Anda di halaman 1dari 255

REKAPITULASI RENCANA ANGGARAN BIAYA

REHABILITASI BALAI BESAR PENGEMBANGAN KESELAMATAN KERJA


KOTA MAKASSAR TAHUN ANGGARAN 2019

NO U R A I A N

I PEKERJAAN PERSIAPAN
II PEKERJAAN PEMBONGKARAN
III PEKERJAAN ARSITEKTUR LANTAI I
IV PEKERJAAN ARSITEKTUR LANTAI II
V PEKERJAAN KUSEN PINTU & JENDELA LANTAI I
VI PEKERJAAN KUSEN PINTU & JENDELA LANTAI II
VII PEKERJAAN FINISHING LANTAI I
VIII PEKERJAAN FINISHING LANTAI II
IX PEKERJAAN SANITASI LANTAI I
X PEKERJAAN SANITASI LANTAI II
XI PEKERJAAN Dinding Partisi Rg. Laboratorium
XII PEKERJAAN Wallpaper Rg Kepala UPTD

JUMLAH REALCOAST
PPN 10%
JUMLAH
DIBULATKAN
TERBILANG :

Seratus Lima Puluh Tujuh Juta Rupiah


NGGARAN BIAYA
NGAN KESELAMATAN KERJA
ANGGARAN 2019

JUMLAH HARGA
(Rp)
Rp 4,000,000.00 2.803 Luas bangunan ;
Rp 4,156,857.10 2.912
Rp 3,109,776.71 2.179
Rp 55,005,853.06 38.539
Rp 1,570,000.00 1.100
Rp 875,000.00 0.613 200,000,000
Rp 1,640,642.70 1.149 177,000,000
Rp 14,678,091.31 10.284
Rp 11,603,476.32 8.130
Rp 8,434,428.07 5.909
Rp 7,630,319.65 5.346
Rp 30,024,156.00 21.036

100.000
Rp 142,728,600.92
Rp 14,272,860.09
Rp 157,001,461.02
Rp 157,000,000.00 Harga/M2

ujuh Juta Rupiah


Lantai 01 ; #REF!

Jumlah #REF!

23,000,000
ANALISA KONSTRUKSI
PEKERJAAN PERSIAPAN
Pembuatan 1 M2 Pagar Sementara dari Seng Gelombang Tinggi 2 meter

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.200
Tukang Kayu OH 0.400
Kepala Tukang OH 0.020
Mandor OH 0.020

B Bahan
Dolken kayu Æ 8-10/400 cm Btg 1.250
Semen Portland Kg 2.500
Seng Gelombang Lbr 1.200
Pasir pasang M3 0.005
Koral Beton M3 0.009
Kayu 5/7 M3 0.072
Paku biasa 2" - 5" Kg 0.060
Meni Besi Ltr 0.450

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pengukuran dan Pemasangan 1 M' Bouwplank

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.10
Tukang Kayu OH 0.10
Kepala Tukang OH 0.01
Mandor OH 0.05

B Bahan
Kayu Balok 5/7 M3 0.00012
Paku 2"-3" Kg 0.02
Kayu Papan 3/20 M3 0.007

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 4
Pembuatan 1 M2 kantor sementara lantai plesteran

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 2.00
Tukang Kayu OH 2.00
Tukang Batu OH 1.00
Kepala Tukang OH 0.30
Mandor OH 0.05

Analisa Page 5
B Bahan
Dolken Kayu Diameter 8-10/400 cm batang 1.25
Kayu M3 0.0018
paku biasa Kg 0.08
Besi Strip Kg 1.1
Semen Portland Kg 35
Pasir Pasang M3 0.15
Pasir Beton Koral Beton M3 0.1
Bata Merah Bh 0.15
Seng Plat Lbr 0.3
Jendela Naco Bh 0.25
Kaca Polos M2 0.2
Kunci Tanam Bh 0.15
Plywood 4 mm Lbr 0.06

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pembuatan 1 M2 Gudang Semen dan Peralatan

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.00
Tukang Kayu OH 2.00
Kepala Tukang OH 0.20
Mandor OH 0.05

B Bahan
Dolken Kayu Diameter 8-10/400 cm batang 1.7
Kayu M3 0.21
paku biasa Kg 0.3
Semen Portland Kg 10.5
Pasir Pasang M3 0.03
Pasir Beton Koral Beton M3 0.05
Seng Plat Lbr 0.25
Seng Gelombang Lbr 1.5

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

1 m² Pembongkaran Plafond

No Uraian Satuan Koefisien

Analisa Page 6
No Uraian Satuan Koefisien

1 Pekerja OH 0.09
2 Mandor OH 0.01

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

1 m² Pembongkaran Lantai

No Uraian Satuan Koefisien

1 Pekerja OH 0.2
2 Mandor OH 0.01

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

1 m² Pembongkaran Dinding

No Uraian Satuan Koefisien

1 Pekerja OH 1.1
2 Mandor OH 0.003

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

PEKERJAAN TANAH
Penggalian 1 M3 Tanah Biasa Sedalam 1 m

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.75
Mandor OH 0.025

B Bahan

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 7
Penggalian 1 M3 Tanah Biasa Sedalam 2 m

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.9
Mandor OH 0.45

B Bahan

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pengurugan Kembali 1 M3 Galian Tanah

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.25
Mandor OH 0.008

B Bahan

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pengurugan 1 M3 dengan pasir urug

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.5
Mandor OH 0.05

B Bahan
Pasir Urug M3 1.2

C Peralatan

Analisa Page 8
D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 9
Pengurugan 1 M3 dengan Sirtu

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.30
Mandor OH 0.01

B Bahan
Sirtu M3 1.2

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pengurugan 1 M3 dengan Tanah Timbunan

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.5
Mandor OH 0.05

B Bahan
Tanah Timbunang M3 1.20

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemadatan Sirtu 1 M3 ( per 20 cm )

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.5
Mandor OH 0.05

B Bahan
- Sirtu m3 1.2

C Peralatan

Analisa Page 10
D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 11
PEKERJAAN PONDASI
Pemasangan 1 M3 Pondasi Batu gunung Campuran 1 SP : 4PP

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.500
Tukang Batu OH 0.750
Kepala Tukang OH 0.075
Mandor OH 0.075

B Bahan
Batu gunung M3 1.200
Semen Portland kg 163.000
pasir Pasang M3 0.520

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 M3 Pondasi Batu gunung Campuran 1 SP : 5PP

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.500
Tukang Batu OH 0.750
Kepala Tukang OH 0.075
Mandor OH 0.075

B Bahan
Batu gunung M3 1.200
Semen Portland kg 136.000
pasir Pasang M3 0.544

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 M3 Batu Kosong (Anstamping)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.780

Analisa Page 12
Tukang Batu OH 0.390
Kepala Tukang OH 0.039
Mandor OH 0.039

B Bahan
Batu gunung M3 1.20
pasir Pasang M3 0.52

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 M3 Pondasi Sumuran, diamater 100 cm

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.780
Tukang Batu OH 0.390
Kepala Tukang OH 0.039
Mandor OH 0.039

B Bahan
Batu Belah M3 0.450
Semen Portland kg 194.000
Pasir Beton M3 0.312
Kerikil M3 0.468

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 M3 Pondasi Siklop, 60% beton Campuran 1 Sp : 2 Pb : 3 Kr dan 40 % Batu Belah

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.780
Tukang Batu OH 0.390
Kepala Tukang OH 0.039
Mandor OH 0.039

B Bahan

Analisa Page 13
Batu Belah M3 0.480
Semen Portland kg 194.000
Pasir Beton M3 0.312
Kerikil M3 0.468
Besi Beton Kg 100.000
Kawat Beton Kg 1.800

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 14
Pemasangan 1 m' Rolaag Bata ( 5x11x22 ) cm tebal 1 batu camp. 1SP : 3PP tinggi 40 cm

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.300
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015

B Bahan
Batu Merah Bh 56.00
Semen Portland Kg 11.50
Pasir Pasangan M3 0.03

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan Besi
Besi Polos u. Tulangan Beton + 10% 10Kg

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.070
Tukang Batu OH 0.070
Kepala Tukang OH 0.007
Mandor OH 0.004

B Bahan
Besi Beton Kg 10.50
Kawat Beton Kg 0.15

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)
F

Besi 1 Kg Besi Hitam

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.050

Analisa Page 15
Tukang Batu OH 0.060
Kepala Tukang OH 0.006
Mandor OH 0.003

B Bahan
Besi Hitam Kg 1.10
Cat Besi Kg 0.05

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Besi 1 Kg Besi Plat

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.050
Tukang Batu OH 0.060
Kepala Tukang OH 0.006
Mandor OH 0.003

B Bahan
Besi Hitam Kg 1.10
Cat Besi Kg 0.05

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan Pembesian Wiremesh M8 - m2

No Uraian Satuan Koefisien

A Tenaga
Pekerja Pembesian OH 0.100
Tukang Besi OH 0.075
Mandor OH 0.010

B Bahan
Wiremesh M8 M2 1.01
Kawat Las Kg 0.10

Analisa Page 16
C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan 1 M2 Bondex

No Uraian Satuan Koefisien

A Tenaga
Pekerja Pembesian OH 0.050
Tukang Las OH 0.030
Mandor OH 0.010

Analisa Page 17
B Bahan
Bondex 0.75 M2 1.01
Kawat Las Kg 0.10
Kayu Kelas III m3 0.04
Scafolding m2 1.10

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan 1 M2 Pasang Aluminium Composite Panel

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.500
Tukang Las OH 0.750
Kepala Tukang OH 0.075
Mandor Ls 0.075

B Bahan
ACP M2 1.100
Besi Kotak 4 x4 M' 4.025
Dynabolt M10 x 120 Bh 3.000
Mur + Baut M10 x 70 Bh 2.000
Sealant Tube 0.250
Ramset Nails Bh 12.000

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan Pemasangan 1 Kg Baja HBEAM (300.300.10.15)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.037
Tukang Las Konstruksi OH 0.037
Kepala Tukang OH 0.005
Mandor OH 0.003

B Bahan

Analisa Page 18
Besi Baja HBeam (300.300.10.15) Kg 1.150

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 19
Pekerjaan Pemasangan 1 Kg Baja HBEAM (250.250.9.14)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.037
Tukang Las Konstruksi OH 0.037
Kepala Tukang OH 0.005
Mandor OH 0.003

B Bahan
Besi Baja HBeam (250.250.9.14) Kg 1.150

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan Pemasangan 1 Kg Baja HBEAM (200.200.8.12)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.037
Tukang Las Konstruksi OH 0.037
Kepala Tukang OH 0.005
Mandor OH 0.003

B Bahan
Besi Baja HBeam (200.200.8.12) Kg 1.150

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan Pemasangan 1 Kg Baja IWF (250.125.6.9)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.037
Tukang Las Konstruksi OH 0.037
Kepala Tukang OH 0.005
Mandor OH 0.003

B Bahan

Analisa Page 20
Besi Baja IWF (250.125.6.9) Kg 1.150

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 21
Pekerjaan Pemasangan 1 Kg Baja IWF (300.150.6,5.9)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.037
Tukang Las Konstruksi OH 0.037
Kepala Tukang OH 0.005
Mandor OH 0.003

B Bahan
Besi Baja IWF (300.150.6,5.9) Kg 1.150

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan Pemasangan 1 Kg Baja IWF (350.175.7.11)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.037
Tukang Las Konstruksi OH 0.037
Kepala Tukang OH 0.005
Mandor OH 0.003

B Bahan
Besi Baja IWF (350.175.7.11) Kg 1.150

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan Pemasangan 1 Kg Baja IWF (200.100.5,5.8)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.037
Tukang Las Konstruksi OH 0.037
Kepala Tukang OH 0.005
Mandor OH 0.003

B Bahan

Analisa Page 22
Besi Baja IWF (200.100.5,5.8) Kg 1.150

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 23
Pekerjaan Pemasangan 1 Kg Baja IWF (150.75.5.7)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.037
Tukang Las Konstruksi OH 0.037
Kepala Tukang OH 0.005
Mandor OH 0.003

B Bahan
Besi Baja IWF (150.75.5.7) Kg 1.150

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 kg CNP 125.50.20.3.2

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.06
Tukang Las Konstruksi OH 0.06
Kepala Tukang OH 0.006
Mandor OH 0.003

B Bahan
CNP125.50.20.3.2 Kg 1.15

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan 10 Cm Pengelasan dengan Las Listrik

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.040
Tukang Las Konstruksi OH 0.020
Kepala Tukang OH 0.002
Mandor OH 0.002

B Bahan

Analisa Page 24
Kawat Las Listrik Kg 0.400
Solar Ltr 0.300
Minyak Pelumas Ltr 0.040

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan Pemasangan 1 m2 Sunscreen

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.070
Tukang Las Konstruksi OH 0.105
Kepala Tukang OH 0.004
Mandor OH 0.003

B Bahan
Sunscreen M2 1.000

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

A.4.1.1.20 Membuat 1 m2 bekisting untuk pondasi

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.520
Tukang Kayu OH 0.260
Kepala Tukang OH 0.026
Mandor OH 0.026

B Bahan
Kayu Kls III m3 0.04
Paku 5 - 10 cm kg 0.30
Minyak bekesting ltr 0.100

C Peralatan/Pengelasan

Analisa Page 25
D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

A.4.1.1.22 Membuat 1 m2 bekisting untuk kolom

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.6600
Tukang Kayu OH 0.3300
Kepala Tukang OH 0.0330
Mandor OH 0.0330

B Bahan
Paku 5 - 10 cm kg 0.4000
Minyak bekesting ltr 0.2000
Balok kayu kls III m3 0.0150
Triples tbl 9 mm Lbr 0.3500
Dolken Kayu btg 2.0000

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

A.4.1.1.21 Membuat 1 m2 bekisting untuk sloof

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.5200
Tukang Kayu OH 0.2600
Kepala Tukang OH 0.0260
Mandor OH 0.0260

Analisa Page 26
B Bahan
Kayu Kls III m3 0.0450
Paku 5 - 10 cm kg 0.3000
Minyak bekesting ltr 0.1000

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

A. 4 1 1 24 Membuat 1 m2 bekisting untuk lantai

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.6600
Tukang Kayu OH 0.3300
Kepala Tukang OH 0.0330
Mandor OH 0.0330

B Bahan
Kayu Kls III m3 0.0200
Paku 5 - 10 cm kg 0.4000
Minyak bekesting ltr 0.2000
Balok kayu kls III m3 0.0080
Triples tbl 9 mm Lbr 0.1750
Dolken Kayu btg 3.0000

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

A. 4 1 1 26 Membuat 1 m2 bekisting untuk Tangga ( 2 x Pakai )

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.6600
Tukang Kayu OH 0.3300
Kepala Tukang OH 0.0330
Mandor OH 0.0330

B Bahan
Kayu Kls III m3 0.0150

Analisa Page 27
Paku 5 - 10 cm kg 0.4000
Minyak bekesting ltr 0.1500
Balok kayu kls III m3 0.0080
Triples tbl 9 mm Lbr 0.1750
Dolken Kayu btg 1.0000

C Peralatan/Pengelasan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat 1 M3 pondasi beton bertulang (250 kg besi + bekesting)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 5.300
Tukang Batu OH 0.275
Tukang Kayu OH 1.300
Tukang Besi OH 1.050
Kepala Tukang OH 0.262
Mandor OH 0.262

B Bahan
Kayu Kls III M3 0.20
Paku 5 Cm - 12 cm kg 1.50
Minyak Bekesting Liter 0.40
Besi Beton Polos Kg 157.50
Kawat Beton Kg 2.25
Semen Portland Kg 336.00
Pasir Beton M3 0.54
Kerikil M3 0.81

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 28
Membuat 1 M3 sloof beton bertulang (200 kg besi + bekesting)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 5.650
Tukang Batu OH 0.275
Tukang Kayu OH 1.560
Tukang Besi OH 1.400
Kepala Tukang OH 0.323
Mandor OH 0.283

B Bahan
Kayu Kls III M3 0.27
Paku 5 Cm - 12 cm kg 2.00
Minyak Bekesting Liter 0.60
Besi Beton Polos Kg 210.00
Kawat Beton Kg 3.00
Semen Portland Kg 336.00
Pasir Beton M3 0.54
Kerikil M3 0.81

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat 1 M3 kolom beton bertulang (150 kg besi + bekesting)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 5.300
Tukang Batu OH 0.275
Tukang Kayu OH 1.300
Tukang Besi OH 1.050
Kepala Tukang OH 0.265
Mandor OH 0.265

B Bahan
Kayu Kls III M3 0.32
Paku 5 Cm - 12 cm kg 3.20
Minyak Bekesting Liter 1.60
Besi Beton Polos Kg 157.50
Kawat Beton Kg 2.25
Semen Portland Kg 336.00
Pasir Beton M3 0.54
Kerikil M3 0.81
Kayu Kls II Balok M3 0.12

Analisa Page 29
Plywood 9 mm lbr 2.80
Dolken Kayu Dia ( 8-10) Cm. Pjg 4 m Batang 32.00

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 30
Membuat 1 M' kolom praktis beton bertulang (11 x11 ) cm

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.180
Tukang Batu OH 0.020
Tukang Kayu OH 0.200
Tukang Besi OH 0.020
Kepala Tukang OH 0.006
Mandor OH 0.009

B Bahan
Kayu Kls III M3 0.002
Paku 5 Cm - 12 cm kg 0.010
Minyak Bekesting Liter
Besi Beton Polos Kg 3.000
Kawat Beton Kg 0.450
Semen Portland Kg 4.000
Pasir Beton M3 0.006
Kerikil M3 0.009

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat 1 M3 balok beton bertulang (200 kg besi + bekesting)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.850
Tukang Batu OH 0.275
Tukang Kayu OH 1.650
Tukang Besi OH 1.400
Kepala Tukang OH 0.333
Mandor OH 0.318

B Bahan
Kayu Kls III M3 0.32
Paku 5 Cm - 12 cm kg 3.20
Minyak Bekesting Liter 1.60
Besi Beton Polos Kg 210.00
Kawat Beton Kg 3.00
Semen Portland Kg 336.00
Pasir Beton M3 0.54
Kerikil M3 0.81

Analisa Page 31
Kayu Kls II Balok M3 0.14
Plywood 9 mm lbr 2.80
Dolken Kayu Dia ( 8-10) Cm. Pjg 4 m Batang 16.00

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 32
Membuat 1 M' Ring Balok beton bertulang ( 10 x 15 ) cm

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.297
Tukang Batu OH 0.033
Tukang Kayu OH 0.033
Tukang Besi OH 0.033
Kepala Tukang OH 0.010
Mandor OH 0.015

B Bahan
Kayu Kls III M3 0.003
Paku 5 Cm - 12 cm kg 0.020
Minyak Bekesting Liter
Besi Beton Polos Kg 3.600
Kawat Beton Kg 0.050
Semen Portland Kg 5.500
Pasir Beton M3 0.009
Kerikil M3 0.015

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat 1 M3 Plat beton bertulang (200 kg besi + bekesting)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 5.650
Tukang Batu OH 0.275
Tukang Kayu OH 1.650
Tukang Besi OH 1.400
Kepala Tukang OH 0.323
Mandor OH 0.283

B Bahan
Kayu Kls III M3 0.32
Paku 5 Cm - 12 cm kg 3.20
Minyak Bekesting Liter 1.60
Besi Beton Polos Kg 210.00
Kawat Beton Kg 3.00
Semen Portland Kg 336.00
Pasir Beton M3 0.54
Kerikil M3 0.81
Kayu Kls II Balok M3 0.14

Analisa Page 33
Plywood 9 mm lbr 0.35
Dolken Kayu Dia ( 8-10) Cm. Pjg 4 m Batang 16.00

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 34
Membuat 1 M3 Tangga beton bertulang (200 kg besi + bekesting)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 6.350
Tukang Batu OH 0.275
Tukang Kayu OH 1.650
Tukang Besi OH 1.400
Kepala Tukang OH 0.333
Mandor OH 0.318

B Bahan
Kayu Kls III M3 0.32
Paku 5 Cm - 12 cm kg 3.20
Minyak Bekesting Liter 1.60
Besi Beton Polos Kg 210.00
Kawat Beton Kg 3.00
Semen Portland Kg 336.00
Pasir Beton M3 0.54
Kerikil M3 0.81
Kayu Kls II Balok M3 0.14
Plywood 9 mm lbr 0.35
Dolken Kayu Dia ( 8-10) Cm. Pjg 4 m Batang 16.00

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat 1 M3 Beton Tumbuk 1 Pc : 2 Ps : 3 Kr

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.650
Tukang Batu OH 0.250
Kepala Tukang OH 0.025
Mandor OH 0.080

B Bahan
Semen Portland Kg 323.00
Pasir Beton M3 0.52
Kerikil M3 0.78

C Peralatan

D Jumlah (A+B+C)

Analisa Page 35
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 36
Membuat 1 M3 Beton Tumbuk 1 Pc : 3 Ps : 5 Kr

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.650
Tukang Batu OH 0.275
Kepala Tukang OH 0.028
Mandor OH 0.080

B Bahan
Semen Portland Kg 218.00
Pasir Beton M3 0.52
Kerikil M3 0.87

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat 1 M3 Beton 14,5 Mpa ( K100 ) Slump ( 12 +/- 2 )

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.200
Tukang Batu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.060

B Bahan
Semen Portland Kg 230.00
Pasir Beton Kg 138.89
Kerikil Kg 1,027.00
air L 200.00

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat 1 M3 Beton 14,5 Mpa ( K175 ) Slump ( 12 +/- 2 )

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.650

Analisa Page 37
Tukang Batu OH 0.275
Kepala Tukang OH 0.028
Mandor OH 0.083

B Bahan
Semen Portland Kg 326.00
Pasir Beton Kg 760.00
Kerikil Kg 1,029.00
air L 215.00

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat 1 M3 Beton 21,75 Mpa ( K225 ) Slump ( 12 +/- 2 )

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.650
Tukang Batu OH 0.275
Kepala Tukang OH 0.028
Mandor OH 0.083

B Bahan
Semen Portland Kg 371.00
Pasir Beton Kg 698.00
Kerikil Kg 1047.00
air L 215.00

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat 1 M3 Beton 21,7 Mpa ( K250 ) Slump ( 12 +/- 2 )

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.650
Tukang Batu OH 0.275
Kepala Tukang OH 0.028
Mandor OH 0.083

Analisa Page 38
B Bahan
Semen Portland Kg 384.000
Pasir Beton M3 0.494
Kerikil M3 0.770
air L 215.000

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 39
Membuat 1 M3 Beton 21,75 Mpa ( K300 ) Slump ( 12 +/- 2 )

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 1.650
Tukang Batu OH 0.275
Kepala Tukang OH 0.028
Mandor OH 0.083

B Bahan
Semen Portland Kg 413.00
Pasir Beton Kg 681.00
Kerikil Kg 1021.00
air L 215.00

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

PEKERJAAN PASANGAN DINDING


Pemasangan 1 m2 dinding Transram bata merah ( 5x11x22 ) cm tebal 1/2 batu camp. 1SP : 3PP

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.300
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015

B Bahan
Batu Merah Bh 70.00
Semen Portland Kg 14.37
Pasir Pasangan M3 0.04

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m2 dinding Transram bata merah ( 5x11x22 ) cm tebal 1/2 batu camp. 1SP : 4PP

No Uraian Satuan Koefisien

A Tenaga

Analisa Page 40
Pekerja OH 0.300
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015

B Bahan
Batu Merah Bh 70.00
Semen Portland Kg 11.50
Pasir Pasangan M3 0.043

Analisa Page 41
C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m2 dinding bata merah ( 5x11x22 ) cm tebal 1/2 batu camp. 1SP : 5PP

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.300
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015

B Bahan
Batu Merah Bh 70.000
Semen Portland Kg 9.680
Pasir Pasangan M3 0.045

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m2 dinding Hebel ( Bata Ringan) 75 x 200 x 600 mm)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.320
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015

B Bahan
Batu Ringan Bh 8.750
Primer Mortar (PM-100) Kg 2.520
Angkur Besi Kg 0.150

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 42
Pemasangan 1 m2 Partisi Gypsum

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.200
Tukang Plafond OH 0.050
Kepala Tukang OH 0.005
Mandor OH 0.005

B Bahan
Gypsum board 1200 mm x 2400 mm x 12 mm lbr 0.729
Siku metal furing L.2.5 cm m 4.000
Canal C metal furing C.2 x 3 x 2 cm m 2.000
Paku ramset+misiu kg 0.220
Joint Tape @ 75 m roll 0.143
Skrup bh 16.000
Jointing Coumpond kg 1.000

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Memasang 1 m' Saluran Keliling bangunan

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.600
Tukang Batu OH 0.450
Kepala Tukang OH 0.045
Mandor OH 0.003

B Bahan
Batu Merah Bj 16.000
Semen Portland Kg 6.250
Pasir Pasang Kg 0.022
Pekerjaan Galian M3 0.090

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 43
PEKERJAAN PLESTERAN
Pemasangan 1 m² plesteran 1SP:2PP tebal 15mm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.300
Tukang batu OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 7.778
Pasir pasang m3 0.023
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1m² plesteran 1SP:4PP tebal 15 mm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.300
Tukang batu OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 5.884
Pasir pasang m3 0.021
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 44
Pemasangan 1m² plesteran 1SP:5PP tebal 15 mm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.300
Tukang batu OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 5.184
Pasir pasang m3 0.026
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² acian

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.200
Tukang batu OH 0.100
Kepala tukang OH 0.010
Mandor OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Plesteran Transtram + Acian = 101,149.68


Plesteran + Acian = 98,118.21

Pemasangan 1 m² acian Hebel

No Uraian Satuan Koefisien

A TENAGA

Analisa Page 45
Pekerja OH 0.200
Tukang batu OH 0.100
Kepala tukang OH 0.010
Mandor OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 3.250
JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan 1 m² Plamir Tembok & Beton

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.084
Tukang batu OH 0.126
Kepala tukang OH 0.013
Mandor OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Plamir kg 0.180
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

PEKERJAAN PUNUTUP LANTAI DAN PENUTUP DINDING


Pemasangan 1 m² Lantai Keramik Ukuran 20 cm x 20 cm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.270
Tukang batu OH 0.130
Kepala tukang OH 0.013
Mandor OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Keramik Warna Bh 26.250

Analisa Page 46
Semen portland Kg 10.400
Semen Warna Kg 1.500
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 47
Pemasangan 1 m² Lantai Keramik Warna Ukuran 25 cm x 25 cm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.700
Tukang batu OH 0.350
Kepala tukang OH 0.035
Mandor OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik Warna Bh 16.870
Semen portland Kg 10.000
Semen Warna Kg 1.500
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² Lantai Keramik Ukuran 30 cm x 30 cm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.700
Tukang batu OH 0.350
Kepala tukang OH 0.035
Mandor OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik Warna Bh 11.870
Semen portland Kg 10.000
Semen Warna Kg 1.500
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² Lantai Keramik Ukuran 40 cm x 40 cm

Analisa Page 48
No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.700
Tukang batu OH 0.350
Kepala tukang OH 0.035
Mandor OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik Warna Bh 6.630
Semen portland Kg 9.800
Semen Warna Kg 1.300
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 49
Pemasangan 1 m² Lantai Keramik Warna Ukuran 60 cm x60 cm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.700
Tukang batu OH 0.350
Kepala tukang OH 0.035
Mandor OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik Warna ex Garanito Bh 2.780
Semen portland Kg 10.400
Semen Warna Kg 1.620
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m' Plint Keramik ukuran 10 cm x 40 cm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.090
Tukang batu OH 0.090
Kepala tukang OH 0.009
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Keramik Warna Bh 1.700
Semen portland Kg 1.140
Semen Warna Kg 0.100
Pasir Pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m' Plint Keramik ukuran 10 cm x 60 cm

No Uraian Satuan Koefisien

Analisa Page 50
No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.090
Tukang batu OH 0.090
Kepala tukang OH 0.009
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Keramik Warna Bh 1.700
Semen portland Kg 1.140
Semen Warna Kg 0.100
Pasir Pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 51
Pemasangan 1 m² dinding Keramik Warna Ukuran 30 cm x 30 cm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.700
Tukang batu OH 0.320
Kepala tukang OH 0.027
Mandor OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Keramik Warna Bh 11.870
Semen portland Kg 10.000
Semen Warna Kg 1.500
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² dinding Keramik Warna Ukuran 25 cm x 25 cm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.700
Tukang batu OH 0.350
Kepala tukang OH 0.035
Mandor OH 0.035
JUMLAH TENAGA KERJA

B BAHAN
Keramik 25 x 25 Bh 17.490
Semen portland Kg 9.500
Semen Warna Kg 1.200
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² dinding Keramik Warna Ukuran 25 cm x 40 cm

Analisa Page 52
No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.700
Tukang batu OH 0.350
Kepala tukang OH 0.035
Mandor OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik Warna Bh 10.000
Semen portland Kg 9.500
Semen Warna Kg 1.200
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m' List keramik Ukuran 5 cm x 30 cm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.090
Tukang batu OH 0.090
Kepala tukang OH 0.009
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Keramik Warna Bh 5.300
Semen portland Kg 0.570
Semen Warna Kg 0.013
Pasir Pasang M3 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² dinding batu tempel hitam/batu alam

No Uraian Satuan Koefisien

Analisa Page 53
A TENAGA
Pekerja OH 0.700
Tukang batu OH 0.350
Kepala tukang OH 0.035
Mandor OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Batu alam m2 1.100
Semen portland Kg 11.750
Pasir Pasang M3 0.035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

WALLPAPER/ M2

No Uraian Satuan Koefisien

WALLPAPER/ M2
Bahan
- Wall paper ex. Import m2 1
- Alat bantu ls 1
- Ongkos pasang m2 1

Jumlah
keuntungan pemborong 10%
Total
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m' List gypsum Profil

No Uraian Satuan Koefisien

A TENAGA

Analisa Page 54
Pekerja OH 0.050
Tukang Plafond OH 0.050
Kepala tukang OH 0.050
Mandor OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
List Gypsum Profil M' 1.050
Paku Skrup Gypsum kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 buah kunci tanam + handel pintu biasa 2 slaag

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.010
Tukang kayu OH 0.200
Kepala tukang OH 0.050
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kunci Tanam Biasa Bh 1.000
Handel Pintu Bh 1.000
JUMLAH HARGA BAHAN

C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 buah kunci kamar mandi

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.005
Tukang kayu OH 0.500

Analisa Page 55
Kepala tukang OH 0.050
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kunci Tanam Kamar Mandi Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 Bh Engsel Pintu

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.015
Tukang kayu OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Engsel Pintu Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 Bh Engsel Jendela

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.0100
Tukang kayu OH 0.1000
Kepala tukang OH 0.0100
Mandor OH 0.0005
JUMLAH TENAGA KERJA
B BAHAN
Engsel Jendela Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

Analisa Page 56
D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 Bh Hak angin Jendela

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.0100
Tukang kayu OH 0.1000
Kepala tukang OH 0.0100
Mandor OH 0.0005
JUMLAH TENAGA KERJA
B BAHAN
Hak angin jendela Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 Bh handle jendela

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.0100
Tukang kayu OH 0.1000
Kepala tukang OH 0.0100
Mandor OH 0.0005
JUMLAH TENAGA KERJA
B BAHAN
handle Jendela Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 57
Pemasangan 1 Bh Grendel Pintu dan Grendel Jendela

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.0100
Tukang kayu OH 0.1000
Kepala tukang OH 0.0100
Mandor OH 0.0005
JUMLAH TENAGA KERJA
B BAHAN
Grendel Pintu Bh 1.000
Grendel Jendela Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1
Jumlah (A+B+C) 2
E Overhead & Profit 1 10 % x D
Overhead & Profit 2
F Harga Satuan Pekerjaaan (D+E) 1
F Harga Satuan Pekerjaaan (D+E) 2

PEKERJAAN ATAP
Pekerjaan 1 m² Rangka Atap Baja Ringan

No Uraian Satuan Koefisien

A Bahan
Canal C M' 3.500
GOC 0.35mm (Reng + Skoring Angin) M' 2.500
L Breket M' 2.000
Dynabolt Bh 8.000
Self Drilling Screw Lbr 25.000
Alat Bantu Ls 1.000

B Tenaga
Pekerja OH 0.3000
Tukang kayu OH 0.3000
Kepala tukang OH 0.0300
Mandor OH 0.0150

D Jumlah (A+B)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan 1 m² Atap Spandek

No Uraian Satuan Koefisien

Analisa Page 58
No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.0150
Tukang kayu OH 0.0750
Kepala tukang OH 0.0080
Mandor OH 0.0060
JUMLAH TENAGA KERJA
B BAHAN
Spandek Zincalume 0.35 M' 1.050
Sekrup Cteks 12-14x50 Bh 6.000
Sekrup Cteks 10-16x16 Bh 2.000
Paku Kg 0.020
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan 1 m² Atap Metal

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.2000
Tukang kayu OH 0.1000
Kepala tukang OH 0.0100
Mandor OH 0.0010
JUMLAH TENAGA KERJA
B BAHAN
Atap Metal M' 1.660
Sekrup Kg 0.020

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan 1 m² Karet Pelapis Atap

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.1500
Tukang kayu OH 0.0500

Analisa Page 59
Kepala tukang OH 0.0050
Mandor OH 0.0080
JUMLAH TENAGA KERJA
B BAHAN
Karet M2 1.100
Paku Skrup Kg 0.020
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 60
Pemasangan 1 m1 listplank Ukuran L = 3 x 30 cm GRC

No Uraian Satuan Koefisien

A Bahan
Pekerja OH 0.100
Tukang kayu OH 0.200
Kepala tukang OH 0.020
Mandor OH 0.005
JUMLAH TENAGA K
B BAHAN
ListPlank L= 30 cm M1 1.100
Sekrup KG 0.050
JUMLAH HARGA BA
C PERALATAN

JUMLAH HARGA AL

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.200
Tukang OH 0.200
Kepala tukang OH 0.020
Mandor OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Seng plat m2 1.050
Paku 1-2 cm kg 0.015
Papan kayu kelas III m3 0.019

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m1 Nok / Bumbungan Atap (Seng Plat

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.100

Analisa Page 61
Tukang OH 0.100
Kepala tukang OH 0.100
Mandor OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Nok Spandek m1 1.100
Paku sekrup kg 0.040

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

PEKERJAAN KUSEN PINTU DAN JENDELA


PEMASANGAN 1 m2 KACA TEBAL 3 MM

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.015
Tukang OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.008
JUMLAH TENAGA KERJA

B BAHAN
Kaca M2 1.100

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

PEMASANGAN 1 m2 KACA REFLEXINDO

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.800
Tukang OH 0.800
Kepala tukang OH 0.180
Mandor OH 0.035

Analisa Page 62
B BAHAN
Kaca Reflexindo tebal 6mm M2 1.100

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 63
Pek. Pintu Aluminium Spandrel

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 1.800
Tukang OH 1.800
Kepala tukang OH 0.180
Mandor OH 0.035

B BAHAN
Profile Aluminium m' 5.120
Spandrel Btg 1.850
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Memasang 1 m' Kusen Aluminium (Pintu dan Jendela)

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.043
Tukang Alma/Besi OH 0.043
Kepala tukang OH 0.003
Mandor OH 0.001

B BAHAN
Kusen Aluminium warna 4" x 1 3/4" M' 1.100
Sekrup Fixer Bh 2.000
Sealent Tube 0.060

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Memasang 1 M2 Pintu Kaca Rangka Aluminium

No Uraian Satuan Koefisien

A TENAGA

Analisa Page 64
Pekerja OH 0.085
Tukang Alma/Besi OH 0.085
Kepala tukang OH 0.009
Mandor OH 0.005

B BAHAN
Kusen Aluminium warna 4" x 1 3/4" M' 1.100
Profil Aluminium M' 1.100
Sealent Tube 0.270

JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Memasang 1 M2 Pintu Kaca Rangka Aluminium

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.085
Tukang Alma/Besi OH 0.085
Kepala tukang OH 0.009
Mandor OH 0.005

B BAHAN
Pintu Aluminium M' 4.400
Profil Kaca M' 4.500
Sealent Tube 0.270

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Memasang 1 M2 Pasang Pintu Multipleks Rangka Lapis HPL

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.800
Tukang Alma/Besi OH 2.000

Analisa Page 65
Kepala tukang OH 0.200
Mandor OH 0.040

B BAHAN
Multiplex Bh 0.336
HPL Bh 0.730
Lem Kayu Kg 1.000
Alat Bantu + Perlengkapan Ls 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 66
Membuat dan Memasang 1 M2 Kaca Tempered 12 mm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.015
Tukang Alma/Besi OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.00075

B BAHAN
Kaca Tempered 12 mm M2 1.100
Sealent Tube 0.050
Karet Kaca M' 1.100

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat dan Memasang 1 M2 Kaca Tebal 10 mm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.015
Tukang Alma/Besi OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.00075

B BAHAN
Kaca 10 mm M2 1.100
Sealent Tube 0.050
Karet Kaca M' 1.100

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat dan Memasang 1 M2 Kaca Tebal 8 mm Warna

No Uraian Satuan Koefisien

A TENAGA

Analisa Page 67
Pekerja OH 0.015
Tukang Alma/Besi OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.00075

B BAHAN
Kaca 8 mm M2 1.100
Sealent Tube 0.050
Karet Kaca M' 1.100

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat dan Memasang 1 M2 Kaca Tebal 8 mm ( Kaca Panasap warna )

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.015
Tukang Alma/Besi OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.00075

B BAHAN
Kaca Panasap 8 mm ( Kaca Panasap Warna ) M2 1.100
Sealent Tube 0.050
Karet Kaca M' 1.100

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Membuat dan Memasang 1 M2 Kaca Tebal 5 mm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.015
Tukang Alma/Besi OH 0.150
Kepala tukang OH 0.015
Mandor OH 0.00075

Analisa Page 68
B BAHAN
Kaca 05 mm M2 1.100
Sealent Tube 0.050
Karet Kaca M' 1.100

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 69
PEKERJAAN PLAFOND
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafond

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.035
Tukang besi OH 0.350
Kepala tukang OH 0.035
Mandor OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40.2 mm m' 2.000
Rangka metal hollow 20.40.2 mm m' 2.000
assesoris (perkuatan, las, dll) Ls 100%xrangka
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m² langit-langit ukuran 120x240mm. (gypsumboard)/Kalsoboard )

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.100
Tukang kayu OH 0.030
Kepala tukang OH 0.005
Mandor OH 0.001
JUMLAH TENAGA KERJA
B BAHAN

Gypsumboard Lbr 0.364


Calsiboard Lbr 0.364
Paku skrup kg 0.110
JUMLAH HARGA BAHAN

C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)

E Overhead & Profit 10 % x D

F Harga Satuan Pekerjaaan (D+E)

Analisa Page 70
Plafond Gypsum + rangka hollow
Plafond Calsiboard + rangka hollow

Analisa Page 71
Pemasangan 1 m2 Langit-Langit Gypsum Board 12 mm

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.100
Tukang besi OH 0.050
Kepala tukang OH 0.005
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Gypsum Board 9 mm Lbr 0.364
Skrup Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m' Listplafond Gypsum

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.100
Tukang kayu OH 0.050
Kepala tukang OH 0.005
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Listplafond Gypsum M' 1.050
Paku skrup Kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m2 Plafond & Dinding PVC

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.100
Tukang besi OH 0.050

Analisa Page 72
Kepala tukang OH 0.005
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Skrup Bh 18.000
Plafond PVC M2 1.000
Rangka PVC M' 1.100
JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m' Listplafond PVC

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.100
Tukang kayu OH 0.050
Kepala tukang OH 0.005
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Listplafond PVC M' 1.000
Paku skrup Bh 18.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

PEKERJAAN PENGECATAN
1 m² Pengecetan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.070
Tukang cat OH 0.009
Kepala tukang OH 0.006
Mandor OH 0.003
JUMLAH TENAGA KERJA
B BAHAN

Analisa Page 73
Cat menie kg 0.200
Cat dasar kg 0.170
Cat penutup kg 0.260
Kuas bh 0.010
Pengencer kg 0.030
Amplas lbr 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 74
Pengecatan 1 m² Plafond

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.028
Tukang cat OH 0.042
Kepala tukang OH 0.004
Mandor OH 0.003
JUMLAH TENAGA KERJA

B BAHAN
Cat dasar ltr 0.120
Cat penutup kg 0.180
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pengecatan 1 m² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.0200
Tukang cat OH 0.0630
Kepala tukang OH 0.0063
Mandor OH 0.0030
JUMLAH TENAGA KERJA
B BAHAN
Plamuur ltr 0.100
Cat dasar kg 0.100
Cat penutup ex. Metrolite (1) kg 0.260
Cat penutup ex. Mowilex (2) kg 0.260
JUMLAH HARGA BAHAN (1
JUMLAH HARGA BAHAN (2
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


Jumlah (A+B+C).È (2)
E Overhead & Profit È. (1) 10 % x D
Overhead & Profit È. (2) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)
Harga Satuan Pekerjaaan (D+E) È. (2)

Analisa Page 75
1 m² Pengecetan bidang Baja / Besi dengan 1 x Cat dasar 2 x Cat Penutup

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.020
Tukang cat OH 0.200
Kepala tukang OH 0.020
Mandor OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar kg 0.120
Cat penutup kg 0.180
Kuas bh 0.010
Pengencer Ltr 0.030
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pekerjaan 1 m² Pek. Water Proofing plat beton

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.0280
Tukang cat OH 0.0420
Kepala tukang OH 0.0042
Mandor OH 0.0025
JUMLAH TENAGA KERJA

B BAHAN
Lapisan dasar kg 0.120
Waterprofing kg 0.400
JUMLAH HARGA BAHAN (1
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


E Overhead & Profit È. (1) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)

PEKERJAAN ME
Pasang Instalasi Listrik NYM 2x2,5mm2 tiap titik

No Uraian Satuan Koefisien

Analisa Page 76
No Uraian Satuan Koefisien

1 BAHAN
Kabel NYM 2x2,5 mm2 m' 6.000
Corduit pipa dia 5/8\" C m' 12.000
L.bow Sekrup bh 1.000
Sadel bh 10.000
Isolasi bh 0.200
Tee dos bh 2.000
Inbow dos bh 1.000
Sock bh 3.000
Klem Conduit bh 9.000
Lastdop bh 3.000
Flexible pipe m' 1.000
Elbow bh 2.000
Paku,sekrup,fizzer bh 10.000

2 UPAH
Instalator Oh 0.300
Pekerja Oh 0.150
Mandor Oh 0.015

Pemasangan 1 set Titik Lampu SL Led

No Uraian Satuan Koefisien

A TENAGA
Tukang Listrik OH 0.3000
JUMLAH TENAGA KERJA

B BAHAN
Kabel NYA 1 x 2,5mm Mtr 5.000
Fitting Bh 1.000
Lampu SL Led 8 watt Set 1.000
Lampu SL Led 12 watt Set 1.000
Lampu SL Led 18 watt Set 1.000
JUMLAH HARGA BAHAN (1
JUMLAH HARGA BAHAN (2
JUMLAH HARGA BAHAN (3
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


Jumlah (A+B+C).È (2)
Jumlah (A+B+C).È (3)
E Overhead & Profit È. (1) 10 % x D
Overhead & Profit È. (2) 10 % x D
Overhead & Profit È. (3) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)

Analisa Page 77
F Harga Satuan Pekerjaaan (D+E) È. (2)
F Harga Satuan Pekerjaaan (D+E) È. (3)

Pemasangan 1 set Lampu Downlight

No Uraian Satuan Koefisien

A TENAGA
Tukang Listrik OH 0.3000
JUMLAH TENAGA KERJA

B BAHAN
Kabel NYA 1 x 2,5mm Mtr 5.000
Lampu Downlight Bh 1.000
JUMLAH HARGA BAHAN (1
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


E Overhead & Profit È. (1) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)

Pemasangan 1 set Lampu Baret

No Uraian Satuan Koefisien

A TENAGA
Tukang Listrik OH 0.3000
JUMLAH TENAGA KERJA

B BAHAN
Kabel NYA 1 x 2,5mm Mtr 5.000
Lampu Baret Bh 1.000
JUMLAH HARGA BAHAN (1

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


E Overhead & Profit È. (1) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)

Pemasangan 1 set Lampu RM 2 x 18 watt

No Uraian Satuan Koefisien

A TENAGA
Tukang Listrik OH 0.3000

Analisa Page 78
JUMLAH TENAGA KERJA

B BAHAN
Kabel NYA 1 x 2,5mm Mtr 5.000
Lampu RM 2 x 18 watt Bh 1.000
JUMLAH HARGA BAHAN (1
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


E Overhead & Profit È. (1) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)

Pemasangan 1 set Stop Kontak Tunggal

No Uraian Satuan Koefisien

A TENAGA
Tukang Listrik OH 0.0060
JUMLAH TENAGA KERJA

B BAHAN
Pipa PVC 5/8" Btg 0.500
Kabel NYA 2 x 1.5 mm M' 5.000
Inbow Dos Bh 1.000
Stop Kontak Set 1.000
MCB 4 Ampere Bh 1.000
JUMLAH HARGA BAHAN (1
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


E Overhead & Profit È. (1) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)

Pemasangan 1 set Stop Kontak Ganda

No Uraian Satuan Koefisien

A TENAGA
Tukang Listrik OH 0.0060
JUMLAH TENAGA KERJA

B BAHAN
Pipa PVC 5/8" Btg 0.500
Kabel NYA 2 x 1.5 mm M' 5.000
Inbow Dos Bh 1.000
Stop Kontak Set 1.000
MCB 4 Ampere Bh 1.000

Analisa Page 79
JUMLAH HARGA BAHAN (1
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


E Overhead & Profit È. (1) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)

Pemasangan 1 set Saklar Tunggal

No Uraian Satuan Koefisien

A TENAGA
Tukang Listrik OH 0.0060
JUMLAH TENAGA KERJA

B BAHAN
Pipa PVC 5/8" Btg 0.500
Kabel NYA 2 x 1.5 mm M' 5.000
Inbow Dos Bh 1.000
Saklar Tunggal Set 1.000
JUMLAH HARGA BAHAN (1
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


E Overhead & Profit È. (1) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)

Pemasangan 1 set Saklar Ganda

No Uraian Satuan Koefisien

A TENAGA
Tukang Listrik OH 0.0060
JUMLAH TENAGA KERJA

B BAHAN
Pipa PVC 5/8" Btg 0.500
Kabel NYA 2 x 1.5 mm M' 5.000
Inbow Dos Bh 1.000
Saklar Ganda Set 1.000
JUMLAH HARGA BAHAN (1
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


E Overhead & Profit È. (1) 10 % x D

Analisa Page 80
F Harga Satuan Pekerjaaan (D+E) È. (1)

Analisa Page 81
Pemasangan 1 PMDP / DP Panel

No Uraian Satuan Koefisien

A TENAGA
Tukang Listrik OH 0.0060
JUMLAH TENAGA KERJA

B BAHAN
Pipa PVC 5/8" Btg 0.500
Kabel NYA 2 x 1.5 mm M' 10.000
MCB 16 A 1 Phase Bh 20.000
Box Panel Set 1.000
Isolator Kecil Roll 1.000
Alat Bantu Ls 1.000
JUMLAH HARGA BAHAN (1
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


E Overhead & Profit È. (1) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)

Tranking Kabel PVC

No Uraian Satuan Koefisien

A TENAGA
Tukang Listrik OH 0.0060
JUMLAH TENAGA KERJA

B BAHAN
Kabel Duck PVC 16 x 16 mm Btg 0.500
Besi Plat Strip 3.25 mm M' 10.000
Skrup Fixer Bh 2.000
Alat Bantu Ls 1.000
JUMLAH HARGA BAHAN (1
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


E Overhead & Profit È. (1) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)

1 m' Kabel Instalasi NYM 2 x 1,5

No Uraian Satuan Koefisien

A TENAGA

Analisa Page 82
Tukang Listrik OH 0.1660
Pembantu Tukang listrik OH 0.1660
Kepala Tukang Listrik OH 0.0330
Mandor OH 0.0170
JUMLAH TENAGA KERJA

B BAHAN
Kabel NYM 2 x 1.5 mm M' 1.000
Alat Bantu Ls 5.000
JUMLAH HARGA BAHAN (1
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)È. (1)


E Overhead & Profit È. (1) 10 % x D
F Harga Satuan Pekerjaaan (D+E) È. (1)

PEKERJAAN SANITASI
Pemasangan 1 Buah Wastafel

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 1.200
Tukang batu OH 1.450
Kepala tukang OH 0.150
Mandor OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Wastafel Unit 1.200
Semen Portland Kg 6.000
Pasir Pasang M3 0.010
Perlengkapan % 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 Buah Urinoir

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 1.000
Tukang OH 1.000
Kepala tukang OH 0.100
Mandor OH 0.050

Analisa Page 83
JUMLAH TENAGA KERJA
B BAHAN
Urinoir Unit 1.000
Semen Portland Kg 6.000
Pasir Pasang M3 0.010
Perlengkapan % 0.300
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 84
Pemasangan 1 Buah Closet Duduk

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 1.200
Tukang batu OH 1.450
Kepala tukang OH 0.150
Mandor OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Closet Duduk Unit 1.000
Perlengkapan Ls 6% X Closet
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 Buah floor drain

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.010
Tukang batu OH 0.100
Kepala tukang OH 0.010
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Floor drain Unit 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 Kran Air

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.010
Tukang batu OH 0.100
Kepala tukang OH 0.010
Mandor OH 0.005
JUMLAH TENAGA KERJA

Analisa Page 85
B BAHAN
Kran Air Unit 1.000
Seal tape Bh 0.025
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 86
Pemasangan 1 m Pipa PVC AW 1/2 "

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.036
Tukang pipa OH 0.060
Kepala tukang OH 0.006
Mandor OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa 1/2 " m 1.200
Perlengkapan Ls 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m Pipa PVC AW 3/4 "

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.036
Tukang pipa OH 0.060
Kepala tukang OH 0.006
Mandor OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa 3/4 " m 1.200
Perlengkapan Ls 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m Pipa PVC AW 1 "

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.036
Tukang pipa OH 0.060
Kepala tukang OH 0.006
Mandor OH 0.002

Analisa Page 87
JUMLAH TENAGA KERJA
B BAHAN
Pipa 1 " m 1.200
Perlengkapan Ls 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 88
Pemasangan 1 m Pipa PVC 3 "

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.081
Tukang pipa OH 0.135
Kepala tukang OH 0.014
Mandor OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa 3 " m 1.200
Perlengkapan Ls 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m Pipa PVC 4 "

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.081
Tukang pipa OH 0.135
Kepala tukang OH 0.014
Mandor OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa 4 " m 1.200
Perlengkapan Ls 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m Pipa GIP 1"

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.081
Tukang pipa OH 0.135
Kepala tukang OH 0.014
Mandor OH 0.004

Analisa Page 89
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP 1" m 1.200
Perlengkapan Ls 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 90
Pemasangan 1 Titik Springkler

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.1660
Tukang pipa OH 0.1660
Kepala tukang OH 0.0330
Mandor OH 0.0170
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP 3/4" Btg 2.400
Plat Strip 2 x 4 m' 1.100
Pressure Switch Bh 1.000
Manometer Bh 1.000
Time Delay Relay Bh 1.000
Savety Valve Bh 1.000
Pressure Reducing Valve Bh 1.000
Kepala Springkler head 3/4" Bh 1.000
Accessories Ls 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Pemasangan 1 m2 Paving Block 8 cm (K-300)

No Uraian Satuan Koefisien

A Tenaga
Pekerja OH 0.0500
Tukang Batu OH 0.0311
Kepala Tukang OH 0.0310
Mandor OH 0.0025

B Bahan
Paving t. 8 cm Bh 50.000
Pasir Pasangan m3 0.050
Alat bantu Ls 1.000

C Peralatan

D Jumlah (A+B+C)
E Overhead & Profit 10 % x D
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 91
Pembuatan 1 bh Septic Tank dan peresapan

No Uraian Satuan Koefisien

A TENAGA DAN BAHAN

Galian Tanah m3 25.000


Pas. Batu bata 1/2 bata camp. 1 PC : 4 PP m2 40.000
Pelat Beton K-225 m3 1.250
Plesteran 15 mm camp. 1 PC : 4 PP m2 80.000
Pipa PVC 4" m 20.000
Pipa GIP 1" m 1.000
Pas Ijuk m2 12.500

JUMLAH HARGA BAHAN


B PERALATAN

JUMLAH HARGA ALAT


C Jumlah (A+B)
D Overhead & Profit 10 % x C
E Harga Satuan Pekerjaaan (C+D)

Analisa Page 92
PEMASANGAN ELEVATOR ( LIFT )

No Uraian Satuan Koefisien

B BAHAN
1 Pemasangan mesin penggerak (gearless machine), SET 1.000
alat - alat control lift, pusat kontrol di dalam ruangan motor, panel
operasi tiap lantai (hall call button), safety edge, instalasi listrik, panel
lift, termasuk kabel feeder, dudukan pondasi mesin lift

2 Pemasangan rem, katrol, baja pengimbang berat SET 1.000


(counter weights), rel penuntun (guide rails).
Sepatu penuntun (guide shoes), kawat baja penggantung (hoisting -
ropes), pekerjaan penunjang instalasi lift termasuk blok insulasi
(insulating block) dan alat anti vibrasi.

3 Pemasangan lift car, car doors dengan sistim door


opening two panel center opening automatic door, plat form, ceiling,
finishing dinding dan lantai, perlengkapan car seperti emergency car
light with automatic charger, over load protective device, interphone,
electric door sensor, car arrival gong, attendance service, car lift --
indicator, car opening panel, paging speaker, AC Variable Voltage,
Variable Frequency (VVVF), lampu - lampu di kereta termasuk
instalasinya.
a. Sangkar Lift
Dinding Sangkar Lift SET 1.000
Car Transom SET 1.000
Front Panel at COP SET 1.000
Car Door SET 1.000
Door Jamb SET 1.000
Handrail Lift SET 1.000
b. Ceiling
Wide Vaulted Light SET 1.000
Light Board SET 1.000
c. Lantai / Flooring
Pola Lantai Marmer Ls 1.000
4 Pemasangan landing doors, ambang pintu lantai
(jamb), door sills, panel operasi tiap lantai.
Landing Door Panel SET 11.000
Landing Door Jamb SET 11.000
5 Pemasangan Emergency Landing Device (ARD) dan SET 1.000
perlengkapannya.
6 Pemasangan Car Operating Panel (COP) SET 1.000

7 Pemasangan Hall Indicator Panel (HOP) SET 11.000

8 Pemasangan Sensor Gempa (Earth Quake) SET 1.000

9 Pemasangan AC di ruang mesin SET 1.000

Analisa Page 93
10 Panel Distribusi di Ruang Mesin Lift SET 1.000

JUMLAH .
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 0%xD
F Harga Satuan Pekerjaaan (D+E)

Analisa Page 94
Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 17,000.00
107,000.00 42,800.00
115,000.00 2,300.00
130,000.00 2,600.00
Jumlah (1) 64,700.00

0.00 -
1,312.50 3,281.25
25,000.00 30,000.00
190,000.00 950.00
0.00 -
540,000.00 38,880.00
25,000.00 1,500.00
0.00 -
Jumlah (2) 74,611.25

Jumlah (3) -

139,311.25
13,931.13
153,242.38

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 8,500.00
107,000.00 10,700.00
115,000.00 1,150.00
130,000.00 6,500.00
Jumlah (1) 26,850.00

540,000.00 64.80
25,000.00 500.00
2,900,000.00 20,300.00
Jumlah (2) 20,864.80

Jumlah (3) -

47,714.80
4,771.48
52,486.28

Analisa Page 95
Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 170,000.00
107,000.00 214,000.00
107,000.00 107,000.00
115,000.00 34,500.00
130,000.00 6,500.00
Jumlah (1) 532,000.00

Analisa Page 96
0.00 -
540,000.00 972.00
25,000.00 2,000.00
34,500.00 37,950.00
1,312.50 45,937.50
190,000.00 28,500.00
0.00 -
550.00 82.50
95,000.00 28,500.00
11,500.00 2,875.00
115,000.00 23,000.00
185,000.00 27,750.00
110,000.00 6,600.00
Jumlah (2) 204,167.00

Jumlah (3) -

736,167.00
73,616.70
809,783.70

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 85,000.00
107,000.00 214,000.00
115,000.00 23,000.00
130,000.00 6,500.00
Jumlah (1) 328,500.00

0.00 -
540,000.00 113,400.00
25,000.00 7,500.00
1,312.50 13,781.25
190,000.00 5,700.00
0.00 -
95,000.00 23,750.00
75,000.00 112,500.00
Jumlah (2) 276,631.25

Jumlah (3) -

605,131.25
60,513.13
665,644.38

Harga Satuan Jumlah Harga

Analisa Page 97
Harga Satuan Jumlah Harga

(Rp) (Rp)
85,000.00 7,650.00
130,000.00 1,300.00
Jumlah (1) 8,950.00
8,950.00
895.00
9,845.00

Harga Satuan Jumlah Harga

(Rp) (Rp)
85,000.00 17,000.00
130,000.00 1,300.00
Jumlah (1) 18,300.00
18,300.00
1,830.00
20,130.00

Harga Satuan Jumlah Harga

(Rp) (Rp)
85,000.00 93,500.00
130,000.00 390.00
Jumlah (1) 93,890.00
93,890.00
9,389.00
103,279.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 63,750.00
130,000.00 3,250.00
Jumlah (1) 67,000.00

Jumlah (2) -

Jumlah (3) -

67,000.00
6,700.00
73,700.00

Analisa Page 98
Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 76,500.00
130,000.00 58,500.00
Jumlah (1) 135,000.00

Jumlah (2) -

Jumlah (3) -

135,000.00
13,500.00
148,500.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 21,250.00
130,000.00 1,040.00
Jumlah (1) 22,290.00

Jumlah (2) -

Jumlah (3) -

22,290.00
2,229.00
24,519.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 42,500.00
130,000.00 6,500.00
Jumlah (1) 49,000.00

140,000.00 168,000.00
Jumlah (2) 168,000.00

Jumlah (3) -

Analisa Page 99
217,000.00
21,700.00
238,700.00

Analisa Page 100


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 25,500.00
130,000.00 1,300.00
Jumlah (1) 26,800.00

265,000.00 318,000.00
Jumlah (2) 318,000.00

Jumlah (3) -

344,800.00
34,480.00
379,280.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 42,500.00
130,000.00 6,500.00
Jumlah (1) 49,000.00

81,000.00 97,200.00
Jumlah (2) 97,200.00

Jumlah (3) -

146,200.00
14,620.00
160,820.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 42,500.00
130,000.00 6,500.00
Jumlah (1) 49,000.00

265,000.00 318,000.00
Jumlah (2) 318,000.00

Jumlah (3) -

Analisa Page 101


367,000.00
36,700.00
403,700.00

Analisa Page 102


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 127,500.00
107,000.00 80,250.00
115,000.00 8,625.00
130,000.00 9,750.00
Jumlah (1) 226,125.00

165,000.00 198,000.00
1,312.50 213,937.50
190,000.00 98,800.00
Jumlah (2) 510,737.50

Jumlah (3) -

736,862.50
73,686.25
810,548.75

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 127,500.00
107,000.00 80,250.00
115,000.00 8,625.00
130,000.00 9,750.00
Jumlah (1) 226,125.00

165,000.00 198,000.00
1,312.50 178,500.00
190,000.00 103,360.00
Jumlah (2) 479,860.00

Jumlah (3) -

705,985.00
70,598.50
776,583.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 66,300.00

Analisa Page 103


107,000.00 41,730.00
115,000.00 4,485.00
130,000.00 5,070.00
Jumlah (1) 117,585.00

165,000.00 198,000.00
190,000.00 98,800.00
Jumlah (2) 296,800.00

Jumlah (3) -

414,385.00
41,438.50
455,823.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 66,300.00
107,000.00 41,730.00
115,000.00 4,485.00
130,000.00 5,070.00
Jumlah (1) 117,585.00

165,000.00 74,250.00
1,312.50 254,625.00
195,000.00 60,840.00
310,000.00 145,080.00
Jumlah (2) 534,795.00

Jumlah (3) -

652,380.00
65,238.00
717,618.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 66,300.00
107,000.00 41,730.00
115,000.00 4,485.00
130,000.00 5,070.00
Jumlah (1) 117,585.00

Analisa Page 104


165,000.00 79,200.00
1,312.50 254,625.00
195,000.00 60,840.00
310,000.00 145,080.00
11,000.00 1,100,000.00
22,000.00 39,600.00
Jumlah (2) 1,679,345.00

Jumlah (3) -

1,796,930.00
179,693.00
1,976,623.00

Analisa Page 105


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 25,500.00
107,000.00 10,700.00
115,000.00 1,150.00
130,000.00 1,950.00
Jumlah (1) 39,300.00

500.00 28,000.00
1,312.50 15,088.50
190,000.00 6,080.00
Jumlah (2) 49,168.50

Jumlah (3) -

88,468.50
8,846.85
97,315.35

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 5,950.00
107,000.00 7,490.00
115,000.00 805.00
130,000.00 520.00
Jumlah (1) 14,765.00

11,000.00 115,500.00
22,000.00 3,300.00
Jumlah (2) 118,800.00

Jumlah (3) -

133,565.00
13,356.50
146,921.50
14,692.15

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 4,250.00

Analisa Page 106


107,000.00 6,420.00
115,000.00 690.00
130,000.00 390.00
Jumlah (1) 11,750.00

12,000.00 13,200.00
35,000.00 1,750.00
Jumlah (2) 14,950.00

4,485.00
Jumlah (3) 4,485.00

31,185.00
3,118.50
34,303.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 4,250.00
107,000.00 6,420.00
85,000.00 510.00
130,000.00 390.00
Jumlah (1) 11,570.00

10,800.00 11,880.00
35,000.00 1,750.00
Jumlah (2) 13,630.00
4,089.00
Jumlah (3) 4,089.00

29,289.00
2,928.90
32,217.90

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 8,500.00
107,000.00 8,025.00
130,000.00 1,300.00
Jumlah (1) 17,825.00

55,000.00 55,550.00
42,000.00 4,200.00
Jumlah (2) 59,750.00

Analisa Page 107


Jumlah (3) -

77,575.00
7,757.50
85,332.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 4,250.00
107,000.00 3,210.00
130,000.00 1,300.00
Jumlah (1) 8,760.00

Analisa Page 108


105,000.00 106,050.00
42,000.00 4,200.00
2,450,000.00 98,000.00
5,500.00 6,050.00
Jumlah (2) 214,300.00

Jumlah (3) -

223,060.00
22,306.00
245,366.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 127,500.00
107,000.00 80,250.00
115,000.00 8,625.00
130,000.00 9,750.00
Jumlah (1) 226,125.00

265,000.00 291,500.00
39,090.91 157,340.91
2,500.00 7,500.00
2,000.00 4,000.00
7,500.00 1,875.00
1,500.00 18,000.00
Jumlah (2) 480,215.91

Jumlah (3) -

706,340.91
70,634.09
776,975.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,145.00
107,000.00 3,959.00
115,000.00 575.00
130,000.00 390.00
Jumlah (1) 8,069.00

Analisa Page 109


12,900.00 14,835.00
Jumlah (2) 14,835.00

Jumlah (3) -

22,904.00
2,290.40
25,194.40

Analisa Page 110


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,145.00###
107,000.00 3,959.00###
115,000.00 575.00###
130,000.00 390.00### 4,433.25
Jumlah (1) 8,069.00

12,850.00 14,777.50 3,069.00


Jumlah (2) 14,777.50

Jumlah (3) -

22,846.50
2,284.65
25,131.15

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,145.00
107,000.00 3,959.00
115,000.00 575.00
130,000.00 390.00
Jumlah (1) 8,069.00

12,800.00 14,720.00
Jumlah (2) 14,720.00

Jumlah (3) -

22,789.00
2,278.90
25,067.90

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,145.00
107,000.00 3,959.00
115,000.00 575.00
130,000.00 390.00
Jumlah (1) 8,069.00

Analisa Page 111


11,500.00 13,225.00
Jumlah (2) 13,225.00

Jumlah (3) -

21,294.00
2,129.40
23,423.40

Analisa Page 112


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,145.00
107,000.00 3,959.00
115,000.00 575.00
130,000.00 390.00
Jumlah (1) 8,069.00

12,500.00 14,375.00
Jumlah (2) 14,375.00

Jumlah (3) -

22,444.00
2,244.40
24,688.40

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,145.00
107,000.00 3,959.00
115,000.00 575.00 Balok BB.1 IWF 350X175X7X11
130,000.00 390.00
Jumlah (1) 8,069.00

12,650.00 14,547.50
Jumlah (2) 14,547.50

Jumlah (3) -

22,616.50
2,261.65
24,878.15

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,145.00
107,000.00 3,959.00
115,000.00 575.00
130,000.00 390.00
Jumlah (1) 8,069.00

Analisa Page 113


11,000.00 12,650.00
Jumlah (2) 12,650.00

Jumlah (3) -

20,719.00
2,071.90
22,790.90

Analisa Page 114


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,145.00
107,000.00 3,959.00
115,000.00 575.00
130,000.00 390.00
Jumlah (1) 8,069.00

10,500.00 12,075.00
Jumlah (2) 12,075.00

Jumlah (3) -

20,144.00
2,014.40
22,158.40

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 5,100.00
107,000.00 6,420.00
115,000.00 690.00
130,000.00 390.00
Jumlah (1) 12,600.00

6,500.00 7,475.00
Jumlah (2) 7,475.00

Jumlah (3) -

20,075.00
2,007.50
22,082.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,400.00
107,000.00 2,140.00
115,000.00 230.00
130,000.00 260.00
Jumlah (1) 6,030.00

Analisa Page 115


42,000.00 16,800.00
9,500.00 2,850.00
20,500.00 820.00
Jumlah (2) 20,470.00

Jumlah (3) -

26,500.00
2,650.00
29,150.00
Untuk 1 cm 2,915.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 5,950.00
107,000.00 11,235.00
115,000.00 460.00
130,000.00 325.00
Jumlah (1) 17,970.00

425,000.00 425,000.00
Jumlah (2) 425,000.00

Jumlah (3) -

442,970.00
44,297.00
487,267.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 44,200.00
107,000.00 27,820.00
115,000.00 2,990.00
130,000.00 3,380.00
Jumlah (1) 78,390.00

2,700,000.00 108,000.00
25,000.00 7,500.00
12,000.00 1,200.00
Jumlah (2) 116,700.00

Analisa Page 116


Jumlah (3)

195,090.00
19,509.00
214,599.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 56,100.00
107,000.00 35,310.00
115,000.00 3,795.00
130,000.00 4,290.00
Jumlah (1) 99,495.00

25,000.00 10,000.00
12,000.00 2,400.00
2,700,000.00 40,500.00
140,000.00 49,000.00
22,000.00 44,000.00
Jumlah (2) 145,900.00

Jumlah (3)

245,395.00
24,539.50
269,934.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 44,200.00
107,000.00 27,820.00
115,000.00 2,990.00
130,000.00 3,380.00
Jumlah (1) 78,390.00

Analisa Page 117


2,700,000.00 121,500.00
25,000.00 7,500.00
12,000.00 1,200.00
Jumlah (2) 130,200.00

Jumlah (3)

208,590.00
20,859.00
229,449.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 56,100.00
107,000.00 35,310.00
115,000.00 3,795.00
130,000.00 4,290.00
Jumlah (1) 99,495.00

2,700,000.00 54,000.00
25,000.00 10,000.00
12,000.00 2,400.00
2,700,000.00 21,600.00
140,000.00 24,500.00
22,000.00 66,000.00
Jumlah (2) 178,500.00

Jumlah (3)

277,995.00
27,799.50
305,794.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 56,100.00
107,000.00 35,310.00
115,000.00 3,795.00
130,000.00 4,290.00
Jumlah (1) 99,495.00

2,700,000.00 40,500.00

Analisa Page 118


25,000.00 10,000.00
12,000.00 1,800.00
2,700,000.00 21,600.00
140,000.00 24,500.00
22,000.00 22,000.00
Jumlah (2) 120,400.00

Jumlah (3)

219,895.00
21,989.50
241,884.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 450,500.00
100,000.00 27,500.00
100,000.00 130,000.00
100,000.00 105,000.00
125,000.00 32,750.00
150,000.00 39,300.00
Jumlah (1) 785,050.00

2,700,000.00 540,000.00
25,000.00 37,500.00
12,000.00 4,800.00
11,000.00 1,732,500.00
22,000.00 49,500.00
1,312.50 441,000.00
118,000.00 63,720.00
250,000.00 202,500.00
Jumlah (2) 3,071,520.00

Jumlah (3) -

3,856,570.00
385,657.00
4,242,227.00

Analisa Page 119


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 480,250.00
100,000.00 27,500.00
100,000.00 156,000.00
100,000.00 140,000.00
125,000.00 40,375.00
150,000.00 42,450.00
Jumlah (1) 886,575.00

2,700,000.00 729,000.00
25,000.00 50,000.00
12,000.00 7,200.00
11,000.00 2,310,000.00
22,000.00 66,000.00
1,312.50 441,000.00
118,000.00 63,720.00
250,000.00 202,500.00
Jumlah (2) 3,869,420.00

Jumlah (3) -

4,755,995.00
475,599.50
5,231,594.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 450,500.00
100,000.00 27,500.00
100,000.00 130,000.00
100,000.00 105,000.00
125,000.00 33,125.00
150,000.00 39,750.00
Jumlah (1) 785,875.00

2,700,000.00 864,000.00
25,000.00 80,000.00
12,000.00 19,200.00
11,000.00 1,732,500.00
22,000.00 49,500.00
1,312.50 441,000.00
118,000.00 63,720.00
250,000.00 202,500.00
3,550,000.00 426,000.00

Analisa Page 120


130,000.00 364,000.00
15,000.00 480,000.00
Jumlah (2) 4,722,420.00

Jumlah (3) -

5,508,295.00
550,829.50
6,059,124.50

Analisa Page 121


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 15,300.00
100,000.00 2,000.00
100,000.00 20,000.00
100,000.00 2,000.00
125,000.00 750.00
150,000.00 1,350.00
Jumlah (1) 41,400.00

2,700,000.00 5,400.00
25,000.00 250.00
12,000.00 -
11,000.00 33,000.00
22,000.00 9,900.00
1,312.50 5,250.00
118,000.00 708.00
250,000.00 2,250.00
Jumlah (2) 56,758.00

Jumlah (3) -

98,158.00
9,815.80
107,973.80

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 157,250.00
100,000.00 27,500.00
100,000.00 165,000.00
100,000.00 140,000.00
125,000.00 41,625.00
150,000.00 47,700.00
Jumlah (1) 579,075.00

2,700,000.00 864,000.00
25,000.00 80,000.00
12,000.00 19,200.00
11,000.00 2,310,000.00
22,000.00 66,000.00
1,312.50 441,000.00
118,000.00 63,720.00
250,000.00 202,500.00

Analisa Page 122


3,550,000.00 497,000.00
130,000.00 364,000.00
15,000.00 240,000.00
Jumlah (2) 5,147,420.00

Jumlah (3) -

5,726,495.00
572,649.50
6,299,144.50

Analisa Page 123


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 25,245.00
100,000.00 3,300.00
100,000.00 3,300.00
100,000.00 3,300.00
125,000.00 1,250.00
150,000.00 2,250.00
Jumlah (1) 38,645.00

2,700,000.00 8,100.00
25,000.00 500.00
12,000.00 -
11,000.00 39,600.00
22,000.00 1,100.00
1,312.50 7,218.75
118,000.00 1,062.00
250,000.00 3,750.00
Jumlah (2) 61,330.75

Jumlah (3) -

99,975.75
9,997.58
109,973.33

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 480,250.00
100,000.00 27,500.00
100,000.00 165,000.00
100,000.00 140,000.00
125,000.00 40,375.00
150,000.00 42,450.00
Jumlah (1) 895,575.00

2,700,000.00 864,000.00
25,000.00 80,000.00
12,000.00 19,200.00
11,000.00 2,310,000.00
22,000.00 66,000.00
1,312.50 441,000.00
118,000.00 63,720.00
250,000.00 202,500.00
3,550,000.00 497,000.00

Analisa Page 124


130,000.00 45,138.89
15,000.00 240,000.00
Jumlah (2) 4,828,558.89

Jumlah (3) -

5,724,133.89
572,413.39
6,296,547.28

Analisa Page 125


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 539,750.00
100,000.00 27,500.00
100,000.00 165,000.00
100,000.00 140,000.00
125,000.00 41,625.00
150,000.00 47,700.00
Jumlah (1) 961,575.00

2,700,000.00 864,000.00
25,000.00 80,000.00
12,000.00 19,200.00
11,000.00 2,310,000.00
22,000.00 66,000.00
1,312.50 441,000.00
118,000.00 63,720.00
250,000.00 202,500.00
3,550,000.00 497,000.00
130,000.00 45,138.89
15,000.00 240,000.00
Jumlah (2) 4,828,558.89

Jumlah (3) -

5,790,133.89
579,013.39
6,369,147.28

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 140,250.00
107,000.00 26,750.00
115,000.00 2,875.00
130,000.00 10,400.00
Jumlah (1) 180,275.00

1,312.50 423,937.50
195,000.00 101,400.00
320,000.00 249,600.00
Jumlah (2) 774,937.50

Jumlah (3) -

955,212.50

Analisa Page 126


95,521.25
1,050,733.75

Analisa Page 127


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 140,250.00
107,000.00 29,425.00
115,000.00 3,220.00
130,000.00 10,400.00
Jumlah (1) 183,295.00

1,312.50 286,125.00
195,000.00 101,400.00
320,000.00 278,400.00
Jumlah (2) 665,925.00

Jumlah (3) -

849,220.00
84,922.00
934,142.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 102,000.00
107,000.00 21,400.00
115,000.00 2,300.00
130,000.00 7,800.00
Jumlah (1) 133,500.00

1,312.50 301,875.00
139.29 19,345.39
246.15 252,800.00
75.00 15,000.00
Jumlah (2) 589,020.39

Jumlah (3) -

722,520.39
72,252.04
794,772.43

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 140,250.00

Analisa Page 128


107,000.00 29,425.00
115,000.00 3,220.00
130,000.00 10,790.00
Jumlah (1) 183,685.00

1,312.50 427,875.00
139.29 105,857.14
246.15 253,292.31
75.00 16,125.00
Jumlah (2) 803,149.45

Jumlah (3) -

986,834.45
98,683.45
1,085,517.90

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 140,250.00
107,000.00 29,425.00
115,000.00 3,220.00
130,000.00 10,790.00
Jumlah (1) 183,685.00

1,312.50 486,937.50
139.29 97,221.43
246.15 257,723.08
75.00 16,125.00
Jumlah (2) 858,007.01

Jumlah (3) -

1,041,692.01
104,169.20
1,145,861.21

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 140,250.00
107,000.00 29,425.00
115,000.00 3,220.00
130,000.00 10,790.00
Jumlah (1) 183,685.00

Analisa Page 129


1,312.50 504,000.00
195,000.00 96,385.71
320,000.00 246,281.48
75.00 16,125.00
Jumlah (2) 862,792.20

Jumlah (3) -

1,046,477.20
104,647.72
1,151,124.92

Analisa Page 130


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 140,250.00
107,000.00 29,425.00
115,000.00 3,220.00
130,000.00 10,790.00
Jumlah (1) 183,685.00

1,312.50 542,062.50
139.29 94,853.57
246.15 251,323.08
75.00 16,125.00
Jumlah (2) 904,364.15

Jumlah (3) -

1,088,049.15
108,804.91
1,196,854.06

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 25,500.00
100,000.00 10,000.00
125,000.00 1,250.00
150,000.00 2,250.00
Jumlah (1) 39,000.00

550.00 38,500.00
1,312.50 18,860.63
190,000.00 7,600.00
Jumlah (2) 64,960.63

Jumlah (3) -

103,960.63
10,396.06
114,356.69

Harga Satuan Jumlah Harga

(Rp) (Rp)

Analisa Page 131


85,000.00 25,500.00
100,000.00 10,000.00
125,000.00 1,250.00
150,000.00 2,250.00
Jumlah (1) 39,000.00

550.00 38,500.00
1,312.50 15,093.75
190,000.00 8,170.00
Jumlah (2) 61,763.75

Analisa Page 132


Jumlah (3) -

100,763.75
10,076.38
110,840.13

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 25,500.00
100,000.00 10,000.00
125,000.00 1,250.00
150,000.00 2,250.00
Jumlah (1) 39,000.00

550.00 38,500.00
1,312.50 12,705.00
190,000.00 8,550.00
Jumlah (2) 59,755.00

Jumlah (3) -

98,755.00
9,875.50
108,630.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 27,200.00
100,000.00 10,000.00
125,000.00 1,250.00
150,000.00 2,250.00
Jumlah (1) 40,700.00

9,375.00 82,031.25
2,250.00 5,670.00
11,000.00 1,650.00
Jumlah (2) 89,351.25

Jumlah (3) -

130,051.25
13,005.13
143,056.38

Analisa Page 133


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 17,000.00
100,000.00 5,000.00
125,000.00 625.00
150,000.00 750.00
Jumlah (1) 23,375.00

110,000.00 80,208.33
17,500.00 70,000.00
21,000.00 42,000.00
55,000.00 12,100.00
45,000.00 6,428.57
350.00 5,600.00
57,000.00 57,000.00

Jumlah (2) 273,336.90

Jumlah (3) -

296,711.90
29,671.19
326,383.10

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 51,000.00
100,000.00 45,000.00
125,000.00 5,625.00
150,000.00 450.00
Jumlah (1) 102,075.00

550.00 8,800.00
1,312.50 8,203.13
190,000.00 4,180.00
73,700.00 6,633.00
Jumlah (2) 27,816.13

Jumlah (3) -

129,891.13
12,989.11
142,880.24

Analisa Page 134


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 25,500.00
100,000.00 15,000.00
125,000.00 1,875.00
150,000.00 2,250.00
TENAGA KERJA 44,625.00

1,312.50 10,208.63
135,000.00 3,105.00
HARGA BAHAN 13,313.63

-
HARGA ALAT -

57,938.63
5,793.86
63,732.49

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 25,500.00
100,000.00 15,000.00
125,000.00 1,875.00
150,000.00 2,250.00
TENAGA KERJA 44,625.00

1,312.50 7,722.75
135,000.00 2,835.00
HARGA BAHAN 10,557.75

HARGA ALAT -
-
55,182.75
5,518.28
60,701.03

Analisa Page 135


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 25,500.00
100,000.00 15,000.00
125,000.00 1,875.00
150,000.00 2,250.00
TENAGA KERJA 44,625.00

1,312.50 6,804.00
135,000.00 3,510.00
HARGA BAHAN 10,314.00

HARGA ALAT -
-
54,939.00
5,493.90
60,432.90

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 17,000.00
100,000.00 10,000.00
125,000.00 1,250.00
150,000.00 1,500.00
TENAGA KERJA 29,750.00

1,312.50 4,265.63
HARGA BAHAN 4,265.63

-
HARGA ALAT -

34,015.63
3,401.56
37,417.19

Harga Satuan Jumlah Harga

(Rp) (Rp)

Analisa Page 136


85,000.00 17,000.00
100,000.00 10,000.00
125,000.00 1,250.00
150,000.00 1,500.00
TENAGA KERJA 29,750.00

2,250.00 7,312.50
HARGA BAHAN 7,312.50

-
HARGA ALAT -

37,062.50
3,706.25
40,768.75

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 7,140.00
100,000.00 12,600.00
125,000.00 1,625.00
150,000.00 1,200.00
TENAGA KERJA 22,565.00

5,500.00 990.00
HARGA BAHAN 990.00

-
HARGA ALAT -

23,555.00
2,355.50
25,910.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 22,950.00
107,000.00 13,910.00
115,000.00 1,495.00
130,000.00 1,820.00
TENAGA KERJA 40,175.00

2,480.00 65,100.00

Analisa Page 137


1,312.50 13,650.00
8,500.00 12,750.00
190,000.00 8,550.00
HARGA BAHAN 100,050.00

-
HARGA ALAT -

140,225.00
14,022.50
154,247.50

Analisa Page 138


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 59,500.00
100,000.00 35,000.00
125,000.00 4,375.00
150,000.00 5,250.00
TENAGA KERJA 104,125.00

3,350.00 56,514.50
1,312.50 13,125.00
10,000.00 15,000.00
135,000.00 6,075.00
HARGA BAHAN 90,714.50

-
HARGA ALAT -

194,839.50
19,483.95
214,323.45

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 59,500.00
100,000.00 35,000.00
125,000.00 4,375.00
150,000.00 5,250.00
TENAGA KERJA 104,125.00

5,220.52 61,967.60
1,312.50 13,125.00
10,000.00 15,000.00
135,000.00 6,075.00
HARGA BAHAN 96,167.60

-
HARGA ALAT -

200,292.60
20,029.26
220,321.86

Analisa Page 139


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 59,500.00
100,000.00 35,000.00
125,000.00 4,375.00
150,000.00 5,250.00
TENAGA KERJA 104,125.00

10,240.00 67,891.20
1,312.50 12,862.50
10,000.00 13,000.00
135,000.00 6,075.00
HARGA BAHAN 99,828.70

-
HARGA ALAT -

203,953.70
20,395.37
224,349.07

Analisa Page 140


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 59,500.00
100,000.00 35,000.00
125,000.00 4,375.00
150,000.00 5,250.00
TENAGA KERJA 104,125.00

51,250.00 142,475.00
1,312.50 13,650.00
10,000.00 16,200.00
135,000.00 6,075.00
HARGA BAHAN 178,400.00

-
HARGA ALAT -

282,525.00
28,252.50
310,777.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 7,650.00
100,000.00 9,000.00
125,000.00 1,125.00
150,000.00 750.00
TENAGA KERJA 18,525.00

10,240.00 17,408.00
1,312.50 1,496.25
10,000.00 1,000.00
135,000.00 405.00
HARGA BAHAN 20,309.25

-
HARGA ALAT -

38,834.25
3,883.43
42,717.68

Harga Satuan Jumlah Harga

Analisa Page 141


(Rp) (Rp)

85,000.00 7,650.00
100,000.00 9,000.00
125,000.00 1,125.00
150,000.00 750.00
TENAGA KERJA 18,525.00

18,636.36 31,681.82
1,312.50 1,496.25
10,000.00 1,000.00
135,000.00 405.00
HARGA BAHAN 34,583.07

-
HARGA ALAT -

53,108.07
5,310.81
58,418.88

Analisa Page 142


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 59,500.00
100,000.00 32,000.00
125,000.00 3,375.00
150,000.00 2,250.00
TENAGA KERJA 97,125.00

5,220.52 61,967.60
1,312.50 13,125.00
10,000.00 15,000.00
135,000.00 6,075.00
HARGA BAHAN 96,167.60

-
HARGA ALAT -

193,292.60
19,329.26
212,621.86

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 59,500.00
100,000.00 35,000.00
125,000.00 4,375.00
150,000.00 5,250.00
TENAGA KERJA 104,125.00

4,062.50 71,053.13
1,312.50 12,468.75
10,000.00 12,000.00
135,000.00 6,075.00
HARGA BAHAN 101,596.88

-
HARGA ALAT -

205,721.88
20,572.19
226,294.06

Analisa Page 143


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 59,500.00
100,000.00 35,000.00
125,000.00 4,375.00
150,000.00 5,250.00
TENAGA KERJA 104,125.00

6,500.00 65,000.00
1,312.50 12,468.75
10,000.00 12,000.00
135,000.00 6,075.00
HARGA BAHAN 95,543.75

-
HARGA ALAT -

199,668.75
19,966.88
219,635.63

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 7,650.00
100,000.00 9,000.00
125,000.00 1,125.00
150,000.00 750.00
TENAGA KERJA 18,525.00

3,500.00 18,550.00
1,312.50 748.13
10,000.00 130.00
135,000.00 202.50
HARGA BAHAN 19,630.63

-
HARGA ALAT -

38,155.63
3,815.56
41,971.19

Harga Satuan Jumlah Harga

(Rp) (Rp)

Analisa Page 144


85,000.00 59,500.00
100,000.00 35,000.00
125,000.00 4,375.00
150,000.00 5,250.00
TENAGA KERJA 104,125.00

210,000.00 231,000.00
1,312.50 15,421.88
135,000.00 4,725.00
HARGA BAHAN 251,146.88

-
HARGA ALAT -

355,271.88
35,527.19
390,799.06

Harga Satuan Jumlah Harga

(Rp) (Rp)

225,000 225,000.00
15,000 15,000.00
55,000 55,000.00

295,000.00
29,500.00
324,500.00
354,000.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

Analisa Page 145


85,000.00 4,250.00
100,000.00 5,000.00
125,000.00 6,250.00
150,000.00 7,500.00
TENAGA KERJA 23,000.00

29,500.00 30,975.00
1,000.00 10.00
HARGA BAHAN 30,985.00

HARGA ALAT
-
-
53,985.00
5,398.50
59,383.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 850.00
107,000.00 21,400.00
115,000.00 5,750.00
130,000.00 650.00
TENAGA KERJA 28,650.00

153,000.00 153,000.00
115,000.00 115,000.00
HARGA BAHAN 268,000.00

HARGA ALAT
-
-
296,650.00
29,665.00
326,315.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 425.00
107,000.00 53,500.00

Analisa Page 146


115,000.00 5,750.00
130,000.00 650.00
TENAGA KERJA 60,325.00

185,000.00 185,000.00
HARGA BAHAN 185,000.00

HARGA ALAT
-
-
245,325.00
24,532.50
269,857.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 1,275.00
107,000.00 16,050.00
115,000.00 1,725.00
130,000.00 104.00
TENAGA KERJA 19,154.00

27,000.00 27,000.00
HARGA BAHAN 27,000.00

HARGA ALAT
-
-
46,154.00
4,615.40
50,769.40

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 850.00
107,000.00 10,700.00
115,000.00 1,150.00
130,000.00 65.00
TENAGA KERJA 12,765.00

10,500.00 10,500.00
HARGA BAHAN 10,500.00

HARGA ALAT
-

Analisa Page 147


-
23,265.00
2,326.50
25,591.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 850.00
107,000.00 10,700.00
115,000.00 1,150.00
130,000.00 65.00
TENAGA KERJA 12,765.00

14,000.00 14,000.00
HARGA BAHAN 14,000.00

HARGA ALAT
-
-
26,765.00
2,676.50
29,441.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 850.00
107,000.00 10,700.00
115,000.00 1,150.00
130,000.00 65.00
TENAGA KERJA 12,765.00

85,000.00 85,000.00
HARGA BAHAN 85,000.00

HARGA ALAT
-
-
97,765.00
9,776.50
107,541.50

Analisa Page 148


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 850.00
107,000.00 10,700.00
115,000.00 1,150.00
130,000.00 65.00
TENAGA KERJA 12,765.00

20,500.00 20,500.00
8,700.00 8,700.00
HARGA BAHAN

HARGA ALAT
-
33,265.00
21,465.00
3,326.50
2,146.50
36,591.50
23,611.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

21,000.00 73,500.00
8,500.00 21,250.00
17,500.00 35,000.00
2,500.00 20,000.00
250.00 6,250.00
8,404.00 12,080.00
Jumlah (1) 168,080.00

85,000.00 25,500.00
107,000.00 32,100.00
115,000.00 3,450.00
130,000.00 1,950.00

Jumlah (2) 63,000.00


231,080.00
23,108.00
254,188.00

Harga Satuan Jumlah Harga

Analisa Page 149


(Rp) (Rp)

85,000.00 1,275.00
107,000.00 8,025.00
115,000.00 920.00
130,000.00 780.00
TENAGA KERJA 11,000.00

63,000.00 66,150.00
500.00 3,000.00
400.00 800.00
25,500.00 510.00
HARGA BAHAN 70,460.00

HARGA ALAT
-
-
81,460.00
8,146.00
89,606.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 17,000.00
107,000.00 10,700.00
115,000.00 1,150.00
130,000.00 130.00
TENAGA KERJA 28,980.00

54,000.00 89,640.00
500.00 10.00

HARGA BAHAN 89,650.00

HARGA ALAT
-
-
118,630.00
11,863.00
130,493.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 12,750.00
107,000.00 5,350.00

Analisa Page 150


115,000.00 575.00
130,000.00 1,040.00
TENAGA KERJA 19,715.00

5,500.00 6,050.00
18,000.00 360.00
HARGA BAHAN 6,050.00

HARGA ALAT
-
-
25,765.00
2,576.50
28,341.50

Analisa Page 151


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 8,500.00
107,000.00 21,400.00
115,000.00 2,300.00
130,000.00 650.00
LAH TENAGA KERJA 32,850.00

35,000.00 38,500.00
18,000.00 900.00
LAH HARGA BAHAN 38,500.00

LAH HARGA ALAT -

71,350.00
7,135.00
78,485.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 17,000.00
107,000.00 21,400.00
115,000.00 2,300.00
130,000.00 130.00
TENAGA KERJA 40,830.00

95,000.00 99,750.00
23,000.00 345.00
5,000,000.00 95,000.00
-
HARGA BAHAN 195,095.00

-
HARGA ALAT -
235,925.00
23,592.50
259,517.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 8,500.00

Analisa Page 152


107,000.00 10,700.00
115,000.00 11,500.00
130,000.00 6,500.00
TENAGA KERJA 37,200.00

45,700.00 50,270.00
18,000.00 720.00
-
HARGA BAHAN 50,990.00

-
HARGA ALAT -
88,190.00
8,819.00
97,009.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 1,275.00
107,000.00 16,050.00
115,000.00 1,725.00
130,000.00 1,040.00
TENAGA KERJA 20,090.00

100,000.00 110,000.00

HARGA BAHAN 110,000.00

-
HARGA ALAT -
130,090.00
13,009.00
143,099.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 68,000.00
107,000.00 85,600.00
115,000.00 20,700.00
130,000.00 4,550.00
178,850.00

Analisa Page 153


425,000.00 467,500.00

HARGA BAHAN 467,500.00

-
HARGA ALAT -
646,350.00
64,635.00
710,985.00

Analisa Page 154


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 153,000.00
107,000.00 192,600.00
115,000.00 20,700.00
130,000.00 4,550.00
370,850.00

55,833.33 285,866.67
47,800.00 88,430.00
HARGA BAHAN 374,296.67

-
HARGA ALAT -
745,146.67
74,514.67
819,661.33

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,655.00
107,000.00 4,601.00
115,000.00 345.00
130,000.00 130.00
8,731.00

85,000.00 93,500.00
150.00 300.00
7,500.00 450.00

HARGA BAHAN 94,250.00

-
HARGA ALAT -
102,981.00
10,298.10
113,279.10

Harga Satuan Jumlah Harga

(Rp) (Rp)

Analisa Page 155


85,000.00 7,225.00
107,000.00 9,095.00
115,000.00 1,035.00
130,000.00 650.00
18,005.00

85,000.00 93,500.00
55,833.33 61,416.67
7,500.00 2,025.00

HARGA BAHAN 156,941.67

-
HARGA ALAT -
174,946.67
17,494.67
192,441.33

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 7,225.00
107,000.00 9,095.00
115,000.00 1,035.00
130,000.00 650.00
18,005.00

85,000.00 374,000.00
55,833.33 251,250.00
7,500.00 2,025.00

HARGA BAHAN 627,275.00

-
HARGA ALAT -
645,280.00
64,528.00
709,808.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 68,000.00
107,000.00 214,000.00

Analisa Page 156


115,000.00 23,000.00
130,000.00 5,200.00
310,200.00

120,000.00 40,320.00
265,000.00 193,450.00
25,000.00 25,000.00
3,000.00 3,000.00
HARGA BAHAN 261,770.00

-
HARGA ALAT -
571,970.00
57,197.00
629,167.00

Analisa Page 157


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 1,275.00
107,000.00 16,050.00
115,000.00 1,725.00
130,000.00 97.50
19,147.50

615,000.00 676,500.00
7,500.00 375.00
3,500.00 3,850.00

HARGA BAHAN 680,725.00

-
HARGA ALAT -
699,872.50
69,987.25
769,859.75

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 1,275.00
107,000.00 16,050.00
115,000.00 1,725.00
130,000.00 97.50
19,147.50

450,000.00 495,000.00
7,500.00 375.00
3,500.00 3,850.00

HARGA BAHAN 499,225.00

-
HARGA ALAT -
518,372.50
51,837.25
570,209.75

Harga Satuan Jumlah Harga

(Rp) (Rp)

Analisa Page 158


85,000.00 1,275.00
107,000.00 16,050.00
115,000.00 1,725.00
130,000.00 97.50
19,147.50

220,000.00 242,000.00
7,500.00 375.00
3,500.00 3,850.00

HARGA BAHAN 246,225.00

-
HARGA ALAT -
265,372.50
26,537.25
291,909.75

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 1,275.00
107,000.00 16,050.00
115,000.00 1,725.00
130,000.00 97.50
19,147.50

425,000.00 467,500.00
7,500.00 375.00
3,500.00 3,850.00

HARGA BAHAN 471,725.00

-
HARGA ALAT -
490,872.50
49,087.25
539,959.75

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 1,275.00
107,000.00 16,050.00
115,000.00 1,725.00
130,000.00 97.50
19,147.50

Analisa Page 159


140,000.00 154,000.00
7,500.00 375.00
3,500.00 3,850.00

HARGA BAHAN 158,225.00

-
HARGA ALAT -
177,372.50
17,737.25
195,109.75

Analisa Page 160


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 2,975.00
107,000.00 37,450.00
115,000.00 4,025.00
130,000.00 2,340.00
TENAGA KERJA 46,790.00

6,000.00 12,000.00
4,666.67 9,333.33
5,000.00 5,000.00
HARGA BAHAN 26,333.33

-
HARGA ALAT -

73,123.33
7,312.33
80,435.67

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 8,500.00
107,000.00 3,210.00
115,000.00 575.00
130,000.00 65.00
TENAGA KERJA 12,350.00

63,500.00 23,114.00
72,000.00 26,208.00
18,000.00 1,980.00
HARGA BAHAN
Gypsuboard 25,094.00
Kalsiboard 28,188.00

HARGA ALAT
Gypsuboard -
Kalsiboard -
Gypsuboard 37,444.00
Kalsiboard 40,538.00
4,053.80
Kalsiboard 4,053.80
Gypsuboard 41,497.80

Analisa Page 161


Kalsiboard 44,591.80

121,933.47
125,027.47

Analisa Page 162


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 8,500.00
107,000.00 5,350.00
115,000.00 575.00
130,000.00 650.00
TENAGA KERJA 15,075.00

103,000.00 37,492.00
18,000.00 1,800.00
HARGA BAHAN 39,292.00

-
HARGA ALAT -

54,367.00
5,436.70
59,803.70

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 8,500.00
107,000.00 5,350.00
115,000.00 575.00
130,000.00 650.00
TENAGA KERJA 15,075.00

8,500.00 8,925.00
18,000.00 180.00
HARGA BAHAN 9,105.00

HARGA ALAT
-
-
24,180.00
2,418.00
26,598.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 8,500.00
107,000.00 5,350.00

Analisa Page 163


115,000.00 575.00
130,000.00 650.00
TENAGA KERJA 15,075.00

180.00 3,240.00
165,000.00 165,000.00
29,090.91 32,000.00
HARGA BAHAN 200,240.00

-
HARGA ALAT -

215,315.00
21,531.50
236,846.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 8,500.00
107,000.00 5,350.00
115,000.00 575.00
130,000.00 650.00
TENAGA KERJA 15,075.00

36,000.00 36,000.00
180.00 3,240.00
HARGA BAHAN 39,240.00

HARGA ALAT
-
-
54,315.00
5,431.50
59,746.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 5,950.00
107,000.00 963.00
115,000.00 690.00
130,000.00 390.00
TENAGA KERJA 7,993.00

Analisa Page 164


45,000.00 9,000.00
45,000.00 7,650.00
65,000.00 16,900.00
10,000.00 100.00
20,000.00 600.00
8,000.00 1,600.00
HARGA BAHAN 35,850.00

-
HARGA ALAT -
43,843.00
4,384.30
48,227.30

Analisa Page 165


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 2,380.00
107,000.00 4,494.00
115,000.00 483.00
130,000.00 390.00
TENAGA KERJA 7,747.00

34,000.00 4,080.00
90,000.00 16,200.00
HARGA BAHAN 20,280.00

-
HARGA ALAT -

28,027.00
2,802.70
30,829.70

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 1,700.00
107,000.00 6,741.00
115,000.00 724.50
130,000.00 390.00
TENAGA KERJA 9,555.50

15,000.00 1,500.00
35,000.00 3,500.00
55,000.00 14,300.00
61,666.67 16,033.33
ARGA BAHAN (1) 19,300.00
ARGA BAHAN (2) 21,033.33

-
HARGA ALAT -

28,855.50
30,588.83
2,885.55
3,058.88
31,741.05
33,647.72

Analisa Page 166


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 1,700.00
107,000.00 21,400.00
115,000.00 2,300.00
130,000.00 1,300.00
TENAGA KERJA 26,700.00

25,000.00 3,000.00
57,000.00 10,260.00
5,000.00 50.00
15,000.00 450.00
HARGA BAHAN 13,760.00

-
HARGA ALAT -
40,460.00
4,046.00
44,506.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 2,380.00
107,000.00 4,494.00
115,000.00 483.00
130,000.00 325.00
TENAGA KERJA 7,682.00

54,000.00 -
225,000.00 90,000.00
ARGA BAHAN (1) 90,000.00

-
HARGA ALAT -

97,682.00
9,768.20
107,450.20

Harga Satuan Jumlah Harga

Analisa Page 167


(Rp) (Rp)

6,500.00 39,000.00
2,625.00 31,500.00
5,000.00 5,000.00
500.00 5,000.00
10,000.00 2,000.00
6,500.00 13,000.00
7,000.00 7,000.00
2,000.00 6,000.00
1,500.00 13,500.00
1,500.00 4,500.00
7,500.00 7,500.00
2,000.00 4,000.00
150.00 1,500.00
Jumlah (1) 139,500.00

125,000.00 37,500.00
75,000.00 11,250.00
150,000.00 2,250.00
Jumlah (2) 51,000.00
JUMLAH (1) + (2) 190,500.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

107,000.00 32,100.00
TENAGA KERJA 32,100.00

5,500.00 27,500.00
27,500.00 27,500.00
32,000.00 32,000.00
42,000.00 42,000.00
47,000.00 47,000.00
ARGA BAHAN (1) 87,000.00
ARGA BAHAN (2) 97,000.00
ARGA BAHAN (3) 102,000.00

-
HARGA ALAT -

119,100.00
129,100.00
134,100.00
11,910.00
12,910.00
13,410.00
131,010.00

Analisa Page 168


142,010.00
147,510.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

107,000.00 32,100.00
TENAGA KERJA 32,100.00

5,500.00 27,500.00
145,000.00 145,000.00
ARGA BAHAN (1) 172,500.00

-
HARGA ALAT -

204,600.00
20,460.00
225,060.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

107,000.00 32,100.00
TENAGA KERJA 32,100.00

5,500.00 27,500.00
345,000.00 345,000.00
ARGA BAHAN (1) 372,500.00

-
HARGA ALAT -

404,600.00
40,460.00
445,060.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

107,000.00 32,100.00

Analisa Page 169


TENAGA KERJA 32,100.00

5,500.00 27,500.00
225,000.00 225,000.00
ARGA BAHAN (1) 252,500.00

-
HARGA ALAT -

284,600.00
28,460.00
313,060.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

107,000.00 642.00
TENAGA KERJA 642.00

9,000.00 4,500.00
5,500.00 27,500.00
5,000.00 5,000.00
28,500.00 28,500.00
46,500.00 46,500.00
ARGA BAHAN (1) 112,000.00

-
HARGA ALAT -

112,642.00
11,264.20
123,906.20

Harga Satuan Jumlah Harga

(Rp) (Rp)

107,000.00 642.00
TENAGA KERJA 642.00

9,000.00 4,500.00
5,500.00 27,500.00
5,000.00 5,000.00
35,000.00 35,000.00
46,500.00 46,500.00

Analisa Page 170


ARGA BAHAN (1) 118,500.00

-
HARGA ALAT -

119,142.00
11,914.20
131,056.20

Harga Satuan Jumlah Harga

(Rp) (Rp)

107,000.00 642.00
TENAGA KERJA 642.00

9,000.00 4,500.00
5,500.00 27,500.00
5,000.00 5,000.00
17,500.00 17,500.00
ARGA BAHAN (1) 54,500.00

-
HARGA ALAT -

55,142.00
5,514.20
60,656.20

Harga Satuan Jumlah Harga

(Rp) (Rp)

107,000.00 642.00
TENAGA KERJA 642.00

9,000.00 4,500.00
5,500.00 27,500.00
5,000.00 5,000.00
24,500.00 24,500.00
ARGA BAHAN (1) 61,500.00

-
HARGA ALAT -

62,142.00
6,214.20

Analisa Page 171


68,356.20

Analisa Page 172


Harga Satuan Jumlah Harga

(Rp) (Rp)

107,000.00 642.00
TENAGA KERJA 642.00

9,000.00 4,500.00
5,500.00 55,000.00
56,500.00 1,130,000.00
1,500,000.00 1,500,000.00
5,200.00 5,200.00
1,000,000.00 1,000,000.00
ARGA BAHAN (1) 3,694,700.00

-
HARGA ALAT -

3,695,342.00
369,534.20
4,064,876.20

Harga Satuan Jumlah Harga

(Rp) (Rp)

107,000.00 642.00
TENAGA KERJA 642.00

7,500.00 3,750.00
12,000.00 120,000.00
150.00 300.00
150,000.00 150,000.00
ARGA BAHAN (1) 274,050.00

-
HARGA ALAT -

274,692.00
27,469.20
302,161.20

Harga Satuan Jumlah Harga

(Rp) (Rp)

Analisa Page 173


107,000.00 17,762.00
85,000.00 14,110.00
115,000.00 3,795.00
130,000.00 2,210.00
TENAGA KERJA 37,877.00

5,500.00 5,500.00
15,000.00 75,000.00
ARGA BAHAN (1) 80,500.00

-
HARGA ALAT -

118,377.00
11,837.70
130,214.70

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 102,000.00
107,000.00 155,150.00
115,000.00 17,250.00
130,000.00 7,800.00
TENAGA KERJA 282,200.00

950,000.00 1,140,000.00
1,312.50 7,875.00
135,000.00 1,350.00
1,149,225.00 137,907.00
HARGA BAHAN 1,287,132.00

-
HARGA ALAT -
1,569,332.00
156,933.20
1,726,265.20

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 85,000.00
107,000.00 107,000.00
115,000.00 11,500.00
130,000.00 6,500.00

Analisa Page 174


TENAGA KERJA 210,000.00

950,000.00 950,000.00
1,312.50 7,875.00
135,000.00 1,350.00
959,225.00 287,767.50
HARGA BAHAN 1,246,992.50

-
HARGA ALAT -
1,456,992.50
145,699.25
1,602,691.75

Analisa Page 175


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 102,000.00
107,000.00 155,150.00
115,000.00 17,250.00
130,000.00 7,800.00
TENAGA KERJA 282,200.00

2,200,000.00 2,200,000.00
132,000.00 132,000.00
HARGA BAHAN 2,332,000.00

-
HARGA ALAT -
2,614,200.00
261,420.00
2,875,620.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 850.00
107,000.00 10,700.00
115,000.00 1,150.00
130,000.00 650.00
TENAGA KERJA 13,350.00

67,500.00 67,500.00
HARGA BAHAN 67,500.00

-
HARGA ALAT -
80,850.00
8,085.00
88,935.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 850.00
107,000.00 10,700.00
115,000.00 1,150.00
130,000.00 650.00
TENAGA KERJA 13,350.00

Analisa Page 176


45,000.00 45,000.00
3,500.00 87.50
HARGA BAHAN 45,087.50

-
HARGA ALAT -
58,437.50
5,843.75
64,281.25

Analisa Page 177


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,060.00
100,000.00 6,000.00
115,000.00 690.00
130,000.00 260.00
TENAGA KERJA 10,010.00

4,625.00 5,550.00
1,942.50
HARGA BAHAN 5,550.00

-
HARGA ALAT -
15,560.00
1,556.00
17,116.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,060.00
100,000.00 6,000.00
115,000.00 690.00
130,000.00 260.00
TENAGA KERJA 10,010.00

7,100.00 8,520.00
2,982.00
HARGA BAHAN 8,520.00

-
HARGA ALAT -
18,530.00
1,853.00
20,383.00

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 3,060.00
100,000.00 6,000.00
115,000.00 690.00
130,000.00 260.00

Analisa Page 178


TENAGA KERJA 10,010.00

5,750.00 6,900.00
2,415.00
HARGA BAHAN 6,900.00

-
HARGA ALAT -
16,910.00
1,691.00
18,601.00

Analisa Page 179


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 6,885.00
100,000.00 13,500.00
115,000.00 1,610.00
130,000.00 520.00
TENAGA KERJA 22,515.00

27,500.00 33,000.00
11,550.00
HARGA BAHAN 33,000.00

-
HARGA ALAT -
55,515.00
5,551.50
61,066.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 6,885.00
100,000.00 13,500.00
115,000.00 1,610.00
130,000.00 520.00
TENAGA KERJA 22,515.00

30,000.00 36,000.00
12,600.00
HARGA BAHAN 36,000.00

-
HARGA ALAT -
58,515.00
5,851.50
64,366.50

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 6,885.00
100,000.00 13,500.00
115,000.00 1,610.00
130,000.00 520.00

Analisa Page 180


TENAGA KERJA 22,515.00

30,833.33 37,000.00
12,950.00
HARGA BAHAN 37,000.00

-
HARGA ALAT -
59,515.00
5,951.50
65,466.50

Analisa Page 181


Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 14,110.00
100,000.00 16,600.00
115,000.00 3,795.00
130,000.00 2,210.00
TENAGA KERJA 36,715.00

20,000.00 48,000.00
34,500.00 37,950.00
325,000.00 325,000.00
250,000.00 250,000.00
450,000.00 450,000.00
150,000.00 150,000.00
250,000.00 250,000.00
1,250,000.00 1,250,000.00 2,760,950.00
2,760,950.00 138,047.50
HARGA BAHAN 2,898,997.50

-
HARGA ALAT -
2,935,712.50
293,571.25
3,229,283.75

Harga Satuan Jumlah Harga

(Rp) (Rp)

85,000.00 4,250.00
107,000.00 3,327.70
115,000.00 3,565.00
130,000.00 325.00
Jumlah (1) 11,467.70

1,818.18 90,909.09
135,000.00 6,750.00
5,000.00 5,000.00
Jumlah (2) 102,659.09

Jumlah (3) -

114,126.79
11,412.68
125,539.47

Analisa Page 182


Harga Satuan Jumlah Harga

(Rp) (Rp)

73,700.00 1,842,500.00
110,840.13 4,433,605.00
1,145,861.21 1,432,326.51
60,701.03 4,856,082.00
30,000.00 600,000.00
30,833.33 30,833.33
42,000.00 525,000.00

HARGA BAHAN 13,720,346.84

-
HARGA ALAT -
13,720,346.84
1,372,034.68
15,092,381.52

Analisa Page 183


Harga Satuan Jumlah Harga

(Rp) (Rp)
Harga 2014 Harga 2018
241,500,000.00 241,500,000.00 230,000,000.00 11,500,000.00

278,250,000.00 278,250,000.00 265,000,000.00 13,250,000.00

26,250,000.00 26,250,000.00 25,000,000.00 1,250,000.00


4,500,000.00 4,500,000.00
7,500,000.00 7,500,000.00
5,500,000.00 5,500,000.00
2,500,000.00 2,500,000.00
900,000.00 900,000.00

4,000,000.00 4,000,000.00
750,000.00 750,000.00

3,000,000.00 3,000,000.00

1,750,000.00 19,250,000.00
2,450,000.00 26,950,000.00
36,750,000.00 36,750,000.00 35,000,000.00 1,750,000.00

12,500,000.00 12,500,000.00

2,500,000.00 27,500,000.00

57,750,000.00 57,750,000.00 55,000,000.00 2,750,000.00

6,500,000.00 6,500,000.00

Analisa Page 184


4,500,000.00 4,500,000.00

766,350,000.00

-
HARGA ALAT -
766,350,000.00
-
766,350,000.00

Analisa Page 185


II
1
2

III

Analisa Page 186


4

10
SUB TOTAL III.PEKERJAAN PENGADAAN LIFT

IV

V
1
a
b

Analisa Page 187


WF 350X175X7X11

Analisa Page 188


241,500,000.00

278,250,000.00

26,250,000.00

36,750,000.00

57,750,000.00

Analisa Page 189


PEKERJAAN ARSITEKTUR
Pemasangan Archittraf Pintu LIFT Lantai Dasar bh
Pas. Lantai 60x60 ex Niro Granite (Lobi dan Depan Pintu Lift lt.Dasar) m2
SUB TOTAL.II. PEKERJAAN Arsitektur
PENGADAAN DAN PEMASANGAN ELEVATOR
ELEVATOR PENUMPANG
Kapasitas: 1000 kg / 15orang.
Melayani: 11 lantai.
Kecepatan: 90 MPM.

Pengadaan dan pemasangan mesin penggerak (gearless machine), set


alat - alat control lift, pusat kontrol di dalam ruangan motor, panel
operasi tiap lantai (hall call button), safety edge, instalasi listrik, panel
lift, termasuk kabel feeder, dudukan pondasi mesin lift

Pengadaan dan pemasangan rem, katrol, baja pengimbang berat set


(counter weights), rel penuntun (guide rails).
Sepatu penuntun (guide shoes), kawat baja penggantung (hoisting -
ropes), pekerjaan penunjang instalasi lift termasuk blok insulasi
(insulating block) dan alat anti vibrasi.

Pengadaan dan pemasangan lift car, car doors dengan sistim door
opening two panel center opening automatic door, plat form, ceiling,
finishing dinding dan lantai, perlengkapan car seperti emergency car
light with automatic charger, over load protective device, interphone,
electric door sensor, car arrival gong, attendance service, car lift --
indicator, car opening panel, paging speaker, AC Variable Voltage,
Variable Frequency (VVVF), lampu - lampu di kereta termasuk
instalasinya.
a. Sangkar Lift
set
Car Transom set
Front Panel at COP set
Car Door set
Door Jamb set
Handrail Lift set

b. Ceiling
Wide Vaulted Light set
Light Board set

Analisa Page 190


c. Lantai / Flooring
Pola Lantai Marmer set

Pengadaan dan pemasangan landing doors, ambang pintu lantai


(jamb), door sills, panel operasi tiap lantai.
Landing Door Panel set
Landing Door Jamb set

Pengadaan dan pemasangan Emergency Landing Device (ARD) dan set


perlengkapannya.

Pengadaan dan Pemasangan Car Operating Panel (COP) set

Pengadaan dan Pemasangan Hall Indicator Panel (HOP) set

Pengadaan dan Pemasangan Sensor Gempa (Earth Quake) set

Pengadaan dan Pemasangan AC di ruang mesin set

Revitalisasi Panel Distribusi (existing)di Ruang Mesin Lift lot


I.PEKERJAAN PENGADAAN LIFT

TESTING DAN COMMISSIONING


Biaya testing dan commissioning, termasuk penyediaan tenaga/ keg
dayanya, bahan bakar untuk operasi lengkap dengan instalasi dan
pengkabelan dari panel (sumber daya) sampai ke alat (mesin) yang
akan ditest.
SU TOTAL IV PEKERJAAN TES DAN COMMISIONING
PEKERJAAN TAMBAHAN ACCESSORIES LIFT
PEMASANGAN AKSES CONTROL LIFT UTAMA
Card Reader set
Instalasi akses kontrol ls
SUB TOTAL V.PEKERJAAN AKSES KONTROL

JUMLAH TOTAL I-V


PPN 10%
TOTAL
PEMBULATAN

Analisa Page 191


2 6,500,000.00 13,000,000.00
18 450,000.00 8,100,000.00
21,100,000.00

2 230,000,000.00 460,000,000.00

2 265,000,000.00 530,000,000.00

2 25,000,000.00 50,000,000.00
2 4,500,000.00 9,000,000.00
2 7,500,000.00 15,000,000.00
2 5,500,000.00 11,000,000.00
2 2,500,000.00 5,000,000.00
2 900,000.00 1,800,000.00

2 4,000,000.00 8,000,000.00
2 750,000.00 1,500,000.00

Analisa Page 192


2 3,000,000.00 6,000,000.00

22 1,750,000.00 38,500,000.00
22 2,450,000.00 53,900,000.00

2 35,000,000.00 70,000,000.00

2 12,500,000.00 25,000,000.00

22 2,500,000.00 55,000,000.00

2 55,000,000.00 110,000,000.00

2 6,500,000.00 13,000,000.00

1 4,500,000.00 4,500,000.00
1,467,200,000.00

2 5,000,000.00 10,000,000.00

10,000,000.00

1 25,000,000.00 25,000,000.00
1 4,000,000.00 4,000,000.00
29,000,000.00

1,642,100,000.00
164,210,000.00
1,806,310,000.00

Analisa Page 193


RENCANA ANGGARAN BIAYA
REHABILITASI BALAI BESAR PENGEMBANGAN KESELAMATAN KERJA
KOTA MAKASSAR TAHUN ANGGARAN 2019

NO URAIAN PEKERJAAN VOL SAT

I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1.00 Unit
2 Pagar Seng Sementara Ls
3 Direksi Keet . Ls
4 Papan Proyek 1.00 Bh
5 Pekerjaan Pengukuran / Pas.Bowplank 1.00 Ls
6 Dokumentasi & Laporan 1.00 Ls
Sub Total I
II Pekerjaan Pembongkaran
1 Pembongkaran Dinding 8.10 M2
2 Pembongkaran Keramik Lantai dan Dinding 53.19 M2
3 Pembongkaran Plafond LT 1 17.25 M2
3 Pembongkaran Plafond LT 2 211.25 M2

Sub Total II
IV PEKERJAAN ARSITEKTUR LANTAI I
5 Pekerjaan Plafond Kalsiboard & Rangka 17.45 M²
6 Pekerjaan List Plafond Gysum 34.90 M²
Sub Total VII
V PEKERJAAN ARSITEKTUR LANTAI II
1 Pekerjaan Plafond Kalsiboard & Rangka 411.12 M²
2 Pekerjaan List Plafond Gysum 135.52 M²

Sub Total VIII


4 Pek.Type Pintu Km Aluminium Crome KM/WC + Assesories 2.00 Bh
Sub. Total Type P3
Sub Total X
VI PEKERJAAN KUSEN PINTU & JENDELA LANTAI II.
2 Pek.Type Pintu Km Aluminium Crome KM/WC + Assesories 1.00 Bh
Sub. Total Type P3
Sub Total XI
VII PEKERJAAN FINISHING LANTAI I
3 Pekerjaan Pengecatan Dinding KM 32.77 M²
4 Pekerjaan Pengecatan Plafond 17.45 M²
Sub Total XIII
VIII PEKERJAAN FINISHING LANTAI II
4 Pekerjaan Pengecatan Dinding 59.54 M²
5 Pekerjaan Pengecatan Plafond 411.12 M²

Sub Total XIV


IX PEKERJAAN SANITASI LANTAI I
1 Pekerjaan Lantai Keramik KM/WC 30 x 30 4.68 M²
2 Pekerjaan Dinding Keramik KM/WC 30 x 30 21.86 M²
3 Pekerjaan Klosed Duduk 2.00 Bh
4 Wastafel ex toto Bh
5 Wastafel dapur + Meja beton Ls
6 Pekerjaan Floor Drain 1.00 Bh
7 Pekerjaan Stock Kran 1.00 Bh
8 Pekerjaan Kran air 1/2'' 1.00 Bh
9 Pekerjaan Instalasi Pipa Air Kotor Ø 3 " M'
10 Pekerjaan Instalasi Pipa Air Limbah Ø 3 " M'
11 Pekerjaan Instalasi Pipa Air Bersih Ø 1/2 " M'
12 Pekerjaan Septiktank & Resapan unit
13 Pekerjaan Instalasi Connector IPAL Ls
Sub Total XIX
X PEKERJAAN SANITASI LANTAI II
1 Pekerjaan Lantai Keramik KM/WC 30 x 30 4.81 M²
2 Pekerjaan Dinding Keramik KM/WC 30 x 30 21.84 M²
3 Pekerjaan Klosed Duduk 1.00 Bh
4 Wastafel ex toto Bh
5 Pekerjaan Floor Drain 1.00 Bh
6 Pekerjaan Stock Kran 1.00 Bh
7 Pekerjaan Kran air 1.00 Bh
Sub Total XX
XI PEKERJAAN Dinding Partisi Rg. Laboratorium
1 Dinding Partisi 12.72 M²
3 Pekerjaan Type P.1
- Kusen Alumunium 5.35 M'
- Bingkai Alumunium 5.85 M'
- Daun pintu ( Multipleks+Hpl ) 1.79 M²
- Kunci Pintu + Hendle pintu 1.00 set
- Engsel 4.00 Bh
- Grendel 4.00 Bh

Sub Total XX
XII PEKERJAAN Wallpaper Rg Kepala UPTD
1 Pasang Wallpaper 84.81 M²
2

Sub Total XIX


A
ESELAMATAN KERJA
RAN 2019

HARGA JUMLAH
SATUAN HARGA

Rp 500,000.00 Rp 250,000.00
Rp 3,500,000.00 Rp -
Rp 5,000,000.00 Rp -
Rp 500,000.00 Rp 250,000.00
Rp 2,500,000.00 Rp 2,500,000.00
Rp 1,500,000.00 Rp 1,000,000.00
Rp 4,000,000.00

Rp 103,279.00 Rp 836,559.90
Rp 20,130.00 Rp 1,070,714.70
Rp 9,845.00 Rp 169,826.25
Rp 9,845.00 Rp 2,079,756.25

Rp 4,156,857.10

Rp 125,027.47 Rp 2,181,573.01
Rp 26,598.00 Rp 928,203.71 15.8625 1.58625
Rp 3,109,776.71 dari autocad

Rp 125,027.47 Rp 51,401,292.10 411.12 41.112


Rp 26,598.00 Rp 3,604,560.96 123.2 12.32

Rp 55,005,853.06
Rp 785,000.00 Rp 1,570,000.00
Rp 1,570,000.00
Rp 1,570,000.00
Rp 875,000.00 Rp 875,000.00
Rp 875,000.00
Rp 875,000.00
Rp 33,647.72 Rp 1,102,702.97
Rp 30,829.70 Rp 537,939.73
Rp 1,640,642.70

Rp 33,647.72 Rp 2,003,385.05
Rp 30,829.70 Rp 12,674,706.26

Rp 14,678,091.31

Rp 220,321.86 Rp 1,031,106.29
Rp 212,621.86 Rp 4,647,913.78
Rp 2,875,620.00 Rp 5,751,240.00
Rp 1,726,265.20 Rp -
Rp 2,500,000.00 Rp -
Rp 88,935.00 Rp 88,935.00
Rp 20,000.00 Rp 20,000.00
Rp 64,281.25 Rp 64,281.25
Rp 61,066.50 Rp -
Rp 61,066.50 Rp -
Rp 17,116.00 Rp -
Rp 5,000,000.00 Rp -
Rp 5,000,000.00 Rp -
Rp 11,603,476.32
Rp 154,247.50 Rp 741,930.48
Rp 212,621.86 Rp 4,643,661.34
Rp 2,875,620.00 Rp 2,875,620.00
Rp 1,726,265.20 Rp -
Rp 88,935.00 Rp 88,935.00
Rp 20,000.00 Rp 20,000.00
Rp 64,281.25 Rp 64,281.25
Rp 8,434,428.07

Rp 326,383.10 Rp 4,151,592.97

Rp 113,279.10 Rp 606,043.19
Rp 192,441.33 Rp 1,125,781.80
Rp 629,167.00 Rp 1,123,063.10
Rp 326,315.00 Rp 326,315.00
Rp 50,769.40 Rp 203,077.60
Rp 23,611.50 Rp 94,446.00

Rp 7,630,319.65

Rp 354,000.00 Rp 30,024,156.00
Rp -
Rp -
Rp 30,024,156.00
DAFTAR SATUAN BAHAN BANGUNAN DAN UPAH KERJA
KOTA MAKASSAR 2018

HARGA
No JENIS BAHAN
(Rp)
I BAHAN DASAR
1 Batu Kali belah Rp 165,000.00
2 Batu Belah 10 - 15 Cm Rp 272,000.00
3 Batu Belah 7 - 10 Cm Rp 295,000.00
4 Batu Pecah 5 - 7 Cm Rp 310,000.00
5 Batu Pecah 3 - 5 Cm Rp 315,000.00
6 Batu pecah 2 - 3 Cm Rp 320,000.00
7 Batu Pecah 1 - 2 Cm Rp 420,000.00
8 Batu Pecah 0,5 -1 Cm Rp 450,000.00
9 Batu pecah 2 - 3 Cm Rp 246.15
10 Batu pecah 1 - 2 Cm Rp 323.08
11 Batu Gunung Rp 165,000.00
12 Tanah Timbunan Rp 81,000.00
13 Pasir Timbunan /Urug Rp 140,000.00
14 Pasir Pasangan Rp 190,000.00
15 Pasir Beton Rp 195,000.00
16 Pasir Beton Rp 139.29
17 Sirtu Rp 265,000.00
18 Kerikil Sungai Rp 275,000.00
19 Kerikil Sungai Rp 211.54
20 Kapur Pasangan/Kapur Hidrasi Rp 29,000.00
21 Kapur Pasangan 3 Kg Rp 29.00
22 Semen (PC) 50 Kg Rp 74,000.00
23 Semen (PC) Rp 1,480.00
24 Semen (PC) 40 Kg Rp 52,500.00
25 Semen (PC) Rp 1,312.50
26 Semen Putih 40 Kg Rp 105,000.00
27 Semen Putih Rp 2,625.00
28 Semen Warna / Semen Nut Rp 8,500.00
29 Semen Mortar (Perekat Hebel) 40 Kg Rp 90,000.00
30 Semen Mortar (Perekat Hebel) 40 Kg Rp 2,250.00
31 Batu Merah Standar Rp 550.00
32 Bata Ringan (Hebel) Rp 750,000.00
33 Bata Ringan (Hebel) Rp 9,375.00
34 Plamur Rp 5,500.00
35 Paving Block K-300 Tebal 6 cm Rp 1,477.27
36 Paving Block K-300 Tebal 8 cm Rp 1,818.18
37 Air Kerja Rp 75.00
38 Gorong- gorong beton 80 cm Rp 285,000.00
II BAHAN KAYU
1 Kayu Kelas - I Bayam (Balok) Sawmil Rp 18,000,000.00
2 Kayu Kelas - I Bayam (Papan) Sawmil Rp 19,000,000.00
3 Kayu Kelas - I Bayam (Balok) Senso Rp 11,000,000.00
4 Kayu Kelas - I Bayam (Papan) Senso Rp 16,000,000.00
5 Kayu Kelas - II Samarinda Kayu Balok Rp 4,750,000.00
6 Kayu Kelas - II Samarinda Kayu Papan Rp 5,000,000.00
9 Kayu Mangga/Kemiri papan untuk begesting Rp 2,450,000.00
10 Kayu Kelas - III Balok untuk begesting Rp 2,700,000.00
11 Kayu Kelas - III Papan untuk begesting Rp 2,900,000.00
12 kayu perancah Rp 87,500.00
13 Dolken kayu Rp 22,000.00
14 Bambu Sedang Rp 25,000.00
15 Lem Kayu Rp 25,000.00
III BAHAN KACA & ACC
1 Kaca Bening 3 mm Rp 115,000.00
2 Kaca Bening 5 mm Rp 140,000.00
3 Kaca Warna biru. 8 mm Rp 220,000.00
4 Kaca Panasap 8 mm ( Kaca Panasap Warna ) Rp 425,000.00
5 Kaca Bening 10 Rp 450,000.00
6 Kaca Tempered 12 mm Rp 615,000.00
7 Kaca Es Buram 5 mm/10 mm Rp 675,000.00
8 Kaca Ryben 3 mm Rp 115,000.00
9 Kaca Ryben 5 mm Rp 160,000.00
10 Sealent Rp 7,500.00
11 Karet Kaca Rp 3,500.00
12 Kaca / Jendela Naco Rp 11,500.00

IV BAHAN LANTAI & DINDING


1 Putih 20 x 20 cm Rp 60,000.00
2 Putih 20 x 20 cm Rp 2,400.00
3 Warna 20 x 20 cm Rp 62,000.00
4 Warna 20 x 20 cm Rp 2,480.00
5 Putih 20 x 25 cm Rp 65,000.00
6 Putih 20 x 25 cm Rp 3,250.00
7 Warna 20 x 25 cm Rp 67,000.00
8 Warna 20 x 25 cm Rp 3,350.00
9 Keramik Putih 30 x 30 cm Rp 58,000.00
10 Keramik Putih 30 x 30 cm Rp 5,220.52
11 Keramik Warna 30 x 30 cm Rp 60,000.00
12 Keramik Warna 30 x 30 cm Rp 5,400.54
13 Keramik Putih 40 x 40 cm Rp 62,000.00
14 Keramik Putih 40 x 40 cm Rp 9,920.00
15 Keramik Warna 40 x 40 cm Rp 64,000.00
16 Keramik Warna 40 x 40 cm Rp 10,240.00
17 Warna 60 x 60 cm Ex Granite Rp 205,000.00
18 Warna 60 x 60 cm Ex Granite Rp 51,250.00
19 Warna 15 x 60 cm Ex Granite Rp 18,636.36
20 Batu Alam 10 x 20 Rp 200,000.00
21 Batu Alam 10 x 20 Rp 4,000.00
22 Batu Alam 20 x 20 Rp 210,000.00
23 Batu Alam 20 x 20 Rp 4,200.00
24 Step Nosing Tangga Rp 165,000.00
V BAHAN BESI
1 Paku Seng (Payung) RRT Rp 34,000.00
2 Paku Skrup 3 1/2 Inci Rp 18,000.00
3 Paku Skrup Rp 150.00
4 Paku Payung Berulir 75 mm Rp 25,500.00
5 Paku skrup Gypsum Rp 55,000.00
6 Paku Campuran (5-10 Cm) Rp 25,000.00
7 Paku 2 Cm- 3 Cm Rp 23,000.00
8 Paku 7 Cm- 10 Cm Rp 27,000.00
9 Paku 12 Cm Rp 31,000.00
10 Paku Beton Hitam Rp 25,500.00
11 Paku Beton Putih Rp 15,000.00
12 Besi Beton polos (Campuran) Rp 11,000.00
13 Besi Striip 30 x 3 mm Rp 12,000.00
14 HBEAM (200.200.8.12) Rp 12,800.00
15 HBEAM (250.250.9.14) Rp 12,850.00
16 HBEAM (300.300.10.15) Rp 12,900.00
17 Besi Profil IWF (350.175. 7.11) Rp 12,650.00
18 Besi Profil IWF (300.150. 6,5. 9) Rp 12,500.00
19 Besi Profil IWF (250.125.6.9) Rp 11,500.00
20 Besi Profil IWF (200.100.5,5.8) Rp 11,000.00
21 Besi Profil IWF (175.90.5.8) Rp 10,800.00
22 Besi Profil IWF (150.75.5.7) Rp 10,500.00
23 CNP 125.50.20.3.2 Rp 6,500.00
24 Besi Plat 12 mm Rp 9,500.00
25 Besi Plat 8 mm Rp 9,000.00
26 Mour baut baja Rp 8,500.00
27 Angkur Baut, w 19 p= 700 mm Rp 21,000.00
28 Besi Hollow 40.40. 2 mm p= 6 mm Rp 215,000.00
29 Besi Hollow 40.40. 2 mm p= 6 mm Rp 39,090.91
30 Besi Hollow 40.20. 2 mm p= 6 mm Rp 160,000.00
31 Besi Hollow 40.20. 2 mm p= 6 mm Rp 29,090.91
32 Hollow Aluminium rangka plafond 40 x 20 x 2 mm Rp 70,000.00
33 Hollow Aluminium rangka plafond 40 x 20 x 2 mm Rp 12,727.27
34 Hollow Aluminium rangka plafond 40 x 40 x 2 mm Rp 85,000.00
35 Hollow Aluminium rangka plafond 40 x 40 x 2 mm Rp 15,454.55
36 Hollow Aluminium rangka plafond 40 x 20 x 8 mm Rp 165,000.00
37 Hollow Aluminium rangka plafond 40 x 20 x 8 mm Rp - Rp 30,000.00
38 Kawat Penggantung Hollow aluminium Rp 31,000.00
39 GOC 0.35 mm (Reng + Skoring Angin) Rp 8,500.00
40 Self Driling Screw Rp 250.00
41 Alat Bantu Rp 5,000.00
42 Besi Plat Strip 3.25 mm Rp 34,500.00
43 Kawat ikat Beton Rp 22,000.00
44 Smartdeck 0.75 mm (BONDEK) Rp 105,000.00
45 Besi Wire Mesh M.10 /m2 Rp 85,000.00
46 Besi Wire Mesh M.8 /m2 Rp 55,000.00
47 Kawat Las Rp 42,000.00
48 Besi type C ( Rangka Baja Ringan ) Rp 21,000.00
49 L Braket Rp 17,500.00
50 Suncreen Alluminumm Rp 425,000.00
V BAHAN PIPA PVC AW
1 Ø 1/2 Inci - 4 m Rp 18,500.00
2 Ø 1/2 Inci Rp 4,625.00
3 Ø 3/4 Inci - 4 m Rp 21,000.00
4 Ø 3/4 Inci Rp 7,100.00
5 Ø 1 Inci - 4 m Rp 23,000.00
6 Ø 1 Inci Rp 5,750.00
7 Ø 11/2 Inci - 4 m Rp 25,000.00
8 Ø 11/2 Inci Rp 6,250.00
9 Ø 2 Inci - 4 m Rp 30,000.00
10 Ø 2 Inci Rp 7,500.00
11 Ø 2 1/2 Inci - 4 m Rp 38,000.00
12 Ø 2 1/2 Inci Rp 9,500.00
13 Ø 3 Inci - 4 m Rp 110,000.00
14 Ø 3 Inci Rp 27,500.00
15 Ø 4 Inci - 4 m Rp 120,000.00
16 Ø 4 Inci Rp 30,000.00
Pipa Besi GIP
1 Ø 1/2 Inci - 6 m Rp 97,000.00
Rp 16,166.67
2 Ø 3/4 Inci - 6 m Rp 120,000.00
Rp 20,000.00
3 Ø 1 Inci - 6 m Rp 185,000.00
Rp 30,833.33
4 Ø 2 Inci - 6 m Rp 395,000.00
Rp 65,833.33
5 Ø 2 1/2 Inci - 6 m Rp 475,000.00
Rp 79,166.67
Pipa Jenis Btg C untuk Instalasi Listrik
1 Ø 5/8 Inci - 4 m Rp 9,000.00
2 Ø 3/4 Inci - 4 m Rp 12,000.00
3 Ø 1 Inci - 4 m Rp 18,000.00
4 Ø 11/2 Inci - 4 m Rp 27,000.00
5 Kabel Duck PVC 16 X 16 mm Rp 7,500.00
6 Ijuk Rp 42,000.00
VI BAHAN - BAHAN LANGIT
1 Multipleks 120 x 240 x 1,2 cm Rp 202,000.00
2 Multipleks 120 x 240 x 0,6 cm Rp 120,000.00
3 Multipleks 120 x 240 x 0,4 cm Rp 110,000.00
4 Multipleks 120 x 240 x 0,9 cm Rp 140,000.00
5 Calsi Board Rp 72,000.00
6 Gypsum Board 122x 224x T 9 mm Rp 103,000.00
7 Gypsum Board 122x 224x T 12 mm Rp 110,000.00
8 List Profil kayu 2x3 cm Rp 4,500.00
9 List Profil kayu 3x3 cm Rp 5,500.00
10 List Profil kayu 5x5 cm Rp 7,500.00
11 List Plafond Gyfsum polos Rp 7,500.00
12 List Plafond Gyfsum profil Rp 8,500.00
13 Listplank Woadplank Rp 45,000.00
14 Listplank Calsiplank Rp 40,000.00
15 Listplank GRC Rp 35,000.00
16 Skrup Rp 350.00
17 Skrup fixer Rp 1,000.00
18 Plafond PVC Rp 165,000.00
19 List plafond PVC Rp 36,000.00
20 Joint Tape @ 75 m Rp 45,000.00

VII BAHAN ATAP


1 Seng Gelombang (BWG 33) Rp 75,000.00
Seng Gelombang (BWG 33) Rp 7,000.00
2 Seng Plat 0,30 mm Rp 95,000.00
3 Atap Spandek Zuncalume 0,35 mm Rp 63,000.00
4 Nok Spandek Zuncalume 0,35 mm Rp 45,700.00
5 Atap Metal Roof Rp 54,000.00
6 Nok Metal Roof Rp 35,000.00
7 Karet Pelapis Rp 10,500.00
8 ACP Exterior Rp 265,000.00
9 ACP Interior Rp 255,000.00
10 Aluminium Stifner Panel Rp 37,000.00
11 Aluminium siku 30 x 16 Rp 20,833.33
12 Besi Kotak 4 x 4 Rp 39,166.67
13 Bracket Besi Siku 70.70.7 Rp 12,000.00
14 Dynabolt M10 x 120 Rp 2,500.00
15 Mur+Baut M10 x 70 Rp 2,000.00
16 Zinchromate Rp 45,000.00
17 Ramsel Nails Rp 1,500.00
18 Screw Cteks 12-14x50 Rp 500.00
19 Screw Cteks 10x16-16 Rp 400.00
20 HPL Rp 265,000.00
21 Sekrup Fixer Rp 150.00
22 Aluminium 4 " Rp 85,000.00
23 profil alluminium T Rp 55,833.33
24 Spandrel Aluminium Rp 47,800.00
25 Nok / Bubungan
- Genteng Beton Rp 7,500.00
- Genteng Asbes Rp 23,000.00
- Genteng Keramik Rp 30,000.00
- Nok steeel rata 105 cm Rp 40,000.00

VIII BAHAN PENGGANTUNG


1 Kunci tanam 2x putar Rp 185,000.00
2 Ses 2 x Slag (Semacamnya) Rp 225,000.00
3 Hak Angin Rp 14,000.00
4 Kait Angin Rp 8,700.00
5 Grendel Biasa Jendela Rp 8,500.00
6 Grendel Biasa Pintu Rp 20,500.00
7 Engsel Pintu Kuningan Rp 27,000.00
8 Engsel Jendela Kuningan Rp 10,500.00
9 Door closer Set Rp 205,000.00
10 Expanyolet Rp 35,000.00
11 Handel Pintu Rp 115,000.00
12 Handel Jendela Rp 85,000.00
IX BAHAN SANITER
1 Kloset Duduk Keramik Tanpa Tabung Rp 745,000.00
2 Kloset Duduk Ex KIA Lengkap (Putih) Tangki Batu Rp 2,225,000.00
3 Kloset Duduk Ex KIA Lengkap (warna) Tangki Batu Rp 2,325,000.00
4 Kloset Duduk Ex TOTO Lengkap Ass. Warna Putih Rp 2,200,000.00
5 Kloset Duduk Ex TOTO Lengkap Ass. Warna Gelap Rp 2,250,000.00
6 Kloset Jongkok Ex KIA Rp 450,000.00
7 Kloset Jongkok Ex Biasa Rp 200,000.00
8 Wasthafel Polos/Putih Biasa Rp 350,000.00
9 Wasthafel Warna Lengkap Rp 950,000.00
10 Wasthafel Cuci Piring Logam 1 bak Rp 400,000.00
11 Wasthafel Cuci Piring Logam 2 bak Rp 550,000.00
12 Waterdrain Rp 55,000.00
13 Bak Mandi Fiber Rp 220,000.00
14 Bak Reservoir (Tandon/Fiber 1200 ltr ) Rp 1,500,000.00
15 Stop Kran Rp 20,000.00
16 Kran Air Rp 45,000.00
17 Floor Drain Rp 12,500.00
18 Urineoir Rp 950,000.00
19 Seal Tape Rp 3,500.00
20 Zhimizu Otomatis 230 ( 200 Watt) Rp 950,000.00
21 Kusen Pintu Fiber + Acc Rp 325,000.00
22 Pintu KM/WC PVC Lengkap Ass Rp 542,000.00
23 Pintu KM/WC Aluminium Crome Lengkap Accesories Rp 785,000.00
X BAHAN FINISHING / CAT
1 Cat Dasar tembok Rp 85,000.00
2 Cat Dasar tembok Rp 34,000.00
3 Cat tembok ex metrolite Rp 60,000.00
4 Cat tembok ex metrolite Rp 24,000.00
5 Cat tembok ex Aries Rp 55,000.00
6 Cat tembok ex Aries Rp 22,000.00
7 Cat Water Profing Ex Aqugart Rp 53,000.00
8 Cat Water Profing Ex Aquaproof Rp 54,000.00
9 Cat Anti Lumut (No Drop) Rp 1,250,000.00
10 Cat Anti Lumut (No Drop) Rp 65,789.47
11 Cat tembok Ex Kimex Rp 65,000.00
12 Cat tembok Ex Kimex Rp 21,666.67
13 Cat tembok ex Mowilex Rp 225,000.00
14 Cat tembok ex Mowilex Rp 90,000.00
15 Avian Rp 57,000.00
16 Politur Rp 25,000.00
17 Cat Dasar Meni Rp 125,000.00
18 Cat Dasar Meni Rp 25,000.00
19 Cat meni ex glatik Rp 100,000.00
20 Cat meni ex glatik Rp 20,000.00
21 Tenner Rp 15,000.00
22 Minyak Cat (aff duner) Rp 8,500.00
23 Minyak Bekisting Rp 12,000.00
24 Plamur Ex Boyo Rp 45,000.00
25 Plamur Ex Boyo Rp 15,000.00
26 Amplas/Kertas Gosok Rp 5,000.00
27 Dempul Rp 22,000.00
28 Residu Rp 6,500.00
29 Paper Tape Rp 15,000.00
30 Coumpond Rp 57,000.00
31 Kuas 2'' Ex Eterna Rp 5,000.00
32 Kuas 3'' Ex Eterna Rp 7,500.00
33 Kuas 4'' Ex Eterna Rp 8,500.00
34 Solar Rp 9,500.00
35 Minyak Pelumas Rp 20,500.00
36 Waterproofing Rp 225,000.00
XI BAHAN INSTALSI LISTRIK
1 Kabel NYA 4 x 1.5 mm Rp 550,000.00
2 Kabel NYM 2 x 1.5 mm Rp 5,500.00
3 Kabel NYY 2 X 2,5 mm Rp 15,000.00
4 Lampu SLE 18 Watt Rp 47,000.00
5 Lampu SLE 12 Watt Rp 42,000.00
6 Lampu SLE 8 Watt Rp 32,000.00
7 Lampu RM 2 X 20 Watt Rp 225,000.00
8 Lampu Pijar 25 W Rp 5,900.00
9 Lampu Pijar 40 W Rp 7,000.00
10 Lampu Pijar 60 W Rp 11,000.00
11 Lampu Pijar 100 W Rp 12,000.00
12 Lampu Jalan Mercury Rp 350,000.00
13 Lampu Taman Rp 450,000.00
14 Lampu RM 2 X 40 Watt Rp 586,000.00
15 Lampu Downlight Rp 145,000.00
16 Lampu Baret Rp 345,000.00
17 Sakelar Tunggal Putih Rp 17,500.00
18 Sakelar Double Putih Rp 24,500.00
19 Stop Kontak Tunggal Rp 28,500.00
20 Stop Kontak Ganda Rp 35,000.00
21 Klem Kabel No-10 Rp 550.00
22 Inbow Dos Rp 5,000.00
23 Las Dop Rp 2,500.00
24 Isolasi Rp 3,000.00
25 T-Dos 5/8' Rp 5,000.00
26 Isolator Rp 5,200.00
27 lokal 2 Group Automat Rp 245,000.00
28 Lokal 3 Group Biasa Rp 150,000.00
29 Fitting Rp 27,500.00
30 MCB 16 A 1 Phase Rp 56,500.00
31 MCB 4 Ampere Rp 46,500.00
32 Box Panel Rp 1,500,000.00
33 Panel MDP Rp 24,750,000.00
34 Springkler Springkler head 3/4'' Rp 875,000.00
35 Stand Down Light 4" Rp 40,250.00
36 Exhaust pan Rp 250,000.00
XII DAFTAR UPAH KERJA
1 Pekerja Rp 85,000.00
2 Tukang :
Tukang Kayu Rp 107,000.00
Tukang Batu Rp 107,000.00
Tukang Cat Rp 107,000.00
Tukang Listrik Rp 107,000.00
Tukang Pipa Rp 107,000.00
Tukang Besi Rp 107,000.00
Tukang las Rp 107,000.00
3 Kepala Tukang :
Kepala Tukang Kayu Rp 115,000.00
Kepala Tukang Rp 115,000.00
Kepala Tukang Batu Rp 115,000.00
Kepala Tukang Listrik Rp 115,000.00
Kepala Tukang Cat Rp 115,000.00
Kepala Tukang Pipa Rp 115,000.00
Kepala Tukang Besi Rp 115,000.00
Pembantu Tukang Rp 115,000.00
4 Mandor Rp 130,000.00
5 Penjaga Malam/Gudang Rp 110,000.00
KERJA

SAT
harga mangasa 2017
jangan hapus
M3 Batu Kali Rp179,000.00
M3 Batu Kali belah Rp171,400.00
M3 Batu Belah 10 - 15 Cm Rp372,800.00
M3 Batu Belah 7 - 10 Cm Rp298,300.00
M3 Batu Pecah 5 - 7 Cm Rp360,700.00
M3 Batu Pecah 3 - 5 Cm Rp359,300.00
M3 Batu pecah 2 - 3 Cm Rp385,000.00
M3 Batu Pecah 1 - 2 Cm Rp421,700.00
Kg Batu Pecah 0,5 -1 Cm Rp455,500.00
Kg Batu pecah 2 - 3 Cm Rp202.63
M3 Batu pecah 1 - 2 Cm Rp221.95
M3 Batu Gunung Rp335,000.00
M3 Tanah Timbunan Rp87,500.00
M3 Pasir Timbunan /Urug Rp143,700.00
M3 Pasir Pasangan Rp194,500.00
Kg Pasir Beton Rp194,500.00
M3 Pasir Beton Rp121.56
M3 Kerikil Sungai Rp275,100.00
Kg Kerikil Sungai Rp171.94
M3 Kapur Pasangan Rp29,800.00
Kg Kapur Pasangan Rp9,933.33
Sak Semen (PC) 50 Kg Rp74,500.00
Kg Semen (PC) Rp1,490.00
Sak Semen (PC) 40 Kg Rp54,500.00
Kg Semen (PC) Rp1,362.50
Sak Semen Putih 40 Kg Rp105,800.00
Kg Semen Putih Rp2,645.00
Kg Semen Mortar (Perekat Hebel) 40 Kg Rp92,500.00
Sak Semen Mortar (Perekat Hebel) 40 Kg Rp2,312.50
Kg Batu Merah Standar Rp550.00
Bj Bata Ringan (Hebel) Rp750,000.00
M3 Bata Ringan (Hebel) Rp7,800.00
Bj Plamur Rp5,500.00
Kg Paving Block K-300 Tebal 8 cm Rp1,000.00
Bj Air Kerja Rp75.00
Bj
Ltr
meter
M3 Kayu Kelas - I Bayam (Balok) Gergaji Sawmil Rp20,691,000.00
M3 Kayu Kelas - I Bayam (Papan) Gergaji Sawmil Rp22,990,000.00
M3 Kayu Kelas - I Bayam (Balok) Gergaji Sansaw Rp11,180,700.00
M3 Kayu Kelas - I Bayam (Papan) Gergaji Sansaw Rp16,720,000.00
M3 Kayu Kelas - II Samarinda Kayu Balok Rp4,754,800.00
M3 Kayu Kelas - II Samarinda Kayu Papan Rp5,068,300.00
M3 Kayu Mangga/Kemiri papan Rp2,769,300.00
M3 Kayu Kelas - III Papan Rp3,422,400.00
M3 kayu perancah Rp2,873,800.00
Btg Kayu Kumea Balok Rp6,792,500.00
Btg Kayu Kumea Papan Rp6,792,500.00
Btg papan Kelas I Rp19,760,000.00
Kg Papan Kelas II Rp7,280,000.00

M2 Kaca Bening 3 mm Rp115,000.00


M2 Kaca Bening 5 mm Rp146,600.00
M2 Kaca Bening 8 mm Rp165,000.00
M2 Kaca Bening 10 mm Rp187,000.00
M2 Kaca Ryben 3 mm Rp115,000.00
M2 Kaca Ryben 5 mm Rp161,000.00
M2 Sealent Rp7,500.00
M2
M2
tube
M'
Bh

Dos Putih 20 x 20 cm Rp60,100.00


Bh Putih 20 x 20 cm Rp2,404.00
Dos Putih 20 x 25 cm Rp62,300.00
Bh Putih 20 x 25 cm Rp3,115.00
Dos Warna 20 x 25 cm Rp70,000.00
Bh Warna 20 x 25 cm Rp3,500.00
Dos Keramik Putih 20 x 40 cm Rp61,000.00
Bh Keramik Putih 20 x 40 cm Rp4,880.00
Dos Keramik Putih 30 x 30 cm Rp58,400.00
Bh Keramik Putih 30 x 30 cm Rp5,256.00
Dos Keramik Putih 40 x 40 cm Rp62,100.00
Bh Keramik Putih 40 x 40 cm Rp9,936.00
Dos Warna 60 x 60 cm Ex Granite Rp205,000.00
Bh Warna 60 x 60 cm Ex Granite Rp73,800.00
Dos Warna 15 x 60 cm Ex Granite Rp18,450.00
Bh Batu Alam 10 x 20 Rp200,000.00
Dos Batu Alam 10 x 20 Rp4,000.00
Bh
Bh
M2
Bh
M2
Bh
m'
Kg Paku Seng (Payung) RRT Rp34,000.00
Kg Paku Skrup 3 1/2 Inci Rp18,300.00
Bj Paku Skrup Rp550.00
Kg Paku Payung Berulir 75 mm Rp25,600.00
Kg Paku skrup Gypsum Rp55,000.00
Kg Paku Biasa Rp25,000.00
Kg Paku 2 Cm- 5 Cm Rp23,000.00
Kg Paku 7 Cm- 10 Cm Rp27,000.00
Kg Paku 12 Cm Rp31,000.00
Kg Paku Beton Hitam Rp25,500.00
Kg Paku Beton Putih Rp15,200.00
Kg
M'
Kg HBEAM (200.200.8.12) Rp13,000.00
Kg HBEAM (250.250.9.14) Rp13,750.00
Kg HBEAM (300.300.10.15) Rp14,500.00
Kg Besi Profil IWF (300.150.6,5.9) Rp11,250.00
Kg Besi Profil IWF (250.125.6.9) Rp11,000.00
Kg Besi Profil IWF (200.100.5,5.8) Rp10,650.00
Kg Besi Profil IWF (175.90.5.8) Rp10,250.00
Kg Besi Profil IWF (150.75.5.7)) Rp9,650.00
Kg
Kg
Kg
Kg CNP 100.50.20.2,3 Rp6,500.00
Kg Besi Plat 12 mm Rp9,900.00
bh Besi Plat 8 mm Rp9,800.00
Btg Angkur 3/4 x 51 Rp8,500.00
M' Baut 5/8 x 2" Rp3,500.00
Btg Besi Hollow 40.40. 2 mm p= 6 mm Rp215,600.00
M' Besi Hollow 40.40. 2 mm p= 6 mm Rp35,933.33
Btg Besi Hollow 40.20. 2 mm p= 6 mm Rp161,000.00
M' Besi Hollow 40.40. 2 mm p= 6 mm Rp26,833.33
Btg Hollow Aluminium rangka plafond 0,25 Rp21,700.00
M' Hollow Aluminium rangka plafond 0,25 Rp5,425.00
Btg Hollow Aluminium rangka plafond 0,3 Rp22,900.00
M' Hollow Aluminium rangka plafond 0,3 Rp5,725.00
Kg Hollow Aluminium rangka plafond 40 x 20 x 2 m Rp32,700.00
M' Hollow Aluminium rangka plafond 40 x 20 x 2 m Rp8,175.00
Lbr Hollow Aluminium rangka plafond 40 x 40 x 2 m Rp40,300.00
Ls Hollow Aluminium rangka plafond 40 x 40 x 2 m Rp10,075.00
M' Hollow Aluminium rangka plafond 40 x 20 x 8 m Rp27,100.00
Kg Hollow Aluminium rangka plafond 40 x 20 x 8 m Rp6,775.00
M2 Besi Hollow Rp30,916.67
M2 Kawat Penggantung Hollow aluminium Rp31,000.00
M2 Pintu KM/WC PVC Lengkap Acc Rp574,800.00
Kg Pintu KM/WC Aluminium Lengkap Acc Rp725,000.00
M' GOC 0.35mm (Reng + Skoring Angin) Rp8,500.00
M' Self Driling Screw Rp255.00
M2 Alat Bantu Rp5,000.00
Btg Jenis Btg (AW) untuk Saluran Pembuangan Air
M' Ø 1/2 Inci - 4 m Rp19,000.00
Btg Ø 3/4 Inci - 4 m Rp15,000.00
M' Ø 3/4 Inci - 4 m Rp3,750.00
Btg Ø 1 Inci - 4 m Rp19,000.00
M' Ø 11/2 Inci - 4 m Rp24,000.00
Btg Ø 2 Inci - 4 m Rp30,000.00
M' Ø 2 1/2 Inci - 4 m Rp38,000.00
Btg Ø 3 Inci - 4 m Rp115,000.00
M' Ø 3 Inci - 4 m Rp28,750.00
Btg Ø 4 Inci - 4 m Rp71,000.00
M' Pipa Jenis Btg C untuk Instalasi Listrik
Btg Ø 5/8 Inci - 4 m Rp9,000.00
M' Ø 3/4 Inci - 4 m Rp12,500.00
Btg Ø 1 Inci - 4 m Rp18,750.00
M' Ø 11/2 Inci - 4 m Rp27,000.00
Pipa Besi GIP
Btg Ø 1/2 Inci - 6 m Rp97,300.00
M'
Btg Ø 3/4 Inci - 6 m Rp120,700.00
M'
Btg Ø 1 Inci - 6 m Rp185,700.00
M'
Btg Ø 2 Inci - 6 m Rp398,500.00
M'
Btg Ø 2 1/2 Inci - 6 m Rp477,600.00
M'

Btg
Btg
Btg
Btg
M'
M2
Lbr Multipleks 120 x 240 x 1,2 cm Rp202,000.00
Lbr Multipleks 120 x 240 x 0,6 cm Rp187,000.00
Lbr Multipleks 120 x 240 x 0,9 cm Rp141,000.00
Lbr Calsi Board 4 mm Rp73,000.00
Lbr Gypsum Board 9 mm Rp103,500.00
Lbr List Profil kayu 2x3 cm Rp4,325.00
Lbr List Profil kayu 3x3 cm Rp5,512.50
M' List Profil kayu 5x5 cm Rp7,700.00
M' List Plafond Gyfsum polos Rp4,550.00
M' List Plafond Gyfsum profil Rp5,950.00
M' Listplank GRC Rp65,000.00
M' Skrup Rp650.00
M' plafond PVC Rp160,000.00
M' List plafond PVC Rp12,500.00
M' List plafond Calsiboard Rp4,350.00
Bh
Bh
M2
M'
rol

Lembar BAHAN ATAP


kaki
Lembar Beton Rp30,000.00
M' Keramik Rp11,000.00
M' Asbes Rp46,000.00
Lembar Seng Gelombang (BWG 33) Rp75,000.00
M' Seng Gelombang BJLS (BWG 33) Rp7,000.00
M2 Seng Licin BWG 30 mm Rp97,000.00
M2 Seng Licin BWG 28 mm Rp118,500.00
M2 Atap Spandek Zuncalume 0,35 mm Rp67,000.00
M' Nok Spandek Zuncalume 0,35 mm Rp53,000.00
M' Atap Metal Roof Ex Metal roof Rp54,900.00
M' Nok Metal Roof Rp38,700.00
Kg Karet Pelapis Rp10,000.00
Bh ACP Rp135,000.00
BH Aluminium Stifner Panel Rp75,000.00
Kg Aluminium siku 30 x 16 Rp75,000.00
Bh Besi Kotak 4 x 4 Rp34,000.00
Bh Bracket Besi Siku 70.70.7 Rp12,000.00
BH Dynabolt M10 x 120 Rp2,500.00
Lbr Mur+Baut M10 x 70 Rp2,000.00
Bh Zinchromate Rp45,000.00
M' Ramsel Nails Rp4,500.00
M' Screw Cteks 12-14x50 Rp450.00
M' Screw Cteks 10x16-16 Rp400.00
HPL Rp285,000.00
Bh Lem Kayu Rp25,000.00
Bh Sekrup Fixer Rp2,000.00
Bh Aluminium 4 " Rp86,800.00
Lbr profil alluminium T Rp25,400.00
Nok / Bubungan
- Genteng Beton Rp7,500.00
Bh Kunci tanam 2x putar Rp183,500.00
Bh Ses 2 x Slag (Semacamnya) Rp225,000.00
Bh Penggantung
Bh Hak Angin Rp14,400.00
Bh Kait Angin Rp8,700.00
Bh Grendel Biasa Jendela Rp8,400.00
Bh Grendel Biasa Pintu Rp20,500.00
Bh Grendel Panjang Rp23,000.00
Set Engsel Pintu Rp27,400.00
Bh Engsel Jendela Rp10,400.00
Psg Door closer Rp205,000.00
Psg Expanyolet Rp35,000.00

Unit Kloset Duduk Keramik Tanpa Tabung Rp742,500.00


Unit Kloset Duduk Keramik lengkap acc Rp2,225,700.00
Unit Kloset Jongkok Rp130,400.00
Unit Wasthafel Keramik Rp355,000.00
Unit Wasthafel Cuci Piring Logam 1 bak Rp520,000.00
Bh Wasthafel Cuci Piring Logam 2 bak Rp345,000.00
Bh Waterdrain Rp56,500.00
Bh Bak Mandi Fiber Rp220,000.00
Bh Bak Reservoir (Tandon/Fiber 1200 Ltr) Excel Rp1,400,000.00
Bh Stop Kran Rp20,000.00
Bh Kran Air Rp16,000.00
Bh Floor Drain Rp12,500.00
Bh Seal Tape Rp3,700.00
Bh Zhimizu Otomatis 130 (125 Watt) Rp512,050.00
Bh Zhimizu Otomatis 230 ( 200 Watt) Rp877,800.00
Bh Kusen Pintu Fiber + Acc Rp325,000.00
Bh
Bh
Bh
Unit
Unit
Unit
Unit
Klg Cat Dasar tembok Rp88,100.00
Kg Avitex Rp15,000.00
Klg Cat tembok ex metrolite Rp24,750.00
Kg Dulux Rp20,000.00
Klg Cat Anti Lumut (Water Profing) Rp53,750.00
Kg Glotex Rp27,000.00
Kg Avian Rp57,500.00
Kg Cat Dasar Rp19,500.00
Pall Politur Rp25,000.00
Kg Cat meni ex glatik Rp29,028.57
Klg Minyak Cat (aff duner) Rp8,400.00
Kg Minyak Bekisting Rp12,500.00
Klg Yoko Rp12,650.00
Kg Lem Seng Rp5,750.00
Kg Lem Kayu Rp27,000.00
Kg Plamur Rp15,000.00
Klg Amplas/Kertas Gosok Rp6,000.00
Kg Dempul Rp17,500.00
Klg Residu Rp6,500.00
Kg Paper Tape Rp10,000.00
Kg Coumpond Rp57,000.00
Kg Kuas Rp18,800.00
Ltr Solar Rp10,000.00
Klg
Kg
Lbr
Kg Minyak Pelumas Rp20,500.00
Kg
Roll
Sak
Bh
Bh
Bh
Ltr
Ltr
Sak

Roll Kabel NYA 2 x 1.5 mm Rp275,600.00


Mtr Kabel NYA 2 x 1.5 mm Rp5,500.00
Mtr Kabel NYY 2 X 2,5 mm Rp15,100.00
Bh Lampu SLE 18 Watt Rp47,900.00
Bh Lampu SLE 12 Watt Rp42,000.00
Bh Lampu SLE 8 Watt Rp32,500.00
Set Lampu RM 2 X 20 Watt Rp200,000.00
Bh Lampu Pijar 25 W Rp5,900.00
Bh Lampu Pijar 40 W Rp7,000.00
Bh Lampu Pijar 60 W Rp11,000.00
Bh Lampu Pijar 100 W Rp12,000.00
Bh Lampu Taman Mercury Rp350,000.00
Bh Lampu Taman Rp450,000.00
Set Sakelar Tunggal Putih Rp17,300.00
Bh Sakelar Double Putih Rp24,200.00
Bh Stop Kontak Rp28,750.00
Bh Klem Kabel No-10 Rp550.00
Bh Inbow Dos Rp5,000.00
Bh Las Dop Rp3,250.00
Bh Isolasi Rp3,000.00
Bh T-Dos 5/8' Rp5,000.00
Bh Isolator Rp5,250.00
Bh lokal 2 Group Automat Rp79,000.00
Roll Lokal 3 Group Biasa Rp88,000.00
Bh Fitting Rp14,000.00
Bh MCB 16 A 1 Phase Rp70,900.00
Bh MCB 4 Ampere Rp25,000.00
Bh Box Panel Rp877,100.00
Bh Stand Down Light 4" Rp40,250.00
Bh Exhaust pan Rp250,000.00
Bh
Bh
Set
Bh
Bh
Bh

Org/Hari Pekerja
Tukang :
Org/Hari Tukang Kayu
Org/Hari Tukang Batu
Org/Hari Tukang Cat
Org/Hari Tukang Listrik
Org/Hari Tukang Pipa
Org/Hari Tukang Besi
Org/Hari Kepala Tukang :
Kepala Tukang Kayu
Org/Hari Kepala Tukang
Org/Hari Kepala Tukang Batu
Org/Hari Kepala Tukang Listrik
Org/Hari Kepala Tukang Cat
Org/Hari Kepala Tukang Pipa
Org/Hari Kepala Tukang Besi
Org/Hari Pembantu Tukang
Org/Hari Mandor
Org/Hari Penjaga Malam/Gudang
Org/Hari
BAHAN DASAR
Batu Kali
Batu Kali belah
Batu Belah 10 - 15 Cm
Batu
Batu Belah
Pecah 7 5- 10
- 7Cm
Cm
Batu Pecah 3 - 5 Cm
M³ Batu Pecah 1 - 2 Cm
M³ Batu Pecah 0,5 -1 Cm
M³ Batu pecah 2 - 3 Cm
M³ Batu pecah 1 - 2 Cm
M³ Batu Gunung
M³ Tanah Timbunan
M³ Pasir Timbunan /Urug
M³ Pasir Pasangan
M³ Pasir Beton
Kg Pasir Beton
Kg Kerikil Sungai
M³ Kerikil Sungai
M³ Kapur Pasangan
M³ Kapur Pasangan
M³ Semen (PC) 50 Kg
M³ Semen (PC)
Kg Semen (PC) 40 Kg
M³ Semen (PC)
Kg Semen Putih 40 Kg
M³ Semen Putih
Kg Semen Mortar (Perekat Hebel) 40 Kg
Sak Semen Mortar (Perekat Hebel) 40 Kg
Kg Batu Merah Standar
Sak Bata Ringan (Hebel)
Kg Bata Ringan (Hebel)
Sak Plamur
Kg Paving Block K-300 Tebal 8 cm
Sak Air Kerja
Kg
Buah BAHAN KAYU
M³ Kayu Kelas - I Bayam (Balok) Gergaji S
Biji Kayu Kelas - I Bayam (Papan) Gergaji S
Kg Kayu Kelas - I Bayam (Balok) Gergaji S
Biji Kayu Kelas - I Bayam (Papan) Gergaji
Ltr Kayu Kelas - II Samarinda Kayu Balok
Kayu Kelas - II Samarinda Kayu Papan
Kayu Kelas - II Kayu Papan (Jati)
Kayu Kelas - III Kapur/kemiri Kayu Balo
Kayu Mangga/Kemiri papan
M³ Kayu Kelas - III Papan
M³ kayu perancah
M³ Kayu Kumea Balok
M³ Kayu Kumea Papan
M³ papan Kelas I
M³ Papan Kelas II
M³ Lem Kayu

M³ BAHAN KACA & ACC
M³ Kaca Bening 3 mm
M³ Kaca Bening 5 mm
M³ Kaca Bening 8 mm
M³ Kaca Bening 10 mm
Kaca Ryben 3 mm
M2 Kaca Ryben 5 mm
M2 Sealent
M2
M2 BAHAN LANTAI & DINDING
M2 Tegel Keramik
M2 Putih 20 x 20 cm
Tube Putih 20 x 20 cm
Putih 20 x 25 cm
Putih 20 x 25 cm
Warna 20 x 25 cm
Warna 20 x 25 cm
Keramik Putih 20 x 40 cm
Keramik Putih 20 x 40 cm
Keramik Putih 30 x 30 cm
Dos Keramik Putih 30 x 30 cm
Bh Keramik Putih 40 x 40 cm
Dos Keramik Putih 40 x 40 cm
Bh Warna 60 x 60 cm Ex Granite
Dos Warna 60 x 60 cm Ex Granite
Bh Warna 15 x 60 cm Ex Granite
Dos Batu Alam 10 x 20
Bh Batu Alam 10 x 20
Dos
Bh Paku
Dos Paku Seng (Payung) RRT
Bh Paku Skrup 3 1/2 Inci
Dos Paku Skrup
Bh Paku Payung Berulir 75 mm
Bh Paku skrup Gypsum
M2 Paku Biasa
Bh Paku 2 Cm- 5 Cm
Paku 7 Cm- 10 Cm
Paku 12 Cm
Paku Beton Hitam
Paku Beton Putih

Besi
Besi Beton polos
Besi Diameter 4 mm
Besi Diameter 6 mm
Kg Besi Diameter 8 mm
Kg Besi Diameter 10 mm
biji Besi Diameter 12 mm
Kg Besi Diameter 14 mm
Kg Besi Diameter 16 mm
Kg Besi Diameter 19 mm
Kg Besi Diameter 20 mm
Kg Besi Striip
Kg HBEAM (200.200.8.12)
Kg HBEAM (250.250.9.14)
Kg HBEAM (300.300.10.15)
Besi Profil IWF (300.150.6,5.9)
Besi Profil IWF (250.125.6.9)
Besi Profil IWF (200.100.5,5.8)
Besi Profil IWF (175.90.5.8)
Besi Profil IWF (150.75.5.7))
CNP 100.50.20.2,3
Besi Plat 12 mm
Besi Plat 8 mm
Angkur 3/4 x 51
Baut 5/8 x 2"
Besi Hollow 40.40. 2 mm p= 6 mm

Besi Hollow 40.40. 2 mm p= 6 mm


Kg Besi Hollow 40.20. 2 mm p= 6 mm
Kg Besi Hollow 40.40. 2 mm p= 6 mm
Kg Hollow Aluminium rangka plafond 0,25
Kg Hollow Aluminium rangka plafond 0,25
Kg Hollow Aluminium rangka plafond 0,3
Btg Hollow Aluminium rangka plafond 0,3
M' Hollow Aluminium rangka plafond 40 x
Btg Hollow Aluminium rangka plafond 40 x
M' Hollow Aluminium rangka plafond 40 x
Btng Hollow Aluminium rangka plafond 40 x
M' Hollow Aluminium rangka plafond 40 x
Btng Hollow Aluminium rangka plafond 40 x
M' Besi Hollow
Btng Kawat Penggantung Hollow aluminium
M' Pintu KM/WC PVC Lengkap Acc
Btng Tebal 1 mm/m1 Pintu KM/WC Aluminium Lengkap Acc
M' Tebal 0.75 mm/m1 GOC 0.35mm (Reng + Skoring Angin)
Btng Self Driling Screw
M' Alat Bantu
M' Kawat ikat Beton
Kg Smartdeck 0.70 mm
Unit M.8/m2 Besi Wire Mesh M.10 /m2
Unit/set M.10/m2 Kawat Las
M' M.6/m2 Canal C Baja Ringan
Lbr L Braket
Ls
Pipa Besi GIP
Ø 1/2 Inci - 6 m
Btg Ø 3/4 Inci - 6 m
Btg Ø 1 Inci - 6 m
M' Ø 2 Inci - 6 m
Btg Ø 2 1/2 Inci - 6 m
Btg Pipa Paralon PVC (Air Bersih)
Btg Ø 1/2 Inci - 4 m
Btg
Btg Ø 3/4 Inci - 4 m (Maspion)
M'
Btg Ø 1 Inci - 4 m (Maspion)

Btg Ø 1 1/2 Inci - 4 m


Btg
Btg Ø 2 Inci - 4 m
Btg

Btg

Btg

Btg

Btg

Btg

Ø 3 Inci - 4 m

Ø 4 Inci - 4 m

Jenis Btg (AW) untuk Saluran Pembuangan A


Ø 1/2 Inci - 4 m
Ø 3/4 Inci - 4 m
Ø 3/4 Inci - 4 m
Ø 1 Inci - 4 m
Lbr Ø 11/2 Inci - 4 m
Lbr Ø 2 Inci - 4 m
Lbr Ø 2 1/2 Inci - 4 m
Lbr Ø 3 Inci - 4 m
Lbr Ø 3 Inci - 4 m
M' Ø 4 Inci - 4 m
M' Pipa Jenis Btg C untuk Instalasi Listrik
M' Ø 5/8 Inci - 4 m
M' Ø 3/4 Inci - 4 m
M' Ø 1 Inci - 4 m
M² Ø 11/2 Inci - 4 m
Bh Kabel Duck PVC 16 X 16 mm
M² Ijuk
M'
M' BAHAN - BAHAN LANGIT
Multipleks 120 x 240 x 1,2 cm
Multipleks 120 x 240 x 0,6 cm
Multipleks 120 x 240 x 0,9 cm
Calsi Board 4 mm

Gypsum Board 9 mm
List Profil kayu 2x3 cm
List Profil kayu 3x3 cm

bh List Profil kayu 5x5 cm


Lbr List Plafond Gyfsum polos
Lbr List Plafond Gyfsum profil
Lbr Listplank GRC
Kaki Skrup
Lbr plafond PVC
Lbr List plafond PVC
M' List plafond Calsiboard
M'
Lbr BAHAN ATAP
M¹ Beton
M2 Keramik
M2 Asbes
m' Seng Gelombang (BWG 33)
m' Seng Gelombang BJLS (BWG 33)
m' Seng Licin BWG 30 mm
kg Seng Licin BWG 28 mm
Bh Atap Spandek Zuncalume 0,35 mm
Bh Nok Spandek Zuncalume 0,35 mm
kg Atap Metal Roof Ex Metal roof
Bh Nok Metal Roof
Bh Karet Pelapis
Bh ACP
bH Aluminium Stifner Panel
Kg Aluminium siku 30 x 16
Bh Besi Kotak 4 x 4
M' Bracket Besi Siku 70.70.7
M' Dynabolt M10 x 120
Mur+Baut M10 x 70
bh Zinchromate
Bh Ramsel Nails
Bh Screw Cteks 12-14x50
Screw Cteks 10x16-16
Bh HPL
Bh Lem Kayu
Bh Sekrup Fixer
Bh Aluminium 4 "
Bh profil alluminium T
Bh Nok / Bubungan
Bh - Genteng Beton
Set - Genteng Asbes
Bh - Genteng Keramik

Unit BAHAN PENGGANTUNG


Unit Kunci Tanam
Bh Kunci tanam 2x putar
Bh Ses 2 x Slag (Semacamnya)
Bh Penggantung
Bh Hak Angin
Bh Kait Angin
Bh Grendel Biasa Jendela
Bh Grendel Biasa Pintu
Bh Grendel Panjang
Bh Engsel Pintu
Bh Engsel Jendela
Bh Door closer
Bh Expanyolet
Bh Handel Pintu
set Handel Pintu
Handel Jendela
Handel Jendela

BAHAN SANITER
Kloset Duduk Keramik Tanpa Tabung
Kloset Duduk Keramik lengkap acc
Kloset Jongkok
Wasthafel Keramik
Wasthafel Cuci Piring Logam 1 bak
Kg Wasthafel Cuci Piring Logam 2 bak
Kg Waterdrain
Kg Bak Mandi Fiber
Kg Bak Reservoir (Tandon/Fiber 1200 Ltr)
Kg Stop Kran
Kg Kran Air
Kg Floor Drain
Kg Seal Tape
Kg Zhimizu Otomatis 130 (125 Watt)
Kg Zhimizu Otomatis 230 ( 200 Watt)
Kg Kusen Pintu Fiber + Acc
Ltr
Kg BAHAN FINISHING / CAT
Kg Cat Dasar tembok
Kg Avitex
Kg Cat tembok ex metrolite
Lbr Dulux
Kg Cat Anti Lumut (Water Profing)
Kg Glotex
Roll Avian
zak Cat Dasar
bh Politur
Ltr Cat meni ex glatik
Minyak Cat (aff duner)
Minyak Bekisting
Yoko
Ltr Lem Seng
Lem Kayu
Plamur
Amplas/Kertas Gosok
Dempul
Residu
Paper Tape
Coumpond
Kuas
Solar
Minyak Pelumas
Roll
Meter BAHAN INSTALSI LISTRIK
Meter Kabel NYA 2 x 1.5 mm
Bh Kabel NYA 2 x 1.5 mm
Bh Kabel NYY 2 X 2,5 mm
Bh Lampu SLE 18 Watt
Set Lampu SLE 12 Watt
Bh Lampu SLE 8 Watt
Bh Lampu RM 2 X 20 Watt
Bh Lampu Pijar 25 W
Bh Lampu Pijar 40 W
Bh Lampu Pijar 60 W
Bh Lampu Pijar 100 W
Bh Lampu Taman Mercury
Bh Lampu Taman
Bh Sakelar Tunggal Putih
Bh Sakelar Double Putih
Bh Stop Kontak
Bh Klem Kabel No-10
Roll Inbow Dos
Bh Las Dop
Bh Isolasi
Bh T-Dos 5/8'
Bh Isolator
Bh lokal 2 Group Automat
Bh Lokal 3 Group Biasa
Bh Fitting
Bh MCB 16 A 1 Phase
Bh MCB 4 Ampere
Bh Box Panel
Stand Down Light 4"
Exhaust pan

DAFTAR UPAH KERJA


Pekerja
Tukang :
Tukang Batu
Rp87,000.00 Ogr/hr Tukang Cat
Tukang Listrik
Rp110,000.00 Ogr/hr Tukang Pipa
Rp110,000.00 Ogr/hr Tukang Besi
Rp110,000.00 Ogr/hr Kepala Tukang :
Rp110,000.00 Ogr/hr Kepala Tukang Kayu
Rp110,000.00 Ogr/hr Kepala Tukang
Rp110,000.00 Ogr/hr Kepala Tukang Batu
Kepala Tukang Listrik
Rp120,000.00 Org/hr Kepala Tukang Cat
Rp120,000.00 Org/hr Kepala Tukang Pipa
Rp120,000.00 Org/hr Kepala Tukang Besi
Rp120,000.00 Org/hr Pembantu Tukang
Rp120,000.00 Org/hr Mandor
Rp120,000.00 Org/hr Penjaga Malam/Gudang
Rp120,000.00 Org/hr
Rp90,000.00 Org/hr
Rp140,000.00 Org/hr
Rp110,000.00 Org/hr 140000
Rp179,000.00 M³
Rp171,400.00 M³
Rp372,800.00 M³
Rp298,300.00
Rp360,700.00 M³

Rp359,300.00 M³
Rp421,700.00 M³
Rp455,500.00 M³
Rp202.63 Kg
Rp221.95 Kg
Rp335,000.00 M³
Rp87,500.00 M³
Rp143,700.00 M³
Rp194,500.00 M³
Rp194,500.00 M³
Rp121.56 Kg
Rp275,100.00 M³
Rp171.94 Kg
Rp29,800.00 M³
Rp9,933.33 Kg
Rp74,500.00 Sak
Rp1,490.00 Kg
Rp54,500.00 Sak
Rp1,362.50 Kg
Rp105,800.00 Sak
Rp2,645.00 Kg
Rp92,500.00 Sak
Rp2,312.50 Kg
Rp550.00 Buah
Rp750,000.00 M³
Rp7,800.00 Biji
Rp5,500.00 Kg
Rp1,000.00 Biji
Rp75.00 Ltr

Rp20,691,000.00 M³
Rp22,990,000.00 M³
Rp11,180,700.00 M³
Rp16,720,000.00 M³
Rp4,754,800.00 M³
Rp5,068,300.00 M³
Rp7,280,000.00 M³
Rp2,926,000.00 M³
Rp2,769,300.00 M³
Rp3,422,400.00 M³
Rp2,873,800.00 M³
Rp6,792,500.00 M³
Rp6,792,500.00 M³
Rp19,760,000.00 M³
Rp7,280,000.00 M³
Rp17,100.00 Kg

Rp115,000.00 M2
Rp146,600.00 M2
Rp165,000.00 M2
Rp187,000.00 M2
Rp115,000.00 M2
Rp161,000.00 M2
Rp7,500.00 Tube

Rp60,100.00 Dos
Rp2,404.00 Bh
Rp62,300.00 Dos
Rp3,115.00 Bh
Rp70,000.00 Dos
Rp3,500.00 Bh
Rp61,000.00 Dos
Rp4,880.00 Bh
Rp58,400.00 Dos
Rp5,256.00 Bh
Rp62,100.00 Dos
Rp9,936.00 Bh
Rp205,000.00 Dos
Rp73,800.00 Bh
Rp18,450.00 Bh
Rp200,000.00 M2
Rp4,000.00 Bh

Rp34,000.00 Kg
Rp18,300.00 Kg
Rp550.00 biji
Rp25,600.00 Kg
Rp55,000.00 Kg
Rp25,000.00 Kg
Rp23,000.00 Kg
Rp27,000.00 Kg
Rp31,000.00 Kg
Rp25,500.00 Kg
Rp15,200.00 Kg

Rp11,267.73 Kg
Rp24,000.00 Btg
Rp32,300.00 Btg
Rp55,200.00 Btg
Rp71,000.00 Btg
Rp104,500.00 Btg
Rp144,900.00 Btg
Rp195,500.00 Btg
Rp272,800.00 Btg
Rp464,400.00 Btg
Rp12,950.00 M'
Rp13,000.00 Kg
Rp13,750.00 Kg
Rp14,500.00 Kg
Rp11,250.00 Kg
Rp11,000.00 Kg
Rp10,650.00 Kg
Rp10,250.00 Kg
Rp9,650.00 Kg
Rp6,500.00 Kg
Rp9,900.00 Kg
Rp9,800.00 Kg
Rp8,500.00 Kg
Rp3,500.00 Kg
Rp215,600.00 Btg

Rp35,933.33 M'
Rp161,000.00 Btg
Rp26,833.33 M'
Rp21,700.00 Btng
Rp5,425.00 M'
Rp22,900.00 Btng
Rp5,725.00 M'
Rp32,700.00 Btng
Rp8,175.00 M'
Rp40,300.00 Btng
Rp10,075.00 M'
Rp27,100.00 Btng
Rp6,775.00 M'
Rp30,916.67 M'
Rp31,000.00 Kg
Rp574,800.00 Unit
Rp725,000.00 Unit/set
Rp8,500.00 M'
Rp255.00 Lbr
Rp5,000.00 Ls
Rp22,200.00 Kg
Rp98,000.00 m2
Rp48,500.00 m2
Rp44,500.00 kg
Rp17,500.00 M'
Rp17,500.00 M'
Rp97,300.00 Btg
Rp120,700.00 Btg
Rp185,700.00 Btg
Rp398,500.00 Btg
Rp477,600.00 Btg

Rp19,000.00 Btg
Rp4,750.00 M'
Rp29,000.00 Btg
Rp7,250.00 M'
Rp40,500.00 Btg
Rp10,125.00 M'
Rp67,000.00 Btg
Rp16,750.00 M'
Rp72,000.00 Btg
Rp18,000.00 M'

Rp192,600.00 Btg
Rp48,150.00 M'
Rp247,600.00 Btg
Rp61,900.00 M'
n Pembuangan Air
Rp19,000.00 Btg
Rp15,000.00 Btg
Rp3,750.00 M'
Rp19,000.00 Btg
Rp24,000.00 Btg
Rp30,000.00 Btg
Rp38,000.00 Btg
Rp115,000.00 Btg
Rp28,750.00 M'
Rp71,000.00 Btg

Rp9,000.00 Btg
Rp12,500.00 Btg
Rp18,750.00 Btg
Rp27,000.00 Btg
Rp7,500.00 M'
Rp45,000.00 M2

Rp202,000.00 Lbr
Rp187,000.00 Lbr
Rp141,000.00 Lbr
Rp73,000.00 Lbr

Rp103,500.00 Lbr
Rp4,325.00 M'
Rp5,512.50 M'

Rp7,700.00 M'
Rp4,550.00 M'
Rp5,950.00 M'
Rp65,000.00 M²
Rp650.00 Bh
Rp160,000.00 M²
Rp12,500.00 M'
Rp4,350.00 M'

Rp30,000.00 bh
Rp11,000.00 Lbr
Rp46,000.00 Lbr
Rp75,000.00 Lbr
Rp7,000.00 Kaki
Rp97,000.00 Lbr
Rp118,500.00 Lbr
Rp67,000.00 M'
Rp53,000.00 M'
Rp54,900.00 Lbr
Rp38,700.00 M¹
Rp10,000.00 M2
Rp135,000.00 M2
Rp75,000.00 m'
Rp75,000.00 m'
Rp34,000.00 m'
Rp12,000.00 kg
Rp2,500.00 Bh
Rp2,000.00 Bh
Rp45,000.00 kg
Rp4,500.00 Bh
Rp450.00 Bh
Rp400.00 Bh
Rp285,000.00 bH
Rp25,000.00 Kg
Rp2,000.00 Bh
Rp86,800.00 M'
Rp25,400.00 M'

Rp7,500.00 bh
Rp23,000.00 bh
Rp30,600.00 bh

Rp183,500.00 Bh
Rp225,000.00 Bh

Rp14,400.00 Bh
Rp8,700.00 Bh
Rp8,400.00 Bh
Rp20,500.00 Bh
Rp23,000.00 Bh
Rp27,400.00 Bh
Rp10,400.00 Bh
Rp205,000.00 Set
Rp35,000.00 Bh
Rp235,000.00 Psg
Rp117,500.00 bh
Rp178,500.00 Psg
Rp89,250.00 bh

Rp742,500.00 Unit
Rp2,225,700.00 Unit
Rp130,400.00 Bh
Rp355,000.00 Bh
Rp520,000.00 Bh
Rp345,000.00 Bh
Rp56,500.00 Bh
Rp220,000.00 Bh
Rp1,400,000.00 Bh
Rp20,000.00 Bh
Rp16,000.00 Bh
Rp12,500.00 Bh
Rp3,700.00 Bh
Rp512,050.00 Bh
Rp877,800.00 Bh
Rp325,000.00 set

Rp88,100.00 Kg
Rp15,000.00 Kg
Rp24,750.00 Kg
Rp20,000.00 Kg
Rp53,750.00 Kg
Rp27,000.00 Kg
Rp57,500.00 Kg
Rp19,500.00 Kg
Rp25,000.00 Kg
Rp29,028.57 Kg
Rp8,400.00 Kg
Rp12,500.00 Ltr
Rp12,650.00 Kg
Rp5,750.00 Kg
Rp27,000.00 Kg
Rp15,000.00 Kg
Rp6,000.00 Lbr
Rp17,500.00 Kg
Rp6,500.00 Kg
Rp10,000.00 Roll
Rp57,000.00 zak
Rp18,800.00 bh
Rp10,000.00 Ltr
Rp20,500.00 Ltr

Rp275,600.00 Roll
Rp5,500.00 Meter
Rp15,100.00 Meter
Rp47,900.00 Bh
Rp42,000.00 Bh
Rp32,500.00 Bh
Rp200,000.00 Set
Rp5,900.00 Bh
Rp7,000.00 Bh
Rp11,000.00 Bh
Rp12,000.00 Bh
Rp350,000.00 Bh
Rp450,000.00 Bh
Rp17,300.00 Bh
Rp24,200.00 Bh
Rp28,750.00 Bh
Rp550.00 Bh
Rp5,000.00 Bh
Rp3,250.00 Bh
Rp3,000.00 Roll
Rp5,000.00 Bh
Rp5,250.00 Bh
Rp79,000.00 Bh
Rp88,000.00 Bh
Rp14,000.00 Bh
Rp70,900.00 Bh
Rp25,000.00 Bh
Rp877,100.00 Bh
Rp40,250.00 Bh
Rp250,000.00 Bh

Rp87,000.00 Ogr/hr

Rp110,000.00 Ogr/hr
Rp110,000.00 Ogr/hr
Rp110,000.00 Ogr/hr
Rp110,000.00 Ogr/hr
Rp110,000.00 Ogr/hr

Rp120,000.00 Org/hr
Rp120,000.00 Org/hr
Rp120,000.00 Org/hr
Rp120,000.00 Org/hr
Rp120,000.00 Org/hr
Rp120,000.00 Org/hr
Rp120,000.00 Org/hr
Rp90,000.00 Org/hr
Rp140,000.00 Org/hr
Rp110,000.00 Org/hr
Pembongkaran Dinding Gedung Lab
No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Dinding Km 2.70 3.00 1.00 8.10

JUMLAH 8.10

8.10

Pembongkaran Keramik Dinding KM LT 1


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Dinding Km 12.40 2.00 1.00 24.80

JUMLAH 24.80
Dikurangi Lubang Pintu 2.94
21.86

Pembongkaran Keramik Lantai KM LT 1


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Dinding Km 2.34 1.00 2.00 4.68

JUMLAH 4.68
Dikurangi Lubang Pintu -
4.68

Pembongkaran Keramik Dinding KM LT 2


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Lantai Km 12.60 2.00 1.00 25.20

JUMLAH 25.20
Dikurangi Lubang Pintu 3.36
21.84

Pembongkaran Keramik Lantai KM LT 2


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Lantai Km 2.41 1.00 2.00 4.81

JUMLAH 4.81
Dikurangi Lubang Pintu -
4.81

Pembongkaran Plafond LT 1 - KLINIK


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Lantai Km 17.25 1.00 1.00 17.25

JUMLAH 17.25
-
17.25

Pembongkaran Plafond LT 2- Rg Tengah


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Plafond 55.25 1.00 1.00 55.25

JUMLAH 55.25
-
55.25

Pembongkaran Plafond LT 2- Rg Pelatihan


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Plafond 52.00 1.00 1.00 52.00

JUMLAH 52.00
-
52.00

Pembongkaran Plafond LT 2- Rg Pelayanan Teknik -1


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Plafond 52.00 1.00 1.00 52.00

JUMLAH 52.00
-
52.00

Pembongkaran Plafond LT 2- Rg Pelayanan Teknik -2


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Plafond 52.00 1.00 1.00 52.00

JUMLAH 52.00
-
52.00

Pengecatan Dinding KM LT-1


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Dinding KM 4.68 1.40 1.00 6.55
Dindind Luar 4.65 3.00 2.00 27.90

JUMLAH 34.45
Lubang Pintu Km 1.68
32.77

Pengecatan Dinding KM LT-2


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Dinding KM 13.00 1.40 1.00 18.20
Dindind Luar 7.45 3.00 2.00 44.70

JUMLAH 62.90
Lubang Pintu Km 3.36
59.54

Pintu Rg. Lab


No. Uraian dan Volume sat.
Panjang (m') Lebar (m') Jml. ttk
Panjang (m') Lebar (m') Jml. ttk
Ukuran
(a) (b) (d) (e) (f) (g)
3 Pek. Type P.2 (4 Buah)
- Kusen Alumunium 5.35 1.00 5.35 m'
- Bingkai Alumunium 5.85 1.00 5.85 m'
- Multipleks+Hpl 2.10 0.85 1.00 1.79 m2
- Kaca t= 5 mm 0.00 m2

Dinding Partisi Rg Lab


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Partisi 4.87 3.00 1.00 14.61
0.00

JUMLAH 14.61
Lubang Pintu Km 1.89
12.72

Wallpaper Rg Kepala UPTD


No. Uraian dan Volume (m2)
Panjang (m') Tinggi (m') Jml. ttk
Ukuran (dxexf)
(a) (b) (d) (e) (f) (g)
c
Dinding 23.75 4.00 1.00 95.00
0.00

JUMLAH 95.00
Lubang Pintu / jendela 10.19
84.81
JADWAL PERALATAN
REHABILITASI BALAI BESAR PENGEMBANGAN KESELAMATAN KERJA
KOTA MAKASSAR TAHUN ANGGARAN 2019

JADWAL PEMAKAIA
NO JENIS PERALATAN SAT VOLUME KAPASITAS BOBOT REC/REA
Bln 1 Bln 2
1 Dump Truck Unit 2 6 Ton 80.10 Renc 2 2
Rea
2 Concrete Mixer Unit 2 0.5 m3 1.52 Renc 2 2
Rea
3 Concrete Vibrator Unit 1 0.27 Renc 1 1
Rea
4 Stamper Unit 1 1.17 Renc 1 1
Rea
5 Waterpass Unit 1 0.76 Renc 1 1
Rea
6 Theodolite Unit 1 3.49 Renc 1 1
Rea
7 Scafolding Set 300 9.24 Renc 150 300
Rea
8 Tangki Air Unit 2 0.12 Renc 2 2
Rea
9 Pompa Air Unit 1 0.05 Renc 1 1
Rea
10 Mesin Las Listrik Unit 2 0.48 Renc 2 2
Rea
11 Bar Cutter Unit 2 0.29 Renc 2 2
Rea
12 Bar Bender Unit 2 1.44 Renc 2 2
Rea
13 Pemotong Keramik Unit 2 0.04 Renc 0 1
Rea
14 Genset Unit 1 1.04 Renc 1 1
Rea
Jumlah Rencana (Bulan) % 0 53% 100%
Jumlah Realisasi (Bulan) %
Deviasi Kinerja Peralatan (%)
SELAMATAN KERJA
2019

JADWAL PEMAKAIAN ALAT


Keterangan
Bln 3 Bln 4 Bln 5 Bln 6
2 2 2 2 100

2 2 2 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

300 300 300 300

2 2 2 2

1 1 1 1

2 2 2 2

2 2 2 1

2 2 2 1

2 2 2 2

1 1 1 1

100% 100% 100% 99%

0
0
0

Err:509
Err:509
JADWAL PERSONIL
REHABILITASI BALAI BESAR PENGEMBANGAN KESELAMATAN KERJA
KOTA MAKASSAR TAHUN ANGGARAN 2019

JADWAL TENAGA LAPANGAN


NO JABATAN
Bln 01 Bln 02 Bln 03 Bln 04 Bln 05 Bln 06
1 Team Leader 1 1 1 1 1 1
2 Tenaga Ahli Landscape 1 1 1 1 1 1
3 Juru Ukur 1 1 1 1 1 1
4 Juru Gambar 1 1 1 1 1 1
5 Administrasi dan Logistik 1 1 1 1 1 1
6 Mandor 1 1 2 2 2 2
7 Kepala Tukang 3 3 5 5 5 5
8 Tukang 10 12 18 20 20 16
9 Tenaga 14 14 16 16 10 10

Jumlah 33 35 46 48 42 38

0
0
0

Err:509
Err:509
RJA

KETERANGAN
JADWAL MATERIAL
REHABILITASI BALAI BESAR PENGEMBANGAN KESELAMATAN KERJA
KOTA MAKASSAR TAHUN ANGGARAN 2019

JADWAL PENGADAAN MATERIAL


NO JENIS MATERIAL UNIT/SAT VOLUME
Pertama Kedua Ketiga Keempat Kelima
1
JADWAL PENGADAAN MATERIAL
NO JENIS MATERIAL UNIT/SAT VOLUME
Pertama Kedua Ketiga Keempat Kelima

0
0
0

Err:509
Err:509
N KERJA

RIAL
KETERANGAN
Keenam
RIAL
KETERANGAN
Keenam

Anda mungkin juga menyukai