Anda di halaman 1dari 2

Jihan Agustin

18062035

Hidrologi dan Hidrolika

Curah Hujan.

Tabel Perhitungan 3 Jenis Rumus Intensitas Curah Hujan

t I
NO I.t I2 I2.t log t log I
(menit) (mm/jam)
1 1 167 835 27889 139445 0.69897 2.22272
2 10 55.5 555 3080.25 30802.5 1 1.7443
3 20 120.5 2410 14520.25 290405 1.30103 2.08098
4 30 75.3 2259 5670.09 170102.7 1.47711 1.87679
5 40 46.2 1848 2134.44 85377.6 1.60206 1.66464
6 60 95 5700 9025 541500 1.77815 1.97772
7 80 110.4 8832 12188.16 975052.8 1.90309 2.04296
8 120 30 3600 900 108000 2.07918 1.47712
[] 699.9 26039 75407.19 2340685.6 11.83959 15.08723

NO log t.log I Logt2 √t I . √t I2.√t


1 1.55361 0.48856 2.236 373.41 62359.8
2 1.7443 1 3.162 175.49 9739.75
3 2.70741 1.69268 4.472 538.88 64934.56
4 2.77222 2.18185 5.477 412.42 31055.08
5 2.66685 2.5666 6.325 292.22 13500.33
6 3.51668 3.16182 7.746 464.76 69907.65
7 3.88793 3.62175 8.944 987.42 109010.9
8 3.07119 4.32299 10.954 328.62 9858.6
[] 21.92019 19.03625 3573.22 370366.7

1. JENIS I
𝑎 (26039×75407.19)−(2340685.6×699.9)
I= » 𝑎= (8×75407.19)−(699.9×699.9)
≌ 2869
𝑡+𝑏
(699.9 × 26039) − (8 × 2340685.6)
𝑏= ≅4
(8 × 75410.19) − (699.9 × 699.9)

2. JENIS II
a
I=
tn
(15.08723 × 19.03625) − (21.92019 × 11.83959)
log a ≅2
(8 × 19.03625) − (11.83959 × 11.83959)

(15.08723 × 11.83959) − (8 × 21.92019)


𝑛= ≅ 0.27
(8 × 19.03625) − (11.83959 × 11.83959)

3. JENIS III
𝑎
I=
√𝑡+ 𝑏

(3573.22 × 75407.19) − (8 × 370366.7)


𝑎= ≅ 2350
(8 × 75407.19) − (699.9 × 699.9)

(699.9 × 3573.22) − (8 × 370366.7)


𝑏= ≅ 4.07
(8 × 75407.19) − (699.9 × 699.9)

Anda mungkin juga menyukai