PROYEK 0
PEKERJAAN 0
LOKASI 0
TAHUN : 2004
A. Bahan Pasir
1 Pasir Urug m3
2 Pasir Pasang m3
3 Pasir Cor m3
4 Sirtu m3
5 Tanah Urug m3
6 Tanah grosok m3
B. Bahan Batu
1 Batu Kali Pecah 15/20 ( tangan ) m3
2 Batu Kali m3
3 Batu Kali Pecah 7/10 ( tangan ) m3
4 Batu Kali Pecah 5/7 ( tangan ) m3
5 Batu Kali Pecah 3/5 ( mesin ) m3
6 Batu Kali Pecah 2/3 ( mesin ) m3
7 Batu Kali Pecah 0.5 - 1 ( mesin ) m3
8 Batu Kali Pecah 1/2 ( mesin ) m3
9 Koral Beton 1/2 m3
10 Koral Beton 2/3 m3
11 Batu Bata merah ( kelas I ) m3
12 Paving stone / beton blok kelas I m3
13 Paving stone / beton blok kelas II m3
14 Rooster beton bh
14.b Bata berongga bh
15 Hollow block 10 bh
16 Hollow block 15 bh
17 Hollow block 20 bh
18 Conblock 10 bh
19 Conblock 15 bh
20 Conblock 20 bh
C. Bahan Semen
1 Semen Gresik 50 kg zak
2 Semen Tiga Roda 50 kg zak
3 Semen putih ( Azano / Tiga Roda ) zak
4 Semen merah zak
D. Bahan kapur
1 Kapur bubuk m3
2 Kapur gamping m3
E. Bahan Lantai
1 Tegel abu-abu 20 x 20 cm m2
2 Tegel Wafel 20 x 20 cm m2
3 Tegel keramik 30x30 cm ( KW I ) m2
4 Tegel keramik 20x20 cm ( KW I ) m2
5 Tegel keramik motif 30x30 cm m2
6 Keramik dinding 20x25 cm ( KW I ) m2
7 Granit 30x30 cm m2
F. Bahan Kayu
1 Papan jati m3
2 Kayu reng jati 2/3 m3
3 Kayu Kamfer balok 8/12, 6/15 m3
4 Kayu kamfer usuk 5/7 m3
5 Kayu kamfer papan 2.5/20 m3
6 Kayu Kamfer reng 2/3 m3
7 Kayu kruing papan 2/20 m3
8 Kayu kruing balok 8/12,6/15 m3
9 Kayu kruing usuk 5/7 m3
10 Kayu kruing usuk 4/6 m3
11 Kayu kruing reng 2/3 m3
12 Kayu bengkirai 8/12, 6/15 m3
13 Kayu meranti balok 8/12, 6/15 m3
14 Keyu meranti usuk 5/7 m3
15 Kayu meranti papan 3/25/400 m3
16 Teakwood 90.210.4 mm lbr
17 Teakwood 110.210.4 mm lbr
18 Teakwood 122.244.4 mm lbr
No. Jenis Bahan Satuan
J. Bahan Cat
1 Kertas gosok lbr
2 Plamur tembok kg
3 Plamur kayu " PEDANG " kg
4 Cat kayu / besi EMCO/setara kg
5 Cat tembok "DECOLITH" kg
6 Cat tembok "PARAGON" kg
7 Cat meni "PEDANG" kg
8 Dempul kayu kg
9 Minyak cat / thiner B ltr
10 Spiritus ltr
11 Plitur jadi ltr
12 Kolter ltr
13 Lem kayu " RAJAWALI " kg
14 Teer kg
15 Cherelag kg
K. Bahan Kaca
1 Kaca bening 3 mm m2
2 Kaca bening 5 mm m2
3 Kaca rayband 3 mm m2
4 Kaca raybend 5 mm m2
5 Kaca nako + rangka "NIKY" m2
L. Bahan Penggantung dan Pengunci
1 Kunci "UNION" 2 x putar bh
2 Kunci "ANCHOR" 2 x tanam bh
3 Kunci "KUDA TERBANG" 2 x putar bh
4 Engsel Nylon "ARCH" asli pintu bh
5 Engsel jendela bh
6 Grendel injak bh
7 Grendel tanam pintu bh
8 Grendel tanam jendela bh
9 Hak angin psg
M. Bahan Instalasi Air
1 Kran air "SAN EI" bh
2 Kran air "AMICO 1/2" bh
3 Kran air "AMICO 3/4" bh
4 Pompa air "GOLD STAR" bh
5 Pompa air "NASIONAL" bh
6 Pipa PVC AW o 1/2" 4 m ljr
7 Pipa PVC AW o 3/4" 4m ljr
8 Pipa PVC AW o 1".4m ljr
9 Pipa PVC AW o 2" 4 m ljr
10 Pipa PVC AW o 3" 4 m ljr
11 Pipa PVC AW o 4" 4m ljr
12 Talang " U " Maspion 4m ljr
13 Floor drains bh
14 Closed Jongkok INA warna bh
15 Closed duduk "TOTO" bh
16 Tutup bak mandi bh
17 Lem paralon bh
18 Westafel bh
19 Pompa air " NASIONAL " bh
8 Fiting Plafoond bh
9 T dos PVC bh
10 Stop Kontak "BROCO" bh
11 Saklar tunggal "BROCO" bh
12 Sakla ganda " BROCO " bh
13 Sekrering Tunggal "LN" bh
14 Sekering ganda "LN" bh
15 Kabel NYA 1000 Volt 1,5 mm m
16 Kabel NYA 1000 Volt 2,5 mm m
17 Kabel NYA 1000 Volt 4 mm m
18 Panel MCB unit
0
0
0
0
SATUAN BAHAN & UPAH TENAGA KERJA
Harga
Satuan
34,500.00 34,500.00
50,000.00 50,000.00
50,000.00 50,000.00
49,000.00 49,000.00
24,000.00 24,000.00
54,000.00 54,000.00
75,000.00 75,000.00
69,000.00 69,000.00
83,000.00 83,000.00
84,000.00 84,000.00
100,000.00 100,000.00
110,000.00 110,000.00
130,000.00 130,000.00
130,000.00 130,000.00
125,000.00 125,000.00
110,000.00 110,000.00
220.00 220.00
30,000.00 30,000.00
27,000.00 27,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
2,000.00 2,000.00
620.00 31,000.00
580.00 29,000.00
900.00 45,000.00
350,000.00 350,000.00
375,000.00 375,000.00
15,000.00 15,000.00
16,500.00 16,500.00
29,000.00 29,000.00
34,000.00 34,000.00
34,000.00 34,000.00
34,000.00 34,000.00
65,000.00 65,000.00
6,950,000.00 6,950,000.00
6,950,000.00 6,950,000.00
2,725,000.00 2,725,000.00
2,425,000.00 2,425,000.00
2,725,000.00 2,725,000.00
2,225,000.00 2,225,000.00
1,625,000.00 1,625,000.00
1,625,000.00 1,625,000.00
1,625,000.00 1,625,000.00
1,625,000.00 1,625,000.00
1,275,000.00 1,275,000.00
2,175,000.00 2,175,000.00
1,175,000.00 1,175,000.00
1,175,000.00 1,175,000.00
1,175,000.00 1,175,000.00
34,000.00 34,000.00
45,000.00 45,000.00
50,000.00 50,000.00
Harga Harga
Satuan Satuan
60,500.00 60,500.00
27,000.00 27,000.00
30,000.00 30,000.00
22,000.00 22,000.00
30,500.00 30,500.00
33,000.00 33,000.00
41,000.00 41,000.00
64,000.00 64,000.00
88,500.00 88,500.00
1,500.00 1,500.00
6,950,000.00 6,950,000.00
6,000.00 6,000.00
6,000.00 6,000.00
6,000.00 6,000.00
6,000.00 6,000.00
8,500.00 8,500.00
7,000.00 7,000.00
7,000.00 7,000.00
8,500.00 8,500.00
8,500.00 8,500.00
8,500.00 8,500.00
2,500.00 2,500.00
8,500.00 8,500.00
15,000.00 15,000.00
10,000.00 10,000.00
2,250.00 2,250.00
200.00 200.00
500.00 500.00
165,000.00 165,000.00
187,000.00 187,000.00
50,000.00 50,000.00
62,000.00 62,000.00
65,000.00 65,000.00
39,500.00 39,500.00
40,000.00 40,000.00
50,000.00 50,000.00
60,000.00 60,000.00
70,000.00 70,000.00
95,000.00 95,000.00
120,000.00 120,000.00
10,000.00 10,000.00
15,000.00 15,000.00
20,000.00 20,000.00
24,000.00 24,000.00
40,000.00 40,000.00
44,000.00 44,000.00
55,000.00 55,000.00
90,000.00 90,000.00
10,000.00 10,000.00
12,500.00 12,500.00
350.00 350.00
750.00 750.00
750.00 750.00
2,000.00 2,000.00
2,000.00 2,000.00
1,500.00 1,500.00
5,000.00 5,000.00
55,000.00 55,000.00
35,000.00 35,000.00
47,500.00 47,500.00
20,000.00 20,000.00
Harga Harga
Satuan Satuan
3,000.00 3,000.00
3,500.00 3,500.00
9,000.00 9,000.00
35,000.00 35,000.00
10,250.00 10,250.00
10,250.00 10,250.00
10,000.00 10,000.00
9,000.00 9,000.00
3,500.00 3,500.00
10,000.00 10,000.00
10,000.00 10,000.00
2,500.00 2,500.00
7,000.00 7,000.00
6,000.00 6,000.00
27,500.00 27,500.00
35,750.00 35,750.00
51,000.00 51,000.00
52,000.00 52,000.00
66,000.00 66,000.00
8,500.00 8,500.00
57,500.00 57,500.00
65,000.00 65,000.00
57,500.00 57,500.00
8,500.00 8,500.00
5,250.00 5,250.00
10,000.00 10,000.00
6,500.00 6,500.00
3,000.00 3,000.00
5,000.00 5,000.00
15,500.00 15,500.00
14,000.00 14,000.00
16,000.00 16,000.00
300,000.00 300,000.00
275,000.00 275,000.00
12,000.00 12,000.00
15,000.00 15,000.00
20,000.00 20,000.00
30,000.00 30,000.00
42,000.00 42,000.00
60,000.00 60,000.00
41,000.00 41,000.00
3,500.00 3,500.00
150,000.00 150,000.00
945,000.00 945,000.00
2,000.00 2,000.00
4,500.00 4,500.00
35,000.00 35,000.00
275,000.00 275,000.00
44,000.00 44,000.00
33,000.00 33,000.00
43,000.00 43,000.00
60,000.00 60,000.00
9,000.00 9,000.00
5,000.00 5,000.00
2,000.00 2,000.00
Harga Harga
Satuan Satuan
500.00 500.00
750.00 750.00
13,000.00 13,000.00
13,000.00 13,000.00
14,000.00 14,000.00
28,000.00 28,000.00
41,000.00 41,000.00
1,000.00 1,000.00
1,500.00 1,500.00
2,250.00 2,250.00
82,500.00 82,500.00
40,000.00 40,000.00
35,000.00 35,000.00
37,500.00 37,500.00
30,000.00 30,000.00
35,000.00 35,000.00
35,000.00 35,000.00
30,000.00 30,000.00
32,500.00 32,500.00
22,500.00 22,500.00
32,500.00 32,500.00
32,500.00 32,500.00
PEKERJAAN PERSIAPAN
1. 1 m2 Pembersihan Lapangan dan Peralatan
Upah An. SNI ( Revisi ) 6.8.1
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 4,250.00
Harga 1 m2 = Rp 4,250.00
2. 1 m' Pengukuran dan Pasang Papan Bowplank
Bahan An. SNI ( Revisi ) 6.4.1
0.012 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 14,100.00
0.020 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 140.00
0.007 m3 Kayu Papan meranti 3/20 @ Rp. 1,175,000.00 = Rp 8,225.00
= Rp 22,465.00
Upah An. SNI ( Revisi ) 6.4.2
0.100 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 3,500.00
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.010 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 6,300.00
Total Upah dan Bahan = Rp 28,765.00
3. 1 m' Pagar sementara dari kayu tinggi 2 m
Bahan An. SNI ( Revisi ) 6.1.1
1.250 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. = Rp -
5.500 kg Semen Portland @ Rp. 620.00 = Rp 3,410.00
0.005 m3 Pasir beton @ Rp. 50,000.00 = Rp 250.00
0.009 m3 Koral beton @ Rp. 110,000.00 = Rp 990.00
0.072 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 84,600.00
0.060 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 420.00
0.400 Lt Residu @ Rp. = Rp -
= Rp 89,670.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 7,000.00
0.400 Oh Pekerja @ Rp. 22,500.00 = Rp 9,000.00
0.020 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 700.00
0.020 Oh Mandor @ Rp. 40,000.00 = Rp 800.00
= Rp 17,500.00
Total Upah dan Bahan = Rp 107,170.00
4. 1 m' Pagar sementara dari seng gelombang tinggi 2 m
Bahan An. SNI ( Revisi ) 6.2.1
1.250 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. = Rp -
2.500 kg Semen Portland @ Rp. 620.00 = Rp 1,550.00
1.200 Lbr Seng gelombang 3" - 5" @ Rp. 20,000.00 = Rp 24,000.00
0.005 m3 Pasir beton @ Rp. 50,000.00 = Rp 250.00
0.009 m3 Koral beton @ Rp. 110,000.00 = Rp 990.00
0.072 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 84,600.00
0.060 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 420.00
0.450 kg Meni besi @ Rp. 10,000.00 = Rp 4,500.00
= Rp 116,310.00
Upah An. SNI ( Revisi ) 6.2.2
0.200 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 7,000.00
0.400 Oh Pekerja @ Rp. 22,500.00 = Rp 9,000.00
0.020 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 700.00
0.020 Oh Mandor @ Rp. 40,000.00 = Rp 800.00
= Rp 17,500.00
Total Upah dan Bahan = Rp 133,810.00
5. 1 m' Pagar sementara dari kawat duri tinggi 1.8 m
Bahan An. SNI ( Revisi ) 6.3.1
1.250 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. = Rp -
2.000 kg Semen Portland @ Rp. 620.00 = Rp 1,240.00
25.000 kg Kawat duri @ Rp. 39,500.00 = Rp 987,500.00
0.005 m3 Pasir beton @ Rp. 50,000.00 = Rp 250.00
0.009 m3 Koral beton @ Rp. 110,000.00 = Rp 990.00
0.060 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 420.00
= Rp 990,400.00
Upah An. SNI ( Revisi ) 6.3.2
0.200 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 7,000.00
0.300 Oh Pekerja @ Rp. 22,500.00 = Rp 6,750.00
0.020 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 700.00
0.020 Oh Mandor @ Rp. 40,000.00 = Rp 800.00
= Rp 15,250.00
Total Upah dan Bahan = Rp 1,005,650.00
6. 1 m2 Pembuatan kantor sementara, dengan lantai plesteran
Bahan An. SNI ( Revisi ) 6.5.1
1.250 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. = Rp -
0.180 m3 Kayu meranti 5/7 @ Rp. 1,175,000.00 = Rp 211,500.00
0.850 kg Paku biasa 2" - 5 " @ Rp. 7,000.00 = Rp 5,950.00
1.100 kg Besi strip @ Rp. 8,500.00 = Rp 9,350.00
35.000 kg Semen Portland @ Rp. 620.00 = Rp 21,700.00
0.150 m3 Pasir pasang @ Rp. 50,000.00 = Rp 7,500.00
0.100 m3 Pasir beton @ Rp. 50,000.00 = Rp 5,000.00
0.150 m3 Koral beton @ Rp. 110,000.00 = Rp 16,500.00
30.000 Bh Bata merah @ Rp. 220.00 = Rp 6,600.00
0.250 Lbr Seng plat @ Rp. 20,000.00 = Rp 5,000.00
2.000 m2 Jendela nako @ Rp. 8,500.00 = Rp 17,000.00
0.080 m2 Kaca polos @ Rp. 51,000.00 = Rp 4,080.00
0.150 Bh Kunci tanam @ Rp. 65,000.00 = Rp 9,750.00
0.060 Lbr Playwood 4mm @ Rp. 33,000.00 = Rp 1,980.00
= Rp 321,910.00
Upah An. SNI ( Revisi ) 6.5.2
2.000 Oh Tukang Kayu @ Rp. 35,000.00 = Rp 70,000.00
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
0.300 Oh Kepala Tukang @ Rp. 35,000.00 = Rp 10,500.00
0.050 Oh Mandor @ Rp. 40,000.00 = Rp 2,000.00
= Rp 105,000.00
Total Upah dan Bahan = Rp 426,910.00
2,100.00
2,100.00
328.00
40.00
4,568.00
4,568.00
1,225,000.00
1,225,000.00
3,375.00
2,625.00
280.00
320.00
6,600.00
1,231,600.00
1,500,000.00
1,500,000.00
3,375.00
2,100.00
2,100.00
320.00
7,895.00
1,507,895.00
1,875,000.00
3,000,000.00
-
4,875,000.00
9,000.00
7,000.00
700.00
80.00
16,780.00
4,891,780.00
13,625,000.00
21,800,000.00
71,200.00
35,496,200.00
9,000.00
7,000.00
700.00
80.00
16,780.00
35,512,980.00
242,000.00
240,000.00
976.00
482,976.00
9,000.00
7,000.00
700.00
80.00
16,780.00
499,756.00
3,600.00
350.00
3,950.00
3,150.00
2,345.00
245.00
280.00
6,020.00
9,970.00
250.00
22,440.00
22,690.00
3,150.00
2,625.00
280.00
320.00
6,375.00
29,065.00
-
1,800.00
1,800.00
3,150.00
2,625.00
280.00
320.00
6,375.00
8,175.00
450.00
240.00
690.00
3,150.00
2,450.00
245.00
280.00
6,125.00
6,815.00
-
360.00
360.00
3,150.00
2,450.00
245.00
280.00
6,125.00
6,485.00
875.00
720.00
1,595.00
3,150.00
2,450.00
245.00
280.00
6,125.00
7,720.00
24,150.00
630.00
24,780.00
3,150.00
2,450.00
245.00
280.00
6,125.00
30,905.00
5,280.00
2,400.00
7,680.00
3,150.00
2,345.00
245.00
280.00
6,020.00
13,700.00
140,250.00
-
140,250.00
3,150.00
2,345.00
245.00
280.00
6,020.00
146,270.00
600.00
1,560.00
2,160.00
3,150.00
2,345.00
245.00
280.00
6,020.00
8,180.00
12,950.00
3,600.00
16,550.00
3,150.00
2,345.00
245.00
280.00
6,020.00
22,570.00
-
-
-
3,150.00
2,345.00
245.00
280.00
6,020.00
6,020.00
-
-
-
3,150.00
2,345.00
245.00
280.00
6,020.00
6,020.00
-
-
-
3,150.00
2,345.00
245.00
280.00
6,020.00
6,020.00
-
-
-
3,150.00
2,345.00
245.00
280.00
6,020.00
6,020.00
-
-
-
1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00
-
-
-
1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00
-
-
-
1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00
-
-
-
1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00
-
-
-
1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00
-
-
-
1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00
-
-
-
2,250.00
5,250.00
455.00
160.00
8,115.00
8,115.00
-
-
-
1,890.00
4,375.00
455.00
160.00
6,880.00
6,880.00
-
-
-
4,500.00
3,500.00
350.00
400.00
8,750.00
8,750.00
-
-
-
-
-
4,500.00
10,500.00
105.00
400.00
15,505.00
15,505.00
-
-
-
4,500.00
3,500.00
350.00
40.00
8,390.00
8,390.00
-
-
-
3,735.00
8,750.00
875.00
320.00
13,680.00
13,680.00
-
-
-
-
-
-
9,000.00
7,000.00
700.00
800.00
17,500.00
17,500.00
-
-
-
-
2,812.50
8,750.00
875.00
240.00
12,677.50
12,677.50
-
-
-
5,625.00
5,250.00
525.00
520.00
11,920.00
11,920.00
-
-
-
-
-
2,812.50
8,750.00
875.00
240.00
12,677.50
12,677.50
-
-
-
2,700.00
2,100.00
210.00
240.00
5,250.00
5,250.00
-
-
-
3,375.00
2,450.00
280.00
240.00
6,345.00
6,345.00
-
-
-
3,375.00
26,250.00
280.00
240.00
30,145.00
30,145.00
-
-
-
2,250.00
35,000.00
350.00
400.00
38,000.00
38,000.00
-
-
3,375.00
1,750.00
175.00
320.00
5,620.00
5,620.00
PEKERJAAN PENUTUP PLAFOND
1. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.1.1
1.100 Lbr Asbes langit-langit tbl 6 mm @ Rp. - = Rp -
0.010 Kg Paku @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.1.2
0.030 Oh Pekerja @ Rp. 22,500.00 = Rp 675.00
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp 2,450.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.0015 Oh Mandor @ Rp. 40,000.00 = Rp 60.00
= Rp 3,430.00
Total harga = Rp 3,430.00
2. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.2.1
1.100 Lbr Asbes langit-langit tbl 5 mm @ Rp. 24,000.00 = Rp 26,400.00
0.010 Kg Paku @ Rp. 54,000.00 = Rp 540.00
= Rp 26,940.00
Upah An. SNI ( Revisi ) 6.2.2
0.030 Oh Pekerja @ Rp. 22,500.00 = Rp 675.00
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp 2,450.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.0015 Oh Mandor @ Rp. 40,000.00 = Rp 60.00
= Rp 3,430.00
Total harga = Rp 30,370.00
3. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.3.1
1.100 Lbr Asbes langit-langit tbl 4 mm @ Rp. 220.00 = Rp 242.00
0.010 Kg Paku @ Rp. 30,000.00 = Rp 300.00
= Rp 542.00
Upah An. SNI ( Revisi ) 6.3.2
0.030 Oh Pekerja @ Rp. 22,500.00 = Rp 675.00
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp 2,450.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.0015 Oh Mandor @ Rp. 40,000.00 = Rp 60.00
= Rp 3,430.00
Total harga = Rp 3,972.00
4. 1 m2 Pasang langit-langit asbes ( 1.00 x 1.00 ) m, tebal 3.5 mm
Bahan An. SNI ( Revisi ) 6.4.1
1.100 Lbr Asbes langit-langit tbl 3.5 mm @ Rp. 16,500.00 = Rp 18,150.00
0.010 Kg Paku @ Rp. 29,000.00 = Rp 290.00
= Rp 18,440.00
Upah An. SNI ( Revisi ) 6.4.2
0.030 Oh Pekerja @ Rp. 22,500.00 = Rp 675.00
0.070 Oh Tukang kayu @ Rp. 35,000.00 = Rp 2,450.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.0015 Oh Mandor @ Rp. 40,000.00 = Rp 60.00
= Rp 3,430.00
Total harga = Rp 21,870.00
5. 1 m2 Pasang langit-langit akustik ( 30 x 30 ) cm
Bahan An. SNI ( Revisi ) 6.5.1
11.500 Lbr Akustik ukuran 30 x 30 cm @ Rp. 1,625,000.00 = Rp 18,687,500.00
0.050 Kg Paku @ Rp. 1,625,000.00 = Rp 81,250.00
= Rp 18,768,750.00
Upah An. SNI ( Revisi ) 6.5.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.120 Oh Tukang kayu @ Rp. 35,000.00 = Rp 4,200.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 6,090.00
Total harga = Rp 18,774,840.00
6. 1 m2 Pasang langit-langit akustik ( 30 x 60 ) cm
Bahan An. SNI ( Revisi ) 6.6.1
5.800 Lbr Akustik ukuran 30 x 60 cm @ Rp. Satuan = Rp #VALUE!
0.050 Kg Paku @ Rp. - = Rp -
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.6.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 5,320.00
Total harga = Rp #VALUE!
7. 1 m2 Pasang langit-langit akustik ( 60 x 120 ) cm
Bahan An. SNI ( Revisi ) 6.7.1
1.500 Lbr Akustik arm strong 60 x 120 cm @ Rp. 6,000.00 = Rp 9,000.00
0.050 Kg Paku @ Rp. 6,000.00 = Rp 300.00
= Rp 9,300.00
Upah An. SNI ( Revisi ) 6.7.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 5,320.00
Total harga = Rp 14,620.00
8. 1 m2 Pasang langit-langit plywood ( 30 x 60 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.8.1
0.360 Lbr Plywood 4' x 8' x 4 mm @ Rp. 10,000.00 = Rp 3,600.00
0.030 Kg Paku @ Rp. 2,250.00 = Rp 67.50
= Rp 3,667.50
Upah An. SNI ( Revisi ) 6.8.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp 9,232.50
9. 1 m2 Pasang langit-langit plywood ( 30 x 60 ) cm, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.9.1
0.360 Lbr Plywood 4' x 8' x 6 mm @ Rp. 70,000.00 = Rp 25,200.00
0.030 Kg Paku @ Rp. 95,000.00 = Rp 2,850.00
= Rp 28,050.00
Upah An. SNI ( Revisi ) 6.9.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp 33,615.00
10. 1 m2 Pasang langit-langit plywood ( 60 x 120 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.10.1
0.375 Lbr Plywood 4' x 8' x 4 mm @ Rp. 12,500.00 = Rp 4,687.50
0.030 Kg Paku @ Rp. - = Rp -
= Rp 4,687.50
Upah An. SNI ( Revisi ) 6.10.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp 10,252.50
11. 1 m2 Pasang langit-langit plywood ( 60 x 120 ) cm, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.11.1
0.375 Lbr Plywood 4' x 8' x 6 mm @ Rp. - = Rp -
0.030 Kg Paku @ Rp. Harga = Rp #VALUE!
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.11.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp #VALUE!
12. 1 m2 Pasang langit-langit teakwood ( 30 x 60 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.12.1
0.360 Lbr Teakwood 4' x 8' x 4 mm @ Rp. 3,500.00 = Rp 1,260.00
0.030 Kg Paku @ Rp. 10,000.00 = Rp 300.00
= Rp 1,560.00
Upah An. SNI ( Revisi ) 6.12.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp 7,125.00
13. 1 m2 Pasang langit-langit teakwood ( 60 x 120 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.13.1
0.375 Lbr Teakwood 4' x 8' x 4 mm @ Rp. - = Rp -
0.030 Kg Paku @ Rp. 57,500.00 = Rp 1,725.00
= Rp 1,725.00
Upah An. SNI ( Revisi ) 6.13.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp 1,575.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.0035 Oh Mandor @ Rp. 40,000.00 = Rp 140.00
= Rp 5,565.00
Total harga = Rp 7,290.00
14. 1 m2 Pasang langit-langit lat kayu jati
Bahan An. SNI ( Revisi ) 6.14.1
0.024 m3 Kayu jati, papan @ Rp. 16,000.00 = Rp 384.00
0.010 Kg Paku @ Rp. 300,000.00 = Rp 3,000.00
0.050 Kg Paku sekrup @ Rp. 275,000.00 = Rp 13,750.00
= Rp 17,134.00
Upah An. SNI ( Revisi ) 6.14.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp 21,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 28,000.00
Total harga = Rp 45,134.00
15. 1 m2 Pasang langit-langit lat kayu ramin
Bahan An. SNI ( Revisi ) 6.15.1
0.024 m3 Kayu ramin @ Rp. 4,500.00 = Rp 108.00
0.010 Kg Paku @ Rp. 35,000.00 = Rp 350.00
0.050 Kg Paku sekrup @ Rp. 275,000.00 = Rp 13,750.00
= Rp 14,208.00
Upah An. SNI ( Revisi ) 6.15.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp 21,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 28,000.00
Total harga = Rp 42,208.00
16. 1 m2 Pasang langit-langit lat kayu kamper
Bahan An. SNI ( Revisi ) 6.16.1
0.024 m3 Kayu kamper, papan @ Rp. 500.00 = Rp 12.00
0.010 Kg Paku @ Rp. 750.00 = Rp 7.50
0.050 Kg Paku sekrup @ Rp. 13,000.00 = Rp 650.00
= Rp 669.50
Upah An. SNI ( Revisi ) 6.16.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp 21,000.00
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,100.00
0.010 Oh Mandor @ Rp. 40,000.00 = Rp 400.00
= Rp 28,000.00
Total harga = Rp 28,669.50
17. 1 m2 Pasang langit-langit soft board
Bahan An. SNI ( Revisi ) 6.17.1
0.350 Lbr Soft board 4' x 8' x 4mm @ Rp. 35,000.00 = Rp 12,250.00
0.030 Kg Paku @ Rp. 37,500.00 = Rp 1,125.00
= Rp 13,375.00
Upah An. SNI ( Revisi ) 6.17.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp 3,500.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 17,470.00
Total harga = Rp 30,845.00
18. 1 m2 Pasang langit-langit akustik 60 x 120 cm + rangka alluminium
Bahan An. SNI ( Revisi ) 6.18.1
3.600 m' Profil alluminium T @ Rp. - = Rp -
0.150 Kg Kawat seng polos @ Rp. - = Rp -
1.000 Bh Ramset/dinabolt @ Rp. - = Rp -
1.500 Lbr Akustik arm strong 60x120 cm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.18.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp 17,500.00
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,750.00
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp 300.00
= Rp 22,925.00
Total harga = Rp 22,925.00
19. 1 m' Pasang list langit-langit kayu profil
Bahan An. SNI ( Revisi ) 6.19.1
1.100 m' List kayu profil @ Rp. - = Rp -
0.010 Kg Paku @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.19.2
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp 1,125.00
0.050 Oh Tukang kayu @ Rp. 35,000.00 = Rp 1,750.00
0.005 Oh Kepala tukang @ Rp. 35,000.00 = Rp 175.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 3,170.00
Total harga = Rp 3,170.00
20. 1 m2 Pasang langit-langit asbes ( 1.00x1.00 ) m, tebal 3.2 mm, rangka borneo
Bahan An. SNI ( Revisi ) 6.20.1
0.012 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa @ Rp. - = Rp -
1.100 Lbr Asbes 1.00 x 1.00 m @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.20.2
0.180 Oh Pekerja @ Rp. 22,500.00 = Rp 4,050.00
0.320 Oh Tukang kayu @ Rp. 35,000.00 = Rp 11,200.00
0.032 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,120.00
0.009 Oh Mandor @ Rp. 40,000.00 = Rp 360.00
= Rp 16,730.00
Total harga = Rp 16,730.00
21. 1 m2 Pasang langit-langit plywood 4 mm + rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.21.1
0.023 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa 2" - 5" @ Rp. - = Rp -
0.390 Lbr Plywood 4' x 8 ' x 4 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.270 Oh Pekerja @ Rp. 22,500.00 = Rp 6,075.00
0.400 Oh Tukang kayu @ Rp. 35,000.00 = Rp 14,000.00
0.040 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,400.00
0.0135 Oh Mandor @ Rp. 40,000.00 = Rp 540.00
= Rp 22,015.00
Total harga = Rp 22,015.00
22. 1 m2 Pasang langit-langit akustik ( 30 x 60 ) cm + rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.22.1
0.023 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa @ Rp. - = Rp -
5.800 Lbr Akustik 30 x 60 cm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.260 Oh Pekerja @ Rp. 22,500.00 = Rp 5,850.00
0.400 Oh Tukang kayu @ Rp. 35,000.00 = Rp 14,000.00
0.040 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,400.00
0.013 Oh Mandor @ Rp. 40,000.00 = Rp 520.00
= Rp 21,770.00
Total harga = Rp 21,770.00
23. 1 m2 Pasang langit-langit akustik ( 30 x 30 ) cm + rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.23.1
0.027 m3 Kayu borneo @ Rp. - = Rp -
0.060 Kg Paku biasa @ Rp. - = Rp -
11.500 Lbr Akustik 30 x 30 cm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.310 Oh Pekerja @ Rp. 22,500.00 = Rp 6,975.00
0.470 Oh Tukang kayu @ Rp. 35,000.00 = Rp 16,450.00
0.047 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,645.00
0.0155 Oh Mandor @ Rp. 40,000.00 = Rp 620.00
= Rp 25,690.00
Total harga = Rp 25,690.00
24. 1 m2 Pasang langit-langit gypsum board, tebal 9 mm
Bahan An. SNI ( Revisi ) 6.24.1
0.364 Lbr Gypsum board ( 120x240x9 mm ) @ Rp. - = Rp -
0.110 Kg Paku sekrup @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp 2,250.00
0.050 Oh Tukang kayu @ Rp. 35,000.00 = Rp 1,750.00
0.005 Oh Kepala tukang @ Rp. 35,000.00 = Rp 175.00
0.0050 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 4,375.00
Total harga = Rp 4,375.00
PEKERJAAN SANITASI
1. Memasang 1 buah kloset duduk/monoblok
Bahan An. SNI ( Revisi ) 6.1.1
1.000 Bh Kloset duduk/monoblok @ Rp. - = Rp -
6% harga kloset = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.1.2
3.300 Oh Pekerja @ Rp. 22,500.00 = Rp 74,250.00
1.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 33,000.00
0.001 Oh Kepala tukang @ Rp. 35,000.00 = Rp 35.00
0.1600 Oh Mandor @ Rp. 40,000.00 = Rp 6,400.00
= Rp 113,685.00
Total harga = Rp 113,685.00
2. Memasang 1 buah kloset jongkok porselen
Bahan An. SNI ( Revisi ) 6.2.1
1.000 Bh Kloset jongkok porselen @ Rp. 24,000.00 = Rp 24,000.00
6.000 Kg Semen portland @ Rp. 54,000.00 = Rp 324,000.00
0.010 m3 Pasir pasang @ Rp. 1,440.00 = Rp 1,440.00
= Rp 349,440.00
Upah An. SNI ( Revisi ) 6.2.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
1.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 45,000.00
0.150 Oh Kepala tukang @ Rp. 35,000.00 = Rp 5,250.00
0.160 Oh Mandor @ Rp. 40,000.00 = Rp 6,400.00
= Rp 79,150.00
Total harga = Rp 428,590.00
3. Memasang 1 buah kloset jongkok teraso
Bahan An. SNI ( Revisi ) 6.3.1
1.000 Bh Kloset jongkok teraso @ Rp. 30,000.00 = Rp 30,000.00
7.000 Bh Bata merah 5 x 11 x 22 @ Rp. 27,000.00 = Rp 189,000.00
6.000 Kg Semen portland @ Rp. 27,000.00 = Rp 162,000.00
0.010 m3 Pasir pasang @ Rp. 1,800.00 = Rp 1,800.00
= Rp 382,800.00
Upah An. SNI ( Revisi ) 6.3.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
1.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 45,000.00
0.300 Oh Kepala tukang @ Rp. 35,000.00 = Rp 10,500.00
0.110 Oh Mandor @ Rp. 40,000.00 = Rp 4,400.00
= Rp 82,400.00
Total harga = Rp 465,200.00
4. Memasang 1 buah urinoir
Bahan An. SNI ( Revisi ) 6.4.1
1.000 Bh Urinoir @ Rp. 34,000.00 = Rp 34,000.00
30% harga urinoir = Perlengkapan @ Rp. 10,200.00 = Rp -
6.000 Kg Semen portland @ Rp. 34,000.00 = Rp 204,000.00
0.010 m3 Pasir pasang @ Rp. 2,040.00 = Rp 2,040.00
= Rp 240,040.00
Upah An. SNI ( Revisi ) 6.4.2
1.000 Oh Pekerja @ Rp. 22,500.00 = Rp 22,500.00
1.000 Oh Tukang batu @ Rp. 30,000.00 = Rp 30,000.00
0.100 Oh Kepala tukang @ Rp. 35,000.00 = Rp 3,500.00
0.100 Oh Mandor @ Rp. 40,000.00 = Rp 4,000.00
= Rp 60,000.00
Total harga = Rp 300,040.00
5. Memasang 1 buah wastafel
Bahan An. SNI ( Revisi ) 6.5.1
1.000 Bh Wastafel @ Rp. 2,175,000.00 = Rp 2,175,000.00
12% harga wstfel. = Perlengkapan @ Rp. 261,000.00 = Rp -
6.000 Kg Semen portland @ Rp. 1,175,000.00 = Rp 7,050,000.00
0.010 m3 Pasir pasang @ Rp. 130,500.00 = Rp 130,500.00
= Rp 9,355,500.00
Upah An. SNI ( Revisi ) 6.5.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp 4,500.00
1.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 43,500.00
0.150 Oh Kepala tukang @ Rp. 35,000.00 = Rp 5,250.00
0.100 Oh Mandor @ Rp. 40,000.00 = Rp 4,000.00
= Rp 57,250.00
Total harga = Rp 9,412,750.00
6. Memasang 1 buah bak mandi teraso volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.6.1
1.000 Bh Bak teraso @ Rp. 33,000.00 = Rp 33,000.00
6.000 Kg Semen portland @ Rp. 41,000.00 = Rp 246,000.00
0.010 m3 Pasir pasang @ Rp. 1,980.00 = Rp 1,980.00
= Rp 280,980.00
Upah An. SNI ( Revisi ) 6.6.2
2.100 Oh Pekerja @ Rp. 22,500.00 = Rp 47,250.00
0.750 Oh Tukang batu @ Rp. 30,000.00 = Rp 22,500.00
0.070 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,450.00
0.110 Oh Mandor @ Rp. 40,000.00 = Rp 4,400.00
= Rp 76,600.00
Total harga = Rp 357,580.00
7. Memasang 1 buah bak mandi fiberglass volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.7.1
1.000 Bh Bak fiberglass @ Rp. 8,500.00 = Rp 8,500.00
18% harga bak = Perlengkapan @ Rp. 1,530.00 = Rp -
= Rp 8,500.00
Upah An. SNI ( Revisi ) 6.7.2
1.800 Oh Pekerja @ Rp. 22,500.00 = Rp 40,500.00
2.700 Oh Tukang batu @ Rp. 30,000.00 = Rp 81,000.00
0.540 Oh Kepala tukang @ Rp. 35,000.00 = Rp 18,900.00
0.110 Oh Mandor @ Rp. 40,000.00 = Rp 4,400.00
= Rp 144,800.00
Total harga = Rp 153,300.00
8. Memasang 1 buah bak mandi batu bata volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.8.1
0.400 m3 Batu bata @ Rp. 65,000.00 = Rp 26,000.00
120.000 Kg Semen portland @ Rp. 39,500.00 = Rp 4,740,000.00
0.300 m3 Pasir pasang @ Rp. 40,000.00 = Rp 12,000.00
360.000 Bh Porselen ( 11x11 ) cm @ Rp. 50,000.00 = Rp 18,000,000.00
6.000 Kg Semen nat @ Rp. 11,700.00 = Rp 70,200.00
= Rp 22,848,200.00
Upah An. SNI ( Revisi ) 6.8.2
6.000 Oh Pekerja @ Rp. 22,500.00 = Rp 135,000.00
3.000 Oh Tukang batu @ Rp. 30,000.00 = Rp 90,000.00
0.300 Oh Kepala tukang @ Rp. 35,000.00 = Rp 10,500.00
0.300 Oh Mandor @ Rp. 40,000.00 = Rp 12,000.00
= Rp 247,500.00
Total harga = Rp 23,095,700.00
9. Memasang 1 buah badkip porselen
Bahan An. SNI ( Revisi ) 6.9.1
1.000 m3 Badkip @ Rp. 90,000.00 = Rp 90,000.00
20% harga badkip = Perlengkapan @ Rp. 16,200.00 = Rp -
= Rp 90,000.00
Upah An. SNI ( Revisi ) 6.9.2
0.000 Oh Pekerja @ Rp. 22,500.00 = Rp -
0.075 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,250.00
0.750 Oh Kepala tukang @ Rp. 35,000.00 = Rp 26,250.00
0.250 Oh Mandor @ Rp. 40,000.00 = Rp 10,000.00
= Rp 38,500.00
Total harga = Rp 128,500.00
10. Membuat 1 buah bak beton volume 1 m3 air
Bahan An. SNI ( Revisi ) 6.10.1
0.900 m3 Beton 1 : 1.5 : 2.5 @ Rp. 47,500.00 = Rp 42,750.00
180.000 Kg Besi beton @ Rp. 20,000.00 = Rp 3,600,000.00
8.000 m3 Kayu cetakan @ Rp. - = Rp -
5.000 m2 Ubin porselen @ Rp. Harga = Rp #VALUE!
10% harga bhn = Perlengkapan @ Rp. #VALUE! = Rp #VALUE!
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.10.2
3.500 Oh Pekerja @ Rp. 22,500.00 = Rp 78,750.00
4.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 135,000.00
0.900 Oh Kepala tukang @ Rp. 35,000.00 = Rp 31,500.00
0.900 Oh Mandor @ Rp. 40,000.00 = Rp 36,000.00
= Rp 281,250.00
Total harga = Rp #VALUE!
11. Memasang 1 buah bak mandi fiberglass volume 1 m3 air
Bahan An. SNI ( Revisi ) 6.11.1
1.000 Bh Bak fiberglass @ Rp. 10,000.00 = Rp 10,000.00
12% harga bak = Perlengkapan @ Rp. 1,800.00 = Rp -
= Rp 10,000.00
Upah An. SNI ( Revisi ) 6.11.2
3.000 Oh Pekerja @ Rp. 22,500.00 = Rp 67,500.00
4.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 135,000.00
0.900 Oh Kepala tukang @ Rp. 35,000.00 = Rp 31,500.00
0.900 Oh Mandor @ Rp. 40,000.00 = Rp 36,000.00
= Rp 270,000.00
Total harga = Rp 280,000.00
12. Memasang 1 m' pipa penyalur air limbah jenis pipa tanah, Ø 15 cm
Bahan An. SNI ( Revisi ) 6.12.1
1.600 Bh Pipa tanah @ Rp. 57,500.00 = Rp 92,000.00
0.680 Kg Semen portland @ Rp. 65,000.00 = Rp 44,200.00
0.013 m3 Pasir pasang @ Rp. 57,500.00 = Rp 747.50
0.011 m3 Pasir urug @ Rp. 10,350.00 = Rp 113.85
= Rp 137,061.35
Upah An. SNI ( Revisi ) 6.12.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp 100.00
= Rp 2,455.00
Total harga = Rp 139,516.35
13. Memasang 1 m' pipa penyalur air limbah jenis pipa tanah, Ø 20 cm
Bahan An. SNI ( Revisi ) 6.13.1
1.600 Bh Pipa tanah @ Rp. 12,000.00 = Rp 19,200.00
0.870 Kg Semen portland @ Rp. 15,000.00 = Rp 13,050.00
0.014 m3 Pasir pasang @ Rp. 20,000.00 = Rp 280.00
0.014 m3 Pasir urug @ Rp. 2,160.00 = Rp 30.24
= Rp 32,560.24
Upah An. SNI ( Revisi ) 6.13.2
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp 1,800.00
0.040 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,200.00
0.004 Oh Kepala tukang @ Rp. 35,000.00 = Rp 140.00
0.007 Oh Mandor @ Rp. 40,000.00 = Rp 280.00
= Rp 3,420.00
Total harga = Rp 35,980.24
14. Memasang 1 m' pipa beton, Ø 15 - 20 cm
Bahan An. SNI ( Revisi ) 6.14.1
1.100 Bh Pipa beton @ Rp. - = Rp -
0.027 m3 Batu bata @ Rp. - = Rp -
3.920 Kg Semen portland @ Rp. 44,000.00 = Rp 172,480.00
0.065 m3 Pasir pasang @ Rp. 33,000.00 = Rp 2,145.00
0.024 m3 Pasir urug @ Rp. - = Rp -
= Rp 174,625.00
Upah An. SNI ( Revisi ) 6.14.2
0.140 Oh Pekerja @ Rp. 22,500.00 = Rp 3,150.00
0.070 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,100.00
0.007 Oh Kepala tukang @ Rp. 35,000.00 = Rp 245.00
0.007 Oh Mandor @ Rp. 40,000.00 = Rp 280.00
= Rp 5,775.00
Total harga = Rp 180,400.00
15. Memasang 1 m' pipa beton, Ø 30 - 100 cm
Bahan An. SNI ( Revisi ) 6.15.1
1.100 Bh Pipa beton @ Rp. 41,000.00 = Rp 45,100.00
0.550 m3 Batu bata @ Rp. 41,000.00 = Rp 22,550.00
10.300 Kg Semen portland @ Rp. 1,000.00 = Rp 10,300.00
0.061 m3 Pasir pasang @ Rp. 1,500.00 = Rp 91.50
0.069 m3 Pasir urug @ Rp. 7,380.00 = Rp 509.22
= Rp 78,550.72
Upah An. SNI ( Revisi ) 6.15.2
0.380 Oh Pekerja @ Rp. 22,500.00 = Rp 8,550.00
0.190 Oh Tukang batu @ Rp. 30,000.00 = Rp 5,700.00
0.019 Oh Kepala tukang @ Rp. 35,000.00 = Rp 665.00
0.019 Oh Mandor @ Rp. 40,000.00 = Rp 760.00
= Rp 15,675.00
Total harga = Rp 94,225.72
16. Memasang 1 buah bak kontrol pas. batu bata ( 30x30 ) cm, tinggi 35 cm
Bahan An. SNI ( Revisi ) 6.16.1
0.145 m3 Batu bata @ Rp. 22,500.00 = Rp 3,262.50
44.000 Kg Semen portland @ Rp. 32,500.00 = Rp 1,430,000.00
0.070 m3 Pasir pasang @ Rp. 32,500.00 = Rp 2,275.00
0.070 m3 Batu kerikil @ Rp. - = Rp -
1.600 Kg Besi beton @ Rp. - = Rp -
0.060 m3 Pasir beton @ Rp. 4,050.00 = Rp 243.00
= Rp 1,435,780.50
Upah An. SNI ( Revisi ) 6.16.2
3.200 Oh Pekerja @ Rp. 22,500.00 = Rp 72,000.00
1.015 Oh Tukang batu @ Rp. 30,000.00 = Rp 30,450.00
0.0015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 52.50
0.016 Oh Mandor @ Rp. 40,000.00 = Rp 640.00
= Rp 103,142.50
Total harga = Rp 1,538,923.00
17. Memasang 1 buah bak kontrol pas. batu bata ( 45x45 ) cm, tinggi 50 cm
Bahan An. SNI ( Revisi ) 6.17.1
0.250 m3 Batu bata @ Rp. - = Rp -
77.000 Kg Semen portland @ Rp. - = Rp -
0.130 m3 Pasir pasang @ Rp. - = Rp -
0.020 m3 Batu kerikil @ Rp. - = Rp -
2.600 Kg Besi beton @ Rp. - = Rp -
0.090 m3 Pasir beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.17.2
1.420 Oh Pekerja @ Rp. 22,500.00 = Rp 31,950.00
0.470 Oh Tukang batu @ Rp. 30,000.00 = Rp 14,100.00
0.047 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,645.00
0.071 Oh Mandor @ Rp. 40,000.00 = Rp 2,840.00
= Rp 50,535.00
Total harga = Rp 50,535.00
18. Memasang 1 buah bak kontrol pas. batu bata ( 60x60 ) cm, tinggi 65 cm
Bahan An. SNI ( Revisi ) 6.18.1
0.371 m3 Batu bata @ Rp. - = Rp -
114.000 Kg Semen portland @ Rp. - = Rp -
0.184 m3 Pasir pasang @ Rp. - = Rp -
0.033 m3 Batu kerikil @ Rp. - = Rp -
4.850 Kg Besi beton @ Rp. - = Rp -
0.120 m3 Pasir beton @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.18.2
2.160 Oh Pekerja @ Rp. 22,500.00 = Rp 48,600.00
0.720 Oh Tukang batu @ Rp. 30,000.00 = Rp 21,600.00
0.072 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,520.00
0.108 Oh Mandor @ Rp. 40,000.00 = Rp 4,320.00
0.100 Oh Tukang gali @ Rp. 30,000.00 = Rp 3,000.00
= Rp 80,040.00
Total harga = Rp 80,040.00
19. Memasang 1 m' pipa galvanis ø 1/2"
Bahan An. SNI ( Revisi ) 6.19.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.19.2
0.054 Oh Pekerja @ Rp. 22,500.00 = Rp 1,215.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.027 Oh Mandor @ Rp. 40,000.00 = Rp 1,080.00
= Rp 5,310.00
Total harga = Rp 5,310.00
20. Memasang 1 m' pipa galvanis ø 3/4"
Bahan An. SNI ( Revisi ) 6.20.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.20.2
0.054 Oh Pekerja @ Rp. 22,500.00 = Rp 1,215.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.027 Oh Mandor @ Rp. 40,000.00 = Rp 1,080.00
= Rp 5,310.00
Total harga = Rp 5,310.00
21. Memasang 1 m' pipa galvanis ø 1"
Bahan An. SNI ( Revisi ) 6.21.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.054 Oh Pekerja @ Rp. 22,500.00 = Rp 1,215.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.027 Oh Mandor @ Rp. 40,000.00 = Rp 1,080.00
= Rp 5,310.00
Total harga = Rp 5,310.00
22. Memasang 1 m' pipa galvanis ø 1.5"
Bahan An. SNI ( Revisi ) 6.22.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.108 Oh Pekerja @ Rp. 22,500.00 = Rp 2,430.00
0.180 Oh Tukang batu @ Rp. 30,000.00 = Rp 5,400.00
0.018 Oh Kepala tukang @ Rp. 35,000.00 = Rp 630.00
0.0054 Oh Mandor @ Rp. 40,000.00 = Rp 216.00
= Rp 8,676.00
Total harga = Rp 8,676.00
23. Memasang 1 m' pipa galvanis ø 3"
Bahan An. SNI ( Revisi ) 6.23.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.108 Oh Pekerja @ Rp. 22,500.00 = Rp 2,430.00
0.180 Oh Tukang batu @ Rp. 30,000.00 = Rp 5,400.00
0.018 Oh Kepala tukang @ Rp. 35,000.00 = Rp 630.00
0.0054 Oh Mandor @ Rp. 40,000.00 = Rp 216.00
= Rp 8,676.00
Total harga = Rp 8,676.00
24. Memasang 1 m' pipa galvanis ø 4"
Bahan An. SNI ( Revisi ) 6.24.1
1.200 m' Pipa galvanis @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.135 Oh Pekerja @ Rp. 22,500.00 = Rp 3,037.50
0.225 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,750.00
0.0225 Oh Kepala tukang @ Rp. 35,000.00 = Rp 787.50
0.0068 Oh Mandor @ Rp. 40,000.00 = Rp 272.00
= Rp 10,847.00
Total harga = Rp 10,847.00
25. Memasang 1 m' pipa PVC tipe AW ø 1/2"
Bahan An. SNI ( Revisi ) 6.25.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.25.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
26. Memasang 1 m' pipa PVC tipe AW ø 3/4"
Bahan An. SNI ( Revisi ) 6.26.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.26.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
27. Memasang 1 m' pipa PVC tipe AW ø 1"
Bahan An. SNI ( Revisi ) 6.27.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.27.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
28. Memasang 1 m' pipa PVC tipe AW ø 1.5"
Bahan An. SNI ( Revisi ) 6.28.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.28.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
29. Memasang 1 m' pipa PVC tipe AW ø 2"
Bahan An. SNI ( Revisi ) 6.29.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.29.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
30. Memasang 1 m' pipa PVC tipe AW ø 2.5"
Bahan An. SNI ( Revisi ) 6.30.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.30.2
0.036 Oh Pekerja @ Rp. 22,500.00 = Rp 810.00
0.060 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,800.00
0.0060 Oh Kepala tukang @ Rp. 35,000.00 = Rp 210.00
0.0018 Oh Mandor @ Rp. 40,000.00 = Rp 72.00
= Rp 2,892.00
Total harga = Rp 2,892.00
31. Memasang 1 m' pipa PVC tipe AW ø 3"
Bahan An. SNI ( Revisi ) 6.31.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.31.2
0.081 Oh Pekerja @ Rp. 22,500.00 = Rp 1,822.50
0.135 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,050.00
0.0135 Oh Kepala tukang @ Rp. 35,000.00 = Rp 472.50
0.0041 Oh Mandor @ Rp. 40,000.00 = Rp 164.00
= Rp 6,509.00
Total harga = Rp 6,509.00
32. Memasang 1 m' pipa PVC tipe AW ø 4"
Bahan An. SNI ( Revisi ) 6.32.1
1.200 m' Pipa PVC @ Rp. - = Rp -
35% harga pipa = Perlengkapan @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.32.2
0.081 Oh Pekerja @ Rp. 22,500.00 = Rp 1,822.50
0.135 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,050.00
0.0135 Oh Kepala tukang @ Rp. 35,000.00 = Rp 472.50
0.0041 Oh Mandor @ Rp. 40,000.00 = Rp 164.00
= Rp 6,509.00
Total harga = Rp 6,509.00
33. Memasang 1 buah bak cuci piring stainless steel
Bahan An. SNI ( Revisi ) 6.33.1
1.000 Bh Bak cuci stainless steel @ Rp. - = Rp -
1.000 set Water drain + assesories @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.33.2
0.030 Oh Pekerja @ Rp. 22,500.00 = Rp 675.00
0.300 Oh Tukang batu @ Rp. 30,000.00 = Rp 9,000.00
0.030 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,050.00
0.0015 Oh Mandor @ Rp. 40,000.00 = Rp 60.00
= Rp 10,785.00
Total harga = Rp 10,785.00
34. Memasang 1 buah bak cuci piring teraso
Bahan An. SNI ( Revisi ) 6.34.1
1.000 Bh Bak cuci teraso @ Rp. - = Rp -
1.000 set Water drain + assesories @ Rp. - = Rp -
20.000 Kg Semen portland @ Rp. - = Rp -
0.050 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.34.2
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp 1,125.00
0.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 15,000.00
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,750.00
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp 100.00
= Rp 17,975.00
Total harga = Rp 17,975.00
35. Memasang 1 buah kran ø 3/4" atau 1/2"
Bahan An. SNI ( Revisi ) 6.35.1
1.000 Bh Kran air @ Rp. - = Rp -
0.025 Bh Seal tape @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.35.2
0.010 Oh Pekerja @ Rp. 22,500.00 = Rp 225.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 3,775.00
Total harga = Rp 3,775.00
36. Memasang 1 buah floor drain
Bahan An. SNI ( Revisi ) 6.36.1
1.000 Bh Floor drain @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.36.2
0.010 Oh Pekerja @ Rp. 22,500.00 = Rp 225.00
0.100 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,000.00
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp 350.00
0.005 Oh Mandor @ Rp. 40,000.00 = Rp 200.00
= Rp 3,775.00
Total harga = Rp 3,775.00
#VALUE!
PEKERJAAN BESI & ALLUMINIUM
1. 1 Kg Pasang rangka atap baja
Bahan An. SNI ( Revisi ) 6.1.1
1.100 Kg Besi profil WF @ Rp. - = Rp
0.080 Kg Meni besi @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.006 Oh Tukang besi @ Rp. 32,500.00 = Rp
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp
0.006 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0003 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
2. 1 m2 Pasang pintu besi baja
Bahan An. SNI ( Revisi ) 6.2.1
1.000 m2 Pintu besi baja @ Rp. 24,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.650 Oh Tukang besi @ Rp. 32,500.00 = Rp
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp
0.065 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.032 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
3. 1 m2 Pasang jendela besi
Bahan An. SNI ( Revisi ) 6.3.1
1.000 m2 Jendela besi @ Rp. 110,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
1.050 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.105 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00525 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
4. 1 m2 Pasang jendela besi tahan api
Bahan An. SNI ( Revisi ) 6.4.1
1.000 m2 Jendela besi tahan api @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
1.200 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.022 Oh Pekerja @ Rp. 22,500.00 = Rp
0.120 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.006 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
5. 1 m2 Pasang pintu gulung besi
Bahan An. SNI ( Revisi ) 6.5.1
1.000 m2 Pintu gulung besi @ Rp. 2,425,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.5.2
1.200 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.200 Oh Pekerja @ Rp. 22,500.00 = Rp
0.120 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.006 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
6. 1 m2 Pasang pintu lipat
Bahan An. SNI ( Revisi ) 6.6.1
1.000 m2 Pintu lipat @ Rp. 34,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
1.050 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.105 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0052 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
7. 1 m2 Pasang pintu sunscreen alliminium
Bahan An. SNI ( Revisi ) 6.7.1
1.000 m2 Sunscreen alluminium @ Rp. 41,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.800 Oh Tukang besi @ Rp. 32,500.00 = Rp
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp
0.080 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.004 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
8. 1 m2 Pasang rolling door
Bahan An. SNI ( Revisi ) 6.8.1
1.000 m2 Rolling door @ Rp. 8,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
1.500 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.105 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0052 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
9. 1 m2 Pasang pintu alluminium
Bahan An. SNI ( Revisi ) 6.9.1
1.000 m2 Pintu alluminium @ Rp. 50,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
1.050 Oh Tukang besi @ Rp. 32,500.00 = Rp
1.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.105 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0052 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
10. 1 m2 Pasang venetions blinds
Bahan An. SNI ( Revisi ) 6.10.1
1.000 m2 Venetions blind @ Rp. 15,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.350 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.350 Oh Pekerja @ Rp. 22,500.00 = Rp
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00175 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
11. 1 m2 Pasang verticals blinds
Bahan An. SNI ( Revisi ) 6.11.1
1.000 m2 Verticals blind @ Rp. 750.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.350 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.350 Oh Pekerja @ Rp. 22,500.00 = Rp
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00175 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
12. 1 m2 Pasang terali besi
Bahan An. SNI ( Revisi ) 6.12.1
11.500 m' Besi strip 2 x 3 @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
1.200 Oh Tukang las @ Rp. 32,500.00 = Rp
1.200 Oh Pekerja @ Rp. 22,500.00 = Rp
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0006 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
13. 1 m2 Pasang kawat harmonika
Bahan An. SNI ( Revisi ) 6.13.1
1.100 m2 Kawat harmonika @ Rp. 10,000.00 = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 2,500.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 7,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
14. 1 m2 Pasang kawat nyamuk
Bahan An. SNI ( Revisi ) 6.14.1
1.100 m2 Kawat nyamuk @ Rp. 57,500.00 = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 8,500.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 5,250.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
15. 1 m2 Pasang kawat kassa
Bahan An. SNI ( Revisi ) 6.15.1
1.100 m2 Kawat kassa @ Rp. 15,000.00 = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 20,000.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 30,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
16. 1 m2 Pasang kawat burung
Bahan An. SNI ( Revisi ) 6.16.1
1.100 m2 Kawat burung @ Rp. - = Rp
0.020 Kg Paku biasa 1/2" - 1" @ Rp. 44,000.00 = Rp
0.0018 m3 Kayu kamper, papan @ Rp. 33,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
17. 1 m2 Pasang jendela nako & trallis
Bahan An. SNI ( Revisi ) 6.17.1
1.100 m2 Jendela nako @ Rp. 14,000.00 = Rp
0.020 Kg Paku biasa 1/2" - 1"/ skrup @ Rp. 28,000.00 = Rp
0.025 m2 Besi strip @ Rp. 41,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.200 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.001 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
18. 1 m' Pasang talang datar, seng bjls 28
Bahan An. SNI ( Revisi ) 6.18.1
0.500 Lbr Seng plat 3' x 6' bjls 28 @ Rp. 35,000.00 = Rp
0.015 Kg Paku biasa 1/2" - 1" @ Rp. 30,000.00 = Rp
0.0096 m3 Kayu borneo, papan @ Rp. 32,500.00 = Rp
0.250 Kg Flincote/meni besi @ Rp. 32,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.400 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
19. 1 m' Pasang talang miring, seng bjls 28
Bahan An. SNI ( Revisi ) 6.19.1
0.500 Lbr Seng plat 3' x 6' bjls 28 @ Rp. - = Rp
0.015 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.019 m3 Kayu borneo, papan @ Rp. - = Rp
0.300 Kg Flincote/meni besi @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.040 Oh Pekerja @ Rp. 22,500.00 = Rp
0.400 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
20. 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng bjls 28
Bahan An. SNI ( Revisi ) 6.20.1
0.300 Lbr Seng plat 3' x 6' bjls 28 @ Rp. - = Rp
0.100 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.019 m3 Kayu borneo, papan @ Rp. - = Rp
0.500 Kg Besi strip @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
21. 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng bjls 24
Bahan An. SNI ( Revisi ) 6.21.1
0.300 Lbr Seng plat 3' x 6' bjls 24 @ Rp. - = Rp
0.100 Kg Paku biasa 1/2" - 1" @ Rp. - = Rp
0.019 m3 Kayu borneo, papan @ Rp. - = Rp
0.500 Kg Besi strip @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
-
-
-
195.00
1,350.00
210.00
12.00
1,767.00
1,767.00
24,000.00
24,000.00
21,125.00
14,625.00
2,275.00
1,280.00
39,305.00
63,305.00
110,000.00
110,000.00
34,125.00
23,625.00
3,675.00
210.00
61,635.00
171,635.00
-
-
39,000.00
22,995.00
4,200.00
240.00
66,435.00
66,435.00
2,425,000.00
2,425,000.00
39,000.00
27,000.00
4,200.00
240.00
70,440.00
2,495,440.00
34,000.00
34,000.00
34,125.00
23,625.00
3,675.00
208.00
61,633.00
95,633.00
41,000.00
41,000.00
26,000.00
1,800.00
2,800.00
160.00
30,760.00
71,760.00
8,500.00
8,500.00
48,750.00
23,625.00
3,675.00
208.00
76,258.00
84,758.00
50,000.00
50,000.00
34,125.00
23,625.00
3,675.00
208.00
61,633.00
111,633.00
15,000.00
15,000.00
12,250.00
7,875.00
1,225.00
70.00
21,420.00
36,420.00
750.00
750.00
12,250.00
7,875.00
1,225.00
70.00
21,420.00
22,170.00
-
-
39,000.00
27,000.00
420.00
24.00
66,444.00
66,444.00
11,000.00
50.00
12.60
11,062.60
2,250.00
3,500.00
350.00
20.00
6,120.00
17,182.60
63,250.00
170.00
9.45
63,429.45
2,250.00
3,500.00
350.00
20.00
6,120.00
69,549.45
16,500.00
400.00
54.00
16,954.00
2,250.00
3,500.00
350.00
20.00
6,120.00
23,074.00
-
880.00
59.40
939.40
2,250.00
3,500.00
350.00
20.00
6,120.00
7,059.40
15,400.00
560.00
1,025.00
16,985.00
4,500.00
7,000.00
700.00
40.00
12,240.00
29,225.00
17,500.00
450.00
312.00
8,125.00
26,387.00
3,375.00
14,000.00
875.00
50.00
18,300.00
44,687.00
-
-
-
-
-
900.00
14,000.00
875.00
50.00
15,825.00
15,825.00
-
-
-
-
-
3,375.00
8,750.00
875.00
50.00
13,050.00
13,050.00
-
-
-
-
-
3,375.00
8,750.00
875.00
50.00
13,050.00
13,050.00
PEKERJAAN KUNCI & KACA
1. 1 buah pasang kunci tanam antik
Bahan An. SNI ( Revisi ) 6.1.1
1.000 Bh Kunci tanam antik @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.003 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
2. 1 buah pasang kunci tanam biasa
Bahan An. SNI ( Revisi ) 6.2.1
1.000 Bh Kunci tanam biasa @ Rp. 49,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.010 Oh Pekerja @ Rp. 22,500.00 = Rp
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
3. 1 buah pasang kunci tanam KM/WC
Bahan An. SNI ( Revisi ) 6.3.1
1.000 Bh Kunci tanam KM/WC @ Rp. 125,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
0.005 Oh Pekerja @ Rp. 22,500.00 = Rp
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.005 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
4. 1 buah pasang kunci silinder
Bahan An. SNI ( Revisi ) 6.4.1
1.000 Bh Kunci silinder @ Rp. 375,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
0.005 Oh Pekerja @ Rp. 22,500.00 = Rp
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.005 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
5. 1 buah pasang engsel pintu
Bahan An. SNI ( Revisi ) 6.5.1
1.000 Bh Engsel pintu @ Rp. 2,725,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.5.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
6. 1 buah pasang engsel jendela kupu-kupu
Bahan An. SNI ( Revisi ) 6.6.1
1.000 Bh Engsel jendela @ Rp. 1,175,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
0.010 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
7. 1 buah pasang engsel angin
Bahan An. SNI ( Revisi ) 6.7.1
1.000 Bh Engsel angin @ Rp. 33,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.020 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.010 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
8. 1 buah pasang spring knip
Bahan An. SNI ( Revisi ) 6.8.1
1.000 Bh Spring knip @ Rp. 7,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
9. 1 buah pasang kait angin
Bahan An. SNI ( Revisi ) 6.9.1
1.000 Bh Kait angin @ Rp. 187,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
10. 1 buah pasang door closer
Bahan An. SNI ( Revisi ) 6.10.1
1.000 Bh Door closer @ Rp. 10,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
11. 1 buah pasang kunci selot
Bahan An. SNI ( Revisi ) 6.11.1
1.000 Bh Kunci selot @ Rp. 750.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.020 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.001 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
12. 1 buah pasang pegangan pintu/door holder
Bahan An. SNI ( Revisi ) 6.12.1
1.000 Bh Door holder @ Rp. Satuan = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
0.050 Oh Pekerja @ Rp. 22,500.00 = Rp
0.500 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
13. 1 buah pasang door stop
Bahan An. SNI ( Revisi ) 6.13.1
1.000 Bh Door stop @ Rp. 10,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.010 Oh Pekerja @ Rp. 22,500.00 = Rp
0.100 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.010 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0005 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
14. 1 buah pasang rel pintu dorong
Bahan An. SNI ( Revisi ) 6.14.1
1.000 Bh Rel pintu dorong @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp
0.600 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.060 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.003 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
15. 1 buah pasang kunci lemari
Bahan An. SNI ( Revisi ) 6.15.1
1.000 Bh Kunci lemari @ Rp. 14,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.025 Oh Pekerja @ Rp. 22,500.00 = Rp
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
16. 1 m2 pasang kaca, tebal 3 mm
Bahan An. SNI ( Revisi ) 6.16.1
1.100 m2 Kaca tebal 3 mm @ Rp. 150,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
17. 1 m2 pasang kaca, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.17.1
1.100 m2 Kaca tebal 5 mm @ Rp. 9,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
18. 1 m2 pasang kaca, tebal 8 mm
Bahan An. SNI ( Revisi ) 6.18.1
1.100 m2 Kaca tebal 8 mm @ Rp. 1,000.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.0165 Oh Pekerja @ Rp. 22,500.00 = Rp
0.165 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.0165 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00080 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
19. 1 m2 pasang kaca buram, tebal 12 mm
Bahan An. SNI ( Revisi ) 6.19.1
1.100 m2 Kaca buram @ Rp. 30,000.00 = Rp
0.050 Kg Sealent @ Rp. 32,500.00 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.025 Oh Pekerja @ Rp. 22,500.00 = Rp
0.250 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.025 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00125 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
20. 1 m2 pasang kaca cermin, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.20.1
1.100 m2 Kaca cermin @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
21. 1 m2 pasang kaca cermin, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.21.1
1.100 m2 Kaca cermin @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
22. 1 m2 pasang kaca cermin, tebal 8 mm
Bahan An. SNI ( Revisi ) 6.22.1
1.100 m2 Kaca cermin @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.22.2
0.0165 Oh Pekerja @ Rp. 22,500.00 = Rp
0.165 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.0165 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00080 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
23. 1 m2 pasang kaca wireglass, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.23.1
1.100 m2 Kaca wireglass @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.23.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
24. 1 m2 pasang kaca patri, tebal 5 mm
Bahan An. SNI ( Revisi ) 6.24.1
1.100 m2 Kaca patri @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.24.2
0.015 Oh Pekerja @ Rp. 22,500.00 = Rp
0.150 Oh Tukang kayu @ Rp. 35,000.00 = Rp
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.00075 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
-
-
1,350.00
21,000.00
2,100.00
120.00
24,570.00
24,570.00
49,000.00
49,000.00
225.00
17,500.00
350.00
200.00
18,275.00
67,275.00
125,000.00
125,000.00
112.50
17,500.00
175.00
100.00
17,887.50
142,887.50
375,000.00
375,000.00
112.50
17,500.00
175.00
10.00
17,797.50
392,797.50
2,725,000.00
2,725,000.00
337.50
5,250.00
525.00
30.00
6,142.50
2,731,142.50
1,175,000.00
1,175,000.00
225.00
3,500.00
350.00
20.00
4,095.00
1,179,095.00
33,000.00
33,000.00
450.00
7,000.00
700.00
400.00
8,550.00
41,550.00
7,000.00
7,000.00
337.50
5,250.00
525.00
30.00
6,142.50
13,142.50
187,000.00
187,000.00
337.50
5,250.00
525.00
30.00
6,142.50
193,142.50
10,000.00
10,000.00
1,125.00
17,500.00
1,750.00
100.00
20,475.00
30,475.00
750.00
750.00
450.00
7,000.00
700.00
40.00
8,190.00
8,940.00
#VALUE!
#VALUE!
1,125.00
17,500.00
1,750.00
100.00
20,475.00
#VALUE!
10,000.00
10,000.00
225.00
3,500.00
350.00
20.00
4,095.00
14,095.00
-
-
1,350.00
21,000.00
2,100.00
120.00
24,570.00
24,570.00
14,000.00
14,000.00
562.50
8,750.00
875.00
50.00
10,237.50
24,237.50
165,000.00
165,000.00
337.50
5,250.00
525.00
30.00
6,142.50
171,142.50
9,900.00
9,900.00
337.50
5,250.00
525.00
30.00
6,142.50
16,042.50
1,100.00
1,100.00
371.25
5,775.00
577.50
32.00
6,755.75
7,855.75
33,000.00
1,625.00
34,625.00
562.50
8,750.00
875.00
50.00
10,237.50
44,862.50
-
-
337.50
5,250.00
525.00
30.00
6,142.50
6,142.50
-
-
337.50
5,250.00
525.00
30.00
6,142.50
6,142.50
-
-
371.25
5,775.00
577.50
32.00
6,755.75
6,755.75
-
-
337.50
5,250.00
525.00
30.00
6,142.50
6,142.50
-
-
337.50
5,250.00
525.00
30.00
6,142.50
6,142.50
PEKERJAAN PENUTUP LANTAI & DINDING
1. 1 m2 Pasang lantai ubin PC abu-abu akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.1.1
6.630 Bh Ubin abu-abu 40 x 40 cm @ Rp. - = Rp -
9.800 Kg Semen portland @ Rp. - = Rp -
0.0215 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.1.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.125 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,750.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,295.00
Total harga = Rp 10,295.00
2. 1 m2 Pasang lantai ubin PC abu-abu akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.2.1
11.870 Bh Ubin abu-abu 30 x 30 cm @ Rp. 24,000.00 = Rp 284,880.00
10.000 Kg Semen portland @ Rp. 54,000.00 = Rp 540,000.00
0.0215 m3 Pasir pasang @ Rp. 54,000.00 = Rp 1,161.00
= Rp 826,041.00
Upah An. SNI ( Revisi ) 6.2.2
0.260 Oh Pekerja @ Rp. 22,500.00 = Rp 5,850.00
0.125 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,750.00
0.0125 Oh Kepala tukang @ Rp. 35,000.00 = Rp 437.50
0.013 Oh Mandor @ Rp. 40,000.00 = Rp 520.00
= Rp 10,557.50
Total harga = Rp 836,598.50
3. 1 m2 Pasang lantai ubin PC abu-abu akuran 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.3.1
26.500 Bh Ubin abu-abu 20 x 20 cm @ Rp. 30,000.00 = Rp 795,000.00
10.400 Kg Semen portland @ Rp. 27,000.00 = Rp 280,800.00
0.0135 m3 Pasir pasang @ Rp. 27,000.00 = Rp 364.50
= Rp 1,076,164.50
Upah An. SNI ( Revisi ) 6.3.2
0.270 Oh Pekerja @ Rp. 22,500.00 = Rp 6,075.00
0.130 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,900.00
0.0130 Oh Kepala tukang @ Rp. 35,000.00 = Rp 455.00
0.0135 Oh Mandor @ Rp. 40,000.00 = Rp 540.00
= Rp 10,970.00
Total harga = Rp 1,087,134.50
4. 1 m2 Pasang lantai ubin warna akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.4.1
6.630 Bh Ubin warna 40 x 40 cm @ Rp. 34,000.00 = Rp 225,420.00
8.160 Kg Semen portland @ Rp. 34,000.00 = Rp 277,440.00
0.023 m3 Pasir pasang @ Rp. 34,000.00 = Rp 782.00
0.900 Kg Semen warna @ Rp. 65,000.00 = Rp 58,500.00
= Rp 562,142.00
Upah An. SNI ( Revisi ) 6.4.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 572,287.00
5. 1 m2 Pasang lantai ubin warna akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.5.1
11.870 Bh Ubin warna 30 x 30 cm @ Rp. 1,275,000.00 = Rp 15,134,250.00
8.360 Kg Semen portland @ Rp. 2,175,000.00 = Rp 18,183,000.00
0.023 m3 Pasir pasang @ Rp. 2,175,000.00 = Rp 50,025.00
0.900 Kg Semen warna @ Rp. 1,175,000.00 = Rp 1,057,500.00
= Rp 34,424,775.00
Upah An. SNI ( Revisi ) 6.5.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 34,434,920.00
6. 1 m2 Pasang lantai ubin warna akuran 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.6.1
26.500 Bh Ubin warna 20 x 20 cm @ Rp. 30,500.00 = Rp 808,250.00
8.760 Kg Semen portland @ Rp. 33,000.00 = Rp 289,080.00
0.023 m3 Pasir pasang @ Rp. 33,000.00 = Rp 759.00
0.900 Kg Semen warna @ Rp. 64,000.00 = Rp 57,600.00
= Rp 1,155,689.00
Upah An. SNI ( Revisi ) 6.6.2
0.270 Oh Pekerja @ Rp. 22,500.00 = Rp 6,075.00
0.130 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,900.00
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp 455.00
0.0135 Oh Mandor @ Rp. 40,000.00 = Rp 540.00
= Rp 10,970.00
Total harga = Rp 1,166,659.00
7. 1 m2 Pasang lantai ubin teraso akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.7.1
6.250 Bh Ubin teraso 40 x 40 cm @ Rp. 8,500.00 = Rp 53,125.00
8.800 Kg Semen portland @ Rp. 8,500.00 = Rp 74,800.00
0.0215 m3 Pasir pasang @ Rp. 8,500.00 = Rp 182.75
0.900 Kg Semen warna @ Rp. 8,500.00 = Rp 7,650.00
= Rp 135,757.75
Upah An. SNI ( Revisi ) 6.7.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 145,902.75
8. 1 m2 Pasang lantai ubin teraso akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.8.1
11.870 Bh Ubin teraso 30 x 30 cm @ Rp. 40,000.00 = Rp 474,800.00
10.000 Kg Semen portland @ Rp. 50,000.00 = Rp 500,000.00
0.0215 m3 Pasir pasang @ Rp. 50,000.00 = Rp 1,075.00
1.540 Kg Semen warna @ Rp. 70,000.00 = Rp 107,800.00
= Rp 1,083,675.00
Upah An. SNI ( Revisi ) 6.8.2
0.260 Oh Pekerja @ Rp. 22,500.00 = Rp 5,850.00
0.125 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,750.00
0.013 Oh Kepala tukang @ Rp. 35,000.00 = Rp 437.50
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,537.50
Total harga = Rp 1,094,212.50
9. 1 m2 Pasang lantai ubin granito akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.9.1
6.930 Bh Ubin granito 40 x 40 cm @ Rp. 10,000.00 = Rp 69,300.00
9.800 Kg Semen portland @ Rp. 12,500.00 = Rp 122,500.00
0.0215 m3 Pasir pasang @ Rp. 12,500.00 = Rp 268.75
1.300 Kg Semen warna @ Rp. 350.00 = Rp 455.00
= Rp 192,523.75
Upah An. SNI ( Revisi ) 6.9.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 202,668.75
10. 1 m2 Pasang lantai ubin granito akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.10.1
11.870 Bh Ubin granito 30 x 30 cm @ Rp. Harga = Rp #VALUE!
10.000 Kg Semen portland @ Rp. Satuan = Rp #VALUE!
0.0215 m3 Pasir pasang @ Rp. Satuan = Rp #VALUE!
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp #VALUE!
Upah An. SNI ( Revisi ) 6.10.2
0.260 Oh Pekerja @ Rp. 22,500.00 = Rp 5,850.00
0.125 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,750.00
0.0130 Oh Kepala tukang @ Rp. 35,000.00 = Rp 455.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,555.00
Total harga = Rp #VALUE!
11. 1 m2 Pasang lantai ubin teralux kerang akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.11.1
6.250 Bh Ubin teralux kerang 40 x 40 cm @ Rp. 2,500.00 = Rp 15,625.00
8.800 Kg Semen portland @ Rp. 7,000.00 = Rp 61,600.00
0.0215 m3 Pasir pasang @ Rp. 7,000.00 = Rp 150.50
1.300 Kg Semen warna @ Rp. 27,500.00 = Rp 35,750.00
= Rp 113,125.50
Upah An. SNI ( Revisi ) 6.11.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.0120 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 123,270.50
12. 1 m2 Pasang lantai ubin teralux kerang akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.12.1
11.870 Bh Ubin teralux kerang 30 x 30 cm @ Rp. 5,250.00 = Rp 62,317.50
10.000 Kg Semen portland @ Rp. 10,000.00 = Rp 100,000.00
0.0215 m3 Pasir pasang @ Rp. 10,000.00 = Rp 215.00
1.125 Kg Semen warna @ Rp. 3,000.00 = Rp 3,375.00
= Rp 165,907.50
Upah An. SNI ( Revisi ) 6.12.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.0120 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 176,052.50
13. 1 m2 Pasang lantai ubin teralux marmer akuran 60 x 60 cm
Bahan An. SNI ( Revisi ) 6.13.1
5.600 Bh Ubin teralux marmer 60 x 60 cm @ Rp. 42,000.00 = Rp 235,200.00
8.190 Kg Semen portland @ Rp. 60,000.00 = Rp 491,400.00
0.045 m3 Pasir pasang @ Rp. 60,000.00 = Rp 2,700.00
1.000 Kg Semen warna @ Rp. 3,500.00 = Rp 3,500.00
= Rp 732,800.00
Upah An. SNI ( Revisi ) 6.13.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp 5,625.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0125 Oh Mandor @ Rp. 40,000.00 = Rp 500.00
= Rp 10,145.00
Total harga = Rp 742,945.00
14. 1 m2 Pasang lantai ubin teralux marmer akuran 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.14.1
6.250 Bh Ubin teralux marmer 40 x 40 cm @ Rp. 60,000.00 = Rp 375,000.00
8.800 Kg Semen portland @ Rp. 9,000.00 = Rp 79,200.00
0.0215 m3 Pasir pasang @ Rp. 9,000.00 = Rp 193.50
1.300 Kg Semen warna @ Rp. 2,000.00 = Rp 2,600.00
= Rp 456,993.50
Upah An. SNI ( Revisi ) 6.14.2
0.672 Oh Pekerja @ Rp. 22,500.00 = Rp 15,120.00
0.224 Oh Tukang batu @ Rp. 30,000.00 = Rp 6,720.00
0.022 Oh Kepala tukang @ Rp. 35,000.00 = Rp 770.00
0.0340 Oh Mandor @ Rp. 40,000.00 = Rp 1,360.00
= Rp 23,970.00
Total harga = Rp 480,963.50
15. 1 m2 Pasang lantai ubin teralux marmer akuran 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.15.1
11.870 Bh Ubin teralux marmer 30 x 30 cm @ Rp. 2,250.00 = Rp 26,707.50
10.000 Kg Semen portland @ Rp. 82,500.00 = Rp 825,000.00
0.0215 m3 Pasir pasang @ Rp. 82,500.00 = Rp 1,773.75
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp 853,481.25
Upah An. SNI ( Revisi ) 6.15.2
0.700 Oh Pekerja @ Rp. 22,500.00 = Rp 15,750.00
0.340 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,200.00
0.034 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,190.00
0.0350 Oh Mandor @ Rp. 40,000.00 = Rp 1,400.00
= Rp 28,540.00
Total harga = Rp 882,021.25
16. 1 m' Pasang plint ubin pc abu-abu akuran 15 x 20 cm
Bahan An. SNI ( Revisi ) 6.16.1
5.300 Bh Plint ubin 15 x 20 cm @ Rp. - = Rp -
1.560 Kg Semen portland @ Rp. - = Rp -
0.004 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.16.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
17. 1 m' Pasang plint ubin pc abu-abu akuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.17.1
3.530 Bh Plint ubin 10 x 30 cm @ Rp. - = Rp -
1.560 Kg Semen portland @ Rp. - = Rp -
0.003 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.17.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
18. 1 m' Pasang plint ubin pc abu-abu ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.18.1
2.650 Bh Plint ubin 10 x 40 cm @ Rp. - = Rp -
1.560 Kg Semen portland @ Rp. - = Rp -
0.003 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.18.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
19. 1 m' Pasang plint ubin pc warna ukuran 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.19.1
5.300 Bh Plint ubin pc warna 10 x 20 cm @ Rp. - = Rp -
1.200 Kg Semen portland @ Rp. - = Rp -
0.003 m3 Pasir pasang @ Rp. - = Rp -
0.190 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.19.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
20. 1 m' Pasang plint ubin pc warna ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.20.1
3.330 Bh Plint ubin pc warna 10 x 30 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.20.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
21. 1 m' Pasang plint ubin pc warna ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.21.1
2.650 Bh Plint ubin pc warna 10 x 40 cm @ Rp. - = Rp -
1.200 Kg Semen portland @ Rp. - = Rp -
0.0030 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.21.2
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp 1,800.00
0.040 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,200.00
0.004 Oh Kepala tukang @ Rp. 35,000.00 = Rp 140.00
0.004 Oh Mandor @ Rp. 40,000.00 = Rp 160.00
= Rp 3,300.00
Total harga = Rp 3,300.00
22. 1 m' Pasang plint ubin teraso ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.22.1
3.530 Bh Plint ubin teraso 10 x 30 cm @ Rp. - = Rp -
1.560 Kg Semen portland @ Rp. - = Rp -
0.0030 m3 Pasir pasang @ Rp. - = Rp -
0.190 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.22.2
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp 1,800.00
0.040 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,200.00
0.004 Oh Kepala tukang @ Rp. 35,000.00 = Rp 140.00
0.004 Oh Mandor @ Rp. 40,000.00 = Rp 160.00
= Rp 3,300.00
Total harga = Rp 3,300.00
23. 1 m' Pasang plint ubin teraso ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.23.1
2.650 Bh Plint ubin teraso 10 x 40 cm @ Rp. - = Rp -
1.200 Kg Semen portland @ Rp. - = Rp -
0.0030 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.23.2
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp 1,800.00
0.040 Oh Tukang batu @ Rp. 30,000.00 = Rp 1,200.00
0.004 Oh Kepala tukang @ Rp. 35,000.00 = Rp 140.00
0.004 Oh Mandor @ Rp. 40,000.00 = Rp 160.00
= Rp 3,300.00
Total harga = Rp 3,300.00
24. 1 m' Pasang plint ubin granito ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.24.1
2.650 Bh Plint ubin granito 10 x 40 cm @ Rp. - = Rp -
1.200 Kg Semen portland @ Rp. - = Rp -
0.0030 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.24.2
0.060 Oh Pekerja @ Rp. 22,500.00 = Rp 1,350.00
0.030 Oh Tukang batu @ Rp. 30,000.00 = Rp 900.00
0.003 Oh Kepala tukang @ Rp. 35,000.00 = Rp 105.00
0.003 Oh Mandor @ Rp. 40,000.00 = Rp 120.00
= Rp 2,475.00
Total harga = Rp 2,475.00
25. 1 m' Pasang plint ubin granito ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.25.1
3.330 Bh Plint ubin granito 10 x 30 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.25.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
26. 1 m' Pasang plint ubin teralux kerang ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.26.1
2.500 Bh Plint ubin teralux kerang 10 x 40 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.26.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
27. 1 m' Pasang plint ubin teralux kerang ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.27.1
3.330 Bh Plint ubin teralux kerang 10 x 30 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.27.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
28. 1 m' Pasang plint ubin teralux marmer ukuran 10 x 60 cm
Bahan An. SNI ( Revisi ) 6.28.1
1.700 Bh Plint ubin teralux marmer 10 x 60 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.28.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
29. 1 m' Pasang plint ubin teralux marmer ukuran 10 x 40 cm
Bahan An. SNI ( Revisi ) 6.29.1
2.500 Bh Plint ubin teralux marmer 10 x 40 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.29.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
30. 1 m' Pasang plint ubin teralux marmer ukuran 10 x 30 cm
Bahan An. SNI ( Revisi ) 6.30.1
3.330 Bh Plint ubin teralux marmer 10 x 30 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.30.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
31. 1 m2 Pasang teraso cor ditempat
Bahan An. SNI ( Revisi ) 6.31.1
0.0036 m3 Bahan teraso cor @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.31.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
32. 1 m2 Pasang teralux cor ditempat, tebal 3 cm
Bahan An. SNI ( Revisi ) 6.32.1
0.0036 m3 Bahan teralux cor @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.32.2
0.900 Oh Pekerja @ Rp. 22,500.00 = Rp 20,250.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 23,445.00
Total harga = Rp 23,445.00
33. 1 m2 Pasang ubin tahan asam
Bahan An. SNI ( Revisi ) 6.33.1
1.050 m3 Ubin tahan asam @ Rp. - = Rp -
14.140 Kg Semen tahan asam @ Rp. - = Rp -
0.040 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.33.2
0.270 Oh Pekerja @ Rp. 22,500.00 = Rp 6,075.00
0.150 Oh Tukang batu @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.0135 Oh Mandor @ Rp. 40,000.00 = Rp 540.00
= Rp 11,640.00
Total harga = Rp 11,640.00
34. 1 m2 Pasang lantai keramik artistik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.34.1
50.000 Bh Ubin keramik artistik 10x20 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.34.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
35. 1 m2 Pasang lantai keramik artistik 10 x 10 cm
Bahan An. SNI ( Revisi ) 6.35.1
100.000 Bh Ubin keramik artistik 10x10 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
2.000 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.35.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
36. 1 m2 Pasang lantai keramik artistik 5 x 20 cm
Bahan An. SNI ( Revisi ) 6.36.1
100.000 Bh Ubin keramik artistik 5x20 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.36.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
37. 1 m' Pasang plint keramik artistik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.37.1
5.000 Bh Plint keramik artistik 10x20 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.100 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.37.2
0.090 Oh Pekerja @ Rp. 22,500.00 = Rp 2,025.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 5,220.00
Total harga = Rp 5,220.00
38. 1 m' Pasang plint keramik artistik 10 x 10 cm
Bahan An. SNI ( Revisi ) 6.38.1
10.000 Bh Plint keramik artistik 10x10 cm @ Rp. - = Rp -
1.650 Kg Semen portland @ Rp. - = Rp -
0.0032 m3 Pasir pasang @ Rp. - = Rp -
0.120 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.38.2
0.090 Oh Pekerja @ Rp. 22,500.00 = Rp 2,025.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 5,220.00
Total harga = Rp 5,220.00
39. 1 m' Pasang plint keramik artistik 5 x 20 cm
Bahan An. SNI ( Revisi ) 6.39.1
5.000 Bh Plint keramik artistik 5x20 cm @ Rp. - = Rp -
0.850 Kg Semen portland @ Rp. - = Rp -
0.0022 m3 Pasir pasang @ Rp. - = Rp -
0.080 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.39.2
0.090 Oh Pekerja @ Rp. 22,500.00 = Rp 2,025.00
0.090 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,700.00
0.009 Oh Kepala tukang @ Rp. 35,000.00 = Rp 315.00
0.0045 Oh Mandor @ Rp. 40,000.00 = Rp 180.00
= Rp 5,220.00
Total harga = Rp 5,220.00
40. 1 m' Internal cove artistik ( 5 x 5 x 20 ) cm
Bahan An. SNI ( Revisi ) 6.40.1
10.000 Bh Internal cove ( 5x5x20 ) cm @ Rp. - = Rp -
1.415 Kg Semen portland @ Rp. - = Rp -
0.0390 m3 Pasir pasang @ Rp. - = Rp -
1.200 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.40.2
0.750 Oh Pekerja @ Rp. 22,500.00 = Rp 16,875.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0375 Oh Mandor @ Rp. 40,000.00 = Rp 1,500.00
= Rp 33,450.00
Total harga = Rp 33,450.00
41. 1 m' Pasang plint vinyl tanpa adukan
Bahan An. SNI ( Revisi ) 6.41.1
3.500 Bh Lt vinyl karet 30x30 KW 1 @ Rp. - = Rp -
0.080 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.41.2
0.080 Oh Pekerja @ Rp. 22,500.00 = Rp 1,800.00
0.080 Oh Tukang batu @ Rp. 30,000.00 = Rp 2,400.00
0.008 Oh Kepala tukang @ Rp. 35,000.00 = Rp 280.00
0.0040 Oh Mandor @ Rp. 40,000.00 = Rp 160.00
= Rp 4,640.00
Total harga = Rp 4,640.00
42. 1 m2 Pasang lantai keramik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.42.1
50.000 Bh Ubin keramik 10x20 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.42.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
43. 1 m2 Pasang lantai keramik 15 x 15 cm
Bahan An. SNI ( Revisi ) 6.43.1
44.000 Bh Ubin keramik 15x15 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.43.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
44. 1 m2 Pasang lantai keramik 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.44.1
25.000 Bh Ubin keramik 20x20 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.44.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
45. 1 m2 Pasang lantai keramik 25 x 25 cm
Bahan An. SNI ( Revisi ) 6.45.1
16.000 Bh Ubin keramik 25x25 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.45.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
46. 1 m2 Pasang lantai keramik 15 x 20 cm
Bahan An. SNI ( Revisi ) 6.46.1
35.000 Bh Ubin keramik 15x20 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.46.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
47. 1 m2 Pasang lantai keramik 33 x 33 cm
Bahan An. SNI ( Revisi ) 6.47.1
10.000 Bh Ubin keramik 33x33 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.47.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
48. 1 m2 Pasang lantai keramik 33 x 33 cm anti slip
Bahan An. SNI ( Revisi ) 6.48.1
10.000 Bh Ubin keramik 33x33 cm anti slip @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.48.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
49. 1 m2 Pasang lantai keramik 10 x 33 cm
Bahan An. SNI ( Revisi ) 6.49.1
33.000 Bh Ubin keramik 10x33 cm @ Rp. - = Rp -
11.380 Kg Semen portland @ Rp. - = Rp -
0.0420 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.49.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
50. 1 m2 Pasang lantai mosaik 30 x 30 cm, lokal
Bahan An. SNI ( Revisi ) 6.50.1
12.000 Bh Mosaik 30x30cm @ Rp. - = Rp -
14.150 Kg Semen portland @ Rp. - = Rp -
0.0390 m3 Pasir pasang @ Rp. - = Rp -
2.000 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.50.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
51. 1 m2 Pasang lantai marmer
Bahan An. SNI ( Revisi ) 6.51.1
1.052 m2 Mosaik 30x30cm @ Rp. - = Rp -
14.150 Kg Semen portland @ Rp. - = Rp -
0.0390 m3 Pasir pasang @ Rp. - = Rp -
2.000 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.51.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
52. 1 m2 Pasang lantai karper 100% wool
Bahan An. SNI ( Revisi ) 6.52.1
1.050 m2 Feltex carpet 100% T-21 @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.52.2
0.170 Oh Pekerja @ Rp. 22,500.00 = Rp 3,825.00
0.170 Oh Tukang @ Rp. 30,000.00 = Rp 5,100.00
0.017 Oh Kepala tukang @ Rp. 35,000.00 = Rp 595.00
0.0085 Oh Mandor @ Rp. 40,000.00 = Rp 340.00
= Rp 9,860.00
Total harga = Rp 9,860.00
53. 1 m2 Pasang lantai karper 80% wool, 20% nylon
Bahan An. SNI ( Revisi ) 6.53.1
1.050 m2 Carpet 80% wool, 20% nylon @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.53.2
0.170 Oh Pekerja @ Rp. 22,500.00 = Rp 3,825.00
0.170 Oh Tukang @ Rp. 30,000.00 = Rp 5,100.00
0.017 Oh Kepala tukang @ Rp. 35,000.00 = Rp 595.00
0.0085 Oh Mandor @ Rp. 40,000.00 = Rp 340.00
= Rp 9,860.00
Total harga = Rp 9,860.00
54. 1 m2 Pasang underlyer, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.54.1
1.050 m2 Underlyer/rubber corrugated, 6 mm @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.54.2
0.120 Oh Pekerja @ Rp. 22,500.00 = Rp 2,700.00
0.120 Oh Tukang @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 6,960.00
Total harga = Rp 6,960.00
55. 1 m2 Pasang lantai karper
Bahan An. SNI ( Revisi ) 6.55.1
1.050 m2 Carpet @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.55.2
0.170 Oh Pekerja @ Rp. 22,500.00 = Rp 3,825.00
0.170 Oh Tukang @ Rp. 30,000.00 = Rp 5,100.00
0.017 Oh Kepala tukang @ Rp. 35,000.00 = Rp 595.00
0.0085 Oh Mandor @ Rp. 40,000.00 = Rp 340.00
= Rp 9,860.00
Total harga = Rp 9,860.00
56. 1 m2 Pasang lantai parquet jati
Bahan An. SNI ( Revisi ) 6.56.1
1.050 m2 Parquet jati @ Rp. - = Rp -
0.600 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.56.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.350 Oh Tukang @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0325 Oh Mandor @ Rp. 40,000.00 = Rp 1,300.00
= Rp 27,650.00
Total harga = Rp 27,650.00
57. 1 m2 Pasang gymfloor
Bahan An. SNI ( Revisi ) 6.57.1
1.050 m2 Gymfloor @ Rp. - = Rp -
0.600 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.57.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.350 Oh Tukang @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0325 Oh Mandor @ Rp. 40,000.00 = Rp 1,300.00
= Rp 27,650.00
Total harga = Rp 27,650.00
58. 1 m2 Pasang dinding porselin 11 x 11 cm, putih
Bahan An. SNI ( Revisi ) 6.58.1
83.000 Bh Porselin 11x11 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.58.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 15,000.00
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,750.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 31,900.00
Total harga = Rp 31,900.00
59. 1 m2 Pasang dinding porselin 11 x 11 cm, warna
Bahan An. SNI ( Revisi ) 6.59.1
83.000 Bh Porselin 11x11 cm, warna @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.59.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 15,000.00
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,750.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 31,900.00
Total harga = Rp 31,900.00
60. 1 m2 Pasang dinding porselin 15 x 15 cm, putih
Bahan An. SNI ( Revisi ) 6.60.1
45.000 Bh Porselin 15x15 cm, putih @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.60.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
61. 1 m2 Pasang dinding porselin 15 x 15 cm, warna
Bahan An. SNI ( Revisi ) 6.61.1
45.000 Bh Porselin 15x15 cm, warna @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.61.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
62. 1 m2 Pasang dinding porselin 10 x 20 cm, warna
Bahan An. SNI ( Revisi ) 6.62.1
50.000 Bh Porselin 10x20 cm, warna @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.62.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
63. 1 m2 Pasang dinding porselin 20 x 20 cm, warna
Bahan An. SNI ( Revisi ) 6.63.1
25.000 Bh Porselin 20x20 cm, warna @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.63.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
64. 1 m2 Pasang dinding keramik artistik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.64.1
50.000 Bh Keramik artistik 10x20 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.64.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
65. 1 m2 Pasang dinding keramik artistik 5 x 20 cm
Bahan An. SNI ( Revisi ) 6.65.1
100.000 Bh Keramik artistik 5x20 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.65.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
66. 1 m2 Pasang dinding keramik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.66.1
50.000 Bh Keramik 10x20 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.66.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
67. 1 m2 Pasang dinding keramik 15 x 15 cm
Bahan An. SNI ( Revisi ) 6.67.1
45.000 Bh Keramik 15x15 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.67.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
68. 1 m2 Pasang dinding keramik 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.68.1
25.000 Bh Keramik 20x20 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.68.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
69. 1 m2 Pasang dinding keramik 10 x 20 cm
Bahan An. SNI ( Revisi ) 6.69.1
50.000 Bh Keramik 10x20 cm @ Rp. - = Rp -
9.300 Kg Semen portland @ Rp. - = Rp -
0.0180 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.69.2
0.600 Oh Pekerja @ Rp. 22,500.00 = Rp 13,500.00
0.450 Oh Tukang batu @ Rp. 30,000.00 = Rp 13,500.00
0.045 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,575.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 29,775.00
Total harga = Rp 29,775.00
70. 1 m2 Pasang dinding marmer
Bahan An. SNI ( Revisi ) 6.70.1
1.020 m2 Marmer @ Rp. - = Rp -
2.000 Bh Paku pancing 60x230 @ Rp. - = Rp -
12.440 Kg Semen portland @ Rp. - = Rp -
0.0250 m3 Pasir pasang @ Rp. - = Rp -
1.500 Kg Semen warna @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.70.2
0.720 Oh Pekerja @ Rp. 22,500.00 = Rp 16,200.00
0.650 Oh Tukang batu @ Rp. 30,000.00 = Rp 19,500.00
0.065 Oh Kepala tukang @ Rp. 35,000.00 = Rp 2,275.00
0.0350 Oh Mandor @ Rp. 40,000.00 = Rp 1,400.00
= Rp 39,375.00
Total harga = Rp 39,375.00
71. 1 m2 Pasang dinding bata pelapis 7 x 3 x 24 cm
Bahan An. SNI ( Revisi ) 6.71.1
60.000 Bh Bata pelapis dinding @ Rp. - = Rp -
12.440 Kg Semen portland @ Rp. - = Rp -
0.0250 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.71.2
0.650 Oh Pekerja @ Rp. 22,500.00 = Rp 14,625.00
0.500 Oh Tukang batu @ Rp. 30,000.00 = Rp 15,000.00
0.050 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,750.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 32,575.00
Total harga = Rp 32,575.00
72. 1 m2 Pasang dinding bata klinker 5 x 5 x 24 cm
Bahan An. SNI ( Revisi ) 6.72.1
80.000 Bh Bata pelapis klinker @ Rp. - = Rp -
12.440 Kg Semen portland @ Rp. - = Rp -
0.0250 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.72.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
73. 1 m2 Pasang dinding batu paros
Bahan An. SNI ( Revisi ) 6.73.1
1.050 m2 Batu paros @ Rp. - = Rp -
11.750 Kg Semen portland @ Rp. - = Rp -
0.0350 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.73.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
74. 1 m2 Pasang dinding batu tempel hitam
Bahan An. SNI ( Revisi ) 6.74.1
1.050 m2 Batu tempel hitam @ Rp. - = Rp -
11.750 Kg Semen portland @ Rp. - = Rp -
0.0350 m3 Pasir pasang @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.74.2
0.620 Oh Pekerja @ Rp. 22,500.00 = Rp 13,950.00
0.350 Oh Tukang batu @ Rp. 30,000.00 = Rp 10,500.00
0.035 Oh Kepala tukang @ Rp. 35,000.00 = Rp 1,225.00
0.0300 Oh Mandor @ Rp. 40,000.00 = Rp 1,200.00
= Rp 26,875.00
Total harga = Rp 26,875.00
75. 1 m2 Pasang lantai vinyl karet 30 x 30 cm KL 1
Bahan An. SNI ( Revisi ) 6.75.1
11.050 Bh Vinyl karet 30x30 cm KL1 @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.75.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.150 Oh Tukang @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp 300.00
= Rp 8,700.00
Total harga = Rp 8,700.00
76. 1 m2 Pasang lantai vinyl karet 30 x 30 cm KL 2
Bahan An. SNI ( Revisi ) 6.76.1
11.050 Bh Vinyl karet 30x30 cm KL2 @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.76.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.150 Oh Tukang @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp 300.00
= Rp 8,700.00
Total harga = Rp 8,700.00
77. 1 m2 Pasang lantai vinyl asbes 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.77.1
11.050 Bh Vinyl asbes 30x30 cm @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.77.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.150 Oh Tukang @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp 300.00
= Rp 8,700.00
Total harga = Rp 8,700.00
78. 1 m2 Pasang lantai vinyl motif kembang 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.78.1
11.050 Bh Vinyl mtf kembang 30x30 cm ex DN @ Rp. - = Rp -
0.350 Kg Lem vinyl @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.78.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp 3,375.00
0.150 Oh Tukang @ Rp. 30,000.00 = Rp 4,500.00
0.015 Oh Kepala tukang @ Rp. 35,000.00 = Rp 525.00
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp 300.00
= Rp 8,700.00
Total harga = Rp 8,700.00
79. 1 m2 Pasang wall covering lebar 50 cm
Bahan An. SNI ( Revisi ) 6.79.1
1.100 m2 Vinyl wall covering, 50 cm @ Rp. - = Rp -
0.250 Kg Lem @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.79.2
0.750 Oh Pekerja @ Rp. 22,500.00 = Rp 16,875.00
0.170 Oh Tukang @ Rp. 30,000.00 = Rp 5,100.00
0.017 Oh Kepala tukang @ Rp. 35,000.00 = Rp 595.00
0.0085 Oh Mandor @ Rp. 40,000.00 = Rp 340.00
= Rp 22,910.00
Total harga = Rp 22,910.00
80. 1 m2 Floor hardener ferrovax
Bahan An. SNI ( Revisi ) 6.80.1
3.000 Kg Floor hardener ferrovax @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.80.2
0.120 Oh Pekerja @ Rp. 22,500.00 = Rp 2,700.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 6,960.00
Total harga = Rp 6,960.00
81. 1 m2 Floor hardener mastercron
Bahan An. SNI ( Revisi ) 6.81.1
5.000 Kg Mastercron "S" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.81.2
0.120 Oh Pekerja @ Rp. 22,500.00 = Rp 2,700.00
0.120 Oh Tukang batu @ Rp. 30,000.00 = Rp 3,600.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 6,960.00
Total harga = Rp 6,960.00
82. 1 m2 Plint kayu 2 x 10 cm
Bahan An. SNI ( Revisi ) 6.82.1
0.0024 m3 Kayu jati, papan @ Rp. - = Rp -
0.050 Kg Paku skrup 3.5" @ Rp. - = Rp -
= Rp -
Upah An. SNI ( Revisi ) 6.82.2
0.120 Oh Pekerja @ Rp. 22,500.00 = Rp 2,700.00
0.120 Oh Tukang kayu @ Rp. 35,000.00 = Rp 4,200.00
0.012 Oh Kepala tukang @ Rp. 35,000.00 = Rp 420.00
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp 240.00
= Rp 7,560.00
Total harga = Rp 7,560.00
PEKERJAAN PENGECATAN
1. 1 m2 Mengikis/mengerok permukaan cat tembok lama
Bahan An. SNI ( Revisi ) 6.1.1
0.050 Kg Soda api @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.1.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0 Oh Tukang cat @ Rp. 30,000.00 = Rp
0 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
2. 1 m2 Mencuci bidang permukaan tembok yang pernah dicat
Bahan An. SNI ( Revisi ) 6.2.1
0.050 Kg S a b u n @ Rp. Sirtu = Rp
= Rp
Upah An. SNI ( Revisi ) 6.2.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0 Oh Tukang cat @ Rp. 30,000.00 = Rp
0 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
3. 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
Bahan An. SNI ( Revisi ) 6.3.1
0.050 Kg S a b u n @ Rp. Koral Beton 1/2 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0 Oh Tukang cat @ Rp. 30,000.00 = Rp
0 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
4. 1 m2 Menyabun permukaan tembok lama
Bahan An. SNI ( Revisi ) 6.4.1
0.050 Kg S a b u n @ Rp. Kapur gamping = Rp
= Rp
Upah An. SNI ( Revisi ) 6.4.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0 Oh Tukang cat @ Rp. 30,000.00 = Rp
0 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
5. 1 m2 Mengerok karat atau cat lama permukaan baja dengan pancar pasir ( sanblasting )
dengan tingkat kebersihan Sa 2.5%
Bahan An. SNI ( Revisi ) 6.5.1
40.000 Kg Pasir silika @ Rp. Kayu reng jati 2/3 = Rp
10.000 Ltr B B M @ Rp. Kayu Kamfer balok 8/12, 6 = Rp
= Rp
Alat An. SNI ( Revisi ) 6.5.2
Sewa / hari Kompressor, blasting pot, @ Rp. - = Rp
selang dan nozle
= Rp
Upah An. SNI ( Revisi ) 6.5.3
1.600 Oh Pekerja @ Rp. 22,500.00 = Rp
1.600 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.800 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.500 Oh Mandor @ Rp. 40,000.00 = Rp
= Rp
Total harga = Rp
6. 1 m2 Mendempul dan menggosok kayu
Bahan An. SNI ( Revisi ) 6.6.1
0.080 Kg Dempul jati @ Rp. - = Rp
0.020 Kg Minyak cat @ Rp. - = Rp
0.010 Kg Batu apung @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.6.2
0.040 Oh Pekerja @ Rp. 22,500.00 = Rp
0.040 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.004 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
7. 1 m2 Pengecatan bidang kayu lama
Bahan An. SNI ( Revisi ) 6.7.1
0.150 Kg Plamir @ Rp. Besi beton Polos o 8 mm = Rp
0.170 Kg Cat dasar @ Rp. Besi beton Polos o 10 mm = Rp
0.170 Kg Cat penutup @ Rp. Besi beton Polos o 10 mm = Rp
= Rp
Upah An. SNI ( Revisi ) 6.7.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp
0.075 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0075 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
8. 1 m2 Pengecatan bidang kayu baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.8.1
0.200 Kg Cat meni @ Rp. Mur baut gording = Rp
0.150 Kg Plamir @ Rp. Paku payung = Rp
0.170 Kg Cat dasar @ Rp. Ankur kusen = Rp
0.260 Kg Cat penutup 2x @ Rp. Ankur kusen = Rp
= Rp
Upah An. SNI ( Revisi ) 6.8.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp
0.009 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0060 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
9. 1 m2 Pengecatan bidang kayu baru ( 1x plamir , 1x cat dasar, 3x cat penutup )
Bahan An. SNI ( Revisi ) 6.9.1
0.200 Kg Cat meni @ Rp. - = Rp
0.150 Kg Plamir @ Rp. Buis beton bulat o 15 cm, = Rp
0.170 Kg Cat dasar @ Rp. Buis beton bulat o 20 cm, = Rp
0.350 Kg Cat penutup 2x @ Rp. Buis beton bulat o 20 cm, = Rp
= Rp
Upah An. SNI ( Revisi ) 6.9.2
0.070 Oh Pekerja @ Rp. 22,500.00 = Rp
0.105 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0040 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
10. 1 m2 Pelaburan bidang kayu dengan teak oil
Bahan An. SNI ( Revisi ) 6.10.1
0.360 Ltr Teak oil @ Rp. Genteng bubungan Nglayu = Rp
= Rp
Upah An. SNI ( Revisi ) 6.10.2
0.040 Oh Pekerja @ Rp. 22,500.00 = Rp
0.063 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0630 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
11. 1 m2 Pelaburan bidang kayu dengan politur
Bahan An. SNI ( Revisi ) 6.11.1
0.150 Ltr Politur @ Rp. - = Rp
0.372 Ltr Politur jadi @ Rp. - = Rp
2.000 Lbr Ampelas @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.11.2
0.000 Oh Pekerja @ Rp. 22,500.00 = Rp
0.060 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0160 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
12. 1 m2 Pelaburan bidang kayu dengan cat residu dan ter
Bahan An. SNI ( Revisi ) 6.12.1
0.350 Ltr Residu atau ter @ Rp. Kolter = Rp
= Rp
Upah An. SNI ( Revisi ) 6.12.2
0.100 Oh Pekerja @ Rp. 22,500.00 = Rp
0.000 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0000 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
13. 1 m2 Pelaburan bidang kayu dengan vernis
Bahan An. SNI ( Revisi ) 6.13.1
0.150 Ltr Vernis @ Rp. Kunci "ANCHOR" 2 x tan = Rp
0.050 Kg Dempul @ Rp. Kunci "KUDA TERBANG" 2= Rp
0.100 Lbr Ampelas @ Rp. Engsel Nylon "ARCH" asli = Rp
0.010 Bh Kuas @ Rp. Engsel jendela = Rp
= Rp
Upah An. SNI ( Revisi ) 6.13.2
0.160 Oh Pekerja @ Rp. 22,500.00 = Rp
0.160 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0160 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
14. 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.14.1
0.100 Kg Plamir @ Rp. Pipa PVC AW o 3" 4 m = Rp
0.100 Kg Cat dasar @ Rp. Pipa PVC AW o 4" 4m = Rp
0.260 Kg Cat penutup 2x @ Rp. Pipa PVC AW o 4" 4m = Rp
= Rp
Upah An. SNI ( Revisi ) 6.14.2
0.020 Oh Pekerja @ Rp. 22,500.00 = Rp
0.063 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0063 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
15. 1 m2 Pengecatan tembok lama ( 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.15.1
0.120 Kg Cat dasar @ Rp. Lampu TL 1 x 40 w PHILIP = Rp
0.180 Kg Cat penutup 2x @ Rp. Lampu TL 1 x 40 w PHILIP = Rp
= Rp
Upah An. SNI ( Revisi ) 6.15.2
0.028 Oh Pekerja @ Rp. 22,500.00 = Rp
0.042 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0042 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
16. 1 m2 Melabur tembok dengan kalkarium
Bahan An. SNI ( Revisi ) 6.16.1
0.100 Kg Kalkarium @ Rp. Kabel NYA 1000 Volt 1,5 = Rp
= Rp
Upah An. SNI ( Revisi ) 6.16.2
0.028 Oh Pekerja @ Rp. - = Rp
0.042 Oh Tukang cat @ Rp. - = Rp
0.0042 Oh Kepala tukang @ Rp. - = Rp
0.0025 Oh Mandor @ Rp. - = Rp
. = Rp
Total harga = Rp
17. 1 m2 Melabur tembok dengan kapur sirih
Bahan An. SNI ( Revisi ) 6.17.1
0.100 Lbr Ampelas @ Rp. Tukang Batu = Rp
0.250 Ikt Alang-alang @ Rp. Tukang kayu = Rp
0.002 m3 Perancah kayu @ Rp. Kepala Tukang = Rp
0.150 Kg Kapur sirih @ Rp. Tukang Cat = Rp
= Rp
Upah An. SNI ( Revisi ) 6.17.2
0.150 Oh Pekerja @ Rp. 22,500.00 = Rp
0.001 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0001 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
18. 1 m2 Melabur tembok lama dengan kapur sirih ( untuk pemeliharaan )
Bahan An. SNI ( Revisi ) 6.18.1
0.002 m3 Perancah kayu @ Rp. - = Rp
0.300 Kg Kapur sirih @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.18.2
0.040 Oh Pekerja @ Rp. 22,500.00 = Rp
0.005 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0005 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
19. 1 m2 Pemasangan wallpaper
Bahan An. SNI ( Revisi ) 6.19.1
1.200 m2 Wall paper @ Rp. - = Rp
0.200 Kg Perekat @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.19.2
0.020 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0020 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0025 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
20. 1 m2 Pengecatan permukaan baja dengan meni besi
Bahan An. SNI ( Revisi ) 6.20.1
0.100 Kg Meni besi @ Rp. - = Rp
0.010 Bh Kuas @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.20.2
0.020 Oh Pekerja @ Rp. 22,500.00 = Rp
0.200 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0200 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0100 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
21. 1 m2 Pengecatan permukaan baja dengan meni besi dan perancah
Bahan An. SNI ( Revisi ) 6.21.1
0.100 Kg Meni besi @ Rp. - = Rp
0.010 Bh Kuas @ Rp. - = Rp
0.002 m3 Perancah kayu @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.21.2
0.250 Oh Pekerja @ Rp. 22,500.00 = Rp
0.225 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
22. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual
sistem 4 lapis cat konvensional dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.22.1
0.100 Kg Meni ( read lead ) A @ Rp. - = Rp
0.100 Kg Meni ( read lead ) B @ Rp. - = Rp
0.040 Kg Alluminium C @ Rp. - = Rp
0.040 Kg Alluminium B @ Rp. - = Rp
0.010 Ltr Pengencer @ Rp. - = Rp
0.002 m3 Perancah kayu @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.22.2
0.006 Oh Pekerja @ Rp. 22,500.00 = Rp
0.006 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0225 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0075 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
23. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual
sistem 1 lapis cat mutakhir dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.23.1
0.300 Kg C a t @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.23.2
0.006 Oh Pekerja @ Rp. 22,500.00 = Rp
0.060 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.0120 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.0060 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
24. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara manual
sistem 3 lapis cat konvensional dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.24.1
0.110 Kg Cat dasar @ Rp. - = Rp
0.170 Kg Cat antara @ Rp. - = Rp
0.080 Kg Cat penutup @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.24.2
0.500 Oh Pekerja @ Rp. 22,500.00 = Rp
0.800 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.3000 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.2000 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
25. 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara semprot ( airless spray )
sistem 1 lapis cat mutakhir dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.25.1
0.300 Kg Cat dasar @ Rp. - = Rp
= Rp
Upah An. SNI ( Revisi ) 6.25.2
0.400 Oh Pekerja @ Rp. 22,500.00 = Rp
0.700 Oh Tukang cat @ Rp. 30,000.00 = Rp
0.2000 Oh Kepala tukang @ Rp. 35,000.00 = Rp
0.2000 Oh Mandor @ Rp. 40,000.00 = Rp
. = Rp
Total harga = Rp
-
-
3,375.00
-
-
100.00
3,475.00
3,475.00
#VALUE!
#VALUE!
3,375.00
-
-
100.00
3,475.00
#VALUE!
#VALUE!
#VALUE!
3,375.00
-
-
100.00
3,475.00
#VALUE!
#VALUE!
#VALUE!
3,375.00
-
-
100.00
3,475.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
-
36,000.00
48,000.00
28,000.00
20,000.00
132,000.00
#VALUE!
-
-
-
-
900.00
1,200.00
140.00
100.00
2,340.00
2,340.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,575.00
2,250.00
262.50
100.00
4,187.50
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,575.00
270.00
210.00
100.00
2,155.00
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
#VALUE!
1,575.00
3,150.00
140.00
100.00
4,965.00
#VALUE!
#VALUE!
#VALUE!
900.00
1,890.00
2,205.00
100.00
5,095.00
#VALUE!
-
-
-
-
-
1,800.00
560.00
100.00
2,460.00
2,460.00
#VALUE!
#VALUE!
2,250.00
-
-
240.00
2,490.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,600.00
4,800.00
560.00
100.00
9,060.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
450.00
1,890.00
220.50
100.00
2,660.50
#VALUE!
#VALUE!
#VALUE!
#VALUE!
630.00
1,260.00
147.00
100.00
2,137.00
#VALUE!
#VALUE!
#VALUE!
-
-
-
-
-
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,375.00
30.00
3.50
100.00
3,508.50
#VALUE!
-
-
-
900.00
150.00
17.50
100.00
1,167.50
1,167.50
-
-
-
450.00
6,000.00
70.00
100.00
6,620.00
6,620.00
-
-
-
450.00
6,000.00
700.00
400.00
7,550.00
7,550.00
-
-
-
-
5,625.00
6,750.00
787.50
300.00
13,462.50
13,462.50
-
-
-
-
-
-
-
135.00
180.00
787.50
300.00
1,402.50
1,402.50
-
-
135.00
1,800.00
420.00
240.00
2,595.00
2,595.00
-
-
-
-
11,250.00
24,000.00
10,500.00
8,000.00
53,750.00
53,750.00
-
-
9,000.00
21,000.00
7,000.00
8,000.00
45,000.00
45,000.00
REKAPITULASI PEKERJAAN
PROYEK 0
PEKERJAAN 0
LOKASI 0
TAHUN ANGGARAN : 2003
jumlah #REF!
PPn 10 % #REF!
Jumlah + PPn #REF!
Dibulatkan 386,096,000.00
terbilang : TIGA RATUS DELAPAN PULUH ENAM JUTA SEMBILAN PULUH ENAM RIBU RUPIAH
0
0
0
Direktur
RENCANA ANGGARAN BIAYA ( RAB )
PROYEK
PEKERJAAN
LOKASI
TAHUN ANGGARAN : 2004
HARGA
NO. JENIS PEKERJAAN VOLUME SAT. SATUAN
( Rp. )
1 2 3 4 5
I. PEKERJAAN PENDAHULUAN
1 Pembersihan lokasi 342.00 m2 4,250.00
2 Uitset 1.00 lsm 477,650.00
3 Bowplank 126.00 m' 28,765.00
4 Papan nama 1.00 bh 250,000.00
5 Dokumentasi & pelaporan 3.00 bln 150,000.00
6 IMB 1.00 lsm 273,600.00
Sub jumlah
TOTAL
RAB )
JUMLAH HARGA
( Rp. )
6
1,453,500.00
477,650.00
3,624,390.00
250,000.00
450,000.00
273,600.00
6,529,140.00
1,626,548.80
1,265,000.00
#REF!
1,531,406.25
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
4,373,325.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
427,200.00
432,000.00
210,750.00
118,350.00
226,500.00
226,500.00
1,064,251.00
#REF!
1,501,756.00
-
-
-
-
65,789.00
-
46,200.00
1,613,745.00
6
500,000.00
550,000.00
729,750.00
52,000.00
56,000.00
52,000.00
2,064,000.00
126,000.00
4,129,750.00
#REF!