TOTAL KETERANGAN
No Item pekerjaan
( Rp )
VOLUME PEKERJAAN
BILL 1 PERSIAPAN
#REF!
JUMLAH #REF!
TOTAL #REF!
PERSIAPAN
Page 2 of 39
BILL OF QUANTITY NO. 1 - UNTUK PEKRJAAN PERSIAPAN
PERSIAPAN
Halaman 1 0
TOTAL 0
Page 3 of 39
REKAPITULASI AKHIR - TABEL UNIT
No
5 LANTAI 6 8.00
No
5 LANTAI 6 8.00
SUMMARY/1
413076839.xls Rekapitulasi akhir 4 / 4
EXECUTIVE
2.00
2.00
EXECUTIVE
6.00
6.00
JUMLAH 29,399,710,092.23
JUMLAH 32,339,681,101.45
JUMLAH 35,573,649,212
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR LOBBY UTAMA
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
II PEKERJAAN PLAFON
1 Plafond Gypsum m² 231.02 130,000.00 30,032,600.00
2 Decorative Lampu & Dudukan Lampu set 1.00 4,207,500.00 4,207,500.00
Plywood 15mm m1 7.90 75,000.00 592,500.00
plat 5mm m1 7.90 100,000.00 790,000.00
Alabastar 3mm m1 7.90 250,000.00 1,975,000.00
Alat Bantu ls 1.00 350,000.00 350,000.00
Upah ls 1.00 500,000.00 500,000.00
Total 4,207,500.00
3 Drop Plafond m' 21.50 325,000.00 6,987,500.00
4 Cat Plafond m² 231.02 25,000.00 5,775,500.00
TOTAL 585,933,911.00
PEMBANGUNAN MAL DAN HOTEL
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR FUCTION HALL
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
II PEKERJAAN PLAFON
1 Plafond Gypsum m² 430.00 130,000.00 55,900,000.00
2 Drop Plafond m' 134.00 325,000.00 43,550,000.00
3 Cat Plafond m² 430.00 25,000.00 10,750,000.00
4 Decorative Lampu & Dudukan Lampu set 4.00 4,207,500.00 16,830,000.00
Plywood 15mm m1 7.90 75,000.00 592,500.00
plat 5mm m1 7.90 100,000.00 790,000.00
Alabastar 3mm m1 7.90 250,000.00 1,975,000.00
Alat Bantu ls 1.00 350,000.00 350,000.00
Upah ls 1.00 500,000.00 500,000.00
Total 4,207,500.00
III PEKERJAAN PINTU
1 Pintu termasuk hardware set 4.00 8,500,000.00 34,000,000.00
TOTAL 1,204,829,271.43
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR FUCTION HALL
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
II PEKERJAAN PLAFON
1 Plafond Gypsum m² 307.74 130,000.00 40,006,200.00
2 Drop Plafond 1 m' 62.73 120,000.00 7,527,744.00
3 Drop Plafond 2 m' 12.68 120,000.00 1,521,600.00
4 Cat Plafond m² 383.15 25,000.00 9,578,780.00
IV PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Finishing Lantai m² 307.74 175,000.00 53,854,500.00
( material gani marble by owner )
TOTAL 561,058,774.00
PEMBANGUNAN MAL DAN HOTEL
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
II PEKERJAAN PLAFON
1 Plafond Gypsum m² 285.88 130,000.00 37,164,400.00
2 Cat Plafond m² 285.88 25,000.00 7,147,000.00
TOTAL 817,584,536.80
PEMBANGUNAN MAL DAN HOTEL
II PEKERJAAN PLAFON
1 Plafond Gypsum m² 54.00 130,000.00 7,020,000.00
2 Cat Plafond m² 54.00 25,000.00 1,350,000.00
TOTAL 129,580,720.00
PEMBANGUNAN MAL DAN HOTEL
II PEKERJAAN PLAFON
1 Plafond Gypsum m² 54.00 130,000.00 7,020,000.00
2 Cat Plafond m² 54.00 25,000.00 1,350,000.00
TOTAL 129,399,600.00
PEMBANGUNAN MAL DAN HOTEL
II PEKERJAAN PLAFON
1 Plafond Gypsum m² 44.00 130,000.00 5,720,000.00
2 Cat Plafond m² 44.00 25,000.00 1,100,000.00
TOTAL 116,826,400.00
PEMBANGUNAN MAL DAN HOTEL
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
II PEKERJAAN PLAFON
1 Plafond Gypsum m² 591.52 130,000.00 76,897,600.00
2 Cat Plafond m² 591.52 25,000.00 14,788,000.00
TOTAL 709,295,100.00
PEMBANGUNAN MAL DAN HOTEL
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
II PEKERJAAN PLAFON
1 Plafond Gypsum m² 96.86 130,000.00 12,591,800.00
2 Cat Plafond m² 96.86 25,000.00 2,421,500.00
TOTAL 426,993,750.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 24.79 165,000.00 4,089,525.00
dan Multipleks 9mm
2 Wallpaper m² 23.30 450,000.00 10,485,000.00
3 Plywood Lapis HPL Kombinasi m² 15.69 550,000.00 8,626,750.00
4 Plywood Lapis Grey Mirror m² 2.89 1,500,000.00 4,335,000.00
5 Plywood Lapis White Painted Glass m² 3.00 1,500,000.00 4,500,000.00
6 Dinding Lapis Solid Surface m² 1.13 2,000,000.00 2,250,000.00
7 Dinding Kaca Kamar Mandi m² 2.07 875,000.00 1,811,250.00
8 Skirting 10 cm m' 20.85 60,000.00 1,251,000.00
II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00
IV FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,550,000.00 3,550,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
5 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
6 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00
Page 17 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 24.79 165,000.00 4,089,525
dan Multipleks 9mm
2 Wallpaper m² 23.30 450,000.00 11,153,250.00
3 Plywood Lapis HPL Kombinasi m² 15.69 550,000.00 12,815,000.00
4 Plywood Lapis Grey Mirror m² 2.89 1,500,000.00 4,335,000.00
5 Plywood Lapis White Painted Glass m² 3.00 1,500,000.00 4,335,000.00
6 Dinding Lapis Solid Surface m² 1.13 2,000,000.00 6,000,000.00
7 Dinding Kaca Kamar Mandi m² 2.07 875,000.00 984,375.00
8 Skirting 10 cm m' 20.85 60,000.00 1,251,000.00
II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00
IV FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
5 Bed Head include Bed Site Table unit 1.00 5,375,000.00 5,375,000.00
6 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00
Page 18 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 23.64 165,000.00 3,899,775.00
dan Multipleks 9mm
2 Wallpaper m² 23.95 450,000.00 10,777,500.00
3 Plywood Lapis HPL Kombinasi m² 15.69 550,000.00 8,626,750.00
4 Plywood Lapis Grey Mirror m² 3.83 1,500,000.00 5,737,500.00
5 Plywood Lapis White Painted Glass m² 3.00 1,500,000.00 4,500,000.00
6 Dinding Lapis Solid Surface m² 1.13 2,000,000.00 2,250,000.00
7 Dinding Kaca Kamar Mandi m² 2.07 875,000.00 1,811,250.00
8 Skirting 10 cm m' 24.58 60,000.00 1,474,800.00
II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00
IV FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
2 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
3 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00
Page 19 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 dan Multipleks 9mm m² 23.64 165,000.00 3,899,775.00
2 Wallpaper m² 40.64 450,000.00 18,288,000.00
3 Plywood Lapis HPL Kombinasi m² 15.69 550,000.00 8,626,750.00
4 Plywood Lapis Grey Mirror m² 3.83 1,500,000.00 5,737,500.00
5 Plywood Lapis White Painted Glass m² 3.00 1,500,000.00 4,500,000.00
6 Dinding Lapis Solid Surface m² 1.13 2,000,000.00 2,250,000.00
7 Dinding Kaca Kamar Mandi m² 2.07 875,000.00 1,811,250.00
8 Skirting 10 cm m' 35.38 60,000.00 2,122,800.00
II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00
IV FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
5 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
6 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00
7 TV Panel FF-6501 unit 1.00 4,150,000.00 4,150,000.00
Page 20 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 15.04 165,000.00 2,481,039.00
dan Multipleks 9mm
2 Wallpaper m² 29.36 450,000.00 13,212,000.00
3 Plywood Lapis HPL Kombinasi m² 15.69 550,000.00 8,626,750.00
4 Plywood Lapis Grey Mirror m² 3.83 1,500,000.00 5,737,500.00
5 Plywood Lapis White Painted Glass m² 3.00 1,500,000.00 4,500,000.00
6 Dinding Lapis Solid Surface m² 1.13 2,000,000.00 2,250,000.00
7 Dinding Kaca Kamar Mandi m² 2.07 875,000.00 1,811,250.00
8 Skirting 10 cm m' 8.00 60,000.00 480,000.00
II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00
IV FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
5 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
6 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00
Page 21 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 28.25 165,000.00 4,661,167.50
dan Multipleks 9mm
2 Wallpaper m² 36.42 450,000.00 16,389,000.00
3 Plywood Lapis HPL Kombinasi m² 18.82 550,000.00 10,352,100.00
4 Plywood Lapis Grey Mirror m² 4.59 1,500,000.00 6,885,000.00
5 Plywood Lapis White Painted Glass m² 3.60 1,500,000.00 5,400,000.00
6 Dinding Lapis Solid Surface m² 1.24 2,000,000.00 2,475,000.00
7 Dinding Kaca Kamar Mandi m² 2.48 875,000.00 2,173,500.00
8 Skirting 10 cm m' 8.00 60,000.00 480,000.00
II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00
IV PEKERJAAN LANTAI
1 Lantai Foyer m² 12.11 2,150,000.00 26,036,500.00
V FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 + Bar Table unit 1.00 13,215,000.00 13,215,000.00
2 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
3 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00
Page 22 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
Backing Dengan Rangka Hollow Galvanized 40x40x0.6 mm
1 m² 28.25 165,000.00 4,661,167.50
dan Multipleks 9mm
2 Wallpaper m² 19.32 450,000.00 8,694,000.00
3 Plywood Lapis HPL Kombinasi m² 18.82 550,000.00 10,352,100.00
4 Plywood Lapis Grey Mirror m² 4.59 1,500,000.00 6,885,000.00
5 Plywood Lapis White Painted Glass m² 3.60 1,500,000.00 5,400,000.00
6 Dinding Lapis Solid Surface m² 1.24 2,000,000.00 2,475,000.00
7 Dinding Kaca Kamar Mandi m² 2.48 875,000.00 2,173,500.00
8 Skirting 10 cm m' 25.66 60,000.00 1,539,600.00
II PEKERJAAN PINTU
1 Pintu Sorong KM ( PS1) unit 1.00 7,250,000.00 7,250,000.00
2 Pintu Sorong KM ( PS2) unit 1.00 5,750,000.00 5,750,000.00
IV PEKERJAAN LANTAI
1 Lantai Foyer m² 4.45 2,150,000.00 9,567,500.00
V FURNITURE
1 Wardrobe FF-6311 unit 1.00 8,565,000.00 8,565,000.00
2 Minibar FF-6310 unit 1.00 3,845,000.00 3,845,000.00
3 Luggage Rack FF-6309 unit 1.00 1,875,000.00 1,875,000.00
4 Sink FF-6308 unit 1.00 9,500,000.00 9,500,000.00
2 Bed Head include Bed Site Table unit 1.00 5,175,000.00 5,175,000.00
3 Divider FF-6302 unit 1.00 7,550,000.00 7,550,000.00
Page 23 of 39
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
II PEKERJAAN LANTAI
1 Screeding m² 4.74 82,000.00 388,680.00
2 Waterproofing m² 8.06 125,000.00 1,007,562.50
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
1 Dinding Homogenous Tile m² 16.17 455,000.00 7,357,350.00
2 Dinding Kaca m² 1.10 850,000.00 935,000.00
II PEKERJAAN PINTU
Pintu Shower termasuk handle TX 10 B dan
1 asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
Pintu Closet termasuk handle TX 10 B dan
2 dan asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
IV FURNITURE
1 Meja Wastafel unit 1.00 8,375,000.00 8,375,000.00
2 Cermin unit 2.00 650,000.00 1,300,000.00
TOTAL 38,911,012.50
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Pasangan Dinding Bata Ringan termasuk m² 2.89 220,000.00 634,920.00
kolom praktis, sloof dan ring balok
II PEKERJAAN LANTAI
1 Screeding m² 6.92 82,000.00 567,440.00
2 Waterproofing m² 17.11 125,000.00 2,138,750.00
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
1 Dinding Homogenous Tile m² 25.35 455,000.00 11,534,250.00
2 Dinding Kaca m² 2.25 850,000.00 1,912,500.00
II PEKERJAAN PINTU
Pintu Shower termasuk handle TX 10 B dan
1 asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
Pintu Closet termasuk handle TX 10 B dan
2 dan asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
IV FURNITURE
1 Meja Wastafel unit 1.00 8,375,000.00 8,375,000.00
2 Cermin unit 1.00 650,000.00 650,000.00
TOTAL 49,211,460.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
Pasangan Dinding Bata Ringan termasuk
1 kolom praktis, sloof dan ring balok m² 2.22 220,000.00 488,400.00
II PEKERJAAN LANTAI
1 Screeding m² 5.80 82,000.00 475,600.00
2 Waterproofing m² 14.61 125,000.00 1,826,250.00
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
1 Dinding Homogenous Tile m² 21.92 455,000.00 9,973,600.00
2 Dinding Kaca m² 1.10 850,000.00 935,000.00
II PEKERJAAN PINTU
Pintu Shower termasuk handle TX 10 B dan
1 asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
Pintu Closet termasuk handle TX 10 B dan
2 dan asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
IV PEKERJAAN LANTAI
1 Lantai Homogenous Tile m² 5.80 455,000.00 2,639,000.00
V FURNITURE
1 Meja Wastafel unit 1.00 8,375,000.00 8,375,000.00
2 Cermin unit 2.00 650,000.00 1,300,000.00
TOTAL 43,012,850.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Pasangan Dinding Bata Ringan termasuk m² 2.22 220,000.00 488,400.00
kolom praktis, sloof dan ring balok
II PEKERJAAN LANTAI
1 Screeding m² 7.25 82,000.00 594,500.00
2 Waterproofing m² 13.67 125,000.00 1,708,750.00
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
1 Dinding Homogenous Tile m² 20.50 455,000.00 9,327,500.00
2 Dinding Kaca m² 8.24 850,000.00 7,004,000.00
II PEKERJAAN PINTU
Pintu Shower termasuk handle TX 10 B dan
1 asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
Pintu Closet termasuk handle TX 10 B dan
2 dan asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
IV PEKERJAAN LANTAI
1 Lantai Homogenous Tile m² 7.25 455,000.00 3,298,750.00
V FURNITURE
1 Meja Wastafel unit 1.00 8,375,000.00 8,375,000.00
2 Cermin unit 2.00 650,000.00 1,300,000.00
TOTAL 49,096,900.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR BEDROOM
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Pasangan Dinding Bata Ringan termasuk m² 2.44 220,000.00 537,240.00
kolom praktis, sloof dan ring balok
II PEKERJAAN LANTAI
1 Screeding m² 6.43 82,000.00 527,260.00
2 Waterproofing m² 12.41 125,000.00 1,551,250.00
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
1 Dinding Homogenous Tile m² 18.62 455,000.00 8,472,100.00
2 Dinding Kaca m² 1.34 850,000.00 1,139,000.00
II PEKERJAAN PINTU
Pintu Shower termasuk handle TX 10 B dan
1 asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
Pintu Closet termasuk handle TX 10 B dan
2 dan asesoris ( handle, engsel, door stopper & unit 1.00 8,000,000.00 8,000,000.00
karet sirip pintu )
IV PEKERJAAN LANTAI
1 Lantai Homogenous Tile m² 6.43 455,000.00 2,925,650.00
V FURNITURE
1 Meja Wastafel unit 1.00 8,375,000.00 8,375,000.00
2 Cermin unit 2.00 650,000.00 1,300,000.00
TOTAL 41,827,500.00
PEMBANGUNAN MAL DAN HOTEL
TOTAL 294,525,350.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR KORIDOR & LOBBY LIFT
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
TOTAL 294,525,350.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR KORIDOR & LOBBY LIFT
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
TOTAL 458,413,400.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR KORIDOR & LOBBY LIFT
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
TOTAL 298,336,000.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR KORIDOR & LOBBY LIFT
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
TOTAL 298,336,000.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR TOILET PUBLIC
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Penebalan Dinding m² 5.33 220,000.00 1,172,160.00
II PEKERJAAN LANTAI
1 Screeding m² 23.18 82,000.00 1,900,760.00
2 Waterproofing m² 56.78 125,000.00 7,097,500.00
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
II PEKERJAAN PINTU
1 Pintu Closet termasuk handle dan asesoris m² 4.24 4,750,000.00 20,140,000.00
IV PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Finishing Lantai m² 23.18 175,000.00 4,056,500.00
( material gani marble by owner )
V FURNITURE
1 Meja Wastafel m² 6.46 2,120,000.00 13,695,200.00
2 Cermin unit 4.00 900,000.00 3,600,000.00
TOTAL 174,433,770.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR TOILET PUBLIC
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Penebalan Dinding m² 10.66 220,000.00 2,344,320.00
II PEKERJAAN LANTAI
1 Screeding m² 33.43 82,000.00 2,741,260.00
2 Waterproofing m² 90.17 125,000.00 11,271,250.00
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
II PEKERJAAN PINTU
1 Pintu Closet termasuk handle dan asesoris unit 3.00 4,750,000.00 14,250,000.00
IV PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Finishing Lantai m² 33.43 175,000.00 5,850,250.00
( material gani marble by owner )
V FURNITURE
1 Meja Wastafel m² 7.10 2,120,000.00 15,052,000.00
2 Cermin unit 6.00 725,000.00 4,350,000.00
TOTAL 212,610,230.00
PEMBANGUNAN MAL DAN HOTEL
DI JALAN MALIOBORO YOGYAKARTA
-
RAB
PT. BIDAKARA INDAH SEJAHTERA PAKET INTERIOR TOILET PUBLIC
Jln. Malioboro, No. 52-58, Yogyakarta 55001 2017
A PEKERJAAN SIPIL
I PEKERJAAN DINDING
1 Penebalan Dinding m² 10.66 220,000.00 2,344,320.00
II PEKERJAAN LANTAI
1 Screeding m² 33.43 82,000.00 2,741,260.00
2 Waterproofing m² 90.17 125,000.00 11,271,250.00
B PEKERJAAN INTERIOR
I PEKERJAAN DINDING
II PEKERJAAN PINTU
1 Pintu Closet termasuk handle dan asesoris unit 3.00 4,750,000.00 14,250,000.00
IV PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Finishing Lantai m² 33.43 175,000.00 5,850,250.00
( material gani marble by owner )
V FURNITURE
1 Meja Wastafel m² 7.10 2,120,000.00 15,052,000.00
2 Cermin unit 6.00 725,000.00 4,350,000.00