PEKERJAAN :
LOKASI :
KEC. NAMLEA
KONSULTAN PERENCANA
CV. GRIYA HESANDE KONSULTAN
Jln. Dr. Malaiholo No.10 D Taman Makmur - Ambon
DAFTAR HARGA SATUAN UPAH dan BAHAN
BAHAN LOKAL
1 PASIR URUG M3 256,000.00
2 PASIR PASANGAN ( SUNGAI KALI ) M3 355,600.00
3 TANAH URUG M3 196,200.00
4 SIRTU KALI M3 355,600.00
5 BATU KALI M3 483,400.00
6 BATU KARANG GUNUNG M3 421,600.00
7 BATU PECAH 2/3 M3 495,000.00
8 KERIKIL SARING SUNGAI M3 365,600.00
9 BATU BATA BH 1,250.00
10 BATAKO 25 X 15 X 13 CM BH 3,200.00
11 KAYU KLAS I M3 4,800,000.00
12 KAYU KLAS II M3 3,300,000.00
BAHAN NON LOKAL
1 SEMEN ZAK 90,000.00
2 SEMEN KG 1,800.00
3 SEMEN PUTIH ZAK 120,000.00
4 SEMEN PEREKAT INSTAN AM / SETARA KG 18,480.00
5 SEMEN NAT KG 67,400.00
6 SEMEN WARNA KG 15,400.00
7 BESI BETON KG 14,850.00
8 KAWAT BAJA / BENDRAT KG 26,000.00
9 PAKU BIASA KG 19,000.00
10 PAKU SENK KG 27,000.00
11 BAUT Dia. 1/2 INCH KG 21,200.00
12 PAKU BETON KG 23,500.00
13 PAKU TRIPLEKS KG 22,000.00
14 LEM KAYU Kg 45,000.00
15 BESI STRIP KG 14,850.00
16 KAWAT LAS KG 35,000.00
17 MULTIPLEKS 10 mm LBR 124,500.00
18 TEAK WOOD LBR 127,500.00
19 PLAYWOOD LBR 127,000.00
20 SENG GELOMBANG BJLS 0,20 LBR 47,400.00
21 SENG GELOMBANG BJLS 0,25 LBR 60,400.00
22 SENG DATAR BJLS 0.20 LBR 49,400.00
23 SENG DATAR BJLS 0.25 LBR 63,400.00
24 SENG DATAR BJLS 0.30 LBR 74,400.00
25 ATAP MULTIROOF BH 45,400.00
26 BUBUNGAN MULTIROOF M1 35,400.00
27 TRIPLEKS 3 MM M2 60,500.00
28 DINDING KERAMIK MOTIF BATU ALAM 20/40 M2 80,200.00
DINDING KERAMIK MOTIF BATU ALAM 20/40 BH 6,416.00
29 KERAMIK 40/40 M2 82,400.00
KERAMIK 40/40 Bh 12,428.36
NO. URAIAN SATUAN HARGA
(Rp)
1 2 3 4
30 PLAMIR KG 26,000.00
31 KAPUR API KG 12,200.00
32 CAT TEMBOK KG 27,500.00
33 CAT KAYU SETARA GLOTEK KG 56,000.00
34 CAT DASAR KG 21,000.00
35 CAT RESIDU KAYU KG 56,000.00
36 CAT MENI ZENK KG 56,000.00
37 CAT MENI KAYU LTR 56,000.00
38 MINYAK CAT KG 31,000.00
39 KUAS 3 BH 10,200.00
40 DEMPUL DINDING KG 26,000.00
41 KERTAS AMPLAS LBR 6,100.00
42 DEMPUL KAYU KG 26,000.00
43 KACA POLOS 3 MM M2 314,500.00
44 KACA POLOS 5 MM M2 336,500.00
45 LIST PLAFOND KAYU PROFIL Ky Klas II M' 25,500.00
46 HANDLE PINTU Bh 125,100.00
47 KUNCI PINTU Bh 200,200.00
48 ENGSEL PINTU Bh 50,100.00
49 ENGSEL JENDELA Bh 45,100.00
50 GRENDEL PINTU Bh 30,100.00
51 GRENDEL JENDELA Bh 30,100.00
52 DOOR CLOSER Bh 376,000.00
53 KAIT ANGIN Bh 25,100.00
54 CLOSET DUDUK BH 3,050,000.00
55 CLOSET JONGKOK BH 215,000.00
56 WASHTAFEL BH 376,000.00
57 KRAN TEMBOK BH 125,000.00
58 KRAN LEHER ANGSA BH 200,000.00
59 FLOOR DRAIN BH 27,200.00
60 DRAIN BAK AIR BH 35,100.00
61 KACA CERMIN BH 165,000.00
62 LAMPU TL 1x18 WATT PHILLIPS BH 55,200.00
63 LAMPU DOWN LIHGT 22 watt (Lengkap) BH 110,500.00
64 LAMPU PIJAR 60 WATT BH 30,200.00
65 SAKLAR GANDA BH 26,200.00
66 SAKLAR TUNGGAL BH 26,200.00
67 STOP KONTAK BH 23,200.00
68 Pipa GIV Dia. 1/2 Inch M' 29,500.00
69 Pipa GIV Dia. 3/4 Inch M' 43,000.00
70 Pipa GIV Dia. 1 Inch M' 53,000.00
71 Pipa GIV Dia. 1 1/2 Inch M' 84,000.00
72 Pipa GIV Dia. 2 Inch M' 134,000.00
73 Pipa GIV Dia. 3 Inch M' 152,500.00
74 Pipa GIV Dia. 4 Inch M' 160,800.00
75 Pipa GIV Dia. 6 Inch M 216,000.00
76 Pipa PVC Dia. 1/2 Inch STAF 23,200.00
77 Pipa PVC Dia. 3/4 Inch STAF 30,200.00
78 Pipa PVC Dia. 1 Inch STAF 41,500.00
79 Pipa PVC Dia. 1 1/2 Inch STAF 60,200.00
80 Pipa PVC Dia. 2 Inch STAF 85,500.00
81 Pipa PVC Dia. 3 Inch STAF 145,500.00
82 Pipa PVC Dia. 4 Inch STAF 150,500.00
NO. URAIAN SATUAN HARGA
(Rp)
1 2 3 4
1 2 3
TERBILANG : Seratus Dua Puluh Enam Juta Dua Ratus Sembilan Puluh Satu Ribu Rupiah,-
Catatan : Harga tersebut diatas sudah termasuk Jasa, Over Head, IMB dan Pajak-pajak sesuai dengan
ketentuan yang berlaku.
Dibuat Oleh,
KONSULTAN PERENCANA
CV. GRIYA HESANDE KONSULTAN
MADE A. LATUCONSINA, ST
Team Leader
REKAPITULASI
ENGINEER'S ESTIMATE (EE)
HARGA
NO URAIAN PEKERJAAN SAT VOLUME SATUAN
(Rp)
1 2 3 4 5
II PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Karang M3 11.26 17.32 73,700.00
2 Urugan Pasir Bawah Pondasi M3 1.35 2.08 367,400.00
3 Urugan Pasir Bawah Lantai M3 2.60 4.00 367,400.00
4 Urugan Tanah Kembali Bekas Galian M3 3.75 5.77 53,900.00
5 Urugan Tanah Bawah Lantai M3 7.80 12.00 288,464.00
IV PEKERJAAN BETON
1 Pek. Sloef 15/20 (150 kg/m3) elv - 0.25 M3 0.51 0.78 5,836,347.00
2 Pek. Kolom 20/20 (150 kg/m3) elv - 0.10 s/d + 3.80 M3 0.42 0.64 7,363,642.00
3 Pek. Kolom Praktis 12/12 (230 kg/m3) elv - 0.10 s/d + 3.80 M3 0.41 0.63 8,670,442.00
4 Pek. Ring Balok 15/20 (150 kg/m3) elv + 3.80 M3 0.51 0.78 6,694,677.00
3,500,000.00
2,500,000.00
750,000.00
3,500,000.00
10,250,000.00
829,834.36
496,724.80
955,240.00
202,297.93
2,250,019.20
4,734,116.29
1,635,883.56
5,730,526.17
5,519,260.95
4,336,562.17
1,446,836.10
2,645,748.88
2,264,822.56
23,579,640.39
2,959,027.93
3,063,275.07
3,570,834.83
3,394,201.24
12,987,339.07
4,965,589.20
1,762,850.06
6,728,439.26
2,467,428.39
2,355,006.90
4,623,874.11
2,127,090.67
7,835,493.83
5,907,510.48
1,275,834.56
2,309,085.35
6,059,084.91
1,992,790.44
2,350,062.00
39,303,261.63
343,141.58
2,135,734.00
1,951,097.70
281,189.64
4,711,162.92
3,681,535.00
283,855.00
324,390.00
800,000.00
299,354.00
149,677.00
286,154.00
453,000.00
6,277,965.00
155,212.20
37,837.80
3,002,235.35
888,898.21
754,759.01
650,000.00
749,320.49
6,238,263.05
ANALISA HARGA SATUAN UPAH DAN BAHAN
C PERALATAN
A.3.2.1.2 Pemasangan 1 m3 Fondasi pasangan batu karang gunung campuran 1SP : 4PP
A.3.2.1.3 Pemasangan 1 m3 Pondasi Pasangan Batu Karang Gunung Campuran 1SP : 5PP
A.4.4.1.4 Pemasangan 1 m2 Dinding batako (8x15x30) cm tebal 1 batu campuran 1SP : 5PP
A.4.6 .1.5. Pembuatan dan Pemasangan 1 M2 Daun Pintu Panel Kayu Kls I
A.4.6 .1.6. Pembuatan dan Pemasangan 1 M2 Pintu dan Jendela Kaca Kayu Kls I
A.4.6 .1.13. Pemasangan 1 M3 Konstruksi Kuda-kuda Konvensional Kayu Kls I Bentangan 6 meter
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
DOKUMEN PERENCANAAN :
■ DESAIN GAMBAR KERJA
■ ENGINEER ESTIMATE [EE]
■ BILL OF QUANTITY [BOQ]
LOKASI :
KEC. NAMLEA
KONSULTAN PERENCANA
CV. GRIYA HESANDE KONSULTAN
Jln. Dr. Malaiholo No.10 D Taman Makmur - Ambon