RENCANA PELAKSANAAN
JUMLAH BOBOT
NO. URAIAN PEKERJAAN MG.1 MG.2 MG.3 MG.4 MG.5 MG.6 MG.7 MG.8 MG.9 MG.10 MG.11 MG.12 MG.13 MG.14 MG.15 MG.16 MG.17 MG.18 KET.
HARGA (%)
1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120
A. PEKERJAAN KONSTRUKSI
0.99 1.00
I. PEKERJAAN PERSIAPAN 30,600,000.00 1.65 1.65
0.95
II. PEKERJAAN TANAH/PASIR 60,431,100.60 3.27 1.63 1.63 0.90
III. PEKERJAAN PASANGAN/PLESTERAN/LANTAI 596,501,170.16 32.23 3.90 3.87 3.87 3.87 3.87 3.87 3.87 2.26 2.87 0.82
IV. PEKERJAAN BETON / STRUKTUR 258,448,496.56 13.96 2.33 2.33 2.33 2.33 2.33 2.33 0.75
V. PEKERJAAN KUSEN PINTU/JENDELA DLL. 72,953,928.52 3.94 0.79 0.63 2.52
0.67
VI. PEKERJAAN KUDA-KUDA/GORDING/PLAFONT 471,729,485.16 25.49 3.31 10.20 6.63 5.35
0.58
VII. PEKERJAAN PENGECATAN 112,776,002.36 6.09 2.56 2.56 0.97
DOLLY SENGKEY
Direktur