Anda di halaman 1dari 39

REKAPITULASI AKHIR

Proyek : HOTEL SANTIKA BELITUNG


Pekerjaan : Rekapitulasi Akhir
Elemen Biaya : PEKERJAAN FUNITURE PUBLIK AREA DAN UNIT KAMAR HOTEL

TOTAL KETERANGAN
No Item pekerjaan
( Rp )

VOLUME PEKERJAAN

BILL 1 PERSIAPAN

BILL 2 SUPERIOR ROOM (SR) TYPE A #REF!

BILL 3 SUPERIOR ROOM (SR) TYPE B #REF!

BILL 4 DELUXE ROOM (DR) #REF!

BILL 5 FAMILY ROOM #REF!

BILL 6 SUITE ROOM #REF!

BILL 7 EXECUTIVE ROOM #REF!

BILL 8 VILLA #REF!

BILL 9 PEKERJAAN TAMBAH KURANG #REF!

#REF!

JUMLAH #REF!

PPn 10% #REF!

TOTAL #REF!

413076839.xls Rekapitulasi akhir 1 / 1


BILL OF QUANTITY NO. I - UNTUK PEKRJAAN PERSIAPAN

Proyek HOTEL SANTIKA BELITUNG


Level : PERSIAPAN
Elemen B: PEKERJAAN FUNITURE

Unit Rate Total


No Item pekerjaan Sat Quantity
( Rp ) ( Rp )

PERSIAPAN

Biaya persiapan meliputi antara lain : Set 1.00

Biaya manajement kontraktor


Biaya penurunan ke gudang
Biaya penyimpanan ke gudang
Biaya listrik dan iar kerja
Biaya perliundungan funiture
Biaya pemasangan funiture
dll
Asuransi Kerja (BPJS tenaga kerja)

Page 2 of 39
BILL OF QUANTITY NO. 1 - UNTUK PEKRJAAN PERSIAPAN

Proyek HOTEL SANTIKA BELITUNG


Level : PERSIAPAN
Elemen B: PEKERJAAN FUNITURE

Unit Rate Total


No Item pekerjaan Sat Quantity
( Rp ) ( Rp )

PERSIAPAN

Halaman 1 0

TOTAL 0

Page 3 of 39
REKAPITULASI AKHIR - TABEL UNIT

Proyek : HOTEL SANTIKA


Pekerjaan : Rekapitulasi Akhir - TABLE UNIT
Elemen Biaya : PEKERJAAN INTERIOR DAN FUNITURE PUBLIK AREA DAN UNIT KAMAR HOTEL

No

LANTAI SUPERIOR A SUPERIOR B DELUXE FAMILY SUITE

1 LANTAI 1 6.00 7.00

2 LANTAI 2 10.00 20.00 1.00

3 LANTAI 3 10.00 20.00 6.00 1.00

4 LANTAI 5 10.00 20.00 6.00 1.00

5 LANTAI 6 8.00

38.00 66.00 12.00 7.00 3.00

TOTAL ROOM KEY


128.00

No

LANTAI SUPERIOR A SUPERIOR B DELUXE FAMILY SUITE

1 LANTAI 1 6.00 7.00

2 LANTAI 2 10.00 20.00 2.00

3 LANTAI 3 10.00 20.00 6.00 2.00

4 LANTAI 5 10.00 20.00 6.00 2.00

5 LANTAI 6 8.00

38.00 66.00 12.00 7.00 6.00

TOTAL ROOM BAY


135.00

SUMMARY/1
413076839.xls Rekapitulasi akhir 4 / 4
EXECUTIVE

2.00

2.00

EXECUTIVE

6.00

6.00

413076839.xls Rekapitulasi akhir 5 / 5


PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
DESIGN DAN ENGINEER CONSULTANTS
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

Unit Rate SUB TOTAL TOTAL


No Item pekerjaan Sat QTY
Rp Rp Rp

I PEKERJAAN PERSIAPAN Ls 1 2,000,000,000.00 2,000,000,000.00 2,000,000,000.00

II PEKERJAAN INTERIOR AREA LOBBY, FUCTION, DINNING DLL 2,351,821,956.43

1 Lobby - Lantai 1 unit 1 585,933,911.00 585,933,911.00


2 Fuction Hall - Lantai 4 unit 1 1,204,829,271.43 1,204,829,271.43
3 Prefuction - Lantai 4 unit 1 561,058,774.00 561,058,774.00
2,329,680,106.80
4 Meeting Room - Lantai 6 unit 1 375,806,720.00 375,806,720.00
5 Prefuction Meeting Room Lantai 6 unit 1 817,584,536.80 817,584,536.80
6 Dinning Area - Lantai 7 unit 1 709,295,100.00 709,295,100.00
7 Foyer - Lantai 7 unit 1 426,993,750.00 426,993,750.00

III INTERIOR BED ROOM & TOILET HOTEL ( 4 S/D 8 )

A INTERIOR BED ROOM

1 Twin Bedroom T1 unit 63 99,499,025.00 6,268,438,575.00 6,268,438,575.00


2 Double Bedroom 8,611,908,899.00
Type T1 unit 67 107,608,650.00 7,209,779,550.00
Type T2 unit 4 105,988,075.00 423,952,300.00
Type T3 unit 5 125,076,075.00 625,380,375.00
Type T4 unit 1 118,957,039.00 118,957,039.00
Type T5 unit 1 131,426,767.50 131,426,767.50
Tipe T6 unit 1 102,412,867.50 102,412,867.50

B INTERIOR TOILET BEDROOM 5,594,070,225.00


Type T1 & T2 unit 134 38,911,012.50 5,214,075,675.00
Type T3 unit 5 49,211,460.00 246,057,300.00
Type T4 unit 1 43,012,850.00 43,012,850.00
Type T5 unit 1 49,096,900.00 49,096,900.00
Tipe T6 unit 1 41,827,500.00 41,827,500.00

IV INTERIOR KORIDOR KAMAR 1,644,136,100.00


Lantai 4 unit 1 294,525,350.00 294,525,350.00
Lantai 5 unit 1 294,525,350.00 294,525,350.00
Lantai 6 unit 1 458,413,400.00 458,413,400.00
Lantai 7 unit 1 298,336,000.00 298,336,000.00
Lantai 8 unit 1 298,336,000.00 298,336,000.00

IV PUBLIC TOILET 599,654,230.00

Lantai 1 unit 1 174,433,770.00 174,433,770.00


Lantai 4 unit 1 212,610,230.00 212,610,230.00
Lantai 7 unit 1 212,610,230.00 212,610,230.00

JUMLAH 29,399,710,092.23

KEUNTUNGAN 10% 2,939,971,009.22

JUMLAH 32,339,681,101.45

PPN 10% 3,233,968,110

JUMLAH 35,573,649,212
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA

RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR LOBBY UTAMA
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
LOBBY HOTEL
A PEKERJAAN SIPIL
I PEKERJAAN LANTAI
Pekerjaan Pemasangan Finishing Lantai Lobby
1 termasuk lantai lift hotel ( material gani marble m² 231.02 175,000.00 40,428,500.00
by owner )
2 Screed termasuk acian m² 35.00 82,000.00 2,870,000.00

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING

1 Backing Dengan Rangka Hollow Galvanized m² 221.60 165,000.00 36,564,759.00


40x40x0.6 mm dan Multipleks 9mm

Panel Kombinasi Pada Dinding Lobby Lift ( 2


2 unit ) termasuk Jump Lift m² 41.66 1,150,000.00 47,909,000.00
3 Panel Kombinasi Pada Dinding Tipe 2 m² 13.41 1,075,000.00 14,420,050.00
4 Panel Kombinasi Pada Dinding Tipe 3 m² 24.88 1,075,000.00 26,748,580.00
5 Panel Kombinasi Pada Dinding Tipe 4 m² 31.47 1,075,000.00 33,827,885.00
6 Panel Kombinasi Pada Dinding Tipe 5 m² 32.33 1,075,000.00 34,759,265.00
7 Panel Kombinasi Pada Dinding Tipe 6 m² 28.85 3,440,000.00 99,229,552.00
8 Panel Kombinasi Pada Kolom 1 & 2 m² 43.68 3,440,000.00 150,259,200.00
9 Meja reception bh 2.00 20,000,000.00 40,000,000.00
10 Skirting 10 cm m' 58.32 60,000.00 3,499,020.00

II PEKERJAAN PLAFON
1 Plafond Gypsum m² 231.02 130,000.00 30,032,600.00
2 Decorative Lampu & Dudukan Lampu set 1.00 4,207,500.00 4,207,500.00
Plywood 15mm m1 7.90 75,000.00 592,500.00
plat 5mm m1 7.90 100,000.00 790,000.00
Alabastar 3mm m1 7.90 250,000.00 1,975,000.00
Alat Bantu ls 1.00 350,000.00 350,000.00
Upah ls 1.00 500,000.00 500,000.00
Total 4,207,500.00
3 Drop Plafond m' 21.50 325,000.00 6,987,500.00
4 Cat Plafond m² 231.02 25,000.00 5,775,500.00

TOTAL 585,933,911.00
PEMBANGUNAN MAL DAN HOTEL

DI JALAN MALIOBORO YOGYAKARTA

-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR FUCTION HALL
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
FUCTION HALL
I PEKERJAAN DINDING

1 Backing Dengan Rangka Hollow Galvanized m² 710.92 165,000.00 117,301,800.00


40x40x0.6 mm dan Multipleks 9mm
2 Panel Kombinasi Pada Dinding Section A m² 208.25 1,200,000.00 249,900,000.00
3 Panel Kombinasi Pada Dinding Section B m² 180.41 1,200,000.00 216,492,000.00
4 Panel Kombinasi Pada Dinding Section C m² 107.45 1,075,000.00 115,508,750.00
5 Panel Kombinasi Pada Dinding Section D m² 107.45 1,075,000.00 115,508,750.00
6 Panel Kombinasi Pada Kolom m² 71.82 3,000,000.00 215,460,000.00
7 Skirting 10 cm m' 86.88 60,000.00 5,212,971.43

II PEKERJAAN PLAFON
1 Plafond Gypsum m² 430.00 130,000.00 55,900,000.00
2 Drop Plafond m' 134.00 325,000.00 43,550,000.00
3 Cat Plafond m² 430.00 25,000.00 10,750,000.00
4 Decorative Lampu & Dudukan Lampu set 4.00 4,207,500.00 16,830,000.00
Plywood 15mm m1 7.90 75,000.00 592,500.00
plat 5mm m1 7.90 100,000.00 790,000.00
Alabastar 3mm m1 7.90 250,000.00 1,975,000.00
Alat Bantu ls 1.00 350,000.00 350,000.00
Upah ls 1.00 500,000.00 500,000.00
Total 4,207,500.00
III PEKERJAAN PINTU
1 Pintu termasuk hardware set 4.00 8,500,000.00 34,000,000.00

TOTAL 1,204,829,271.43
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR FUCTION HALL
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
PRE FUCTION HALL
I PEKERJAAN DINDING

1 Backing Dengan Rangka Hollow Galvanized m² 710.92 165,000.00 117,301,800.00


40x40x0.6 mm dan Multipleks 9mm

2 Decorative Door Opening m² 29.18 1,200,000.00 35,020,800.00


3 Decorative Kolom Bulat m² 22.78 1,625,000.00 37,017,500.00
4 Panel Tipe 1 A m² 27.29 1,075,000.00 29,336,750.00
5 Cover Kolom Kotak m² 26.83 3,000,000.00 80,484,000.00
6 Panel Tipe 2 A m² 16.44 1,075,000.00 17,673,000.00
7 Panel Section A-A m² 26.04 1,075,000.00 27,993,000.00
8 Panel Section B-B m² 23.82 1,075,000.00 25,606,500.00
9 Panel Section C-C m² 15.70 1,075,000.00 16,877,500.00
10 Panel Section D-D m² 28.38 1,075,000.00 30,508,500.00
11 Skirting 10 cm m' 112.51 60,000.00 6,750,600.00

II PEKERJAAN PLAFON
1 Plafond Gypsum m² 307.74 130,000.00 40,006,200.00
2 Drop Plafond 1 m' 62.73 120,000.00 7,527,744.00
3 Drop Plafond 2 m' 12.68 120,000.00 1,521,600.00
4 Cat Plafond m² 383.15 25,000.00 9,578,780.00

III PEKERJAAN PINTU


1 Pintu termasuk hardware set 4.00 6,000,000.00 24,000,000.00

IV PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Finishing Lantai m² 307.74 175,000.00 53,854,500.00
( material gani marble by owner )

TOTAL 561,058,774.00
PEMBANGUNAN MAL DAN HOTEL

DI JALAN MALIOBORO YOGYAKARTA


-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR MEEETING ROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
PRE-FUCTION MEETING ROOM
A PEKERJAAN SIPIL
I PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Finishing Lantai m² 240.79 175,000.00 42,138,250.00
( material gani marble by owner )
2 Pasangan HT m² 45.08 455,000.00 20,511,400.00
3 Raise Floor m² 4.98 2,486,000.00 12,380,280.00
Bahan
- Panel Raised floor calcium, Stringer, Padestal m2 1.00
2,300,000.00 2,300,000.00
- Panel Lifter m2 0.01 1,600,000.00 16,000.00
- Cushion rubber m2 1.00 25,000.00 25,000.00
Upah dan Alat Bantu -
- Upah Pasang ls 1.00 125,000.00 125,000.00
- Alat Bantu ls 1.00 20,000.00 20,000.00
2,486,000.00

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING

1 Backing Dengan Rangka Hollow Galvanized m² 481.45 165,000.00 79,439,910.00


40x40x0.6 mm dan Multipleks 9mm

2 Wall Paper m² 25.09 450,000.00 11,289,600.00


3 Kombinasi Panel 1 A m² 54.00 1,075,000.00 58,050,000.00
4 Kombinasi Panel 2 A m² 43.98 1,075,000.00 47,278,500.00
5 Kombinasi Panel 3 A bh 17.38 1,075,000.00 18,679,200.00
6 Brick and Painted 4 m² 4.46 1,075,000.00 4,794,500.00
7 Kombinasi Panel 5 A m² 9.63 1,075,000.00 10,352,250.00
8 Kombinasi Panel 7 A m² 10.78 1,075,000.00 11,588,500.00
9 Kombinasi Panel 8 A m² 30.43 1,075,000.00 32,712,250.00
10 Kombinasi Panel 9 A m² 1.50 1,075,000.00 1,612,500.00
11 Kombinasi Panel 10 A m² 13.27 1,075,000.00 14,265,250.00
12 Kombinasi Panel 11 A m² 12.89 1,075,000.00 13,856,750.00
Kombinasi Panel 12 A Inclede Door and
13 m² 18.20 2,100,000.00 38,220,000.00
Hardware
14 Grey Mirror m² 22.60 1,500,000.00 33,900,000.00
15 Painted Glass m² 1.74 1,500,000.00 2,610,000.00
16 Skirting 10 cm m' 215.51 60,000.00 12,930,600.00

II PEKERJAAN PLAFON
1 Plafond Gypsum m² 285.88 130,000.00 37,164,400.00
2 Cat Plafond m² 285.88 25,000.00 7,147,000.00

III PEKERJAAN FIX FURNITURE


1 Table Bar unit 1.00 1,250,000.00 1,250,000.00
2 Hanging Bar unit 1.00 20,000,000.00 20,000,000.00
3 Stair and Railing m' 14.53 7,978,825.25 115,932,330.90
1. Alat Bahan dan Upah (Stair)
- HT ex roman m2 1.20 217,500.00 261,000.00
- AM Tile Adhesive zak 0.65 120,000.00 78,000.00
- AM Tile Grout kg 0.21 18,000.00 3,780.00
- Marmer New Ariston m2 1.20 2,500,000.00 3,000,000.00
- Pasir Pasang m3 0.03 300,000.00 9,600.00
- Semen zak 0.28 46,500.00 12,787.50
- Alat Bantu ls 1.00 30,000.00 30,000.00
- Upah ls 1.00 135,000.00 135,000.00
Total per m2 3,530,167.50
total 21,08m2 74,415,930.90
2. Alat Bahan dan Upah (Railing)
- Railing Stainless Fin Hpl Ex lamitax m1 25.50 910,000.00 23,205,000.00
- Hollow Steel 4x6 Fin Black colour m1 257.50 25,000.00 6,437,500.00
- Rialing hollow 2x4 fin coating m1 32.50 20,000.00 650,000.00
- Railing Fin Hpl Lamitak ls 3.72 240,000.00 892,800.00
- Grey Mirror Ex Asahimas m2 5.09 650,000.00 3,311,100.00
- Clear Glass 12mm ex asahimas m2 10.80 650,000.00 7,020,000.00
Total 41,516,400.00

TOTAL 817,584,536.80
PEMBANGUNAN MAL DAN HOTEL

DI JALAN MALIOBORO YOGYAKARTA


-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR MEEETING ROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
MEETING ROOM 1
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized
1 m² 71.17 165,000.00 11,742,720.00
40x40x0.6 mm dan Multipleks 9mm
2 Tampak Section A-A m² 25.98 1,075,000.00 27,932,800.00
3 Tampak Section B-B, Include Hardware m² 25.98 1,500,000.00 38,976,000.00
4 Tampak Section C-C m² 19.20 1,075,000.00 20,640,000.00
5 Tampak Section D-D m² 19.20 1,075,000.00 20,640,000.00
6 Skirting 10 cm m' 21.32 60,000.00 1,279,200.00

II PEKERJAAN PLAFON
1 Plafond Gypsum m² 54.00 130,000.00 7,020,000.00
2 Cat Plafond m² 54.00 25,000.00 1,350,000.00

TOTAL 129,580,720.00
PEMBANGUNAN MAL DAN HOTEL

DI JALAN MALIOBORO YOGYAKARTA


-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR MEEETING ROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
MEETING ROOM 2&3
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized
1 m² 71.04 165,000.00 11,721,600.00
40x40x0.6 mm dan Multipleks 9mm
2 Tampak Section A-A m² 25.92 1,075,000.00 27,864,000.00
3 Tampak Section B-B, Include Hardware m² 25.92 1,500,000.00 38,880,000.00
4 Tampak Section C-C m² 19.20 1,075,000.00 20,640,000.00
5 Tampak Section D-D m² 19.20 1,075,000.00 20,640,000.00
6 Skirting 10 cm m' 21.40 60,000.00 1,284,000.00

II PEKERJAAN PLAFON
1 Plafond Gypsum m² 54.00 130,000.00 7,020,000.00
2 Cat Plafond m² 54.00 25,000.00 1,350,000.00

TOTAL 129,399,600.00
PEMBANGUNAN MAL DAN HOTEL

DI JALAN MALIOBORO YOGYAKARTA


-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR MEEETING ROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
MEETING ROOM 4
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized
1 m² 65.76 165,000.00 10,850,400.00
40x40x0.6 mm dan Multipleks 9mm
2 Tampak Section A-A m² 25.09 1,075,000.00 26,969,600.00
3 Tampak Section B-B, Include Hardware m² 25.09 1,500,000.00 37,632,000.00
4 Tampak Section C-C m² 15.58 1,075,000.00 16,752,800.00
5 Tampak Section D-D m² 15.58 1,075,000.00 16,752,800.00
6 Skirting 10 cm m' 17.48 60,000.00 1,048,800.00

II PEKERJAAN PLAFON
1 Plafond Gypsum m² 44.00 130,000.00 5,720,000.00
2 Cat Plafond m² 44.00 25,000.00 1,100,000.00

TOTAL 116,826,400.00
PEMBANGUNAN MAL DAN HOTEL

DI JALAN MALIOBORO YOGYAKARTA


-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR ALL DINNING
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
DINNING ROOM
A PEKERJAAN SIPIL
I PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Finishing Lantai m² 591.52 175,000.00 103,516,000.00
( material gani marble by owner )

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING

1 Backing Dengan Rangka Hollow Galvanized m² 591.52 165,000.00 97,600,800.00


40x40x0.6 mm dan Multipleks 9mm

2 Kombinasi Panel 1 A m² 11.12 1,325,000.00 14,734,000.00


3 Kombinasi Panel 2 A m² 39.84 1,325,000.00 52,788,000.00
4 Kombinasi Panel 3 A bh 21.28 1,325,000.00 28,196,000.00
5 Brick and Painted 8 A m² 13.82 1,325,000.00 18,311,500.00
6 Kombinasi Panel 9 A m² 25.41 1,325,000.00 33,668,250.00
7 Kombinasi Panel 7 A m² 10.78 1,325,000.00 14,283,500.00
8 Kombinasi Panel 8 A m² 30.43 1,325,000.00 40,319,750.00
9 Kombinasi Panel 9 A m² 3.86 1,325,000.00 5,114,500.00
10 Kombinasi Panel Sliding 1 m² 40.32 1,500,000.00 60,480,000.00
11 Kombinasi Panel Sliding 2 m² 10.30 1,500,000.00 15,450,000.00
12 Box sliding m² 5.17 3,000,000.00 15,510,000.00
13 Grey Mirror m² 6.16 1,500,000.00 9,240,000.00
14 Sytetic Grass m² 6.91 300,000.00 2,073,000.00
15 Blue Glass m² 11.87 1,500,000.00 17,805,000.00
16 Skirting 10 cm m' 100.32 60,000.00 6,019,200.00

II PEKERJAAN PLAFON
1 Plafond Gypsum m² 591.52 130,000.00 76,897,600.00
2 Cat Plafond m² 591.52 25,000.00 14,788,000.00

III PEKERJAAN FIX FURNITURE


1 Kitchen Set unit 1.00 70,000,000.00 70,000,000.00
2 Reception Table unit 1.00 12,500,000.00 12,500,000.00

TOTAL 709,295,100.00
PEMBANGUNAN MAL DAN HOTEL

DI JALAN MALIOBORO YOGYAKARTA


-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR ALL DINNING
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
FOYER LT.7
A PEKERJAAN SIPIL
I PEKERJAAN LANTAI
1 Pasangan Roman Granit GT-60211R m² 44.44 455,000.00 20,220,200.00
2 Pasangan Roman Granit GT-605509R m² 10.77 455,000.00 4,900,350.00
3 Pasangan Vynil m² 12.00 325,000.00 3,900,000.00

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING

1 Backing Dengan Rangka Hollow Galvanized m² 328.13 165,000.00 54,141,450.00


40x40x0.6 mm dan Multipleks 9mm

2 Kombinasi Panel 1 A m² 8.57 1,075,000.00 9,212,750.00


3 Kombinasi Panel 2,3,7 & 8 ; A m² 34.87 1,075,000.00 37,485,250.00
4 Kombinasi Panel 4 A bh 7.39 1,900,000.00 14,041,000.00
5 Brick and Painted 5 A m² 28.20 2,500,000.00 70,500,000.00
6 Kombinasi Panel 6 A m² 10.59 1,075,000.00 11,384,250.00
7 Kombinasi Panel 9 A m² 18.19 1,200,000.00 21,828,000.00
8 Kombinasi Panel 10 A m² 15.15 1,075,000.00 16,286,250.00
9 Kombinasi Panel 11 A m² 18.07 1,075,000.00 19,425,250.00
10 Kombinasi Panel 12 A m² 5.64 3,100,000.00 17,484,000.00
11 Kombinasi Panel 13 A m² 27.77 1,075,000.00 29,852,750.00
12 Kombinasi Panel 14 A m² 10.91 1,075,000.00 11,728,250.00
13 Grey Mirror m² 9.24 1,500,000.00 13,860,000.00
14 Aluminium Powder Coating m' 15.24 150,000.00 2,286,000.00
15 Marble m² 9.60 2,500,000.00 24,000,000.00
16 Panel Laser Cut m² 4.80 700,000.00 3,360,000.00
17 Wall Paper m² 28.13 450,000.00 12,658,500.00
18 Pintu Kaca bh 2.00 4,500,000.00 9,000,000.00
19 Skirting 10 cm m' 73.77 60,000.00 4,426,200.00

II PEKERJAAN PLAFON
1 Plafond Gypsum m² 96.86 130,000.00 12,591,800.00
2 Cat Plafond m² 96.86 25,000.00 2,421,500.00

TOTAL 426,993,750.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TYPICAL DOUBLE BEDROOM T1
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
Pasangan Dinding Bata Ringan termasuk kolom praktis, sloof
1 dan ring balok m² 10.33 220,000.00 2,271,500

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 24.79 165,000.00 4,089,525.00
dan Multipleks 9mm
2 Wallpaper m² 23.30 450,000.00 10,485,000.00
3 Plywood Lapis HPL Kombinasi m² 15.69 550,000.00 8,626,750.00
4 Plywood Lapis Grey Mirror m² 2.89 1,500,000.00 4,335,000.00
5 Plywood Lapis White Painted Glass m² 3.00 1,500,000.00 4,500,000.00
6 Dinding Lapis Solid Surface m² 1.13 2,000,000.00 2,250,000.00
7 Dinding Kaca Kamar Mandi m² 2.07 875,000.00 1,811,250.00
8 Skirting 10 cm m' 20.85 60,000.00 1,251,000.00

II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00

III PEKERJAAN LANTAI


1 Lantai Foyer m² 4.96 2,150,000.00 10,664,000.00

IV FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,550,000.00 3,550,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
5 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
6 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00

TOTAL 1 Kamar 99,499,025.00

Page 17 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TYPICAL TWIN BEDROOM T1
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
Pasangan Dinding Bata Ringan termasuk kolom praktis, sloof
1 dan ring balok m² 10.33 220,000.00 2,271,500

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 24.79 165,000.00 4,089,525
dan Multipleks 9mm
2 Wallpaper m² 23.30 450,000.00 11,153,250.00
3 Plywood Lapis HPL Kombinasi m² 15.69 550,000.00 12,815,000.00
4 Plywood Lapis Grey Mirror m² 2.89 1,500,000.00 4,335,000.00
5 Plywood Lapis White Painted Glass m² 3.00 1,500,000.00 4,335,000.00
6 Dinding Lapis Solid Surface m² 1.13 2,000,000.00 6,000,000.00
7 Dinding Kaca Kamar Mandi m² 2.07 875,000.00 984,375.00
8 Skirting 10 cm m' 20.85 60,000.00 1,251,000.00

II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00

III PEKERJAAN LANTAI


1 Lantai Foyer m² 4.96 2,150,000.00 10,664,000.00

IV FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
5 Bed Head include Bed Site Table unit 1.00 5,375,000.00 5,375,000.00
6 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00

TOTAL 1 Kamar 107,608,650.00

Page 18 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TYPICAL DOUBLE BEDROOM T2
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
Pasangan Dinding Bata Ringan termasuk kolom praktis, sloof
1 dan ring balok m² 8.93 220,000.00 1,963,500

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 23.64 165,000.00 3,899,775.00
dan Multipleks 9mm
2 Wallpaper m² 23.95 450,000.00 10,777,500.00
3 Plywood Lapis HPL Kombinasi m² 15.69 550,000.00 8,626,750.00
4 Plywood Lapis Grey Mirror m² 3.83 1,500,000.00 5,737,500.00
5 Plywood Lapis White Painted Glass m² 3.00 1,500,000.00 4,500,000.00
6 Dinding Lapis Solid Surface m² 1.13 2,000,000.00 2,250,000.00
7 Dinding Kaca Kamar Mandi m² 2.07 875,000.00 1,811,250.00
8 Skirting 10 cm m' 24.58 60,000.00 1,474,800.00

II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00

III PEKERJAAN LANTAI


1 Lantai Foyer m² 7.18 2,150,000.00 15,437,000.00

IV FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
2 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
3 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00

TOTAL 1 Kamar 105,988,075.00

Page 19 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TYPICAL DOUBLE BEDROOM T3
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
Pasangan Dinding Bata Ringan termasuk kolom praktis, sloof
1 dan ring balok m² 10.33 220,000.00 2,271,500

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 dan Multipleks 9mm m² 23.64 165,000.00 3,899,775.00
2 Wallpaper m² 40.64 450,000.00 18,288,000.00
3 Plywood Lapis HPL Kombinasi m² 15.69 550,000.00 8,626,750.00
4 Plywood Lapis Grey Mirror m² 3.83 1,500,000.00 5,737,500.00
5 Plywood Lapis White Painted Glass m² 3.00 1,500,000.00 4,500,000.00
6 Dinding Lapis Solid Surface m² 1.13 2,000,000.00 2,250,000.00
7 Dinding Kaca Kamar Mandi m² 2.07 875,000.00 1,811,250.00
8 Skirting 10 cm m' 35.38 60,000.00 2,122,800.00

II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00

III PEKERJAAN LANTAI


1 Lantai Foyer m² 10.19 2,150,000.00 21,908,500.00

IV FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
5 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
6 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00
7 TV Panel FF-6501 unit 1.00 4,150,000.00 4,150,000.00

TOTAL 1 Kamar 125,076,075.00

Page 20 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TYPICAL DOUBLE BEDROOM T4
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
Pasangan Dinding Bata Ringan termasuk kolom praktis, sloof
1 dan ring balok m² 12.08 220,000.00 2,656,500

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 15.04 165,000.00 2,481,039.00
dan Multipleks 9mm
2 Wallpaper m² 29.36 450,000.00 13,212,000.00
3 Plywood Lapis HPL Kombinasi m² 15.69 550,000.00 8,626,750.00
4 Plywood Lapis Grey Mirror m² 3.83 1,500,000.00 5,737,500.00
5 Plywood Lapis White Painted Glass m² 3.00 1,500,000.00 4,500,000.00
6 Dinding Lapis Solid Surface m² 1.13 2,000,000.00 2,250,000.00
7 Dinding Kaca Kamar Mandi m² 2.07 875,000.00 1,811,250.00
8 Skirting 10 cm m' 8.00 60,000.00 480,000.00

II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00

III PEKERJAAN LANTAI


1 Lantai Foyer m² 12.88 2,150,000.00 27,692,000.00

IV FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
5 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
6 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00

TOTAL 1 Kamar 118,957,039.00

Page 21 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TYPICAL DOUBLE BEDROOM T5
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
Pasangan Dinding Bata Ringan termasuk kolom praktis, sloof
1 dan ring balok m² 15.23 220,000.00 3,349,500

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 28.25 165,000.00 4,661,167.50
dan Multipleks 9mm
2 Wallpaper m² 36.42 450,000.00 16,389,000.00
3 Plywood Lapis HPL Kombinasi m² 18.82 550,000.00 10,352,100.00
4 Plywood Lapis Grey Mirror m² 4.59 1,500,000.00 6,885,000.00
5 Plywood Lapis White Painted Glass m² 3.60 1,500,000.00 5,400,000.00
6 Dinding Lapis Solid Surface m² 1.24 2,000,000.00 2,475,000.00
7 Dinding Kaca Kamar Mandi m² 2.48 875,000.00 2,173,500.00
8 Skirting 10 cm m' 8.00 60,000.00 480,000.00

II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00

IV PEKERJAAN LANTAI
1 Lantai Foyer m² 12.11 2,150,000.00 26,036,500.00

V FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 + Bar Table unit 1.00 13,215,000.00 13,215,000.00
2 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
3 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00

TOTAL 1 Kamar 131,426,767.50

Page 22 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TYPICAL DOUBLE BEDROOM T6
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
Pasangan Dinding Bata Ringan termasuk kolom praktis, sloof
1 dan ring balok m² 5.25 220,000.00 1,155,000

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 28.25 165,000.00 4,661,167.50
dan Multipleks 9mm
2 Wallpaper m² 19.32 450,000.00 8,694,000.00
3 Plywood Lapis HPL Kombinasi m² 18.82 550,000.00 10,352,100.00
4 Plywood Lapis Grey Mirror m² 4.59 1,500,000.00 6,885,000.00
5 Plywood Lapis White Painted Glass m² 3.60 1,500,000.00 5,400,000.00
6 Dinding Lapis Solid Surface m² 1.24 2,000,000.00 2,475,000.00
7 Dinding Kaca Kamar Mandi m² 2.48 875,000.00 2,173,500.00
8 Skirting 10 cm m' 25.66 60,000.00 1,539,600.00

II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00

IV PEKERJAAN LANTAI
1 Lantai Foyer m² 4.45 2,150,000.00 9,567,500.00

V FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
2 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
3 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00

TOTAL 1 Kamar 102,412,867.50

Page 23 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TOILET TYPICAL DOUBLE BEDROOM T1 & T2

A PEKERJAAN SIPIL
I PEKERJAAN DINDING

1 Pasangan Dinding Bata Ringan termasuk m² 1.78 220,000.00 390,720.00


kolom praktis, sloof dan ring balok

II PEKERJAAN LANTAI
1 Screeding m² 4.74 82,000.00 388,680.00
2 Waterproofing m² 8.06 125,000.00 1,007,562.50

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
1 Dinding Homogenous Tile m² 16.17 455,000.00 7,357,350.00
2 Dinding Kaca m² 1.10 850,000.00 935,000.00

II PEKERJAAN PINTU
Pintu Shower termasuk handle TX 10 B dan
1 asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
Pintu Closet termasuk handle TX 10 B dan
2 dan asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )

III PEKERJAAN LANTAI


1 Lantai Homogenous Tile m² 4.74 455,000.00 2,156,700.00

IV FURNITURE
1 Meja Wastafel unit 1.00 8,375,000.00 8,375,000.00
2 Cermin unit 2.00 650,000.00 1,300,000.00

V UPAH PASANG SANITARY


1 Wastafel Dan Kran unit 1.00 210,000.00 210,000.00
3 Shower unit 1.00 170,000.00 170,000.00
4 Closet unit 1.00 260,000.00 260,000.00
5 Jet Washer unit 1.00 45,000.00 45,000.00
6 Floor Drain unit 2.00 45,000.00 90,000.00
7 Paper Holder unit 1.00 45,000.00 45,000.00
8 Towel Rack unit 1.00 45,000.00 45,000.00
9 Robe Hook unit 1.00 45,000.00 45,000.00
10 Clean Out unit 1.00 45,000.00 45,000.00
11 Tempat Sabun unit 1.00 45,000.00 45,000.00

TOTAL 38,911,012.50
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TOILET TYPICAL DOUBLE BEDROOM T3

A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Pasangan Dinding Bata Ringan termasuk m² 2.89 220,000.00 634,920.00
kolom praktis, sloof dan ring balok

II PEKERJAAN LANTAI
1 Screeding m² 6.92 82,000.00 567,440.00
2 Waterproofing m² 17.11 125,000.00 2,138,750.00

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
1 Dinding Homogenous Tile m² 25.35 455,000.00 11,534,250.00
2 Dinding Kaca m² 2.25 850,000.00 1,912,500.00

II PEKERJAAN PINTU
Pintu Shower termasuk handle TX 10 B dan
1 asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
Pintu Closet termasuk handle TX 10 B dan
2 dan asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )

III PEKERJAAN LANTAI


1 Lantai Homogenous Tile m² 6.92 455,000.00 3,148,600.00

IV FURNITURE
1 Meja Wastafel unit 1.00 8,375,000.00 8,375,000.00
2 Cermin unit 1.00 650,000.00 650,000.00

V UPAH PASANG SANITARY


1 Wastafel Dan Kran unit 1.00 210,000.00 210,000.00
3 Shower unit 1.00 170,000.00 170,000.00
4 Closet unit 1.00 260,000.00 260,000.00
5 Jet Washer unit 1.00 45,000.00 45,000.00
6 Floor Drain unit 2.00 45,000.00 90,000.00
7 Paper Holder unit 1.00 45,000.00 45,000.00
8 Towel Rack unit 1.00 45,000.00 45,000.00
9 Robe Hook unit 1.00 45,000.00 45,000.00
10 Clean Out unit 1.00 45,000.00 45,000.00
11 Tempat Sabun unit 1.00 45,000.00 45,000.00
12 Bathup unit 1.00 3,000,000.00 3,000,000.00
13 Four Hole Lever Bathup unit 1.00 250,000.00 250,000.00

TOTAL 49,211,460.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TOILET TYPICAL DOUBLE BEDROOM T4

A PEKERJAAN SIPIL
I PEKERJAAN DINDING
Pasangan Dinding Bata Ringan termasuk
1 kolom praktis, sloof dan ring balok m² 2.22 220,000.00 488,400.00

II PEKERJAAN LANTAI
1 Screeding m² 5.80 82,000.00 475,600.00
2 Waterproofing m² 14.61 125,000.00 1,826,250.00

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
1 Dinding Homogenous Tile m² 21.92 455,000.00 9,973,600.00
2 Dinding Kaca m² 1.10 850,000.00 935,000.00

II PEKERJAAN PINTU
Pintu Shower termasuk handle TX 10 B dan
1 asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
Pintu Closet termasuk handle TX 10 B dan
2 dan asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )

IV PEKERJAAN LANTAI
1 Lantai Homogenous Tile m² 5.80 455,000.00 2,639,000.00

V FURNITURE
1 Meja Wastafel unit 1.00 8,375,000.00 8,375,000.00
2 Cermin unit 2.00 650,000.00 1,300,000.00

VI UPAH PASANG SANITARY


1 Wastafel Dan Kran unit 1.00 210,000.00 210,000.00
3 Shower unit 1.00 170,000.00 170,000.00
4 Closet unit 1.00 260,000.00 260,000.00
5 Jet Washer unit 1.00 45,000.00 45,000.00
6 Floor Drain unit 2.00 45,000.00 90,000.00
7 Paper Holder unit 1.00 45,000.00 45,000.00
8 Towel Rack unit 1.00 45,000.00 45,000.00
9 Robe Hook unit 1.00 45,000.00 45,000.00
10 Clean Out unit 1.00 45,000.00 45,000.00
11 Tempat Sabun unit 1.00 45,000.00 45,000.00

TOTAL 43,012,850.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TOILET TYPICAL DOUBLE BEDROOM T5

A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Pasangan Dinding Bata Ringan termasuk m² 2.22 220,000.00 488,400.00
kolom praktis, sloof dan ring balok

II PEKERJAAN LANTAI
1 Screeding m² 7.25 82,000.00 594,500.00
2 Waterproofing m² 13.67 125,000.00 1,708,750.00

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
1 Dinding Homogenous Tile m² 20.50 455,000.00 9,327,500.00
2 Dinding Kaca m² 8.24 850,000.00 7,004,000.00

II PEKERJAAN PINTU
Pintu Shower termasuk handle TX 10 B dan
1 asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
Pintu Closet termasuk handle TX 10 B dan
2 dan asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )

IV PEKERJAAN LANTAI
1 Lantai Homogenous Tile m² 7.25 455,000.00 3,298,750.00

V FURNITURE
1 Meja Wastafel unit 1.00 8,375,000.00 8,375,000.00
2 Cermin unit 2.00 650,000.00 1,300,000.00

VI UPAH PASANG SANITARY


1 Wastafel Dan Kran unit 1.00 210,000.00 210,000.00
3 Shower unit 1.00 170,000.00 170,000.00
4 Closet unit 1.00 260,000.00 260,000.00
5 Jet Washer unit 1.00 45,000.00 45,000.00
6 Floor Drain unit 2.00 45,000.00 90,000.00
7 Paper Holder unit 1.00 45,000.00 45,000.00
8 Towel Rack unit 1.00 45,000.00 45,000.00
9 Robe Hook unit 1.00 45,000.00 45,000.00
10 Clean Out unit 1.00 45,000.00 45,000.00
11 Tempat Sabun unit 1.00 45,000.00 45,000.00

TOTAL 49,096,900.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TOILET TYPICAL DOUBLE BEDROOM T6

A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Pasangan Dinding Bata Ringan termasuk m² 2.44 220,000.00 537,240.00
kolom praktis, sloof dan ring balok

II PEKERJAAN LANTAI
1 Screeding m² 6.43 82,000.00 527,260.00
2 Waterproofing m² 12.41 125,000.00 1,551,250.00

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
1 Dinding Homogenous Tile m² 18.62 455,000.00 8,472,100.00
2 Dinding Kaca m² 1.34 850,000.00 1,139,000.00

II PEKERJAAN PINTU
Pintu Shower termasuk handle TX 10 B dan
1 asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
Pintu Closet termasuk handle TX 10 B dan
2 dan asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )

IV PEKERJAAN LANTAI
1 Lantai Homogenous Tile m² 6.43 455,000.00 2,925,650.00

V FURNITURE
1 Meja Wastafel unit 1.00 8,375,000.00 8,375,000.00
2 Cermin unit 2.00 650,000.00 1,300,000.00

VI UPAH PASANG SANITARY


1 Wastafel Dan Kran unit 1.00 210,000.00 210,000.00
3 Shower unit 1.00 170,000.00 170,000.00
4 Closet unit 1.00 260,000.00 260,000.00
5 Jet Washer unit 1.00 45,000.00 45,000.00
6 Floor Drain unit 2.00 45,000.00 90,000.00
7 Paper Holder unit 1.00 45,000.00 45,000.00
8 Towel Rack unit 1.00 45,000.00 45,000.00
9 Robe Hook unit 1.00 45,000.00 45,000.00
10 Clean Out unit 1.00 45,000.00 45,000.00
11 Tempat Sabun unit 1.00 45,000.00 45,000.00

TOTAL 41,827,500.00
PEMBANGUNAN MAL DAN HOTEL

DI JALAN MALIOBORO YOGYAKARTA


-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR KORIDOR & LOBBY LIFT
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
KORIDOR LANTAI 4
I PEKERJAAN DINDING

1 Backing Dengan Rangka Hollow Galvanized m² 308.25 165,000.00 50,861,250.00


40x40x0.6 mm dan Multipleks 9mm

2 Wallpaper m² 277.97 450,000.00 125,086,500.00


3 Plywood Lapis HPL Kombinasi Pada Lobby Lift m² 30.28 550,000.00 16,654,000.00
4 Skirting 10 cm m' 153.31 60,000.00 9,198,600.00

II PEKERJAAN PINTU SHAFT


1 Pintu Shaft W2 bh 14.00 3,350,000.00 46,900,000.00
2 Pintu Shaft W3 bh 13.00 3,525,000.00 45,825,000.00

TOTAL 294,525,350.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR KORIDOR & LOBBY LIFT
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
KORIDOR LANTAI 5
I PEKERJAAN DINDING

Backing Dengan Rangka Hollow Galvanized


1 40x40x0.6 mm dan Multipleks 9mm m² 308.25 165,000.00 50,861,250.00

2 Wallpaper m² 277.97 450,000.00 125,086,500.00


3 Plywood Lapis HPL Kombinasi Pada Lobby Lift m² 30.28 550,000.00 16,654,000.00
4 Skirting 10 cm m' 153.31 60,000.00 9,198,600.00

II PEKERJAAN PINTU SHAFT


1 Pintu Shaft W2 bh 14.00 3,350,000.00 46,900,000.00
2 Pintu Shaft W3 bh 13.00 3,525,000.00 45,825,000.00

TOTAL 294,525,350.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR KORIDOR & LOBBY LIFT
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
KORIDOR LANTAI 6
I PEKERJAAN DINDING

Backing Dengan Rangka Hollow Galvanized


1 40x40x0.6 mm dan Multipleks 9mm m² 523.40 165,000.00 86,361,000.00

2 Wallpaper m² 493.12 450,000.00 221,904,000.00


3 Plywood Lapis HPL Kombinasi Pada Lobby Lift m² 30.28 550,000.00 16,654,000.00
4 Skirting 10 cm m' 218.24 60,000.00 13,094,400.00

II PEKERJAAN PINTU SHAFT


1 Pintu Shaft W2 bh 17.00 3,350,000.00 56,950,000.00
2 Pintu Shaft W3 bh 18.00 3,525,000.00 63,450,000.00

TOTAL 458,413,400.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR KORIDOR & LOBBY LIFT
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
KORIDOR LANTAI 7
I PEKERJAAN DINDING

Backing Dengan Rangka Hollow Galvanized


1 40x40x0.6 mm dan Multipleks 9mm m² 338.20 165,000.00 55,803,000.00

2 Wallpaper m² 307.92 450,000.00 138,564,000.00


3 Plywood Lapis HPL Kombinasi Pada Lobby Lift m² 30.28 550,000.00 16,654,000.00
4 Skirting 10 cm m' 139.00 60,000.00 8,340,000.00

II PEKERJAAN PINTU SHAFT


1 Pintu Shaft W2 bh 12.00 3,350,000.00 40,200,000.00
2 Pintu Shaft W3 bh 11.00 3,525,000.00 38,775,000.00

TOTAL 298,336,000.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR KORIDOR & LOBBY LIFT
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
KORIDOR LANTAI 8
I PEKERJAAN DINDING

Backing Dengan Rangka Hollow Galvanized


1 40x40x0.6 mm dan Multipleks 9mm m² 338.20 165,000.00 55,803,000.00

2 Wallpaper m² 307.92 450,000.00 138,564,000.00


3 Plywood Lapis HPL Kombinasi Pada Lobby Lift m² 30.28 550,000.00 16,654,000.00
4 Skirting 10 cm m' 139.00 60,000.00 8,340,000.00

II PEKERJAAN PINTU SHAFT


1 Pintu Shaft W2 bh 12.00 3,350,000.00 40,200,000.00
2 Pintu Shaft W3 bh 11.00 3,525,000.00 38,775,000.00

TOTAL 298,336,000.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR TOILET PUBLIC
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TOILET PUBLIC LANTAI 1 / UG

A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Penebalan Dinding m² 5.33 220,000.00 1,172,160.00

II PEKERJAAN LANTAI
1 Screeding m² 23.18 82,000.00 1,900,760.00
2 Waterproofing m² 56.78 125,000.00 7,097,500.00

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING

1 Pekerjaan Pemasangan Finishing Dinding m² 75.22 175,000.00 13,163,500.00


( material gani marble by owner )

2 Grey Mirrow m² 3.27 1,500,000.00 4,905,000.00


3 Dinding Kaca Kubical termasuk asesoris m² 16.69 5,700,000.00 95,133,000.00

II PEKERJAAN PINTU
1 Pintu Closet termasuk handle dan asesoris m² 4.24 4,750,000.00 20,140,000.00

III PEKERJAAN PLAFON


1 Plafon Gypsum m² 23.18 130,000.00 3,013,400.00
2 Cuve Plafond m² 18.45 105,000.00 1,937,250.00
3 Cat Plafon m² 23.18 25,000.00 579,500.00

IV PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Finishing Lantai m² 23.18 175,000.00 4,056,500.00
( material gani marble by owner )

V FURNITURE
1 Meja Wastafel m² 6.46 2,120,000.00 13,695,200.00
2 Cermin unit 4.00 900,000.00 3,600,000.00

VI UPAH PASANG SANITARY


1 Wastafel Dan Kran unit 5.00 210,000.00 1,050,000.00
2 Closet unit 5.00 260,000.00 1,300,000.00
3 Urinal unit 2.00 260,000.00 520,000.00
4 Jet Washer unit 5.00 45,000.00 225,000.00
5 Floor Drain unit 5.00 45,000.00 225,000.00
6 Paper Holder unit 5.00 45,000.00 225,000.00
7 Robe Hook unit 5.00 45,000.00 225,000.00
8 Clean Out unit 4.00 45,000.00 180,000.00
9 Handrayer unit 2.00 45,000.00 90,000.00

TOTAL 174,433,770.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR TOILET PUBLIC
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TOILET PUBLIC LANTAI 4

A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Penebalan Dinding m² 10.66 220,000.00 2,344,320.00

II PEKERJAAN LANTAI
1 Screeding m² 33.43 82,000.00 2,741,260.00
2 Waterproofing m² 90.17 125,000.00 11,271,250.00

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING

1 Pekerjaan Pemasangan Finishing Dinding m² 108.39 175,000.00 18,968,250.00


( material gani marble by owner )

2 Grey Mirrow m² 2.53 1,500,000.00 3,795,000.00


3 Dinding Kaca Kubical termasuk asesoris m² 21.22 5,700,000.00 120,954,000.00

II PEKERJAAN PINTU
1 Pintu Closet termasuk handle dan asesoris unit 3.00 4,750,000.00 14,250,000.00

III PEKERJAAN PLAFON


1 Plafon Gypsum m² 33.43 130,000.00 4,345,900.00
2 Cuve Plafond m² 18.45 105,000.00 1,937,250.00
3 Cat Plafon m² 33.43 25,000.00 835,750.00

IV PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Finishing Lantai m² 33.43 175,000.00 5,850,250.00
( material gani marble by owner )

V FURNITURE
1 Meja Wastafel m² 7.10 2,120,000.00 15,052,000.00
2 Cermin unit 6.00 725,000.00 4,350,000.00

VI UPAH PASANG SANITARY


1 Wastafel Dan Kran unit 7.00 210,000.00 1,470,000.00
2 Closet unit 7.00 260,000.00 1,820,000.00
3 Urinal unit 3.00 260,000.00 780,000.00
4 Jet Washer unit 7.00 45,000.00 315,000.00
5 Floor Drain unit 12.00 45,000.00 540,000.00
6 Paper Holder unit 7.00 45,000.00 315,000.00
7 Robe Hook unit 7.00 45,000.00 315,000.00
8 Clean Out unit 6.00 45,000.00 270,000.00
9 Handrayer unit 2.00 45,000.00 90,000.00

TOTAL 212,610,230.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA

-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR TOILET PUBLIC
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017

UNIT RATE TOTAL


NO. ITEM PEKERJAAN SAT. QTY.
Rp Rp
TOILET PUBLIC LANTAI 7

A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Penebalan Dinding m² 10.66 220,000.00 2,344,320.00

II PEKERJAAN LANTAI
1 Screeding m² 33.43 82,000.00 2,741,260.00
2 Waterproofing m² 90.17 125,000.00 11,271,250.00

B PEKERJAAN INTERIOR
I PEKERJAAN DINDING

Pekerjaan Pemasangan Finishing Dinding


1 ( material gani marble by owner ) m² 108.39 175,000.00 18,968,250.00

2 Grey Mirrow m² 2.53 1,500,000.00 3,795,000.00


3 Dinding Kaca Kubical termasuk asesoris m² 21.22 5,700,000.00 120,954,000.00

II PEKERJAAN PINTU
1 Pintu Closet termasuk handle dan asesoris unit 3.00 4,750,000.00 14,250,000.00

III PEKERJAAN PLAFON


1 Plafon Gypsum m² 33.43 130,000.00 4,345,900.00
2 Cuve Plafond m² 18.45 105,000.00 1,937,250.00
3 Cat Plafon m² 33.43 25,000.00 835,750.00

IV PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Finishing Lantai m² 33.43 175,000.00 5,850,250.00
( material gani marble by owner )

V FURNITURE
1 Meja Wastafel m² 7.10 2,120,000.00 15,052,000.00
2 Cermin unit 6.00 725,000.00 4,350,000.00

VI UPAH PASANG SANITARY


1 Wastafel Dan Kran unit 7.00 210,000.00 1,470,000.00
2 Closet unit 7.00 260,000.00 1,820,000.00
3 Urinal unit 3.00 260,000.00 780,000.00
4 Jet Washer unit 7.00 45,000.00 315,000.00
5 Floor Drain unit 12.00 45,000.00 540,000.00
6 Paper Holder unit 7.00 45,000.00 315,000.00
7 Robe Hook unit 7.00 45,000.00 315,000.00
8 Clean Out unit 6.00 45,000.00 270,000.00
9 Handrayer unit 2.00 45,000.00 90,000.00
TOTAL 212,610,230.00