Anda di halaman 1dari 72

KEGIATAN : PEMBANGUNAN REHABILITASI KANTOR UNIT PENYELENGGARA PELABUHAN KELAS III BIRINGKASSI

PEKERJAAN : RENOVASI KANTOR UNIT PENYELENGGARA PELABUHAN BIRINGKASSI


LOKASI : BIRINGKASSI. KABUPATEN PANGKEP - SULAWESI SELATAN
TAHUN ANGGARAN : 2015

NO URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PENDAHULUAN Rp 127,138,577.50

II PEKERJAAN TANAH DAN PONDASI #N/A

III PEKERJAAN BETON #N/A

IV PEKERJAAN PLESTERAN DAN DINDING Rp 172,382,405.06

V PENGECATAN #N/A

VI PEKERJAAN LANTAI DAN DINDING KERAMIK #N/A

VII PEKERJAAN SANITAIR #N/A

VIII PEKERJAAN PINTU,DAN JENDELA #N/A

VII INSTALASI LISTRIK Rp 25,578,876.89

X PEKERJAAN PLAFOND #N/A

XI PEKERJAAN PANEL ALLUCOPAN Rp 93,102,000.00

REAL COST #N/A


PPN 10 % #N/A
TOTAL #N/A
DIBULATKAN #N/A

Terbilang : SATU MILYAR SEMBILAN RATUS LIMA PULUH JUTA RUPIAH


###

Biringkassi ,januari , 2015

PEJABAT PEMBUAT KOMITMEN

MAENA S Kom
Penata Tk I (III/D)
NIP.19730608 199803 2 001
REKAPITULASI - RAB
KEGIATAN : PEMBANGUNAN FASILITAS PELABUHAN LAUT BAJOE
PEKERJAAN : LANJUTAN PEMBANGUNAN FASPEL LAUT BAJOE TERDIRI DARI :
PEKERJAAN TRESTLE SEGMEN XIX - XX (50X8)M2 : Pek. Beton Bertulang
PEKERJAAN TRESTLE SEGMEN XXI - XXV (50x8)M2 : Pengadaan Tiang , Pemancangan
dan Beton Bertulang
PEKERJAAN TRESTLE SEGMEN XXVI (50x8)M2 : Pengadaan Tiang
LOKASI : BAJOE - SULAWESI SELATAN
TAHUN ANGGARAN : 2014

NO URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PENDAHULUAN Rp 335,168,577.50

II PEK. TRESTLE SEGMEN XIX (50 x 8) M2 Rp 2,579,921,516.76

III PEK. TRESTLE SEGMEN XX (50 x 8) M2 Rp 2,579,921,516.76

IV PEK. TRESTLE SEGMEN XXI (50 x 8) M2 Rp 3,198,753,418.92

V PEK. TRESTLE SEGMEN XXII (50 x 8) M2 Rp 4,496,935,786.79

VI PEK. TRESTLE SEGMEN XXIII (50 x 8) M2 Rp 6,010,771,770.79

VII PEK. TRESTLE SEGMEN XXIV (50 x 8) M2 Rp 6,010,771,770.79

VIII PEK. TRESTLE SEGMEN XXV (50 x 8) M2 Rp 5,470,058,087.12

IX PEK. TRESTLE SEGMEN XXVI (50 x 8) M2 Rp 851,530,447.17

X PEKERJAAN LAIN-LAIN Rp 67,000,000.00

REAL COST Rp 31,600,832,892.61


PPN 10 % Rp 3,160,083,289.26
TOTAL Rp 34,760,916,181.87
DIBULATKAN Rp 34,760,000,000.00

Terbilang : Tiga Puluh Empat Milyar Seratus Delapan Puluh Juta Rupiah.-

Bajoe, 16 Desember 2013


Kepala Kantor
Unit Penyelenggara Pelabuhan
Kelas III Bajoe

ABBAS, SH., M.Si.


Penata Muda Tk. I (III/b)
NIP. 19670609 199112 1 001
HARGA PERHITUNGAN SENDIRI (HPS)
KEGIATAN : PEMBANGUNAN REHABILITASI KANTOR UNIT PENYELENGGARA PELABUHAN KELAS III BIRINGKASSI
PEKERJAAN : RENOVASI KANTOR UNIT PENYELENGGARA PELABUHAN BIRINGKASSI
LOKASI : BIRINGKASSI. KABUPATEN PANGKEP - SULAWESI SELATAN
TAHUN ANGGARAN : 2015

NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

(1) (2) (3) (4) (5) (4) x (5)


I PEKERJAAN PENDAHULUAN
1 Papan Nama Proyek Ls 1.0000 Rp 850,000.00 Rp 850,000.00
2 Pembersihan Lokasi Pekerjaan Ls 1.0000 Rp 7,568,577.50 Rp 7,568,577.50
3 Pagar Pengaman Lokasi Proyek Ls 1.0000 Rp 6,000,000.00 Rp 6,000,000.00
4 Penerangan Lokasi Pekerjaan dan Keamanan Ls 1.0000 Rp 5,000,000.00 Rp 5,000,000.00
6 Direksi Keet Ls 1.0000 Rp 15,000,000.00 Rp 15,000,000.00
7 Gudang Bahan Ls 1.0000 Rp 15,000,000.00 Rp 15,000,000.00
8 Air Kerja Ls 1.0000 Rp 12,500,000.00 Rp 12,500,000.00
9 Bangsal Kerja Ls 1.0000 Rp 15,000,000.00 Rp 15,000,000.00
Pembongkaran Bangunan Lama m2 251.1000 Rp 200,000.00 Rp 50,220,000.00
SUB TOTAL Rp 127,138,577.50
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Bowplank + Pengukuran m' 110.00 Rp 87,500 Rp 9,625,000.00
2 Pek. Galian Tanah Pondasi M3 27.04 Rp 68,063 Rp 1,840,410.00
3 Pek. Urugan Kembali M3 6.76 Rp 50,325 Rp 340,197.00
4 Pek. Urugan Tanah Bawah Lantai M3 75.16 Rp 191,492 Rp 14,391,939.19
5 Pek. Urugan Pasir Bawah Lantai M3 20.93 #N/A #N/A
6 Pek. Pondasi Batu Gunung 1:3 M3 46.33 Rp 756,558 Rp 35,049,062.47
7 Pek. Batu Kosong M3 21.52 Rp 508,059 Rp 10,931,395.83
SUB TOTAL #N/A
III PEKERJAAN BETON
Lantai 01
1 Pek. Beton Pondasi Poer
- pek. besi telapak Kg 1,201 Rp 20,345.49 Rp 24,426,254.10
- pek. beton K.225 M3 11.36 #N/A #N/A
- pek. lantai kerja M3 3.20 #N/A #N/A
2 pek. Pedestal
- Pek.Bekisting M2 2.16 #N/A #N/A
- Pek.Besi Beton Kg 808.06 Rp 20,345.49 Rp 16,440,335.96
- Pek.Beton K.225 M3 2.16 #N/A #N/A
3 Pek. Beton Sloef 25 X 30
- pek. Bekisting M2 1.36 #N/A #N/A
- Pek.Besi Beton Kg 85.68 Rp 20,345.49 Rp 1,743,135.91
- Pek.Beton K.225 M3 8.29 #N/A #N/A
5 Pek. Beton Kolom 15X15 (KP)
- Pek.Bekisting M2 13.65 #N/A #N/A
- Pek.Besi Beton Kg 8.97 Rp 20,345.49 Rp 182,564.15
- Pek.Beton K.225 M3 1.02 #N/A #N/A
6 Pek. Beton Kolom 30X30 (K1)
- Pek.Bekisting M2 56.00 #N/A #N/A
- Pek.Besi Beton Kg 142.44 Rp 20,345.49 Rp 2,898,011.60
- Pek.Beton K.225 M3 3.50 #N/A #N/A
7 Pek. Beton Tangga
- Pek.Bekisting M2 9.00 #N/A #N/A
- Pek.Besi Beton Kg 205.82 Rp 20,345.49 Rp 4,187,508.75
- Pek.Beton K.225 M3 1.38 #N/A #N/A
Lantai 02
1 Pek. Beton Kolom 15X15 (KP)
- Pek.Bekisting M2 14.70 #N/A #N/A
- Pek.Besi Beton Kg 9.66 Rp 20,345.49 Rp 196,537.43
- Pek.Beton K.225 M3 1.10 #N/A #N/A
2 Pek. Beton Kolom 25X25
- Pek.Bekisting M2 56.00 #N/A #N/A
- Pek.Besi Beton Kg 142.44 Rp 20,345.49 Rp 2,897,930.21
- Pek.Beton K.225 M3 3.50 #N/A #N/A
NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

(1) (2) (3) (4) (5) (4) x (5)


3 Pek. Beton Balok 25 X 30 B1
- Pek.Bekisting M2 88.00 #N/A #N/A
- Pek.Besi Beton Kg 1,631.89 Rp 20,345.49 Rp 33,201,601.68
- Pek.Beton K.225 M3 8.25 #N/A #N/A
4 Pek. Beton Balok 20 X 25 B2
- Pek.Bekisting M2 49.08 #N/A #N/A
- Pek.Besi Beton Kg 1,387.86 Rp 20,345.49 Rp 28,236,773.13
- Pek.Beton K.225 M3 3.78 #N/A #N/A
5 Pek. Beton plat lantai
- Pek.Bekisting M2 146.74 #N/A #N/A
- Pek.Besi Beton Kg 3,066.47 Rp 20,345.49 Rp 62,388,855.07
- Pek.Beton K.225 M3 20.00 #N/A #N/A
Lantai atap
1 Pek. Beton Balok 25 X 30 B1
- Pek.Bekisting M2 88.00 #N/A #N/A
- Pek.Besi Beton Kg 1,631.89 Rp 20,345.49 Rp 33,201,556.92
- Pek.Beton K.225 M3 8.25 #N/A #N/A
2 Pek. Beton Balok 20 X 25 B2
- Pek.Bekisting M2 49.08 #N/A #N/A
- Pek.Besi Beton Kg 1,148.28 Rp 20,345.49 Rp 23,362,380.29
- Pek.Beton K.225 M3 3.78 #N/A #N/A
3 Pek. Beton plat lantai
- Pek.Bekisting M2 170.84 #N/A #N/A
- Pek.Besi Beton Kg 2,330.37 Rp 20,345.49 Rp 47,412,519.53
- Pek.Beton K.225 M3 16.58 #N/A #N/A
SUB TOTAL #N/A
IV PEKERJAAN PLESTERAN DAN DINDING
Lantai 01
1 Pek. Acian M2 584.83 Rp 35,895.75 Rp 20,993,055.06
2 Pek. Plesteran 1 : 4 M2 584.83 Rp 54,059.50 Rp 31,615,833.62
3 Pek. Pas bata merah trasraam M2 48.32 Rp 121,255.75 Rp 5,859,199.10
4 Pek. Pas 1/2 bata merah 1:4 M2 244.10 Rp 111,424.50 Rp 27,198,274.75
Lantai 02
1 Pek. Acian M2 592.04 Rp 35,895.75 Rp 21,251,719.83
2 Pek. Plesteran 1 : 4 M2 592.04 Rp 54,059.50 Rp 32,005,386.38
3 Pek. Pas bata merah 1 : 4 M2 247.70 Rp 111,424.50 Rp 27,599,737.23
4 Pek. Pas bata merah trasraam M2 48.32 Rp 121,255.75 Rp 5,859,199.10
SUB TOTAL Rp 172,382,405.06
V PENGECATAN
Lantai 01
1 Pek. Cat Dinding M2 584.83 #N/A #N/A
2 Pek. Cat Plafond M2 189.00 #N/A #N/A
Lantai 02
1 Pek. Cat Dinding M2 592.04 #N/A #N/A
2 Pek. Cat Plafond M2 189.00 #N/A #N/A
4 Pek. Cat Waterprofing Plat M2 214.00 #N/A #N/A
SUB TOTAL #N/A
VI PEKERJAAN LANTAI DAN DINDING KERAMIK
Lantai 01
Pas. Lantai keramik 40X40 M2 184.50 #N/A #N/A
Lantai keramik 20X20 M2 4.50 Rp 128,739.60 Rp 579,328.20
Dinding keramik 20X20 cm M2 16.84 #N/A #N/A
Lantai 02
Pas. Lantai keramik 40X40 M2 179.55 #N/A #N/A
Lantai keramik 20X20 M2 9.45 Rp 128,739.60 Rp 1,216,589.22
Dinding keramik 20X20 cm M2 30.08 #N/A #N/A
SUB TOTAL #N/A
VII PEKERJAAN SANITAIR
Lantai 01
Pek. Pas. kloset duduk Bh 2.00 #N/A #N/A
Pek. Pas. Wastafel + Aksesoris + Cermin Bh 2.00 #N/A #N/A
Pek. Pas. kran air 1/2 inci Bh 2.00 #N/A #N/A
Pek. Pas. Pipa Disposal Padat Ø 4 inchi M' 16.00 Rp 318,458.25 Rp 5,095,332.00
Pek. Pas. Pipa Air Kotor Ø 3 inchi M' 12.00 Rp 200,846.25 Rp 2,410,155.00
Pek. Pas. Pipa Air Bersih Ø 1/2 inchi M' 20.00 Rp 84,106.55 Rp 1,682,131.00
NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

(1) (2) (3) (4) (5) (4) x (5)


Pek. Pas. Pipa Air Bersih Ø 3/4 inchi M' 20.00 Rp 34,203.87 Rp 684,077.35
Pek. Septictank Unit 1.00 Rp 5,000,000.00 Rp 5,000,000.00
Pek. Pas. Floor Drain Bh 2.00 Rp 41,607.50 Rp 83,215.00
Lantai 02
Pek. Pas. kloset duduk Bh 3.00 #N/A #N/A
Pek. Pas. Wastafel + Aksesoris + Cermin Bh 3.00 #N/A #N/A
Pek. Pas. kran air 1/2 inci Bh 7.00 #N/A #N/A
Pek. Pas. Pipa Disposal Padat Ø 4 inchi M' 30.00 Rp 318,458.25 Rp 9,553,747.50
Pek. Pas. Pipa Air Kotor Ø 3 inchi M' 38.00 Rp 200,846.25 Rp 7,632,157.50
Pek. Pas. Pipa Air Bersih Ø 1/2 inchi M' 25.00 Rp 84,106.55 Rp 2,102,663.75
Pek. Pas. Pipa Air Bersih Ø 3/4 inchi M' 23.00 Rp 34,203.87 Rp 786,688.95
Pek. Pas. Floor Drain Bh 5.00 Rp 41,607.50 Rp 208,037.50
SUB TOTAL #N/A
VIII PEKERJAAN PINTU,DAN JENDELA
Pintu dan Jendela
Pintu Type D1 Unit 5.00 #N/A #N/A
Pintu Type D2 Unit 7.00 #N/A #N/A
Pintu Type D3 Unit 3.00 #N/A #N/A
Pintu Type P3 Unit 2.00 Rp 12,000,000.00 Rp 24,000,000.00
Jendela Type J1 Unit 16.00 #N/A #N/A
Jendela Type J2 Unit 11.00 #N/A #N/A
Jendela Type J3 Unit 2.00 #N/A #N/A
Jendela type J4 Unit 7.00 #N/A #N/A
SUB TOTAL #N/A
IX INSTALASI LISTRIK
Pek. Pas. Stop Kontak Titik 22.00 Rp 160,798.50 Rp 3,537,566.89
Pek. Pas. Saklar Tunggal Bh 1.00 Rp 30,470.00 Rp 30,470.00
Pek. Pas. Saklar Ganda Bh 18.00 Rp 39,050.00 Rp 702,900.00
Pek.Pas. Lampu Downlight Titik 88.00 Rp 150,000.00 Rp 13,200,000.00
Penyambungan daya ke PLN Ls 1.00 Rp 5,000,000.00 Rp 5,000,000.00
Pek. Pas. CCTV BH 7.00 Rp 237,820.00 Rp 1,664,740.00
Pek.Pas.LAN Titik 20.00 Rp 72,160.00 Rp 1,443,200.00

SUB TOTAL Rp 25,578,876.89


X PEKERJAAN PLAFOND
Lantai 01
Pas.Rangka Plafond Kalsiboard M2 243.28 Rp 348,529.50 Rp 84,789,768.82
Pas. Plafond Kalsiboard M2 243.28 #N/A #N/A
Lantai 01
Pas.Rangka Plafond Kalsiboard M2 244.60 Rp 348,529.50 Rp 85,250,838.49
Pas. Plafond Kalsiboard M2 244.60 #N/A #N/A
SUB TOTAL #N/A
XI PEKERJAAN PANEL ALLUCOPAN
Pasang Allucopan M2 155.17 Rp 600,000.00 Rp 93,102,000.00
SUB TOTAL Rp 93,102,000.00
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN FASILITAS PELABUHAN LAUT BAJOE
PEKERJAAN : LANJUTAN PEMBANGUNAN FASPEL LAUT BAJOE TERDIRI DARI :
PEKERJAAN TRESTLE SEGMEN XIX - XX (50X8)M2 : Pek. Beton Bertulang
PEKERJAAN TRESTLE SEGMEN XXI - XXV (50x8)M2 : Pengadaan Tiang , Pemancangan
dan Beton Bertulang
PEKERJAAN TRESTLE SEGMEN XXVI (50x8)M2 : Pengadaan Tiang
LOKASI : BAJOE - SULAWESI SELATAN
TAHUN ANGGARAN : 2014

NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

(1) (2) (3) (4) (5) (4) x (5)


I PEKERJAAN PENDAHULUAN
1 Papan Nama Proyek Ls 1.0000 Rp 850,000.00 Rp 850,000.00
2 Pembersihan Lokasi Pekerjaan Ls 1.0000 Rp 7,568,577.50 Rp 7,568,577.50
3 Pagar Pengaman Lokasi Proyek (150 m') Ls 1.0000 Rp 38,500,000.00 Rp 38,500,000.00
4 Penerangan Lokasi Pekerjaan dan Keamanan Ls 1.0000 Rp 15,000,000.00 Rp 15,000,000.00
5 Pengukuran dan Pemasangan Titik Tetap Ls 1.0000 Rp 7,500,000.00 Rp 7,500,000.00
6 Direksi Keet (36 m²) Ls 1.0000 Rp 25,500,000.00 Rp 25,500,000.00
7 Gudang Bahan (24 m²) Ls 1.0000 Rp 11,000,000.00 Rp 11,000,000.00
8 Air Kerja Ls 1.0000 Rp 7,500,000.00 Rp 7,500,000.00
9 Bangsal Kerja (24 m²) Ls 1.0000 Rp 35,750,000.00 Rp 35,750,000.00
10 Mobilisasi dan Demobilisasi Ls 1.0000 Rp 186,000,000.00 Rp 186,000,000.00
SUB TOTAL I Rp 335,168,577.50

II PEK. TRESTLE SEGMEN XIX (50 x 8) M2


1 Beton Bertulang (K-400)
- Beton Bertulang untuk Pengisi Tiang Pancang M3 6.3995 Rp 10,741,307.15 Rp 68,738,995.11
- Beton Bertulang untuk Pile Cap 90.90.80 M3 15.1415 Rp 11,343,723.09 Rp 171,760,983.14
- Beton Bertulang untuk Balok Melintang 50/70 M3 18.2000 Rp 11,360,191.73 Rp 206,755,489.49
- Beton Bertulang untuk Balok Memanjang 50/70 M3 20.0000 Rp 11,360,191.73 Rp 227,203,834.60
- Beton Bertulang untuk Balok Anak 35/50 M3 3.5000 Rp 11,360,191.73 Rp 39,760,671.06
- Beton Bertulang untuk Balok Dudukan Tiang Lampu M3 0.1750 Rp 11,360,191.73 Rp 1,988,033.55
- Beton Bertulang untuk Plat Lantai t = 30 cm M3 120.0000 Rp 10,727,426.50 Rp 1,287,291,179.60
- Beton Bertulang untuk Kansteen M3 3.8500 Rp 9,274,973.13 Rp 35,708,646.54
2 Anti corrosion tape tiang pancang + pemasangan M2 100.7797 Rp 4,880,049.95 Rp 491,809,969.95
3 Delatasi M' 16.0000 Rp 426,687.64 Rp 6,827,002.30
4 Pengadaan dan Pemasangan Lampu Solar Cell Bh 1.0000 Rp 40,098,233.56 Rp 40,098,233.56
5 Pengecatan Kansteen M2 61.0500 Rp 32,407.50 Rp 1,978,477.88
SUB TOTAL II Rp 2,579,921,516.76

III PEK. TRESTLE SEGMEN XX (50 x 8) M2


1 Beton Bertulang (K-400)
- Beton Bertulang untuk Pengisi Tiang Pancang M3 6.3995 Rp 10,741,307.15 Rp 68,738,995.11
- Beton Bertulang untuk Pile Cap 90.90.80 M3 15.1415 Rp 11,343,723.09 Rp 171,760,983.14
- Beton Bertulang untuk Balok Melintang 50/70 M3 18.2000 Rp 11,360,191.73 Rp 206,755,489.49
- Beton Bertulang untuk Balok Memanjang 50/70 M3 20.0000 Rp 11,360,191.73 Rp 227,203,834.60
- Beton Bertulang untuk Balok Memanjang 35/50 M3 3.5000 Rp 11,360,191.73 Rp 39,760,671.06
- Beton Bertulang untuk Balok Dudukan Tiang Lampu M3 0.1750 Rp 11,360,191.73 Rp 1,988,033.55
- Beton Bertulang untuk Plat Lantai t = 30 cm M3 120.0000 Rp 10,727,426.50 Rp 1,287,291,179.60
- Beton Bertulang untuk Kansteen M3 3.8500 Rp 9,274,973.13 Rp 35,708,646.54
2 Anti corrosion tape tiang pancang + pemasangan M2 100.7797 Rp 4,880,049.95 Rp 491,809,969.95
3 Delatasi M' 16.0000 Rp 426,687.64 Rp 6,827,002.30
4 Pengadaan dan Pemasangan Lampu Solar Cell Bh 1.0000 Rp 40,098,233.56 Rp 40,098,233.56
5 Pengecatan Kansteen M2 61.0500 Rp 32,407.50 Rp 1,978,477.88
SUB TOTAL III Rp 2,579,921,516.76
NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

(1) (2) (3) (4) (5) (4) x (5)

IV PEK. TRESTLE SEGMEN XXI (50 x 8) M2


1 Tiang Pancang
- Pembuatan Sepatu Tiang Pancang BH 20.0000 3,819,354.85 Rp 76,387,097.00
- Sambungan Tiang Pancang BH 40.0000 1,041,658.88 Rp 41,666,355.20
- Pengangkutan Tiang Pancang ke Titik Pancang M' 520.0000 152,030.17 Rp 79,055,687.55
- Pemancangan Tanpa Diesel Hammer M' 80.0000 524,275.22 Rp 41,942,017.39
- Pemancangan Tiang Pancang Tegak M' 440.0000 771,446.63 Rp 339,436,518.02
- Pemotongan Tiang Pancang BH 20.0000 2,017,211.35 Rp 40,344,227.00
2 Beton Bertulang (K-400)
- Beton Bertulang untuk Pengisi Tiang Pancang M3 6.3995 Rp 10,741,307.15 Rp 68,738,995.11
- Beton Bertulang untuk Pile Cap 90.90.80 M3 15.1415 Rp 11,343,723.09 Rp 171,760,983.14
- Beton Bertulang untuk Balok Melintang 50/70 M3 18.2000 Rp 11,360,191.73 Rp 206,755,489.49
- Beton Bertulang untuk Balok Memanjang 50/70 M3 20.0000 Rp 11,360,191.73 Rp 227,203,834.60
- Beton Bertulang untuk Balok Memanjang 35/50 M3 3.5000 Rp 11,360,191.73 Rp 39,760,671.06
- Beton Bertulang untuk Balok Dudukan Tiang Lampu M3 0.1750 Rp 11,360,191.73 Rp 1,988,033.55
- Beton Bertulang untuk Plat Lantai t = 30 cm M3 120.0000 Rp 10,727,426.50 Rp 1,287,291,179.60
- Beton Bertulang untuk Kansteen M3 3.8500 Rp 9,274,973.13 Rp 35,708,646.54
3 Anti corrosion tape tiang pancang + pemasangan M2 100.7797 Rp 4,880,049.95 Rp 491,809,969.95
4 Delatasi M' 16.0000 Rp 426,687.64 Rp 6,827,002.30
5 Pengadaan dan Pemasangan Lampu Solar Cell Bh 1.0000 Rp 40,098,233.56 Rp 40,098,233.56
6 Pengecatan Kansteen M2 61.0500 Rp 32,407.50 Rp 1,978,477.88
SUB TOTAL IV Rp 3,198,753,418.92

V PEK. TRESTLE SEGMEN XXII (50 x 8) M2


1 Tiang Pancang
- Tiang Pancang Baja Ø 457, 2 mm t = 12,7 mm Kg 36,194.4440 26,140.50 Rp 946,140,863.38
- Pembuatan Sepatu Tiang Pancang BH 26.0000 3,819,354.85 Rp 99,303,226.10
- Sambungan Tiang Pancang BH 52.0000 1,041,658.88 Rp 54,166,261.76
- Pengangkutan Tiang Pancang ke Titik Pancang M' 676.0000 152,030.17 Rp 102,772,393.81
- Pemancangan Tanpa Diesel Hammer M' 104.0000 524,275.22 Rp 54,524,622.61
- Pemancangan Tiang Pancang Tegak M' 572.0000 771,446.63 Rp 441,267,473.42
- Pengecatan Tiang Pancang M2 970.4700 171,455.00 Rp 166,391,933.85
- Pemotongan Tiang Pancang BH 26.0000 2,017,211.35 Rp 52,447,495.10
2 Beton Bertulang (K-400)
- Beton Bertulang untuk Pengisi Tiang Pancang M3 6.3995 Rp 10,741,307.15 Rp 68,738,995.11
- Beton Bertulang untuk Pile Cap 90.90.80 M3 15.1415 Rp 11,343,723.09 Rp 171,760,983.14
- Beton Bertulang untuk Balok Melintang 50/70 M3 18.2000 Rp 11,360,191.73 Rp 206,755,489.49
- Beton Bertulang untuk Balok Memanjang 50/70 M3 20.0000 Rp 11,360,191.73 Rp 227,203,834.60
- Beton Bertulang untuk Balok Memanjang 35/50 M3 3.5000 Rp 11,360,191.73 Rp 39,760,671.06
- Beton Bertulang untuk Balok Dudukan Tiang Lampu M3 0.1750 Rp 11,360,191.73 Rp 1,988,033.55
- Beton Bertulang untuk Plat Lantai t = 30 cm M3 120.0000 Rp 10,727,426.50 Rp 1,287,291,179.60
- Beton Bertulang untuk Kansteen M3 3.8500 Rp 9,274,973.13 Rp 35,708,646.54
3 Anti corrosion tape tiang pancang + pemasangan M2 100.7797 Rp 4,880,049.95 Rp 491,809,969.95
4 Delatasi M' 16.0000 Rp 426,687.64 Rp 6,827,002.30
5 Pengadaan dan Pemasangan Lampu Solar Cell Bh 1.0000 Rp 40,098,233.56 Rp 40,098,233.56
6 Pengecatan Kansteen M2 61.0500 Rp 32,407.50 Rp 1,978,477.88
SUB TOTAL V Rp 4,496,935,786.79
VI PEK. TRESTLE SEGMEN XXIII (50 x 8) M2
1 Tiang Pancang
- Tiang Pancang Baja Ø 457, 2 mm t = 12,7 mm Kg 94,105.9600 26,140.50 Rp 2,459,976,847.38
- Pembuatan Sepatu Tiang Pancang BH 26.0000 3,819,354.85 Rp 99,303,226.10
- Sambungan Tiang Pancang BH 52.0000 1,041,658.88 Rp 54,166,261.76
- Pengangkutan Tiang Pancang ke Titik Pancang M' 676.0000 152,030.17 Rp 102,772,393.81
- Pemancangan Tanpa Diesel Hammer M' 104.0000 524,275.22 Rp 54,524,622.61
- Pemancangan Tiang Pancang Tegak M' 572.0000 771,446.63 Rp 441,267,473.42
- Pengecatan Tiang Pancang M2 970.4700 171,455.00 Rp 166,391,933.85
- Pemotongan Tiang Pancang BH 26.0000 2,017,211.35 Rp 52,447,495.10
2 Beton Bertulang (K-400)
- Beton Bertulang untuk Pengisi Tiang Pancang M3 6.3995 Rp 10,741,307.15 Rp 68,738,995.11
- Beton Bertulang untuk Pile Cap 90.90.80 M3 15.1415 Rp 11,343,723.09 Rp 171,760,983.14
- Beton Bertulang untuk Balok Melintang 50/70 M3 18.2000 Rp 11,360,191.73 Rp 206,755,489.49
- Beton Bertulang untuk Balok Memanjang 50/70 M3 20.0000 Rp 11,360,191.73 Rp 227,203,834.60
- Beton Bertulang untuk Balok Memanjang 35/50 M3 3.5000 Rp 11,360,191.73 Rp 39,760,671.06
- Beton Bertulang untuk Balok Dudukan Tiang Lampu M3 0.1750 Rp 11,360,191.73 Rp 1,988,033.55
- Beton Bertulang untuk Plat Lantai t = 30 cm M3 120.0000 Rp 10,727,426.50 Rp 1,287,291,179.60
- Beton Bertulang untuk Kansteen M3 3.8500 Rp 9,274,973.13 Rp 35,708,646.54
3 Anti corrosion tape tiang pancang + pemasangan M2 100.7797 Rp 4,880,049.95 Rp 491,809,969.95
4 Delatasi M' 16.0000 Rp 426,687.64 Rp 6,827,002.30
5 Pengadaan dan Pemasangan Lampu Solar Cell Bh 1.0000 Rp 40,098,233.56 Rp 40,098,233.56
6 Pengecatan Kansteen M2 61.0500 Rp 32,407.50 Rp 1,978,477.88
SUB TOTAL VI Rp 6,010,771,770.79
NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

(1) (2) (3) (4) (5) (4) x (5)


VII PEK. TRESTLE SEGMEN XXIV (50 x 8) M2
1 Tiang Pancang
- Tiang Pancang Baja Ø 457, 2 mm t = 12,7 mm Kg 94,105.9600 26,140.50 Rp 2,459,976,847.38
- Pembuatan Sepatu Tiang Pancang BH 26.0000 3,819,354.85 Rp 99,303,226.10
- Sambungan Tiang Pancang BH 52.0000 1,041,658.88 Rp 54,166,261.76
- Pengangkutan Tiang Pancang ke Titik Pancang M' 676.0000 152,030.17 Rp 102,772,393.81
- Pemancangan Tanpa Diesel Hammer M' 104.0000 524,275.22 Rp 54,524,622.61
- Pemancangan Tiang Pancang Tegak M' 572.0000 771,446.63 Rp 441,267,473.42
- Pengecatan Tiang Pancang M2 970.4700 171,455.00 Rp 166,391,933.85
- Pemotongan Tiang Pancang BH 26.0000 2,017,211.35 Rp 52,447,495.10
2 Beton Bertulang (K-400)
- Beton Bertulang untuk Pengisi Tiang Pancang M3 6.3995 Rp 10,741,307.15 Rp 68,738,995.11
- Beton Bertulang untuk Pile Cap 90.90.80 M3 15.1415 Rp 11,343,723.09 Rp 171,760,983.14
- Beton Bertulang untuk Balok Melintang 50/70 M3 18.2000 Rp 11,360,191.73 Rp 206,755,489.49
- Beton Bertulang untuk Balok Memanjang 50/70 M3 20.0000 Rp 11,360,191.73 Rp 227,203,834.60
- Beton Bertulang untuk Balok Memanjang 35/50 M3 3.5000 Rp 11,360,191.73 Rp 39,760,671.06
- Beton Bertulang untuk Balok Dudukan Tiang Lampu M3 0.1750 Rp 11,360,191.73 Rp 1,988,033.55
- Beton Bertulang untuk Plat Lantai t = 30 cm M3 120.0000 Rp 10,727,426.50 Rp 1,287,291,179.60
- Beton Bertulang untuk Kansteen M3 3.8500 Rp 9,274,973.13 Rp 35,708,646.54
3 Anti corrosion tape tiang pancang + pemasangan M2 100.7797 Rp 4,880,049.95 Rp 491,809,969.95
4 Delatasi M' 16.0000 Rp 426,687.64 Rp 6,827,002.30
5 Pengadaan dan Pemasangan Lampu Solar Cell Bh 1.0000 Rp 40,098,233.56 Rp 40,098,233.56
6 Pengecatan Kansteen M2 61.0500 Rp 32,407.50 Rp 1,978,477.88
SUB TOTAL VII Rp 6,010,771,770.79
VIII PEK. TRESTLE SEGMEN XXV (50 x 8) M2
1 Tiang Pancang
- Tiang Pancang Baja Ø 457, 2 mm t = 12,7 mm Kg 94,105.9600 26,140.50 Rp 2,459,976,847.38
- Pembuatan Sepatu Tiang Pancang BH 26.0000 3,819,354.85 Rp 99,303,226.10
- Sambungan Tiang Pancang BH 52.0000 1,041,658.88 Rp 54,166,261.76
- Pengangkutan Tiang Pancang ke Titik Pancang M' 676.0000 152,030.17 Rp 102,772,393.81
- Pemancangan Tanpa Diesel Hammer M' 104.0000 524,275.22 Rp 54,524,622.61
- Pemancangan Tiang Pancang Tegak M' 572.0000 771,446.63 Rp 441,267,473.42
- Pengecatan Tiang Pancang M2 970.4700 171,455.00 Rp 166,391,933.85
- Pemotongan Tiang Pancang BH 26.0000 2,017,211.35 Rp 52,447,495.10
2 Beton Bertulang (K-400)
- Beton Bertulang untuk Pengisi Tiang Pancang M3 6.3995 10,741,307.15 Rp 68,738,995.11
- Beton Bertulang untuk Pile Cap 90.90.80 M3 15.1415 11,343,723.09 Rp 171,760,983.14
- Beton Bertulang untuk Balok Melintang 50/70 M3 18.2000 11,360,191.73 Rp 206,755,489.49
- Beton Bertulang untuk Balok Memanjang 50/70 M3 20.0000 11,360,191.73 Rp 227,203,834.60
- Beton Bertulang untuk Balok Memanjang 35/50 M3 3.5000 11,360,191.73 Rp 39,760,671.06
- Beton Bertulang untuk Balok Dudukan Tiang Lampu M3 0.1750 11,360,191.73 Rp 1,988,033.55
- Beton Bertulang untuk Plat Lantai t = 30 cm M3 120.0000 10,727,426.50 Rp 1,287,291,179.60
- Beton Bertulang untuk Kansteen M3 3.8500 9,274,973.13 Rp 35,708,646.54
SUB TOTAL VIII Rp 5,470,058,087.12
IX PEK. TRESTLE SEGMEN XXVI (50 x 8) M2
1 Tiang Pancang
- Tiang Pancang Baja Ø 457, 2 mm t = 12,7 mm Kg 32,575.1400 26,140.50 Rp 851,530,447.17
SUB TOTAL IX Rp 851,530,447.17
X PEKERJAAN LAIN-LAIN
1 Administrasi dan Dokumentasi Ls 1.0000 35,000,000.00 Rp 35,000,000.00
2 Penyelesaian Akhir Ls 1.0000 32,000,000.00 Rp 32,000,000.00

SUB TOTAL X Rp 67,000,000.00


ANALISIS HARGA SATUAN PEKERJAAN
BIDANG PEKERJAAN UMUM
No. 11/PRT/M/2013

Satuan Upah Bahan Jumlah


No Uraian Kode Sat. Koef.
(Rp) (Rp) (Rp) (Rp)
HARGA SATUAN PEKERJAAN PERSIAPAN

Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 m'


A TENAGA
Pekerja L.01 OH 0.200 78,000.00 15,600.00
Tukang Kayu L.02 OH 0.400 100,000.00 40,000.00
Kepala Tukang Kayu L.03 OH 0.020 137,000.00 2,740.00
Mandor L.04 OH 0.020 135,000.00 2,700.00
B BAHAN
Dolken kayu Ø 8-10/400 cm Btg 1.250 7,000.00 8,750.00
Semen PC (50 kg) Kg 2.500 1,250.00 3,125.00
Seng gelombang Lbr 1.200 #N/A #N/A
Pasir beton m3 0.005 296,000.00 1,480.00
Koral beton m3 0.009 #N/A #N/A
Kayu 5/7 m3 0.072 2,850,000.00 205,200.00
Paku biasa 2' - 5' Kg 0.060 16,200.00 972.00
Meni besi Liter 0.450 #N/A #N/A
61,040.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Pengukuran dan pemasangan 1 m' Bouwplank


A TENAGA
Pekerja L.01 OH 0.100 78,000.00 7,800.00
Tukang Kayu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang Kayu L.03 OH 0.010 137,000.00 1,370.00
Mandor L.04 OH 0.005 135,000.00 675.00
B BAHAN
Kayu balok 5/5 m3 0.120 2,850,000.00 342,000.00
Paku biasa 2' - 3' kg 0.020 #N/A #N/A
Kayu papan 3/20 m3 0.007 2,850,000.00 19,950.00
19,845.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Pembuatan 1 m2 kantor senentara
A TENAGA
Pekerja L.01 OH 1.000 78,000.00 78,000.00
Tukang Kayu L.02 OH 1.500 100,000.00 150,000.00
Kepala Tukang Kayu L.03 OH 0.150 137,000.00 20,550.00
Mandor L.04 OH 0.050 135,000.00 6,750.00
B BAHAN
Dolken kayu Ø 8-10/400 cm Btg 3.000 #N/A #N/A
Kayu m3 0.276 2,850,000.00 786,600.00
Paku biasa Kg 0.700 #N/A #N/A
Seng gelombang Lbr 1.500 #N/A #N/A
255,300.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

HARGA SATUAN PEKERJAAN TANAH

Penggalian 1 m3 tanah biasa sedalam 1 m'


A TENAGA
Pekerja L.01 OH 0.750 78,000.00 58,500.00
Mandor L.04 OH 0.025 135,000.00 3,375.00
B BAHAN
61,875.00 - 61,875.00
Jumlah A + B 61,875.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 61,875.00
E Overhead & Profit ( % X D ) 10% 6,187.50
F Harga Sat. Pekerjaaan (D+E) 68,062.50

Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m3 galian dihitung 1/3 kali dari Koef. pekerjaan galian
A TENAGA
Pekerja L.01 OH 0.500 78,000.00 39,000.00
Mandor L.04 OH 0.050 135,000.00 6,750.00
B BAHAN
45,750.00 - 45,750.00
Jumlah A + B 45,750.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 45,750.00
E Overhead & Profit ( % X D ) 10% 4,575.00
F Harga Sat. Pekerjaaan (D+E) 50,325.00

0070C0Analisa Harga Satuan


Pemadatan tanah 1 m3 tanah (per 20 cm )
A TENAGA
Pekerja L.01 OH 0.500 78,000.00 39,000.00
Mandor L.04 OH 0.050 135,000.00 6,750.00
JUMLAH TENAGA KERJA 45,750.00
B BAHAN
52,500.00 - 52,500.00
Jumlah A + B 52,500.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 52,500.00
E Overhead & Profit ( % X D ) 10% 5,250.00
F Harga Sat. Pekerjaaan (D+E) 57,750.00

Pengurugan 1 m3 dengan pasir urug


A TENAGA
Pekerja L.01 OH 0.300 78,000.00 23,400.00
Mandor L.04 OH 0.010 135,000.00 1,350.00
B BAHAN
Pasir urug m3 1.200 #N/A #N/A
24,750.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Pengurugan 1 m3 dengan tanah urug


A TENAGA
Pekerja L.01 OH 0.300 78,000.00 23,400.00
Mandor L.04 OH 0.010 135,000.00 1,350.00
B BAHAN
Tanah Timbunan Biasa m3 1.400 106,666.67 149,333.33
24,750.00 149,333.33 174,083.33
Jumlah A + B 174,083.33
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 174,083.33
E Overhead & Profit ( % X D ) 10% 17,408.33
F Harga Sat. Pekerjaaan (D+E) 191,491.67

Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


A TENAGA
Pekerja L.01 OH 0.150 78,000.00 11,700.00
Mandor L.04 OH 0.015 135,000.00 2,025.00
B BAHAN
Ijuk m2 6.000 #N/A #N/A
#N/A - #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Pengurugan 1 m3 sirtu padat
A TENAGA
Pekerja L.01 OH 0.250 78,000.00 19,500.00
Mandor L.04 OH 0.025 135,000.00 3,375.00
B BAHAN
Sirtu m3 1.200 #N/A #N/A
22,875.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

HARGA SATUAN PEKERJAAN PONDASI

Pemasangan 1 m3 pondasi batu gunung campuran 1SP:5PP


A TENAGA
Pekerja L.01 OH 1.500 78,000.00 117,000.00
Tukang batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang Batu L.03 OH 0.075 137,000.00 10,275.00
Mandor L.04 OH 0.075 135,000.00 10,125.00
B BAHAN
Batu belah m3 1.200 195,550.00 234,660.00
Semen PC (50 kg) Kg 136.000 1,250.00 170,000.00
Pasir pasangan m3 0.544 130,000.00 70,720.00
212,400.00 475,380.00 687,780.00
Jumlah A + B 687,780.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 687,780.00
E Overhead & Profit ( % X D ) 10% 68,778.00
F Harga Sat. Pekerjaaan (D+E) 756,558.00

Pemasangan 1 m3 pondasi batu kosong (anstamping)


A TENAGA
Pekerja L.01 OH 0.780 78,000.00 60,840.00
Tukang batu L.02 OH 0.390 100,000.00 39,000.00
Kepala Tukang Batu L.03 OH 0.039 137,000.00 5,343.00
Mandor L.04 OH 0.039 135,000.00 5,265.00
B BAHAN
Batu belah m3 1.200 195,550.00 234,660.00
Pasir urug m3 0.485 240,750.00 116,763.75
110,448.00 351,423.75 461,871.75
Jumlah A + B 461,871.75
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 461,871.75
E Overhead & Profit ( % X D ) 10% 46,187.18
F Harga Sat. Pekerjaaan (D+E) 508,058.93

0070C0Analisa Harga Satuan


HARGA SATUAN PEKERJAAN BETON

Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)


A TENAGA
Pekerja L.01 OH 5.300 78,000.00 413,400.00
Tukang batu L.02 OH 0.275 100,000.00 27,500.00
Tukang Kayu L.02 OH 1.300 100,000.00 130,000.00
Tukang besi L.02 OH 1.050 100,000.00 105,000.00
Kepala Tukang Besi L.03 OH 0.262 137,000.00 35,894.00
Mandor L.04 OH 0.265 135,000.00 35,775.00
B BAHAN
Kayu Balok kelas III m3 0.200 2,850,000.00 570,000.00
Paku 5 - 12 cm Kg 1.500 #N/A #N/A
Minyak bekisting Ltr 0.400 #N/A #N/A
Besi beton Polos Kg 157.500 16,000.00 2,520,000.00
Kawat beton Kg 2.250 #N/A #N/A
Semen PC (50 kg) Kg 336.000 1,250.00 420,000.00
Pasir beton m3 0.540 #N/A #N/A
Kerikil m3 0.810 #N/A #N/A
747,569.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Membuat 1 m2 bekisting untuk sloof


A TENAGA
Pekerja L.01 OH 0.520 78,000.00 40,560.00
Tukang Kayu L.02 OH 0.260 100,000.00 26,000.00
Kepala Tukang Kayu L.03 OH 0.026 137,000.00 3,562.00
Mandor L.04 OH 0.026 135,000.00 3,510.00
B BAHAN
Kayu Balok kelas III m3 0.045 2,850,000.00 128,250.00
Paku 5 - 10 cm Kg 0.300 #N/A #N/A
Minyak bekisting Ltr 0.100 #N/A #N/A
73,632.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A
Membuat 1 m2 bekisting untuk kolom
A TENAGA
Pekerja L.01 OH 0.660 78,000.00 51,480.00
Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang Kayu L.03 OH 0.033 137,000.00 4,521.00
Mandor L.04 OH 0.033 135,000.00 4,455.00
B BAHAN
Kayu Balok kelas III m3 0.040 2,850,000.00 114,000.00
Paku 5 - 10 cm Kg 0.400 17,500.00 7,000.00
Minyak bekisting Ltr 0.200 #N/A #N/A
Kayu Balok kelas II m3 0.015 5,250,000.00 78,750.00
Plywood 9 mm Lbr 0.350 #N/A #N/A
Dolken kayu Ø 8-10/400 cm Btg 2.000 #N/A #N/A
93,456.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Membuat 1 m2 bekisting untuk balok
A TENAGA
Pekerja L.01 OH 0.660 78,000.00 51,480.00
Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang Kayu L.03 OH 0.033 137,000.00 4,521.00
Mandor L.04 OH 0.033 135,000.00 4,455.00
B BAHAN
Kayu Balok kelas III m3 0.040 2,850,000.00 114,000.00
Paku 5 - 10 cm Kg 0.400 17,500.00 7,000.00
Minyak bekisting Ltr 0.200 #N/A #N/A
Kayu Balok kelas II m3 0.018 5,250,000.00 94,500.00
Plywood 9 mm Lbr 0.350 #N/A #N/A
Dolken kayu Ø 8-10/400 cm Btg 2.000 #N/A #N/A
93,456.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Membuat 1 m2 bekisting untuk lantai


A TENAGA
Pekerja L.01 OH 0.660 78,000.00 51,480.00
Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang Kayu L.03 OH 0.033 137,000.00 4,521.00
Mandor L.04 OH 0.033 135,000.00 4,455.00
B BAHAN
Kayu Balok kelas III m3 0.040 2,850,000.00 114,000.00 114,000.00
Paku 5 - 10 cm Kg 0.400 17,500.00 7,000.00 7,000.00
Minyak bekisting Ltr 0.200 #N/A #N/A #N/A
Kayu Balok kelas II m3 0.015 5,250,000.00 78,750.00 78,750.00
Plywood 9 mm Lbr 0.350 #N/A #N/A #N/A
Dolken kayu Ø 8-10/400 cm Btg 6.000 #N/A #N/A #N/A
#N/A #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A
Membuat 1 m3 beton mutu f' = 7,4 Mpa (K 100), slump (12 ±2) cm, w/c = 0,87
A TENAGA
Pekerja L.01 OH 1.650 78,000.00 128,700.00
Tukang batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang Batu L.03 OH 0.028 137,000.00 3,836.00
Mandor L.04 OH 0.083 135,000.00 11,205.00
B BAHAN
Semen PC (50 kg) Kg 247.000 1,250.00 308,750.00
Pasir beton Kg 869.000 80.55 69,997.95
Kerikil (Maks. 30 mm) Kg 999.000 138.21 138,071.79
Air Bersih Ltr 215.000 #N/A #N/A
171,241.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Membuat 1 m3 beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58
A TENAGA
Pekerja L.01 OH 1.650 78,000.00 128,700.00
Tukang batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang Batu L.03 OH 0.028 137,000.00 3,836.00
Mandor L.04 OH 0.083 135,000.00 11,205.00
B BAHAN
Semen PC (50 kg) Kg 371.000 1,250.00 463,750.00
Pasir beton Kg 698.000 80.55 56,223.90
Kerikil (Maks. 30 mm) Kg 1,047.000 138.21 144,705.87
Air Bersih Ltr 215.000 #N/A #N/A
171,241.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Membuat 10 kg dengan besi polos atau besi ulir


A TENAGA
Pekerja L.01 OH 0.070 78,000.00 5,460.00
Tukang besi L.02 OH 0.070 100,000.00 7,000.00
Kepala Tukang Besi L.03 OH 0.007 137,000.00 959.00
Mandor L.04 OH 0.004 135,000.00 540.00
B BAHAN
Besi beton (polos/ulir) Kg 10.500 16,000.00 168,000.00
Kawat beton Kg 0.150 20,000.00 3,000.00
13,959.00 171,000.00 184,959.00
Jumlah A + B 184,959.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 184,959.00
E Overhead & Profit ( % X D ) 10% 18,495.90
F Harga Sat. Pekerjaaan (D+E) 203,454.90
G Harga Sat. Pekerjaaan /Kg (F/10) 20,345.49

Membuat 1 m3 beton sloef


A TENAGA
Pekerja L.01 OH 7.050 78,000.00 549,900.00
Tukang Kayu L.02 OH 1.560 100,000.00 156,000.00
Kepala Tukang Kayu L.03 OH 0.403 137,000.00 55,211.00
Mandor L.04 OH 0.353 135,000.00 47,655.00
B BAHAN
Kayu Balok kelas III m3 0.380 2,850,000.00 1,083,000.00
Paku 5 - 12 cm Kg 3.800 #N/A #N/A
Minyak bekisting Ltr 1.600 #N/A #N/A
808,766.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Membuat 1 m3 kolom beton
A TENAGA
Pekerja L.01 OH 7.050 78,000.00 549,900.00
Tukang batu L.02 OH 0.275 100,000.00 27,500.00
Tukang Kayu L.02 OH 1.560 100,000.00 156,000.00
Tukang besi L.02 OH 2.100 100,000.00 210,000.00
Kepala Tukang Besi L.03 OH 0.403 137,000.00 55,211.00
Mandor L.04 OH 0.353 135,000.00 47,655.00
B BAHAN
Kayu Balok kelas III m3 0.320 2,850,000.00 912,000.00
Paku 5 - 12 cm Kg 3.200 #N/A #N/A
Minyak bekisting Ltr 1.600 #N/A #N/A
Besi beton Polos Kg 171.260 16,000.00 2,740,160.00
Kawat beton Kg 2.250 #N/A #N/A
Semen PC (50 kg) Kg 336.000 1,250.00 420,000.00
Pasir beton m3 0.540 296,000.00 159,840.00
Kerikil m3 0.810 #N/A #N/A
Kayu Balok kelas II m3 0.200 5,250,000.00 1,050,000.00
Plywood 9 mm Lbr 2.800 #N/A #N/A
Dolken kayu Ø 8-10/400 cm Btg 32.000 #N/A #N/A
1,046,266.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Membuat 1 m3 kolom beton


A TENAGA
Pekerja L.01 OH 7.050 78,000.00 549,900.00
Tukang batu L.02 OH 0.275 100,000.00 27,500.00
Tukang Kayu L.02 OH 1.560 100,000.00 156,000.00
Tukang besi L.02 OH 2.100 100,000.00 210,000.00
Kepala Tukang Besi L.03 OH 0.403 137,000.00 55,211.00
Mandor L.04 OH 0.353 135,000.00 47,655.00
B BAHAN
Kayu Balok kelas III m3 0.320 2,850,000.00 912,000.00
Paku 5 - 12 cm Kg 3.200 #N/A #N/A
Minyak bekisting Ltr 1.600 #N/A #N/A
Besi beton Polos Kg 189.380 16,000.00 3,030,080.00
Kawat beton Kg 2.250 #N/A #N/A
Semen PC (50 kg) Kg 336.000 1,250.00 420,000.00
Pasir beton m3 0.540 296,000.00 159,840.00
Kerikil m3 0.810 #N/A #N/A
Kayu Balok kelas II m3 0.120 5,250,000.00 630,000.00
Plywood 9 mm Lbr 2.800 #N/A #N/A
Dolken kayu Ø 8-10/400 cm Btg 32.000 #N/A #N/A
1,046,266.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Membuat 1 m3 kolom beton
A TENAGA
Pekerja L.01 OH 7.050 78,000.00 549,900.00
Tukang batu L.02 OH 0.275 100,000.00 27,500.00
Tukang Kayu L.02 OH 1.560 100,000.00 156,000.00
Tukang besi L.02 OH 2.100 100,000.00 210,000.00
Kepala Tukang Besi L.03 OH 0.403 137,000.00 55,211.00
Mandor L.04 OH 0.353 135,000.00 47,655.00
B BAHAN
Kayu Balok kelas III m3 0.320 2,850,000.00 912,000.00
Paku 5 - 12 cm Kg 3.200 #N/A #N/A
Minyak bekisting Ltr 1.600 #N/A #N/A
Besi beton Polos Kg 171.260 16,000.00 2,740,160.00
Kawat beton Kg 2.250 #N/A #N/A
Semen PC (50 kg) Kg 343.000 1,250.00 428,750.00
Pasir beton m3 0.540 296,000.00 159,840.00
Kerikil m3 0.810 #N/A #N/A
Kayu Balok kelas II m3 0.300 5,250,000.00 1,575,000.00
Plywood 9 mm Lbr 2.800 #N/A #N/A
Dolken kayu Ø 8-10/400 cm Btg 32.000 #N/A #N/A
1,046,266.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Membuat 1 m3 kolom beton 15X15


A TENAGA
Pekerja L.01 OH 7.050 78,000.00 549,900.00
Tukang batu L.02 OH 0.275 100,000.00 27,500.00
Tukang Kayu L.02 OH 1.560 100,000.00 156,000.00
Tukang besi L.02 OH 2.100 100,000.00 210,000.00
Kepala Tukang Besi L.03 OH 0.403 137,000.00 55,211.00
Mandor L.04 OH 0.353 135,000.00 47,655.00
B BAHAN
Kayu Balok kelas III m3 0.320 2,850,000.00 912,000.00
Paku 5 - 12 cm Kg 3.200 #N/A #N/A
Minyak bekisting Ltr 1.600 #N/A #N/A
Besi beton Polos Kg 136.120 16,000.00 2,177,920.00
Kawat beton Kg 2.250 #N/A #N/A
Semen PC (50 kg) Kg 336.000 1,250.00 420,000.00
Pasir beton m3 0.540 296,000.00 159,840.00
Kerikil m3 0.810 #N/A #N/A
Kayu Balok kelas II m3 0.200 5,250,000.00 1,050,000.00
Plywood 9 mm Lbr 2.800 #N/A #N/A
Dolken kayu Ø 8-10/400 cm Btg 32.000 #N/A #N/A
1,046,266.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Membuat 1 m3 balok beton
A TENAGA
Pekerja L.01 OH 7.050 78,000.00 549,900.00
Tukang batu L.02 OH 0.275 100,000.00 27,500.00
Tukang Kayu L.02 OH 1.560 100,000.00 156,000.00
Tukang besi L.02 OH 2.100 100,000.00 210,000.00
Kepala Tukang Besi L.03 OH 0.403 137,000.00 55,211.00
Mandor L.04 OH 0.353 135,000.00 47,655.00
B BAHAN
Kayu Balok kelas III m3 0.320 2,850,000.00 912,000.00
Paku 5 - 12 cm Kg 3.200 #N/A #N/A
Minyak bekisting Ltr 1.600 #N/A #N/A
Besi beton Polos Kg 171.260 16,000.00 2,740,160.00
Kawat beton Kg 2.250 #N/A #N/A
Semen PC (50 kg) Kg 336.000 1,250.00 420,000.00
Pasir beton m3 0.540 296,000.00 159,840.00
Kerikil m3 0.810 #N/A #N/A
Kayu Balok kelas II m3 0.120 5,250,000.00 630,000.00
Plywood 9 mm Lbr 2.800 #N/A #N/A
Dolken kayu Ø 8-10/400 cm Btg 32.000 #N/A #N/A
1,046,266.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

Pemasangan 1 m2 kusen pintu alluminium


A TENAGA
Pekerja L.02 OH 0.043 78,000.00 3,354.00
Tukang aluminium L.02 OH 0.043 #N/A #N/A
Kepala tukang Aluminiu L.03 OH 0.004 137,000.00 589.10
Mandor L.04 OH 0.002 135,000.00 283.50
B BAHAN
Profil alluminium m 1.100 297,000.00 326,700.00
Skrup biji 2.000 250.00 500.00
Sealant tube 0.060 #N/A #N/A
#N/A #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


HARGA SATUAN PEKERJAAN PASANGAN DINDING

Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:2PP
A TENAGA
Pekerja L.02 OH 0.300 78,000.00 23,400.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang Batu L.03 OH 0.010 137,000.00 1,370.00
Mandor L.04 OH 0.015 135,000.00 2,025.00
B BAHAN
Bata merah bh 74.000 550.00 40,700.00
Semen PC (50 kg) kg 19.950 1,250.00 24,937.50
Pasir pasangan m3 0.060 130,000.00 7,800.00
36,795.00 73,437.50 110,232.50
Jumlah A + B 110,232.50
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 110,232.50
E Overhead & Profit ( % X D ) 10% 11,023.25
F Harga Sat. Pekerjaaan (D+E) 121,255.75

Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:4PP
A TENAGA
Pekerja L.02 OH 0.300 78,000.00 23,400.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang Batu L.03 OH 0.010 137,000.00 1,370.00
Mandor L.04 OH 0.015 135,000.00 2,025.00
B BAHAN
Bata merah bh 74.000 550.00 40,700.00
Semen PC (50 kg) kg 12.800 1,250.00 16,000.00
Pasir pasangan m3 0.060 130,000.00 7,800.00
36,795.00 64,500.00 101,295.00
Jumlah A + B 101,295.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 101,295.00
E Overhead & Profit ( % X D ) 10% 10,129.50
F Harga Sat. Pekerjaaan (D+E) 111,424.50

HARGA Sat. PEKERJAAN PLESTERAN

Pemasangan 1 m2 plesteran 1SP:2PP tebal 15mm


A TENAGA
Pekerja L.02 OH 0.300 78,000.00 23,400.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang Batu L.03 OH 0.010 137,000.00 1,370.00
Mandor L.04 OH 0.015 135,000.00 2,025.00
B BAHAN
Semen PC (50 kg) kg 10.224 1,250.00 12,780.00
Pasir pasangan m3 0.035 130,000.00 4,550.00
36,795.00 17,330.00 54,125.00
Jumlah A + B 54,125.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 54,125.00
E Overhead & Profit ( % X D ) 10% 5,412.50
F Harga Sat. Pekerjaaan (D+E) 59,537.50

0070C0Analisa Harga Satuan


Pemasangan 1 m2 plesteran 1SP:4PP tebal 15mm
A TENAGA
Pekerja L.02 OH 0.300 78,000.00 23,400.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang Batu L.03 OH 0.010 137,000.00 1,370.00
Mandor L.04 OH 0.015 135,000.00 2,025.00
B BAHAN
Semen PC (50 kg) kg 6.240 1,250.00 7,800.00
Pasir pasangan m3 0.035 130,000.00 4,550.00
36,795.00 12,350.00 49,145.00
Jumlah A + B 49,145.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 49,145.00
E Overhead & Profit ( % X D ) 10% 4,914.50
F Harga Sat. Pekerjaaan (D+E) 54,059.50

Pemasangan 1 m2 acian
A TENAGA
Pekerja L.02 OH 0.200 78,000.00 15,600.00
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang Batu L.03 OH 0.010 137,000.00 1,370.00
Mandor L.04 OH 0.010 135,000.00 1,350.00
B BAHAN
Semen PC (50 kg) kg 3.450 1,250.00 4,312.50
28,320.00 4,312.50 32,632.50
Jumlah A + B 32,632.50
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 32,632.50
E Overhead & Profit ( % X D ) 10% 3,263.25
F Harga Sat. Pekerjaaan (D+E) 35,895.75

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

Pemasangan 1 m2 lantai keramik ukuran 40x 40cm


A TENAGA
Pekerja L.02 OH 0.240 78,000.00 18,720.00
Tukang Batu L.02 OH 0.120 100,000.00 12,000.00
Kepala Tukang Batu L.03 OH 0.012 137,000.00 1,644.00
Mandor L.04 OH 0.012 135,000.00 1,620.00
B BAHAN
Keramik 40X40 Putih m2 1.000 75,000.00 75,000.00
Semen PC (50 kg) kg 9.800 1,250.00 12,250.00
Semen warna kg 1.500 #N/A #N/A
Pasir Pasangan m3 0.046 130,000.00 5,967.00
33,984.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Pemasangan 1 m2 lantai keramik warna ukuran 20x20cm
A TENAGA
Pekerja L.02 OH 0.250 78,000.00 19,500.00
Tukang Batu L.02 OH 0.125 100,000.00 12,500.00
Kepala Tukang Batu L.03 OH 0.013 137,000.00 1,781.00
Mandor L.04 OH 0.013 135,000.00 1,755.00
B BAHAN
Keramik 20X20 Warna m2 1.000 63,400.00 63,400.00
Semen PC (50 kg) kg 9.800 1,250.00 12,250.00
Semen warna kg 1.500 16,600.00
Pasir Pasangan m3 0.045 130,000.00 5,850.00
35,536.00 81,500.00 117,036.00
Jumlah A + B 117,036.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 117,036.00
E Overhead & Profit ( % X D ) 10% 11,703.60
F Harga Sat. Pekerjaaan (D+E) 128,739.60

Pemasangan 1 m' Plint 20 X 40 cm


A TENAGA
Pekerja L.02 OH 0.090 78,000.00 7,020.00
Tukang batu L.02 OH 0.090 100,000.00 9,000.00
Kepala tukang Batu L.03 OH 0.009 137,000.00 1,233.00
Mandor L.04 OH 0.005 135,000.00 675.00
B BAHAN
Keramik 40X40 Putih m2 0.040 75,000.00 3,000.00
Semen PC (50 kg) kg 1.140 1,250.00 1,425.00
Semen warna kg 0.100 #N/A #N/A
Pasir Pasangan m3 0.003 130,000.00 390.00
17,928.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Pemasangan 1 m2 dinding keramik 20x20 cm


A TENAGA
Pekerja L.02 OH 0.179 78,000.00 13,962.00
Tukang batu L.02 OH 0.179 100,000.00 17,900.00
Kepala tukang Batu L.03 OH 0.018 137,000.00 2,452.30
Mandor L.04 OH 0.010 135,000.00 1,336.50
B BAHAN
Keramik 20x20 polos m2 1.000 50,000.00 50,000.00
Semen PC (50 kg) kg 1.140 1,250.00 1,425.00
Semen warna kg 0.100 #N/A #N/A
Pasir pasangan m3 0.003 130,000.00 390.00
35,650.80 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


DAFTAR HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafond


A TENAGA
Pekerja L.02 OH 0.350 78,000.00 27,300.00
Tukang Besi L.02 OH 0.350 100,000.00 35,000.00
Kepala tukang Besi L.03 OH 0.035 137,000.00 4,795.00
Mandor L.04 OH 0.018 135,000.00 2,430.00
B BAHAN
Besi Hollow 0.8X40X40 mm Lbr 4.000 51,525.00 206,100.00
assesoris (perkuatan, las, dll) kg 20% 206,100.00 41,220.00
69,525.00 247,320.00 316,845.00
Jumlah A + B 316,845.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 316,845.00
E Overhead & Profit ( % X D ) 10% 31,684.50
F Harga Sat. Pekerjaaan (D+E) 348,529.50

Pemasangan 1 m2 langit-langit calsiboard ukuran (120x240x9)mm. tebal 9mm


A TENAGA
Pekerja L.02 OH 0.100 78,000.00 7,800.00
Tukang kayu L.02 OH 0.050 100,000.00 5,000.00
Kepala tukang Batu L.03 OH 0.005 137,000.00 685.00
Mandor L.04 OH 0.005 135,000.00 675.00
B BAHAN
Calsiboard Lbr 0.464 65,000.00 30,160.00
Paku skrup kg 0.110 #N/A #N/A
14,160.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Pemasangan 1 m2 List Langit-langit Gipsum


A TENAGA
Pekerja L.02 OH 0.050 78,000.00 3,900.00
Tukang kayu L.02 OH 0.050 100,000.00 5,000.00
Kepala tukang Batu L.03 OH 0.005 137,000.00 685.00
Mandor L.04 OH 0.003 135,000.00 405.00
B BAHAN
List Profil Gipsum m 1.059 26,100.00 27,639.90
Paku Gipsum kg 0.020 #N/A #N/A
9,990.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Pemasangan 1 m2 rangka langit-langit besi hollow 40.40 (Lihat pada Pekerjaan Besi dan Alluminium)
HARGA SATUAN PEKERJAAN ALUMUNIUM

Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, alumunium


A TENAGA
Pekerja L.02 OH 0.043 78,000.00 3,354.00
Tukang alumunium L.02 OH 0.043 100,000.00 4,300.00
Kepala tukang alumuni L.03 OH 0.004 137,000.00 589.10
Mandor L.04 OH 0.002 135,000.00 283.50
B BAHAN
profil alumunium m 1.100 100,000.00 110,000.00
skrup fixer buah 2.000 400.00 800.00
sealant tube 0.060 16,500.00 990.00
8,526.60 111,790.00 120,316.60
Jumlah A + B 120,316.60
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 120,316.60
E Overhead & Profit ( % X D ) 10% 12,031.66
F Harga Sat. Pekerjaaan (D+E) 132,348.26

0070C0Analisa Harga Satuan


Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
A TENAGA
Pekerja L.02 OH 1.000 78,000.00 78,000.00
Tukang kayu L.02 OH 3.000 100,000.00 300,000.00
Kepala tukang Kayu L.03 OH 0.300 137,000.00 41,100.00
Mandor L.04 OH 0.050 135,000.00 6,750.00
B BAHAN
Kayu Papan Kelas I m3 0.040 16,000,000.00 640,000.00
Lem kayu kg 0.050 - -
425,850.00 640,000.00 1,065,850.00
Jumlah A + B 1,065,850.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 1,065,850.00
E Overhead & Profit ( % X D ) 10% 106,585.00
F Harga Sat. Pekerjaaan (D+E) 1,172,435.00

0070C0Analisa Harga Satuan


Pemasangan 1 m' listplank Woodplank
A TENAGA
Pekerja L.02 OH 0.100 78,000.00 7,800.00
Tukang kayu L.02 OH 0.200 100,000.00 20,000.00
Kepala tukang Kayu L.03 OH 0.020 137,000.00 2,740.00
Mandor L.04 OH 0.005 135,000.00 675.00
B BAHAN
Woodplank 8 - 30 cm m1 1.100 #N/A #N/A
Paku Skrup kg 0.057 #N/A #N/A
31,215.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

HARGA SATUAN PEKERJAAN KUNCI DAN KACA

Pemasangan 1 buah kunci tanam biasa


A TENAGA
Pekerja L.02 OH 0.010 78,000.00 780.00
Tukang kayu L.02 OH 0.500 100,000.00 50,000.00
Kepala tukang Kayu L.03 OH 0.050 137,000.00 6,850.00
Mandor L.04 OH 0.005 135,000.00 675.00
B BAHAN
Kunci tanam biasa bh 1.000 #N/A #N/A
58,305.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Pemasangan 1 buah Grendel Pintu Tanam


A TENAGA
Pekerja L.02 OH 0.015 78,000.00 1,170.00
Tukang kayu L.02 OH 0.150 100,000.00 15,000.00
Kepala tukang Kayu L.03 OH 0.015 137,000.00 2,055.00
Mandor L.04 OH 0.001 135,000.00 108.00
B BAHAN
Grendel Pintu Tanam bh 1.000 #N/A #N/A
18,333.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Pemasangan 1 buah engsel pintu
A TENAGA
Pekerja L.02 OH 0.015 78,000.00 1,170.00
Tukang kayu L.02 OH 0.150 100,000.00 15,000.00
Kepala tukang Kayu L.03 OH 0.015 137,000.00 2,055.00
Mandor L.04 OH 0.001 135,000.00 108.00
B BAHAN
Engsel pintu bh 1.000 165,000.00 165,000.00
18,333.00 165,000.00 183,333.00
Jumlah A + B 183,333.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 183,333.00
E Overhead & Profit ( % X D ) 10% 18,333.30
F Harga Sat. Pekerjaaan (D+E) 201,666.30

Pemasangan 1 buah engsel jendela


A TENAGA
Pekerja L.02 OH 0.015 78,000.00 1,170.00
Tukang kayu L.02 OH 0.150 100,000.00 15,000.00
Kepala tukang Kayu L.03 OH 0.015 137,000.00 2,055.00
Mandor L.04 OH 0.001 135,000.00 108.00
B BAHAN
Engsel jendela bh 1.000 22,000.00 22,000.00
18,333.00 22,000.00 40,333.00
Jumlah A + B 40,333.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 40,333.00
E Overhead & Profit ( % X D ) 10% 4,033.30
F Harga Sat. Pekerjaaan (D+E) 44,366.30

Pemasangan 1 m2 kaca tebal 5 mm


A TENAGA
Pekerja L.02 OH 0.015 78,000.00 1,170.00
Tukang kayu L.02 OH 0.150 100,000.00 15,000.00
Kepala tukang Kayu L.03 OH 0.015 137,000.00 2,055.00
Mandor L.04 OH 0.001 135,000.00 108.00
B BAHAN
Kaca Bening 5 mm m2 1.200 #N/A #N/A
Sealent kg 0.050 #N/A #N/A
18,333.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Pemasangan 1 m2 kaca tebal 12 mm


A TENAGA
Pekerja L.02 OH 0.015 78,000.00 1,170.00
Tukang kayu L.02 OH 0.150 100,000.00 15,000.00
Kepala tukang Kayu L.03 OH 0.015 137,000.00 2,055.00
Mandor L.04 OH 0.001 135,000.00 108.00
B BAHAN
Kaca temper 12 mm m2 1.100 700,000.00 770,000.00
Sealent kg 0.050 #N/A #N/A
18,333.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A

0070C0Analisa Harga Satuan


E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Pintu Type D1
1 1 m kusen pintu dan kusen jendela, alumunium 5.16 132,348.26 682,917.02
2 1 m2 daun pintu panel, kayu kelas I atau II 1.72 1,172,435.00 2,016,588.20
3 1 buah kunci tanam biasa 2.00 #N/A #N/A
4 1 buah Grendel Pintu Tanam 1.00 #N/A #N/A
5 1 buah engsel pintu 3.00 201,666.30 604,998.90
#N/A
Pintu Type D2
1 1 m kusen pintu dan kusen jendela, alumunium 4.96 132,348.26 656,447.37
2 1 m2 daun pintu panel, kayu kelas I atau II 1.29 1,172,435.00 1,512,441.15
3 1 buah kunci tanam biasa 1.00 #N/A #N/A
4 1 buah Grendel Pintu Tanam 1.00 #N/A #N/A
5 1 buah engsel pintu 3.00 201,666.30 604,998.90
#N/A
Pintu Type D3
1 1 m kusen pintu dan kusen jendela, alumunium 5.56 132,348.26 735,856.33
2 1 m2 daun pintu panel, kayu kelas I atau II 2.58 1,172,435.00 3,024,882.30
3 1 buah kunci tanam biasa 2.00 #N/A #N/A
4 1 buah Grendel Pintu Tanam 2.00 #N/A #N/A
5 1 buah engsel pintu 6.00 201,666.30 1,209,997.80
#N/A
jendela Type J1
1 1 m kusen pintu dan kusen jendela, alumunium 3.60 132,348.26 476,453.74
2 Pemasangan 1 m2 kaca tebal 5 mm 0.62 #N/A #N/A
#N/A
Jendela Type J2
1 1 m3 kusen pintu dan kusen jendela, kayu kelas I 5.49 132,348.26 726,591.95
3 1 m2 kaca tebal 5 mm 2.03 #N/A #N/A
#N/A
Jendela Type J3
1 1 m3 kusen pintu dan kusen jendela, kayu kelas I 14.30 132,348.26 1,892,580.12
3 1 m2 kaca tebal 12 mm 5.36 #N/A #N/A
#N/A
Jendela Type J4
1 1 m3 kusen pintu dan kusen jendela, kayu kelas I 2.80 132,348.26 370,575.13
3 1 m2 kaca tebal 5 mm 0.40 #N/A #N/A
#N/A
HARGA SATUAN PEKERJAAN PENGECATAN

Pengerokan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
A TENAGA
Pekerja L.02 OH 0.070 78,000.00 5,460.00
Tukang cat L.02 OH 0.105 100,000.00 10,500.00
Kepala tukang Cat L.03 OH 0.004 137,000.00 548.00
Mandor L.04 OH 0.003 135,000.00 405.00
B BAHAN
Meni Kayu kg 0.200 #N/A #N/A
Plamur Kayu kg 0.150 #N/A #N/A
Cat dasar Kayu kg 0.170 #N/A #N/A
Cat penutup Kayu kg 0.350 #N/A #N/A
Kuas bh 0.010 #N/A #N/A
Thinner kg 0.030 #N/A #N/A
Amplas lbr 0.200 #N/A #N/A
16,913.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.02 OH 0.020 78,000.00 1,560.00
Tukang cat L.02 OH 0.063 100,000.00 6,300.00
Kepala tukang Cat L.03 OH 0.006 137,000.00 863.10
Mandor L.04 OH 0.003 135,000.00 405.00
B BAHAN
Plamur Tembok kg 0.100 #N/A #N/A
Cat dasar Tembok kg 0.100 #N/A #N/A
Cat Penutup Tembok kg 0.260 101,200.00 26,312.00
9,128.10 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

Pemasangan 1 buah closet duduk/monoblock


A TENAGA
Pekerja L.02 OH 3.300 78,000.00 257,400.00
Tukang batu L.02 OH 1.100 100,000.00 110,000.00
Kepala tukang Batu L.03 OH 0.010 137,000.00 1,370.00
Mandor L.04 OH 0.160 135,000.00 21,600.00
B BAHAN
Kloset duduk unit 1.000 #N/A #N/A
Perlengk. (6% Kloset Duduk) ls 6% #N/A #N/A
390,370.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Pemasangan 1 buah wastafel


A TENAGA
Pekerja L.02 OH 1.200 78,000.00 93,600.00
Tukang batu L.02 OH 1.450 100,000.00 145,000.00
Kepala tukang Batu L.03 OH 0.150 137,000.00 20,550.00
Mandor L.04 OH 0.060 135,000.00 8,100.00
B BAHAN
Wastafel unit 1.000 #N/A #N/A
Semen PC (50 kg) kg 6.000 1,250.00 7,500.00
Pasir pasangan m3 0.010 130,000.00 1,300.00
Perlengkapan % 12.000 #N/A #N/A
267,250.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

0070C0Analisa Harga Satuan


Pemasangan 1 buah floor drain
A TENAGA
Pekerja L.02 OH 0.010 78,000.00 780.00
Tukang batu L.02 OH 0.100 100,000.00 10,000.00
Kepala tukang Batu L.03 OH 0.010 137,000.00 1,370.00
Mandor L.04 OH 0.005 135,000.00 675.00
B BAHAN
Floor drain unit 1.000 25,000.00 25,000.00
12,825.00 25,000.00 37,825.00
Jumlah A + B 37,825.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 37,825.00
E Overhead & Profit ( % X D ) 10% 3,782.50
F Harga Sat. Pekerjaaan (D+E) 41,607.50

Pemasangan 1 buah kran Ø ½" atau ¾"


A TENAGA
Pekerja L.02 OH 0.010 78,000.00 780.00
Tukang batu L.02 OH 0.400 100,000.00 40,000.00
Kepala tukang Batu L.03 OH 0.040 137,000.00 5,480.00
Mandor L.04 OH 0.005 135,000.00 675.00
B BAHAN
Kran Air bh 1.000 36,000.00 36,000.00
Sealtape bh 0.025 #N/A #N/A
46,935.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

Pemasangan 1 m' pipa PVC tipe AW Ø ½"


A TENAGA
Pekerja L.02 OH 0.036 78,000.00 2,808.00
Tukang batu L.02 OH 0.060 100,000.00 6,000.00
Kepala tukang Batu L.03 OH 0.006 137,000.00 822.00
Mandor L.04 OH 0.002 135,000.00 270.00
B BAHAN
Pipa PVC Ø ½" m' 1.200 9,200.00 11,040.00
Perlengkapan % 35.000 11,040.00 386,400.00
9,900.00 397,440.00 407,340.00
Jumlah A + B 407,340.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 407,340.00
E Overhead & Profit ( % X D ) 10% 40,734.00
F Harga Sat. Pekerjaaan (D+E) 448,074.00

0070C0Analisa Harga Satuan


Pemasangan 1 m' pipa PVC tipe AW Ø ¾"
A TENAGA
Pekerja L.02 OH 0.036 78,000.00 2,808.00
Tukang batu L.02 OH 0.060 100,000.00 6,000.00
Kepala tukang Batu L.03 OH 0.006 137,000.00 822.00
Mandor L.04 OH 0.002 135,000.00 270.00
B BAHAN
Pipa PVC Ø ¾" m' 1.200 9,700.00 11,640.00
Perlengkapan % 35.000 11,640.00 407,400.00
9,900.00 419,040.00 428,940.00
Jumlah A + B 428,940.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 428,940.00
E Overhead & Profit ( % X D ) 10% 42,894.00
F Harga Sat. Pekerjaaan (D+E) 471,834.00

Pemasangan 1 m' pipa PVC tipe AW Ø 3"


A TENAGA
Pekerja L.02 OH 0.081 78,000.00 6,318.00
Tukang batu L.02 OH 0.135 100,000.00 13,500.00
Kepala tukang Batu L.03 OH 0.014 137,000.00 1,849.50
Mandor L.04 OH 0.004 135,000.00 540.00
B BAHAN
Pipa PVC Ø 3" m' 1.200 99,000.00 118,800.00
Perlengkapan % 35.000 118,800.00 41,580.00
22,207.50 160,380.00 182,587.50
Jumlah A + B 182,587.50
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 182,587.50
E Overhead & Profit ( % X D ) 10% 18,258.75
F Harga Sat. Pekerjaaan (D+E) 200,846.25

Pemasangan 1 m' pipa PVC tipe AW Ø 4"


A TENAGA
Pekerja L.02 OH 0.081 78,000.00 6,318.00
Tukang batu L.02 OH 0.135 100,000.00 13,500.00
Kepala tukang Batu L.03 OH 0.014 137,000.00 1,849.50
Mandor L.04 OH 0.004 135,000.00 540.00
B BAHAN
Pipa PVC Ø 4" m' 1.200 165,000.00 198,000.00
Perlengkapan % 35.000 198,000.00 69,300.00
22,207.50 267,300.00 289,507.50
Jumlah A + B 289,507.50
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 289,507.50
E Overhead & Profit ( % X D ) 10% 28,950.75
F Harga Sat. Pekerjaaan (D+E) 318,458.25

0070C0Analisa Harga Satuan


Pemasangan 1 m' pipa Air Bersih limbah Ø 20 cm
A TENAGA
Pekerja L.02 OH 0.080 78,000.00 6,240.00
Tukang batu L.02 OH 0.040 100,000.00 4,000.00
Kepala tukang Batu L.03 OH 0.004 137,000.00 548.00
Mandor L.04 OH 0.004 135,000.00 540.00
B BAHAN
Pipa bh 1.600 10,120.00 16,192.00
Semen PC (50 kg) kg 35.000 1,250.00 43,750.00
Pasir pasangan m3 0.014 130,000.00 1,820.00
Pasir urug m3 0.014 240,750.00 3,370.50
11,328.00 65,132.50 76,460.50
Jumlah A + B 76,460.50
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 76,460.50
E Overhead & Profit ( % X D ) 10% 7,646.05
F Harga Sat. Pekerjaaan (D+E) 84,106.55

Pemasangan 1 m' pipa Air Bersih limbah jenis pipa tanah Ø 15 cm


A TENAGA
Pekerja L.02 OH 0.060 78,000.00 4,680.00
Tukang batu L.02 OH 0.030 100,000.00 3,000.00
Kepala tukang Batu L.03 OH 0.003 137,000.00 411.00
Mandor L.04 OH 0.004 135,000.00 526.50
B BAHAN
Pipa bh 1.600 10,670.00 17,072.00
Semen PC (50 kg) kg 0.680 1,250.00 850.00
Pasir pasangan m3 0.013 130,000.00 1,690.00
Pasir urug m3 0.012 240,750.00 2,864.93
8,617.50 22,476.93 31,094.43
Jumlah A + B 31,094.43
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 31,094.43
E Overhead & Profit ( % X D ) 10% 3,109.44
F Harga Sat. Pekerjaaan (D+E) 34,203.87

Pemasangan 1 m2 partisi Gipsum


A TENAGA
Pekerja L.02 OH 0.050 78,000.00 3,900.00
Tukang kayu L.02 OH 0.050 100,000.00 5,000.00
Kepala tukang Batu L.03 OH 0.005 137,000.00 685.00
Mandor L.04 OH 0.003 135,000.00 405.00
B BAHAN
kalsiboard LEMBAR 1.050 71,050.00 74,602.50
Paku Gipsum kg 0.010 #N/A #N/A
9,990.00 #N/A #N/A
Jumlah A + B #N/A
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C #N/A
E Overhead & Profit ( % X D ) 10% #N/A
F Harga Sat. Pekerjaaan (D+E) #N/A

HARGA SATUAN PEKERJAAN PEMASANGAN CCTV

INSTALASI CCTV
A TENAGA
Pekerja L.02 OH 1.000 78,000.00 78,000.00
Tukang Listrik L.02 OH 0.500 100,000.00 50,000.00
Kepala tukang L.03 OH 0.050 137,000.00 6,850.00
Mandor L.04 OH 0.005 135,000.00 675.00
alat bantu L.05 OH 0.005 135,000.00 675.00

0070C0Analisa Harga Satuan


B BAHAN
kabel Coaxial 5c-2v mm m 16.000 5,000.00 80,000.00
Pvc Conduit dia 20 mm ls 16.000 3,900.00 62,400.00
Socket PVC dia 20 mm ls 6.000 17,000.00 102,000.00
Tee Dos bh 1.000 600.00 600.00
Klem Pipa bh 16.000 500.00 8,000.00
Flexible Conduit ls 1.000 8,000.00 8,000.00
Material Bantu ls 1.000 250,000.00 250,000.00
136,200.00 80,000.00 216,200.00
Jumlah A + B 216,200.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 216,200.00
E Overhead & Profit ( % X D ) 10% 21,620.00
F Harga Sat. Pekerjaaan (D+E) 237,820.00
HARGA SATUAN PEKERJAAN PEMASANGAN LAN PORT

INSTALASI 5 PORT LAN


A TENAGA
Pekerja L.02 OH 1.000 78,000.00 78,000.00
B BAHAN
switch bh 1.000 250,000.00 250,000.00
kabel 20 m 20.000 3,000.00 60,000.00
Jack RJ 45 bh 4.000 2,000.00 8,000.00
78,000.00 250,000.00 328,000.00
Jumlah A + B 328,000.00
C PERALATAN
- -
Jumlah (Harga Alat) C -
D Jumlah A + B + C 328,000.00
E Overhead & Profit ( % X D ) 10% 32,800.00
F Harga Sat. Pekerjaaan (D+E) 360,800.00
Harga Sat. Pekerjaaan 72,160.00

0070C0Analisa Harga Satuan


DAFTAR ANALISA HARGA SATUAN BIDANG PERHUBUNGAN LAUT

Jumlah Harga
Anls. ID Res. lD Nama Bahan / Upah / Alat Sat. Koef. Harga Satuan Jumlah
Upah Bahan Alat
Bekisting Kansteen
2001 201 Pekerja oh 0.0114 78,000.00 889.20 889.20
2001 202 Tukang oh 0.0114 100,000.00 1,140.00 1,140.00
2001 205 Kepala Tukang oh 0.0011 125,000.00 137.50 137.50
2001 206 Mandor oh 0.0029 135,000.00 391.50 391.50
2001 801 Alat Bantu bulan 1.0000 662,487.45 662,487.45 662,487.45
2001 2201 Paku kg 0.4500 24,750.00 11,137.50 11,137.50
2001 6030 Kayu Kelas III m3 0.0520 2,850,000.00 148,200.00 148,200.00
2001 6044 Multipleks 18 mm lbr 0.4500 350,000.00 157,500.00 157,500.00
2001 7030 Oli ltr 0.2000 55,000.00 11,000.00 11,000.00
JUMLAH 2,558.20 327,837.50 662,487.45 992,883.15

Pengecatan Kansteen
2003 201 Pekerja oh 0.0600 78,000.00 4,680.00 4,680.00
2003 202 Tukang oh 0.0500 100,000.00 5,000.00 5,000.00
2003 205 Kepala Tukang oh 0.0050 125,000.00 625.00 625.00
2003 206 Mandor oh 0.0030 135,000.00 405.00 405.00
2003 7105 Cat Kilap kg 0.2400 89,000.00 21,360.00 21,360.00
2003 7144 Minyak Cat kg 0.0150 22,500.00 337.50 337.50
JUMLAH 10,710.00 21,697.50 0.00 32,407.50

Operasional Carawel Carane (Hari)


3001 204 Operator oh 1.0000 90,965.00 90,965.00 90,965.00
3001 226 Pembantu Operator oh 2.0000 55,500.00 111,000.00 111,000.00
3001 618 Crawler crane jam 5.0000 407,968.21 2,039,841.05 2,039,841.05
3001 7019 Grease kg 2.0000 70,000.00 140,000.00 140,000.00
3001 7030 Oli ltr 5.0000 55,000.00 275,000.00 275,000.00
3001 7041 Solar ltr 250.0000 18,500.00 4,625,000.00 4,625,000.00
JUMLAH 201,965.00 5,040,000.00 2,039,841.05 7,281,806.05

Operasional Ponton Transport (Hari)


3002 201 Pekerja oh 10.0000 78,000.00 780,000.00 780,000.00
3002 204 Operator oh 1.0000 90,965.00 90,965.00 90,965.00
3002 226 Pembantu Operator oh 2.0000 55,500.00 111,000.00 111,000.00
3002 639 Ponton Transport jam 5.0000 1,325,000.00 6,625,000.00 6,625,000.00
3002 7019 Grease kg 2.0000 70,000.00 140,000.00 140,000.00
3002 7030 Oli ltr 5.0000 55,000.00 275,000.00 275,000.00
3002 7041 Solar ltr 200.0000 18,500.00 3,700,000.00 3,700,000.00
JUMLAH 981,965.00 4,115,000.00 6,625,000.00 11,721,965.00

Pengangkutan Tiang Pancang ke Titik Pancang (M')


3003 93001 Operasional Crawel Crane (Hari) hari 0.0080 7,281,806.05 1,615.72 40,320.00 16,318.73 58,254.45
3003 93002 Operasional Ponton Transport (Hari) hari 0.0080 11,721,965.00 7,855.72 32,920.00 53,000.00 93,775.72
JUMLAH 9,471.44 73,240.00 69,318.73 152,030.17

Operasional Disel Hammer (Hari)


3004 201 Pekerja oh 3.0000 78,000.00 234,000.00 234,000.00
3004 204 Operator oh 1.0000 90,965.00 90,965.00 90,965.00
3004 226 Pembantu Operator oh 2.0000 55,500.00 111,000.00 111,000.00
3004 672 Diesel Hammer jam 5.0000 587,000.00 2,935,000.00 2,935,000.00
3004 7020 Karbit kg 2.0000 65,800.00 131,600.00 131,600.00
3004 7030 Oli ltr 4.0000 55,000.00 220,000.00 220,000.00
3004 7041 Solar ltr 200.0000 18,500.00 3,700,000.00 3,700,000.00
JUMLAH 435,965.00 4,051,600.00 2,935,000.00 7,422,565.00

Operasional Pontong Pancang (Hari)


3005 204 Operator oh 2.0000 90,965.00 181,930.00 181,930.00
3005 226 Pembantu Operator oh 10.0000 55,500.00 555,000.00 555,000.00
3005 257 Tukang Pancang oh 1.0000 115,000.00 115,000.00 115,000.00
3005 638 Pontong Pancang jam 5.0000 1,625,000.00 8,125,000.00 8,125,000.00
3005 7020 Karbit kg 2.0000 65,800.00 131,600.00 131,600.00
3005 7030 Oli ltr 4.0000 55,000.00 220,000.00 220,000.00
3005 7041 Solar ltr 100.0000 18,500.00 1,850,000.00 1,850,000.00
JUMLAH 851,930.00 2,201,600.00 8,125,000.00 11,178,530.00

Pemancangan Tiang Tegak (M')


3006 93003 Pengangkutan Tiang Pancang Ke Ttk Pancang (M') m' 1.0000 152,030.17 9,471.44 73,240.00 69,318.73 152,030.17
3006 93005 Operator Diesel Hammer (Hari) hari 0.0333 7,422,565.00 14,517.63 134,918.28 97,735.50 247,171.41
3006 93004 Operator Pontong Pancang (Hari) hari 0.0333 11,178,530.00 28,369.27 73,313.28 270,562.50 372,245.05
JUMLAH 52,358.34 281,471.56 437,616.73 771,446.63

FF0000Proyek Pembangunan Fasilitas Pelabuhan Laut Bajoe, TA. 2014


Jumlah Harga
Anls. ID Res. lD Nama Bahan / Upah / Alat Sat. Koef. Harga Satuan Jumlah
Upah Bahan Alat
Pemancangan Tiang Tegak (M') - Tanpa Diesel Hammer
3006 93003 Pengangkutan Tiang Pancang Ke Ttk Pancang (M') m' 1.0000 152,030.17 9,471.44 73,240.00 69,318.73 152,030.17
3006 93004 Opersional Pontong Pancang (Hari) hari 0.0333 11,178,530.00 28,369.27 73,313.28 270,562.50 372,245.05
JUMLAH 37,840.71 146,553.28 339,881.23 524,275.22

Pemancangan Tiang Miring (M')


3007 93003 Pengangkutan Tiang Pancang Ke Titik m2 1.0000 152,030.17 9,471.44 73,240.00 69,318.73 152,030.17
Pancang (M3)
3007 93004 Operator Diesel Hammer (Hari) hari 0.0417 7,422,565.00 18,179.74 168,951.72 122,389.50 309,520.96
3007 93005 Operator Pontong Pancang (Hari) hari 0.0417 11,178,530.00 35,525.48 91,806.72 338,812.50 466,144.70
JUMLAH 63,176.66 333,998.44 530,520.73 927,695.83
###
Penyambungan Tiang Pancang Baja (buah)
3008 201 Pekerja oh 0.2000 78,000.00 15,600.00 15,600.00
3008 206 Mandor oh 0.0200 135,000.00 2,700.00 2,700.00
3008 254 Tukang Las oh 0.2000 115,000.00 23,000.00 23,000.00
3008 626 Generator Set jam 1.0000 276,533.47 276,533.47 276,533.47
3008 633 Mesin Las 40 Amp jam 1.0000 280,950.41 280,950.41 280,950.41
3008 2317 Kawat Las (Elektroda) Kg 6.2500 67,500.00 421,875.00 421,875.00
3008 2120 Plat Baja kg 1.0000 21,000.00 21,000.00 21,000.00
JUMLAH 41,300.00 442,875.00 557,483.88 1,041,658.88

Pemotongan Tiang Pancang Baja (buah)


3009 201 Pekerja oh 1.0000 78,000.00 78,000.00 78,000.00
3009 254 Tukang Las oh 0.5000 115,000.00 57,500.00 57,500.00
3009 634 Mesin Las Karbit jam 1.0000 232,071.23 232,071.23 232,071.23
3009 639 Pontong Transport jam 0.0250 1,325,000.00 33,125.00 33,125.00
3009 811 Alat Bantu Pemotongan Tiang Pancang ls 1.0000 31,015.12 31,015.12 31,015.12
3009 7003 Acetelin @ 15 kg tabung 0.3000 3,570,000.00 1,071,000.00 1,071,000.00
3009 7029 Oksigen (Tabung) tabung 0.1500 3,430,000.00 514,500.00 514,500.00
JUMLAH 135,500.00 1,585,500.00 296,211.35 2,017,211.35

Pegecatan Tiang Pancang Baja (M2)


3010 201 Pekerja oh 0.1500 78,000.00 11,700.00 11,700.00
3010 205 Kepala Tukang oh 0.0250 125,000.00 3,125.00 3,125.00
3010 206 Mandor oh 0.0080 135,000.00 1,080.00 1,080.00
3010 248 Tukang Cat oh 0.2500 115,000.00 28,750.00 28,750.00
3010 7001 AC Marine Use (Anti Corrosive M U) kg 0.2000 430,000.00 86,000.00 86,000.00
3010 7002 A F Marine Use (Anti Fauling) ltr 0.1000 408,000.00 40,800.00 40,800.00
JUMLAH 44,655.00 126,800.00 0.00 171,455.00

Perlindungan Tiang Pancang dengan Splash Guard (M2)


3011 201 Pekerja oh 0.5000 78,000.00 39,000.00 39,000.00
3011 206 Mandor oh 0.0500 135,000.00 6,750.00 6,750.00
3011 260 Tukang Selam oh 0.2500 187,250.00 46,812.50 46,812.50
3011 801 Alat Bantu bulan 1.0000 662,487.45 662,487.45 662,487.45
3011 7165 Splash Guard m2 1.1000 3,750,000.00 4,125,000.00 4,125,000.00
JUMLAH 92,562.50 4,125,000.00 662,487.45 4,880,049.95

Perancah Kerja Pengecoran (M2)


3012 201 Pekerja oh 0.5000 78,000.00 39,000.00 39,000.00
3012 205 Kepala Tukang oh 0.0500 125,000.00 6,250.00 6,250.00
3012 206 Mandor oh 0.0100 135,000.00 1,350.00 1,350.00
3012 247 Tukang Bongkar oh 0.5000 84,746.00 42,373.00 42,373.00
3012 252 Tukang Kayu oh 2.0000 115,000.00 230,000.00 230,000.00
3012 801 Alat Bantu bulan 1.0000 662,487.45 662,487.45 662,487.45
3012 2201 Paku kg 1.0000 24,750.00 24,750.00 24,750.00
3012 6033 Kayu Papan Kelas III m3 0.0400 2,850,000.00 114,000.00 114,000.00
JUMLAH 318,973.00 138,750.00 662,487.45 1,120,210.45

Pelat Stopper Tiang Pancang (1 Unit)


3019 201 Pekerja oh 0.5000 78,000.00 39,000.00 39,000.00
3019 206 Mandor oh 0.0250 135,000.00 3,375.00 3,375.00
3019 254 Tukang Las oh 0.0100 115,000.00 1,150.00 1,150.00
3019 2124 Plat Baja Strip kg 12.0000 21,000.00 252,000.00 252,000.00
3019 2316 Kawat Las kg 0.1000 67,500.00 6,750.00 6,750.00
JUMLAH 43,525.00 258,750.00 0.00 302,275.00

Beton Bertulang Mutu K-400 Untuk isian Tiang Pancang (M3)


3020 90148 Pembesian kg 295.0000 24,551.08 1,668,962.50 5,310,000.00 263,606.87 7,242,569.37
3020 91433 Beton mutu K-400 m3 1.0000 3,196,462.78 657,850.00 1,834,266.80 704,345.98 3,196,462.78
3020 93019 Plat stopper Tiang Pancang unit 1.0000 302,275.00 43,525.00 258,750.00 0.00 302,275.00
JUMLAH 2,370,337.50 7,403,016.80 967,952.85 10,741,307.15

FF0000Proyek Pembangunan Fasilitas Pelabuhan Laut Bajoe, TA. 2014


Jumlah Harga
Anls. ID Res. lD Nama Bahan / Upah / Alat Sat. Koef. Harga Satuan Jumlah
Upah Bahan Alat
Delatasi (M')
3027 201 Pekerja oh 1.0000 78,000.00 78,000.00 78,000.00
3027 202 Tukang oh 0.0100 100,000.00 1,000.00 1,000.00
3027 206 Mandor oh 0.1000 135,000.00 13,500.00 13,500.00
3027 633 Mesin Las 40 Amp jam 0.3500 280,950.41 98,332.64 98,332.64
3027 2004 Besi beton kg 4.0000 16,000.00 64,000.00 64,000.00
3027 2015 Besi Siku L.100.100.10 kg 7.3800 21,000.00 154,980.00 154,980.00
3027 2316 Kawat Las kg 0.2500 67,500.00 16,875.00 16,875.00
JUMLAH 92,500.00 235,855.00 98,332.64 426,687.64

Pembuatan sepatu tiang pancang pipa baja (buah)


3035 201 Pekerja oh 1.0000 78,000.00 78,000.00 78,000.00
3035 206 Mandor oh 0.2000 135,000.00 27,000.00 27,000.00
3035 254 Tukang Las oh 0.5000 115,000.00 57,500.00 57,500.00
3035 626 Generator set jam 1.2500 276,533.47 345,666.84 345,666.84
3035 633 Mesin Las 40 Amp jam 1.2500 280,950.41 351,188.01 351,188.01
3035 2012 Besi Plat kg 40.0000 21,000.00 840,000.00 840,000.00
3035 2316 Kawat Las kg 6.0000 67,500.00 405,000.00 405,000.00
3035 7029 Oksigen (tabung) tabung 0.5000 3,430,000.00 1,715,000.00 1,715,000.00
JUMLAH 162,500.00 2,960,000.00 696,854.85 3,819,354.85

Pengukuran, Positioning dan Sounding (ls/hari)


3036 201 Pekerja oh 0.1667 78,000.00 13,002.60 13,002.60
3036 205 Kepala Tukang oh 0.1000 125,000.00 12,500.00 12,500.00
3036 206 Mandor oh 0.1667 135,000.00 22,504.50 22,504.50
3036 227 Pembantu Surveyor oh 1.0000 109,000.00 109,000.00 109,000.00
3036 236 Surveyor oh 1.0000 160,500.00 160,500.00 160,500.00
3036 252 Tukang Kayu oh 0.1667 115,000.00 19,170.50 19,170.50
3036 666 Theodolite jam 5.0000 87,102.62 435,513.10 435,513.10
3036 667 Waterpass jam 5.0000 19,194.67 95,973.35 95,973.35
3036 2201 Paku kg 0.0417 24,750.00 1,032.08 1,032.08
3036 6027 Kayu Kaso Kelas II m3 0.0500 5,250,000.00 262,500.00 262,500.00
3036 6030 Kayu Kelas III m3 0.0317 2,850,000.00 90,345.00 90,345.00
JUMLAH 336,677.60 353,877.08 531,486.45 1,222,041.13

Pengadaan Tiang Pancang Baja (1 kg)


3037 512 Bongkar muat di pelabuhan kg 1.0000 550.00 550.00 550.00
3037 523 Pengangkutan dari pabrik ke pelabuhan kg 1.0000 950.00 950.00 950.00
3037 531 Transpor dari pelabuhan ke pelabuhan Makassar kg 1.0000 5,453.00 5,453.00 5,453.00
3037 513 Bongkar muat di pelabuhan Makassar kg 1.0000 650.00 650.00 650.00
3037 532 Transpor dari pelabuhan Makassar ke kg 1.0000 3,050.00 3,050.00 3,050.00
lokasi proyek
3037 3021 Tiang Pancang Pipa Baja φ 45,72 cm t = 12 mm kg 1.0000 15,202.50 15,202.50 15,202.50
3037 6030 Kayu Kelas III m3 0.0001 2,850,000.00 285.00 285.00
JUMLAH 10,653.00 15,487.50 0.00 26,140.50

Pembersihan Lokasi Pekerjaan dengan Alat Berat (ls/hari)


3038 204 Operator oh 1.0000 90,965.00 90,965.00 90,965.00
3038 206 Mandor oh 2.0000 135,000.00 270,000.00 270,000.00
3038 206 Mandor oh 5.0000 135,000.00 675,000.00 675,000.00
3038 226 Pembantu Operator oh 1.0000 55,500.00 55,500.00 55,500.00
3038 620 Dump Truck 3.5 Ton jam 5.0000 162,666.75 813,333.75 813,333.75
3038 623 Excavator jam 5.0000 379,555.75 1,897,778.75 1,897,778.75
3038 7030 Oli ltr 1.2000 55,000.00 66,000.00 66,000.00
3038 7041 Solar ltr 200.0000 18,500.00 3,700,000.00 3,700,000.00
JUMLAH 1,091,465.00 3,766,000.00 2,711,112.50 7,568,577.50

Pekerjaan Beton Mutu K -400


1433 201 Pekerja ho 5.75000 78,000.00 448,500.00 448,500.00
1433 206 Mandor ho 0.56000 135,000.00 75,600.00 75,600.00
1433 211 Kepala tukang ho 0.15000 125,000.00 18,750.00 18,750.00
1433 243 Tukang batu ho 1.00000 115,000.00 115,000.00 115,000.00
1433 607 Compressor jam 0.30000 116,035.61 34,810.68 34,810.68
1433 608 Concrette mixer (mesin molen) jam 2.00000 145,044.01 290,088.02 290,088.02
1433 611 Concrette thriller jam 2.00000 145,044.51 290,089.02 290,089.02
1433 803 Alat bantu beton ls 1.00000 89,358.26 89,358.26 89,358.26
1433 1126 Semen PC (50 kg) zak 10.68000 91,260.00 974,656.80 974,656.80
1433 2030 Pasir beton m3 0.54000 296,000.00 159,840.00 159,840.00
1433 7007 Air m3 0.65000 55,000.00 35,750.00 35,750.00
1433 7041 Split / Batu pecah m3 0.84000 790,500.00 664,020.00 664,020.00
JUMLAH 657,850.00 1,834,266.80 704,345.98 3,196,462.78

FF0000Proyek Pembangunan Fasilitas Pelabuhan Laut Bajoe, TA. 2014


Jumlah Harga
Anls. ID Res. lD Nama Bahan / Upah / Alat Sat. Koef. Harga Satuan Jumlah
Upah Bahan Alat
Pekerjaan Pembesian - 100 Kg
3040 201 Pekerja ho 4.0000 78,000.00 312,000.00 312,000.00
3040 212 Kepala tukang ho 0.6500 125,000.00 81,250.00 81,250.00
3040 244 Tukang besi ho 1.5000 115,000.00 172,500.00 172,500.00
3040 810 Alat bantu pembesian ls 1.0000 89,358.26 89,358.26 89,358.26
3040 2004 Besi beton kg 110.0000 16,000.00 1,760,000.00 1,760,000.00
3040 2303 Kawat beton kg 2.0000 20,000.00 40,000.00 40,000.00
JUMLAH 565,750.00 1,800,000.00 89,358.26 2,455,108.26
Untuk 1 Kg Pembesian 5,657.50 18,000.00 893.58 24,551.08

Pekerjaan Cetakan Beton/Bekisting - 10 M2


201 Pekerja ho 2.0000 78,000.00 156,000.00 156,000.00
214 Kepala tukang ho 0.4000 125,000.00 50,000.00 50,000.00
252 Tukang kayu ho 5.0000 115,000.00 575,000.00 575,000.00
296 Mandor ho 0.1000 135,000.00 13,500.00 13,500.00
820 Alat bantu ls 1.0000 8,241.78 8,241.78 8,241.78
2201 Paku kg 4.0000 24,750.00 99,000.00 99,000.00
6029 Kayu Kelas II m3 0.4000 5,250,000.00 2,100,000.00 2,100,000.00
6043 Multipleks 12 mm lbr 2.0000 250,000.00 500,000.00 500,000.00
JUMLAH 794,500.00 2,699,000.00 8,241.78 3,501,741.78
Untuk 1 M2 Cetakan 79,450.00 269,900.00 824.18 350,174.18

Pekerjaan Menyiram dan Membongkar Bekisting - 1 M2


201 Pekerja ho 0.2000 78,000.00 15,600.00 15,600.00
JUMLAH 15,600.00 0.00 0.00 15,600.00

Pekerjaan Perancah Untuk Pengecoran - 10 M2


201 Pekerja ho 0.5000 78,000.00 39,000.00 39,000.00
214 Kepala tukang ho 0.0500 125,000.00 6,250.00 6,250.00
252 Tukang kayu ho 2.0000 115,000.00 230,000.00 230,000.00
296 Mandor ho 0.1000 135,000.00 13,500.00 13,500.00
820 Alat bantu ls 1.0000 8,241.78 8,241.78 8,241.78
2201 Paku kg 1.2500 24,750.00 30,937.50 30,937.50
6029 Kayu kelas II m3 0.4500 5,250,000.00 2,362,500.00 2,362,500.00
JUMLAH 288,750.00 2,393,437.50 8,241.78 2,690,429.28
Untuk 1 M2 Perancah 28,875.00 239,343.75 824.18 269,042.93

Beton Bertulang Mutu K-400 Untuk Pile Cap I.S.C


3039 Beton mutu K-400 m3 1.0000 3,196,462.78 657,850.00 1,834,266.80 704,345.98 3,196,462.78
3041 Cetakan beton / Bekesting m2 6.0000 350,174.18 476,700.00 1,619,400.00 4,945.07 2,101,045.07
3040 Pembesian kg 245.0000 24,551.08 1,386,087.50 4,410,000.00 218,927.74 6,015,015.24
3042 Menyiram dan membongkar bekesting m2 2.0000 15,600.00 31,200.00 0.00 0.00 31,200.00
JUMLAH 2,551,837.50 7,863,666.80 928,218.79 11,343,723.09

Beton Bertulang Mutu K-400 Untuk Balok I.S.C


3039 Beton mutu K-400 m3 1.0000 3,196,462.78 657,850.00 1,834,266.80 704,345.98 3,196,462.78
3041 Cetakan beton / Bekesting m2 5.5000 350,174.18 436,975.00 1,484,450.00 4,532.98 1,925,957.98
3040 Pembesian kg 237.0000 24,551.08 1,340,827.50 4,266,000.00 211,779.08 5,818,606.58
3042 Menyiram dan membongkar bekesting m2 1.0000 15,600.00 15,600.00 0.00 0.00 15,600.00
3043 Perancah kerja m2 1.5000 269,042.93 43,312.50 359,015.63 1,236.27 403,564.39
JUMLAH 2,494,565.00 7,943,732.43 921,894.31 11,360,191.73

Beton Bertulang Mutu K-400 Untuk Lantai I.S.C


3039 Beton mutu K-400 m3 1.0000 3,196,462.78 657,850.00 1,834,266.80 704,345.98 3,196,462.78
3041 Cetakan beton / Bekesting m2 6.0000 350,174.18 476,700.00 1,619,400.00 4,945.07 2,101,045.07
3042 Menyiram dan membongkar bekesting m2 2.9400 15,600.00 45,864.00 0.00 0.00 45,864.00
3040 Pembesian kg 185.0000 24,551.08 1,046,637.50 3,330,000.00 165,312.78 4,541,950.28
3043 Perancah kerja m2 3.1300 269,042.93 90,378.75 749,145.94 2,579.68 842,104.36
JUMLAH 2,317,430.25 7,532,812.74 877,183.51 10,727,426.50

Beton Bertulang Mutu K-400 Untuk Kansteen I.S.C


3039 Beton mutu K-400 m3 1.0000 3,196,462.78 657,850.00 1,834,266.80 704,345.98 3,196,462.78
3041 Cetakan beton / Bekesting m2 5.0000 350,174.18 397,250.00 1,349,500.00 4,120.89 1,750,870.89
3042 Menyiram dan membongkar bekesting m2 2.0000 15,600.00 31,200.00 0.00 0.00 31,200.00
3040 Pembesian kg 175.0000 24,551.08 990,062.50 3,150,000.00 156,376.96 4,296,439.46
JUMLAH 2,076,362.50 6,333,766.80 864,843.83 9,274,973.13

Pengadaan dan Pemasangan Tiang Listrik Galvanize


201 Pekerja ho 3.0000 78,000.00 234,000.00 234,000.00
296 Mandor ho 0.3000 135,000.00 40,500.00 40,500.00
255 Tukang Listrik ho 0.0250 115,000.00 2,875.00 2,875.00
820 Alat Bantu ls 1.0000 8,241.78 8,241.78 8,241.78
9839 Tiang Listrik Galvanized Bh 1.0000 11,750,000.00 11,750,000.00 11,750,000.00
JUMLAH 277,375.00 11,750,000.00 8,241.78 12,035,616.78

FF0000Proyek Pembangunan Fasilitas Pelabuhan Laut Bajoe, TA. 2014


Jumlah Harga
Anls. ID Res. lD Nama Bahan / Upah / Alat Sat. Koef. Harga Satuan Jumlah
Upah Bahan Alat
Pasangan Lampu SL-0250r LED
201 Pekerja ho 3.0000 78,000.00 234,000.00 234,000.00
255 Tukang Listrik ho 0.0250 115,000.00 2,875.00 2,875.00
296 Mandor ho 0.3000 135,000.00 40,500.00 40,500.00
820 Alat Bantu Ls 1.0000 8,241.78 8,241.78 8,241.78
9361 Isolasi Listrik Bh 1.0000 2,000.00 2,000.00 2,000.00
SL-0250ER LED Steet Light 48/52 Watt Cool W Bh 1.0000 6,250,000.00 6,250,000.00 6,250,000.00
JUMLAH 277,375.00 6,252,000.00 8,241.78 6,537,616.78

Pasangan Lampu Solar Sell (1 Unit)


Pegadaan & Pemasangan Tiang Listrik Bh 1.0000 12,035,616.78 277,375.00 11,750,000.00 8,241.78 12,035,616.78
Pasangan Lampu Solar Sell SL-0250R LED Bh 1.0000 6,537,616.78 277,375.00 6,252,000.00 8,241.78 6,537,616.78
Solar Panel 200 wp Mono Chrystalline Bh 1.0000 10,250,000.00 10,250,000.00 10,250,000.00
Reg.Charger 3.Battery MPPT 20A otomatis on/off Bh 1.0000 2,000,000.00 2,000,000.00 2,000,000.00
Battery VRLA Hybrid GD Cycle Surya 12-10 (2 Pcs) Bh 1.0000 4,000,000.00 4,000,000.00 4,000,000.00
Box Baterai Baja 12 mm, Powder Coating Painted Bh 1.0000 1,475,000.00 1,475,000.00 1,475,000.00
Pole Conical 8 mm, kerucut Dukungan panel surya Bh 1.0000 3,150,000.00 3,150,000.00 3,150,000.00
Kabel + Accesories Set 1.0000 650,000.00 650,000.00 650,000.00
JUMLAH 554,750.00 39,527,000.00 16,483.56 40,098,233.56

Pekerjaan Fender Karet


201 Pekerja Oh 2.0000 78,000.00 Rp 156,000.00
202 Tukang Oh 0.5000 115,000.00 Rp 57,500.00
206 Mandor Oh 0.1000 117,877.00 Rp 11,787.70
633 Mesin las 40 Amp Jam 0.4000 280,950.41 Rp 112,380.16
816 Alat bantu pengelesan Ls 1.0000 31,015.12 Rp 31,015.12
2405 Angkur dia. 25mm Bh 8.0000 37,450.00 Rp 299,600.00
22017 Fender Karet 400H X 2000 L Bh 1.0000 28,000,000.00 Rp 28,000,000.00
Rp 28,668,282.98

Bollard dermaga 25 ton (unit)


201 Pekerja Oh 2.0000 77,528.00 Rp 155,056.00
202 Tukang Oh 0.5000 115,000.00 Rp 57,500.00
206 Mandor Oh 0.1000 117,877.00 Rp 11,787.70
633 Mesin las 40 Amp Jam 0.4000 280,950.41 Rp 112,380.16
816 Alat bantu pengelasan ls 1.0000 31,015.12 Rp 31,015.12
2405 Angkur Dia 25 mm Bh 4.0000 37,450.00 Rp 149,800.00
22005 Bollard 25 T unit 1.0000 24,500,000.00 Rp 24,500,000.00
Rp 25,017,538.98

Timbunan dan Pemadatan


Pekerja Oh 0.0087 78,000.00 Rp 678.60
Mandor Oh 0.0022 135,000.00 Rp 297.00
Water Tanker Jam 0.0070 224,263.22 Rp 1,569.84
Excavator Hari 0.0087 1,897,778.75 Rp 16,510.68
Dump Truck Jam 0.1839 203,333.43 Rp 37,393.02
Motor Grader jam 0.0020 261,134.35 Rp 522.27
Vibro roller Jam 0.0543 2,483,162.16 Rp 134,835.71
Tanah Urug M3 1.2000 106,666.67 Rp 128,000.00
Rp 319,807.11

Pek.pasangan Batu Camp.1 : 4


Pekerja Oh 1.5000 78,000.00 Rp 117,000.00
Mandor Oh 0.0750 135,000.00 Rp 10,125.00
Kepala tukang batu Oh 0.0750 125,000.00 Rp 9,375.00
Tukang batu Oh 0.7500 100,000.00 Rp 75,000.00
Semen PC 50kg zak 3.2600 91,260.00 Rp 297,507.60
Batu belah 15/20 M3 1.2000 495,000.00 Rp 594,000.00
Pasir pasang M3 0.5200 130,000.00 Rp 67,600.00
Rp 1,170,607.60

Pek.pasangan Batu Armor 10-15 Kg


Pekerja Oh 0.7800 78,000.00 Rp 60,840.00
Mandor Oh 0.0390 135,000.00 Rp 5,265.00
Kepala tukang batu Oh 0.0390 137,000.00 Rp 5,343.00
Tukang batu Oh 0.3900 100,000.00 Rp 39,000.00
Batu Armor 10-15 Kg M3 1.2000 380,250.00 Rp 456,300.00
Rp 566,748.00

Pek.pasangan Batu Armor 100-150 Kg


Pekerja Oh 0.7800 78,000.00 Rp 60,840.00
Mandor Oh 0.0390 135,000.00 Rp 5,265.00
Kepala tukang batu Oh 0.0390 31,500.00 Rp 1,228.50
Tukang batu Oh 0.3900 100,000.00 Rp 39,000.00
Batu Armor 100-150 Kg M3 1.2000 380,250.00 Rp 456,300.00
Rp 562,633.50

Pek.pasangan Geotextile
Pekerja Oh 0.0200 78,000.00 Rp 1,560.00
Mandor Oh 0.0180 135,000.00 Rp 2,430.00
Geotextile non woven M3 1.1000 66,500.00 Rp 73,150.00
Rp 77,140.00

FF0000Proyek Pembangunan Fasilitas Pelabuhan Laut Bajoe, TA. 2014


ANALISA HARGA SATUAN
PROYEK : PEMBANGUNAN FASILITAS PELABUHAN LAUT BAJOE
PEKERJAAN : LANJUTAN PEMBANGUNAN FASPEL LAUT BAJOE TERDIRI DARI :
PEKERJAAN TRESTLE SEGMEN XIX - XX (50X8)M2 : Pek. Beton Bertulang
PEKERJAAN TRESTLE SEGMEN XXI - XXV (50x8)M2 : Pengadaan Tiang , Pemancangan
dan Beton Bertulang
#REF!
#REF!
LOKASI : BAJOE - SULAWESI SELATAN
TAHUN ANGGARAN : 2014

1. PENGUKURAN DAN POSITIONING


0.4500 M3 Kayu Kelas II @ Rp. 3,025,000.00 = Rp. 1,361,250.00
15.0000 Btg Patok Kayu Dolken @ Rp. 92,500.00 = Rp. 1,387,500.00
30.0000 Jam Theodolite @ Rp. #REF! = Rp. #REF!
30.0000 Jam Waterpass @ Rp. #REF! = Rp. #REF!
5.0000 ho Juru Ukur @ Rp. 82,968.00 = Rp. 414,840.00
20.0000 ho Pekerja @ Rp. #REF! = Rp. #REF!
Rp. #REF!

2. PEMBUATAN GUDANG, BANGSAL KERJA & DIREKSI KEET / M2


0.0750 M³ Kayu Kelas II @ Rp. 3,025,000.00 = Rp. 226,875.00
0.3750 Lbr Multipleks 5 mm @ Rp. 82,500.00 = Rp. 30,937.50
0.9000 Lbr Seng Gelombang @ Rp. 56,250.00 = Rp. 50,625.00
0.5000 Kg Paku @ Rp. 18,500.00 = Rp. 9,250.00
0.1000 Kg Paku Seng @ Rp. 23,500.00 = Rp. 2,350.00
0.2000 M³ Pasir Pasang @ Rp. 190,000.00 = Rp. 38,000.00
1.1500 Zak Semen @ Rp. 65,000.00 = Rp. 74,750.00
1.5000 ho Tukang Kayu @ Rp. #REF! = Rp. #REF!
0.2000 ho Kepala Tukang @ Rp. #REF! = Rp. #REF!
1.2000 ho Pekerja @ Rp. #REF! = Rp. #REF!
0.7500 ho Mandor @ Rp. #REF! = Rp. #REF!
Rp. #REF!

3. PEKERJAAN BETON
A. 1 M3 BETON MUTU K 300
0.8500 m3 Split / Batu pecah @ Rp. 790,500.00 = Rp. 671,925.00
0.5400 m3 Pasir beton @ Rp. 296,000.00 = Rp. 159,840.00
8.4000 zak Semen PC (50 kg) @ Rp. 91,260.00 = Rp. 766,584.00
0.6500 m3 Air @ Rp. 55,000.00 = Rp. 35,750.00
2.0000 jam Concrette mixer (mesin molen) @ Rp. 145,044.01 = Rp. 290,088.02
2.0000 jam Concrette thriller @ Rp. 145,044.51 = Rp. 290,089.02
0.3000 jam Compressor @ Rp. 116,035.61 = Rp. 34,810.68
1.0000 ls Alat bantu beton @ Rp. 89,358.26 = Rp. 89,358.26
1.0000 ho Tukang batu @ Rp. 115,000.00 = Rp. 115,000.00
0.1500 ho Kepala tukang @ Rp. 137,000.00 = Rp. 20,550.00
5.7500 ho Pekerja @ Rp. 78,000.00 = Rp. 448,500.00
0.5600 ho Mandor @ Rp. 135,000.00 = Rp. 75,600.00
Rp. 2,998,094.98
ANALISA HARGA SATUAN
B. PEKERJAAN PEMBESIAN / 100 kg
110.0000 kg Besi beton @ Rp. 16,000.00 = Rp. 1,760,000.00
2.0000 kg Kawat beton @ Rp. 20,000.00 = Rp. 40,000.00
1.0000 ls Alat bantu pembesian @ Rp. 89,358.26 = Rp. 89,358.26
1.5000 ho Tukang besi @ Rp. 115,000.00 = Rp. 172,500.00
0.6500 ho Kepala tukang @ Rp. 137,000.00 = Rp. 89,050.00
4.0000 ho Pekerja @ Rp. 78,000.00 = Rp. 312,000.00
Rp. 2,462,908.26
Untuk 1 kg pembesian = Rp. 24,629.08
C. PEKERJAAN CETAKAN BETON / BEKESTING UNTUK 10 M2
0.4000 m3 Kayu Kelas II @ Rp. 5,250,000.00 =
Rp. 2,100,000.00
4.0000 kg Paku @ Rp. 24,750.00 =
Rp. 99,000.00
2.0000 lbr Multipleks 12 mm @ Rp. 250,000.00 =
Rp. 500,000.00
1.0000 ls Alat bantu @ Rp. 8,241.78 =
Rp. 8,241.78
5.0000 ho Tukang kayu @ Rp. 115,000.00 =
Rp. 575,000.00
0.4000 ho Kepala tukang @ Rp. 137,000.00 =
Rp. 54,800.00
2.0000 ho Pekerja @ Rp. 78,000.00 =
Rp. 156,000.00
0.1000 ho Mandor @ Rp. 135,000.00 =
Rp. 13,500.00
Rp. 3,506,541.78
Untuk 1 M2 cetakan beton = Rp. 350,654.18

D. 1 M2 PEKERJAAN MENYIRAM DAN MEMBONGKAR BEKESTING


0.2000 ho Pekerja @ Rp. 78,000.00 = Rp. 15,600.00
Rp. 15,600.00

E. PEKERJAAN PERANCAH KERJA PENGECORAN UNTUK 10 M2


0.4500 m3 Kayu kls. II @ Rp. 5,250,000.00 = Rp. 2,362,500.00
1.2500 kg Paku @ Rp. 24,750.00 = Rp. 30,937.50
2.0000 ho Tukang kayu @ Rp. 115,000.00 = Rp. 230,000.00
0.0500 ho Kepala tukang @ Rp. 137,000.00 = Rp. 6,850.00
0.5000 ho Pekerja @ Rp. 78,000.00 = Rp. 39,000.00
0.1000 ho Mandor @ Rp. 135,000.00 = Rp. 13,500.00
1.0000 ls Alat bantu @ Rp. 8,241.78 = Rp. 8,241.78
Rp. 2,691,029.28
Untuk 1 M2 perancah beton = Rp. 269,102.93

4. 1.0000 M3 BETON BERTULANG MUTU K-300 UNTUK SELIMUT TIANG - I.S.C.


1.0000 m3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
6.0000 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 2,103,925.07
245.0000 kg Pembesian @ Rp. 24,629.08 = Rp. 6,034,125.24
2.0000 m2 Menyiram dan membongkar bekesting @ Rp. 15,600.00 = Rp. 31,200.00
Rp. 11,167,345.29

5. 1.0000 M3 BETON BERTULANG MUTU K-300 PENGISI TIANG PANCANG - I.S.C.


1.0000 m3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
290.0000 kg Pembesian @ Rp. 24,629.08 = Rp. 7,142,433.95
3.0000 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 1,051,962.53
1.0000 ls Alat bantu di laut @ Rp. 89,358.26 = Rp. 89,358.26
Rp. 11,281,849.73
ANALISA HARGA SATUAN

6. 1.0000 M3 BETON BERTULANG MUTU K-300 UNTUK POER - I.S.C.


1.0000 m3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
7.5000 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 2,629,906.34
240.0000 kg Pembesian @ Rp. 24,629.08 = Rp. 5,910,979.82
1.0000 m2 Menyiram dan membongkar bekesting @ Rp. 15,600.00 = Rp. 15,600.00
1.5000 m2 Perancah kerja @ Rp. 269,102.93 = Rp. 403,654.39
Rp. 11,958,235.53

7. 1.0000 M3 BETON BERTULANG MUTU K-300 UNTUK BALOK - I.S.C.


1.0000 m3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
7.5000 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 2,629,906.34
235.0000 kg Pembesian @ Rp. 24,629.08 = Rp. 5,787,834.41
1.0000 m2 Menyiram dan membongkar bekesting @ Rp. 15,600.00 = Rp. 15,600.00
1.5000 m2 Perancah kerja @ Rp. 269,102.93 = Rp. 403,654.39
Rp. 11,835,090.12

8. 1.0000 M3 BETON BERTULANG MUTU K-300 UNTUK LANTAI - I.S.C.


1.0000 m3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
6.0000 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 2,103,925.07
2.9400 m2 Menyiram dan membongkar bekesting @ Rp. 15,600.00 = Rp. 45,864.00
215.0000 kg Pembesian @ Rp. 24,629.08 = Rp. 5,295,252.76
3.1300 m2 Perancah kerja @ Rp. 269,102.93 = Rp. 842,292.16
Rp. 11,285,428.97

9. 1.0000 M3 BETON BERTULANG MUTU K-300 UNTUK KANSTEEN


1.0000 m3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
3.5000 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 1,227,289.62
175.0000 kg Pembesian @ Rp. 24,629.08 = Rp. 4,310,089.46
2.0000 m2 Menyiram dan membongkar bekesting @ Rp. 15,600.00 = Rp. 31,200.00
Rp. 8,566,674.06

10. 1.0000 M3 BETON BERTULANG MUTU K-300 UNTUK LISPLANK


1.0000 m3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
6.0000 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 2,103,925.07
245.0000 kg Pembesian @ Rp. 24,629.08 = Rp. 6,034,125.24
2.0000 m2 Menyiram dan membongkar bekesting @ Rp. 15,600.00 = Rp. 31,200.00
Rp. 11,167,345.29

11. 1.0000 TON PENGADAAN TIANG PANCANG


1.0000 ton Pipa baja dia. 457,2 mm @ Rp. 15,000,000.00 = Rp. 15,000,000.00
1.0000 ton Pengangkutan pipa baja dari pabrik @ Rp. 515,000.00 = Rp. 515,000.00
ke Tanjung Perak Surabaya
1.0000 ton Bongkar muat di pelabuhan T. Perak @ Rp. 395,000.00 = Rp. 395,000.00
1.0000 ton Transport dari Pelab. Tanjung Perak ke @ Rp. 5,680,000.00 = Rp. 5,680,000.00
Pelabuhan Bajoe
1.0000 ton Bongkar muat di pelabuhan Bajoe @ Rp. 415,000.00 = Rp. 415,000.00
1.0000 ton Pengangkutan pipa baja dari pelabuhan @ Rp. 485,000.00 = Rp. 485,000.00
ke lokasi proyek Rp. 22,490,000.00
Untuk 1,0 kg Tiang Pancang pipa Baja = Rp. 22,490.00
ANALISA HARGA SATUAN

12. 1.0000 BH SEPATU TIANG PANCANG


8.0000 kg Kawat las / electrode @ Rp. 43,500.00 = Rp. 348,000.00
35.0000 kg Plat baja @ Rp. 18,700.00 = Rp. 654,500.00
1.0000 ho Tukang Las @ Rp. #REF! = Rp. #REF!
0.4000 ho Mandor @ Rp. #REF! = Rp. #REF!
1.0000 ho Pekerja @ Rp. #REF! = Rp. #REF!
0.7500 jam Mesin las listrik dan perlengkapannya @ Rp. #REF! = Rp. #REF!
0.7500 jam Generator @ Rp. #REF! = Rp. #REF!
1.0000 ls Alat bantu pemotongan @ Rp. #REF! = Rp. #REF!
Rp. #REF!

13. 1.0000 BH PENYAMBUNGAN TIANG PANCANG


6.0000 kg Kawat las / electrode @ Rp. 43,500.00 = Rp. 261,000.00
12.0000 kg Plat baja @ Rp. 18,700.00 = Rp. 224,400.00
0.8000 ho Tukang Las @ Rp. #REF! = Rp. #REF!
0.5000 ho Mandor @ Rp. #REF! = Rp. #REF!
1.5000 ho Pekerja @ Rp. #REF! = Rp. #REF!
2.0000 jam Mesin las listrik dan perlengkapannya @ Rp. #REF! = Rp. #REF!
1.0000 ls Alat bantu pemotongan @ Rp. #REF! = Rp. #REF!
Rp. #REF!

14. 1.0000 M' PENGANGKUTAN TIANG PANCANG KE TITIK PANCANG


A. Biaya Crawel Crane per hari
1.0000 ho Operator alat berat @ Rp. #REF! = Rp. #REF!
2.0000 ho Pembantu operator @ Rp. #REF! = Rp. #REF!
2.5000 liter Oli @ Rp. 43,500.00 = Rp. 108,750.00
150.0000 liter Solar @ Rp. 10,500.00 = Rp. 1,575,000.00
2.0000 kg Grease @ Rp. 36,500.00 = Rp. 73,000.00
6.0000 jam Crane @ Rp. #REF! = Rp. #REF!
JUMLAH ( A ) Rp. #REF!

B. Biaya Ponton Transport per hari


1.0000 ho Operator alat berat @ Rp. #REF! = Rp. #REF!
2.0000 ho Pembantu operator @ Rp. #REF! = Rp. #REF!
10.0000 ho Pekerja @ Rp. #REF! = Rp. #REF!
2.5000 liter Oli @ Rp. 43,500.00 = Rp. 108,750.00
150.0000 liter Solar @ Rp. 10,500.00 = Rp. 1,575,000.00
2.0000 kg Grease @ Rp. 36,500.00 = Rp. 73,000.00
1.0000 hari Ponton transport @ Rp. #REF! = Rp. #REF!
1.0000 hari Motor Jhonson 40 PK @ Rp. #REF! = Rp. #REF!
JUMLAH ( B ) Rp. #REF!
Dalam sehari dapat diangkut tiang pancang sepanjang (L1) :
10 batang x panjang 12 = 120 m'
Biaya transport tiang pancang per meter = ( A + B ) / L1 = Rp. #REF!
ANALISA HARGA SATUAN
15. 1.0000 Ttk PEMANCANGAN TIANG PANCANG
C. Biaya Diesel Hammer
1.0000 ho Operator alat berat @ Rp. #REF! = Rp. #REF!
2.0000 ho Pembantu operator @ Rp. #REF! = Rp. #REF!
6.0000 ho Pekerja @ Rp. #REF! = Rp. #REF!
4.0000 liter Oli @ Rp. 43,500.00 = Rp. 174,000.00
200.0000 liter Solar @ Rp. 10,500.00 = Rp. 2,100,000.00
2.0000 kg Grease @ Rp. 36,500.00 = Rp. 73,000.00
1.0000 hari Sewa Diesel Hammer @ Rp. #REF! = Rp. #REF!
JUMLAH ( C ) Rp. #REF!
D. Biaya Ponton Pancang
1.0000 ho Operator alat berat @ Rp. #REF! = Rp. #REF!
2.0000 ho Pembantu operator @ Rp. #REF! = Rp. #REF!
6.0000 ho Tukang pancang @ Rp. #REF! = Rp. #REF!
4.0000 liter Oli @ Rp. 43,500.00 = Rp. 174,000.00
200.0000 liter Solar @ Rp. 10,500.00 = Rp. 2,100,000.00
2.0000 kg Grease @ Rp. 36,500.00 = Rp. 73,000.00
1.0000 hari Ponton Pancang @ Rp. #REF! = Rp. #REF!
JUMLAH ( D ) Rp. #REF!
a. TIANG TEGAK
Sehari dapat dipancang tiang tegak sepanjang ( L2 ) :
3 batang x panjang 12 M' = 36,0 M'
Harga pemancangan tiang tegak per meter = (C + D)/L2 = Rp. #REF!

16. 1.0000 M2 PENGECATAN TIANG PANCANG


0.4500 kg Cat anti karat @ Rp. 83,500.00 = Rp. 37,575.00
1.0000 ls Alat bantu pengecatan @ Rp. #REF! = Rp. #REF!
0.1500 ho Tukang cat @ Rp. #REF! = Rp. #REF!
0.0150 ho Kepala tukang @ Rp. #REF! = Rp. #REF!
0.2000 ho Pekerja @ Rp. #REF! = Rp. #REF!
0.0100 ho Mandor @ Rp. #REF! = Rp. #REF!
Rp. #REF!

17. 1.0000 BH PEMOTONGAN TIANG PANCANG


0.6500 btl Oksigen @ Rp. 525,000.00 = Rp. 341,250.00
1.0000 kg Karbit @ Rp. 31,500.00 = Rp. 31,500.00
0.4500 ho Tukang Las @ Rp. #REF! = Rp. #REF!
0.7500 ho Pekerja @ Rp. #REF! = Rp. #REF!
0.1000 ho Mandor @ Rp. #REF! = Rp. #REF!
2.5000 jam Mesin las karbit @ Rp. #REF! = Rp. #REF!
1.0000 ls Alat bantu pemotongan @ Rp. #REF! = Rp. #REF!
Rp. #REF!

18. 1.0000 M' DELATASI


15.1000 Kg Besi Siku L 100.100.10 @ Rp. 18,700.00 = Rp. 282,370.00
4.0000 Kg Besi Beton @ Rp. 18,350.00 = Rp. 73,400.00
0.2500 Kg Kawat Las @ Rp. 43,500.00 = Rp. 10,875.00
2.4500 Jam Mesin Las Listrik @ Rp. #REF! = Rp. #REF!
0.0100 ho Tukang Las @ Rp. #REF! = Rp. #REF!
0.7500 ho Pekerja @ Rp. #REF! = Rp. #REF!
0.1000 ho Mandor @ Rp. #REF! = Rp. #REF!
Rp. #REF!
ANALISA HARGA SATUAN

19. 1.0000 M3 BETON TALUD


1.0000 M3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
175.0000 kg Pembesian @ Rp. 24,629.08 = Rp. 4,310,089.46
1.5000 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 525,981.27
1.0000 m2 Menyiram dan membongkar bekesting @ Rp. 15,600.00 = Rp. 15,600.00
Rp. 7,849,765.71

20. 1.0000 M3 BETON BERTULANG MUTU K-300 UNTUK KANSTEEN


1.0000 m3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
1.1300 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 396,239.22
120.0000 kg Pembesian @ Rp. 24,629.08 = Rp. 2,955,489.91
1.0000 m2 Menyiram dan membongkar bekesting @ Rp. 15,600.00 = Rp. 15,600.00
Rp. 6,365,424.12

21. 1.0000 M3 BETON COR UNTUK LANTAI CAUSEWAY


1.0000 M3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
35.0000 kg Pembesian @ Rp. 24,629.08 = Rp. 862,017.89
1.5000 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 525,981.27
1.0000 m2 Menyiram dan membongkar bekesting @ Rp. 15,600.00 = Rp. 15,600.00
Rp. 4,401,694.14

22. 1.0000 M3 BETON COR UNTUK LANTAI DASAR CAUSEWAY


1.0000 M3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
1.5000 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 525,981.27
1.0000 m2 Menyiram dan membongkar bekesting @ Rp. 15,600.00 = Rp. 15,600.00
Rp. 3,539,676.25

23. 1.0000 M3 BETON BERTULANG PLAT INJAK


1.0000 M3 Beton mutu K-300 @ Rp. 2,998,094.98 = Rp. 2,998,094.98
125.0000 kg Pembesian @ Rp. 24,629.08 = Rp. 3,078,635.33
2.0000 m2 Cetakan beton / Bekesting @ Rp. 350,654.18 = Rp. 701,308.36
1.0000 m2 Menyiram dan membongkar bekesting @ Rp. 15,600.00 = Rp. 15,600.00
Rp. 6,793,638.66

24. 1.0000 M3 URUGAN SIRTU


1.2000 m3 Sirtu @ Rp. 175,000.00 = Rp. 210,000.00
0.2000 ho Pekerja @ Rp. #REF! = Rp. #REF!
0.0200 ho Mandor @ Rp. #REF! = Rp. #REF!
1.0000 ls Alat bantu @ Rp. #REF! = Rp. #REF!
Rp. #REF!

25. 1.0000 M3 PASANGAN BATU KALI 1 : 4


1.2000 M3 Batu Gunung / Kali @ Rp. 270,000.00 = Rp. 324,000.00
4.2300 zak Semen PC 50 kg/zak @ Rp. 65,000.00 = Rp. 274,950.00
0.7600 M3 Pasir pasang @ Rp. 190,000.00 = Rp. 144,400.00
1.2000 ho Tukang batu @ Rp. #REF! = Rp. #REF!
0.1200 ho Kepala tukang @ Rp. #REF! = Rp. #REF!
2.6000 ho Pekerja @ Rp. #REF! = Rp. #REF!
0.0800 ho Mandor @ Rp. #REF! = Rp. #REF!
Rp. #REF!
ANALISA HARGA SATUAN
26. 1.0000 M3 PASANGAN BATU KOSONG W = 10 - 15 KG
1.1000 m3 Batu kali w = 10 - 15 kg @ Rp. 270,000.00 = Rp. 297,000.00
1.0000 ls Alat bantu @ Rp. #REF! = Rp. #REF!
1.2000 ho Pekerja @ Rp. #REF! = Rp. #REF!
0.0500 ho Mandor @ Rp. #REF! = Rp. #REF!
Rp. #REF!

27. 1.0000 M3 PASANGAN BATU KOSONG W = 100 - 150 KG


1.1000 m3 Batu kali w = 100 - 150 kg @ Rp. 270,000.00 = Rp. 297,000.00
1.0000 ho Alat bantu @ Rp. #REF! = Rp. #REF!
1.2000 ho Pekerja @ Rp. #REF! = Rp. #REF!
0.0500 ho Mandor @ Rp. #REF! = Rp. #REF!
Rp. #REF!

28. 1.0000 M2 PEMASANGAN GEOTEXTILE


1.1000 M2 Geotextile @ Rp. 66,500.00 = Rp. 73,150.00
0.1000 ho Tukang selam @ Rp. #REF! = Rp. #REF!
0.5000 ho Pekerja @ Rp. #REF! = Rp. #REF!
0.0500 ho Tukang batu @ Rp. #REF! = Rp. #REF!
1.0000 Ls Alat bantu @ Rp. #REF! = Rp. #REF!
Rp. #REF!

29. 1.0000 BTG PEKERJAAN CERUCUK DOLKEN ø 10 CM, L= 4,0 M


1.0000 btg Cerucuk dolken ø 10-15 cm, L = 4,0 M' @ Rp. 92,500.00 = Rp. 92,500.00
1.0000 ls Alat bantu @ Rp. #REF! = Rp. #REF!
0.2000 ho Tukang kayu @ Rp. #REF! = Rp. #REF!
0.2000 ho Pekerja @ Rp. #REF! = Rp. #REF!
0.0200 ho Mandor @ Rp. #REF! = Rp. #REF!
Rp. #REF!

30. 1.00 Titik PEK. PENGADAAN DAN PEMASANGAN LAMPU & INSTALASI LISTRIK

A. 1.00 Unit Pengadaan Lampu Mercury 250 Watt Rp. 2,150,000.00


B. 1.00 Bh Pengadaan Tiang Lampu Pipa Galvanis (P=9,0 M) Rp. 5,350,000.00
C. 1.00 Set Pengadaan Box Terminal Rp. 1,975,000.00
D. 1.00 Set Pengadaan Assesoris untuk Panel Distribusi Rp. 5,650,000.00

1.0000 BH PEKERJAAN PEMASANGAN TIANG LAMPU


3.0000 oh Tukang listrik @ Rp. #REF! = Rp. #REF!
0.4500 oh Kepala tukang listrik @ Rp. #REF! = Rp. #REF!
0.2000 oh Mandor @ Rp. #REF! = Rp. #REF!
6.0000 oh Pekerja @ Rp. #REF! = Rp. #REF!
1.0000 ls Alat bantu @ Rp. #REF! = Rp. #REF!
Rp. #REF!

1.0000 BH PEKERJAAN PEMASANGAN LAMPU MERCURY


2.0000 oh Tukang listrik @ Rp. #REF! = Rp. #REF!
0.4000 oh Kepala tukang listrik @ Rp. #REF! = Rp. #REF!
0.4000 oh Mandor @ Rp. #REF! = Rp. #REF!
2.5000 oh Pekerja @ Rp. #REF! = Rp. #REF!
1.0000 ls Alat bantu @ Rp. #REF! = Rp. #REF!
Rp. #REF!
ANALISA HARGA SATUAN

1.0000 BH PEKERJAAN PEMASANGAN PANEL DISTRIBUSI


2.0000 oh Tukang listrik @ Rp. #REF! = Rp. #REF!
0.2000 oh Kepala tukang listrik @ Rp. #REF! = Rp. #REF!
0.6000 oh Mandor @ Rp. #REF! = Rp. #REF!
6.0000 oh Pekerja @ Rp. #REF! = Rp. #REF!
2.8000 jam Peralatan Tukang Listrik @ Rp. 225,000.00 = Rp. 630,000.00
1.0000 ls Alat bantu @ Rp. #REF! = Rp. #REF!
Rp. #REF!

31. 1.0000 BH PEKERJAAN PEMASANGAN BOX TERMINAL


1.5000 oh Tukang listrik @ Rp. #REF! = Rp. #REF!
0.2500 oh Kepala tukang listrik @ Rp. #REF! = Rp. #REF!
0.1500 oh Mandor @ Rp. #REF! = Rp. #REF!
2.0000 oh Pekerja @ Rp. #REF! = Rp. #REF!
1.0000 ls Alat bantu @ Rp. #REF! = Rp. #REF!
Rp. #REF!

1 titik Pengadaan dan Pemasangan Tiang Lampu Rp. #REF!

32. 1.0000 M' PEMASANGAN PAGAR PENGAMAN


0.0643 M³ Kayu Kelas II @ Rp. 3,025,000.00 = Rp. 194,552.88
2.3000 Lbr Seng Gelombang @ Rp. 56,250.00 = Rp. 129,375.00
0.1000 Kg Paku @ Rp. 18,500.00 = Rp. 1,850.00
0.1000 Kg Paku Seng @ Rp. 23,500.00 = Rp. 2,350.00
0.1500 ho Tukang Kayu @ Rp. #REF! = Rp. #REF!
0.0150 ho Kepala Tukang @ Rp. #REF! = Rp. #REF!
0.2500 ho Pekerja @ Rp. #REF! = Rp. #REF!
Rp. #REF!
HARGA SATUAN BAHAN
KEGIATAN : PEMBANGUNAN REHABILITASI KANTOR UNIT PENYELENGGARA PELABUHAN KELAS III BIRINGKASSI
PEKERJAAN : RENOVASI KANTOR UNIT PENYELENGGARA PELABUHAN BIRINGKASSI ###
LOKASI : BIRINGKASSI. KABUPATEN PANGKEP - SULAWESI SELATAN
TAHUN ANGGARAN : 2015

NO NAMA BAHAN SATUAN HARGA

SEMEN ###
1100 SEMEN ###
1101 Semen Merah m3 Rp. 105,000.00
1102 Semen PC kg Rp. 1,250.00
1103 Semen Putih kg Rp. 1,975.00
1104 Semen Warna kg Rp. 4,500.00
1105 Acian Plasteran & Beton (MU 200) kg Rp. 3,875.00
1106 Acian Plasteran (MU 250) kg Rp. 2,425.00
1107 Acian Profil (MU 260) kg Rp. 7,520.00
1108 Acian Putih (MU 270) kg Rp. 6,120.00
1109 Bahan Addictive Silicafume kg Rp. 33,333.00
1110 Fast Setting Tile Addesive (MU 490) kg Rp. 12,800.00
1111 Finish Coat Repair (MU 840) kg Rp. 12,800.00
1112 Finish Plester (MU 290) kg Rp. 2,425.00
1113 Floor Hardner (MU 700) kg Rp. 5,500.00
1114 Multipurpose Tile Addesive (MU 485) kg Rp. 27,500.00
1115 Non Shrink Grout (MU 800) kg Rp. 3,850.00
1116 Pasangan & Plaster Bata (MU 301) kg Rp. 1,090.00
1117 Pelapis Kedap Air (MU 600) kg Rp. 35,333.33
1118 Pengisi Nat Keramik (MU 408) kg Rp. 11,500.00
1119 Perbaikan Permukaan Beton (MU 830) kg Rp. 6,425.00
1120 Perekat Bata Ringan (MU 380) kg Rp. 3,600.00
1121 Perekat Keramik Dinding (MU 400) kg Rp. 5,440.00
1122 Perekat Mortar & Beton/Bonding Agent (MU L-500) kg Rp. 100,250.00
1123 Plester Premium (MU 100) kg Rp. 1,475.00
1124 Plester Trasram (MU 101) kg Rp. 2,250.00
1125 Portland Cement (PC) Grouting kg Rp. 6,900.00
1126 Semen PC (50 Kg/Zak) Zak Rp. 91,260.00
1127 Semen Putih (40 Kg/Zak) Zak Rp. 79,000.00
AGGREGAT/BATU/PASIR
1200 AGREGATE
1201 Aggregat Halus m3 Rp. 252,294.80
1202 Aggregat Kasar m3 Rp. 395,000.00
1203 Aggregat Pecah Mesin 0-5 mm m3 Rp. 495,000.00
1204 Aggregat Pecah Mesin 10-20 mm m3 Rp. 495,000.00
1205 Aggregat Pecah Mesin 20-30 mm m3 Rp. 495,000.00
1206 Aggregat Pecah Mesin 5-10 mm m3 Rp. 495,000.00
1207 Bahan Pilihan m3 Rp. 90,600.00
1208 Bahan Timbunan m3 Rp. 90,600.00
1209 Balas Kricak uk. 2x6 m3 Rp. 232,003.00
1210 Balas Sirtu m3 Rp. 194,066.70
1211 Balas Split uk. 1x2 m3 Rp. 306,178.00
1212 Balas Split uk. 2x3 m3 Rp. 306,178.00
1213 Bata Merah (20x9,5x4) cm Proses Tangan bh Rp. 550.00
1214 Bata Merah Press Mesin bh Rp. 550.00
NO NAMA BAHAN SATUAN HARGA

1215 Bata Ringan ex. Hebel m3 Rp. 829,666.70


1216 Batu Apung kg Rp. 30,000.00
1217 Batu Armor 100-150 kg/unit m3 Rp. 380,250.00
1218 Batu Armor 10-15 kg/unit m3 Rp. 380,250.00
1219 Batu Bata Merah 20x9,5x4 cm uk. Kecil (Proses Tangan) bh Rp. 348.00
1220 Batu Belah 15/20 m3 Rp. 245,500.00
1221 Batu Granito kg Rp. 2,750.00
1222 Batu Gunung/Kali m3 Rp. 195,550.00
1223 Batu Kapur/Limestone m3 Rp. 56,026.67
1224 Batu Palimanan m3 Rp. 79,866.67
1225 Batu Pecah 0,5/1 m3 Rp. 495,000.00
1226 Batu Pecah 1/2 m3 Rp. 495,000.00
1227 Batu Pecah 10/15 m3 Rp. 495,000.00
1228 Batu Pecah 2/3 m3 Rp. 495,000.00
1229 Batu Pecah 3/5 m3 Rp. 495,000.00
1230 Batu Pecah 5/7 m3 Rp. 495,000.00
1231 Batu Pecah 7/10 m3 Rp. 495,000.00
1232 Batu Tela/Batako/Batu Pres bh Rp. 2,500.00
1233 Batu Tempel Hitam m2 Rp. 45,000.00
1234 Batu Teraso kg Rp. 1,750.00
1235 Chipping kg Rp. 164.31
1236 Conblock/Paving Block bh Rp. 2,675.00
1237 Concrete Block (CB. 10) bh Rp. 3,700.00
1238 Concrete Block (CB. 15) bh Rp. 4,250.00
1239 Concrete Block (CB. 20) bh Rp. 5,000.00
1240 Gamping kg Rp. 56,026.67
1241 Hollow Block (HB.10) bh Rp. 3,200.00
1242 Hollow Block (HB.15) bh Rp. 3,700.00
1243 Hollow Block (HB.20) bh Rp. 4,250.00
1244 Kapur m3 Rp. 138,300.00
1245 Kerikil Halus m3 Rp. 202,432.00
1246 Koral/Krikil m3 Rp. 156,550.00
1247 Pasir m3 Rp. 214,283.30
1248 Pasir Aspal/Abu Batu/Screening m3 Rp. 199,433.30
1249 Pasir Beton m3 Rp. 296,000.00
1250 Pasir Halus m3 Rp. 207,600.00
1251 Pasir Hitam m3 Rp. 199,433.30
1252 Pasir Pasang m3 Rp. 130,000.00
1253 Pasir Putih (Bangka) m3 Rp. 217,200.00
1254 Pasir Silka m3 Rp. 165,000.00
1255 Pasir Urug m3 Rp. 240,750.00
1256 Paving Block m2 Rp. 155,000.00
1257 Rooster bh Rp. 8,250.00
1258 Rooster Bata Merah bh Rp. 3,956.67
1259 Rooster Beton bh Rp. 5,035.00
1260 Sirtu m3 Rp. 275,000.00
1261 Split m3 Rp. 790,500.00
1262 Tanah Liat m3 Rp. 106,666.67
1263 Tanah Merah m3 Rp. 106,666.67
1264 Tanah Urug m3 Rp. 106,666.67
2000 BESI-BAJA ###
2001 Aluminium Alloy 10x10x2 cm bh Rp. 58,000.00
2002 Aluminium Alloy 10x15x2 cm bh Rp. 65,200.00
2003 Aluminium Foil m2 Rp. 7,800.00
2004 Besi Beton kg Rp. 16,000.00
2005 Besi Beton Polos kg Rp. 16,000.00
2006 Besi Beton kg Rp. 16,000.00
NO NAMA BAHAN SATUAN HARGA

2007 Besi Beugel/Kawel kg Rp. 16,000.00


2008 Besi Kanal "C" kg Rp. 16,000.00
2009 Besi L 300x90x11/6 kg Rp. 16,000.00
2010 Besi Pengikat Baja Profil Desain (Blocking) bh Rp. 81,900.00
2011 Besi Pengikat Galvanis bh Rp. 13,309.00
2012 Besi Plat kg Rp. 21,000.00
2013 Besi Profil kg Rp. 21,000.00
2014 Besi Siku kg Rp. 21,000.00
2015 Besi Siku L.100.100.10 kg Rp. 21,000.00
2016 Besi Siku Penahan Tulangan (Pengelasan dlm. Air) Set Rp. 183,600.00
2017 Besi Strip kg Rp. 21,000.00
2018 Besi WF kg Rp. 16,000.00
2019 Bordes Plat kg Rp. 16,000.00
2020 Dowel and Tie Bar kg Rp. 16,000.00
2021 Dowel Bar D=25 mm bh Rp. 62,400.00
2022 Hollow 20x40 btg Rp. 105,000.00
2023 Hollow 40x40 btg Rp. 209,000.00
2024 Besi Bulat 1" btg Rp. 82,000.00
2025 Besi Bulat 1,25" btg Rp. 143,000.00
2026 Split Tembaga dia. 1 bh Rp. 60,000.00
2027 Besi Siku L.30.30.3 (1,36 kg/m) kg Rp. 16,000.00
2100 BAJA ###
2101 Baja Beam (WF + H-Beam) kg Rp. 16,000.00
2102 Baja Bergelombang kg Rp. 18,700.00
2103 Baja C.200x80x7,5/11 kg Rp. 16,000.00
2104 Baja Prategeng kg Rp. 18,700.00
2105 Baja Profil kg Rp. 16,000.00
2106 Baja Profil (WF/C) kg Rp. 16,000.00
2107 Baja Profil / Plat kg Rp. 16,000.00
2108 Baja Siku kg Rp. 16,000.00
2110 Baja Tulangan Polos U24 kg Rp. 16,000.00
2111 Baja Tulangan Polos U32 kg Rp. 16,000.00
2112 Baja Tulangan Ulir D32 kg Rp. 16,000.00
2113 Baja Tulangan Ulir D39 kg Rp. 16,000.00
2114 Baja Tulangan Ulir D48 kg Rp. 17,400.00
2115 Baja WF kg Rp. 16,000.00
2116 CNP 100x50x20x3,2 kg Rp. 16,000.00
2117 INP 100x50 m' Rp. 155,000.00
2118 IWF kg Rp. 16,000.00
2119 Kanal-C Galvaspan m' Rp. 155,000.00
2120 Plat Baja kg Rp. 21,000.00
2121 Plat Baja Galvanis kg Rp. 57,500.00
2122 Plat Baja Landasan Guide Roller MB kg Rp. 21,000.00
2123 Plat Baja Penghubung MB ke Dudukan MB kg Rp. 21,000.00
2124 Plat Baja Strip kg Rp. 21,000.00
2125 Plat Baja t = 12 mm kg Rp. 21,000.00
2126 Plat Baja t = 8 mm kg Rp. 21,000.00
2127 Plat Beugel Tebal 5 mm bh Rp. 21,000.00
2128 Plat Landas bh Rp. 439,641.00
2129 Plat Ponton T.12 mm Marine Plat kg Rp. 21,000.00
2130 Plat Sambung (Plat Strip) 8 cm² m' Rp. 23,000.00
2131 Plat Seng Tebal 0,050 cm lebar 0,90 m m' Rp. 69,600.00
2132 Plat Strip Ukuran 4x30 mm m' Rp. 25,000.00
2133 Profil Baja dan Plat Penutup Trench. Angker kg Rp. 21,000.00
2134 Profil Baja Siku 100x100x10 kg Rp. 21,000.00
2135 Profil Baja WF 100.50.5.7 kg Rp. 21,000.00
2136 Profil Baja WF 200.100.8.12 kg Rp. 21,000.00
NO NAMA BAHAN SATUAN HARGA

2137 Profil Baja WF 450.250.9.12 kg Rp. 21,000.00


2138 Profil & Plat Baja Penutup Cable Trench kg Rp. 21,000.00
2139 Plat Strip Ukuran 40x40 mm m' Rp. 26,800.00
2140 Angkur Besi Siku Uk. 40x40 mm m' Rp. 32,100.00
2141 Plat Baja 3 mm kg Rp. 8,800.00
2200 PAKU-KAWAT-BAUT-MUR-ANGKUR ###
2201 Paku kg Rp. 24,750.00
2202 Paku uk. 2 cm kg Rp. 24,750.00
2203 Paku uk. 3 cm kg Rp. 18,853.33
2204 Paku uk. 4-5 cm kg Rp. 18,853.33
2205 Paku uk. 6-7 cm kg Rp. 18,853.33
2206 Paku uk. 10-15 cm kg Rp. 18,853.33
2207 Paku Asbes kg Rp. 23,366.67
2208 Paku Asbes Segala Ukuran bh Rp. 550.00
2209 Paku Seng kg Rp. 22,733.33
2210 Paku Seng Segala Ukuran kg Rp. 22,733.33
2211 Paku Kayu kg Rp. 19,053.33
2212 Paku Kayu Segala Ukuran kg Rp. 19,053.33
2213 Paku Maskrum kg Rp. 22,733.33
2214 Paku Kait Segala Ukuran bh Rp. 550.00
2215 Paku Sumbat Segala Ukuran bh Rp. 700.00
2216 Paku Plywood kg Rp. 19,053.33
2217 Paku Sekrup kg Rp. 19,053.33
2218 Paku Strip kg Rp. 19,053.33
2219 Paku Ulin kg Rp. 19,053.33
2220 Paku Tirefond bh Rp. 96,200.00
2221 Paku Keling bh Rp. 2,500.00
2301 Kabel Prestressed kg Rp. 25,500.00
2302 Kawat baja/Bindraad kg Rp. 22,500.00
2303 Kawat Beton kg Rp. 20,000.00
2304 Kawat Beton/Bendrat RRT kg Rp. 20,000.00
2305 Kawat Bronjong kg Rp. 16,500.00
2306 Kawat dia. 5 mm kg Rp. 16,500.00
2307 Kawat Duri m' Rp. 1,500.00
2308 Kawat Duri (40 m') rol Rp. 90,400.00
2309 Kawat Duri (kg) kg Rp. 16,500.00
2310 Kawat Duri (m') m' Rp. 1,500.00
2311 Kawat Duri 10 kg (P.60M) rol Rp. 65,600.00
2312 Kawat Duri (1 rool = 7kg = 30 m') kg Rp. 16,500.00
2313 Kawat galvanis 2 mm kg Rp. 35,000.00
2314 Kawat galvanis 3 mm kg Rp. 58,000.00
2315 Kawat Harmonika Gas m2 Rp. 10,750.00
2316 Kawat Las kg Rp. 45,000.00
2317 Kawat Las (Elektroda) kg Rp. 67,500.00
2318 Kawat Nyamuk/Kasa Besi m2 Rp. 15,000.00
2319 Kawat Nyamuk/Kasa Plastik m2 Rp. 15,000.00
2320 Kawat Pral kg Rp. 38,151.00
2321 Penambat Elastis Untuk Bantalan Kayu set Rp. 433,800.00
2322 Sling Baja ls Rp. 20,881.00
2323 Tyreb (Pengikat Cable) bh Rp. 321,000.00
2324 Kawat Jaring Galvanis lembar Rp. 50,000.00
2401 Angkur bh Rp. 8,239.00
2402 Angkur Besi Siku Ukuran 30x30x3 mm m' Rp. 30,000.00
2403 Angkur Besi Siku Ukuran 50x50x4 mm m' Rp. 29,925.00
2404 Angkur diameter 16 mm bh Rp. 18,079.00
2405 Angkur diameter 25 mm bh Rp. 37,450.00
2406 Angkur diameter 32 mm bh Rp. 47,936.00
NO NAMA BAHAN SATUAN HARGA

2407 Angkur diameter 50 mm (Stainles) bh Rp. 2,522,055.00


2408 Angkur Bar f 22 mm kg Rp. 24,750.00
2410 Angkur Dudukan Tiang Listrik bh Rp. 311,584.00
2411 Angkur Plat Landasan Catwalk bh Rp. 260,000.00
2412 Angkur Portal Baja Penggantung Hidrolik bh Rp. 17,170,820.00
2413 Angkur dia. 19 mm panjang 60 cm bh Rp. 83,000.00
2414 Angkur dia. 22 mm panjang 100 cm bh Rp. 95,000.00
2501 Baut Segala Ukuran kg Rp. 24,750.00
2502 Baut 3/8" Panjang 20 Cm bh Rp. 13,803.00
2503 Baut 3/8" Panjang 35 Cm bh Rp. 16,692.00
2504 Baut 5/8" Panjang 20 Cm bh Rp. 17,762.00
2505 Baut 5/8" Panjang 30 Cm bh Rp. 23,816.00
2506 Baut 5/8" Panjang 35 Cm bh Rp. 30,816.00
2507 Baut 5/8" Panjang 40 Cm bh Rp. 35,524.00
2508 Baut 5/8" Panjang 45 Cm bh Rp. 41,516.00
2509 Baut Bantalan dia. 19 P = 270 mm bh Rp. 47,234.00
2510 Baut dia 10 mm bh Rp. 6,313.00
2511 Baut dia 8 mm bh Rp. 4,300.00
2512 Baut/Mur bh Rp. 3,150.00
2513 Baut Isol bh Rp. 109,910.00
2514 Baut Kopel dia. 19 mm P = 800 mm bh Rp. 59,224.00
2515 Baut Lasplat bh Rp. 109,910.00
2516 Baut Sindik Bantalan Jembatan bh Rp. 103,006.00
2517 Mur Baut 6 Cm bh Rp. 4,300.00
2518 Mur Baut 3/4" bh Rp. 1,200.00
2519 Mur Baut Beam 12x25 mm bh Rp. 6,500.00
2520 Mur Baut Blocking 16x30 mm bh Rp. 8,200.00
2521 Mur Baut Pengaman bh Rp. 3,150.00
2522 Mur Baut Post 16x48 mm bh Rp. 7,875.00
2523 Mur/Baut Klem bh Rp. 2,350.00
2524 Sekrup Segala Ukuran bh Rp. 400.00
2525 Tutup Baut Angkur bh Rp. 18,500.00
2526 Rivet/Panel bh Rp. 1,200.00
2527 Klem 3x40x450 mm bh Rp. 12,000.00
2528 Klem 3x40x600 mm bh Rp. 12,000.00
2529 Baut/Mur dia. 14 mm untuk Flange bh Rp. 8,500.00
2530 Baut/Mur Klem dia. 12 mm. bh Rp. 7,200.00
2531 Mur/Baut dia. 22 mm untuk Flange bh Rp. 11,500.00
2532 Mur/Baut Klem dia. 16 mm bh Rp. 9,200.00
2601 Bantalan Beton Lengkap dng Penambat Elastis btg Rp. 617,925.00
2602 Begel Rel Bendel dia. 19 mm set Rp. 65,946.00
2603 Bondex m2 Rp. 461,000.00
2604 Box Culvert Type 100x100 HD-A/(T-20) unit Rp. 5,494,800.00
2605 Conector Galvanis 4 mm bh Rp. 18,500.00
2606 Lasplat Sambung R.54 bh Rp. 6,515,200.00
2607 Lasplat Isol bh Rp. 6,414,200.00
2608 Lempengan Besi Baja Profil Desain Galvanis (Beam) pjg=4m btg Rp. 848,000.00
2609 Pasak 6 mm bh Rp. 75,500.00
2610 Rabat Beton 7 cm Keliling Bangunan Dermaga m3 Rp. 59,600.00
2611 Rangka Ponton L. 70.70.7 kg Rp. 12,835.91
2612 Rantai Penahan bh Rp. 565,599.00
2613 Shakel ls Rp. 6,215.00
2614 Tiang Penyangga Besi st. 32 Galvanis (post) 1800x320x4,5 btg Rp. 345,000.00
2615 Tiang Penyangga Besi st. 32 Galvanis (post) 1800x320x6 btg Rp. 521,500.00
2616 Timah kg Rp. 26,750.00
2617 Wire Mesh kg Rp. 20,000.00
2999 Material Bantu Bekisting Plat Besi ls Rp. 2,000.00
NO NAMA BAHAN SATUAN HARGA

3000 PIPA ###


3001 Flange Pipa dia. 3" t = 10 mm bh Rp. 75,000.00
3002 Flange Pipa dia. 6" t = 10 mm bh Rp. 142,000.00
3003 Flange Pipa dia. 8" t = 10 mm bh Rp. 270,000.00
3004 Knee Galvanis dia. 1 bh Rp. 7,500.00
3005 Knee Galvanis dia. 1,5 bh Rp. 14,750.00
3006 Knee Galvanis dia. 1/2 bh Rp. 4,000.00
3007 Knee Galvanis dia. 2 bh Rp. 22,000.00
3008 Knee Galvanis dia. 2,5 bh Rp. 25,500.00
3009 Knee Galvanis dia. 3 bh Rp. 29,000.00
3010 Knee Galvanis dia. 3/4 bh Rp. 5,250.00
3011 Knee Galvanis dia. 4 bh Rp. 36,250.00
3012 Knee PVC dia. 1 bh Rp. 3,250.00
3013 Knee PVC dia. 1,5 bh Rp. 6,500.00
3014 Knee PVC dia. 1/2 bh Rp. 1,750.00
3015 Knee PVC dia. 2 bh Rp. 9,750.00
3016 Knee PVC dia. 2,5 bh Rp. 11,250.00
3017 Knee PVC dia. 3 bh Rp. 12,500.00
3018 Knee PVC dia. 3/4 bh Rp. 2,250.00
3019 Knee PVC dia. 4 bh Rp. 15,750.00
3020 Pipa Arde m' Rp. 85,000.00
3021 Pipa Baja kg Rp. 12,950.00
3022 Pipa & Oil utk Operasional Testing & Training set Rp. 425,780,300.00
3023 Pipa Galvanis dia. 1" (6 m) ljr Rp. 115,600.00
3024 Pipa Galvanis dia. 1,5" m' Rp. 79,200.00
3025 Pipa Galvanis dia. 1,5" (6 m) ljr Rp. 158,900.00
3026 Pipa Galvanis dia. 1/2" (6 m) ljr Rp. 82,500.00
3027 Pipa Galvanis dia. 2" (6 m) ljr Rp. 165,000.00
3028 Pipa Galvanis dia. 2" m' Rp. 111,900.00
3029 Pipa Galvanis dia. 2,5" (6 m) ljr Rp. 172,300.00
3030 Pipa Galvanis dia. 3" (6 m) ljr Rp. 178,800.00
3031 Pipa Galvanis dia. 3" m' Rp. 28,700.00
3032 Pipa Galvanis dia. 3/4" (6 m) ljr Rp. 115,600.00
3033 Pipa Galvanis dia. 4" (6 m) ljr Rp. 1,440,000.00
3034 Pipa Galvanis dia. 6" m' Rp. 239,000.00
3035 Pipa Galvanis dia. 12" m' Rp. 1,400,000.00
3036 Pipa Galvanis dia. 1" m' Rp. 19,200.00
3037 Pipa Galvanis dia. 8" m' Rp. 825,000.00
3038 Pipa GIP dia. 1,5" m' Rp. 79,200.00
3039 Pipa GSP D = 2,5", t = 3 mm m' Rp. 330,400.00
3040 Pipa Hitam dia. 1,5" m' Rp. 75,000.00
3041 Pipa Hydraulik Type Van Pump Operation Pressure max 140 kg/cm² set Rp. 425,780,300.00
3042 Pipa Pengaman PVC btg Rp. 53,500.00
3043 Pipa PVC 5/8 (6 m) ljr Rp. 7,500.00
3044 Pipa PVC dia. 2" btg Rp. 69,100.00
3045 Pipa PVC dia. 2,5" btg Rp. 69,600.00
3046 Pipa PVC dia. 3/4" bh Rp. 47,600.00
3047 Pipa PVC dia. 4" bh Rp. 111,300.00
3048 Pipa PVC dia. 6" btg Rp. 601,100.00
3049 Pipa PVC tipe AW dia. 1 (6 m) ljr Rp. 53,500.00
3050 Pipa PVC tipe AW dia. 1,5 (6 m) ljr Rp. 71,750.00
3051 Pipa PVC tipe AW dia. 1/2 (6 m) ljr Rp. 27,500.00
3052 Pipa PVC tipe AW dia. 2 (6 m) ljr Rp. 91,300.00
3053 Pipa PVC tipe AW dia. 2,5 (6 m) ljr Rp. 117,000.00
3054 Pipa PVC tipe AW dia. 3 (6 m) ljr Rp. 165,350.00
3055 Pipa PVC tipe AW dia. 3/4 (6 m) ljr Rp. 40,850.00
3056 Pipa PVC tipe AW dia. 4 (6 m) ljr Rp. 258,200.00
NO NAMA BAHAN SATUAN HARGA

3057 Pipa PVC tipe AW dia. 6 (6 m) ljr Rp. 450,000.00


3058 Pipa PVC tipe AW dia. 8 (6 m) ljr Rp. 625,000.00
3059 Pipa PVC tipe C dia. 1 (6 m) ljr Rp. 20,150.00
3060 Pipa PVC tipe C dia. 1,5 (6 m) ljr Rp. 27,000.00
3061 Pipa PVC tipe C dia. 1/2 (6 m) ljr Rp. 10,350.00
3062 Pipa PVC tipe C dia. 2 (6 m) ljr Rp. 36,300.00
3063 Pipa PVC tipe C dia. 2,5 (6 m) ljr Rp. 46,200.00
3064 Pipa PVC tipe C dia. 3 (6 m) ljr Rp. 54,600.00
3065 Pipa PVC tipe C dia. 3/4 (6 m) ljr Rp. 15,400.00
3066 Pipa PVC tipe C dia. 4 (6 m) ljr Rp. 69,500.00
3067 Pipa PVC tipe D dia. 1 (6 m) ljr Rp. 26,750.00
3068 Pipa PVC tipe D dia. 1,5 (6 m) ljr Rp. 35,875.00
3069 Pipa PVC tipe D dia. 1/2 (6 m) ljr Rp. 13,750.00
3070 Pipa PVC tipe D dia. 2 (6 m) ljr Rp. 43,750.00
3071 Pipa PVC tipe D dia. 2,5 (6 m) ljr Rp. 63,950.00
3072 Pipa PVC tipe D dia. 3 (6 m) ljr Rp. 92,850.00
3073 Pipa PVC tipe D dia. 3/4 (6 m) ljr Rp. 20,425.00
3074 Pipa PVC tipe D dia. 4 (6 m) ljr Rp. 130,600.00
3075 Pipa railing dia. 2,5".Tebal 3 mm m' Rp. 285,500.00
3076 Pipa Saluran 1,5' btg Rp. 126,400.00
3077 Pipa Screen pvc tive AW Dia 6 (6m) ljr Rp. 550,000.00
3078 Rib Base Plate t=10mm bh Rp. 85,000.00
3079 Rib Plate Flange Pipa dia.3"t=10mm bh Rp. 17,000.00
3080 Rib Plate Flange Pipa dia.6"t=6mm bh Rp. 29,000.00
3081 Rib Plate Flange Pipa dia.8"t=6mm bh Rp. 39,000.00
3082 Shock Galpanis Dia 1 bh Rp. 5,650.00
3083 Shock Galpanis Dia 1.5 bh Rp. 11,250.00
3084 Shock Galpanis Dia 1/2 bh Rp. 2,750.00
3085 Shock Galpanis Dia 2 bh Rp. 18,600.00
3086 Shock Galpanis Dia 2,5 bh Rp. 22,500.00
3087 Shock Galpanis Dia 3 bh Rp. 25,500.00
3088 Shok Galpanis Dia 3/4 bh Rp. 4,500.00
3089 Shock Galpanis Dia 4 bh Rp. 31,000.00
3090 shock PVC Dia 1 bh Rp. 2,500.00
3091 Shock PVC Dia 1,5 bh Rp. 5,000.00
3092 shock PVC dia 1/2 bh Rp. 1,250.00
3093 shock PVC Dia 2 bh Rp. 8,250.00
3094 Shock PVC Dia 2,5 bh Rp. 10,000.00
3095 Shock PVC Dia 3 bh Rp. 11,250.00
3096 Shock PVC Dia 3/4 bh Rp. 2,000.00
3097 Shock PVC Dia 4 bh Rp. 13,750.00
3098 Tutup Pipa dia.12" bh Rp. 35,000.00
3099 Tutup Pipa dia. 3" bh Rp. 12,000.00
3100 Tutup Pipa dia.6" bh Rp. 17,000.00
3101 Tutup Pipa dia. 8" bh Rp. 24,500.00
3102 Tutup Pipa diameter 2" bh Rp. 9,100.00
3103 Tutup Pipa diameter 1,5" bh Rp. 3,700.00
3104 Tutup pipa diameter 2" bh Rp. 6,100.00
5000 TIANG PANCANG ###
5001 Brancing antar Tiang Pancang WF 150.100.7.10 (23,65 kg/m) kg Rp. 21,400.00
5002 L Bars/Stek Tiang Pancang/Tulangan Stek utk Tiang Pancang φ 16 bh Rp. 1,177,000.00
5003 Ring Untuk Sepatu Tiang Pancang set Rp. 278,200.00
5004 Sekat Ponton T.10 mm kg Rp. 14,980.00
5005 Tiang Pancang Pipa Baja φ 45,72 cm t = 12,7 mm kg Rp. 15,202.50
5006 Tiang Pancang Bulat φ 30 Cm m' Rp. 348,000.00
5007 Tiang Pancang Bulat φ 35 Cm m' Rp. 428,000.00
NO NAMA BAHAN SATUAN HARGA

5008 Tiang Pancang Bulat φ 40 Cm m' Rp. 563,000.00


5009 Tiang Pancang Bulat φ 45 Cm m' Rp. 697,000.00
5010 Tiang Pancang Bulat φ 50 Cm m' Rp. 835,000.00
5011 Tiang Pancang Bulat φ 60 Cm m' Rp. 1,130,000.00
5012 Tiang Pancang Bulat φ 80 Cm m' Rp. 2,000,000.00
5013 Tiang Pancang Bulat φ 100 Cm m' Rp. 3,500,000.00
5014 Tiang Pancang Pipa Beton Pratekan m3 Rp. 1,087,700.00
5015 Tiang Pancang Pipa Beton Presstres φ 50 cm m' Rp. 1,087,700.00
5016 PCI Girder L = 17 m buah Rp. 54,000,000.00
5017 PCI Girder L = 21 m buah Rp. 92,000,000.00
5018 PCI Girder L = 26 m buah Rp. 126,000,000.00
5019 PCI Girder L = 32 m buah Rp. 129,000,000.00
5020 PCI Girder L = 36 m buah Rp. 158,000,000.00
5021 PCI Girder L = 41 m buah Rp. 174,000,000.00
5022 Tiang Pancang Baja φ 40 cm m' Rp. 147,125.00
5023 Elastomer Jenis 1 buah Rp. 385,500.00
5024 Elastomer Jenis 2 buah Rp. 650,000.00
5025 Elastomer Jenis 3 buah Rp. 838,000.00
5026 Expansion Tipe Joint Asphaltic Plug m' Rp. 1,000,000.00
5027 Expansion Joint Tipe Rubber m' Rp. 1,200,000.00
5028 Expansion Joint Baja Siku m' Rp. 275,000.00
5029 Elastomer buah Rp. 300,000.00
5030 Expansion Cap m2 Rp. 6,050.00
5031 Sheet Pile CCSP W.325 K.700 Pjg 9 m Btg Rp. 1,003,365.00
6000 KAYU ###
6001 Balok Jangkar 5/10 cm m3 Rp. 2,477,264.00
6002 Balok Pengaman 10 x 10 cm m3 Rp. 12,560,520.00
6003 Balok Pengaman 20 x 20 cm m3 Rp. 12,560,520.00
6004 Bambu dia. 10 cm btg Rp. 17,000.00
6005 Bambu dia. 7-10 cm btg Rp. 18,000.00
6006 Bambu dia. 5-7 cm btg Rp. 17,000.00
6007 Bantalan Kayu bh Rp. 1,070,600.00
6008 Bantalan Kelapa m' Rp. 23,000.00
6009 Cerucuk m' Rp. 22,000.00
6010 Dolken btg Rp. 23,000.00
6011 Dolken Kayu dia. 8 cm btg Rp. 23,000.00
6012 Gapit Kayu Galam dia. 6 cm, Panjang = 4 m btg Rp. 107,000.00
6013 Gapit Kayu Galam dia. 6 cm, Panjang = 6 m btg Rp. 602,000.00
6014 Gapit/Kalang 10 x 10 cm m3 Rp. 12,560,520.00
6015 Gapit/Kalang 20 x 20 cm m3 Rp. 12,560,520.00
6016 Gelagar Kayu Kamper Klas I, 10 x 10 cm m3 Rp. 12,560,520.00
6017 Gelagar Kayu Ulin 20 x 20 cm m3 Rp. 12,560,520.00
6018 Kayu Albasiah m3 Rp. 4,850,000.00
6019 Kayu Bakar m3 Rp. 50,000.00
6020 Kayu Balok Klas I m3 Rp. 16,000,000.00
6021 Kayu Balok Klas II m3 Rp. 5,250,000.00
6022 Kayu Balok Klas III m3 Rp. 2,850,000.00
6023 Kayu Bulat dia. 10-15 cm, Panjang 4 m btg Rp. 2,114,667.75
6024 Kayu Galam dia. 10 cm x 6 m btg Rp. 155,075.64
6025 Kayu Ganjal bh Rp. 24,942.24
6026 Kayu Kaso Klas I m3 Rp. 16,000,000.00
6027 Kayu Kaso Klas II m3 Rp. 5,250,000.00
6028 Kayu Kaso Klas III m3 Rp. 2,850,000.00
6029 Kayu Klas II m3 Rp. 5,250,000.00
6030 Kayu Klas III m3 Rp. 2,850,000.00
6031 Kayu papan Klas I m3 Rp. 16,000,000.00
NO NAMA BAHAN SATUAN HARGA

6032 Kayu papan Klas II m3 Rp. 5,250,000.00


6033 Kayu papan Klas III m3 Rp. 2,850,000.00
6034 Kayu Papan Rentang m3 Rp. 3,199,112.75
6035 Kayu Perancah/Bekisting m3 Rp. 3,350,000.00
6036 Kayu Ramin m3 Rp. 7,100,000.00
6037 Kayu Ramin Segala Ukuran (Balok) m3 Rp. 7,100,000.00
6038 Kayu Reng Klas II m3 Rp. 3,500,000.00
6039 Kayu Reng Klas III m3 Rp. 2,550,000.00
6040 Kayu Ulin Segala Ukuran (papan & Balok) m3 Rp. 12,142,500.00
6041 List Profil m' Rp. 7,750.00
6042 Multiplek 10 mm m2 Rp. 250,000.00
6043 Multiplek 12 mm lbr Rp. 250,000.00
6044 Multiplek 18 mm lbr Rp. 350,000.00
6045 Multiplek 6 mm m2 Rp. 85,000.00
6046 Multiplek 9 mm m2 Rp. 112,500.00
6047 Papan untuk Alas bh Rp. 2,400.00
6048 Plywood lbr Rp. 230,522.00
6049 Plywood (120 x 240) cm x 4 m lbr Rp. 108,350.00
6050 Plywood (30 x 60) cm x 4 m lbr Rp. 108,350.00
6051 Plywood (30 x 60) cm x 6 m lbr Rp. 108,350.00
6052 Plywood (90 x 220) cm x 4 m lbr Rp. 108,350.00
6053 Plywood (90 x 220) cm x 6 m lbr Rp. 108,350.00
6054 Plywood (t=12 mm) lbr Rp. 246,000.00
6055 Plywood (t=18 mm) lbr Rp. 286,000.00
6056 Plywood (t=3 mm) lbr Rp. 65,000.00
6057 Plywood (t=4 mm) lbr Rp. 108,350.00
6058 Plywood (t=6 mm) lbr Rp. 128,500.00
6059 Plywood (t=9 mm) lbr Rp. 134,500.00
6060 Plywood Lapis Aluminium lbr Rp. 81,333.38
6061 Senteleng Bambu lbr Rp. 108,336.06
6062 Sirap Ulin lbr Rp. 1,518.22
6063 Sloof Kayu Galam dia. 10-6 m btg Rp. 697,731.91
6064 Sloof Kayu Kamper Klas I 15 x 15 cm m3 Rp. 14,574,615.47
6065 Sloof Kayu Ulin 20 x 20 cm m3 Rp. 14,574,615.47
6066 Sloof Kayu Ulin dia. 10-6 m btg Rp. 697,731.91
6067 Teakwood lbr Rp. 115,000.00
6068 Teakwood (120 x 240) cm x 4 mm lbr Rp. 115,000.00
6069 Teakwood (90 x 220) cm x 4 mm lbr Rp. 115,000.00
6070 Teakwood (60 x 120) cm x 4 mm lbr Rp. 115,000.00
6071 Tiang Kayu Kamper 15/15 Panjang 6 m (Induk) btg Rp. 645,500.00
6072 Tiang Kayu Kamper 15/15 Panjang 8 m (Gapit) btg Rp. 868,000.00
6073 Tiang kayu Ulin 15/15 Panjang 10 m btg Rp. 2,550,000.00
6074 Tiang kayu Ulin 20/20 Panjang 10 m (Induk) btg Rp. 4,550,000.00
6075 Tiang kayu Ulin 20/20 Panjang 12 m (Gapit) btg Rp. 5,350,000.00
6076 Tiang kayu Ulin 20/20 Panjang 15 m (Gapit) btg Rp. 6,800,000.00
6077 Tiang kayu Ulin 20/20 Panjang 15 m (Induk) btg Rp. 6,500,000.00
6078 Tiang kayu Ulin 20/20 Panjang 5 m btg Rp. 2,260,000.00
6079 Triplek t = 12 mm lbr Rp. 120,000.00
6080 Triplek t = 15 mm lbr Rp. 197,666.70
6081 Triplek t = 18 mm lbr Rp. 210,600.00
6082 Triplek t = 3 mm lbr Rp. 90,000.00
6083 Triplek t = 4 mm lbr Rp. 80,000.00
6084 Triplek t = 6 mm lbr Rp. 90,000.00
6085 Triplek t = 9 mm lbr Rp. 110,000.00
6086 Reng : 2/3. 3/5 (Borneo) m3 Rp. 3,450,000.00
6087 Usuk : 5/7 (Borneo) m3 Rp. 3,450,000.00
6088 Balok8 (Borneo) m3 Rp. 3,450,000.00
NO NAMA BAHAN SATUAN HARGA

6089 Papan (2x20) cm (Borneo) m3 Rp. 3,650,000.00


6090 Papan (3x20) cm (Borneo) m3 Rp. 3,650,000.00
6091 Papan (3x30) cm (Borneo) m3 Rp. 3,650,000.00
6092 Reng : 2/3. 3/5 (Meranti) m3 Rp. 3,500,000.00
6093 Usuk : 5/7 (Meranti) m3 Rp. 3,500,000.00
6094 Balok7 (Meranti) m3 Rp. 3,800,000.00
6095 Papan (2x20) cm (Meranti) m3 Rp. 3,800,000.00
6096 Papan (3x20) cm (Meranti) m3 Rp. 3,800,000.00
6097 Papan (3x30) cm (Meranti) m3 Rp. 3,800,000.00
6098 Reng : 2/3. 3/5 (Kruing) m3 Rp. 5,500,000.00
6099 Usuk : 5/7 (Kruing) m3 Rp. 5,500,000.00
6100 Balok6 (Kruing) m3 Rp. 5,700,000.00
6101 Papan (2x20) cm (Kruing) m3 Rp. 5,500,000.00
6102 Papan (3x20) cm (Kruing) m3 Rp. 5,500,000.00
6103 Papan (3x30) cm (Kruing) m3 Rp. 5,500,000.00
6104 Reng : 2/3. 3/5 (Bengkiral) m3 Rp. 5,800,000.00
6105 Usuk : 5/7 (Bengkiral) m3 Rp. 5,800,000.00
6106 Balok5 (Bengkiral) m3 Rp. 5,800,000.00
6107 Papan (2x20) cm (Bengkiral) m3 Rp. 6,200,000.00
6108 Papan (3x20) cm (Bengkiral) m3 Rp. 6,200,000.00
6109 Papan (3x30) cm (Bengkiral) m3 Rp. 6,200,000.00
6110 Reng : 2/3. 3/5 (Kamper) m3 Rp. 7,700,000.00
6111 Usuk : 5/7 (Kamper) m3 Rp. 7,700,000.00
6112 Balok4 (Kamper) m3 Rp. 8,000,000.00
6113 Papan (2x20) cm (Kamper) m3 Rp. 8,200,000.00
6114 Papan (3x20) cm (Kamper) m3 Rp. 8,200,000.00
6115 Papan (3x30) cm (Kamper) m3 Rp. 8,200,000.00
6116 Reng : 2/3. 3/5 (Jati) m3 Rp. 37,000,000.00
6117 Usuk : 5/7 (Jati) m3 Rp. 37,000,000.00
6118 Balok3 (Jati) m3 Rp. 50,000,000.00
6119 Papan (2x20) cm (Jati) m3 Rp. 50,000,000.00
6120 Papan (3x20) cm (Jati) m3 Rp. 50,000,000.00
6121 Papan (3x30) cm (Jati) m3 Rp. 50,000,000.00
6122 Reng : 2/3. 3/5 m3 Rp. 11,500,000.00
6123 Usuk 1xx : 5/7 m3 Rp. 11,500,000.00
6124 Balok2 m3 Rp. 11,500,000.00
6125 Papan (2x20) cm m3 Rp. 11,500,000.00
6126 Papan (3x20) cm m3 Rp. 11,500,000.00
6127 Papan (3x30) cm m3 Rp. 11,500,000.00
6128 Reng : 2/3. 3/5 m3 Rp. 15,000,000.00
6129 Usuk 1xxx : 5/7 m3 Rp. 15,000,000.00
6130 Balok1 m3 Rp. 15,000,000.00
6131 Papan (2x20) cm m3 Rp. 15,000,000.00
6132 Papan (3x20) cm m3 Rp. 15,000,000.00
6133 Papan (3x30) cm m3 Rp. 15,000,000.00
6134 Sirap m3 Rp. 4,100,000.00
6135 Bakar m3 Rp. 4,350,000.00
6136 List kayu Profil m' Rp. 5,000.00
6137 List kayu 2/4 m3 Rp. 2,250,000.00
6138 Gedeg (2.00 x 3.00) m lbr Rp. 25,000.00
6139 Bilik Bambu m2 Rp. 50,000.00
6140 Partisi Ruangan lot Rp. 64,200,000.00
7000 PELUMAS-PEREKAT-BAHAN BAKAR ###
7001 A C Marine Use (Anti Corrosive M U) kg Rp. 430,000.00
7002 A F Marine Use (Anti Fouling) ltr Rp. 408,000.00
7003 Acetelin @ 15 kg tabung Rp. 3,570,000.00
7004 Acetelin @ 45 kg tabung Rp. 370,000.00
NO NAMA BAHAN SATUAN HARGA

7005 Additive ltr Rp. 52,000.00


7006 Admixture ltr Rp. 25,000.00
7007 Air m3 Rp. 55,000.00
7008 Air Accu ltr Rp. 11,800.00
7009 Air Filler ltr Rp. 157,000.00
7010 Aluminium Anoda kg Rp. 148,000.00
7011 Bahan Pengawet : Kreosot ltr Rp. 15,000.00
7012 Bensin ltr Rp. 6,000.00
7013 Bunker Oil liter Rp. 6,000.00
7014 Densopaste tubr Rp. 162,000.00
7015 Densopole rol Rp. 235,000.00
7016 Densotape rol Rp. 181,000.00
7017 Gas LPG kg Rp. 5,500.00
7018 Gemuk kg Rp. 70,000.00
7019 Grease kg Rp. 70,000.00
7020 Karbit kg Rp. 65,800.00
7021 Minyak Aspal ltr Rp. 2,700.00
7022 Minyak Bekisting ltr Rp. 2,500.00
7023 Minyak Cat ltr Rp. 22,500.00
7024 Minyak Cat SSK kg Rp. 19,653.33
7025 Minyak Pelumas ltr Rp. 40,000.00
7026 Minyak tanah ltr Rp. 9,000.00
7027 Oil Filter ltr Rp. 156,900.00
7028 Oksigen (Tabung) tabung Rp. 3,430,000.00
7029 Oli ltr Rp. 55,000.00
7030 Oli Mediterain 40 ltr Rp. 57,800.00
7031 Oli SAE 30-40 ltr Rp. 28,500.00
7032 Penetran Cleaner 400 ml botol Rp. 209,100.00
7033 Penetran Developer 400 ml botol Rp. 122,900.00
7034 Penetran Revolfer 400 ml botol Rp. 209,100.00
7035 Puzzdith - 100 XR ltr Rp. 50,000.00
7036 Repidrant galon Rp. 25,000.00
7037 Residu/Ter ltr Rp. 6,500.00
7038 Residu/Ter (Per Gallon) galon Rp. 46,350.50
7039 Soda Api kg Rp. 37,613.00
7040 Solar Industri ltr Rp. 18,500.00
7041 Spirtus ltr Rp. 11,700.00
7042 Strorox 100 kg Rp. 65,000.00
7043 Teak Oil ltr Rp. 26,966.67
7044 Thinner ltr Rp. 38,120.00
7100 CAT-PLASTIK ###
7101 Alas Plastik m2 Rp. 300,000.00
7102 Amplas lbr Rp. 10,886.67
7103 Batacote kg Rp. 5,000.00
7104 Bronz kg Rp. 24,473.33
7105 Cat kg Rp. 64,216.67
7106 Cat Anti Karat kg Rp. 181,400.00
7107 Cat Besi kg Rp. 72,225.00
7108 Cat Besi Khusus kg Rp. 81,507.00
7109 Cat Brown kg Rp. 36,300.00
7110 Cat Dasar kg Rp. 64,216.67
7111 Cat dasar Besi kg Rp. 64,216.67
7112 Cat Dasar Kayu kg Rp. 64,216.67
7113 Cat Dasar Tembok kg Rp. 64,216.67
7114 Cat Genteng kg Rp. 39,000.00
7115 Cat kayu kg Rp. 64,216.67
NO NAMA BAHAN SATUAN HARGA

7116 Cat Kilap kg Rp. 89,000.00


7117 Cat marka (Non Thermoplastic) kg Rp. 25,000.00
7118 Cat marka (Thermoplastic) kg Rp. 22,275.00
7119 Cat Meni Besi kg Rp. 46,820.00
7120 Cat Meni kayu kg Rp. 46,820.00
7121 Cat Tembok kg Rp. 58,650.00
7122 Cat Tembok Dalam kg Rp. 40,441.91
7123 Cat Tembok Luar kg Rp. 58,650.60
7124 Coldplastic kg Rp. 26,800.00
7125 Curing Compound kg Rp. 6,500.00
7126 Dempul kg Rp. 32,566.67
7127 Dempul Jadi kg Rp. 32,566.67
7128 Dempul Kayu kg Rp. 32,566.67
7129 Fibre Mesh kg Rp. 139,000.00
7130 Filler kg Rp. 600.00
7131 Formika (90 x 220) cm lbr Rp. 50,000.00
7132 Formtie bh/psg Rp. 5,500.00
7133 Geotextile m2 Rp. 39,552.50
7134 Geotextile Non Woven m2 Rp. 39,552.50
7135 Geotextile Woven m2 Rp. 39,552.50
7136 Geotextile/Filter Cloth m2 Rp. 39,552.50
7137 Glass Bead kg Rp. 20,000.00
7138 Jaring BRC per Lembar lbr Rp. 824,600.00
7139 Jaring BRC per Roll roll Rp. 4,603,800.00
7140 Jaring Ulir per Lembar lbr Rp. 1,426,100.00
7141 Jaring Ulir per Roll roll Rp. 4,955,200.00
7142 Joint Sealant m' Rp. 16,500.00
7143 Kalkarium kg Rp. 6,500.00
7144 Kapur Sirih kg Rp. 3,900.00
7145 Kertas Gosok lbr Rp. 4,250.00
7146 Kuas bh/psg Rp. 15,160.00
7147 Lem Kayu kg Rp. 33,903.60
7148 Lem Mixed Epoxy Adhesive kg Rp. 82,000.00
7149 Lem Pipa PVC kg Rp. 26,000.00
7150 Lem Vinyl kg Rp. 45,500.00
7151 Pelitur kg Rp. 45,346.67
7152 Pelitur Jadi ltr Rp. 58,500.00
7153 Plamur kg Rp. 11,700.00
7154 Plamur Besi kg Rp. 11,700.00
7155 Plamur Kayu kg Rp. 11,700.00
7156 Plamur Tembok kg Rp. 11,700.00
7157 Plamur Tembok (5 kg) kaleng Rp. 59,550.00
7158 Polypropilene Pad (tebal 5 cm) kg Rp. 2,862,300.00
7159 Roll Cat bh Rp. 32,000.00
7160 Sabun kg Rp. 26,000.00
7161 Sapu/Sikat Jerami bh Rp. 15,300.00
7162 Seal tape/TBA bh Rp. 2,000.00
7163 Serat Polypropilene kg Rp. 126,700.00
7164 Sirlak kg Rp. 162,500.00
7165 Splash Guard m2 Rp. 3,750,000.00
7166 Tambang Manila dia. 19 mm kg Rp. 77,100.00
7167 Tenda Plastik 3 x 4 bh Rp. 219,700.00
7168 Terpal untuk Blokir Air set Rp. 40,400.00
7169 Thermoplastik kg Rp. 23,900.00
7170 Ultraproof kg Rp. 161,550.00
7171 Vernis ltr Rp. 39,940.00
7172 Waterproofing kg Rp. 117,000.00
8410 List Gypsum m' Rp. 18,435.57
NO NAMA BAHAN SATUAN HARGA

8411 Soft Board lbr Rp. 65,066.70


8412 Gypsum Board lbr Rp. 65,000.00
NO NAMA BAHAN SATUAN HARGA

LISTRIK ###
9300 LISTRIK ###
9301 1 KVA Uninteruptible Power Supply Unit Rp. 5,000,000.00
9302 1-4 Booster Splitter Unit Unit Rp. 4,100,000.00
9303 Alarm Balancer set Rp. 21,400,000.00
9304 Armatur Box Lampu bh Rp. 115,500.00
9305 Artificial Load ltr Rp. 5,650,000.00
9306 Bos Distribusi Untuk 4 Lampu Unit Rp. 9,750,000.00
9307 Box Panel Penerangan bh Rp. 32,100,000.00
9308 Coaxial Cable m' Rp. 20,500.00
9309 Control Cable 2 Pair m' Rp. 10,500.00
9310 Control WL dengan Konfigurasi (double Flasher) bh Rp. 6,750,000.00
9311 Delegate Unit bh Rp. 5,000.00
9312 Elektroda Tanah ls Rp. 735,000.00
9313 Fitting Flafond bh Rp. 7,500.00
9314 Generator Set 25 KVA Unit Rp. 255,000,000.00
9315 Generator Set Kapasitas 25 KVA Unit Rp. 268,153,700.00
9316 Genset 1,5 KVA Unit Rp. 5,400,000.00
9317 Instalasi Penerangan m' Rp. 33,700.00
9318 Isolator m' Rp. 500.00
9319 Junction Cable Switch bh Rp. 47,100.00
9320 Kabel NYFGBY 4x6 mm m' Rp. 44,100.00
9321 Kabel BC 75 mm2 m' Rp. 32,400.00
9322 Kabel NYA 2,5 mm m' Rp. 1,850.00
9323 Kabel NYA 4,0 mm m' Rp. 5,500.00
9324 Kabel NYY 4 x 2,5 m' Rp. 9,800.00
9325 Kawat BC m' Rp. 35,000.00
9326 Lampu Penerangan Jalan Titik Rp. 906,800.00
9327 Lampu Pijar 5 - 40 Watt bh Rp. 15,000.00
9328 Lampu Pijar 50 - 100 Watt bh Rp. 25,000.00
9329 Lampu Sorot 1000 Watt Unit Rp. 4,579,600.00
9330 Lampu TL 20 Watt Unit Rp. 130,800.00
9331 Lampu TL Komplit 20 Watt bh Rp. 50,000.00
9332 Lampu TL Komplit 40 Watt bh Rp. 75,000.00
9333 Lampu XL 14 Watt bh Rp. 25,000.00
9334 Lampu XL 18 Watt bh Rp. 27,500.00
9335 Lampu XL 23 Watt bh Rp. 28,500.00
9336 Lampu XL 5 Watt bh Rp. 22,500.00
9337 Lampu XL 8 Watt bh Rp. 22,500.00
9338 Las Doof bh Rp. 350.00
9339 Panel Listrik bh Rp. 52,093,000.00
9340 Pasang Baru PLN ls Rp. 2,200,000.00
9341 Pembatas Arus Listrik bh Rp. 44,000.00
9342 Penyambung Listrik (PLN) Unit Rp. 2,354,000.00
9343 Saklar Broco bh Rp. 25,000.00
9344 Saklar Ganda bh Rp. 83,700.00
9345 Saklar Tunggal bh Rp. 53,000.00
9346 Sekring Kast 1 Group bh Rp. 221,300.00
9347 Set Terminal Kabel bh Rp. 18,000.00
9348 Stop Kontak bh Rp. 20,000.00
9349 Supply Cable m' Rp. 6,300.00
9350 T Dos PVC bh Rp. 650.00
9351 Tackle Electric Kapasitas 35 Ton/Unit Unit Rp. 374,444,800.00
9352 Tambah Daya 2200 Watt ls Rp. 2,000,000.00
9353 Terminal End (Sleeve Beam) Type 1 bh Rp. 848,000.00
9354 Terminal Kabel bh Rp. 20,700.00
9355 Zekering Kast Lokal 1 Group Unit Rp. 50,000.00
NO NAMA BAHAN SATUAN HARGA

9356 Zekering Kast Lokal 2 Group Unit Rp. 75,000.00


9357 Zekering Kast Lokal 3 Group Unit Rp. 100,000.00
9358 Terminal End (Sleeve Beam) Type 2 bh Rp. 335,000.00
9359 Kabel NYY 4 x 3 m' Rp. 25,400.00
9360 Isolasi Scoth 23 bh Rp. 51,000.00
9361 Isolasi Listrik bh Rp. 75,000.00
9362 kabel Coaxial 5c-2v mm m Rp. 5,000.00
9363 Pvc Conduit dia 20 mm m Rp. 3,900.00
9364 Socket PVC dia 20 mm m Rp. 17,000.00
9365 Tee Dos bh Rp. 600.00
9366 Klem Pipa bh Rp. 500.00
9367 Flexible Conduit m Rp. 8,000.00
9368 switch bh Rp. 250,000.00
9369 kabel m Rp. 3,000.00
9370 jack RJ45 bh Rp. 2,000.00
HARGA SATUAN ALAT
KEGIATAN : PEMBANGUNAN REHABILITASI KANTOR UNIT PENYELENGGARA PELABUHAN KELAS III BIRINGKASSI
PEKERJAAN : RENOVASI KANTOR UNIT PENYELENGGARA PELABUHAN BIRINGKASSI
LOKASI : BIRINGKASSI. KABUPATEN PANGKEP - SULAWESI SELATAN
TAHUN ANGGARAN : 2015

NO NAMA PERALATAN SATUAN HARGA

601 AMP Jam Rp. 4,763,450.00


602 Asphalt Distributor Jam Rp. 25,337.50
603 Asphalt Finisher Jam Rp. 407,751.32
604 Asphalt Sprayer Jam Rp. 25,337.50
605 Asphalt Liquid Mixer Jam Rp. 379,555.75
606 Buldozer Jam Rp. 248,648.05
607 Compressor Jam Rp. 116,035.61
608 Concrete Mixer Jam Rp. 145,044.01
609 Concrete Pan Mixer (Batching Plant) Jam Rp. 407,317.54
610 Concrete Pump Jam Rp. 20,306.23
611 Concrete Thriller Jam Rp. 145,044.51
612 Concrete Vibrator Jam Rp. 149,111.18
613 Crane 10-15 ton Jam Rp. 372,940.63
614 Crane 25 ton Jam Rp. 455,900.67
615 Crane 30 ton Jam Rp. 534,631.38
616 Crane 75 ton Jam Rp. 787,415.51
617 Crane On Track 35 ton Jam Rp. 1,489,918.98
618 Crawler Crane Jam Rp. 407,968.21
619 CTB Mixing Plant Jam Rp. 813,333.75
620 Dump Truck 3,5 ton Jam Rp. 162,666.75
621 Dump Truck 5 ton Jam Rp. 203,333.43
622 Dump Truck 10 ton Jam Rp. 244,000.12
623 Excavator Jam Rp. 379,555.75
624 Flatbed Truck 3,5 ton Jam Rp. 363,397.51
625 Fulvi Mixer (Cold Milling) Jam Rp. 374,133.52
626 Generator Set Jam Rp. 276,533.47
627 Genset 10 KVA Jam Rp. 162,666.75
628 Genset 20 KVA Jam Rp. 216,889.00
629 Pile Driver + Hammer Jam Rp. 1,072,732.99
630 Jack Hammer Jam Rp. 75,000.00
631 Mesin Gerinda Profil Jam Rp. 36,068.64
632 Mesin Las Jam Rp. 280,950.41
633 Mesin Las 40 Amp Jam Rp. 280,950.41
634 Mesin Las Karbit Jam Rp. 232,071.23
635 Welding Set Jam Rp. 300,608.15
636 Mixer Truck Jam Rp. 74,284.48
637 Motor Grader Jam Rp. 261,134.35
638 Ponton Pancang Jam Rp. 1,625,000.00
639 Ponton Transport Jam Rp. 1,325,000.00
NO NAMA PERALATAN SATUAN HARGA

640 Sprayer Cat Jam Rp. 16,402.23


641 Stamper Jam Rp. 97,600.05
642 Stone Crusher Jam Rp. 417,511.32
643 Tandem Roller Jam Rp. 716,105.66
644 Three Wheel Roller Jam Rp. 596,444.75
645 Tire Roller Jam Rp. 619,977.20
646 Trailer Jam Rp. 278,340.16
647 Tronton Jam Rp. 1,487,750.09
648 Tugboat utk Menarik Ponton dng Waktu Tunggu 4x1 Hari Jam Rp. 673,947.86
649 Vibrator Roller Jam Rp. 716,105.66
650 Track Loader Jam Rp. 216,889.00
651 Water Tanker Jam Rp. 224,263.22
652 Wheel Loader Jam Rp. 206,044.55
653 Cutter Tangan Jam Rp. 27,569.84
654 Bar Bender Jam Rp. 28,795.26
655 Bar Cutter Jam Rp. 27,569.84
656 Blander Potong Jam Rp. 5,964.44
657 Blending Equipment Jam Rp. 202,510.34
658 Chipping Hammer Jam Rp. 22,366.67
659 Echosounder Jam Rp. 290,089.03
660 Epoxy Grout Mixer Jam Rp. 22,366.67
661 Epoxy Mixer Kecil Jam Rp. 14,911.11
662 Gerinda Amplas Jam Rp. 23,857.79
663 Grouting Mixer (Kap. 7,5 Liter) Jam Rp. 149,111.18
664 Grouting Pump Jam Rp. 149,111.18
665 Pompa Air (/Jam) Jam Rp. 43,377.80
666 Theodolite Jam Rp. 87,102.62
667 Waterpass Jam Rp. 19,194.67
668 Bore Pile Machine Jam Rp. 379,555.75
669 Cold Milling Machine Jam Rp. 383,893.53
670 Pedestarian Roller Jam Rp. 32,533.35
671 Slip Form Paver Jam Rp. 271,111.25
672 Diesel Hammer Jam Rp. 587,000.00
673 Handy Talky Jam Rp. 32,533.35
674 Mistar Ukur Jam Rp. 2,277.33
675 Sewa Blender Potong Jam Rp. 20,437.45
676 Tarafo Las Jam Rp. 38,768.90
677 Chainsaw Jam Rp. 108.44
678 Cutter Machine Jam Rp. 0.00
701 Compressor (/hari) Hari Rp. 1,520,250.00
702 Crane (/hari) Hari Rp. 1,114,850.00
703 Crane 20 ton (/hari) Hari Rp. 2,610,801.33
704 Crane 25 ton (/hari) Hari Rp. 3,190,979.41
705 Crane 30 ton (/hari) Hari Rp. 3,742,202.80
706 Crane 75 ton (/hari) Hari Rp. 5,511,691.71
707 Diesel Hammer (/hari) Hari Rp. 2,147,201.10
708 Drill berikut Operator (/hari) Hari Rp. 406,666.87
709 Excavator (/hari) Hari Rp. 1,897,778.75
710 Generator Set (/hari) Hari Rp. 1,382,667.37
711 Hidrolik Hammer (/hari) Hari Rp. 5,363,664.97
NO NAMA PERALATAN SATUAN HARGA

712 Mesin Bor (/hari) Hari Rp. 1,084,445.00


713 Mesin Gerinda MP 12 (/hari) Hari Rp. 143,363.62
714 Mesin Gerinda Tangan (/hari) Hari Rp. 130,350.28
715 Mesin Las Karbit (/hari) Hari Rp. 1,571,360.80
716 Mesin Las Listrik dan Perlengkapan (/hari) Hari Rp. 1,965,556.56
717 Mesin Weld Sher (manual) (/hari) Hari Rp. 125,361.84
718 Motor Grader (/hari) Hari Rp. 1,225,516.11
719 Motor Johnson 40 PK (/hari) Hari Rp. 620,844.76
720 Road Roller (Mesin Gilas) (/hari) Hari Rp. 12,415,810.80
721 Pompa Tes (/hari) Hari Rp. 3,795,557.50
722 Ponton Pancang (/hari) Hari Rp. 5,964,447.50
723 Ponton Transport (/hari) Hari Rp. 2,982,223.75
724 Sandblasting Hari Rp. 1,084,445.00
725 Stamper (/hari) Hari Rp. 303,644.60
726 Tandem Roller (/hari) Hari Rp. 5,151,113.75
727 Tug Boat Hari Rp. 4,469,648.51
728 Wheel Loader (/hari) Hari Rp. 1,030,222.75
729 Pompa Air (Kap. 30 m³/hari)) Hari Rp. 216,889.00
730 Theodolite (/hari) Hari Rp. 435,513.11
731 Waterpass Hari Rp. 310,585.04
732 Sewa kapal 500 DWT Hari Rp. 16,808,897.50
733 Sewa Perahu Motor Hari Rp. 184,355.65
734 Sewa Kapal 30 GT Hari Rp. 1,626,667.50
735 Sewa Tongkang/LCT Hari Rp. 32,533,350.00
736 Sewa Alat Survey (Totalstation, DGPS & Echosounder) Hari Rp. 2,711,112.50
737 Kendaraan (/hari) Hari Rp. 464,142.46
738 Crane Telescopic 45 Ton Hari Rp. 775,378.17
739 Forklift Hari Rp. 5,422,225.00
740 Trailer Hari Rp. 9,760,005.00
741 Genset, Mesin Las. DLL. Hari Rp. 10,844,450.00
742 Toolkit utk Pemasangan Garbarata Hari Rp. 1,084,445.00
743 Scafolding, Tangga, Lampu Penerangan, Dll. Hari Rp. 867,556.00
744 Truk Hari Rp. 1,626,667.50
801 Alat Bantu Bulan Rp. 662,487.45
802 Alat Bantu Ls Rp. 4,446.22
803 Alat Bantu Beton di Laut Ls Rp. 89,358.26
804 Alat Bantu (Pikulan; Balok Angkut Rel; Tali; Pengikat) Ls Rp. 4,446.22
805 Alat Bantu Cor Beton Jam Rp. 8,458.67
806 Alat Bantu Galian Tanah Ls Rp. 89,358.26
807 Alat Bantu Galian Tanah Jam Rp. 4,446.22
808 Alat Bantu Pemasangan Geotekstil Ls Rp. 89,358.26
809 Alat Bantu Pemasangan Pipa Ls Rp. 5,747.55
810 Alat Bantu Pembesian Bekisting Ls Rp. 89,358.26
811 Alat Bantu Pemotongan Tiang Pancang Ls Rp. 31,015.12
812 Alat Bantu Pengaspalan per 100 m² Ls Rp. 216,889.00
813 Alat Bantu Pengecatan Ls Rp. 10,410.67
814 Alat Bantu Pengecatan Tiang Pancang Ls Rp. 31,015.12
815 Alat Bantu Pengecatan Beton Ls Rp. 74,501.37
816 Alat Bantu Pengelasan/Pemotongan Ls Rp. 31,015.12
817 Alat Bantu Pengukuran Ls Rp. 976.00
NO NAMA PERALATAN SATUAN HARGA

818 Alat Bantu Penutup Tiang Pancang Ls Rp. 31,015.12


819 Alat Bantu Penyambungan Tiang Pancang Ls Rp. 21,688.90
820 Alat Bantu Penyetelan Ls Rp. 8,241.78
821 Alat Bantu Sepatu Tiang Pancang Ls Rp. 24,833.79
822 Alat Bantu Timbunan Ls Rp. 21,688.90
823 Alat Bantu Muat/Bongkar Rel & Alat Penambat Ls Rp. 2,711.11
824 Gergaji Besi Standar Buah Rp. 15,009.80
825 Kamera Hari Rp. 2,483,162.16
826 Alat Bantu Instalasi Kabel Power Lot Rp. 162,666.75
827 Pabrikasi Ls Rp. 2,168.89
828 Alat Bantu Pemasangan Remote Control Desk Ls Rp. 5,964,447.50
901 Konstruksi Penyangga Bekisting Ls Rp. 2,060,445.50
902 Mobilisasi dan Demobilisasi Ls Rp. 838,059.09
903 Pembersihan Lokasi Ls Rp. 3,724,743.24
904 Sewa Mesin Bor & Bahan Bakar/Lubang Ls Rp. 86,007.33
905 Meja & Mesin Gambar + Peralatannya Unit Rp. 9,435,972.83
906 Panel Control Unit Rp. 3,724,743.24
907 Sumur Pompa Tangan Lengkap. Unit Rp. 162,666.75
HARGA SATUAN UPAH
KEGIATAN : PEMBANGUNAN REHABILITASI KANTOR UNIT PENYELENGGARA PELABUHAN KELAS III BIRINGKASSI
PEKERJAAN : RENOVASI KANTOR UNIT PENYELENGGARA PELABUHAN BIRINGKASSI
LOKASI : BIRINGKASSI. KABUPATEN PANGKEP - SULAWESI SELATAN
TAHUN ANGGARAN : 2015

NO NAMA PEKERJA STN. HARGA

201 Pekerja OH Rp. 78,000.00


202 Tukang OH Rp. 100,000.00
203 Pembantu Tukang OH Rp. 55,500.00
204 Operator OH Rp. 90,965.00
205 Kepala Tukang OH Rp. 125,000.00
206 Mandor OH Rp. 135,000.00
207 Asisten Laborat OH Rp. 77,528.00
208 Instalator OH Rp. 104,427.00
209 Juru Gambar OH Rp. 89,842.00
210 Juru Ukur OH Rp. 82,968.00
211 Kepala Tukang Batu OH Rp. 137,000.00
212 Kepala Tukang Besi OH Rp. 137,000.00
213 Kepala Tukang Cat OH Rp. 137,000.00
214 Kepala Tukang Kayu OH Rp. 137,000.00
215 Kepala Tukang Las OH Rp. 137,000.00
216 Kepala Tukang Listrik OH Rp. 137,000.00
217 Kepala Tukang Pipa OH Rp. 137,000.00
218 Masinis OH Rp. 71,550.00
219 Mekanik OH Rp. 86,746.00
220 Operator Alat Berat OH Rp. 135,000.00
221 Operator Mesin OH Rp. 66,200.00
222 Operator Pancang OH Rp. 145,221.00
223 Pekerja Pembersihan OH Rp. 31,500.00
224 Pembantu Instalator OH Rp. 55,500.00
225 Pembantu Mekanik OH Rp. 55,500.00
226 Pembantu Operator OH Rp. 55,500.00
227 Pembantu Surveyor OH Rp. 109,000.00
228 Pembantu Tukang Las OH Rp. 55,500.00
229 Pengajar OH Rp. 123,000.00
230 Pengawas Pekerjaan Las OH Rp. 82,968.00
231 Pengawas OH Rp. 117,877.00
232 Penjaga Api OH Rp. 71,550.00
233 Programer Lampu Lalu Lintas OH Rp. 97,726.00
234 Satpam OH Rp. 55,500.00
235 Sopir OH Rp. 85,145.00
236 Surveyor OH Rp. 160,500.00
237 Teknisi Line Up/Set Up System OH Rp. 165,000.00
238 Teknisi OH Rp. 58,850.00
NO NAMA PEKERJA STN. HARGA

239 Tenaga Ahli OH Rp. 170,000.00


240 Tukang Anyaman OH Rp. 58,850.00
241 Tukang Aspal OH Rp. 88,953.00
242 Tukang Babat Rumput OH Rp. 75,528.00
243 Tukang Batu OH Rp. 115,000.00
244 Tukang Besi OH Rp. 115,000.00
245 Tukang Beton OH Rp. 115,000.00
246 Tukang Bongkar Cetakan Beton/Siram OH Rp. 84,746.00
247 Tukang Bongkar OH Rp. 84,746.00
248 Tukang Cat OH Rp. 115,000.00
249 Tukang Gali OH Rp. 115,000.00
250 Tukang Gerinda OH Rp. 70,335.00
251 Tukang Jaga OH Rp. 84,746.00
252 Tukang Kayu OH Rp. 115,000.00
253 Tukang Las Penyambung Tiang Pancang OH Rp. 84,746.00
254 Tukang Las OH Rp. 115,000.00
255 Tukang Listrik OH Rp. 115,000.00
256 Tukang Masak Aspal OH Rp. 59,704.00
257 Tukang Pancang OH Rp. 115,000.00
258 Tukang Pipa OH Rp. 75,528.00
259 Tukang Plitur OH Rp. 115,000.00
260 Tukang Selam OH Rp. 187,250.00
261 Tukang Taman OH Rp. 84,746.00
262 Pembantu Tukang Listrik OH Rp. 53,500.00
263 Tenaga Ahli Khusus OH Rp. 270,000.00
264 Tenaga Ahli Garbarata OH Rp. 450,000.00
265 Teknisi Garbarata OH Rp. 250,000.00
266 Pembantu Teknisi Garbarata OH Rp. 90,000.00
267 Ahli Line Up/Set Up System OH Rp. 270,000.00
268 Ahli Muda Line Up/Set Up System OH Rp. 210,000.00
269 Personil Direktorat Teknis OH Rp. 143,221.00
270 Tenaga Ahli Pusat (Termasuk Tiket+Hotel+Akomodasi) OH Rp. 9,500,000.00
271 Tenaga Agen (Termasuk Tiket) (Disesuaikan dengan Lokasi Kegiatan) OH Rp. 9,500,000.00
272 Mandor (Pengukuran) OH Rp. 78,500.00
273 Teknisi Gardu Traksi OH Rp. 355,637.15
301 Sekretaris OH Rp. 1,500,000.00
302 Engineer dan Crew LS Rp. 400,000.00
303 Gaji ABK OH Rp. 112,350.00
304 Gaji KKM OH Rp. 156,220.00
305 Gaji Nahkoda OH Rp. 169,060.00
306 Gaji Perwira OH Rp. 149,800.00
307 Premi Awak Kapal OH Rp. 81,320.00
308 Uang Makan Awak Kapal OH Rp. 50,290.00
309 Tunjangan Keruk OH Rp. 100,000.00
310 Personil Direktorat Teknis OH Rp. 143,221.00
401 Album Foto Eksamplar Rp. 150,000.00
402 As Built Drawing Eksamplar Rp. 400,000.00
403 Laporan Bulanan Eksamplar Rp. 200,000.00
404 Laporan Harian Eksamplar Rp. 50,000.00
405 Laporan Mingguan Eksamplar Rp. 120,000.00
NO NAMA PEKERJA STN. HARGA

406 Alat Tulis Kantor Bulan Rp. 500,000.00


501 Biaya Administrasi Angkutan Balas dg KA/m3 m³ Rp. 7,800.00
502 Biaya Angkut per Km LS Rp. 3,900.00
503 Biaya Erection Kg Rp. 2,000.00
504 Biaya Galvanisasi Baja Kg Rp. 8,500.00
505 Biaya Komunikasi/Dokumentasi Bulan Rp. 650,000.00
506 Biaya Pem. HC, Instalasi, Pemb. Pipa dan Oli LS Rp. 117,700,000.00
507 Biaya Pemasangan Plat Sambung Permanen / unit Unit Rp. 390,000.00
508 Biaya Pengamanan dan Transportasi LS Rp. 36,000.00
509 Biaya Transport dari Workshop ke Site LS Rp. 1,765,500.00
510 Biaya Trial Erection Kg Rp. 1,000.00
511 Bongkar di Lokasi LS Rp. 3,100,000.00
512 Bongkar Muat di Pelabuhan Kg Rp. 550.00
513 Bongkar Muat di Pelabuhan Sementara Kg Rp. 650.00
514 Job Mix Design LS Rp. 3,500,000.00
515 Muat di Pelabuhan LS Rp. 3,100,000.00
516 Ongkos Angkut Maks. Dari Quarry ke Depo Balas HO Rp. 24,700.00
517 Ongkos Bongkar Balas uk. 2x6 & Ecer di Lokasi LS/Jam Rp. 33,961.84
518 Ongkos Bongkar Sub-Balas uk.2x6 & Ecer diLokasi LS/Jam Rp. 11,351.73
519 Ongkos Muat Balas uk. 2x6 ke Gerbong dg Orang LS/Jam Rp. 37,340.40
520 Ongkos Muat Bongkar Rel R.42/R.54 (m²) m² Rp. 314,751.10
521 Ongkos Muat SubBalas uk. 2x6 ke Gerbong dg Orang LS/Jam Rp. 12,446.49
522 Ongkos Balas Batu Pecah uk. 2x6 cm ecer di Lokasi m³ Rp. 46,750.00
523 Pengangkutan dr Pabrik (1 ton pipa ekiv. 2 m³ vol.) Kg Rp. 950.00
524 Pengetesan dengan Ultrasonic LS Rp. 19,520.01
525 Processing & Ploting LS Rp. 2,711,112.50
526 Sand Cone Test LS Rp. 1,084,445.00
527 Sounding m² Rp. 3,795.55
528 Tes Kuat Tekan LS Rp. 5,422,225.00
529 Tes PDA OH Rp. 17,405,342.25
530 Tes Tanah OH Rp. 2,900,890.37
531 Trans. dari Pelabuhan ke Pelabuhan Sementara. m³ Rp. 5,453.00
532 Trans. dari Pelabuhan Sementara ke Lokasi Proyek m³ Rp. 3,050.00
533 Transportasi & Tenaga Lokal LS Rp. 2,168,890.00
534 Upah Pengelasan Cm Rp. 3,253.33
535 Biaya Operasi MTT Kali Rp. 12,268.86
536 Biaya Operasi PBR Kali Rp. 12,268.86
537 Biaya Cetak Pkt. Rp. 216,889.00
538 Biaya Pembuatan/Pengelasan Rambu Kg Rp. 9,217.78
539 Pengecatan Tiang & Patok Pengaman Buah Rp. 37,413.35
540 Pemasangan Cable Audio/Video/Antenna Unit Rp. 4,337.78
541 Pemasangan Cable Power/Penyamb. Dari Panel m Rp. 3,253.33
542 Pengadaan/Pemasangan Karpet m² Rp. 14,097.78
543 Uang Saku utk Pelatihan Teknisi/operator OH Rp. 124,711.17
544 Biaya Angkut Material Kg Rp. 2,168.89
545 Biaya Instalasi WDI/Rotating Beacon Unit Rp. 542,222.50
546 Biaya Inst. Control Desk lkp. Termasuk Inst. Kabel power Unit Rp. 16,266,675.00
547 Drilling Taxiway & Jalan utk. Jalur Kabel & Pipa. m' Rp. 813,333.75
Pengadaan Material Untuk Proyek Sikeli 2014
Luar Domain
No. Jumlah Harga PM Harga PT. Jumlah Harga PT.
Material Volume Satuan Harga PM 75
75 Suatri Suatri
1 Tiang Pancang Ø 457, 2 mm t = 12 mm 177,352.92 Kg 15,000.00 2,660,293,740 -
2 A F Marine Use (Anti Fauling) 388.19 Liter 436,560.00 169,467,353 -
3 AC Marine Use (Anti Corrosive M U) 124.00 kg 460,100.00 57,052,400 -
4 Acetelin @ 15 kg 37.20 Tbng 155,150.00 5,771,580 3,570,000 132,804,000
5 Air 730.34 m3 60,000.00 43,820,244 -
6 Battery VRLA Hybrid GD Cycle Surya 12-10 (2 Pcs) 6.00 bh - -
7 Besi Beton 253,795.26 kg 18,135.43 4,602,686,118 -
8 Besi Plat 4,960.00 kg 14,305.90 70,957,264 -
9 Besi Siku L.100.100.10 708.48 kg 13,003.71 9,212,868 -
10 Box Baterai Baja 12 mm, Powder Coating Painted 6.00 bh - -
11 Cat Kilap 87.91 kg 80,250.00 7,054,938 -
12 Grease 206.34 kg 74,900.00 15,454,566 -
13 Isolasi Listrik 6.00 bh -
14 Kabel + Accesories 6.00 set - -
15 Karbit 396.40 kg 19,688.00 7,804,386 -
16 Kawat beton 4,607.48 kg 21,071.51 97,086,506
17 Kawat Las 2,321.84 kg 26,750.00 62,109,212
18 Kayu Kelas II 372.87 m3 7,918,000.00 2,952,385,729
19 Kayu Kelas III 17.74 m3 3,745,000.00 66,418,667
20 Minyak Cat 5.49 kg 21,028.71 115,542
21 Multipleks 12 mm 1,272.49 lbr 301,740.00 383,962,279
22 Oksigen (tabung) 80.60 tbg 642,000.00 51,745,200
23 Oli 1,309.85 ltr 35,207.00 46,115,762
24 Paku 2,873.80 kg 20,386.71 58,587,266
25 Pasir beton 606.74 m3 229,282.00 139,114,983 -
26 Plat Baja 248.00 kg 14,305.90 3,547,863
27 Plat Baja Strip 460.76 kg 13,733.45 6,327,879
28 Pole Conical 8 mm, kerucut Dukungan panel surya 6.00 bh -
29 Reg.Charger 3.Battery MPPT 20A otomatis on/off 6.00 bh -
30 SL-0250ER LED Steet Light 48/52 Watt Cool W 6.00 bh -
31 Semen PC (50 kg) 12,000.01 zak 61,702.62 740,431,766
32 Solar Panel 200 wp Mono Chrystalline 6.00 bh -
33 Solar 52,317.20 ltr 10,270.00 537,297,644
34 Splash Guard 665.15 m2 2,651,995.00 1,763,963,919
35 Split / Batu pecah 943.82 m3 227,196.00 214,432,274
36 Tiang Listrik Galvanized 6.00 Bh -
JUMLAH 14,773,217,950 132,804,000
Jumlah Harga PM Harga PT. Jumlah Harga PT.
Material Volume Satuan Harga PM 75
75 Suatri Suatri
1 Pengangkutan pipa baja dari pabrik ke Tanjung Perak Surabaya Ton 841,421.25 - -
1 Bongkar muat di pelabuhan T. Perak Ton 623,275.00 - -
1 Transport dari Pelab. Tanjung Perak ke Pelabuhan Sikeli Ton 5,609,475.00 - -
1 Bongkar muat di pelabuhan Sikeli Ton 810,257.50 - -
1 Kayu Kelas II Ton 218,146.25 - -
1 Pengangkutan pipa baja dari pelabuhan ke lokasi proyek Ton 2,742,410.00 - -
JUMLAH - -

No. Rekap Selisih antara harga PM 75 dengan PT. Suatri PM 75 PT. Suatri
1 Luar Domain 14,773,217,950 132,804,000
2 Domain 394,010,493 423,088,851
3 Lokal/Proyek 1,551,702,719 844,118,655
4 Belum Ada Lokasi Pengadaan Material 239,722,698 263,557,680
Jumlah 16,958,653,860 1,663,569,187
Harga PT. Jumlah Harga PT.
Peralatan Volume Satuan Harga PM 75 Jumlah Harga PM 75
No. Suatri Suatri
1 Alat bantu 911.29 ls - -
2 Alat Bantu 604.68 bln - -
3 Alat bantu beton 1,123.60 ls - -
4 Alat bantu pembesian 2,303.74 ls
5 Alat Bantu Pemotongan Tiang Pancang 124.00 ls - -
6 Compressor 413.87 jam - -
7 Concrette mixer (mesin molen) 2,170.40 jam - -
8 Concrette thriller 2,247.19 jam - -
9 Crawler crane 257.92 jam - -
10 Diesel Hammer 454.21 jam - -
11 Dump Truck 3.5 Ton 5.00 jam - -
12 Excavator 5.00 jam - -
13 Generator set 403.00 jam - -
14 Mesin Las 40 Amp 436.60 jam - -
15 Mesin Las Karbit 124.00 jam - -
16 Ponton Transport 261.02 jam - -
Jumlah 11,845.52 - -

Harga PT. Jumlah Harga PT.


Mobilisasi dan Demobilisasi Volume Satuan Harga PM 75 Jumlah Harga PM 75
No. Suatri Suatri
1 - -
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
Jumlah 87,375,000.00 -

Harga PT. Jumlah Harga PT.


No. Upah Volume Satuan Harga PM 75 Jumlah Harga PM 75
Suatri Suatri
1 Kepala tukang 2,032.50 ho 127,680.38 259,510,262.53 -
2 Mandor 832.45 ho 144,446.47 120,244,608.41 -
3 Operator 409.73 ho 133,380.85 54,649,975.61 -
4 Pekerja 19,742.60 ho 94,149.43 1,858,754,858.19 -
5 Pembantu Operator 1,462.61 ho 66,690.43 97,542,269.24 -
6 Tukang 19.28 ho 95,192.55 1,834,836.40 -
7 Tukang batu 1,123.60 ho 95,192.55 106,957,968.41 -
8 Tukang besi 3,455.61 ho 95,192.55 328,948,142.08 -
9 Tukang Cat 970.47 ho 95,192.55 92,381,514.00 -
10 Tukang kayu 3,707.33 ho 95,192.55 352,910,148.80 -
11 Tukang Las 173.98 ho 95,192.55 16,561,977.76 -
12 Tukang Listrik 0.30 ho 95,192.55 28,557.77 -
13 Tukang Pancang 107.36 ho 90,678.00 9,735,117.54
14 Tukang Selam 151.17 ho 200,375.50 30,290,674.17 -
Jumlah 3,330,350,910.90 130,800,000.00

Harga PT. Jumlah Harga PT.


No. DLL Volume Satuan Harga PM 75 Jumlah Harga PM 75
Suatri Suatri
1 Administrasi dan Dokumentasi 1.00 Ls - 35,000,000.00 35,000,000.00
2 Penyelesaian Akhir 1.00 Ls - 32,000,000.00 32,000,000.00
3 Air kerja 1.00 Ls - 7,500,000.00 7,500,000.00
4 Bangsal Kerja (24 m²) 1.00 Ls - 35,750,000.00 35,750,000.00
5 Direksi Keet (36 m²) 1.00 Ls - 25,500,000.00 25,500,000.00
6 Gudang Bahan (24 m²) 1.00 Ls - 11,000,000.00 11,000,000.00
7 Mobilisasi dan Demobilisasi 1.00 Ls - 186,000,000.00 186,000,000.00
8 Pagar Pengaman Lokasi Proyek (150 m') 1.00 Ls - 38,500,000.00 38,500,000.00
9 Papan Nama Proyek 1.00 Ls - 850,000.00 850,000.00
10 Penerangan Lokasi Pekerjaan dan Keamanan 1.00 Ls - 15,000,000.00 15,000,000.00
11 Pengukuran dan Pemasangan Titik Tetap 1.00 Ls - 7,500,000.00 7,500,000.00
12 Penyelesaian Akhir 1.00 Ls - 25,500,000.00 25,500,000.00
13 - -
14 - -
Jumlah - 110,250,000.00
DAFTAR HARGA SATUAN JADI
KEGIATAN : PEMBANGUNAN FASILITAS PELABUHAN LAUT BAJOE
PEKERJAAN : LANJUTAN PEMBANGUNAN FASPEL LAUT BAJOE TERDIRI DARI :
PEKERJAAN TRESTLE SEGMEN XIX - XX (50X8)M2 : Pek. Beton Bertulang
PEKERJAAN TRESTLE SEGMEN XXI - XXX (50x8)M2 : Pengadaan Tiang , Pemancangan
dan Beton Bertulang
PEKERJAAN TRESTLE SEGMEN XXXI (50x8)M2 : Pengadaan Tiang
LOKASI : BAJOE - SULAWESI SELATAN
TAHUN ANGGARAN : 2014

HARGA SATUAN HARGA SAT. PM 75


NO URAIAN PEKERJAAN HARGA SATUAN (Rp)
SAT PM 75 (Rp) X 1,0135 (Rp)
(1) (2) (3) (5) (6) (7)

Bekisting Kansteen m2 992,883.15 1,013,966.79 1,027,655.34


Pembesian Polos/Ulir (1 kg) Kg 19,241.50 12,407.93 12,575.44
Pengecatan Kansteen m2 32,407.50 27,081.10 27,446.69
Operasional Carawel Carane (Hari) Hari 7,281,806.05 5,115,687.55 5,184,749.33
Operasional Ponton Transport (Hari) Hari 11,721,965.00 8,747,667.15 8,865,760.66
Pengangkutan Tiang Pancang ke Titik Pancang (M') M' 152,030.17 110,906.84 112,404.08
Operasional Disel Hammer (Hari) Hari 7,422,565.00 4,804,931.43 4,869,798.00
Operasional Pontong Pancang (Hari) Hari 11,178,530.00 9,764,717.32 9,896,541.00
Pemancangan Tiang Tegak (M') M' 771,446.63 596,561.57 604,615.15
Pemancangan Tiang Tegak (M') - Tanpa Diesel Hammer M' 524,275.22
Pemancangan Tiang Miring (M') M' 927,695.83
Penyambungan Tiang Pancang Baja (buah) Buah 1,041,658.88 -
Pemotongan Tiang Pancang Baja (buah) Buah 2,017,211.35 493,388.24 500,048.98
Pegecatan Tiang Pancang Baja (M2) M2 171,455.00 175,328.21 177,695.14
Perlindungan Tiang Pancang dengan Splash Guard (M2) M2 4,880,049.95 3,667,553.77 3,717,065.75
Perancah Kerja Pengecoran (M2) M2 1,120,210.45 1,119,541.13 1,134,654.94
3019 Pelat Stopper Tiang Pancang (M3) M3 #REF! 60,867.57 61,689.28
3020 Beton Bertulang Mutu K-400 Untuk isian Tiang Pancang (M3) M3 10,741,307.15 3,903,906.19 3,956,608.92
3027 Delatasi (M') M' 426,687.64 366,385.03 371,331.23
3035 Pembuatan sepatu tiang pancang pipa baja (buah) Buah 3,819,354.85 - -
3036 Pengukuran, Positioning dan Sounding (ls/hari) Ls/Hari 1,222,041.13 1,229,232.64 1,245,827.28
3037 Pengadaan Tiang Pancang Baja (1 kg) Kg 26,140.50 24,309.00 24,637.17
3038 Pembersihan Lokasi Pekerjaan dengan Alat Berat (ls/hari) Ls/Hari 7,568,577.50 5,791,604.68 5,869,791.34
1433 Pekerjaan Beton Mutu K -400 M3 3,196,462.78 2,620,487.70 2,655,864.28
Pekerjaan Cetakan Beton/Bekisting - 10 M2 M2 350,174.18 -
Pekerjaan Menyiram dan Membongkar Bekisting - 1 M2 M2 15,600.00 -
Pekerjaan Perancah Untuk Pengecoran - 10 M2 M2 269,042.93 -
Beton Bertulang Mutu K-400 Untuk Pile Cap I.S.C M3 11,343,723.09 -
Beton Bertulang Mutu K-400 Untuk Balok I.S.C M3 11,360,191.73 -
Beton Bertulang Mutu K-400 Untuk Lantai I.S.C M3 10,727,426.50 -
Beton Bertulang Mutu K-400 Untuk Kansteen I.S.C M3 9,274,973.13 -
Pengadaan dan Pemasangan Tiang Listrik Galvanize 12,035,616.78 -
Pasangan Lampu SL-0250r LED 6,537,616.78 -
Pasangan Lampu Solar Sell (1 Unit) 40,098,233.56
SELISIH HARGA
SAT. (Rp)
(8)

-34,772.19
6,666.06
4,960.81
2,097,056.71
2,856,204.34
39,626.09
2,552,767.00
1,281,989.00
166,831.48

1,517,162.37
-6,240.14
1,162,984.20
-14,444.49
#REF!
6,784,698.23
55,356.42
3,819,354.85
-23,786.16
1,503.33
1,698,786.16
540,598.50
350,174.18
15,600.00
269,042.93
11,343,723.09
11,360,191.73
10,727,426.50
9,274,973.13
12,035,616.78
6,537,616.78

Anda mungkin juga menyukai