Anda di halaman 1dari 159

DAFTAR HARGA SATUAN BAHAN & UPAH TENAGA KERJA

PROYEK 0
PEKERJAAN 0
LOKASI 0
TAHUN : 2004

No. Jenis Bahan Satuan

A. Bahan Pasir
1 Pasir Urug m3
2 Pasir Pasang m3
3 Pasir Cor m3
4 Sirtu m3
5 Tanah Urug m3
6 Tanah grosok m3
B. Bahan Batu
1 Batu Kali Pecah 15/20 ( tangan ) m3
2 Batu Kali m3
3 Batu Kali Pecah 7/10 ( tangan ) m3
4 Batu Kali Pecah 5/7 ( tangan ) m3
5 Batu Kali Pecah 3/5 ( mesin ) m3
6 Batu Kali Pecah 2/3 ( mesin ) m3
7 Batu Kali Pecah 0.5 - 1 ( mesin ) m3
8 Batu Kali Pecah 1/2 ( mesin ) m3
9 Koral Beton 1/2 m3
10 Koral Beton 2/3 m3
11 Batu Bata merah ( kelas I ) m3
12 Paving stone / beton blok kelas I m3
13 Paving stone / beton blok kelas II m3
14 Rooster beton bh
14.b Bata berongga bh
15 Hollow block 10 bh
16 Hollow block 15 bh
17 Hollow block 20 bh
18 Conblock 10 bh
19 Conblock 15 bh
20 Conblock 20 bh

C. Bahan Semen
1 Semen Gresik 50 kg zak
2 Semen Tiga Roda 50 kg zak
3 Semen putih ( Azano / Tiga Roda ) zak
4 Semen merah zak
D. Bahan kapur
1 Kapur bubuk m3
2 Kapur gamping m3
E. Bahan Lantai
1 Tegel abu-abu 20 x 20 cm m2
2 Tegel Wafel 20 x 20 cm m2
3 Tegel keramik 30x30 cm ( KW I ) m2
4 Tegel keramik 20x20 cm ( KW I ) m2
5 Tegel keramik motif 30x30 cm m2
6 Keramik dinding 20x25 cm ( KW I ) m2
7 Granit 30x30 cm m2
F. Bahan Kayu
1 Papan jati m3
2 Kayu reng jati 2/3 m3
3 Kayu Kamfer balok 8/12, 6/15 m3
4 Kayu kamfer usuk 5/7 m3
5 Kayu kamfer papan 2.5/20 m3
6 Kayu Kamfer reng 2/3 m3
7 Kayu kruing papan 2/20 m3
8 Kayu kruing balok 8/12,6/15 m3
9 Kayu kruing usuk 5/7 m3
10 Kayu kruing usuk 4/6 m3
11 Kayu kruing reng 2/3 m3
12 Kayu bengkirai 8/12, 6/15 m3
13 Kayu meranti balok 8/12, 6/15 m3
14 Keyu meranti usuk 5/7 m3
15 Kayu meranti papan 3/25/400 m3
16 Teakwood 90.210.4 mm lbr
17 Teakwood 110.210.4 mm lbr
18 Teakwood 122.244.4 mm lbr
No. Jenis Bahan Satuan

19 Triplek lapis aluminium lbr


20 Triplek 90.210.3 mm lbr
21 Triplek 90.210.4 mm lbr
22 Triplek 120.240.2 mm lbr
23 Triplek 120.240.3 mm lbr
24 Triplek 120.240.4 mm lbr
25 Triplek 120.240.6 mm lbr
26 Triplek 120.240.9 mm lbr
27 Triplek 120.240.12 mm lbr
28 List plafond 1/5 m'
29 Kayu kalimantan m3
G. Bahan Besi
1 Besi beton Polos o 6 mm kg
2 Besi beton Polos o 8 mm kg
3 Besi beton Polos o 10 mm kg
4 Besi beton Polos o 12 mm kg
5 Kawat bendrat kg
6 Paku reng kg
7 Paku usuk kg
8 Paku eternit kg
9 Besi lempeng / bulat / strip kg
10 Mur baut kuda-kuda kg
11 Mur baut kuda-kuda bh
12 Plat baut kuda-kuda kg
13 Plat baut kuda-kuda bh
14 Plat baut gording bh
15 Mur baut gording bh
16 Paku payung bh
17 Ankur kusen bh
18 Pagar BRC 90.240 cm unit
19 Pagar BRC 120.240 cm unit
20 Besi siku 30x30x3 panjang 6 m ljr
21 Besi siku 40x40x3 panjang 6 m ljr
22 Besi siku 40x40x4 panjang 6 m ljr
23 Kawat berduri 50 m rol
24 Pipa air galvanis medium 1/2" ljr
25 Pipa air galvanis medium 3/4" ljr
26 Pipa air galvanis medium 1" ljr
27 Pipa air galvanis medium 1,25" ljr
28 Pipa air galvanis medium 2" ljr
29 Pipa air galvanis medium 3" ljr
H. Buis beton
1 Buis beton bulat o 15 cm, 1 m' m
2 Buis beton bulat o 20 cm, 1 m' m
3 Buis beton bulat o 30 cm, 1 m' m
4 Buis beton bulat o 40 cm, 1 m' m
5 Buis beton bulat o 50 cm, 1 m' m
6 Buis beton bulat o 60 cm, 1 m' m
7 Buis beton bulat o 80 cm, 1 m' m
8 Buis beton bulat o 100 cm, 1 m' m
9 Buis beton U - 20cm , m' m
10 Buis beton U - 30cm , m' m
I. Bahan Penutup
1 Genteng lokal ex Mojokembamg bh
2 Genteng Nglayur bh
3 Genteng karang pilang bh
4 Genteng bubungan Nglayur bh
5 Genteng bubungan karang pilang bh
6 Genteng bubungan lokal bh
7 Eternit 1x1m bh
8 Asbes gelombang besar 225 x 110 lbr
9 Asbes gelombang kecil 225 x 105 lbr
10 Bubungan Asbes Gelombang 110 bh
11 Seng plat BJLS 30.80.300 cm lbr

No. Jenis Bahan Satuan

J. Bahan Cat
1 Kertas gosok lbr
2 Plamur tembok kg
3 Plamur kayu " PEDANG " kg
4 Cat kayu / besi EMCO/setara kg
5 Cat tembok "DECOLITH" kg
6 Cat tembok "PARAGON" kg
7 Cat meni "PEDANG" kg
8 Dempul kayu kg
9 Minyak cat / thiner B ltr
10 Spiritus ltr
11 Plitur jadi ltr
12 Kolter ltr
13 Lem kayu " RAJAWALI " kg
14 Teer kg
15 Cherelag kg
K. Bahan Kaca
1 Kaca bening 3 mm m2
2 Kaca bening 5 mm m2
3 Kaca rayband 3 mm m2
4 Kaca raybend 5 mm m2
5 Kaca nako + rangka "NIKY" m2
L. Bahan Penggantung dan Pengunci
1 Kunci "UNION" 2 x putar bh
2 Kunci "ANCHOR" 2 x tanam bh
3 Kunci "KUDA TERBANG" 2 x putar bh
4 Engsel Nylon "ARCH" asli pintu bh
5 Engsel jendela bh
6 Grendel injak bh
7 Grendel tanam pintu bh
8 Grendel tanam jendela bh
9 Hak angin psg
M. Bahan Instalasi Air
1 Kran air "SAN EI" bh
2 Kran air "AMICO 1/2" bh
3 Kran air "AMICO 3/4" bh
4 Pompa air "GOLD STAR" bh
5 Pompa air "NASIONAL" bh
6 Pipa PVC AW o 1/2" 4 m ljr
7 Pipa PVC AW o 3/4" 4m ljr
8 Pipa PVC AW o 1".4m ljr
9 Pipa PVC AW o 2" 4 m ljr
10 Pipa PVC AW o 3" 4 m ljr
11 Pipa PVC AW o 4" 4m ljr
12 Talang " U " Maspion 4m ljr
13 Floor drains bh
14 Closed Jongkok INA warna bh
15 Closed duduk "TOTO" bh
16 Tutup bak mandi bh
17 Lem paralon bh
18 Westafel bh
19 Pompa air " NASIONAL " bh

N. Bahan lampu dan instalasi listrik


1 Pasang listrik ttk
2 Lampu TL 1 x 10 w PHILIPS bh
3 Lampu TL 1 x 20 w PHILIPS bh
4 Lampu TL 1 x 40 w PHILIPS bh
5 Lampu pijar 40 - 100 w PHILIPS bh
6 Isolator bh
7 Las Doof bh
No. Jenis Bahan Satuan

8 Fiting Plafoond bh
9 T dos PVC bh
10 Stop Kontak "BROCO" bh
11 Saklar tunggal "BROCO" bh
12 Sakla ganda " BROCO " bh
13 Sekrering Tunggal "LN" bh
14 Sekering ganda "LN" bh
15 Kabel NYA 1000 Volt 1,5 mm m
16 Kabel NYA 1000 Volt 2,5 mm m
17 Kabel NYA 1000 Volt 4 mm m
18 Panel MCB unit

O. Harga upah tenaga kerja


1 Mandor Org/hr
2 Kepala Tukang Batu Org/hr
3 Kepala Tukang Kayu Org/hr
4 Tukang Batu Org/hr
5 Tukang kayu Org/hr
6 Kepala Tukang Org/hr
7 Tukang Cat Org/hr
8 Tukang besi Org/hr
9 Pekerja Org/hr
10 Tukang pelitur Org/hr
11 Tukang listrik Org/hr

0
0

0
0
SATUAN BAHAN & UPAH TENAGA KERJA

Harga
Satuan

34,500.00 34,500.00
50,000.00 50,000.00
50,000.00 50,000.00
49,000.00 49,000.00
24,000.00 24,000.00
54,000.00 54,000.00

75,000.00 75,000.00
69,000.00 69,000.00
83,000.00 83,000.00
84,000.00 84,000.00
100,000.00 100,000.00
110,000.00 110,000.00
130,000.00 130,000.00
130,000.00 130,000.00
125,000.00 125,000.00
110,000.00 110,000.00
220.00 220.00
30,000.00 30,000.00
27,000.00 27,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00

620.00 31,000.00
580.00 29,000.00
900.00 45,000.00

350,000.00 350,000.00
375,000.00 375,000.00

15,000.00 15,000.00
16,500.00 16,500.00
29,000.00 29,000.00
34,000.00 34,000.00
34,000.00 34,000.00
34,000.00 34,000.00
65,000.00 65,000.00

6,950,000.00 6,950,000.00
6,950,000.00 6,950,000.00
2,725,000.00 2,725,000.00
2,425,000.00 2,425,000.00
2,725,000.00 2,725,000.00
2,225,000.00 2,225,000.00
1,625,000.00 1,625,000.00
1,625,000.00 1,625,000.00
1,625,000.00 1,625,000.00
1,625,000.00 1,625,000.00
1,275,000.00 1,275,000.00
2,175,000.00 2,175,000.00
1,175,000.00 1,175,000.00
1,175,000.00 1,175,000.00
1,175,000.00 1,175,000.00
34,000.00 34,000.00
45,000.00 45,000.00
50,000.00 50,000.00
Harga Harga
Satuan Satuan
60,500.00 60,500.00
27,000.00 27,000.00
30,000.00 30,000.00
22,000.00 22,000.00
30,500.00 30,500.00
33,000.00 33,000.00
41,000.00 41,000.00
64,000.00 64,000.00
88,500.00 88,500.00
1,500.00 1,500.00
6,950,000.00 6,950,000.00

6,000.00 6,000.00
6,000.00 6,000.00
6,000.00 6,000.00
6,000.00 6,000.00
8,500.00 8,500.00
7,000.00 7,000.00
7,000.00 7,000.00
8,500.00 8,500.00
8,500.00 8,500.00
8,500.00 8,500.00
2,500.00 2,500.00
8,500.00 8,500.00
15,000.00 15,000.00
10,000.00 10,000.00
2,250.00 2,250.00
200.00 200.00
500.00 500.00
165,000.00 165,000.00
187,000.00 187,000.00
50,000.00 50,000.00
62,000.00 62,000.00
65,000.00 65,000.00
39,500.00 39,500.00
40,000.00 40,000.00
50,000.00 50,000.00
60,000.00 60,000.00
70,000.00 70,000.00
95,000.00 95,000.00
120,000.00 120,000.00

10,000.00 10,000.00
15,000.00 15,000.00
20,000.00 20,000.00
24,000.00 24,000.00
40,000.00 40,000.00
44,000.00 44,000.00
55,000.00 55,000.00
90,000.00 90,000.00
10,000.00 10,000.00
12,500.00 12,500.00

350.00 350.00
750.00 750.00
750.00 750.00
2,000.00 2,000.00
2,000.00 2,000.00
1,500.00 1,500.00
5,000.00 5,000.00
55,000.00 55,000.00
35,000.00 35,000.00
47,500.00 47,500.00
20,000.00 20,000.00
Harga Harga
Satuan Satuan

3,000.00 3,000.00
3,500.00 3,500.00
9,000.00 9,000.00
35,000.00 35,000.00
10,250.00 10,250.00
10,250.00 10,250.00
10,000.00 10,000.00
9,000.00 9,000.00
3,500.00 3,500.00
10,000.00 10,000.00
10,000.00 10,000.00
2,500.00 2,500.00
7,000.00 7,000.00
6,000.00 6,000.00
27,500.00 27,500.00

35,750.00 35,750.00
51,000.00 51,000.00
52,000.00 52,000.00
66,000.00 66,000.00
8,500.00 8,500.00

57,500.00 57,500.00
65,000.00 65,000.00
57,500.00 57,500.00
8,500.00 8,500.00
5,250.00 5,250.00
10,000.00 10,000.00
6,500.00 6,500.00
3,000.00 3,000.00
5,000.00 5,000.00

15,500.00 15,500.00
14,000.00 14,000.00
16,000.00 16,000.00
300,000.00 300,000.00
275,000.00 275,000.00
12,000.00 12,000.00
15,000.00 15,000.00
20,000.00 20,000.00
30,000.00 30,000.00
42,000.00 42,000.00
60,000.00 60,000.00
41,000.00 41,000.00
3,500.00 3,500.00
150,000.00 150,000.00
945,000.00 945,000.00
2,000.00 2,000.00
4,500.00 4,500.00
35,000.00 35,000.00
275,000.00 275,000.00

44,000.00 44,000.00
33,000.00 33,000.00
43,000.00 43,000.00
60,000.00 60,000.00
9,000.00 9,000.00
5,000.00 5,000.00
2,000.00 2,000.00
Harga Harga
Satuan Satuan
500.00 500.00
750.00 750.00
13,000.00 13,000.00
13,000.00 13,000.00
14,000.00 14,000.00
28,000.00 28,000.00
41,000.00 41,000.00
1,000.00 1,000.00
1,500.00 1,500.00
2,250.00 2,250.00
82,500.00 82,500.00

40,000.00 40,000.00
35,000.00 35,000.00
37,500.00 37,500.00
30,000.00 30,000.00
35,000.00 35,000.00
35,000.00 35,000.00
30,000.00 30,000.00
32,500.00 32,500.00
22,500.00 22,500.00
32,500.00 32,500.00
32,500.00 32,500.00
PEKERJAAN PERSIAPAN
1. 1 m2 Pembersihan Lapangan dan Peralatan
Upah An. SNI ( Revisi ) 6.8.1
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 4,250.00
Harga 1 m2 = Rp 4,250.00
2. 1 m' Pengukuran dan Pasang Papan Bowplank
Bahan An. SNI ( Revisi ) 6.4.1
0.012 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 14,100.00
0.020 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 140.00
0.007 m3 Kayu Papan meranti 3/20 @ Rp. 1,175,000.00 = Rp 8,225.00
= Rp 22,465.00
Upah An. SNI ( Revisi ) 6.4.2
0.100 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 3,500.00
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.010 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 6,300.00
Total Upah dan Bahan = Rp 28,765.00
3. 1 m' Pagar sementara dari kayu tinggi 2 m
Bahan An. SNI ( Revisi ) 6.1.1
1.250 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. = Rp -
5.500 kg Semen Portland @ Rp. 620.00 = Rp 3,410.00
0.005 m3 Pasir beton @ Rp. 50,000.00 = Rp 250.00
0.009 m3 Koral beton @ Rp. 110,000.00 = Rp 990.00
0.072 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 84,600.00
0.060 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 420.00
0.400 Lt Residu @ Rp. = Rp -
= Rp 89,670.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 7,000.00
0.400 Oh Pekerja @ Rp. 22,500.00 = Rp 9,000.00
0.020 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 700.00
0.020 Oh Mandor @ Rp. 40,000.00 = Rp 800.00
= Rp 17,500.00
Total Upah dan Bahan = Rp 107,170.00
4. 1 m' Pagar sementara dari seng gelombang tinggi 2 m
Bahan An. SNI ( Revisi ) 6.2.1
1.250 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. = Rp -
2.500 kg Semen Portland @ Rp. 620.00 = Rp 1,550.00
1.200 Lbr Seng gelombang 3" - 5" @ Rp. 20,000.00 = Rp 24,000.00
0.005 m3 Pasir beton @ Rp. 50,000.00 = Rp 250.00
0.009 m3 Koral beton @ Rp. 110,000.00 = Rp 990.00
0.072 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 84,600.00
0.060 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 420.00
0.450 kg Meni besi @ Rp. 10,000.00 = Rp 4,500.00
= Rp 116,310.00
Upah An. SNI ( Revisi ) 6.2.2
0.200 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 7,000.00
0.400 Oh Pekerja @ Rp. 22,500.00 = Rp 9,000.00
0.020 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 700.00
0.020 Oh Mandor @ Rp. 40,000.00 = Rp 800.00
= Rp 17,500.00
Total Upah dan Bahan = Rp 133,810.00
5. 1 m' Pagar sementara dari kawat duri tinggi 1.8 m
Bahan An. SNI ( Revisi ) 6.3.1
1.250 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. = Rp -
2.000 kg Semen Portland @ Rp. 620.00 = Rp 1,240.00
25.000 kg Kawat duri @ Rp. 39,500.00 = Rp 987,500.00
0.005 m3 Pasir beton @ Rp. 50,000.00 = Rp 250.00
0.009 m3 Koral beton @ Rp. 110,000.00 = Rp 990.00
0.060 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 420.00
= Rp 990,400.00
Upah An. SNI ( Revisi ) 6.3.2
0.200 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 7,000.00
0.300 Oh Pekerja @ Rp. 22,500.00 = Rp 6,750.00
0.020 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 700.00
0.020 Oh Mandor @ Rp. 40,000.00 = Rp 800.00
= Rp 15,250.00
Total Upah dan Bahan = Rp 1,005,650.00
6. 1 m2 Pembuatan kantor sementara, dengan lantai plesteran
Bahan An. SNI ( Revisi ) 6.5.1
1.250 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. = Rp -
0.180 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 211,500.00
0.850 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 5,950.00
1.100 kg Besi strip @ Rp. 8,500.00 = Rp 9,350.00
35.000 kg Semen Portland @ Rp. 620.00 = Rp 21,700.00
0.150 m3 Pasir pasang @ Rp. 50,000.00 = Rp 7,500.00
0.100 m3 Pasir beton @ Rp. 50,000.00 = Rp 5,000.00
0.150 m3 Koral beton @ Rp. 110,000.00 = Rp 16,500.00
30.000 Bh Bata merah @ Rp. 220.00 = Rp 6,600.00
0.250 Lbr Seng plat @ Rp. 20,000.00 = Rp 5,000.00
2.000 m2 Jendela nako @ Rp. 8,500.00 = Rp 17,000.00
0.080 m2 Kaca polos @ Rp. 51,000.00 = Rp 4,080.00
0.150 Bh Kunci tanam @ Rp. 65,000.00 = Rp 9,750.00
0.060 Lbr Playwood 4mm @ Rp. 33,000.00 = Rp 1,980.00
= Rp 321,910.00
Upah An. SNI ( Revisi ) 6.5.2
2.000 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 70,000.00
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
0.300 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 10,500.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 105,000.00
Total Upah dan Bahan = Rp 426,910.00

7. 1 m2 Pembuatan gudang semen dan alat-alat


Bahan An. SNI ( Revisi ) 6.6.1
1.700 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. = Rp -
0.210 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 246,750.00
0.300 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 2,100.00
10.500 kg Semen Portland @ Rp. 620.00 = Rp 6,510.00
0.030 m3 Pasir beton @ Rp. 50,000.00 = Rp 1,500.00
0.050 m3 Koral beton @ Rp. 110,000.00 = Rp 5,500.00
1.500 Lbr Seng gelombang bljs 32 @ Rp. 20,000.00 = Rp 30,000.00
= Rp 292,360.00
Upah An. SNI ( Revisi ) 6.6.2
2.000 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 70,000.00
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
0.200 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 7,000.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 101,500.00
Total Upah dan Bahan = Rp 393,860.00
8. 1 m2 Pembuatan rumah jaga/konstruksi kayu
Bahan An. SNI ( Revisi ) 6.7.1
3.000 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. - = Rp -
0.276 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 324,300.00
0.700 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 4,900.00
1.500 Lbr Seng gelombang bljs 32 @ Rp. 20,000.00 = Rp 30,000.00
= Rp 359,200.00
Upah An. SNI ( Revisi ) 6.7.2
1.500 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 52,500.00
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
0.150 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 5,250.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 82,250.00
Total Upah dan Bahan = Rp 441,450.00
9. 1 m2 Pembuatan bedeng buruh
Bahan An. SNI ( Revisi ) 6.9.1
1.250 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. = Rp -
0.186 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 218,550.00
0.300 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 2,100.00
18.000 kg Semen Portland @ Rp. 620.00 = Rp 11,160.00
0.030 m3 Pasir beton @ Rp. 50,000.00 = Rp 1,500.00
0.050 m3 Koral beton @ Rp. 110,000.00 = Rp 5,500.00
1.500 Lbr Seng gelombang bljs 32 @ Rp. 20,000.00 = Rp 30,000.00
1.350 Lbr Playwood 4mm @ Rp. 33,000.00 = Rp 44,550.00
= Rp 313,360.00
Upah An. SNI ( Revisi ) 6.9.2
2.000 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 70,000.00
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
0.200 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 7,000.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 101,500.00
Total Upah dan Bahan = Rp 414,860.00
10. 1 m2 Pembuatan bak adukan ukuran ( 40 x 50 x 25 ) cm
Bahan An. SNI ( Revisi ) 6.10.1
0.036 m3 Kayu Terentang @ Rp. = Rp -
0.080 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 560.00
1.000 Btg Kaso meranti 5/7 @ Rp. 1,175,000.00 = Rp 1,175,000.00
= Rp 1,175,560.00
Upah An. SNI ( Revisi ) 6.10.2
0.300 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 10,500.00
= Rp 10,500.00
Total Upah dan Bahan = Rp 1,186,060.00
11. 1 m2 Pembuatan stegger dari bambu
Bahan An. SNI ( Revisi ) 6.11.1
1.000 Btg Bambu Ø 6 - 10 / 600 cm @ Rp. = Rp -
0.250 Kg Tali ijuk @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.11.2
0.250 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 8,750.00
0.002 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 70.00
0.017 Oh Pekerja @ Rp. 22,500.00 = Rp 382.50
0.013 Oh Mandor @ Rp. 40,000.00 = Rp 520.00
= Rp 9,722.50
Total Upah dan Bahan = Rp 9,722.50

12. 1 m2 Pembuatan jalan sementara


Bahan An. SNI ( Revisi ) 6.12.1
0.150 m3 Batu belah 15/20 @ Rp. 75,000.00 = Rp 11,250.00
0.090 m3 Batu pecah 5/7 @ Rp. 84,000.00 = Rp 7,560.00
0.010 m3 Pasir pasang @ Rp. 50,000.00 = Rp 500.00
= Rp 19,310.00
Upah An. SNI ( Revisi ) 6.12.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 24,500.00
Total Upah dan Bahan = Rp 43,810.00
13. 1 m3 Bongkaran beton bertulang
Upah An. SNI ( Revisi ) 6.13.1
6.667 Oh Pekerja @ Rp. 22,500.00 = Rp 150,007.50
0.333 Oh Mandor @ Rp. 40,000.00 = Rp 13,320.00
= Rp 163,327.50
Total Upah = Rp #VALUE!
14. 1 m3 Bongkaran dinding tembok bata merah
Upah An. SNI ( Revisi ) 6.14.1+ membuat
6.667 Oh Pekerja @ Rp. 22,500.00 = Rp 150,007.50
0.333 Oh Mandor @ Rp. 40,000.00 = Rp 13,320.00
= Rp 163,327.50
Total Upah x 3/4 = Rp #VALUE!
15. 1 m' Pasang pagar kawat jaring galvanis, panjang 240 cm
Bahan An. SNI ( Revisi ) 6.15.1
0.434 Lbr Pagar kawat jaring @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.15.2
0.042 Oh Pekerja @ Rp. 22,500.00 = Rp 945.00
0.004 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 140.00
0.042 Oh Tukang @ Rp. 30,000.00 = Rp 1,260.00
0.002 Oh Mandor @ Rp. 40,000.00 = Rp 80.00
= Rp 2,425.00
Total Upah dan Bahan = Rp 2,425.00
16. 1 m' Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm
Bahan An. SNI ( Revisi ) 6.16.1
0.986 Lbr Panel beton pracetak @ Rp. - = Rp -
0.525 Btg Kolom beton pracetak @ Rp. - = Rp -
0.074 m3 Pasir beton @ Rp. 50,000.00 = Rp 3,700.00
0.146 m3 Koral 2/3 @ Rp. 110,000.00 = Rp 16,060.00
45.000 Kg Semen abu-abu @ Rp. 620.00 = Rp 27,900.00
= Rp 27,900.00
Upah An. SNI ( Revisi ) 6.16.2
0.125 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,750.00
0.375 Oh Pekerja @ Rp. 22,500.00 = Rp 8,437.50
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.019 Oh Mandor @ Rp. 40,000.00 = Rp 760.00
= Rp 13,367.50
Total Upah dan Bahan = Rp 41,267.50
PEKERJAAN TANAH
1. 1 m3 Galian Untuk Tanah Biasa sedalam 1 m
Upah An. SNI ( Revisi ) 6.1.1
0.400 Oh Pekerja @ Rp. 22,500.00 = Rp. 9,000.00
0.040 Oh Mandor @ Rp. 40,000.00 = Rp. 1,600.00
= Rp. 10,600.00
2. 1 m3 Galian Untuk Tanah Biasa sedalam 2 m
Upah An. SNI ( Revisi ) 6.2.1
0.526 Oh Pekerja @ Rp. 22,500.00 = Rp. 11,835.00
0.052 Oh Mandor @ Rp. 40,000.00 = Rp. 2,080.00
= Rp. 13,915.00
3. 1 m3 Galian Untuk Tanah Biasa sedalam 3 m
Upah An. SNI ( Revisi ) 6.3.1
0.735 Oh Pekerja @ Rp. 22,500.00 = Rp. 16,537.50
0.073 Oh Mandor @ Rp. 40,000.00 = Rp. 2,920.00
= Rp. 19,457.50
4. 1 m3 Galian Untuk Tanah keras sedalam 1 m
Upah An. SNI ( Revisi ) 6.4.1
0.625 Oh Pekerja @ Rp. 22,500.00 = Rp. 14,062.50
0.062 Oh Mandor @ Rp. 40,000.00 = Rp. 2,480.00
= Rp. 16,542.50
5. 1 m3 Galian Untuk Tanah cadas sedalam 1 m
Upah An. SNI ( Revisi ) 6.5.1
1.250 Oh Pekerja @ Rp. 22,500.00 = Rp. 28,125.00
0.125 Oh Mandor @ Rp. 40,000.00 = Rp. 5,000.00
= Rp. 33,125.00
6. 1 m3 Galian Untuk Tanah lumpur sedalam 1 m
Upah An. SNI ( Revisi ) 6.6.1
0.823 Oh Pekerja @ Rp. 22,500.00 = Rp. 18,517.50
0.083 Oh Mandor @ Rp. 40,000.00 = Rp. 3,320.00
= Rp. 21,837.50
7. 1 m2 Pekerjaan stripping setinggi 1 m
Upah An. SNI ( Revisi ) 6.7.1
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp. 1,125.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp. 200.00
= Rp. 1,325.00
8. 1 m3 Pembuangan tanah sejauh 150 m
Upah An. SNI ( Revisi ) 6.8.1
0.516 Oh Pekerja @ Rp. 22,500.00 = Rp. 11,610.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp. 2,000.00
= Rp. 13,610.00
9. 1 m3 Urugan kembali
Upah An. SNI ( Revisi ) 6.9.1
0.192 Oh Pekerja @ Rp. 22,500.00 = Rp. 4,320.00
0.019 Oh Mandor @ Rp. 40,000.00 = Rp. 760.00
= Rp. 5,080.00
10. 1 m3 Pemadatan tanah
Upah An. SNI ( Revisi ) 6.10.1
0.500 Oh Pekerja @ Rp. 22,500.00 = Rp. 11,250.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp. 2,000.00
= Rp. 13,250.00
11. 1 m3 Urugan pasir
Bahan An. SNI ( Revisi ) 6.11.1
1.200 m3 Pasir urug @ Rp. 34,500.00 = 41,400.00
= 41,400.00
Upah An. SNI ( Revisi ) 6.11.2
0.300 Oh Pekerja @ Rp. 22,500.00 = 6,750.00
0.0100 Oh Mandor @ Rp. 40,000.00 = 400.00
= 7,150.00
Total Upah dan Bahan = 48,550.00
12. 1 m3 Lapisan pudel campuran 1 Kp : 3 Ps : 7 Tl
Bahan An. SNI ( Revisi ) 6.12.1
0.330 m3 Pasir urug @ Rp. 34,500.00 = 11,385.00
0.109 m3 Kapur padam @ Rp. 375,000.00 = 40,875.00
0.763 m3 Tanah liat @ Rp. 54,000.00 = 41,202.00
= 41,202.00
Upah An. SNI ( Revisi ) 6.12.2
0.833 Oh Pekerja @ Rp. 22,500.00 = 18,742.50
0.416 Oh Tukang batu @ Rp. 30,000.00 = 12,480.00
0.040 Oh Kepala tukang @ Rp. 35,000.00 = 1,400.00
0.0830 Oh Mandor @ Rp. 40,000.00 = 3,320.00
= 4,720.00
Total Upah dan Bahan = 45,922.00
13. 1 m3 Lapisan pudel campuran 1 Kp : 5 Tl
Bahan An. SNI ( Revisi ) 6.13.1
0.200 m3 Kapur padam @ Rp. 375,000.00 = 75,000.00
1.000 m3 Tanah liat @ Rp. 54,000.00 = 54,000.00
= 54,000.00
Upah An. SNI ( Revisi ) 6.13.2
0.833 Oh Pekerja @ Rp. 22,500.00 = 18,742.50
0.416 Oh Tukang batu @ Rp. 30,000.00 = 12,480.00
0.041 Oh Kepala tukang @ Rp. 35,000.00 = 1,435.00
0.081 Oh Mandor @ Rp. 40,000.00 = 3,240.00
= 4,675.00
Total Upah dan Bahan = 58,675.00
14. 1 m3 Pemasangan lapisan ijuk
Bahan An. SNI ( Revisi ) 6.14.1
1.200 m3 Ijuk @ Rp. = -
= #REF!
Upah An. SNI ( Revisi ) 6.14.2
0.150 Oh Pekerja @ Rp. 22,500.00 = 3,375.00
0.015 Oh Mandor @ Rp. 40,000.00 = 600.00
= 600.00
Total Upah dan Bahan = #REF!
15. 1 m3 Urugan sirtu
Bahan An. SNI ( Revisi ) 6.15.1
1.200 m3 Sirtu @ Rp. 49,000.00 = 58,800.00
= #REF!
Upah An. SNI ( Revisi ) 6.15.2
0.250 Oh Pekerja @ Rp. 22,500.00 = 5,625.00
0.025 Oh Mandor @ Rp. 40,000.00 = 1,000.00
= 1,000.00
Total Upah dan Bahan = #REF!
16. 1 m2 Pembuatan jalan sementara, tebal 25 cm
Bahan An. SNI ( Revisi ) 6.17.1
0.250 m3 Batu belah @ Rp. 75,000.00 = #VALUE!
0.030 m3 Kerikil @ Rp. 125,000.00 = #VALUE!
0.050 m3 Pasir pasang @ Rp. 50,000.00 = #VALUE!
= #VALUE!
Upah An. SNI ( Revisi ) 6.17.2
1.000 Oh Pekerja @ Rp. 22,500.00 = #VALUE!
0.100 Oh Mandor @ Rp. 40,000.00 = #VALUE!
= #VALUE!
Total Upah dan Bahan = #VALUE!
PEKERJAAN PONDASI
1. 1 m3 Pasang pondasi batu kosong
Bahan An. SNI ( Revisi ) 6.14.1
1.200 m3 Batu belah ( 15/20 ) @ Rp. 75,000.00 = Rp 90,000.00
0.300 m3 Pasir urug @ Rp. 34,500.00 = Rp 10,350.00
= Rp 100,350.00
Upah An. SNI ( Revisi ) 6.14.2
0.780 Oh Pekerja @ Rp. 22,500.00 = Rp 17,550.00
0.390 Oh Tukang batu @ Rp. 30,000.00 = Rp 11,700.00
0.039 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,365.00
0.039 Oh Mandor @ Rp. 40,000.00 = Rp 1,560.00
= Rp 32,175.00
Total harga = Rp 132,525.00
2. 1 m3 Pasang pondasi batu kali 1 Pc : 1 Ps
Bahan An. SNI ( Revisi ) 6.1.1
1.200 m3 Batu belah ( 15/20 ) @ Rp. 75,000.00 = Rp 90,000.00
392.000 Kg Semen porland @ Rp. 620.00 = Rp 243,040.00
0.314 m3 Pasir pasang @ Rp. 50,000.00 = Rp 15,700.00
= Rp 348,740.00
Upah An. SNI ( Revisi ) 6.1.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 33,750.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 18,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 56,850.00
Total harga = Rp 405,590.00
3. 1 m3 Pasang pondasi batu kali 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.2.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75,000.00 = Rp 82,500.00
267.000 Kg Semen porland @ Rp. 620.00 = Rp 165,540.00
0.427 m3 Pasir pasang @ Rp. 34,500.00 = Rp 14,731.50
= Rp 262,771.50
Upah An. SNI ( Revisi ) 6.2.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 33,750.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 18,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 56,850.00
Total harga = Rp 319,621.50
4. 1 m3 Pasang pondasi batu kali 1 Pc : 2.5 Ps
Bahan An. SNI ( Revisi ) 6.3.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75,000.00 = Rp 82,500.00
392.000 Kg Semen porland @ Rp. 620.00 = Rp 243,040.00
0.314 m3 Pasir pasang @ Rp. 50,000.00 = Rp 15,700.00
= Rp 341,240.00
Upah An. SNI ( Revisi ) 6.3.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 33,750.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 18,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 56,850.00
Total harga = Rp 398,090.00
5. 1 m3 Pasang pondasi batu kali 1 Pc : 3 Ps
Bahan An. SNI ( Revisi ) 6.4.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75,000.00 = Rp 82,500.00
202.000 Kg Semen porland @ Rp. 620.00 = Rp 125,240.00
0.485 m3 Pasir pasang @ Rp. 50,000.00 = Rp 24,250.00
= Rp 231,990.00
Upah An. SNI ( Revisi ) 6.4.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 33,750.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 18,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 56,850.00
Total harga = Rp 288,840.00
6. 1 m3 Pasang pondasi batu kali 1 Pc : 4 Ps
Bahan An. SNI ( Revisi ) 6.5.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75,000.00 = Rp 82,500.00
163.000 Kg Semen porland @ Rp. 620.00 = Rp 101,060.00
0.520 m3 Pasir pasang @ Rp. 50,000.00 = Rp 26,000.00
= Rp 209,560.00
Upah An. SNI ( Revisi ) 6.5.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 33,750.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 18,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 56,850.00
Total harga = Rp 266,410.00
7. 1 m3 Pasang pondasi batu kali 1 Pc : 5 Ps
Bahan An. SNI ( Revisi ) 6.6.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75,000.00 = Rp 82,500.00
136.000 Kg Semen porland @ Rp. 620.00 = Rp 84,320.00
0.544 m3 Pasir pasang @ Rp. 50,000.00 = Rp 27,200.00
= Rp 194,020.00
Upah An. SNI ( Revisi ) 6.6.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 33,750.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 18,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 56,850.00
Total harga = Rp 250,870.00
8. 1 m3 Pasang pondasi batu kali 1 Pc : 6 Ps
Bahan An. SNI ( Revisi ) 6.7.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75,000.00 = Rp 82,500.00
117.000 Kg Semen porland @ Rp. 620.00 = Rp 72,540.00
0.561 m3 Pasir pasang @ Rp. 50,000.00 = Rp 28,050.00
2.925 = Rp 183,090.00
Upah An. SNI ( Revisi ) 6.7.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 33,750.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 18,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 56,850.00
Total harga = Rp 239,940.00
9. 1 m3 Pasang pondasi batu kali 1 Pc : 8 Ps
Bahan An. SNI ( Revisi ) 6.8.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75,000.00 = Rp 82,500.00
91.000 Kg Semen porland @ Rp. 620.00 = Rp 56,420.00
0.561 m3 Pasir pasang @ Rp. 50,000.00 = Rp 28,050.00
= Rp 166,970.00
Upah An. SNI ( Revisi ) 6.8.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 33,750.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 18,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 56,850.00
Total harga = Rp 223,820.00
10. 1 m3 Pasang pondasi batu kali 1 Kp : 1 Sm : 1 Ps
Bahan An. SNI ( Revisi ) 6.9.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75,000.00 = Rp 82,500.00
0.229 Kg Kapur pasang @ Rp. 350,000.00 = Rp 80,150.00
0.229 m3 Semen merah @ Rp. - = Rp -
0.544 m3 Pasir pasang @ Rp. 50,000.00 = Rp 27,200.00
= Rp 189,850.00
Upah An. SNI ( Revisi ) 6.9.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 33,750.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 18,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 56,850.00
Total harga = Rp 246,700.00
11. 1 m3 Pasang pondasi batu kali 1 Kp : 1 Sm : 2 Ps
Bahan An. SNI ( Revisi ) 6.10.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75,000.00 = Rp 82,500.00
0.170 Kg Kapur pasang @ Rp. 50,000.00 = Rp 8,500.00
0.170 m3 Semen merah @ Rp. - = Rp -
0.340 m3 Pasir pasang @ Rp. 50,000.00 = Rp 17,000.00
= Rp 108,000.00
Upah An. SNI ( Revisi ) 6.10.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 52,500.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp -
0.075 Oh Mandor @ Rp. 40,000.00 = Rp -
-- = Rp 76,500.00
Total harga = Rp 184,500.00
12. 1 m3 Pasang pondasi batu kali 1 Pc : 1/4 Kp : 4 Ps
Bahan An. SNI ( Revisi ) 6.11.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75000 = Rp 385,000.00
156.000 Kg Semen portland @ Rp. 620 = Rp 7,800,000.00
0.032 m3 Kapur pasang @ Rp. 350,000.00 = Rp -
0.584 m3 Pasir pasang @ Rp. 50,000.00 = Rp 20,440.00
35,000.00 = Rp 8,205,440.00
Upah An. SNI ( Revisi ) 6.11.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 52,500.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp -
0.075 Oh Mandor @ Rp. 40,000.00 = Rp -
-- = Rp 76,500.00
Total harga = Rp 8,281,940.00
13. 1 m3 Pasang pondasi batu kali 1 Pc : 3 Kp : 10 Ps
Bahan An. SNI ( Revisi ) 6.12.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75000 = Rp 385,000.00
61.000 Kg Semen portland @ Rp. 620 = Rp 3,050,000.00
0.147 m3 Kapur pasang @ Rp. 350,000.00 = Rp -
0.492 m3 Pasir pasang @ Rp. 50,000.00 = Rp 40,590.00
82,500.00 = Rp 3,475,590.00
Upah An. SNI ( Revisi ) 6.12.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 52,500.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp -
0.075 Oh Mandor @ Rp. 40,000.00 = Rp -
-- = Rp 76,500.00
Total harga = Rp 3,552,090.00
14. 1 m3 Pasang pondasi batu kali 1/4 Pc : 1 Kp : 4 Ps
Bahan An. SNI ( Revisi ) 6.13.1
1.100 m3 Batu belah ( 15/20 ) @ Rp. 75000 = Rp 385,000.00
41.000 Kg Semen portland @ Rp. 620 = Rp 2,050,000.00
0.131 m3 Kapur pasang @ Rp. 350,000.00 = Rp -
0.523 m3 Pasir pasang @ Rp. 50,000.00 = Rp -
- = Rp 2,435,000.00
Upah An. SNI ( Revisi ) 6.13.2
1.500 Oh Pekerja @ Rp. 22,500.00 = Rp 52,500.00
0.600 Oh Tukang batu @ Rp. 30,000.00 = Rp 24,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp -
0.075 Oh Mandor @ Rp. 40,000.00 = Rp -
- = Rp 76,500.00
Total harga = Rp 2,511,500.00
15. 1 m3 Pasang pondasi siklop 40 % batu kali
Bahan An. SNI ( Revisi ) 6.15.1
75.000 Kg Besi beton @ Rp. 6000 = Rp 3,750,000.00
202.000 Kg Semen portland @ Rp. 620 = Rp 22,220,000.00
0.320 m3 Pasir beton @ Rp. 50,000.00 = Rp 2,720.00
0.490 m3 Koral beton @ Rp. 110,000.00 = Rp -
0.800 Kg Kawat beton @ Rp. 8,500.00 = Rp -
- = Rp 25,972,720.00
Upah An. SNI ( Revisi ) 6.15.2
3.000 Oh Pekerja @ Rp. 22,500.00 = Rp 105,000.00
0.850 Oh Tukang batu @ Rp. 30,000.00 = Rp 34,000.00
0.085 Oh Kepala tukang @ Rp. 35,000.00 = Rp -
0.150 Oh Mandor @ Rp. 40,000.00 = Rp -
- = Rp 139,000.00
Total harga = Rp 26,111,720.00
16. 1 m3 Pasang pondasi sumuran Ø 100 cm
Bahan An. SNI ( Revisi ) 6.16.1
0.450 m3 Batu belah ( 15/20 ) @ Rp. 75000 = Rp 22,500.00
280.000 Kg Semen portland @ Rp. 620 = Rp 30,800,000.00
0.450 m3 Pasir beton @ Rp. 50,000.00 = Rp -
0.670 m3 Koral beton @ Rp. 110,000.00 = Rp -
- = Rp 30,822,500.00
Upah An. SNI ( Revisi ) 6.16.2
2.380 Oh Pekerja @ Rp. 22,500.00 = Rp 83,300.00
0.300 Oh Tukang batu @ Rp. 30,000.00 = Rp 12,000.00
0.030 Oh Kepala tukang @ Rp. 35,000.00 = Rp -
0.080 Oh Mandor @ Rp. 40,000.00 = Rp -
- = Rp 95,300.00
Total harga = Rp 30,917,800.00
17. 1 m' Pembuatan tiang pancang ( 40 x 40 ) cm, beton bertulang
Bahan An. SNI ( Revisi ) 6.17.1
0.019 m3 Pasir urug darat @ Rp. 34500= Rp 2,090.00
0.094 m3 Pasir beton @ Rp. 50000= Rp 58.28
0.150 m3 Koral beton @ Rp. 110,000.00= Rp 900.00
60.500 Kg Semen portland @ Rp. 620.00= Rp 514,250.00
45.000 Kg Besi beton @ Rp. 6,000.00= Rp 52,875,000.00
0.900 Kg Kawat beton @ Rp. 8,500.00= Rp 6,300.00
0.032 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00= Rp -
0.120 Kg Paku @ Rp. 7,000.00= Rp 420.00
0.090 Lt Minyak bekisting @ Rp. = Rp -
0.240 Kg Plamuur tembok @ Rp. 3,500.00 = Rp -
- = Rp 53,399,018.28
Upah An. SNI ( Revisi ) 6.17.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 35,000.00
0.670 Oh Tukang batu @ Rp. 30,000.00 = Rp 26,800.00
0.067 Oh Kepala tukang @ Rp. 35,000.00 = Rp -
0.050 Oh Mandor @ Rp. 40,000.00 = Rp -
-- = Rp 61,800.00
Total harga = Rp 53,460,818.28
18. 1 m' Pembuatan tiang pancang ( 35 x 35 ) cm, beton bertulang
Bahan An. SNI ( Revisi ) 6.18.1
0.016 m3 Pasir urug darat @ Rp. 34500 = Rp 1,760.00
0.080 m3 Pasir beton @ Rp. 50000 = Rp 49.60
0.125 m3 Koral beton @ Rp. 110,000.00 = Rp 750.00
49.000 Kg Semen portland @ Rp. 620.00 = Rp 416,500.00
34.500 Kg Besi beton @ Rp. 6,000.00 = Rp 40,537,500.00
0.700 Kg Kawat beton @ Rp. 8,500.00 = Rp 4,900.00
0.027 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp -
0.120 Kg Paku @ Rp. 7,000.00 = Rp 420.00
0.090 Lt Minyak bekisting @ Rp. - = Rp -
0.200 Kg Plamuur tembok @ Rp. 3,500.00 = Rp -
- = Rp 40,961,879.60
Upah An. SNI ( Revisi ) 6.18.2
0.800 Oh Pekerja @ Rp. 22,500.00 = Rp 28,000.00
0.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 20,000.00
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp -
0.040 Oh Mandor @ Rp. 40,000.00 = Rp -
-- = Rp 48,000.00
Total harga = Rp 41,009,879.60
PEKERJAAN BETON
1. 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr
Bahan An. SNI ( Revisi ) 6.1.1
218.000 Kg Semen portland @ Rp. 620.00 = Rp 135,160.00
0.520 m3 Pasir beton @ Rp. 50,000.00 = Rp 26,000.00
0.870 m3 Koral beton @ Rp. 110,000.00 = Rp 95,700.00
= Rp 256,860.00
Upah An. SNI ( Revisi ) 6.1.2
1.650 Oh Pekerja @ Rp. 22,500.00 = Rp 37,125.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.080 Oh Mandor @ Rp. 40,000.00 = Rp 3,200.00
= Rp 48,700.00
Total harga = Rp 305,560.00
2. 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 6 Kr
Bahan An. SNI ( Revisi ) 6.2.1
197.000 Kg Semen portland @ Rp. 620.00 = Rp 122,140.00
0.470 m3 Pasir beton @ Rp. 50,000.00 = Rp 23,500.00
0.940 m3 Koral beton @ Rp. 110,000.00 = Rp 103,400.00
= Rp 249,040.00
Upah An. SNI ( Revisi ) 6.2.2
1.650 Oh Pekerja @ Rp. 22,500.00 = Rp 37,125.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.080 Oh Mandor @ Rp. 40,000.00 = Rp 3,200.00
= Rp 48,700.00
Total harga = Rp 297,740.00
3. 1 m3 Membuat beton tumbuk, 1 Pc : 4 Ps : 6 Kr
Bahan An. SNI ( Revisi ) 6.3.1
173.000 Kg Semen portland @ Rp. 620.00 = Rp 107,260.00
0.570 m3 Pasir beton @ Rp. 50,000.00 = Rp 28,500.00
0.870 m3 Koral beton @ Rp. 110,000.00 = Rp 95,700.00
= Rp 231,460.00
Upah An. SNI ( Revisi ) 6.3.2
1.650 Oh Pekerja @ Rp. 22,500.00 = Rp 37,125.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.080 Oh Mandor @ Rp. 40,000.00 = Rp 3,200.00
= Rp 48,700.00
Total harga = Rp 280,160.00
4. 1 m3 Membuat lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr
Bahan An. SNI ( Revisi ) 6.4.1
10.000 Kg Semen portland @ Rp. 620.00 = Rp 6,200.00
0.026 m3 Pasir beton @ Rp. 50,000.00 = Rp 1,300.00
0.044 m3 Koral beton @ Rp. 110,000.00 = Rp 4,840.00
= Rp 12,340.00
Upah An. SNI ( Revisi ) 6.4.2
1.150 Oh Pekerja @ Rp. 22,500.00 = Rp 25,875.00
0.020 Oh Tukang batu @ Rp. 30,000.00 = Rp 600.00
0.002 Oh Kepala tukang @ Rp. 35,000.00 = Rp 70.00
0.006 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 26,785.00
Total harga = Rp 39,125.00
5. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan An. SNI ( Revisi ) 6.5.1
232.000 Kg Semen portland @ Rp. 620.00 = Rp 143,840.00
0.520 m3 Pasir beton @ Rp. 50,000.00 = Rp 26,000.00
0.780 m3 Koral beton @ Rp. 110,000.00 = Rp 85,800.00
= Rp 255,640.00
Upah An. SNI ( Revisi ) 6.5.2
1.650 Oh Pekerja @ Rp. 22,500.00 = Rp 37,125.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.080 Oh Mandor @ Rp. 40,000.00 = Rp 3,200.00
= Rp 48,700.00
Total harga = Rp 304,340.00
6. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 4 Kr
Bahan An. SNI ( Revisi ) 6.6.1
280.000 Kg Semen portland @ Rp. 620.00 = Rp 173,600.00
0.450 m3 Pasir beton @ Rp. 50,000.00 = Rp 22,500.00
0.900 m3 Koral beton @ Rp. 110,000.00 = Rp 99,000.00
= Rp 295,100.00
Upah An. SNI ( Revisi ) 6.6.2
1.650 Oh Pekerja @ Rp. 22,500.00 = Rp 37,125.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.080 Oh Mandor @ Rp. 40,000.00 = Rp 3,200.00
= Rp 48,700.00
Total harga = Rp 343,800.00
7. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 2.5 Kr
Bahan An. SNI ( Revisi ) 6.7.1
352.000 Kg Semen portland @ Rp. 620.00 = Rp 218,240.00
0.560 m3 Pasir beton @ Rp. 50,000.00 = Rp 28,000.00
0.700 m3 Koral beton @ Rp. 110,000.00 = Rp 77,000.00
= Rp 323,240.00
Upah An. SNI ( Revisi ) 6.7.2
1.650 Oh Pekerja @ Rp. 22,500.00 = Rp 37,125.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.080 Oh Mandor @ Rp. 40,000.00 = Rp 3,200.00
= Rp 48,700.00
Total harga = Rp 371,940.00
8. 1 m3 Membuat beton bertulang, 1 Pc : 1.5 Ps : 3 Kr
Bahan An. SNI ( Revisi ) 6.8.1
357.000 Kg Semen portland @ Rp. 620.00 = Rp 221,340.00
0.420 m3 Pasir beton @ Rp. 50,000.00 = Rp 21,000.00
0.540 m3 Koral beton @ Rp. 110,000.00 = Rp 59,400.00
= Rp 301,740.00
Upah An. SNI ( Revisi ) 6.8.2
1.650 Oh Pekerja @ Rp. 22,500.00 = Rp 37,125.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.080 Oh Mandor @ Rp. 40,000.00 = Rp 3,200.00
= Rp 48,700.00
Total harga = Rp 350,440.00
9. 1 m3 Membuat beton bertulang, 1 Pc : 1.5 Ps : 2.5 Kr
Bahan An. SNI ( Revisi ) 6.9.1
386.000 Kg Semen portland @ Rp. 620.00 = Rp 239,320.00
0.470 m3 Pasir beton @ Rp. 50,000.00 = Rp 23,500.00
0.780 m3 Koral beton @ Rp. 110,000.00 = Rp 85,800.00
= Rp 348,620.00
Upah An. SNI ( Revisi ) 6.9.2
1.650 Oh Pekerja @ Rp. 22,500.00 = Rp 37,125.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.080 Oh Mandor @ Rp. 40,000.00 = Rp 3,200.00
= Rp 48,700.00
Total harga = Rp 397,320.00
10. 1 m3 Membuat beton bertulang, 1 Pc : 1 Ps : 2 Kr
Bahan An. SNI ( Revisi ) 6.10.1
479.000 Kg Semen portland @ Rp. 620.00 = Rp 296,980.00
0.370 m3 Pasir beton @ Rp. 50,000.00 = Rp 18,500.00
0.740 m3 Koral beton @ Rp. 110,000.00 = Rp 81,400.00
= Rp 396,880.00
Upah An. SNI ( Revisi ) 6.10.2
1.650 Oh Pekerja @ Rp. 22,500.00 = Rp 37,125.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.080 Oh Mandor @ Rp. 40,000.00 = Rp 3,200.00
= Rp 48,700.00
Total harga = Rp 445,580.00
11. 1 m3 Membuat tiang pancang prestressed beton
Bahan An. SNI ( Revisi ) 6.11.1
440.000 Kg Semen portland @ Rp. 620.00 = Rp 272,800.00
0.500 m3 Pasir beton @ Rp. 50,000.00 = Rp 25,000.00
0.800 m3 Koral beton @ Rp. 110,000.00 = Rp 88,000.00
2.460 Gln Repidrant @ Rp. 10,250.00 = Rp 25,215.00
= Rp 411,015.00
Upah An. SNI ( Revisi ) 6.11.2
1.650 Oh Pekerja @ Rp. 22,500.00 = Rp 37,125.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.080 Oh Mandor @ Rp. 40,000.00 = Rp 3,200.00
= Rp 48,700.00
Total harga = Rp 459,715.00
12. 1 m3 Membuat beton dengan puzzdith - 100 XR
Bahan An. SNI ( Revisi ) 6.12.1
336.000 Kg Semen portland @ Rp. 620.00 = Rp 208,320.00
0.540 m3 Pasir beton @ Rp. 50,000.00 = Rp 27,000.00
0.810 m3 Koral beton @ Rp. 110,000.00 = Rp 89,100.00
1.000 Ltr Puzzdith - 100 XR @ Rp. 8,500.00 = Rp 8,500.00
= Rp 332,920.00
Upah An. SNI ( Revisi ) 6.12.2
1.650 Oh Pekerja @ Rp. 22,500.00 = Rp 37,125.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.080 Oh Mandor @ Rp. 40,000.00 = Rp 3,200.00
= Rp 48,700.00
Total harga = Rp 381,620.00
13. 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 1 Kr
Bahan An. SNI ( Revisi ) 6.17.1
615.000 Kg Semen portland @ Rp. 620.00 = Rp 381,300.00
0.520 m3 Pasir beton @ Rp. 50,000.00 = Rp 26,000.00
0.520 m3 Koral beton @ Rp. 110,000.00 = Rp 57,200.00
= Rp 464,500.00
Upah An. SNI ( Revisi ) 6.17.2
2.000 Oh Pekerja @ Rp. 22,500.00 = Rp 45,000.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
1.000 Oh Mandor @ Rp. 40,000.00 = Rp 40,000.00
= Rp 96,725.00
Total harga = Rp 561,225.00
14. 1 m3 Membuat beton kedap air dengan storox - 100
Bahan An. SNI ( Revisi ) 6.18.1
400.000 Kg Semen portland @ Rp. 620.00 = Rp 248,000.00
0.480 m3 Pasir beton @ Rp. 50,000.00 = Rp 24,000.00
0.800 m3 Koral beton 2/3 @ Rp. 110,000.00 = Rp 88,000.00
1.200 Kg Storox - 100 @ Rp. 4,500.00 = Rp 5,400.00
= Rp 365,400.00
Upah An. SNI ( Revisi ) 6.18.2
2.000 Oh Pekerja @ Rp. 22,500.00 = Rp 45,000.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
1.000 Oh Mandor @ Rp. 40,000.00 = Rp 40,000.00
= Rp 96,725.00
Total harga = Rp 462,125.00
15. 1 m' Memasang PVC waterstop lebar 150 mm
Bahan An. SNI ( Revisi ) 6.19.1
1.050 m' Waterstop lebar 150 mm @ Rp. 750.00 = Rp 787.50
= Rp 787.50
Upah An. SNI ( Revisi ) 6.19.2
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp 1,125.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.002 Oh Mandor @ Rp. 40,000.00 = Rp 80.00
= Rp 2,210.00
Total harga = Rp 2,997.50
16. 1 m' Memasang PVC waterstop lebar 200 mm
Bahan An. SNI ( Revisi ) 6.20.1
1.050 m' Waterstop lebar 200 mm @ Rp. 40,000.00 = Rp 42,000.00
= Rp 42,000.00
Upah An. SNI ( Revisi ) 6.20.2
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp 1,125.00
0.035 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,050.00
0.0035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 122.50
0.002 Oh Mandor @ Rp. 40,000.00 = Rp 80.00
= Rp 2,377.50
Total harga = Rp 44,377.50
17. 1 m' Memasang PVC waterstop lebar 230 mm
Bahan An. SNI ( Revisi ) 6.21.1
1.050 m' Waterstop lebar 230 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.550 Oh Pekerja @ Rp. 22,500.00 = Rp 12,375.00
0.035 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,050.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 13,545.00
Total harga = Rp 13,545.00
18. 1 m' Memasang PVC waterstop lebar 250 mm
Bahan An. SNI ( Revisi ) 6.22.1
1.050 m' Waterstop lebar 250 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.550 Oh Pekerja @ Rp. 22,500.00 = Rp 12,375.00
0.035 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,050.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 13,545.00
Total harga = Rp 13,545.00
19. 1 m' Memasang PVC waterstop lebar 300 mm
Bahan An. SNI ( Revisi ) 6.23.1
1.050 m' Waterstop lebar 300 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.550 Oh Pekerja @ Rp. 22,500.00 = Rp 12,375.00
0.035 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,050.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 13,545.00
Total harga = Rp 13,545.00
20. 1 m' Memasang PVC waterstop lebar 320 mm
Bahan An. SNI ( Revisi ) 6.24.1
1.050 m' Waterstop lebar 320 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.550 Oh Pekerja @ Rp. 22,500.00 = Rp 12,375.00
0.035 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,050.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 13,545.00
Total harga = Rp 13,545.00
21. 1 Kg Pembesian dengan besi polos atau ulir
Bahan An. SNI ( Revisi ) 6.25.1
1.050 Kg Besi beton ( polos/ulir ) @ Rp. 6,000.00 = Rp 6,300.00
0.015 Kg Kawat beton @ Rp. 8,500.00 = Rp 127.50
= Rp 6,427.50
Upah An. SNI ( Revisi ) 6.25.2
0.007 Oh Pekerja @ Rp. 22,500.00 = Rp 157.50
0.007 Oh Tukang besi @ Rp. 32,500.00 = Rp 227.50
0.0007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 24.50
0.0003 Oh Mandor @ Rp. 40,000.00 = Rp 12.00
= Rp 421.50
Total harga = Rp 6,849.00
22. 1 Kg Kabel presstessed polos/strands
Bahan An. SNI ( Revisi ) 6.26.1
1.050 Kg Besi presstessed polos @ Rp. - = Rp -
0.010 Kg Kawat beton @ Rp. 8,500.00 = Rp 85.00
= Rp 85.00
Upah An. SNI ( Revisi ) 6.26.2
0.005 Oh Pekerja @ Rp. 22,500.00 = Rp 112.50
0.005 Oh Tukang besi @ Rp. 32,500.00 = Rp 162.50
0.0005 Oh Kepala tukang @ Rp. 35,000.00 = Rp 17.50
0.0003 Oh Mandor @ Rp. 40,000.00 = Rp 12.00
= Rp 304.50
Total harga = Rp 389.50
23. 1 Kg Jaring kawat baja
Bahan An. SNI ( Revisi ) 6.27.1
1.020 Kg Besi jaring kawat baja @ Rp. - = Rp -
0.805 Kg Kawat beton @ Rp. 8,500.00 = Rp 6,842.50
= Rp 6,842.50
Upah An. SNI ( Revisi ) 6.27.2
0.025 Oh Pekerja @ Rp. 22,500.00 = Rp 562.50
0.025 Oh Tukang besi @ Rp. 32,500.00 = Rp 812.50
0.0025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 87.50
0.0015 Oh Mandor @ Rp. 40,000.00 = Rp 60.00
= Rp 1,522.50
Total harga = Rp 8,365.00
24. 1 m2 Pasang bekisting untuk pondasi
Bahan An. SNI ( Revisi ) 6.28.1
0.040 m3 Kayu terentang @ Rp. - = Rp -
0.300 Kg Paku biasa 2" - 5" @ Rp. 7,000.00 = Rp 2,100.00
0.100 Ltr Minyak bekisting @ Rp. - = Rp -
= Rp 2,100.00
Upah An. SNI ( Revisi ) 6.28.2
0.300 Oh Pekerja @ Rp. 22,500.00 = Rp 6,750.00
0.260 Oh Tukang kayu @ Rp. 35,000.00 = Rp 9,100.00
0.026 Oh Kepala tukang @ Rp. 35,000.00 = Rp 910.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 16,960.00
Total harga = Rp 19,060.00
25. 1 m2 Pasang bekisting untuk sloof
Bahan An. SNI ( Revisi ) 6.29.1
0.045 m3 Kayu terentang @ Rp. - = Rp -
0.300 Kg Paku biasa 2" - 5" @ Rp. 7,000.00 = Rp 2,100.00
0.100 Ltr Minyak bekisting @ Rp. - = Rp -
= Rp 2,100.00
Upah An. SNI ( Revisi ) 6.29.2
0.300 Oh Pekerja @ Rp. 22,500.00 = Rp 6,750.00
0.260 Oh Tukang kayu @ Rp. 35,000.00 = Rp 9,100.00
0.026 Oh Kepala tukang @ Rp. 35,000.00 = Rp 910.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 16,960.00
Total harga = Rp 19,060.00
26. 1 m2 Pasang bekisting untuk kolom
Bahan An. SNI ( Revisi ) 6.30.1
0.040 m3 Kayu terentang @ Rp. - = Rp -
0.400 Kg Paku biasa 2" - 5" @ Rp. 7,000.00 = Rp 2,800.00
0.200 Ltr Minyak bekisting @ Rp. - = Rp -
0.015 m3 Balok kayu borneo @ Rp. 6,950,000.00 = Rp 104,250.00
0.350 Lbr Plywood tebal 9 mm @ Rp. 64,000.00 = Rp 22,400.00
2.000 Btg Dolken kayu galam Ø 8-10 / 4 m @ Rp. - = Rp -
= Rp 2,800.00
Upah An. SNI ( Revisi ) 6.30.2
0.300 Oh Pekerja @ Rp. 22,500.00 = Rp 6,750.00
0.330 Oh Tukang kayu @ Rp. 35,000.00 = Rp 11,550.00
0.033 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,155.00
0.006 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 19,695.00
Total harga = Rp 22,495.00
27. 1 m2 Pasang bekisting untuk balok
Bahan An. SNI ( Revisi ) 6.31.1
0.040 m3 Kayu terentang @ Rp. - = Rp -
0.400 Kg Paku biasa 2" - 5" @ Rp. 7,000.00 = Rp 2,800.00
0.200 Ltr Minyak bekisting @ Rp. - = Rp -
0.018 m3 Balok kayu borneo @ Rp. 6,950,000.00 = Rp 125,100.00
0.350 Lbr Plywood tebal 9 mm @ Rp. 64,000.00 = Rp 22,400.00
2.000 Btg Dolken kayu galam Ø 8-10 / 4 m @ Rp. - = Rp -
= Rp 2,800.00
Upah An. SNI ( Revisi ) 6.31.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.330 Oh Tukang kayu @ Rp. 35,000.00 = Rp 11,550.00
0.033 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,155.00
0.006 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 20,145.00
Total harga = Rp 22,945.00
28. 1 m2 Pasang bekisting untuk lantai
Bahan An. SNI ( Revisi ) 6.32.1
0.040 m3 Kayu terentang @ Rp. - = Rp -
0.400 Kg Paku biasa 2" - 5" @ Rp. 7,000.00 = Rp 2,800.00
0.200 Ltr Minyak bekisting @ Rp. - = Rp -
0.015 m3 Balok kayu borneo @ Rp. 6,950,000.00 = Rp 104,250.00
0.350 Lbr Plywood tebal 9 mm @ Rp. 64,000.00 = Rp 22,400.00
6.000 Btg Dolken kayu galam Ø 8-10 / 4 m @ Rp. - = Rp -
= Rp 2,800.00
Upah An. SNI ( Revisi ) 6.32.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.330 Oh Tukang kayu @ Rp. 35,000.00 = Rp 11,550.00
0.033 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,155.00
0.006 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 20,145.00
Total harga = Rp 22,945.00
29. 1 m2 Pasang bekisting untuk dinding
Bahan An. SNI ( Revisi ) 6.33.1
0.030 m3 Kayu terentang @ Rp. - = Rp -
0.400 Kg Paku biasa 2" - 5" @ Rp. 7,000.00 = Rp 2,800.00
0.200 Ltr Minyak bekisting @ Rp. - = Rp -
0.020 m3 Balok kayu borneo @ Rp. 6,950,000.00 = Rp 139,000.00
0.350 Lbr Plywood tebal 9 mm @ Rp. 64,000.00 = Rp 22,400.00
3.000 Btg Dolken kayu galam Ø 8-10 / 4 m @ Rp. - = Rp -
4.000 Bh Formtie/penjaga jarak bkstng @ Rp. - = Rp -
= Rp 2,800.00
Upah An. SNI ( Revisi ) 6.33.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.330 Oh Tukang kayu @ Rp. 35,000.00 = Rp 11,550.00
0.033 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,155.00
0.006 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 20,145.00
Total harga = Rp 22,945.00
30. 1 m2 Pasang bekisting untuk tangga
Bahan An. SNI ( Revisi ) 6.34.1
0.030 m3 Kayu terentang @ Rp. - = Rp -
0.400 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.150 Ltr Minyak bekisting @ Rp. - = Rp -
0.015 m3 Balok kayu borneo @ Rp. - = Rp -
0.350 Lbr Plywood tebal 9 mm @ Rp. - = Rp -
2.000 Btg Dolken kayu galam Ø 8-10 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.34.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.330 Oh Tukang kayu @ Rp. 35,000.00 = Rp 11,550.00
0.033 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,155.00
0.006 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 20,145.00
Total harga = Rp 20,145.00
31. 1 m3 Membuat beton dengan mutu K 225
Bahan An. SNI ( Revisi ) 6.35.1
388.000 Kg Semen portland @ Rp. 620.00 = Rp 240,560.00
0.650 m3 Pasir beton @ Rp. 50,000.00 = Rp 32,500.00
0.650 m3 Koral beton @ Rp. 110,000.00 = Rp 71,500.00
= Rp 240,560.00
Upah An. SNI ( Revisi ) 6.35.2
6.000 Oh Pekerja @ Rp. 22,500.00 = Rp 135,000.00
1.000 Oh Tukang batu @ Rp. 30,000.00 = Rp 30,000.00
0.100 Oh Kepala tukang @ Rp. 35,000.00 = Rp 3,500.00
0.300 Oh Mandor @ Rp. 40,000.00 = Rp 12,000.00
= Rp 180,500.00
Total harga = Rp 421,060.00
32. 1 m3 Membuat beton dengan mutu K 275
Bahan An. SNI ( Revisi ) 6.36.1
400.000 Kg Semen portland @ Rp. 620.00 = Rp 248,000.00
0.400 m3 Pasir beton @ Rp. 50,000.00 = Rp 20,000.00
0.820 m3 Koral beton @ Rp. 110,000.00 = Rp 90,200.00
= Rp 248,000.00
Upah An. SNI ( Revisi ) 6.36.2
6.000 Oh Pekerja @ Rp. 22,500.00 = Rp 135,000.00
1.000 Oh Tukang batu @ Rp. 30,000.00 = Rp 30,000.00
0.100 Oh Kepala tukang @ Rp. 35,000.00 = Rp 3,500.00
0.300 Oh Mandor @ Rp. 40,000.00 = Rp 12,000.00
= Rp 180,500.00
Total harga = Rp 428,500.00
33. 1 m2 Pasang jembatan cor
Bahan An. SNI ( Revisi ) 6.37.1
0.0264 m3 Kayu terentang @ Rp. - = Rp -
0.600 Kg Paku biasa 2" - 5" @ Rp. 7,000.00 = Rp -
0.500 Btg Dolken kayu galam Ø 8-10 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.37.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.050 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,500.00
0.005 Oh Kepala tukang @ Rp. 35,000.00 = Rp 175.00
0.007 Oh Mandor @ Rp. 40,000.00 = Rp 280.00
= Rp 5,330.00
Total harga = Rp 5,330.00
34. 1 m3 Membuat pondasi beton bertulang ( 150 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.38.1
0.200 m3 Kayu terentang @ Rp. - = Rp -
1.500 Kg Paku biasa 2" - 5" @ Rp. 7,000.00 = Rp -
0.400 Ltr Minyak bekisting @ Rp. - = Rp -
150.000 Kg Besi beton polos @ Rp. 6,000.00 = Rp -
2.250 Kg Kawat beton @ Rp. 8,500.00 = Rp -
323.000 Kg Semen portland @ Rp. 620.00 = Rp -
0.520 m3 Pasir beton @ Rp. 50,000.00 = Rp -
0.780 m3 Koral beton @ Rp. 110,000.00 = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.38.2
3.900 Oh Pekerja @ Rp. 22,500.00 = Rp 87,750.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
1.040 Oh Tukang kayu @ Rp. 35,000.00 = Rp 36,400.00
1.050 Oh Tukang besi @ Rp. 32,500.00 = Rp 34,125.00
0.245 Oh Kepala tukang @ Rp. 35,000.00 = Rp 8,575.00
0.165 Oh Mandor @ Rp. 40,000.00 = Rp 6,600.00
= Rp 183,950.00
Total harga = Rp 183,950.00
35. 1 m3 Membuat sloof beton bertulang ( 200 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.39.1
0.270 m3 Kayu terentang @ Rp. - = Rp -
2.000 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.600 Ltr Minyak bekisting @ Rp. - = Rp -
200.000 Kg Besi beton polos @ Rp. - = Rp -
3.000 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.39.2
4.850 Oh Pekerja @ Rp. 22,500.00 = Rp 109,125.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
1.560 Oh Tukang kayu @ Rp. 35,000.00 = Rp 54,600.00
1.400 Oh Tukang besi @ Rp. 32,500.00 = Rp 45,500.00
0.331 Oh Kepala tukang @ Rp. 35,000.00 = Rp 11,585.00
0.170 Oh Mandor @ Rp. 40,000.00 = Rp 6,800.00
= Rp 238,110.00
Total harga = Rp 238,110.00
36. 1 m3 Membuat kolom beton bertulang ( 300 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.40.1
0.400 m3 Kayu terentang @ Rp. - = Rp -
4.000 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
2.000 Ltr Minyak bekisting @ Rp. - = Rp -
300.000 Kg Besi beton polos @ Rp. - = Rp -
4.500 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
0.015 m3 Balok kayu borneo @ Rp. - = Rp -
3.500 Lbr Plywood tebal 9 mm @ Rp. - = Rp -
20.000 Btg Dolken kayu galam Ø 8 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.40.2
7.300 Oh Pekerja @ Rp. 22,500.00 = Rp 164,250.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
3.300 Oh Tukang kayu @ Rp. 35,000.00 = Rp 115,500.00
2.100 Oh Tukang besi @ Rp. 32,500.00 = Rp 68,250.00
0.570 Oh Kepala tukang @ Rp. 35,000.00 = Rp 19,950.00
0.250 Oh Mandor @ Rp. 40,000.00 = Rp 10,000.00
= Rp 388,450.00
Total harga = Rp 388,450.00
37. 1 m3 Membuat balok beton bertulang ( 200 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.41.1
0.320 m3 Kayu terentang @ Rp. - = Rp -
3.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
1.600 Ltr Minyak bekisting @ Rp. - = Rp -
200.000 Kg Besi beton polos @ Rp. - = Rp -
3.000 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
0.140 m3 Balok kayu borneo @ Rp. - = Rp -
2.800 Lbr Plywood tebal 9 mm @ Rp. - = Rp -
16.000 Btg Dolken kayu galam Ø 8 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.41.2
5.960 Oh Pekerja @ Rp. 22,500.00 = Rp 134,100.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
2.800 Oh Tukang kayu @ Rp. 35,000.00 = Rp 98,000.00
1.400 Oh Tukang besi @ Rp. 32,500.00 = Rp 45,500.00
0.455 Oh Kepala tukang @ Rp. 35,000.00 = Rp 15,925.00
0.208 Oh Mandor @ Rp. 40,000.00 = Rp 8,320.00
= Rp 312,345.00
Total harga = Rp 312,345.00
38. 1 m3 Membuat balok beton bertulang ( 150 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.42.1
0.320 m3 Kayu terentang @ Rp. - = Rp -
3.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
1.600 Ltr Minyak bekisting @ Rp. - = Rp -
150.000 Kg Besi beton polos @ Rp. - = Rp -
2.250 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
0.120 m3 Balok kayu borneo @ Rp. - = Rp -
2.800 Lbr Plywood tebal 9 mm @ Rp. - = Rp -
32.000 Btg Dolken kayu galam Ø 8 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.42.2
5.800 Oh Pekerja @ Rp. 22,500.00 = Rp 130,500.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
2.800 Oh Tukang kayu @ Rp. 35,000.00 = Rp 98,000.00
1.050 Oh Tukang besi @ Rp. 32,500.00 = Rp 34,125.00
0.420 Oh Kepala tukang @ Rp. 35,000.00 = Rp 14,700.00
0.185 Oh Mandor @ Rp. 40,000.00 = Rp 7,400.00
= Rp 295,225.00
Total harga = Rp 295,225.00
39. 1 m3 Membuat dinding beton bertulang ( 150 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.43.1
0.240 m3 Kayu terentang @ Rp. - = Rp -
3.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
1.600 Ltr Minyak bekisting @ Rp. - = Rp -
150.000 Kg Besi beton polos @ Rp. - = Rp -
2.250 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
0.160 m3 Balok kayu borneo @ Rp. - = Rp -
2.800 Lbr Plywood tebal 9 mm @ Rp. - = Rp -
24.000 Btg Dolken kayu galam Ø 8 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.43.2
5.600 Oh Pekerja @ Rp. 22,500.00 = Rp 126,000.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
2.640 Oh Tukang kayu @ Rp. 35,000.00 = Rp 92,400.00
1.050 Oh Tukang besi @ Rp. 32,500.00 = Rp 34,125.00
0.400 Oh Kepala tukang @ Rp. 35,000.00 = Rp 14,000.00
0.193 Oh Mandor @ Rp. 40,000.00 = Rp 7,720.00
= Rp 284,745.00
Total harga = Rp 284,745.00
40. 1 m3 Membuat tangga beton bertulang ( 200 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.44.1
0.250 m3 Kayu terentang @ Rp. - = Rp -
3.000 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
1.200 Ltr Minyak bekisting @ Rp. - = Rp -
200.000 Kg Besi beton polos @ Rp. - = Rp -
3.000 Kg Kawat beton @ Rp. - = Rp -
323.000 Kg Semen portland @ Rp. - = Rp -
0.520 m3 Pasir beton @ Rp. - = Rp -
0.780 m3 Koral beton @ Rp. - = Rp -
0.105 m3 Balok kayu borneo @ Rp. - = Rp -
2.500 Lbr Plywood tebal 9 mm @ Rp. - = Rp -
14.000 Btg Dolken kayu galam Ø 8 / 4 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.44.2
5.600 Oh Pekerja @ Rp. 22,500.00 = Rp 126,000.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
2.300 Oh Tukang kayu @ Rp. 35,000.00 = Rp 80,500.00
1.400 Oh Tukang besi @ Rp. 32,500.00 = Rp 45,500.00
0.405 Oh Kepala tukang @ Rp. 35,000.00 = Rp 14,175.00
0.202 Oh Mandor @ Rp. 40,000.00 = Rp 8,080.00
= Rp 284,755.00
Total harga = Rp 284,755.00
41. 1 m' Membuat kolom penguat beton bertulang ( 11 x 11 ) cm
Bahan An. SNI ( Revisi ) 6.45.1
0.002 m3 Kayu terentang @ Rp. - = Rp -
0.010 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
3.000 Kg Besi beton polos @ Rp. - = Rp -
0.450 Kg Kawat beton @ Rp. - = Rp -
4.000 Kg Semen portland @ Rp. - = Rp -
0.006 m3 Pasir beton @ Rp. - = Rp -
0.009 m3 Koral beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.45.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.020 Oh Tukang batu @ Rp. 30,000.00 = Rp 600.00
0.020 Oh Tukang kayu @ Rp. 35,000.00 = Rp 700.00
0.020 Oh Tukang besi @ Rp. 32,500.00 = Rp 650.00
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 3,630.00
Total harga = Rp 3,630.00
42. 1 m' Membuat ring balok beton bertulang ( 10 x 15 ) cm
Bahan An. SNI ( Revisi ) 6.46.1
0.003 m3 Kayu terentang @ Rp. - = Rp -
0.020 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
3.600 Kg Besi beton polos @ Rp. - = Rp -
0.050 Kg Kawat beton @ Rp. - = Rp -
5.500 Kg Semen portland @ Rp. - = Rp -
0.009 m3 Pasir beton @ Rp. - = Rp -
0.015 m3 Koral beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.46.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.033 Oh Tukang batu @ Rp. 30,000.00 = Rp 990.00
0.033 Oh Tukang kayu @ Rp. 35,000.00 = Rp 1,155.00
0.033 Oh Tukang besi @ Rp. 32,500.00 = Rp 1,072.50
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 6,017.50
Total harga = Rp 6,017.50
PEKERJAAN PASANGAN
1. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps
Bahan An. SNI ( Revisi ) 6.1.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 30,800.00
64.030 Kg Semen portland @ Rp. 620.00 = Rp 39,698.60
0.059 m3 Pasir pasang @ Rp. 50,000.00 = Rp 2,950.00
= Rp 73,448.60
Upah An. SNI ( Revisi ) 6.1.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 22,525.00
Total harga = Rp 95,973.60
2. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.2.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 30,800.00
43.500 Kg Semen portland @ Rp. 620.00 = Rp 26,970.00
0.080 m3 Pasir pasang @ Rp. 50,000.00 = Rp 4,000.00
= Rp 61,770.00
Upah An. SNI ( Revisi ) 6.2.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 22,525.00
Total harga = Rp 84,295.00
3. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps
Bahan An. SNI ( Revisi ) 6.3.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 30,800.00
32.950 Kg Semen portland @ Rp. 620.00 = Rp 20,429.00
0.091 m3 Pasir pasang @ Rp. 50,000.00 = Rp 4,550.00
= Rp 55,779.00
Upah An. SNI ( Revisi ) 6.3.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 22,525.00
Total harga = Rp 78,304.00
4. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps
Bahan An. SNI ( Revisi ) 6.4.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 30,800.00
26.550 Kg Semen portland @ Rp. 620.00 = Rp 16,461.00
0.093 m3 Pasir pasang @ Rp. 50,000.00 = Rp 4,650.00
= Rp 51,911.00
Upah An. SNI ( Revisi ) 6.4.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 22,525.00
Total harga = Rp 74,436.00
5. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps
Bahan An. SNI ( Revisi ) 6.5.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 30,800.00
22.200 Kg Semen portland @ Rp. 620.00 = Rp 13,764.00
0.102 m3 Pasir pasang @ Rp. 50,000.00 = Rp 5,100.00
= Rp 49,664.00
Upah An. SNI ( Revisi ) 6.5.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 22,525.00
Total harga = Rp 72,189.00
6. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps
Bahan An. SNI ( Revisi ) 6.6.1
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 30,800.00
22.200 Kg Semen portland @ Rp. 620.00 = Rp 13,764.00
0.102 m3 Pasir pasang @ Rp. 50,000.00 = Rp 5,100.00
= Rp 49,664.00
Upah An. SNI ( Revisi ) 6.6.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 22,525.00
Total harga = Rp 72,189.00
7. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps
Bahan An. SNI ( Revisi ) 6.7.1
140.0000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 30,800.00
10.0800 Kg Semen portland @ Rp. 620.00 = Rp 6,249.60
0.0925 m3 Pasir pasang @ Rp. 50,000.00 = Rp 4,625.00
0.0275 m3 Kapur pasang @ Rp. 375,000.00 = Rp 10,312.50
= Rp 51,987.10
Upah An. SNI ( Revisi ) 6.7.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 22,525.00
Total harga = Rp 74,512.10
8. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 1 Ps
Bahan An. SNI ( Revisi ) 6.8.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 15,400.00
27.800 Kg Semen portland @ Rp. 620.00 = Rp 17,236.00
0.028 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,400.00
= Rp 34,036.00
Upah An. SNI ( Revisi ) 6.8.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 3,950.00
Total harga = Rp #VALUE!
9. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.9.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 15,400.00
18.950 Kg Semen portland @ Rp. 620.00 = Rp 11,749.00
0.038 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,900.00
= Rp 29,049.00
Upah An. SNI ( Revisi ) 6.9.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 3,950.00
Total harga = Rp 32,999.00
10. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
Bahan An. SNI ( Revisi ) 6.10.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 15,400.00
14.370 Kg Semen portland @ Rp. 620.00 = Rp 8,909.40
0.004 m3 Pasir pasang @ Rp. 50,000.00 = Rp 200.00
= Rp 9,109.40
Upah An. SNI ( Revisi ) 6.10.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 11,150.00
Total harga = Rp 20,259.40
11. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
Bahan An. SNI ( Revisi ) 6.4.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 15,400.00
11.500 Kg Semen portland @ Rp. 620.00 = Rp 7,130.00
0.043 m3 Pasir pasang @ Rp. 50,000.00 = Rp 2,150.00
= Rp 24,680.00
Upah An. SNI ( Revisi ) 6.4.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 11,150.00
Total harga = Rp 11,150.00
12. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps
Bahan An. SNI ( Revisi ) 6.12.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 15,400.00
9.680 Kg Semen portland @ Rp. 620.00 = Rp 6,001.60
0.045 m3 Pasir pasang @ Rp. 50,000.00 = Rp 2,250.00
= Rp 23,651.60
Upah An. SNI ( Revisi ) 6.12.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 11,150.00
Total harga = Rp 34,801.60
13. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
Bahan An. SNI ( Revisi ) 6.13.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 15,400.00
8.320 Kg Semen portland @ Rp. 620.00 = Rp 5,158.40
0.049 m3 Pasir pasang @ Rp. 50,000.00 = Rp 2,450.00
= Rp 23,008.40
Upah An. SNI ( Revisi ) 6.13.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 11,150.00
Total harga = Rp 34,158.40
14. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps
Bahan An. SNI ( Revisi ) 6.14.1
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 15,400.00
6.500 Kg Semen portland @ Rp. 620.00 = Rp 4,030.00
0.050 m3 Pasir pasang @ Rp. 50,000.00 = Rp 2,500.00
= Rp 21,930.00
Upah An. SNI ( Revisi ) 6.14.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 11,150.00
Total harga = Rp 33,080.00
15. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps
Bahan An. SNI ( Revisi ) 6.15.1
70.0000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 15,400.00
4.5000 Kg Semen portland @ Rp. 620.00 = Rp 2,790.00
0.0500 m3 Pasir pasang @ Rp. 50,000.00 = Rp 2,500.00
0.0150 m3 Kapur padam @ Rp. 375,000.00 = Rp 5,625.00
= Rp 26,315.00
Upah An. SNI ( Revisi ) 6.15.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 11,150.00
Total harga = Rp 37,465.00
16. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps
Bahan An. SNI ( Revisi ) 6.16.1
70.0000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 15,400.00
0.0180 Kg Semen merah / bata merah tumbuk @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. 50,000.00 = Rp 900.00
0.0180 m3 Kapur padam @ Rp. 375,000.00 = Rp 6,750.00
= Rp 23,050.00
Upah An. SNI ( Revisi ) 6.16.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 11,150.00
Total harga = Rp 34,200.00
17. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps
Bahan An. SNI ( Revisi ) 6.17.1
70.0000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 220.00 = Rp 15,400.00
0.0140 Kg Semen merah / bata merah tumbuk @ Rp. - = Rp -
0.0280 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,400.00
0.0140 m3 Kapur padam @ Rp. 375,000.00 = Rp 5,250.00
= Rp 22,050.00
Upah An. SNI ( Revisi ) 6.17.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 11,150.00
Total harga = Rp 33,200.00
18. 1 m2 Pasangan dinding hollow block ( HB. 20 )
Bahan An. SNI ( Revisi ) 6.18.1
12.5000 Bh Hollow block ( HB. 20 ) @ Rp. 2,000.00 = Rp 25,000.00
13.5000 Kg Semen portland @ Rp. 620.00 = Rp 8,370.00
0.0480 m3 Pasir pasang @ Rp. 50,000.00 = Rp 2,400.00
1.9500 Kg Besi beton polos @ Rp. 6,000.00 = Rp 11,700.00
= Rp 47,470.00
Upah An. SNI ( Revisi ) 6.18.2
0.350 Oh Pekerja @ Rp. 22,500.00 = Rp 7,875.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.017 Oh Mandor @ Rp. 40,000.00 = Rp 680.00
= Rp 13,580.00
Total harga = Rp 61,050.00
19. 1 m2 Pasangan dinding hollow block ( HB. 15 )
Bahan An. SNI ( Revisi ) 6.19.1
12.5000 Bh Hollow block ( HB. 15 ) @ Rp. 2,000.00 = Rp 25,000.00
10.4500 Kg Semen portland @ Rp. 620.00 = Rp 6,479.00
0.0380 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,900.00
1.9500 Kg Besi beton polos @ Rp. 6,000.00 = Rp 11,700.00
= Rp 45,079.00
Upah An. SNI ( Revisi ) 6.19.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 11,820.00
Total harga = Rp 56,899.00
20. 1 m2 Pasangan dinding hollow block ( HB. 10 )
Bahan An. SNI ( Revisi ) 6.20.1
12.5000 Bh Hollow block ( HB. 10 ) @ Rp. 2,000.00 = Rp 25,000.00
7.5000 Kg Semen portland @ Rp. 620.00 = Rp 4,650.00
0.0270 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,350.00
1.9500 Kg Besi beton polos @ Rp. 6,000.00 = Rp 11,700.00
= Rp 42,700.00
Upah An. SNI ( Revisi ) 6.20.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 11,150.00
Total harga = Rp 53,850.00
21. 1 m2 Pasangan dinding conblock ( CB. 20 )
Bahan An. SNI ( Revisi ) 6.21.1
12.5000 Bh Concrete block ( CB. 20 ) @ Rp. 2,000.00 = Rp 25,000.00
14.0500 Kg Semen portland @ Rp. 620.00 = Rp 8,711.00
0.0040 m3 Pasir beton @ Rp. 50,000.00 = Rp 200.00
0.0420 m3 Pasir pasang @ Rp. 50,000.00 = Rp 2,100.00
3.8700 Kg Besi beton polos Ø 8 mm @ Rp. 6,000.00 = Rp 23,220.00
0.0060 Kg Paku biasa 2" - 5" @ Rp. 7,000.00 = Rp 42.00
0.0010 m3 Kayu terentang @ Rp. - = Rp -
0.0300 Kg Kawat beton @ Rp. 8,500.00 = Rp 255.00
0.0050 m3 Koral beton @ Rp. 110,000.00 = Rp 550.00
= Rp 59,231.00
Upah An. SNI ( Revisi ) 6.21.2
0.3700 Oh Pekerja @ Rp. 22,500.00 = Rp 8,325.00
0.1570 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,710.00
0.0070 Oh Tukang besi @ Rp. 32,500.00 = Rp 227.50
0.0164 Oh Kepala tukang @ Rp. 35,000.00 = Rp 574.00
0.0185 Oh Mandor @ Rp. 40,000.00 = Rp 740.00
= Rp 14,576.50
Total harga = Rp 73,807.50
22. 1 m2 Pasangan dinding conblock ( CB. 15 )
Bahan An. SNI ( Revisi ) 6.22.1
12.5000 Bh Concrete block ( CB. 15 ) @ Rp. 2,000.00 = Rp 25,000.00
10.4600 Kg Semen portland @ Rp. 620.00 = Rp 6,485.20
0.0030 m3 Pasir beton @ Rp. 50,000.00 = Rp 150.00
0.0320 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,600.00
0.8700 Kg Besi beton polos Ø 8 mm @ Rp. 6,000.00 = Rp 5,220.00
0.0040 Kg Paku biasa 2" - 5" @ Rp. 7,000.00 = Rp 28.00
0.0010 m3 Kayu terentang @ Rp. - = Rp -
0.0200 Kg Kawat beton @ Rp. 8,500.00 = Rp 170.00
0.0040 m3 Koral beton @ Rp. 110,000.00 = Rp 440.00
= Rp 38,455.20
Upah An. SNI ( Revisi ) 6.22.2
0.3400 Oh Pekerja @ Rp. 22,500.00 = Rp 7,650.00
0.1300 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,900.00
0.0070 Oh Tukang besi @ Rp. 32,500.00 = Rp 227.50
0.0137 Oh Kepala tukang @ Rp. 35,000.00 = Rp 479.50
0.0170 Oh Mandor @ Rp. 40,000.00 = Rp 680.00
= Rp 12,937.00
Total harga = Rp 51,392.20
23. 1 m2 Pasangan dinding conblock ( CB. 10 )
Bahan An. SNI ( Revisi ) 6.23.1
12.5000 Bh Concrete block ( CB. 10 ) @ Rp. 2,000.00 = Rp 25,000.00
7.2000 Kg Semen portland @ Rp. 620.00 = Rp 4,464.00
0.0020 m3 Pasir beton @ Rp. 50,000.00 = Rp 100.00
0.0210 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,050.00
2.5400 Kg Besi beton polos Ø 8 mm @ Rp. 6,000.00 = Rp 15,240.00
0.0030 Kg Paku biasa 2" - 5" @ Rp. 7,000.00 = Rp 21.00
0.0010 m3 Kayu terentang @ Rp. - = Rp -
0.0150 Kg Kawat beton @ Rp. 8,500.00 = Rp 127.50
0.0030 m3 Koral beton @ Rp. 110,000.00 = Rp 330.00
= Rp 45,854.00
Upah An. SNI ( Revisi ) 6.23.2
0.3400 Oh Pekerja @ Rp. 22,500.00 = Rp 7,650.00
0.1070 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,210.00
0.0070 Oh Tukang besi @ Rp. 32,500.00 = Rp 227.50
0.0114 Oh Kepala tukang @ Rp. 35,000.00 = Rp 399.00
0.0170 Oh Mandor @ Rp. 40,000.00 = Rp 680.00
= Rp 12,166.50
Total harga = Rp 58,020.50
24. 1 m2 Pasangan dinding latai
Bahan An. SNI ( Revisi ) 6.24.1
2.5000 Bh Bondbeam 40 x 20 x 20 cm @ Rp. - = Rp -
5.1000 Kg Semen portland @ Rp. 620.00 = Rp 3,162.00
0.0800 m3 Pasir beton @ Rp. 50,000.00 = Rp 4,000.00
1.5000 Kg Besi beton polos Ø 8 mm @ Rp. 6,000.00 = Rp 9,000.00
0.1500 m3 Koral beton @ Rp. 110,000.00 = Rp 16,500.00
= Rp 16,162.00
Upah An. SNI ( Revisi ) 6.24.2
0.1000 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.0300 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.0300 Oh Tukang besi @ Rp. 32,500.00 = Rp 975.00
0.0060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0050 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 4,535.00
Total harga = Rp 20,697.00
25. 1 m2 Pasangan dinding roster/terawang ( 12 x 11 x 24 ) cm
Bahan An. SNI ( Revisi ) 6.25.1
36.0000 Bh Roster/terawang @ Rp. 2,000.00 = Rp 72,000.00
12.8000 Kg Semen portland @ Rp. 620.00 = Rp 7,936.00
0.0350 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,750.00
= Rp 81,686.00
Upah An. SNI ( Revisi ) 6.25.2
0.3000 Oh Pekerja @ Rp. 22,500.00 = Rp 6,750.00
0.1000 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.0100 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0150 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 10,700.00
Total harga = Rp 92,386.00
26. 1 m2 Pasangan bata berongga ( 5 x 11 x 24 ) cm
Bahan An. SNI ( Revisi ) 6.26.1
80.0000 Bh Bata berongga @ Rp. 2,000.00 = Rp 160,000.00
23.6500 Kg Semen portland @ Rp. 620.00 = Rp 14,663.00
0.5700 m3 Pasir pasang @ Rp. 50,000.00 = Rp 28,500.00
= Rp 203,163.00
Upah An. SNI ( Revisi ) 6.26.2
0.3200 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.1500 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.0150 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.0150 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 12,825.00
Total harga = Rp 215,988.00
27. 1 m2 Pasangan dinding anyaman bambu, rangka kayu
Bahan An. SNI ( Revisi ) 6.27.1
1.5000 M2 Bilik bambu @ Rp. - = Rp -
0.0140 M3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 16,450.00
0.0120 Kg Paku @ Rp. 7,000.00 = Rp 84.00
0.0030 m3 List kayu 2/4 @ Rp. 1,500.00 = Rp 4.50
= Rp 16,538.50
Upah An. SNI ( Revisi ) 6.27.2
0.1000 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.0500 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,500.00
0.0050 Oh Kepala tukang @ Rp. 35,000.00 = Rp 175.00
0.0020 Oh Mandor @ Rp. 40,000.00 = Rp 80.00
= Rp 4,005.00
Total harga = Rp 20,543.50
PEKERJAAN PLESTERAN
1. 1 m2 Plesteran, 1 Pc : 1 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.1.1
12.920 Kg Semen portland @ Rp. 620.00 = Rp 8,010.40
0.013 m3 Pasir pasang @ Rp. 50,000.00 = Rp 650.00
= Rp 8,660.40
Upah An. SNI ( Revisi ) 6.1.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp 18,585.40
2. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.2.1
8.520 Kg Semen portland @ Rp. 620.00 = Rp 5,282.40
0.017 m3 Pasir pasang @ Rp. 50,000.00 = Rp 850.00
= Rp 6,132.40
Upah An. SNI ( Revisi ) 6.2.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp 16,057.40
3. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.3.1
6.480 Kg Semen portland @ Rp. 620.00 = Rp 4,017.60
0.019 m3 Pasir pasang @ Rp. 50,000.00 = Rp 950.00
= Rp 4,967.60
Upah An. SNI ( Revisi ) 6.3.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp 14,892.60
4. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.4.1
5.200 Kg Semen portland @ Rp. 620.00 = Rp 3,224.00
0.020 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,000.00
= Rp 4,224.00
Upah An. SNI ( Revisi ) 6.4.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp 14,149.00
5. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.5.1
4.320 Kg Semen portland @ Rp. 620.00 = Rp 2,678.40
0.022 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,100.00
= Rp 3,778.40
Upah An. SNI ( Revisi ) 6.5.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp 13,703.40
6. 1 m2 Plesteran, 1 Pc : 6 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.6.1
3.680 Kg Semen portland @ Rp. 620.00 = Rp 2,281.60
0.023 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,150.00
= Rp 3,431.60
Upah An. SNI ( Revisi ) 6.6.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp 13,356.60
7. 1 m2 Plesteran, 1 Pc : 8 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.7.1
2.880 Kg Semen portland @ Rp. 620.00 = Rp 1,785.60
0.024 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,200.00
= Rp 2,985.60
Upah An. SNI ( Revisi ) 6.7.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp 12,910.60
8. 1 m2 Plesteran, 1 Pc : 0.5 Kp : 3 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.8.1
5.760 Kg Semen portland @ Rp. 620.00 = Rp 3,571.20
0.003 m3 Kapur Padam @ Rp. 350,000.00 = Rp 1,050.00
0.013 m3 Pasir pasang @ Rp. 50,000.00 = Rp 650.00
= Rp 5,271.20
Upah An. SNI ( Revisi ) 6.8.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp 15,196.20
9. 1 m2 Plesteran, 1 Pc : 3 Kp : 10 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.9.1
1.840 Kg Semen portland @ Rp. 95,000.00 = Rp 174,800.00
0.006 m3 Kapur Padam @ Rp. 70,000.00 = Rp 420.00
0.014 m3 Pasir pasang @ Rp. 95,000.00 = Rp 1,330.00
= Rp 176,550.00
Upah An. SNI ( Revisi ) 6.9.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp 186,475.00
10. 1 m2 Plesteran, 0.5 Pc : 1 Kp : 4 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.10.1
3.000 Kg Semen portland @ Rp. 350.00 = Rp 1,050.00
0.005 m3 Kapur Padam @ Rp. - = Rp -
0.019 m3 Pasir pasang @ Rp. 350.00 = Rp 6.65
= Rp 1,056.65
Upah An. SNI ( Revisi ) 6.10.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp 10,981.65
11. 1 m2 Plesteran, 1 Kp : 1 Sm : 1 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.11.1
0.009 m3 Semen merah @ Rp. - = Rp -
0.009 m3 Kapur Padam @ Rp. Satuan = Rp #VALUE!
0.009 m3 Pasir pasang @ Rp. - = Rp -
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.11.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp #VALUE!
12. 1 m2 Plesteran, 1 Kp : 1 Sm : 2 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.12.1
0.007 m3 Semen merah @ Rp. 7,000.00 = Rp 49.00
0.007 m3 Kapur Padam @ Rp. 2,500.00 = Rp 17.50
0.150 m3 Pasir pasang @ Rp. 7,000.00 = Rp 1,050.00
= Rp 1,116.50
Upah An. SNI ( Revisi ) 6.12.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 9,925.00
Total harga = Rp 11,041.50
13. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.13.1
14.280 Kg Semen portland @ Rp. 5,250.00 = Rp 74,970.00
0.023 m3 Pasir pasang @ Rp. 5,250.00 = Rp 120.75
= Rp 75,090.75
Upah An. SNI ( Revisi ) 6.13.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 12,825.00
Total harga = Rp 87,915.75
14. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.14.1
10.800 Kg Semen portland @ Rp. 20,000.00 = Rp 216,000.00
0.026 m3 Pasir pasang @ Rp. 20,000.00 = Rp 520.00
= Rp 216,520.00
Upah An. SNI ( Revisi ) 6.14.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 12,825.00
Total harga = Rp 229,345.00
15. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.15.1
8.680 Kg Semen portland @ Rp. - = Rp -
0.028 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.15.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 12,825.00
Total harga = Rp 12,825.00
16. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.16.1
7.290 Kg Semen portland @ Rp. 13,000.00 = Rp 94,770.00
0.028 m3 Pasir pasang @ Rp. 13,000.00 = Rp 364.00
= Rp 95,134.00
Upah An. SNI ( Revisi ) 6.16.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 12,825.00
Total harga = Rp 107,959.00
17. 1 m2 Plesteran, 1 Pc : 6 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.17.1
6.240 Kg Semen portland @ Rp. 30,000.00 = Rp 187,200.00
0.030 m3 Pasir pasang @ Rp. 30,000.00 = Rp 900.00
= Rp 188,100.00
Upah An. SNI ( Revisi ) 6.17.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 12,825.00
Total harga = Rp 200,925.00
18. 1 m2 Plesteran, 1 Kp : 1 Sm : 2 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.18.1
0.009 m3 Semen merah @ Rp. - = Rp -
0.009 m3 Pasir padam @ Rp. - = Rp -
0.018 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.18.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 12,825.00
Total harga = Rp 12,825.00
19. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 25 mm
Bahan An. SNI ( Revisi ) 6.19.1
15.500 Kg Semen portland @ Rp. - = Rp -
0.013 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.19.2
0.300 Oh Pekerja @ Rp. 22,500.00 = Rp 6,750.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0130 Oh Mandor @ Rp. 40,000.00 = Rp 520.00
= Rp 13,970.00
Total harga = Rp 13,970.00
20. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 25 mm
Bahan An. SNI ( Revisi ) 6.20.1
11.750 Kg Semen portland @ Rp. - = Rp -
0.035 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.20.2
0.300 Oh Pekerja @ Rp. 22,500.00 = Rp 6,750.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0130 Oh Mandor @ Rp. 40,000.00 = Rp 520.00
= Rp 13,970.00
Total harga = Rp 13,970.00
21. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 25 mm
Bahan An. SNI ( Revisi ) 6.21.1
9.480 Kg Semen portland @ Rp. - = Rp -
0.038 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.300 Oh Pekerja @ Rp. 22,500.00 = Rp 6,750.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0130 Oh Mandor @ Rp. 40,000.00 = Rp 520.00
= Rp 13,970.00
Total harga = Rp 13,970.00
22. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 25 mm
Bahan An. SNI ( Revisi ) 6.22.1
7.940 Kg Semen portland @ Rp. - = Rp -
0.039 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.300 Oh Pekerja @ Rp. 22,500.00 = Rp 6,750.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0130 Oh Mandor @ Rp. 40,000.00 = Rp 520.00
= Rp 13,970.00
Total harga = Rp 13,970.00
23. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.23.1
18.650 Kg Semen portland @ Rp. - = Rp -
0.035 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.0150 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 16,175.00
Total harga = Rp 16,175.00
24. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.24.1
14.150 Kg Semen portland @ Rp. - = Rp -
0.039 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.0150 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 16,175.00
Total harga = Rp 16,175.00
25. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.25.1
11.380 Kg Semen portland @ Rp. - = Rp -
0.042 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.25.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.0150 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 16,175.00
Total harga = Rp 16,175.00
26. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.26.1
8.190 Kg Semen portland @ Rp. - = Rp -
0.045 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.26.2
0.320 Oh Pekerja @ Rp. 22,500.00 = Rp 7,200.00
0.250 Oh Tukang batu @ Rp. 30,000.00 = Rp 7,500.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.0150 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 16,175.00
Total harga = Rp 16,175.00
27. 1 m2 Berapen, 1 Pc : 3 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.27.1
7.070 Kg Semen portland @ Rp. - = Rp -
0.021 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.27.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.070 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,100.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.0080 Oh Mandor @ Rp. 40,000.00 = Rp 320.00
= Rp 6,040.00
Total harga = Rp 6,040.00
28. 1 m2 Berapen, 1 Pc : 5 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.28.1
5.670 Kg Semen portland @ Rp. - = Rp -
0.023 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.28.2
0.150 Oh Pekerja @ Rp. - = Rp -
0.070 Oh Tukang batu @ Rp. - = Rp -
0.007 Oh Kepala tukang @ Rp. - = Rp -
0.0080 Oh Mandor @ Rp. - = Rp -
= Rp -
Total harga = Rp -
29. 1 m2 Plesteran beton, 1 Pc : 2 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.29.1
9.300 Kg Semen portland @ Rp. - = Rp -
0.018 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.29.2
0.260 Oh Pekerja @ Rp. 22,500.00 = Rp 5,850.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0130 Oh Mandor @ Rp. 40,000.00 = Rp 520.00
= Rp 13,070.00
Total harga = Rp 13,070.00
30. 1 m2 Plesteran beton, 1 Pc : 3 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.30.1
7.070 Kg Semen portland @ Rp. - = Rp -
0.021 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.30.2
0.260 Oh Pekerja @ Rp. 22,500.00 = Rp 5,850.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.0130 Oh Mandor @ Rp. 40,000.00 = Rp 520.00
= Rp 13,070.00
Total harga = Rp 13,070.00
31. 1 m2 Plesteran skoning, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.31.1
0.500 Kg Semen portland @ Rp. - = Rp -
0.002 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.31.2
0.057 Oh Pekerja @ Rp. 22,500.00 = Rp 1,282.50
0.038 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,140.00
0.038 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,330.00
0.0020 Oh Mandor @ Rp. 40,000.00 = Rp 80.00
= Rp 3,832.50
Total harga = Rp 3,832.50
32. 1 m2 Plesteran granito, 1 Pc warna : 2 Granito, tebal 10 mm
Bahan An. SNI ( Revisi ) 6.32.1
0.144 Kg Pc warna @ Rp. - = Rp -
15.000 Kg Batu granito @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp 1,125.00
0.020 Oh Tukang batu @ Rp. 30,000.00 = Rp 600.00
0.002 Oh Kepala tukang @ Rp. 35,000.00 = Rp 70.00
0.0050 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 1,995.00
Total harga = Rp 1,995.00
33. 1 m2 Plesteran Teraso, 1 Pc warna : 2 batu teraso, tebal 10 mm
Bahan An. SNI ( Revisi ) 6.33.1
0.440 Kg Pc warna @ Rp. - = Rp -
11.500 Kg Batu teraso @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.33.2
0.450 Oh Pekerja @ Rp. 22,500.00 = Rp 10,125.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.002 Oh Kepala tukang @ Rp. 35,000.00 = Rp 70.00
0.025 Oh Mandor @ Rp. 40,000.00 = Rp 1,000.00
= Rp 17,195.00
Total harga = Rp 17,195.00
34. 1 m2 Plesteran ciprat, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.34.1
4.320 Kg Semen portland @ Rp. - = Rp -
0.016 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.34.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.001 Oh Kepala tukang @ Rp. 35,000.00 = Rp 35.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 9,260.00
Total harga = Rp 9,260.00
35. 1 m2 Plesteran siar adukan, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.35.1
4.320 Kg Semen portland @ Rp. - = Rp -
0.016 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.35.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.070 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,100.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.008 Oh Mandor @ Rp. 40,000.00 = Rp 320.00
= Rp 6,040.00
Total harga = Rp 6,040.00
36. 1 m2 Plesteran waterproof batacote 3 lapis
Bahan An. SNI ( Revisi ) 6.36.1
0.500 Kg Semen portland @ Rp. - = Rp -
2.900 Kg Batacote @ Rp. - = Rp -
0.006 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.36.2
0.300 Oh Pekerja @ Rp. 22,500.00 = Rp 6,750.00
0.200 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,000.00
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp 700.00
0.015 Oh Mandor @ Rp. 40,000.00 = Rp 600.00
= Rp 14,050.00
Total harga = Rp 14,050.00
PEKERJAAN KAYU
1. 1 m3 Pasang kusen pintu & jendela kayu jati
Bahan An. SNI ( Revisi ) 6.1.1
1.100 m3 Kayu jati, balok @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.1.2
6.000 Oh Pekerja @ Rp. 22,500.00 = Rp 135,000.00
20.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 700,000.00
2.000 Oh Kepala tukang @ Rp. 35,000.00 = Rp 70,000.00
0.300 Oh Mandor @ Rp. 40,000.00 = Rp 12,000.00
= Rp 917,000.00
Total harga = Rp 917,000.00
2. 1 m3 Pasang kusen pintu & jendela kayu kamper
Bahan An. SNI ( Revisi ) 6.2.1
1.200 m3 Kayu kamper, balok @ Rp. 49,000.00 = Rp 58,800.00
= Rp 58,800.00
Upah An. SNI ( Revisi ) 6.2.2
6.000 Oh Pekerja @ Rp. 22,500.00 = Rp 135,000.00
18.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 630,000.00
2.000 Oh Kepala tukang @ Rp. 35,000.00 = Rp 70,000.00
0.300 Oh Mandor @ Rp. 40,000.00 = Rp 12,000.00
= Rp 847,000.00
Total harga = Rp 905,800.00
3. 1 m3 Pasang kusen pintu & jendela kayu borneo
Bahan An. SNI ( Revisi ) 6.3.1
1.200 m3 Kayu borneo, balok @ Rp. 125,000.00 = Rp 150,000.00
= Rp 150,000.00
Upah An. SNI ( Revisi ) 6.3.2
6.000 Oh Pekerja @ Rp. 22,500.00 = Rp 135,000.00
18.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 630,000.00
2.000 Oh Kepala tukang @ Rp. 35,000.00 = Rp 70,000.00
0.300 Oh Mandor @ Rp. 40,000.00 = Rp 12,000.00
= Rp 847,000.00
Total harga = Rp 997,000.00
4. 1 m3 Pasang kusen pintu & jendela kayu damar laut
Bahan An. SNI ( Revisi ) 6.4.1
1.200 m3 Kayu damar laut, balok @ Rp. 375,000.00 = Rp 450,000.00
= Rp 450,000.00
Upah An. SNI ( Revisi ) 6.4.2
6.000 Oh Pekerja @ Rp. 22,500.00 = Rp 135,000.00
18.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 630,000.00
2.000 Oh Kepala tukang @ Rp. 35,000.00 = Rp 70,000.00
0.300 Oh Mandor @ Rp. 40,000.00 = Rp 12,000.00
= Rp 847,000.00
Total harga = Rp 1,297,000.00
5. 1 m2 Pasang pintu klamp kayu kamper
Bahan An. SNI ( Revisi ) 6.5.1
0.036 m3 Kayu kamper papan @ Rp. 6,950,000.00 = Rp 250,200.00
0.050 Kg Paku biasa 2" - 5" @ Rp. 2,725,000.00 = Rp 136,250.00
= Rp 136,250.00
Upah An. SNI ( Revisi ) 6.5.2
0.350 Oh Pekerja @ Rp. 22,500.00 = Rp 7,875.00
1.050 Oh Tukang kayu @ Rp. 35,000.00 = Rp 36,750.00
0.105 Oh Kepala tukang @ Rp. 35,000.00 = Rp 3,675.00
0.018 Oh Mandor @ Rp. 40,000.00 = Rp 720.00
= Rp 49,020.00
Total harga = Rp 185,270.00
6. 1 m2 Pasang pintu klamp kayu borneo
Bahan An. SNI ( Revisi ) 6.6.1
0.036 m3 Kayu borneo papan @ Rp. 1,175,000.00 = Rp 42,300.00
0.050 Kg Paku biasa 2" - 5" @ Rp. 34,000.00 = Rp 1,700.00
= Rp 1,700.00
Upah An. SNI ( Revisi ) 6.6.2
0.350 Oh Pekerja @ Rp. 22,500.00 = Rp 7,875.00
1.050 Oh Tukang kayu @ Rp. 35,000.00 = Rp 36,750.00
0.105 Oh Kepala tukang @ Rp. 35,000.00 = Rp 3,675.00
0.018 Oh Mandor @ Rp. 40,000.00 = Rp 720.00
= Rp 49,020.00
Total harga = Rp 50,720.00
7. 1 m2 Pasang pintu panil kayu jati
Bahan An. SNI ( Revisi ) 6.7.1
0.040 m3 Kayu jati, papan @ Rp. 41,000.00 = Rp 1,640.00
= Rp 1,640.00
Upah An. SNI ( Revisi ) 6.7.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
2.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp 87,500.00
0.250 Oh Kepala tukang @ Rp. 35,000.00 = Rp 8,750.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 120,750.00
Total harga = Rp 122,390.00
8. 1 m2 Pasang pintu panil kayu kamper
Bahan An. SNI ( Revisi ) 6.8.1
0.040 m3 Kayu kamper, papan @ Rp. 8,500.00 = Rp 340.00
= Rp 340.00
Upah An. SNI ( Revisi ) 6.8.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
2.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp 87,500.00
0.250 Oh Kepala tukang @ Rp. 35,000.00 = Rp 8,750.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 120,750.00
Total harga = Rp 121,090.00
9. 1 m2 Pasang pintu & jendela kaca kayu jati
Bahan An. SNI ( Revisi ) 6.9.1
0.035 m3 Kayu jati, papan @ Rp. 50,000.00 = Rp 1,750.00
= Rp 1,750.00
Upah An. SNI ( Revisi ) 6.9.2
0.800 Oh Pekerja @ Rp. 22,500.00 = Rp 18,000.00
2.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 70,000.00
0.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 7,000.00
0.040 Oh Mandor @ Rp. 40,000.00 = Rp 1,600.00
= Rp 96,600.00
Total harga = Rp 98,350.00
10. 1 m2 Pasang pintu & jendela kaca kayu kamper
Bahan An. SNI ( Revisi ) 6.10.1
0.035 m3 Kayu kamper, papan @ Rp. 15,000.00 = Rp 525.00
= Rp 525.00
Upah An. SNI ( Revisi ) 6.10.2
0.800 Oh Pekerja @ Rp. 22,500.00 = Rp 18,000.00
2.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 70,000.00
0.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 7,000.00
0.040 Oh Mandor @ Rp. 40,000.00 = Rp 1,600.00
= Rp 96,600.00
Total harga = Rp 97,125.00
11. 1 m2 Pasang pintu & jendela kaca kayu borneo
Bahan An. SNI ( Revisi ) 6.11.1
0.035 m3 Kayu borneo, papan @ Rp. 750.00 = Rp 26.25
= Rp 26.25
Upah An. SNI ( Revisi ) 6.11.2
0.800 Oh Pekerja @ Rp. 22,500.00 = Rp 18,000.00
2.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 70,000.00
0.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 7,000.00
0.040 Oh Mandor @ Rp. 40,000.00 = Rp 1,600.00
= Rp 96,600.00
Total harga = Rp 96,626.25
12. 1 m2 Pasang pintu & jendela jalusi kayu jati
Bahan An. SNI ( Revisi ) 6.12.1
0.064 m3 Kayu jati, papan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.12.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
3.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 105,000.00
0.300 Oh Kepala tukang @ Rp. 35,000.00 = Rp 10,500.00
0.300 Oh Mandor @ Rp. 40,000.00 = Rp 12,000.00
= Rp 150,000.00
Total harga = Rp 150,000.00
13. 1 m2 Pasang pintu & jendela jalusi kayu kamper
Bahan An. SNI ( Revisi ) 6.13.1
0.064 m3 Kayu kamper, papan @ Rp. 10,000.00 = Rp 640.00
= Rp 640.00
Upah An. SNI ( Revisi ) 6.13.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
3.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 105,000.00
0.300 Oh Kepala tukang @ Rp. 35,000.00 = Rp 10,500.00
0.500 Oh Mandor @ Rp. 40,000.00 = Rp 20,000.00
= Rp 158,000.00
Total harga = Rp 158,640.00
14. 1 m2 Pasang pintu plywood rangkap, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.14.1
0.0196 m3 Kayu jati, papan @ Rp. 66,000.00 = Rp 1,293.60
0.030 Kg Paku biasa 1/2" - 1" @ Rp. 8,500.00 = Rp 255.00
0.300 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 3' x 4 mm @ Rp. 57,500.00 = Rp 57,500.00
= Rp 57,500.00
Upah An. SNI ( Revisi ) 6.14.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
2.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 70,000.00
0.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 7,000.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 91,700.00
Total harga = Rp 149,200.00
15. 1 m2 Pasang pintu plywood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.15.1
0.0196 m3 Kayu kamper, papan @ Rp. 16,000.00 = Rp 313.60
0.030 Kg Paku biasa 1/2" - 1" @ Rp. 300,000.00 = Rp 9,000.00
0.300 Lt Lem kayu @ Rp. 275,000.00 = Rp 82,500.00
1.000 Lbr Plywood 4' x 3' x 4 mm @ Rp. 12,000.00 = Rp 12,000.00
= Rp 12,000.00
Upah An. SNI ( Revisi ) 6.15.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
2.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 70,000.00
0.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 7,000.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 91,700.00
Total harga = Rp 103,700.00
16. 1 m2 Pasang jalusi mati kusen kayu jati
Bahan An. SNI ( Revisi ) 6.16.1
0.060 m3 Kayu jati, papan @ Rp. 35,000.00 = Rp 2,100.00
0.150 Kg Paku biasa 1/2" - 1" @ Rp. 275,000.00 = Rp 41,250.00
= Rp 43,350.00
Upah An. SNI ( Revisi ) 6.16.2
0.500 Oh Pekerja @ Rp. 22,500.00 = Rp 11,250.00
2.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 70,000.00
0.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 7,000.00
0.025 Oh Mandor @ Rp. 40,000.00 = Rp 1,000.00
= Rp 89,250.00
Total harga = Rp 132,600.00
17. 1 m2 Pasang jalusi mati kusen kayu kamper
Bahan An. SNI ( Revisi ) 6.17.1
0.060 m3 Kayu kamper, papan @ Rp. 500.00 = Rp 30.00
0.150 Kg Paku biasa 1/2" - 1" @ Rp. 750.00 = Rp 112.50
= Rp 142.50
Upah An. SNI ( Revisi ) 6.17.2
0.500 Oh Pekerja @ Rp. 22,500.00 = Rp 11,250.00
2.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 70,000.00
0.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 7,000.00
0.025 Oh Mandor @ Rp. 40,000.00 = Rp 1,000.00
= Rp 89,250.00
Total harga = Rp 89,392.50
18. 1 m2 Pasang pintu plywood rangkap,rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.18.1
0.0196 m3 Kayu borneo, papan @ Rp. 40,000.00 = Rp 784.00
0.030 Kg Paku biasa 1/2" - 1" @ Rp. 35,000.00 = Rp 1,050.00
0.300 Lt Lem kayu @ Rp. 37,500.00 = Rp 11,250.00
1.000 Lbr Plywood 4' x 3' x 4 mm @ Rp. 30,000.00 = Rp 30,000.00
= Rp 30,000.00
Upah An. SNI ( Revisi ) 6.18.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
2.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 70,000.00
0.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 7,000.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 91,700.00
Total harga = Rp 91,700.00
19. 1 m2 Pasang pintu teakwood rangkap, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.19.1
0.0196 m3 Kayu jati, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
0.300 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Teakwood 4' x 8' x 4 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.19.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
2.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 70,000.00
0.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 7,000.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 91,700.00
Total harga = Rp 91,700.00
20. 1 m2 Pasang pintu teakwood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.20.1
0.0196 m3 Kayu kamper, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
0.300 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Teakwood 4' x 8' x 4 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.20.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
2.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 70,000.00
0.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 7,000.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 91,700.00
Total harga = Rp 91,700.00
21. 1 m2 Pasang pintu plywood & formika, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.21.1
0.0196 m3 Kayu jati, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
0.800 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
0.500 Lbr Formica 4' x 3' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.800 Oh Pekerja @ Rp. 22,500.00 = Rp 18,000.00
2.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp 87,500.00
0.250 Oh Kepala tukang @ Rp. 35,000.00 = Rp 8,750.00
0.040 Oh Mandor @ Rp. 40,000.00 = Rp 1,600.00
= Rp 115,850.00
Total harga = Rp 115,850.00
22. 1 m2 Pasang pintu plywood & formika, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.22.1
0.0196 m3 Kayu kamper, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
0.800 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
0.500 Lbr Formica 4' x 3' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.800 Oh Pekerja @ Rp. 22,500.00 = Rp 18,000.00
2.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp 87,500.00
0.250 Oh Kepala tukang @ Rp. 35,000.00 = Rp 8,750.00
0.040 Oh Mandor @ Rp. 40,000.00 = Rp 1,600.00
= Rp 115,850.00
Total harga = Rp 115,850.00
23. 1 m2 Pasang pintu teakwood & formika, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.23.1
0.0196 m3 Kayu jati, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
0.800 Lt Lem kayu @ Rp. - = Rp -
0.500 Lbr Teakwood 4' x 8' x 4 mm @ Rp. - = Rp -
0.500 Lbr Formica 4' x 8' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.800 Oh Pekerja @ Rp. 22,500.00 = Rp 18,000.00
2.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp 87,500.00
0.250 Oh Kepala tukang @ Rp. 35,000.00 = Rp 8,750.00
0.040 Oh Mandor @ Rp. 40,000.00 = Rp 1,600.00
= Rp 115,850.00
Total harga = Rp 115,850.00
24. 1 m2 Pasang pintu teakwood & formika, rangka kayu kamper ( divernis )
Bahan An. SNI ( Revisi ) 6.24.1
0.0196 m3 Kayu kamper, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
0.800 Lt Lem kayu @ Rp. - = Rp -
0.500 Lbr Teakwood 4' x 8' x 4 mm @ Rp. - = Rp -
0.500 Lt Vernis @ Rp. - = Rp -
0.500 Lbr Formica 4' x 8' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.800 Oh Pekerja @ Rp. 22,500.00 = Rp 18,000.00
2.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp 87,500.00
0.250 Oh Kepala tukang @ Rp. 35,000.00 = Rp 8,750.00
0.040 Oh Mandor @ Rp. 40,000.00 = Rp 1,600.00
= Rp 115,850.00
Total harga = Rp 115,850.00
25. 1 m2 Pasang pintu formika double, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.25.1
0.0196 m3 Kayu jati, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
1.200 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
1.000 Lbr Formica 4' x 8' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.25.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
2.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp 91,000.00
0.260 Oh Kepala tukang @ Rp. 35,000.00 = Rp 9,100.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 124,600.00
Total harga = Rp 124,600.00
26. 1 m2 Pasang pintu formika double, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.26.1
0.0196 m3 Kayu kamper, papan @ Rp. - = Rp -
0.300 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp -
1.200 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
1.000 Lbr Formica 4' x 8' @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.26.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
2.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp 91,000.00
0.260 Oh Kepala tukang @ Rp. 35,000.00 = Rp 9,100.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 124,600.00
Total harga = Rp 124,600.00
27. 1 m3 Pasang konstruksi kuda-kuda kayu jati
Bahan An. SNI ( Revisi ) 6.27.1
1.100 m3 Kayu jati, balok @ Rp. - = Rp -
15.000 Kg Besi strip @ Rp. - = Rp -
0.800 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.27.2
4.000 Oh Pekerja @ Rp. 22,500.00 = Rp 90,000.00
12.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 420,000.00
1.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 42,000.00
0.200 Oh Mandor @ Rp. 40,000.00 = Rp 8,000.00
= Rp 560,000.00
Total harga = Rp 560,000.00
28. 1 m3 Pasang konstruksi kuda-kuda kayu kamper
Bahan An. SNI ( Revisi ) 6.28.1
1.100 m3 Kayu kamper, balok @ Rp. - = Rp -
15.000 Kg Besi strip @ Rp. - = Rp -
0.800 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.28.2
4.000 Oh Pekerja @ Rp. 22,500.00 = Rp 90,000.00
12.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 420,000.00
1.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 42,000.00
0.200 Oh Mandor @ Rp. 40,000.00 = Rp 8,000.00
= Rp 560,000.00
Total harga = Rp 560,000.00
29. 1 m3 Pasang konstruksi kuda-kuda kayu borneo
Bahan An. SNI ( Revisi ) 6.29.1
1.100 m3 Kayu borneo, balok @ Rp. - = Rp -
15.000 Kg Besi strip @ Rp. - = Rp -
0.800 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.29.2
4.000 Oh Pekerja @ Rp. 22,500.00 = Rp 90,000.00
12.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 420,000.00
1.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 42,000.00
0.200 Oh Mandor @ Rp. 40,000.00 = Rp 8,000.00
= Rp 560,000.00
Total harga = Rp 560,000.00
30. 1 m3 Pasang konstruksi kuda-kuda kayu kruing
Bahan An. SNI ( Revisi ) 6.30.1
1.100 m3 Kayu kruing, balok @ Rp. - = Rp -
15.000 Kg Besi strip @ Rp. - = Rp -
0.800 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.30.2
4.000 Oh Pekerja @ Rp. 22,500.00 = Rp 90,000.00
12.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp 420,000.00
1.200 Oh Kepala tukang @ Rp. 35,000.00 = Rp 42,000.00
0.200 Oh Mandor @ Rp. 40,000.00 = Rp 8,000.00
= Rp 560,000.00
Total harga = Rp 560,000.00
31. 1 m2 Pasang kaso + reng genteng kodok kayu kamper
Bahan An. SNI ( Revisi ) 6.31.1
0.012 m3 Kayu kamper, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.31.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 6,300.00
Total harga = Rp 6,300.00
32. 1 m2 Pasang kaso + reng genteng kodok kayu borneo
Bahan An. SNI ( Revisi ) 6.32.1
0.012 m3 Kayu borneo, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.32.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 6,300.00
Total harga = Rp 6,300.00
33. 1 m2 Pasang kaso + reng genteng munier kayu jati
Bahan An. SNI ( Revisi ) 6.33.1
0.014 m3 Kayu jati, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.33.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 6,300.00
Total harga = Rp 6,300.00
34. 1 m2 Pasang kaso + reng genteng munier kayu kamper
Bahan An. SNI ( Revisi ) 6.34.1
0.014 m3 Kayu kamper, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.34.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 6,300.00
Total harga = Rp 6,300.00
35. 1 m2 Pasang kaso + reng genteng beton kayu borneo
Bahan An. SNI ( Revisi ) 6.35.1
0.014 m3 Kayu borneo, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.35.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 6,300.00
Total harga = Rp 6,300.00
36. 1 m2 Pasang kaso + reng atap sirap kayu kamper
Bahan An. SNI ( Revisi ) 6.36.1
0.165 m3 Kayu kamper, balok @ Rp. - = Rp -
0.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.36.2
0.120 Oh Pekerja @ Rp. 22,500.00 = Rp 2,700.00
0.120 Oh Tukang kayu @ Rp. 35,000.00 = Rp 4,200.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.006 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 7,560.00
Total harga = Rp 7,560.00
37. 1 m2 Pasang kaso + reng atap sirap kayu borneo
Bahan An. SNI ( Revisi ) 6.37.1
0.165 m3 Kayu borneo, balok @ Rp. - = Rp -
0.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.37.2
0.120 Oh Pekerja @ Rp. 22,500.00 = Rp 2,700.00
0.120 Oh Tukang kayu @ Rp. 35,000.00 = Rp 4,200.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.006 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 7,560.00
Total harga = Rp 7,560.00
38. 1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu jati
Bahan An. SNI ( Revisi ) 6.38.1
0.012 m3 Kayu jati, balok @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.38.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp 8,750.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 16,000.00
Total harga = Rp 16,000.00
39. 1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu kamper
Bahan An. SNI ( Revisi ) 6.39.1
0.012 m3 Kayu kamper, balok @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.39.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp 8,750.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 16,000.00
Total harga = Rp 16,000.00
40. 1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu borneo
Bahan An. SNI ( Revisi ) 6.40.1
0.012 m3 Kayu borneo, balok @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.40.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp 8,750.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 16,000.00
Total harga = Rp 16,000.00
41. 1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu jati
Bahan An. SNI ( Revisi ) 6.41.1
0.023 m3 Kayu jati, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.41.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.300 Oh Tukang kayu @ Rp. 35,000.00 = Rp 10,500.00
0.030 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,050.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 16,450.00
Total harga = Rp 16,450.00
42. 1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.42.1
0.023 m3 Kayu kamper, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.42.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.300 Oh Tukang kayu @ Rp. 35,000.00 = Rp 10,500.00
0.030 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,050.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 16,450.00
Total harga = Rp 16,450.00
43. 1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu borneo
Bahan An. SNI ( Revisi ) 6.43.1
0.023 m3 Kayu borneo, balok @ Rp. - = Rp -
0.150 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.43.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.300 Oh Tukang kayu @ Rp. 35,000.00 = Rp 10,500.00
0.030 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,050.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 16,450.00
Total harga = Rp 16,450.00
44. 1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu jati
Bahan An. SNI ( Revisi ) 6.44.1
0.027 m3 Kayu jati, balok @ Rp. - = Rp -
0.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.44.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.350 Oh Tukang kayu @ Rp. 35,000.00 = Rp 12,250.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 19,600.00
Total harga = Rp 19,600.00
45. 1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.45.1
0.027 m3 Kayu kamper, balok @ Rp. - = Rp -
0.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.45.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.350 Oh Tukang kayu @ Rp. 35,000.00 = Rp 12,250.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 19,600.00
Total harga = Rp 19,600.00
46. 1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu borneo
Bahan An. SNI ( Revisi ) 6.46.1
0.027 m3 Kayu borneo, balok @ Rp. - = Rp -
0.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.46.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.350 Oh Tukang kayu @ Rp. 35,000.00 = Rp 12,250.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 19,600.00
Total harga = Rp 19,600.00
47. 1 m' Pasang lisplang ukuran ( 3 x 20 ) cm, kayu jati
Bahan An. SNI ( Revisi ) 6.47.1
0.0072 m3 Kayu jati, papan @ Rp. - = Rp -
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.47.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp 7,000.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.0050 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 10,325.00
Total harga = Rp 10,325.00
48. 1 m' Pasang lisplang ukuran ( 3 x 20 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.48.1
0.0072 m3 Kayu kamper, papan @ Rp. - = Rp -
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.48.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp 7,000.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.0050 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 10,325.00
Total harga = Rp 10,325.00
49. 1 m' Pasang lisplang ukuran ( 3 x 30 ) cm, kayu jati
Bahan An. SNI ( Revisi ) 6.49.1
0.011 m3 Kayu jati, papan @ Rp. - = Rp -
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.49.2
0.110 Oh Pekerja @ Rp. 22,500.00 = Rp 2,475.00
0.220 Oh Tukang kayu @ Rp. 35,000.00 = Rp 7,700.00
0.022 Oh Kepala tukang @ Rp. 35,000.00 = Rp 770.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 11,145.00
Total harga = Rp 11,145.00
50. 1 m' Pasang lisplang ukuran ( 3 x 30 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.50.1
0.011 m3 Kayu kamper, papan @ Rp. - = Rp -
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.50.2
0.110 Oh Pekerja @ Rp. 22,500.00 = Rp 2,475.00
0.220 Oh Tukang kayu @ Rp. 35,000.00 = Rp 7,700.00
0.022 Oh Kepala tukang @ Rp. 35,000.00 = Rp 770.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 11,145.00
Total harga = Rp 11,145.00
51. 1 m' Pasang lisplang ukuran 2 x ( 3 x 20 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.51.1
0.0145 m3 Kayu kamper, papan @ Rp. - = Rp -
0.060 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.51.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp 8,750.00
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp 875.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 16,000.00
Total harga = Rp 16,000.00
52. 1 m' Pasang lisplang ukuran 2 x ( 2 x 20 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.52.1
0.0086 m3 Kayu kamper, papan @ Rp. - = Rp -
0.060 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.52.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 8,100.00
Total harga = Rp 8,100.00
53. 1 m' Pasang lisplang ukuran 2 x ( 2 x 20 ) cm, kayu borneo
Bahan An. SNI ( Revisi ) 6.53.1
0.0088 m3 Kayu borneo, papan @ Rp. - = Rp -
0.060 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.53.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 8,100.00
Total harga = Rp 8,100.00
54. 1 m2 Pasang rangka dinding pemisah kayu kamper
Bahan An. SNI ( Revisi ) 6.54.1
0.0195 m3 Kayu kamper, balok @ Rp. - = Rp -
0.007 m3 Kayu kamper, papan @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.54.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.450 Oh Tukang kayu @ Rp. 35,000.00 = Rp 15,750.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 23,700.00
Total harga = Rp 23,700.00
55. 1 m2 Pasang rangka dinding pemisah kayu borneo
Bahan An. SNI ( Revisi ) 6.55.1
0.0195 m3 Kayu borneo, balok @ Rp. - = Rp -
0.007 m3 Kayu borneo, papan @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.55.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.450 Oh Tukang kayu @ Rp. 35,000.00 = Rp 15,750.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 23,700.00
Total harga = Rp 23,700.00
56. 1 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.56.1
0.0195 m3 Kayu kamper, balok @ Rp. - = Rp -
0.007 m3 Kayu kamper, papan @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.56.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.450 Oh Tukang kayu @ Rp. 35,000.00 = Rp 15,750.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.075 Oh Mandor @ Rp. 40,000.00 = Rp 3,000.00
= Rp 23,700.00
Total harga = Rp 23,700.00
56. 1 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.56.1
0.0195 m3 Kayu kamper, balok @ Rp. - = Rp -
0.007 m3 Kayu kamper, papan @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.560 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Teakwood 4' x 8' x 4 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.56.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp 21,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 28,000.00
Total harga = Rp 28,000.00
57. 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.57.1
0.0195 m3 Kayu kamper, balok @ Rp. - = Rp -
0.007 m3 Kayu kamper, papan @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.560 Lt Lem kayu @ Rp. - = Rp -
1.000 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.57.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp 21,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 28,000.00
Total harga = Rp 28,000.00
58. 1 m2 Pasang dinding lambriziring dari papan jati
Bahan An. SNI ( Revisi ) 6.58.1
0.0070 m3 Kayu jati, balok @ Rp. - = Rp -
0.100 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.150 Kg Paku skrup 3,5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.58.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
1.800 Oh Tukang kayu @ Rp. 35,000.00 = Rp 63,000.00
0.180 Oh Kepala tukang @ Rp. 35,000.00 = Rp 6,300.00
0.030 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 84,000.00
Total harga = Rp 84,000.00
59. 1 m2 Pasang plywood tebal 4 mm untuk dinding
Bahan An. SNI ( Revisi ) 6.59.1
0.400 Lbr Plywood 4' x 8' x 4 mm @ Rp. - = Rp -
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.59.2
0.025 Oh Pekerja @ Rp. 22,500.00 = Rp 562.50
0.075 Oh Tukang kayu @ Rp. 35,000.00 = Rp 2,625.00
0.0075 Oh Kepala tukang @ Rp. 35,000.00 = Rp 262.50
0.0013 Oh Mandor @ Rp. 40,000.00 = Rp 52.00
= Rp 3,502.00
Total harga = Rp 3,502.00
60. 1 m' Pasang list plafond, kayu profil
Bahan An. SNI ( Revisi ) 6.60.1
1.050 m' Kayu profil @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.60.2
0.021 Oh Pekerja @ Rp. 22,500.00 = Rp 472.50
0.021 Oh Tukang kayu @ Rp. 35,000.00 = Rp 735.00
0.002 Oh Kepala tukang @ Rp. 35,000.00 = Rp 70.00
0.001 Oh Mandor @ Rp. 40,000.00 = Rp 40.00
= Rp 1,317.50
Total harga = Rp 1,317.50
PEKERJAAN PENUTUP ATAP
1. 1 m2 Pasang atap genteng plenthong kecil
Bahan An. SNI ( Revisi ) 6.1.1
25.000 Bh Genteng plenthong @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.150 Oh Pekerja @ Rp. 14,000.00 = Rp
0.075 Oh Tukang kayu @ Rp. 28,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 41,000.00 = Rp
0.008 Oh Mandor @ Rp. 5,000.00 = Rp
= Rp
Total harga = Rp
2. 1 m2 Pasang atap genteng kodok/glazzur
Bahan An. SNI ( Revisi ) 6.2.1
25.000 Bh Genteng kodok @ Rp. 49,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.075 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.008 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
3. 1 m2 Pasang atap genteng plenthong super/besar
Bahan An. SNI ( Revisi ) 6.3.1
12.000 Bh Genteng plenthong super @ Rp. 125,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.060 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.008 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
4. 1 m' Pasang genteng bubung plenthong kecil
Bahan An. SNI ( Revisi ) 6.4.1
5.000 Bh Genteng bubung plenthong kecil @ Rp. 375,000.00 = Rp
8.000 Kg Semen portland @ Rp. 375,000.00 = Rp
0.032 m3 Pasir pasang @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
0.400 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.002 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
5. 1 m' Pasang genteng bubung kodok glazzur
Bahan An. SNI ( Revisi ) 6.5.1
5.000 Bh Genteng bubung kodok @ Rp. 2,725,000.00 = Rp
8.000 Kg Semen portland @ Rp. 2,725,000.00 = Rp
0.032 m3 Pasir pasang @ Rp. 2,225,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.5.2
0.400 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.002 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
6. 1 m' Pasang genteng bubung plenthong besar
Bahan An. SNI ( Revisi ) 6.6.1
4.000 Bh Genteng bubung plenthong besar @ Rp. 60,500.00 = Rp
8.000 Kg Semen portland @ Rp. 30,000.00 = Rp
0.032 m3 Pasir pasang @ Rp. 30,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
0.400 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.002 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
7. 1 m2 Pasang roof light fiberglass ( 180 x 90 ) cm
Bahan An. SNI ( Revisi ) 6.7.1
0.600 Lbr Roof light fiberglass @ Rp. 6,000.00 = Rp
0.050 Kg Paku biasa 1/2" - 1" @ Rp. 7,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.067 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
8. 1 m2 Pasang atap asbes glmbg ( 2.50 x 0.92 )m x 5 mm
Bahan An. SNI ( Revisi ) 6.8.1
0.500 Lbr Asbes glmbg @ Rp. 500.00 = Rp
0.120 Kg Paku pancing 60 x 230 @ Rp. 187,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.075 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.008 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
9. 1 m2 Pasang atap asbes glmbg ( 2.25 x 0.92 )m x 5 mm
Bahan An. SNI ( Revisi ) 6.9.1
0.600 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing 60 x 230 @ Rp. 15,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.075 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.008 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
10. 1 m2 Pasang atap asbes glmbg ( 2.00 x 0.92 )m x 5 mm
Bahan An. SNI ( Revisi ) 6.10.1
0.600 Lbr Asbes glmbg @ Rp. 750.00 = Rp
0.120 Kg Paku pancing 60 x 230 @ Rp. 2,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
11. 1 m2 Pasang atap asbes glmbg ( 1.80 x 0.92 )m x 5 mm
Bahan An. SNI ( Revisi ) 6.11.1
0.750 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing 60 x 230 @ Rp. 3,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
12. 1 m2 Pasang atap asbes glmbg ( 3.00 x 1.05 )m x 4 mm
Bahan An. SNI ( Revisi ) 6.12.1
0.350 Lbr Asbes glmbg @ Rp. 2,500.00 = Rp
0.120 Kg Paku pancing @ Rp. 6,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
13. 1 m2 Pasang atap asbes glmbg ( 2.70 x 1.05 )m x 4 mm
Bahan An. SNI ( Revisi ) 6.13.1
0.420 Lbr Asbes glmbg @ Rp. 57,500.00 = Rp
0.120 Kg Paku pancing @ Rp. 5,250.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
14. 1 m2 Pasang atap asbes glmbg ( 2.40 x 1.05 )m x 4 mm
Bahan An. SNI ( Revisi ) 6.14.1
0.440 Lbr Asbes glmbg @ Rp. 12,000.00 = Rp
0.120 Kg Paku pancing @ Rp. 20,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.067 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
15. 1 m2 Pasang atap asbes glmbg ( 2.10 x 1.05 )m x 4 mm
Bahan An. SNI ( Revisi ) 6.15.1
0.510 Lbr Asbes glmbg @ Rp. 275,000.00 = Rp
0.120 Kg Paku pancing @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.067 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
16. 1 m2 Pasang atap asbes glmbg ( 1.50 x 1.05 )m x 4 mm
Bahan An. SNI ( Revisi ) 6.16.1
0.800 Lbr Asbes glmbg @ Rp. 750.00 = Rp
0.120 Kg Paku pancing @ Rp. 13,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.067 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
17. 1 m2 Pasang atap asbes glmbg ( 3.00 x 1.08 )m x 6 mm
Bahan An. SNI ( Revisi ) 6.17.1
0.370 Lbr Asbes glmbg @ Rp. 35,000.00 = Rp
0.120 Kg Paku pancing @ Rp. 30,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.067 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
18. 1 m2 Pasang atap asbes glmbg ( 2.70 x 1.08 )m x 6 mm
Bahan An. SNI ( Revisi ) 6.18.1
0.380 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.067 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
19. 1 m2 Pasang atap asbes glmbg ( 2.40 x 1.08 )m x 6 mm
Bahan An. SNI ( Revisi ) 6.19.1
0.460 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.067 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
20. 1 m2 Pasang atap asbes glmbg ( 2.10 x 1.08 )m x 6 mm
Bahan An. SNI ( Revisi ) 6.20.1
0.490 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.067 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
21. 1 m2 Pasang atap asbes glmbg ( 1.80 x 1.08 )m x 6 mm
Bahan An. SNI ( Revisi ) 6.21.1
0.570 Lbr Asbes glmbg @ Rp. - = Rp
0.120 Kg Paku pancing @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp
0.067 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.007 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
22. 1 m' Pasang bubung stel gelombang 0.92 m
Bahan An. SNI ( Revisi ) 6.22.1
2.400 Lbr Bubung stel gelombang @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.22.2
0.084 Oh Pekerja @ Rp. 22,500.00 = Rp
0.125 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.004 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
23. 1 m' Pasang nok stel gelombang 1.05 m
Bahan An. SNI ( Revisi ) 6.23.1
2.100 Lbr Nok stel gelombang @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.23.2
0.084 Oh Pekerja @ Rp. 22,500.00 = Rp
0.125 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.004 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
24. 1 m' Pasang nok stel gelombang 1.08 m
Bahan An. SNI ( Revisi ) 6.24.1
2.050 Lbr Nok stel gelombang @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.24.2
0.084 Oh Pekerja @ Rp. 22,500.00 = Rp
0.125 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.004 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
25. 1 m' Pasang nok paten 0.92 m
Bahan An. SNI ( Revisi ) 6.25.1
1.200 Lbr Nok paten @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.25.2
0.084 Oh Pekerja @ Rp. 22,500.00 = Rp
0.125 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.004 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
26. 1 m' Pasang nok paten 1.05 m
Bahan An. SNI ( Revisi ) 6.26.1
1.200 Lbr Nok paten @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.26.2
0.084 Oh Pekerja @ Rp. 22,500.00 = Rp
0.125 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.004 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
27. 1 m' Pasang nok paten 1.08 m
Bahan An. SNI ( Revisi ) 6.27.1
1.200 Lbr Nok paten @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.27.2
0.084 Oh Pekerja @ Rp. 22,500.00 = Rp
0.125 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.004 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
28. 1 m' Pasang nok stel rata 0.92 m
Bahan An. SNI ( Revisi ) 6.28.1
1.100 Lbr Nok stel rata @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.28.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.004 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
29. 1 m' Pasang nok stel rata 1.05 m
Bahan An. SNI ( Revisi ) 6.29.1
1.100 Lbr Nok stel rata @ Rp. - = Rp
6.000 Bh Paku sekrup 3.5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.29.2
0.084 Oh Pekerja @ Rp. 22,500.00 = Rp
0.125 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.004 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
30. 1 m2 Pasang atap genteng beton
Bahan An. SNI ( Revisi ) 6.30.1
11.000 Bh Genteng beton @ Rp. - = Rp
0.030 Kg Paku biasa 2" - 5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.30.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.010 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
31. 1 m2 Pasang atap genteng aspal
Bahan An. SNI ( Revisi ) 6.31.1
6.900 Lbr Genteng aspal @ Rp. - = Rp
0.350 Lbr Plywood 4" x 8" x 6 mm @ Rp. - = Rp
0.030 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.500 Bh Plastic aerator @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.31.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp
0.300 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.010 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
32. 1 m2 Pasang atap genteng metal
Bahan An. SNI ( Revisi ) 6.32.1
1.020 Lbr Genteng metal @ Rp. - = Rp
0.200 Kg Paku biasa 2" - 5" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.32.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.001 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
33. 1 m2 Pasang atap sirap
Bahan An. SNI ( Revisi ) 6.33.1
60.000 Bh Genteng sirap @ Rp. - = Rp
0.200 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.33.2
0.166 Oh Pekerja @ Rp. 22,500.00 = Rp
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.008 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
34. 1 m' Pasang nok genteng beton
Bahan An. SNI ( Revisi ) 6.34.1
3.500 Bh Nok genteng beton @ Rp. - = Rp
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp
10.800 Kg Semen abu-abu @ Rp. - = Rp
0.032 m3 Pasir pasang @ Rp. - = Rp
1.000 Kg Semen warna @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.34.2
0.400 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.020 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
35. 1 m' Pasang nok genteng aspal
Bahan An. SNI ( Revisi ) 6.35.1
2.000 Bh Nok genteng aspal @ Rp. - = Rp
0.050 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.0035 m3 Kayu borneo, balok @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.35.2
0.125 Oh Pekerja @ Rp. 22,500.00 = Rp
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.006 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
36. 1 m' Pasang nok genteng metal
Bahan An. SNI ( Revisi ) 6.36.1
1.100 Bh genteng decra bond @ Rp. - = Rp
0.050 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.36.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.013 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
37. 1 m' Pasang nok sirap
Bahan An. SNI ( Revisi ) 6.37.1
0.400 Lbr Seng plat 3" x 6" bjls 28 @ Rp. - = Rp
0.060 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.050 Kg Paku biasa 2" - 5" @ Rp. - = Rp
0.004 m3 Kayu borneo, papan tebal 3 cm @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.37.2
0.125 Oh Pekerja @ Rp. 22,500.00 = Rp
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.006 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
38. 1 m2 Pasang atap seng gelombang
Bahan An. SNI ( Revisi ) 6.38.1
0.700 Lbr Seng glmbg 3" x 6" bjls 28 @ Rp. - = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.38.2
0.120 Oh Pekerja @ Rp. 22,500.00 = Rp
0.060 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.006 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
39. 1 m2 Pasang atap nok seng
Bahan An. SNI ( Revisi ) 6.39.1
0.300 Lbr Seng plat 3" x 6" bjls 28 @ Rp. - = Rp
0.040 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.39.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.006 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
40. 1 m2 Pasang atap alluminium
Bahan An. SNI ( Revisi ) 6.40.1
1.050 m2 Atap alluminium glmbg tbl 0.55 @ Rp. - = Rp
0.020 Kg Paku hak panjang 15 cm @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.40.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.750 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.008 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.006 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
41. 1 m2 Pasang nok alluminium
Bahan An. SNI ( Revisi ) 6.41.1
1.200 m2 Nok standar 40 cm 18, swg 22 @ Rp. - = Rp
0.040 Kg Paku hak panjang 15 cm @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.41.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
1.000 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.010 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
42. 1 m2 Pasang alluminium foil/sisalation
Bahan An. SNI ( Revisi ) 6.42.1
1.050 m2 Alluminium foil/sisalation @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.42.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.050 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.005 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.008 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
-
-

2,100.00
2,100.00
328.00
40.00
4,568.00
4,568.00

1,225,000.00
1,225,000.00

3,375.00
2,625.00
280.00
320.00
6,600.00
1,231,600.00

1,500,000.00
1,500,000.00

3,375.00
2,100.00
2,100.00
320.00
7,895.00
1,507,895.00

1,875,000.00
3,000,000.00
-
4,875,000.00

9,000.00
7,000.00
700.00
80.00
16,780.00
4,891,780.00

13,625,000.00
21,800,000.00
71,200.00
35,496,200.00

9,000.00
7,000.00
700.00
80.00
16,780.00
35,512,980.00
242,000.00
240,000.00
976.00
482,976.00

9,000.00
7,000.00
700.00
80.00
16,780.00
499,756.00

3,600.00
350.00
3,950.00

3,150.00
2,345.00
245.00
280.00
6,020.00
9,970.00

250.00
22,440.00
22,690.00

3,150.00
2,625.00
280.00
320.00
6,375.00
29,065.00

-
1,800.00
1,800.00

3,150.00
2,625.00
280.00
320.00
6,375.00
8,175.00

450.00
240.00
690.00

3,150.00
2,450.00
245.00
280.00
6,125.00
6,815.00
-
360.00
360.00

3,150.00
2,450.00
245.00
280.00
6,125.00
6,485.00

875.00
720.00
1,595.00

3,150.00
2,450.00
245.00
280.00
6,125.00
7,720.00

24,150.00
630.00
24,780.00

3,150.00
2,450.00
245.00
280.00
6,125.00
30,905.00

5,280.00
2,400.00
7,680.00

3,150.00
2,345.00
245.00
280.00
6,020.00
13,700.00

140,250.00
-
140,250.00

3,150.00
2,345.00
245.00
280.00
6,020.00
146,270.00
600.00
1,560.00
2,160.00

3,150.00
2,345.00
245.00
280.00
6,020.00
8,180.00

12,950.00
3,600.00
16,550.00

3,150.00
2,345.00
245.00
280.00
6,020.00
22,570.00

-
-
-

3,150.00
2,345.00
245.00
280.00
6,020.00
6,020.00

-
-
-

3,150.00
2,345.00
245.00
280.00
6,020.00
6,020.00

-
-
-

3,150.00
2,345.00
245.00
280.00
6,020.00
6,020.00
-
-
-

3,150.00
2,345.00
245.00
280.00
6,020.00
6,020.00

-
-
-

1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00

-
-
-

1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00

-
-
-

1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00

-
-
-

1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00
-
-
-

1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00

-
-
-

1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00

-
-
-

2,250.00
5,250.00
455.00
160.00
8,115.00
8,115.00

-
-
-

1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00

-
-
-

4,500.00
3,500.00
350.00
400.00
8,750.00
8,750.00
-
-
-
-
-

4,500.00
10,500.00
105.00
400.00
15,505.00
15,505.00

-
-
-

4,500.00
3,500.00
350.00
40.00
8,390.00
8,390.00

-
-
-

3,735.00
8,750.00
875.00
320.00
13,680.00
13,680.00

-
-
-
-
-
-

9,000.00
7,000.00
700.00
800.00
17,500.00
17,500.00

-
-
-
-
2,812.50
8,750.00
875.00
240.00
12,677.50
12,677.50

-
-
-

5,625.00
5,250.00
525.00
520.00
11,920.00
11,920.00

-
-
-
-
-

2,812.50
8,750.00
875.00
240.00
12,677.50
12,677.50

-
-
-

2,700.00
2,100.00
210.00
240.00
5,250.00
5,250.00

-
-
-

3,375.00
2,450.00
280.00
240.00
6,345.00
6,345.00
-
-
-

3,375.00
26,250.00
280.00
240.00
30,145.00
30,145.00

-
-
-

2,250.00
35,000.00
350.00
400.00
38,000.00
38,000.00

-
-

3,375.00
1,750.00
175.00
320.00
5,620.00
5,620.00
PEKERJAAN PENUTUP PLAFOND
1. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.1.1
1.100 Lbr Asbes langit-langit tbl 6 mm @ Rp. - = Rp -
0.010 Kg Paku @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.1.2
0.030 Oh Pekerja @ Rp. 22,500.00 = Rp 675.00
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp 2,450.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.0015 Oh Mandor @ Rp. 40,000.00 = Rp 60.00
= Rp 3,430.00
Total harga = Rp 3,430.00
2. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.2.1
1.100 Lbr Asbes langit-langit tbl 5 mm @ Rp. 24,000.00 = Rp 26,400.00
0.010 Kg Paku @ Rp. 54,000.00 = Rp 540.00
= Rp 26,940.00
Upah An. SNI ( Revisi ) 6.2.2
0.030 Oh Pekerja @ Rp. 22,500.00 = Rp 675.00
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp 2,450.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.0015 Oh Mandor @ Rp. 40,000.00 = Rp 60.00
= Rp 3,430.00
Total harga = Rp 30,370.00
3. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.3.1
1.100 Lbr Asbes langit-langit tbl 4 mm @ Rp. 220.00 = Rp 242.00
0.010 Kg Paku @ Rp. 30,000.00 = Rp 300.00
= Rp 542.00
Upah An. SNI ( Revisi ) 6.3.2
0.030 Oh Pekerja @ Rp. 22,500.00 = Rp 675.00
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp 2,450.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.0015 Oh Mandor @ Rp. 40,000.00 = Rp 60.00
= Rp 3,430.00
Total harga = Rp 3,972.00
4. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 3.5 mm
Bahan An. SNI ( Revisi ) 6.4.1
1.100 Lbr Asbes langit-langit tbl 3.5 mm @ Rp. 16,500.00 = Rp 18,150.00
0.010 Kg Paku @ Rp. 29,000.00 = Rp 290.00
= Rp 18,440.00
Upah An. SNI ( Revisi ) 6.4.2
0.030 Oh Pekerja @ Rp. 22,500.00 = Rp 675.00
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp 2,450.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.0015 Oh Mandor @ Rp. 40,000.00 = Rp 60.00
= Rp 3,430.00
Total harga = Rp 21,870.00
5. 1 m2 Pasang langit-langit akustik ( 30 x 30 ) cm
Bahan An. SNI ( Revisi ) 6.5.1
11.500 Lbr Akustik ukuran 30 x 30 cm @ Rp. 1,625,000.00 = Rp 18,687,500.00
0.050 Kg Paku @ Rp. 1,625,000.00 = Rp 81,250.00
= Rp 18,768,750.00
Upah An. SNI ( Revisi ) 6.5.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.120 Oh Tukang kayu @ Rp. 35,000.00 = Rp 4,200.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 6,090.00
Total harga = Rp 18,774,840.00
6. 1 m2 Pasang langit-langit akustik ( 30 x 60 ) cm
Bahan An. SNI ( Revisi ) 6.6.1
5.800 Lbr Akustik ukuran 30 x 60 cm @ Rp. Satuan = Rp #VALUE!
0.050 Kg Paku @ Rp. - = Rp -
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.6.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 5,320.00
Total harga = Rp #VALUE!
7. 1 m2 Pasang langit-langit akustik ( 60 x 120 ) cm
Bahan An. SNI ( Revisi ) 6.7.1
1.500 Lbr Akustik arm strong 60 x 120 cm @ Rp. 6,000.00 = Rp 9,000.00
0.050 Kg Paku @ Rp. 6,000.00 = Rp 300.00
= Rp 9,300.00
Upah An. SNI ( Revisi ) 6.7.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 5,320.00
Total harga = Rp 14,620.00
8. 1 m2 Pasang langit-langit plywood ( 30 x 60 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.8.1
0.360 Lbr Plywood 4' x 8' x 4 mm @ Rp. 10,000.00 = Rp 3,600.00
0.030 Kg Paku @ Rp. 2,250.00 = Rp 67.50
= Rp 3,667.50
Upah An. SNI ( Revisi ) 6.8.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp 9,232.50
9. 1 m2 Pasang langit-langit plywood ( 30 x 60 ) cm, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.9.1
0.360 Lbr Plywood 4' x 8' x 6 mm @ Rp. 70,000.00 = Rp 25,200.00
0.030 Kg Paku @ Rp. 95,000.00 = Rp 2,850.00
= Rp 28,050.00
Upah An. SNI ( Revisi ) 6.9.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp 33,615.00
10. 1 m2 Pasang langit-langit plywood ( 60 x 120 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.10.1
0.375 Lbr Plywood 4' x 8' x 4 mm @ Rp. 12,500.00 = Rp 4,687.50
0.030 Kg Paku @ Rp. - = Rp -
= Rp 4,687.50
Upah An. SNI ( Revisi ) 6.10.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp 10,252.50
11. 1 m2 Pasang langit-langit plywood ( 60 x 120 ) cm, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.11.1
0.375 Lbr Plywood 4' x 8' x 6 mm @ Rp. - = Rp -
0.030 Kg Paku @ Rp. Harga = Rp #VALUE!
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.11.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp #VALUE!
12. 1 m2 Pasang langit-langit teakwood ( 30 x 60 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.12.1
0.360 Lbr Teakwood 4' x 8' x 4 mm @ Rp. 3,500.00 = Rp 1,260.00
0.030 Kg Paku @ Rp. 10,000.00 = Rp 300.00
= Rp 1,560.00
Upah An. SNI ( Revisi ) 6.12.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp 7,125.00
13. 1 m2 Pasang langit-langit teakwood ( 60 x 120 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.13.1
0.375 Lbr Teakwood 4' x 8' x 4 mm @ Rp. - = Rp -
0.030 Kg Paku @ Rp. 57,500.00 = Rp 1,725.00
= Rp 1,725.00
Upah An. SNI ( Revisi ) 6.13.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp 7,290.00
14. 1 m2 Pasang langit-langit lat kayu jati
Bahan An. SNI ( Revisi ) 6.14.1
0.024 m3 Kayu jati, papan @ Rp. 16,000.00 = Rp 384.00
0.010 Kg Paku @ Rp. 300,000.00 = Rp 3,000.00
0.050 Kg Paku sekrup @ Rp. 275,000.00 = Rp 13,750.00
= Rp 17,134.00
Upah An. SNI ( Revisi ) 6.14.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp 21,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 28,000.00
Total harga = Rp 45,134.00
15. 1 m2 Pasang langit-langit lat kayu ramin
Bahan An. SNI ( Revisi ) 6.15.1
0.024 m3 Kayu ramin @ Rp. 4,500.00 = Rp 108.00
0.010 Kg Paku @ Rp. 35,000.00 = Rp 350.00
0.050 Kg Paku sekrup @ Rp. 275,000.00 = Rp 13,750.00
= Rp 14,208.00
Upah An. SNI ( Revisi ) 6.15.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp 21,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 28,000.00
Total harga = Rp 42,208.00
16. 1 m2 Pasang langit-langit lat kayu kamper
Bahan An. SNI ( Revisi ) 6.16.1
0.024 m3 Kayu kamper, papan @ Rp. 500.00 = Rp 12.00
0.010 Kg Paku @ Rp. 750.00 = Rp 7.50
0.050 Kg Paku sekrup @ Rp. 13,000.00 = Rp 650.00
= Rp 669.50
Upah An. SNI ( Revisi ) 6.16.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp 21,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 28,000.00
Total harga = Rp 28,669.50
17. 1 m2 Pasang langit-langit soft board
Bahan An. SNI ( Revisi ) 6.17.1
0.350 Lbr Soft board 4' x 8' x 4mm @ Rp. 35,000.00 = Rp 12,250.00
0.030 Kg Paku @ Rp. 37,500.00 = Rp 1,125.00
= Rp 13,375.00
Upah An. SNI ( Revisi ) 6.17.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 17,470.00
Total harga = Rp 30,845.00
18. 1 m2 Pasang langit-langit akustik 60 x 120 cm + rangka alluminium
Bahan An. SNI ( Revisi ) 6.18.1
3.600 m' Profil alluminium T @ Rp. - = Rp -
0.150 Kg Kawat seng polos @ Rp. - = Rp -
1.000 Bh Ramset/dinabolt @ Rp. - = Rp -
1.500 Lbr Akustik arm strong 60x120 cm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.18.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp 17,500.00
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,750.00
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp 300.00
= Rp 22,925.00
Total harga = Rp 22,925.00
19. 1 m' Pasang list langit-langit kayu profil
Bahan An. SNI ( Revisi ) 6.19.1
1.100 m' List kayu profil @ Rp. - = Rp -
0.010 Kg Paku @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.19.2
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp 1,125.00
0.050 Oh Tukang kayu @ Rp. 35,000.00 = Rp 1,750.00
0.005 Oh Kepala tukang @ Rp. 35,000.00 = Rp 175.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 3,170.00
Total harga = Rp 3,170.00
20. 1 m2 Pasang langit-langit asbes ( 1.00x1.00 ) m, tebal 3.2 mm, rangka borneo
Bahan An. SNI ( Revisi ) 6.20.1
0.012 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa @ Rp. - = Rp -
1.100 Lbr Asbes 1.00 x 1.00 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.20.2
0.180 Oh Pekerja @ Rp. 22,500.00 = Rp 4,050.00
0.320 Oh Tukang kayu @ Rp. 35,000.00 = Rp 11,200.00
0.032 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,120.00
0.009 Oh Mandor @ Rp. 40,000.00 = Rp 360.00
= Rp 16,730.00
Total harga = Rp 16,730.00
21. 1 m2 Pasang langit-langit plywood 4 mm + rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.21.1
0.023 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.390 Lbr Plywood 4' x 8 ' x 4 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.270 Oh Pekerja @ Rp. 22,500.00 = Rp 6,075.00
0.400 Oh Tukang kayu @ Rp. 35,000.00 = Rp 14,000.00
0.040 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,400.00
0.0135 Oh Mandor @ Rp. 40,000.00 = Rp 540.00
= Rp 22,015.00
Total harga = Rp 22,015.00
22. 1 m2 Pasang langit-langit akustik ( 30 x 60 ) cm + rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.22.1
0.023 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa @ Rp. - = Rp -
5.800 Lbr Akustik 30 x 60 cm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.260 Oh Pekerja @ Rp. 22,500.00 = Rp 5,850.00
0.400 Oh Tukang kayu @ Rp. 35,000.00 = Rp 14,000.00
0.040 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,400.00
0.013 Oh Mandor @ Rp. 40,000.00 = Rp 520.00
= Rp 21,770.00
Total harga = Rp 21,770.00
23. 1 m2 Pasang langit-langit akustik ( 30 x 30 ) cm + rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.23.1
0.027 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa @ Rp. - = Rp -
11.500 Lbr Akustik 30 x 30 cm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.310 Oh Pekerja @ Rp. 22,500.00 = Rp 6,975.00
0.470 Oh Tukang kayu @ Rp. 35,000.00 = Rp 16,450.00
0.047 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,645.00
0.0155 Oh Mandor @ Rp. 40,000.00 = Rp 620.00
= Rp 25,690.00
Total harga = Rp 25,690.00
24. 1 m2 Pasang langit-langit gypsum board, tebal 9 mm
Bahan An. SNI ( Revisi ) 6.24.1
0.364 Lbr Gypsum board ( 120x240x9 mm ) @ Rp. - = Rp -
0.110 Kg Paku sekrup @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.050 Oh Tukang kayu @ Rp. 35,000.00 = Rp 1,750.00
0.005 Oh Kepala tukang @ Rp. 35,000.00 = Rp 175.00
0.0050 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 4,375.00
Total harga = Rp 4,375.00
PEKERJAAN SANITASI
1. Memasang 1 buah kloset duduk/monoblok
Bahan An. SNI ( Revisi ) 6.1.1
1.000 Bh Kloset duduk/monoblok @ Rp. - = Rp -
6% harga kloset = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.1.2
3.300 Oh Pekerja @ Rp. 22,500.00 = Rp 74,250.00
1.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 33,000.00
0.001 Oh Kepala tukang @ Rp. 35,000.00 = Rp 35.00
0.1600 Oh Mandor @ Rp. 40,000.00 = Rp 6,400.00
= Rp 113,685.00
Total harga = Rp 113,685.00
2. Memasang 1 buah kloset jongkok porselen
Bahan An. SNI ( Revisi ) 6.2.1
1.000 Bh Kloset jongkok porselen @ Rp. 24,000.00 = Rp 24,000.00
6.000 Kg Semen portland @ Rp. 54,000.00 = Rp 324,000.00
0.010 m3 Pasir pasang @ Rp. 1,440.00 = Rp 1,440.00
= Rp 349,440.00
Upah An. SNI ( Revisi ) 6.2.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
1.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 45,000.00
0.150 Oh Kepala tukang @ Rp. 35,000.00 = Rp 5,250.00
0.160 Oh Mandor @ Rp. 40,000.00 = Rp 6,400.00
= Rp 79,150.00
Total harga = Rp 428,590.00
3. Memasang 1 buah kloset jongkok teraso
Bahan An. SNI ( Revisi ) 6.3.1
1.000 Bh Kloset jongkok teraso @ Rp. 30,000.00 = Rp 30,000.00
7.000 Bh Bata merah 5 x 11 x 22 @ Rp. 27,000.00 = Rp 189,000.00
6.000 Kg Semen portland @ Rp. 27,000.00 = Rp 162,000.00
0.010 m3 Pasir pasang @ Rp. 1,800.00 = Rp 1,800.00
= Rp 382,800.00
Upah An. SNI ( Revisi ) 6.3.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
1.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 45,000.00
0.300 Oh Kepala tukang @ Rp. 35,000.00 = Rp 10,500.00
0.110 Oh Mandor @ Rp. 40,000.00 = Rp 4,400.00
= Rp 82,400.00
Total harga = Rp 465,200.00
4. Memasang 1 buah urinoir
Bahan An. SNI ( Revisi ) 6.4.1
1.000 Bh Urinoir @ Rp. 34,000.00 = Rp 34,000.00
30% harga urinoir = Perlengkapan @ Rp. 10,200.00 = Rp -
6.000 Kg Semen portland @ Rp. 34,000.00 = Rp 204,000.00
0.010 m3 Pasir pasang @ Rp. 2,040.00 = Rp 2,040.00
= Rp 240,040.00
Upah An. SNI ( Revisi ) 6.4.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
1.000 Oh Tukang batu @ Rp. 30,000.00 = Rp 30,000.00
0.100 Oh Kepala tukang @ Rp. 35,000.00 = Rp 3,500.00
0.100 Oh Mandor @ Rp. 40,000.00 = Rp 4,000.00
= Rp 60,000.00
Total harga = Rp 300,040.00
5. Memasang 1 buah wastafel
Bahan An. SNI ( Revisi ) 6.5.1
1.000 Bh Wastafel @ Rp. 2,175,000.00 = Rp 2,175,000.00
12% harga wstfel. = Perlengkapan @ Rp. 261,000.00 = Rp -
6.000 Kg Semen portland @ Rp. 1,175,000.00 = Rp 7,050,000.00
0.010 m3 Pasir pasang @ Rp. 130,500.00 = Rp 130,500.00
= Rp 9,355,500.00
Upah An. SNI ( Revisi ) 6.5.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
1.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 43,500.00
0.150 Oh Kepala tukang @ Rp. 35,000.00 = Rp 5,250.00
0.100 Oh Mandor @ Rp. 40,000.00 = Rp 4,000.00
= Rp 57,250.00
Total harga = Rp 9,412,750.00
6. Memasang 1 buah bak mandi teraso volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.6.1
1.000 Bh Bak teraso @ Rp. 33,000.00 = Rp 33,000.00
6.000 Kg Semen portland @ Rp. 41,000.00 = Rp 246,000.00
0.010 m3 Pasir pasang @ Rp. 1,980.00 = Rp 1,980.00
= Rp 280,980.00
Upah An. SNI ( Revisi ) 6.6.2
2.100 Oh Pekerja @ Rp. 22,500.00 = Rp 47,250.00
0.750 Oh Tukang batu @ Rp. 30,000.00 = Rp 22,500.00
0.070 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,450.00
0.110 Oh Mandor @ Rp. 40,000.00 = Rp 4,400.00
= Rp 76,600.00
Total harga = Rp 357,580.00
7. Memasang 1 buah bak mandi fiberglass volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.7.1
1.000 Bh Bak fiberglass @ Rp. 8,500.00 = Rp 8,500.00
18% harga bak = Perlengkapan @ Rp. 1,530.00 = Rp -
= Rp 8,500.00
Upah An. SNI ( Revisi ) 6.7.2
1.800 Oh Pekerja @ Rp. 22,500.00 = Rp 40,500.00
2.700 Oh Tukang batu @ Rp. 30,000.00 = Rp 81,000.00
0.540 Oh Kepala tukang @ Rp. 35,000.00 = Rp 18,900.00
0.110 Oh Mandor @ Rp. 40,000.00 = Rp 4,400.00
= Rp 144,800.00
Total harga = Rp 153,300.00
8. Memasang 1 buah bak mandi batu bata volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.8.1
0.400 m3 Batu bata @ Rp. 65,000.00 = Rp 26,000.00
120.000 Kg Semen portland @ Rp. 39,500.00 = Rp 4,740,000.00
0.300 m3 Pasir pasang @ Rp. 40,000.00 = Rp 12,000.00
360.000 Bh Porselen ( 11x11 ) cm @ Rp. 50,000.00 = Rp 18,000,000.00
6.000 Kg Semen nat @ Rp. 11,700.00 = Rp 70,200.00
= Rp 22,848,200.00
Upah An. SNI ( Revisi ) 6.8.2
6.000 Oh Pekerja @ Rp. 22,500.00 = Rp 135,000.00
3.000 Oh Tukang batu @ Rp. 30,000.00 = Rp 90,000.00
0.300 Oh Kepala tukang @ Rp. 35,000.00 = Rp 10,500.00
0.300 Oh Mandor @ Rp. 40,000.00 = Rp 12,000.00
= Rp 247,500.00
Total harga = Rp 23,095,700.00
9. Memasang 1 buah badkip porselen
Bahan An. SNI ( Revisi ) 6.9.1
1.000 m3 Badkip @ Rp. 90,000.00 = Rp 90,000.00
20% harga badkip = Perlengkapan @ Rp. 16,200.00 = Rp -
= Rp 90,000.00
Upah An. SNI ( Revisi ) 6.9.2
0.000 Oh Pekerja @ Rp. 22,500.00 = Rp -
0.075 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,250.00
0.750 Oh Kepala tukang @ Rp. 35,000.00 = Rp 26,250.00
0.250 Oh Mandor @ Rp. 40,000.00 = Rp 10,000.00
= Rp 38,500.00
Total harga = Rp 128,500.00
10. Membuat 1 buah bak beton volume 1 m3 air
Bahan An. SNI ( Revisi ) 6.10.1
0.900 m3 Beton 1 : 1.5 : 2.5 @ Rp. 47,500.00 = Rp 42,750.00
180.000 Kg Besi beton @ Rp. 20,000.00 = Rp 3,600,000.00
8.000 m3 Kayu cetakan @ Rp. - = Rp -
5.000 m2 Ubin porselen @ Rp. Harga = Rp #VALUE!
10% harga bhn = Perlengkapan @ Rp. #VALUE! = Rp #VALUE!
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.10.2
3.500 Oh Pekerja @ Rp. 22,500.00 = Rp 78,750.00
4.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 135,000.00
0.900 Oh Kepala tukang @ Rp. 35,000.00 = Rp 31,500.00
0.900 Oh Mandor @ Rp. 40,000.00 = Rp 36,000.00
= Rp 281,250.00
Total harga = Rp #VALUE!
11. Memasang 1 buah bak mandi fiberglass volume 1 m3 air
Bahan An. SNI ( Revisi ) 6.11.1
1.000 Bh Bak fiberglass @ Rp. 10,000.00 = Rp 10,000.00
12% harga bak = Perlengkapan @ Rp. 1,800.00 = Rp -
= Rp 10,000.00
Upah An. SNI ( Revisi ) 6.11.2
3.000 Oh Pekerja @ Rp. 22,500.00 = Rp 67,500.00
4.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 135,000.00
0.900 Oh Kepala tukang @ Rp. 35,000.00 = Rp 31,500.00
0.900 Oh Mandor @ Rp. 40,000.00 = Rp 36,000.00
= Rp 270,000.00
Total harga = Rp 280,000.00
12. Memasang 1 m' pipa penyalur air limbah jenis pipa tanah, Ø 15 cm
Bahan An. SNI ( Revisi ) 6.12.1
1.600 Bh Pipa tanah @ Rp. 57,500.00 = Rp 92,000.00
0.680 Kg Semen portland @ Rp. 65,000.00 = Rp 44,200.00
0.013 m3 Pasir pasang @ Rp. 57,500.00 = Rp 747.50
0.011 m3 Pasir urug @ Rp. 10,350.00 = Rp 113.85
= Rp 137,061.35
Upah An. SNI ( Revisi ) 6.12.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp 100.00
= Rp 2,455.00
Total harga = Rp 139,516.35
13. Memasang 1 m' pipa penyalur air limbah jenis pipa tanah, Ø 20 cm
Bahan An. SNI ( Revisi ) 6.13.1
1.600 Bh Pipa tanah @ Rp. 12,000.00 = Rp 19,200.00
0.870 Kg Semen portland @ Rp. 15,000.00 = Rp 13,050.00
0.014 m3 Pasir pasang @ Rp. 20,000.00 = Rp 280.00
0.014 m3 Pasir urug @ Rp. 2,160.00 = Rp 30.24
= Rp 32,560.24
Upah An. SNI ( Revisi ) 6.13.2
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp 1,800.00
0.040 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,200.00
0.004 Oh Kepala tukang @ Rp. 35,000.00 = Rp 140.00
0.007 Oh Mandor @ Rp. 40,000.00 = Rp 280.00
= Rp 3,420.00
Total harga = Rp 35,980.24
14. Memasang 1 m' pipa beton, Ø 15 - 20 cm
Bahan An. SNI ( Revisi ) 6.14.1
1.100 Bh Pipa beton @ Rp. - = Rp -
0.027 m3 Batu bata @ Rp. - = Rp -
3.920 Kg Semen portland @ Rp. 44,000.00 = Rp 172,480.00
0.065 m3 Pasir pasang @ Rp. 33,000.00 = Rp 2,145.00
0.024 m3 Pasir urug @ Rp. - = Rp -
= Rp 174,625.00
Upah An. SNI ( Revisi ) 6.14.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp 3,150.00
0.070 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,100.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.007 Oh Mandor @ Rp. 40,000.00 = Rp 280.00
= Rp 5,775.00
Total harga = Rp 180,400.00
15. Memasang 1 m' pipa beton, Ø 30 - 100 cm
Bahan An. SNI ( Revisi ) 6.15.1
1.100 Bh Pipa beton @ Rp. 41,000.00 = Rp 45,100.00
0.550 m3 Batu bata @ Rp. 41,000.00 = Rp 22,550.00
10.300 Kg Semen portland @ Rp. 1,000.00 = Rp 10,300.00
0.061 m3 Pasir pasang @ Rp. 1,500.00 = Rp 91.50
0.069 m3 Pasir urug @ Rp. 7,380.00 = Rp 509.22
= Rp 78,550.72
Upah An. SNI ( Revisi ) 6.15.2
0.380 Oh Pekerja @ Rp. 22,500.00 = Rp 8,550.00
0.190 Oh Tukang batu @ Rp. 30,000.00 = Rp 5,700.00
0.019 Oh Kepala tukang @ Rp. 35,000.00 = Rp 665.00
0.019 Oh Mandor @ Rp. 40,000.00 = Rp 760.00
= Rp 15,675.00
Total harga = Rp 94,225.72
16. Memasang 1 buah bak kontrol pas. batu bata ( 30x30 ) cm, tinggi 35 cm
Bahan An. SNI ( Revisi ) 6.16.1
0.145 m3 Batu bata @ Rp. 22,500.00 = Rp 3,262.50
44.000 Kg Semen portland @ Rp. 32,500.00 = Rp 1,430,000.00
0.070 m3 Pasir pasang @ Rp. 32,500.00 = Rp 2,275.00
0.070 m3 Batu kerikil @ Rp. - = Rp -
1.600 Kg Besi beton @ Rp. - = Rp -
0.060 m3 Pasir beton @ Rp. 4,050.00 = Rp 243.00
= Rp 1,435,780.50
Upah An. SNI ( Revisi ) 6.16.2
3.200 Oh Pekerja @ Rp. 22,500.00 = Rp 72,000.00
1.015 Oh Tukang batu @ Rp. 30,000.00 = Rp 30,450.00
0.0015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 52.50
0.016 Oh Mandor @ Rp. 40,000.00 = Rp 640.00
= Rp 103,142.50
Total harga = Rp 1,538,923.00
17. Memasang 1 buah bak kontrol pas. batu bata ( 45x45 ) cm, tinggi 50 cm
Bahan An. SNI ( Revisi ) 6.17.1
0.250 m3 Batu bata @ Rp. - = Rp -
77.000 Kg Semen portland @ Rp. - = Rp -
0.130 m3 Pasir pasang @ Rp. - = Rp -
0.020 m3 Batu kerikil @ Rp. - = Rp -
2.600 Kg Besi beton @ Rp. - = Rp -
0.090 m3 Pasir beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.17.2
1.420 Oh Pekerja @ Rp. 22,500.00 = Rp 31,950.00
0.470 Oh Tukang batu @ Rp. 30,000.00 = Rp 14,100.00
0.047 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,645.00
0.071 Oh Mandor @ Rp. 40,000.00 = Rp 2,840.00
= Rp 50,535.00
Total harga = Rp 50,535.00
18. Memasang 1 buah bak kontrol pas. batu bata ( 60x60 ) cm, tinggi 65 cm
Bahan An. SNI ( Revisi ) 6.18.1
0.371 m3 Batu bata @ Rp. - = Rp -
114.000 Kg Semen portland @ Rp. - = Rp -
0.184 m3 Pasir pasang @ Rp. - = Rp -
0.033 m3 Batu kerikil @ Rp. - = Rp -
4.850 Kg Besi beton @ Rp. - = Rp -
0.120 m3 Pasir beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.18.2
2.160 Oh Pekerja @ Rp. 22,500.00 = Rp 48,600.00
0.720 Oh Tukang batu @ Rp. 30,000.00 = Rp 21,600.00
0.072 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,520.00
0.108 Oh Mandor @ Rp. 40,000.00 = Rp 4,320.00
0.100 Oh Tukang gali @ Rp. 30,000.00 = Rp 3,000.00
= Rp 80,040.00
Total harga = Rp 80,040.00
19. Memasang 1 m' pipa galvanis ø 1/2"
Bahan An. SNI ( Revisi ) 6.19.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.19.2
0.054 Oh Pekerja @ Rp. 22,500.00 = Rp 1,215.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.027 Oh Mandor @ Rp. 40,000.00 = Rp 1,080.00
= Rp 5,310.00
Total harga = Rp 5,310.00
20. Memasang 1 m' pipa galvanis ø 3/4"
Bahan An. SNI ( Revisi ) 6.20.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.20.2
0.054 Oh Pekerja @ Rp. 22,500.00 = Rp 1,215.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.027 Oh Mandor @ Rp. 40,000.00 = Rp 1,080.00
= Rp 5,310.00
Total harga = Rp 5,310.00
21. Memasang 1 m' pipa galvanis ø 1"
Bahan An. SNI ( Revisi ) 6.21.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.054 Oh Pekerja @ Rp. 22,500.00 = Rp 1,215.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.027 Oh Mandor @ Rp. 40,000.00 = Rp 1,080.00
= Rp 5,310.00
Total harga = Rp 5,310.00
22. Memasang 1 m' pipa galvanis ø 1.5"
Bahan An. SNI ( Revisi ) 6.22.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.108 Oh Pekerja @ Rp. 22,500.00 = Rp 2,430.00
0.180 Oh Tukang batu @ Rp. 30,000.00 = Rp 5,400.00
0.018 Oh Kepala tukang @ Rp. 35,000.00 = Rp 630.00
0.0054 Oh Mandor @ Rp. 40,000.00 = Rp 216.00
= Rp 8,676.00
Total harga = Rp 8,676.00
23. Memasang 1 m' pipa galvanis ø 3"
Bahan An. SNI ( Revisi ) 6.23.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.108 Oh Pekerja @ Rp. 22,500.00 = Rp 2,430.00
0.180 Oh Tukang batu @ Rp. 30,000.00 = Rp 5,400.00
0.018 Oh Kepala tukang @ Rp. 35,000.00 = Rp 630.00
0.0054 Oh Mandor @ Rp. 40,000.00 = Rp 216.00
= Rp 8,676.00
Total harga = Rp 8,676.00
24. Memasang 1 m' pipa galvanis ø 4"
Bahan An. SNI ( Revisi ) 6.24.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.135 Oh Pekerja @ Rp. 22,500.00 = Rp 3,037.50
0.225 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,750.00
0.0225 Oh Kepala tukang @ Rp. 35,000.00 = Rp 787.50
0.0068 Oh Mandor @ Rp. 40,000.00 = Rp 272.00
= Rp 10,847.00
Total harga = Rp 10,847.00
25. Memasang 1 m' pipa PVC tipe AW ø 1/2"
Bahan An. SNI ( Revisi ) 6.25.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.25.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
26. Memasang 1 m' pipa PVC tipe AW ø 3/4"
Bahan An. SNI ( Revisi ) 6.26.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.26.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
27. Memasang 1 m' pipa PVC tipe AW ø 1"
Bahan An. SNI ( Revisi ) 6.27.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.27.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
28. Memasang 1 m' pipa PVC tipe AW ø 1.5"
Bahan An. SNI ( Revisi ) 6.28.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.28.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
29. Memasang 1 m' pipa PVC tipe AW ø 2"
Bahan An. SNI ( Revisi ) 6.29.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.29.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
30. Memasang 1 m' pipa PVC tipe AW ø 2.5"
Bahan An. SNI ( Revisi ) 6.30.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.30.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.0060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
31. Memasang 1 m' pipa PVC tipe AW ø 3"
Bahan An. SNI ( Revisi ) 6.31.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.31.2
0.081 Oh Pekerja @ Rp. 22,500.00 = Rp 1,822.50
0.135 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,050.00
0.0135 Oh Kepala tukang @ Rp. 35,000.00 = Rp 472.50
0.0041 Oh Mandor @ Rp. 40,000.00 = Rp 164.00
= Rp 6,509.00
Total harga = Rp 6,509.00
32. Memasang 1 m' pipa PVC tipe AW ø 4"
Bahan An. SNI ( Revisi ) 6.32.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.32.2
0.081 Oh Pekerja @ Rp. 22,500.00 = Rp 1,822.50
0.135 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,050.00
0.0135 Oh Kepala tukang @ Rp. 35,000.00 = Rp 472.50
0.0041 Oh Mandor @ Rp. 40,000.00 = Rp 164.00
= Rp 6,509.00
Total harga = Rp 6,509.00
33. Memasang 1 buah bak cuci piring stainless steel
Bahan An. SNI ( Revisi ) 6.33.1
1.000 Bh Bak cuci stainless steel @ Rp. - = Rp -
1.000 set Water drain + assesories @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.33.2
0.030 Oh Pekerja @ Rp. 22,500.00 = Rp 675.00
0.300 Oh Tukang batu @ Rp. 30,000.00 = Rp 9,000.00
0.030 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,050.00
0.0015 Oh Mandor @ Rp. 40,000.00 = Rp 60.00
= Rp 10,785.00
Total harga = Rp 10,785.00
34. Memasang 1 buah bak cuci piring teraso
Bahan An. SNI ( Revisi ) 6.34.1
1.000 Bh Bak cuci teraso @ Rp. - = Rp -
1.000 set Water drain + assesories @ Rp. - = Rp -
20.000 Kg Semen portland @ Rp. - = Rp -
0.050 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.34.2
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp 1,125.00
0.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 15,000.00
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,750.00
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp 100.00
= Rp 17,975.00
Total harga = Rp 17,975.00
35. Memasang 1 buah kran ø 3/4" atau 1/2"
Bahan An. SNI ( Revisi ) 6.35.1
1.000 Bh Kran air @ Rp. - = Rp -
0.025 Bh Seal tape @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.35.2
0.010 Oh Pekerja @ Rp. 22,500.00 = Rp 225.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 3,775.00
Total harga = Rp 3,775.00
36. Memasang 1 buah floor drain
Bahan An. SNI ( Revisi ) 6.36.1
1.000 Bh Floor drain @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.36.2
0.010 Oh Pekerja @ Rp. 22,500.00 = Rp 225.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 3,775.00
Total harga = Rp 3,775.00
#VALUE!
PEKERJAAN BESI & ALLUMINIUM
1. 1 Kg Pasang rangka atap baja
Bahan An. SNI ( Revisi ) 6.1.1
1.100 Kg Besi profil WF @ Rp. - = Rp
0.080 Kg Meni besi @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.006 Oh Tukang besi @ Rp. 32,500.00 = Rp
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0003 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
2. 1 m2 Pasang pintu besi baja
Bahan An. SNI ( Revisi ) 6.2.1
1.000 m2 Pintu besi baja @ Rp. 24,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.650 Oh Tukang besi @ Rp. 32,500.00 = Rp
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp
0.065 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.032 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
3. 1 m2 Pasang jendela besi
Bahan An. SNI ( Revisi ) 6.3.1
1.000 m2 Jendela besi @ Rp. 110,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
1.050 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.105 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00525 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
4. 1 m2 Pasang jendela besi tahan api
Bahan An. SNI ( Revisi ) 6.4.1
1.000 m2 Jendela besi tahan api @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
1.200 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.022 Oh Pekerja @ Rp. 22,500.00 = Rp
0.120 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.006 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
5. 1 m2 Pasang pintu gulung besi
Bahan An. SNI ( Revisi ) 6.5.1
1.000 m2 Pintu gulung besi @ Rp. 2,425,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.5.2
1.200 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.200 Oh Pekerja @ Rp. 22,500.00 = Rp
0.120 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.006 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
6. 1 m2 Pasang pintu lipat
Bahan An. SNI ( Revisi ) 6.6.1
1.000 m2 Pintu lipat @ Rp. 34,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
1.050 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.105 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0052 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
7. 1 m2 Pasang pintu sunscreen alliminium
Bahan An. SNI ( Revisi ) 6.7.1
1.000 m2 Sunscreen alluminium @ Rp. 41,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.800 Oh Tukang besi @ Rp. 32,500.00 = Rp
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp
0.080 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.004 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
8. 1 m2 Pasang rolling door
Bahan An. SNI ( Revisi ) 6.8.1
1.000 m2 Rolling door @ Rp. 8,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
1.500 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.105 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0052 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
9. 1 m2 Pasang pintu alluminium
Bahan An. SNI ( Revisi ) 6.9.1
1.000 m2 Pintu alluminium @ Rp. 50,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
1.050 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.105 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0052 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
10. 1 m2 Pasang venetions blinds
Bahan An. SNI ( Revisi ) 6.10.1
1.000 m2 Venetions blind @ Rp. 15,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.350 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.350 Oh Pekerja @ Rp. 22,500.00 = Rp
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00175 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
11. 1 m2 Pasang verticals blinds
Bahan An. SNI ( Revisi ) 6.11.1
1.000 m2 Verticals blind @ Rp. 750.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.350 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.350 Oh Pekerja @ Rp. 22,500.00 = Rp
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00175 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
12. 1 m2 Pasang terali besi
Bahan An. SNI ( Revisi ) 6.12.1
11.500 m' Besi strip 2 x 3 @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
1.200 Oh Tukang las @ Rp. 32,500.00 = Rp
1.200 Oh Pekerja @ Rp. 22,500.00 = Rp
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0006 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
13. 1 m2 Pasang kawat harmonika
Bahan An. SNI ( Revisi ) 6.13.1
1.100 m2 Kawat harmonika @ Rp. 10,000.00 = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 2,500.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 7,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
14. 1 m2 Pasang kawat nyamuk
Bahan An. SNI ( Revisi ) 6.14.1
1.100 m2 Kawat nyamuk @ Rp. 57,500.00 = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 8,500.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 5,250.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
15. 1 m2 Pasang kawat kassa
Bahan An. SNI ( Revisi ) 6.15.1
1.100 m2 Kawat kassa @ Rp. 15,000.00 = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 20,000.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 30,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
16. 1 m2 Pasang kawat burung
Bahan An. SNI ( Revisi ) 6.16.1
1.100 m2 Kawat burung @ Rp. - = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 44,000.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 33,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
17. 1 m2 Pasang jendela nako & trallis
Bahan An. SNI ( Revisi ) 6.17.1
1.100 m2 Jendela nako @ Rp. 14,000.00 = Rp
0.020 Kg Paku biasa 1/2" - 1"/ skrup @ Rp. 28,000.00 = Rp
0.025 m2 Besi strip @ Rp. 41,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.001 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
18. 1 m' Pasang talang datar, seng bjls 28
Bahan An. SNI ( Revisi ) 6.18.1
0.500 Lbr Seng plat 3' x 6' bjls 28 @ Rp. 35,000.00 = Rp
0.015 Kg Paku biasa 1/2" - 1" @ Rp. 30,000.00 = Rp
0.0096 m3 Kayu borneo, papan @ Rp. 32,500.00 = Rp
0.250 Kg Flincote/meni besi @ Rp. 32,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.400 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
19. 1 m' Pasang talang miring, seng bjls 28
Bahan An. SNI ( Revisi ) 6.19.1
0.500 Lbr Seng plat 3' x 6' bjls 28 @ Rp. - = Rp
0.015 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.019 m3 Kayu borneo, papan @ Rp. - = Rp
0.300 Kg Flincote/meni besi @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.040 Oh Pekerja @ Rp. 22,500.00 = Rp
0.400 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
20. 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng bjls 28
Bahan An. SNI ( Revisi ) 6.20.1
0.300 Lbr Seng plat 3' x 6' bjls 28 @ Rp. - = Rp
0.100 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.019 m3 Kayu borneo, papan @ Rp. - = Rp
0.500 Kg Besi strip @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
21. 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng bjls 24
Bahan An. SNI ( Revisi ) 6.21.1
0.300 Lbr Seng plat 3' x 6' bjls 24 @ Rp. - = Rp
0.100 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.019 m3 Kayu borneo, papan @ Rp. - = Rp
0.500 Kg Besi strip @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
-
-
-

195.00
1,350.00
210.00
12.00
1,767.00
1,767.00

24,000.00
24,000.00

21,125.00
14,625.00
2,275.00
1,280.00
39,305.00
63,305.00

110,000.00
110,000.00

34,125.00
23,625.00
3,675.00
210.00
61,635.00
171,635.00

-
-

39,000.00
22,995.00
4,200.00
240.00
66,435.00
66,435.00

2,425,000.00
2,425,000.00

39,000.00
27,000.00
4,200.00
240.00
70,440.00
2,495,440.00
34,000.00
34,000.00

34,125.00
23,625.00
3,675.00
208.00
61,633.00
95,633.00

41,000.00
41,000.00

26,000.00
1,800.00
2,800.00
160.00
30,760.00
71,760.00

8,500.00
8,500.00

48,750.00
23,625.00
3,675.00
208.00
76,258.00
84,758.00

50,000.00
50,000.00

34,125.00
23,625.00
3,675.00
208.00
61,633.00
111,633.00

15,000.00
15,000.00

12,250.00
7,875.00
1,225.00
70.00
21,420.00
36,420.00
750.00
750.00

12,250.00
7,875.00
1,225.00
70.00
21,420.00
22,170.00

-
-

39,000.00
27,000.00
420.00
24.00
66,444.00
66,444.00

11,000.00
50.00
12.60
11,062.60

2,250.00
3,500.00
350.00
20.00
6,120.00
17,182.60

63,250.00
170.00
9.45
63,429.45

2,250.00
3,500.00
350.00
20.00
6,120.00
69,549.45

16,500.00
400.00
54.00
16,954.00

2,250.00
3,500.00
350.00
20.00
6,120.00
23,074.00
-
880.00
59.40
939.40

2,250.00
3,500.00
350.00
20.00
6,120.00
7,059.40

15,400.00
560.00
1,025.00
16,985.00

4,500.00
7,000.00
700.00
40.00
12,240.00
29,225.00

17,500.00
450.00
312.00
8,125.00
26,387.00

3,375.00
14,000.00
875.00
50.00
18,300.00
44,687.00

-
-
-
-
-

900.00
14,000.00
875.00
50.00
15,825.00
15,825.00

-
-
-
-
-
3,375.00
8,750.00
875.00
50.00
13,050.00
13,050.00

-
-
-
-
-

3,375.00
8,750.00
875.00
50.00
13,050.00
13,050.00
PEKERJAAN KUNCI & KACA
1. 1 buah pasang kunci tanam antik
Bahan An. SNI ( Revisi ) 6.1.1
1.000 Bh Kunci tanam antik @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.003 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
2. 1 buah pasang kunci tanam biasa
Bahan An. SNI ( Revisi ) 6.2.1
1.000 Bh Kunci tanam biasa @ Rp. 49,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.010 Oh Pekerja @ Rp. 22,500.00 = Rp
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
3. 1 buah pasang kunci tanam KM/WC
Bahan An. SNI ( Revisi ) 6.3.1
1.000 Bh Kunci tanam KM/WC @ Rp. 125,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
0.005 Oh Pekerja @ Rp. 22,500.00 = Rp
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.005 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
4. 1 buah pasang kunci silinder
Bahan An. SNI ( Revisi ) 6.4.1
1.000 Bh Kunci silinder @ Rp. 375,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
0.005 Oh Pekerja @ Rp. 22,500.00 = Rp
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.005 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
5. 1 buah pasang engsel pintu
Bahan An. SNI ( Revisi ) 6.5.1
1.000 Bh Engsel pintu @ Rp. 2,725,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.5.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
6. 1 buah pasang engsel jendela kupu-kupu
Bahan An. SNI ( Revisi ) 6.6.1
1.000 Bh Engsel jendela @ Rp. 1,175,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
0.010 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
7. 1 buah pasang engsel angin
Bahan An. SNI ( Revisi ) 6.7.1
1.000 Bh Engsel angin @ Rp. 33,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.020 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.010 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
8. 1 buah pasang spring knip
Bahan An. SNI ( Revisi ) 6.8.1
1.000 Bh Spring knip @ Rp. 7,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
9. 1 buah pasang kait angin
Bahan An. SNI ( Revisi ) 6.9.1
1.000 Bh Kait angin @ Rp. 187,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
10. 1 buah pasang door closer
Bahan An. SNI ( Revisi ) 6.10.1
1.000 Bh Door closer @ Rp. 10,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
11. 1 buah pasang kunci selot
Bahan An. SNI ( Revisi ) 6.11.1
1.000 Bh Kunci selot @ Rp. 750.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.020 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.001 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
12. 1 buah pasang pegangan pintu/door holder
Bahan An. SNI ( Revisi ) 6.12.1
1.000 Bh Door holder @ Rp. Satuan = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
13. 1 buah pasang door stop
Bahan An. SNI ( Revisi ) 6.13.1
1.000 Bh Door stop @ Rp. 10,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.010 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
14. 1 buah pasang rel pintu dorong
Bahan An. SNI ( Revisi ) 6.14.1
1.000 Bh Rel pintu dorong @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.003 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
15. 1 buah pasang kunci lemari
Bahan An. SNI ( Revisi ) 6.15.1
1.000 Bh Kunci lemari @ Rp. 14,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.025 Oh Pekerja @ Rp. 22,500.00 = Rp
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
16. 1 m2 pasang kaca, tebal 3 mm
Bahan An. SNI ( Revisi ) 6.16.1
1.100 m2 Kaca tebal 3 mm @ Rp. 150,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
17. 1 m2 pasang kaca, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.17.1
1.100 m2 Kaca tebal 5 mm @ Rp. 9,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
18. 1 m2 pasang kaca, tebal 8 mm
Bahan An. SNI ( Revisi ) 6.18.1
1.100 m2 Kaca tebal 8 mm @ Rp. 1,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.0165 Oh Pekerja @ Rp. 22,500.00 = Rp
0.165 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.0165 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00080 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
19. 1 m2 pasang kaca buram, tebal 12 mm
Bahan An. SNI ( Revisi ) 6.19.1
1.100 m2 Kaca buram @ Rp. 30,000.00 = Rp
0.050 Kg Sealent @ Rp. 32,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.025 Oh Pekerja @ Rp. 22,500.00 = Rp
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
20. 1 m2 pasang kaca cermin, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.20.1
1.100 m2 Kaca cermin @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
21. 1 m2 pasang kaca cermin, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.21.1
1.100 m2 Kaca cermin @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
22. 1 m2 pasang kaca cermin, tebal 8 mm
Bahan An. SNI ( Revisi ) 6.22.1
1.100 m2 Kaca cermin @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.22.2
0.0165 Oh Pekerja @ Rp. 22,500.00 = Rp
0.165 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.0165 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00080 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
23. 1 m2 pasang kaca wireglass, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.23.1
1.100 m2 Kaca wireglass @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.23.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
24. 1 m2 pasang kaca patri, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.24.1
1.100 m2 Kaca patri @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.24.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
-
-

1,350.00
21,000.00
2,100.00
120.00
24,570.00
24,570.00

49,000.00
49,000.00

225.00
17,500.00
350.00
200.00
18,275.00
67,275.00

125,000.00
125,000.00

112.50
17,500.00
175.00
100.00
17,887.50
142,887.50

375,000.00
375,000.00

112.50
17,500.00
175.00
10.00
17,797.50
392,797.50

2,725,000.00
2,725,000.00

337.50
5,250.00
525.00
30.00
6,142.50
2,731,142.50

1,175,000.00
1,175,000.00
225.00
3,500.00
350.00
20.00
4,095.00
1,179,095.00

33,000.00
33,000.00

450.00
7,000.00
700.00
400.00
8,550.00
41,550.00

7,000.00
7,000.00

337.50
5,250.00
525.00
30.00
6,142.50
13,142.50

187,000.00
187,000.00

337.50
5,250.00
525.00
30.00
6,142.50
193,142.50

10,000.00
10,000.00

1,125.00
17,500.00
1,750.00
100.00
20,475.00
30,475.00

750.00
750.00

450.00
7,000.00
700.00
40.00
8,190.00
8,940.00
#VALUE!
#VALUE!

1,125.00
17,500.00
1,750.00
100.00
20,475.00
#VALUE!

10,000.00
10,000.00

225.00
3,500.00
350.00
20.00
4,095.00
14,095.00

-
-

1,350.00
21,000.00
2,100.00
120.00
24,570.00
24,570.00

14,000.00
14,000.00

562.50
8,750.00
875.00
50.00
10,237.50
24,237.50

165,000.00
165,000.00

337.50
5,250.00
525.00
30.00
6,142.50
171,142.50
9,900.00
9,900.00

337.50
5,250.00
525.00
30.00
6,142.50
16,042.50

1,100.00
1,100.00

371.25
5,775.00
577.50
32.00
6,755.75
7,855.75

33,000.00
1,625.00
34,625.00

562.50
8,750.00
875.00
50.00
10,237.50
44,862.50

-
-

337.50
5,250.00
525.00
30.00
6,142.50
6,142.50

-
-

337.50
5,250.00
525.00
30.00
6,142.50
6,142.50
-
-

371.25
5,775.00
577.50
32.00
6,755.75
6,755.75

-
-

337.50
5,250.00
525.00
30.00
6,142.50
6,142.50

-
-

337.50
5,250.00
525.00
30.00
6,142.50
6,142.50
PEKERJAAN PENUTUP LANTAI & DINDING
1. 1 m2 Pasang lantai ubin PC abu-abu akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.1.1
6.630 Bh Ubin abu-abu 40 x 40 cm @ Rp. - = Rp -
9.800 Kg Semen portland @ Rp. - = Rp -
0.0215 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.1.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.125 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,750.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,295.00
Total harga = Rp 10,295.00
2. 1 m2 Pasang lantai ubin PC abu-abu akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.2.1
11.870 Bh Ubin abu-abu 30 x 30 cm @ Rp. 24,000.00 = Rp 284,880.00
10.000 Kg Semen portland @ Rp. 54,000.00 = Rp 540,000.00
0.0215 m3 Pasir pasang @ Rp. 54,000.00 = Rp 1,161.00
= Rp 826,041.00
Upah An. SNI ( Revisi ) 6.2.2
0.260 Oh Pekerja @ Rp. 22,500.00 = Rp 5,850.00
0.125 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,750.00
0.0125 Oh Kepala tukang @ Rp. 35,000.00 = Rp 437.50
0.013 Oh Mandor @ Rp. 40,000.00 = Rp 520.00
= Rp 10,557.50
Total harga = Rp 836,598.50
3. 1 m2 Pasang lantai ubin PC abu-abu akuran 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.3.1
26.500 Bh Ubin abu-abu 20 x 20 cm @ Rp. 30,000.00 = Rp 795,000.00
10.400 Kg Semen portland @ Rp. 27,000.00 = Rp 280,800.00
0.0135 m3 Pasir pasang @ Rp. 27,000.00 = Rp 364.50
= Rp 1,076,164.50
Upah An. SNI ( Revisi ) 6.3.2
0.270 Oh Pekerja @ Rp. 22,500.00 = Rp 6,075.00
0.130 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,900.00
0.0130 Oh Kepala tukang @ Rp. 35,000.00 = Rp 455.00
0.0135 Oh Mandor @ Rp. 40,000.00 = Rp 540.00
= Rp 10,970.00
Total harga = Rp 1,087,134.50
4. 1 m2 Pasang lantai ubin warna akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.4.1
6.630 Bh Ubin warna 40 x 40 cm @ Rp. 34,000.00 = Rp 225,420.00
8.160 Kg Semen portland @ Rp. 34,000.00 = Rp 277,440.00
0.023 m3 Pasir pasang @ Rp. 34,000.00 = Rp 782.00
0.900 Kg Semen warna @ Rp. 65,000.00 = Rp 58,500.00
= Rp 562,142.00
Upah An. SNI ( Revisi ) 6.4.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 572,287.00
5. 1 m2 Pasang lantai ubin warna akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.5.1
11.870 Bh Ubin warna 30 x 30 cm @ Rp. 1,275,000.00 = Rp 15,134,250.00
8.360 Kg Semen portland @ Rp. 2,175,000.00 = Rp 18,183,000.00
0.023 m3 Pasir pasang @ Rp. 2,175,000.00 = Rp 50,025.00
0.900 Kg Semen warna @ Rp. 1,175,000.00 = Rp 1,057,500.00
= Rp 34,424,775.00
Upah An. SNI ( Revisi ) 6.5.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 34,434,920.00
6. 1 m2 Pasang lantai ubin warna akuran 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.6.1
26.500 Bh Ubin warna 20 x 20 cm @ Rp. 30,500.00 = Rp 808,250.00
8.760 Kg Semen portland @ Rp. 33,000.00 = Rp 289,080.00
0.023 m3 Pasir pasang @ Rp. 33,000.00 = Rp 759.00
0.900 Kg Semen warna @ Rp. 64,000.00 = Rp 57,600.00
= Rp 1,155,689.00
Upah An. SNI ( Revisi ) 6.6.2
0.270 Oh Pekerja @ Rp. 22,500.00 = Rp 6,075.00
0.130 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,900.00
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp 455.00
0.0135 Oh Mandor @ Rp. 40,000.00 = Rp 540.00
= Rp 10,970.00
Total harga = Rp 1,166,659.00
7. 1 m2 Pasang lantai ubin teraso akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.7.1
6.250 Bh Ubin teraso 40 x 40 cm @ Rp. 8,500.00 = Rp 53,125.00
8.800 Kg Semen portland @ Rp. 8,500.00 = Rp 74,800.00
0.0215 m3 Pasir pasang @ Rp. 8,500.00 = Rp 182.75
0.900 Kg Semen warna @ Rp. 8,500.00 = Rp 7,650.00
= Rp 135,757.75
Upah An. SNI ( Revisi ) 6.7.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 145,902.75
8. 1 m2 Pasang lantai ubin teraso akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.8.1
11.870 Bh Ubin teraso 30 x 30 cm @ Rp. 40,000.00 = Rp 474,800.00
10.000 Kg Semen portland @ Rp. 50,000.00 = Rp 500,000.00
0.0215 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,075.00
1.540 Kg Semen warna @ Rp. 70,000.00 = Rp 107,800.00
= Rp 1,083,675.00
Upah An. SNI ( Revisi ) 6.8.2
0.260 Oh Pekerja @ Rp. 22,500.00 = Rp 5,850.00
0.125 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,750.00
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp 437.50
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,537.50
Total harga = Rp 1,094,212.50
9. 1 m2 Pasang lantai ubin granito akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.9.1
6.930 Bh Ubin granito 40 x 40 cm @ Rp. 10,000.00 = Rp 69,300.00
9.800 Kg Semen portland @ Rp. 12,500.00 = Rp 122,500.00
0.0215 m3 Pasir pasang @ Rp. 12,500.00 = Rp 268.75
1.300 Kg Semen warna @ Rp. 350.00 = Rp 455.00
= Rp 192,523.75
Upah An. SNI ( Revisi ) 6.9.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 202,668.75
10. 1 m2 Pasang lantai ubin granito akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.10.1
11.870 Bh Ubin granito 30 x 30 cm @ Rp. Harga = Rp #VALUE!
10.000 Kg Semen portland @ Rp. Satuan = Rp #VALUE!
0.0215 m3 Pasir pasang @ Rp. Satuan = Rp #VALUE!
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.10.2
0.260 Oh Pekerja @ Rp. 22,500.00 = Rp 5,850.00
0.125 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,750.00
0.0130 Oh Kepala tukang @ Rp. 35,000.00 = Rp 455.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,555.00
Total harga = Rp #VALUE!
11. 1 m2 Pasang lantai ubin teralux kerang akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.11.1
6.250 Bh Ubin teralux kerang 40 x 40 cm @ Rp. 2,500.00 = Rp 15,625.00
8.800 Kg Semen portland @ Rp. 7,000.00 = Rp 61,600.00
0.0215 m3 Pasir pasang @ Rp. 7,000.00 = Rp 150.50
1.300 Kg Semen warna @ Rp. 27,500.00 = Rp 35,750.00
= Rp 113,125.50
Upah An. SNI ( Revisi ) 6.11.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.0120 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 123,270.50
12. 1 m2 Pasang lantai ubin teralux kerang akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.12.1
11.870 Bh Ubin teralux kerang 30 x 30 cm @ Rp. 5,250.00 = Rp 62,317.50
10.000 Kg Semen portland @ Rp. 10,000.00 = Rp 100,000.00
0.0215 m3 Pasir pasang @ Rp. 10,000.00 = Rp 215.00
1.125 Kg Semen warna @ Rp. 3,000.00 = Rp 3,375.00
= Rp 165,907.50
Upah An. SNI ( Revisi ) 6.12.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.0120 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 176,052.50
13. 1 m2 Pasang lantai ubin teralux marmer akuran 60 x 60 cm
Bahan An. SNI ( Revisi ) 6.13.1
5.600 Bh Ubin teralux marmer 60 x 60 cm @ Rp. 42,000.00 = Rp 235,200.00
8.190 Kg Semen portland @ Rp. 60,000.00 = Rp 491,400.00
0.045 m3 Pasir pasang @ Rp. 60,000.00 = Rp 2,700.00
1.000 Kg Semen warna @ Rp. 3,500.00 = Rp 3,500.00
= Rp 732,800.00
Upah An. SNI ( Revisi ) 6.13.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 742,945.00
14. 1 m2 Pasang lantai ubin teralux marmer akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.14.1
6.250 Bh Ubin teralux marmer 40 x 40 cm @ Rp. 60,000.00 = Rp 375,000.00
8.800 Kg Semen portland @ Rp. 9,000.00 = Rp 79,200.00
0.0215 m3 Pasir pasang @ Rp. 9,000.00 = Rp 193.50
1.300 Kg Semen warna @ Rp. 2,000.00 = Rp 2,600.00
= Rp 456,993.50
Upah An. SNI ( Revisi ) 6.14.2
0.672 Oh Pekerja @ Rp. 22,500.00 = Rp 15,120.00
0.224 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,720.00
0.022 Oh Kepala tukang @ Rp. 35,000.00 = Rp 770.00
0.0340 Oh Mandor @ Rp. 40,000.00 = Rp 1,360.00
= Rp 23,970.00
Total harga = Rp 480,963.50
15. 1 m2 Pasang lantai ubin teralux marmer akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.15.1
11.870 Bh Ubin teralux marmer 30 x 30 cm @ Rp. 2,250.00 = Rp 26,707.50
10.000 Kg Semen portland @ Rp. 82,500.00 = Rp 825,000.00
0.0215 m3 Pasir pasang @ Rp. 82,500.00 = Rp 1,773.75
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp 853,481.25
Upah An. SNI ( Revisi ) 6.15.2
0.700 Oh Pekerja @ Rp. 22,500.00 = Rp 15,750.00
0.340 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,200.00
0.034 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,190.00
0.0350 Oh Mandor @ Rp. 40,000.00 = Rp 1,400.00
= Rp 28,540.00
Total harga = Rp 882,021.25
16. 1 m' Pasang plint ubin pc abu-abu akuran 15 x 20 cm
Bahan An. SNI ( Revisi ) 6.16.1
5.300 Bh Plint ubin 15 x 20 cm @ Rp. - = Rp -
1.560 Kg Semen portland @ Rp. - = Rp -
0.004 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.16.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
17. 1 m' Pasang plint ubin pc abu-abu akuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.17.1
3.530 Bh Plint ubin 10 x 30 cm @ Rp. - = Rp -
1.560 Kg Semen portland @ Rp. - = Rp -
0.003 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.17.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
18. 1 m' Pasang plint ubin pc abu-abu ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.18.1
2.650 Bh Plint ubin 10 x 40 cm @ Rp. - = Rp -
1.560 Kg Semen portland @ Rp. - = Rp -
0.003 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.18.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
19. 1 m' Pasang plint ubin pc warna ukuran 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.19.1
5.300 Bh Plint ubin pc warna 10 x 20 cm @ Rp. - = Rp -
1.200 Kg Semen portland @ Rp. - = Rp -
0.003 m3 Pasir pasang @ Rp. - = Rp -
0.190 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.19.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
20. 1 m' Pasang plint ubin pc warna ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.20.1
3.330 Bh Plint ubin pc warna 10 x 30 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.20.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
21. 1 m' Pasang plint ubin pc warna ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.21.1
2.650 Bh Plint ubin pc warna 10 x 40 cm @ Rp. - = Rp -
1.200 Kg Semen portland @ Rp. - = Rp -
0.0030 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp 1,800.00
0.040 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,200.00
0.004 Oh Kepala tukang @ Rp. 35,000.00 = Rp 140.00
0.004 Oh Mandor @ Rp. 40,000.00 = Rp 160.00
= Rp 3,300.00
Total harga = Rp 3,300.00
22. 1 m' Pasang plint ubin teraso ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.22.1
3.530 Bh Plint ubin teraso 10 x 30 cm @ Rp. - = Rp -
1.560 Kg Semen portland @ Rp. - = Rp -
0.0030 m3 Pasir pasang @ Rp. - = Rp -
0.190 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp 1,800.00
0.040 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,200.00
0.004 Oh Kepala tukang @ Rp. 35,000.00 = Rp 140.00
0.004 Oh Mandor @ Rp. 40,000.00 = Rp 160.00
= Rp 3,300.00
Total harga = Rp 3,300.00
23. 1 m' Pasang plint ubin teraso ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.23.1
2.650 Bh Plint ubin teraso 10 x 40 cm @ Rp. - = Rp -
1.200 Kg Semen portland @ Rp. - = Rp -
0.0030 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp 1,800.00
0.040 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,200.00
0.004 Oh Kepala tukang @ Rp. 35,000.00 = Rp 140.00
0.004 Oh Mandor @ Rp. 40,000.00 = Rp 160.00
= Rp 3,300.00
Total harga = Rp 3,300.00
24. 1 m' Pasang plint ubin granito ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.24.1
2.650 Bh Plint ubin granito 10 x 40 cm @ Rp. - = Rp -
1.200 Kg Semen portland @ Rp. - = Rp -
0.0030 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
25. 1 m' Pasang plint ubin granito ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.25.1
3.330 Bh Plint ubin granito 10 x 30 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.25.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
26. 1 m' Pasang plint ubin teralux kerang ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.26.1
2.500 Bh Plint ubin teralux kerang 10 x 40 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.26.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
27. 1 m' Pasang plint ubin teralux kerang ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.27.1
3.330 Bh Plint ubin teralux kerang 10 x 30 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.27.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
28. 1 m' Pasang plint ubin teralux marmer ukuran 10 x 60 cm
Bahan An. SNI ( Revisi ) 6.28.1
1.700 Bh Plint ubin teralux marmer 10 x 60 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.28.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
29. 1 m' Pasang plint ubin teralux marmer ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.29.1
2.500 Bh Plint ubin teralux marmer 10 x 40 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.29.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
30. 1 m' Pasang plint ubin teralux marmer ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.30.1
3.330 Bh Plint ubin teralux marmer 10 x 30 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.30.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
31. 1 m2 Pasang teraso cor ditempat
Bahan An. SNI ( Revisi ) 6.31.1
0.0036 m3 Bahan teraso cor @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.31.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
32. 1 m2 Pasang teralux cor ditempat, tebal 3 cm
Bahan An. SNI ( Revisi ) 6.32.1
0.0036 m3 Bahan teralux cor @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.32.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
33. 1 m2 Pasang ubin tahan asam
Bahan An. SNI ( Revisi ) 6.33.1
1.050 m3 Ubin tahan asam @ Rp. - = Rp -
14.140 Kg Semen tahan asam @ Rp. - = Rp -
0.040 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.33.2
0.270 Oh Pekerja @ Rp. 22,500.00 = Rp 6,075.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.0135 Oh Mandor @ Rp. 40,000.00 = Rp 540.00
= Rp 11,640.00
Total harga = Rp 11,640.00
34. 1 m2 Pasang lantai keramik artistik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.34.1
50.000 Bh Ubin keramik artistik 10x20 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.34.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
35. 1 m2 Pasang lantai keramik artistik 10 x 10 cm
Bahan An. SNI ( Revisi ) 6.35.1
100.000 Bh Ubin keramik artistik 10x10 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
2.000 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.35.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
36. 1 m2 Pasang lantai keramik artistik 5 x 20 cm
Bahan An. SNI ( Revisi ) 6.36.1
100.000 Bh Ubin keramik artistik 5x20 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.36.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
37. 1 m' Pasang plint keramik artistik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.37.1
5.000 Bh Plint keramik artistik 10x20 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.37.2
0.090 Oh Pekerja @ Rp. 22,500.00 = Rp 2,025.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 5,220.00
Total harga = Rp 5,220.00
38. 1 m' Pasang plint keramik artistik 10 x 10 cm
Bahan An. SNI ( Revisi ) 6.38.1
10.000 Bh Plint keramik artistik 10x10 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.120 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.38.2
0.090 Oh Pekerja @ Rp. 22,500.00 = Rp 2,025.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 5,220.00
Total harga = Rp 5,220.00
39. 1 m' Pasang plint keramik artistik 5 x 20 cm
Bahan An. SNI ( Revisi ) 6.39.1
5.000 Bh Plint keramik artistik 5x20 cm @ Rp. - = Rp -
0.850 Kg Semen portland @ Rp. - = Rp -
0.0022 m3 Pasir pasang @ Rp. - = Rp -
0.080 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.39.2
0.090 Oh Pekerja @ Rp. 22,500.00 = Rp 2,025.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 5,220.00
Total harga = Rp 5,220.00
40. 1 m' Internal cove artistik ( 5 x 5 x 20 ) cm
Bahan An. SNI ( Revisi ) 6.40.1
10.000 Bh Internal cove ( 5x5x20 ) cm @ Rp. - = Rp -
1.415 Kg Semen portland @ Rp. - = Rp -
0.0390 m3 Pasir pasang @ Rp. - = Rp -
1.200 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.40.2
0.750 Oh Pekerja @ Rp. 22,500.00 = Rp 16,875.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0375 Oh Mandor @ Rp. 40,000.00 = Rp 1,500.00
= Rp 33,450.00
Total harga = Rp 33,450.00
41. 1 m' Pasang plint vinyl tanpa adukan
Bahan An. SNI ( Revisi ) 6.41.1
3.500 Bh Lt vinyl karet 30x30 KW 1 @ Rp. - = Rp -
0.080 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.41.2
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp 1,800.00
0.080 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,400.00
0.008 Oh Kepala tukang @ Rp. 35,000.00 = Rp 280.00
0.0040 Oh Mandor @ Rp. 40,000.00 = Rp 160.00
= Rp 4,640.00
Total harga = Rp 4,640.00
42. 1 m2 Pasang lantai keramik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.42.1
50.000 Bh Ubin keramik 10x20 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.42.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
43. 1 m2 Pasang lantai keramik 15 x 15 cm
Bahan An. SNI ( Revisi ) 6.43.1
44.000 Bh Ubin keramik 15x15 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.43.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
44. 1 m2 Pasang lantai keramik 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.44.1
25.000 Bh Ubin keramik 20x20 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.44.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
45. 1 m2 Pasang lantai keramik 25 x 25 cm
Bahan An. SNI ( Revisi ) 6.45.1
16.000 Bh Ubin keramik 25x25 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.45.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
46. 1 m2 Pasang lantai keramik 15 x 20 cm
Bahan An. SNI ( Revisi ) 6.46.1
35.000 Bh Ubin keramik 15x20 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.46.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
47. 1 m2 Pasang lantai keramik 33 x 33 cm
Bahan An. SNI ( Revisi ) 6.47.1
10.000 Bh Ubin keramik 33x33 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.47.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
48. 1 m2 Pasang lantai keramik 33 x 33 cm anti slip
Bahan An. SNI ( Revisi ) 6.48.1
10.000 Bh Ubin keramik 33x33 cm anti slip @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.48.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
49. 1 m2 Pasang lantai keramik 10 x 33 cm
Bahan An. SNI ( Revisi ) 6.49.1
33.000 Bh Ubin keramik 10x33 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.49.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
50. 1 m2 Pasang lantai mosaik 30 x 30 cm, lokal
Bahan An. SNI ( Revisi ) 6.50.1
12.000 Bh Mosaik 30x30cm @ Rp. - = Rp -
14.150 Kg Semen portland @ Rp. - = Rp -
0.0390 m3 Pasir pasang @ Rp. - = Rp -
2.000 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.50.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
51. 1 m2 Pasang lantai marmer
Bahan An. SNI ( Revisi ) 6.51.1
1.052 m2 Mosaik 30x30cm @ Rp. - = Rp -
14.150 Kg Semen portland @ Rp. - = Rp -
0.0390 m3 Pasir pasang @ Rp. - = Rp -
2.000 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.51.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
52. 1 m2 Pasang lantai karper 100% wool
Bahan An. SNI ( Revisi ) 6.52.1
1.050 m2 Feltex carpet 100% T-21 @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.52.2
0.170 Oh Pekerja @ Rp. 22,500.00 = Rp 3,825.00
0.170 Oh Tukang @ Rp. 30,000.00 = Rp 5,100.00
0.017 Oh Kepala tukang @ Rp. 35,000.00 = Rp 595.00
0.0085 Oh Mandor @ Rp. 40,000.00 = Rp 340.00
= Rp 9,860.00
Total harga = Rp 9,860.00
53. 1 m2 Pasang lantai karper 80% wool, 20% nylon
Bahan An. SNI ( Revisi ) 6.53.1
1.050 m2 Carpet 80% wool, 20% nylon @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.53.2
0.170 Oh Pekerja @ Rp. 22,500.00 = Rp 3,825.00
0.170 Oh Tukang @ Rp. 30,000.00 = Rp 5,100.00
0.017 Oh Kepala tukang @ Rp. 35,000.00 = Rp 595.00
0.0085 Oh Mandor @ Rp. 40,000.00 = Rp 340.00
= Rp 9,860.00
Total harga = Rp 9,860.00
54. 1 m2 Pasang underlyer, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.54.1
1.050 m2 Underlyer/rubber corrugated, 6 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.54.2
0.120 Oh Pekerja @ Rp. 22,500.00 = Rp 2,700.00
0.120 Oh Tukang @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 6,960.00
Total harga = Rp 6,960.00
55. 1 m2 Pasang lantai karper
Bahan An. SNI ( Revisi ) 6.55.1
1.050 m2 Carpet @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.55.2
0.170 Oh Pekerja @ Rp. 22,500.00 = Rp 3,825.00
0.170 Oh Tukang @ Rp. 30,000.00 = Rp 5,100.00
0.017 Oh Kepala tukang @ Rp. 35,000.00 = Rp 595.00
0.0085 Oh Mandor @ Rp. 40,000.00 = Rp 340.00
= Rp 9,860.00
Total harga = Rp 9,860.00
56. 1 m2 Pasang lantai parquet jati
Bahan An. SNI ( Revisi ) 6.56.1
1.050 m2 Parquet jati @ Rp. - = Rp -
0.600 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.56.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.350 Oh Tukang @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0325 Oh Mandor @ Rp. 40,000.00 = Rp 1,300.00
= Rp 27,650.00
Total harga = Rp 27,650.00
57. 1 m2 Pasang gymfloor
Bahan An. SNI ( Revisi ) 6.57.1
1.050 m2 Gymfloor @ Rp. - = Rp -
0.600 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.57.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.350 Oh Tukang @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0325 Oh Mandor @ Rp. 40,000.00 = Rp 1,300.00
= Rp 27,650.00
Total harga = Rp 27,650.00
58. 1 m2 Pasang dinding porselin 11 x 11 cm, putih
Bahan An. SNI ( Revisi ) 6.58.1
83.000 Bh Porselin 11x11 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.58.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 15,000.00
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,750.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 31,900.00
Total harga = Rp 31,900.00
59. 1 m2 Pasang dinding porselin 11 x 11 cm, warna
Bahan An. SNI ( Revisi ) 6.59.1
83.000 Bh Porselin 11x11 cm, warna @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.59.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 15,000.00
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,750.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 31,900.00
Total harga = Rp 31,900.00
60. 1 m2 Pasang dinding porselin 15 x 15 cm, putih
Bahan An. SNI ( Revisi ) 6.60.1
45.000 Bh Porselin 15x15 cm, putih @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.60.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
61. 1 m2 Pasang dinding porselin 15 x 15 cm, warna
Bahan An. SNI ( Revisi ) 6.61.1
45.000 Bh Porselin 15x15 cm, warna @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.61.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
62. 1 m2 Pasang dinding porselin 10 x 20 cm, warna
Bahan An. SNI ( Revisi ) 6.62.1
50.000 Bh Porselin 10x20 cm, warna @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.62.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
63. 1 m2 Pasang dinding porselin 20 x 20 cm, warna
Bahan An. SNI ( Revisi ) 6.63.1
25.000 Bh Porselin 20x20 cm, warna @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.63.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
64. 1 m2 Pasang dinding keramik artistik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.64.1
50.000 Bh Keramik artistik 10x20 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.64.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
65. 1 m2 Pasang dinding keramik artistik 5 x 20 cm
Bahan An. SNI ( Revisi ) 6.65.1
100.000 Bh Keramik artistik 5x20 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.65.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
66. 1 m2 Pasang dinding keramik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.66.1
50.000 Bh Keramik 10x20 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.66.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
67. 1 m2 Pasang dinding keramik 15 x 15 cm
Bahan An. SNI ( Revisi ) 6.67.1
45.000 Bh Keramik 15x15 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.67.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
68. 1 m2 Pasang dinding keramik 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.68.1
25.000 Bh Keramik 20x20 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.68.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
69. 1 m2 Pasang dinding keramik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.69.1
50.000 Bh Keramik 10x20 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.69.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
70. 1 m2 Pasang dinding marmer
Bahan An. SNI ( Revisi ) 6.70.1
1.020 m2 Marmer @ Rp. - = Rp -
2.000 Bh Paku pancing 60x230 @ Rp. - = Rp -
12.440 Kg Semen portland @ Rp. - = Rp -
0.0250 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.70.2
0.720 Oh Pekerja @ Rp. 22,500.00 = Rp 16,200.00
0.650 Oh Tukang batu @ Rp. 30,000.00 = Rp 19,500.00
0.065 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,275.00
0.0350 Oh Mandor @ Rp. 40,000.00 = Rp 1,400.00
= Rp 39,375.00
Total harga = Rp 39,375.00
71. 1 m2 Pasang dinding bata pelapis 7 x 3 x 24 cm
Bahan An. SNI ( Revisi ) 6.71.1
60.000 Bh Bata pelapis dinding @ Rp. - = Rp -
12.440 Kg Semen portland @ Rp. - = Rp -
0.0250 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.71.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 15,000.00
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,750.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 32,575.00
Total harga = Rp 32,575.00
72. 1 m2 Pasang dinding bata klinker 5 x 5 x 24 cm
Bahan An. SNI ( Revisi ) 6.72.1
80.000 Bh Bata pelapis klinker @ Rp. - = Rp -
12.440 Kg Semen portland @ Rp. - = Rp -
0.0250 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.72.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
73. 1 m2 Pasang dinding batu paros
Bahan An. SNI ( Revisi ) 6.73.1
1.050 m2 Batu paros @ Rp. - = Rp -
11.750 Kg Semen portland @ Rp. - = Rp -
0.0350 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.73.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
74. 1 m2 Pasang dinding batu tempel hitam
Bahan An. SNI ( Revisi ) 6.74.1
1.050 m2 Batu tempel hitam @ Rp. - = Rp -
11.750 Kg Semen portland @ Rp. - = Rp -
0.0350 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.74.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
75. 1 m2 Pasang lantai vinyl karet 30 x 30 cm KL 1
Bahan An. SNI ( Revisi ) 6.75.1
11.050 Bh Vinyl karet 30x30 cm KL1 @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.75.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.150 Oh Tukang @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp 300.00
= Rp 8,700.00
Total harga = Rp 8,700.00
76. 1 m2 Pasang lantai vinyl karet 30 x 30 cm KL 2
Bahan An. SNI ( Revisi ) 6.76.1
11.050 Bh Vinyl karet 30x30 cm KL2 @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.76.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.150 Oh Tukang @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp 300.00
= Rp 8,700.00
Total harga = Rp 8,700.00
77. 1 m2 Pasang lantai vinyl asbes 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.77.1
11.050 Bh Vinyl asbes 30x30 cm @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.77.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.150 Oh Tukang @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp 300.00
= Rp 8,700.00
Total harga = Rp 8,700.00
78. 1 m2 Pasang lantai vinyl motif kembang 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.78.1
11.050 Bh Vinyl mtf kembang 30x30 cm ex DN @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.78.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.150 Oh Tukang @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp 300.00
= Rp 8,700.00
Total harga = Rp 8,700.00
79. 1 m2 Pasang wall covering lebar 50 cm
Bahan An. SNI ( Revisi ) 6.79.1
1.100 m2 Vinyl wall covering, 50 cm @ Rp. - = Rp -
0.250 Kg Lem @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.79.2
0.750 Oh Pekerja @ Rp. 22,500.00 = Rp 16,875.00
0.170 Oh Tukang @ Rp. 30,000.00 = Rp 5,100.00
0.017 Oh Kepala tukang @ Rp. 35,000.00 = Rp 595.00
0.0085 Oh Mandor @ Rp. 40,000.00 = Rp 340.00
= Rp 22,910.00
Total harga = Rp 22,910.00
80. 1 m2 Floor hardener ferrovax
Bahan An. SNI ( Revisi ) 6.80.1
3.000 Kg Floor hardener ferrovax @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.80.2
0.120 Oh Pekerja @ Rp. 22,500.00 = Rp 2,700.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 6,960.00
Total harga = Rp 6,960.00
81. 1 m2 Floor hardener mastercron
Bahan An. SNI ( Revisi ) 6.81.1
5.000 Kg Mastercron "S" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.81.2
0.120 Oh Pekerja @ Rp. 22,500.00 = Rp 2,700.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 6,960.00
Total harga = Rp 6,960.00
82. 1 m2 Plint kayu 2 x 10 cm
Bahan An. SNI ( Revisi ) 6.82.1
0.0024 m3 Kayu jati, papan @ Rp. - = Rp -
0.050 Kg Paku skrup 3.5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.82.2
0.120 Oh Pekerja @ Rp. 22,500.00 = Rp 2,700.00
0.120 Oh Tukang kayu @ Rp. 35,000.00 = Rp 4,200.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 7,560.00
Total harga = Rp 7,560.00
PEKERJAAN PENGECATAN
1. 1 m2 Mengikis/mengerok permukaan cat tembok lama
Bahan An. SNI ( Revisi ) 6.1.1
0.050 Kg Soda api @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0 Oh Tukang cat @ Rp. 30,000.00 = Rp
0 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
2. 1 m2 Mencuci bidang permukaan tembok yang pernah dicat
Bahan An. SNI ( Revisi ) 6.2.1
0.050 Kg S a b u n @ Rp. Sirtu = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0 Oh Tukang cat @ Rp. 30,000.00 = Rp
0 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
3. 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
Bahan An. SNI ( Revisi ) 6.3.1
0.050 Kg S a b u n @ Rp. Koral Beton 1/2 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0 Oh Tukang cat @ Rp. 30,000.00 = Rp
0 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
4. 1 m2 Menyabun permukaan tembok lama
Bahan An. SNI ( Revisi ) 6.4.1
0.050 Kg S a b u n @ Rp. Kapur gamping = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0 Oh Tukang cat @ Rp. 30,000.00 = Rp
0 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
5. 1 m2 Mengerok karat atau cat lama permukaan baja dengan pancar pasir ( sanblasting )
dengan tingkat kebersihan Sa 2.5%
Bahan An. SNI ( Revisi ) 6.5.1
40.000 Kg Pasir silika @ Rp. Kayu reng jati 2/3 = Rp
10.000 Ltr B B M @ Rp. Kayu Kamfer balok 8/12, 6 = Rp
= Rp
Alat An. SNI ( Revisi ) 6.5.2
Sewa / hari Kompressor, blasting pot, @ Rp. - = Rp
selang dan nozle
= Rp
Upah An. SNI ( Revisi ) 6.5.3
1.600 Oh Pekerja @ Rp. 22,500.00 = Rp
1.600 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.800 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.500 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
6. 1 m2 Mendempul dan menggosok kayu
Bahan An. SNI ( Revisi ) 6.6.1
0.080 Kg Dempul jati @ Rp. - = Rp
0.020 Kg Minyak cat @ Rp. - = Rp
0.010 Kg Batu apung @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
0.040 Oh Pekerja @ Rp. 22,500.00 = Rp
0.040 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.004 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
7. 1 m2 Pengecatan bidang kayu lama
Bahan An. SNI ( Revisi ) 6.7.1
0.150 Kg Plamir @ Rp. Besi beton Polos o 8 mm = Rp
0.170 Kg Cat dasar @ Rp. Besi beton Polos o 10 mm = Rp
0.170 Kg Cat penutup @ Rp. Besi beton Polos o 10 mm = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp
0.075 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0075 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
8. 1 m2 Pengecatan bidang kayu baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.8.1
0.200 Kg Cat meni @ Rp. Mur baut gording = Rp
0.150 Kg Plamir @ Rp. Paku payung = Rp
0.170 Kg Cat dasar @ Rp. Ankur kusen = Rp
0.260 Kg Cat penutup 2x @ Rp. Ankur kusen = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp
0.009 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0060 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
9. 1 m2 Pengecatan bidang kayu baru ( 1x plamir , 1x cat dasar, 3x cat penutup )
Bahan An. SNI ( Revisi ) 6.9.1
0.200 Kg Cat meni @ Rp. - = Rp
0.150 Kg Plamir @ Rp. Buis beton bulat o 15 cm, = Rp
0.170 Kg Cat dasar @ Rp. Buis beton bulat o 20 cm, = Rp
0.350 Kg Cat penutup 2x @ Rp. Buis beton bulat o 20 cm, = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp
0.105 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0040 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
10. 1 m2 Pelaburan bidang kayu dengan teak oil
Bahan An. SNI ( Revisi ) 6.10.1
0.360 Ltr Teak oil @ Rp. Genteng bubungan Nglayu = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.040 Oh Pekerja @ Rp. 22,500.00 = Rp
0.063 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0630 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
11. 1 m2 Pelaburan bidang kayu dengan politur
Bahan An. SNI ( Revisi ) 6.11.1
0.150 Ltr Politur @ Rp. - = Rp
0.372 Ltr Politur jadi @ Rp. - = Rp
2.000 Lbr Ampelas @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.000 Oh Pekerja @ Rp. 22,500.00 = Rp
0.060 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0160 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
12. 1 m2 Pelaburan bidang kayu dengan cat residu dan ter
Bahan An. SNI ( Revisi ) 6.12.1
0.350 Ltr Residu atau ter @ Rp. Kolter = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
0.000 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0000 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
13. 1 m2 Pelaburan bidang kayu dengan vernis
Bahan An. SNI ( Revisi ) 6.13.1
0.150 Ltr Vernis @ Rp. Kunci "ANCHOR" 2 x tan = Rp
0.050 Kg Dempul @ Rp. Kunci "KUDA TERBANG" 2= Rp
0.100 Lbr Ampelas @ Rp. Engsel Nylon "ARCH" asli = Rp
0.010 Bh Kuas @ Rp. Engsel jendela = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.160 Oh Pekerja @ Rp. 22,500.00 = Rp
0.160 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0160 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
14. 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.14.1
0.100 Kg Plamir @ Rp. Pipa PVC AW o 3" 4 m = Rp
0.100 Kg Cat dasar @ Rp. Pipa PVC AW o 4" 4m = Rp
0.260 Kg Cat penutup 2x @ Rp. Pipa PVC AW o 4" 4m = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.020 Oh Pekerja @ Rp. 22,500.00 = Rp
0.063 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0063 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
15. 1 m2 Pengecatan tembok lama ( 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.15.1
0.120 Kg Cat dasar @ Rp. Lampu TL 1 x 40 w PHILIP = Rp
0.180 Kg Cat penutup 2x @ Rp. Lampu TL 1 x 40 w PHILIP = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.028 Oh Pekerja @ Rp. 22,500.00 = Rp
0.042 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0042 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
16. 1 m2 Melabur tembok dengan kalkarium
Bahan An. SNI ( Revisi ) 6.16.1
0.100 Kg Kalkarium @ Rp. Kabel NYA 1000 Volt 1,5 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.028 Oh Pekerja @ Rp. - = Rp
0.042 Oh Tukang cat @ Rp. - = Rp
0.0042 Oh Kepala tukang @ Rp. - = Rp
0.0025 Oh Mandor @ Rp. - = Rp
. = Rp
Total harga = Rp
17. 1 m2 Melabur tembok dengan kapur sirih
Bahan An. SNI ( Revisi ) 6.17.1
0.100 Lbr Ampelas @ Rp. Tukang Batu = Rp
0.250 Ikt Alang-alang @ Rp. Tukang kayu = Rp
0.002 m3 Perancah kayu @ Rp. Kepala Tukang = Rp
0.150 Kg Kapur sirih @ Rp. Tukang Cat = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.001 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0001 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
18. 1 m2 Melabur tembok lama dengan kapur sirih ( untuk pemeliharaan )
Bahan An. SNI ( Revisi ) 6.18.1
0.002 m3 Perancah kayu @ Rp. - = Rp
0.300 Kg Kapur sirih @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.040 Oh Pekerja @ Rp. 22,500.00 = Rp
0.005 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0005 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
19. 1 m2 Pemasangan wallpaper
Bahan An. SNI ( Revisi ) 6.19.1
1.200 m2 Wall paper @ Rp. - = Rp
0.200 Kg Perekat @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.020 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
20. 1 m2 Pengecatan permukaan baja dengan meni besi
Bahan An. SNI ( Revisi ) 6.20.1
0.100 Kg Meni besi @ Rp. - = Rp
0.010 Bh Kuas @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.020 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0200 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0100 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
21. 1 m2 Pengecatan permukaan baja dengan meni besi dan perancah
Bahan An. SNI ( Revisi ) 6.21.1
0.100 Kg Meni besi @ Rp. - = Rp
0.010 Bh Kuas @ Rp. - = Rp
0.002 m3 Perancah kayu @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp
0.225 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
22. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual
sistem 4 lapis cat konvensional dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.22.1
0.100 Kg Meni ( read lead ) A @ Rp. - = Rp
0.100 Kg Meni ( read lead ) B @ Rp. - = Rp
0.040 Kg Alluminium C @ Rp. - = Rp
0.040 Kg Alluminium B @ Rp. - = Rp
0.010 Ltr Pengencer @ Rp. - = Rp
0.002 m3 Perancah kayu @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.22.2
0.006 Oh Pekerja @ Rp. 22,500.00 = Rp
0.006 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
23. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual
sistem 1 lapis cat mutakhir dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.23.1
0.300 Kg C a t @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.23.2
0.006 Oh Pekerja @ Rp. 22,500.00 = Rp
0.060 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0120 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
24. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual
sistem 3 lapis cat konvensional dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.24.1
0.110 Kg Cat dasar @ Rp. - = Rp
0.170 Kg Cat antara @ Rp. - = Rp
0.080 Kg Cat penutup @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.24.2
0.500 Oh Pekerja @ Rp. 22,500.00 = Rp
0.800 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.3000 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.2000 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
25. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara semprot ( airless spray )
sistem 1 lapis cat mutakhir dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.25.1
0.300 Kg Cat dasar @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.25.2
0.400 Oh Pekerja @ Rp. 22,500.00 = Rp
0.700 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.2000 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.2000 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
-
-

3,375.00
-
-
100.00
3,475.00
3,475.00

#VALUE!
#VALUE!

3,375.00
-
-
100.00
3,475.00
#VALUE!

#VALUE!
#VALUE!

3,375.00
-
-
100.00
3,475.00
#VALUE!

#VALUE!
#VALUE!

3,375.00
-
-
100.00
3,475.00
#VALUE!

#VALUE!
#VALUE!
#VALUE!

-
36,000.00
48,000.00
28,000.00
20,000.00
132,000.00
#VALUE!

-
-
-
-

900.00
1,200.00
140.00
100.00
2,340.00
2,340.00

#VALUE!
#VALUE!
#VALUE!
#VALUE!

1,575.00
2,250.00
262.50
100.00
4,187.50
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

1,575.00
270.00
210.00
100.00
2,155.00
#VALUE!

-
#VALUE!
#VALUE!
#VALUE!
#VALUE!

1,575.00
3,150.00
140.00
100.00
4,965.00
#VALUE!
#VALUE!
#VALUE!

900.00
1,890.00
2,205.00
100.00
5,095.00
#VALUE!

-
-
-
-

-
1,800.00
560.00
100.00
2,460.00
2,460.00

#VALUE!
#VALUE!

2,250.00
-
-
240.00
2,490.00
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

3,600.00
4,800.00
560.00
100.00
9,060.00
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!

450.00
1,890.00
220.50
100.00
2,660.50
#VALUE!
#VALUE!
#VALUE!
#VALUE!

630.00
1,260.00
147.00
100.00
2,137.00
#VALUE!

#VALUE!
#VALUE!

-
-
-
-
-
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

3,375.00
30.00
3.50
100.00
3,508.50
#VALUE!

-
-
-

900.00
150.00
17.50
100.00
1,167.50
1,167.50

-
-
-

450.00
6,000.00
70.00
100.00
6,620.00
6,620.00
-
-
-

450.00
6,000.00
700.00
400.00
7,550.00
7,550.00

-
-
-
-

5,625.00
6,750.00
787.50
300.00
13,462.50
13,462.50

-
-
-
-
-
-
-

135.00
180.00
787.50
300.00
1,402.50
1,402.50

-
-

135.00
1,800.00
420.00
240.00
2,595.00
2,595.00

-
-
-
-
11,250.00
24,000.00
10,500.00
8,000.00
53,750.00
53,750.00

-
-

9,000.00
21,000.00
7,000.00
8,000.00
45,000.00
45,000.00
REKAPITULASI PEKERJAAN

PROYEK 0
PEKERJAAN 0
LOKASI 0
TAHUN ANGGARAN : 2003

NO JENIS PEKERJAAN JUMLAH HARGA ( Rp )

1 PEKERJAAN PENDAHULUAN 6,529,140.00

2 PEKERJAAN TANAH & GALIAN #REF!

3 PEKERJAAN BETON #REF!

4 PEKERJAAN PASANGAN & PLESTERAN #REF!

5 PEKERJAAN KAYU #REF!

6 PEK. PENUTUP ATAP #REF!

7 PEKERJAAN LANTAI #REF!

8 PEK. ALAT PENGGANTUNG & PENGUNCI #REF!

9 PEKERJAAN PENGECATAN 1,613,745.00

10 PEKERJAAN INSTALASI LISTRIK 4,129,750.00

jumlah #REF!
PPn 10 % #REF!
Jumlah + PPn #REF!
Dibulatkan 386,096,000.00

terbilang : TIGA RATUS DELAPAN PULUH ENAM JUTA SEMBILAN PULUH ENAM RIBU RUPIAH

0
0

0
Direktur
RENCANA ANGGARAN BIAYA ( RAB )
PROYEK
PEKERJAAN
LOKASI
TAHUN ANGGARAN : 2004
HARGA
NO. JENIS PEKERJAAN VOLUME SAT. SATUAN
( Rp. )
1 2 3 4 5

I. PEKERJAAN PENDAHULUAN
1 Pembersihan lokasi 342.00 m2 4,250.00
2 Uitset 1.00 lsm 477,650.00
3 Bowplank 126.00 m' 28,765.00
4 Papan nama 1.00 bh 250,000.00
5 Dokumentasi & pelaporan 3.00 bln 150,000.00
6 IMB 1.00 lsm 273,600.00
Sub jumlah

II PEKERJAAN TANAH & GALIAN


1 Galian tanah biasa 153.45 m3 10,600.00
2 galian tanah strouss 46.00 m3 27,500.00
3 Uruk tanah kembali 51.98 m3 #REF!
4 penebalan tanah keliling gedung 41.25 m3 37,125.00
5 urugan pasir bawah pondasi & lantai 50.70 m3 #REF!
6 Urug pasir 180.34 m3 #REF!

III PEKERJAAN BETON


1 pondasi strouss d 30 cm H : 3 m 9.75 m3 #REF!
2 poor 30/60/60 4.97 m3 #REF!
3 sloof 15/30 7.43 m3 #REF!
4 kopel sloof 15/25 6.73 m3 #REF!
5 kolom utama struktur 15/25 6.70 m3 #REF!
6 kolom praktis 12/15 0.45 m3 #REF!
7 konsol teras 15/20 0.27 m3 #REF!
8 ring balk 12/15 3.46 m3 #REF!
9 balok latei 12/15 2.16 m3 #REF!
10 rabat 1 : 3 : 6 tebal 5 cm 17.10 m3 #REF!
Sub jumlah

IV PEKERJAAN PASANGAN & PLESTERAN


1 ansatmping 33.00 m3 132,525.00
2 batu kali 1 : 3 : 8 72.60 m3 #REF!
3 trasram bata merah 1 : 2 5.37 m2 #REF!
4 Pas. Dinding 1 : 3 : 8 46.00 m3 #REF!
5 Pas. Dinding konsol 1 : 3 : 8 0.54 m3 #REF!
6 Pas. Gewel 1 : 4 5.57 m3 #REF!
7 Plester batu kali 1 : 3 tebal 15 mm 33.00 m2 #REF!
8 Plester trasram 1 : 2 tebal 10 mm 89.44 m2 #REF!
9 Plester dinding 1 : 3 : 8 tebal 10 mm 471.60 m2 #REF!
10 Plester betom 1 : 3 tebal 10 mm 96.85 m2 #REF!
11 benangan sudut 132.00 m' #REF!
12 alur kusen/tali air 391.60 m' #REF!
13 kol-kolan tinggi 8 cm 24.96 m2 #REF!
Sub jumlah
1 2 3 4 5
V PEKERJAAN KAYU
1 kusen kamper 6/15 3.08 m3 #REF!
2 mur plat 6/12 kruing 0.58 m3 #REF!
3 kuda-kuda konsol 8/12 kruing 1.96 m3 #REF!
4 gording nok 8/12 kruing 2.30 m3 #REF!
5 papan ruiter 3/20 meranti 8.00 m2 #REF!
6 usuk kruing 5/7 reng kamper 2/3 480.00 m2 #REF!
7 plafond meranti + eternit 462.00 m2 #REF!
8 listplang kamper 3/25 38.40 m2 #REF!
9 papan kompres kamper 3/15 7.20 m2 #REF!
10 daun jendela kaca 3/8 kamper 28.00 m2 #REF!
11 isian bovenlis gewel 9.00 m2 #REF!
12 daun pinti panil kamper 3.5 cm 16.40 m2 #REF!
13 list kamper 1/5 406.00 m' #REF!
Sub jumlah

VI PEK. PENUTUP ATAP


1 Pas. Genteng nglayur model Kr. Pilang 480.00 m2 #REF!
2 bubungan nglayur 40.00 m' #REF!
Sub jumlah

VII. PEKERJAAN LANTAI


1 Pas. Keramik lantai putih 30x30 348.40 m2 #REF!
Sub jumlah

VIII PEK. ALAT PENGGANTUNG & PENGUNCI


1 kaca bening 5 mm 49.94 m2 #REF!
2 kunci pintu 2x putar " UNION " 6.00 bh 71,200.00
3 engsel jendela nylon ARCH asli 40.00 psg 10,800.00
4 engsel pintu nylon " ARCH " asli 15.00 psg 14,050.00
5 grendel pintu 12.00 bh 9,862.50
6 grendel jendela 40.00 bh 5,662.50
7 hak angin 40.00 psg 5,662.50
8 mur baut/angkur bolt dll 125.21 kg 8,500.00
Sub jumlah

IX. PEKERJAAN PENGECATAN


1 pengeteran kayu 2 x 432.16 m2 3,475.00
2 cat mani EMCO 328.05 m2 -
3 cat kayu 2 x EMCO 238.05 m2 -
4 cat jendela 2x EMCO 29.92 m2 -
5 cat pintu 2x EMCO 32.80 m2 -
6 cat dinding PARAGON + plamir ( 3 x ) 657.89 m2 100.00
cat kol-kolan 24.96 m2 -
7 cat eternit 3 x PARAGON + plamir 462.00 m2 100.00
Sub jumlah
1 2 3 4 5
X. PEKERJAAN INSTALASI LISTRIK
1 penyambungan instalasi listrik 2.00 unit 250,000.00
2 panel MCB 2 group 2.00 bh 275,000.00
3 pas. Instalasi listrik 14.00 ttk 52,125.00
4 saklar tunggal BROCO 4.00 bh 13,000.00
5 saklar ganda BROCO 4.00 bh 14,000.00
6 stop kontak BROCO 4.00 bh 13,000.00
7 lampu TL 20 w Philip 48.00 bh 43,000.00
8 lampu pijar 25 w Philip 14.00 bh 9,000.00
Sub jumlah

TOTAL
RAB )

JUMLAH HARGA
( Rp. )
6

1,453,500.00
477,650.00
3,624,390.00
250,000.00
450,000.00
273,600.00
6,529,140.00

1,626,548.80
1,265,000.00
#REF!
1,531,406.25
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

4,373,325.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!

#REF!
427,200.00
432,000.00
210,750.00
118,350.00
226,500.00
226,500.00
1,064,251.00
#REF!

1,501,756.00
-
-
-
-
65,789.00
-
46,200.00
1,613,745.00
6

500,000.00
550,000.00
729,750.00
52,000.00
56,000.00
52,000.00
2,064,000.00
126,000.00
4,129,750.00

#REF!

Anda mungkin juga menyukai