Anda di halaman 1dari 1

KETERANGAN :

SHOP DRAWING :
Rev. For Approval Tanggal

5.00 4.00 4.00 6.00 2.00 4.00 4.00

2.00
TOILET KONTRAKTOR PELAKSANA:
4.00

PP - BK KSO
RUANG PM RUANG DEPT. PM RUANG TEKNIK JL.LETJEND.HERTASNING BLOK II NO. 1
MAKASSAR - SULAWESI SELATAN
PT BUMI KARSA

2.00

6.00
RUANG JDN
WUDHU MUSHOLLAH
AREA 24 M2 Drafter SEM PM
Muh. Syawal B Irfan A Fattah Helmi Adam

2.00
TOILET Tgl : Tgl : Tgl :
KONSULTAN PENGAWAS:
4.50
12.00

4.00

PT. YODYA KARYA (PERSERO)


RUANG RAPAT RUANG ADMINISTRASI JL. ANDI PANGERAN PETTARANI No. 74
MAKASSAR-SULAWESI SELATAN

2.00

2.00
YODYA KARYA
TERAS
3.00

Ass. Geoteknik Eng. Geoteknik Eng. Team Leader.


Johan Halik Sainuddin Herman

1.00 6.50
Tgl : Tgl : Tgl :
NAMA PEKERJAAN :
RUANG JDN
4.00

4.00
RUANG TAMU PEKERJAAN REKLAMASI, PENGERUKAN,
AREA +53 M2 LAPANGAN KONTAINER DAN CAUSEWAY
3.00

MAKASSAR NEW PORT (PAKET B)

LOKASI :

KELURAHAN: BULOA KECAMATAN: TALLO


KOTA MAKASSAR PROVINSI SULAWESI SELATAN

PEMBERI TUGAS :
2.00

TERAS
PELINDO 4

DIPERIKSA OLEH
Ass. KEPALA SATUAN PENGELOLAAN PROYEK
BIDANG TEKNIK
5.00 4.00 12.00

NOPINDRA IRAWAN
LAYOUT DIREKSI KEET MENYETUJUI DAN MENGETAHUI
SKALA 1 : 100 KEPALA SATUAN PENGELOLAAN PROYEK

ARWIN

JUDUL GAMBAR :

LAYOUT DIREKSI KEET

REFERENSI : -
SKALA KODE GAMBAR NO. LBR NO. REV

1 : 100 - 01 00

Anda mungkin juga menyukai