REKAPITULASI - RAB
KEGIATAN : PEMBANGUNAN FASILITAS PELABUHAN LAUT BAJOE
PEKERJAAN : LANJUTAN PEMBANGUNAN FASPEL LAUT BAJOE TERDIRI DARI :
PEKERJAAN TRESTLE SEGMEN XIX - XX (50X8)M2 : Pek. Beton Bertulang
PEKERJAAN TRESTLE SEGMEN XXI - XXV (50x8)M2 : Pengadaan Tiang , Pemancangan
dan Beton Bertulang
PEKERJAAN TRESTLE SEGMEN XXVI (50x8)M2 : Pengadaan Tiang
LOKASI : BAJOE - SULAWESI SELATAN
TAHUN ANGGARAN : 2014
Terbilang : Tiga Puluh Empat Milyar Seratus Delapan Puluh Juta Rupiah.-
NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:2PP
A TENAGA
Pekerja L.02 OH 0.300 78,000.00 23,400.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang Batu L.03 OH 0.010 137,000.00 1,370.00
Mandor L.04 OH 0.015 135,000.00 2,025.00
B BAHAN
Bata merah bh 74.000 550.00 40,700.00
Semen PC (50 kg) kg 19.950 1,250.00 24,937.50
Pasir pasangan m3 0.060 130,000.00 7,800.00
36,795.00 73,437.50 110,232.50
Jumlah A + B 110,232.50
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 110,232.50
E Overhead & Profit ( % X D ) 10% 11,023.25
F Harga Sat. Pekerjaaan (D+E) 121,255.75
Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:4PP
A TENAGA
Pekerja L.02 OH 0.300 78,000.00 23,400.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang Batu L.03 OH 0.010 137,000.00 1,370.00
Mandor L.04 OH 0.015 135,000.00 2,025.00
B BAHAN
Bata merah bh 74.000 550.00 40,700.00
Semen PC (50 kg) kg 12.800 1,250.00 16,000.00
Pasir pasangan m3 0.060 130,000.00 7,800.00
36,795.00 64,500.00 101,295.00
Jumlah A + B 101,295.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 101,295.00
E Overhead & Profit ( % X D ) 10% 10,129.50
F Harga Sat. Pekerjaaan (D+E) 111,424.50
Pemasangan 1 m2 acian
A TENAGA
Pekerja L.02 OH 0.200 78,000.00 15,600.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang Batu L.03 OH 0.010 137,000.00 1,370.00
Mandor L.04 OH 0.010 135,000.00 1,350.00
B BAHAN
Semen PC (50 kg) kg 3.450 1,250.00 4,312.50
28,320.00 4,312.50 32,632.50
Jumlah A + B 32,632.50
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 32,632.50
E Overhead & Profit ( % X D ) 10% 3,263.25
F Harga Sat. Pekerjaaan (D+E) 35,895.75
Pengerokan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
A TENAGA
Pekerja L.02 OH 0.070 78,000.00 5,460.00
Tukang cat L.02 OH 0.105 100,000.00 10,500.00
Kepala tukang Cat L.03 OH 0.004 137,000.00 548.00
Mandor L.04 OH 0.003 135,000.00 405.00
B BAHAN
Meni Kayu kg 0.200 #N/A #N/A
Plamur Kayu kg 0.150 #N/A #N/A
Cat dasar Kayu kg 0.170 #N/A #N/A
Cat penutup Kayu kg 0.350 #N/A #N/A
Kuas bh 0.010 #N/A #N/A
Thinner kg 0.030 #N/A #N/A
Amplas lbr 0.200 #N/A #N/A
16,913.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A
INSTALASI CCTV
A TENAGA
Pekerja L.02 OH 1.000 78,000.00 78,000.00
Tukang Listrik L.02 OH 0.500 100,000.00 50,000.00
Kepala tukang L.03 OH 0.050 137,000.00 6,850.00
Mandor L.04 OH 0.005 135,000.00 675.00
alat bantu L.05 OH 0.005 135,000.00 675.00
Jumlah Harga
Anls. ID Res. lD Nama Bahan / Upah / Alat Sat. Koef. Harga Satuan Jumlah
Upah Bahan Alat
Bekisting Kansteen
2001 201 Pekerja oh 0.0114 78,000.00 889.20 889.20
2001 202 Tukang oh 0.0114 100,000.00 1,140.00 1,140.00
2001 205 Kepala Tukang oh 0.0011 125,000.00 137.50 137.50
2001 206 Mandor oh 0.0029 135,000.00 391.50 391.50
2001 801 Alat Bantu bulan 1.0000 662,487.45 662,487.45 662,487.45
2001 2201 Paku kg 0.4500 24,750.00 11,137.50 11,137.50
2001 6030 Kayu Kelas III m3 0.0520 2,850,000.00 148,200.00 148,200.00
2001 6044 Multipleks 18 mm lbr 0.4500 350,000.00 157,500.00 157,500.00
2001 7030 Oli ltr 0.2000 55,000.00 11,000.00 11,000.00
JUMLAH 2,558.20 327,837.50 662,487.45 992,883.15
Pengecatan Kansteen
2003 201 Pekerja oh 0.0600 78,000.00 4,680.00 4,680.00
2003 202 Tukang oh 0.0500 100,000.00 5,000.00 5,000.00
2003 205 Kepala Tukang oh 0.0050 125,000.00 625.00 625.00
2003 206 Mandor oh 0.0030 135,000.00 405.00 405.00
2003 7105 Cat Kilap kg 0.2400 89,000.00 21,360.00 21,360.00
2003 7144 Minyak Cat kg 0.0150 22,500.00 337.50 337.50
JUMLAH 10,710.00 21,697.50 0.00 32,407.50
Pek.pasangan Geotextile
Pekerja Oh 0.0200 78,000.00 Rp 1,560.00
Mandor Oh 0.0180 135,000.00 Rp 2,430.00
Geotextile non woven M3 1.1000 66,500.00 Rp 73,150.00
Rp 77,140.00
3. PEKERJAAN BETON
A. 1 M3 BETON MUTU K 300
0.8500 m3 Split / Batu pecah @ Rp. 790,500.00 = Rp. 671,925.00
0.5400 m3 Pasir beton @ Rp. 296,000.00 = Rp. 159,840.00
8.4000 zak Semen PC (50 kg) @ Rp. 91,260.00 = Rp. 766,584.00
0.6500 m3 Air @ Rp. 55,000.00 = Rp. 35,750.00
2.0000 jam Concrette mixer (mesin molen) @ Rp. 145,044.01 = Rp. 290,088.02
2.0000 jam Concrette thriller @ Rp. 145,044.51 = Rp. 290,089.02
0.3000 jam Compressor @ Rp. 116,035.61 = Rp. 34,810.68
1.0000 ls Alat bantu beton @ Rp. 89,358.26 = Rp. 89,358.26
1.0000 ho Tukang batu @ Rp. 115,000.00 = Rp. 115,000.00
0.1500 ho Kepala tukang @ Rp. 137,000.00 = Rp. 20,550.00
5.7500 ho Pekerja @ Rp. 78,000.00 = Rp. 448,500.00
0.5600 ho Mandor @ Rp. 135,000.00 = Rp. 75,600.00
Rp. 2,998,094.98
ANALISA HARGA SATUAN
B. PEKERJAAN PEMBESIAN / 100 kg
110.0000 kg Besi beton @ Rp. 16,000.00 = Rp. 1,760,000.00
2.0000 kg Kawat beton @ Rp. 20,000.00 = Rp. 40,000.00
1.0000 ls Alat bantu pembesian @ Rp. 89,358.26 = Rp. 89,358.26
1.5000 ho Tukang besi @ Rp. 115,000.00 = Rp. 172,500.00
0.6500 ho Kepala tukang @ Rp. 137,000.00 = Rp. 89,050.00
4.0000 ho Pekerja @ Rp. 78,000.00 = Rp. 312,000.00
Rp. 2,462,908.26
Untuk 1 kg pembesian = Rp. 24,629.08
C. PEKERJAAN CETAKAN BETON / BEKESTING UNTUK 10 M2
0.4000 m3 Kayu Kelas II @ Rp. 5,250,000.00 =
Rp. 2,100,000.00
4.0000 kg Paku @ Rp. 24,750.00 =
Rp. 99,000.00
2.0000 lbr Multipleks 12 mm @ Rp. 250,000.00 =
Rp. 500,000.00
1.0000 ls Alat bantu @ Rp. 8,241.78 =
Rp. 8,241.78
5.0000 ho Tukang kayu @ Rp. 115,000.00 =
Rp. 575,000.00
0.4000 ho Kepala tukang @ Rp. 137,000.00 =
Rp. 54,800.00
2.0000 ho Pekerja @ Rp. 78,000.00 =
Rp. 156,000.00
0.1000 ho Mandor @ Rp. 135,000.00 =
Rp. 13,500.00
Rp. 3,506,541.78
Untuk 1 M2 cetakan beton = Rp. 350,654.18
30. 1.00 Titik PEK. PENGADAAN DAN PEMASANGAN LAMPU & INSTALASI LISTRIK
SEMEN ###
1100 SEMEN ###
1101 Semen Merah m3 Rp. 105,000.00
1102 Semen PC kg Rp. 1,250.00
1103 Semen Putih kg Rp. 1,975.00
1104 Semen Warna kg Rp. 4,500.00
1105 Acian Plasteran & Beton (MU 200) kg Rp. 3,875.00
1106 Acian Plasteran (MU 250) kg Rp. 2,425.00
1107 Acian Profil (MU 260) kg Rp. 7,520.00
1108 Acian Putih (MU 270) kg Rp. 6,120.00
1109 Bahan Addictive Silicafume kg Rp. 33,333.00
1110 Fast Setting Tile Addesive (MU 490) kg Rp. 12,800.00
1111 Finish Coat Repair (MU 840) kg Rp. 12,800.00
1112 Finish Plester (MU 290) kg Rp. 2,425.00
1113 Floor Hardner (MU 700) kg Rp. 5,500.00
1114 Multipurpose Tile Addesive (MU 485) kg Rp. 27,500.00
1115 Non Shrink Grout (MU 800) kg Rp. 3,850.00
1116 Pasangan & Plaster Bata (MU 301) kg Rp. 1,090.00
1117 Pelapis Kedap Air (MU 600) kg Rp. 35,333.33
1118 Pengisi Nat Keramik (MU 408) kg Rp. 11,500.00
1119 Perbaikan Permukaan Beton (MU 830) kg Rp. 6,425.00
1120 Perekat Bata Ringan (MU 380) kg Rp. 3,600.00
1121 Perekat Keramik Dinding (MU 400) kg Rp. 5,440.00
1122 Perekat Mortar & Beton/Bonding Agent (MU L-500) kg Rp. 100,250.00
1123 Plester Premium (MU 100) kg Rp. 1,475.00
1124 Plester Trasram (MU 101) kg Rp. 2,250.00
1125 Portland Cement (PC) Grouting kg Rp. 6,900.00
1126 Semen PC (50 Kg/Zak) Zak Rp. 91,260.00
1127 Semen Putih (40 Kg/Zak) Zak Rp. 79,000.00
AGGREGAT/BATU/PASIR
1200 AGREGATE
1201 Aggregat Halus m3 Rp. 252,294.80
1202 Aggregat Kasar m3 Rp. 395,000.00
1203 Aggregat Pecah Mesin 0-5 mm m3 Rp. 495,000.00
1204 Aggregat Pecah Mesin 10-20 mm m3 Rp. 495,000.00
1205 Aggregat Pecah Mesin 20-30 mm m3 Rp. 495,000.00
1206 Aggregat Pecah Mesin 5-10 mm m3 Rp. 495,000.00
1207 Bahan Pilihan m3 Rp. 90,600.00
1208 Bahan Timbunan m3 Rp. 90,600.00
1209 Balas Kricak uk. 2x6 m3 Rp. 232,003.00
1210 Balas Sirtu m3 Rp. 194,066.70
1211 Balas Split uk. 1x2 m3 Rp. 306,178.00
1212 Balas Split uk. 2x3 m3 Rp. 306,178.00
1213 Bata Merah (20x9,5x4) cm Proses Tangan bh Rp. 550.00
1214 Bata Merah Press Mesin bh Rp. 550.00
NO NAMA BAHAN SATUAN HARGA
LISTRIK ###
9300 LISTRIK ###
9301 1 KVA Uninteruptible Power Supply Unit Rp. 5,000,000.00
9302 1-4 Booster Splitter Unit Unit Rp. 4,100,000.00
9303 Alarm Balancer set Rp. 21,400,000.00
9304 Armatur Box Lampu bh Rp. 115,500.00
9305 Artificial Load ltr Rp. 5,650,000.00
9306 Bos Distribusi Untuk 4 Lampu Unit Rp. 9,750,000.00
9307 Box Panel Penerangan bh Rp. 32,100,000.00
9308 Coaxial Cable m' Rp. 20,500.00
9309 Control Cable 2 Pair m' Rp. 10,500.00
9310 Control WL dengan Konfigurasi (double Flasher) bh Rp. 6,750,000.00
9311 Delegate Unit bh Rp. 5,000.00
9312 Elektroda Tanah ls Rp. 735,000.00
9313 Fitting Flafond bh Rp. 7,500.00
9314 Generator Set 25 KVA Unit Rp. 255,000,000.00
9315 Generator Set Kapasitas 25 KVA Unit Rp. 268,153,700.00
9316 Genset 1,5 KVA Unit Rp. 5,400,000.00
9317 Instalasi Penerangan m' Rp. 33,700.00
9318 Isolator m' Rp. 500.00
9319 Junction Cable Switch bh Rp. 47,100.00
9320 Kabel NYFGBY 4x6 mm m' Rp. 44,100.00
9321 Kabel BC 75 mm2 m' Rp. 32,400.00
9322 Kabel NYA 2,5 mm m' Rp. 1,850.00
9323 Kabel NYA 4,0 mm m' Rp. 5,500.00
9324 Kabel NYY 4 x 2,5 m' Rp. 9,800.00
9325 Kawat BC m' Rp. 35,000.00
9326 Lampu Penerangan Jalan Titik Rp. 906,800.00
9327 Lampu Pijar 5 - 40 Watt bh Rp. 15,000.00
9328 Lampu Pijar 50 - 100 Watt bh Rp. 25,000.00
9329 Lampu Sorot 1000 Watt Unit Rp. 4,579,600.00
9330 Lampu TL 20 Watt Unit Rp. 130,800.00
9331 Lampu TL Komplit 20 Watt bh Rp. 50,000.00
9332 Lampu TL Komplit 40 Watt bh Rp. 75,000.00
9333 Lampu XL 14 Watt bh Rp. 25,000.00
9334 Lampu XL 18 Watt bh Rp. 27,500.00
9335 Lampu XL 23 Watt bh Rp. 28,500.00
9336 Lampu XL 5 Watt bh Rp. 22,500.00
9337 Lampu XL 8 Watt bh Rp. 22,500.00
9338 Las Doof bh Rp. 350.00
9339 Panel Listrik bh Rp. 52,093,000.00
9340 Pasang Baru PLN ls Rp. 2,200,000.00
9341 Pembatas Arus Listrik bh Rp. 44,000.00
9342 Penyambung Listrik (PLN) Unit Rp. 2,354,000.00
9343 Saklar Broco bh Rp. 25,000.00
9344 Saklar Ganda bh Rp. 83,700.00
9345 Saklar Tunggal bh Rp. 53,000.00
9346 Sekring Kast 1 Group bh Rp. 221,300.00
9347 Set Terminal Kabel bh Rp. 18,000.00
9348 Stop Kontak bh Rp. 20,000.00
9349 Supply Cable m' Rp. 6,300.00
9350 T Dos PVC bh Rp. 650.00
9351 Tackle Electric Kapasitas 35 Ton/Unit Unit Rp. 374,444,800.00
9352 Tambah Daya 2200 Watt ls Rp. 2,000,000.00
9353 Terminal End (Sleeve Beam) Type 1 bh Rp. 848,000.00
9354 Terminal Kabel bh Rp. 20,700.00
9355 Zekering Kast Lokal 1 Group Unit Rp. 50,000.00
NO NAMA BAHAN SATUAN HARGA
No. Rekap Selisih antara harga PM 75 dengan PT. Suatri PM 75 PT. Suatri
1 Luar Domain 14,773,217,950 132,804,000
2 Domain 394,010,493 423,088,851
3 Lokal/Proyek 1,551,702,719 844,118,655
4 Belum Ada Lokasi Pengadaan Material 239,722,698 263,557,680
Jumlah 16,958,653,860 1,663,569,187
Harga PT. Jumlah Harga PT.
Peralatan Volume Satuan Harga PM 75 Jumlah Harga PM 75
No. Suatri Suatri
1 Alat bantu 911.29 ls - -
2 Alat Bantu 604.68 bln - -
3 Alat bantu beton 1,123.60 ls - -
4 Alat bantu pembesian 2,303.74 ls
5 Alat Bantu Pemotongan Tiang Pancang 124.00 ls - -
6 Compressor 413.87 jam - -
7 Concrette mixer (mesin molen) 2,170.40 jam - -
8 Concrette thriller 2,247.19 jam - -
9 Crawler crane 257.92 jam - -
10 Diesel Hammer 454.21 jam - -
11 Dump Truck 3.5 Ton 5.00 jam - -
12 Excavator 5.00 jam - -
13 Generator set 403.00 jam - -
14 Mesin Las 40 Amp 436.60 jam - -
15 Mesin Las Karbit 124.00 jam - -
16 Ponton Transport 261.02 jam - -
Jumlah 11,845.52 - -
-34,772.19
6,666.06
4,960.81
2,097,056.71
2,856,204.34
39,626.09
2,552,767.00
1,281,989.00
166,831.48
1,517,162.37
-6,240.14
1,162,984.20
-14,444.49
#REF!
6,784,698.23
55,356.42
3,819,354.85
-23,786.16
1,503.33
1,698,786.16
540,598.50
350,174.18
15,600.00
269,042.93
11,343,723.09
11,360,191.73
10,727,426.50
9,274,973.13
12,035,616.78
6,537,616.78