BILL OF QUANTITY
Sub Total
PPN 10 %
Total
Dibulatkan
Terbilang :
Penajam, 2017
Dibuat Oleh:
PT/CV.......................
....................................
Direktur/Direktris
I. BIAYA LANGSUNG PERSONIL (REMUNERATION)
JUMLAH JUMLAH HARGA SATUAN JUMLAH
N0 URAIAN SAT
PERSONIL BULAN (Rp) (Rp)
A. Tenaga Ahli
1 Ahli Teknik Lingkungan (Team Leader) 1,00 SBOB 2,00
2 Ahli Hidrologi 1,00 SBOB 1,00
3 Ahli Geodesi 1,00 SBOB 1,00
4 Ahli Sosial 1,00 SBOB 1,00
5 Ahli Ekonomi 1,00 SBOB 1,00
6 Ahli Kesehatan Lingkungan 1,00 SBOB 1,00
Sub Total I A
B. Asisten Tenaga Ahli
1 Asisten Ahli Teknik Lingkungan 1,00 SBOB 2,00
2 Asistensi Ahli Hidrologi 1,00 SBOB 2,00
3 Asistensi Ahli Geodesi 1,00 SBOB 1,00
4 CAD Operator 1,00 SBOB 1,00
5 Surveyor 1,00 SBOB 1,00
Sub Total I B
C. Tenaga Pendukung
1 Administrator 1,00 SBOB 2,00
2 Asisten Surveyor 1,00 SBOB 1,00
Sub Total I C
Total I
Sub Total II A
B. Lump Sum
1 Pengumpulan Data Sekunder Ls 1,00
2 Diskusi dan Koordinasi Ls 1,00
3 Uji Laboratorium Ls 1,00
Sub Total II B
Total II