2
t1 302 T1 446 W benzen 20299.86
t2 392 T2 446 w steam #DIV/0!
1 heat balance w=Q/(w*tbes-tkec)
benzen
Tav 347 C fig 2
Q 0 Q=wc(tbesar-tkecil)
steam
tav 446 c fig 2
Q 0
2 delta t
hot fluid cold fluid dif
T1 446 higher t2 392 54 delta t2
T2 446 lower t1 302 144 delta t1
T1-T2 0 t2-t1 90 90 delta t2-delta t1
LMTD=(delta t2-delta t1)/(2,3 log(delta t2/delta t1))
LMTD -91.8622233 FT fig 18 hal 829 diambil untuk 2 shell passes 4 or more tube passes
R 0 delta t 0
S 0.625
3 Tc dan tc
rata-rata suhu setiap fluida karena lmtd kurang dr 50
Tc 446 Tc= (T1+T2)/2
tc 347
Vt #DIV/0! fps
7' jH fig 28 7 jH
L/D 0
jH fig 24
9' ho 0 9 hi
hi grafik fig 25 dr Vt
faktor koreksi fig 25 insert dr ID tube
hi 0 hi=hi grafik*faktor koreksi
hio #DIV/0!
karena asumsi ɸ = 1, maka ɸs dan ɸt = 1. Dan Point 10, 11 dan 12 tidak dihitung.
13 Uc #DIV/0!
14 Rd
Rd dr table 8 = 0,003 krn light organic dan water
Maka Rd perhitungan, #DIV/0!
PRESSURE DROP
hot fluid : steam cold fluid : benzen,
1' untuk Res #DIV/0! 1 untuk Ret #DIV/0!
f fig 29 f fig 26
deltaPr
s
delta PT
asumsi-asumsi (design guidelines) (robert &thomas, hal 158):
1. penempatan fluida
yg ditube water di shell etil benzen (robert &thomas, hal 87)
fluida korosid di tube, krn mudah dibersihkan di tube
air pendingin biasanya di tube
*kriteria penempatan fluida dpt dilihat di tabel 3.4 (robert &thomas, hal 86)
3. tubing
(robert &thomas, hal 158) dapat dipilih
16 BWG length 16
(kern, hal 843) table 10 dengan tube OD 1 1/4 , 16 BWG maka
wall thickness 0,065 in; ID 1,12 in; flow area per tube a't 0,985 in2; surface per lin f outside 0,3271 f
karena 16 BWG punya wall thickness 0,065 a''
4. tube layout
kode soal uas 1 1/4 in OD tubes on 1 9/16 in square pitch
5. baffles
dipilih exchanger 2 shell pass 4 or more tube passes dengan baffle (fig 19, hal 829)
exchanger
shell side tube side
ID 15.25 number & length 43 16
baffle space OD, BWG, pitch 1 1/4 16
136 passes 2 passes 4
ert dr ID tube
fik*faktor koreksi
urface per lin f outside 0,3271 f2, inside 0,2932 f2
0.3271
1 9/16
T steam t benzen Q diketahui 327134.16
T1 446 t1 302 W steam dik 598.79555556
T2 446 t2 392 w benzen dik 20299.86 pakai ini
1 heat balance w=Q/(c*tbes-tkec)
benzen
tav 347 c 0.562 fig 2
Qc 1026766.81 Q=wc(tbesar-tkecil) w benzen dicari 9221.3086824
3 Caloric Tempetarure
berdasarkan table 6.2 hal 110 exchanger 4 x 3 IPS menunjukkan bahwa flow area inner pipe>annulus.
Maka aliran yg lebih besar ditempatkan pada flow area yg besar yaitu inner pipe.
De 0.09425419
5' Mass velocity 5 Mass velocity
Ga 27747.34573 Gp 179711.01002
10 hio 145.39826393
11 Uc 132.5499125
PRESSURE DROP
Hot fluid : Annulus, Steam cold fluid : benzen, inner pipe
1' D'e 0.043833333 1 untuk Rep 189859.9789
R'ea 33505.74805 f 0.0051019977
f 0.006819356
v 1.15 table 7
s 0.013965208 s 0.88 table 6
rho 0.872825515 rho 55
interpolasi s dari table 7
444.59 1.1613 v 1.15
446 x
456.28 1.032
2' delta Fa 48.1460395 2 delta Fp 0.0652414835
1026766.81
ta t2-delta t1
pe>annulus.
4 by 3 in IPS
D2 : ID yg 4 in
D1 : OD yg 3 in
D : ID yg 3 in
summary
1500 h outside 145.3982639
Uc 132.5499124872
Ud 69.2109978227
T etil benzen t water Q diketahui 647158.76
T1 239 t1 86 W etil benzen 112776.06667
T2 113 t2 176 w water 73859.955556
1 heat balance w=Q/(c*tbes-tkec)
etil benzen
Tav 176 C 0.491 fig 2
water
tav 131 c 1 fig 2
2 delta t
hot fluid cold fluid dif
T1 239 higher t2 176 63 delta t2
T2 113 lower t1 86 27 delta t1
T1-T2 126 t2-t1 90 36 delta t2-delta t1
LMTD=(delta t2-delta t1)/(2,3 log(delta t2/delta t1))
LMTD 42.53576459 FT 0.585 fig 18 hal 829 diambil untuk 2 shell passes 4 or more tube passe
R 1.4 delta t 24.88342
S 0.588235294
3 Tc dan tc
rata-rata suhu setiap fluida karena lmtd kurang dr 50
Tc 176 Tc= (T1+T2)/2
tc 131
Vt 4.635470539 fps
9' ho 456.9390677 9 hi
hi grafik 1400 fig 25 dr Vt
faktor koreksi 0.9 fig 25 insert dr ID tube
hi 1260 hi=hi grafik*faktor koreksi
hio 1128.96
karena asumsi ɸ = 1, maka ɸs dan ɸt = 1. Dan Point 10, 11 dan 12 tidak dihitung.
13 Uc 325.2829517 summary
456.93907 houtside
14 Rd Uc 325.283
Rd dr table 8 = 0,003 krn light organic dan water Ud 120
Maka Rd perhitungan, 0.005259087 Rd calculated
Rd required
PRESSURE DROP
hot fluid : etil benzen, shell side cold fluid : water, tube side
1' untuk Res 41252.51982 1 untuk Ret 80450.315
f 0.0018 fig 29 f 0.00028 fig 26
s 0.87 table 6 s 1 table 6
2' No. Of crosses 13.71428571 2 delta Pt 4.0011369
Ds 1.288954083
deltaPr 0.04
delta PT 4.0411369
asumsi-asumsi (design guidelines) (robert &thomas, hal 158):
1. penempatan fluida
yg ditube water di shell etil benzen (robert &thomas, hal 87)
fluida korosid di tube, krn mudah dibersihkan di tube
air pendingin biasanya di tube
*kriteria penempatan fluida dpt dilihat di tabel 3.4 (robert &thomas, hal 86)
3. tubing
(robert &thomas, hal 158) dapat dipilih
16 BWG length 16
(kern, hal 843) table 10 dengan tube OD 1 1/4 , 16 BWG maka
wall thickness 0,065 in; ID 1,12 in; flow area per tube a't 0,985 in2; surface per lin f outside 0,3271 f
karena 16 BWG punya wall thickness 0,065 a''
4. tube layout
kode soal uas 1 1/4 in OD tubes on 1 9/16 in square pitch
5. baffles
dipilih exchanger 2 shell pass 4 or more tube passes dengan baffle (fig 19, hal 829)
exchanger
shell side tube side
ID 15.47 number & length 41 16
baffle space 14 OD, BWG, pitch 1 1/4 16
passes 2 passes 4
t dr ID tube
*faktor koreksi
1128.96
0.0052590868
0.003
urface per lin f outside 0,3271 f2, inside 0,2932 f2
0.3271
1 9/16