No Elevasi
M
²
Ha M³ Komulatif
1 234.5 30.00 0.00 - -
2 235 52.00 0.01 20.25 20.25
3 236 193.00 0.02 149.55 149.55
4 237 593.00 0.06 374.77 524.31
5 238 1,180.00 0.12 869.83 1,394.15
6 239 2,211.00 0.22 1,668.74 3,062.89
Sumber : Hasil Analisa Topograf
V
1
3
Hi 1 - Hi Ai 1 Ai A i 1 * A1
240.0
239.0
238.0
237.0
236.0
235.0
234.0
233.0
232.0
0 500 1,000 1,500 2,000 2,500 3,000 3,500
0.15
0.52
1.39
3.06
No Elevasi
1 234.5
2 235
235.5
3 236
4 237
5 238
6 239
7
8
9
10
00 500 0
00 3,000 3,500
M² Ha M³ Komulatif
30.00 0.00 - -
52.00 0.01 - -
56.00 0.01 26.99 26.99
193.00 0.02 58.83 85.82
593.00 0.06 374.77 460.59
1,180.00 0.12 869.83 1,330.42
2,211.00 0.22 1,668.74 2,999.17
63.73
TABEL HIT
STASIU
2 Kelembaban Relatif RH %
m/dt
Tabel PN.1
6 t ⁰C
7 eɣ/ea mbar
8 w
9 f (t)
10 RH %
11 ed eɣ * RH
Tabel PN.2
13 LL ⁰LS
14 Rɣ mm/hr
15 n/N %
18 U m/dt
19 f (U) 0,27(1+0,864 U)
Tabel PN.3
21 C
BULAN
KET.
Jan Feb Mar Apr Mei Jun Jul
PENYELESAIAN
31 28 31 30 31 30 31
AN
31 30 31 30 31
Luas Permukaan 2,211.00
N 0.02
U ea - ed Evaporasi
BULAN
3500
3000
2500
2000
1500
1000
500
0
Jan I Jan II Feb I Feb II Mar I Mar II April I
-500
-1000
-1500
-2000
0.00 0.72 0.72
0.1244 l/dt
II Feb I Feb II Mar I Mar II April I April II Mei I Mei II Juni I Juni II Juli I Juli II Agust I Agust II Sept I Sept II Okt I Okt II Nop I Nop II
10 Ha 12 Ha 13,5 Ha 14 Ha
Periode
Sept II Okt I Okt II Nop I Nop II Des I Des II
SIMULASI JIKA PEMBERIAN AIR IRIGASI PADA
Lua Areal Irigasi Layanan 3.88
Luas Permukaan LS 2,211.00
vol 2,999.17
Inflow Evaporasi
BULAN
lt/dt m3 Cm/Hari m3
Hari (1) (2) (3) (4)
15 Jan I 76.39 98,999.12 0.03 10.74
16 Jan II 76.39 105,599.06 0.03 11.46
14 Feb I 86.65 104,811.23 0.03 8.75
14 Feb II 86.65 104,811.23 0.03 8.75
15 Mar I 67.17 87,051.69 0.03 8.35
16 Mar II 67.17 92,855.13 0.03 8.90
15 April I 55.19 71,522.86 0.03 9.88
15 April II 55.19 71,522.86 0.03 9.88
15 Mei I 27.22 35,272.44 0.04 12.56
16 Mei II 27.22 37,623.94 0.04 13.40
15 Juni I 24.17 31,321.38 0.04 12.49
15 Juni II 24.17 31,321.38 0.04 12.49
15 Juli I 14.74 19,105.59 0.05 15.81
16 Juli II 14.74 20,379.30 0.05 16.86
15 Agust I 9.58 12,418.63 0.06 21.23
16 Agust II 9.58 13,246.54 0.06 22.65
15 Sept I 6.44 8,341.18 0.07 24.49
15 Sept II 6.44 8,341.18 0.07 24.49
15 Okt I 4.05 5,246.87 0.07 23.01
16 Okt II 4.05 5,596.66 0.07 24.54
15 Nop I 3.34 4,323.29 0.05 17.00
15 Nop II 3.34 4,323.29 0.05 17.00
15 Des I 23.80 30,843.97 0.06 19.24
16 Des II 23.80 32,900.23 0.06 20.52
AIR IRIGASI PADA MT II DAN MT III TANPA FAKTOR K (HASIL AIR BAKU BISA
Ha
m2
m3
Kebutuhan
Net Inflow Kebutuhan
Irigasi Surplus/Defisit Suplai Dari
Air Baku Long Storage
(1) - (4) 3.88 Ha
m3 lt/dt m3 lt/dt m3 m3 m3
(5) (6) (7) (8) (9) (10) (11)
98,988.37 4.83 6,261.01 2.8 3,628.80 89,098.56 -
105,587.60 1.15 1,593.76 2.8 3,870.72 100,123.12 -
104,802.47 3.56 4,310.53 2.8 3,386.88 97,105.06 -
104,802.47 1.26 1,522.69 2.8 3,386.88 99,892.90 -
87,043.34 3.37 4,364.45 2.8 3,628.80 79,050.09 -
92,846.23 3.37 4,657.61 2.8 3,870.72 84,317.90 -
71,512.98 3.13 4,058.02 2.8 3,628.80 63,826.16 -
71,512.98 3.85 4,986.15 2.8 3,628.80 62,898.03 -
35,259.88 4.66 6,042.95 2.8 3,628.80 25,588.13 -
37,610.54 3.65 5,045.41 2.8 3,870.72 28,694.41 -
31,308.89 3.94 5,103.82 2.8 3,628.80 22,576.27 -
31,308.89 3.40 4,410.10 2.8 3,628.80 23,270.00 -
19,089.79 3.04 3,933.54 2.8 3,628.80 11,527.45 -
20,362.44 2.98 4,115.84 2.8 3,870.72 12,375.88 -
12,397.40 2.08 2,694.03 2.8 3,628.80 6,074.57 -
13,223.89 2.34 3,227.92 2.8 3,870.72 6,125.25 -
8,316.69 3.29 4,259.35 2.8 3,628.80 428.54 -
8,316.69 3.32 4,302.38 2.8 3,628.80 385.52 -
5,223.87 2.65 3,429.80 2.8 3,628.80 (1,834.74) 1,834.74
5,572.13 0.82 1,135.80 2.8 3,870.72 565.61 -
4,306.29 0.96 1,245.74 2.8 3,628.80 (568.25) 568.25
4,306.29 1.42 1,836.15 2.8 3,628.80 (1,158.66) 1,158.66
30,824.72 3.63 4,701.34 2.8 3,628.80 22,494.58 -
32,879.71 3.40 4,703.27 2.8 3,870.72 24,305.72 -
AIR BAKU BISA 2,8 l/dt)
Volume Volume
Akhir Melimpas Sisa
Tampungan
LS Bendung
m3 m3 m3
(12) (.3)
2,999.17 89,098.56 2,999.17
2,999.17 100,123.11 2,999.17
2,999.17 97,105.06 2,999.17
2,999.17 99,892.90 2,999.17
2,999.17 79,050.09 2,999.17
2,999.17 84,317.90 2,999.17
2,999.17 63,826.16 2,999.17
2,999.17 62,898.03 2,999.17
2,999.17 25,588.13 2,999.17
2,999.17 28,694.41 2,999.17
2,999.17 22,576.27 2,999.17
2,999.17 23,270.00 2,999.17
2,999.17 11,527.45 2,999.17
2,999.17 12,375.88 2,999.17
2,999.17 6,074.57 2,999.17
2,999.17 6,125.25 2,999.17
2,999.17 428.54 2,999.17
2,999.17 385.52 2,999.17
1,164.43 - 1,164.43
1,730.04 - 1,730.04
1,161.79 - 1,161.79
3.13 - 3.13
2,999.17 19,498.54 2,999.17
2,999.17 24,305.72 2,999.17
22,497.71
KEBTH
Pengisian IRIGASI
Kembali
lt/dt
m3
0.00 1.25
0.00 0.30
- 0.92
- 0.32
- 0.87
- 0.87
- 0.81
- 0.99
- 1.20
- 0.94
- 1.01
- 0.88
- 0.78
- 0.77
- 0.54
- 0.60
- 0.85
- 0.86
- 0.68
565.61 0.21
- 0.25
- 0.37
2,996.04 0.93
- 0.88 22,494.58
SIMULASI JIKA PEMBERIAN AIR IRIGASI PADA M
Lua Areal Irigasi Layanan 3.88
Luas Permukaan LS 2,211.00
vol 2,999.17
Inflow Evaporasi
BULAN
lt/dt m3 Cm/Hari m3
Hari (1) (2) (3) (4)
15 Jan I 76.39 98,999.12 0.03 10.74
16 Jan II 76.39 105,599.06 0.03 11.46
14 Feb I 86.65 104,811.23 0.03 8.75
14 Feb II 86.65 104,811.23 0.03 8.75
15 Mar I 67.17 87,051.69 0.03 8.35
16 Mar II 67.17 92,855.13 0.03 8.90
15 April I 55.19 71,522.86 0.03 9.88
15 April II 55.19 71,522.86 0.03 9.88
15 Mei I 27.22 35,272.44 0.04 12.56
16 Mei II 27.22 37,623.94 0.04 13.40
15 Juni I 24.17 31,321.38 0.04 12.49
15 Juni II 24.17 31,321.38 0.04 12.49
15 Juli I 14.74 19,105.59 0.05 15.81
16 Juli II 14.74 20,379.30 0.05 16.86
15 Agust I 9.58 12,418.63 0.06 21.23
16 Agust II 9.58 13,246.54 0.06 22.65
15 Sept I 6.44 8,341.18 0.07 24.49
15 Sept II 6.44 8,341.18 0.07 24.49
15 Okt I 4.05 5,246.87 0.07 23.01
16 Okt II 4.05 5,596.66 0.07 24.54
15 Nop I 3.34 4,323.29 0.05 17.00
15 Nop II 3.34 4,323.29 0.05 17.00
15 Des I 23.80 30,843.97 0.06 19.24
16 Des II 23.80 32,900.23 0.06 20.52
AIR IRIGASI PADA MT II DAN MT III DIBERI FAKTOR K 0.7 (HASIL AIR BAKU BIS
Ha
m2
m3
Kebutuhan
Net Inflow Kebutuhan
Irigasi Surplus/Defisit Suplai Dari
Air Baku Long Storage
(1) - (4) 3.88 Ha
m3 lt/dt m3 lt/dt m3 m3 m3
(5) (6) (7) (8) (9) (10) (11)
98,988.37 4.83 6,261.01 3 3,888.00 88,839.36 -
105,587.60 1.15 1,593.76 3 4,147.20 99,846.64 -
104,802.47 3.56 4,310.53 3 3,628.80 96,863.14 -
104,802.47 1.26 1,522.69 3 3,628.80 99,650.98 -
87,043.34 2.36 3,055.11 3 3,888.00 80,100.23 -
92,846.23 2.36 3,260.33 3 4,147.20 85,438.70 -
71,512.98 2.19 2,840.61 3 3,888.00 64,784.36 -
71,512.98 2.69 3,490.31 3 3,888.00 64,134.67 -
35,259.88 3.26 4,230.07 3 3,888.00 27,141.82 -
37,610.54 2.55 3,531.79 3 4,147.20 29,931.56 -
31,308.89 2.76 3,572.68 3 3,888.00 23,848.22 -
31,308.89 2.38 3,087.07 3 3,888.00 24,333.83 -
19,089.79 2.12 2,753.48 3 3,888.00 12,448.31 -
20,362.44 2.08 2,881.09 3 4,147.20 13,334.15 -
12,397.40 1.46 1,885.82 3 3,888.00 6,623.58 -
13,223.89 1.63 2,259.54 3 4,147.20 6,817.15 -
8,316.69 2.30 2,981.55 3 3,888.00 1,447.15 -
8,316.69 2.32 3,011.66 3 3,888.00 1,417.03 -
5,223.87 1.85 2,400.86 3 3,888.00 (1,065.00) 1,065.00
5,572.13 0.58 795.06 3 4,147.20 629.87 -
4,306.29 0.67 872.02 3 3,888.00 (453.73) 453.73
4,306.29 0.99 1,285.31 3 3,888.00 (867.02) 867.02
30,824.72 2.54 3,290.94 3 3,888.00 23,645.78 -
32,879.71 2.38 3,292.29 3 4,147.20 25,440.22 -
IL AIR BAKU BISA 3 l/dt)
Volume Volume
Akhir Melimpas Sisa
Tampungan
LS Bendung
m3 m3 m3
(12) (.3)
2,999.17 88,839.36 2,999.17
2,999.17 99,846.63 2,999.17
2,999.17 96,863.14 2,999.17
2,999.17 99,650.98 2,999.17
2,999.17 80,100.23 2,999.17
2,999.17 85,438.70 2,999.17
2,999.17 64,784.36 2,999.17
2,999.17 64,134.67 2,999.17
2,999.17 27,141.82 2,999.17
2,999.17 29,931.56 2,999.17
2,999.17 23,848.22 2,999.17
2,999.17 24,333.83 2,999.17
2,999.17 12,448.31 2,999.17
2,999.17 13,334.15 2,999.17
2,999.17 6,623.58 2,999.17
2,999.17 6,817.15 2,999.17
2,999.17 1,447.15 2,999.17
2,999.17 1,417.03 2,999.17
1,934.17 - 1,934.17
2,564.04 - 2,564.04
2,110.31 - 2,110.31
1,243.29 - 1,243.29
2,999.17 21,889.91 2,999.17
2,999.17 25,440.22 2,999.17
24,889.08
KEBTH
Pengisian IRIGASI K
Kembali
lt/dt
m3
Inflow Evaporasi
BULAN
lt/dt m3 Cm/Hari m3
Hari (1) (2) (3) (4)
15 Jan I 76.39 98,999.12 0.03 10.74
16 Jan II 76.39 105,599.06 0.03 11.46
14 Feb I 86.65 104,811.23 0.03 8.75
14 Feb II 86.65 104,811.23 0.03 8.75
15 Mar I 67.17 87,051.69 0.03 8.35
16 Mar II 67.17 92,855.13 0.03 8.90
15 April I 55.19 71,522.86 0.03 9.88
15 April II 55.19 71,522.86 0.03 9.88
15 Mei I 27.22 35,272.44 0.04 12.56
16 Mei II 27.22 37,623.94 0.04 13.40
15 Juni I 24.17 31,321.38 0.04 12.49
15 Juni II 24.17 31,321.38 0.04 12.49
15 Juli I 14.74 19,105.59 0.05 15.81
16 Juli II 14.74 20,379.30 0.05 16.86
15 Agust I 9.58 12,418.63 0.06 21.23
16 Agust II 9.58 13,246.54 0.06 22.65
15 Sept I 6.44 8,341.18 0.07 24.49
15 Sept II 6.44 8,341.18 0.07 24.49
15 Okt I 4.05 5,246.87 0.07 23.01
16 Okt II 4.05 5,596.66 0.07 24.54
15 Nop I 3.34 4,323.29 0.05 17.00
15 Nop II 3.34 4,323.29 0.05 17.00
15 Des I 23.80 30,843.97 0.06 19.24
16 Des II 23.80 32,900.23 0.06 20.52
4,000.00
3,750.00
Kebutuhan
Net Inflow Kebutuhan
Irigasi Surplus/Defisit Suplai Dari
Air Baku Long Storage
(1) - (4) 3.88 Ha
m3 lt/dt m3 lt/dt m3 m3 m3
(5) (6) (7) (8) (9) (10) (11)
98,988.37 4.83 6,261.01 3.5 4,536.00 88,191.36 -
105,587.60 1.15 1,593.76 3.5 4,838.40 99,155.44 -
104,802.47 3.56 4,310.53 3.5 4,233.60 96,258.34 -
104,802.47 1.26 1,522.69 3.5 4,233.60 99,046.18 -
87,043.34 1.68 2,182.22 3.5 4,536.00 80,325.12 -
92,846.23 1.68 2,328.81 3.5 4,838.40 85,679.02 -
71,512.98 1.57 2,029.01 3.5 4,536.00 64,947.97 -
71,512.98 1.92 2,493.08 3.5 4,536.00 64,483.90 -
35,259.88 2.33 3,021.48 3.5 4,536.00 27,702.41 -
37,610.54 1.82 2,522.70 3.5 4,838.40 30,249.44 -
31,308.89 1.97 2,551.91 3.5 4,536.00 24,220.98 -
31,308.89 1.70 2,205.05 3.5 4,536.00 24,567.84 -
19,089.79 1.52 1,966.77 3.5 4,536.00 12,587.02 -
20,362.44 1.49 2,057.92 3.5 4,838.40 13,466.12 -
12,397.40 1.04 1,347.02 3.5 4,536.00 6,514.38 -
13,223.89 1.17 1,613.96 3.5 4,838.40 6,771.53 -
8,316.69 1.64 2,129.68 3.5 4,536.00 1,651.02 -
8,316.69 1.66 2,151.19 3.5 4,536.00 1,629.50 -
5,223.87 1.32 1,714.90 3.5 4,536.00 (1,027.03) 1,027.03
5,572.13 0.41 567.90 3.5 4,838.40 165.83 -
4,306.29 0.48 622.87 3.5 4,536.00 (852.58) 852.58
4,306.29 0.71 918.08 3.5 4,536.00 (1,147.79) 1,147.79
30,824.72 1.81 2,350.67 3.5 4,536.00 23,938.05 -
32,879.71 1.70 2,351.63 3.5 4,838.40 25,689.67 -
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
-
Jan I Jan II Feb I Feb II Mar I Mar II April I April II Mei I Mei II Juni I Juni II Juli I Juli II Agust I Agust II Sept I Sept II Okt I Ok
00)
00)
00)
00)
00)
00)
Tampungan
00)
00)
Periode
L AIR BAKU BISA 3,5 l/dt)
Volume Volume
Akhir Melimpas Sisa
Tampungan
LS Bendung
m3 m3 m3
(12) (.3)
2,999.17 88,191.36 2,999.17
2,999.17 99,155.43 2,999.17
2,999.17 96,258.34 2,999.17
2,999.17 99,046.18 2,999.17
2,999.17 80,325.12 2,999.17
2,999.17 85,679.02 2,999.17
2,999.17 64,947.97 2,999.17
2,999.17 64,483.90 2,999.17
2,999.17 27,702.41 2,999.17
2,999.17 30,249.44 2,999.17
2,999.17 24,220.98 2,999.17
2,999.17 24,567.84 2,999.17
2,999.17 12,587.02 2,999.17
2,999.17 13,466.12 2,999.17
2,999.17 6,514.38 2,999.17
2,999.17 6,771.53 2,999.17
2,999.17 1,651.02 2,999.17
2,999.17 1,629.50 2,999.17
1,972.14 - 1,972.14
2,137.96 - 2,137.96
1,285.38 - 1,285.38
137.59 - 137.59
2,999.17 21,076.47 2,999.17
2,999.17 25,689.67 2,999.17
24,075.64
m3