JUSTEK (1) PERHITUNGAN BALOK SALURAN INDUK

RUAS : BKKi.1e - BKKi.1i

BALOK
Uraian
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Dimensi Balok b | h (mm) 0 0 0 0 200 300 200 300 200
kuat tekan beton, fc' (Mpa) 14.50 14.50 14.50 14.50 14.50
tegangan leleh baja, fy (Mpa) 240.00 240.00 240.00 240.00 240.00
diameter tulangan.utama, Ø (mm) 16.00 16.00 12.00 12.00 16.00
diameter puntir, Ø (mm) 12.00 12.00 12.00 12.00 12.00
diameter beugel, P (mm) 8.00 8.00 8.00 8.00 8.00
selimut beton, ts (mm) 25.00 25.00 25.00 25.00 25.00
tebal plat, d (mm) 100.00 100.00 100.00 100.00 100.00
lebar saluran, b (m) 14.00 14.00 14.00 14.00 14.00
slope talud, m 1.50 1.50 1.50 1.50 1.50
tinggi air, h.air (m) 1.41 1.41 1.41 1.41 0.55
lebar-lereng, L = ((h+w)^2(1+m2)^0.5) (m) 3.98 3.98 3.98 3.98 3.98
lebar arah sumbu x, b/∑.pias,Lx (m) 5.00 5.00 2.50 5.00 1.99
lebar plat arah sumbu y, Ly (m) 7.00 7.00 7.00 7.00 2.50

411315025.xlsx
beban mati, Qd = d.plat*24 (kN/m) 2.40 2.40 3.84 3.84 4.32
beban hidup, Ql=h.air*10 (kN/m) 14.10 14.10 14.10 14.10 5.53
beban total, Q= Qd+Ql (kN/m) 16.50 16.50 17.94 17.94 9.85
beban, Qu = 1,2*Qd (kN/m) 2.88 2.88 4.61 4.61 5.18
beban tumpuan, P =0.50*Lx*(Qd + Ql) (kN) 41.25 41.25 22.43 44.85 9.81
momen lapangan ult arah x, Mu(+)=1/12 Qu*Lx² (kNm/m) 6.00 6.00 2.40 9.60 1.71
momen tumpuan ult arah y, Mu(-) =1/10 *Qu*Lx² (kNm/m) 7.20 7.20 2.88 11.52 2.06
gaya geser ultimate, Vu = 0.50*Lx*(Qd + Ql) (kN) 41.25 41.25 22.43 44.85 9.81
faktor bentuk distribusi tegangan terfaktor, β1 0.85 0.85 0.85 0.85 0.85
rasio tul kondisi balance, ρb = β1*0.85*fc'/fy*600/(600+fy) 0.0312 0.0312 0.0312 0.0312 0.0312
faktor tahanan momen max, ρ.max = 0.75*ρb*fy*(1-0.50*0.75*ρb*fy/(0.85*fc')) 4.3345 4.3345 4.3345 4.3345 4.3345
faktor reduski kuat lentur, Φ 0.80 0.80 0.80 0.80 0.80
jrk tul kesisi luar, ds = ts+P+D/2 (mm) 41.00 41.00 39.00 39.00 41.00
jml tul perbaris, ns = (b-2*ds)/(25+D), (bh) -2.00 -2.00 3.30 3.30 2.88
jrk tul dipakai, ns =int(ns)+1, (bh) -1.00 -1.00 4.00 4.00 3.00
jrk antar tul, x = (b-ns*D-2*ds)/(ns-1) (mm) 33.00 33.00 24.67 24.67 35.00
jrk vert tul ke pusat, y = D + 25, (mm) 41.00 41.00 37.00 37.00 41.00

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Tulangan Mu(+)
0 0 0 0 200 300 200 300 200
Momen nominal renc, Mn = Mu(+)/ Φ, (kNm) 7.5000 7.5000 3.0000 12.0000 2.1429
jrk pusat tul lentur, d' = ds + y/2 (mm) 61.50 61.50 57.50 57.50 61.50
tinggi eff balk, d = h - d' (mm) -61.50 -61.50 242.50 242.50 338.50
faktor tahanan momen, Rn = Mu(+)*10^6/ (b*d²) #DIV/0! #DIV/0! 0.2551 1.0203 0.0935
Rn<ρ.max ? #DIV/0! #DIV/0! Oke Oke Oke
rasio tul diperlukan, ρ = 0.85*fc'/fy *((1--2*Rn/(0.85*fc'))^0.50)) #DIV/0! #DIV/0! 0.0011 0.0044 0.0004
rasio tul min, ρ.min.1 = √fc' /(4*fy) 0.0040 0.0040 0.0040 0.0040 0.0040
rasio tul minimum, ρ.min.2 = 1.40/ fy 0.0058 0.0058 0.0058 0.0058 0.0058
rasio tul dibutuhkan, ρ = max(ρ, ρ.min.1, ρ.min.2) #DIV/0! #DIV/0! 0.0058 0.0058 0.0058
luas tulangan, As = ρ*b*d (mm2) #DIV/0! #DIV/0! 282.92 282.92 394.92
Digunakan diameter tulangan, Ø(mm), 16.00 16.00 12.00 12.00 16.00
jml tul yg diperlukan, n = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 2.50 2.50 1.96
jml tul yg dibutuhkan, n = int(n)+1 (bh) #DIV/0! #DIV/0! 3.00 3.00 2.00
luas tulangan, As = n*л/4 * D² (mm2) #DIV/0! #DIV/0! 339.43 339.43 402.29
jml baris tul, nb = n / ns (bh) #DIV/0! #DIV/0! 0.63 0.63 0.65
luas tul yg diperluka, As' = n*л/ 4 * D² (mm2) #DIV/0! #DIV/0! 84.86 84.86 100.57
digunakan diameter tulangan, Ø(mm), 12.00 12.00 12.00 12.00 12.00
jml tul yg dibutuhkan, n' = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 0.75 0.75 0.89
tulangan yg dibutuhkan, n' = int(n')+1 (bh) #DIV/0! #DIV/0! 1.00 1.00 1.00
luas tul diperlukan, As = n'*л/4 * D² (mm2) #DIV/0! #DIV/0! 113.14 113.14 201.14
jml baris tul, nb = / ns (bh) #DIV/0! #DIV/0! 0.25 0.25 0.33
syarat, nb<3 ? #DIV/0! #DIV/0! Oke Oke Oke
letak ttk berat, ''d' = ∑(ni*y1)/ n (mm) 41.00 41.00 39.00 39.00 41.00
'd'<d' ? Oke Oke Oke Oke Oke
tinggi eff balk, d = h - d' (mm) -41.00 -41.00 261.00 261.00 359.00
a = As*fy/ (0.85*fc'*b) (mm) #DIV/0! #DIV/0! 33.05 33.05 39.17
momen nominal, Mn = As*fy* (d-a/2)/ 10^6 (kNm) #DIV/0! #DIV/0! 19.92 19.92 32.77
tahanan momen balok, Φ*Mn #DIV/0! #DIV/0! 15.93 15.93 26.22
syarat Φ*Mn>Mu(+) ? #DIV/0! #DIV/0! Oke Oke Oke

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Tulangan Mu(-)
0 0 0 0 200 300 200 300 200
Momen nominal renc, Mn = Mu(+)/ Φ, (kNm) 9.00 9.00 3.60 14.40 2.57
jrk pusat tul lentur, d' = ds + y/2 (mm) 61.50 61.50 57.50 57.50 61.50
tinggi eff balk, d = h - d' (mm) -61.50 -61.50 242.50 242.50 338.50
faktor tahanan momen, Rn = Mu(+)*10^6/ (b*d²) #DIV/0! #DIV/0! 0.3061 1.2244 0.1122
Rn<ρ.max ? #DIV/0! #DIV/0! Oke Oke Oke
rasio tul diperlukan, ρ = 0.85*fc'/fy *((1--2*Rn/(0.85*fc'))^0.50)) #DIV/0! #DIV/0! 0.0013 0.0054 0.0005
rasio tul min, ρ.min.1 = √fc' /(4*fy) 0.0040 0.0040 0.0040 0.0040 0.0040
rasio tul minimum, ρ.min.2 = 1.40/ fy 0.0058 0.0058 0.0058 0.0058 0.0058
rasio tul dibutuhkan, ρ = max(ρ, ρ.min.1, ρ.min.2) #DIV/0! #DIV/0! 0.0058 0.0058 0.0058
luas tulangan, As = ρ*b*d (mm2) #DIV/0! #DIV/0! 282.92 282.92 394.92
digunakan diameter tulangan, Ø(mm), 16.00 12.00 16.00 16.00 16.00
jml tul yg diperlukan, n = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 1.41 1.41 1.96
jml tul yg dibutuhkan, n = int(n)+1 (bh) #DIV/0! #DIV/0! 2.00 2.00 2.00
luas tulangan, As = n*л/4 * D² (mm2) #DIV/0! #DIV/0! 226.29 226.29 402.29
jml baris tul, nb = n / ns (bh) #DIV/0! #DIV/0! 0.50 0.50 0.67
luas tul yg diperluka, As' = n*л/ 4 * D² (mm2) #DIV/0! #DIV/0! 56.57 56.57 100.57
digunakan diameter tulangan, Ø(mm), 12.00 12.00 12.00 12.00 12.00
jml tul yg dibutuhkan, n' = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 0.50 0.50 0.89
tulangan yg dibutuhkan, n' = int(n')+1 (bh) #DIV/0! #DIV/0! 1.00 1.00 1.00
luas tul diperlukan, As = n'*л/4 * D² (mm2) #DIV/0! #DIV/0! 113.14 113.14 201.14
jml baris tul, nb = / ns (bh) #DIV/0! #DIV/0! 0.25 0.25 0.33
syarat, nb<3 ? #DIV/0! #DIV/0! Oke Oke Oke
letak ttk berat, ''d' = ∑(ni*y1)/ n (mm) 41.00 41.00 37.00 37.00 41.00
'd'<d' ? Oke Oke Oke Oke Oke
tinggi eff balk, d = h - d' (mm) -41.00 -41.00 261.00 261.00 359.00
a = As*fy/ (0.85*fc'*b) (mm) #DIV/0! #DIV/0! 22.03 22.03 39.17
momen nominal, Mn = As*fy* (d-a/2)/ 10^6 (kNm) #DIV/0! #DIV/0! 13.58 13.58 32.77
tahanan momen balok, Φ*Mn (kNm) #DIV/0! #DIV/0! 10.86 10.86 26.22
syarat Φ*Mn>Mu(+) ? #DIV/0! #DIV/0! Oke Oke Oke

411315025.xlsx
Tulangan Geser, Tumpuan
gaya geser ult Vu = (kN) 41.25 41.25 22.43 44.85 9.81
faktor reduski geser, Φ 0.75 0.75 0.75 0.75 0.75
kuat geser beton, Vc = √fc'/6 * b /1000 (kN) 0.00 0.00 33.13 33.13 45.57
tahanan geser beton, Φ*Vc (kN) 0.00 0.00 24.85 24.85 34.18

tahanan geser sengkang, Φ.Vs =Vu-Φ.Vc (kN) 41.25 41.25 -2.42 20.00 -24.37
kuat gsr sengkang, Vs (kN) 55.00 55.00 -3.23 26.67 -32.49
jmh sengkang, nP (bh) 1.00 1.00 1.00 1.00 1.00
luas tul geser sengkang, Av = ns*л/4 * P² (mm2) 50.29 50.29 50.29 50.29 50.29
jrk sengkang, s = Av*fy*d/ (Vs*1000) (mm) 9 9 976 118 133
jrk sengkang, s.max = d / 2 (mm) -21 -21 131 131 180
sengkang dipakai, s (mm) 170 170 170 170 170
Geser Lapangan
gaya geser ultimate, Vu (kN) 41.25 41.25 22.43 44.85 9.81
faktor reduski geser, Φ 0.75 0.75 0.75 0.75 0.75
kuat geser beton, Vc = √fc'/ 6 *b*d/ 1000 (kN) 0.00 0.00 33.13 33.13 45.57
tahanan geser, Φ*Vc (kN) 0.00 0.00 24.85 24.85 34.18

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
UraIan
0 0 0 0 200 300 200 300 200
tahanan geser sengkang, Φ.Vs =Vu-Φ.Vc (kN) 41.25 41.25 -2.42 20.00 -24.37
kuat geser sengkang, Vs (kN) 55.00 55.00 -3.23 26.67 -32.49
jmh sengkang, nP (bh) 1.00 1.00 1.00 1.00 1.00
luas tul geser, Av = ns*л/4 * P² (mm2) -50 -50 201 201 151
jrk sengkang, s = Av*fy*d/ (Vs*1000) (mm) 9 9 3902 472 400
jrk sengkang, s.max = d / 2 (mm) -21 -21 131 131 180
sengkang dipakai, s (mm) 170 170 170 170 170
Pada Lapangan
Tulangan Tarik ### Ø 16 ### Ø 16 3 Ø 12 3 Ø 12 2 Ø
Tulangan Puntir 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Tekan ### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Beugel Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 -
Pada Tumpuan
Tulangan Tarik ### Ø 16 ### Ø 12 3 Ø 16 3 Ø 16 2 Ø
Tulangan Puntir 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Tekan ### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Beugel Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 -

Skets Penulangan pada Potongan Melintang

Lapangan Lapangan Lapangan Lapangan Lapangan

Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170

0 0 300 300 400

411315025.xlsx
0 0 200 200 200
### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2
2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
### Ø 16 ### Ø 16 3 Ø 12 3 Ø 12 2 Ø 16

Tumpuan Tumpuan Tumpuan Tumpuan Tumpuan

Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170

0 0 300 300 400

0 0 200 200 200


### Ø 16 ### Ø 12 3 Ø 16 3 Ø 16 2
2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2 Ø 12
BALOK LONG KAKI

411315025.xlsx
JUSTEK (1) PERHITUNGAN BALOK SALURAN INDUK
RUAS : BKKi.1i - BKKi.1m

BALOK
Uraian
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Dimensi Balok b | h (mm) 0 0 0 0 200 300 200 300 200
kuat tekan beton, fc' (Mpa) 14.50 14.50 14.50 14.50 14.50
tegangan leleh baja, fy (Mpa) 240.00 240.00 240.00 240.00 240.00
diameter tulangan.utama, Ø (mm) 16.00 16.00 12.00 12.00 16.00
diameter puntir, Ø (mm) 12.00 12.00 12.00 12.00 12.00
diameter beugel, P (mm) 8.00 8.00 8.00 8.00 8.00
selimut beton, ts (mm) 25.00 25.00 25.00 25.00 25.00
tebal plat, d (mm) 100.00 100.00 100.00 100.00 100.00
lebar saluran, b (m) 14.00 14.00 14.00 14.00 14.00
slope talud, m 1.50 1.50 1.50 1.50 1.50
tinggi air, h.air (m) 1.46 1.46 1.46 1.46 0.57
lebar-lereng, L = ((h+w)^2(1+m2)^0.5) (m) 4.07 4.07 4.07 4.07 4.07
lebar arah sumbu x, b/∑.pias,Lx (m) 5.00 5.00 2.50 5.00 2.04
lebar plat arah sumbu y, Ly (m) 7.00 7.00 7.00 7.00 2.50

411315025.xlsx
beban mati, Qd = d.plat*24 (kN/m) 2.40 2.40 3.84 3.84 4.32
beban hidup, Ql=h.air*10 (kN/m) 14.60 14.60 14.60 14.60 5.65
beban total, Q= Qd+Ql (kN/m) 17.00 17.00 18.44 18.44 9.97
beban, Qu = 1,2*Qd (kN/m) 2.88 2.88 4.61 4.61 5.18
beban tumpuan, P =0.50*Lx*(Qd + Ql) (kN) 42.50 42.50 23.05 46.10 10.16
momen lapangan ult arah x, Mu(+)=1/12 Qu*Lx² (kNm/m) 6.00 6.00 2.40 9.60 1.79
momen tumpuan ult arah y, Mu(-) =1/10 *Qu*Lx² (kNm/m) 7.20 7.20 2.88 11.52 2.15
gaya geser ultimate, Vu = 0.50*Lx*(Qd + Ql) (kN) 42.50 42.50 23.05 46.10 10.16
faktor bentuk distribusi tegangan terfaktor, β1 0.85 0.85 0.85 0.85 0.85
rasio tul kondisi balance, ρb = β1*0.85*fc'/fy*600/(600+fy) 0.0312 0.0312 0.0312 0.0312 0.0312
faktor tahanan momen max, ρ.max = 0.75*ρb*fy*(1-0.50*0.75*ρb*fy/(0.85*fc')) 4.3345 4.3345 4.3345 4.3345 4.3345
faktor reduski kuat lentur, Φ 0.80 0.80 0.80 0.80 0.80
jrk tul kesisi luar, ds = ts+P+D/2 (mm) 41.00 41.00 39.00 39.00 41.00
jml tul perbaris, ns = (b-2*ds)/(25+D), (bh) -2.00 -2.00 3.30 3.30 2.88
jrk tul dipakai, ns =int(ns)+1, (bh) -1.00 -1.00 4.00 4.00 3.00
jrk antar tul, x = (b-ns*D-2*ds)/(ns-1) (mm) 33.00 33.00 24.67 24.67 35.00
jrk vert tul ke pusat, y = D + 25, (mm) 41.00 41.00 37.00 37.00 41.00

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Tulangan Mu(+)
0 0 0 0 200 300 200 300 200
Momen nominal renc, Mn = Mu(+)/ Φ, (kNm) 7.5000 7.5000 3.0000 12.0000 2.2410
jrk pusat tul lentur, d' = ds + y/2 (mm) 61.50 61.50 57.50 57.50 61.50
tinggi eff balk, d = h - d' (mm) -61.50 -61.50 242.50 242.50 338.50
faktor tahanan momen, Rn = Mu(+)*10^6/ (b*d²) #DIV/0! #DIV/0! 0.2551 1.0203 0.0978
Rn<ρ.max ? #DIV/0! #DIV/0! Oke Oke Oke
rasio tul diperlukan, ρ = 0.85*fc'/fy *((1--2*Rn/(0.85*fc'))^0.50)) #DIV/0! #DIV/0! 0.0011 0.0044 0.0004
rasio tul min, ρ.min.1 = √fc' /(4*fy) 0.0040 0.0040 0.0040 0.0040 0.0040
rasio tul minimum, ρ.min.2 = 1.40/ fy 0.0058 0.0058 0.0058 0.0058 0.0058
rasio tul dibutuhkan, ρ = max(ρ, ρ.min.1, ρ.min.2) #DIV/0! #DIV/0! 0.0058 0.0058 0.0058
luas tulangan, As = ρ*b*d (mm2) #DIV/0! #DIV/0! 282.92 282.92 394.92
Digunakan diameter tulangan, Ø(mm), 16.00 16.00 12.00 12.00 16.00
jml tul yg diperlukan, n = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 2.50 2.50 1.96
jml tul yg dibutuhkan, n = int(n)+1 (bh) #DIV/0! #DIV/0! 3.00 3.00 2.00
luas tulangan, As = n*л/4 * D² (mm2) #DIV/0! #DIV/0! 339.43 339.43 402.29
jml baris tul, nb = n / ns (bh) #DIV/0! #DIV/0! 0.63 0.63 0.65
luas tul yg diperluka, As' = n*л/ 4 * D² (mm2) #DIV/0! #DIV/0! 84.86 84.86 100.57
digunakan diameter tulangan, Ø(mm), 12.00 12.00 12.00 12.00 12.00
jml tul yg dibutuhkan, n' = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 0.75 0.75 0.89
tulangan yg dibutuhkan, n' = int(n')+1 (bh) #DIV/0! #DIV/0! 1.00 1.00 1.00
luas tul diperlukan, As = n'*л/4 * D² (mm2) #DIV/0! #DIV/0! 113.14 113.14 201.14
jml baris tul, nb = / ns (bh) #DIV/0! #DIV/0! 0.25 0.25 0.33
syarat, nb<3 ? #DIV/0! #DIV/0! Oke Oke Oke
letak ttk berat, ''d' = ∑(ni*y1)/ n (mm) 41.00 41.00 39.00 39.00 41.00
'd'<d' ? Oke Oke Oke Oke Oke
tinggi eff balk, d = h - d' (mm) -41.00 -41.00 261.00 261.00 359.00
a = As*fy/ (0.85*fc'*b) (mm) #DIV/0! #DIV/0! 33.05 33.05 39.17
momen nominal, Mn = As*fy* (d-a/2)/ 10^6 (kNm) #DIV/0! #DIV/0! 19.92 19.92 32.77
tahanan momen balok, Φ*Mn #DIV/0! #DIV/0! 15.93 15.93 26.22
syarat Φ*Mn>Mu(+) ? #DIV/0! #DIV/0! Oke Oke Oke

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Tulangan Mu(-)
0 0 0 0 200 300 200 300 200
Momen nominal renc, Mn = Mu(+)/ Φ, (kNm) 9.00 9.00 3.60 14.40 2.69
jrk pusat tul lentur, d' = ds + y/2 (mm) 61.50 61.50 57.50 57.50 61.50
tinggi eff balk, d = h - d' (mm) -61.50 -61.50 242.50 242.50 338.50
faktor tahanan momen, Rn = Mu(+)*10^6/ (b*d²) #DIV/0! #DIV/0! 0.3061 1.2244 0.1173
Rn<ρ.max ? #DIV/0! #DIV/0! Oke Oke Oke
rasio tul diperlukan, ρ = 0.85*fc'/fy *((1--2*Rn/(0.85*fc'))^0.50)) #DIV/0! #DIV/0! 0.0013 0.0054 0.0005
rasio tul min, ρ.min.1 = √fc' /(4*fy) 0.0040 0.0040 0.0040 0.0040 0.0040
rasio tul minimum, ρ.min.2 = 1.40/ fy 0.0058 0.0058 0.0058 0.0058 0.0058
rasio tul dibutuhkan, ρ = max(ρ, ρ.min.1, ρ.min.2) #DIV/0! #DIV/0! 0.0058 0.0058 0.0058
luas tulangan, As = ρ*b*d (mm2) #DIV/0! #DIV/0! 282.92 282.92 394.92
digunakan diameter tulangan, Ø(mm), 16.00 12.00 12.00 12.00 16.00
jml tul yg diperlukan, n = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 2.50 2.50 1.96
jml tul yg dibutuhkan, n = int(n)+1 (bh) #DIV/0! #DIV/0! 3.00 3.00 2.00
luas tulangan, As = n*л/4 * D² (mm2) #DIV/0! #DIV/0! 339.43 339.43 402.29
jml baris tul, nb = n / ns (bh) #DIV/0! #DIV/0! 0.75 0.75 0.67
luas tul yg diperluka, As' = n*л/ 4 * D² (mm2) #DIV/0! #DIV/0! 84.86 84.86 100.57
digunakan diameter tulangan, Ø(mm), 12.00 12.00 12.00 12.00 12.00
jml tul yg dibutuhkan, n' = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 0.75 0.75 0.89
tulangan yg dibutuhkan, n' = int(n')+1 (bh) #DIV/0! #DIV/0! 1.00 1.00 1.00
luas tul diperlukan, As = n'*л/4 * D² (mm2) #DIV/0! #DIV/0! 113.14 113.14 201.14
jml baris tul, nb = / ns (bh) #DIV/0! #DIV/0! 0.25 0.25 0.33
syarat, nb<3 ? #DIV/0! #DIV/0! Oke Oke Oke
letak ttk berat, ''d' = ∑(ni*y1)/ n (mm) 41.00 41.00 37.00 37.00 41.00
'd'<d' ? Oke Oke Oke Oke Oke
tinggi eff balk, d = h - d' (mm) -41.00 -41.00 261.00 261.00 359.00
a = As*fy/ (0.85*fc'*b) (mm) #DIV/0! #DIV/0! 33.05 33.05 39.17
momen nominal, Mn = As*fy* (d-a/2)/ 10^6 (kNm) #DIV/0! #DIV/0! 19.92 19.92 32.77
tahanan momen balok, Φ*Mn (kNm) #DIV/0! #DIV/0! 15.93 15.93 26.22
syarat Φ*Mn>Mu(+) ? #DIV/0! #DIV/0! Oke Oke Oke

411315025.xlsx
Tulangan Geser, Tumpuan
gaya geser ult Vu = (kN) 42.50 42.50 23.05 46.10 10.16
faktor reduski geser, Φ 0.75 0.75 0.75 0.75 0.75
kuat geser beton, Vc = √fc'/6 * b /1000 (kN) 0.00 0.00 33.13 33.13 45.57
tahanan geser beton, Φ*Vc (kN) 0.00 0.00 24.85 24.85 34.18

tahanan geser sengkang, Φ.Vs =Vu-Φ.Vc (kN) 42.50 42.50 -1.80 21.25 -24.02
kuat gsr sengkang, Vs (kN) 56.67 56.67 -2.40 28.34 -32.03
jmh sengkang, nP (bh) 1.00 1.00 1.00 1.00 1.00
luas tul geser sengkang, Av = ns*л/4 * P² (mm2) 50.29 50.29 50.29 50.29 50.29
jrk sengkang, s = Av*fy*d/ (Vs*1000) (mm) 9 9 1315 111 135
jrk sengkang, s.max = d / 2 (mm) -21 -21 131 131 180
sengkang dipakai, s (mm) 170 170 170 170 170
Geser Lapangan
gaya geser ultimate, Vu (kN) 42.50 42.50 23.05 46.10 10.16
faktor reduski geser, Φ 0.75 0.75 0.75 0.75 0.75
kuat geser beton, Vc = √fc'/ 6 *b*d/ 1000 (kN) 0.00 0.00 33.13 33.13 45.57
tahanan geser, Φ*Vc (kN) 0.00 0.00 24.85 24.85 34.18

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
UraIan
0 0 0 0 200 300 200 300 200
tahanan geser sengkang, Φ.Vs =Vu-Φ.Vc (kN) 42.50 42.50 -1.80 21.25 -24.02
kuat geser sengkang, Vs (kN) 56.67 56.67 -2.40 28.34 -32.03
jmh sengkang, nP (bh) 1.00 1.00 1.00 1.00 1.00
luas tul geser, Av = ns*л/4 * P² (mm2) -50 -50 201 201 151
jrk sengkang, s = Av*fy*d/ (Vs*1000) (mm) 9 9 5260 445 406
jrk sengkang, s.max = d / 2 (mm) -21 -21 131 131 180
sengkang dipakai, s (mm) 170 170 170 170 170
Pada Lapangan
Tulangan Tarik ### Ø 16 ### Ø 16 3 Ø 12 3 Ø 12 2 Ø
Tulangan Puntir 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Tekan ### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Beugel Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 -
Pada Tumpuan
Tulangan Tarik ### Ø 16 ### Ø 12 3 Ø 12 3 Ø 12 2 Ø
Tulangan Puntir 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Tekan ### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Beugel Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 -

Skets Penulangan pada Potongan Melintang

Lapangan Lapangan Lapangan Lapangan Lapangan

Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170

0 0 300 300 400

411315025.xlsx
0 0 200 200 200
### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2
2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
### Ø 16 ### Ø 16 3 Ø 12 3 Ø 12 2 Ø 16

Tumpuan Tumpuan Tumpuan Tumpuan Tumpuan

Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170

0 0 300 300 400

0 0 200 200 200


### Ø 16 ### Ø 12 3 Ø 12 3 Ø 12 2
2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2 Ø 12

411315025.xlsx
JUSTEK (1) PERHITUNGAN BALOK SALURAN INDUK
RUAS : BKKi.1m - BKKi.1

BALOK
Uraian
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Dimensi Balok b | h (mm) 0 0 0 0 200 300 200 300 200
kuat tekan beton, fc' (Mpa) 14.50 14.50 14.50 14.50 14.50
tegangan leleh baja, fy (Mpa) 240.00 240.00 240.00 240.00 240.00
diameter tulangan.utama, Ø (mm) 16.00 16.00 12.00 12.00 16.00
diameter puntir, Ø (mm) 12.00 12.00 12.00 12.00 12.00
diameter beugel, P (mm) 8.00 8.00 8.00 8.00 8.00
selimut beton, ts (mm) 25.00 25.00 25.00 25.00 25.00
tebal plat, d (mm) 100.00 100.00 100.00 100.00 100.00
lebar saluran, b (m) 14.00 14.00 14.00 14.00 14.00
slope talud, m 1.50 1.50 1.50 1.50 1.50
tinggi air, h.air (m) 1.77 1.77 1.77 1.77 0.64
lebar-lereng, L = ((h+w)^2(1+m2)^0.5) (m) 4.63 4.63 4.63 4.63 4.63
lebar arah sumbu x, b/∑.pias,Lx (m) 5.00 5.00 2.50 5.00 2.32
lebar plat arah sumbu y, Ly (m) 7.00 7.00 7.00 7.00 2.50

411315025.xlsx
beban mati, Qd = d.plat*24 (kN/m) 2.40 2.40 3.84 3.84 4.32
beban hidup, Ql=h.air*10 (kN/m) 17.70 17.70 17.70 17.70 6.43
beban total, Q= Qd+Ql (kN/m) 20.10 20.10 21.54 21.54 10.75
beban, Qu = 1,2*Qd (kN/m) 2.88 2.88 4.61 4.61 5.18
beban tumpuan, P =0.50*Lx*(Qd + Ql) (kN) 50.25 50.25 26.93 53.85 12.45
momen lapangan ult arah x, Mu(+)=1/12 Qu*Lx² (kNm/m) 6.00 6.00 2.40 9.60 2.32
momen tumpuan ult arah y, Mu(-) =1/10 *Qu*Lx² (kNm/m) 7.20 7.20 2.88 11.52 2.78
gaya geser ultimate, Vu = 0.50*Lx*(Qd + Ql) (kN) 50.25 50.25 26.93 53.85 12.45
faktor bentuk distribusi tegangan terfaktor, β1 0.85 0.85 0.85 0.85 0.85
rasio tul kondisi balance, ρb = β1*0.85*fc'/fy*600/(600+fy) 0.0312 0.0312 0.0312 0.0312 0.0312
faktor tahanan momen max, ρ.max = 0.75*ρb*fy*(1-0.50*0.75*ρb*fy/(0.85*fc')) 4.3345 4.3345 4.3345 4.3345 4.3345
faktor reduski kuat lentur, Φ 0.80 0.80 0.80 0.80 0.80
jrk tul kesisi luar, ds = ts+P+D/2 (mm) 41.00 41.00 39.00 39.00 41.00
jml tul perbaris, ns = (b-2*ds)/(25+D), (bh) -2.00 -2.00 3.30 3.30 2.88
jrk tul dipakai, ns =int(ns)+1, (bh) -1.00 -1.00 4.00 4.00 3.00
jrk antar tul, x = (b-ns*D-2*ds)/(ns-1) (mm) 33.00 33.00 24.67 24.67 35.00
jrk vert tul ke pusat, y = D + 25, (mm) 41.00 41.00 37.00 37.00 41.00

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Tulangan Mu(+)
0 0 0 0 200 300 200 300 200
Momen nominal renc, Mn = Mu(+)/ Φ, (kNm) 7.5000 7.5000 3.0000 12.0000 2.8979
jrk pusat tul lentur, d' = ds + y/2 (mm) 61.50 61.50 57.50 57.50 61.50
tinggi eff balk, d = h - d' (mm) -61.50 -61.50 242.50 242.50 338.50
faktor tahanan momen, Rn = Mu(+)*10^6/ (b*d²) #DIV/0! #DIV/0! 0.2551 1.0203 0.1265
Rn<ρ.max ? #DIV/0! #DIV/0! Oke Oke Oke
rasio tul diperlukan, ρ = 0.85*fc'/fy *((1--2*Rn/(0.85*fc'))^0.50)) #DIV/0! #DIV/0! 0.0011 0.0044 0.0005
rasio tul min, ρ.min.1 = √fc' /(4*fy) 0.0040 0.0040 0.0040 0.0040 0.0040
rasio tul minimum, ρ.min.2 = 1.40/ fy 0.0058 0.0058 0.0058 0.0058 0.0058
rasio tul dibutuhkan, ρ = max(ρ, ρ.min.1, ρ.min.2) #DIV/0! #DIV/0! 0.0058 0.0058 0.0058
luas tulangan, As = ρ*b*d (mm2) #DIV/0! #DIV/0! 282.92 282.92 394.92
Digunakan diameter tulangan, Ø(mm), 16.00 16.00 12.00 12.00 16.00
jml tul yg diperlukan, n = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 2.50 2.50 1.96
jml tul yg dibutuhkan, n = int(n)+1 (bh) #DIV/0! #DIV/0! 3.00 3.00 2.00
luas tulangan, As = n*л/4 * D² (mm2) #DIV/0! #DIV/0! 339.43 339.43 402.29
jml baris tul, nb = n / ns (bh) #DIV/0! #DIV/0! 0.63 0.63 0.65
luas tul yg diperluka, As' = n*л/ 4 * D² (mm2) #DIV/0! #DIV/0! 84.86 84.86 100.57
digunakan diameter tulangan, Ø(mm), 12.00 12.00 12.00 12.00 12.00
jml tul yg dibutuhkan, n' = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 0.75 0.75 0.89
tulangan yg dibutuhkan, n' = int(n')+1 (bh) #DIV/0! #DIV/0! 1.00 1.00 1.00
luas tul diperlukan, As = n'*л/4 * D² (mm2) #DIV/0! #DIV/0! 113.14 113.14 201.14
jml baris tul, nb = / ns (bh) #DIV/0! #DIV/0! 0.25 0.25 0.33
syarat, nb<3 ? #DIV/0! #DIV/0! Oke Oke Oke
letak ttk berat, ''d' = ∑(ni*y1)/ n (mm) 41.00 41.00 39.00 39.00 41.00
'd'<d' ? Oke Oke Oke Oke Oke
tinggi eff balk, d = h - d' (mm) -41.00 -41.00 261.00 261.00 359.00
a = As*fy/ (0.85*fc'*b) (mm) #DIV/0! #DIV/0! 33.05 33.05 39.17
momen nominal, Mn = As*fy* (d-a/2)/ 10^6 (kNm) #DIV/0! #DIV/0! 19.92 19.92 32.77
tahanan momen balok, Φ*Mn #DIV/0! #DIV/0! 15.93 15.93 26.22
syarat Φ*Mn>Mu(+) ? #DIV/0! #DIV/0! Oke Oke Oke

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Tulangan Mu(-)
0 0 0 0 200 300 200 300 200
Momen nominal renc, Mn = Mu(+)/ Φ, (kNm) 9.00 9.00 3.60 14.40 3.48
jrk pusat tul lentur, d' = ds + y/2 (mm) 61.50 61.50 57.50 57.50 61.50
tinggi eff balk, d = h - d' (mm) -61.50 -61.50 242.50 242.50 338.50
faktor tahanan momen, Rn = Mu(+)*10^6/ (b*d²) #DIV/0! #DIV/0! 0.3061 1.2244 0.1517
Rn<ρ.max ? #DIV/0! #DIV/0! Oke Oke Oke
rasio tul diperlukan, ρ = 0.85*fc'/fy *((1--2*Rn/(0.85*fc'))^0.50)) #DIV/0! #DIV/0! 0.0013 0.0054 0.0006
rasio tul min, ρ.min.1 = √fc' /(4*fy) 0.0040 0.0040 0.0040 0.0040 0.0040
rasio tul minimum, ρ.min.2 = 1.40/ fy 0.0058 0.0058 0.0058 0.0058 0.0058
rasio tul dibutuhkan, ρ = max(ρ, ρ.min.1, ρ.min.2) #DIV/0! #DIV/0! 0.0058 0.0058 0.0058
luas tulangan, As = ρ*b*d (mm2) #DIV/0! #DIV/0! 282.92 282.92 394.92
digunakan diameter tulangan, Ø(mm), 16.00 12.00 12.00 12.00 16.00
jml tul yg diperlukan, n = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 2.50 2.50 1.96
jml tul yg dibutuhkan, n = int(n)+1 (bh) #DIV/0! #DIV/0! 3.00 3.00 2.00
luas tulangan, As = n*л/4 * D² (mm2) #DIV/0! #DIV/0! 339.43 339.43 402.29
jml baris tul, nb = n / ns (bh) #DIV/0! #DIV/0! 0.75 0.75 0.67
luas tul yg diperluka, As' = n*л/ 4 * D² (mm2) #DIV/0! #DIV/0! 84.86 84.86 100.57
digunakan diameter tulangan, Ø(mm), 12.00 12.00 12.00 12.00 12.00
jml tul yg dibutuhkan, n' = As/ (л/4 * D² (bh) #DIV/0! #DIV/0! 0.75 0.75 0.89
tulangan yg dibutuhkan, n' = int(n')+1 (bh) #DIV/0! #DIV/0! 1.00 1.00 1.00
luas tul diperlukan, As = n'*л/4 * D² (mm2) #DIV/0! #DIV/0! 113.14 113.14 201.14
jml baris tul, nb = / ns (bh) #DIV/0! #DIV/0! 0.25 0.25 0.33
syarat, nb<3 ? #DIV/0! #DIV/0! Oke Oke Oke
letak ttk berat, ''d' = ∑(ni*y1)/ n (mm) 41.00 41.00 37.00 37.00 41.00
'd'<d' ? Oke Oke Oke Oke Oke
tinggi eff balk, d = h - d' (mm) -41.00 -41.00 261.00 261.00 359.00
a = As*fy/ (0.85*fc'*b) (mm) #DIV/0! #DIV/0! 33.05 33.05 39.17
momen nominal, Mn = As*fy* (d-a/2)/ 10^6 (kNm) #DIV/0! #DIV/0! 19.92 19.92 32.77
tahanan momen balok, Φ*Mn (kNm) #DIV/0! #DIV/0! 15.93 15.93 26.22
syarat Φ*Mn>Mu(+) ? #DIV/0! #DIV/0! Oke Oke Oke

411315025.xlsx
Tulangan Geser, Tumpuan
gaya geser ult Vu = (kN) 50.25 50.25 26.93 53.85 12.45
faktor reduski geser, Φ 0.75 0.75 0.75 0.75 0.75
kuat geser beton, Vc = √fc'/6 * b /1000 (kN) 0.00 0.00 33.13 33.13 45.57
tahanan geser beton, Φ*Vc (kN) 0.00 0.00 24.85 24.85 34.18

tahanan geser sengkang, Φ.Vs =Vu-Φ.Vc (kN) 50.25 50.25 2.08 29.00 -21.73
kuat gsr sengkang, Vs (kN) 67.00 67.00 2.77 38.67 -28.97
jmh sengkang, nP (bh) 1.00 1.00 1.00 1.00 1.00
luas tul geser sengkang, Av = ns*л/4 * P² (mm2) 50.29 50.29 50.29 50.29 50.29
jrk sengkang, s = Av*fy*d/ (Vs*1000) (mm) 7 7 1137 81 150
jrk sengkang, s.max = d / 2 (mm) -21 -21 131 131 180
sengkang dipakai, s (mm) 170 170 170 170 170
Geser Lapangan
gaya geser ultimate, Vu (kN) 50.25 50.25 26.93 53.85 12.45
faktor reduski geser, Φ 0.75 0.75 0.75 0.75 0.75
kuat geser beton, Vc = √fc'/ 6 *b*d/ 1000 (kN) 0.00 0.00 33.13 33.13 45.57
tahanan geser, Φ*Vc (kN) 0.00 0.00 24.85 24.85 34.18

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
UraIan
0 0 0 0 200 300 200 300 200
tahanan geser sengkang, Φ.Vs =Vu-Φ.Vc (kN) 50.25 50.25 2.08 29.00 -21.73
kuat geser sengkang, Vs (kN) 67.00 67.00 2.77 38.67 -28.97
jmh sengkang, nP (bh) 1.00 1.00 1.00 1.00 1.00
luas tul geser, Av = ns*л/4 * P² (mm2) -50 -50 201 201 151
jrk sengkang, s = Av*fy*d/ (Vs*1000) (mm) 7 7 4546 326 449
jrk sengkang, s.max = d / 2 (mm) -21 -21 131 131 180
sengkang dipakai, s (mm) 170 170 170 170 170
Pada Lapangan
Tulangan Tarik ### Ø 16 ### Ø 16 3 Ø 12 3 Ø 12 2 Ø
Tulangan Puntir 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Tekan ### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Beugel Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 -
Pada Tumpuan
Tulangan Tarik ### Ø 16 ### Ø 12 3 Ø 12 3 Ø 12 2 Ø
Tulangan Puntir 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Tekan ### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Beugel Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 -

Skets Penulangan pada Potongan Melintang

Lapangan Lapangan Lapangan Lapangan Lapangan

Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170

0 0 300 300 400

411315025.xlsx
0 0 200 200 200
### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2
2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
### Ø 16 ### Ø 16 3 Ø 12 3 Ø 12 2 Ø 16

Tumpuan Tumpuan Tumpuan Tumpuan Tumpuan

Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170

0 0 300 300 400

0 0 200 200 200


### Ø 16 ### Ø 12 3 Ø 12 3 Ø 12 2
2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
### Ø 12 ### Ø 12 2 Ø 12 2 Ø 12 2 Ø 12

JUSTEK (1) PERHITUNGAN BALOK SALURAN INDUK

411315025.xlsx
RUAS : BKKi.1e - BKKi.1

BALOK
Uraian
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Dimensi Balok b | h (mm) 200 400 200 300 200 400 200 400 200
kuat tekan beton, fc' (Mpa) 14.50 14.50 14.50 14.50 14.50
tegangan leleh baja, fy (Mpa) 240.00 240.00 240.00 240.00 240.00
diameter tulangan.utama, Ø (mm) 16.00 16.00 16.00 16.00 16.00
diameter puntir, Ø (mm) 12.00 12.00 12.00 12.00 12.00
diameter beugel, P (mm) 8.00 8.00 8.00 8.00 8.00
selimut beton, ts (mm) 25.00 25.00 25.00 25.00 25.00
tebal plat, d (mm) 100.00 100.00 100.00 100.00 100.00
lebar saluran, b (m) 14.00 14.00 14.00 14.00 14.00
slope talud, m 2.00 2.00 2.00 2.00 2.00
tinggi air, h.air (m) 2.025 2.03 2.03 2.03 0.71
lebar-lereng, L = ((h+w)^2(1+m2)^0.5) (m) 6.32 6.32 6.32 6.32 6.32
lebar arah sumbu x, b/∑.pias,Lx (m) 5.00 5.00 2.50 5.00 3.16
lebar plat arah sumbu y, Ly (m) 7.00 7.00 7.00 7.00 2.50
beban mati, Qd = d.plat*24 (kN/m) 4.32 3.84 4.32 4.32 4.32
beban hidup, Ql=h.air*10 (kN/m) 20.25 20.25 20.25 20.25 7.06

411315025.xlsx
beban total, Q= Qd+Ql (kN/m) 24.57 24.09 24.57 24.57 11.38
beban, Qu = 1,2*Qd (kN/m) 5.18 4.61 5.18 5.18 5.18
beban tumpuan, P =0.50*Lx*(Qd + Ql) (kN) 61.43 60.23 30.71 61.43 17.98
momen lapangan ult arah x, Mu(+)=1/12 Qu*Lx² (kNm/m) 10.80 9.60 2.70 10.80 4.31
momen tumpuan ult arah y, Mu(-) =1/10 *Qu*Lx² (kNm/m) 12.96 11.52 3.24 12.96 5.17
gaya geser ultimate, Vu = 0.50*Lx*(Qd + Ql) (kN) 61.43 60.23 30.71 61.43 17.98
faktor bentuk distribusi tegangan terfaktor, β1 0.85 0.85 0.85 0.85 0.85
rasio tul kondisi balance, ρb = β1*0.85*fc'/fy*600/(600+fy) 0.0312 0.0312 0.0312 0.0312 0.0312
faktor tahanan momen max, ρ.max = 0.75*ρb*fy*(1-0.50*0.75*ρb*fy/(0.85*fc')) 4.3345 4.3345 4.3345 4.3345 4.3345
faktor reduski kuat lentur, Φ 0.80 0.80 0.80 0.80 0.80
jrk tul kesisi luar, ds = ts+P+D/2 (mm) 41.00 41.00 41.00 41.00 41.00
jml tul perbaris, ns = (b-2*ds)/(25+D), (bh) 2.88 2.88 2.88 2.88 2.88
jrk tul dipakai, ns =int(ns)+1, (bh) 3.00 3.00 3.00 3.00 3.00
jrk antar tul, x = (b-ns*D-2*ds)/(ns-1) (mm) 35.00 35.00 35.00 35.00 35.00
jrk vert tul ke pusat, y = D + 25, (mm) 41.00 41.00 41.00 41.00 41.00

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Tulangan Mu(+)
200 400 200 300 200 400 200 400 200
Momen nominal renc, Mn = Mu(+)/ Φ, (kNm) 13.5000 12.0000 3.3750 13.5000 5.3869
jrk pusat tul lentur, d' = ds + y/2 (mm) 61.50 61.50 61.50 61.50 61.50
tinggi eff balk, d = h - d' (mm) 338.50 238.50 338.50 338.50 338.50
faktor tahanan momen, Rn = Mu(+)*10^6/ (b*d²) 0.5891 1.0548 0.1473 0.5891 0.2351
Rn<ρ.max ? Oke Oke Oke Oke Oke
rasio tul diperlukan, ρ = 0.85*fc'/fy *((1--2*Rn/(0.85*fc'))^0.50)) 0.0025 0.0046 0.0006 0.0025 0.0010
rasio tul min, ρ.min.1 = √fc' /(4*fy) 0.0040 0.0040 0.0040 0.0040 0.0040
rasio tul minimum, ρ.min.2 = 1.40/ fy 0.0058 0.0058 0.0058 0.0058 0.0058
rasio tul dibutuhkan, ρ = max(ρ, ρ.min.1, ρ.min.2) 0.0058 0.0058 0.0058 0.0058 0.0058
luas tulangan, As = ρ*b*d (mm2) 394.92 278.25 394.92 394.92 394.92
Digunakan diameter tulangan, Ø(mm), 16.00 16.00 16.00 16.00 16.00
jml tul yg diperlukan, n = As/ (л/4 * D² (bh) 1.96 1.38 1.96 1.96 1.96
jml tul yg dibutuhkan, n = int(n)+1 (bh) 2.00 2.00 2.00 2.00 2.00
luas tulangan, As = n*л/4 * D² (mm2) 402.29 402.29 402.29 402.29 402.29
jml baris tul, nb = n / ns (bh) 0.65 0.46 0.65 0.65 0.65
luas tul yg diperluka, As' = n*л/ 4 * D² (mm2) 100.57 100.57 100.57 100.57 100.57
digunakan diameter tulangan, Ø(mm), 12.00 12.00 12.00 12.00 12.00
jml tul yg dibutuhkan, n' = As/ (л/4 * D² (bh) 0.89 0.89 0.89 0.89 0.89
tulangan yg dibutuhkan, n' = int(n')+1 (bh) 1.00 1.00 1.00 1.00 1.00
luas tul diperlukan, As = n'*л/4 * D² (mm2) 201.14 201.14 201.14 201.14 201.14
jml baris tul, nb = / ns (bh) 0.33 0.33 0.33 0.33 0.33
syarat, nb<3 ? Oke Oke Oke Oke Oke
letak ttk berat, ''d' = ∑(ni*y1)/ n (mm) 41.00 41.00 41.00 41.00 41.00
'd'<d' ? Oke Oke Oke Oke Oke
tinggi eff balk, d = h - d' (mm) 359.00 259.00 359.00 359.00 359.00
a = As*fy/ (0.85*fc'*b) (mm) 39.17 39.17 39.17 39.17 39.17
momen nominal, Mn = As*fy* (d-a/2)/ 10^6 (kNm) 32.77 23.12 32.77 32.77 32.77
tahanan momen balok, Φ*Mn 26.22 18.49 26.22 26.22 26.22
syarat Φ*Mn>Mu(+) ? Oke Oke Oke Oke Oke

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
Tulangan Mu(-)
200 400 200 300 200 400 200 400 200
Momen nominal renc, Mn = Mu(+)/ Φ, (kNm) 16.20 14.40 4.05 16.20 6.46
jrk pusat tul lentur, d' = ds + y/2 (mm) 61.50 61.50 61.50 61.50 61.50
tinggi eff balk, d = h - d' (mm) 338.50 238.50 338.50 338.50 338.50
faktor tahanan momen, Rn = Mu(+)*10^6/ (b*d²) 0.7069 1.2658 0.1767 0.7069 0.2821
Rn<ρ.max ? Oke Oke Oke Oke Oke
rasio tul diperlukan, ρ = 0.85*fc'/fy *((1--2*Rn/(0.85*fc'))^0.50)) 0.0030 0.0056 0.0007 0.0030 0.0012
rasio tul min, ρ.min.1 = √fc' /(4*fy) 0.0040 0.0040 0.0040 0.0040 0.0040
rasio tul minimum, ρ.min.2 = 1.40/ fy 0.0058 0.0058 0.0058 0.0058 0.0058
rasio tul dibutuhkan, ρ = max(ρ, ρ.min.1, ρ.min.2) 0.0058 0.0058 0.0058 0.0058 0.0058
luas tulangan, As = ρ*b*d (mm2) 394.92 278.25 394.92 394.92 394.92
digunakan diameter tulangan, Ø(mm), 16.00 12.00 16.00 16.00 16.00
jml tul yg diperlukan, n = As/ (л/4 * D² (bh) 1.96 2.46 1.96 1.96 1.96
jml tul yg dibutuhkan, n = int(n)+1 (bh) 2.00 3.00 2.00 2.00 2.00
luas tulangan, As = n*л/4 * D² (mm2) 402.29 603.43 402.29 402.29 402.29
jml baris tul, nb = n / ns (bh) 0.67 1.00 0.67 0.67 0.67
luas tul yg diperluka, As' = n*л/ 4 * D² (mm2) 100.57 150.86 100.57 100.57 100.57
digunakan diameter tulangan, Ø(mm), 12.00 12.00 12.00 12.00 12.00
jml tul yg dibutuhkan, n' = As/ (л/4 * D² (bh) 0.89 1.33 0.89 0.89 0.89
tulangan yg dibutuhkan, n' = int(n')+1 (bh) 1.00 2.00 1.00 1.00 1.00
luas tul diperlukan, As = n'*л/4 * D² (mm2) 201.14 402.29 201.14 201.14 201.14
jml baris tul, nb = / ns (bh) 0.33 0.67 0.33 0.33 0.33
syarat, nb<3 ? Oke Oke Oke Oke Oke
letak ttk berat, ''d' = ∑(ni*y1)/ n (mm) 41.00 41.00 41.00 41.00 41.00
'd'<d' ? Oke Oke Oke Oke Oke
tinggi eff balk, d = h - d' (mm) 359.00 259.00 359.00 359.00 359.00
a = As*fy/ (0.85*fc'*b) (mm) 39.17 58.75 39.17 39.17 39.17
momen nominal, Mn = As*fy* (d-a/2)/ 10^6 (kNm) 32.77 33.25 32.77 32.77 32.77
tahanan momen balok, Φ*Mn (kNm) 26.22 26.60 26.22 26.22 26.22
syarat Φ*Mn>Mu(+) ? Oke Oke Oke Oke Oke

411315025.xlsx
Tulangan Geser, Tumpuan
gaya geser ult Vu = (kN) 61.43 60.23 30.71 61.43 17.98
faktor reduski geser, Φ 0.75 0.75 0.75 0.75 0.75
kuat geser beton, Vc = √fc'/6 * b /1000 (kN) 45.57 32.87 45.57 45.57 45.57
tahanan geser beton, Φ*Vc (kN) 34.18 24.66 34.18 34.18 34.18

tahanan geser sengkang, Φ.Vs =Vu-Φ.Vc (kN) 27.25 35.57 -3.46 27.25 -16.20
kuat gsr sengkang, Vs (kN) 36.33 47.43 -4.62 36.33 -21.60
jmh sengkang, nP (bh) 1.00 1.00 1.00 1.00 1.00
luas tul geser sengkang, Av = ns*л/4 * P² (mm2) 50.29 50.29 50.29 50.29 50.29
jrk sengkang, s = Av*fy*d/ (Vs*1000) (mm) 119 66 938 119 201
jrk sengkang, s.max = d / 2 (mm) 180 130 180 180 180
sengkang dipakai, s (mm) 170 170 170 170 170
Geser Lapangan
gaya geser ultimate, Vu (kN) 61.43 60.23 30.71 61.43 17.98
faktor reduski geser, Φ 0.75 0.75 0.75 0.75 0.75
kuat geser beton, Vc = √fc'/ 6 *b*d/ 1000 (kN) 45.57 32.87 45.57 45.57 45.57
tahanan geser, Φ*Vc (kN) 34.18 24.66 34.18 34.18 34.18

411315025.xlsx
Cross Cross-Deletasi Long-kaki Long-Tengah Lereng-Mini
UraIan
200 400 200 300 200 400 200 400 200
tahanan geser sengkang, Φ.Vs =Vu-Φ.Vc (kN) 27.25 35.57 -3.46 27.25 -16.20
kuat geser sengkang, Vs (kN) 36.33 47.43 -4.62 36.33 -21.60
jmh sengkang, nP (bh) 1.00 1.00 1.00 1.00 1.00
luas tul geser, Av = ns*л/4 * P² (mm2) 151 151 151 151 151
jrk sengkang, s = Av*fy*d/ (Vs*1000) (mm) 358 198 2815 358 602
jrk sengkang, s.max = d / 2 (mm) 180 130 180 180 180
sengkang dipakai, s (mm) 170 170 170 170 170
Pada Lapangan
Tulangan Tarik 2 Ø 16 2 Ø 16 2 Ø 16 2 Ø 16 2 Ø
Tulangan Puntir 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Tekan 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Beugel Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 -
Pada Tumpuan
Tulangan Tarik 2 Ø 16 2 Ø 12 2 Ø 16 2 Ø 16 2 Ø
Tulangan Puntir 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Tekan 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
Tulangan Beugel Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 -

Skets Penulangan pada Potongan Melintang

Lapangan Lapangan Lapangan Lapangan Lapangan

Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170

400 300 400 400 400

411315025.xlsx
200 200 200 200 200
2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2
2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
2 Ø 16 2 Ø 16 2 Ø 16 2 Ø 16 2 Ø 16

Tumpuan Tumpuan Tumpuan Tumpuan Tumpuan

Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170

400 300 400 400 400

200 200 200 200 200


2 Ø 16 2 Ø 12 2 Ø 16 2 Ø 16 2
2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø
2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12

411315025.xlsx
HITUNGAN BALOK SALURAN INDUK KLAMBU KIRI

BALOK
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
14.50 14.50 14.50 14.50
240.00 240.00 240.00 240.00
16.00 12.00 12.00 12.00
12.00 12.00 10.00 12.00
8.00 8.00 8.00 8.00
25.00 25.00 25.00 40.00
100.00 100.00 70.00 70.00
14.00 14.00 14.00 14.00
1.50 1.50 1.50 1.50
0.55 0.55 0.55 0.55
3.98 3.98 3.98 3.98
1.99 1.99 1.99 2.00
2.50 2.50 2.50 1.99

411315025.xlsx
4.32 3.48 3.12 7.68
5.53 5.53 5.53 5.53
9.85 9.01 8.65 13.21
5.18 4.18 3.74 9.22
9.81 8.97 8.61 13.21
1.71 1.38 1.24 3.07
2.06 1.66 1.49 3.69
9.81 8.97 8.61 13.21
0.85 0.85 0.85 0.85
0.0312 0.0312 0.0312 0.0312
4.3345 4.3345 4.3345 4.3345
0.80 0.80 0.80 0.80
41.00 39.00 39.00 54.00
2.88 1.95 3.30 7.54
3.00 2.00 4.00 8.00
35.00 48.00 24.67 42.29
41.00 37.00 37.00 52.00

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
2.1429 1.7262 1.5476 3.8400
61.50 57.50 57.50 80.00
338.50 242.50 242.50 420.00
0.0935 0.1957 0.1316 0.0435
Oke Oke Oke Oke
0.0004 0.0008 0.0006 0.0002
0.0040 0.0040 0.0040 0.0040
0.0058 0.0058 0.0058 0.0058
0.0058 0.0058 0.0058 0.0058
394.92 212.19 282.92 1225.00
16.00 12.00 12.00 12.00
1.96 1.88 2.50 10.83
2.00 2.00 3.00 11.00
402.29 226.29 339.43 1244.57
0.65 0.94 0.63 1.35
100.57 56.57 84.86 311.14
12.00 12.00 12.00 12.00
0.89 0.50 0.75 2.75
1.00 1.00 1.00 3.00
201.14 113.14 113.14 339.43
0.33 0.50 0.25 0.38
Oke Oke Oke Oke
41.00 39.00 39.00 54.00
Oke Oke Oke Oke
359.00 261.00 261.00 446.00
39.17 29.38 33.05 48.47
32.77 13.38 19.92 125.98
26.22 10.70 15.93 100.78
Oke Oke Oke Oke

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
2.57 2.07 1.86 4.61
61.50 57.50 57.50 80.00
338.50 242.50 242.50 420.00
0.1122 0.2348 0.1579 0.0522
Oke Oke Oke Oke
0.0005 0.0010 0.0007 0.0002
0.0040 0.0040 0.0040 0.0040
0.0058 0.0058 0.0058 0.0058
0.0058 0.0058 0.0058 0.0058
394.92 212.19 282.92 1225.00
16.00 12.00 12.00 12.00
1.96 1.88 2.50 10.83
2.00 2.00 3.00 11.00
402.29 226.29 339.43 1244.57
0.67 1.00 0.75 1.38
100.57 56.57 84.86 311.14
12.00 12.00 12.00 12.00
0.89 0.50 0.75 2.75
1.00 1.00 1.00 3.00
201.14 113.14 113.14 339.43
0.33 0.50 0.25 0.38
Oke Oke Oke Oke
41.00 37.00 37.00 52.00
Oke Oke Oke Oke
359.00 261.00 261.00 446.00
39.17 29.38 33.05 48.47
32.77 13.38 19.92 125.98
26.22 10.70 15.93 100.78
Oke Oke Oke Oke

411315025.xlsx
9.81 8.97 8.61 13.21
0.75 0.75 0.75 0.75
45.57 24.85 33.13 141.53
34.18 18.63 24.85 106.14

-24.37 -9.67 -16.24 -92.94


-32.49 -12.89 -21.65 -123.92
1.00 1.00 1.00 1.00
50.29 50.29 50.29 50.29
133 244 146 43
180 131 131 223
170 170 170 170

9.81 8.97 8.61 13.21


0.75 0.75 0.75 0.75
45.57 24.85 33.13 141.53
34.18 18.63 24.85 106.14

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
-24.37 -9.67 -16.24 -92.94
-32.49 -12.89 -21.65 -123.92
1.00 1.00 1.00 1.00
151 101 201 402
400 489 582 347
180 131 131 223
170 170 170 170

16 2 Ø 12 3 Ø 12 11 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
12 2 Ø 12 2 Ø 12 3 Ø 12
170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170

16 2 Ø 12 3 Ø 12 11 Ø 12
12 2 Ø 12 2 Ø 12 2 Ø 12
12 2 Ø 12 2 Ø 12 3 Ø 12
170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170

Skets Penulangan pada Potongan Melintang

Lapangan Lapangan Lapangan Lapangan

Ø8 - 170 Ø8 - 170 Ø8 - 170

300 300 500

411315025.xlsx
200 150 200 500
Ø 12 2 Ø 12 2 Ø 12 6 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
2 Ø 12 3 Ø 12 3 Ø 12

Tumpuan Tumpuan Tumpuan Tumpuan

Ø8 - 170 Ø8 - 170 Ø8 - 170

300 300 500

200 150 200 500


Ø 16 2 Ø 12 3 Ø 12 6 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
2 Ø 12 2 Ø 12 3 Ø 12

411315025.xlsx
HITUNGAN BALOK SALURAN INDUK KLAMBU KIRI

BALOK
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
14.50 14.50 14.50 14.50
240.00 240.00 240.00 240.00
16.00 12.00 12.00 12.00
12.00 12.00 10.00 12.00
8.00 8.00 8.00 8.00
25.00 25.00 25.00 40.00
100.00 100.00 70.00 70.00
14.00 14.00 14.00 14.00
1.50 1.50 1.50 1.50
0.57 0.57 0.57 0.57
4.07 4.07 4.07 4.07
2.04 2.04 2.04 2.00
2.50 2.50 2.50 2.04

411315025.xlsx
4.32 3.48 3.12 7.68
5.65 5.65 5.65 5.65
9.97 9.13 8.77 13.33
5.18 4.18 3.74 9.22
10.16 9.30 8.93 13.33
1.79 1.44 1.29 3.07
2.15 1.73 1.55 3.69
10.16 9.30 8.93 13.33
0.85 0.85 0.85 0.85
0.0312 0.0312 0.0312 0.0312
4.3345 4.3345 4.3345 4.3345
0.80 0.80 0.80 0.80
41.00 39.00 39.00 54.00
2.88 1.95 3.30 7.54
3.00 2.00 4.00 8.00
35.00 48.00 24.67 42.29
41.00 37.00 37.00 52.00

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
2.2410 1.8052 1.6185 3.8400
61.50 57.50 57.50 80.00
338.50 242.50 242.50 420.00
0.0978 0.2047 0.1376 0.0435
Oke Oke Oke Oke
0.0004 0.0009 0.0006 0.0002
0.0040 0.0040 0.0040 0.0040
0.0058 0.0058 0.0058 0.0058
0.0058 0.0058 0.0058 0.0058
394.92 212.19 282.92 1225.00
16.00 12.00 12.00 12.00
1.96 1.88 2.50 10.83
2.00 2.00 3.00 11.00
402.29 226.29 339.43 1244.57
0.65 0.94 0.63 1.35
100.57 56.57 84.86 311.14
12.00 12.00 12.00 12.00
0.89 0.50 0.75 2.75
1.00 1.00 1.00 3.00
201.14 113.14 113.14 339.43
0.33 0.50 0.25 0.38
Oke Oke Oke Oke
41.00 39.00 39.00 54.00
Oke Oke Oke Oke
359.00 261.00 261.00 446.00
39.17 29.38 33.05 48.47
32.77 13.38 19.92 125.98
26.22 10.70 15.93 100.78
Oke Oke Oke Oke

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
2.69 2.17 1.94 4.61
61.50 57.50 57.50 80.00
338.50 242.50 242.50 420.00
0.1173 0.2456 0.1651 0.0522
Oke Oke Oke Oke
0.0005 0.0010 0.0007 0.0002
0.0040 0.0040 0.0040 0.0040
0.0058 0.0058 0.0058 0.0058
0.0058 0.0058 0.0058 0.0058
394.92 212.19 282.92 1225.00
16.00 12.00 12.00 12.00
1.96 1.88 2.50 10.83
2.00 2.00 3.00 11.00
402.29 226.29 339.43 1244.57
0.67 1.00 0.75 1.38
100.57 56.57 84.86 311.14
12.00 12.00 12.00 12.00
0.89 0.50 0.75 2.75
1.00 1.00 1.00 3.00
201.14 113.14 113.14 339.43
0.33 0.50 0.25 0.38
Oke Oke Oke Oke
41.00 37.00 37.00 52.00
Oke Oke Oke Oke
359.00 261.00 261.00 446.00
39.17 29.38 33.05 48.47
32.77 13.38 19.92 125.98
26.22 10.70 15.93 100.78
Oke Oke Oke Oke

411315025.xlsx
10.16 9.30 8.93 13.33
0.75 0.75 0.75 0.75
45.57 24.85 33.13 141.53
34.18 18.63 24.85 106.14

-24.02 -9.34 -15.91 -92.81


-32.03 -12.45 -21.22 -123.75
1.00 1.00 1.00 1.00
50.29 50.29 50.29 50.29
135 253 148 43
180 131 131 223
170 170 170 170

10.16 9.30 8.93 13.33


0.75 0.75 0.75 0.75
45.57 24.85 33.13 141.53
34.18 18.63 24.85 106.14

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
-24.02 -9.34 -15.91 -92.81
-32.03 -12.45 -21.22 -123.75
1.00 1.00 1.00 1.00
151 101 201 402
406 506 594 348
180 131 131 223
170 170 170 170

16 2 Ø 12 3 Ø 12 11 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
12 2 Ø 12 2 Ø 12 3 Ø 12
170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170

16 2 Ø 12 3 Ø 12 11 Ø 12
12 2 Ø 12 2 Ø 12 2 Ø 12
12 2 Ø 12 2 Ø 12 3 Ø 12
170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170

Skets Penulangan pada Potongan Melintang

Lapangan Lapangan Lapangan Lapangan

Ø8 - 170 Ø8 - 170 Ø8 - 170

300 300 500

411315025.xlsx
200 150 200 500
Ø 12 2 Ø 12 2 Ø 12 6 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
2 Ø 12 3 Ø 12 3 Ø 12

Tumpuan Tumpuan Tumpuan Tumpuan

Ø8 - 170 Ø8 - 170 Ø8 - 170

300 300 500

200 150 200 500


Ø 16 2 Ø 12 3 Ø 12 6 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
2 Ø 12 2 Ø 12 3 Ø 12

411315025.xlsx
HITUNGAN BALOK SALURAN INDUK KLAMBU KIRI

BALOK
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
14.50 14.50 14.50 14.50
240.00 240.00 240.00 240.00
16.00 12.00 12.00 12.00
12.00 12.00 10.00 12.00
8.00 8.00 8.00 8.00
25.00 25.00 25.00 40.00
100.00 100.00 70.00 70.00
14.00 14.00 14.00 14.00
1.50 1.50 1.50 1.50
0.64 0.64 0.64 0.64
4.63 4.63 4.63 4.63
2.32 2.32 2.32 2.00
2.50 2.50 2.50 2.32

411315025.xlsx
4.32 3.48 3.12 7.68
6.43 6.43 6.43 6.43
10.75 9.91 9.55 14.11
5.18 4.18 3.74 9.22
12.45 11.47 11.06 14.11
2.32 1.87 1.67 3.07
2.78 2.24 2.01 3.69
12.45 11.47 11.06 14.11
0.85 0.85 0.85 0.85
0.0312 0.0312 0.0312 0.0312
4.3345 4.3345 4.3345 4.3345
0.80 0.80 0.80 0.80
41.00 39.00 39.00 54.00
2.88 1.95 3.30 7.54
3.00 2.00 4.00 8.00
35.00 48.00 24.67 42.29
41.00 37.00 37.00 52.00

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
2.8979 2.3344 2.0929 3.8400
61.50 57.50 57.50 80.00
338.50 242.50 242.50 420.00
0.1265 0.2646 0.1780 0.0435
Oke Oke Oke Oke
0.0005 0.0011 0.0007 0.0002
0.0040 0.0040 0.0040 0.0040
0.0058 0.0058 0.0058 0.0058
0.0058 0.0058 0.0058 0.0058
394.92 212.19 282.92 1225.00
16.00 12.00 12.00 12.00
1.96 1.88 2.50 10.83
2.00 2.00 3.00 11.00
402.29 226.29 339.43 1244.57
0.65 0.94 0.63 1.35
100.57 56.57 84.86 311.14
12.00 12.00 12.00 12.00
0.89 0.50 0.75 2.75
1.00 1.00 1.00 3.00
201.14 113.14 113.14 339.43
0.33 0.50 0.25 0.38
Oke Oke Oke Oke
41.00 39.00 39.00 54.00
Oke Oke Oke Oke
359.00 261.00 261.00 446.00
39.17 29.38 33.05 48.47
32.77 13.38 19.92 125.98
26.22 10.70 15.93 100.78
Oke Oke Oke Oke

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
3.48 2.80 2.51 4.61
61.50 57.50 57.50 80.00
338.50 242.50 242.50 420.00
0.1517 0.3176 0.2135 0.0522
Oke Oke Oke Oke
0.0006 0.0013 0.0009 0.0002
0.0040 0.0040 0.0040 0.0040
0.0058 0.0058 0.0058 0.0058
0.0058 0.0058 0.0058 0.0058
394.92 212.19 282.92 1225.00
16.00 12.00 12.00 12.00
1.96 1.88 2.50 10.83
2.00 2.00 3.00 11.00
402.29 226.29 339.43 1244.57
0.67 1.00 0.75 1.38
100.57 56.57 84.86 311.14
12.00 12.00 12.00 12.00
0.89 0.50 0.75 2.75
1.00 1.00 1.00 3.00
201.14 113.14 113.14 339.43
0.33 0.50 0.25 0.38
Oke Oke Oke Oke
41.00 37.00 37.00 52.00
Oke Oke Oke Oke
359.00 261.00 261.00 446.00
39.17 29.38 33.05 48.47
32.77 13.38 19.92 125.98
26.22 10.70 15.93 100.78
Oke Oke Oke Oke

411315025.xlsx
12.45 11.47 11.06 14.11
0.75 0.75 0.75 0.75
45.57 24.85 33.13 141.53
34.18 18.63 24.85 106.14

-21.73 -7.16 -13.79 -92.04


-28.97 -9.55 -18.39 -122.72
1.00 1.00 1.00 1.00
50.29 50.29 50.29 50.29
150 330 171 44
180 131 131 223
170 170 170 170

12.45 11.47 11.06 14.11


0.75 0.75 0.75 0.75
45.57 24.85 33.13 141.53
34.18 18.63 24.85 106.14

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
-21.73 -7.16 -13.79 -92.04
-28.97 -9.55 -18.39 -122.72
1.00 1.00 1.00 1.00
151 101 201 402
449 660 685 351
180 131 131 223
170 170 170 170

16 2 Ø 12 3 Ø 12 11 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
12 2 Ø 12 2 Ø 12 3 Ø 12
170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170

16 2 Ø 12 3 Ø 12 11 Ø 12
12 2 Ø 12 2 Ø 12 2 Ø 12
12 2 Ø 12 2 Ø 12 3 Ø 12
170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170

Skets Penulangan pada Potongan Melintang

Lapangan Lapangan Lapangan Lapangan

Ø8 - 170 Ø8 - 170 Ø8 - 170

300 300 500

411315025.xlsx
200 150 200 500
Ø 12 2 Ø 12 2 Ø 12 6 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
2 Ø 12 3 Ø 12 3 Ø 12

Tumpuan Tumpuan Tumpuan Tumpuan

Ø8 - 170 Ø8 - 170 Ø8 - 170

300 300 500

200 150 200 500


Ø 16 2 Ø 12 3 Ø 12 6 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
2 Ø 12 2 Ø 12 3 Ø 12

HITUNGAN BALOK SALURAN INDUK KLAMBU KIRI

411315025.xlsx
BALOK
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
14.50 14.50 14.50 14.50
240.00 240.00 240.00 240.00
16.00 12.00 12.00 12.00
12.00 12.00 10.00 12.00
8.00 8.00 8.00 8.00
25.00 25.00 25.00 40.00
100.00 100.00 70.00 70.00
14.00 14.00 14.00 14.00
2.00 2.00 2.00 2.00
0.71 0.71 0.71 0.71
6.32 6.32 6.32 6.32
3.16 3.16 3.16 2.00
2.50 2.50 2.50 3.16
4.32 3.48 3.12 7.68
7.06 7.06 7.06 7.06

411315025.xlsx
11.38 10.54 10.18 14.74
5.18 4.18 3.74 9.22
17.98 16.65 16.08 14.74
4.31 3.47 3.11 3.07
5.17 4.17 3.73 3.69
17.98 16.65 16.08 14.74
0.85 0.85 0.85 0.85
0.0312 0.0312 0.0312 0.0312
4.3345 4.3345 4.3345 4.3345
0.80 0.80 0.80 0.80
41.00 39.00 39.00 54.00
2.88 1.95 3.30 7.54
3.00 2.00 4.00 8.00
35.00 48.00 24.67 42.29
41.00 37.00 37.00 52.00

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
5.3869 4.3395 3.8906 3.8400
61.50 57.50 57.50 80.00
338.50 242.50 242.50 420.00
0.2351 0.4920 0.3308 0.0435
Oke Oke Oke Oke
0.0010 0.0021 0.0014 0.0002
0.0040 0.0040 0.0040 0.0040
0.0058 0.0058 0.0058 0.0058
0.0058 0.0058 0.0058 0.0058
394.92 212.19 282.92 1225.00
16.00 12.00 12.00 12.00
1.96 1.88 2.50 10.83
2.00 2.00 3.00 11.00
402.29 226.29 339.43 1244.57
0.65 0.94 0.63 1.35
100.57 56.57 84.86 311.14
12.00 12.00 12.00 12.00
0.89 0.50 0.75 2.75
1.00 1.00 1.00 3.00
201.14 113.14 113.14 339.43
0.33 0.50 0.25 0.38
Oke Oke Oke Oke
41.00 39.00 39.00 54.00
Oke Oke Oke Oke
359.00 261.00 261.00 446.00
39.17 29.38 33.05 48.47
32.77 13.38 19.92 125.98
26.22 10.70 15.93 100.78
Oke Oke Oke Oke

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
6.46 5.21 4.67 4.61
61.50 57.50 57.50 80.00
338.50 242.50 242.50 420.00
0.2821 0.5903 0.3970 0.0522
Oke Oke Oke Oke
0.0012 0.0025 0.0017 0.0002
0.0040 0.0040 0.0040 0.0040
0.0058 0.0058 0.0058 0.0058
0.0058 0.0058 0.0058 0.0058
394.92 212.19 282.92 1225.00
16.00 12.00 12.00 12.00
1.96 1.88 2.50 10.83
2.00 2.00 3.00 11.00
402.29 226.29 339.43 1244.57
0.67 1.00 0.75 1.38
100.57 56.57 84.86 311.14
12.00 12.00 12.00 12.00
0.89 0.50 0.75 2.75
1.00 1.00 1.00 3.00
201.14 113.14 113.14 339.43
0.33 0.50 0.25 0.38
Oke Oke Oke Oke
41.00 37.00 37.00 52.00
Oke Oke Oke Oke
359.00 261.00 261.00 446.00
39.17 29.38 33.05 48.47
32.77 13.38 19.92 125.98
26.22 10.70 15.93 100.78
Oke Oke Oke Oke

411315025.xlsx
17.98 16.65 16.08 14.74
0.75 0.75 0.75 0.75
45.57 24.85 33.13 141.53
34.18 18.63 24.85 106.14

-16.20 -1.99 -8.77 -91.40


-21.60 -2.65 -11.69 -121.87
1.00 1.00 1.00 1.00
50.29 50.29 50.29 50.29
201 1190 269 44
180 131 131 223
170 170 170 170

17.98 16.65 16.08 14.74


0.75 0.75 0.75 0.75
45.57 24.85 33.13 141.53
34.18 18.63 24.85 106.14

411315025.xlsx
Lereng-Mini Frame Tanggul-Mini Tanggul-SSP
400 150 300 200 300 500 500
-16.20 -1.99 -8.77 -91.40
-21.60 -2.65 -11.69 -121.87
1.00 1.00 1.00 1.00
151 101 201 402
602 2379 1078 353
180 131 131 223
170 170 170 170

16 2 Ø 12 3 Ø 12 11 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
12 2 Ø 12 2 Ø 12 3 Ø 12
170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170

16 2 Ø 12 3 Ø 12 11 Ø 12
12 2 Ø 12 2 Ø 12 2 Ø 12
12 2 Ø 12 2 Ø 12 3 Ø 12
170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170

Skets Penulangan pada Potongan Melintang

Lapangan Lapangan Lapangan Lapangan

Ø8 - 170 Ø8 - 170 Ø8 - 170

300 300 500

411315025.xlsx
200 150 200 500
Ø 12 2 Ø 12 2 Ø 12 6 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
2 Ø 12 3 Ø 12 3 Ø 12

Tumpuan Tumpuan Tumpuan Tumpuan

Ø8 - 170 Ø8 - 170 Ø8 - 170

300 300 500

200 150 200 500


Ø 16 2 Ø 12 3 Ø 12 6 Ø 12
12 2 Ø 12 2 Ø 10 2 Ø 12
2 Ø 12 2 Ø 12 3 Ø 12

411315025.xlsx
[Tab]57/57

PERHITUNGAN PELAT BETON


Ruas : BKKi.1e - BKKi.1i
Skets plat beto
Data teknis :
b.saluran = 14.00 m
h.air = 1.41 m
m= 1.50
free board, w = 0.80 m Ly
b.lereng = 3.98 m
Jml Precast = 2.00 bh (ukuran: 60x90x7 cm) Oke !!
bentang, Ly = 4.67 m ( dibagi 3 bentang)
Lx = 5.00 m
Ly/Lx = 0.93 C.ly = 34.00 M.ly = 0.001 x
beban terfaktor, Qu = 2.88 kN/m2 C.lx = 18.00 M.lx = 0.001 x
Mu(+) = 2.45 N.m C.ty = 73.00 M.ty = 0.001 x
Mu(-) = 5.26 N.m C.tx = 57.00 M.tx = 0.001 x
fc = 14.50 Mpa
fy = 240 MPa
Φ = 0.80
b = 1000 mm
tebal plat, h = 100 mm
selimut, ts = 20 mm

Perhitungan :
Mn = Mu/ Φ
5.26 / 0.80 = 6.5700
faktor tahanan momen, Rn = Mn/ (b.d²) = 7E+06 / ( 1000 x 5625 )
= 1.1680
m = fy/ (0.85 * f'c)
= 240.00 / ( 0.85 x 14.50 )
= 19.47262
Rasio tul, ρ = 1/m [1 - √(1 - 2m.Rn/fy) ]
= 0.051354 x [ 1.00 -√( 1.00 - 0.1895 )
= 0.0051
ρ.min = 0.0025
Dipakai ρ = 0.0051
As = ρ.b.d
= 0.0051 x 1000 x 75.00
= 384 mm2
jarak sengkang, 's = л/4*ز*b/As = 3.14 / 4.00 x 100 x 1000 / 384
= 205 mm
s.max = 2 * h
= 200 mm

[file]-411315025.xlsx
[Tab]58/58

Dipakai Ø 10 - 200 = 393 > 384 mm2 Oke aman

SKETS DENAH PENULANGAN LANTAI

14.00
1.25 Ø10-200

1.17 2.33 1.17 1.17 2.33

5.00 2.50

Ø 10 - 200 Ø10 - 200


1.25 -

1.25

0.50 1.17 2.33 1.17 1.17 2.33

0.79 0.50 2.50

5.00

1.00
Ø10-200 1.25

1.99 1.99 4.67


2.78
Lokasi sambungan besi dalam pelaksanaan

Skets Potongan Melintang Saluran


pilecap beton 20/30 cm

beton tile t (m) = 0.07

beton K.175 - t (m0.10 0.80


beton K.175 t (m) = 0.10

1.41

Minipile K.300

∆12x12x12 cm - L=3.0m 4.67 4.67

balok beton K.175

14.00

[file]-411315025.xlsx
[Tab]59/59

PERHITUNGAN PELAT BETON


Ruas : BKKi.1i - BKKi.1m
Skets plat beto
Data teknis :
b.saluran = 14.00 m
h.air = 1.46 m
m= 1.50
free board, w = 0.80 m Ly
b.lereng = 4.07 m
Jml Precast = 2.00 bh (ukuran: 60x90x7 cm) Oke !!
bentang, Ly = 7.00 m ( dibagi 2 bentang)
Lx = 5.00 m
Ly/Lx = 1.40 C.ly = 34.00 M.ly = 0.001 x
beban terfaktor, Qu = 2.88 kN/m2 C.lx = 18.00 M.lx = 0.001 x
Mu(+) = 2.45 N.m C.ty = 73.00 M.ty = 0.001 x
Mu(-) = 5.26 N.m C.tx = 57.00 M.tx = 0.001 x
fc = 14.50 Mpa
fy = 240 MPa
Φ = 0.80
b = 1000 mm
tebal plat, h = 100 mm
selimut, ts = 20 mm

Perhitungan :
Mn = Mu/ Φ
5.26 / 0.80 = 6.5700
faktor tahanan momen, Rn = Mn/ (b.d²) = 7E+06 / ( 1000 x 5625 )
= 1.1680
m = fy/ (0.85 * f'c)
= 240.00 / ( 0.85 x 14.50 )
= 19.47262
Rasio tul, ρ = 1/m [1 - √(1 - 2m.Rn/fy) ]
= 0.051354 x [ 1.00 -√( 1.00 - 0.1895 )
= 0.0051
ρ.min = 0.0025
Dipakai ρ = 0.0051
As = ρ.b.d
= 0.0051 x 1000 x 75.00
= 384 mm2
jarak sengkang, 's = л/4*ز*b/As = 3.14 / 4.00 x 100 x 1000 / 384
= 205 mm
s.max = 2 * h
= 200 mm

[file]-411315025.xlsx
[Tab]60/60

Dipakai Ø 10 - 200 = 393 > 384 mm2 Oke aman

SKETS DENAH PENULANGAN LANTAI

14.00
1.25 Ø10-200

1.75 3.50 1.75 1.75 3.50

5.00 2.50

Ø 10 - 200 Ø10 - 200


1.25 -

1.25

0.51 1.75 3.50 1.75 1.75 3.50

0.84 0.51 2.50

5.00

1.02
Ø10-200 1.25

2.04 2.04 7.00


2.87
Lokasi sambungan besi dalam pelaksanaan

Skets Potongan Melintang Saluran


pilecap beton 20/30 cm

beton tile t (m) = 0.07

beton K.175 - t (m0.10 0.80


beton K.175 t (m) = 0.10

1.46

Minipile K.300

∆12x12x12 cm - L=3.0m
balok beton K.175

14.00

[file]-411315025.xlsx
[Tab]61/61

PERHITUNGAN PELAT BETON


Ruas : BKKi.1m - BKKi.1
Skets plat beto
Data teknis :
b.saluran = 14.00 m
h.air = 1.77 m
m= 1.50
free board, w = 0.80 m Ly
b.lereng = 4.63 m
Jml Precast = 2.00 bh (ukuran: 60x90x7 cm) Oke !!
bentang, Ly = 7.00 m ( dibagi 2 bentang)
Lx = 5.00 m
Ly/Lx = 1.40 C.ly = 34.00 M.ly = 0.001 x
beban terfaktor, Qu = 2.88 kN/m2 C.lx = 18.00 M.lx = 0.001 x
Mu(+) = 2.45 N.m C.ty = 73.00 M.ty = 0.001 x
Mu(-) = 5.26 N.m C.tx = 57.00 M.tx = 0.001 x
fc = 14.50 Mpa
fy = 240 MPa
Φ = 0.80
b = 1000 mm
tebal plat, h = 100 mm
selimut, ts = 20 mm

Perhitungan :
Mn = Mu/ Φ
5.26 / 0.80 = 6.5700
faktor tahanan momen, Rn = Mn/ (b.d²) = 7E+06 / ( 1000 x 5625 )
= 1.1680
m = fy/ (0.85 * f'c)
= 240.00 / ( 0.85 x 14.50 )
= 19.47262
Rasio tul, ρ = 1/m [1 - √(1 - 2m.Rn/fy) ]
= 0.051354 x [ 1.00 -√( 1.00 - 0.1895 )
= 0.0051
ρ.min = 0.0025
Dipakai ρ = 0.0051
As = ρ.b.d
= 0.0051 x 1000 x 75.00
= 384 mm2
jarak sengkang, 's = л/4*ز*b/As = 3.14 / 4.00 x 100 x 1000 / 384
= 205 mm
s.max = 2 * h
= 200 mm

[file]-411315025.xlsx
[Tab]62/62

Dipakai Ø 10 - 200 = 393 > 384 mm2 Oke aman

SKETS DENAH PENULANGAN LANTAI

14.00
1.25 Ø10-200

1.75 3.50 1.75 1.75 3.50

5.00 2.50

Ø 10 - 200 Ø10 - 200


1.25 -

1.25

0.58 1.75 3.50 1.75 1.75 3.50

1.12 0.58 2.50

5.00

1.16
Ø10-200 1.25

2.32 2.32 7.00


3.43
Lokasi sambungan besi dalam pelaksanaan

Skets Potongan Melintang Saluran


pilecap beton 20/30 cm

beton tile t (m) = 0.07

beton K.175 - t (m0.10 0.80


beton K.175 t (m) = 0.10

1.77

Minipile K.300

∆12x12x12 cm - L=3.0m
balok beton K.175

14.00

[file]-411315025.xlsx
[Tab]63/63

ITUNGAN PELAT BETON

Skets plat beton


4.67

5.00

Lx
2.88 x 5.00 ²x 34.00 = 2.448 kNm
2.88 x 5.00 ²x 18.00 = 1.296 kNm
2.88 x 5.00 ²x 73.00 = 5.256 kNm
2.88 x 5.00 ²x 57.00 = 4.104 kNm

Skets tulangan

h 200 200 d

[file]-411315025.xlsx
[Tab]64/64

Ø10 - 200
Ø10 - 200 ts

S DENAH PENULANGAN LANTAI

2.33 1.17

2.33 1.17

4.67

Potongan Melintang Saluran

1.20

2.78

1.50

1.66 1.66

balok beton K.175

[file]-411315025.xlsx
[Tab]65/65

ITUNGAN PELAT BETON

Skets plat beton


7.00

5.00

Lx
2.88 x 5.00 ²x 34.00 = 2.448 kNm
2.88 x 5.00 ²x 18.00 = 1.296 kNm
2.88 x 5.00 ²x 73.00 = 5.256 kNm
2.88 x 5.00 ²x 57.00 = 4.104 kNm

Skets tulangan

h 200 200 d

[file]-411315025.xlsx
[Tab]66/66

Ø10 - 200
Ø10 - 200 ts

S DENAH PENULANGAN LANTAI

3.50 1.75

3.50 1.75

7.00

Potongan Melintang Saluran

1.20

2.87

1.50

1.70 1.70

balok beton K.175

[file]-411315025.xlsx
[Tab]67/67

ITUNGAN PELAT BETON

Skets plat beton


7.00

5.00

Lx
2.88 x 5.00 ²x 34.00 = 2.448 kNm
2.88 x 5.00 ²x 18.00 = 1.296 kNm
2.88 x 5.00 ²x 73.00 = 5.256 kNm
2.88 x 5.00 ²x 57.00 = 4.104 kNm

Skets tulangan

h 200 200 d

[file]-411315025.xlsx
[Tab]68/68

Ø10 - 200
Ø10 - 200 ts

S DENAH PENULANGAN LANTAI

3.50 1.75

3.50 1.75

7.00

Potongan Melintang Saluran

1.20

3.43

1.50

1.93 1.93

balok beton K.175

[file]-411315025.xlsx
Justek Perhitungan Plat Beton

JUSTEK PERHITUNGAN PELAT


Ruas : BKKi.17 - BKKi.18

Data teknis :
b.saluran = 7.50 m Beban mati QD (berat sendiri plat) =
h.air = 1.40 m Beban hidup QL bergerak (Air) =
m = 1.50 Beban rencana terfaktor, Qu =
free board, w = 0.75 m Qu = 1.2 * QD + 1.6 * QL =
b.lereng = 3.88 m
Jml Precast = 4.00 bh Oke !
bentang, Lx = 3.75 m ( dibagi 2 bentang)
bentang, Ly = 6.30 m
Ly/Lx = 1.68 C.ly = 35.0 M.ly =
beban terfaktor, Qu = 2.88 kN/m2 C.lx = 17.5 M.lx =
Mu(+) = 1.42 N.m C.ty = 74.5 M.ty =
Mu(-) = 3.02 N.m C.tx = 57.0 M.tx =
Kuat tekan beton, fc = 14.50 Mpa KONTROL LENDUT
Kuat leleh baja tulangan, fy = 240 MPa Modulus elastis beton
Faktor reduksi kekuatan lentur, Φ = 0.80 Modulus elastis baja
Ditinjau plat lantai selebar 1 m, → b = 1000 mm Beban merata (tak te
tebal plat lantai dan linning, h = 100 mm Panjang bentang plat
selimut, ts = 20 mm Batas lendutan maks
diameter tulangan, Ø = 10 mm Momen inersia brutto
Jarak tulangan terhadap sisi luar beton, Modulus keruntuhan
ds = ts + Ø / 2 = 25 mm Nilai perbandingan m
tebal efektif plat d = h - ds = 75 mm Jarak garis netral terh
Untuk : fc' ≤ 14,5 MPa, → β1 = 0.85
d
Ƿb = β1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) = 0.03 h (mm) = 100
Rmax = 0.75*Ƿb*fy*[1– ½* 0.75 * Ƿb*fy/(0.85*fc')] =
4.33 ds
Faktor tahanan momen, Rn < Rmax → (OK) tebal plat memenuhi syarat
0.03 ˂ 4.33 Momen inersia penam

Perhitungan :
Momen nominal rencana, Mn = Mu/ Φ
3.02 / 0.80 = 3.772 kNm
faktor tahanan momen, Rn = Mn/ (b.d²) = 4E+06 / ( 1000 x 5625 )
= 0.031
m = fy/ (0.85 * f'c)
= 240.0 / ( 0.85 x 14.50 )
= 19.473

Rasio tulangan pada kondisi balance, ρ = 1/m [1 - √(1 - 2m.Rn/fy) ] Faktor ketergantu
= 0.0514 x [ 1.00 -√( 1.00 - 38.945 x 0.031
411315025.xlsx
Justek Perhitungan Plat Beton
= 0.0001
ρ.min = 0.0025 Lendutan jangka
Dipakai ρ = 0.0025
Luas tulangan terpakai, As = ρ.b.d
= 0.003 x 1000 x 75.00
= 188 mm2

jarak sengkang, 's = л/4*ز*b/As = 3.14 / 4.00 x 100 x


= 419.0 mm
s.max = 2 * h
= 200 mm
Tul Pokok Ø 10 - 200 = 393 > 188 mm2 Oke a
Tul bagi Ø 10 - 200 = 393 > 188 mm2 Oke a

SKET DENAH PENULANGAN PLAT BETO

precast 60x90x7
1.48 0.40 4.15 0.40

Ø10 - 200 Ø10 - 200

precast 60x90x7
1.48 0.40 4.15 0.40 4.15

Ø10 - 200 Ø10 - 200

1.94 1.94 3.75


1.48 7.50
K.175 3.88 = sambungan pembesian
b(m)= 0.20
h(m)= 0.30 precast 60x90x7 t(m) = 0.07 SKET POTONGAN LINTANG SALURAN

3.60 beton K.175 t(m) = 0.1 w = 0.75


1
1.5
h = 1.40
0.28 1.08
K.175
b(m)= 0.20 4.15
h(m)= 0.30 7.50
Minipile K.300 - L=3m balok beton
Δ 12x12x12 cm eksisting

411315025.xlsx
Justek Perhitungan Plat Beton

K.175 SKET POTONGAN LINTANG SALURAN


b(m)= 0.20 Ruas : BKKi.17 - BKKi.18
h(m)= 0.30 precast 60x90x7 t(m) = 0.07

3.60 beton K.175 t(m) = 0.1 w = 0.75


1
1.5
h = 1.40
0.28 1.08
K.175
b(m)= 0.20 4.15
h(m)= 0.30 7.50
Minipile K.300 - L=3m balok beton
Δ 12x12x12 cm eksisting

Data Tanah : Yt = 1.645 t/m3 Skets gaya yang bekerja


Sudut geser dalam, phi = 13.00 ᵒ
Nilai Kohesi tanah, c = 1.70 t/m2
qc = 8.00 kg/cm2
Tf = 110.00 kg/cm2
Nc = 11.410
Faktor daya dukung terzaghi Nq = 3.630 Reaksi Tanah :
ditentukan oleh besar sudut geser dalam Ny = 1.040 daya dukung tanah, V
kedalaman pondasi, Df = 0.40 m berat precast, V
Yc = 2.40 ton/m3 berat Lantai beton, V
DAYA DUKUNG MINIPILE DAN DOLKEN
(1) Design data
Diameter Minipile (setara) D = 8.00 cm
Panjang Minipile L = 4.00 m
Luas Minipile A = 1/4 x π x D2 = 50.27
Keliling Minipile W = πxD = 25.13
Hasil sondir qc = 7.00 kg/cm2 = 0.70
Tf = 124.00 kg/cm = 12.40
(2) Daya Dukung Vertikal, (qu)
qu = qc x A/ 3 + Tf x P/ 5
= 7.00 x 50.27 / 3.00 + 124.00 x 25.13 / 5.00
= 117.29 + 623.29 = 740.58 kg/pile
(3) Daya Dukung Ijin Vertikal, (qa)
qa = qu/n = 740.58 / 1.00 = 740.58 kg/pile
( safety factor n = 1.00 )
(4) Kapasitas Daya Dukung Horizotal
(a) Design data : Dolken (pile) :
E = 80,000 kg/cm2 (Young's modulus)
d = Allowable horizontal displacement
N = SPT N-value is assumed as qc /
Ø = 10.00 ᵒ Tg 2ɸ/3 = 0.1169
411315025.xlsx
Justek Perhitungan Plat Beton
Vt = 21.786 t/m2
V = 0.120 ton (beban balok peilcap)
p x D4
I = = 201.10 cm4 (I : Moment
64
(b) Gaya Horizontal Dolken (Ha)
a = 0.20 E = 28 x N
Kh = a x E x D -3/4

= 0.20 x( 28 x 1.75 )x(

4 4
Kh x D 2.060 x
b = =
4 EI 4 x 80,000 x

Kh x D 2.060 x 8.00
Ha = x d =
b 0.022
Gaya Horizontal Dolken, Ha = 0.073 ton
(c) Kapasitas Daya Dukung Horizontal Dolken
Ha = 2 x b x Ma
σs = Tegangan Ijin Dolken = 75.00
p x D3
W = = 25.13 cm3 ; (W : modulu
64
Ma = σs x W = 75.00 x 25.13
Ha = 2 x b x Ma
Kapasitas Daya Dukung Horizontal Dolken, Ha = 2 x 0.022 x 1,885.0 = 84.81

(5) Jarak Antar Dolken


(a) Untuk Horizontal Ha = 0.085 ton/pile ; (Ha : Gaya Horizontal )
Hr = H - = H - V x tan(2f/3) = 0.073
Ha 0.085
Jarak Antar Dolken = = = 1.43 m
Hr 0.059
Digunakan Jarak = 1.40 m (jarak dolken as ke as)

(b) Untuk Jarak Vertikal V = 0.120 ton/m : Berat Balok Peilcap


qa = 0.741 ton/pile : Daya Dukung Ijin Vertik
qa 0.741
Jarak Antar Dolken = = = 6.17
V 0.120
Diambil Jarak = 6.00 m Aman jika dipasang jarak

411315025.xlsx
Justek Perhitungan Plat Beton

(6) Kajian Stabilitas Linning Saluran


Data teknis : H = 2.150 m β = 33.69
Gs = 2.652 t/m3 α = 20.690
Yt = 1.645 t/m3 sin β = 0.555
Yd = 1.156 t/m3 sin α = 0.353
C = 1.700 t/m2 cos α = 0.936
Ø = 13.000 º L(A-B) = 6.085
Perhitungan Stabilitas Lereng
W = 0,50 x Yt x H^2 x [sin (β-α)/(sin βxsin α)]
= 4.364 ton
Gaya Geser yang bekerja
Ta = W x sin α
= 1.542 ton
Tahanan Geser w=
Tr = L x (Cd + σ.Tg Ø
= L ((c/f)+(Na/L) * tg (Ø/F))
Na = W x cos σ = 4.083
Tr = Ta
L = H/ sin α = 6.085 m
Tr = (1/F)*(L - C + Na x tg 16º )
1 = (1/F) x ( 6.085 - 2.643
Fs = 2.233 > 1.50 Oke aman

(6) Kajian Stabilitas Tanggul Saluran

Datasoil : Sket Critical Slip Circle pada l


Wd = 10.43 kN/m2
Ws = 16.45 kN/m2
Kohesi tanah, c = 17.00 kN/m2 53°

Sudut geser tanah, Ø = 13.00 ᵒ 49°

Berat isi tanah (gt)= 16.45 kN/m3 43°

37°

Dengan menggunakan Method Slope Stability Bishop 31°

Hasilnya didapat sbb : 5.00


5.00 26°

Critical Slip Circle : 21°

Center x = 5.00 m 16°

y= 4.00 m 12°

R= 5.00 m 7°


Fs = 1.526 2
3

0.40 0.40 0.40

411315025.xlsx
Justek Perhitungan Plat Beton
b h g W C CxL a Cos a
No
(m) (m) ( KN/m )3
( KN ) ( KN/m ) 2
( KN/m ) (°)
1 0.40 0.13 16.45 0.428 17.00 2 0.999
2 0.40 0.36 16.45 2.369 17.00 7 0.993
3 0.40 0.57 16.45 3.751 17.00 12 0.978
4 0.40 0.73 16.45 4.803 17.00 16 0.961
5 0.40 0.86 16.45 5.659 17.00 21 0.934
6 0.40 0.96 16.45 6.317 17.00 26 0.899
7 0.40 1.00 16.45 6.580 17.00 31 0.857
8 0.40 1.00 16.45 6.580 17.00 37 0.799
9 0.40 0.67 16.45 4.409 17.00 43 0.731
10 0.40 0.25 16.45 0.823 17.00 49 0.656
S 19.276

Pias no 10 berupa segitiga


W = 0,5 x g x b x h = 0.5 x 16.45 x 0.40 x x 0.25 = 0.823
q = 13.00 °
R = 5.00 m
L = ( q / 360 ) x 2pR = 1.134 m

S C.L = 17.00 x 1.134 = 19.276 KN/m

( S C.L + W. Cosa . Tgf ) 19.276 + 8.469 ==


F = = 1.526 > 1.5
S W Sina 18.181

KESIMPULAN :
Dari hasil perhitungan diatas dapat disimpulkan desain konstruksi saluran den
lantai 10cm dan balok melintang memanjang pada dasar, linning dan peilcap b
keamanan terhadap kontrol lendutan dan kontrol retak karena pengaruh beba
mempertimbangkan daya dukung tanah dengan syarat kondisi tanah dasar de
dengan pengawasan dan linning tanggul kritis dapat diperbaiki dengan dolken

411315025.xlsx
Justek Perhitungan Plat Beton

SKET POTONGAN LINTANG SALURAN

SKET DENAH SALURAN

411315025.xlsx
Justek Perhitungan Plat Beton

= Sambungan Pembesian

SKET DETAIL SAMBUNGAN

Urugan
dipadat
lokasi y
tergeru

DETAIL BALOK PEILCAP DETAIL BALOK LINNING

CATATAN :
Dolken dapat digunakan sebagai pendukung stabilitas pada linning saluran, di
mendekati 1,5 dari angka keamanan yaitu, FS = 1,526

411315025.xlsx
Justek Perhitungan Plat Beton

PERHITUNGAN PELAT BETON


BKKi.17 - BKKi.18

2.40 kN/m2
207.74 kN/m2
3.75
335.26 kN/m3

6.30

0.001 x 2.88 x 3.75 ²x 35.00 = 1.42 kNm


0.001 x 2.88 x 3.75 ²x 17.50 = 0.71 kNm
0.001 x 2.88 x 3.75 ²x 74.50 = 3.02 kNm
0.001 x 2.88 x 3.75 ²x 57.00 = 2.31 kNm
KONTROL LENDUTAN PLAT Mpa = N/mm2
Modulus elastis beton, Ec = 4700*√ fc' = 17,897 MPa
Modulus elastis baja tulangan, 0 Es = 210,000 MPa
Beban merata (tak terfaktor) pada plat, Q = QD + QL = 210.14
Panjang bentang plat, Lx = 3.75
Batas lendutan maksimum yang diijinkan, Lx / 240 = 0.02
Momen inersia brutto penampang plat, Ig = 1/12 * b * h3 = 8E+06 mm
Modulus keruntuhan lentur beton, fr = 0.7 * √ fc' = 2.67 mm3
Nilai perbandingan modulus elastis, n = Es / Ec = 11.73 MPa
Jarak garis netral terhadap sisi atas beton, c = n * As / b = 2.20 mm

d
daya dukung tanah, Vt
ds Vt = c.Nc + Yt.D.Nq + 0,5.Yt.B.Ny = 21.79 t/m2

Momen inersia penampang retak yang ditransformasikan ke beton dihitung sbb. :


Icr = 1/3 * b * c3 + n * As * ( d - c )2 = 11,663,602 mm4
yt = h / 2 = 50.00 mm
Momen retak : Mcr = fr * Ig / yt = 444,253 Nmm
Momen maksimum akibat beban (tanpa faktor beban) :
Ma = 1 / 8 * Q * Lx2 = 98,503,143 Nmm
Inersia efektif untuk perhitungan lendutan,
Ie = ( Mcr / Ma )3 * Ig + [ 1 - ( Mcr / Ma )3 ] * Icr =
11,663,602 mm4
Lendutan elastis seketika akibat beban mati dan beban hidup :
de = 5 / 384 * Q * Lx4 / ( Ec * Ie ) = 49.15 mm
r = As / ( b * d ) = 0.003
Faktor ketergantungan waktu untuk beban mati (jangka waktu > 5 tahun), nilai :
0.031 / 240 )] z= 2.00
411315025.xlsx
Justek Perhitungan Plat Beton
l = z / ( 1 + 50 * r ) = 1.78
Lendutan jangka panjang akibat rangkak dan susut :
dg = l * 5 / 384 * Q * Lx4 / ( Ec * Ie ) = 87.39 mm
Lendutan total, dtot = de + dg = 136.54 mm
Syarat : dtot / Vt ≤ Lx / 240
6.27 < 15.63 ® AMAN (OK)

1000 / 188 Skets tulangan

h 200 200 d= 75
mm2 Oke aman ɸ 10 - 200
mm2 Oke aman ɸ 10 - 200 ds 25

ENAH PENULANGAN PLAT BETON

4.15 0.40 1.48


6.30
Ø10 - 200

4.15 0.40 1.48 6.30

Ø10 - 200

3.75 1.94 1.94


1.48
3.88 K.175
b(m)= 0.20
POTONGAN LINTANG SALURAN h(m)= 0.30

1.08
K.175
4.15 b(m)= 0.20
h(m)= 0.30
balok beton Minipile K.300 - L=3m
eksisting Δ 12x12x12 cm

411315025.xlsx
Justek Perhitungan Plat Beton

POTONGAN LINTANG SALURAN K.175


BKKi.17 - BKKi.18 b(m)= 0.20
h(m)= 0.30

1.08
K.175
4.15 b(m)= 0.20
h(m)= 0.30
balok beton Minipile K.300 - L=3m
eksisting Δ 12x12x12 cm

Skets gaya yang bekerja pada saluran,

Reaksi Tanah :
daya dukung tanah, Vt = c.Nc + Yt.D.Nq + 0,5.Yt.B.Ny = 21.79 t/m2
berat precast, V1 = Yc x t x L = 1.28 t/m2
berat Lantai beton, V2 = Yc x L x t = 1.80 t/m2

Dimensi Minipile :
t = 10.39 cm
12
cm2 A = 62.35 cm2
cm 12 P = 36.00 cm
t/m2 D = 8.91 cm
t/m Ls = 62.33

(Young's modulus)
= 0.10 m
4 = 1.75
0.1169
411315025.xlsx
Justek Perhitungan Plat Beton

(I : Moment of Inertia for a pile)

8.00 )-3/4 = 2.060 kg/cm3

8.0
= 0.022 cm
201.1

8.00
x 0.10 = 73.26 kg

kg/cm2

(W : modulus tahanan pile)

25.13 = 1,885.0 kg.cm

84.81 kg/pile = 0.085 ton/pile

(Ha : Gaya Horizontal )


- 0.014 = 0.059 ton/m

Berat Balok Peilcap


Daya Dukung Ijin Vertikal, (qa)

Aman jika dipasang jarak <= 3.00 m

411315025.xlsx
Justek Perhitungan Plat Beton

º
º

H^2 x [sin (β-α)/(sin βxsin α)]

Skets Profil Saluran C B


w= 0.75
1.5 Ta
W
1 N
h= 1.40 H = 2.15 a Tr
β P
Tr
Ø
A

) / 1.542

Sket Critical Slip Circle pada lining/tanggul saluran:


4.00
4.00

53°

49°

43°

1.00
37°

31°

5.00 26°

21°
10 0.25
16° 1,5
9 0.67
1 8 1.00
12°
7 1.00
6 2.00 0.96

5 0.86
4 0.73

3 0.57
2 0.36
1 0.13

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

411315025.xlsx
Justek Perhitungan Plat Beton
f Tg f W.cosa x tgf Sin a W Sina
(°) ( KN ) ( KN )
13.00 0.231 0.099 0.035 0.015
13.00 0.231 0.543 0.122 0.289
13.00 0.231 0.847 0.208 0.780
13.00 0.231 1.066 0.276 1.324
13.00 0.231 1.220 0.358 2.028
13.00 0.231 1.311 0.438 2.769
13.00 0.231 1.302 0.515 3.389
13.00 0.231 1.213 0.602 3.960
13.00 0.231 0.744 0.682 3.007
13.00 0.231 0.125 0.755 0.621
8.469 18.181

0.823

® AMAN (OK)

in konstruksi saluran dengan dimensi diatas dengan tebal plat linning dan
asar, linning dan peilcap balok pada top linning memenuhi syarat angka
k karena pengaruh beban, gaya geser dan gaya guling dengan
at kondisi tanah dasar dengan urugan padas pilihan yang dipadatkan
diperbaiki dengan dolken dan minipile dengan ketentuan diatas.

411315025.xlsx
Justek Perhitungan Plat Beton

T POTONGAN LINTANG SALURAN

SKET DENAH SALURAN

411315025.xlsx
Justek Perhitungan Plat Beton

SKET DETAIL SAMBUNGAN

Urugan padas
dipadatkan pada
lokasi yang
tergerus

Urugan padas
dipadatkan pada
lokasi yang
tergerus

DETAIL SAMBUNGAN PLAT LANTAI

s pada linning saluran, dikarenakan batas keamanan pada linning


6

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 85\100

JUSTEK PERHITUNGAN BALOK BETO


Gambar : Distribusi tegangan tekan pada balok beton yang telah mencapai kekuatan nominal RUAS :

Uraian
Cross Cross-Deletasi Long-kaki
Dimensi Balok b | h (mm) 200 x 400 200 x 400 200 x
kuat tekan beton, fc' (Mpa) 14.50 14.50 14.50
tegangan leleh baja, fy (Mpa) 240.00 240.00 240.00
diameter tulangan.utama, Ø (mm) 16.00 16.00 16.00
diameter puntir, Ø (mm) 12.00 12.00 12.00
diameter beugel,Ø (mm) 8.00 8.00 8.00
selimut beton, ts (mm) 25.00 25.00 25.00
tebal plat, d (mm) 100.00 100.00 100.00
lebar saluran, b (m) 3.75 3.75 3.75
slope talud, m 1.50 1.50 1.50
tinggi air, h.air (m) 1.40 1.40 1.40

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 86\100

lebar-lereng, L = ((h+w)^2(1+m2)^0.5) (m) 4.33 4.33 4.33


lebar arah sumbu x, b/∑.pias,Lx (m) 3.75 3.75 1.88
lebar plat arah sumbu y, Ly (m) 6.30 6.30 6.30
beban mati, Qd = d.plat*24 (kN/m) 4.32 4.32 4.32
beban hidup, Ql=h.air*10 (kN/m) 14.00 14.00 14.00
beban total, Q= Qd+Ql (kN/m) 18.32 18.32 18.32
beban, Qu = 1,2*Qd (kN/m) 5.18 5.18 5.18
beban tumpuan, P =0.50*Lx*(Qd + Ql) (kN) 34.35 34.35 17.18
momen lapangan ult arah x, Mu(+)=1/12 Qu*Lx² (kNm/m) 6.08 6.08 1.52
momen tumpuan ult arah y, Mu(-) =1/10 *Qu*Lx² (kNm/m) 7.29 7.29 1.82
gaya geser ultimate, Vu = 0.50*Lx*(Qd + Ql) (kN) 34.35 34.35 17.18
faktor bentuk distribusi tegangan terfaktor, β1 0.85 0.85 0.85
rasio tul kondisi balance, ρb = β1*0.85*fc'/fy*600/(600+fy) 0.0312 0.0312 0.0312
faktor tahanan momen max, ρ.max = 0.75*ρb*fy*(1-0.50*0.75*ρb*fy/(0.85*fc')) 4.3345 4.3345 4.3345

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 87\100
Cross Cross-Deletasi Long-kaki
Tulangan Mu(+) : Lapangan
200 x 400 200 x 400 200 x
faktor reduski kuat lentur, Φ 0.80 0.80 0.80
jrk tul kesisi luar, ds = ts+P+D/2 (mm) 41.00 41.00 41.00
jml tul perbaris, ns = (b-2*ds)/(25+D), (bh) 2.88 2.88 2.88
jrk tul dipakai, ns =int(ns)+1, (bh) 3.00 3.00 3.00
jrk antar tul, x = (b-ns*D-2*ds)/(ns-1) (mm) 35.00 35.00 35.00
jrk vert tul ke pusat, y = D + 25, (mm) 41.00 41.00 41.00
Momen nominal renc, Mn = Mu(+)/ Φ, (kNm) 7.5938 7.5938 1.8984
jrk pusat tul lentur, d' = ds + y/2 (mm) 61.50 61.50 61.50
tinggi eff balk, d = h - d' (mm) 338.50 338.50 338.50
faktor tahanan momen, Rn = Mu(+)*10^6/ (b*d²) 0.3314 0.3314 0.0828
Cek dimensi balok, Rn<ρ.max ? Oke Oke Oke
rasio tul diperlukan, ρ = 0.85*fc'/fy *((1--2*Rn/(0.85*fc'))^0.50)) 0.0014 0.0014 0.0003
rasio tul min, ρ.min.1 = √fc' /(4*fy) 0.0040 0.0040 0.0040
rasio tul minimum, ρ.min.2 = 1.40/ fy 0.0058 0.0058 0.0058
rasio tul dibutuhkan, ρ = max(ρ, ρ.min.1, ρ.min.2) 0.0058 0.0058 0.0058
luas tulangan, As = ρ*b*d (mm2) 394.92 394.92 394.92
Digunakan diameter tulangan, Ø(mm), 16.00 16.00 16.00
jml tul yg diperlukan, n = As/ (л/4 * D² (bh) 1.96 1.96 1.96
jml tul yg dibutuhkan, n = int(n)+1 (bh) 2.00 2.00 2.00
luas tulangan, As = n*л/4 * D² (mm2) 402.29 402.29 402.29
jml baris tul, nb = n / ns (bh) 0.65 0.65 0.65
luas tul yg diperluka, As' = n*л/ 4 * D² (mm2) 100.57 100.57 100.57
digunakan diameter tulangan, Ø(mm), 12.00 12.00 12.00
jml tul yg dibutuhkan, n' = As/ (л/4 * D² (bh) 0.89 0.89 0.89
tulangan yg dibutuhkan, n' = int(n')+1 (bh) 1.00 1.00 1.00
luas tul diperlukan, As = n'*л/4 * D² (mm2) 201.14 201.14 201.14
jml baris tul, nb = / ns (bh) 0.33 0.33 0.33

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 88\100

syarat, nb<3 ? Oke Oke Oke


letak ttk berat, ''d' = ∑(ni*y1)/ n (mm) 41.00 41.00 41.00
'd'<d' ? Oke Oke Oke
tinggi eff balk, d = h - d' (mm) 359.00 359.00 359.00
a = As*fy/ (0.85*fc'*b) (mm) 39.17 39.17 39.17
momen nominal, Mn = As*fy* (d-a/2)/ 10^6 (kNm) 32.77 32.77 32.77
tahanan momen balok, Φ*Mn 26.22 26.22 26.22
Tahanan momen balok, syarat Φ*Mn>Mu(+) ? Oke Oke Oke

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 89\100
Cross Cross-Deletasi Long-kaki
Tulangan Mu(-) : Tumpuan
200 x 400 200 x 400 200 x
Momen nominal renc, Mn = Mu(+)/ Φ, (kNm) 9.11 9.11 2.28
jrk pusat tul lentur, d' = ds + y/2 (mm) 61.50 61.50 61.50
tinggi eff balk, d = h - d' (mm) 338.50 338.50 338.50
faktor tahanan momen, Rn = Mu(+)*10^6/ (b*d²) 0.3976 0.3976 0.0994
Rn<ρ.max ? Oke Oke Oke
rasio tul diperlukan, ρ = 0.85*fc'/fy *((1--2*Rn/(0.85*fc'))^0.50)) 0.0017 0.0017 0.0004
rasio tul min, ρ.min.1 = √fc' /(4*fy) 0.0040 0.0040 0.0040
rasio tul minimum, ρ.min.2 = 1.40/ fy 0.0058 0.0058 0.0058
rasio tul dibutuhkan, ρ = max(ρ, ρ.min.1, ρ.min.2) 0.0058 0.0058 0.0058
luas tulangan, As = ρ*b*d (mm2) 394.92 394.92 394.92
digunakan diameter tulangan, Ø(mm), 16.00 16.00 16.00
jml tul yg diperlukan, n = As/ (л/4 * D² (bh) 1.96 1.96 1.96
jml tul yg dibutuhkan, n = int(n)+1 (bh) 2.00 2.00 2.00
luas tulangan, As = n*л/4 * D² (mm2) 402.29 402.29 402.29
jml baris tul, nb = n / ns (bh) 0.67 0.67 0.67
luas tul yg diperluka, As' = n*л/ 4 * D² (mm2) 100.57 100.57 100.57
digunakan diameter tulangan, Ø(mm), 16.00 16.00 16.00
jml tul yg dibutuhkan, n' = As/ (л/4 * D² (bh) 1.50 1.50 1.50
tulangan yg dibutuhkan, n' = int(n')+1 (bh) 2.00 2.00 2.00
luas tul diperlukan, As = n'*л/4 * D² (mm2) 402.29 402.29 402.29
jml baris tul, nb = / ns (bh) 0.67 0.67 0.67
syarat, nb<3 ? Oke Oke Oke
letak ttk berat, ''d' = ∑(ni*y1)/ n (mm) 41.00 41.00 41.00
'd'<d' ? Oke Oke Oke
tinggi eff balk, d = h - d' (mm) 359.00 359.00 359.00
a = As*fy/ (0.85*fc'*b) (mm) 39.17 39.17 39.17
momen nominal, Mn = As*fy* (d-a/2)/ 10^6 (kNm) 32.77 32.77 32.77

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 90\100

tahanan momen balok, Φ*Mn (kNm) 26.22 26.22 26.22


syarat Φ*Mn>Mu(+) ? Oke Oke Oke
Tulangan Geser, Tumpuan
gaya geser ult Vu = (kN) 34.35 34.35 17.18
faktor reduski geser, Φ 0.75 0.75 0.75
kuat geser beton, Vc = √fc'/6 * b /1000 (kN) 45.57 45.57 45.57
tahanan geser beton, Φ*Vc (kN) 34.18 34.18 34.18

tahanan geser sengkang, Φ.Vs =Vu-Φ.Vc (kN) 0.17 0.17 -17.00


kuat gsr sengkang, Vs (kN) 0.23 0.23 -22.67
jmh sengkang, nP (bh) 1.00 1.00 1.00
luas tul geser sengkang, Av = ns*л/4 * P² (mm2) 50.29 50.29 50.29
jrk sengkang, s = Av*fy*d/ (Vs*1000) (mm) 18652 18652 191
jrk sengkang, s.max = d / 2 (mm) 180 180 180
sengkang dipakai, s (mm) 170 170 170
Geser Lapangan
gaya geser ultimate, Vu (kN) 34.35 34.35 17.18
faktor reduski geser, Φ 0.75 0.75 0.75
kuat geser beton, Vc = √fc'/ 6 *b*d/ 1000 (kN) 45.57 45.57 45.57
tahanan geser, Φ*Vc (kN) 34.18 34.18 34.18

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 91\100
Cross Cross-Deletasi Long-kaki
UraIan
200 x 400 200 x 400 200 x
tahanan geser sengkang, Φ.Vs =Vu-Φ.Vc (kN) 0.17 0.17 -17.00
kuat geser sengkang, Vs (kN) 0.23 0.23 -22.67
jmh sengkang, nP (bh) 1.00 1.00 1.00
luas tul geser, Av = ns*л/4 * P² (mm2) 151 151 151
jrk sengkang, s = Av*fy*d/ (Vs*1000) (mm) 55955 55955 573
jrk sengkang, s.max = d / 2 (mm) 180 180 180
sengkang dipakai, s (mm) 170 170 170
KESIMPULAN
Tulangan Lapangan 2 Ø 16 2 Ø 16 2 Ø
Tulangan Puntir 2 Ø 12 2 Ø 12 2 Ø
Tulangan Tumpuan 2 Ø 16 2 Ø 16 2 Ø
Tulangan Beugel Ø 8 - 170 Ø 8 - 170 Ø 8 -

Skets Penulangan

Lapangan Lapangan Lapangan

Ø 170 Ø8 - 170 Ø8 - 170

400 400 400

200 200 200

2 Ø 16 2 Ø 16 2

2 Ø 12 2 Ø 12 2 Ø

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 92\100

2 Ø 16 2 Ø 16 2 Ø 16

Tumpuan Tumpuan Tumpuan

Ø8 - 170 Ø8 - 170 Ø8 - 170

400 400 400

200 200 200

2 Ø 16 2 Ø 16 2

2 Ø 12 2 Ø 12 2 Ø

2 Ø 16 2 Ø 16 2 Ø 16

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 93\100

RHITUNGAN BALOK BETON SALURAN INDUK KLAMBU KIRI


RUAS : BKKi.17 - BKKi.18

BALOK
Long-kaki Long-Tengah Lereng-Mini Frame Tanggul-Mini
400 200 x 400 200 x 400 150 x 300 200 x 300
14.50 14.50 14.50 14.50 14.50
240.00 240.00 240.00 240.00 240.00
16.00 16.00 12.00 12.00 12.00
12.00 12.00 12.00 12.00 12.00
8.00 8.00 8.00 8.00 8.00
25.00 25.00 25.00 25.00 25.00
100.00 100.00 100.00 100.00 70.00
3.75 3.75 3.75 3.75 3.75
1.50 1.50 1.50 1.50 1.50
1.40 1.40 0.54 0.54 0.54

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 94\100

4.33 4.33 4.33 4.33 4.33


1.88 3.75 2.16 2.16 2.16
6.30 6.30 1.88 1.88 1.88
4.32 4.32 4.32 3.48 3.12
14.00 14.00 5.38 5.38 5.38
18.32 18.32 9.70 8.86 8.50
5.18 5.18 5.18 4.18 3.74
17.18 34.35 10.49 9.58 9.19
1.52 6.08 2.02 1.63 1.46
1.82 7.29 2.43 1.95 1.75
17.18 34.35 10.49 9.58 9.19
0.85 0.85 0.85 0.85 0.85
0.0312 0.0312 0.0312 0.0312 0.0312
4.3345 4.3345 4.3345 4.3345 4.3345

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 95\100
Long-kaki Long-Tengah Lereng-Mini Frame Tanggul-Mini
400 200 x 400 200 x 400 150 x 300 200 x 300
0.80 0.80 0.80 0.80 0.80
41.00 41.00 39.00 39.00 39.00
2.88 2.88 3.30 1.95 3.30
3.00 3.00 4.00 2.00 4.00
35.00 35.00 24.67 48.00 24.67
41.00 41.00 37.00 37.00 37.00
1.8984 7.5938 2.5272 2.0358 1.8252
61.50 61.50 57.50 57.50 57.50
338.50 338.50 342.50 242.50 242.50
0.0828 0.3314 0.1077 0.2308 0.1552
Oke Oke Oke Oke Oke
0.0003 0.0014 0.0005 0.0010 0.0007
0.0040 0.0040 0.0040 0.0040 0.0040
0.0058 0.0058 0.0058 0.0058 0.0058
0.0058 0.0058 0.0058 0.0058 0.0058
394.92 394.92 399.58 212.19 282.92
16.00 16.00 12.00 12.00 12.00
1.96 1.96 3.53 1.88 2.50
2.00 2.00 2.00 1.00 2.00
402.29 402.29 226.29 113.14 226.29
0.65 0.65 0.88 0.94 0.63
100.57 100.57 56.57 28.29 56.57
12.00 12.00 12.00 12.00 12.00
0.89 0.89 0.50 0.25 0.50
1.00 1.00 1.00 1.00 1.00
201.14 201.14 113.14 113.14 113.14
0.33 0.33 0.25 0.50 0.25

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 96\100

Oke Oke Oke Oke Oke


41.00 41.00 39.00 39.00 39.00
Oke Oke Oke Oke Oke
359.00 359.00 361.00 261.00 261.00
39.17 39.17 22.03 14.69 22.03
32.77 32.77 19.01 6.89 13.58
26.22 26.22 15.21 5.51 10.86
Oke Oke Oke Oke Oke

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 97\100
Long-kaki Long-Tengah Lereng-Mini Frame Tanggul-Mini
400 200 x 400 200 x 400 150 x 300 200 x 300
2.28 9.11 3.03 2.44 2.19
61.50 61.50 57.50 57.50 57.50
338.50 338.50 342.50 242.50 242.50
0.0994 0.3976 0.1293 0.2770 0.1862
Oke Oke Oke Oke Oke
0.0004 0.0017 0.0005 0.0012 0.0008
0.0040 0.0040 0.0040 0.0040 0.0040
0.0058 0.0058 0.0058 0.0058 0.0058
0.0058 0.0058 0.0058 0.0058 0.0058
394.92 394.92 399.58 212.19 282.92
16.00 16.00 12.00 12.00 12.00
1.96 1.96 3.53 1.88 2.50
2.00 2.00 2.00 1.00 2.00
402.29 402.29 226.29 113.14 226.29
0.67 0.67 0.50 0.50 0.50
100.57 100.57 56.57 28.29 56.57
16.00 16.00 12.00 12.00 12.00
1.50 1.50 1.50 1.25 1.50
2.00 2.00 2.00 2.00 2.00
402.29 402.29 226.29 226.29 226.29
0.67 0.67 0.50 1.00 0.50
Oke Oke Oke Oke Oke
41.00 41.00 37.00 37.00 37.00
Oke Oke Oke Oke Oke
359.00 359.00 361.00 261.00 261.00
39.17 39.17 22.03 14.69 22.03
32.77 32.77 19.01 6.89 13.58

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 98\100

26.22 26.22 15.21 5.51 10.86


Oke Oke Oke Oke Oke

17.18 34.35 10.49 9.58 9.19


0.75 0.75 0.75 0.75 0.75
45.57 45.57 45.82 24.85 33.13
34.18 34.18 34.37 18.63 24.85

-17.00 0.17 -23.88 -9.06 -15.66


-22.67 0.23 -31.84 -12.08 -20.88
1.00 1.00 1.00 1.00 1.00
50.29 50.29 50.29 50.29 50.29
191 18652 137 261 151
180 180 181 131 131
170 170 170 170 170

17.18 34.35 10.49 9.58 9.19


0.75 0.75 0.75 0.75 0.75
45.57 45.57 45.82 24.85 33.13
34.18 34.18 34.37 18.63 24.85

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 99\100
Long-kaki Long-Tengah Lereng-Mini Frame Tanggul-Mini
400 200 x 400 200 x 400 150 x 300 200 x 300
-17.00 0.17 -23.88 -9.06 -15.66
-22.67 0.23 -31.84 -12.08 -20.88
1.00 1.00 1.00 1.00 1.00
151 151 201 101 201
573 55955 547 522 604
180 180 181 131 131
170 170 170 170 170

16 2 Ø 16 2 Ø 12 1 Ø 12 2 Ø 12
12 2 Ø 12 2 Ø 12 2 Ø 12 1 Ø 12
16 2 Ø 16 2 Ø 12 1 Ø 12 2 Ø 12
170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170 Ø 8 - 170

Skets Penulangan pada Potongan Melintang

Lapangan Lapangan Lapangan Lapangan Lapangan

Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170

400 400 300 300

200 200 200 150 200

Ø 16 2 Ø 16 2 Ø 12 1 Ø 12 2 Ø 12

12 2 Ø 12 2 Ø 12 2 Ø 12 1 Ø 12

411315025.xlsx
Justek Perhitungan Betok Ruas BKKi.1c-BKKi.1g Hal 100\100

2 Ø 16 2 Ø 12 1 Ø 12 2 Ø 12

Tumpuan Tumpuan Tumpuan Tumpuan Tumpuan

Ø8 - 170 Ø8 - 170 Ø8 - 170 Ø8 - 170

400 400 300 300

200 200 200 150 200

Ø 16 2 Ø 16 2 Ø 12 1 Ø 12 2 Ø 12

12 2 Ø 12 2 Ø 12 2 Ø 12 1 Ø 12

2 Ø 16 2 Ø 12 1 Ø 12 2 Ø 12

411315025.xlsx