Anda di halaman 1dari 2

PT.

PERKEBUNAN NUSANTARA IV
MEDAN - SUMATERA UTARA -INDONESIA

GAMBAR KERJA :
REKONDISI KOLAM LIMBAH DI UNIT PKS MAYANG

CV. PUTRI AEK RANGAT


INSTANSI

PT. PERKEBUNAN
NUSANTARA IV
MEDAN - SUMATERA UTARA
Sungai Ban Boluk
LEGENDA

PROYEK

REKONDISI KOLAM LIMBAH DI UNIT


PKS MAYANG

DISETUJUI OLEH :
Masinis Kepala
50.00
(MasKep)

20.00

30.00
25.00
ALGAE POND 40.00

194.50

_____________________________

DIPERIKSA OLEH :
36.00

PRIMARY ANAEROBIC POND


Mandor Lapangan

50.00
-4.20m

TC : 1.00m
94.50

130.00
TP : 1.20m
14.00

61.00
17.00

ACIDIFICATION POND
TC : 1.20m 100.00
-2.40m 20.00
TP : 1.20m

24.00
36.00
-2.00m
8.00

DEOILING
DEOILING POND I
45.00

TC : 1.00m; TP : 1.20m POND II


SECONDARY ANAEROBIC POND 50.00 ____________________________
-2.40m FACULTATIVE POND
41.00

Bak VAT - FIT KONSULTAN PELAKSANA :


VOLUME
TC : 1.00m
1. Deoiling Pond I = 567 M
TP : 1.20m CV. PUTRI AEK RANGAT
Deoiling Pond II = 2.382 M
90.00
2. Acidification = 2.489 M
60.00
3. Primary Anaerobic Pond = 35.217 M Direktur Paraf

4. Secondary Anaerobic Pond = 18.395 M


MARJULIANA LUMBANGAOL
Lokasi Land Aplikasi 5. Facultative Pond = 14.224 M

6. Algae Pond = 2.200 M Tim Teknis Paraf


Kolam pengerukan dari pemasangan cerucuk bambu

JUMLAH = 75.372 M
JBR NADAPDAP

JUDUL GAMBAR SKALA

TANGGAL NO GAMBAR JLH. GAMBAR