HARGA SATUAN
NO URAIAN VOLUME
(Rp)
1 2 3 4
A BIAYA PENGELOLAAN
~ Hr. Panitia Pelaksana Kegiatan 3 Org x 3 Bln
~ Biaya Rapat Persiapan Pelaksanaan 15 Org x 1 Hr
~ ATK Ls
B BIAYA PERENCANAAN Ls
C BIAYA PENGAWASAN Ls
D BIAYA PELAKSANAAN
1. Bahan Material
~ Batu Gebal 600 m3
~ Batu Pecah 140 m3
~ Pasir Urug 150 m3
~ Tanah Urug 70 m3
2. Upah Tenaga Kerja
~ Upah Tenaga Kerja 364 HOK
JUMLAH
Karangjati, Januar
Mengetahui : KETUA KELOMPOK
KEPALA DESA LEGUNDI "TANI MANDIRI
KECAMATAN KARANGJATI
SUYITNO SUKARDI
BAB II
RENCANA ANGGARAN BIAYA
3,000,000.00
200,000.00 1,800,000.00
7,500.00 112,500.00
1,087,500.00 1,087,500.00
2,000,000.00 2,000,000.00
2,000,000.00 2,000,000.00
93,000,000.00
85,000.00 51,000,000.00
125,000.00 17,500,000.00
70,000.00 10,500,000.00
70,000.00 4,900,000.00
25,000.00 9,100,000.00
JUMLAH 100,000,000.00
SUKARDI