REF!

14 Pas.Pintu Plywood, Rangka kayu Jati PK 6. 14 1 M² #REF! #REF! #REF!

15 Pas.Pintu Plywood, Rangka kayu M.Batu PK 6. 15 1 M² #REF! #REF! #REF!

16 Pas.Jalusi mati, kusen kayu Jati PK 6. 16 1 M² #REF! #REF! #REF!

17 Pas.Jalusi mati, kusen kayu D.Laut PK 6. 17 1 M² #REF! #REF! #REF!

18 Pas.Pintu Plywood, Rangka kayu Meranti PK 6. 18 1 M² #REF! #REF! #REF!

18 Pas.Pintu Teakwood, Rangka kayu Jati PK 6. 19 1 M² #REF! #REF! #REF!

19 Pas.Pintu Teakwood, Rangka kayu M.Batu PK 6. 20 1 M² #REF! #REF! #REF!


20 Pas.Pintu Plywood + Formica, Rangka kayu PK 6. 21 1 M² #REF! #REF! #REF!
Jati
21 Pas.Pintu Plywood + Formica, Rangka kayu PK 6. 22 1 M² #REF! #REF! #REF!
Meranti Batu
22 Pas.Pintu Teakwood + Formica, Rangka kayu PK 6. 23 1 M² #REF! #REF! #REF!
Jati
23 Pas.Pintu Teakwood + Formica, Rangka kayu PK 6. 24 1 M² #REF! #REF! #REF!
Meranti Batu
24 Pas.Konstruksi Kuda-kuda, kayu D.Laut PK 6. 29 1 M³ #REF! #REF! #REF!

25 Pas.Konstruksi Kuda-kuda, kayu Meranti PK 6. 30 1 M³ #REF! #REF! #REF!


26 Pas.Kaso + reng genteng kodok, kayu PK 6. 31 1 M² #REF! #REF! #REF!
Meranti
27 Pas.Kaso + reng genteng kodok, kayu PK 6. 32 1 M² #REF! #REF! #REF!
Damar Laut
28 Pas.Kaso + reng genteng monier, kayu Jati PK 6. 33 1 M² #REF! #REF! #REF!

Pas.Kaso + reng genteng monier, kayu PK 6. 34 1 M² #REF! #REF! #REF!


29
Damar Laut
Pas.Kaso + reng Genteng beton, kayu Damar PK 6. 35 1 M² #REF! #REF! #REF!
30
Laut
31 Pas.Kaso + reng Atap Sirap, kayu D.Laut PK 6. 36 1 M² #REF! #REF! #REF!

32 Pas.Kaso + reng Atap Sirap, kayu Meranti PK 6. 37 1 M² #REF! #REF! #REF!

33 Pas.Rangka Langit2 1 x 1 m, kayu Jati PK 6. 38 1 M² #REF! #REF! #REF!

34 Pas.Rangka Langit2 1 x 1 m, kayu D.Laut PK 6. 38 A 1 M² #REF! #REF! #REF!

35 Pas.Rangka Langit2 1 x 1 m, kayu Meranti PK 6. 38 B 1 M² #REF! #REF! #REF!


1 2 3 4 5 6 7

36 Pas.Rangka Langit2 30 x 30 cm, kayu Jati PK 6. 44 1 M² #REF! #REF! #REF!


37 Pas.Rangka Langit2 30 x 30 cm, kayu Damar PK 6. 45 1 M² #REF! #REF! #REF!
Laut
38 PK 6. 46 1 M² #REF! #REF! #REF!
Pas.Rangka Langit2 30 x 30 cm, kayu Meranti

39 Pas.Lisplank 3 x 20 cm, kayu Meranti PK 6. 47 1 M' #REF! #REF! #REF!

40 Pas.Lisplank 3 x 20 cm, kayu Meranti Batu PK 6. 48 1 M' #REF! #REF! #REF!

41 Pas.Lisplank 3 x 30 cm, kayu Jati PK 6. 49 1 M' #REF! #REF! #REF!

42 Pas.Lisplank 3 x 30 cm, kayu Meranti Batu PK 6. 50 1 M' #REF! #REF! #REF!


43 Pas.Lisplank 2 x ( 3 x 20) cm, kayu Meranti PK 6. 51 1 M' #REF! #REF! #REF!
Batu
44 Pas.Lisplank 2 x ( 2 x 20) cm, kayu Meranti PK 6. 52 1 M' #REF! #REF! #REF!
Batu
45 Pas.Lisplank 2 x ( 2 x 20) cm, kayu Meranti PK 6. 53 1 M' #REF! #REF! #REF!

46 Pas.Rangka Dinding Pemisah, kayu D.Laut PK 6. 54 1 M² #REF! #REF! #REF!


PK 6. 55 1 M² #REF! #REF! #REF!
47 Pas.Rangka Dinding Pemisah, kayu Meranti
48 Pas.Dinding Pemisah Teakwood, kayu Damar PK 6. 56 1 M² #REF! #REF! #REF!
Laut
49 Pas.Dinding Pemisah Plywood, kayu Damar PK 6. 57 1 M² #REF! #REF! #REF!
Laut
50 Pas.Dinding Lambesring, kayu Jati PK 6. 58 1 M² #REF! #REF! #REF!

51 Pas.Plywood 4 mm utk Dinding PK 6. 59 1 M² #REF! #REF! #REF!

52 Pas.List Plafond, kayu profil PK 6. 60 1 M' #REF! #REF! #REF!

G. PEKERJAAN BETON

1 Pas. Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr PB 6. 1 1 M³ 519,700.47 162,630.00 682,330.47

2 Pas. Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr PB 6. 2 1 M³ #REF! #REF! #REF!

3 Pas. Beton Tumbuk, 1 Pc : 4 Ps : 6 Kr PB 6. 3 1 M³ #REF! #REF! #REF!

Pas. Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr, tebal 5


4 PB 6. 4 1 M² #REF! #REF! #REF!
cm
5 Pas. Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr PB 6. 5 1 M³ #REF! #REF! #REF!

6 Pas. Beton Tumbuk, 1 Pc : 2 Ps : 4 Kr PB 6. 6 1 M³ #REF! #REF! #REF!

7 Pas. Beton Tumbuk, 1 Pc : 2 Ps : 2½ Kr PB 6. 7 1 M³ #REF! #REF! #REF!

8 Pas. Beton Tumbuk, 1 Pc : 1½ Ps : 3 Kr PB 6. 8 1 M³ #REF! #REF! #REF!

9 Pas. Beton Tumbuk, 1 Pc : 1½ Ps : 2½ Kr PB 6. 9 1 M³ #REF! #REF! #REF!

10 Pas. Beton Bertulang, 1 Pc : 1 Ps : 2 Kr PB 6. 10 1 M³ #REF! #REF! #REF!

11 Membuat Tiang Pancang Prestressed Beton PB 6. 11 1 M³ #REF! #REF! #REF!

12 Pas. Beton Bertulang, 1 Pc : 2 Ps : 3 Kr PB 6. 13 1 M³ #REF! #REF! #REF!

13 Pas. Beton Bertulang, 1 Pc : 2 Ps : 4 Kr PB 6. 14 1 M³ #REF! #REF! #REF!

14 Pas. Beton Bertulang, 1 Pc : 1½ Ps : 3 Kr PB 6. 15 1 M³ #REF! #REF! #REF!

15 Pas. Beton Bertulang, 1 Pc : 1½ Ps : 2½ Kr PB 6. 16 1 M³ #REF! #REF! #REF!

16 Pas. Beton Bertulang, 1 Pc : 1 Ps : 1 Kr PB 6. 17 1 M³ #REF! #REF! #REF!

17 Pembesian dengan besi polos PB 6. 25 1 Kg #REF! #REF! #REF!

18 Kabel Prestressed polos / strends PB 6. 26 1 Kg #REF! #REF! #REF!

19 Pas. Bekisting untuk Pondasi PB 6. 28 1 M² #REF! #REF! #REF!


1 2 3 4 5 6 7
20 Pas. Bekisting untuk Sloof PB 6. 29 1 M² #REF! #REF! #REF!

21 Pas. Bekisting untuk Kolom PB 6. 30 1 M² #REF! #REF! #REF!

22 Pas. Bekisting untuk Balok PB 6. 31 1 M² #REF! #REF! #REF!

23 Pas. Bekisting untuk Lantai PB 6. 32 1 M² #REF! #REF! #REF!

24 Pas. Bekisting untuk Dinding PB 6. 33 1 M² #REF! #REF! #REF!

25 Pas. Bekisting untuk Tangga PB 6. 34 1 M² #REF! #REF! #REF!

26 Pas. Beton dengan Mutu K 225 PB 6. 35 1 M³ #REF! #REF! #REF!

27 Pas. Beton dengan Mutu K 275 PB 6. 36 1 M³ #REF! #REF! #REF!

28 Pas. Bekisting Jembatan Cor PB 6. 37 1 M² #REF! #REF! #REF!


Membuat Pondasi beton bertulang
29 PB 6. 38 1 M³ #REF! #REF! #REF!
( 150 kg besi + bekisting )
Membuat Sloof beton bertulang
30 PB 6. 39 1 M³ #REF! #REF! #REF!
( 200 kg besi + bekisting )
Membuat Kolom beton bertulang
31 PB 6. 40 1 M³ #REF! #REF! #REF!
( 300 kg besi + bekisting )
Membuat Balok beton bertulang
32 PB 6. 41 1 M³ #REF! #REF! #REF!
( 200 kg besi + bekisting )
Membuat Balok beton bertulang
33 PB 6. 42 1 M³ #REF! #REF! #REF!
( 150 kg besi + bekisting )
Membuat Dinding beton bertulang
34 PB 6. 43 1 M³ #REF! #REF! #REF!
( 150 kg besi + bekisting )
Membuat Tangga beton bertulang
35 PB 6. 44 1 M³ #REF! #REF! #REF!
( 150 kg besi+bekisting )
36 Pas. Ringbalk Btn Bertulang, (10 x 15) cm PB 6. 46 1 M³ #REF! #REF! #REF!

H. PEKERJAAN PENUTUP ATAP

1 Pas. Atap Genteng Plantong kecil PPA 6 1 1 M² 41,750.00 20,430.00 62,180.00

2 Pas. Atap Genteng kodok / Glazzur PPA 6 2 1 M² 54,250.00 20,430.00 74,680.00

3 Pas. Atap Genteng Plantong Super / besar PPA 6 3 1 M² 47,760.00 18,710.00 66,470.00

4 Pas. Bubung Genteng Plantong kecil PPA 6 4 1 M' #REF! #REF! #REF!

5 Pas. Bubung Atap Genteng kodok PPA 6 5 1 M' #REF! #REF! #REF!

6 Pas. Bubung Genteng Plantong besar PPA 6 6 1 M' #REF! #REF! #REF!

7 Pas. Atap Roof light Fibreglass 180x90 cm PPA 6 7 1 M² 28,734.00 18,670.00 47,404.00
Pas. Atap Asbes Gelombang
8 PPA 6 8 1 M² 53,147.70 19,680.00 72,827.70
(2,70 x 0,92 x 5 mm)
Pas. Atap Asbes Gelombang
9 PPA 6 9 1 M² 53,593.20 19,680.00 73,273.20
(2,40 x 0,92 x 5 mm)
Pas. Atap Asbes Gelombang
10 PPA 6 10 1 M² 58,345.20 19,680.00 78,025.20
(2,10 x 0,92 x 5 mm)
Pas. Atap Asbes Gelombang
11 PPA 6 11 1 M² 58,295.70 18,970.00 77,265.70
(1,80 x 0,92 x 5 mm)
Pas. Atap Asbes Gelombang
12 PPA 6 12 1 M² 53,741.70 18,970.00 72,711.70
(2,40 x 1,05 x 4 mm)
Pas. Atap Asbes Gelombang
13 PPA 6 13 1 M² 51,668.20 18,970.00 70,638.20
(2,10 x 1,05 x 4 mm)
Pas. Atap Asbes Gelombang
14 PPA 6 14 1 M² 22,387.20 18,670.00 41,057.20
(1,80 x 1,05 x 4 mm)
Pas. Atap Asbes Gelombang
15 PPA 6 18 1 M² 64,146.60 18,670.00 82,816.60
(2,70 x 1,08 x 6 mm)
Pas. Atap Asbes Gelombang
16 PPA 6 19 1 M² 62,849.70 18,670.00 81,519.70
(2,40 x 1,08 x 6 mm)
Pas. Atap Asbes Gelombang
17 PPA 6 20 1 M² 64,103.70 18,670.00 82,773.70
(2,10 x 1,08 x 6 mm)
Pas. Atap Asbes Gelombang
18 PPA 6 21 1 M² 64,146.60 18,670.00 82,816.60
(1,80 x 1,08 x 6 mm)

19 Pas. Bubung/Nok stel gelombang 0,92 m PPA 6 22 1 M' 50,256.00 20,630.00 70,886.00
1 2 3 4 5 6 7

20 Pas. Bubung/Nok stel gelombang 1,05 m PPA 6 23 1 M' 57,819.00 20,630.00 78,449.00

21 Pas. Bubung/Nok stel gelombang 1,08 m PPA 6 24 1 M' 61,685.50 20,630.00 82,315.50

22 Pas. Nok Paten 0,92 m PPA 6 25 1 M' 47,412.00 20,630.00 68,042.00

23 Pas. Nok Paten 1,05 m PPA 6 26 1 M' 39,540.00 20,630.00 60,170.00

24 Pas. Nok Paten 1,08 m PPA 6 27 1 M' 51,960.00 20,630.00 72,590.00

25 Pas. Nok stel rata 0,92 m PPA 6 28 1 M' 42,928.00 24,330.00 67,258.00

26 Pas. Nok stel rata 1,05 m PPA 6 29 1 M' 36,515.00 20,630.00 57,145.00

27 Pas. Atap Genteng Beton PPA 6 30 1 M² 66,236.70 27,100.00 93,336.70

28 Pas. Atap Genteng Aspal PPA 6 31 1 M² 241,440.20 46,330.00 287,770.20

29 Pas. Atap Genteng Metal/Multi roof PPA 6 32 1 M² 95,833.00 27,100.00 122,933.00

30 Pas. Atap Sirap PPA 6 33 1 M² 65,578.00 41,000.00 106,578.00

31 Pas. Nok genteng Beton PPA 6 34 1 M' 51,761.10 54,200.00 105,961.10

32 Pas. Nok genteng Aspal PPA 6 35 1 M' 83,498.19 37,725.00 121,223.19

33 Pas. Nok genteng Metal PPA 6 36 1 M' 46,198.50 36,700.00 82,898.50

34 Pas. Nok genteng Sirap PPA 6 37 1 M' 75,539.26 37,725.00 113,264.26

35 Pas. Atap Seng Gelombang PPA 6 38 1 M² 53,417.40 16,260.00 69,677.40

36 Pas. Nok Atap seng gelombang PPA 6 39 1 M' 35,497.20 19,730.00 55,227.20

37 Pas. Atap Alluminium PPA 6 40 1 M² 103,699.60 20,230.00 123,929.60

38 Pas. Nok Alluminium PPA 6 41 1 M' 58,689.20 19,600.00 78,289.20

39 Pas. Alluminium foil / sisalation PPA 6 42 1 M² 81,060.00 17,600.00 98,660.00

I. PEKERJAAN LANGIT LANGIT

Pas. Langit2 Asbes (1 x 1) m tbl.6 mm PLL 6 1 1 M² 19,581.90 10,420.00 30,001.90

2 Pas. Langit2 Asbes (1 x 1) m tbl.5 mm PLL 6 2 1 M² 103,424.50 22,920.00 126,344.50

3 Pas. Langit2 Asbes (1 x 1) m tbl.4 mm PLL 6 3 1 M² 99,950.50 19,100.00 119,050.50

4 Pas. Langit2 Asbes (1 x 1) m tbl.3,5 mm PLL 6 4 1 M² 103,379.50 19,100.00 122,479.50

5 Pas. Langit2 Akustik (30 x 30) cm PLL 6 5 1 M² 26,932.95 19,100.00 46,032.95

6 Pas. Langit2 Akustik (30 x 60) cm PLL 6 6 1 M² 102,419.00 152,800.00 255,219.00

7 Pas. Langit2 Akustik (60 x 120) cm PLL 6 7 1 M² 27,713.74 18,500.00 46,213.74

8 Pas. Langit2 Plywood (30 x 60) cm t.4 mm PLL 6 8 1 M² 16,383.00 11,460.00 27,843.00

9 Pas. Langit2 Plywood (30 x 60) cm t.6 mm PLL 6 9 1 M² 33,031.50 95,500.00 128,531.50

10 Pas. Langit2 Plywood (60 x 120) cm t.4 mm PLL 6 10 1 M² 22,228.40 9,600.00 31,828.40

11 Pas. Langit2 Plywood (60 x 120) cm t.6 mm PLL 6 11 1 M² #REF! #REF! #REF!

12 Pas. Langit2 Teakwood (30 x 60) cm t.4 mm PLL 6 12 1 M² #REF! #REF! #REF!

13 Pas. Langit2 Teakwood (60 x 120) cm 4 mm PLL 6 13 1 M² #REF! #REF! #REF!

14 Pas. Langit2 Kayu Jati PLL 6 14 1 M² #REF! #REF! #REF!

15 Pas. Langit2 Papan Rider PLL 6 16 1 M² #REF! #REF! #REF!

16 Pas. Langit2 Soft board PLL 6 17 1 M² #REF! #REF! #REF!


1 2 3 4 5 6 7
Pas. Langit2 Akustik 60 x 120 cm + Rangka
17 PLL 6 18 1 M² #REF! #REF! #REF!
Alluminium
18 Pas. List Langit2 Kayu Profil 3" PLL 6 19 1 M' #REF! #REF! #REF!

Pas. Langit2 Asbes (1 x 1) m, tbl.3,2 mm,


19 PLL 6 20 1 M² #REF! #REF! #REF!
Rangka Kayu Meranti
Pas. Langit2 Plywood 4 mm + Rangka Kayu
20 PLL 6 21 1 M² #REF! #REF! #REF!
Meranti
Pas. Langit2 Akustik (30 x 60) cm + Rangka
21 PLL 6 22 1 M² #REF! #REF! #REF!
Kayu Meranti
Pas. Langit2 Akustik (30 x 30) cm + Rangka
22 PLL 6 23 1 M² #REF! #REF! #REF!
Kayu Meranti
23 Pas. Langit2 Gypsum Board, tebal 9 mm PLL 6 24 1 M² #REF! #REF! #REF!

24 Pas. Langit2 Gypsum Board, tebal 6 mm PLL 6 24A 1 M² #REF! #REF! #REF!

25 Pas. Langit2 Gypsum Board, tebal 12 mm PLL 6 24B 1 M² #REF! #REF! #REF!

J. PEKERJAAN SANITASI
1 Kloset Duduk / monoblok PS 6 1 1 Bh 1,501,829.20 430,000.00 1,931,829.20

2 Kloset Jongkok Porselen PS 6 2 1 Bh 168,482.00 260,000.00 428,482.00

3 Kloset Jongkok Teraso PS 6 3 1 Bh #REF! #REF! #REF!

4 Urinoir PS 6 4 1 Bh 974,722.00 196,000.00 1,170,722.00

5 Washtafel PS 6 5 1 Bh 596,902.00 261,500.00 858,402.00

6 Bak Mandi Teraso volume 0,3 m³ PS 6 6 1 Bh #REF! #REF! #REF!

7 Bak Mandi Fibreglass volume 0,3 m³ PS 6 7 1 Bh 214,170.00 205,940.00 420,110.00

8 Bak Mandi Batu bata volume 0,3 m³ PS 6 8 1 Bh 690,020.00 588,000.00 1,278,020.00

9 Bak Kift Porselen PS 6 9 1 Bh #REF! #REF! #REF!

10 Bak Beton volume 1 m³ PS 6 10 1 Bh #REF! #REF! #REF!

11 Bak Fibreglass volume 1 m³ PS 6 11 1 Bh 585,446.40 864,000.00 1,449,446.40

12 Pas. Pipa Beton Ø 30 - 100 cm PS 6 15 1 M' #REF! #REF! #REF!

13 Bak Kontrol bt.bata (30 x30) cm, t= 35 cm PS 6 16 1 Bh 238,417.00 343,265.00 581,682.00

14 Bak Kontrol bt.bata (45 x45) cm, t= 50 cm PS 6 17 1 Bh 390,568.00 166,070.00 556,638.00

15 Bak Kontrol bt.bata (60 x60) cm, t= 65 cm PS 6 18 1 Bh 588,905.52 260,220.00 849,125.52

16 Pas. Pipa Galvanis Ø ½" PS 6 19 1 M' 22,893.50 16,740.00 39,633.50

17 Pas. Pipa Galvanis Ø ¾" PS 6 20 1 M' 26,024.50 16,740.00 42,764.50

18 Pas. Pipa Galvanis Ø 1" PS 6 21 1 M' 32,534.50 16,740.00 49,274.50

19 Pas. Pipa Galvanis Ø 1½" PS 6 22 1 M' 48,794.00 28,620.00 77,414.00

20 Pas. Pipa Galvanis Ø 2" PS 6 23 1 M' 66,681.00 28,620.00 95,301.00

21 Pas. Pipa Galvanis Ø 3" PS 6 24 1 M' #REF! #REF! #REF!

22 Pas. Pipa PVC type AW Ø ½" PS 6 25 1 M' 9,005.50 9,540.00 18,545.50

23 Pas. Pipa PVC type AW Ø ¾" PS 6 26 1 M' 12,090.00 9,540.00 21,630.00

24 Pas. Pipa PVC type AW Ø 1" PS 6 27 1 M' 22,149.50 9,540.00 31,689.50

25 Pas. Pipa PVC type AW Ø 1½" PS 6 28 1 M' 31,992.00 9,540.00 41,532.00

26 Pas. Pipa PVC type AW Ø 2" PS 6 29 1 M' 37,711.50 14,310.00 52,021.50

27 Pas. Pipa PVC type AW Ø 2½" PS 6 30 1 M' 43,291.50 9,540.00 52,831.50

28 Pas. Pipa PVC type AW Ø 3" PS 6 31 1 M' 48,530.50 21,470.00 70,000.50

29 Pas. Pipa PVC type AW Ø 4" PS 6 32 1 M' 81,204.50 21,470.00 102,674.50


1 2 3 4 5 6 7

30 Bak Cuci Piring Steinlees 2 lobang PS 6 33 1 Bh 816,510.00 35,700.00 852,210.00

31 Bak Cuci Piring Teraso 2 lobang PS 6 34 1 Bh 304,540.00 59,500.00 364,040.00

32 Pas. Kran air ½" atau ¾" PS 6 35 1 Bh 15,000.00 12,350.00 27,350.00

33 Pas. Floor Drain # 4" PS 6 36 1 Bh 21,170.00 12,350.00 33,520.00

K. PEKERJAAN BESI DAN ALLUMINIUM

1 Pas. Rangka Atap baja PBA 6 1 1 Kg 28,359.00 11,190.00 39,549.00

2 Pas. Pintu besi PBA 6 2 1 M² 28,359.00 11,460.00 39,819.00

3 Pas. Jendela besi PBA 6 3 1 M² 8,813.00 18,110.00 26,923.00

4 Pas. Pintu Gulung besi PBA 6 5 1 M² 989,170.00 200,500.00 1,189,670.00

5 Pas. Pintu Lipat besi PBA 6 6 1 M² #REF! #REF! #REF!

6 Pas. Sunscreen Alluminium PBA 6 7 1 M² #REF! #REF! #REF!

7 Pas. Rolling Door PBA 6 8 1 M² #REF! #REF! #REF!

8 Pas. Pintu Alluminium PBA 6 9 1 M² #REF! #REF! #REF!

9 Pas. Venetions blainds PBA 6 10 1 M² #REF! #REF! #REF!

10 Pas. Verticals blainds PBA 6 11 1 M² #REF! #REF! #REF!

11 Pas. Teralis besi PBA 6 12 1 M² #REF! #REF! #REF!

12 Pas. Kawat Harmonika # 2" PBA 6 13 1 M² #REF! #REF! #REF!

13 Pas. Kawat Nyamuk PBA 6 14 1 M² #REF! #REF! #REF!

14 Pas. Kawat Kassa PBA 6 15 1 M² #REF! #REF! #REF!

15 Pas. Kawat Burung PBA 6 16 1 M² #REF! #REF! #REF!

16 Pas. Jendela Naco dan Teralis PBA 6 17 1 M² #REF! #REF! #REF!

17 Pas. Talang Datar, Seng BJLS 35 PBA 6 18 1 M' #REF! #REF! #REF!

18 Pas. Talang Miring, Seng BJLS 35 PBA 6 19 1 M' #REF! #REF! #REF!

19 Pas. Talang 1/2 Ø 10 cm, Seng BJLS 35 PBA 6 20 1 M' #REF! #REF! #REF!

20 Pas. Talang 1/2 Ø 10 cm, Seng BJLS 30 PBA 6 21 1 M' #REF! #REF! #REF!

L. PEKERJAAN KUNCI DAN KACA

1 Pas. Kunci Tanam Antik PKK 6 1 1 Bh 214,500.00 71,400.00 285,900.00

2 Pas. Kunci Tanam Biasa PKK 6 2 1 Bh 59,820.00 52,350.00 112,170.00

3 Pas. Kunci Tanam Kmr.mandi PKK 6 3 1 Bh 35,300.00 51,175.00 86,475.00

4 Pas. Kunci Silinder PKK 6 4 1 Bh 35,260.00 50,950.00 86,210.00

5 Pas. Engsel Pintu PKK 6 5 1 Bh 14,110.00 17,850.00 31,960.00

6 Pas. Engsel Jendela Kupu-kupu PKK 6 6 1 Bh 8,390.00 11,900.00 20,290.00

7 Pas. Engsel Angin PKK 6 7 1 Bh 25,050.00 24,700.00 49,750.00

8 Pas. Spring Knip PKK 6 8 1 Bh #REF! #REF! #REF!

9 Pas. Kait Angin PKK 6 9 1 Bh 19,120.00 17,850.00 36,970.00

10 Pas. Door closer PKK 6 10 1 Bh 209,900.00 59,500.00 269,400.00

11 Pas. Kunci Selot PKK 6 11 1 Bh 27,230.00 23,800.00 51,030.00

12 Pas. Pegangan/Handle Pintu PKK 6 12 1 Bh 104,950.00 59,500.00 164,450.00


1 2 3 4 5 6 7

13 Pas. Door stop PKK 6 13 1 Bh 38,120.00 11,900.00 50,020.00

14 Pas. Rel pintu dorong PKK 6 14 1 Bh 160,330.00 71,400.00 231,730.00

15 Pas. Kunci Lemari PKK 6 15 1 M² 12,340.00 29,750.00 42,090.00

16 Pas. Kaca Polos tbl.3 mm PKK 6 16 1 M² 95,832.00 17,850.00 113,682.00

17 Pas. Kaca Polos tbl.5 mm PKK 6 17 1 M² 159,500.00 18,442.50 177,942.50

18 Pas. Kaca Polos tbl.8 mm PKK 6 18 1 M² 255,200.00 19,632.50 274,832.50

19 Pas. Kaca Buram tbl.5 mm PKK 6 19 1 M² 124,418.50 18,442.50 142,861.00

20 Pas. Kaca Cermin tbl.5 mm PKK 6 20 1 M² 177,870.00 18,442.50 196,312.50

21 Pas. Kaca Cermin tbl.8 mm PKK 6 21 1 M² 284,592.00 19,632.50 304,224.50

22 Pas. Kaca Wireglass tbl.5 mm PKK 6 23 1 M² 166,375.00 18,442.50 184,817.50

23 Pas. Kaca Patri tbl.5 mm PKK 6 24 1 M² 186,340.00 29,750.00 216,090.00

23 Pas. Kaca Reyben tbl.5 mm PKK 6 24A 1 M² 194,590.00 18,442.50 213,032.50

M. PEK. PENUTUP DINDING DAN LANTAI

1 Pas. Lantai Ubin Granito 40 x 40 cm PPL 6 9 1 M² 82,726.00 33,980.00 116,706.00

2 Pas. Lantai Ubin Granito 30 x 30 cm PPL 6 10 1 M² #REF! #REF! #REF!

3 Pas. Lantai Ubin Terralux Marmar 60/60 cm PPL 6 13 1 M² #REF! #REF! #REF!

4 Pas. Lantai Ubin Terralux Marmar 40/40 cm PPL 6 14 1 M² #REF! #REF! #REF!

5 Pas. Lantai Ubin Terralux Marmar 30/30 cm PPL 6 15 1 M² #REF! #REF! #REF!

6 Pas. Plint Ubin Granito 10 x 40 cm PPL 6 24 1 M' #REF! #REF! #REF!

7 Pas. Plint Ubin Granito 10 x 30 cm PPL 6 25 1 M' #REF! #REF! #REF!

8 Pas. Plint Terralux Marmar 10 x 60 cm PPL 6 28 1 M' #REF! #REF! #REF!

9 Pas. Plint Terralux Marmar 10 x 40 cm PPL 6 29 1 M' 331,182.00 33,980.00 365,162.00

10 Pas. Plint Terralux Marmar 10 x 30 cm PPL 6 30 1 M' 334,211.20 35,230.00 369,441.20

11 Pas. Lantai Keramik Artistik 10 x 20 cm PPL 6 34 1 M² #REF! #REF! #REF!

12 Pas. Lantai Keramik Artistik 10 x 10 cm PPL 6 35 1 M² #REF! #REF! #REF!

13 Pas. Lantai Keramik Artistik 5 x 20 cm PPL 6 36 1 M² 361,474.00 32,520.00 393,994.00

14 Pas. Plint Keramik Artistik 10 x 20 cm PPL 6 37 1 M' 342,453.00 33,980.00 376,433.00

15 Pas. Plint Keramik Artistik 10 x 10 cm PPL 6 38 1 M' 345,725.10 35,230.00 380,955.10

16 Pas. Plint Keramik Artistik 5 x 20 cm PPL 6 39 1 M' #REF! #REF! #REF!

17 Pas. Plint Keramik 10 x 20 cm PPL 6 39A 1 M' #REF! #REF! #REF!

18 Pas. Plint Keramik 10 x 30 cm PPL 6 39B 1 M' #REF! #REF! #REF!

19 Pas. Plint Keramik 10 x 40 cm PPL 6 39C 1 M' #REF! #REF! #REF!

20 Pas. Plint Vynil tanpa adukan PPL 6 41 1 M' #REF! #REF! #REF!

21 Pas. Lantai Keramik 10 x 20 cm PPL 6 42 1 M² #REF! #REF! #REF!

22 Pas. Lantai Keramik 15 x 15 cm PPL 6 43 1 M² #REF! #REF! #REF!

23 Pas. Lantai Keramik 20 x 20 cm PPL 6 44 1 M² #REF! #REF! #REF!


1 2 3 4 5 6 7
24 Pas. Lantai Keramik 20 x 25 cm PPL 6 45 1 M² 176,741.20 17,240.00 193,981.20

25 Pas. Lantai Keramik 25 x 25 cm PPL 6 46 1 M² 10,966.50 17,240.00 28,206.50

26 Pas. Lantai Keramik 30 x 30 cm PPL 6 47 1 M² #REF! #REF! #REF!

27 Pas. Lantai Keramik 30 x 30 cm anti slip PPL 6 48 1 M² #REF! #REF! #REF!

28 Pas. Lantai Keramik 40 x 40 cm PPL 6 49 1 M² 113,796.20 17,240.00 131,036.20

29 Pas. Lantai Mosaik 30 x 30 cm Ex lokal PPL 6 50 1 M² 79,062.20 17,240.00 96,302.20

30 Pas. Lantai Marmar PPL 6 51 1 M² 59,786.40 17,240.00 77,026.40

31 Pas. Lantai Karpet 100% Wool PPL 6 52 1 M² #REF! #REF! #REF!

32 Pas. Lantai Karpet 80% Wool, 20% Nylon PPL 6 53 1 M² 14,005.00 94,850.00 108,855.00

33 Pas. Lantai Karpet Vynil PPL 6 55 1 M² 15,553.00 94,850.00 110,403.00

34 Pas. Lantai Parquet Jati PPL 6 56 1 M² #REF! #REF! #REF!

35 Pas. Dinding Porselen 11 x 11 cm, putih PPL 6 58 1 M² 87,790.00 94,850.00 182,640.00

36 Pas. Dinding Porselen 11 x 11 cm, warna PPL 6 59 1 M² 81,729.80 94,850.00 176,579.80

37 Pas. Dinding Porselen 15 x 15 cm, putih PPL 6 60 1 M² #REF! #REF! #REF!

38 Pas. Dinding Porselen 15 x 15 cm, warna PPL 6 61 1 M² 194,161.40 94,850.00 289,011.40

39 Pas. Dinding Keramik artistik 10 x 20 cm PPL 6 64 1 M² 15,151.20 17,240.00 32,391.20

40 Pas. Dinding Keramik artistik 5 x 20 cm PPL 6 65 1 M² 11,580.20 17,240.00 28,820.20

41 Pas. Dinding Keramik 10 x 20 cm PPL 6 66 1 M² 5,748.82 17,240.00 22,988.82

42 Pas. Dinding Keramik 15 x 15 cm PPL 6 67 1 M² #REF! #REF! #REF!

43 Pas. Dinding Keramik 20 x 20 cm PPL 6 68 1 M² 306,153.40 94,850.00 401,003.40

44 Pas. Dinding Keramik 20 x 25 cm PPL 6 69 1 M² 51,425.50 32,520.00 83,945.50

45 Pas. Dinding Marmar PPL 6 70 1 M² 12,000.00 #REF! #REF!

46 Pas. Dinding Bata pelapis 7 x 3 x 20 cm PPL 6 71 1 M² 0.00 438,036.50 438,036.50

47 Pas. Dinding Batu Poros PPL 6 73 1 M² 0.00 191,181.50 191,181.50

48 Pas. Dinding Batu tempel hitam PPL 6 74 1 M² 5,160.00 5,000.00 10,160.00

49 Pas. Lantai Vynil karet 30 x 30 cm Kls.I PPL 6 75 1 M² 1,818.00 4,950.00 6,768.00

50 Pas. Lantai Vynil karet 30 x 30 cm Kls.II PPL 6 76 1 M² #REF! #REF! #REF!

51 Pas. Lantai Vynil asbes 30 x 30 cm PPL 6 77 1 M² 1,818.00 4,950.00 6,768.00

52 Pas. Lantai Vynil motif kembang 30 x 30 cm PPL 6 78 1 M² 1,818.00 4,950.00 6,768.00

53 Pas. Wall corverting lbr 50 cm PPL 6 79 1 M² 1,818.00 4,950.00 6,768.00

54 Pas. Plint kayu jati 2 x 10 cm PPL 6 82 1 M' 1,818.00 4,950.00 6,768.00

55 Pas. Plint kayu Meranti Batu 2 x 10 cm PPL 6 82A 1 M' 2,525.00 7,150.00 9,675.00
1 2 3 4 5 6 7

N. PEKERJAAN PENGECATAN

1 Mengikis/mengerok permukaan cat lama PC 6 1 1 M² 605.00 11,500.00 12,105.00


2 Mencuci bidang permukaan tembok yang
PC 6 2 1 M² 514.50 11,500.00 12,014.50
pernah di cat
3 Mengerok karat cat lama permukaan baja
PC 6 3 1 M² 514.50 11,500.00 12,014.50
dengan cara manual
4 Menyabun permukaan tembok lama PC 6 4 1 M² 514.50 11,500.00 12,014.50

5 Mendempul/menggosok permukaan kayu PC 6 6 1 M² 1,222.20 11,650.00 12,872.20

6 Mengecat permukaan bidang kayu lama PC 6 7 1 M² 11,631.30 13,825.00 25,456.30


7 Pengecatan bidang kayu baru 1 lps plamir,
PC 6 8 1 M² 27,501.10 15,490.00 42,991.10
1lps cat dasar, 2lps cat minyak
8 Pengecatan bidang kayu baru 1 lps plamir,
PC 6 9 1 M² 21,642.60 11,840.00 33,482.60
1lps cat dasar, 3lps cat minyak
9 Pelaburan kayu dengan politur PC 6 11 1 M² #REF! #REF! #REF!

10 Pelaburan kayu dengan Residu PC 6 12 1 M² 8,830.50 8,100.00 16,930.50

11 Pelaburan bidang kayu dgn vernis PC 6 13 1 M² 9,352.40 30,010.00 39,362.40


12 Pengecatan tembok baru ( 1 lapis plamir, 1
PC 6 14 1 M² 12,087.60 16,520.00 28,607.60
lps cat dasar, 2 lps cat penutup )
13 Pengecatan tembok lama ( 1 lps cat dasar, 2
PC 6 15 1 M² 11,118.00 12,390.00 23,508.00
lps cat penutup )
14 Pas. Wall paper PC 6 19 1 M² 130,138.00 21,970.00 152,108.00

15 Pengecatan permukaan baja dgn menie besi PC 6 20 1 M² 3,683.40 6,700.00 10,383.40

16 Pengecatan permukaan baja dgn cat menie PC 6 21 1 M² 17,314.08 44,475.00 61,789.08


17 Pengecatan permukaan baja dgn cat menie
PC 6 23 1 M² 14,418.00 24,300.00 38,718.00
besi dgn perancah
18 Pengecatan permukaan baja lapis seng
PC 6 24 1 M² 14,110.30 170,500.00 184,610.30
(galbani), cara manual 1 lapis tbl.200
19 Pengecatan permukaan baja lapis seng
PC 6 25 1 M² 11,649.00 142,000.00 153,649.00
(galbani), cara manual 3 lapis tbl.200

Medan, Maret 2008

DIKETAHUI OLEH : DIBUAT OLEH : TIM TEKNIS


Kepala Dinas Penataan Ruang dan 1. Ir. Jeremias Sinaga, MAP ( ……………. )

Permukiman Prov. Sumatera Utara 2. Ir. Herimas ( ……………. )


3. H. Sugiarto Bharata, ST ( ……………. )

4. H. Ali Muhar, ST ( ……………. )


Ir. H. Syafruddin Siregar, MSi 5. Sakula Karo karo, ST ( ……………. )
Pembina Utama Muda 6. Ebenser Saragih, SE ( ……………. )
NIP. 400025884 7. Sahat Hasudungan, ST ( ……………. )
8. Ir. Tanogara Siahaan ( ……………. )
9. Ali Fauzan, ST ( ……………. )
10. Ir. Naimul Ahmad R. ST ( ……………. )

11. Chandra, ST ( ……………. )

Anda mungkin juga menyukai