Anda di halaman 1dari 137

RENCANA ANGGARAN BIAYA (RAB)

SATKER
PEKERJAAN
LOKASI
TAHUN ANGGARAN

NO URAIAN JUMLAH HARGA

A PEKERJAAN PENDAHULUAN Rp 46,127,923.52

B PEKERJAAN STRUKTUR Rp 60,646,628.37

C PEKERJAAN KONTRUKSI ATAP Rp 17,115,639.88

D PEKERJAAN ARSITEKTUR Rp 90,914,927.50

E PEKERJAAN ELEKTRIKAL & MEKANIKAL Rp -

F PEKERJAAN LANDSCAPE Rp -
SUB JUMLAH Rp 214,805,119.27
PPN 10% Rp 21,480,511.93
JUMLAH Rp 236,285,631.19
PEMBULATAN Rp 236,285,600.00
PROVISIONAL SUM : IMB Rp 10,000,000.00
TOTAL BIAYA KONSTRUKSI Rp 246,285,600.00
TERBILANG : DUA RATUS EMPAT PULUH ENAM JUTA DUA RATUS DELAPAN PULUH LIM
RIBU ENAM RATUS RUPIAH

1
JUMLAH HARGA

Rp 46,127,923.52

Rp 60,646,628.37

Rp 17,115,639.88

Rp 90,914,927.50

Rp -

Rp -
Rp 214,805,119.27
Rp 21,480,511.93
Rp 236,285,631.19
Rp 236,285,600.00
Rp 10,000,000.00
Rp 246,285,600.00
ELAPAN PULUH LIMA

2
RENCANA ANGGARAN BIAYA (RAB)
SATKER
PEKERJAAN
LOKASI
TAHUN ANGGARAN

I. PEKERJAAN PENDAHULUAN

HARGA SATUAN
NO JENIS PEKERJAAN VOLUME SATUAN
(RP)
A PEKERJAAN PENDAHULUAN
1 Asuransi Allrisk 1 ls Rp 5,000,000.00
2 Direksi keet dan gudang bahan 20 m2 Rp 710,114.03
3 pagar pengaman proyek 34 m Rp 261,651.64
4 pengukuran awal dan pemasangan bowplank 30 m Rp 100,982.91
5 pengadaan listrik kerja 1 ls Rp 5,000,000.00
6 pengadaan air kerja 1 ls Rp 5,000,000.00
7 pelaporan atau dokumentasi 1 set Rp 5,000,000.00
TOTAL PEKERJAAN PENDAHULUAN

2
JUMLAH HARGA
(RP)

Rp 5,000,000.00
Rp 14,202,280.58
Rp 8,896,155.72
Rp 3,029,487.22
Rp 5,000,000.00
Rp 5,000,000.00
Rp 5,000,000.00
Rp 46,127,923.52

3
RENCANA ANGGARAN BIAYA (RAB)
SATKER
PEKERJAAN
LOKASI
TAHUN ANGGARAN

HARGA SATUAN
NO JENIS PEKERJAAN VOLUME SATUAN
(Rp)
B PEKERJAAN STRUKTUR
1 Pekerjaan Pondasi
a. Galian Tanah 28.16 m³ Rp 45,320.00
b. Pek.Pas Pasir urug dibawah Pondasi 2.56 m³ Rp 1,952,652.50
c. Pemasangan Batu kosong 5.12 m³ Rp 1,733,011.24
d. Pas. Batu kali 8.64 m³ Rp 2,054,121.34
e. Urugan Tanah kembali 9.39 m³ Rp 21,670.00
f. spesi 5 cm 5.18 m³ Rp 721,261.61

2 Pekerjaan Sloof 15 x 15 cm
a. Beton K200 0.95 m³ Rp 2,670,465.35
b. Pembesian Ø 10 104 kg Rp 36,312.04
c. Pembesian Ø 6 41 kg Rp 36,312.04
d. Bekisting 25.20 m² Rp 294,331.25

3 Pekerjaan Kolom beton bertulang


a. beton K200 0.72 m³ Rp 2,670,465.35
b. Pembesian Ø 10 79 kg Rp 36,312.04
c. Pembesian Ø 6 31 kg Rp 36,312.04
d. Bekisting 10 m² Rp 281,523.27
TOTAL PEKERJAAN KONSTRUKSI ATAP

3
JUMLAH HARGA
(Rp)

Rp 1,276,211
Rp 4,998,790
Rp 8,873,018
Rp 17,747,608
Rp 203,409
Rp 3,732,529

Rp 2,523,590
Rp 3,761,927
Rp 1,487,486
Rp 7,417,148

Rp 1,922,735
Rp 2,866,230
Rp 1,133,323
Rp 2,702,623
Rp 60,646,628.37

4
RENCANA ANGGARAN BIAYA (RAB)
SATKER
PEKERJAAN
LOKASI
TAHUN ANGGARAN

HARGA SATUAN
NO JENIS PEKERJAAN VOLUME SATUAN
Rp
C PEKERJAAN KONSTRUKSI ATAP
1 Pekerjaan Ring Balok 15 x 20 cm
a. beton K200 0.72 m³ Rp 2,670,465
b. pembesian Ø 10 78.9 kg Rp 36,312
c. pembesian Ø 6 35.94 kg Rp 36,312
d. bekisting ring balok 39.15 m² Rp 281,523

2 Pekerjaan Kuda kuda


a. balok tarik 5/10 m³ Rp 5,199,985
b. balok tiang kuda kuda 5/10 m³ Rp 5,199,985
c. balok kaki kuda kuda 5/10 m³ Rp 5,199,985
d. balok pengapit 5/10 m³ Rp 7,664,315
e. balok gording 5/10 m³ Rp 5,242,156
f. balok penahan gording 5/10 m³ Rp 5,242,156
g. balok bubungan 5/10 m³ Rp 5,199,985
h. papan bubungan m³ Rp 5,199,985
i. balok skor 5/10 m³ Rp 5,199,985
j. Balok pengunci 5/10 m³ Rp 5,199,985
k. balok penyokong m³ Rp 5,199,985
l. kebutuhan baut buah Rp 77,880

3 penutup atap/ nok atap m Rp 79,927


2 pemasangan atap seng bjls 30 m² Rp 98,477
2 pengecatan atap m² Rp 87,237
TOTAL PEKERJAAN KONSTRUKSI ATAP

4
JUMLAH HARGA
Rp

Rp 1,922,735
Rp 2,866,230
Rp 1,305,039
Rp 11,021,636

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp 17,115,640

5
RENCANA ANGGARAN BIAYA (RAB)
SATKER
PEKERJAAN
LOKASI
TAHUN ANGGARAN

HARGA SATUAN
NO JENIS PEKERJAAN VOLUME SATUAN
Rp
D PEKERJAAN ARSITEKTUR
1 Pekerjaan arsitektur dinding
a.pekerjaan dinding bata 90.66 m² Rp 998,310
b.pekerjaan Plesteran 2.72 m³ Rp 108,172
b.pekerjaan acian 2.72 m³ Rp 43,738

2 Pekerjaan plafon
a.pekerjaan plafon multipleks m² Rp 175,019
b.rangka plafon 5/5 m³ Rp 35,925
c.pekerjaan list plafon m² Rp 35,925

3 Pekerjaan kusen pintu jendela dan ventilasi


pemasangan pintu type 1 unit Rp 564,784

4 Pekerjaan lantai dan dinding keramik


a. pekerjaan lantai keramik 40 x 40 cm m² Rp 877,510
b. pekerjaan lantai keramik 20 x 20 cm m² Rp 281,638

5 pekerjaan pengecatan
a. dinding interior m² Rp 26,811
b. dinding eksterior m² Rp 26,811
c. plafon m² Rp 52,575
d. kusen pintu jendela dan ventilasi m² Rp 57,225
TOTAL PEKERJAAN ARSITEKTUR

6
JUMLAH HARGA
Rp

Rp 90,501,784
Rp 294,191
Rp 118,953

Rp -
Rp -
Rp -

Rp -

Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp 90,914,927

7
RENCANA ANGGARAN BIAYA (RAB)
SATKER
PEKERJAAN
LOKASI
TAHUN ANGGARAN

HARGA SATUAN
NO JENIS PEKERJAAN VOL SAT
Rp
E PEKERJAAN MEKANIKAL & ELEKTRIKAL
1 Pekerjaan listrik
a.pekerjaan pemasangan panel/meteran bh Rp 844,748
b.pemasangan kabel NYY m Rp 66,976
c.pemasangan kabel tray m Rp 49,908
d.pemasangan lampu biasa bh Rp 104,721
e.pemasangan saklar tunggal bh Rp 148,447
f.pemasangan saklar ganda bh Rp 141,452
g.pemasangan stopkontak bh Rp 68,068
h. instalasi lampu dan stop kontak titik Rp 583,334

2 Pekerjaan saniter
a.pemasangan kloset duduk bh Rp 4,608,282
b.pemasangan washtaffel dan kran set Rp 1,537,053
c.pemasangan floor drain bh Rp 107,242
d.pemasangan kran bh Rp 228,281
e.pemasangan pipa pembuangan m Rp 200,036
f.pemasangan pipa air bersih m Rp 109,051
g. pemasangan bak mandi bh Rp 800,648
TOTAL PEKERJAAN MEKANIKAL & ELEKTRIKAL

7
JUMLAH HARGA
Rp

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

8
RENCANA ANGGARAN BIAYA (RAB)
SATKER
PEKERJAAN
LOKASI
TAHUN ANGGARAN

HARGA SATUAN
NO JENIS PEKERJAAN VOLUME SATUAN
Rp
F PEKERJAAN LANDSCAPE
1 pekerjaan saptictank
a. galian tanah m³ Rp 113,531.00
b. lantai cor saptictank m³ Rp 135,327.46
c. pasangan bata saptictank m³ Rp 998,309.90
d. balok beton saptictank m³ Rp 2,670,465.35
e. pembesian Ø 10 kg Rp 36,312.04
e. pembesian Ø 6 kg Rp 36,312.04
f. plat beton m³ Rp 2,670,465.35
g. pembesian Ø 10 kg Rp 36,312.04

2 pekerjaan peresapan
a. galian tanah m³ Rp 45,320.00
b. balok beton m³ Rp 2,670,465.35
c. pembesian Ø 10 kg Rp 36,312.04
c. pembesian Ø 6 kg Rp 36,312.04
d. urugan pasir m³ Rp 1,952,652.50
e. kerikil m³ Rp 743,480.76
f. lapisan ijuk m³ Rp 23,038.57
h. urugan tanah kembali m³ Rp 56,650.00

3 pemasangan pipa PVC Ø 4 m Rp 150,812.91


TOTAL PEKERJAAN LANDSCAPE

7
JUMLAH HARGA
Rp

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -

8
RENCANA ANGGARAN BIAYA (RAB)
SATKER
PEKERJAAN
LOKASI
TAHUN ANGGARAN

A. PEKERJAAN PENDAHULUAN
Jenis Pekerjaan : Direksi Keet (SNI-2016)
Satuan Pembayaran : m2 (Meter persegi)
HARGA SATUAN
NO ITEM PEKERJAAN SATUAN KOEFISIEN
(Rp)
A TENAGA KERJA
pekerja Oh 0.200 Rp 90,000.00
tukang kayu Oh 0.400 Rp 100,000.00
kepala tukang Oh 0.020 Rp 110,000.00
mandor Oh 0.020 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
Kayu matoa 5 x 10 panjang 4 m m3 0.020 Rp 3,403,323.42
Papan kayu matoa 2,5 x 20 m3 0.040 Rp 3,148,964.42
Seng BJLS 0,30 gelombang lbr 1.500 Rp 101,997.96
Seng plat BJLS 30 lebar 40 cm m' 0.250 Rp 39,680.00
paku 5-7 biasa kg 0.060 Rp 26,962.05
Jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D Jumlah (A+B+C)
E Overhead & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pagar pengaman proyek (SNI-2016)


Satuan Pembayaran : m1 (Meter Lari)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.200 Rp 90,000.00
tukang kayu oh 0.400 Rp 100,000.00
kepala tukang oh 0.020 Rp 110,000.00
mandor oh 0.020 Rp 130,000.00
Jumlah Harga Tenaga Kerja
B BAHAN

8
Seng BJLS 0.30 gelombang lbr 1.200 Rp 101,997.96
Kayu matoa 5 x 10 panjang 4 m m3 0.015 Rp 3,403,323.42
paku 5 biasa kg 0.030 Rp 26,962.05
paku 7 biasa kg 0.030 Rp 26,962.05
jumlah harga bahan
C PERALATAN

Jumlah harga peralatan


D Jumlah (A+B+C)
E Overhed & provit 10%
F Jumlah (D+E)
JUMLAH
Jenis Pekrjaan : Pengukuran dan Pemasangan 1 m' Bowplank (SNI-2013)
Satuan Pembayaran : m1 (Meter Lari)

HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.100 Rp 90,000.00
tukang kayu oh 0.100 Rp 100,000.00
kepala tukang oh 0.010 Rp 110,000.00
mandor oh 0.005 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
Paku 5 biasa kg 0.020 Rp 26,962.05
Papan kayu matoa 2,5 x 20 panjan m3 0.007 Rp 3,148,964.42
kayu matoa 5 x 5 panjang 4 m m3 0.012 Rp 4,039,220.92
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D Jumlah (A+B+C)
E Overhed & Profit 10%
F jumlah (D+E)
JUMLAH

B. PEKERJAAN STRUKTUR
1. PEKERJAAN PONDASI
Jenis Pekrjaan : Galian Tanah Biasa dalam 1 m (SNI-2016)
Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)

9
A TENAGA KERJA
pekerja oh 0.400 Rp 90,000.00
mandor oh 0.040 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN

jumlah harga bahan


C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhead & profit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekrjaan : Urugan Tanah Kembali (SNI-2010)


Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.190 Rp 90,000.00
mandor oh 0.020 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN

jumlah harga bahan


C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

10
Jenis Pekrjaan : Urugan Pasir Bawah Pondasi (SNI-2016)
Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
Pekerja Oh 0.010 Rp 90,000.00
Mandor Oh 0.030 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
Pasir Halus m3 1.200 Rp 1,475,282.20

jumlah harga bahan


C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekrjaan : Pemasangan Pondasi Batu Kali (SNI-2000)


Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.780 Rp 90,000.00

11
tukang batu oh 0.750 Rp 100,000.00
kepala tukang oh 0.075 Rp 110,000.00
mandor oh 0.390 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
batu belah m3 1.100 Rp 859,733.42
semen gersik kg 3.260 Rp 2,880.62
pasir halus m3 0.480 Rp 1,475,282.20
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : Pemasangan Pondasi Batu Kosong (SNI-2002)


Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.600 Rp 90,000.00
tukang batu oh 0.400 Rp 100,000.00
kepala tukang oh 0.030 Rp 110,000.00
mandor oh 0.030 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
batu belah m3 1.200 Rp 859,733.42
pasir halus m3 0.300 Rp 1,475,282.20
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

12
Jenis Pekerjaan : spesi 5cm (SNI-2016)
Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.010 Rp 90,000.00
kepala tukang oh 0.040 Rp 110,000.00
mandor oh 0.039 Rp 130,000.00
jumlah harga bahan
B BAHAN
pasir halus m3 0.043 Rp 1,475,282.20
semen gresik kg 202.000 Rp 2,880.62
jumlah harga bahan
C PERALATAN

jumlah harga tenaga kerja


D jumlah (A+B+C)
E overhead & provit 10%
F jumlah (D+E)
JUMLAH

2. PEKERJAAN SLOOF 15 x 15
Jenis Pekerjaan : membuat beton bertulang K200 (SNI 2008)
Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
Pekerja oh 1.650 Rp 90,000.00
Tukang Batu oh 0.275 Rp 100,000.00
Kepala Tukang oh 0.280 Rp 110,000.00
Mandor oh 0.830 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
semen portland kg 352.000 Rp 2,880.62
pasir beton m3 0.540 Rp 585,800.00
kerikil m3 0.810 Rp 1,137,513.00
jumlah harga bahan

13
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan 10 kg besi polos/ulir (SNI 2002)


Satuan Pembayaran : kg ( kilogram )
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
Pekerja oh 0.070 Rp 90,000.00
Tukang besi oh 0.070 Rp 100,000.00
Kepala Tukang oh 0.007 Rp 110,000.00
Mandor oh 0.003 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
besi beton polos/ulir kg 1.050 Rp 17,581.15
kawat beton kg 0.015 Rp 32,049.23
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : bekisting sloof (SNI 2002)


Satuan Pembayaran : m3 (Meter kubik)

14
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
Pekerja oh 0.5200 Rp 90,000.00
Tukang Kayu oh 0.2600 Rp 100,000.00
Kepala Tukang oh 0.0260 Rp 110,000.00
Mandor oh 0.0260 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
paku 5-10 cm kg 0.300 Rp 26,962.05
minyak bekisting ltr 0.100 Rp 20,603.08
balok kayu matoa 5/5 4meter m3 0.045 Rp 4,039,220.92
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : bekisting kolom (SNI 2016)


Satuan Pembayaran : m2 (Meter persegi )
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
Pekerja oh 0.660 Rp 90,000.00
Tukang Kayu oh 0.330 Rp 100,000.00
Kepala Tukang oh 0.033 Rp 110,000.00
Mandor oh 0.033 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
paku 5-10 cm kg 0.400 Rp 26,962.05

15
minyak bekisting ltr 0.200 Rp 20,603.08
plywood 9mm m3 0.350 Rp 206,539.51
balok kayu matoa 5/5 4meter m3 0.018 Rp 4,039,220.92
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhead & provit 10%
F jumlah (D+E)
JUMLAH

C. PEKERJAAN KONSTRUKSI ATAP

1. PEKERJAAN RING BALOK


Jenis Pekerjaan : bekisting ring balok (SNI 2016)
Satuan Pembayaran : m2 (Meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
Pekerja oh 0.660 Rp 90,000.00
Tukang Kayu oh 0.330 Rp 100,000.00
Kepala Tukang oh 0.033 Rp 110,000.00
Mandor oh 0.033 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
paku 5-10 cm kg 0.400 Rp 26,962.05
minyak bekisting ltr 0.200 Rp 20,603.08
plywood 9mm m3 0.350 Rp 206,539.51
balok kayu matoa 5/5 4meter m3 0.018 Rp 4,039,220.92
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhead & provit 10%
F jumlah (D+E)
JUMLAH

16
2. PEKERJAAN KUDA KUDA
Jenis Pekerjaan : pemasangan kuda kuda balok 5/10 (SNI-2016)
Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 4.000 Rp 90,000.00
tukang kayu oh 1.200 Rp 100,000.00
kepala tukang oh 1.200 Rp 110,000.00
mandor oh 0.200 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kayu matoa m3 1.100 Rp 3,403,323.42
paku 10 putih kg 5.600 Rp 33,321.03
besi plat kg 15.000 Rp 10,600.38
jumlah harga bahan
C PERALATAN

jumlah harga peralatan.


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan balok pengapit (SNI-2013)


Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 6.700 Rp 90,000.00
tukang kayu oh 20.100 Rp 100,000.00
kepala tukang oh 2.010 Rp 110,000.00
mandor oh 0.340 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kayu matoa 5/10 m3 1.100 Rp 3,403,323.42
paku 10 putih kg 5.600 Rp 33,321.03
besi strip kg 15.000 Rp 10,600.38
jumlah harga bahan
C PERALATAN

jumlah harga peralatan

17
D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan gording 5/10 (SNI-2016)


Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 2.400 Rp 90,000.00
tukang kayu oh 7.200 Rp 100,000.00
kepala tukang oh 0.720 Rp 110,000.00
mandor oh 0.120 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kayu matoa 5/10 m3 1.100 Rp 3,403,323.42
paku 10 biasa kg 0.250 Rp 26,962.05
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan dudukan gording 5/10 (SNI-2016)


Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 2.4 Rp 90,000.00
tukang kayu oh 7.2 Rp 100,000.00
kepala tukang oh 0.72 Rp 110,000.00

18
mandor oh 0.12 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kayu matoa 5/10 m3 1.100 Rp 3,403,323.42
paku 10 biasa kg 0.250 Rp 26,962.05
jumlah harga peralatan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan baut (SNI-2008)


Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.400 Rp 90,000.00
kepala tukang oh 0.020 Rp 110,000.00
mandor oh 0.020 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
baut bh 3.000 Rp 10,000.00
jumlah harga peralatan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%

19
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pengecatan atap seng gelombang (SNI-2016)


Satuan Pembayaran : m2 (Meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.006 Rp 90,000.00
tukang cat oh 0.100 Rp 100,000.00
kepala tukang oh 0.120 Rp 110,000.00
mandor oh 0.006 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
cat atap kg 0.300 Rp 102,979.06
kuas sedang 3 inchi bh 1.000 Rp 24,672.82
jumlah harga peralatan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan penutup atap (SNI-2016)


Satuan Pembayaran : m2 (Meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA

20
tenaga kerja oh 0.150 Rp 90,000.00
tukang kayu oh 0.070 Rp 100,000.00
kepala tukang oh 0.007 Rp 110,000.00
mandor oh 0.006 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
seng plat bjls 30 m3 0.300 Rp 166,859.50
paku seng kg 0.040 Rp 33,321.03
jumlah harga peralatan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan atap seng gelombang (SNI-2016)


Satuan Pembayaran : m2 (Meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.120 Rp 90,000.00
tukang kayu oh 0.060 Rp 100,000.00
kepala tukang oh 0.006 Rp 110,000.00
mandor oh 0.006 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
seng gel. Bjls 30 m3 0.700 Rp 101,997.96
paku seng kg 0.020 Rp 33,321.03
jumlah harga peralatan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

21
D, PEKERJAAN ARSITEKTUR
1. PEKERJAAN ARSITEKTUR DINDING
Jenis Pekerjaan : Pemasangan dinding bata(SNI-2016)
Satuan Pembayaran : m2 (Meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.300 Rp 90,000.00
tukang batu oh 0.100 Rp 100,000.00
kepala tukang oh 0.010 Rp 110,000.00
mandor oh 0.015 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
bata merah buah 70.000 Rp 12,417.62
semen kg 0.014 Rp 2,880.62
pasir halus m3 0.014 Rp 12,908.72
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : plesteran dan acian (SNI-2008)


Satuan Pembayaran : m2 (Meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.300 Rp 90,000.00
tukang batu oh 0.150 Rp 100,000.00
kepala tukang oh 0.015 Rp 110,000.00
mandor oh 0.015 Rp 130,000.00
jumlah harga tenaga kerja

22
B BAHAN
semen kg 3.456 Rp 2,880.62
pasir halus m3 0.029 Rp 1,475,282.20
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : acian (SNI-2016)


Satuan Pembayaran : m2 (Meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.200 Rp 90,000.00
tukang batu oh 0.100 Rp 100,000.00
kepala tukang oh 0.010 Rp 110,000.00
mandor oh 0.010 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
semen kg 3.250 Rp 2,880.62
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

2. PEKERJAAN PLAFON
Jenis Pekerjaan : Pemasangan plafond tripleks (SNI-2010)

23
Satuan Pembayaran : m2 (Meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.27 Rp 90,000.00
tukang kayu oh 0.40 Rp 100,000.00
kepala tukang oh 0.04 Rp 110,000.00
mandor oh 0.01 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
tripleks lbr 0.375 Rp 123,872.83
kayu matoa 5/5 panjang 4 m m3 0.010 Rp 4,039,220.92
paku 5 biasa kg 0.030 Rp 26,962.05
paku tripleks kg 0.030 Rp 33,321.03
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : Pemasangan Lisplank 2 x (2 x 20 cm) (SNI-2010)


Satuan Pembayaran : m2 (Meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
Pekerja oh 0.10 Rp 90,000.00
Tukang Kayu oh 0.20 Rp 100,000.00
Kepala Tukang oh 0.02 Rp 110,000.00
Mandor oh 0.01 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN

24
papan kayu matoa m3 0.010 Rp 3,148,964.42
paku 5 biasa kg 0.030 Rp 26,962.05
paku 7 biasa kg 0.030 Rp 26,962.05
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan rangka plafon kayu 5/5 (SNI-2010)


Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
Pekerja oh 0.10 Rp 90,000.00
Tukang Kayu oh 0.20 Rp 100,000.00
Kepala Tukang oh 0.02 Rp 110,000.00
Mandor oh 0.01 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kayu matoa 5 x 5 panjang 4m m3 0.010 Rp 4,039,220.92
paku 5 biasa kg 0.030 Rp 33,321.03
paku 7 biasa kg 0.030 Rp 26,962.05
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

25
3. PEKERJAAN PINTU, KUSEN, DAN JENDELA
Jenis Pekerjaan : Membuat dan Memasang Kusen Pintu dan Jendela Kayu Besi (SNI-2011)
Satuan Pembayaran : m3 (meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 6.000 Rp 90,000.00
tukang kayu oh 18.000 Rp 100,000.00
kepala tukang oh 2.000 Rp 110,000.00
mandor oh 0.300 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kayu besi m3 1.200 Rp 5,946,913.42
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : Membuat dan Memasang daun pintu (SNI-2011)


Satuan Pembayaran : m2 (meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 1.000 Rp 90,000.00
tukang kayu oh 2.500 Rp 100,000.00
kepala tukang oh 0.250 Rp 110,000.00
mandor oh 0.050 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
papan kayu m3 0.040 Rp 3,148,964.42
paku biasa 2" - 5" kg 0.500 Rp 26,962.05
jumlah harga bahan
C PERALATAN
jumlah harga peralatan
D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

26
Jenis Pekerjaan : Pemasangan pintu type 1 (SNI 2008)
Satuan Pembayaran : 1 unit
HARGA
NO ITEM PEKERJAAN SAT VOLUME
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.800 Rp 90,000.00
tukang kayu oh 2.400 Rp 100,000.00
kepala tukang oh 0.240 Rp 110,000.00
mandor oh 0.040 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kusen kayu matoa m3 Rp 10,665,925.71
daun pintu m2 Rp 564,783.56
engsel kupu kupu ps 1.000 Rp 65,115.90
grendel biasa bh 1.000 Rp 24,958.98
handle ps 1.000 Rp 154,141.55
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : Pemasangan pintu type 2 (SNI 2008)


Satuan Pembayaran : 1 unit
HARGA
NO ITEM PEKERJAAN SAT VOLUME
SATUAN (Rp)

27
A TENAGA KERJA
tenaga kerja oh 0.800 Rp 90,000.00
tukang kayu oh 2.400 Rp 100,000.00
kepala tukang oh 0.240 Rp 110,000.00
mandor oh 0.040 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kusen kayu matoa m3 Rp 10,665,925.71
daun pintu m2 Rp 564,783.56
engsel kupu kupu ps 1.000 Rp 65,115.90
grendel biasa bh 1.000 Rp 24,418.46
handle ps 1.000 Rp 154,141.55
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : Pemasangan jendela type 1 (SNI 2008)


Satuan Pembayaran : 1 unit
HARGA
NO ITEM PEKERJAAN SAT VOLUME
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.800 Rp 90,000.00
tukang kayu oh 2.400 Rp 100,000.00
kepala tukang oh 0.240 Rp 110,000.00
mandor oh 0.040 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kusen kayu matoa m3 Err:509 Rp 10,665,925.71
engsel jendela ps 1.000 Rp 33,321.03
grendel biasa bh 1.000 Rp 14,244.10
kait angin bh 1.000 Rp 20,603.08
kaca m2 1.000 Rp 239,996.23
jumlah harga bahan

28
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : Pemasangan jendela type 2 (SNI 2008)


Satuan Pembayaran : 1 unit
HARGA
NO ITEM PEKERJAAN SAT VOLUME
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.800 Rp 90,000.00
tukang kayu oh 2.400 Rp 100,000.00
kepala tukang oh 0.240 Rp 110,000.00
mandor oh 0.040 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kusen kayu matoa m3 Err:509 Rp 10,665,925.71
engsel jendela ps 1.000 Rp 35,864.62
grendel biasa bh 1.000 Rp 14,244.10
kait angin bh 1.000 Rp 20,603.08
kaca ribben m2 Err:509 Rp 239,996.23
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : Pemasangan jendela type 3 (SNI 2008)


Satuan Pembayaran : 1 unit
HARGA
NO ITEM PEKERJAAN SAT VOLUME
SATUAN (Rp)

29
A TENAGA KERJA
tenaga kerja oh 0.800 Rp 90,000.00
tukang kayu oh 2.400 Rp 100,000.00
kepala tukang oh 0.240 Rp 110,000.00
mandor oh 0.040 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kusen kayu matoa m3 Err:509 Rp 10,665,925.71
engsel jendela ps 1.000 Rp 35,864.62
grendel biasa bh 1.000 Rp 14,244.10
kait angin bh 1.000 Rp 20,603.08
kaca ribben m2 Err:509 Rp 239,996.23
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : Pemasangan ventilasi (SNI 2008)


Satuan Pembayaran : 1 unit
HARGA
NO ITEM PEKERJAAN SAT VOLUME
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.800 Rp 90,000.00
tukang kayu oh 2.400 Rp 100,000.00
kepala tukang oh 0.240 Rp 110,000.00
mandor oh 0.040 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kusen kayu matoa m3 Err:509 Rp 10,665,925.71
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

30
Jenis Pekerjaan : memasang engsel pintu (SNI-2016)
Satuan Pembayaran : m2 (meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.015 Rp 90,000.00
tukang kayu oh 0.150 Rp 100,000.00
kepala tukang oh 0.015 Rp 110,000.00
mandor oh 0.0008 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
engsel pintu ps 1.000 Rp 65,115.90
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : memasang pegangan pintu (SNI-2016)


Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.050 Rp 90,000.00
tukang kayu oh 0.500 Rp 100,000.00
kepala tukang oh 0.050 Rp 110,000.00
mandor oh 0.0025 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
pegangan pintu bh 1.000 Rp 152,510.00
jumlah harga bahan
C PERALATAN

31
jumlah harga peralatan
D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : memasang engsel jendela (SNI-2016)


Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.010 Rp 90,000.00
tukang kayu oh 0.100 Rp 100,000.00
kepala tukang oh 0.010 Rp 110,000.00
mandor oh 0.0005 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
engsel jendela bh 1.000 Rp 35,864.62
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasang grendel (SNI-2008)

32
Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.010 Rp 90,000.00
tukang kayu oh 0.010 Rp 100,000.00
kepala tukang oh 0.010 Rp 110,000.00
mandor oh 0.0005 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
grendel bh 1.000 Rp 33,321.03
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan kait angin (SNI-2008)


Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.015 Rp 90,000.00
tukang kayu oh 0.150 Rp 100,000.00
kepala tukang oh 0.015 Rp 110,000.00
mandor oh 0.008 Rp 130,000.00
jumlah harga tenaga kerja

33
B BAHAN
kait angin m3 1.000 Rp 39,680.00
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan kaca ribben tebal 3-5mm (SNI-2013)


Satuan Pembayaran : m3 (meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.020 Rp 90,000.00
tukang kayu oh 0.150 Rp 100,000.00
kepala tukang oh 0.020 Rp 110,000.00
mandor oh 0.0008 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kaca ribben tebal 5mm m3 1.100 Rp 257,029.81
153 x 122 cm
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

34
4. PEKERJAAN LANTAI DAN DINDING KERAMIK
Jenis Pekerjaan : Pemasangan lantai keramik 40 x 40 (SNI-2013)
Satuan Pembayaran : m2 (meter persegi)

HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
Pekerja OH 0.250 Rp 90,000.00
Tukang Batu OH 0.125 Rp 100,000.00
Kepala Tukang OH 0.013 Rp 110,000.00
Mandor OH 0.013 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
Keramik 40 x 40 cm m2 6.630 Rp 98,436.93
semen gresik kg 9.800 Rp 2,880.62
pasir pasang kg 0.045 Rp 1,475,282.20
Semen Warna m3 0.600 Rp 20,603.08
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan lantai keramik 20 x 20 (SNI-2008)


Satuan Pembayaran : m2 (meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.700 Rp 90,000.00
tukang batu oh 0.350 Rp 100,000.00
kepala tukang oh 0.035 Rp 110,000.00
mandor oh 0.035 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
keramik 20x20 kelas II doss 1.000 Rp 53,288.21
semen kg 10.400 Rp 2,880.62
pasir halus m3 0.045 Rp 1,475,282.20
jumlah harga bahan

35
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

5. PEKERJAAN CAT
Jenis Pekerjaan : pengecatan tembok baru (SNI-2008)
Satuan Pembayaran : m2 (meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.020 Rp 90,000.00
tukang cat oh 0.063 Rp 100,000.00
kepala tukang oh 0.0063 Rp 110,000.00
mandor oh 0.003 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
plamuur kg 0.100 Rp 29,760.00
cat dasar kg 0.100 Rp 34,847.18
cat penutup kg 0.260 Rp 33,575.39
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pengecatan plafon (SNI-2002)


Satuan Pembayaran : m2 (meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)

36
A TENAGA KERJA
tenaga kerja oh 0.130 Rp 90,000.00
tukang cat oh 0.200 Rp 100,000.00
kepala tukang oh 0.020 Rp 110,000.00
mandor oh 0.010 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
cat tembok kg 0.130 Rp 34,847.18
plamir tembok kg 0.110 Rp 29,760.00
rol cat bh 0.010 Rp 35,000.00
steger werk ls 1.000 Rp 1,000.00
amplas lbr 0.330 Rp 10,428.72
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pengecatan kayu dengan vernis (SNI-2013)


Satuan Pembayaran : m2 (meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.160 Rp 90,000.00
tukang cat oh 0.160 Rp 100,000.00
kepala tukang oh 0.016 Rp 110,000.00
mandor oh 0.0025 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
vernis kg 0.150 Rp 98,436.93
dempul kg 0.050 Rp 74,590.78
amplas lbr 0.100 Rp 10,428.72
jumlah harga bahan
C PERALATAN

37
jumlah harga peralatan
D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pengecatan kayu dengan politur (SNI-2013)


Satuan Pembayaran : m2 (meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.040 Rp 90,000.00
tukang cat oh 0.060 Rp 100,000.00
kepala tukang oh 0.016 Rp 110,000.00
mandor oh 0.0025 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
politur ltr 0.150 Rp 98,436.93
amplas lbr 2.000 Rp 10,428.72
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

E. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


1. PEKERJAAN LISTRIK

38
Jenis Pekerjaan : pemasangan panel/meteran (SNI-2008)
Satuan Pembayaran : bh ( buah )
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.200 Rp 90,000.00
tukang listrik oh 0.200 Rp 100,000.00
kepala tukang oh 0.015 Rp 110,000.00
jumlah harga tenaga kerja
B BAHAN
pipa listrik bh 3.000 Rp 24,418.46
kabel m 15.000 Rp 33,321.03
tee dos bh 1.000 Rp 14,244.10
L bow bh 2.000 Rp 9,156.92
klem biasa bh 24.000 Rp 4,069.74
MCB bh 1.000 Rp 25,000.00
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan kabel NYY (SNI-2010)


Satuan Pembayaran : m (meter)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.100 Rp 90,000.00
tukang listrik oh 0.025 Rp 100,000.00
kepala tukang oh 0.005 Rp 110,000.00
jumlah harga tenaga kerja
B BAHAN
kabel NYM 3 x 2.5mm m 2.000 Rp 24,418.46
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)

39
JUMLAH

Jenis Pekerjaan : pemasangan kabel NYM 4mm (SNI-2008)


Satuan Pembayaran : m (meter)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
tenaga kerja oh 0.100 Rp 90,000.00
tukang listrik oh 0.025 Rp 100,000.00
kepala tukang oh 0.005 Rp 110,000.00
jumlah harga tenaga kerja
B BAHAN
kabel NYM 4mm m 1.000 Rp 33,321.03
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : instalasi lampu dan stop kontak (SNI-2008)


Satuan Pembayaran : ttk (titik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.480 Rp 90,000.00
tukang listrik oh 0.048 Rp 100,000.00
kepala tukang oh 0.480 Rp 110,000.00
jumlah harga tenaga kerja
B BAHAN
Kabel NYM 3 x 2,5 mm M¹ 8.00 Rp 24,418.46
Pipa Clipsal 20 mm hitam Bt 3.00 Rp 24,418.46
Tee dos clipsal 20 mm hitam Bh 2.00 Rp 14,244.10
Klem clipsal 20 mm hitam Bj 15.00 Rp 4,069.74

40
Sock clipsal 20 mm hitam Bj 3.00 Rp 4,069.74
Inbow dos plastik clipal E157 Bj 1.00 Rp 9,156.92
Biaya Pasang Ttk 1.00 Rp 50,000.00
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan stop kontak (SNI-2008)


Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.200 Rp 90,000.00
tukang listrik oh 0.020 Rp 100,000.00
kepala tukang oh 0.020 Rp 110,000.00
jumlah harga tenaga kerja
B BAHAN
stop kontak bh 1.000 Rp 39,680.00
jumlah harga bahan
C PERALATAN

jumlah harga tenaga kerja


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan lampu (SNI-2008)


Satuan Pembayaran : bh (buah)

41
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.200 Rp 90,000.00
tukang listrik oh 0.020 Rp 100,000.00
kepala tukang oh 0.020 Rp 110,000.00
jumlah harga tenaga kerja
B BAHAN
lampu 18 watt bh 1.00 Rp 73,001.03
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan saklar ganda (SNI-2008)


Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.400 Rp 90,000.00
tukang listrik oh 0.040 Rp 100,000.00
kepala tukang oh 0.040 Rp 110,000.00
jumlah harga tenaga kerja
B BAHAN
saklar ganda bh 1.00 Rp 84,192.83
jumlah harga bahan
C PERALATAN
jumlah harga peralatan
D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH
Jenis Pekerjaan : pemasangan saklar tunggal (SNI-2008)
Satuan Pembayaran : bh (Buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.400 Rp 90,000.00
tukang listrik oh 0.040 Rp 100,000.00
kepala tukang oh 0.040 Rp 110,000.00
jumlah harga tenaga kerja

42
B BAHAN
saklar tunggal bh 1.00 Rp 90,551.80
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

2. PEKERJAAN SANITER
Jenis Pekerjaan : pemasangan closet duduk (SNI-2002)
Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 3.300 Rp 90,000.00
tukang pipa oh 1.100 Rp 100,000.00
kepala tukang oh 0.001 Rp 110,000.00
jumlah harga tenaga kerja

B BAHAN
kloset duduk bh 1.00 Rp 3,568,148.05
perlengkapan 6% harga kloset duduk
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

43
Jenis Pekerjaan : pemasangan washtafel (SNI-2002)
Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 1.2 Rp 90,000.00
tukang batu oh 1.450 Rp 100,000.00
kepala tukang oh 0.150 Rp 110,000.00
mandor oh 0.150 Rp 130,000.00
jumlah harga peralatan
B BAHAN
wastafel bh 1.00 Rp 960,968.30
perlengkapan 12% harga westafel
semen kg 6.00 Rp 2,880.62
pasir halus m3 0.01 Rp 1,475,282.20
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan kran air (SNI-2013)


Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.010 Rp 90,000.00
tukang batu oh 0.400 Rp 100,000.00
kepala tukang oh 0.040 Rp 110,000.00
mandor oh 0.010 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
kran air bh 1.00 Rp 160,500.53
seal tape bh 0.03 Rp 14,244.10
jumlah harga bahan
C PERALATAN

44
jumlah harga peralatan
D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan floordrain (SNI-2008)


Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.010 Rp 90,000.00
tukang pipa oh 0.100 Rp 100,000.00
kepala tukang oh 0.010 Rp 110,000.00
mandor oh 0.010 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
floor drain bh 1.00 Rp 84,192.83
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan pipa PVC Ø 2.5 (SNI-2008)


Satuan Pembayaran : m (meter)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.036 Rp 90,000.00

45
tukang pipa oh 0.060 Rp 100,000.00
kepala tukang oh 0.006 Rp 110,000.00
mandor oh 0.0018 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
Pipa PVC Ø 2.5 m 1.20 Rp 57,421.54
perlengkapan 35% harga pipa PVC Ø 2.5
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan bak mandi (SNI-2008)


Satuan Pembayaran : bh (buah)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.300 Rp 90,000.00
tukang pipa oh 0.450 Rp 100,000.00
kepala tukang oh 0.045 Rp 110,000.00
mandor oh 0.0150 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
bak air fiberglass m 1.00 Rp 579,429.80
perlengkapan 12% harga bak air
jumlah harga bahan
C PERALATAN

46
jumlah harga peralatan
D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan pipa Ø 4 (SNI-2008)


Satuan Pembayaran : m ( meter )
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.081 Rp 90,000.00
tukang pipa oh 0.135 Rp 100,000.00
kepala tukang oh 0.135 Rp 110,000.00
mandor oh 0.0041 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
Pipa PVC Ø 4 m 1.20 Rp 93,985.65
perlengkapan 35% harga pipa PVC Ø 4
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

F. PEKERJAAN LANDSCAPE

47
Jenis Pekerjaan : pemasangan lapisan ijuk (SNI-2002)
Satuan Pembayaran : m3 (meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.150 Rp 90,000.00
mandor oh 0.015 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
ijuk m3 1.200 Rp 4,578.46
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : galian tanah saptictank (SNI-2008)


Satuan Pembayaran : m3 (meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 1.050 Rp 90,000.00
mandor oh 0.067 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekrjaan : Urugan Pasir Bawah Pondasi (SNI-2008)


Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
Pekerja Oh 0.300 Rp 90,000.00
Mandor Oh 0.010 Rp 130,000.00
jumlah harga tenaga kerja

48
B BAHAN
Pasir Halus m3 1.200 Rp 1,475,282.20

jumlah harga bahan


C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH
Jenis Pekrjaan : Urugan tanah kembali (SNI-2008)
Satuan Pembayaran : m3 (Meter kubik)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
Pekerja Oh 0.500 Rp 90,000.00
Mandor Oh 0.050 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN

jumlah harga bahan


C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : pemasangan pipa Ø 4 (SNI-2008)


Satuan Pembayaran : m (meter)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.081 Rp 90,000.00
tukang pipa oh 0.135 Rp 100,000.00
kepala tukang oh 0.135 Rp 110,000.00
mandor oh 0.0041 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
Pipa PVC Ø 4 m 1.20 Rp 65,115.90
perlengkapan 35% harga pipa PVC Ø 4
jumlah harga bahan
C PERALATAN

49
jumlah harga peralatan
D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

Jenis Pekerjaan : lantai cor beton (SNI-2008)


Satuan Pembayaran : m2 (meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.780 Rp 90,000.00
tukang batu oh 0.390 Rp 100,000.00
kepala tukang oh 0.039 Rp 110,000.00
mandor oh 0.0390 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
semen gresik 40 kg m3 1.20 Rp 2,880.62
pasir halus m3 0.432 Rp 1,475,282.20
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)

50
JUMLAH

Jenis Pekerjaan : pengurugan sirtu padat (SNI-2016)


Satuan Pembayaran : m3 (meter persegi)
HARGA
NO ITEM PEKERJAAN SAT KOEFISIEN
SATUAN (Rp)
A TENAGA KERJA
pekerja oh 0.250 Rp 90,000.00
mandor oh 0.025 Rp 130,000.00
jumlah harga tenaga kerja
B BAHAN
sirtu m3 1.20 Rp 541,784.67
jumlah harga bahan
C PERALATAN

jumlah harga peralatan


D jumlah (A+B+C)
E overhed & provit 10%
F jumlah (D+E)
JUMLAH

51
TOTAL
(Rp)

Rp 18,000
Rp 40,000
Rp 2,200
Rp 2,600
Rp 62,800

Rp 68,066
Rp 125,959
Rp 152,997
Rp 234,119
Rp 1,618
Rp 582,758

Rp 645,558
Rp 64,555.82
Rp 710,114.03
Rp 710,114.03

TOTAL (Rp)

Rp 18,000
Rp 40,000
Rp 2,200
Rp 2,600
Rp 62,800

52
Rp 122,398
Rp 51,050
Rp 809
Rp 809
Rp 175,065

Rp 237,865
Rp 23,786.51
Rp 261,652
Rp 261,652

TOTAL (Rp)

Rp 9,000
Rp 10,000
Rp 1,100
Rp 650
Rp 20,750

Rp 539
Rp 22,043
Rp 48,471
Rp 71,053

Rp 91,803
Rp 9,180.26
Rp 100,983
Rp 100,983

TOTAL (Rp)

53
Rp 36,000.00
Rp 5,200.00
Rp 41,200.00

Rp 41,200.00
Rp 4,120.00
Rp 45,320.00
Rp 45,320.00

TOTAL (Rp)

Rp 17,100.00
Rp 2,600.00
Rp 19,700.00

Rp 19,700.000
Rp 1,970.000
Rp 21,670.000
Rp 21,670.000

54
TOTAL (Rp)

Rp 900.00
Rp 3,900.00
Rp 4,800.000

Rp 1,770,338.64
Rp 1,770,338.64

Rp 1,775,138.640
Rp 177,513.86
Rp 1,952,652.504
Rp 1,952,652.504

TOTAL (Rp)

Rp 70,200.00

55
Rp 75,000.00
Rp 8,250.00
Rp 50,700.00
Rp 204,150.00

Rp 945,706.762
Rp 9,390.821
Rp 708,135.456
Rp 1,663,233.04

Rp 1,867,383.039
Rp 186,738.30
Rp 2,054,121.34
Rp 2,054,121.343

TOTAL (Rp)

Rp 54,000.00
Rp 40,000.00
Rp 3,300.00
Rp 3,900.00
Rp 101,200.000

Rp 1,031,680
Rp 442,585
Rp 1,474,265

Rp 1,575,465
Rp 157,546
Rp 1,733,011
Rp 1,733,011

56
TOTAL (Rp)

Rp 900.00
Rp 4,400.00
Rp 5,070.00
Rp 10,370.000

Rp 63,437.135
Rp 581,885.240
Rp 645,322.375

Rp 655,692.375
Rp 65,569.24
Rp 721,261.612
Rp 721,261.612

TOTAL (Rp)

Rp 148,500.00
Rp 27,500.00
Rp 30,800.00
Rp 107,900.00
Rp 176,000.000

Rp 1,013,978.240
Rp 316,332.000
Rp 921,385.530
Rp 2,251,695.770

57
Rp 2,427,695.770
Rp 242,769.58
Rp 2,670,465.347
Rp 2,670,465.347

TOTAL (Rp)

Rp 6,300.00
Rp 7,000.00
Rp 770.00
Rp 390.00
Rp 14,070.000

Rp 18,460.208
Rp 480.738
Rp 18,940.946

Rp 33,010.946
Rp 3,301.09
Rp 36,312.041
Rp 36,312.041

58
TOTAL (Rp)

Rp 46,800.00
Rp 26,000.00
Rp 2,860.00
Rp 3,380.00
Rp 75,660.000

Rp 8,088.615
Rp 2,060.308
Rp 181,764.941
Rp 191,913.864

Rp 267,573.864
Rp 26,757.39
Rp 294,331.251
Rp 294,331.251

TOTAL (Rp)

Rp 59,400.00
Rp 33,000.00
Rp 3,630.00
Rp 4,290.00
Rp 96,030.000

Rp 10,784.820

59
Rp 4,120.616
Rp 72,288.829
Rp 72,705.977
Rp 159,900.241

Rp 255,930.241
Rp 25,593.02
Rp 281,523.265
Rp 281,523.265

TOTAL (Rp)

Rp 59,400.00
Rp 33,000.00
Rp 3,630.00
Rp 4,290.00
Rp 96,030.000

Rp 10,784.820
Rp 4,120.616
Rp 72,288.829
Rp 72,705.977
Rp 159,900.241

Rp 255,930.241
Rp 25,593.02
Rp 281,523.265
Rp 281,523.265

60
TOTAL (Rp)

Rp 360,000.00
Rp 120,000.00
Rp 132,000.00
Rp 26,000.00
Rp 638,000.000

Rp 3,743,655.762
Rp 186,597.768
Rp 159,005.700
Rp 4,089,259.230

Rp 4,727,259.230
Rp 472,725.92
Rp 5,199,985.153
Rp 5,199,985.153

TOTAL (Rp)

Rp 603,000.00
Rp 2,010,000.00
Rp 221,100.00
Rp 44,200.00
Rp 2,878,300.000

Rp 3,743,655.762
Rp 186,597.768
Rp 159,005.700
Rp 4,089,259.230

61
Rp 6,967,559.230
Rp 696,755.92
Rp 7,664,315.153
Rp 7,664,315.153

TOTAL (Rp)

Rp 216,000.00
Rp 720,000.00
Rp 79,200.00
Rp 15,600.00
Rp 1,015,200.000

Rp 3,743,655.762
Rp 6,740.513
Rp 3,750,396.275

Rp 4,765,596.275
Rp 476,559.63
Rp 5,242,155.902
Rp 5,242,155.902

TOTAL (Rp)

Rp 216,000.00
Rp 720,000.00
Rp 79,200.00

62
Rp 15,600.00
Rp 1,015,200.000

Rp 3,743,655.762
Rp 6,740.513
Rp 3,750,396.275

Rp 4,765,596.275
Rp 476,559.63
Rp 5,242,155.902
Rp 5,242,155.902

TOTAL (Rp)

Rp 36,000.00
Rp 2,200.00
Rp 2,600.00
Rp 40,800.000

Rp 30,000.000
Rp 30,000.000

Rp 70,800.000
Rp 7,080.00

63
Rp 77,880.000
Rp 77,880.000

TOTAL (Rp)

Rp 540.00
Rp 10,000.00
Rp 13,200.00
Rp 780.00
Rp 23,740.000

Rp 30,893.718
Rp 24,672.820
Rp 55,566.538

Rp 79,306.538
Rp 7,930.65
Rp 87,237.192
Rp 87,237.192

TOTAL (Rp)

64
Rp 13,500.00
Rp 7,000.00
Rp 770.00
Rp 780.00
Rp 21,270.000

Rp 50,057.850
Rp 1,332.841
Rp 51,390.691

Rp 72,660.691
Rp 7,266.07
Rp 79,926.760
Rp 79,926.760

TOTAL (Rp)

Rp 10,800.00
Rp 6,000.00
Rp 660.00
Rp 780.00
Rp 17,460.000

Rp 71,398.572
Rp 666.421
Rp 72,064.993

Rp 89,524.993
Rp 8,952.50
Rp 98,477.492
Rp 98,477.492

65
TOTAL (Rp)

Rp 27,000.00
Rp 10,000.00
Rp 1,100.00
Rp 1,950.00
Rp 38,100.000

Rp 869,233.400
Rp 40.329
Rp 180.722
Rp 869,454.451

Rp 907,554.451
Rp 90,755.45
Rp 998,309.896
Rp 998,309.896

TOTAL (Rp)

Rp 27,000.00
Rp 15,000.00
Rp 1,650.00
Rp 1,950.00
Rp 45,600.000

66
Rp 9,955.423
Rp 42,783.184
Rp 52,738.607

Rp 98,338.607
Rp 9,833.86
Rp 108,172.467
Rp 108,172.467

TOTAL (Rp)

Rp 18,000.00
Rp 10,000.00
Rp 1,100.00
Rp 1,300.00
Rp 30,400.000

Rp 9,362.015
Rp 9,362.015

Rp 39,762.015
Rp 3,976.20
Rp 43,738.217
Rp 43,738.217

67
TOTAL (Rp)

Rp 24,300.00
Rp 40,000.00
Rp 4,400.00
Rp 1,755.00
Rp 70,455.000

Rp 46,452.311
Rp 40,392.209
Rp 808.862
Rp 999.631
Rp 88,653.013

Rp 159,108.013
Rp 15,910.80
Rp 175,018.814
Rp 175,018.814

TOTAL (Rp)

Rp 9,000
Rp 20,000
Rp 2,200
Rp 650
Rp 31,850

68
Rp 31,490
Rp 809
Rp 809
Rp 33,107

Rp 32,658.862
Rp 3,265.89
Rp 35,924.748
Rp 35,924.748

TOTAL (Rp)

Rp 9,000.00
Rp 20,000.00
Rp 2,200.00
Rp 650.00
Rp 31,850.000

Rp 40,392.209
Rp 999.631
Rp 808.862
Rp 42,200.702

Rp 32,658.862
Rp 3,265.89
Rp 35,924.748
Rp 35,924.748

69
u Besi (SNI-2011)

TOTAL (Rp)

Rp 540,000.00
Rp 1,800,000.00
Rp 220,000.00
Rp 39,000.00
Rp 2,560,000.000

Rp 7,136,296.104
Rp 7,136,296.104

Rp 9,696,296.104
Rp 969,629.61
Rp 10,665,925.714
Rp 10,665,925.714

TOTAL (Rp)

Rp 90,000.00
Rp 250,000.00
Rp 27,500.00
Rp 6,500.00
Rp 374,000.000

Rp 125,958.577
Rp 13,481.025
Rp 139,439.602

Rp 513,439.602
Rp 51,343.96
Rp 564,783.562
Rp 564,783.562

70
TOTAL (Rp)

Rp 72,000.00
Rp 240,000.00
Rp 26,400.00
Rp 5,200.00
Rp 343,600.000

Rp -
Rp -
Rp 65,115.900
Rp 24,958.980
Rp 154,141.550
Rp -

Rp 343,600.000
Rp 34,360.00
Rp 377,960.000
Rp 377,960.000

TOTAL (Rp)

71
Rp 72,000.00
Rp 240,000.00
Rp 26,400.00
Rp 5,200.00
Rp 343,600.000

Rp -
Rp -
Rp 65,115.900
Rp 24,418.460
Rp 154,141.550
Rp -

Rp 343,600.000
Rp 34,360.00
Rp 377,960.000
Rp 377,960.000

TOTAL (Rp)

Rp 72,000.00
Rp 240,000.00
Rp 26,400.00
Rp 5,200.00
Rp 343,600.000

Err:509
Rp 33,321.030
Rp 14,244.100
Rp 20,603.080
Rp 239,996.230
Err:509

72
Err:509
Err:509
Err:509
Err:509

TOTAL (Rp)

Rp 72,000.00
Rp 240,000.00
Rp 26,400.00
Rp 5,200.00
Rp 343,600.000

Err:509
Rp 35,864.620
Rp 14,244.100
Rp 20,603.080
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

TOTAL (Rp)

73
Rp 72,000.00
Rp 240,000.00
Rp 26,400.00
Rp 5,200.00
Rp 343,600.000

Err:509
Rp 35,864.620
Rp 14,244.100
Rp 20,603.080
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

TOTAL (Rp)

Rp 72,000.00
Rp 240,000.00
Rp 26,400.00
Rp 5,200.00
Rp 343,600.000

Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

74
TOTAL (Rp)

Rp 1,350.00
Rp 15,000.00
Rp 1,650.00
Rp 104.00
Rp 18,104.000

Rp 65,115.900
Rp 65,115.900

Rp 83,219.900
Rp 8,321.99
Rp 91,541.890
Rp 91,541.890

TOTAL (Rp)

Rp 4,500.00
Rp 50,000.00
Rp 5,500.00
Rp 325.00
Rp 60,325.000

Rp 152,510.000
Rp 152,510.000

75
Rp 212,835.000
Rp 21,283.50
Rp 234,118.500
Rp 234,118.500

TOTAL (Rp)

Rp 900.00
Rp 10,000.00
Rp 1,100.00
Rp 65.00
Rp 12,065.000

Rp 35,864.620
Rp 35,864.620

Rp 47,929.620
Rp 4,792.96
Rp 52,722.582
Rp 52,722.582

76
TOTAL (Rp)

Rp 900.00
Rp 1,000.00
Rp 1,100.00
Rp 65.00
Rp 3,065.000

Rp 33,321.030
Rp 33,321.030

Rp 36,386.030
Rp 3,638.60
Rp 40,024.633
Rp 40,024.633

TOTAL (Rp)

Rp 1,350.00
Rp 15,000.00
Rp 1,650.00
Rp 1,040.00
Rp 19,040.000

77
Rp 39,680.000
Rp 39,680.000

Rp 58,720.000
Rp 5,872.00
Rp 64,592.000
Rp 64,592.000

TOTAL (Rp)

Rp 1,800.00
Rp 15,000.00
Rp 2,200.00
Rp 104.00
Rp 19,104.000

Rp 282,732.791

Rp 282,732.791

Rp 301,836.791
Rp 30,183.68
Rp 332,020.470
Rp 332,020.470

78
TOTAL (Rp)

Rp 22,500.00
Rp 12,500.00
Rp 1,430.00
Rp 1,690.00
Rp 38,120.000

Rp 652,636.846
Rp 28,230.076
Rp 66,387.699
Rp 12,361.848
Rp 759,616.469

Rp 797,736.469
Rp 79,773.65
Rp 877,510.116
Rp 877,510.116

TOTAL (Rp)

Rp 63,000.00
Rp 35,000.00
Rp 3,850.00
Rp 4,550.00
Rp 106,400.000

Rp 53,288.210
Rp 29,958.448
Rp 66,387.699
Rp 149,634.357

79
Rp 256,034.357
Rp 25,603.44
Rp 281,637.793
Rp 281,637.793

TOTAL (Rp)

Rp 1,800.00
Rp 6,300.00
Rp 693.00
Rp 390.00
Rp 9,183.000

Rp 2,976.000
Rp 3,484.718
Rp 8,729.601
Rp 15,190.319

Rp 24,373.319
Rp 2,437.33
Rp 26,810.651
Rp 26,810.651

TOTAL (Rp)

80
Rp 11,700.00
Rp 20,000.00
Rp 2,200.00
Rp 1,300.00
Rp 35,200.000

Rp 4,530.133
Rp 3,273.600
Rp 350.000
Rp 1,000.000
Rp 3,441.478
Rp 12,595.211

Rp 47,795.211
Rp 4,779.52
Rp 52,574.732
Rp 52,574.732

TOTAL (Rp)

Rp 14,400.00
Rp 16,000.00
Rp 1,760.00
Rp 325.00
Rp 32,485.000

Rp 14,765.540
Rp 3,729.539
Rp 1,042.872
Rp 19,537.951

81
Rp 52,022.951
Rp 5,202.30
Rp 57,225.246
Rp 57,225.246

TOTAL (Rp)

Rp 3,600.00
Rp 6,000.00
Rp 1,760.00
Rp 325.00
Rp 11,685.000

Rp 14,765.540
Rp 20,857.440
Rp 35,622.980

Rp 47,307.980
Rp 4,730.80
Rp 52,038.777
Rp 52,038.777

KAL

82
TOTAL (Rp)

Rp 18,000.00
Rp 20,000.00
Rp 1,650.00
Rp 39,650.000

Rp 73,255.380
Rp 499,815.450
Rp 14,244.100
Rp 18,313.840
Rp 97,673.760
Rp 25,000.000
Rp 728,302.530

Rp 767,952.530
Rp 76,795.25
Rp 844,747.783
Rp 844,747.783

TOTAL (Rp)

Rp 9,000.00
Rp 2,500.00
Rp 550.00
Rp 12,050.000

Rp 48,836.920
Rp 48,836.920

Rp 60,886.920
Rp 6,088.69
Rp 66,975.612

83
Rp 66,975.612

TOTAL (Rp)

Rp 9,000.00
Rp 2,500.00
Rp 550.00
Rp 12,050.000

Rp 33,321.030
Rp 33,321.030

Rp 45,371.030
Rp 4,537.10
Rp 49,908.133
Rp 49,908.133

TOTAL (Rp)

Rp 43,200.00
Rp 4,800.00
Rp 52,800.00
Rp 100,800.000

Rp 195,347.680
Rp 73,255.380
Rp 28,488.200
Rp 61,046.100

84
Rp 12,209.220
Rp 9,156.920
Rp 50,000.000
Rp 429,503.500

Rp 530,303.500
Rp 53,030.35
Rp 583,333.850
Rp 583,333.850

TOTAL (Rp)

Rp 18,000.00
Rp 2,000.00
Rp 2,200.00
Rp 22,200.000

Rp 39,680.000
Rp 39,680.000

Rp 61,880.000
Rp 6,188.00
Rp 68,068.000
Rp 68,068.000

85
TOTAL (Rp)

Rp 18,000.00
Rp 2,000.00
Rp 2,200.00
Rp 22,200.000

Rp 73,001.030
Rp 73,001.030

Rp 95,201.030
Rp 9,520.10
Rp 104,721.133
Rp 104,721.133

TOTAL (Rp)

Rp 36,000.00
Rp 4,000.00
Rp 4,400.00
Rp 44,400.000

Rp 84,192.830
Rp 84,192.830

Rp 128,592.830
Rp 12,859.28
Rp 141,452.113
Rp 141,452.113

TOTAL (Rp)

Rp 36,000.000
Rp 4,000.000
Rp 4,400.000
Rp 44,400.000

86
Rp 90,551.800
Rp 90,551.800

Rp 134,951.800
Rp 13,495.18
Rp 148,446.980
Rp 148,446.980

TOTAL (Rp)

Rp 297,000.00
Rp 110,000.00
Rp 110.00
Rp -
Rp 407,110.000

Rp 3,568,148.050
Rp 214,088.88
Rp 3,782,236.933

Rp 4,189,346.933
Rp 418,934.69
Rp 4,608,281.626
Rp 4,608,281.626

87
TOTAL (Rp)

Rp 108,000.00
Rp 145,000.00
Rp 16,500.00
Rp 19,500.00
Rp 289,000.000

Rp 960,968.300
Rp 115,316.196
Rp 17,283.720
Rp 14,752.822
Rp 1,108,321.038

Rp 1,397,321.038
Rp 139,732.10
Rp 1,537,053.142
Rp 1,537,053.142

TOTAL (Rp)

Rp 900.000
Rp 40,000.000
Rp 4,400.000
Rp 1,300.000
Rp 46,600.000

Rp 160,500.530
Rp 427.323
Rp 160,927.853

88
Rp 207,527.853
Rp 20,752.79
Rp 228,280.638
Rp 228,280.638

TOTAL (Rp)

Rp 900.000
Rp 10,000.000
Rp 1,100.000
Rp 1,300.000
Rp 13,300.000

Rp 84,192.830
Rp 84,192.830

Rp 97,492.830
Rp 9,749.28
Rp 107,242.113
Rp 107,242.113

TOTAL (Rp)

Rp 3,240.000

89
Rp 6,000.000
Rp 660.000
Rp 234.000
Rp 10,134.000

Rp 68,905.848
Rp 20,097.539
Rp 89,003.387

Rp 99,137.387
Rp 9,913.74
Rp 109,051.126
Rp 109,051.126

TOTAL (Rp)

Rp 27,000.000
Rp 45,000.000
Rp 4,950.000
Rp 1,950.000
Rp 78,900.000

Rp 579,429.800
Rp 69,531.576
Rp 648,961.376

90
Rp 727,861.376
Rp 72,786.14
Rp 800,647.514
Rp 800,647.514

TOTAL (Rp)

Rp 7,290.000
Rp 13,500.000
Rp 14,850.000
Rp 533.000
Rp 36,173.000

Rp 112,782.780
Rp 32,894.978
Rp 145,677.758

Rp 181,850.758
Rp 18,185.08
Rp 200,035.833
Rp 200,035.833

91
TOTAL (Rp)

Rp 13,500.00
Rp 1,950.00
Rp 15,450.000

Rp 5,494.152
Rp 5,494.152

Rp 20,944.152
Rp 2,094.42
Rp 23,038.567
Rp 23,038.567

TOTAL (Rp)

Rp 94,500.00
Rp 8,710.00
Rp 103,210.000

Rp 103,210.000
Rp 10,321.00
Rp 113,531.000
Rp 113,531.000

TOTAL (Rp)

Rp 27,000.00
Rp 1,300.00
Rp 28,300.000

92
Rp 1,770,338.64
Rp 1,770,338.64

Rp 1,798,638.640
Rp 179,863.86
Rp 1,978,502.504
Rp 1,978,502.504

TOTAL (Rp)

Rp 45,000.00
Rp 6,500.00
Rp 51,500.000

Rp 51,500.000
Rp 5,150.00
Rp 56,650.000
Rp 56,650.000

TOTAL (Rp)

Rp 7,290.000
Rp 13,500.000
Rp 14,850.000
Rp 533.000
Rp 36,173.000

Rp 78,139.080
Rp 22,790.565
Rp 100,929.645

93
Rp 137,102.645
Rp 13,710.26
Rp 150,812.910
Rp 150,812.910

TOTAL (Rp)

Rp 70,200.000
Rp 39,000.000
Rp 4,290.000
Rp 5,070.000
Rp 118,560.000

Rp 3,456.744
Rp 1,008.217
Rp 4,464.961

Rp 123,024.961
Rp 12,302.50
Rp 135,327.457

94
Rp 135,327.457

TOTAL (Rp)

Rp 22,500.000
Rp 3,250.000
Rp 25,750.000

Rp 650,141.604
Rp 650,141.604

Rp 675,891.604
Rp 67,589.16
Rp 743,480.764
Rp 743,480.764

95
DAFTAR HARGA SATUAN BAHAN
TAHUN ANGGARAN 2017

HARGA
NO NAMA BARANG SATUAN MSK ANALISA
DASAR

FINISHING
1 Amplas lbr Rp 7,000.00 Rp 10,274.60
2 Amplas mtr Rp 20,000.00 Rp 26,563.60
3 Amplas kain lbr Rp 10,000.00 Rp 14,033.60
4 Kawat has m' Rp 35,000.00 Rp 45,358.60
5 Kawat has Plastik lbr Rp 20,000.00 Rp 26,563.60
6 Cat besi (Hamerton) Kaleng 1 kg kg Rp 65,000.00 Rp 82,948.60
7 Cat besi (Avian) Kaleng 1 kg kg Rp 175,000.00 Rp 220,778.60
8 Cat Besi (polibest) kaleng 1 kg kg Rp 62,500.00 Rp 79,816.10
Cat Meni Besi/dasar (Polibest) Kaleng
9 kg Rp 68,750.00 Rp 87,647.35
0,8 kg
Cat Meni Besi/dasar (Yoko) Kaleng 0,8
10 kg Rp 56,250.00 Rp 71,984.85
kg
Cat kayu+Besi/dasar (polibest) kaleng
11 kg Rp 68,750.00 Rp 87,647.35
0.8 kg
Cat kayu+Besi/dasar (Yoko) kaleng 0.8
12 kg Rp 56,250.00 Rp 71,984.85
kg
13 Cat Kayu Yoko kg Rp 65,000.00 Rp 82,948.60
14 Cat menie besi (Glotex) Kaleng 1 kg kg Rp 50,000.00 Rp 64,153.60
15 Cat menie besi (Yoko) Kaleng 1 kg kg Rp 25,000.00 Rp 32,828.60
16 Cat menie besi (Avian) Kaleng 1 kg kg Rp 120,000.00 Rp 151,863.60
17 Cat menie kayu (polibest) 0,8 kg kg Rp 78,571.43 Rp 101,457.20
18 Cat tembok (Jotun) kg Rp 265,000.00 Rp 335,052.20
19 Cat tembok Grahalux 5 Kg kg Rp 11,000.00 Rp 16,790.20
20 Cat tembok Paragon 5 Kg kg Rp 24,000.00 Rp 33,079.20
21 Cat tembok (aries) 5 kg kg Rp 18,444.44 Rp 26,118.09
22 Cat tembok (vitex) Kaleng 5 kg kg Rp 25,000.00 Rp 34,332.20
23 Cat tembok (vitex) Kaleng 4.5 kg kg Rp 13,333.33 Rp 19,713.87
24 Cat monilex klg Rp 75,000.00 Rp 96,982.20
30 Dempul kayu (polibest) 0,8 Kg kg Rp 56,250.00 Rp 73,488.45
31 Dempul kayu (Pedang) 0.8 kg kg Rp 60,000.00 Rp 78,187.20
32 Dempul kayu (Impra) 1 kg liter Rp 65,000.00 Rp 84,452.20
34 Kuas Besar 5 inch bh Rp 35,000.00 Rp 46,862.20
35 Kuas Besar 4 inch bh Rp 25,000.00 Rp 34,332.20
36 Kuas Sedang 3 inch bh Rp 17,000.00 Rp 24,308.20
37 Kuas roll 7" bh Rp 20,000.00 Rp 28,067.20
37 Kuas roll 10" bh Rp 50,000.00 Rp 65,657.20
38 Kuas roll 4" bh Rp 40,000.00 Rp 53,127.20
39 Kuas Kecil 2 inch bh Rp 13,000.00 Rp 19,296.20
40 Mild zak Rp 30,000.00 Rp 40,597.20
41 Minyak cat/Thiner A Kaleng 0,8 liter ltr Rp 56,250.00 Rp 73,488.45
42 Plamir kayu 1kg kg Rp 55,000.00 Rp 71,922.20

42
43 Plamir tembok 5 kg merk B0y0 kg Rp 13,000.00 Rp 19,296.20
44 Plamir tembok 5 kg merk lion kg Rp 11,000.00 Rp 16,790.20
45 Plamir tembok 5 kg merk Paragon kg Rp 21,000.00 Rp 29,320.20
46 Plamir tembok 5 kg kg Rp 13,000.00 Rp 19,296.20
47 Politur (Boyo) kaleng 1 liter ltr Rp 75,000.00 Rp 96,982.20
48 Politur (Joly) kaleng 1 liter ltr Rp 65,000.00 Rp 84,452.20
49 Politur (vernis) kaleng 1 liter kg Rp 75,000.00 Rp 96,982.20
50 Politur (india) kaleng 1 liter ltr Rp 47,500.00 Rp 62,524.70
51 Thiner A kaleng 1/2 liter Ltr Rp 70,000.00 Rp 90,717.20
52 Thiner A Avian kaleng 1 liter ltr Rp 60,000.00 Rp 78,187.20
53 Thiner A kaleng 1 liter Ltr Rp 55,000.00 Rp 71,922.20
54 Thiner B Avian kaleng 1 liter ltr Rp 35,000.00 Rp 46,862.20
55 Thiner B Super kaleng 1 liter Ltr Rp 40,000.00 Rp 53,127.20
56 Thiner Super 5 kg kg Rp 40,000.00 Rp 53,127.20
57 Thiner A Spesial 5 kg kg Rp 35,000.00 Rp 46,862.20
58 Impra 1 Liter ltr Rp 80,000.00 Rp 103,247.20
59 impra clear / sanding 1 l Ltr Rp 73,000.00 Rp 94,476.20
60 impra wood stain 1 l Ltr Rp 73,000.00 Rp 94,476.20

BAHAN BAKAR MINYAK


2 Gemuk /Stempel 16 kg kg Rp 48,125.00 Rp 63,307.83

PENUTUP ATAP
1 Alang-alang panjang 2,4 meter lbr Rp 25,000.00 Rp 32,828.60
2 Alluminium foil m2 Rp 29,000.00 Rp 37,840.60
3 Asbes Bubungan lbr Rp 24,000.00 Rp 31,575.60
Asbes Gelombang 1,80 m x 0,80 m x 5
4 lbr Rp 33,600.00 Rp 43,604.40
mm
Asbes Gelombang 2,4 m x 1,05 m x 4
5 lbr Rp 42,000.00 Rp 54,129.60
mm
6 Asbes Rata 2 m x 1 m x 4 mm lbr Rp 18,000.00 Rp 24,057.60
7 Besi profil WF kg Rp 16,500.00 Rp 22,178.10
8 Besi strip 1kg kg Rp 7,260.00 Rp 10,600.38
9 Bubungan Biasa bj Rp 25,000.00 Rp 32,828.60
10 Bubungan Plentong bj Rp 7,200.00 Rp 10,525.20
11 Genteng plentong dicat bj Rp 1,380.00 Rp 3,232.74
12 Genteng Plentong bj Rp 1,560.00 Rp 3,458.28
13 Ijuk m3 Rp 2,400.00 Rp 4,510.80
14 Seng BJLS 0,20 gelombang lbr Rp 55,000.00 Rp 70,418.60
Seng BJLS 0.20 gelombang gajah
15 lbr Rp 57,000.00 Rp 72,924.60
berlian
16 Seng BJLS 0,25 gelombang lbr Rp 73,000.00 Rp 92,972.60
17 Seng BJLS 0,30 gelombang lbr Rp 79,000.00 Rp 100,490.60
18 Seng Plat BJLS 30 lebar 28 cm lbr Rp 130,000.00 Rp 164,393.60
19 Seng Plat BJLS 30 lebar 30 cm m' Rp 20,000.00 Rp 26,563.60
20 Seng Plat BJLS 30 lebar 38 cm m' Rp 35,000.00 Rp 45,358.60
24 Seng Plat BJLS 30 lebar 40 cm m' Rp 30,000.00 Rp 39,093.60
25 Seng Plat BJLS 30 lebar 44 cm m' Rp 40,000.00 Rp 51,623.60
26 Seng Plat BJLS 20 lebar 30 cm m' Rp 20,000.00 Rp 26,563.60
43
27 Seng Plat BJLS 20 lebar 28 cm m' Rp 30,000.00 Rp 39,093.60
28 Seng Plat BJLS 20 lebar 40 cm m' Rp 25,000.00 Rp 32,828.60
29 Seng Plat BJLS 30 pintu lbr Rp 75,000.00 Rp 95,478.60
30 Seng Plat BJLS 20 pintu m' Rp 78,000.00 Rp 99,237.60
31 Seng plastik gelombang besar tebal lbr Rp 90,000.00 Rp 114,273.60
32 Seng plastik gelombang kecil tebal lbr Rp 25,000.00 Rp 32,828.60
33 Seng plastik gelombang besar tipis lbr Rp 75,000.00 Rp 95,478.60
34 Seng Fiber gelombang besar tebal lbr Rp 65,000.00 Rp 82,948.60
35 Sirap Jati bh Rp 10,200.00 Rp 14,284.20
36 AT roof Bjls 30, 0,8x0,8 lbr Rp 47,000.00 Rp 60,394.60
37 Rainbouw roof Bjls 30, 0,3x1,2 lbr Rp 45,000.00 Rp 57,888.60
Bubungan rainbouw roof Bjls 30, 1,2
38 Bh Rp 45,000.00 Rp 57,888.60
m'
39 Multiroof BJ 300 lbr Rp 90,000.00 Rp 114,273.60
40 Bubungan multiroof Bh Rp 45,000.00 Rp 57,888.60
41 Igi roof 0,2 uk. 0,8x0,8 m' lbr Rp 45,000.00 Rp 57,888.60
42 Sakura roof BJ 30 lbr Rp 75,000.00 Rp 95,478.60

PENGGANTUNG
1 Engsel jendela biasa ps Rp 27,000.00 Rp 35,334.60
2 Engsel jendela biasa Merk King ps Rp 25,000.00 Rp 32,828.60
3 Engsel jendela biasa merk king 3' ps Rp 25,000.00 Rp 32,828.60
4 Engsel jendela merek King 4" ps Rp 30,000.00 Rp 39,093.60
5 Engsel kupu-kupu jendela biasa ps Rp 20,000.00 Rp 26,563.60
6 Engsel kupu-kupu jendela biasa 3" ps Rp 25,000.00 Rp 32,828.60
7 Engsel Jendela Bagus Kuningan ps Rp 40,000.00 Rp 51,623.60
Engsel jendela bagus kuningan modem ps Rp 40,000.00 Rp 51,623.60
8 4'
9 Engsel jendela bagus kuningan 4' ps Rp 45,000.00 Rp 57,888.60
10 Engsel kupu-kupu pintu biasa ps Rp 50,000.00 Rp 64,153.60
11 Engsel kupu-kupu pintu biasa 4" ps Rp 50,000.00 Rp 64,153.60
Engsel kupu-kupu pintu biasa ps Rp 55,000.00 Rp 70,418.60
12 4cmx3cmx3mm merk jezz
Engsel kupu-kupu pintu biasa AFC ps Rp 55,000.00 Rp 70,418.60
13 4cmx3cmx3mm merk king
Engsel kupu-kupu pintu biasa ps Rp 45,000.00 Rp 57,888.60
14 4cmx3cmx3mm merk viper
15 Engsel nylon ps Rp 20,000.00 Rp 26,563.60
16 Espagnoleth set Rp 35,000.00 Rp 45,358.60
17 Grendel kecil biasa bh Rp 10,000.00 Rp 14,033.60
18 Grendel kecil bagus bh Rp 25,000.00 Rp 32,828.60
19 Grendel kecil spring knife brabus/ses bh Rp 30,000.00 Rp 39,093.60
20 Grendel kecil biasa 3" bh Rp 25,000.00 Rp 32,828.60
21 Grendel kecil bagus 2" bh Rp 15,000.00 Rp 20,298.60
22 Grendel kecil spring knife bh Rp 15,000.00 Rp 20,298.60
23 Grendel besar 12" bh Rp 45,000.00 Rp 57,888.60
24 Grendel besar bh Rp 18,000.00 Rp 24,057.60
25 Grendel hararo bh Rp 18,425.00 Rp 24,590.13
26 Kaca 3 mm bening lbr Rp 210,000.00 Rp 264,633.60
44
27 Kaca 3 mm bening 153x122 m2 m2 Rp 133,933.35 Rp 169,322.09
28 Kaca 5 mm bening lbr Rp 235,000.00 Rp 295,958.60
29 Kaca 5 mm bening 200 x 100 m2 Rp 147,500.00 Rp 186,321.10
30 Kaca 5 mm bening 153x122 m2 m2 Rp 160,720.03 Rp 202,885.79
31 Kaca 6 mm bening 153x122 m2 m2 Rp 174,113.36 Rp 219,667.64
32 Kaca 8 mm bening 153x122 m2 m2 Rp 178,934.96 Rp 225,709.11
33 Kaca 10 mm bening m2 - -
34 Kaca 12 mm bening m2 - -
35 Kaca Es/Kapur 3 mm m2 - -
36 Kaca Es/Kapur 5 mm m2 - -
37 Kaca nako bening bh Rp 16,000.00 Rp 21,551.60
38 Kaca nako rayben bh Rp 20,000.00 Rp 26,563.60
39 Kaca ryben 3 mm 153x122 cm m2 Rp 187,506.70 Rp 236,449.49
40 Kaca ryben 5 mm 153x122 cm m2 Rp 200,900.03 Rp 253,231.34
41 Kaca Ryben 5 mm 183 x 132 cm m2 Rp 124,192.75 Rp 157,117.11
42 Kaca ryben 5 mm 200x100 cm m2 Rp 157,500.00 Rp 198,851.10
43 Cermin 3 mm 153x122 cm m2 Rp 182,149.36 Rp 229,736.75
44 Cermin 5 mm 183 x 122 m2 Rp 259,786.80 Rp 327,016.45
45 Kait angin biasa ps Rp 15,000.00 Rp 20,298.60
46 Kait angin bagus bh Rp 30,000.00 Rp 39,093.60
47 Kunci pintu Delmanao bh -
48 Kunci pintu Zeis bh Rp 295,000.00 Rp 371,138.60
49 Kunci pintu TOP bh Rp 65,000.00 Rp 82,948.60
50 Kunci pintu Union bh Rp 125,000.00 Rp 158,128.60
51 Kunci pintu Cap Kuda bodi kecil bh Rp 120,000.00 Rp 151,863.60
52 Kunci pintu Cap Kuda bodi besar bh Rp 125,000.00 Rp 158,128.60
53 Kunci pintu Royal bh Rp 200,000.00 Rp 252,103.60
54 Kunci pintu Globe K bh Rp 150,000.00 Rp 189,453.60
55 Kunci pintu Yale bh Rp 225,000.00 Rp 283,428.60
56 Kunci pintu vanessa bh Rp 175,000.00 Rp 220,778.60
57 Kunci pintu Kodai bh Rp 180,000.00 Rp 227,043.60
58 Kunci pintu Sapphire bh Rp 120,000.00 Rp 151,863.60
59 Kunci slot kecil HPP bh Rp 15,000.00 Rp 20,298.60
60 Kunci slot sedang HPP bh Rp 25,000.00 Rp 32,828.60
61 Kunci slot besar HPP bh Rp 50,000.00 Rp 64,153.60
62 Kunci slot kecil bh Rp 13,000.00 Rp 17,792.60
63 Kunci slot kecil ATS bh Rp 17,000.00 Rp 22,804.60
64 Kunci slot sedang bh Rp 25,000.00 Rp 32,828.60
65 Kunci slot sedang ATS bh Rp 35,000.00 Rp 45,358.60
66 Kunci slot besar bh Rp 50,000.00 Rp 64,153.60
67 Kunci Silinder bh - -
68 Kunci tanam 2 slag Biasa bh Rp 85,000.00 Rp 108,008.60
69 Kunci tanam 2 slag Bagus bh Rp 155,000.00 Rp 195,718.60
70 Kunci tanam 2 slag bagus merk Azzuro bh - -
Kunci tanam 2 slag bagus merk bh
71 Giardano - -
- - - -
KAYU DAN PLAFOND
1 Bambu besar Ukuran 4 m btg Rp 6,000.00 Rp 9,021.60
45
2 Bambu sedang Ukuran 4 m btg Rp 5,000.00 Rp 7,768.60
3 Bambu kecil Ukuran 4 m btg Rp 4,000.00 Rp 6,515.60
4 Celling teak (0,62 x 2,40) m2 lbr Rp 65,000.00 Rp 82,948.60
5 Eternit lbr Rp 47,000.00 Rp 61,898.20
6 Formika lbr Rp 95,000.00 Rp 122,042.20
7 Melamine Lbr Rp 105,000.00 Rp 134,572.20
8 Gedeg kulit kelas I m2 Rp 21,000.00 Rp 29,320.20
9 Gypsum Old lbr Rp 125,000.00 Rp 159,632.20
10 Hard board MDF lbr Rp 105,000.00 Rp 134,572.20
11 Kalsiboard 4,5 mm lbr Rp 80,000.00 Rp 103,247.20
13 Kayu Besi 10 x 10, panjang 4 m' m3 Rp 4,500,000.00 Rp 5,859,028.00
14 Kayu Besi 5 x 10, panjang 4 m' m3 Rp 4,500,000.00 Rp 5,859,028.00
15 Kayu Besi 5 x 5, panjang 4 m' m3 Rp 3,300,000.00 Rp 4,355,428.00
16 Kayu Besi 2.5 x 20, panjang 4 m' m3 Rp 3,500,000.00 Rp 4,606,028.00
17 Kayu Besi 10 x 10, panjang 3 m' m3 Rp 4,600,000.00 Rp 5,984,328.00
18 Kayu Besi 6x 12, panjang 4 m' m3 Rp 5,750,000.00 Rp 7,425,278.00
19 Reng Kayu Besi 2 x 3 m3 Rp 5,300,000.00 Rp 6,861,428.00
20 Kayu Besi 4x 25, panjang 4 m' m3 Rp 5,300,000.00 Rp 6,861,428.00
21 Papan Kayu besi 2,5 x 25, panjang 4 m' m3 Rp 3,500,000.00 Rp 4,606,028.00
22 Papan Cor/Papan Kayu Putih m3 Rp 2,300,000.00 Rp 3,102,428.00
23 Kayu Matoa 10 x10, panjang 4 m' m3 Rp 2,300,000.00 Rp 3,102,428.00
24 Kayu Matoa 5 x 10, panjang 4 m' m3 Rp 2,500,000.00 Rp 3,353,028.00
25 Kayu Matoa 5 x 5, panjang 4 m' m3 Rp 3,000,000.00 Rp 3,979,528.00
26 Kayu Matoa m3 Rp 2,500,000.00 Rp 3,353,028.00
27 Kayu Merbau m3 Rp 3,300,000.00 Rp 4,355,428.00
Papan Kayu Matoa 2,5 x 25, panjang 4
28 m3 Rp 2,300,000.00 Rp 3,102,428.00
m'
Papan Kayu Matoa 2,5 x 20, panjang 4
29 m3 Rp 2,300,000.00 Rp 3,102,428.00
m'

30 Papan Kayu Matoa 3 x 25, panjang 4 m' m3 Rp 2,300,000.00 Rp 3,102,428.00


33 Kayu dolken (pekerjaan sementara) btg Rp 36,000.00 Rp 46,611.60
44 Kayu meranti papan m3 Rp 2,400,000.00 Rp 3,227,728.00
46 Kayu profil m1 Rp 10,000.00 Rp 14,033.60
49 Lem Aibond 450 gr kg Rp 100,000.00 Rp 126,803.60
50 Lem Aibond 700 gr kg Rp 100,000.00 Rp 126,803.60
51 Lem Kayu (fox) kg Rp 40,000.00 Rp 51,623.60
52 Lem Kayu (fox) besar klg Rp 45,000.00 Rp 57,888.60
53 Lem Kayu (Fox) 0.6 klg Rp 100,000.00 Rp 126,803.60
54 Lem Kayu (Fox) klg Rp 15,000.00 Rp 20,298.60
55 Lem Kayu (Fox) Rajawali kg Rp 35,000.00 Rp 45,358.60
57 Minyak bekisting ltr Rp 15,000.00 Rp 20,298.60
58 Tripleks 2.7 mm lbr Rp 68,000.00 Rp 86,707.60
59 Tripleks 3 mm Lbr Rp 95,000.00 Rp 122,042.20
60 Tripleks 3 mm semi meranti Lbr Rp 76,000.00 Rp 98,235.20
61 Tripleks 3.6 mm lbr Rp 78,000.00 Rp 100,741.20
62 Plywood 3 mm Lbr Rp 95,000.00 Rp 122,042.20
63 Tripleks 4 mm Lbr Rp 107,000.00 Rp 137,078.20
46
64 Tripleks 4 mm semi meranti Lbr Rp 80,000.00 Rp 103,247.20
65 Plywood 4 mm lbr Rp 82,500.00 Rp 106,379.70
66 Tripleks 5 mm lbr Rp 150,000.00 Rp 190,957.20
67 Multiplek 6 mm lbr Rp 96,000.00 Rp 123,295.20
68 Plywood 6 mm lbr Rp 102,487.00 Rp 131,423.41
69 Multiplek 9 mm lbr Rp 185,000.00 Rp 234,812.20
70 Plywood 9 mm lbr Rp 160,000.00 Rp 203,487.20
71 Multiplek 12 mm lbr Rp 205,000.00 Rp 259,872.20
72 Plywood 12 mm lbr Rp 210,000.00 Rp 266,137.20
73 Multiplek 18 mm lbr Rp 285,000.00 Rp 360,112.20
74 Plywood aluminium lbr Rp 100,000.00 Rp 128,307.20
75 Teak wood (0,9x2,20) m2 lbr Rp 105,000.00 Rp 134,572.20
76 Teak wood (1,20x2,40) m2 lbr Rp 115,000.00 Rp 147,102.20
- - - - -
KERAMIK
IKAD
1 Ikad (Keramik) Kw. I 10 x 20 cm m2 Rp 51,480.00 Rp 67,511.64
2 Ikad (Keramik) Kw. I 20 x 20 cm m2 Rp 67,500.00 Rp 87,584.70
3 Ikad (Keramik) Kw. I 20 x 30 cm m2 Rp 85,000.00 Rp 109,512.20
4 Ikad (Keramik) Kw. I 30 x 30 cm m2 Rp 85,000.00 Rp 109,512.20
5 Ikad (Keramik) Kw. I 40 x 40 cm m2 Rp 78,000.00 Rp 100,741.20
6 Ikad (Keramik) Kw. II 10 x 20 cm m2 Rp 37,500.00 Rp 49,994.70
7 Ikad (Keramik) Kw. II 20 x 20 cm m2 Rp 39,500.00 Rp 52,500.70
8 Ikad (Keramik) Kw. II 20 x 30 cm m2 Rp 46,500.00 Rp 61,271.70
9 Ikad (Keramik) Kw. II 30 x 30 cm m2 Rp 48,500.00 Rp 63,777.70
10 Ikad (Keramik) Kw. II 40 x 40 cm m2 Rp 55,500.00 Rp 72,548.70

ELEYSIUM
1 Ikad (Keramik) Kw. I 20 x 20 cm m2 Rp 60,000.00 Rp 78,187.20
3 Ikad (Keramik) Kw. I 30 x 30 cm m2 Rp 90,000.00 Rp 115,777.20
4 Ikad (Keramik) Kw. I 40 x 40 cm m2 Rp 90,000.00 Rp 115,777.20

GARUDA
1 Granito 60 x 60 m2 Rp 250,000.00 Rp 316,257.20

ASIA
1 Keramik 10 x 10 kelas I warna muda m2 Rp 52,000.00 Rp 68,163.20
2 Keramik 10 x 20 kelas I warna muda m2 Rp 75,000.00 Rp 96,982.20
3 Keramik 20 x 20 kelas I warna muda m2 Rp 65,000.00 Rp 84,452.20
4 Keramik 20 x 20 kelas I warna tua m2 Rp 70,000.00 Rp 90,717.20
5 Keramik 20 x 25 kelas I warna tua m2 Rp 63,000.00 Rp 81,946.20
6 Keramik 20 x 30 kelas I warna muda m2 Rp 58,000.00 Rp 75,681.20
7 Keramik 30 x 30 kelas I warna muda m2 Rp 80,000.00 Rp 103,247.20
8 Keramik 30 x 30 kelas I warna tua m2 Rp 65,000.00 Rp 84,452.20
9 Keramik 40 x 40 kelas I warna muda m2 Rp 95,000.00 Rp 122,042.20
10 Keramik 40 x 40 warna platinum m2 Rp 85,000.00 Rp 109,512.20
- - - - -
MULIA - - -
1 Keramik 20 x 20 cm kelas I m2 Rp 85,000.00 Rp 109,512.20
47
2 Keramik 40 x 40 cm kelas I m2 Rp 75,000.00 Rp 96,982.20
- - - - -
PICASSO - - -
1 Ikad Keramik KW 1 20 x 20 cm m2 Rp 75,000.00 Rp 96,982.20
2 Ikad Keramik KW 1 20 x 25 cm m2 Rp 85,000.00 Rp 109,512.20
3 Ikad Keramik KW 1 30 x 30 cm m2 Rp 80,000.00 Rp 103,247.20
4 Ikad Keramik KW 1 40 x 40 cm m2 Rp 95,000.00 Rp 122,042.20
- - - - -
SANITAIR - - -
Bak mandi fibre glass 70x70x66 cm
1 bh Rp 450,000.00 Rp 570,866.80
biasa
Bak mandi fibre glass 70x70x66 cm
2 bh Rp 350,000.00 Rp 445,566.80
sudut
3 Bak mandi keramik 50x50 bh Rp 165,000.00 Rp 213,761.80
Floor Drain " TOTO TypeTx 1 Bv 1 "
4 bh Rp 38,000.00 Rp 54,630.80
Square Flange "
5 Floor drain plastik bh Rp 20,000.00 Rp 26,563.60
6 Floor drain stainless bh Rp 65,000.00 Rp 82,948.60
7 Floor drain plastik onda bh Rp 25,000.00 Rp 32,828.60
8 Kloset duduk DATA komplit bh Rp 750,000.00 Rp 941,253.60
9 Kloset duduk INA Komplit bh Rp 2,500,000.00 Rp 3,139,516.80
10 Kloset duduk INA standard bh Rp 1,650,000.00 Rp 2,074,466.80
11 Kloset duduk Amerika Standar bh Rp 2,800,000.00 Rp 3,515,416.80
Kloset duduk " TOTO Type AVANTE
12 CW 821 PJ / SW 821JP bh Rp 1,500,000.00 Rp 1,886,516.80
COMPLIT
Kloset duduk " TOTO Type AVANTE
13 CW 821J"/ SW 821JP bh Rp 5,610,000.00 Rp 7,036,346.80
COMPLIT
Kloset duduk " TOTO Type AVANTE
14 bh Rp 5,600,000.00 Rp 7,023,816.80
CW 823 J
15 Kloset duduk " TOTO Type CW 660J bh Rp 602,800.00 Rp 762,325.20
Kloset duduk " TOTO Type CW 660J /
16 bh Rp 2,550,000.00 Rp 3,202,166.80
SW 660J COMPLIT
Kloset duduk " TOTO Type CW 660J /
17 bh Rp 1,491,000.00 Rp 1,875,239.80
SW 660J COMPLIT WARNA

18 Kloset duduk LOLO warna COMPLIT bh Rp 1,500,000.00 Rp 1,886,516.80

Kloset duduk " TOTO Type CW


19 bh Rp 2,796,200.00 Rp 3,510,655.40
661JT1 BODI COMPLIT
Kloset duduk " TOTO Type CW
20 bh Rp 2,190,000.00 Rp 2,751,086.80
661JT1" / SW 661JP COMPLIT
Kloset duduk " TOTO Type CW
21 bh Rp 1,734,700.00 Rp 2,180,595.90
661JT1" / SW 784JP COMPLIT
Kloset jongkok " TOTO Type CE 6
22 bh Rp 345,000.00 Rp 439,301.80
COMPLIT
23 Kloset jongkok " TOTO bh Rp 370,000.00 Rp 470,626.80
Kloset porselin jongkok Avena
25 bh Rp 175,000.00 Rp 226,291.80
(standar)
48
26 Kloset porselin jongkok Kia (standar) bh Rp 175,000.00 Rp 226,291.80
27 Kloset porselin jongkok VITO (standar) bh Rp 180,000.00 Rp 232,556.80
28 Kloset porselin jongkok Ina (standar) bh Rp 350,000.00 Rp 445,566.80
Kloset porselin jongkok America
29 bh Rp 230,000.00 -
(standar)
30 Kloset porselin jongkok DUTY bh Rp 185,000.00 Rp 238,821.80
34 Kran air 3/4 biasa dari besi bh Rp 125,000.00 Rp 158,128.60
35 Kran air 3/4 biasa dari plastik bh Rp 20,000.00 Rp 26,563.60
36 Kran air 1/2 biasa dari besi bh Rp 110,000.00 Rp 139,333.60
37 Kran SunEi bh Rp 99,000.00 Rp 125,550.60
4 Ikad Keramik KW 1 40 x 40 cm m2 Rp 95,000.00 Rp 122,042.20
- - - - -
SANITAIR - - -
Bak mandi fibre glass 70x70x66 cm
1 bh Rp 450,000.00 Rp 570,866.80
biasa
Bak mandi fibre glass 70x70x66 cm
2 bh Rp 350,000.00 Rp 445,566.80
sudut
3 Bak mandi keramik 50x50 bh Rp 165,000.00 Rp 213,761.80
Floor Drain " TOTO TypeTx 1 Bv 1 "
4 bh Rp 38,000.00 Rp 54,630.80
Square Flange "
5 Floor drain plastik bh Rp 20,000.00 Rp 26,563.60
6 Floor drain stainless bh Rp 65,000.00 Rp 82,948.60
7 Floor drain plastik onda bh Rp 25,000.00 Rp 32,828.60
8 Kloset duduk DATA komplit bh Rp 750,000.00 Rp 941,253.60
9 Kloset duduk INA Komplit bh Rp 2,500,000.00 Rp 3,139,516.80
10 Kloset duduk INA standard bh Rp 1,650,000.00 Rp 2,074,466.80
11 Kloset duduk Amerika Standar bh Rp 2,800,000.00 Rp 3,515,416.80
Kloset duduk " TOTO Type AVANTE
12 CW 821 PJ / SW 821JP bh Rp 1,500,000.00 Rp 1,886,516.80
COMPLIT
Kloset duduk " TOTO Type AVANTE
13 CW 821J"/ SW 821JP bh Rp 5,610,000.00 Rp 7,036,346.80
COMPLIT
Kloset duduk " TOTO Type AVANTE
14 bh Rp 5,600,000.00 Rp 7,023,816.80
CW 823 J
15 Kloset duduk " TOTO Type CW 660J bh Rp 602,800.00 Rp 762,325.20
Kloset duduk " TOTO Type CW 660J /
16 bh Rp 2,550,000.00 Rp 3,202,166.80
SW 660J COMPLIT
Kloset duduk " TOTO Type CW 660J /
17 bh Rp 1,491,000.00 Rp 1,875,239.80
SW 660J COMPLIT WARNA

18 Kloset duduk LOLO warna COMPLIT bh Rp 1,500,000.00 Rp 1,886,516.80

Kloset duduk " TOTO Type CW


19 bh Rp 2,796,200.00 Rp 3,510,655.40
661JT1 BODI COMPLIT
Kloset duduk " TOTO Type CW
20 bh Rp 2,190,000.00 Rp 2,751,086.80
661JT1" / SW 661JP COMPLIT
Kloset duduk " TOTO Type CW
21 bh Rp 1,734,700.00 2.180.595.90
661JT1" / SW 784JP COMPLIT
49
Kloset jongkok " TOTO Type CE 6
22 bh Rp 345,000.00 Rp 439,301.80
COMPLIT
23 Kloset jongkok " TOTO bh Rp 370,000.00 Rp 470,626.80
Kloset porselin jongkok Avena
25 bh Rp 175,000.00 Rp 226,291.80
(standar)
26 Kloset porselin jongkok Kia (standar) bh Rp 175,000.00 Rp 226,291.80
27 Kloset porselin jongkok VITO (standar) bh Rp 180,000.00 Rp 232,556.80
28 Kloset porselin jongkok Ina (standar) bh Rp 350,000.00 Rp 445,566.80
Kloset porselin jongkok America
29 bh Rp 230,000.00 -
(standar)
30 Kloset porselin jongkok DUTY bh Rp 185,000.00 Rp 238,821.80
34 Kran air 3/4 biasa dari besi bh Rp 125,000.00 Rp 158,128.60
35 Kran air 3/4 biasa dari plastik bh Rp 20,000.00 Rp 26,563.60
36 Kran air 1/2 biasa dari besi bh Rp 110,000.00 Rp 139,333.60
37 Kran SunEi bh Rp 99,000.00 Rp 125,550.60
44 Kran washtafel bh Rp 170,000.00 Rp 214,513.60
45 Kran cuci piring bh Rp 150,000.00 Rp 189,453.60
48 Shower Spray biasa bh Rp 295,000.00 Rp 371,138.60
49 Shower Spray TOTO 12 bh Rp 250,000.00 -
50 Shower Spray TOTO bh Rp 250,000.00 Rp 314,753.60
51 Soap holder " TOTO " Type S 6 N " bh - -
52 Seal tape Besar bh Rp 10,000.00 Rp 14,033.60
53 Seal tape kecil bh Rp 6,000.00 Rp 9,021.60
54 Urinoir " TOTO U 57 M bh Rp 1,052,000.00 Rp 1,319,659.60
56 Wastagel KIA Standard bh Rp 595,000.00 Rp 747,038.60
57 Wastagel INA bh Rp 605,000.00 Rp 765,081.80
60 Washtafel LOLO bh Rp 750,000.00 Rp 946,766.80
61 Wastafel KIA Standar 2 (Lubang) bh Rp 450,000.00 Rp 570,866.80
61 Washtafel cuci tangan kecil (Standard) bh Rp 450,000.00 Rp 570,866.80
62 Washtafel cuci tangan besar (Standard) bh Rp 500,000.00 Rp 633,516.80
63 Washtafel cuci piring 2 lubang bh Rp 1,000,000.00 Rp 1,260,016.80
64 Washtafel cuci piring 1 lubang bh Rp 750,000.00 Rp 946,766.80
65 Bak cuci piring single besar bh Rp 350,000.00 Rp 445,566.80
66 Bak cuci piring double besar bh Rp 450,000.00 Rp 570,866.80
67 Bak cuci piring single kecil bh Rp 225,000.00 Rp 288,941.80
- - - - -
PAKU - - -
1 Paku 3 kg Rp 20,000.00 Rp 26,563.60
2 Paku 4 kg Rp 20,000.00 Rp 26,563.60
3 Paku 5 biasa kg Rp 20,000.00 Rp 26,563.60
4 Paku 5 putih kg Rp 25,000.00 Rp 32,828.60
5 Paku 7 biasa kg Rp 20,000.00 Rp 26,563.60
6 Paku 7 putih kg Rp 25,000.00 Rp 32,828.60
7 Paku 8 putih kg Rp 20,000.00 Rp 26,563.60
8 Paku 9 putih kg Rp 20,000.00 Rp 26,563.60
9 Paku 10 biasa kg Rp 20,000.00 Rp 26,563.60
10 Paku 10 putih kg Rp 25,000.00 Rp 32,828.60
50
11 Paku 12 biasa kg Rp 20,000.00 Rp 26,563.60
12 Paku 12 putih kg Rp 25,000.00 Rp 32,828.60
13 Paku 14 biasa kg Rp 15,000.00 Rp 20,298.60
14 Paku 15 biasa kg Rp 20,000.00 Rp 26,563.60
15 Paku 15 putih kg Rp 22,500.00 Rp 29,696.10
16 Paku kalsiboard kg Rp 45,000.00 Rp 57,888.60
17 Paku list SQ kg Rp 20,000.00 Rp 26,563.60
18 Paku pancing 60 x 230 kg Rp 18,750.00 Rp 24,997.35
19 Paku reng/usuk SQ kg Rp 20,000.00 Rp 26,563.60
20 Paku seng 1Kg kg Rp 25,000.00 Rp 32,828.60
22 Paku skrup 1/2" kg Rp 40,000.00 Rp 50,270.36
23 Paku skrup 2" kg Rp 148,000.00 Rp 185,594.36
24 Paku skrup 3.5" kg Rp 75,000.00 Rp 94,125.36
25 Paku skrup 1" bh Rp 200.00 Rp 400.96
26 Paku beton kg Rp 20,000.00 Rp 25,210.36
27 Paku tripleks kg Rp 25,000.00 Rp 32,828.60
28 Besi strip 1kg kg Rp 7,260.00 Rp 10,600.38

PASIR, BATU, KERIKIL, BATA


DAN PARAS
1 Bata gosok ex Tobacco bj Rp 35,000.00 Rp 46,065.11
2 Bata Merah 5 x 11 x 22 cm bj Rp 8,000.00 Rp 12,234.11
3 Bata Ringan/ Bataco 7 x 20 x 60 bj Rp 18,000.00 Rp 24,764.11
4 Bata Ringan/ Bataco 10 x 20 x 60 bj Rp 25,000.00 Rp 33,535.11
5 Batu tela bj Rp 8,000.00 Rp 12,234.11
6 Batu gunung/ belah m3 Rp 500,000.00 Rp 847,028.00
7 Batu karang m3 Rp 128,571.00 Rp 381,627.46
8 Batu lahar Singaraja m3 Rp 138,000.00 Rp 393,442.00
9 Batu Pecah 2-3 m3 Rp 1,062,500.00 Rp 1,932,752.50
10 Batu Pecah 0.5-1/ciping m3 Rp 1,062,500.00 Rp 1,932,752.50
11 Batu Pecah 10-19 m3 Rp 1,000,000.00 Rp 1,453,480.00
12 Batu pipih Singaraja m3 Rp 150,000.00 Rp 408,478.00
13 Glass block 20cmx20cm bj Rp 55,000.00 Rp 71,922.20
14 Roster Keramik 30cmx30cm bh Rp 75,000.00 Rp 96,982.20
15 Koral Beton m3 Rp 1,062,500.00 Rp 1,531,792.50
16 Limestone m3 Rp 79,000.00 Rp 106,003.80
17 kerikil m3 Rp 625,000.00 Rp 1,113,483.58
18 Pasir beton m3 Rp 265,000.00 Rp 559,624.79
19 Pasir halus m3 Rp 1,000,000.00 Rp 1,453,480.00
29 Pasir kasar m3 Rp 1,000,000.00 Rp 1,453,480.00
21 Pasir sedot / Lokal m3 Rp 350,000.00 Rp 659,078.00
22 Sirtu m3 Rp 250,000.00 Rp 533,778.00
23 Tanah urug m3 Rp 150,000.00 Rp 408,478.00
24 Filler/abu batu m3 Rp 1,062,500.00 Rp 1,451,600.50
25 Aspal drum Rp 2,000,000.00 Rp 33,321.03

Pipa
1 Pipa Galvanis 1/2" Medium A (tebal) m1 Rp 30,000.00 Rp 38,759.47
2 Pipa Galvanis 1/2" Medium B (tipis) m1 Rp 20,833.33 Rp 27,273.63
51
3 Pipa Galvanis 1/2' medium B (sedang) m1 Rp 23,666.67 Rp 30,823.80
4 Pipa Galvanis 3/4" Medium A (tebal) m1 Rp 63,333.33 Rp 80,526.13
5 Pipa Galvanis 3/4" Medium A sedang m1 - -
6 Pipa Galvanis 3/4" Medium B m1 Rp 25,833.33 Rp 33,538.63
7 Pipa Galvanis 1 1/4" m1 Rp 62,500.00 Rp 79,481.97
8 Pipa Galvanis 1 1/2" m1 Rp 64,166.67 Rp 81,570.30
9 Pipa Galvanis 1 1/2 " M.B m1 Rp 49,166.67 Rp 62,775.30
10 Pipa Galvanis 1" m1 Rp 60,000.00 Rp 76,349.47
11 Pipa Galvanis 1" MA m1 Rp 50,000.00 Rp 63,819.47
12 Pipa Galvanis 1" MB m1 Rp 33,333.33 Rp 42,936.13
13 Pipa Galvanis 1,5 BSA m1 Rp 55,500.00 Rp 70,710.97
14 Pipa Galvanis 2" m1 Rp 62,500.00 Rp 79,481.97
15 Pipa Galvanis 2" MA m1 Rp 95,000.00 Rp 120,204.47
16 Pipa Galvanis 2" MB m1 Rp 57,500.00 Rp 73,216.97
17 Pipa Galvanis 3" m1 Rp 137,500.00 Rp 173,456.97
18 Pipa Galvanis 3" MA m1 Rp 155,000.00 Rp 195,384.47
19 Pipa Galvanis 3" MB m1 Rp 99,166.67 Rp 125,425.30
38 Pipa Maspion AW 1 m1 Rp 15,000.00 Rp 20,549.20
21 Pipa Winlon AW 1 m1 Rp 9,500.00 Rp 13,657.70
22 Pipa Maspion AW 1/2 m1 Rp 8,750.00 Rp 12,717.95
23 Pipa Winlon AW 1/2 m1 Rp 6,500.00 Rp 9,898.70
24 Pipa Maspion AW 10 m1 Rp 16,250.00 Rp 22,115.45
26 Pipa Winlon AW 1-1/2 m1 Rp 16,250.00 Rp 22,115.45
28 Pipa Winlon D 1-1/2 m1 Rp 9,500.00 Rp 13,657.70
30 Pipa Winlon AW 1-1/4 m1 Rp 13,750.00 Rp 38,533.76
31 Pipa Maspion AW 12 m1 Rp 38,750.00 Rp 50,307.95
32 Pipa Maspion AW 14 m1 Rp 47,500.00 Rp 61,271.70
33 Pipa Maspion AW 16 m1 Rp 60,000.00 Rp 76,934.20
34 Pipa Maspion AW 2 m1 Rp 23,750.00 Rp 31,512.95
35 Pipa Winlon AW 2 m1 Rp 22,500.00 Rp 29,946.70
36 Pipa Maspion D 2 m1 Rp 15,000.00 Rp 20,549.20
37 Pipa Winlon D 2 m1 Rp 12,000.00 Rp 16,790.20
38 Pipa Maspion AW 2-1/2 m1 Rp 43,750.00 Rp 56,572.95
40 Pipa Winlon D 2-1/2 m1 Rp 18,750.00 Rp 25,247.95
42 Pipa Winlon AW 3 m1 Rp 38,250.00 Rp 49,681.45
43 Pipa Maspion AW 3/4 m1 Rp 11,250.00 Rp 15,850.45
44 Pipa Winlon AW 3/4 m1 Rp 7,000.00 Rp 10,525.20
45 Pipa Maspion AW 4 m1 Rp 72,500.00 Rp 92,596.70
46 Pipa Winlon AW 4 m1 Rp 59,500.00 Rp 76,307.70
47 Pipa Maspion D 4" m1 Rp 46,250.00 Rp 59,705.45
48 Pipa Winlon D 4" m1 Rp 36,250.00 Rp 47,175.45
63 Pipa Winlon D 1-1/2 m1 Rp 9,500.00 Rp 13,657.70
65 Pipa Maspion D 1-1/4 m1 Rp 8,750.00 Rp 12,717.95
70 Pipa Maspion D 2-1/2 m1 Rp 22,500.00 Rp 29,946.70
71 Pipa Maspion D 3 m1 Rp 33,750.00 Rp 44,042.95
76 Elbo 1/2" PVC bh Rp 7,000.00 Rp 10,274.60
77 Elbo 3/4" PVC bh Rp 10,000.00 Rp 14,033.60
78 Elbo PVC 4" bh Rp 50,000.00 Rp 64,153.60
79 Elbo PVC 3" bh Rp 40,000.00 Rp 51,623.60
52
80 Elbo PVC 2,5" bh Rp 35,000.00 Rp 45,358.60
81 Selang hipres 1" m1 Rp 34,000.00 Rp 44,105.60
82 Selang hipres 2" m1 Rp 65,000.00 Rp 82,948.60
83 Selang hipres 1,5" m1 Rp 40,000.00 Rp 51,623.60
84 Selang hipres 0,5" m1 Rp 12,000.00 Rp 16,539.60
85 Selang spiral 2" m1 Rp 55,000.00 Rp 70,418.60
- - - - -
SEMEN - - -
1 Semen Gresik 40 kg kg Rp 2,125.00 Rp 2,838.05
2 Semen Tonasa 40 kg kg Rp 2,125.00 Rp 2,838.05
3 Semen warna/semen grouting kg Rp 15,000.00 Rp 20,298.60
4 Semen putih kg Rp 35,000.00 Rp 45,358.60

BESI BETON DAN PAGAR -


1 Besi beton kg Rp 11,001.39 Rp 17,321.33
2 Besi beton Kg Rp 11,001.39 Rp 17,321.33
3 Besi Beton Ulir -
Besi Beton Ulir 16 mm btg Rp 190,000.00 -
Besi Beton Ulir 12 mm btg Rp 125,000.00 -
Besi Beton Ulir 10 mm btg Rp 110,000.00 -
4 Besi Beton -
Diameter 5.5 mm btg Rp 30,000.00 -
Diameter 6 mm btg Rp 30,000.00 -
Diameter 8 mm btg Rp 58,000.00 -
Diameter 9 mm btg - -
Diameter 10 mm btg Rp 90,000.00 -
Diameter 12 mm btg Rp 120,000.00 -
Diameter 16 mm btg Rp 190,000.00 -
Diameter 19 mm btg Rp 295,000.00 -
Diameter 22 mm btg - -
Diameter 25 mm btg - -
5 Besi Siku 4x4 btg Rp 175,000.00 Rp 222,282.20
6 Besi Siku 5 X 5 btg Rp 260,000.00 Rp 328,787.20
7 Besi Siku Lubang btg Rp 90,000.00 Rp 115,777.20
8 Besi UN 60 btg Rp 405,000.00 Rp 510,472.20
9 Besi UN 80 btg Rp 350,000.00 Rp 441,557.20
10 Besi Holous 20 x 40 btg Rp 135,000.00 Rp 172,162.20
11 Besi Holous 40 x 40 btg Rp 185,000.00 Rp 234,812.20
12 Kawat Bronjong ukuran 2 m kg Rp 25,000.00 Rp 34,332.20
13 Kawat Bronjong ukuran 2,7 m kg - -
14 Kawat Bronjong ukuran 3 m kg - -
15 Kawat Bronjong ukuran 3,4 m kg Rp 52,000.00 Rp 68,163.20
16 Kawat Bronjong ukuran 4 m kg - -
17 Kawat berduri roll Rp 95,000.00 Rp 126,051.80
18 Kawat beton RRT 1 Kg kg Rp 24,000.00 Rp 31,575.60
19 Kawat ram m' Rp 35,000.00 Rp 45,358.60
20 Kawat nyamuk m' Rp 35,000.00 Rp 45,358.60
21 Kawat ayakan m' Rp 35,000.00 Rp 45,358.60
22 Kawat Las RB Dos Rp 250,000.00 Rp 314,753.60
53
23 Kawat Las 1kg kg Rp 60,000.00 Rp 76,683.60
24 Kawat Ikat kg Rp 30,000.00 Rp 39,093.60
25 Kawat Harmonika besar mtr Rp 65,000.00 Rp 82,948.60
26 Kawat Harmonika sedang mtr Rp 55,000.00 Rp 70,418.60
27 Pagar BRC FP 90 EP 1,5 Panil Rp 475,200.00 Rp 598,349.27
28 Pagar BRC FP 90 EP 2,0 Panil Rp 526,700.00 Rp 662,878.77
29 Pagar BRC FP 120 EP 1,5 Panil Rp 607,600.00 Rp 764,246.47
30 Pagar BRC FP 120 EP 2,0 Panil Rp 671,100.00 Rp 843,811.97
31 Pagar BRC FP 150 EP 1,5 Panil Rp 689,000.00 Rp 866,240.67
32 Pagar BRC FP 150 EP 2,0 Panil Rp 754,500.00 Rp 948,312.17
33 Pagar BRC FP 175 EP 2,0 Panil Rp 848,500.00 Rp 1,066,094.17
34 Pagar BRC FP 175 EP 2,5 Panil Rp 926,500.00 Rp 1,163,828.17
35 Pagar BRC FP 190 EP 2,5 Panil Rp 998,200.00 Rp 1,253,668.27
36 P90 EP dia.1,5" bh Rp 120,659.79 Rp 154,110.38
37 P90 EP dia.2" bh Rp 150,561.85 Rp 191,577.66
38 P120 EP dia.1,5" bh Rp 144,449.74 Rp 183,919.19
39 P120 EP dia.2" bh Rp 167,577.31 Rp 212,898.04
40 P150 EP dia.1,5" bh Rp 166,239.69 Rp 211,221.99
41 P150 EP dia.2,0" bh Rp 208,092.77 Rp 263,663.91
42 P175 EP dia.2,0" bh Rp 249,865.97 Rp 316,005.72
43 P190 EP dia.1,0" bh Rp 260,530.92 Rp 329,368.92
- - - - -
BAHAN LISTRIK -
1 Saklar (Broco) double bh Rp 35,000.00 Rp 45,358.60
2 Saklar (Broco) engkle bh Rp 25,000.00 Rp 32,828.60
3 Saklar (Oni) double bh Rp 12,000.00 Rp 16,539.60
4 Saklar (Oni) engkle bh Rp 11,000.00 Rp 15,286.60
5 Saklar tunggal philip bh Rp 70,000.00 Rp 89,213.60
6 Saklar ganda philip bh Rp 65,000.00 Rp 82,948.60
7 Stop kontak philip bh Rp 30,000.00 Rp 39,093.60
8 Stop Kontak (Oni) bh Rp 16,000.00 Rp 21,551.60
9 Stop Kontak (Oni) 2 lubang bh Rp 50,000.00 Rp 64,153.60
10 Stop Kontak (Vticon) 2 lubang bh Rp 12,000.00 Rp 16,539.60
11 Stop Kontak (Oni) 3 lubang bh Rp 55,000.00 Rp 70,418.60
12 Stop Kontak (Oni) 4 lubang bh Rp 65,000.00 Rp 82,948.60
13 Fitting Biasa bh Rp 20,000.00 Rp 26,563.60
14 Fitting keramik bh Rp 80,000.00 Rp 101,743.60
15 Steker biasa bh Rp 10,000.00 Rp 14,033.60
16 Steker Broco bh Rp 20,000.00 Rp 26,563.60
17 Coaxial cable 5C - 75 ohm commscof m1 Rp 5,700.00 Rp 8,645.70
18 Kabel NYM 3 x 2.5 mm ex. Supreme m1 Rp 18,000.00 Rp 24,057.60
19 Kabel NYM 3 x 1.5 mm ex. Eterna m1 Rp 15,000.00 Rp 20,298.60
20 Kabel NYM 4 mm m1 Rp 25,000.00 Rp 32,828.60
21 Kabel NYA 4mm rol Rp 755,000.00 Rp 947,518.60
22 Kabel telephone m1 Rp 5,000.00 Rp 7,768.60
23 Lampu 8 Watt (Philip) bh Rp 45,000.00 Rp 59,392.20
24 Lampu 8 Watt (Philip) Tornado bh Rp 50,000.00 Rp 65,657.20
25 Lampu 11 Watt (Philip) bh Rp 55,000.00 Rp 71,922.20
26 Lampu 14 Watt (Philip) bh Rp 55,000.00 Rp 71,922.20

54
27 Lampu 18 Watt (Philip) bh Rp 55,000.00 Rp 71,922.20
28 Lampu 20 Watt (Philip) bh Rp 50,000.00 Rp 65,657.20
29 Lampu 23 Watt (Philip) bh Rp 55,000.00 Rp 71,922.20
30 Lampu 24 Watt (Philip) bh Rp 55,000.00 Rp 71,922.20
31 Lampu 24 Watt (Philip) tornado bh Rp 60,000.00 Rp 78,187.20
32 Lampu 15 Watt (Philip) tornado bh Rp 55,000.00 Rp 71,922.20
33 Lampu downlight 3,5" bh Rp 45,000.00 Rp 59,392.20
34 Lampu downlight 4" bh Rp 50,000.00 Rp 65,657.20
35 Lampu downlight 5" bh Rp 70,000.00 Rp 90,717.20
36 Isolasi unibelt bh Rp 20,000.00 Rp 28,067.20
37 Pipa clipsal 20 mm bt Rp 18,000.00 Rp 24,057.60
39 Sock clipsal 20 mm bj Rp 2,000.00 Rp 4,009.60
40 Tee dos clipsal 20 mm bh Rp 10,000.00 Rp 14,033.60
41 Klem clipsal 0,5 " bj Rp 2,000.00 Rp 4,009.60
42 Inbow dos plastik clipsal E 157 P bj Rp 6,000.00 Rp 9,021.60
- - - - -
PAVING - - -
19 Koral Sikat zak/10 kg Rp 68,000.00 Rp 92,220.80
-
LAIN-LAIN - - -
7 Karpet plastik m2 Rp 45,000.00 Rp 63,401.80
8 Talang PVC P= 4M', L=4" bentuk bulat buah Rp 130,000.00 Rp 169,906.80

Talang PVC P= 4M', L=4" bentuk


9 buah Rp 160,000.00 Rp 207,496.80
kotak
Talang PVC P= 4M', L=8" bentuk
10 buah Rp 250,000.00 Rp 320,266.80
kotak

11 Talang PVC P= 4M', L=6" bentuk bulat buah Rp 125,000.00 Rp 163,641.80

Talang PVC P= 4M', L=140 mm"


13 buah Rp 115,000.00 Rp 151,111.80
bentuk kotak
14 Talang PVC P= 4M', L: 8' buah Rp 120,000.00 Rp 151,863.60

55
DISTRIK
PARIWARI

Rp 10,428.72
Rp 26,962.05
Rp 14,244.10
Rp 46,038.98
Rp 26,962.05
Rp 84,192.83
Rp 224,090.28
Rp 81,013.34
Rp 88,962.06

Rp 73,064.62

Rp 88,962.06

Rp 73,064.62
Rp 84,192.83
Rp 65,115.90
Rp 33,321.03
Rp 154,141.55
Rp 102,979.06
Rp 340,077.98
Rp 17,042.05
Rp 33,575.39
Rp 26,509.86
Rp 34,847.18
Rp 20,009.57
Rp 98,436.93
Rp 74,590.78
Rp 79,360.01
Rp 85,718.98
Rp 47,565.13
Rp 34,847.18
Rp 24,672.82
Rp 28,488.21
Rp 66,642.06
Rp 53,924.11
Rp 19,585.64
Rp 41,206.16
Rp 74,590.78
Rp 73,001.03

56
Rp 19,585.64
Rp 17,042.05
Rp 29,760.00
Rp 19,585.64
Rp 98,436.93
Rp 85,718.98
Rp 98,436.93
Rp 63,462.57
Rp 92,077.96
Rp 79,360.01
Rp 73,001.03
Rp 47,565.13
Rp 53,924.11
Rp 53,924.11
Rp 47,565.13
Rp 104,795.91
Rp 95,893.34
Rp 95,893.34

Rp 64,257.44

Rp 33,321.03
Rp 38,408.21
Rp 32,049.23
Rp 44,258.47

Rp 54,941.54
Rp 24,418.46
Rp 22,510.77
Rp 10,759.39
Rp 33,321.03
Rp 10,683.08
Rp 3,281.23
Rp 3,510.15
Rp 4,578.46
Rp 71,474.88
Rp 74,018.47
Rp 94,367.19
Rp 101,997.96
Rp 166,859.50
Rp 26,962.05
Rp 46,038.98
Rp 39,680.00
Rp 52,397.95
Rp 26,962.05
57
Rp 39,680.00
Rp 33,321.03
Rp 96,910.78
Rp 100,726.16
Rp 115,987.70
Rp 33,321.03
Rp 96,910.78
Rp 84,192.83
Rp 14,498.46
Rp 61,300.52
Rp 58,756.93
Rp 58,756.93
Rp 115,987.70
Rp 58,756.93
Rp 58,756.93
Rp 96,910.78

Rp 35,864.62
Rp 33,321.03
Rp 33,321.03
Rp 39,680.00
Rp 26,962.05
Rp 33,321.03
Rp 52,397.95
Rp 52,397.95

Rp 58,756.93
Rp 65,115.90
Rp 65,115.90
Rp 71,474.88

Rp 71,474.88

Rp 58,756.93

Rp 26,962.05
Rp 46,038.98
Rp 14,244.10
Rp 33,321.03
Rp 39,680.00
Rp 33,321.03
Rp 20,603.08
Rp 20,603.08
Rp 58,756.93
Rp 24,418.46
Rp 24,958.98
Rp 268,603.10
58
Rp 171,861.92
Rp 300,397.98
Rp 189,115.92
Rp 205,929.08
Rp 222,962.66
Rp 229,094.74
-
-
-

Rp 21,874.87
Rp 26,962.05
Rp 239,996.23
Rp 257,029.81
Rp 159,473.87
Rp 201,833.87
Rp 233,182.80
Rp 331,921.70
Rp 20,603.08
Rp 39,680.00
-
Rp 376,705.68
Rp 84,192.83
Rp 160,500.53
Rp 154,141.55
Rp 160,500.53
Rp 255,885.15
Rp 192,295.40
Rp 287,680.03
Rp 224,090.28
Rp 230,449.25
Rp 154,141.55
Rp 20,603.08
Rp 33,321.03
Rp 65,115.90
Rp 18,059.49
Rp 23,146.67
Rp 33,321.03
Rp 46,038.98
Rp 65,115.90
-
Rp 109,628.73
Rp 198,654.38
-
-
-

Rp 9,156.92
59
Rp 7,885.13
Rp 6,613.33
Rp 84,192.83
Rp 62,826.67
Rp 123,872.83
Rp 136,590.78
Rp 29,760.00
Rp 162,026.68
Rp 136,590.78
Rp 104,795.91
Rp 5,946,913.42
Rp 5,946,913.42
Rp 4,420,759.42
Rp 4,675,118.42
Rp 6,074,092.92
Rp 7,536,657.17
Rp 6,964,349.42
Rp 6,964,349.42
Rp 4,675,118.42
Rp 3,148,964.42
Rp 3,148,964.42
Rp 3,403,323.42
Rp 4,039,220.92
Rp 3,403,323.42
Rp 4,420,759.42
Rp 3,148,964.42

Rp 3,148,964.42

Rp 3,148,964.42
Rp 47,310.77
Rp 3,276,143.92
Rp 14,244.10
Rp 128,705.65
Rp 128,705.65
Rp 52,397.95
Rp 58,756.93
Rp 128,705.65
Rp 20,603.08
Rp 46,038.98
Rp 20,603.08
Rp 88,008.21
Rp 123,872.83
Rp 99,708.73
Rp 102,252.32
Rp 123,872.83
Rp 139,134.37
60
Rp 104,795.91
Rp 107,975.40
Rp 193,821.56
Rp 125,144.63
Rp 133,394.76
Rp 238,334.38
Rp 206,539.51
Rp 263,770.28
Rp 270,129.26
Rp 365,513.88
Rp 130,231.81
Rp 136,590.78
Rp 149,308.73
-

Rp 68,524.31
Rp 88,898.47
Rp 111,154.88
Rp 111,154.88
Rp 102,252.32
Rp 50,744.62
Rp 53,288.21
Rp 62,190.78
Rp 64,734.37
Rp 73,636.93

Rp 79,360.01
Rp 117,513.86
Rp 117,513.86

Rp 321,001.06

Rp 69,185.65
Rp 98,436.93
Rp 85,718.98
Rp 92,077.96
Rp 83,175.39
Rp 76,816.42
Rp 104,795.91
Rp 85,718.98
Rp 123,872.83
Rp 111,154.88
-
-
Rp 111,154.88
61
Rp 98,436.93
-
-
Rp 98,436.93
Rp 111,154.88
Rp 104,795.91
Rp 123,872.83
-
-
Rp 579,429.80

Rp 452,250.30
Rp 216,968.23
Rp 55,450.26
Rp 26,962.05
Rp 84,192.83
Rp 33,321.03
Rp 955,372.40
Rp 3,186,609.55
Rp 2,105,583.80
Rp 3,568,148.05

Rp 1,914,814.55

Rp 7,141,892.00

Rp 7,129,174.05
Rp 773,760.08
Rp 3,250,199.30

Rp 1,903,368.40

Rp 1,914,814.55

Rp 3,563,315.23

Rp 2,792,353.10

Rp 2,213,304.84

Rp 445,891.33
Rp 477,686.20
Rp 229,686.18
62
Rp 229,686.18
Rp 236,045.15
Rp 452,250.30
-
Rp 242,404.13
Rp 160,500.53
Rp 26,962.05
Rp 141,423.60
Rp 127,433.86
Rp 123,872.83
-
-
Rp 579,429.80

Rp 452,250.30
Rp 216,968.23
Rp 55,450.26
Rp 26,962.05
Rp 84,192.83
Rp 33,321.03
Rp 955,372.40
Rp 3,186,609.55
Rp 2,105,583.80
Rp 3,568,148.05

Rp 1,914,814.55

Rp 7,141,892.00

Rp 7,129,174.05
Rp 773,760.08
Rp 3,250,199.30

Rp 1,903,368.40

Rp 1,914,814.55

Rp 3,563,315.23

Rp 2,792,353.10

Rp 2,213,304.84
63
Rp 445,891.33
Rp 477,686.20
Rp 229,686.18
Rp 229,686.18
Rp 236,045.15
Rp 452,250.30
-
Rp 242,404.13
Rp 160,500.53
Rp 26,962.05
Rp 141,423.60
Rp 127,433.86
Rp 217,731.30
Rp 192,295.40
Rp 376,705.68
-
Rp 319,474.90
-
Rp 14,244.10
Rp 9,156.20
Rp 1,339,454.49
Rp 758,244.18
Rp 776,558.03
Rp 960,968.30
Rp 579,429.80
Rp 579,429.80
Rp 643,019.55
Rp 1,278,917.05
Rp 960,968.30
Rp 452,250.30
Rp 579,429.80
Rp 293,275.93
-
-
Rp 26,962.05
Rp 26,962.05
Rp 26,962.05
Rp 33,321.03
Rp 26,962.05
Rp 33,321.03
Rp 26,962.05
Rp 26,962.05
Rp 26,962.05
Rp 33,321.03
64
Rp 26,962.05
Rp 33,321.03
Rp 20,603.08
Rp 26,962.05
Rp 30,141.54
Rp 58,756.93
Rp 26,962.05
Rp 25,372.31
Rp 26,962.05
Rp 33,321.03
Rp 51,024.42
Rp 188,378.28
Rp 95,537.24
Rp 406.97
Rp 25,588.52
Rp 33,321.03
Rp 10,600.38

Rp 46,756.09
Rp 12,417.62
Rp 25,135.57
Rp 34,038.14
Rp 12,417.62
Rp 859,733.42
Rp 387,351.87
Rp 399,343.63
Rp 1,961,743.79
Rp 1,961,743.79
Rp 1,475,282.20
Rp 414,605.17
Rp 73,001.03
Rp 98,436.93
Rp 1,554,769.39
Rp 107,593.86
Rp 1,137,513.00
Rp 585,800.00
Rp 1,475,282.20
Rp 1,475,282.20
Rp 668,964.17
Rp 541,784.67
Rp 414,605.17
Rp 1,473,374.51
Rp 2,604,636.16

Rp 39,340.86
Rp 27,682.74
65
Rp 31,286.16
Rp 81,734.03
-
Rp 34,041.71
Rp 80,674.20
Rp 82,793.85
Rp 63,716.93
Rp 77,494.71
Rp 64,776.76
Rp 43,580.18
Rp 71,771.63
Rp 80,674.20
Rp 122,007.53
Rp 74,315.22
Rp 176,058.82
Rp 198,315.23
Rp 127,306.68
Rp 20,857.44
Rp 13,862.57
Rp 12,908.72
Rp 10,047.18
Rp 22,447.18
Rp 22,447.18
Rp 13,862.57
Rp 39,111.77
Rp 51,062.57
Rp 62,190.78
Rp 78,088.21
Rp 31,985.64
Rp 30,395.90
Rp 20,857.44
Rp 17,042.05
Rp 57,421.54
Rp 25,626.67
Rp 50,426.67
Rp 16,088.21
Rp 10,683.08
Rp 93,985.65
Rp 77,452.32
Rp 60,601.03
Rp 47,883.08
Rp 13,862.57
Rp 12,908.72
Rp 30,395.90
Rp 44,703.59
Rp 10,428.72
Rp 14,244.10
Rp 65,115.90
Rp 52,397.95
66
Rp 46,038.98
Rp 44,767.18
Rp 84,192.83
Rp 52,397.95
Rp 16,787.69
Rp 71,474.88
-
-
Rp 2,880.62
Rp 2,880.62
Rp 20,603.08
Rp 46,038.98

-
Rp 17,581.15
Rp 17,581.15
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Rp 225,616.43
Rp 333,719.01
Rp 117,513.86
Rp 518,129.28
Rp 448,180.56
Rp 174,744.63
Rp 238,334.38
Rp 34,847.18
-
-
Rp 69,185.65
-
Rp 127,942.58
Rp 32,049.23
Rp 46,038.98
Rp 46,038.98
Rp 46,038.98
Rp 319,474.90
67
Rp 77,833.85
Rp 39,680.00
Rp 84,192.83
Rp 71,474.88
Rp 607,324.51
Rp 672,821.95
Rp 775,710.16
Rp 856,469.15
Rp 879,234.28
Rp 962,536.85
Rp 1,082,085.58
Rp 1,181,285.59
Rp 1,272,473.29
Rp 156,422.04
Rp 194,451.33
Rp 186,677.98
Rp 216,091.51
Rp 214,390.32
Rp 267,618.87
Rp 320,745.81
Rp 334,309.45
-
-
Rp 46,038.98
Rp 33,321.03
Rp 16,787.69
Rp 15,515.90
Rp 90,551.80
Rp 84,192.83
Rp 39,680.00
Rp 21,874.87
Rp 65,115.90
Rp 16,787.69
Rp 71,474.88
Rp 84,192.83
Rp 26,962.05
Rp 103,269.75
Rp 14,244.10
Rp 26,962.05
Rp 8,775.39
Rp 24,418.46
Rp 20,603.08
Rp 33,321.03
Rp 961,731.38
Rp 7,885.13
Rp 60,283.08
Rp 66,642.06
Rp 73,001.03
Rp 73,001.03

68
Rp 73,001.03
Rp 66,642.06
Rp 73,001.03
Rp 73,001.03
Rp 79,360.01
Rp 73,001.03
Rp 60,283.08
Rp 66,642.06
Rp 92,077.96
Rp 28,488.21
Rp 24,418.46
Rp 4,069.74
Rp 14,244.10
Rp 4,069.74
Rp 9,156.92
-
-
Rp 93,604.11

-
Rp 64,352.83
Rp 172,455.40

Rp 210,609.25

Rp 325,070.80

Rp 166,096.43

Rp 153,378.48
Rp 154,141.55

69
DAFTAR HARGA SATUAN UPAH
TAHUN ANGGARAN 2017

NO URAIAN SATUAN VOLUME HARGA / HARI HARI / JAM


1 Mandor Oh 8 Rp 130,000.00 Rp 16,250.00
2 Kepala Tukang Oh 8 Rp 110,000.00 Rp 13,750.00
3 Tukang Batu Oh 8 Rp 100,000.00 Rp 12,500.00
4 Tukang Kayu Oh 8 Rp 100,000.00 Rp 12,500.00
5 tukang listrik oh 8 Rp 100,000.00 Rp 12,500.00
6 Tukang Besi Oh 8 Rp 100,000.00 Rp 12,500.00
7 Tukang Gali Oh 8 Rp 100,000.00 Rp 12,500.00
8 Tukang Cat Oh 8 Rp 100,000.00 Rp 12,500.00
9 tukang pipa Oh 8 Rp 100,000.00 Rp 12,500.00
10 Pekerja Oh 8 Rp 90,000.00 Rp 11,250.00

54
HARGA / HARI
Rp 130,000.00
Rp 110,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 100,000.00
Rp 90,000.00

55
VOLUME PEKERJAAN

NAMA : RYSTI DWI ANUGERAH


STAMBUK : 162 16 042

A. PEKERJAAN PENDAHULUAN

a. Direksi Keet
= P x L
= 5 x 4
= 20 m²

b. Pemasangan pagar pengaman


= 2 x P L
= 2 x 11.00 6.00
= 34 m

c. Pengukuran awal dan pemasangan bowplang


= 2 x P L
= 2 x 10.00 5.00
= 30 m

B. PEKERJAAN STRUKTUR
1. Pekerjaan Pondasi
a. pekerjaan galian tanah
= Tinggi x Lebar P. Galian
= 1.1 x 0.80 32.00
= 28.16 m³

b. pekerjaan pasir urug bawah pondasi


= Tinggi x Lebar P. Galian
= 0.1 x 0.80 32.00
= 2.56 m³

c. pekerjaan batu kosong


= Tinggi x Lebar P. Galian
= 0.2 x 0.80 32.00
= 5.12 m³

d. pekerjaan batu kali


= lebar
Tinggi P. Galian
= atas bawah
= 0.30 0.60 0.60 32.00
= 8.64 m³

55
e. urugan tanah kembali
= 1/3 x volume galian
= 1/3 x 28.16
= 9.39 m³

f. spesi 5cm
segmen P x L Tebal Volume
segmen 1 4 x 3 0.05 0.6
segmen 2 4 x 3 0.05 0.6
segmen 3 2 x 3 0.05 0.3
segmen 4 3.5 x 3 0.05 0.525
segmen 5 2 x 2 0.05 0.2
segmen 6 2.5 x 2 0.05 0.25
segmen 7 4.5 x 4 0.05 0.9
segmen 8 3 x 3 0.05 0.45
segmen 9 3 x 3 0.05 0.45
segmen 10 3 x 3 0.05 0.45
segmen 11 3 x 3 0.05 0.45
Volume total spesi 5.18

2. Pekerjaan Kolom
a. Volume Kolom
= P x L x Tinggi jumlah kolom
= 0.15 x 0.15 x 3.00
14
= 0.95 m³

b. pembesian
besi Ø 10
P. Besi Jumlah P. besi 1 Berat Besi
= x /
1 Kolom kolom batang Ø 10
= 12 x 14 / 12 7.40
= 14 btg
= 104 kg

besi Ø 6
Jumlah P. besi 1 Berat Besi
= P. Begel x /
begel batang Ø6
= 0.66 x 280 / 12 2.66
= 15.4 btg
= 41 kg

56
c. bekisting kolom
Jumlah Lebar
= T. kolom x 4 lapis x
Kolom Papan
= 3 x 4 x 14 0.15
= 168 m
= 25 m3

3. Pekerjaan sloof
a. Volume Sloof
= Lebar x Tinggi x Panjang
= 0.15 x 0.15 x 32.00
= 0.72 m³

b. pembesian
besi Ø 10
Jumlah P. besi 1 Berat Besi
= P. Besi x /
besi batang Ø 10
= 32 x 4 / 12 7.40
= 10.7 btg
= 79 kg

besi Ø 6
Jumlah P. besi 1 Berat Besi
= P. Begel x /
begel batang Ø6
= 0.66 x 213 / 12 2.66
= 12 btg
= 31 kg

c. bekisting sloof
panjang Lebar
= x 2 lapis
bekisting Papan
= 32 x 2 0.15
= 64 m
= 10 m²

C. PEKERJAAN KONSTRUKSI ATAP


1. Pekerjaan ring balok 15x20
a. Volume ring balok
= Lebar x Tinggi x Panjang
= 0.15 x 0.15 x 32.00
= 0.72 m³

b. pembesian
besi Ø 10
Jumlah P. besi 1 Berat Besi
= P. Besi x /
besi batang Ø 10

57
= 32 x 4 / 12 7.40
= 10.7 btg
= 79 kg

besi Ø 6
Jumlah P. besi 1 Berat Besi
= P. Begel x /
begel batang Ø6
= 0.76 x 213.3333 / 12 2.66
= 14 btg
= 36 kg

c. bekisting ring balok


panjang Lebar
= x 2 lapis
bekisting Papan
= 87 x 3 0.15
= 261 m
= 39 m²

D. PEKERJAAN ARSITEKTUR
1. Pekerjaan dinding
a. dinding bata

luasan dinding 1
= P x T
= 32.00 x 3.00
= 96 m²

total luasan dinding utuh


luas dinding 1 = 96 m²
total luasan dinding = 96 m²

lubang dinding
Type P x L jumlah Luas satuan
P1 2.20 x 1.00 2 4.4 m²
luasan kusen pintu jendela dan ventilasi 4.4 m²

L 1 kolom = 0.0225
J kolom = 14
total luas = 0.945

L. dinding L kusen
= - - L kolom
utuh pijen
luas dinding
= 96 - 4.4 - 0.945
= 90.66 m²

b. pekerjaan plesteran

58
luasan total plesteran
= L dinding x tebal
= 90.66 x 0.03
= 2.72 m²

c. pekerjaan acian
luasan total plesteran
= L dinding x tebal
= 90.66 x 0.03
= 2.72 m²

59

Anda mungkin juga menyukai