02. Power Plants
Dian Budhi Santoso, S. T., M. Eng.
Air
Udara
Sinar
Renewable
Matahari
Ombak
Raw‐enegy Biomassa
Minyak
bumi
Gas alam
Konversi Raw‐Energy → Energi Listrik
Konversi
E. Listrik
Konversi
• SUTET : 500-750 kV
• SUTT : 150 kV Langganan listrik beban/loads:
• SUTM : 20 kV TR : maksimal 197 kVA
• SUTR : 220 Volt TM : minimal 210 kVA
Sebagai Wawasan pengetahuan
Distribution Line
500 kV – 150 kV –
Reactor Capacitor
bank bank
Loads
HHV : higher heating value for these fuels assumes that all of the heat released
when the fuel is burned can be used, including the heat of vaporization of water
that is produced when the hydrogen is combined with oxygen.