RENCANA ANGGARAN BIAYA

PEMBANGUNAN GEDUNG UTSMAN BIN AFFAN M Fajar Abrori


UNIVERSITAS ISLAM MALANG 21401051013

No. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH

A PEKERJAAN DASAR
I PEKERJAAN PERSIAPAN
1 Pembersihan lahan 1,890.11 m2 9,072.00 17,147,077.92
2 Pengukuran/uitset & bouplank 208.60 m1 44,053.92 9,189,647.71
3 Listrik kerja 1.00 ls 15,000,000.00 15,000,000.00
4 Air Kerja 1.00 ls 3,600,000.00 3,600,000.00
5 Direksikeet/tempat bahan 50.00 m2 866,791.16 43,339,558.00
6 Pagar pangaman 252.00 m1 190,768.86 48,073,752.72

II PEKERJAAN TANAH
1 Galian tanah pondasi plat 503.84 m3 31,311.36 15,775,915.62
2 Galian tanah pondasi batu kali 244.06 m3 23,846.40 5,819,952.38
3 Galian tanah pondasi strouss/ D.60 CM 1,360.00 m3 73,975.68 100,606,924.80
4 Urungan tanah kembali 857.28 m3 11,430.72 9,799,327.64
5 Urungan pasir 55.95 m3 112,933.44 6,318,625.97
6 Urungan tanah peninggian lantai 674.04 m3 116,789.04 78,720,484.52

III PEKERJAAN PONDASI


1 Pondasi batu kali 132.83 m3 587,186.06 77,995,924.88
2 Lantai kerja 18.48 m3 1,727,881.20 31,931,244.58
3 Lapisan pasir bawah lantai 253.52 m2 112,933.44 28,630,885.71

B PEKERJAAN BETON
I LANTAI I
1 Pondasi Stross d. 60 523.12 m3 2,332,616.33 1,220,238,251.93
2 Pelat Pondasi 200x200x80 beton K225 180.20 m3 3,086,823.73 556,245,635.25
3 Kolom pondasi 70/90 beton K225 56.45 m3 6,242,006.55 352,361,269.75
4 Kolom pondasi 70/70 beton K225 0.98 m3 6,242,006.55 6,117,166.42
5 Sloof 30/50 Beton K-225 86.04 m3 3,323,038.58 285,914,239.42
6 Kolom d. 60 beton / K.225 ( 2 bh ) 141.12 m3 6,242,006.55 880,871,964.34
7 Kolom 70/90 beton K225 3.92 m3 6,242,006.55 24,468,665.68
8 Dinding Lift 14.96 m3 829,507.50 12,409,432.20
9 Balok Anak 25/40 beton K 225 19.57 m3 5,083,182.13 99,477,874.19
10 Balok Anak 30/50 beton K.225 67.23 m3 5,083,182.13 341,742,334.26
11 Balok Induk 45/70 beton K-225 87.54 m3 5,691,669.78 498,248,772.54
12 Listplank beton t=10 cm beton K-225 7.22 m3 1,065,544.20 7,693,229.12
13 Plat Tangga Beton K225 8.84 m3 4,638,624.92 41,005,444.29
14 Balok Konsol 30/40 L=1.5m 5.20 m3 5,691,669.78 29,596,682.86
15 Plat Lantai Beton t=12 cm beton K225 186.62 m3 5,940,745.28 1,108,661,884.15
16 Kolom Praktis 15x15 beton K175 392.00 m1 53,257.76 20,877,039.96
17 Balok Latei 15/20 K.175 11.13 m3 2,254,997.00 25,098,116.61

II LANTAI II
1 Kolom 70/90 beton K225 141.12 m3 6,242,006.55 880,871,964.34
2 Dinding Lift 12.60 m3 829,507.50 10,451,794.50
3 Balok Anak 25/40 beton K 225 19.57 m3 5,083,182.13 99,477,874.19
4 Balok Anak 30/50 beton K.225 67.23 m3 5,083,182.13 341,742,334.26
5 Balok Induk 45/70 beton K-225 87.54 m3 5,691,669.78 498,248,772.54
6 Listplank beton t=10 cm beton K-225 5.00 m3 1,065,544.20 5,327,721.00
7 Plat Tangga Beton K225 8.87 m3 4,638,624.92 41,144,603.04
8 Balok Konsol 30/40 L=1.5m 7.00 m3 5,691,669.78 39,841,688.46
9 Plat Lantai Beton t=12 cm beton K225 166.14 m3 5,940,745.28 986,995,420.82
10 Kolom Praktis 15x15 beton K175 392.00 m1 53,257.76 20,877,039.96
11 Balok Latei 15/20 K.175 11.13 m3 2,254,997.00 25,098,116.61

III LANTAI III


1 Kolom 70/70 beton K225 109.76 m3 6,242,006.55 685,122,638.93
2 Dinding Lift 12.69 m3 829,507.50 10,526,450.18
3 Balok Anak 25/40 beton K 225 19.57 m3 5,083,182.13 99,477,874.19
4 Balok Anak 30/50 beton K.225 67.23 m3 5,083,182.13 341,742,334.26
5 Balok Induk 45/70 beton K-225 87.54 m3 5,691,669.78 498,248,772.54
6 Plat Tangga Beton K225 8.87 m3 4,638,624.92 41,144,603.04
7 Plat Lantai Beton t=12 cm beton K225 166.14 m3 4,638,624.92 770,661,144.21
8 Kolom praktis 15x15 k-175 392.00 m1 53,257.76 20,877,039.96
9 Balok lantai 15/20 k-175 11.13 m3 2,254,997.00 25,098,116.61

IV LANTAI IV
1 Kolom 70/70 beton K225 109.76 m3 6,242,006.55 685,122,638.93
2 Dinding Lift 12.69 m3 829,507.50 10,526,450.18
3 Balok Anak 25/40 beton K 225 19.57 m3 5,083,182.13 99,477,874.19
4 Balok Anak 30/50 beton K.225 67.23 m3 5,083,182.13 341,742,334.26
5 Balok Induk 45/70 beton K-225 87.54 m3 5,691,669.78 498,248,772.54
6 Plat Tangga Beton K225 8.87 m3 4,638,624.92 41,144,603.04
7 Plat Lantai Beton t=12 cm beton K225 166.14 m3 4,638,624.92 770,661,144.21
8 Kolom praktis 15x15 k-175 392.00 m1 53,257.76 20,877,039.96
9 Balok lantai 15/20 k-175 11.13 m3 2,254,997.00 25,098,116.61

V PEKERJAAN BETON LANTAI V


1 Kolom 70/70 beton K225 109.76 m3 6,242,006.55 685,122,638.93
2 Dinding Lift 12.69 m3 829,507.50 10,526,450.18
3 Balok Anak 25/40 beton K 225 19.57 m3 5,083,182.13 99,477,874.19
4 Balok Anak 30/50 beton K.225 67.23 m3 5,083,182.13 341,742,334.26
5 Balok Induk 45/70 beton K-225 87.54 m3 5,691,669.78 498,248,772.54
6 Plat Tangga Beton K225 8.87 m3 4,638,624.92 41,144,603.04
7 Plat Lantai Beton t=12 cm beton K225 166.14 m3 4,638,624.92 770,661,144.21
8 Kolom praktis 15x15 k-175 392.00 m1 53,257.76 20,877,039.96
9 Balok lantai 15/20 k-175 11.13 m3 2,254,997.00 25,098,116.61

VI PEKERJAAN BETON LANTAI VI/ATAP


1 Kolom 70/70 beton K225 109.76 m3 6,242,006.55 685,122,638.93
2 Dinding Lift 12.69 m3 829,507.50 10,526,450.18
3 Balok Anak 25/40 beton K 225 19.57 m3 5,083,182.13 99,477,874.19
4 Balok Anak 30/50 beton K.225 67.23 m3 5,083,182.13 341,742,334.26
5 Balok Induk 45/70 beton K-225 87.54 m3 5,691,669.78 498,248,772.54
6 Plat Tangga Beton K225 8.87 m3 4,638,624.92 41,144,603.04
7 Plat Lantai Beton t=12 cm beton K225 166.14 m3 4,638,624.92 770,661,144.21
8 Kolom praktis 15x15 k-175 392.00 m1 53,257.76 20,877,039.96
9 Balok lantai 15/20 k-175 11.13 m3 2,254,997.00 25,098,116.61

C PEKERJAAN PASANGAN
I LANTAI I
1 Pas. Dinding Bata Merah 1:4 1,449.00 m2 114,072.68 165,291,310.42
2 Plesteran Dinding 2,710.00 m2 35,254.21 95,538,898.26
3 Plesteran Kolom 904.56 m2 44,515.13 40,266,609.61
4 Acian Dinding 2,710.00 m2 20,714.27 56,135,682.54
5 Benangan Sudut 1,303.70 m2 20,714.27 27,005,199.01
6 Benangan Kusen 1,587.60 m2 20,714.27 32,885,981.40

II LANTAI II
1 Pas. Dinding Bata Merah 1:4 1,449.00 m2 114,072.68 165,291,310.42
2 Plesteran Dinding 2,710.00 m2 35,254.21 95,538,898.26
3 Plesteran Kolom 904.00 m2 44,515.13 40,241,681.14
4 Acian Dinding 2,710.00 m2 20,714.27 56,135,682.54
5 Benangan Sudut 1,303.70 m2 20,714.27 27,005,199.01
6 Benangan Kusen 1,587.60 m2 20,714.27 32,885,981.40

III LANTAI III


1 Pas. Dinding Bata Merah 1:4 931.07 m2 114,072.68 106,209,648.31
2 Plesteran Dinding 1,862.14 m2 35,254.21 65,648,267.16
3 Plesteran Kolom 11,266.76 m2 44,515.13 501,541,331.15
4 Acian Dinding 3,128.90 m2 20,714.27 64,812,891.92
5 Benangan Sudut 1,664.00 m' 20,714.27 34,468,551.94
6 Benangan Kusen 1,168.60 m' 20,714.27 24,206,700.60

IV LANTAI IV
1 Pas. Dinding Bata Merah 1:4 931.07 m2 114,072.68 106,209,648.31
2 Plesteran Dinding 1,862.14 m2 35,254.21 65,648,267.16
3 Plesteran Kolom 11,266.76 m2 44,515.13 501,541,331.15
4 Acian Dinding 3,128.90 m2 20,714.27 64,812,891.92
5 Benangan Sudut 1,664.00 m' 20,714.27 34,468,551.94
6 Benangan Kusen 1,168.60 m' 20,714.27 24,206,700.60

V LANTAI V
1 Pas. Dinding Bata Merah 1:4 931.07 m2 114,072.68 106,209,648.31
2 Plesteran Dinding 1,862.14 m2 35,254.21 65,648,267.16
3 Plesteran Kolom 11,266.76 m2 44,515.13 501,541,331.15
4 Acian Dinding 3,128.90 m2 20,714.27 64,812,891.92
5 Benangan Sudut 1,664.00 m' 20,714.27 34,468,551.94
6 Benangan Kusen 1,168.60 m' 20,714.27 24,206,700.60

VI LANTAI VI
1 Pas. Dinding Bata Merah 1:4 931.07 m2 114,072.68 106,209,648.31
2 Plesteran Dinding 1,862.14 m2 35,254.21 65,648,267.16
3 Plesteran Kolom 11,266.76 m2 44,515.13 501,541,331.15
4 Acian Dinding 3,128.90 m2 20,714.27 64,812,891.92
5 Benangan Sudut 1,664.00 m' 20,714.27 34,468,551.94
6 Benangan Kusen 1,168.60 m' 20,714.27 24,206,700.60

VII LANTAI VII


1 pasangan dinding batu merah 1:4 1,111.40 m2 114,072.68 126,780,374.33
2 plesteran dinding 1:4 1,889.38 m2 35,254.21 66,608,591.73
3 plesteran kolom,balok 1,415.00 m2 44,515.13 62,988,914.61
4 acian 3,304.38 m2 20,714.27 68,447,832.72
5 benangan sudut 2,051.00 m' 20,714.27 42,484,975.97
6 benangan kosen 1,112.80 m' 20,714.27 23,050,844.11

D PEKERJAAN ATAP
1 kuda kuda WF 36,409.13 kg 28,571.37 1,040,258,833.84
2 gording kanal C 15,602.63 kg 40,320.00 629,098,041.60
3 usuk & reng galvalum 1,300.00 m2 198,080.13 257,504,169.00
4 plat simpul &kopel 3,640.00 kg 24,804.00 90,286,560.00
5 angket dia 16cm &plat plendes 1,820.00 kg 43,046.40 78,344,448.00
6 trekstrang& ikatan angin 1,560.30 kg 27,576.40 43,027,456.92
7 mur baut 1.00 ls 1,284,080.00 1,284,080.00
8 kalsiplank 342.20 m' 35,409.00 12,116,959.80
9 pasang genteng keramik 1,300.22 m2 73,350.00 95,371,137.00
10 pasang bubungan 190.00 m' 56,407.20 10,717,368.00

E PEKERJAAN GRANIT DAN KERAMIK


I LANTAI I
1 Pasangan Tegel Granit 30x30 teras 148.20 m2 183,358.96 27,173,798.17
2 Pas. Tegel Keramik Essenza 60 x 60 1,278.40 m2 387,064.50 494,823,256.80
3 Pas. Tegel selasar Essenza 60 x 60 213.00 m2 270,945.15 57,711,316.95
4 Pas. Tegel Keramik Tangga 30x30 62.34 m2 119,620.69 7,457,153.94
5 Stepnosing Tangga 80.30 m2 46,980.60 3,772,542.46
6 Pas. Tegel Keramik 20/20 27.00 m2 120,669.35 3,258,072.56
7 Pas. Tegel Keramik 20/25 Dinding KM 193.60 m2 129,718.69 25,113,538.77
8 Tegel Plint 10 cm 812.50 m1 40,093.10 32,575,643.75
9 Tegel List KM 64.00 m1 31,348.10 2,006,278.40
10 Tegel dinding lift 44.00 m2 137,989.50 6,071,538.00

II LANTAI II
1 Pasangan Tegel Granit 30x30 teras 148.20 m2 183,358.96 27,173,798.17
2 Pas. Tegel Keramik Essenza 60 x 60 1,278.40 m2 387,064.50 494,823,256.80
3 Pas. Tegel selasar Essenza 60 x 60 213.00 m2 270,945.15 57,711,316.95
4 Pas. Tegel Keramik Tangga 30x30 62.34 m2 119,620.69 7,457,153.94
5 Stepnosing Tangga 80.30 m2 46,980.60 3,772,542.46
6 Pas. Tegel Keramik 20/20 27.00 m2 120,669.35 3,258,072.56
7 Pas. Tegel Keramik 20/25 Dinding KM 193.60 m2 129,718.69 25,113,538.77
8 Tegel Plint 10 cm 812.50 m2 40,093.10 32,575,643.75
9 Tegel List KM 64.00 m2 31,348.10 2,006,278.40
10 Tegel dinding lift 44.00 m2 137,989.50 6,071,538.00

III LANTAI III


1 PasanganTegel Keramik 60/60 Ezensa 1,348.00 m2 387,064.50 521,762,946.00
2 PasanganTegel Keramik tangga 30/30 62.34 m2 119,620.69 7,457,452.99
3 Stepnosing tangga 80.30 m2 46,980.60 3,772,542.46
4 Pas. Tegel Keramik 20/20 33.00 m2 120,669.35 3,982,088.68
5 Pas. Tegel Keramik 20/25 Dinding KM 193.60 m2 129,718.69 25,113,538.77
6 Tegel plint 10 cm 582.90 m2 40,093.10 23,370,267.99
7 Tegel List KM 64.00 m2 31,348.10 2,006,278.40
8 Tegel dinding lift 44.00 m2 137,989.50 6,071,538.00

IV LANTAI IV
1 PasanganTegel Keramik 60/60 Ezensa 1,348.00 m2 387,064.50 521,762,946.00
2 PasanganTegel Keramik tangga 30/30 62.34 m2 119,620.69 7,457,452.99
3 Stepnosing tangga 80.30 m2 46,980.60 3,772,542.46
4 Pas. Tegel Keramik 20/20 33.00 m2 120,669.35 3,982,088.68
5 Pas. Tegel Keramik 20/25 Dinding KM 193.60 m2 129,718.69 25,113,538.77
6 Tegel plint 10 cm 582.90 m2 40,093.10 23,370,267.99
7 Tegel List KM 64.00 m2 31,348.10 2,006,278.40
8 Tegel dinding lift 44.00 m2 137,989.50 6,071,538.00

V LANTAI V
1 PasanganTegel Keramik 60/60 Ezensa 1,348.00 m2 387,064.50 521,762,946.00
2 PasanganTegel Keramik tangga 30/30 62.34 m2 119,620.69 7,457,452.99
3 Stepnosing tangga 80.30 m2 46,980.60 3,772,542.46
4 Pas. Tegel Keramik 20/20 33.00 m2 120,669.35 3,982,088.68
5 Pas. Tegel Keramik 20/25 Dinding KM 193.60 m2 129,718.69 25,113,538.77
6 Tegel plint 10 cm 582.90 m2 40,093.10 23,370,267.99
7 Tegel List KM 64.00 m2 31,348.10 2,006,278.40
8 Tegel dinding lift 44.00 m2 137,989.50 6,071,538.00

VI LANTAI VI
1 PasanganTegel Keramik 60/60 Ezensa 1,348.00 m2 387,064.50 521,762,946.00
2 PasanganTegel Keramik tangga 30/30 62.34 m2 119,620.69 7,457,452.99
3 Stepnosing tangga 80.30 m2 46,980.60 3,772,542.46
4 Pas. Tegel Keramik 20/20 33.00 m2 120,669.35 3,982,088.68
5 Pas. Tegel Keramik 20/25 Dinding KM 193.60 m2 129,718.69 25,113,538.77
6 Tegel plint 10 cm 582.90 m2 40,093.10 23,370,267.99
7 Tegel List KM 64.00 m2 31,348.10 2,006,278.40
8 Tegel dinding lift 44.00 m2 137,989.50 6,071,538.00

VII LANTAI VII


1 pasangan tegel keramik 60/60 ezense 843.75 m2 387,064.50 326,585,671.88
2 tegel dinding lif 60/60 ezensa 44.00 m2 119,620.69 5,263,310.45
3 pasangan tegel keramik 30/30 62.34 m2 46,980.60 2,928,770.82
4 stepnosing tangga 80.30 m' 120,669.35 9,689,749.13
5 Pas. Tegel Keramik 20/20 27.00 m2 129,718.69 3,502,404.68
6 Pas. Tegel Keramik 20/25 Dinding KM 193.60 m2 40,093.10 7,762,024.16
7 tegel plint 10cm 812.50 m' 31,348.10 25,470,331.25
8 tegel list KM 64.00 m2 137,989.50 8,831,328.00

F PEKERJAAN PLAFOND
I LANTAI I
1 Rangka Plafond Galvalum 1,555.18 m2 78,470.23 122,035,332.29
2 Gypsum Board 1,555.18 m2 53,309.00 82,905,090.62
3 List Gypsum 842.60 m1 40,467.00 34,097,494.20

II LANTAI II
1 Rangka Plafond Galvalum 1,555.18 m2 78,470.23 122,035,332.29
2 Gypsum Board 1,555.18 m2 53,309.00 82,905,090.62
3 List Gypsum 842.60 m1 40,467.00 34,097,494.20

III LANTAI III


1 Rangka Plafond Galvalum 1,555.18 m2 78,470.23 122,035,332.29
2 Gypsum Board 1,555.18 m2 53,309.00 82,905,090.62
3 List Gypsum 842.60 m1 40,467.00 34,097,494.20

IV LANTAI IV
1 Rangka Plafond Galvalum 1,555.18 m2 78,470.23 122,035,332.29
2 Gypsum Board 1,555.18 m2 53,309.00 82,905,090.62
3 List Gypsum 842.60 m1 40,467.00 34,097,494.20

V LANTAI V
1 Rangka Plafond Galvalum 1,555.18 m2 78,470.23 122,035,332.29
2 Gypsum Board 1,555.18 m2 53,309.00 82,905,090.62
3 List Gypsum 842.60 m1 40,467.00 34,097,494.20

VI LANTAI VI
1 Rangka Plafond Galvalum 1,555.18 m2 78,470.23 122,035,332.29
2 Gypsum Board 1,555.18 m2 53,309.00 82,905,090.62
3 List Gypsum 842.60 m1 40,467.00 34,097,494.20

VII LANTAI VII


1 Rangka Plafond Galvalum 1,096.88 m2 78,470.23 86,072,425.88
2 Gypsum Board 1,096.88 m2 53,309.00 58,473,575.92
3 List Gypsum 842.60 m' 40,467.00 34,097,494.20
4 Pas.kalsiplank 290.00 m' 55,320.00 16,042,800.00

G PEKERJAAN KUSEN
I LANTAI I
1 Kusen Alumunium 1,192.00 m1 186,333.90 222,110,008.80
2 Daun Jendela Aluminium 52.00 bh 465,577.00 24,210,004.00
3 Pintu R. Kuliah 48.00 bh 1,145,880.00 55,002,240.00
4 Kaca 5mm 241.61 m2 138,847.50 33,546,944.48
5 Pintu KM Aluminium 13.00 bh 545,343.00 7,089,459.00
6 Pitu Outdoor 8.00 bh 523,555.00 4,188,440.00
7 Pintu Shaft 4.00 bh 593,883.00 2,375,532.00
8 Panel dan Pintu Otomatis 265x295 1.00 set 6,342,333.00 6,342,333.00
9 Panel dan Pintu Otomatis 560x295 2.00 set 9,453,333.00 18,906,666.00

II LANTAI II
1 Kusen Alumunium 1,192.85 m1 186,333.90 222,268,392.62
2 Daun Jendela Aluminium 52.00 bh 465,577.00 24,210,004.00
3 Pintu R. Kuliah 40.00 bh 1,145,880.00 45,835,200.00
4 Kaca 5mm 241.61 m2 138,847.50 33,546,944.48
5 Pintu KM Aluminium 7.00 bh 545,343.00 3,817,401.00
6 Pitu Outdoor 8.00 bh 523,555.00 4,188,440.00
7 Pintu Shaft 4.00 bh 593,883.00 2,375,532.00

III LANTAI III


1 Kusen alumunium 1,274.30 m' 186,333.90 237,445,288.77
2 Daun pintu R. Kuliah kaca 54.00 bh 1,145,880.00 61,877,520.00
3 Daun Jendela Aluminium 52.00 bh 465,577.00 24,210,004.00
4 Daun bovenlis alumunium 24.00 bh 200,098.00 4,802,352.00
5 Kaca polos 5cm 376.90 m2 138,847.50 52,331,622.75
6 Pintu KM Alumunium 11.00 bh 545,343.00 5,998,773.00
7 Pintu Outdoor 8.00 bh 523,555.00 4,188,440.00
8 Pintu shaft 4.00 bh 593,883.00 2,375,532.00

IV LANTAI IV
1 Kusen alumunium 1,274.30 m' 186,333.90 237,445,288.77
2 Daun pintu R. Kuliah kaca 54.00 bh 1,145,880.00 61,877,520.00
3 Daun Jendela Aluminium 52.00 bh 465,577.00 24,210,004.00
4 Daun bovenlis alumunium 24.00 bh 200,098.00 4,802,352.00
5 Kaca polos 5cm 376.90 m2 138,847.50 52,331,622.75
6 Pintu KM Alumunium 11.00 bh 545,343.00 5,998,773.00
7 Pintu Outdoor 8.00 bh 523,555.00 4,188,440.00
8 Pintu shaft 4.00 bh 593,883.00 2,375,532.00

V LANTAI V
1 Kusen alumunium 1,274.30 m' 186,333.90 237,445,288.77
2 Daun pintu R. Kuliah kaca 54.00 bh 1,145,880.00 61,877,520.00
3 Daun Jendela Aluminium 52.00 bh 465,577.00 24,210,004.00
4 Daun bovenlis alumunium 24.00 bh 200,098.00 4,802,352.00
5 Kaca polos 5cm 376.90 m2 138,847.50 52,331,622.75
6 Pintu KM Alumunium 11.00 bh 545,343.00 5,998,773.00
7 Pintu Outdoor 8.00 bh 523,555.00 4,188,440.00
8 Pintu shaft 4.00 bh 593,883.00 2,375,532.00

VI LANTAI VI
1 Kusen alumunium 1,274.30 m' 186,333.90 237,445,288.77
2 Daun pintu R. Kuliah kaca 54.00 bh 1,145,880.00 61,877,520.00
3 Daun Jendela Aluminium 52.00 bh 465,577.00 24,210,004.00
4 Daun bovenlis alumunium 24.00 bh 200,098.00 4,802,352.00
5 Kaca polos 5cm 376.90 m2 138,847.50 52,331,622.75
6 Pintu KM Alumunium 11.00 bh 545,343.00 5,998,773.00
7 Pintu Outdoor 8.00 bh 523,555.00 4,188,440.00
8 Pintu shaft 4.00 bh 593,883.00 2,375,532.00

VII LANTAI VII


1 Kusen alumunium 1,251.20 m' 186,333.90 233,140,975.68
2 Daun pintu R. Kuliah kaca 24.00 bh 1,145,880.00 27,501,120.00
3 Daun Jendela Aluminium 52.00 bh 465,577.00 24,210,004.00
4 pintu KM alumunium 8.00 bh 545,343.00 4,362,744.00
5 pintu Shaft 4.00 bh 593,883.00 2,375,532.00
6 kaca 5cm 254.84 m2 138,847.50 35,383,896.90
H PEKERJAAN SEKAT PARTISI
I LANTAI 3
1 Partisi Gypsum 9mm 231.53 m2 295,138.89 68,332,031.51
2 List Gypsum 304.60 m1 40,467.00 12,326,248.20
3 List Bawah Aluminium Strip Brown 3" 304.60 m1 15,345.00 4,674,087.00

II LANTAI 4
1 Partisi Gypsum 9mm 277.83 m2 295,138.89 81,998,437.81
2 List Gypsum 377.20 m1 40,467.00 15,264,152.40
3 List Bawah Aluminium Strip Brown 3" 377.20 m1 15,345.00 5,788,134.00

III LANTAI 5
1 Partisi Gypsum 9mm 277.83 m2 295,138.89 81,998,437.81
2 List Gypsum 377.20 m1 40,467.00 15,264,152.40
3 List Bawah Aluminium Strip Brown 3" 377.20 m1 15,345.00 5,788,134.00

IV LANTAI 6
1 Partisi Gypsum 9mm 277.83 m2 295,138.89 81,998,437.81
2 List Gypsum 377.20 m1 40,467.00 15,264,152.40
3 List Bawah Aluminium Strip Brown 3" 377.20 m1 15,345.00 5,788,134.00

I PEKERJAAN PENGECATAN
I LANTAI I
1 Pengecatan dinding dalam/ DULUX 2,114.00 m2 63,535.64 134,314,351.42
2 Pengecatan dinding luar/ DULUX 728.00 m2 111,629.66 81,266,395.39
3 Pengecatan plafond/ CATYLAC 1,555.18 m2 56,375.24 87,673,651.96

II LANTAI II
1 Pengecatan dinding dalam/ DULUX 2,114.20 m2 63,535.64 134,327,058.54
2 Pengecatan dinding luar/ DULUX 728.00 m2 111,629.66 81,266,395.39
3 Pengecatan plafond/ CATYLAC 1,534.38 m2 56,375.24 86,501,046.89

III LANTAI III


1 Pengecatan dinding dalam/ DULUX 2,114.20 m2 63,535.64 134,327,058.54
2 Pengecatan dinding luar/ DULUX 728.00 m2 111,629.66 81,266,395.39
3 Pengecatan plafond/ CATYLAC 1,534.38 m2 56,375.24 86,501,046.89

IV LANTAI IV
1 Pengecatan dinding dalam/ DULUX 2,114.20 m2 63,535.64 134,327,058.54
2 Pengecatan dinding luar/ DULUX 728.00 m2 111,629.66 81,266,395.39
3 Pengecatan plafond/ CATYLAC 1,534.38 m2 56,375.24 86,501,046.89

V LANTAI V
1 Pengecatan dinding dalam/ DULUX 2,114.20 m2 63,535.64 134,327,058.54
2 Pengecatan dinding luar/ DULUX 728.00 m2 111,629.66 81,266,395.39
3 Pengecatan plafond/ CATYLAC 1,534.38 m2 56,375.24 86,501,046.89

VI LANTAI VI
1 Pengecatan dinding dalam/ DULUX 2,114.20 m2 63,535.64 134,327,058.54
2 Pengecatan dinding luar/ DULUX 728.00 m2 111,629.66 81,266,395.39
3 Pengecatan plafond/ CATYLAC 1,534.38 m2 56,375.24 86,501,046.89

VII LANTAI VII


1 Pengecatan dinding dalam/ DULUX 200.34 m2 63,535.64 12,728,730.92
2 Pengecatan dinding luar/ DULUX 1,638.28 m2 111,629.66 182,880,645.94
3 Pengecatan plafond/ CATYLAC 1,096.88 m2 56,375.24 61,836,877.64
4 pengecatan lisplank 171.10 m2 87,394.46 14,953,192.79
J PEKERJAAN INSTALASI LISTRIK
I LANTAI I
1 Instalasi Lampu 129.00 ttk 113,525.00 14,644,725.00
2 Instalasi Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
3 Instalasi Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
4 Instalasi Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
5 Pemasangan Saklar Engkel 2.00 ttk 104,951.00 209,902.00
6 Pemasangan Sklar Seri 25.00 ttk 104,951.00 2,623,775.00
7 Pemasangan Saklar Hotel 2.00 ttk 104,951.00 209,902.00
8 Pemasangan Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
9 Pemasangan Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
10 Panel MDP 1.00 ttk 3,453,433.00 3,453,433.00
11 Panel SDP 1.00 ttk 2,072,059.80 2,072,059.80
12 Pemasangan Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
13 Pemasangan Lampu TL 2 x 40 W (RMI) 64.00 ttk 454,100.00 29,062,400.00
14 Pemasangan Lampu TL 2 x 20 W (RMI) 9.00 ttk 302,733.33 2,724,600.00
15 Pemasangan Downlight, 18 W 52.00 ttk 70,664.00 3,674,528.00
16 Pemasangan Lampu Baret 40 W 1.00 ttk 240,547.00 240,547.00
17 Pemasangan Lampu Baret 20 W 3.00 ttk 160,364.67 481,094.00
18 Pemasangan AC / 1 PK/ Converter 24.00 set 265,770.00 6,378,480.00
19 Penyambungan Kabel Daya 1.00 ls 257,888.00 257,888.00

II LANTAI II
1 Instalasi Lampu 129.00 ttk 113,525.00 14,644,725.00
2 Instalasi Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
3 Instalasi Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
4 Instalasi Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
5 Pemasangan Saklar Engkel 2.00 ttk 104,951.00 209,902.00
6 Pemasangan Sklar Seri 25.00 ttk 104,951.00 2,623,775.00
7 Pemasangan Saklar Hotel 2.00 ttk 104,951.00 209,902.00
8 Pemasangan Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
9 Pemasangan Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
10 Panel SDP 1.00 ttk 2,072,059.80 2,072,059.80
11 Pemasangan Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64.00 ttk 454,100.00 29,062,400.00
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9.00 ttk 302,733.33 2,724,600.00
14 Pemasangan Downlight, 18 W 52.00 ttk 70,664.00 3,674,528.00
15 Pemasangan Lampu Baret 20 W 1.00 ttk 160,364.67 160,364.67
16 Pemasangan AC/ 1 PK 24.00 set 265,770.00 6,378,480.00

III LANTAI III


1 Instalasi Lampu 129.00 ttk 113,525.00 14,644,725.00
2 Instalasi Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
3 Instalasi Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
4 Instalasi Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
5 Pemasangan Saklar Engkel 2.00 ttk 104,951.00 209,902.00
6 Pemasangan Sklar Seri 25.00 ttk 104,951.00 2,623,775.00
7 Pemasangan Saklar Hotel 2.00 ttk 104,951.00 209,902.00
8 Pemasangan Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
9 Pemasangan Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
10 Panel SDP 1.00 ttk 2,072,059.80 2,072,059.80
11 Pemasangan Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64.00 ttk 454,100.00 29,062,400.00
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9.00 ttk 302,733.33 2,724,600.00
14 Pemasangan Downlight, 18 W 52.00 ttk 70,664.00 3,674,528.00
15 Pemasangan Lampu Baret 20 W 1.00 ttk 160,364.67 160,364.67
16 Pemasangan AC/ 1 PK 24.00 set 265,770.00 6,378,480.00

IV LANTAI IV
1 Instalasi Lampu 129.00 ttk 113,525.00 14,644,725.00
2 Instalasi Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
3 Instalasi Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
4 Instalasi Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
5 Pemasangan Saklar Engkel 2.00 ttk 104,951.00 209,902.00
6 Pemasangan Sklar Seri 25.00 ttk 104,951.00 2,623,775.00
7 Pemasangan Saklar Hotel 2.00 ttk 104,951.00 209,902.00
8 Pemasangan Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
9 Pemasangan Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
10 Panel SDP 1.00 ttk 2,072,059.80 2,072,059.80
11 Pemasangan Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64.00 ttk 454,100.00 29,062,400.00
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9.00 ttk 302,733.33 2,724,600.00
14 Pemasangan Downlight, 18 W 52.00 ttk 70,664.00 3,674,528.00
15 Pemasangan Lampu Baret 20 W 1.00 ttk 160,364.67 160,364.67
16 Pemasangan AC/ 1 PK 48.00 set 265,770.00 12,756,960.00

V LANTAI V
1 Instalasi Lampu 129.00 ttk 113,525.00 14,644,725.00
2 Instalasi Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
3 Instalasi Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
4 Instalasi Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
5 Pemasangan Saklar Engkel 2.00 ttk 104,951.00 209,902.00
6 Pemasangan Sklar Seri 25.00 ttk 104,951.00 2,623,775.00
7 Pemasangan Saklar Hotel 2.00 ttk 104,951.00 209,902.00
8 Pemasangan Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
9 Pemasangan Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
10 Panel SDP 1.00 ttk 2,072,059.80 2,072,059.80
11 Pemasangan Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64.00 ttk 454,100.00 29,062,400.00
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9.00 ttk 302,733.33 2,724,600.00
14 Pemasangan Downlight, 18 W 52.00 ttk 70,664.00 3,674,528.00
15 Pemasangan Lampu Baret 20 W 1.00 ttk 160,364.67 160,364.67
16 Pemasangan AC/ 1 PK 48.00 set 265,770.00 12,756,960.00

VI LANTAI VI
1 Instalasi Lampu 129.00 ttk 113,525.00 14,644,725.00
2 Instalasi Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
3 Instalasi Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
4 Instalasi Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
5 Pemasangan Saklar Engkel 2.00 ttk 104,951.00 209,902.00
6 Pemasangan Sklar Seri 25.00 ttk 104,951.00 2,623,775.00
7 Pemasangan Saklar Hotel 2.00 ttk 104,951.00 209,902.00
8 Pemasangan Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
9 Pemasangan Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
10 Panel SDP 1.00 ttk 2,072,059.80 2,072,059.80
11 Pemasangan Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64.00 ttk 454,100.00 29,062,400.00
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9.00 ttk 302,733.33 2,724,600.00
14 Pemasangan Downlight, 18 W 52.00 ttk 70,664.00 3,674,528.00
15 Pemasangan Lampu Baret 20 W 1.00 ttk 160,364.67 160,364.67
16 Pemasangan AC/ 1 PK 48.00 set 265,770.00 12,756,960.00

VII LANTAI VII


1 Instalasi Lampu 129.00 ttk 113,525.00 14,644,725.00
2 Instalasi Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
3 Instalasi Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
4 Instalasi Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
5 Pemasangan Saklar Engkel 2.00 ttk 104,951.00 209,902.00
6 Pemasangan Sklar Seri 25.00 ttk 104,951.00 2,623,775.00
7 Pemasangan Saklar Hotel 2.00 ttk 104,951.00 209,902.00
8 Pemasangan Stop Kontak LCD 8.00 ttk 45,540.00 364,320.00
9 Pemasangan Stop Kontak AC 16.00 ttk 45,540.00 728,640.00
10 Panel SDP 1.00 ttk 2,072,059.80 2,072,059.80
11 Pemasangan Stop Kontak 51.00 ttk 45,540.00 2,322,540.00
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64.00 ttk 454,100.00 29,062,400.00
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9.00 ttk 302,733.33 2,724,600.00
14 Pemasangan Downlight, 18 W 52.00 ttk 70,664.00 3,674,528.00
15 Pemasangan Lampu Baret 20 W 1.00 ttk 160,364.67 160,364.67

K PEKERJAAN SANITASI
I LANTAI I
1 Pemasangan Closet Duduk TOTO 6.00 bh 2,420,729.00 14,524,374.00
2 Pemasangan Urinoir 3.00 bh 1,763,857.00 5,291,571.00
3 Saluran terbuka U30 130.00 m1 14,232.00 1,850,160.00
4 Pipa Air (GIP) 3" (Talang Tegak) 192.00 m1 80,534.00 15,462,528.00
5 Pipa Air PVC 3" 40.00 m1 74,496.90 2,979,876.00
6 Pipa Air PVC 4" 40.00 m1 7,538.95 301,558.14
7 Pipa PVC Air Bersih 1 1/4" 12.00 m1 33,791.20 405,494.40
8 Pipa PVC Air Bersih 1" 30.00 m1 24,801.20 744,036.00
9 Pipa PVC Air Bersih 3/4" 18.00 m1 51,099.08 919,783.38
10 Pipa PVC Air Bersih 1/2" 24.00 m1 15,631.20 375,148.80
11 Pemasangan Wastafel TOTO 4.00 bh 845,797.00 3,383,188.00
12 Floordrain 9.00 bh 45,455.00 409,095.00
13 Kran dinding 1/2" 7.00 bh 67,482.50 472,377.50
14 Septictank 2.00 unit 6,320,824.92 12,641,649.84
15 Sumur Resapan 2.00 bh 1,450,427.04 2,900,854.08
16 Sumur Bor air bersih 20m 2.00 unit 1,671,375.60 3,342,751.20
17 Pompa Air Grunfos 2.00 bh 1,075,320.00 2,150,640.00
18 Groundtank 42.00 m3 384,039.00 16,129,638.00
19 Tandon Air Stainless 5000ltr 2.00 bh 11,740,358.12 23,480,716.23

II LANTAI II
1 Pemasangan Closet Duduk TOTO 6.00 bh 2,420,729.00 14,524,374.00
2 Pemasangan Urinoir 3.00 bh 1,763,857.00 5,291,571.00
3 Pipa Air (GIP) 3" (Talang Tegak) 128.00 m1 80,534.00 10,308,352.00
4 Pipa Air PVC 3" 40.00 m1 74,496.90 2,979,876.00
5 Pipa Air PVC 4" 40.00 m1 7,538.95 301,558.14
6 Pipa PVC Air Bersih 1 1/4" 12.00 m1 33,791.20 405,494.40
7 Pipa PVC Air Bersih 1" 30.00 m1 24,801.20 744,036.00
8 Pipa PVC Air Bersih 3/4" 18.00 m1 51,099.08 919,783.38
9 Pipa PVC Air Bersih 1/2" 24.00 m1 15,631.20 375,148.80
10 Pemasangan Wastafel TOTO 4.00 bh 845,797.00 3,383,188.00
11 Floordrain 9.00 bh 45,455.00 409,095.00
12 Kran dinding 1/2" 7.00 bh 67,482.50 472,377.50

III LANTAI III


1 Pemasangan Closet Duduk TOTO 6.00 bh 2,420,729.00 14,524,374.00
2 Pemasangan Urinoir 3.00 bh 1,763,857.00 5,291,571.00
3 Pipa Air (GIP) 3" (Talang Tegak) 128.00 m1 80,534.00 10,308,352.00
4 Pipa Air PVC 3" 40.00 m1 74,496.90 2,979,876.00
5 Pipa Air PVC 4" 40.00 m1 7,538.95 301,558.14
6 Pipa PVC Air Bersih 1 1/4" 12.00 m1 33,791.20 405,494.40
7 Pipa PVC Air Bersih 1" 30.00 m1 24,801.20 744,036.00
8 Pipa PVC Air Bersih 3/4" 18.00 m1 51,099.08 919,783.38
9 Pipa PVC Air Bersih 1/2" 24.00 m1 15,631.20 375,148.80
10 Pemasangan Wastafel TOTO 4.00 bh 845,797.00 3,383,188.00
11 Floordrain 9.00 bh 45,455.00 409,095.00
12 Kran dinding 1/2" 7.00 bh 67,482.50 472,377.50

IV LANTAI IV
1 Pemasangan Closet Duduk TOTO 6.00 bh 2,420,729.00 14,524,374.00
2 Pemasangan Urinoir 3.00 bh 1,763,857.00 5,291,571.00
3 Pipa Air (GIP) 3" (Talang Tegak) 128.00 m1 80,534.00 10,308,352.00
4 Pipa Air PVC 3" 40.00 m1 74,496.90 2,979,876.00
5 Pipa Air PVC 4" 40.00 m1 7,538.95 301,558.14
6 Pipa PVC Air Bersih 1 1/4" 12.00 m1 33,791.20 405,494.40
7 Pipa PVC Air Bersih 1" 30.00 m1 24,801.20 744,036.00
8 Pipa PVC Air Bersih 3/4" 18.00 m1 51,099.08 919,783.38
9 Pipa PVC Air Bersih 1/2" 24.00 m1 15,631.20 375,148.80
10 Pemasangan Wastafel TOTO 4.00 bh 845,797.00 3,383,188.00
11 Floordrain 9.00 bh 45,455.00 409,095.00
12 Kran dinding 1/2" 7.00 bh 67,482.50 472,377.50

V LANTAI V
1 Pemasangan Closet Duduk TOTO 6.00 bh 2,420,729.00 14,524,374.00
2 Pemasangan Urinoir 3.00 bh 1,763,857.00 5,291,571.00
3 Pipa Air (GIP) 3" (Talang Tegak) 128.00 m1 80,534.00 10,308,352.00
4 Pipa Air PVC 3" 40.00 m1 74,496.90 2,979,876.00
5 Pipa Air PVC 4" 40.00 m1 7,538.95 301,558.14
6 Pipa PVC Air Bersih 1 1/4" 12.00 m1 33,791.20 405,494.40
7 Pipa PVC Air Bersih 1" 30.00 m1 24,801.20 744,036.00
8 Pipa PVC Air Bersih 3/4" 18.00 m1 51,099.08 919,783.38
9 Pipa PVC Air Bersih 1/2" 24.00 m1 15,631.20 375,148.80
10 Pemasangan Wastafel TOTO 4.00 bh 845,797.00 3,383,188.00
11 Floordrain 9.00 bh 45,455.00 409,095.00
12 Kran dinding 1/2" 7.00 bh 67,482.50 472,377.50

VI LANTAI VI
1 Pemasangan Closet Duduk TOTO 6.00 bh 2,420,729.00 14,524,374.00
2 Pemasangan Urinoir 3.00 bh 1,763,857.00 5,291,571.00
3 Pipa Air (GIP) 3" (Talang Tegak) 128.00 m1 80,534.00 10,308,352.00
4 Pipa Air PVC 3" 40.00 m1 74,496.90 2,979,876.00
5 Pipa Air PVC 4" 40.00 m1 7,538.95 301,558.14
6 Pipa PVC Air Bersih 1 1/4" 12.00 m1 33,791.20 405,494.40
7 Pipa PVC Air Bersih 1" 30.00 m1 24,801.20 744,036.00
8 Pipa PVC Air Bersih 3/4" 18.00 m1 51,099.08 919,783.38
9 Pipa PVC Air Bersih 1/2" 24.00 m1 15,631.20 375,148.80
10 Pemasangan Wastafel TOTO 4.00 bh 845,797.00 3,383,188.00
11 Floordrain 9.00 bh 45,455.00 409,095.00
12 Kran dinding 1/2" 7.00 bh 67,482.50 472,377.50

L PEKERJAAN LIFT
1 Konstruksi Lift 1.00 Ls 40,777,666.00 40,777,666.00
2 Lift Mitsubishi 2.00 Bh 140,878,800.00 281,757,600.00

M PEKERJAAN LAIN LAIN


1 Handrail Tangga Stainles 2" (lt. 1 s/d lt. 6) 416.00 m1 390,912.50 162,619,600.00
2 penangkal petir 1.00 unit 6,699,750.00 6,699,750.00

Jumlah 37,695,696,291.36
DAFTAR BAHAN DAN UPAH

Gol Jenis Barang Sat. Proy.

UPAH PEKERJA
Tukang Potong Pohon Hari
Tukang Plitur Hari
Tukang Pipa Hari
Tukang Listrik Hari
Tukang Kayu Hari
Tukang Gali Tanah Hari
Tukang Gali Lumpur Hari
Tukang Cat / Kapur Hari
Tukang Besi Hari
Tukang Batu Hari
Penjaga Hari
Pengemudi/sopir Hari
Pengawas Hari
Pembantu Operator Hari
Pembantu Masinis Hari
Pemasak aspal Hari
Pekerja Terampil Hari
Pekerja / Buruh Tak Terampil Hari
Operator Hari
Mekanik Pembantu Hari
Mekanik Hari
Masinis Hari
Mandor Hari
Kepala Tukang Pipa Hari
Kepala Tukang Listrik Hari
Kepala Tukang Kayu Hari
Kepala Tukang Gali Tanah Hari
Kepala Tukang Cat Hari
Kepala Tukang Besi Hari
Kepala Tukang Batu Hari
PERBAIKAN TANAH
Tanah Urug m³
Sirtu m3
PEMIPAAN
1 Pipa PVC ø 5 " AW ( Ex. MASPION ) m'
Pipa PVC ø 4 " D ( Ex. MASPION ) m'
Pipa PVC ø 4 " AW ( Ex. MASPION ) m'
Pipa PVC ø 3/4 " AW ( Ex. MASPION ) m'
Pipa PVC ø 3 " D ( Ex. MASPION ) m'
Pipa PVC ø 3 " AW ( Ex. MASPION ) m'
Pipa PVC ø 2 " D ( Ex. MASPION ) m'

Halaman ke 12 dari 350 halaman


Pipa PVC ø 2 1/2" AW ( Ex. MASPION ) m'
Pipa PVC ø 1/2 " AW ( Ex. MASPION ) m'
Pipa PVC ø 1 1/4 " AW ( Ex. MASPION ) m'
Pipa PVC ø 1 " AW ( Ex. MASPION ) m'
Pipa PVC D Ø 4" m'
Pipa PVC D Ø 3" m'
Pipa PVC D Ø 2" m'
Pipa Groun GIP 1" m'
Pipa galvanis d = 3/4" m'
Pipa galvanis d = 2" m'
Pipa galvanis d = 1/2" m'
Pipa galvanis d = 1" m'
Clean Out bh
Buis beton U. 20cm m'
Buis Beton ø 50 - 1,00 m m'
Buis Beton d = 80 m'
Buis Beton d = 60 m'
Buis Beton d = 50 m'
Buis Beton d = 40 m'
Buis Beton d = 30 m'
Buis Beton d = 20 m'
Buis Beton d = 15 m'
Beton Buis U. 20cm m'
BESI, BAJA, PROFIL
Railling Tangga t. 2 pipa BSP ø 2 1/2 Finish Cat Duco m'
Railling Tangga t. 1 pipa Stainless Steel ø 2 1/2 m'
Elektroda Las Listrik kg
Plat Besi tebal 10 mm keatas kg
Besi WF 200.100.5,5 kg
Besi plat strip kg
Besi pipa hitam 2" kg
Besi C 150.65.20.3,2 kg
Baja segala jenis WF. I, C kg
Baja Profil SIKU 90.90.9 kg
Baja Profil SIKU 80.80.8 kg
Baja Profil SIKU 70.70.7 kg
Baja Profil SIKU 60.60.6 kg
Baja Profil SIKU 50.50.5 kg
Baja Profil SIKU 30.30.3 kg
Baja Profil Canal C 150.65.20.3,2 kg
Baja Profil Canal C 100.50.2 kg
Baja Profil I WF 600.300 kg
Baja Profil I WF 400.200 kg
Baja Profil I WF 350.200 kg
Baja Profil I WF 300.150 kg
Baja Profil I WF 200.100 kg
WATERPROOFING
Waterproofing Resin m2
Waterproof/Plincood kg.
Halaman ke 13 dari 350 halaman
PLUMBING DAN SANITASI
Washtafel Studio 45 Ex. American Standard bh
Washtafel " toto " komplit bh
Urinoir " toto " komplit bh
Tepung Jimstone + perekat kg
Tempat Sabun 10 x 15 Cm KIA bh
Stop Kran O. 3/4 bh
Stop Kran Ø 3/4" KITT bh
Stop Kran Ø 1" KITT bh
Stop Kran (Stop Valve ) T 4 A, Ex. TOTO bh
Soap disp (Tempat Sabun Cair Meja), TS 126 AR Ex. TOTO bh
Pompa Jet Pump DAB 250 watt unit
Kran Washtafel ( T 205 M, Ex. TOTO ) bh
Kran Taman (Type Y30 RN, Ex. SAN-EI ) bh
Kran Dinding Lokal bh
Kran Bak Zink Lokal bh
Kran Air Buah
Kicthen Zink komplit bh
Gate Valve Ø 1" KITT bh
Gantungan Washtafel TL 220 D bh
Floor Drain Lotus bh
Floor Drain bh
Drain Bak Mandi ø 1/2" bh
Closet jongkok Teraso Buah
Closet jongkok Porselin merk INA Buah
Closet Jongkok Ex. American Standard Unit
Closet Jongkok " toto " komplit bh
Closet duduk Porselin merk TOTO Unit
Closet Duduk " toto " komplit bh
Closet Duduk Granada II Ex. American Standard KIA Unit
Bak Mandi Fibre Glass 60 x 60 Hasgof bh
Bak Kontrol Unit
Bak Cuci Stainless Steel ( MEIWA ) bh
Bak Air 60x60 Traso Buah
1" Plug & Chain Waste With P-Trap T 6 P Ex. TOTO bh
PLAFOND
Gypsum Board 9 mm lbr.
Gypsum 9 mm lbr
Eternit kerang 100 x 100 lbr.
Eternit 1.00 X 1.00 polos lb
ALUMUNIUM
Ukuran 2 " bh
Kusen Alumunium Color 4 x 1" m1
3
pintu

Ukuran 2,5 " bh


Halaman ke 14 dari 350 halaman
Alumunium Voil Single Sided m2
PASIR
Pasir Urug m³
Pasir pasang m³
Pasir cor beton m³
Sirtu m³

LIST SUDUT PLAFOND, LANTAI, DINDING


List Plafon 1 X 5 cm-3M m'
List Kayu 1/3 Kayu Borneo Super m'
List Gypsum 5 cm m'
PENUTUP LANTAI DAN DINDING
Batu LEMPENG m²
Batu Apung kg
Batu BATA Merah kelas I buah
Batu GILANG m²
Batu BELAH m²
Batu BOBOS m²
Batu CIREBON m²
Batu MARMO m²
Batu PALIMANAN m²
Batu PUTIH m²
Batu GRANIT m²
Granito 20 x 20 (kasar ) m²
Granito 30 x 30 (Unpolish ) m²
Granito 30 x 30 (Polish ) m²
Granito 30 x 30 (Polish - Warna Tua) m²
Granito 40 x 40 (Unpolish ) m²
Granito 40 x 40 (Unpolish -Warna Tua ) m²
Granito 40 x 40 (Polish - Warna muda) m²
Granito 40 x 40 (Polish ) m²
Karet list kasa alumunium 50 m' m'
Parkeet Lokal m²
Parkeet Import m²
Keramik Lantai 20 X 20 ex. ROMAN kw 1 m²
Keramik Lantai 30 X 30 ex. ROMAN kw 1 m²
Keramik Lantai 40 X 40 ex. ROMAN kw 1 m²
Keramik Dinding 20 X 25 ex. ROMAN kw1 m²
List Keramik 6 x 20 bh
Stepnose GRANITO bh
Batu MARMER Tulungagung 30 x 60 m²
Batu MARMER Citatah 40 x 40 m²
Batu MARMER ITALY 40 x 40 m²
Paving stone NATURAL 6 cm m²
Paving stone WARNA 6 cm m²
Paving stone NATURAL 8 cm m²
Paving Stone WARNA 8 cm m²
Kanstin m²
Tegel press ABU-ABU 20 x 20 m²
Halaman ke 15 dari 350 halaman
Tegel TERRASO 20 x 20 m²
Tegel TERRASO 30 x 30 m²
Tegel WAFEL 20 x 20 m²
TAMAN DAN POHON
Rumput Gajah + Tanah humus m2
Pohon Perdu Rpn
Pohon Cemara t. +/- 2,00 m Phn
Tanah humus m3
KAWAT
Tiang t. 1m Lampu SL 15 Watt Phlips Lengkap unit
Stop Kontak ex. BROCCO lokal bh
Stop kontak Titik
Skaklar tunggal Titik
Sakalar Serie ex. BROCCO lokal bh
Sakalar Engkle ex. BROCCO lokal bh
Lampu Type SL 82/85 , 9 Watt Titik
Lampu Type SL 82/85 , 9 Watt Titik
Lampu TK 2x36 TL + Reflextor Philip + Armatur Artolite unit
Lampu TK 2x18 TL + Reflextor Philip + Armatur Artolite unit
Lampu TK 1x36 TL + Reflextor Philip + Armatur Artolite unit
Lampu TK 1x18 TL + Reflextor Philip + Armatur Artolite unit
Lampu Taman GLG BG 12" E27 Bening Artolite
Lampu Down light standard unit
Lampu Baret SCB 20 ACR kotak unit
Lampu SL 15 watt Philip Armature Artolite unit
Klem Kable BC bh
Kable BC 25 mm m'
Kable BC 50 mm m'
Instalasi titik lampu ttk
BAHAN LAIN-LAIN
Adesif kg
Angker Baut kg
Dolken btg
Resin Granit kg
Dolosit 25 kg zak
Ijuk kg
Kaca Cermin m²
Lem Fox kg
Lem Kayu Kuning kg
Lem Kayu Putih kg
Mur Baut ø 1/2" x 15 kg
Mur Baut lokal ø 1/2" x 25 kg
Mur Baut Piser ø 12 - 30 cm/dynabolt bh
Nok Bulat Maridional ex Abadi bh
Nok Bulat Meridional ex Abadi bh
Nok Ujung Bubung Genteng bh
Patri/Timah bh
PC Warna kg
Plastik m2
Halaman ke 16 dari 350 halaman
Tangki air exel 1000 ltr bh
KAYU
Bakar truk
BAMBU Batang d. 10 -12 cm Pj. 8 m bh
BAMBU Anyam / SESEK 180 X 200 cm bh
BAMBU Bongkotan 10 - 12 cm Pj 3 m Btg
BENGKIRAI balok - 8/15, 8/12,6/12 M3
BENGKIRAI papan 2/20, 2/25x4 m M3
BENGKIRAI reng 2/3, 3/4x4m M3
BENGKIRAI usuk 5/7, 4/6x4 m M3
DADAP ( Begesting) M3
DOLKEN Kayu d. 8 - 10 cm Btg
GEDEG guling M2
JATI Mlg. Sel. - Balok/Usuk m³
JATI Bojonegoro - Balok/Usuk
JATI Mlg. Sel. - Papan/ Slimaran M3
JATI Bojonegoro - Papan/ Slimaran M3
JATI Reng 2/3, 3/5 M3
KRUING Papan/Usuk M3
KAMPER Papan/ slimaran M3
KAMPER Balok & Usuk M3
KAMPER Reng 2/3, 3/5
MERANTI Papan/ slimaran m³
MERANTI Balok & Usuk M3
MERANTI Reng 2/3, 3/5 M3
RANDU Papan ( Bekisting ) m³
RANDU Balok ( Bekisting )
PAKU
Paku 2"- 5" kg
Paku Asbes / Triplex kg
Paku Beton bh
Paku Gypsum bks
Paku seng Kg
Paku Triplex kg
TRIPLEKS/MULTIPLEKS/PARTIKEL/GYPSUM
Multiplek 12 mm lbr
Multiplek 6 mm lbr
Multiplek 9 mm lbr
PARTIKEL 6 mm lb
PARTIKEL 9 mm lb
PARTIKEL 12 mm lb
Gypsum Board 9 mm lbr
Gypsum Board 6 mm lbr
Formika lbr
Teakwood 4.00 mm 120 X 240 cm lb
Triplex 3 mm lbr

Halaman ke 17 dari 350 halaman


Triplex 4 mm lbr
Triplex lapis almunium lbr.
KAWAT
Kawat HARMONIKA M2
Kawat DURI (pagar) kg
Kawat BENDRAT ( Kawat Tulangan ) Kg
KACA
Kaca Cermin di Washtafel TX 119 A Ex. TOTO bh
Kaca Cermin t. 5 mm m2
Kaca nako dan kerangkan merk NIKY Daun
Kaca Polos / Bening 5.00 mm m²
Kaca polos 3 mm M2
Kaca polos 5 mm M2
Kaca Ray Band 5.00 mm m²
Kaca Rayban 5 mm M2
Kaca t. 3 mm Bening m2
Kaca t. 5 mm Bening m2
Kaca t. 5 mm Ryband m2
JALAN
Kanstein 15 X 20 X 40 CM bh
Bituman (Asphalt) Kg
Bituman (Asphalt Curah) Kg
Bituman ( Asbhuton ) Ton
Aspal Kg
TALANG
Talang seng L=90 cm 0,25MM m'
Talang seng L=60 cm- 0.2MM m'
DINDING
Glass Block 20 x 20 cm ( MULIA ) m2
Gamping bubukan M3
Gamping Bongkahan M3
CAT
Cat Dasar Kayu/Besi (Avian) kg
Cat Dinding Ex. DULUX kg
Cat Kayu SEIV kg
Cat Kayu / Besi Ex " EMCO " kg
Cat kayu EMCO warna muda kg.
Cat kayu EMCO warna tua kg.
Cat kayu/besi merk Avian Kg
Cat kayu/besi merk Emco Kg
Cat meni kayu/besi Kg
Cat tembok Avitex kg.
Cat Tembok Dulux Pearl Glo kg.
Cat Tembok Dulux Pentalite kg.
Cat Tembok Dulux Weathershield kg.
Cat Tembok Ex " CATHILAC " kg
Cat tembok merk Avitex Gln

Halaman ke 18 dari 350 halaman


Cat tembok merk Decolith Gln
Cat tembok merk Paragon Gln
Dempul Alkali Ex. Vinilex kg
Dempul Kayu Cap Kucing kg
Dempul Pelitur (dempul Kasar) kg
Kertas Gosok lbr.
Kuas 2" Buah
Kuas 4" bh.
Melamic kg
Melamine kg
Melaminto untuk pintu 4 mm lbr
Meny Besi kg
Meny Kayu kg
Minyak Cat / Thinner B lt
Minyak cat thiner B Ltr
Oker kg
Oker Putih kg
Oker Warna kg
Plamir / Dempul Kayu kg
Plamir Tembok kg
Plamur kayu kg.
Plamur tembok ( Cap Buaya ) Kg
Sirlak kg
Sirlak ex. India kg
Thinner A ltr
Thinner B ltr.
Tiner Ltr
Varnish kg
Wood Color tone kg
Wood Filler kg
Wood Filler Impra kg
BAHAN BAKAR
Spirtus Ltr
Solar Ltr
Residu blk
Pelumas Ltr
Minyak tanah Ltr
Gemuk/stempet Ltr
Bensin Ltr
BATU-BATUAN
Batu GRAGAL M3
Batu GUNUNG pecah tangan 15/20 M3
Batu Kali Pecah 15 / 20 cm m³
Batu Kali Pecah MESIN 1/1 M3
Batu Kali Pecah MESIN 1/2 M3
Batu Kali Pecah MESIN 2/3 M3
Batu Kali Pecah MESIN 3/5 M3

Halaman ke 19 dari 350 halaman


Batu Kali Pecah MESIN 5/7 M3
Batu Kali Pecah TANGAN 1/2 M3
Batu Kali Pecah TANGAN 15/20 M3
Batu Kali Pecah TANGAN 2/3 M3
Batu Kali Pecah TANGAN 3/5 M3
Batu Kali Pecah TANGAN 5/7 M3
Batu Kerikil + Pasir M3
Batu Kerikil Tersaring M3
Batu Koral Pecah Mesin 1/2 m³
Batu Koral Pecah Mesin 2/3
Batu Koral Pecah Tangan 1/2 m³
Batu Koral Pecah Tangan 2/3
KAWAT
Kawat Bendrat kg
Kawat beton kg
PORTLAND CEMENT
Portland Cement ( 50 kg ) zak
Portland Cement ( PC )/kg kg
Portland Cement ( PC ) 40 kg zak
Portland Cement ( PC ) /kg kg
Portland Cement ( PC ) 50 kg Putih zak
Portland Cement ( PC )/ kg Putih kg
Semen merah M3
Semen warna/zak zak
Semen Warna/ kg kg
BESI BETON
Besi baja anyaman bronjong Kg
Besi baja paku-paku jembatan Kg
Besi beton POLOS kg
Besi beton ULIR kg
Besi beton PRESTRESSED POLOS kg
Besi beton ULIR ø 16 mm kg
Besi beton ULIR ø 19 mm kg
Besi beton ULIR ø 22 mm kg
PENUTUP ATAP
1 Asbes (eternit) 1x1 m Lbr
2 Asbes Gelombang besar 1 x 2.00 m lbr
3 Asbes gelombang besar 3.050x1.050x4 mm Lbr
4 Asbes gelombang kecil 3.050x1.050x4 mm Lbr
5 Bubungan Asbes lbr
6 Bubungan Jatiwangi isi 3,5 bh m'
7 Bubungan nglayur isi 4 bh m'
8 Genteng bambe ( model karangpilang ) Buah
9 Genteng beton Buah
10 Genteng bubungan Bambe bh.
11 Genteng bubungan karangpilang Buah
Genteng bubungan Keramik Buah

Halaman ke 20 dari 350 halaman


Genteng Jatiwangi isi 18 bh Buah
Genteng Karang Pilang Bambe Buah
Genteng kodok ( model karangpilang ) Buah
Genteng Nglayur Isi 24 bh m2
Genteng press lokal Buah
Genting ex Karang Pilang Buah
Genting Keramik CANMURI Buah
1 Genting Pinggir Buah
2 Seng 120x240 LB
3 Seng datar plat Bjls 30.45 x 1 m Lbr
4 Seng Gelombang BJLS 28 - 80 * 180 cm Lbr
5 Seng gelombang BJLS 30.80 X 150cm Lbr
6 Seng gelombang BJLS 30.80 X 300cm Lbr
7 Seng Plat BJLS 30 x 0.55 m'
ACCESSORIES PINTU/JENDELA
1 c. Ukuran 4 " bh
Engsel besar (pintu) Buah
Engsel Jendela bh
Engsel Jendela ø 3" YANK stell
Engsel kecil (jendela) Buah
Engsel Pintu bh
Engsel Pintu Gerbang bh
Engsel Pintu Koboy stell
Engsel Pintu ø 4" YANK stell
Espanyolet / Kunci Putar Almunium bh
Expagnolet bh
Hak Angin bh
Hak Angin bh
Kunci Gembok bh
Kunci Jendela bh
Kunci KM/WC Alpha bh
Kunci Pintu Royal bh
Kunci Pintu SES 226 bh
Kunci Tanam 2X Putar bh
Kunci Tanam KM/WC (Viberset) bh
Pegangan pintu ganda bh
Selot kunci merk Anchor Buah
Selot kunci merk Kuda Terbang Buah
Selot kunci merk Union Buah
Slot Jendela bh
Wire Mesh M4 m2
Grendel Injak bh
Grendel kecil Buah
Grendel panjang Buah
Grendel Sendok bh
Grendel tanam Buah
Grendel Tanam bh

Halaman ke 21 dari 350 halaman


3,614,867.75

Hrg. Sat. Proyek Hrg. Sat. Proyek Hrg. Sat. Proyek


Base Price Up. 10 % Dasar

Rp 64,800.00 49,500.00 Rp 45,000.00


Rp 103,680.00 79,200.00 Rp 72,000.00
Rp 90,720.00 69,300.00 Rp 63,000.00
Rp 90,720.00 69,300.00 Rp 63,000.00
Rp 90,720.00 69,300.00 Rp 63,000.00
Rp 64,800.00 49,500.00 Rp 45,000.00
Rp 64,800.00 49,500.00 Rp 45,000.00
Rp 64,800.00 49,500.00 Rp 45,000.00
Rp 77,760.00 59,400.00 Rp 54,000.00
Rp 77,760.00 59,400.00 Rp 54,000.00
Rp 51,840.00 39,600.00 Rp 36,000.00
Rp 51,840.00 39,600.00 Rp 36,000.00
Rp 64,800.00 49,500.00 Rp 45,000.00
Rp 90,720.00 69,300.00 Rp 63,000.00
Rp 47,952.00 36,630.00 Rp 33,300.00
Rp 51,840.00 39,600.00 Rp 36,000.00
Rp 64,800.00 49,500.00 Rp 45,000.00
Rp 51,840.00 39,600.00 Rp 36,000.00
Rp 129,600.00 99,000.00 Rp 90,000.00
Rp 77,760.00 59,400.00 Rp 54,000.00
Rp 66,096.00 50,490.00 Rp 45,900.00
Rp 77,760.00 59,400.00 Rp 54,000.00
Rp 77,760.00 59,400.00 Rp 54,000.00
Rp 103,680.00 79,200.00 Rp 72,000.00
Rp 103,680.00 79,200.00 Rp 72,000.00
Rp 103,680.00 79,200.00 Rp 72,000.00
Rp 90,720.00 69,300.00 Rp 63,000.00
Rp 90,720.00 69,300.00 Rp 63,000.00
Rp 90,720.00 69,300.00 Rp 63,000.00
Rp 90,720.00 69,300.00 Rp 63,000.00
Rp -
Rp 80,325.00 98,175.00 Rp 89,250.00
Rp 113,602.50 138,847.50 Rp 126,225.00
Rp -
Rp 302,940.00 370,260.00 Rp 336,600.00
Rp 126,684.00 154,836.00 Rp 140,760.00
Rp 191,862.00 234,498.00 Rp 213,180.00
Rp 27,540.00 33,660.00 Rp 30,600.00
Rp 73,440.00 89,760.00 Rp 81,600.00
Rp 131,274.00 160,446.00 Rp 145,860.00
Rp 45,900.00 56,100.00 Rp 51,000.00

Halaman ke 22 dari 350 halaman


Rp 45,900.00 56,100.00 Rp 51,000.00
Rp 22,950.00 28,050.00 Rp 25,500.00
Rp 40,392.00 49,368.00 Rp 44,880.00
Rp 33,048.00 40,392.00 Rp 36,720.00
Rp 35,343.00 43,197.00 Rp 39,270.00
Rp 30,294.00 37,026.00 Rp 33,660.00
Rp 22,720.50 27,769.50 Rp 25,245.00
Rp 266,220.00 325,380.00 Rp 295,800.00
Rp 91,800.00 112,200.00 Rp 102,000.00
Rp 156,060.00 190,740.00 Rp 173,400.00
Rp 73,440.00 89,760.00 Rp 81,600.00
Rp 110,160.00 134,640.00 Rp 122,400.00
Rp 90,882.00 111,078.00 Rp 100,980.00
Rp 43,146.00 52,734.00 Rp 47,940.00
Rp 106,029.00 129,591.00 Rp 117,810.00
Rp 146,880.00 179,520.00 Rp 163,200.00
Rp 119,340.00 145,860.00 Rp 132,600.00
Rp 100,980.00 123,420.00 Rp 112,200.00
Rp 91,800.00 112,200.00 Rp 102,000.00
Rp 82,620.00 100,980.00 Rp 91,800.00
Rp 70,686.00 86,394.00 Rp 78,540.00
Rp 60,588.00 74,052.00 Rp 67,320.00
Rp 30,294.00 37,026.00 Rp 33,660.00
Rp -
Rp 522,571.50 638,698.50 Rp 580,635.00
Rp 624,813.75 763,661.25 Rp 694,237.50
Rp 17,419.05 21,289.95 Rp 19,354.50
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp 10,327.50 12,622.50 Rp 11,475.00
Rp -
Rp 122,400.00 149,600.00 Rp 136,000.00
Rp 76,500.00 93,500.00 Rp 85,000.00
Halaman ke 23 dari 350 halaman
Rp -
Rp 188,572.50 230,477.50 Rp 209,525.00
Rp 483,135.75 590,499.25 Rp 536,817.50
Rp 1,287,495.00 1,573,605.00 Rp 1,430,550.00
Rp 21,458.25 26,226.75 Rp 23,842.50
Rp 24,059.25 29,405.75 Rp 26,732.50
Rp 45,517.50 55,632.50 Rp 50,575.00
Rp 136,552.50 166,897.50 Rp 151,725.00
Rp 201,577.50 246,372.50 Rp 223,975.00
Rp 92,985.75 113,649.25 Rp 103,317.50
Rp 92,985.75 113,649.25 Rp 103,317.50
Rp 1,287,495.00 1,573,605.00 Rp 1,430,550.00
Rp 92,985.75 113,649.25 Rp 103,317.50
Rp 107,291.25 131,133.75 Rp 119,212.50
Rp 35,763.75 43,711.25 Rp 39,737.50
Rp 78,680.25 96,164.75 Rp 87,422.50
Rp 26,010.00 31,790.00 Rp 28,900.00
Rp 500,692.50 611,957.50 Rp 556,325.00
Rp 107,291.25 131,133.75 Rp 119,212.50
Rp 17,166.60 20,981.40 Rp 19,074.00
Rp 97,537.50 119,212.50 Rp 108,375.00
Rp 50,069.25 61,195.75 Rp 55,632.50
Rp 7,152.75 8,742.25 Rp 7,947.50
Rp 45,517.50 55,632.50 Rp 50,575.00
Rp 97,537.50 119,212.50 Rp 108,375.00
Rp 121,596.75 148,618.25 Rp 135,107.50
Rp 171,666.00 209,814.00 Rp 190,740.00
Rp 1,170,450.00 1,430,550.00 Rp 1,300,500.00
Rp 1,001,385.00 1,223,915.00 Rp 1,112,650.00
Rp 1,258,884.00 1,538,636.00 Rp 1,398,760.00
Rp 137,332.80 167,851.20 Rp 152,592.00
Rp 107,291.25 131,133.75 Rp 119,212.50
Rp 343,332.00 419,628.00 Rp 381,480.00
Rp 65,025.00 79,475.00 Rp 72,250.00
Rp 200,277.00 244,783.00 Rp 222,530.00
Rp -
Rp 56,916.00 69,564.00 Rp 63,240.00
Rp 70,686.00 86,394.00 Rp 78,540.00
Rp 9,180.00 11,220.00 Rp 10,200.00
Rp 7,344.00 8,976.00 Rp 8,160.00
Rp -
Rp 6,058.80 7,405.20 Rp 6,732.00
Rp 105,570.00 129,030.00 Rp 117,300.00
Rp 64,260.00 78,540.00 Rp 71,400.00
Rp 100,980.00 123,420.00 Rp 112,200.00
Rp - - Rp -
Rp - - Rp -
Rp - - Rp -
Rp 7,068.60 8,639.40 Rp 7,854.00
Halaman ke 24 dari 350 halaman
Rp 7,068.60 8,639.40 Rp 7,854.00
Rp -
Rp 77,112.00 94,248.00 Rp 85,680.00
Rp 92,106.00 112,574.00 Rp 102,340.00
Rp 117,810.00 143,990.00 Rp 130,900.00
Rp 77,112.00 94,248.00 Rp 85,680.00
Rp - - Rp -
Rp -
Rp 11,475.00 14,025.00 Rp 12,750.00
Rp 11,475.00 14,025.00 Rp 12,750.00
Rp 13,770.00 16,830.00 Rp 15,300.00
Rp -
Rp 17,212.50 21,037.50 Rp 19,125.00
Rp - - Rp -
Rp 114.75 140.25 Rp 127.50
Rp 17,212.50 21,037.50 Rp 19,125.00
Rp 33,660.00 41,140.00 Rp 37,400.00
Rp 15,300.00 18,700.00 Rp 17,000.00
Rp 26,775.00 32,725.00 Rp 29,750.00
Rp 21,420.00 26,180.00 Rp 23,800.00
Rp 45,900.00 56,100.00 Rp 51,000.00
Rp 76,500.00 93,500.00 Rp 85,000.00
Rp 248,625.00 303,875.00 Rp 276,250.00
Rp 52,020.00 63,580.00 Rp 57,800.00
Rp 58,905.00 71,995.00 Rp 65,450.00
Rp 73,057.50 89,292.50 Rp 81,175.00
Rp 78,795.00 96,305.00 Rp 87,550.00
Rp 53,550.00 65,450.00 Rp 59,500.00
Rp 61,965.00 75,735.00 Rp 68,850.00
Rp 103,275.00 126,225.00 Rp 114,750.00
Rp 122,400.00 149,600.00 Rp 136,000.00
Rp 573.75 701.25 Rp 637.50
Rp 95,625.00 116,875.00 Rp 106,250.00
Rp 133,875.00 163,625.00 Rp 148,750.00
Rp 24,862.50 30,387.50 Rp 27,625.00
Rp 24,862.50 30,387.50 Rp 27,625.00
Rp 31,365.00 38,335.00 Rp 34,850.00
Rp 33,277.50 40,672.50 Rp 36,975.00
Rp 5,355.00 6,545.00 Rp 5,950.00
Rp 11,475.00 14,025.00 Rp 12,750.00
Rp 65,025.00 79,475.00 Rp 72,250.00
Rp - - Rp -
Rp - - Rp -
Rp 17,595.00 21,505.00 Rp 19,550.00
Rp 22,950.00 28,050.00 Rp 25,500.00
Rp 22,950.00 28,050.00 Rp 25,500.00
Rp 26,775.00 32,725.00 Rp 29,750.00
Rp 6,502.50 7,947.50 Rp 7,225.00
Rp 19,890.00 24,310.00 Rp 22,100.00
Halaman ke 25 dari 350 halaman
Rp 22,950.00 28,050.00 Rp 25,500.00
Rp 22,950.00 28,050.00 Rp 25,500.00
Rp 22,950.00 28,050.00 Rp 25,500.00
Rp -
Rp 10,710.00 13,090.00 Rp 11,900.00
Rp 50,490.00 61,710.00 Rp 56,100.00
Rp 84,150.00 102,850.00 Rp 93,500.00
Rp 84,150.00 102,850.00 Rp 93,500.00
Rp -
Rp 767,295.00 937,805.00 Rp 852,550.00
Rp 19,507.50 23,842.50 Rp 21,675.00
Rp 19,507.50 23,842.50 Rp 21,675.00
Rp 19,507.50 23,842.50 Rp 21,675.00
Rp 23,409.00 28,611.00 Rp 26,010.00
Rp 23,409.00 28,611.00 Rp 26,010.00
Rp 65,025.00 79,475.00 Rp 72,250.00
Rp 65,025.00 79,475.00 Rp 72,250.00
Rp 1,040,400.00 1,271,600.00 Rp 1,156,000.00
Rp - - Rp -
Rp - - Rp -
Rp - - Rp -
Rp - - Rp -
Rp 122,247.00 149,413.00 Rp 135,830.00
Rp 55,000.00 - Rp -
Rp 442,170.00 540,430.00 Rp 491,300.00
Rp 4,291.65 5,245.35 Rp 4,768.50
Rp 100,138.50 122,391.50 Rp 111,265.00
Rp 100,138.50 122,391.50 Rp 111,265.00
Rp 143,055.00 174,845.00 Rp 158,950.00
Rp -
Rp 33,660.00 41,140.00 Rp 37,400.00
Rp 30,600.00 37,400.00 Rp 34,000.00
Rp 52,020.00 63,580.00 Rp 57,800.00
Rp 214,200.00 261,800.00 Rp 238,000.00
Rp 36,720.00 44,880.00 Rp 40,800.00
Rp 244,800.00 299,200.00 Rp 272,000.00
Rp 171,360.00 209,440.00 Rp 190,400.00
Rp 153,000.00 187,000.00 Rp 170,000.00
Rp 153,000.00 187,000.00 Rp 170,000.00
Rp 33,660.00 41,140.00 Rp 37,400.00
Rp 30,600.00 37,400.00 Rp 34,000.00
Rp 30,600.00 37,400.00 Rp 34,000.00
Rp 91,800.00 112,200.00 Rp 102,000.00
Rp 63,954.00 78,166.00 Rp 71,060.00
Rp 63,954.00 78,166.00 Rp 71,060.00
Rp 134,640.00 164,560.00 Rp 149,600.00
Rp 30,600.00 37,400.00 Rp 34,000.00
Rp 16,830.00 20,570.00 Rp 18,700.00
Rp 12,240.00 14,960.00 Rp 13,600.00
Halaman ke 26 dari 350 halaman
Rp 4,590,000.00 5,610,000.00 Rp 5,100,000.00
Rp -
Rp 612,000.00 748,000.00 Rp 680,000.00
Rp 24,480.00 29,920.00 Rp 27,200.00
Rp 76,500.00 93,500.00 Rp 85,000.00
Rp 15,300.00 18,700.00 Rp 17,000.00
Rp 3,978,000.00 4,862,000.00 Rp 4,420,000.00
Rp 3,978,000.00 4,862,000.00 Rp 4,420,000.00
Rp 3,978,000.00 4,862,000.00 Rp 4,420,000.00
Rp 3,978,000.00 4,862,000.00 Rp 4,420,000.00
Rp 994,500.00 1,215,500.00 Rp 1,105,000.00
Rp 24,480.00 29,920.00 Rp 27,200.00
Rp 45,900.00 56,100.00 Rp 51,000.00
Rp 15,300,000.00 18,700,000.00 Rp 17,000,000.00
Rp 24,786,000.00 30,294,000.00 Rp 27,540,000.00
Rp 16,830,000.00 20,570,000.00 Rp 18,700,000.00
Rp 27,264,600.00 33,323,400.00 Rp 30,294,000.00
Rp 27,264,600.00 33,323,400.00 Rp 30,294,000.00
Rp 3,672,000.00 4,488,000.00 Rp 4,080,000.00
Rp 6,732,000.00 8,228,000.00 Rp 7,480,000.00
Rp 6,120,000.00 7,480,000.00 Rp 6,800,000.00
Rp 6,120,000.00 7,480,000.00 Rp 6,800,000.00
Rp 3,825,000.00 4,675,000.00 Rp 4,250,000.00
Rp 3,366,000.00 4,114,000.00 Rp 3,740,000.00
Rp 3,366,000.00 4,114,000.00 Rp 3,740,000.00
Rp 229,500.00 280,500.00 Rp 255,000.00
Rp 229,500.00 280,500.00 Rp 255,000.00
Rp -
Rp 33,966.00 41,514.00 Rp 37,740.00
Rp 39,627.00 48,433.00 Rp 44,030.00
Rp 849.15 1,037.85 Rp 943.50
Rp 74,725.20 91,330.80 Rp 83,028.00
Rp 56,610.00 69,190.00 Rp 62,900.00
Rp 42,457.50 51,892.50 Rp 47,175.00
Rp -
Rp 198,900.00 243,100.00 Rp 221,000.00
Rp 99,450.00 121,550.00 Rp 110,500.00
Rp 133,875.00 163,625.00 Rp 148,750.00
Rp 68,850.00 84,150.00 Rp 76,500.00
Rp 84,150.00 102,850.00 Rp 93,500.00
Rp 133,875.00 163,625.00 Rp 148,750.00
Rp 47,430.00 57,970.00 Rp 52,700.00
Rp 44,370.00 54,230.00 Rp 49,300.00
Rp 53,550.00 65,450.00 Rp 59,500.00
Rp 78,030.00 95,370.00 Rp 86,700.00
Rp 39,780.00 48,620.00 Rp 44,200.00

Halaman ke 27 dari 350 halaman


Rp 53,856.00 65,824.00 Rp 59,840.00
Rp 109,395.00 133,705.00 Rp 121,550.00
Rp -
Rp 48,195.00 58,905.00 Rp 53,550.00
Rp 6,426.00 7,854.00 Rp 7,140.00
Rp 6,961.50 8,508.50 Rp 7,735.00
Rp -
Rp 353,430.00 431,970.00 Rp 392,700.00
Rp 208,271.25 254,553.75 Rp 231,412.50
Rp 34,425.00 42,075.00 Rp 38,250.00
Rp 164,092.50 200,557.50 Rp 182,325.00
Rp 91,800.00 112,200.00 Rp 102,000.00
Rp 126,225.00 154,275.00 Rp 140,250.00
Rp 195,075.00 238,425.00 Rp 216,750.00
Rp 149,175.00 182,325.00 Rp 165,750.00
Rp 113,602.50 138,847.50 Rp 126,225.00
Rp 138,847.50 169,702.50 Rp 154,275.00
Rp 176,715.00 215,985.00 Rp 196,350.00
Rp -
Rp 25,245.00 30,855.00 Rp 28,050.00
Rp 16,065.00 19,635.00 Rp 17,850.00
Rp 15,606.00 19,074.00 Rp 17,340.00
Rp 14,917,500.00 18,232,500.00 Rp 16,575,000.00
Rp 12,117.60 14,810.40 Rp 13,464.00
Rp -
Rp 58,063.50 70,966.50 Rp 64,515.00
Rp 48,386.25 59,138.75 Rp 53,762.50
Rp -
Rp 700,548.75 856,226.25 Rp 778,387.50
Rp 509,490.00 622,710.00 Rp 566,100.00
Rp 1,273,725.00 1,556,775.00 Rp 1,415,250.00
Rp -
Rp 40,392.00 49,368.00 Rp 44,880.00
Rp 105,570.00 129,030.00 Rp 117,300.00
Rp 100,980.00 123,420.00 Rp 112,200.00
Rp 160,650.00 196,350.00 Rp 178,500.00
Rp 113,602.50 138,847.50 Rp 126,225.00
Rp 126,225.00 154,275.00 Rp 140,250.00
Rp 114,750.00 140,250.00 Rp 127,500.00
Rp 126,225.00 154,275.00 Rp 140,250.00
Rp 41,310.00 50,490.00 Rp 45,900.00
Rp 45,441.00 55,539.00 Rp 50,490.00
Rp 192,780.00 235,620.00 Rp 214,200.00
Rp 165,240.00 201,960.00 Rp 183,600.00
Rp 242,352.00 296,208.00 Rp 269,280.00
Rp 45,441.00 55,539.00 Rp 50,490.00
Rp 68,850.00 84,150.00 Rp 76,500.00

Halaman ke 28 dari 350 halaman


Rp 229,500.00 280,500.00 Rp 255,000.00
Rp 126,225.00 154,275.00 Rp 140,250.00
Rp 57,375.00 70,125.00 Rp 63,750.00
Rp 50,490.00 61,710.00 Rp 56,100.00
Rp 73,210.50 89,479.50 Rp 81,345.00
Rp 10,098.00 12,342.00 Rp 11,220.00
Rp 13,770.00 16,830.00 Rp 15,300.00
Rp 50,490.00 61,710.00 Rp 56,100.00
Rp 121,176.00 148,104.00 Rp 134,640.00
Rp 176,715.00 215,985.00 Rp 196,350.00
Rp 227,205.00 277,695.00 Rp 252,450.00
Rp 68,850.00 84,150.00 Rp 76,500.00
Rp 88,357.50 107,992.50 Rp 98,175.00
Rp 17,671.50 21,598.50 Rp 19,635.00
Rp 11,475.00 14,025.00 Rp 12,750.00
Rp 25,245.00 30,855.00 Rp 28,050.00
Rp 20,196.00 24,684.00 Rp 22,440.00
Rp 37,867.50 46,282.50 Rp 42,075.00
Rp 113,602.50 138,847.50 Rp 126,225.00
Rp 55,539.00 67,881.00 Rp 61,710.00
Rp 42,916.50 52,453.50 Rp 47,685.00
Rp 80,325.00 98,175.00 Rp 89,250.00
Rp 138,847.50 169,702.50 Rp 154,275.00
Rp 277,695.00 339,405.00 Rp 308,550.00
Rp 34,425.00 42,075.00 Rp 38,250.00
Rp 17,671.50 21,598.50 Rp 19,635.00
Rp 32,818.50 40,111.50 Rp 36,465.00
Rp 121,635.00 148,665.00 Rp 135,150.00
Rp 277,695.00 339,405.00 Rp 308,550.00
Rp 138,847.50 169,702.50 Rp 154,275.00
Rp 113,602.50 138,847.50 Rp 126,225.00
Rp -
Rp 16,830.00 20,570.00 Rp 18,700.00
Rp 5,049.00 6,171.00 Rp 5,610.00
Rp 50,490.00 61,710.00 Rp 56,100.00
Rp 64,260.00 78,540.00 Rp 71,400.00
Rp 3,060.00 3,740.00 Rp 3,400.00
Rp 15,300.00 18,700.00 Rp 17,000.00
Rp 5,538.60 6,769.40 Rp 6,154.00
Rp -
Rp 144,585.00 176,715.00 Rp 160,650.00
Rp 175,429.80 214,414.20 Rp 194,922.00
Rp 141,372.00 172,788.00 Rp 157,080.00
Rp 312,120.00 381,480.00 Rp 346,800.00
Rp 275,400.00 336,600.00 Rp 306,000.00
Rp 252,450.00 308,550.00 Rp 280,500.00
Rp 234,090.00 286,110.00 Rp 260,100.00

Halaman ke 29 dari 350 halaman


Rp 229,500.00 280,500.00 Rp 255,000.00
Rp 238,680.00 291,720.00 Rp 265,200.00
Rp 174,420.00 213,180.00 Rp 193,800.00
Rp 220,320.00 269,280.00 Rp 244,800.00
Rp 201,960.00 246,840.00 Rp 224,400.00
Rp 201,960.00 246,840.00 Rp 224,400.00
Rp 144,585.00 176,715.00 Rp 160,650.00
Rp 163,863.00 200,277.00 Rp 182,070.00
Rp 284,580.00 347,820.00 Rp 316,200.00
Rp - - Rp -
Rp 222,156.00 271,524.00 Rp 246,840.00
Rp - - Rp -
Rp -
Rp 20,884.50 25,525.50 Rp 23,205.00
Rp 20,884.50 25,525.50 Rp 23,205.00
Rp -
Rp 52,020.00 63,580.00 Rp 57,800.00
Rp 1,040.40 1,271.60 Rp 1,156.00
Rp 44,370.00 54,230.00 Rp 49,300.00
Rp 1,109.25 1,355.75 Rp 1,232.50
Rp 84,150.00 102,850.00 Rp 93,500.00
Rp 1,683.00 2,057.00 Rp 1,870.00
Rp 114,750.00 140,250.00 Rp 127,500.00
Rp 74,205.00 90,695.00 Rp 82,450.00
Rp 1,484.10 1,813.90 Rp 1,649.00
Rp -
Rp 8,500.00 9,350.00 Rp 8,500.00
Rp 11,900.00 13,090.00 Rp 11,900.00
Rp 8,500.00 9,350.00 Rp 8,500.00
Rp 11,050.00 12,155.00 Rp 11,050.00
Rp 11,050.00 12,155.00 Rp 11,050.00
Rp 11,050.00 12,155.00 Rp 11,050.00
Rp 11,050.00 12,155.00 Rp 11,050.00
Rp 11,050.00 12,155.00 Rp 11,050.00
Rp -
Rp 9,180.00 11,220.00 Rp 10,200.00
Rp 86,842.80 106,141.20 Rp 96,492.00
Rp 45,900.00 56,100.00 Rp 51,000.00
Rp 36,720.00 44,880.00 Rp 40,800.00
Rp 64,627.20 78,988.80 Rp 71,808.00
Rp 43,146.00 52,734.00 Rp 47,940.00
Rp 32,130.00 39,270.00 Rp 35,700.00
Rp 3,029.40 3,702.60 Rp 3,366.00
Rp 3,121.20 3,814.80 Rp 3,468.00
Rp 7,068.60 8,639.40 Rp 7,854.00
Rp 6,426.00 7,854.00 Rp 7,140.00
Rp 18,360.00 22,440.00 Rp 20,400.00

Halaman ke 30 dari 350 halaman


Rp 2,662.20 3,253.80 Rp 2,958.00
Rp 3,029.40 3,702.60 Rp 3,366.00
Rp 3,121.20 3,814.80 Rp 3,468.00
Rp 89,046.00 108,834.00 Rp 98,940.00
Rp 826.20 1,009.80 Rp 918.00
Rp 7,775.46 9,503.34 Rp 8,639.40
Rp 8,262.00 10,098.00 Rp 9,180.00
Rp 12,117.60 14,810.40 Rp 13,464.00
Rp 105,570.00 129,030.00 Rp 117,300.00
Rp 73,440.00 89,760.00 Rp 81,600.00
Rp 45,900.00 56,100.00 Rp 51,000.00
Rp 71,604.00 87,516.00 Rp 79,560.00
Rp 64,260.00 78,540.00 Rp 71,400.00
Rp 26,658.72 32,582.88 Rp 29,620.80
Rp -
Rp 15,147.00 18,513.00 Rp 16,830.00
Rp 11,016.00 13,464.00 Rp 12,240.00
Rp 24,235.20 29,620.80 Rp 26,928.00
Rp 60,588.00 74,052.00 Rp 67,320.00
Rp 9,639.00 11,781.00 Rp 10,710.00
Rp 37,867.50 46,282.50 Rp 42,075.00
Rp 45,441.00 55,539.00 Rp 50,490.00
Rp 75,735.00 92,565.00 Rp 84,150.00
Rp 75,735.00 92,565.00 Rp 84,150.00
Rp 363,528.00 444,312.00 Rp 403,920.00
Rp 75,735.00 92,565.00 Rp 84,150.00
Rp 22,720.50 27,769.50 Rp 25,245.00
Rp 17,901.00 21,879.00 Rp 19,890.00
Rp 75,735.00 92,565.00 Rp 84,150.00
Rp 106,029.00 129,591.00 Rp 117,810.00
Rp 106,029.00 129,591.00 Rp 117,810.00
Rp 206,550.00 252,450.00 Rp 229,500.00
Rp 358,020.00 437,580.00 Rp 397,800.00
Rp 363,528.00 444,312.00 Rp 403,920.00
Rp 181,764.00 222,156.00 Rp 201,960.00
Rp 757,350.00 925,650.00 Rp 841,500.00
Rp 422,188.20 516,007.80 Rp 469,098.00
Rp 260,253.00 318,087.00 Rp 289,170.00
Rp 506,047.50 618,502.50 Rp 562,275.00
Rp 24,786.00 30,294.00 Rp 27,540.00
Rp 18,176.40 22,215.60 Rp 20,196.00
Rp 90,882.00 111,078.00 Rp 100,980.00
Rp 11,016.00 13,464.00 Rp 12,240.00
Rp 16,524.00 20,196.00 Rp 18,360.00
Rp 34,425.00 42,075.00 Rp 38,250.00
Rp 60,588.00 74,052.00 Rp 67,320.00
Rp 106,029.00 129,591.00 Rp 117,810.00

Halaman ke 31 dari 350 halaman


DAFTAR ANALISA UPAH DAN BAHAN (PEKERJAAN BANGUNAN GEDUNG)
DINAS PERMUKIMAN DAN PRASARANA WILAYAH
TAHUN ANGGARAN 2016

PEKERJAAN PERSIAPAN
1 PAGAR SEMENTARA KAYU+SESEK ANYAM BAMBU 1m'
Bahan
1.25 bt Dolken Kayu d.8-10/400 @ 24,480.00 30,600.00
2.5 kg Portland Cement ( PC ) Gresik @ 1,040.40 2,601.00
0.005 m3 Pasir Beton @ 117,810.00 589.05
0.009 m3 Batu Pecah mesin 2/3 @ 252,450.00 2,272.05
0.35 lbr Usuk 5/7 @ 76,500.00 26,775.00
0.06 m3 Paku 2-5" @ 33,966.00 2,037.96
0.4 kg solar @ 5,049.00 2,019.60
Upah :
0.2 Hr Tukang Kayu @ 90,720.00 18,144.00
0.4 Hr Pekerja Kasar @ 51,840.00 20,736.00
0.02 Hr Kepala Tukang @ 103,680.00 2,073.60
0.02 Hr Mandor @ 77,760.00 1,555.20

2 PAGAR SEMENTARA/ SENG GELOMBANG 1m'


Bahan
1.25 bt Dolken Kayu d.8-10/400 @ 24,480.00 30,600.00
2.5 kg Portland Cement ( PC ) Gresik @ 1,040.40 2,601.00
1.2 lbr Seng Gelombang 3"-5" @ 64,260.00 77,112.00
0.005 m3 Pasir Beton @ 117,810.00 589.05
0.009 m3 Batu Pecah mesin 2/3 @ 252,450.00 2,272.05
0.072 m3 Usuk 5/7 @ 76,500.00 5,508.00
0.06 kg Paku 2-5" @ 33,966.00 2,037.96
0.4 kg Meni besi @ 68,850.00 27,540.00
Upah :
0.2 Hr Tukang Kayu @ 90,720.00 18,144.00
0.4 Hr Pekerja Kasar @ 51,840.00 20,736.00
0.02 Hr Kepala Tukang @ 103,680.00 2,073.60
0.02 Hr Mandor @ 77,760.00 1,555.20
3 PAGAR SEMENTARA/SESEK BAMBU ANYAM 1m'
Bahan
1.25 bt Dolken Kayu d.8-10/400 @ 24,480.00 30,600.00
2.5 kg Portland Cement ( PC ) Gresik @ 1,040.40 2,601.00
25 kg Kawat Duri @ 6,426.00 160,650.00
0.005 m3 Pasir Beton @ 117,810.00 589.05
0.072 m3 Batu Pecah Mesin 2/3 @ 252,450.00 18,176.40
0.06 kg Paku 2-5" @ 33,966.00 2,037.96
Upah :
0.2 Hr Tukang Kayu @ 90,720.00 18,144.00
0.4 Hr Pekerja Kasar @ 51,840.00 20,736.00
0.02 Hr Kepala Tukang @ 103,680.00 2,073.60
0.02 Hr Mandor @ 77,760.00 1,555.20
2 PENGUKURAN DAN PEMASANGAN BOWPLANK 1m'
Bahan
0.012 m3 Usuk 5/7 @ 76,500.00 918.00
0.02 kg Paku 2-5" @ 33,966.00 679.32
0.007 m3 Papan 3/20 meranti @ 3,825,000.00 26,775.00
Upah :
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.1 Hr Pekerja Kasar @ 51,840.00 5,184.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.005 Hr Mandor @ 77,760.00 388.80
3 PEMBUATAN KANTOR SEMENTARA/DIREKSI KEET/Lt. plesteran 1m2
Bahan
1.25 bt Dolken Kayu d.8-10/400 @ 24,480.00 30,600.00
0.09 m3 Usuk 5/7 meranti @ 3,366,000.00 302,940.00
1.1 kg Besi Strip @ 8,500.00 9,350.00
35 kg PC Gresik @ 1,040.40 36,414.00
0.15 m3 Pasir Pasang @ 92,106.00 13,815.90

Lembar ke 32 dari 350 halaman


30 bh Bata Merah @ 114.75 3,442.50
0.25 lbr Seng Plat @ 64,260.00 16,065.00
0.15 bh Kunci Tanam @ 206,550.00 30,982.50
0.06 lbr Tripleks 4 mm @ 53,856.00 3,231.36
0.65 kg Paku 2-5" @ 33,966.00 22,077.90
Upah :
2 Hr Tukang Kayu @ 90,720.00 181,440.00
1 Hr Tukang Batu @ 77,760.00 77,760.00
2 Hr Pekerja Kasar @ 51,840.00 103,680.00
0.3 Hr Kepala Tukang @ 103,680.00 31,104.00
0.05 Hr Mandor @ 77,760.00 3,888.00

6 PEMBUATAN GUDANG SEMEN DAN ALAT2 1m2


Bahan
1.7 bt Dolken Kayu d.8-10/400 @ 24,480.00 41,616.00
10 kg Portland Cement ( PC ) Gresik @ 1,040.40 10,404.00
0.21 m3 Usuk 5/7 meranti @ 3,366,000.00 706,860.00
0.03 m3 Pasir Beton @ 117,810.00 3,534.30
0.05 m3 Batu Pecah Mesin 2/3 @ 252,450.00 12,622.50
1.5 lbr Seng Gelombang bjls 32 @ 64,260.00 96,390.00
0.3 kg Paku 2-5" @ 33,966.00 10,189.80
Upah :
2 Hr Tukang Kayu @ 90,720.00 181,440.00
1 Hr Pekerja Kasar @ 51,840.00 51,840.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.05 Hr Mandor @ 77,760.00 3,888.00

7 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU 1m2


Bahan
3 bt Dolken Kayu d.8-10/400 @ 24,480.00 73,440.00
0.21 m3 Usuk 5/7 meranti @ 3,366,000.00 706,860.00
1.5 lbr Seng Gelombang bjls 32 @ 64,260.00 96,390.00
0.7 kg Paku 2-5" @ 33,966.00 23,776.20
Upah :
1.5 Hr Tukang Kayu @ 90,720.00 136,080.00
1 Hr Pekerja Kasar @ 51,840.00 51,840.00
0.15 Hr Kepala Tukang @ 103,680.00 15,552.00
0.05 Hr Mandor @ 77,760.00 3,888.00
4 PEKERJAAN PEMBERSIHAN 1m2
Bahan -
Upah :
0.1 Hr Pekerja Kasar @ 51,840.00 5,184.00
0.05 Hr Mandor @ 77,760.00 3,888.00

9 PEMBUATAN BEDENG BURUH 1m2


Bahan
1.25 bt Dolken Kayu d.8-10/400 @ 24,480.00 30,600.00
18 kg Portland Cement ( PC ) Gresik @ 1,040.40 18,727.20
0.186 m3 Usuk 5/7 meranti @ 3,366,000.00 626,076.00
0.03 m3 Pasir Beton @ 117,810.00 3,534.30
0.05 m3 Batu Pecah Mesin 2/3 @ 252,450.00 12,622.50
1.35 lbr Tripleks 4 mm
1.5 lbr Seng Gelombang bjls 32 @ 64,260.00 96,390.00
0.3 kg Paku 2-5" @ 33,966.00 10,189.80
Upah :
2 Hr Tukang Kayu @ 90,720.00 181,440.00
1 Hr Pekerja Kasar @ 51,840.00 51,840.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.05 Hr Mandor @ 77,760.00 3,888.00

10 PEMBUATAN BAK ADUKAN ( 40 X 50 X 20 ) 1m2


Bahan
0.014 m3 Usuk 5/7 meranti @ 3,366,000.00 47,124.00
0.035 lbr Papan 2/20 meranti @ 3,825,000.00 133,875.00
0.08 kg Paku 2-5" @ 33,966.00 2,717.28
Upah :

Lembar ke 33 dari 350 halaman


0.3 Hr Tukang Kayu @ 90,720.00 27,216.00
0.0015 Hr Mandor @ 77,760.00 116.64

5 PEMBUATAN STEGGER BAMBU/40 X 50 X 20 1m2


Bahan
1 BT Bambu d. 6 -8/600 cm @ 24,480.00 24,480.00
0.25 kg Tali ijuk @ 244,800.00 61,200.00
Upah :
0.017 Hr Tukang Kayu @ 90,720.00 1,542.24
0.002 Hr Pekerja Kasar @ 51,840.00 103.68
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.013 Hr Mandor @ 77,760.00 1,010.88

6 PEMBUATAN JALAN SEMENTARA 1m2


Bahan
0.15 m3 Batu kali 15/20 @ 141,372.00 21,205.80
0.09 lbr Batu Pecah 5/7 @ 229,500.00 20,655.00
0.01 kg Pasir Pasang @ 92,106.00 921.06
Upah :
1 Hr Pekerja Kasar @ 51,840.00 51,840.00
0.05 Hr Mandor @ 77,760.00 3,888.00

3 PAGAR KAWAT JARING GALVANIS/H=1 M 1m'


Bahan
0.434 Lbr Pagar Kawat Jaring @ -
Upah :
0.042 Hr Tukang Kayu @ 90,720.00 3,810.24
0.004 Hr Pekerja Kasar @ 51,840.00 207.36
0.042 Hr Kepala Tukang @ 103,680.00 4,354.56
0.002 Hr Mandor @ 77,760.00 155.52
3 PAGAR BETON PRACETAK 1m'
Bahan
0.985 bt Panel Beton Pracetak @ -
0.525 kg Kolom Beton Pracetak @ -
0.074 m3 Pasir Beton @ 117,810.00 8,717.94
0.148 m3 Batu Pecah Mesin 2/3 @ 252,450.00 37,362.60
45 kg PC (Gresik) @ 1,040.40 46,818.00
Upah :
0.2 Hr Tukang Kayu @ 90,720.00 18,144.00
0.4 Hr Pekerja Kasar @ 51,840.00 20,736.00
0.02 Hr Kepala Tukang @ 103,680.00 2,073.60
0.02 Hr Mandor @ 77,760.00 1,555.20

PEKERJAAN TANAH
1 GALIAN TANAH BIASA SEDALAM 1 M 1m3
Bahan -
Upah :
0.4 Hr Pekerja Kasar @ 51,840.00 20,736.00
0 Hr Tukang gali @ 64,800.00 -
0 Hr Kepala Tukang Gali @ 90,720.00 -
0.04 Hr Mandor @ 77,760.00 3,110.40
1 GALIAN TANAH BIASA SEDALAM 2 M 1m3
Bahan -
Upah :
0.526 Hr Pekerja Kasar @ 51,840.00 27,267.84
0 Hr Tukang gali @ 64,800.00 -
0 Hr Kepala Tukang Gali @ 90,720.00 -
0.052 Hr Mandor @ 77,760.00 4,043.52
2 BOR STRUSS 1m'
Bahan -
Upah :
1.23 Hr Pekerja Kasar @ 51,840.00 63,763.20
0 Hr Tukang gali @ 64,800.00 -

Lembar ke 34 dari 350 halaman


0.05 Hr Kepala Tukang Gali @ 90,720.00 4,536.00
0.073 Hr Mandor @ 77,760.00 5,676.48
3 GALIAN TANAH KERAS SEDALAM 1 M 1m3
Bahan -
Upah :
1.25 Hr Pekerja Kasar @ 51,840.00 64,800.00
0 Hr Tukang gali @ 64,800.00 -
0 Hr Kepala Tukang Gali @ 90,720.00 -
0.125 Hr Mandor @ 77,760.00 9,720.00
5 GALIAN TANAH LUMPUR SEDALAM 1 M 1m3
Bahan -
Upah :
0.823 Hr Pekerja Kasar @ 51,840.00 42,664.32
0 Hr Tukang gali @ 64,800.00 -
0 Hr Kepala Tukang Gali @ 90,720.00 -
0.083 Hr Mandor @ 77,760.00 6,454.08
4 PEKERJAAN STRIPPING SETINGGI 1 M 1m2
Bahan -
Upah :
0.05 Hr Pekerja Kasar @ 51,840.00 2,592.00
0 Hr Tukang gali @ 64,800.00 -
0 Hr Kepala Tukang Gali @ 90,720.00 -
0.005 Hr Mandor @ 77,760.00 388.80
7 PEMBUANGAN TANAH SEJAUH 150 M 1m3
Bahan -
Upah :
0.516 Hr Pekerja Kasar @ 51,840.00 26,749.44
0 Hr Tukang gali @ 64,800.00 -
0 Hr Kepala Tukang Gali @ 90,720.00 -
0.5 Hr Mandor @ 77,760.00 38,880.00
3 URUGAN KEMBALI 1m3
Bahan -
Upah :
0.192 Hr Pekerja Kasar @ 51,840.00 9,953.28
0 Hr Tukang gali @ 64,800.00 -
0 Hr Kepala Tukang Gali @ 90,720.00 -
0.019 Hr Mandor @ 77,760.00 1,477.44
9 PEKERJAAN PEMADATAN TANAH 1m3
Bahan -
Upah :
0.5 Hr Pekerja Kasar @ 51,840.00 25,920.00
0 Hr Tukang gali @ 64,800.00 -
0 Hr Kepala Tukang Gali @ 90,720.00 -
0.005 Hr Mandor @ 77,760.00 388.80
4 URUGAN PASIR 1m3
Bahan
1.2 M3 Pasir Urug @ 77,112.00 92,534.40
Upah :
0.3 Hr Pekerja Kasar @ 51,840.00 15,552.00
0.004 Hr Tukang gali @ 64,800.00 259.20
0.042 Hr Kepala Tukang Gali @ 90,720.00 3,810.24
0.01 Hr Mandor @ 77,760.00 777.60
11 LAPISAN PUDEL 1 KP / 3 PS / 7 TL 1m3
Bahan
1 m3 Pasir Urug @ 77,112.00 77,112.00
0.109 m3 Kapur Padam @ 1,273,725.00 138,836.03
0.763 m3 Tanah Liat @ - -
Upah :
0.833 Hr Pekerja Kasar @ 51,840.00 43,182.72
0.416 Hr Tukang Batu @ 64,800.00 26,956.80
0.04 Hr Kepala Tukang @ 90,720.00 3,628.80
0.083 Hr Mandor @ 77,760.00 6,454.08
5 LAPISAN PUDEL 1 KP / 5 TL 1m3
Bahan
0.2 m3 Kapur Padam @ 1,273,725.00 254,745.00
1 m3 Tanah Liat @ - -

Lembar ke 35 dari 350 halaman


Upah :
0.833 Hr Pekerja Kasar @ 51,840.00 43,182.72
0.416 Hr Tukang Batu @ 64,800.00 26,956.80
0.041 Hr Kepala Tukang @ 90,720.00 3,719.52
0.081 Hr Mandor @ 77,760.00 6,298.56
13 LAPISAN PUDEL 1 KP / 5 TL 1m3
Bahan
0.2 m3 Kapur Padam @ 1,273,725.00 254,745.00
1 m3 Tanah Liat @ - -
Upah :
0.833 Hr Pekerja Kasar @ 51,840.00 43,182.72
0.416 Hr Tukang Batu @ 64,800.00 26,956.80
0.041 Hr Kepala Tukang @ 90,720.00 3,719.52
0.081 Hr Mandor @ 77,760.00 6,298.56
14 PEMASANGAN LAPISAN IJUK 1m3
Bahan
1.2 M3 Ijuk @ 244,800.00 293,760.00
Upah :
0.15 Hr Pekerja Kasar @ 51,840.00 7,776.00
0 Hr Tukang gali @ 64,800.00 -
0 Hr Kepala Tukang Gali @ 90,720.00 -
0.015 Hr Mandor @ 77,760.00 1,166.40
5 URUGAN SIRTU 1m3
Bahan
1.2 M3 Sirtu @ 113,602.50 136,323.00
Upah :
0.25 Hr Tukang Kayu @ 51,840.00 12,960.00
0 Hr Pekerja Kasar @ 64,800.00 -
0 Hr Kepala Tukang @ 90,720.00 -
0.025 Hr Mandor @ 77,760.00 1,944.00
5 URUGAN TANAH GUNUNG/MERAH 1m3
Bahan
1.2 m3 Tanah Urug @ 80,325.00 96,390.00
Upah :
0.3 Hr Pekerja Kasar @ 51,840.00 15,552.00
0.004 Hr Tukang gali @ 64,800.00 259.20
0.042 Hr Kepala Tukang Gali @ 90,720.00 3,810.24
0.01 Hr Mandor @ 77,760.00 777.60

PEKERJAAN PONDASI
1 PONDASI BATU KALI 1 PC : 1 PS 1m3
Bahan
1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
392 kg PC (Gresik ) @ 1,040.40 407,836.80
0.314 m3 Pasir Pasang @ 92,106.00 28,921.28
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
2 PONDASI BATU KALI 1 PC : 2 PS 1m3
Bahan
1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
267 kg PC (Gresik ) @ 1,040.40 277,786.80
0.314 m3 Pasir Pasang @ 92,106.00 28,921.28
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
3 PONDASI BATU KALI 1 PC : 2,5 PS 1m3
Bahan
1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
234 kg PC (Gresik ) @ 1,040.40 243,453.60
0.314 m3 Pasir Pasang @ 92,106.00 28,921.28
Upah :

Lembar ke 36 dari 350 halaman


1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
4 PONDASI BATU KALI 1 PC : 3 PS 1m3
Bahan
1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
202 kg PC (Gresik ) @ 1,040.40 210,160.80
0.314 m3 Pasir Pasang @ 92,106.00 28,921.28
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
1 PONDASI BATU KALI 1 PC : 4 PS 1m3
Bahan
1.2 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 210,515.76
163 kg PC (Gresik ) @ 1,040.40 169,585.20
0.314 m3 Pasir Pasang @ 92,106.00 28,921.28
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
6 PONDASI BATU KALI 1 PC : 5 PS 1m3
Bahan
1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
136 kg PC (Gresik ) @ 1,040.40 141,494.40
0.314 m3 Pasir Pasang @ 92,106.00 28,921.28
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
7 PONDASI BATU KALI 1 PC : 3 PS 1m3
Bahan
1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
117 kg PC (Gresik ) @ 1,040.40 121,726.80
0.314 m3 Pasir Pasang @ 92,106.00 28,921.28
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
8 PONDASI BATU KALI 1 PC : 8 PS 1m3
Bahan
1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
91 kg PC (Gresik ) @ 1,040.40 94,676.40
0.314 m3 Pasir Pasang @ 92,106.00 28,921.28
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
9 PONDASI BATU KALI 1 KP : 1 SM : 1 PS 1m3
Bahan
1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
0.229 kg Kapur Pasang @ -
0.229 m3 Semen Merah @ -
0.544 m3 Pasir Pasang @ 92,106.00 50,105.66
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
10 PONDASI BATU KALI 1 KP : 1 SM : 2 PS 1m3
Bahan

Lembar ke 37 dari 350 halaman


1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
0.17 kg Kapur Pasang @ - -
0.17 m3 Semen Merah @ 114,750.00 19,507.50
0.34 m3 Pasir Pasang @ 92,106.00 31,316.04
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
11 PONDASI BATU KALI 1 PC : 1/4 KP : 4 PS 1m3
Bahan
1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
156 kg PC (Gresik ) @ 1,040.40 162,302.40
0.032 m3 Kapur Pasang @ - -
0.584 m3 Pasir Pasang @ 92,106.00 53,789.90
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
12 PONDASI BATU KALI 1 PC : 3 KP : 10 PS 1m3
Bahan
1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
61 kg PC (Gresik ) @ 1,040.40 63,464.40
0.147 m3 Kapur Pasang @ - -
0.492 m3 Pasir Pasang @ 92,106.00 45,316.15
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
13 PONDASI BATU KALI 1/4 PC : 1 KP : 4 PS 1m3
Bahan
1.1 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 192,972.78
41 kg PC (Gresik ) @ 1,040.40 42,656.40
0.131 m3 Kapur Pasang @ - -
0.523 m3 Pasir Pasang @ 92,106.00 48,171.44
Upah :
1.5 Hr Pekerja Terampil @ 64,800.00 97,200.00
0.6 Hr Tukang Batu @ 77,760.00 46,656.00
0.06 Hr Kepala Tukang @ 90,720.00 5,443.20
0.075 Hr Mandor @ 77,760.00 5,832.00
2 PONDASI BATU KOSONG/ ANSTAMPENG 1m3
Bahan
1.2 m3 Batu Kali pecah tangan 15/20 @ 175,429.80 210,515.76
0.3 m3 Pasir Urug @ 80,325.00 24,097.50
Upah :
0.78 Hr Pekerja Terampil @ 64,800.00 50,544.00
0.39 Hr Tukang Batu @ 77,760.00 30,326.40
0.039 Hr Kepala Tukang @ 90,720.00 3,538.08
0.039 Hr Mandor @ 77,760.00 3,032.64
15 PONDASI SIKLOP 40% BATU KALI 1m3
Bahan
75 kg Besi Tulangan @ 11,050.00 828,750.00
202 kg PC (Gresik ) @ 1,040.40 210,160.80
0.8 kg Kawat Bendrat @ 6,961.50 5,569.20
0.49 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 123,700.50
0.32 m3 Pasir Beton @ 117,810.00 37,699.20
Upah :
3 Hr Pekerja Terampil @ 64,800.00 194,400.00
0.85 Hr Tukang Batu @ 77,760.00 66,096.00
0.085 Hr Kepala Tukang @ 90,720.00 7,711.20
0.15 Hr Mandor @ 77,760.00 11,664.00
16 PONDASI SUMURAN/ D : 100 CM 1m3
Bahan
0.45 kg Batu Kali pecah tangan 15/20 @ 175,429.80 78,943.41
280 kg PC (Gresik ) @ 1,040.40 291,312.00
Lembar ke 38 dari 350 halaman
0.67 Batu Kali Pecah Mesin 2/3 @ 252,450.00 169,141.50
0.45 m3 Pasir Beton @ 117,810.00 53,014.50
Upah :
2.38 Hr Pekerja Terampil @ 64,800.00 154,224.00
0.3 Hr Tukang Batu @ 77,760.00 23,328.00
0.03 Hr Kepala Tukang @ 90,720.00 2,721.60
0.08 Hr Mandor @ 77,760.00 6,220.80
17 PEMBUATAN TIANG PANCANG/40 X 40/ BETON BERTULANG 1m3
Bahan
0.019 m3 Pasir Urug @ 80,325.00 1,526.18
0.094 m3 Pasir Beton @ 117,810.00 11,074.14
0.15 m3 Batu Kali Pecah Mesin 2/3 @ 175,429.80 26,314.47
60 kg PC (Gresik ) @ 1,040.40 62,424.00
45 kg Besi Tulangan @ 11,050.00 497,250.00
0.9 kg Kawat Bendrat @ 6,961.50 6,265.35
0.032 m3 Usuk 5/7 @ 3,366,000.00 107,712.00
0.12 kg Paku @ 33,966.00 4,075.92
0.09 ltr Minyak Bekisting/SOLAR @ 5,049.00 454.41
0.24 kg Plamir Tembok @ 80,325.00 19,278.00
Upah :
1 Hr Pekerja Terampil @ 64,800.00 64,800.00
0.67 Hr Tukang Batu @ 77,760.00 52,099.20
0.067 Hr Kepala Tukang @ 90,720.00 6,078.24
0.05 Hr Mandor @ 77,760.00 3,888.00
18 PEMBUATAN TIANG PANCANG/35 X 35/ BETON BERTULANG 1m3
Bahan
0.016 m3 Pasir Urug @ 80,325.00 1,285.20
0.08 m3 Pasir Beton @ 117,810.00 9,424.80
0.125 m3 Batu Kali Pecah Mesin 2/3 @ 175,429.80 21,928.73
49 kg PC (Gresik ) @ 1,040.40 50,979.60
34.5 kg Besi Tulangan @ 11,050.00 381,225.00
0.7 kg Kawat Bendrat @ 6,961.50 4,873.05
0.027 m3 Usuk 5/7 meranti @ 3,366,000.00 90,882.00
0.12 kg Paku @ 33,966.00 4,075.92
0.09 ltr Minyak Bekisting/Residu @ 5,049.00 454.41
0.2 kg Plamir Tembok @ 80,325.00 16,065.00
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
0.5 Hr Tukang Batu @ 77,760.00 38,880.00
0.05 Hr Kepala Tukang @ 90,720.00 4,536.00
0.04 Hr Mandor @ 77,760.00 3,110.40

PEKERJAAN DINDING
1 PASANGAN DINDING BATA MERAH/TEBAL 1 BATA/1 PC : 1 PS 1m2
Bahan
140 m3 Bata Merah @ 114.75 16,065.00
64 kg PC (Gresik ) @ 1,040.40 66,585.60
0.059 m3 Pasir Pasang @ 92,106.00 5,434.25
Upah :
0.65 Hr Pekerja Terampil @ 64,800.00 42,120.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.03 Hr Mandor @ 77,760.00 2,332.80
2 PASANGAN DINDING BATA MERAH/TEBAL 1 BATA/1 PC : 2 PS 1m2
Bahan
140 m3 Bata Merah @ 114.75 16,065.00
43.5 kg PC (Gresik ) @ 1,040.40 45,257.40
0.08 m3 Pasir Pasang @ 92,106.00 7,368.48
Upah :
0.65 Hr Pekerja Terampil @ 64,800.00 42,120.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.03 Hr Mandor @ 77,760.00 2,332.80
3 PASANGAN DINDING BATA MERAH/TEBAL 1 BATA/1 PC : 3 PS 1m2
Bahan
140 m3 Bata Merah @ 114.75 16,065.00
32.95 kg PC (Gresik ) @ 1,040.40 34,281.18
Lembar ke 39 dari 350 halaman
0.091 m3 Pasir Pasang @ 92,106.00 8,381.65
Upah :
0.65 Hr Pekerja Terampil @ 64,800.00 42,120.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.03 Hr Mandor @ 77,760.00 2,332.80
4 PASANGAN DINDING BATA MERAH/TEBAL 1 BATA/1 PC : 4 PS 1m2
Bahan
140 m3 Bata Merah @ 114.75 16,065.00
26.55 kg PC (Gresik ) @ 1,040.40 27,622.62
0.093 m3 Pasir Pasang @ 92,106.00 8,565.86
Upah :
0.65 Hr Pekerja Terampil @ 64,800.00 42,120.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.03 Hr Mandor @ 77,760.00 2,332.80
5 PASANGAN DINDING BATA MERAH/TEBAL 1 BATA/1 PC : 5 PS 1m2
Bahan
140 m3 Bata Merah @ 114.75 16,065.00
22.2 kg PC (Gresik ) @ 1,040.40 23,096.88
0.102 m3 Pasir Pasang @ 92,106.00 9,394.81
Upah :
0.65 Hr Pekerja Terampil @ 64,800.00 42,120.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.03 Hr Mandor @ 77,760.00 2,332.80
6 PASANGAN DINDING BATA MERAH/TEBAL 1 BATA/1 PC : 6 PS 1m2
Bahan
140 m3 Bata Merah @ 114.75 16,065.00
16.64 kg PC (Gresik ) @ 1,040.40 17,312.26
0.098 m3 Pasir Pasang @ 92,106.00 9,026.39
Upah :
0.65 Hr Pekerja Terampil @ 64,800.00 42,120.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.03 Hr Mandor @ 77,760.00 2,332.80
1 PASANGAN DINDING BATA MERAH/TEBAL 1 BATA/1 PC : 3 KP : 5 1m2
Bahan
70 Bh Bata Merah @ 114.75 8,032.50
5.04 kg PC (Gresik ) @ 1,040.40 5,243.62
0.01375 m3 Kapur Pasang @ -
0.04625 m3 Pasir Pasang @ 92,106.00 4,259.90
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
8 PASANGAN DINDING BATA MERAH/TEBAL 1/2 BATA/1 PC : 1 PS 1m2
Bahan
70 m3 Bata Merah @ 114.75 8,032.50
27.8 kg PC (Gresik ) @ 1,040.40 28,923.12
0.028 m3 Pasir Pasang @ 92,106.00 2,578.97
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
9 PASANGAN DINDING BATA MERAH/TEBAL 1/2 BATA/1 PC : 2 PS 1m2
Bahan
70 m3 Bata Merah @ 114.75 8,032.50
27.8 kg PC (Gresik ) @ 1,040.40 28,923.12
0.028 m3 Pasir Pasang @ 92,106.00 2,578.97
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40

Lembar ke 40 dari 350 halaman


10 PASANGAN DINDING BATA MERAH/TEBAL 1/2 BATA/1 PC : 3 PS 1m2
Bahan
70 m3 Bata Merah @ 114.75 8,032.50
18.95 kg PC (Gresik ) @ 1,040.40 19,715.58
0.038 m3 Pasir Pasang @ 92,106.00 3,500.03
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
2 PASANGAN DINDING BATA MERAH/TEBAL 1/2 BATA/1 PC : 4 PS 1m2
Bahan
70 Bh Bata Merah @ 114.75 8,032.50
11.5 kg PC (Gresik ) @ 1,040.40 11,964.60
0.043 m3 Pasir Pasang @ 92,106.00 3,960.56
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
12 PASANGAN DINDING BATA MERAH/TEBAL 1/2 BATA/1 PC : 5 PS 1m2
Bahan
70 m3 Bata Merah @ 114.75 8,032.50
9.68 kg PC (Gresik ) @ 1,040.40 10,071.07
0.045 m3 Pasir Pasang @ 92,106.00 4,144.77
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
13 PASANGAN DINDING BATA MERAH/TEBAL 1/2 BATA/1 PC : 6 PS 1m2
Bahan
70 m3 Bata Merah @ 114.75 8,032.50
8.32 kg PC (Gresik ) @ 1,040.40 8,656.13
0.049 m3 Pasir Pasang @ 92,106.00 4,513.19
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
14 PASANGAN DINDING BATA MERAH/TEBAL 1/2 BATA/1 PC : 8 PS 1m2
Bahan
70 m3 Bata Merah @ 114.75 8,032.50
6.5 kg PC (Gresik ) @ 1,040.40 6,762.60
0.05 m3 Pasir Pasang @ 92,106.00 4,605.30
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
15 PASANGAN DINDING BATA MERAH/TEBAL 1 BATA/1 PC : 3 KP : 101m2
Bahan
70 m3 Bata Merah @ 114.75 8,032.50
4.5 kg PC (Gresik ) @ 1,040.40 4,681.80
0.05 m3 Kapur Pasang @ 1,273,725.00 63,686.25
0.015 m3 Pasir Pasang @ 92,106.00 1,381.59
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
16 PASANGAN DINDING BATA MERAH/TEBAL 1 BATA/ 1 KP : 1 SM : 11m2
Bahan
70 m3 Bata Merah @ 114.75 8,032.50
0.018 m3 Semen Merah @ 1,040.40 18.73
0.018 m3 Pasir Pasang @ 92,106.00 1,657.91
0.018 m3 Kapur Pasang/Kapur Padam @ 1,273,725.00 22,927.05
Lembar ke 41 dari 350 halaman
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
17 PASANGAN DINDING BATA MERAH/TEBAL 1 BATA/ 1 KP : 1 SM : 21m2
Bahan
70 m3 Bata Merah @ 114.75 8,032.50
0.014 m3 Semen Merah @ 1,040.40 14.57
0.028 m3 Pasir Pasang @ 92,106.00 2,578.97
0.014 m3 Kapur Pasang/Kapur Padam @ 1,273,725.00 17,832.15
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
18 PASANGAN DINDING HOLLOWBLOCK ( HB 20 ) 1m2
Bahan
12.5 bh Hollow Block ( h. 20 ) @ -
13.5 kg PC (Gresik ) @ 1,040.40 14,045.40
0.048 m3 Pasir Pasang @ 92,106.00 4,421.09
1.95 kg Besi Tulangan @ 11,050.00 21,547.50
Upah :
0.35 Hr Pekerja Terampil @ 64,800.00 22,680.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.017 Hr Mandor @ 77,760.00 1,321.92
19 PASANGAN DINDING HOLLOWBLOCK ( HB 15 ) 1m2
Bahan
12.5 bh Hollow Block ( hb. 15 ) @ -
10.45 kg PC (Gresik ) @ 1,040.40 10,872.18
0.038 m3 Pasir Pasang @ 92,106.00 3,500.03
1.95 kg Besi Tulangan @ 11,050.00 21,547.50
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.12 Hr Tukang Batu @ 77,760.00 9,331.20
0.012 Hr Kepala Tukang @ 90,720.00 1,088.64
0.015 Hr Mandor @ 77,760.00 1,166.40
20 PASANGAN DINDING HOLLOWBLOCK ( HB 10 ) 1m2
Bahan
12.5 bh Hollow Block ( hb. 10 ) @ -
7.5 kg PC (Gresik ) @ 1,040.40 7,803.00
0.027 m3 Pasir Pasang @ 92,106.00 2,486.86
1.95 kg Besi Tulangan @ 11,050.00 21,547.50
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.12 Hr Tukang Batu @ 77,760.00 9,331.20
0.012 Hr Kepala Tukang @ 90,720.00 1,088.64
0.015 Hr Mandor @ 77,760.00 1,166.40
21 PASANGAN DINDING CONBLOCK ( CB. 20 ) 1m2
Bahan
12.5 bh Concreete Block ( cb.20) @ -
14.05 kg PC (Gresik ) @ 1,040.40 14,617.62
0.004 m3 Pasir Beton @ 117,810.00 471.24
0.042 m3 Pasir Pasang @ 92,106.00 3,868.45
3.87 kg Besi Tulangan @ 11,050.00 42,763.50
0.006 kg Paku 2" - 5" @ 33,966.00 203.80
0.001 kg Papan 2/20 meranti @ 229,500.00 229.50
0.03 kg Kawat Bendrat @ 6,961.50 208.85
0.005 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 1,262.25
Upah :
0.037 Hr Pekerja Terampil @ 64,800.00 2,397.60
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.007 Hr Tukang Besi @ 77,760.00 544.32
0.0164 Hr Kepala Tukang @ 90,720.00 1,487.81
0.0185 Hr Mandor @ 77,760.00 1,438.56
22 PASANGAN DINDING CONBLOCK ( CB. 15 ) 1m2

Lembar ke 42 dari 350 halaman


Bahan
12.5 bh Concreete Block ( cb.20) @ -
14.05 kg PC (Gresik ) @ 1,040.40 14,617.62
0.004 m3 Pasir Beton @ 117,810.00 471.24
0.042 m3 Pasir Pasang @ 92,106.00 3,868.45
3.87 kg Besi Tulangan @ 11,050.00 42,763.50
0.006 kg Paku 2" - 5" @ 33,966.00 203.80
0.001 kg Papan 2/20 meranti @ 229,500.00 229.50
0.03 kg Kawat Bendrat @ 6,961.50 208.85
0.005 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 1,262.25
Upah :
0.037 Hr Pekerja Terampil @ 64,800.00 2,397.60
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.007 Hr Tukang Besi @ 77,760.00 544.32
0.0164 Hr Kepala Tukang @ 90,720.00 1,487.81
0.0185 Hr Mandor @ 77,760.00 1,438.56
23 PASANGAN DINDING CONBLOCK ( CB. 10 ) 1m2
Bahan
12.5 bh Concreete Block ( cb.20) @ -
10.46 kg PC (Gresik ) @ 1,040.40 10,882.58
0.003 m3 Pasir Beton @ 117,810.00 353.43
0.032 m3 Pasir Pasang @ 92,106.00 2,947.39
0.87 kg Besi Tulangan @ 11,050.00 9,613.50
0.004 kg Paku 2" - 5" @ 33,966.00 135.86
0.001 kg Papan 2/20 meranti @ 229,500.00 229.50
0.02 kg Kawat Bendrat @ 6,961.50 139.23
0.004 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 1,009.80
Upah :
0.34 Hr Pekerja Terampil @ 64,800.00 22,032.00
0.13 Hr Tukang Batu @ 77,760.00 10,108.80
0.007 Hr Tukang Besi @ 77,760.00 544.32
0.0137 Hr Kepala Tukang @ 90,720.00 1,242.86
0.017 Hr Mandor @ 77,760.00 1,321.92
24 PASANGAN DINDING CONBLOCK ( CB. 10 ) 1m2
Bahan
12.5 bh Concreete Block ( cb.20) @ -
7.2 kg PC (Gresik ) @ 1,040.40 7,490.88
0.002 m3 Pasir Beton @ 117,810.00 235.62
0.021 m3 Pasir Pasang @ 92,106.00 1,934.23
2.54 kg Besi Tulangan @ 11,050.00 28,067.00
0.003 kg Paku 2" - 5" @ 33,966.00 101.90
0.001 kg Papan 2/20 meranti @ 229,500.00 229.50
0.015 kg Kawat Bendrat @ 6,961.50 104.42
0.003 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 757.35
Upah :
0.34 Hr Pekerja Terampil @ 64,800.00 22,032.00
0.107 Hr Tukang Batu @ 77,760.00 8,320.32
0.007 Hr Tukang Besi @ 77,760.00 544.32
0.0114 Hr Kepala Tukang @ 90,720.00 1,034.21
0.017 Hr Mandor @ 77,760.00 1,321.92
25 PASANGAN DINDING LATEI 1m2
Bahan
2.5 bh Bondbeam 40 x 20 x 20 cm @ -
5.1 kg PC (Gresik ) @ 1,040.40 5,306.04
0.08 m3 Pasir Beton @ 117,810.00 9,424.80
1.5 kg Besi Tulangan @ 11,050.00 16,575.00
0.15 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 37,867.50
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.03 Hr Tukang Batu @ 77,760.00 2,332.80
0.03 Hr Tukang Besi @ 77,760.00 2,332.80
0.006 Hr Kepala Tukang @ 90,720.00 544.32
0.005 Hr Mandor @ 77,760.00 388.80
26 PASANGAN DINDING ROSTER/TERAWANG/12 X 11 X 24 CM 1m2
Bahan
36 bh Roster/Terawang @ - -
12.8 kg PC (Gresik ) @ 1,040.40 13,317.12

Lembar ke 43 dari 350 halaman


0.035 m3 Pasir Pasang @ 92,106.00 3,223.71
Upah :
0.3 Hr Pekerja Terampil @ 64,800.00 19,440.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
26 PASANGAN DINDING BATA BERONGGA/ 5 X 11 X 24 CM 1m2
Bahan
80 bh Bata Berongga @ -
23.65 kg PC (Gresik ) @ 1,040.40 24,605.46
0.57 m3 Pasir Pasang @ 92,106.00 52,500.42
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.015 Hr Mandor @ 77,760.00 1,166.40
27 PASANGAN DINDING ANYAMAN BAMBU/RANGKA KAYU 1m2
Bahan
1.5 m2 Bilik Bambu @ -
0.014 m3 Usuk 5/7 Meranti @ 3,366,000.00 47,124.00
0.012 kg Paku 2" - 5" @ 33,966.00 407.59
0.003 m3 List Kayu 2/4 @ -
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.05 Hr Tukang Kayu @ 77,760.00 3,888.00
0.005 Hr Kepala Tukang @ 90,720.00 453.60
0.002 Hr Mandor @ 77,760.00 155.52

PEKERJAAN PLESTERAN
1 PLESTERAN TEMBOK 1 PC : 1 PS / TEBAL 15 MM 1m2
Bahan
12.92 kg PC (Gresik ) @ 1,040.40 13,441.97
0.013 m3 Pasir Pasang @ 92,106.00 1,197.38
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
2 PLESTERAN TEMBOK 1 PC : 2 PS / TEBAL 15 MM 1m2
Bahan
8.52 kg PC (Gresik ) @ 1,040.40 8,864.21
0.017 m3 Pasir Pasang @ 92,106.00 1,565.80
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
1 PLESTERAN TEMBOK 1 PC : 3 PS / TEBAL 15 MM 1m2
Bahan
6.48 kg PC (Gresik ) @ 1,040.40 6,741.79
0.019 m3 Pasir Pasang @ 92,106.00 1,750.01
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
2 PLESTERAN TEMBOK 1 PC : 4 PS / TEBAL 15 MM 1m2
Bahan
5.2 kg PC (Gresik ) @ 1,040.40 5,410.08
0.02 m3 Pasir Pasang @ 92,106.00 1,842.12
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
5 PLESTERAN TEMBOK 1 PC : 5 PS / TEBAL 15 MM 1m2

Lembar ke 44 dari 350 halaman


Bahan
4.32 kg PC (Gresik ) @ 1,040.40 4,494.53
0.022 m3 Pasir Pasang @ 92,106.00 2,026.33
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
6 PLESTERAN TEMBOK 1 PC : 6 PS / TEBAL 15 MM 1m2
Bahan
3.68 kg PC (Gresik ) @ 1,040.40 3,828.67
0.023 m3 Pasir Pasang @ 92,106.00 2,118.44
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
3 PLESTERAN TEMBOK 1 PC : 8 PS / TEBAL 15 MM 1m2
Bahan
2.88 kg PC (Gresik ) @ 1,040.40 2,996.35
0.024 m3 Pasir Pasang @ 92,106.00 2,210.54
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
8 PLESTERAN TEMBOK 1 PC : 0,5 KP : 3 PS / TEBAL 15 MM 1m2
Bahan
57.6 kg PC (Gresik ) @ 1,040.40 59,927.04
0.003 m3 Kapur Pasang @ 1,273,725.00 3,821.18
0.013 m3 Pasir Pasang @ 92,106.00 1,197.38
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
9 PLESTERAN TEMBOK 1 PC : 3 KP : 10 PS / TEBAL 15 MM 1m2
Bahan
1.84 kg PC (Gresik ) @ 1,040.40 1,914.34
0.006 m3 Kapur Pasang @ 1,273,725.00 7,642.35
0.014 m3 Pasir Pasang @ 92,106.00 1,289.48
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
10 PLESTERAN TEMBOK 0,5 PC : 1 KP : 4 PS / TEBAL 15 MM 1m2
Bahan
3 kg PC (Gresik ) @ 1,040.40 3,121.20
0.005 m3 Kapur Pasang @ 1,273,725.00 6,368.63
0.019 m3 Pasir Pasang @ 92,106.00 1,750.01
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
11 PLESTERAN TEMBOK 1 KP : 1 SM :1 PS / TEBAL 15 MM 1m2
Bahan
0.009 m3 Semen Merah @ 114,750.00 1,032.75
0.009 m3 Kapur Pasang @ 1,273,725.00 11,463.53
0.009 m3 Pasir Pasang @ 92,106.00 828.95
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
12 PLESTERAN TEMBOK 1 KP : 1 SM : 2 PS / TEBAL 15 MM 1m2

Lembar ke 45 dari 350 halaman


Bahan
0.007 m3 Semen Merah @ 114,750.00 803.25
0.007 m3 Kapur Pasang @ 1,273,725.00 8,916.08
0.015 m3 Pasir Pasang @ 92,106.00 1,381.59
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.15 Hr Tukang Batu @ 77,760.00 11,664.00
0.015 Hr Kepala Tukang @ 90,720.00 1,360.80
0.01 Hr Mandor @ 77,760.00 777.60
13 PLESTERAN TEMBOK 1 PC : 2 PS / TEBAL 20 MM 1m2
Bahan
14.28 kg PC (Gresik ) @ 1,040.40 14,856.91
0.023 m3 Pasir Pasang @ 92,106.00 2,118.44
Upah :
0.25 Hr Pekerja Terampil @ 64,800.00 16,200.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.0125 Hr Mandor @ 77,760.00 972.00
14 PLESTERAN TEMBOK 1 PC : 3 PS / TEBAL 20 MM 1m2
Bahan
10.8 kg PC (Gresik ) @ 1,040.40 11,236.32
0.026 m3 Pasir Pasang @ 92,106.00 2,394.76
Upah :
0.25 Hr Pekerja Terampil @ 64,800.00 16,200.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.0125 Hr Mandor @ 77,760.00 972.00
15 PLESTERAN TEMBOK 1 PC : 4 PS / TEBAL 20 MM 1m2
Bahan
8.68 kg PC (Gresik ) @ 1,040.40 9,030.67
0.028 m3 Pasir Pasang @ 92,106.00 2,578.97
Upah :
0.25 Hr Pekerja Terampil @ 64,800.00 16,200.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.0125 Hr Mandor @ 77,760.00 972.00
16 PLESTERAN TEMBOK 1 PC : 5 PS / TEBAL 20 MM 1m2
Bahan
7.29 kg PC (Gresik ) @ 1,040.40 7,584.52
0.028 m3 Pasir Pasang @ 92,106.00 2,578.97
Upah :
0.25 Hr Pekerja Terampil @ 64,800.00 16,200.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.0125 Hr Mandor @ 77,760.00 972.00
17 PLESTERAN TEMBOK 1 PC : 6 PS / TEBAL 20 MM 1m2
Bahan
6.24 kg PC (Gresik ) @ 1,040.40 6,492.10
0.03 m3 Pasir Pasang @ 92,106.00 2,763.18
Upah :
0.25 Hr Pekerja Terampil @ 64,800.00 16,200.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.0125 Hr Mandor @ 77,760.00 972.00
18 PLESTERAN TEMBOK 1 KP : 1 SM :2 PS / TEBAL 20 MM 1m2
Bahan
0.009 m3 Semen Merah @ 1,040.40 9.36
0.009 m3 Kapur Pasang @ 1,273,725.00 11,463.53
0.018 m3 Pasir Pasang @ 92,106.00 1,657.91
Upah :
0.25 Hr Pekerja Terampil @ 64,800.00 16,200.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.0125 Hr Mandor @ 77,760.00 972.00
19 PLESTERAN TEMBOK 1 PC : 2 PS / TEBAL 25 MM 1m2
Bahan
15.5 kg PC (Gresik ) @ 1,040.40 16,126.20

Lembar ke 46 dari 350 halaman


0.013 m3 Pasir Pasang @ 92,106.00 1,197.38
Upah :
0.3 Hr Pekerja Terampil @ 64,800.00 19,440.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.13 Hr Mandor @ 77,760.00 10,108.80
20 PLESTERAN TEMBOK 1 PC : 3 PS / TEBAL 25 MM 1m2
Bahan
11.75 kg PC (Gresik ) @ 1,040.40 12,224.70
0.035 m3 Pasir Pasang @ 92,106.00 3,223.71
Upah :
0.3 Hr Pekerja Terampil @ 64,800.00 19,440.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.13 Hr Mandor @ 77,760.00 10,108.80
21 PLESTERAN TEMBOK 1 PC : 4 PS / TEBAL 25 MM 1m2
Bahan
9.48 kg PC (Gresik ) @ 1,040.40 9,862.99
0.038 m3 Pasir Pasang @ 92,106.00 3,500.03
Upah :
0.3 Hr Pekerja Terampil @ 64,800.00 19,440.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.13 Hr Mandor @ 77,760.00 10,108.80
22 PLESTERAN TEMBOK 1 PC : 5 PS / TEBAL 25 MM 1m2
Bahan
7.94 kg PC (Gresik ) @ 1,040.40 8,260.78
0.039 m3 Pasir Pasang @ 92,106.00 3,592.13
Upah :
0.3 Hr Pekerja Terampil @ 64,800.00 19,440.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.13 Hr Mandor @ 77,760.00 10,108.80
23 PLESTERAN TEMBOK 1 PC : 2 PS / TEBAL 30 MM 1m2
Bahan
18.65 kg PC (Gresik ) @ 1,040.40 19,403.46
0.035 m3 Pasir Pasang @ 92,106.00 3,223.71
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.25 Hr Tukang Batu @ 77,760.00 19,440.00
0.025 Hr Kepala Tukang @ 90,720.00 2,268.00
0.015 Hr Mandor @ 77,760.00 1,166.40
24 PLESTERAN TEMBOK 1 PC : 3 PS / TEBAL 30 MM 1m2
Bahan
14.15 kg PC (Gresik ) @ 1,040.40 14,721.66
0.039 m3 Pasir Pasang @ 92,106.00 3,592.13
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.25 Hr Tukang Batu @ 77,760.00 19,440.00
0.025 Hr Kepala Tukang @ 90,720.00 2,268.00
0.015 Hr Mandor @ 77,760.00 1,166.40
25 PLESTERAN TEMBOK 1 PC : 4 PS / TEBAL 30 MM 1m2
Bahan
11.38 kg PC (Gresik ) @ 1,040.40 11,839.75
0.042 m3 Pasir Pasang @ 92,106.00 3,868.45
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.25 Hr Tukang Batu @ 77,760.00 19,440.00
0.025 Hr Kepala Tukang @ 90,720.00 2,268.00
0.015 Hr Mandor @ 77,760.00 1,166.40
26 PLESTERAN TEMBOK 1 PC : 5 PS / TEBAL 30 MM 1m2
Bahan
8.19 kg PC (Gresik ) @ 1,040.40 8,520.88
0.045 m3 Pasir Pasang @ 92,106.00 4,144.77
Upah :
0.32 Hr Pekerja Terampil @ 64,800.00 20,736.00
0.25 Hr Tukang Batu @ 77,760.00 19,440.00

Lembar ke 47 dari 350 halaman


0.025 Hr Kepala Tukang @ 90,720.00 2,268.00
0.015 Hr Mandor @ 77,760.00 1,166.40
27 BERAPEN 1 PC : 3 PS/ TEBAL 30 MM 1m2
Bahan
7.07 kg PC (Gresik ) @ 1,040.40 7,355.63
0.021 m3 Pasir Pasang @ 92,106.00 1,934.23
Upah :
0.05 Hr Pekerja Terampil @ 64,800.00 3,240.00
0.07 Hr Tukang Batu @ 77,760.00 5,443.20
0.007 Hr Kepala Tukang @ 90,720.00 635.04
0.008 Hr Mandor @ 77,760.00 622.08
28 BERAPEN 1 PC : 3 PS/ TEBAL 15 MM 1m2
Bahan
5.67 kg PC (Gresik ) @ 1,040.40 5,899.07
0.023 m3 Pasir Pasang @ 92,106.00 2,118.44
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.07 Hr Tukang Batu @ 77,760.00 5,443.20
0.007 Hr Kepala Tukang @ 90,720.00 635.04
0.008 Hr Mandor @ 77,760.00 622.08
29 PLESTERAN BETON PC : 2 PS / TEBAL 15 MM 1m2
Bahan
9.3 kg PC (Gresik ) @ 1,040.40 9,675.72
0.018 m3 Pasir Pasang @ 92,106.00 1,657.91
Upah :
0.26 Hr Pekerja Terampil @ 64,800.00 16,848.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.013 Hr Mandor @ 77,760.00 1,010.88
30 PLESTERAN BETON PC : 3 PS / TEBAL 15 MM 1m2
Bahan
7.07 kg PC (Gresik ) @ 1,040.40 7,355.63
0.021 m3 Pasir Pasang @ 92,106.00 1,934.23
Upah :
0.26 Hr Pekerja Terampil @ 64,800.00 16,848.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.013 Hr Mandor @ 77,760.00 1,010.88
31 PLESTERAN SKONING 1 PC : 2 PS 1m2
Bahan
0.5 kg PC (Gresik ) @ 1,040.40 520.20
0.002 m3 Pasir Pasang @ 92,106.00 184.21
Upah :
0.057 Hr Pekerja Terampil @ 64,800.00 3,693.60
0.038 Hr Tukang Batu @ 77,760.00 2,954.88
0.038 Hr Kepala Tukang @ 90,720.00 3,447.36
0.002 Hr Mandor @ 77,760.00 155.52
32 PLESTERAN GRANITO, 1 PC WARNA : 2 GRANITO/ TEBAL 10 M 1m2
Bahan
0.144 kg PC WARNA @ 1,484.10 213.71
15 kg Batu granito @ 92,106.00 1,381,590.00
Upah :
0.45 Hr Pekerja Terampil @ 64,800.00 29,160.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.025 Hr Mandor @ 77,760.00 1,944.00
33 PLESTERAN TERRASO 1 PC WARNA : 2 BATU TERASSO/ TEBAL 1m2
Bahan
0.44 kg PC WARNA @ 1,484.10 653.00
11.5 kg Batu Terasso @ 92,106.00 1,059,219.00
Upah :
0.45 Hr Pekerja Terampil @ 64,800.00 29,160.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.025 Hr Mandor @ 77,760.00 1,944.00
34 PLESTERAN CIPRAT 1 PC : 2 PS 1m2
Bahan

Lembar ke 48 dari 350 halaman


4.32 kg PC (Gresik ) @ 1,040.40 4,494.53
0.016 m3 Pasir Pasang @ 92,106.00 1,473.70
Upah :
0.25 Hr Pekerja Terampil @ 64,800.00 16,200.00
0.1 Hr Tukang Batu @ 77,760.00 7,776.00
0.01 Hr Kepala Tukang @ 90,720.00 907.20
0.015 Hr Mandor @ 77,760.00 1,166.40
34 PLESTERAN CIPRAT 1 PC : 2 PS 1m2
Bahan
4.32 kg PC (Gresik ) @ 1,040.40 4,494.53
0.016 m3 Pasir Pasang @ 92,106.00 1,473.70
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.07 Hr Tukang Batu @ 77,760.00 5,443.20
0.007 Hr Kepala Tukang @ 90,720.00 635.04
0.008 Hr Mandor @ 77,760.00 622.08
34 PLESTERAN WATERPROOF BATACOTE 3 LAPIS 1m2
Bahan
0.5 kg PC (Gresik ) @ 1,040.40 520.20
2.9 kg Batacote @ -
0.006 m3 Pasir Pasang @ 92,106.00 552.64
Upah :
0.3 Hr Pekerja Terampil @ 64,800.00 19,440.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.015 Hr Mandor @ 77,760.00 1,166.40
4 ACIAN/BENANGAN 1m2
Bahan :
0.009 m3 Pasir pasang @ 92,106.00 828.95
1.3 kg Semen PC @ 1,040.40 1,352.52
Upah :
0.12 Hr Pekerja Terampil @ 64,800.00 7,776.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 90,720.00 1,814.40
0.015 Hr Mandor @ 77,760.00 1,166.40

PEKERJAAN KAYU U/ KUSEN, PINTU DAN JENDELA


1 KUSEN PINTU DAN JENDELA/KAYU JATI 1m3
0.009 m3 Kusen Kayu 6/15 1m' Rp 267,651
0.0072 m3 Kusen Kayu 6/12 1m' Rp 214,121
Bahan
1.1 m3 Kayu JATI @ 24,786,000.00 27,264,600.00
0.9 kg lem putih 'rajawali' @ 33,660.00 30,294.00
0.3 kg Paku 2"- 5" @ 33,966.00 10,189.80
Upah :
6 Hr Pekerja Terampil @ 64,800.00 388,800.00
20 Hr Tukang Kayu @ 90,720.00 1,814,400.00
2 Hr Kepala Tukang @ 103,680.00 207,360.00
0.3 Hr Mandor @ 77,760.00 23,328.00
2 KUSEN PINTU DAN JENDELA/KAYU KAMPER 1m3
0.0108 m3 Kusen Kayu 6/15 1m' Rp 892,308,500
0.00864 m3 Kusen Kayu 6/12 1m' Rp 1,115,385,625
Bahan
1.2 m3 Kayu KAMPER @ 6,120,000.00 7,344,000.00
0.9 kg lem putih 'rajawali' @ 33,660.00 30,294.00
0.3 kg Paku 2"- 5" @ 33,966.00 10,189.80
Upah :
6 Hr Pekerja Terampil @ 64,800.00 388,800.00
18 Hr Tukang Kayu @ 90,720.00 1,632,960.00
2 Hr Kepala Tukang @ 103,680.00 207,360.00
0.3 Hr Mandor @ 77,760.00 23,328.00
3 KUSEN PINTU DAN JENDELA/KAYU MERANTI 1m3
0.0108 m3 Kusen Kayu 6/15 1m' Rp 603,108,500
0.00864 m3 Kusen Kayu 6/12 1m' Rp 753,885,625

Lembar ke 49 dari 350 halaman


Bahan
1.2 m3 Kayu MERANTI @ 3,366,000.00 4,039,200.00
0.9 kg lem putih 'rajawali' @ 33,660.00 30,294.00
0.3 kg Paku 2"- 5" @ 33,966.00 10,189.80
Upah :
6 Hr Pekerja Terampil @ 64,800.00 388,800.00
20 Hr Tukang Kayu @ 90,720.00 1,814,400.00
2 Hr Kepala Tukang @ 103,680.00 207,360.00
0.3 Hr Mandor @ 77,760.00 23,328.00
4 KUSEN PINTU DAN JENDELA/KAYU SUNGKAI 1m3
0.0108 m3 Kusen Kayu 6/15 1m' Rp 212,308,500
0.00864 m3 Kusen Kayu 6/12 1m' Rp 265,385,625
Bahan
1.2 m3 Kayu SUNGKAI @ -
0.9 kg lem putih 'rajawali' @ 33,660.00 30,294.00
0.3 kg Paku 2"- 5" @ 33,966.00 10,189.80
Upah :
6 Hr Pekerja Terampil @ 64,800.00 388,800.00
18 Hr Tukang Kayu @ 90,720.00 1,632,960.00
2 Hr Kepala Tukang @ 103,680.00 207,360.00
0.3 Hr Mandor @ 77,760.00 23,328.00
5 PINTU KLAMP /KAYU KAMPER 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.036 m3 Kayu KAMPER @ 6,120,000.00 220,320.00
0.09 kg lem putih 'rajawali' @ 33,660.00 3,029.40
0.05 kg Paku 2"- 5" @ 33,966.00 1,698.30
Upah :
0.35 Hr Pekerja Terampil @ 64,800.00 22,680.00
1.05 Hr Tukang Kayu @ 90,720.00 95,256.00
0.105 Hr Kepala Tukang @ 103,680.00 10,886.40
0.018 Hr Mandor @ 77,760.00 1,399.68
6 PINTU KLAMP /KAYU MERANTI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.036 m3 Kayu MERANTI @ 3,366,000.00 121,176.00
0.09 kg lem putih 'rajawali' @ 33,660.00 3,029.40
0.05 kg Paku 2"- 5" @ 33,966.00 1,698.30
Upah :
0.35 Hr Pekerja Terampil @ 64,800.00 22,680.00
1.05 Hr Tukang Kayu @ 90,720.00 95,256.00
0.105 Hr Kepala Tukang @ 103,680.00 10,886.40
0.018 Hr Mandor @ 77,760.00 1,399.68
7 PINTU PANIL KAYU JATI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.04 m3 Papan Kayu JATI @ 27,264,600.00 1,090,584.00
0.05 kg lem putih 'rajawali' @ 33,660.00 1,683.00
Upah :
1 Hr Pekerja Terampil @ 64,800.00 64,800.00
2.5 Hr Tukang Kayu @ 90,720.00 226,800.00
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.05 Hr Mandor @ 77,760.00 3,888.00
8 PINTU PANIL KAYU KAMPER 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.04 m3 Papan Kayu KAMPER @ 3,366,000.00 134,640.00
0.05 kg lem putih 'rajawali' @ 33,660.00 1,683.00
Upah :
1 Hr Pekerja Terampil @ 64,800.00 64,800.00
2.5 Hr Tukang Kayu @ 90,720.00 226,800.00
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.05 Hr Mandor @ 77,760.00 3,888.00
9 PINTU KACA/ JENDELA KACA KAYU JATI 1m2
1 bh Pintu 90 x 220 m2 1.98
1 bh Jendela 65 x 130 cm m2 0.85
Bahan
Lembar ke 50 dari 350 halaman
0.035 m3 Papan Kayu JATI @ 27,264,600.00 954,261.00
0.09 kg lem putih 'rajawali' @ 33,660.00 3,029.40
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.04 Hr Mandor @ 77,760.00 3,110.40
10 PINTU KACA/ JENDELA KACA KAYU KAMPER 1m2
1 bh Pintu 90 x 220 m2 1.98
1 bh Jendela 65 x 130 cm m2 0.85
Bahan
0.035 m3 Papan Kayu KAMPER @ 3,366,000.00 117,810.00
0.09 kg lem putih 'rajawali' @ 33,660.00 3,029.40
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.04 Hr Mandor @ 77,760.00 3,110.40
11 PINTU KACA/ JENDELA KACA KAYU MERANTI 1m2
1 bh Pintu 90 x 220 m2 1.98
1 bh Jendela 65 x 130 cm m2 0.85
Bahan
0.035 m3 Papan MERANTI @ 3,366,000.00 117,810.00
0.09 kg lem putih 'rajawali' @ 33,660.00 3,029.40
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.04 Hr Mandor @ 77,760.00 3,110.40
12 PINTU/ JENDELA/ JALUSI/ KAYU JATI 1m2
1 bh Pintu 90 x 220 m2 1.98
1 bh Jendela 65 x 130 cm m2 0.85
Bahan
0.064 m3 Papan Kayu JATI @ 27,264,600.00 1,744,934.40
0.09 kg lem putih 'rajawali' @ 33,660.00 3,029.40
Upah :
1 Hr Pekerja Terampil @ 64,800.00 64,800.00
3 Hr Tukang Kayu @ 90,720.00 272,160.00
0.3 Hr Kepala Tukang @ 103,680.00 31,104.00
0.5 Hr Mandor @ 77,760.00 38,880.00
13 PINTU/ JENDELA/ JALUSI/ KAYU KAMPER 1m2
1 bh Pintu 90 x 220 m2 1.98
1 bh Jendela 65 x 130 cm m2 0.85
Bahan
0.064 m3 Papan Kayu KAMPER @ 3,366,000.00 215,424.00
0.09 kg lem putih 'rajawali' @ 33,660.00 3,029.40
Upah :
1 Hr Pekerja Terampil @ 64,800.00 64,800.00
3 Hr Tukang Kayu @ 90,720.00 272,160.00
0.3 Hr Kepala Tukang @ 103,680.00 31,104.00
0.5 Hr Mandor @ 77,760.00 38,880.00
14 PINTU/ JENDELA/ JALUSI/ KAYU MERANTI 1m2
1 bh Pintu 90 x 220 m2 1.98
1 bh Jendela 65 x 130 cm m2 0.85
Bahan
0.064 m3 Papan Kayu MERANTI @ 3,366,000.00 215,424.00
0.09 kg lem putih 'rajawali' @ 33,660.00 3,029.40
Upah :
1 Hr Pekerja Terampil @ 64,800.00 64,800.00
3 Hr Tukang Kayu @ 90,720.00 272,160.00
0.3 Hr Kepala Tukang @ 103,680.00 31,104.00
0.5 Hr Mandor @ 77,760.00 38,880.00
15 PINTU TRIPLEKS RANGKAP/ RANGKA KAYU JATI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu JATI @ 27,264,600.00 534,386.16

Lembar ke 51 dari 350 halaman


0.03 kg Paku 1/2"- 1" @ 39,627.00 1,188.81
0.3 lt lem Kuning 'rajawali' @ 33,660.00 10,098.00
1 kg Tripleks 4 mm @ 53,856.00 53,856.00
Upah :
0.6 Hr Pekerja Terampil @ 64,800.00 38,880.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.03 Hr Mandor @ 77,760.00 2,332.80
16 PINTU TRIPLEKS RANGKAP/ RANGKA KAYU KAMPER 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu KAMPER @ 3,366,000.00 65,973.60
0.03 kg Paku 1/2"- 1" @ 39,627.00 1,188.81
0.3 lt lem Kuning 'rajawali' @ 33,660.00 10,098.00
1 kg Tripleks 4 mm @ 53,856.00 53,856.00
Upah :
0.6 Hr Pekerja Terampil @ 64,800.00 38,880.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.03 Hr Mandor @ 77,760.00 2,332.80
17 PINTU TRIPLEKS RANGKAP/ RANGKA KAYU MERANTI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu MERANTI @ 3,366,000.00 65,973.60
0.03 kg Paku 1/2"- 1" @ 39,627.00 1,188.81
0.3 lt lem Kuning 'rajawali' @ 33,660.00 10,098.00
1 kg Tripleks 4 mm @ 53,856.00 53,856.00
Upah :
0.6 Hr Pekerja Terampil @ 64,800.00 38,880.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.03 Hr Mandor @ 77,760.00 2,332.80
18 JALUSI MATI/ KUSEN KAYU JATI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.06 m3 Papan Kayu JATI @ 27,264,600.00 1,635,876.00
0.09 kg lem putih 'rajawali' @ 33,660.00 3,029.40
0.15 kg Paku 1/2"- 5" @ 39,627.00 5,944.05
Upah :
0.5 Hr Pekerja Terampil @ 64,800.00 32,400.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.025 Hr Mandor @ 77,760.00 1,944.00
19 JALUSI MATI/ KUSEN KAYU KAMPER 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.06 m3 Papan Kayu KAMPER @ 3,366,000.00 201,960.00
0.09 kg lem putih 'rajawali' @ 33,660.00 3,029.40
0.15 kg Paku 1/2"- 5" @ 39,627.00 5,944.05
Upah :
0.5 Hr Pekerja Terampil @ 64,800.00 32,400.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.025 Hr Mandor @ 77,760.00 1,944.00
20 JALUSI MATI/ KUSEN KAYU MERANTI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.06 m3 Papan Kayu MERANTI @ 3,366,000.00 201,960.00
0.09 kg lem putih 'rajawali' @ 33,660.00 3,029.40
0.15 kg Paku 1/2"- 5" @ 39,627.00 5,944.05
Upah :
0.5 Hr Pekerja Terampil @ 64,800.00 32,400.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.025 Hr Mandor @ 77,760.00 1,944.00
21 PINTU TEAKWOOD RANGKAP/ RANGKA KAYU JATI/SLOT & E 1m2
1 bh Pintu 90 x 220 m2 1.98
Lembar ke 52 dari 350 halaman
Bahan
0.0198 m3 Papan Kayu JATI @ 27,264,600.00 539,839.08
0.03 kg Paku 1/2"- 1" @ 39,627.00 1,188.81
0.3 lt lem Kuning 'rajawali' @ 33,660.00 10,098.00
1 set Engsel @ 75,735.00 75,735.00
bh Slot Pintu @ 422,188.20 -
1 kg Teakwood 4 mm @ 86,700.00 86,700.00
Upah :
0.6 Hr Pekerja Terampil @ 64,800.00 38,880.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.03 Hr Mandor @ 77,760.00 2,332.80
22 PINTU TEAKWOOD RANGKAP/ RANGKA KAYU KAMPER 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0198 m3 Papan Kayu KAMPER @ 3,366,000.00 66,646.80
0.03 kg Paku 1/2"- 1" @ 39,627.00 1,188.81
0.3 lt lem Kuning 'rajawali' @ 33,660.00 10,098.00
1 kg Teakwood 4 mm @ 86,700.00 86,700.00
Upah :
0.6 Hr Pekerja Terampil @ 64,800.00 38,880.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.03 Hr Mandor @ 77,760.00 2,332.80
23 PINTU TEAKWOOD RANGKAP/ RANGKA KAYU MERANTI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0198 m3 Papan Kayu MERANTI @ 3,366,000.00 66,646.80
0.03 kg Paku 1/2"- 1" @ 39,627.00 1,188.81
0.3 lt lem Kuning 'rajawali' @ 33,660.00 10,098.00
1 kg Teakwood 4 mm @ 86,700.00 86,700.00
Upah :
0.6 Hr Pekerja Terampil @ 64,800.00 38,880.00
2 Hr Tukang Kayu @ 90,720.00 181,440.00
0.2 Hr Kepala Tukang @ 103,680.00 20,736.00
0.03 Hr Mandor @ 77,760.00 2,332.80
24 PINTU TRIPLEKS + FORMIKA/ RANGKA KAYU JATI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu JATI @ 27,264,600.00 534,386.16
0.3 kg Paku 1/2"- 1" @ 39,627.00 11,888.10
0.8 lt lem Kuning 'rajawali' @ 33,660.00 26,928.00
0.5 lbr Formika @ 53,550.00 26,775.00
1 kg Tripleks 4 mm @ 53,856.00 53,856.00
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2.5 Hr Tukang Kayu @ 90,720.00 226,800.00
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.04 Hr Mandor @ 77,760.00 3,110.40
25 PINTU TRIPLEKS + FORMIKA/ RANGKA KAYU KAMPER 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu KAMPER @ 3,366,000.00 65,973.60
0.3 kg Paku 1/2"- 1" @ 39,627.00 11,888.10
0.8 lt lem Kuning 'rajawali' @ 33,660.00 26,928.00
0.5 lbr Formika @ 53,550.00 26,775.00
1 kg Tripleks 4 mm @ 53,856.00 53,856.00
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2.5 Hr Tukang Kayu @ 90,720.00 226,800.00
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.04 Hr Mandor @ 77,760.00 3,110.40
26 PINTU TRIPLEKS + FORMIKA/ RANGKA KAYU MERANTI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu MERANTI @ 3,366,000.00 65,973.60
0.3 kg Paku 1/2"- 1" @ 39,627.00 11,888.10

Lembar ke 53 dari 350 halaman


0.8 lt lem Kuning 'rajawali' @ 33,660.00 26,928.00
0.5 lbr Formika @ 53,550.00 26,775.00
1 kg Tripleks 4 mm @ 53,856.00 53,856.00
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2.5 Hr Tukang Kayu @ 90,720.00 226,800.00
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.04 Hr Mandor @ 77,760.00 3,110.40
27 PINTU TEAKWOOD + FORMIKA/ RANGKA KAYU JATI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu JATI @ 27,264,600.00 534,386.16
0.3 kg Paku 1/2"- 1" @ 39,627.00 11,888.10
0.8 lt lem Kuning 'rajawali' @ 33,660.00 26,928.00
0.5 lbr Formika @ 53,550.00 26,775.00
1 kg Teakwood 4 mm @ 86,700.00 86,700.00
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2.5 Hr Tukang Kayu @ 90,720.00 226,800.00
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.04 Hr Mandor @ 77,760.00 3,110.40
28 PINTU TEAKWOOD + FORMIKA/ RANGKA KAYU KAMPER 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu KAMPER @ 3,366,000.00 65,973.60
0.3 kg Paku 1/2"- 1" @ 39,627.00 11,888.10
0.8 lt lem Kuning 'rajawali' @ 33,660.00 26,928.00
0.5 lbr Formika @ 53,550.00 26,775.00
1 kg Teakwood 4 mm @ 86,700.00 86,700.00
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2.5 Hr Tukang Kayu @ 90,720.00 226,800.00
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.04 Hr Mandor @ 77,760.00 3,110.40
29 PINTU TEAKWOOD + FORMIKA/ RANGKA KAYU MERANTI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu MERANTI @ 3,366,000.00 65,973.60
0.3 kg Paku 1/2"- 1" @ 39,627.00 11,888.10
0.8 lt lem Kuning 'rajawali' @ 33,660.00 26,928.00
0.5 lbr Formika @ 53,550.00 26,775.00
1 kg Teakwood 4 mm @ 86,700.00 86,700.00
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2.5 Hr Tukang Kayu @ 90,720.00 226,800.00
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.04 Hr Mandor @ 77,760.00 3,110.40
27 PINTU FORMIKA RANGKAP/ RANGKA KAYU JATI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu JATI @ 27,264,600.00 534,386.16
0.3 kg Paku 1/2"- 1" @ 39,627.00 11,888.10
1.2 lt lem Kuning 'rajawali' @ 33,660.00 40,392.00
1 lbr Formika @ 53,550.00 53,550.00
1 kg Teakwood 4 mm @ 86,700.00 86,700.00
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2.5 Hr Tukang Kayu @ 90,720.00 226,800.00
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.04 Hr Mandor @ 77,760.00 3,110.40
28 PINTU FORMIKA RANGKAP/ RANGKA KAYU KAMPER 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu KAMPER @ 3,366,000.00 65,973.60
0.3 kg Paku 1/2"- 1" @ 39,627.00 11,888.10
1.2 lt lem Kuning 'rajawali' @ 33,660.00 40,392.00
1 lbr Formika @ 53,550.00 53,550.00

Lembar ke 54 dari 350 halaman


1 kg Teakwood 4 mm @ 86,700.00 86,700.00
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2.5 Hr Tukang Kayu @ 90,720.00 226,800.00
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.04 Hr Mandor @ 77,760.00 3,110.40
29 PINTU FORMIKA RANGKAP/ RANGKA KAYU MERANTI 1m2
1 bh Pintu 90 x 220 m2 1.98
Bahan
0.0196 m3 Papan Kayu MERANTI @ 3,366,000.00 65,973.60
0.3 kg Paku 1/2"- 1" @ 39,627.00 11,888.10
1.2 lt lem Kuning 'rajawali' @ 33,660.00 40,392.00
1 lbr Formika @ 53,550.00 53,550.00
1 kg Teakwood 4 mm @ 86,700.00 86,700.00
Upah :
0.8 Hr Pekerja Terampil @ 64,800.00 51,840.00
2.5 Hr Tukang Kayu @ 90,720.00 226,800.00
0.25 Hr Kepala Tukang @ 103,680.00 25,920.00
0.04 Hr Mandor @ 77,760.00 3,110.40

PEKERJAAN KAYU U/ RANGKA ATAP


1 RANGKA KUDA-KUDA KAYU JATI 1m3
Bahan
1.1 m3 Kayu JATI @ 24,786,000.00 27,264,600.00
15 kg Besi Strip @ 10,327.50 154,912.50
0.8 kg Paku 2"- 5" @ 33,966.00 27,172.80
Upah :
4 Hr Pekerja Terampil @ 64,800.00 259,200.00
12 Hr Tukang Kayu @ 90,720.00 1,088,640.00
1.2 Hr Kepala Tukang @ 103,680.00 124,416.00
0.2 Hr Mandor @ 77,760.00 15,552.00
2 RANGKA KUDA-KUDA KAYU KAMPER 1m3
Bahan
1.1 m3 Kayu KAMPER @ 6,120,000.00 6,732,000.00
15 kg Besi Strip @ 10,327.50 154,912.50
0.8 kg Paku 2"- 5" @ 33,966.00 27,172.80
Upah :
4 Hr Pekerja Terampil @ 64,800.00 259,200.00
12 Hr Tukang Kayu @ 90,720.00 1,088,640.00
1.2 Hr Kepala Tukang @ 103,680.00 124,416.00
0.2 Hr Mandor @ 77,760.00 15,552.00
3 RANGKA KUDA-KUDA KAYU MERANTI 1m3
Bahan
1.1 m3 Kayu MERANTI @ 3,366,000.00 3,702,600.00
15 kg Besi Strip @ 10,327.50 154,912.50
0.8 kg Paku 2"- 5" @ 33,966.00 27,172.80
Upah :
4 Hr Pekerja Terampil @ 64,800.00 259,200.00
12 Hr Tukang Kayu @ 90,720.00 1,088,640.00
1.2 Hr Kepala Tukang @ 103,680.00 124,416.00
0.2 Hr Mandor @ 77,760.00 15,552.00
1 RANGKA KUDA-KUDA KAYU KRUING 1m3
Bahan
1.1 m3 Kayu KRUING @ 3,978,000.00 4,375,800.00
15 kg Besi Strip @ 10,327.50 154,912.50
0.8 kg Paku 2"- 5" @ 33,966.00 27,172.80
Upah :
4 Hr Pekerja Terampil @ 64,800.00 259,200.00
12 Hr Tukang Kayu @ 90,720.00 1,088,640.00
1.2 Hr Kepala Tukang @ 103,680.00 124,416.00
0.2 Hr Mandor @ 77,760.00 15,552.00
5 RANGKA KUDA-KUDA KAYU BENGKIRAI 1m3
Bahan
1.1 m3 Kayu BENGKIRAI @ 3,978,000.00 4,375,800.00
15 kg Besi Strip @ 10,327.50 154,912.50
0.8 kg Paku 2"- 5" @ 33,966.00 27,172.80

Lembar ke 55 dari 350 halaman


Upah :
4 Hr Pekerja Terampil @ 64,800.00 259,200.00
12 Hr Tukang Kayu @ 90,720.00 1,088,640.00
1.2 Hr Kepala Tukang @ 103,680.00 124,416.00
0.2 Hr Mandor @ 77,760.00 15,552.00
1 USUK-RENG U/ GENTENG KARANGPILANG KAYU KRUING 1m2
Bahan
0.012 m3 Usuk + reng @ 6,120,000.00 73,440.00
0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.005 Hr Mandor @ 77,760.00 388.80
8 USUK-RENG U/ GENTENG KODOK KAYU MERANTI 1m2
Bahan
0.012 m3 Usuk + reng Meranti @ 3,366,000.00 40,392.00
0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.005 Hr Mandor @ 77,760.00 388.80
9 USUK-RENG U/ GENTENG MONIER KAYU JATI 1m2
Bahan
0.014 m3 Usuk + reng JATI @ 27,264,600.00 381,704.40
0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.005 Hr Mandor @ 77,760.00 388.80
3 USUK-RENG U/ GENTENG MONIER KAYU KAMPER 1m2
Bahan
0.014 m3 Usuk + reng KAMPER @ 6,120,000.00 85,680.00
0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.005 Hr Mandor @ 77,760.00 388.80
11 USUK-RENG U/ GENTENG MONIER KAYU MERANTI 1m2
Bahan
0.014 m3 Usuk + reng Meranti @ 3,366,000.00 47,124.00
0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.005 Hr Mandor @ 77,760.00 388.80
12 USUK-RENG U/ GENTENG BETON KAYU MERANTI 1m2
Bahan
0.014 m3 Usuk + reng Meranti @ 3,366,000.00 47,124.00
0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.005 Hr Mandor @ 77,760.00 388.80
13 USUK-RENG U/ ATAP SIRAP KAYU KAMPER 1m2
Bahan
0.014 m3 Usuk + reng KAMPER @ 6,120,000.00 85,680.00
0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00

Lembar ke 56 dari 350 halaman


0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.005 Hr Mandor @ 77,760.00 388.80
2 ALUMUNIUM FOIL/ SISALATION 1m2
Bahan
1.05 m3 Alumunium Foil @ 7,068.60 7,422.03
0.015 kg Paku 2"- 5" @ 33,966.00 509.49
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.05 Hr Tukang Kayu @ 90,720.00 4,536.00
0.005 Hr Kepala Tukang @ 103,680.00 518.40
0.008 Hr Mandor @ 77,760.00 622.08
15 LISTPLANK PAPAN 3/20 KAYU JATI 1m'
Bahan
0.0072 m3 Papan 3/20 JATI @ 16,830,000.00 121,176.00
0.05 kg Paku 2"- 5" @ 33,966.00 1,698.30
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.2 Hr Tukang Kayu @ 90,720.00 18,144.00
0.025 Hr Kepala Tukang @ 103,680.00 2,592.00
0.005 Hr Mandor @ 77,760.00 388.80
3 LISTPLANK PAPAN 3/20 KAYU KAMPER 1m'
Bahan
0.0072 m3 Papan 3/20 KAMPER @ 3,366,000.00 24,235.20
0.05 kg Paku 2"- 5" @ 33,966.00 1,698.30
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.2 Hr Tukang Kayu @ 90,720.00 18,144.00
0.025 Hr Kepala Tukang @ 103,680.00 2,592.00
0.005 Hr Mandor @ 77,760.00 388.80
17 LISTPLANK PAPAN 3/30 KAYU JATI 1m'
Bahan
0.011 m3 Papan 3/30 JATI @ 16,830,000.00 185,130.00
0.05 kg Paku 2"- 5" @ 33,966.00 1,698.30
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.2 Hr Tukang Kayu @ 90,720.00 18,144.00
0.025 Hr Kepala Tukang @ 103,680.00 2,592.00
0.005 Hr Mandor @ 77,760.00 388.80
6 LISTPLANK PAPAN 3/30 KAYU KAMPER 1m'
Bahan
0.011 m3 Papan 3/30 KAMPER @ 3,366,000.00 37,026.00
0.05 kg Paku 2"- 5" @ 33,966.00 1,698.30
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.2 Hr Tukang Kayu @ 90,720.00 18,144.00
0.025 Hr Kepala Tukang @ 103,680.00 2,592.00
0.005 Hr Mandor @ 77,760.00 388.80
19 LISTPLANK PAPAN 2 X 3/20 KAYU JATI 1m'
Bahan
0.0145 m3 Papan 3/20 JATI @ 3,366,000.00 48,807.00
0.06 kg Paku 2"- 5" @ 33,966.00 2,037.96
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.25 Hr Tukang Kayu @ 90,720.00 22,680.00
0.025 Hr Kepala Tukang @ 103,680.00 2,592.00
0.075 Hr Mandor @ 77,760.00 5,832.00
7 LISTPLANK PAPAN 2 X 3/20 KAYU KAMPER 1m'
Bahan
0.0086 m3 Papan 3/20 KAMPER @ 3,366,000.00 28,947.60
0.06 kg Paku 2"- 5" @ 33,966.00 2,037.96
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.05 Hr Mandor @ 77,760.00 3,888.00
8 LISTPLANK PAPAN 2 X 2/20 KAYU KAMPER 1m'
Lembar ke 57 dari 350 halaman
Bahan
0.0088 m3 Papan 2/20 KAMPER @ 3,366,000.00 29,620.80
0.06 kg Paku 2"- 5" @ 33,966.00 2,037.96
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.05 Hr Mandor @ 77,760.00 3,888.00
22 LISTPLANK PAPAN 2 X 2/20 KAYU MERANTI 1m'
Bahan
0.0088 m3 Papan 2/20 MERANTI @ 7,068.60 62.20
0.06 kg Paku 2"- 5" @ 33,966.00 2,037.96
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.05 Hr Mandor @ 77,760.00 3,888.00

PEKERJAAN RANGKA ATAP BAJA


1 PEKERJAAN RANGKA BAJA CASTELA ( Las Litrik ) 1 kg
Bahan
1.1 kg Baja Profil @ 10,327.50 11,360.25
0.3 kg Elektroda @ 17,419.05 5,225.72
0.08 kg Meni besi @ 68,850.00 5,508.00
Upah :
0.006 Hr Pekerja Terampil @ 64,800.00 388.80
0.06 Hr Tukang Besi @ 90,720.00 5,443.20
0.006 Hr Kepala Tukang Besi @ 103,680.00 622.08
0.0003 Hr Mandor @ 77,760.00 23.33

PEKERJAAN KAYU U/ RANGKA PLAFOND DAN LIST


2 RANGKA PLAFOND 100 X 100 CM KAYU JATI 1m2
Bahan
0.012 m3 Usuk Kayu JATI @ 27,264,600.00 327,175.20
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.25 Hr Tukang Kayu @ 90,720.00 22,680.00
0.025 Hr Kepala Tukang @ 103,680.00 2,592.00
0.075 Hr Mandor @ 77,760.00 5,832.00
2 RANGKA PLAFOND 100 X 100 CM KAYU KAMPER 1m2
Bahan
0.012 m3 Usuk Kayu KAMPER @ 6,120,000.00 73,440.00
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.25 Hr Tukang Kayu @ 90,720.00 22,680.00
0.025 Hr Kepala Tukang @ 103,680.00 2,592.00
0.075 Hr Mandor @ 77,760.00 5,832.00
1 RANGKA PLAFOND 100 X 100 KAYU MERANTI 1m2
Bahan
0.012 m3 Usuk Kayu MERANTI @ 3,366,000.00 40,392.00
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.25 Hr Tukang Kayu @ 90,720.00 22,680.00
0.025 Hr Kepala Tukang @ 103,680.00 2,592.00
0.075 Hr Mandor @ 77,760.00 5,832.00
4 RANGKA PLAFOND 30 X 60 KAYU JATI 1m2
Bahan
0.023 m3 Usuk Kayu JATI @ 27,264,600.00 627,085.80
0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00

Lembar ke 58 dari 350 halaman


0.3 Hr Tukang Kayu @ 90,720.00 27,216.00
0.03 Hr Kepala Tukang @ 103,680.00 3,110.40
0.01 Hr Mandor @ 77,760.00 777.60
5 RANGKA PLAFOND 60 x 90 KAYU KAMPER 1m2
Bahan
0.01785 m3 Usuk Kayu KAMPER @ 6,120,000.00 109,242.00
0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.25 Hr Tukang Kayu @ 90,720.00 22,680.00
0.03 Hr Kepala Tukang @ 103,680.00 3,110.40
0.01 Hr Mandor @ 77,760.00 777.60
3 RANGKA PLAFOND 30 X 60 KAYU MERANTI 1m2
Bahan
0.023 m3 Usuk Kayu MERANTI @ 3,366,000.00 77,418.00
0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.3 Hr Tukang Kayu @ 90,720.00 27,216.00
0.03 Hr Kepala Tukang @ 103,680.00 3,110.40
0.01 Hr Mandor @ 77,760.00 777.60
7 RANGKA PLAFOND 30 X 30 KAYU JATI 1m2
Bahan
0.027 m3 Usuk Kayu JATI @ 27,264,600.00 736,144.20
0.2 kg Paku 2"- 5" @ 33,966.00 6,793.20
Upah :
0.25 Hr Pekerja Terampil @ 64,800.00 16,200.00
0.35 Hr Tukang Kayu @ 90,720.00 31,752.00
0.035 Hr Kepala Tukang @ 103,680.00 3,628.80
0.0125 Hr Mandor @ 77,760.00 972.00
8 RANGKA PLAFOND 30 X 30 KAYU KAMPER 1m2
Bahan
0.027 m3 Usuk Kayu KAMPER @ 6,120,000.00 165,240.00
0.2 kg Paku 2"- 5" @ 33,966.00 6,793.20
Upah :
0.25 Hr Pekerja Terampil @ 64,800.00 16,200.00
0.35 Hr Tukang Kayu @ 90,720.00 31,752.00
0.035 Hr Kepala Tukang @ 103,680.00 3,628.80
0.0125 Hr Mandor @ 77,760.00 972.00
4 RANGKA PLAFOND 30 X 30 KAYU MERANTI 1m2
Bahan
0.027 m3 Usuk Kayu MERANTI @ 3,366,000.00 90,882.00
0.2 kg Paku 2"- 5" @ 33,966.00 6,793.20
Upah :
0.25 Hr Pekerja Terampil @ 64,800.00 16,200.00
0.35 Hr Tukang Kayu @ 90,720.00 31,752.00
0.035 Hr Kepala Tukang @ 103,680.00 3,628.80
0.0125 Hr Mandor @ 77,760.00 972.00
4 LIST PLAFOND KAYU PROFIL 1m'
Bahan
1.05 m3 List Kayu PROFIL @ 11,475.00 12,048.75
0.03 kg Paku 2"- 5" @ 33,966.00 1,018.98
Upah :
0.021 Hr Pekerja Terampil @ 64,800.00 1,360.80
0.021 Hr Tukang Kayu @ 90,720.00 1,905.12
0.002 Hr Kepala Tukang @ 103,680.00 207.36
0.001 Hr Mandor @ 77,760.00 77.76
11 PASANG PLAFOND ETERNIT 1 X 1 1m'
Bahan
1.05 m3 List Kayu PROFIL @ 26,775.00 28,113.75
0.03 kg Paku 2"- 5" @ 33,966.00 1,018.98
Upah :
0.021 Hr Pekerja Terampil @ 64,800.00 1,360.80
0.021 Hr Tukang Kayu @ 90,720.00 1,905.12
0.002 Hr Kepala Tukang @ 103,680.00 207.36
0.001 Hr Mandor @ 77,760.00 77.76

Lembar ke 59 dari 350 halaman


1 PASANG PLAFOND ETERNIT GYPSUM BOARD 9 MM 1m2
a RANGKA PLAFOND 60/90 KAYU MERANTI 4/6 1m2
Bahan
0.01785 m3 Usuk Kayu Meranti 4/6 @ 3,366,000.00 60,083.10
0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.25 Hr Tukang Kayu @ 90,720.00 22,680.00
0.03 Hr Kepala Tukang @ 103,680.00 3,110.40
0.01 Hr Mandor @ 77,760.00 777.60
b PENUTUP PLAFOND GYPSUM 9 MM 1m2
Bahan
0.364 lbr GYPSUM BOARD "jayaboard" @ 47,430.00 17,264.52
0.11 bks Paku Gypsum @ 74,725.20 8,219.77
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.05 Hr Tukang Kayu @ 90,720.00 4,536.00
0.005 Hr Kepala Tukang @ 103,680.00 518.40
0.0005 Hr Mandor @ 77,760.00 38.88
2 #REF! 1m2
a RANGKA PLAFOND 60/90 KAYU MERANTI 4/6 0

0.01785 m3 Usuk Kayu Meranti 4/6 @ 3,366,000.00 60,083.10


0.15 kg Paku 2"- 5" @ 33,966.00 5,094.90

0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00


0.125 Hr Tukang Kayu @ 90,720.00 11,340.00
0.0015 Hr Kepala Tukang @ 103,680.00 155.52
0.005 Hr Mandor @ 77,760.00 388.80
b PENUTUP PLAFOND GYPSUM 9 MM 1m2
Bahan
0.1 lbr GYPSUM BOARD "jayaboard" @ 149,175.00 14,917.50
0.05 bks Paku Gypsum @ 6,426.00 321.30
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.05 Hr Tukang Kayu @ 90,720.00 4,536.00
0.005 Hr Kepala Tukang @ 103,680.00 518.40
0.0005 Hr Mandor @ 77,760.00 38.88

3 PASANG PLAFOND ETERNIT GYPSUM BOARD 9 MM 1m2


RANGKA PLAFOND 30 X 60 KAYU MERANTI 1m2
PENUTUP PLAFOND GYPSUM 9 MM 1m2
Bahan
0.364 lbr GYPSUM BOARD "jayaboard" @ 47,430.00 17,264.52
0.11 bks Paku Tripleks @ 74,725.20 8,219.77
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.05 Hr Tukang Kayu @ 90,720.00 4,536.00
0.005 Hr Kepala Tukang @ 103,680.00 518.40
0.0005 Hr Mandor @ 77,760.00 38.88

Lembar ke 60 dari 350 halaman


4 Drop Ceiling Siku 1m'
RANGKA PLAFOND 30 X 60 KAYU MERANTI 1m2
PENUTUP PLAFOND GYPSUM 9 MM 1m2
Bahan
0.1 lbr GYPSUM BOARD "jayaboard" @ 47,430.00 4,743.00
0.11 bks Paku Tripleks @ 74,725.20 8,219.77
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.05 Hr Tukang Kayu @ 90,720.00 4,536.00
0.005 Hr Kepala Tukang @ 103,680.00 518.40
0.0005 Hr Mandor @ 77,760.00 38.88

PEKERJAAN KAYU U/ RANGKA DINDING PEMISAH


1 RANGKA DINDING PARTISI KAYU KAMPER 1m2
Bahan
0.0195 m3 Usuk Kayu KAMPER @ 6,120,000.00 119,340.00
0.007 m3 Papan Kayu KAMPER @ 3,366,000.00 23,562.00
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.45 Hr Tukang Kayu @ 90,720.00 40,824.00
0.045 Hr Kepala Tukang @ 103,680.00 4,665.60
0.075 Hr Mandor @ 77,760.00 5,832.00
1 RANGKA DINDING PARTISI KAYU MERANTI 1m2
Bahan
0.0195 m3 Usuk Kayu MERANTI @ 3,366,000.00 65,637.00
0.007 m3 Papan Kayu MERANTI @ 3,825,000.00 26,775.00
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.45 Hr Tukang Kayu @ 90,720.00 40,824.00
0.045 Hr Kepala Tukang @ 103,680.00 4,665.60
0.075 Hr Mandor @ 77,760.00 5,832.00
3 RANGKA DINDING PARTISI KAYU KAMPER/TRIPLEKS RANGKA1m2
Bahan
0.0195 m3 Usuk Kayu KAMPER @ 6,120,000.00 119,340.00
0.007 m3 Papan Kayu KAMPER @ 3,366,000.00 23,562.00
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
0.56 ltr Lem Kuning 'RAJAWALI' @ 153,000.00 85,680.00
1 lbr Tripleks 4 mm @ 53,856.00 53,856.00
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.6 Hr Tukang Kayu @ 90,720.00 54,432.00
0.06 Hr Kepala Tukang @ 103,680.00 6,220.80
0.01 Hr Mandor @ 77,760.00 777.60
4 RANGKA DINDING PARTISI KAYU KAMPER/TEAKWOOD RANG 1m2
Bahan
0.0195 m3 Usuk Kayu KAMPER @ 6,120,000.00 119,340.00

Lembar ke 61 dari 350 halaman


0.007 m3 Papan Kayu KAMPER @ 3,366,000.00 23,562.00
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
0.56 ltr Lem Kuning 'RAJAWALI' @ 153,000.00 85,680.00
1 lbr TEAKWOOD 4 mm @ 53,856.00 53,856.00
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.6 Hr Tukang Kayu @ 90,720.00 54,432.00
0.06 Hr Kepala Tukang @ 103,680.00 6,220.80
0.01 Hr Mandor @ 77,760.00 777.60
5 RANGKA DINDING LAMBRIZIRING PAPAN JATI 1m2
Bahan
0.007 m3 Usuk Kayu JATI @ 27,264,600.00 190,852.20
0.1 m3 Paku 2"- 5" @ 33,966.00 3,396.60
0.15 kg Paku sekrup 3,5" @ -
Upah :
6 Hr Pekerja Terampil @ 64,800.00 388,800.00
20 Hr Tukang Kayu @ 90,720.00 1,814,400.00
2 Hr Kepala Tukang @ 103,680.00 207,360.00
0.3 Hr Mandor @ 77,760.00 23,328.00
2 PEMASANGAN TRIPLEKS U/ DINDING PARTISI 1m2
Bahan
1.2 m3 Tripleks 4 mm @ 53,856.00 64,627.20
0.3 kg Paku 2"- 5" @ 33,966.00 10,189.80
Upah :
6 Hr Pekerja Terampil @ 64,800.00 388,800.00
20 Hr Tukang Kayu @ 90,720.00 1,814,400.00
2 Hr Kepala Tukang @ 103,680.00 207,360.00
0.3 Hr Mandor @ 77,760.00 23,328.00
3 DINDING PARTISI RANGKA KAYU KAMPER/TRIPLEKS 4 MM/ T 1m2
Bahan
0.0195 m3 Usuk Kayu KAMPER @ 6,120,000.00 119,340.00
0.007 m3 Papan Kayu KAMPER @ 3,366,000.00 23,562.00
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
0.56 ltr Lem Kuning 'RAJAWALI' @ 153,000.00 85,680.00
0.36 lbr TEAKWOOD 4 mm @ 78,030.00 28,090.80
0.36 lbr Tripleks 4 mm @ 53,856.00 19,388.16
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.6 Hr Tukang Kayu @ 90,720.00 54,432.00
0.06 Hr Kepala Tukang @ 103,680.00 6,220.80
0.01 Hr Mandor @ 77,760.00 777.60
4 #REF! 1m2
5 DINDING PARTISI RANGKA KAYU KAMPER/TRIPLEKS 1m2
Bahan
0.0195 m3 Usuk Kayu KAMPER @ - -
0.007 m3 Papan Kayu KAMPER @ - -
0.1 kg Paku 2"- 5" @ - -
0.56 ltr Lem Kuning 'RAJAWALI' @ - -
0.36 lbr TEAKWOOD 4 mm @ 126,225.00 45,441.00
0.36 lbr Tripleks 4 mm @ 64,800.00 23,328.00
Upah :
0.2 Hr Pekerja Terampil @ 90,720.00 18,144.00
0.6 Hr Tukang Kayu @ 103,680.00 62,208.00
0.06 Hr Kepala Tukang @ 77,760.00 4,665.60
0.01 Hr Mandor @ - -

PEKERJAAN BETON (ADUKAN)


1 ADUKAN BETON TUMBUK 1 PC : 3 PS : 5 KR 1m3
Bahan
218 kg PC ( Gresik ) @ 1,040.40 226,807.20
0.52 m3 Pasir Beton @ 117,810.00 61,261.20
0.87 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 219,631.50
Upah :

Lembar ke 62 dari 350 halaman


1.65 Hr Pekerja Kasar @ 51,840.00 85,536.00
0.25 Hr Tukang Batu @ 77,760.00 19,440.00
0.025 Hr Kepala Tukang @ 90,720.00 2,268.00
0.08 Hr Mandor @ 77,760.00 6,220.80
2 ADUKAN BETON TUMBUK 1 PC : 3 PS : 6 KR 1m3
Bahan
197 kg PC ( Gresik ) @ 1,040.40 204,958.80
0.47 m3 Pasir Beton @ 117,810.00 55,370.70
0.94 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 237,303.00
Upah :
1.65 Hr Pekerja Kasar @ 51,840.00 85,536.00
0.25 Hr Tukang Batu @ 77,760.00 19,440.00
0.025 Hr Kepala Tukang @ 90,720.00 2,268.00
0.08 Hr Mandor @ 77,760.00 6,220.80
3 ADUKAN BETON TUMBUK 1 PC : 4 PS : 6 KR 1m3
Bahan
173 kg PC ( Gresik ) @ 1,040.40 179,989.20
0.57 m3 Pasir Beton @ 117,810.00 67,151.70
0.87 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 219,631.50
Upah :
1.65 Hr Pekerja Kasar @ 51,840.00 85,536.00
0.25 Hr Tukang Batu @ 77,760.00 19,440.00
0.025 Hr Kepala Tukang @ 90,720.00 2,268.00
0.08 Hr Mandor @ 77,760.00 6,220.80
1 ADUKAN BETON TUMBUK 1PC : 3PS : 5KR/LANTAI KERJA T. 5 1m2
HARGA PER M3 1m3
Bahan
10 kg PC ( Gresik ) @ 1,040.40 10,404.00
0.026 m3 Pasir Beton @ 117,810.00 3,063.06
0.044 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 11,107.80
Upah :
1.15 Hr Pekerja Kasar @ 51,840.00 59,616.00
0.02 Hr Tukang Batu @ 77,760.00 1,555.20
0.002 Hr Kepala Tukang @ 90,720.00 181.44
0.006 Hr Mandor @ 77,760.00 466.56
2 ADUKAN BETON STRUKTURAL 1 PC : 2 PS : 3 KR 1m3
Bahan
336 kg PC ( Gresik ) @ 1,040.40 349,574.40
0.54 m3 Pasir Beton @ 117,810.00 63,617.40
0.81 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 204,484.50
Upah :
2 Hr Pekerja Kasar @ 51,840.00 103,680.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kepala Tukang @ 90,720.00 3,175.20
1 Hr Mandor @ 77,760.00 77,760.00
6 ADUKAN BETON STRUKTURAL 1 PC : 2 PS : 4 KR 1m3
Bahan
291 kg PC ( Gresik ) @ 1,040.40 302,756.40
0.47 m3 Pasir Beton @ 117,810.00 55,370.70
0.93 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 234,778.50
Upah :
2 Hr Pekerja Kasar @ 51,840.00 103,680.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kepala Tukang @ 90,720.00 3,175.20
1 Hr Mandor @ 77,760.00 77,760.00
7 ADUKAN BETON STRUKTURAL 1 PC : 2 PS : 2,5 KR 1m3
Bahan
352 kg PC ( Gresik ) @ 1,040.40 366,220.80
0.56 m3 Pasir Beton @ 117,810.00 65,973.60
0.7 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 176,715.00
Upah :
2 Hr Pekerja Kasar @ 51,840.00 103,680.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kepala Tukang @ 90,720.00 3,175.20
1 Hr Mandor @ 77,760.00 77,760.00
8 ADUKAN BETON STRUKTURAL 1 PC : 1,5 PS : 3 KR 1m3

Lembar ke 63 dari 350 halaman


Bahan
367 kg PC ( Gresik ) @ 1,040.40 381,826.80
0.44 m3 Pasir Beton @ 117,810.00 51,836.40
0.88 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 222,156.00
Upah :
2 Hr Pekerja Kasar @ 51,840.00 103,680.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kepala Tukang @ 90,720.00 3,175.20
1 Hr Mandor @ 77,760.00 77,760.00
9 ADUKAN BETON STRUKTURAL 1 PC : 1,5 PS : 2,5 KR 1m3
Bahan
386 kg PC ( Gresik ) @ 1,040.40 401,594.40
0.47 m3 Pasir Beton @ 117,810.00 55,370.70
0.78 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 196,911.00
Upah :
2 Hr Pekerja Kasar @ 51,840.00 103,680.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kepala Tukang @ 90,720.00 3,175.20
1 Hr Mandor @ 77,760.00 77,760.00
10 ADUKAN BETON STRUKTURAL 1 PC : 1 PS : 2 KR 1m3
Bahan
479 kg PC ( Gresik ) @ 1,040.40 498,351.60
0.37 m3 Pasir Beton @ 117,810.00 43,589.70
0.74 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 186,813.00
Upah :
2 Hr Pekerja Kasar @ 51,840.00 103,680.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kepala Tukang @ 90,720.00 3,175.20
1 Hr Mandor @ 77,760.00 77,760.00
3 ADUKAN BETON U/ TIANG PANCANG PRESTRESSED 1m3
Bahan
440 kg PC ( Gresik ) @ 1,040.40 457,776.00
0.5 m3 Pasir Beton @ 117,810.00 58,905.00
0.8 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 201,960.00
2.46 gln Rapidrant @ 252,450.00 621,027.00
Upah :
2 Hr Pekerja Kasar @ 51,840.00 103,680.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kepala Tukang @ 90,720.00 3,175.20
1 Hr Mandor @ 77,760.00 77,760.00
12 ADUKAN BETON + PUZZDITH -100 XR 1m3
Bahan
336 kg PC ( Gresik ) @ 1,040.40 349,574.40
0.54 m3 Pasir Beton @ 117,810.00 63,617.40
0.81 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 204,484.50
1 Ltr Puzzdith - 100 XR @ 252,450.00 252,450.00
Upah :
2 Hr Pekerja Kasar @ 51,840.00 103,680.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kepala Tukang @ 90,720.00 3,175.20
1 Hr Mandor @ 77,760.00 77,760.00
13 ADUKAN BETON KEDAP AIR + STROROX - 100 1m3
Bahan
400 kg PC ( Gresik ) @ 1,040.40 416,160.00
0.48 m3 Pasir Beton @ 117,810.00 56,548.80
0.8 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 201,960.00
1.2 kg Strorox-100 @ 252,450.00 302,940.00
Upah :
2 Hr Pekerja Kasar @ 51,840.00 103,680.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kepala Tukang @ 90,720.00 3,175.20
1 Hr Mandor @ 77,760.00 77,760.00
4 ADUKAN BETON MUTU K 225 1m3
Bahan
388 kg PC ( Gresik ) @ 1,040.40 403,675.20
0.65 m3 Pasir Beton @ 117,810.00 76,576.50

Lembar ke 64 dari 350 halaman


0.65 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 164,092.50
Upah :
6 Hr Pekerja Kasar @ 51,840.00 311,040.00
1 Hr Tukang Batu @ 77,760.00 77,760.00
0.1 Hr Kepala Tukang @ 90,720.00 9,072.00
0.3 Hr Mandor @ 77,760.00 23,328.00
5 ADUKAN BETON MUTU K 275 1m3
Bahan
400 kg PC ( Gresik ) @ 1,040.40 416,160.00
0.4 m3 Pasir Beton @ 117,810.00 47,124.00
0.62 m3 Batu Kali Pecah Mesin 2/3 @ 252,450.00 156,519.00
Upah :
6 Hr Pekerja Kasar @ 51,840.00 311,040.00
1 Hr Tukang Batu @ 77,760.00 77,760.00
0.1 Hr Kepala Tukang @ 90,720.00 9,072.00
0.3 Hr Mandor @ 77,760.00 23,328.00

1 PEMASANGAN PVC WATERSTOP LEBAR 150 1m'


Bahan
1050 m1 Waterstop Lebar 150 mm @ -
Upah :
0.55 Hr Pekerja Kasar @ 51,840.00 28,512.00
0.035 Hr Tukang Batu @ 77,760.00 2,721.60
0.0035 Hr Kepala Tukang @ 90,720.00 317.52
0.003 Hr Mandor @ 77,760.00 233.28
2 PEMASANGAN PVC WATERSTOP LEBAR 200 1m'
Bahan
1050 m1 Waterstop Lebar 200 mm @ -
Upah :
0.55 Hr Pekerja Kasar @ 51,840.00 28,512.00
0.035 Hr Tukang Batu @ 77,760.00 2,721.60
0.0035 Hr Kepala Tukang @ 90,720.00 317.52
0.003 Hr Mandor @ 77,760.00 233.28
3 PEMASANGAN PVC WATERSTOP LEBAR 230 1m'
Bahan
1050 m1 Waterstop Lebar 230 mm @ -
Upah :
0.55 Hr Pekerja Kasar @ 51,840.00 28,512.00
0.035 Hr Tukang Batu @ 77,760.00 2,721.60
0.0035 Hr Kepala Tukang @ 90,720.00 317.52
0.003 Hr Mandor @ 77,760.00 233.28
4 PEMASANGAN PVC WATERSTOP LEBAR 250 1m'
Bahan
1050 m1 Waterstop Lebar 250 mm @ -
Upah :
0.55 Hr Pekerja Kasar @ 51,840.00 28,512.00
0.035 Hr Tukang Batu @ 77,760.00 2,721.60
0.0035 Hr Kepala Tukang @ 90,720.00 317.52
0.003 Hr Mandor @ 77,760.00 233.28
5 PEMASANGAN PVC WATERSTOP LEBAR 300 1m'
Bahan
1050 m1 Waterstop Lebar 300 mm @ -
Upah :
0.55 Hr Pekerja Kasar @ 51,840.00 28,512.00
0.035 Hr Tukang Batu @ 77,760.00 2,721.60
0.0035 Hr Kepala Tukang @ 90,720.00 317.52
0.003 Hr Mandor @ 77,760.00 233.28
6 PEMASANGAN PVC WATERSTOP LEBAR 320 1m'
Bahan
1050 m1 Waterstop Lebar 320 mm @ -
Upah :
0.55 Hr Pekerja Kasar @ 51,840.00 28,512.00
0.035 Hr Tukang Batu @ 77,760.00 2,721.60
0.0035 Hr Kepala Tukang @ 90,720.00 317.52
0.003 Hr Mandor @ 77,760.00 233.28

Lembar ke 65 dari 350 halaman


PEKERJAAN BETON (PEMBESIAN)
1 PEMBESIAN BETON DENGAN BESI POLOS 1kg
Bahan
1.05 kg Besi Tulangan Polos @ 8,500.00 8,925.00
0.015 kg Kawat Bendrat @ 20,884.50 313.27
Upah :
2 Hr Pekerja Kasar @ 51,840.00 103,680.00
0.35 Hr Tukang Besi @ 90,720.00 31,752.00
0.035 Hr Kepala Tukang @ 90,720.00 3,175.20
1 Hr Mandor @ 77,760.00 77,760.00
2 PEMBESIAN BETON DENGAN BESI ULIR 1kg
Bahan
1.05 kg Besi Tulangan Ulir @ 11,050.00 11,602.50
0.015 kg Kawat Bendrat @ 20,884.50 313.27
Upah :
0.007 Hr Pekerja Terampil @ 51,840.00 362.88
0.007 Hr Tukang Besi @ 77,760.00 544.32
0.0007 Hr Kepala Tukang @ 90,720.00 63.50
0.0003 Hr Mandor @ 77,760.00 23.33
2 PEMBESIAN BETON DENGAN KABEL PRESTRESSED P 1kg
Bahan
1.05 kg Besi Prestressed Polos @ 11,050.00 11,602.50
0.01 kg Kawat Bendrat @ 20,884.50 208.85
Upah :
0.007 Hr Pekerja Terampil @ 51,840.00 362.88
0.007 Hr Tukang Besi @ 77,760.00 544.32
0.0007 Hr Kepala Tukang @ 90,720.00 63.50
0.0003 Hr Mandor @ 77,760.00 23.33
2 PEMBESIAN BETON DENGAN JARING KAWAT BAJA 1kg
Bahan
1.05 kg Besi Jaring Kawat Baja @ 8,500.00 8,925.00
0.015 kg Kawat Bendrat @ 20,884.50 313.27
Upah :
0.007 Hr Pekerja Terampil @ 51,840.00 362.88
0.007 Hr Tukang Besi @ 77,760.00 544.32
0.0007 Hr Kepala Tukang @ 90,720.00 63.50
0.0003 Hr Mandor @ 77,760.00 23.33

PEKERJAAN BETON (BEKISTING)


1 PEKERJAAN BEKISTING U/ PONDASI 1m2
Bahan
0.04 m3 Papan Kayu Dadap @ 994,500.00 39,780.00
0.3 kg Paku 2" - 5" @ 33,966.00 10,189.80
0.1 Ltr Solar @ 5,049.00 504.90
Upah :
0.3 Hr Pekerja Kasar @ 51,840.00 15,552.00
0.26 Hr Tukang Kayu @ 90,720.00 23,587.20
0.026 Hr Kepala Tukang @ 103,680.00 2,695.68
0.005 Hr Mandor @ 77,760.00 388.80
2 PEKERJAAN BEKISTING U/ SLOOF 1m2
Bahan
0.045 m3 Papan Kayu Dadap @ 994,500.00 44,752.50
0.3 kg Paku 2" - 5" @ 33,966.00 10,189.80
0.1 Ltr Solar @ 5,049.00 504.90
Upah :
0.3 Hr Pekerja Kasar @ 51,840.00 15,552.00
0.26 Hr Tukang Kayu @ 90,720.00 23,587.20
0.026 Hr Kepala Tukang @ 103,680.00 2,695.68
0.005 Hr Mandor @ 77,760.00 388.80
3 PEKERJAAN BEKISTING U/ KOLOM 1m2
Bahan
0.04 m3 Papan Kayu Dadap @ 994,500.00 39,780.00
0.4 kg Paku 2" - 5" @ 33,966.00 13,586.40
0.2 Ltr Solar @ 5,049.00 1,009.80

Lembar ke 66 dari 350 halaman


0.015 M3 Usuk Meranti 4/6 @ 3,366,000.00 50,490.00
0.35 Lbr Tripleks 9 mm @ 133,875.00 46,856.25
2 bt Dolken Kayu d. 8-10/4 @ -
Upah :
0.3 Hr Pekerja Kasar @ 51,840.00 15,552.00
0.33 Hr Tukang Kayu @ 90,720.00 29,937.60
0.033 Hr Kepala Tukang @ 103,680.00 3,421.44
0.006 Hr Mandor @ 77,760.00 466.56
4 PEKERJAAN BEKISTING U/ KOLOM 1m2
Bahan
0.04 m3 Papan Kayu Dadap @ 994,500.00 39,780.00
0.4 kg Paku 2" - 5" @ 33,966.00 13,586.40
0.2 Ltr Solar @ 5,049.00 1,009.80
0.18 M3 Usuk Meranti 4/6 @ 3,366,000.00 605,880.00
0.35 Lbr Tripleks 9 mm @ 133,875.00 46,856.25
2 bt Dolken Kayu d. 8-10/4 @ 24,480.00 48,960.00
Upah :
0.32 Hr Pekerja Kasar @ 51,840.00 16,588.80
0.33 Hr Tukang Kayu @ 90,720.00 29,937.60
0.033 Hr Kepala Tukang @ 103,680.00 3,421.44
0.006 Hr Mandor @ 77,760.00 466.56
5 PEKERJAAN BEKISTING U/ PLAT LANTAI 1m2
Bahan
0.04 m3 Papan Kayu Dadap @ 994,500.00 39,780.00
0.4 kg Paku 2" - 5" @ 33,966.00 13,586.40
0.2 Ltr Solar @ 5,049.00 1,009.80
0.015 M3 Usuk Meranti 4/6 @ 3,366,000.00 50,490.00
0.35 Lbr Tripleks 9 mm @ 133,875.00 46,856.25
6 bt Dolken Kayu d. 8-10/4 @ 24,480.00 146,880.00
Upah :
0.32 Hr Pekerja Kasar @ 51,840.00 16,588.80
0.33 Hr Tukang Kayu @ 90,720.00 29,937.60
0.033 Hr Kepala Tukang @ 103,680.00 3,421.44
0.006 Hr Mandor @ 77,760.00 466.56
6 PEKERJAAN BEKISTING U/ DINDING 1m2
Bahan
0.03 m3 Papan Kayu Dadap @ 994,500.00 29,835.00
0.4 kg Paku 2" - 5" @ 33,966.00 13,586.40
0.2 Ltr Solar @ 5,049.00 1,009.80
0.02 M3 Usuk Meranti 4/6 @ 3,366,000.00 67,320.00
0.35 Lbr Tripleks 9 mm @ 133,875.00 46,856.25
3 bt Dolken Kayu d. 8-10/4 @ 24,480.00 73,440.00
4 bt Pengaku jarak/Spacer @ -
Upah :
0.32 Hr Pekerja Kasar @ 51,840.00 16,588.80
0.33 Hr Tukang Kayu @ 90,720.00 29,937.60
0.033 Hr Kepala Tukang @ 103,680.00 3,421.44
0.006 Hr Mandor @ 77,760.00 466.56
7 PEKERJAAN BEKISTING U/ TANGGA 1m2
Bahan
0.03 m3 Papan Kayu Dadap @ 994,500.00 29,835.00
0.4 kg Paku 2" - 5" @ 33,966.00 13,586.40
0.15 Ltr Solar @ 5,049.00 757.35
0.015 M3 Usuk Meranti 4/6 @ 3,366,000.00 50,490.00
0.35 Lbr Tripleks 9 mm @ 133,875.00 46,856.25
2 bt Dolken Kayu d. 8-10/4 @ 24,480.00 48,960.00
Upah :
0.32 Hr Pekerja Kasar @ 51,840.00 16,588.80
0.33 Hr Tukang Kayu @ 90,720.00 29,937.60
0.033 Hr Kepala Tukang @ 103,680.00 3,421.44
0.006 Hr Mandor @ 77,760.00 466.56
8 PEKERJAAN BEKISTING U/ TANGGA 1m2
Bahan
0.0264 m3 Papan Kayu Dadap @ 994,500.00 26,254.80
0.6 kg Paku 2" - 5" @ 33,966.00 20,379.60
0.5 bt Dolken Kayu d. 8-10/4 @ 24,480.00 12,240.00

Lembar ke 67 dari 350 halaman


Upah :
0.15 Hr Pekerja Kasar @ 51,840.00 7,776.00
0.05 Hr Tukang Kayu @ 90,720.00 4,536.00
0.005 Hr Kepala Tukang @ 103,680.00 518.40
0.007 Hr Mandor @ 77,760.00 544.32

PEKERJAAN BETON (TOTAL)


1 PONDASI STROUSS BETON BERTULANG ( BESI 150 KG ) 1m3
Bahan
150 kg Besi Tulangan @ 8,500.00 1,275,000.00
2.25 kg Kawat Bendrat @ 20,884.50 46,990.13
323 kg PC (Gresik) @ 1,040.40 336,049.20
0.52 m3 Pasir Beton @ 117,810.00 61,261.20
0.78 m3 Batu Pecah Tangan 2/3 @ 252,450.00 196,911.00
Upah :
3.9 Hr Pekerja Kasar @ 51,840.00 202,176.00
1.04 Hr Tukang Kayu @ 90,720.00 94,348.80
1.05 Hr Tukang Besi @ 77,760.00 81,648.00
0.245 Hr Kepala Tukang @ 103,680.00 25,401.60
0.165 Hr Mandor @ 77,760.00 12,830.40
2 PONDASI BETON BERTULANG K-225 ( BESI 200 KG + BEKISTING ) 1m3
Bahan
0.2 m3 Papan Kayu Dadap @ 994,500.00 198,900.00
1.5 kg Paku 2" - 5" @ 33,966.00 50,949.00
0.4 Ltr Solar @ 5,049.00 2,019.60
200 kg Besi Tulangan @ 8,500.00 1,700,000.00
2.25 kg Kawat Bendrat @ 20,884.50 46,990.13
388 kg PC (Gresik) @ 1,040.40 403,675.20
0.65 m3 Pasir Beton @ 117,810.00 76,576.50
0.65 m3 Batu Pecah Tangan 2/3 @ 252,450.00 164,092.50
Upah :
3.9 Hr Pekerja Kasar @ 51,840.00 202,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
1.04 Hr Tukang Kayu @ 90,720.00 94,348.80
1.05 Hr Tukang Besi @ 77,760.00 81,648.00
0.245 Hr Kepala Tukang @ 103,680.00 25,401.60
0.165 Hr Mandor @ 77,760.00 12,830.40
3 SLOOF BETON BERTULANG K-225 ( BESI 200 KG + BEKISTING ) 1m3
Bahan
0.27 m3 Papan Kayu Dadap @ 994,500.00 268,515.00
2 kg Paku 2" - 5" @ 33,966.00 67,932.00
0.6 Ltr Solar @ 5,049.00 3,029.40
200 kg Besi Tulangan @ 8,500.00 1,700,000.00
3 kg Kawat Bendrat @ 20,884.50 62,653.50
388 kg PC (Gresik) @ 1,040.40 403,675.20
0.65 m3 Pasir Beton @ 117,810.00 76,576.50
0.65 m3 Batu Pecah Tangan 2/3 @ 252,450.00 164,092.50
Upah :
4.85 Hr Pekerja Kasar @ 51,840.00 251,424.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
1.56 Hr Tukang Kayu @ 90,720.00 141,523.20
1.4 Hr Tukang Besi @ 77,760.00 108,864.00
0.331 Hr Kepala Tukang @ 103,680.00 34,318.08
0.17 Hr Mandor @ 77,760.00 13,219.20
4 KOLOM BETON BERTULANG K-225 ( BESI 300 KG + BEKISTING ) 1m3
Bahan
0.4 m3 Papan Kayu Dadap @ 994,500.00 397,800.00
4 kg Paku 2" - 5" @ 33,966.00 135,864.00
2 Ltr Solar @ 5,049.00 10,098.00
300 kg Besi Tulangan @ 8,500.00 2,550,000.00
4.5 kg Kawat Bendrat @ 20,884.50 93,980.25
388 kg PC (Gresik) @ 1,040.40 403,675.20
0.65 m3 Pasir Beton @ 117,810.00 76,576.50
0.65 m3 Batu Pecah Tangan 2/3 @ 252,450.00 164,092.50
0.15 M3 Usuk Meranti 4/6 @ 3,366,000.00 504,900.00
3.5 Lbr Tripleks 9 mm @ 133,875.00 468,562.50

Lembar ke 68 dari 350 halaman


20 bt Dolken Kayu d. 8-10/4 @ 24,480.00 489,600.00
Upah :
7.3 Hr Pekerja Kasar @ 51,840.00 378,432.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
3.3 Hr Tukang Kayu @ 90,720.00 299,376.00
2.1 Hr Tukang Besi @ 77,760.00 163,296.00
0.57 Hr Kepala Tukang @ 103,680.00 59,097.60
0.25 Hr Mandor @ 77,760.00 19,440.00
5 BALOK BETON BERTULANG K-225 ( BESI 300 KG + BEKISTING ) 1m3
Bahan
0.32 m3 Papan Kayu Dadap @ 994,500.00 318,240.00
3.2 kg Paku 2" - 5" @ 33,966.00 108,691.20
1.6 Ltr Solar @ 5,049.00 8,078.40
300 kg Besi Tulangan @ 8,500.00 2,550,000.00
3 kg Kawat Bendrat @ 20,884.50 62,653.50
388 kg PC (Gresik) @ 1,040.40 403,675.20
0.65 m3 Pasir Beton @ 117,810.00 76,576.50
0.65 m3 Batu Pecah Tangan 2/3 @ 252,450.00 164,092.50
0.14 M3 Usuk Meranti 4/6 @ 3,366,000.00 471,240.00
2.8 Lbr Tripleks 9 mm @ 133,875.00 374,850.00
16 bt Dolken Kayu d. 8-10/4 @ 24,480.00 391,680.00
Upah :
5.96 Hr Pekerja Kasar @ 51,840.00 308,966.40
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
2.8 Hr Tukang Kayu @ 90,720.00 254,016.00
1.4 Hr Tukang Besi @ 77,760.00 108,864.00
0.45 Hr Kepala Tukang @ 103,680.00 46,656.00
0.208 Hr Mandor @ 77,760.00 16,174.08
6 BALOK BETON BERTULANG K-225( BESI 200 KG + BEKISTING ) 1m3
Bahan
0.32 m3 Papan Kayu Dadap @ 994,500.00 318,240.00
3.2 kg Paku 2" - 5" @ 33,966.00 108,691.20
1.6 Ltr Residu @ 5,049.00 8,078.40
200 kg Besi Tulangan @ 8,500.00 1,700,000.00
2.25 kg Kawat Bendrat @ 20,884.50 46,990.13
388 kg PC (Gresik) @ 1,040.40 403,675.20
0.65 m3 Pasir Beton @ 117,810.00 76,576.50
0.65 m3 Batu Pecah Tangan 2/3 @ 252,450.00 164,092.50
0.12 M3 Usuk Meranti 4/6 @ 3,366,000.00 403,920.00
2.6 Lbr Tripleks 9 mm @ 133,875.00 348,075.00
32 bt Dolken Kayu d. 8-10/4 @ 24,480.00 783,360.00
Upah :
5.8 Hr Pekerja Kasar @ 51,840.00 300,672.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
2.8 Hr Tukang Kayu @ 90,720.00 254,016.00
1.05 Hr Tukang Besi @ 77,760.00 81,648.00
0.42 Hr Kepala Tukang @ 103,680.00 43,545.60
0.185 Hr Mandor @ 77,760.00 14,385.60
7 DINDING BETON BERTULANG K-225 ( BESI 150 KG + BEKISTING ) 1m3
Bahan
0.24 m3 Papan Kayu Dadap @ 994,500.00 238,680.00
3.2 kg Paku 2" - 5" @ 33,966.00 108,691.20
1.6 Ltr Solar @ 5,049.00 8,078.40
150 kg Besi Tulangan @ 8,500.00 1,275,000.00
2.25 kg Kawat Bendrat @ 20,884.50 46,990.13
388 kg PC (Gresik) @ 1,040.40 403,675.20
0.65 m3 Pasir Beton @ 117,810.00 76,576.50
0.65 m3 Batu Pecah Tangan 2/3 @ 252,450.00 164,092.50
0.16 M3 Usuk Meranti 4/6 @ 3,366,000.00 538,560.00
2.8 Lbr Tripleks 9 mm @ 133,875.00 374,850.00
24 bt Dolken Kayu d. 8-10/4 @ 24,480.00 587,520.00
Upah :
5.6 Hr Pekerja Kasar @ 51,840.00 290,304.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
2.64 Hr Tukang Kayu @ 90,720.00 239,500.80
1.05 Hr Tukang Besi @ 77,760.00 81,648.00
0.4 Hr Kepala Tukang @ 103,680.00 41,472.00
Lembar ke 69 dari 350 halaman
0.193 Hr Mandor @ 77,760.00 15,007.68
8 TANGGA BETON BERTULANG K-225 ( BESI 200 KG + BEKISTING ) 1m3
Bahan
0.25 m3 Papan Kayu Dadap @ 994,500.00 248,625.00
3 kg Paku 2" - 5" @ 33,966.00 101,898.00
1.2 Ltr Residu @ 5,049.00 6,058.80
200 kg Besi Tulangan @ 8,500.00 1,700,000.00
3 kg Kawat Bendrat @ 20,884.50 62,653.50
388 kg PC (Gresik) @ 1,040.40 403,675.20
0.65 m3 Pasir Beton @ 117,810.00 76,576.50
0.65 m3 Batu Pecah Tangan 2/3 @ 252,450.00 164,092.50
0.15 M3 Usuk Meranti 4/6 @ 3,366,000.00 504,900.00
2.5 Lbr Tripleks 9 mm @ 133,875.00 334,687.50
14 bt Dolken Kayu d. 8-10/4 @ 24,480.00 342,720.00
Upah :
5.6 Hr Pekerja Kasar @ 51,840.00 290,304.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
2.3 Hr Tukang Kayu @ 90,720.00 208,656.00
1.4 Hr Tukang Besi @ 77,760.00 108,864.00
0.405 Hr Kepala Tukang @ 103,680.00 41,990.40
0.202 Hr Mandor @ 77,760.00 15,707.52
9 KOLOM PRAKTIS BETON BERTULANG ( 11 X 11 ) 1m'
HARGA PER M3 4,401,467.36
Bahan
0.002 m3 Papan Kayu Dadap @ 994,500.00 1,989.00
0.01 kg Paku 2" - 5" @ 33,966.00 339.66
3 kg Besi Tulangan @ 8,500.00 25,500.00
0.45 kg Kawat Bendrat @ 20,884.50 9,398.03
4 kg PC (Gresik) @ 1,040.40 4,161.60
0.006 m3 Pasir Beton @ 117,810.00 706.86
0.009 m3 Batu Pecah Tangan 2/3 @ 252,450.00 2,272.05
Upah :
0.06 Hr Pekerja Kasar @ 51,840.00 3,110.40
0.02 Hr Tukang Batu @ 77,760.00 1,555.20
0.02 Hr Tukang Kayu @ 90,720.00 1,814.40
0.02 Hr Tukang Besi @ 77,760.00 1,555.20
0.006 Hr Kepala Tukang @ 103,680.00 622.08
0.003 Hr Mandor @ 77,760.00 233.28
10 BALOK PRAKTIS BETON BERTULANG ( 10 X 15 ) 1m'
HARGA PER M3 m3 3,550,517.00
Bahan
0.002 m3 Papan Kayu Dadap @ 994,500.00 1,989.00
0.01 kg Paku 2" - 5" @ 33,966.00 339.66
3 kg Besi Tulangan @ 8,500.00 25,500.00
0.45 kg Kawat Bendrat @ 20,884.50 9,398.03
4 kg PC (Gresik) @ 1,040.40 4,161.60
0.006 m3 Pasir Beton @ 117,810.00 706.86
0.009 m3 Batu Pecah Tangan 2/3 @ 252,450.00 2,272.05
Upah :
0.06 Hr Pekerja Kasar @ 51,840.00 3,110.40
0.02 Hr Tukang Batu @ 77,760.00 1,555.20
0.02 Hr Tukang Kayu @ 90,720.00 1,814.40
0.02 Hr Tukang Besi @ 77,760.00 1,555.20
0.006 Hr Kepala Tukang @ 103,680.00 622.08
0.003 Hr Mandor @ 77,760.00 233.28
11 PLAT LANTAI BETON BERTULANG K-225 ( BESI 200 KG + BEKISTING ) 1m3
Bahan
0.32 m3 Papan Kayu Dadap @ 994,500.00 318,240.00
3.2 kg Paku 2" - 5" @ 33,966.00 108,691.20
1.6 Ltr Solar @ 5,049.00 8,078.40
200 kg Besi Tulangan @ 8,500.00 1,700,000.00
2 kg Kawat Bendrat @ 20,884.50 41,769.00
388 kg PC (Gresik) @ 1,040.40 403,675.20
0.65 m3 Pasir Beton @ 117,810.00 76,576.50
0.65 m3 Batu Pecah Tangan 2/3 @ 252,450.00 164,092.50
0.24 M3 Usuk Meranti 4/6 @ 3,366,000.00 807,840.00

Lembar ke 70 dari 350 halaman


2.8 Lbr Tripleks 9 mm @ 133,875.00 374,850.00
48 bt Dolken Kayu d. 8-10/4 @ 24,480.00 1,175,040.00
Upah :
5.96 Hr Pekerja Kasar @ 51,840.00 308,966.40
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
2.8 Hr Tukang Kayu @ 90,720.00 254,016.00
1.4 Hr Tukang Besi @ 77,760.00 108,864.00
0.45 Hr Kepala Tukang @ 103,680.00 46,656.00
0.208 Hr Mandor @ 77,760.00 16,174.08
PEKERJAAN PENUTUP ATAP
1 ATAP GENTENG KARANG PILANG 1m2
Bahan
25 bh Genteng KARANG PILANG (Bambe ) @ 2,958.00 73,950.00
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
1 ATAP GENTENG KERAMIK CANMURI 1m2
Bahan
16 bh Genteng Keramik CANMURI @ 8,262.00 132,192.00
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.06 Hr Tukang Kayu @ 90,720.00 5,443.20
0.006 Hr Kepala Tukang @ 103,680.00 622.08
0.008 Hr Mandor @ 77,760.00 622.08
3 ATAP GENTENG KODOK 1m2
Bahan
25 bh Genteng KODOK @ -
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
4 ATAP GENTENG BETON 1m2
Bahan
11 bh Genteng BETON @ -
0.03 kg Paku 2"- 5" @ -
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.01 Hr Mandor @ 77,760.00 777.60
5 ATAP GENTENG ASPAL 1m2
Bahan
11 bh Genteng ASPAL @ -
0.35 lbr Tripleks 6 mm @ -
0.03 kg Paku 2"- 5" @ -
0.5 kg Plastik aerator @ -
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.3 Hr Tukang Kayu @ 90,720.00 27,216.00
0.003 Hr Kepala Tukang @ 103,680.00 311.04
0.01 Hr Mandor @ 77,760.00 777.60
6 ATAP GENTENG METAL 1m2
Bahan
1.02 lbr Genteng METAL @ -
0.2 kg Paku 2"- 5" @ -
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.01 Hr Mandor @ 77,760.00 777.60
7 ATAP ASBES GELOMBANG (250 X 92 CM )X 5 MM 1m2
Bahan
0.5 lbr Asbes Gelombang @ -

Lembar ke 71 dari 350 halaman


0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
8 ATAP ASBES GELOMBANG (225 X 92 CM )X 5 MM 1m2
Bahan
0.6 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
9 ATAP ASBES GELOMBANG (200 X 92 CM )X 5 MM 1m2
Bahan
0.6 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
10 ATAP ASBES GELOMBANG (180 X 92 CM )X 5 MM 1m2
Bahan
0.75 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
11 ATAP ASBES GELOMBANG (300 X 92 CM )X 5 MM 1m2
Bahan
0.35 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
12 ATAP ASBES GELOMBANG (270 X 92 CM )X 5 MM 1m2
Bahan
0.42 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
13 ATAP ASBES GELOMBANG (240 X 105 CM )X 5 MM 1m2
Bahan
0.44 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
14 ATAP ASBES GELOMBANG (210 X 105 CM )X 5 MM 1m2
Bahan
0.51 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00

Lembar ke 72 dari 350 halaman


0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
15 ATAP ASBES GELOMBANG (150 X 105 CM )X 5 MM 1m2
Bahan
0.8 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
16 ATAP ASBES GELOMBANG (270 X 105 CM )X 5 MM 1m2
Bahan
0.42 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
17 ATAP ASBES GELOMBANG (240 X 105 CM )X 5 MM 1m2
Bahan
0.44 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
18 ATAP ASBES GELOMBANG (210 X 105 CM )X 5 MM 1m2
Bahan
0.51 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
19 ATAP ASBES GELOMBANG (150 X 105 CM )X 5 MM 1m2
Bahan
0.8 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
20 ATAP ASBES GELOMBANG (270 X 92 CM )X 5 MM 1m2
Bahan
0.42 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
22 ATAP ASBES GELOMBANG (270 X 92 CM )X 5 MM 1m2
Bahan
0.42 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
21 ATAP ASBES GELOMBANG (270 X 92 CM )X 5 MM 1m2
Bahan

Lembar ke 73 dari 350 halaman


0.42 lbr Asbes Gelombang @ -
0.12 kg Paku Pancing 60 x 230 @ -
Upah :
0.14 Hr Pekerja Terampil @ 64,800.00 9,072.00
0.075 Hr Tukang Kayu @ 90,720.00 6,804.00
0.008 Hr Kepala Tukang @ 103,680.00 829.44
0.008 Hr Mandor @ 77,760.00 622.08
1 ATAP SENG GELOMBANG 1m2
Bahan
0.7 lbr Seng Gelombang 3"x6" bkls 28 @ -
0.02 kg Paku 1/2"- 1" @ -
Upah :
0.12 Hr Pekerja Terampil @ 64,800.00 7,776.00
0.06 Hr Tukang Kayu @ 90,720.00 5,443.20
0.006 Hr Kepala Tukang @ 103,680.00 622.08
0.006 Hr Mandor @ 77,760.00 466.56
2 ATAP ALUMUNIUM 1m2
Bahan
1.05 lbr Atap Almunium gel. Tebal 0,55 @ -
0.02 kg Paku 2"- 5" @ -
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.01 Hr Mandor @ 77,760.00 777.60
3 ATAP ALUMUNIUM FOIL/SISALATION 1m2
Bahan
1.05 lbr Almunium Foil/Sisalation @ 7,068.60 7,422.03
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.1 Hr Tukang Kayu @ 90,720.00 9,072.00
0.01 Hr Kepala Tukang @ 103,680.00 1,036.80
0.01 Hr Mandor @ 77,760.00 777.60
4 GENTENG BUBUNG KARANGPILANG 1m'
Bahan
5 bh Genteng Bubung karang pilang @ 7,068.60 35,343.00
8 kg PC ( Gresik) @ 1,040.40 8,323.20
0.032 m3 Pasir Pasang @ 92,106.00 2,947.39
Upah :
0.4 Hr Pekerja Terampil @ 64,800.00 25,920.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 103,680.00 2,073.60
0.002 Hr Mandor @ 77,760.00 155.52
2 GENTENG BUBUNG KERAMIK 1m'
Bahan
4 bh Genteng Bubung Keramik @ 18,360.00 73,440.00
8 kg PC ( Gresik) @ 1,040.40 8,323.20
0.032 m3 Pasir Pasang @ 92,106.00 2,947.39
Upah :
0.4 Hr Pekerja Terampil @ 64,800.00 25,920.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 103,680.00 2,073.60
0.002 Hr Mandor @ 77,760.00 155.52
11 GENTENG BUBUNG GLAZUUR 1m'
Bahan
5 bh Genteng Bubung GLAZUUR @ -
8 kg PC ( Gresik) @ -
0.032 m3 Pasir Pasang @ 64,800.00 2,073.60
Upah :
0.4 Hr Pekerja Terampil @ 64,800.00 25,920.00
0.2 Hr Tukang Batu @ 77,760.00 15,552.00
0.02 Hr Kepala Tukang @ 103,680.00 2,073.60
0.002 Hr Mandor @ 77,760.00 155.52
PEKERJAAN SANITASI
1 #REF! 1m'
Bahan

Lembar ke 74 dari 350 halaman


1.2 m' Pipa PVC ø 3/4 " AW ( Ex. MASPION ) @ 27,540.00 33,048.00
0.35 h-pipa perlengkapan @ 27,540.00 9,639.00
Upah :
0.036 Hr Pekerja Terampil @ 64,800.00 2,332.80
0.06 Hr Tukang Pipa @ 90,720.00 5,443.20
0.006 Hr Kepala Tukang @ 103,680.00 622.08
0.00018 Hr Mandor @ 77,760.00 14.00
1 Pipa pvc AIR Bersih 4 " 1m'
Bahan
1.2 m' Pipa PVC D Ø 3" @ - -
0.35 h-pipa perlengkapan @ - -
Upah :
0.036 Hr Pekerja Terampil @ 103,680.00 3,732.48
0.06 Hr Tukang Pipa @ 51,840.00 3,110.40
0.006 Hr Kepala Tukang @ 113,602.50 681.62
0.00018 Hr Mandor @ 80,325.00 14.46
2 #REF! 1m'
Bahan
1.2 m' Pipa PVC ø 2 1/2" AW ( Ex. MASPION ) @ 45,900.00 55,080.00
0.35 h-pipa perlengkapan @ 45,900.00 16,065.00
Upah :
0.036 Hr Pekerja Terampil @ 64,800.00 2,332.80
0.06 Hr Tukang Pipa @ 90,720.00 5,443.20
0.006 Hr Kepala Tukang @ 103,680.00 622.08
0.00018 Hr Mandor @ 77,760.00 14.00
3 #REF! 1m'
Bahan
1.2 m' Pipa PVC ø 4 " AW ( Ex. MASPION ) @ 191,862.00 230,234.40
0.35 h-pipa perlengkapan @ 67,151.70 23,503.10
Upah :
0.036 Hr Pekerja Terampil @ 64,800.00 2,332.80
0.06 Hr Tukang Pipa @ 90,720.00 5,443.20
0.006 Hr Kepala Tukang @ 103,680.00 622.08
0.00018 Hr Mandor @ 77,760.00 14.00
4 Tandon Air Bawah ( 2 x 2 x 2 ) /Cor Beton/Keramik 20 x 20 ROMAN
Galian 8 m3 31,311.36
Upah :
0.526 Hr Pekerja Kasar @ 51,840.00 27,267.84
0.052 Hr Mandor @ 77,760.00 4,043.52
Cor tandon bawah 1.93 m3 4,401,467.36
Keramik tandon m2 20.00
Pasang keramik m2 148,677.80
Bahan
1.2 m2 Keramik 20 x 20 Roman @ 24,862.50 29,835.00
11.38 kg PC @ 1,040.40 11,839.75
1.5 kg PC warna @ 16,830.00 25,245.00
0.042 m3 Pasir Pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 90,720.00 31,752.00
0.035 Hr Kepala Tukang @ 103,680.00 3,628.80
0.03 Hr Mandor @ 77,760.00 2,332.80
4 #REF! 1m'
Bahan
1.2 m' 0 @ -
0.35 h-pipa perlengkapan @ - -
Upah :
0.036 Hr Pekerja Terampil @ 64,800.00 2,332.80
0.06 Hr Tukang Pipa @ 90,720.00 5,443.20
0.006 Hr Kepala Tukang @ 103,680.00 622.08
0.00018 Hr Mandor @ 77,760.00 14.00
5 Tandon Air Bawah ( 2 x 2 x 2 ) /Cor Beton/Keramik 20 x 20 1m'
Bahan
1.2 m' Baja Profil SIKU 90.90.9 @ -
0.35 h-pipa perlengkapan @ - -
Upah :

Lembar ke 75 dari 350 halaman


0.036 Hr Pekerja Terampil @ 64,800.00 2,332.80
0.06 Hr Tukang Pipa @ 90,720.00 5,443.20
0.006 Hr Kepala Tukang @ 103,680.00 622.08
0.00018 Hr Mandor @ 77,760.00 14.00
6 #REF! 1m'
Bahan
1.2 m' Baja Profil I WF 400.200 @ -
0.35 h-pipa perlengkapan @ - -
Upah : -
0.036 Hr Pekerja Terampil @ 64,800.00 2,332.80
0.06 Hr Tukang Pipa @ 90,720.00 5,443.20
0.006 Hr Kepala Tukang @ 103,680.00 622.08
0.00018 Hr Mandor @ 77,760.00 14.00
7 Septicktank 1m'
Galian 4.00 m3 31,363.20
Upah :
0.53 Hr Pekerja Kasar @ 51,840.00 27,475.20
0.05 Hr Mandor @ 77,760.00 3,888.00
1.60 m3
Septic Tank
Bahan
0.26 m3 Papan kayu dadap @ 994,500.00 258,570.00
1.32 kg Paku 2" - 5" @ 33,966.00 44,835.12
396.00 kg Besi tulangan @ 8,500.00 3,366,000.00
59.40 kg Kawat bendrat @ 6,961.50 413,513.10
528.00 kg PC @ 1,040.40 549,331.20
0.79 m3 Pasir beton @ 117,810.00 93,069.90
1.19 m3 Batu pecah tangan 2/3 @ 220,320.00 262,180.80
Upah :
7.92 Hr Pekerja Kasar @ 51,840.00 410,572.80
2.64 Hr Tukang Batu @ 90,720.00 239,500.80
2.64 Hr Tukang Kayu @ 90,720.00 239,500.80
2.64 Hr Tukang Besi @ 77,760.00 205,286.40
0.79 Hr Kepala Tukang @ 103,680.00 81,907.20
0.40 Hr Mandor @ 77,760.00 31,104.00
8 Sumur resapan 1 unit
31.40 M3 31,363.20
Upah :
0.53 Hr Pekerja Kasar @ 51,840.00 27,475.20
0.05 Hr Mandor @ 77,760.00 3,888.00

Bahan
1,600.00 bh Batu Bata merah @ 114.75 183,600.00
0.63 m3 Pasir Urug @ 77,112.00 48,580.56
0.63 m3 Batu Kali Pecah Tangan 1/2 @ 238,680.00 150,368.40
Upah
0.78 Hr Pekerja Kasar @ 51,840.00 40,435.20
0.39 Hr Tukang Batu @ 90,720.00 35,380.80
0.04 Hr Kepala ukang @ 103,680.00 4,147.20
0.04 Hr Mandor @ 77,760.00 3,110.40
9 Sumur BOR air bersih Unit
20.00 m' Bor Sumur @ 73,975.68 1,479,513.60
1.00 lnj Pipa PVC 4' @ 191,862.00 191,862.00
PEKERJAAN LANTAI
1 PEMASANGAN LANTAI KERAMIK 20 X 20 ROMAN 1m3
Bahan :
1.2 m2 Keramik 20 x 20 ROMAN @ 24,862.50 29,835.00
11.38 kg PC @ 1,040.40 11,839.75
1.5 kg PC Warna @ 1,484.10 2,226.15
0.042 m3 Pasir pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kep.Tukang @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80

Lembar ke 76 dari 350 halaman


tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 72,900.00 91,125.00
2 PEMASANGAN LANTAI KERAMIK 30 X 30 ROMAN 1m3
Bahan :
1.2 m2 Keramik 30 x 30 ROMAN @ 24,862.50 29,835.00
10.8 kg PC @ 1,040.40 11,236.32
1.2 kg PC Warna @ 1,484.10 1,780.92
0.042 m3 Pasir pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kep.Tukang @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 72,900.00 91,125.00
3 PEMASANGAN LANTAI KERAMIK 40 X 40 ROMAN 1m2
Bahan :
1.2 m2 Keramik 40 x 40 ROMAN @ 31,365.00 37,638.00
10.1 kg PC @ 1,040.40 10,508.04
1.1 kg PC Warna @ 1,484.10 1,632.51
0.042 m3 Pasir pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kep.Tukang @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 72,900.00 91,125.00
4 PEMASANGAN LANTAI GRANITO 30 X 30 1m2
Bahan :
1.2 m2 GRANITO 30 x 30 @ 78,795.00 94,554.00
10 kg PC @ 1,040.40 10,404.00
1.1 kg PC Warna @ 1,484.10 1,632.51
0.042 m3 Pasir pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kep.Tukang @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 72,900.00 91,125.00
4 PEMASANGAN LANTAI GRANIT 1m2
Bahan :
1.1 m2 Granit @ Rp 248,625 Rp 273,488
25 kg PC @ Rp 1,040 Rp 26,010
1.5 kg Resin Granit @ Rp 214,200 Rp 321,300
1.65 kg PC Warna @ Rp 1,484 Rp 2,449
0.084 m3 Pasir pasang @ Rp 92,106 Rp 7,737
Upah :
0.75 Hr Pekerja @ Rp 64,800 Rp 48,600
0.5 Hr Tukang Batu @ Rp 77,760 Rp 38,880
0.05 Hr Kep.Tukang @ Rp 90,720 Rp 4,536
0.005 Hr Mandor @ Rp 77,760 Rp 389
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% Rp 92,405 Rp 115,506

5 PEMASANGAN TANGGA GRANIT 1m1


Bahan :
1.1 m2 Granit @ Rp 248,625 Rp 273,488
15 kg PC @ Rp 1,040 Rp 15,606
1.5 kg Resin Granit @ Rp 214,200 Rp 321,300
1.65 kg PC Warna @ Rp 1,484 Rp 2,449
0.084 m3 Pasir pasang @ Rp 92,106 Rp 7,737
Upah :
1.5 Hr Pekerja @ Rp 64,800 Rp 97,200
1 Hr Tukang Batu @ Rp 77,760 Rp 77,760
0.1 Hr Kep.Tukang @ Rp 90,720 Rp 9,072
0.01 Hr Mandor @ Rp 77,760 Rp 778
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% Rp 184,810 Rp 231,012

Lembar ke 77 dari 350 halaman


6 PEMASANGAN LANTAI GRANITO 40 x 40 1m2
Bahan :
1.1 m2 GRANITO 40 x 40 @ 122,400.00 134,640.00
12.75 kg PC @ 1,040.40 13,265.10
1.5 kg PC Warna @ 1,484.10 2,226.15
0.042 m3 Pasir pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kep.Tukang @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 72,900.00 91,125.00
6 PEMASANGAN STEPNOSE GRANITO 1m'
Bahan :
3.5 bh Stepnose GRANITO 8 x 30 @ 11,475.00 40,162.50
0.1138 kg PC @ 1,040.40 118.40
0.015 kg PC Warna @ 1,484.10 22.26
0.00042 m3 Pasir pasang @ 92,106.00 38.68
Upah :
0.095 Hr Pekerja @ 64,800.00 6,156.00
0.0055 Hr Tukang Batu @ 77,760.00 427.68
0.00035 Hr Kep.Tukang @ 90,720.00 31.75
0.0003 Hr Mandor @ 77,760.00 23.33
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 6,638.76 8,298.45
7 PEMASANGAN LANTAI KERAMIK 20 X 20 ROMAN 1m'
Bahan :
1 m2 keramik 20 x 20 ROMAN @ 11,475.00 11,475.00
11.38 kg PC @ 1,040.40 11,839.75
1.5 kg PC Warna @ 1,484.10 2,226.15
0.042 m3 Pasir pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kep.Tukang @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 72,900.00 91,125.00
8 PEMASANGAN LANTAI KERAMIK 20 X 20 ROMAN 1m'
Bahan :
1 m2 keramik 20 x 20 ROMAN @ 11,475.00 11,475.00
11.38 kg PC @ 1,040.40 11,839.75
1.5 kg PC Warna @ 1,484.10 2,226.15
0.042 m3 Pasir pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kep.Tukang @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 72,900.00 91,125.00
7 PEMASANGAN LANTAI BATU AMPYANGAN 1m2
Bahan :
0.63 zak Batu ampyang @ 45,000.00 28,350.00
0.021 m3 Pasir pasang @ 92,106.00 1,934.23
8.1 zak PC @ 1,040.40 8,427.24
Upah :
0.9 hr Pekerja @ 64,800.00 58,320.00
0.09 hr Tukang Batu @ 77,760.00 6,998.40
0.009 hr Kep.Tukang @ 90,720.00 816.48
0.0045 hr Mandor @ 77,760.00 349.92
8 PEMASANGAN LANTAI BATU JALASUTRA 1m2
Bahan :
1.05 m2 Batu Jalasutra @ 33,660.00 35,343.00
0.035 m3 Pasir pasang @ 92,106.00 3,223.71
11.75 kg PC @ 1,040.40 12,224.70
Upah :
0.62 hr Pekerja @ 64,800.00 40,176.00
0.35 hr Tukang Batu @ 77,760.00 27,216.00

Lembar ke 78 dari 350 halaman


0.035 hr Kep.Tukang @ 90,720.00 3,175.20
0.03 hr Mandor @ 77,760.00 2,332.80
9 PEMASANGAN LANTAI BATU GILANG CIREBON 1m2
Bahan :
0.63 m2 Batu Gilang @ 26,775.00 16,868.25
0.021 m3 Pasir pasang @ 92,106.00 1,934.23
8.1 kg PC @ 1,040.40 8,427.24
Upah :
0.62 hr Pekerja @ 64,800.00 40,176.00
0.35 hr Tukang Batu @ 77,760.00 27,216.00
0.035 hr Kep.Tukang @ 90,720.00 3,175.20
0.03 hr Mandor @ 77,760.00 2,332.80
10 PEMASANGAN PAVING STONE 1m2
Bahan :
1 m2 Paving Block @ 17,595.00 17,595.00
0.2 m2 Batu Kali 15/20 ( Underlayer) @ 141,372.00 28,274.40
0.1 m2 Sirtu @ 77,112.00 7,711.20
0.05 m3 Pasir urug @ 26,775.00 1,338.75
Upah :
0.4 hr Pekerja terampil @ 77,760.00 31,104.00
0.02 hr Mandor @ 77,760.00 1,555.20
11 PEMASANGAN KANSTIN m2
Bahan :
2.5 bh Kanstin @ 6,502.50 16,256.25
0.014 kg PC @ 1,040.40 14.57
0.042 m3 Pasir @ 92,106.00 3,868.45

Upah :
0.08 Hr Pekerja Kasar @ 64,800.00 5,184.00
0.125 Hr Tukang Batu @ 77,760.00 9,720.00
0.0125 Hr Kepala Tukang @ 90,720.00 1,134.00
0.005 Hr Mandor @ 77,760.00 388.80
12 PEMASANGAN LANTAI PARKEET m2
Bahan :
1.2 m2 Parkeet Jati @ 95,625.00 114,750.00
1 kg Lem Kayu @ 153,000.00 153,000.00
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Kayu @ 77,760.00 27,216.00
0.035 Hr Kepala Tukang Kayu @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80

13 BORDER KAYU JATI 1m'


Pekerjaan jati /m3 @
0.0015797 m3 Border /m1
PEKERJAAN PENUTUP DINDING
1 PEMASANGAN DINDING KERAMIK 20 X 20 ROMAN 1m2
Bahan :
1.2 m2 Keramik 20 x 20 ROMAN @ 24,862.50 29,835.00
11.38 kg PC @ 1,040.40 11,839.75
1.5 kg PC Warna @ 1,484.10 2,226.15
0.042 m3 Pasir pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kep.Tukang @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 72,900.00 91,125.00
2 PEMASANGAN LIST DINDING KERAMIK 6 x 20 ROMAN1m2
Bahan :
5.5 bh List Keramik 6 x 20 @ 5,355.00 29,452.50
4.2 kg PC @ 1,040.40 4,369.68
0.1 kg PC Warna @ 1,484.10 148.41
0.0084 m3 Pasir pasang @ 92,106.00 773.69
Upah :

Lembar ke 79 dari 350 halaman


0.2 Hr Pekerja @ 64,800.00 12,960.00
0.11 Hr Tukang Batu @ 77,760.00 8,553.60
0.011 Hr Kep.Tukang @ 90,720.00 997.92
0.01 Hr Mandor @ 77,760.00 777.60
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 23,289.12 29,111.40
2 PEMASANGAN DINDING KERAMIK 20 X 25 ROMAN 1m2
Bahan :
1.2 m2 Keramik 20 x 25 ROMAN @ 33,277.50 39,933.00
10.8 kg PC @ 1,040.40 11,236.32
1.2 kg PC Warna @ 1,484.10 1,780.92
0.042 m3 Pasir pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kep.Tukang @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 72,900.00 91,125.00
3 PEMASANGAN DINDING KERAMIK 40 X 40 ROMAN 1m2
Bahan :
1.2 m2 Keramik 40 x 40 ROMAN @ 31,365.00 37,638.00
10.1 kg PC @ 1,040.40 10,508.04
1.1 kg PC Warna @ 1,484.10 1,632.51
0.042 m3 Pasir pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kep.Tukang @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 72,900.00 91,125.00
4 PEMASANGAN DINDING GRANITO 30 X 30 1m2
Bahan :
1.2 m2 GRANITO 30 x 30 @ 78,795.00 94,554.00
10 kg PC @ 1,040.40 10,404.00
0.0215 kg PC Warna @ 1,484.10 31.91
1.5 m3 Pasir pasang @ 92,106.00 138,159.00
Upah :
0.26 Hr Pekerja @ 64,800.00 16,848.00
0.125 Hr Tukang Batu @ 77,760.00 9,720.00
0.0125 Hr Kep.Tukang @ 90,720.00 1,134.00
0.013 Hr Mandor @ 77,760.00 1,010.88
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 28,712.88 35,891.10
5 PEMASANGAN DINDING GRANITO 40 X 40 1m2
Bahan :
1.2 m2 GRANITO 40 x 40 @ 122,400.00 146,880.00
9.8 kg PC @ 1,040.40 10,195.92
0.0215 kg PC Warna @ 1,484.10 31.91
1.3 m3 Pasir pasang @ 92,106.00 119,737.80
Upah :
0.25 Hr Pekerja @ 64,800.00 16,200.00
0.12 Hr Tukang Batu @ 77,760.00 9,331.20
0.012 Hr Kep.Tukang @ 90,720.00 1,088.64
0.0125 Hr Mandor @ 77,760.00 972.00
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 27,591.84 34,489.80
4 PEMASANGAN STEPNOSE GRANITO 1m'
Bahan :
3.5 bh Stepnose GRANITO 8 x 30 @ 6,120,000.00 21,420,000.00
0.1138 kg PC @ 1,040.40 118.40
0.015 kg PC Warna @ 1,484.10 22.26
0.00042 m3 Pasir pasang @ 92,106.00 38.68
Upah :
0.095 Hr Pekerja @ 64,800.00 6,156.00
0.0055 Hr Tukang Batu @ 77,760.00 427.68
0.00035 Hr Kep.Tukang @ 90,720.00 31.75
0.0003 Hr Mandor @ 77,760.00 23.33
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 6,638.76 8,298.45
7 PEMASANGAN DINDING MARMER 1m'
Lembar ke 80 dari 350 halaman
Bahan :
1.2 m2 MARMER TulungagungPolish @ 65,025.00 78,030.00
11.38 kg PC @ 1,040.40 11,839.75
1.5 kg PC Warna @ 1,484.10 2,226.15
0.042 m3 Pasir pasang @ 92,106.00 3,868.45
Upah :
0.62 Hr Pekerja @ 64,800.00 40,176.00
0.35 Hr Tukang Batu @ 77,760.00 27,216.00
0.035 Hr Kep.Tukang @ 90,720.00 3,175.20
0.03 Hr Mandor @ 77,760.00 2,332.80
tiap kenaikan level lantai upah dinaikkan 25% x upah lt.1 125% 72,900.00 91,125.00

PEKERJAAN DINDING PEMISAH


1 RANGKA DINDING PARTISI KAYU KAMPER 1m2
Bahan
0.0195 m3 Usuk Kayu KAMPER @ 6,120,000.00 119,340.00
0.007 m3 Papan Kayu KAMPER @ 6,732,000.00 47,124.00
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.45 Hr Tukang Kayu @ 90,720.00 40,824.00
0.045 Hr Kepala Tukang @ 103,680.00 4,665.60
0.075 Hr Mandor @ 77,760.00 5,832.00
1 RANGKA DINDING PARTISI KAYU MERANTI 1m2
Bahan
0.0195 m3 Usuk Kayu MERANTI @ 3,366,000.00 65,637.00
0.007 m3 Papan Kayu MERANTI @ 3,825,000.00 26,775.00
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
Upah :
0.15 Hr Pekerja Terampil @ 64,800.00 9,720.00
0.45 Hr Tukang Kayu @ 90,720.00 40,824.00
0.045 Hr Kepala Tukang @ 103,680.00 4,665.60
0.075 Hr Mandor @ 77,760.00 5,832.00
3 RANGKA DINDING PARTISI KAYU KAMPER/TRIPLEKS 1m2
Bahan
0.0195 m3 Usuk Kayu KAMPER @ 6,120,000.00 119,340.00
0.007 m3 Papan Kayu KAMPER @ 6,732,000.00 47,124.00
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
0.56 ltr Lem Kuning 'RAJAWALI' @ 153,000.00 85,680.00
1 lbr Tripleks 4 mm @ 53,856.00 53,856.00
Upah :
0.2 Hr Pekerja Terampil @ 64,800.00 12,960.00
0.6 Hr Tukang Kayu @ 90,720.00 54,432.00
0.06 Hr Kepala Tukang @ 103,680.00 6,220.80
0.01 Hr Mandor @ 77,760.00 777.60
4 RANGKA DINDING PARTISI KAYU KAMPER/TEAKWO 1m2
Bahan
0.0195 m3 Usuk Kayu KAMPER @ 6,120,000.00 119,340.00
0.007 m3 Papan Kayu KAMPER @ 6,732,000.00 47,124.00
0.1 kg Paku 2"- 5" @ 33,966.00 3,396.60
0.28 ltr Lem Kuning 'RAJAWALI' @ 153,000.00 42,840.00
0.36 lbr TEAKWOOD 4 mm @ 53,856.00 19,388.16
Upah :
0.1 Hr Pekerja Terampil @ 64,800.00 6,480.00
0.3 Hr Tukang Kayu @ 90,720.00 27,216.00
0.03 Hr Kepala Tukang @ 103,680.00 3,110.40
0.005 Hr Mandor @ 77,760.00 388.80
5 RANGKA DINDING LAMBRIZIRING PAPAN JATI 1m2
Bahan
0.007 m3 Usuk Kayu JATI @ 15,300,000.00 107,100.00
0.1 m3 Paku 2"- 5" @ 33,966.00 3,396.60
0.15 kg Paku sekrup 3,5" @ -
Upah :
6 Hr Pekerja Terampil @ 64,800.00 388,800.00
20 Hr Tukang Kayu @ 90,720.00 1,814,400.00
Lembar ke 81 dari 350 halaman
2 Hr Kepala Tukang @ 103,680.00 207,360.00
0.3 Hr Mandor @ 77,760.00 23,328.00
6 PEMASANGAN TRIPLEKS U/ DINDING PARTISI 1m2
Bahan
1.2 m2 Tripleks 4 mm @ 53,856.00 64,627.20
0.3 kg Paku 2"- 5" @ 33,966.00 10,189.80
Upah :
6 Hr Pekerja Terampil @ 64,800.00 388,800.00
20 Hr Tukang Kayu @ 90,720.00 1,814,400.00
2 Hr Kepala Tukang @ 103,680.00 207,360.00
0.3 Hr Mandor @ 77,760.00 23,328.00
PEKERJAAN CAT DINDING
1 CAT DINDING/ Ex. DULUX / Pentalite m2
Bahan :
0.1 kg Plamur @ 55,539.00 5,553.90
0.26 kg Cat. Tembok DULUX Pentalite @ 192,780.00 50,122.80
Upah :
0.02 Hr Pekerja Terampil @ 64,800.00 1,296.00
0.063 Hr Tukang Cat @ 90,720.00 5,715.36
0.0063 Hr Kepala Tukang @ 103,680.00 653.18
0.0025 Hr Mandor @ 77,760.00 194.40
1 CAT DINDING LUAR / Ex. DULUX / WEATHERSHIELD m2
Bahan :
0.1 kg Plamur @ 165,240.00 16,524.00
0.36 kg Cat. Tembok DULUX Pentalite @ 242,352.00 87,246.72
Upah : -
0.02 Hr Pekerja Terampil @ 64,800.00 1,296.00
0.063 Hr Tukang Cat @ 90,720.00 5,715.36
0.0063 Hr Kepala Tukang @ 103,680.00 653.18
0.0025 Hr Mandor @ 77,760.00 194.40

2 CAT PLAFOND/ Ex. DULUX / Pentalite m2


Bahan :
0.1 kg Plamur @ 55,539.00 5,553.90
0.26 kg Cat. Tembok DULUX Pentalite @ 165,240.00 42,962.40
Upah :
0.02 Hr Pekerja Terampil @ 64,800.00 1,296.00
0.063 Hr Tukang Cat @ 90,720.00 5,715.36
0.0063 Hr Kepala Tukang @ 103,680.00 653.18
0.0025 Hr Mandor @ 77,760.00 194.40

3 CAT LISTPLANK/DINDING LUAR/ Ex. DULUX / WEATH m2


m1
Bahan :
0.1 kg Plamur @ 165,240.00 16,524.00

0.26 kg Cat. Tembok DULUX WEATHERSHIELD @ 242,352.00 63,011.52


Upah :
0.02 Hr Pekerja Terampil @ 64,800.00 1,296.00
0.063 Hr Tukang Cat @ 90,720.00 5,715.36
0.0063 Hr Kepala Tukang @ 103,680.00 653.18
0.0025 Hr Mandor @ 77,760.00 194.40

Lembar ke 82 dari 350 halaman


AN GEDUNG)
H

109,403.46

66,894.66

42,508.80

190,768.86

148,260.06

42,508.80
257,163.21

214,654.41

42,508.80
44,053.92

28,372.32

15,681.60
866,791.16

Lembar ke 83 dari 350 halaman


468,919.16

397,872.00

1,139,520.60

881,616.60

257,904.00

1,116,898.20

900,466.20

207,360.00
9,072.00

9,072.00

1,056,043.80

798,139.80

257,904.00

211,048.92

183,716.28

Lembar ke 84 dari 350 halaman


27,332.64

114,256.80

85,680.00

28,576.80

98,509.86

42,781.86

55,728.00

8,527.68

8,527.68
135,407.34

92,898.54

42,508.80

23,846.40

23,846.40
31,311.36

31,311.36
73,975.68

Lembar ke 85 dari 350 halaman


73,975.68
74,520.00

74,520.00
49,118.40

49,118.40
2,980.80

2,980.80
65,629.44

65,629.44
11,430.72

11,430.72
26,308.80

26,308.80
112,933.44

92,534.40

20,399.04
1,268,678.03

215,948.03

80,222.40
972,507.60

254,745.00

Lembar ke 86 dari 350 halaman


80,157.60
637,605.00

254,745.00

80,157.60
302,702.40

293,760.00

8,942.40
151,227.00

136,323.00

14,904.00
116,789.04

96,390.00

20,399.04

784,862.06

629,730.86

155,131.20
654,812.06

499,680.86

155,131.20
620,478.86

465,347.66

Lembar ke 87 dari 350 halaman


155,131.20
587,186.06

432,054.86

155,131.20
564,153.44

409,022.24

155,131.20
518,519.66

363,388.46

155,131.20
498,752.06

343,620.86

155,131.20
471,701.66

316,570.46

155,131.20
398,209.64

243,078.44

155,131.20
398,927.52

Lembar ke 88 dari 350 halaman


243,796.32

155,131.20
564,196.28

409,065.08

155,131.20
456,884.53

301,753.33

155,131.20
438,931.82

283,800.62

155,131.20
322,054.38

234,613.26

87,441.12
1,485,750.90

1,205,879.70

279,871.20
778,905.81

Lembar ke 89 dari 350 halaman


592,411.41

186,494.40
863,239.91

736,374.47

126,865.44
679,560.11

581,193.71

98,366.40

149,904.05

88,084.85

61,819.20
130,510.08

68,690.88

61,819.20
120,547.03

Lembar ke 90 dari 350 halaman


58,727.83

61,819.20
114,072.68

52,253.48

61,819.20
110,375.89

48,556.69

61,819.20
104,222.84

42,403.64

61,819.20
48,121.62

17,536.02

30,585.60
70,120.19

39,534.59

30,585.60
70,120.19

39,534.59

30,585.60

Lembar ke 91 dari 350 halaman


61,833.71

31,248.11

30,585.60
54,543.26

23,957.66

30,585.60
52,833.94

22,248.34

30,585.60
51,787.42

21,201.82

30,585.60
49,986.00

19,400.40

30,585.60
108,367.74

77,782.14

30,585.60
63,221.79

32,636.19
Lembar ke 92 dari 350 halaman
30,585.60
59,043.78

28,458.18

30,585.60
77,040.71

40,013.99

37,026.72
68,241.95

35,919.71

32,322.24
64,159.60

31,837.36

32,322.24
81,157.49

63,625.20

17,532.29
81,157.49

Lembar ke 93 dari 350 halaman


63,625.20

17,532.29
60,561.20

25,311.30

35,249.90
72,173.66

38,920.90

33,252.77
81,252.06

69,173.34

12,078.72
45,830.43

Lembar ke 94 dari 350 halaman


16,540.83

29,289.60
112,033.08

77,105.88

34,927.20
58,508.71

47,531.59

10,977.12

41,401.75

14,639.35

26,762.40
37,192.41

10,430.01

26,762.40
35,254.21

8,491.81

26,762.40
34,014.60

7,252.20

26,762.40
33,283.26

Lembar ke 95 dari 350 halaman


6,520.86

26,762.40
32,709.51

5,947.11

26,762.40
31,969.30

5,206.90

26,762.40
91,707.99

64,945.59

26,762.40
37,608.57

10,846.17

26,762.40
38,002.24

11,239.84

26,762.40
40,087.63

13,325.23

26,762.40
37,863.32

Lembar ke 96 dari 350 halaman


11,100.92

26,762.40
51,513.75

16,975.35

34,538.40
48,169.48

13,631.08

34,538.40
46,148.04

11,609.64

34,538.40
44,701.88

10,163.48

34,538.40
43,793.68

9,255.28

34,538.40
47,669.20

13,130.80

34,538.40
64,238.78

Lembar ke 97 dari 350 halaman


17,323.58

46,915.20
62,363.61

15,448.41

46,915.20
60,278.22

13,363.02

46,915.20
58,768.11

11,852.91

46,915.20
66,237.57

22,627.17

43,610.40
61,924.19

18,313.79

43,610.40
59,318.60

15,708.20

43,610.40
56,276.05

12,665.65

Lembar ke 98 dari 350 halaman


43,610.40
19,230.17

9,289.85

9,940.32
24,437.83

8,017.51

16,420.32
46,558.91

11,333.63

35,225.28
44,515.13

9,289.85

35,225.28
10,955.77

704.41

10,251.36
1,430,274.11

1,381,803.71

48,470.40
1,108,342.40

1,059,872.00

48,470.40
32,017.82

Lembar ke 99 dari 350 halaman


5,968.22

26,049.60
22,388.54

5,968.22

16,420.32
39,045.64

1,072.84

37,972.80
20,714.27

2,181.47

18,532.80

ENDELA
29,738,971.80

27,305,083.80

2,433,888.00
9,636,931.80

7,384,483.80

2,252,448.00
6,513,571.80

Lembar ke 100 dari 350 halaman


4,079,683.80

2,433,888.00
2,292,931.80

40,483.80

2,252,448.00
355,269.78
703,434.16

225,047.70

130,222.08
256,125.78
507,129.04

125,903.70

130,222.08
1,413,675.00
2,799,076.50

1,092,267.00

321,408.00
457,731.00
906,307.38

136,323.00

321,408.00
1,214,416.80
2,404,545.26
1,026,182.20

Lembar ke 101 dari 350 halaman


957,290.40

257,126.40
377,965.80
748,372.28
319,381.10

120,839.40

257,126.40
377,965.80
748,372.28
319,381.10

120,839.40

257,126.40
2,154,907.80
4,266,717.44
1,820,897.09

1,747,963.80

406,944.00
625,397.40
1,238,286.85
528,460.80

218,453.40

406,944.00
625,397.40
1,238,286.85
528,460.80

218,453.40

406,944.00
842,917.77
1,668,977.18

Lembar ke 102 dari 350 halaman


599,528.97

243,388.80
374,505.21
741,520.32

131,116.41

243,388.80
374,505.21
741,520.32

131,116.41

243,388.80
1,881,369.45
3,725,111.51

1,644,849.45

236,520.00
447,453.45
885,957.83

210,933.45

236,520.00
447,453.45
885,957.83

210,933.45

236,520.00
956,949.69
1,894,760.39
Lembar ke 103 dari 350 halaman
713,560.89

243,388.80
408,022.41
807,884.37

164,633.61

243,388.80
408,022.41
807,884.37

164,633.61

243,388.80
961,503.66
1,903,777.25

653,833.26

307,670.40
493,091.10
976,320.38

185,420.70

307,670.40
493,091.10
976,320.38

Lembar ke 104 dari 350 halaman


185,420.70

307,670.40
994,347.66
1,968,808.37

686,677.26

307,670.40
525,935.10
1,041,351.50

218,264.70

307,670.40
525,935.10
1,041,351.50

218,264.70

307,670.40
1,034,586.66
2,048,481.59

726,916.26

307,670.40
566,174.10
1,121,024.72

Lembar ke 105 dari 350 halaman


258,503.70

307,670.40
566,174.10
1,121,024.72

258,503.70

307,670.40

28,934,493.30

27,446,685.30

1,487,808.00
8,401,893.30

6,914,085.30

1,487,808.00
5,372,493.30

3,884,685.30

1,487,808.00
6,045,693.30

4,557,885.30

1,487,808.00
6,045,693.30

4,557,885.30

Lembar ke 106 dari 350 halaman


1,487,808.00
95,512.50

78,534.90

16,977.60
62,464.50

45,486.90

16,977.60
403,776.90

386,799.30

16,977.60
107,752.50

90,774.90

16,977.60
69,196.50

52,218.90

16,977.60
69,196.50

52,218.90

16,977.60
107,752.50

90,774.90

Lembar ke 107 dari 350 halaman


16,977.60
23,328.00

7,931.52

15,396.48
150,479.10

122,874.30

27,604.80
53,538.30

25,933.50

27,604.80
214,433.10

186,828.30

27,604.80
66,329.10

38,724.30

27,604.80
91,668.96

50,844.96

40,824.00
51,462.36

30,985.56

20,476.80
52,135.56
Lembar ke 108 dari 350 halaman
31,658.76

20,476.80
22,576.96

2,100.16

20,476.80

28,571.37

22,093.97

6,477.41

AN LIST
371,395.80

330,571.80

40,824.00
117,660.60

76,836.60

40,824.00
84,612.60

43,788.60

40,824.00
676,244.70

632,180.70

Lembar ke 109 dari 350 halaman


44,064.00
153,864.90

114,336.90

39,528.00
126,576.90

82,512.90

44,064.00
795,490.20

742,937.40

52,552.80
224,586.00

172,033.20

52,552.80
150,228.00

97,675.20

52,552.80
16,618.77

13,067.73

3,551.04
32,683.77

29,132.73

3,551.04

Lembar ke 110 dari 350 halaman


141,763.57
104,706.00

65,178.00

39,528.00
37,057.57

25,484.29

11,573.28
83,542.32
83,542.32

65,178.00

18,364.32
26,812.08

15,238.80

11,573.28

163,634.47
126,576.90
37,057.57

25,484.29

11,573.28

Lembar ke 111 dari 350 halaman


151,112.95
126,576.90
24,536.05

12,962.77

11,573.28

EMISAH
207,340.20

146,298.60

61,041.60
156,850.20

95,808.60

61,041.60
360,225.00

285,834.60

74,390.40
360,225.00

Lembar ke 112 dari 350 halaman


285,834.60

74,390.40
2,628,136.80

194,248.80

2,433,888.00
2,508,705.00

74,817.00

2,433,888.00
353,847.96

279,457.56

74,390.40
238,804.20
153,786.60

68,769.00

85,017.60

621,164.70

507,699.90

Lembar ke 113 dari 350 halaman


113,464.80
611,097.30

497,632.50

113,464.80
580,237.20

466,772.40

113,464.80
86,394.06
1,727,881.20

24,574.86

61,819.20
829,507.50

617,676.30

211,831.20
804,736.80

592,905.60

211,831.20
820,740.60

608,909.40

211,831.20
867,650.40

Lembar ke 114 dari 350 halaman


655,819.20

211,831.20
865,707.30

653,876.10

211,831.20
940,585.50

728,754.30

211,831.20
1,551,499.20

1,339,668.00

211,831.20
1,081,957.50

870,126.30

211,831.20
1,189,440.00

977,608.80

211,831.20
1,065,544.20

Lembar ke 115 dari 350 halaman


644,344.20

421,200.00
1,041,003.00

619,803.00

421,200.00

31,784.40

31,784.40
31,784.40

31,784.40
31,784.40

31,784.40
31,784.40

31,784.40
31,784.40

31,784.40
31,784.40

31,784.40

Lembar ke 116 dari 350 halaman


225,605.47

9,238.27

216,367.20
12,909.80

11,915.77

994.03
12,805.38

11,811.35

994.03
10,232.30

9,238.27

994.03

92,698.38

50,474.70

42,223.68
97,670.88

55,447.20

42,223.68
201,100.05

Lembar ke 117 dari 350 halaman


151,722.45

49,377.60
806,486.85

756,072.45

50,414.40
349,016.85

298,602.45

50,414.40
282,461.85

232,047.45

50,414.40
240,899.40

190,485.00

50,414.40
72,249.12

58,874.40

Lembar ke 118 dari 350 halaman


13,374.72

2,332,616.33

1,916,211.53

416,404.80
3,086,823.73

2,643,202.93

443,620.80
3,323,038.58

2,746,474.10

576,564.48
6,242,006.55

Lembar ke 119 dari 350 halaman


5,295,148.95

946,857.60
5,691,669.78

4,929,777.30

761,892.48
5,083,182.13

4,361,698.93

721,483.20
4,517,862.41

3,822,713.93

Lembar ke 120 dari 350 halaman


695,148.48
4,638,624.92

3,945,887.00

692,737.92
53,257.76

44,367.20

8,890.56
53,257.76

44,367.20

8,890.56
5,940,745.28

Lembar ke 121 dari 350 halaman


5,178,852.80

761,892.48

91,925.52

73,950.00

17,975.52
148,599.36

132,192.00

16,407.36
17,975.52

17,975.52
23,846.40

23,846.40
41,264.64

41,264.64
23,846.40

23,846.40
17,327.52

Lembar ke 122 dari 350 halaman


-

17,327.52
17,327.52

17,327.52
17,327.52

17,327.52
17,327.52

17,327.52
17,327.52

17,327.52
17,327.52

17,327.52
17,327.52

17,327.52
17,327.52

Lembar ke 123 dari 350 halaman


17,327.52
17,327.52

17,327.52
17,327.52

17,327.52
17,327.52

17,327.52
17,327.52

17,327.52
17,327.52

17,327.52
17,327.52

17,327.52
17,327.52

17,327.52
17,327.52

Lembar ke 124 dari 350 halaman


-

17,327.52
14,307.84

14,307.84
23,846.40

23,846.40
31,268.43

7,422.03

23,846.40
90,314.71

46,613.59

43,701.12
128,411.71

84,710.59

43,701.12
45,774.72

2,073.60

43,701.12

51,099.08

Lembar ke 125 dari 350 halaman


42,687.00

8,412.08
7,538.95

7,538.95
79,557.08

71,145.00

8,412.08
262,149.57

253,737.50

8,412.08
11,740,358.12
250,490.88

8,516,311.16
2,973,556.08

34,573,664.62

8,412.08
17,342,960.95

Lembar ke 126 dari 350 halaman


8,412.08

8,412.08
6,320,824.92
125,452.80

4,987,500.12

1,207,872.00
1,450,427.04
984,804.48

465,622.56
1,671,375.60

120,669.35

47,769.35

72,900.00

Lembar ke 127 dari 350 halaman


119,620.69

46,720.69

72,900.00

126,547.00

53,647.00

72,900.00

183,358.96

110,458.96

72,900.00

Rp 723,388

Rp 630,983

Rp 92,405

Rp 805,389

Rp 620,579

Rp 184,810

Lembar ke 128 dari 350 halaman


226,899.70

153,999.70

72,900.00

46,980.60

40,341.84

6,638.76

102,309.35

29,409.35

72,900.00

102,309.35

29,409.35

72,900.00

105,196.27

38,711.47

66,484.80
123,691.41

50,791.41

Lembar ke 129 dari 350 halaman


72,900.00
100,129.72

27,229.72

72,900.00
87,578.55

54,919.35

32,659.20
36,566.07

20,139.27

16,426.80
340,650.00

267,750.00

72,900.00

43,069.89
27,264,600.00

120,669.35

47,769.35

72,900.00

58,033.40

34,744.28

Lembar ke 130 dari 350 halaman


23,289.12

129,718.69

56,818.69

72,900.00

126,547.00

53,647.00

72,900.00

271,861.79

243,148.91

28,712.88

304,437.47

276,845.63

27,591.84

21,426,818.10

21,420,179.34

6,638.76

168,864.35
Lembar ke 131 dari 350 halaman
95,964.35

72,900.00

230,902.20

169,860.60

61,041.60
156,850.20

95,808.60

61,041.60
383,787.00

309,396.60

74,390.40
269,283.96

232,088.76

37,195.20
2,544,384.60

110,496.60

Lembar ke 132 dari 350 halaman


2,433,888.00
2,508,705.00

74,817.00

2,433,888.00

63,535.64

55,676.70

7,858.94
111,629.66

103,770.72

7,858.94

56,375.24

48,516.30

7,858.94

87,394.46
29,131.49

79,535.52

7,858.94

Lembar ke 133 dari 350 halaman


DAFTAR HARGA BAHAN BANGUNAN

HARGA
No KODE BAHAN BANGUNAN SATUAN
SATUAN

1 M001 Pasir Urug 1 m³ m³ 127,700.00


2 M002 Pasir Pasang 1 m³ m³ 205,700.00
3 M003 Pasir Hitam 1 m³ m³ 220,000.00
4 M004 Pasir Cor 1 m³ m³ 213,400.00
5 M005 Pasir Silika 1 Kg Kg 13,500.00
6 M006 Tanah Urug 1 m³ m³ 130,000.00
7 M007 Sirtu 1 m³ m³ 192,000.00
8 M008 Tanah Urug Taman/Katel 1 m³ m³ 95,200.00
9 M009 Tanah Liat 1 m³ m³ 73,500.00
10 M010 Batu Belah Gunung 1 m³ m³ 157,000.00
11 M011 Batu Belah Kali 1 m³ m³ 189,000.00
12 M012 Batu Kali 1 m³ m³ 190,000.00
13 M013 Stenslah/batu pecah tangan 1/2 1 m³ m³ 323,000.00
14 M014 Stenslah/batu pecah tangan 2/3 1 m³ m³ 314,000.00
15 M015 Stenslah/batu pecah tangan 3/5 1 m³ m³ 273,000.00
16 M016 Stenslah/batu pecah tangan 4/6 - 5/7 1 m³ m³ 225,000.00
17 M017 Batu pecah mesin 1/1 1 m³ m³ 379,000.00
18 M018 Batu pecah mesin 1/2 1 m³ m³ 319,000.00
19 M019 Batu pecah mesin 2/3 1 m³ m³ 321,000.00
20 M020 Batu pecah mesin 3/5 1 m³ m³ 295,000.00
21 M021 Batu pecah mesin 4/6 - 5/7 1 m³ m³ 265,000.00
22 M022 Bata Merah 1 bh bh 900.00
23 M022.a Batu Bata Tahan Api 1 bh bh 18,500.00
24 M023 Bata Berongga 1 bh bh 2,200.00
25 M024 Batako 1 bh bh 7,400.00
26 M025 Rooster 1 bh bh 13,400.00
27 M026 Batu Granito 1 kg kg 24,000.00
28 M027 Batu Teraso 1 kg kg 13,000.00
29 M028 Batu Palimanan 1 m² m² 113,000.00
30 M029 Batu Tempel Hitam 1 m² m² 82,500.00
31 M030 Hollow Blok (HB.20) 1 bh bh 7,000.00
32 M031 Hollow Blok (HB.15) 1 bh bh 6,000.00
33 M032 Hollow Blok (HB.10) 1 bh bh 5,400.00
34 M033 Paving Block Segi Empat Biasa K 250 1 bh bh 1,400.00
35 M034 Paving Block Segi Empat Warna 1 bh bh 1,800.00
36 M035 Paving Block Segi Enam Biasa 1 bh bh 2,900.00
37 M036.a Paving Block Segi Enam Warna 1 bh bh 3,100.00
38 M036.b Paving Block Tiga Berlian Biasa 1 bh bh 2,000.00
39 M036.c Paving Block Tiga Berlian Warna 1 bh bh 2,200.00
40 M037 Portland Cement (PC) 1 kg kg 1,900.00
41 M037.a Portland Cement (PC) Tahan Api 1 kg kg 8,000.00
42 M038 Portland Cement (PC) Putih 1 kg kg 4,000.00
43 M039 Portland Cement (PC) Warna 1 kg kg 18,000.00
44 M040 Portland Cement (PC) Grouting 1 kg kg 17,000.00
45 M041 Kapur 1 m³ m³ 2,010,000.00
46 M042 Gamping 1 kg kg 10,500.00
47 M043 Semen Merah 1 m³ m³ 265,000.00
48 M044 Buis Beton Ø 0.20 m 1 m¹ m¹ 51,200.00
49 M045 Buis Beton Ø 0.30 m 1 m¹ m¹ 70,000.00
50 M046 Buis Beton Ø 0.40 m 1 m¹ m¹ 89,000.00
51 M047 Buis Beton Ø 0.50 m 1 m¹ m¹ 110,000.00
52 M048 Buis Beton Ø 0.60 m 1 m¹ m¹ 161,000.00
53 M049 Buis Beton Ø 0.80 m 1 m¹ m¹ 270,000.00
54 M050 Buis Beton Ø 0.90 m 1 m¹ m¹ 290,000.00
55 M051 Buis Beton Ø 1.00 m 1 m¹ m¹ 370,000.00
56 M052 Buis Beton U Ø 0.20 m 1 m¹ m¹ 45,000.00
57 M053 Buis Beton U Ø 0.30 m 1 m¹ m¹ 57,000.00
58 M054 Reng : 2/3, 3/5 1 m³ m³ 12,400,000.00
59 M055 Usuk : 5/7 1 m³ m³ 12,330,000.00
60 M056 Balok 1 m³ m³ 12,330,000.00
61 M057 Papan (2x20) cm 1 m³ m³ 15,059,200.00
62 M058 Papan (3x20) cm 1 m³ m³ 15,442,000.00
63 M059 Papan (3x30) cm 1 m³ m³ 15,442,000.00
64 M060 Reng 2/3, 3/5 1 m³ m³ 7,080,000.00
65 M061 Usuk 5/7 1 m³ m³ 7,080,000.00
66 M062 Balok 1 m³ m³ 7,950,000.00
67 M063 Papan (2x20) cm 1 m³ m³ 9,455,000.00
68 M064 Papan (3x20) cm 1 m³ m³ 9,525,000.00
69 M065 Papan (3x30) cm 1 m³ m³ 10,685,000.00
70 M066 Reng 2/3, 3/5 1 m³ m³ 8,525,000.00
71 M067 Usuk 5/7 1 m³ m³ 8,525,000.00
72 M068 Balok 1 m³ m³ 8,950,000.00
73 M069 Papan (2x20) cm 1 m³ m³ 9,670,000.00
74 M070 Papan (3x20) cm 1 m³ m³ 9,670,000.00
75 M071 Papan (3x30) cm 1 m³ m³ 9,670,000.00
76 M078 Reng 2/3, 3/5 1 m³ m³ 12,890,000.00
77 M079 Usuk 5/7 1 m³ m³ 13,250,000.00
78 M080 Balok 1 m³ m³ 13,600,000.00
79 M081 Papan (2x20) cm 1 m³ m³ 15,760,000.00
80 M082 Papan (3x20) cm 1 m³ m³ 16,110,000.00
81 M083 Papan (3x30) cm 1 m³ m³ 16,470,000.00
82 M084 Balok Kayu Kelas III 1 m³ m³ 3,230,500.00
83 M085 Papan Kayu kelas III 1 m³ m³ 6,227,000.00
84 M088 Bambu Ø 10 cm 1 btg btg 28,000.00
85 M089 Dolken Kayu Ø 8 cm 1 btg btg 31,000.00
86 M090 List Kayu Profil 1 m¹ m¹ 19,900.00
87 M091 List Kayu 2/4 1 m³ m³ 5,010,000.00
88 M092 Gedeg (2.00 x 3.00) m 1 Ibr Ibr 48,300.00
89 M093 Bilik Bambu 1 m² m² 118,000.00
90 M094 Reng : 2/3, 3/5 1 m³ m³ 18,900,000.00
91 M095 Usuk : 5/7 1 m³ m³ 18,900,000.00
92 M096 Balok 1 m³ m³ 18,121,000.00
93 M097 Papan (2x20) cm 1 m³ m³ 20,185,000.00
94 M098 Papan (3x20) cm 1 m³ m³ 20,185,000.00
95 M099 Papan (3x30) cm 1 m³ m³ 21,500,000.00
96 M100 Reng 2/3, 3/5 1 m³ m³ 27,000,000.00
97 M101 Usuk 5/7 1 m³ m³ 37,500,000.00
98 M102 Balok 1 m³ m³ 33,500,000.00
99 M103 Papan (2x20) cm 1 m³ m³ 22,300,000.00
100 M104 Papan (3x20) cm 1 m³ m³ 22,300,000.00
101 M105 Papan (3x30) cm 1 m³ m³ 22,300,000.00
102 M106 Reng : 2/3, 3/5 1 m³ m³ 27,850,000.00
103 M107 Usuk : 5/7 1 m³ m³ 27,850,000.00
104 M108 Balok 1 m³ m³ 27,850,000.00
105 M109 Papan (2x20) cm 1 m³ m³ 27,850,000.00
106 M110 Papan (3x20) cm 1 m³ m³ 27,850,000.00
107 M111 Papan (3x30) cm 1 m³ m³ 27,850,000.00
108 M112 Besi Beton Polos 1 kg kg 12,100.00
109 M113 Besi Beton Ulir 1 kg kg 18,400.00
109 M113.a Besi Tuang 1 kg kg 13,500.00
110 M114 Besi Strip / Plat Plendes 1 kg kg 12,600.00
111 M115 Besi Beugel/Kawel 1 kg kg 22,000.00
112 M116 Baja Profil 1 kg kg 24,500.00
113 M116.a Plat Baja 1 kg kg 22,000.00
M116.b Roda Railling bh kg 25,400.00
M116.c Besi Hollow 20x40 1 m¹ m¹ 25,400.00
M116.d Besi Hollow 40x40 1 m¹ m¹ 25,400.00
114 M117 Angker Bar / Dynabolt 1 kg kg 39,000.00
115 M118 Kabel prestressed 1 kg kg 41,000.00
116 M119 Pintu Besi Baja 1 m² m² 1,060,000.00
117 M120 Pintu Gulung Besi 1 m² m² 2,900,000.00
118 M121 Pintu Lipat 1 m² m² 2,275,000.00
119 M122 Rolling Door 1 m² m² 1,690,000.00
120 M123 Pagar Besi 1 m² m² 998,000.00
121 M124 Pintu Pagar besi 1 m² m² 1,010,000.00
122 M124.a Pagar Model BRC tinggi 1 m 1 m¹ m¹ 454,000.00
123 M124.b Pintu Pagar Model BRC tinggi 1 m 1 m¹ m¹ 565,000.00
124 M125 Profil Aluminium Putih 1 m¹ m¹ 154,000.00
125 M126 Profil Aluminium Coklat 1 m¹ m¹ 160,800.00
126 M127 Sunscream Aluminium 1 m² m² 440,000.00
127 M128 Pintu Fiber KM 1 Unit Unit 510,000.00
128 M129 Atap Aluminium 1 m² m² 142,000.00
129 M130 Bubung Atap Aluminium 1 m² m² 140,000.00
130 M131 Aluminium Foil/Sesalation 1 m² m² 44,000.00
131 M132 Baja Ringan 1 Kg kg 28,800.00
132 M133 Kawat Galvanis 2 mm 1 Kg kg 61,000.00
133 M134 Kawat Galvanis 3 mm 1 Kg kg 89,700.00
134 M135 Kawat Beton/Bendrat RRT 1 Kg kg 24,000.00
135 M136 Kawat Harmonika Gas 1 m² m² 56,000.00
136 M137 Kawat Duri 1 Rol Rol 124,000.00
137 M138 Kawat Nyamuk 1 m² m² 27,000.00
138 M139 Kawat Nyamuk/Kasa Plastik 1 m² m² 27,500.00
139 M140 Paku Kayu Segala Ukuran 1 Kg kg 29,000.00
140 M141 Paku Seng Segala Ukuran 1 Kg kg 37,900.00
141 M142 Paku Asbes Segala Ukuran 1 bh bh 900.00
142 M143 Paku Sumbat Segala Ukuran 1 bh bh 1,300.00
143 M144 Paku Kait Segala Ukuran 1 bh bh 1,700.00
144 M145 Sekrup segala ukuran 1 bh bh 650.00
145 M146 Baut Segala Ukuran 1 kg kg 27,500.00
146 M147 Paku Keling 1 bh bh 4,700.00
147 M148 Paku Beton 1 kg kg 52,500.00
148 M148.a Wire Mesh M6 Asli 1 m² m² 41,500.00
149 M148.b Sealant 1 tube tube 38,000.00
150 M148.c Aluminium Strip 1 m¹ m¹ 25,800.00
151 M148.d Profil Kaca 1 m¹ m¹ 16,800.00
152 M148.e Venetion blinds dan vertical blinds (tirai) 1 m² m² 829,500.00
153 M148.f Atap Seng Galvalum 1 m² m² 71,428.57
154 M148.g Bubung Atap Seng Galvalum 1 m² m² 145,000.00
155 M149 Genteng Biasa ex. Malang 1 bh bh 1,750.00
156 M150 Genteng Press ex. Trenggalek 1 bh bh 1,850.00
157 M151 Genteng Karang Pilang ex. Malang 1 bh bh 3,500.00
158 M152 Genteng Karang Pilang ex. Trenggalek 1 bh bh 3,700.00
159 M153 Genteng Karang Pilang ex. Surabaya 1 bh bh 3,200.00
160 M154 Genteng Beton 1 bh bh 6,700.00
161 M155 Genteng Kaca 5m 1 bh bh 33,000.00
162 M156 Bubung Genteng Biasa ex. Malang 1 bh bh 2,950.00
163 M157 Bubung Genteng Press ex. Trenggalek 1 bh bh 4,800.00
164 M158 Bubung Genteng Karang Pilang ex. Malang 1 bh bh 6,500.00
165 M159 Bubung Genteng Karang Pilang ex. Trenggalek 1 bh bh 7,200.00
166 M160 Bubung Genteng Karang Pilang ex. Surabaya 1 bh bh 9,700.00
167 M161 Bubung Genteng Beton 1 bh bh 11,000.00
168 M162 Genteng Palentong Kecil 1 bh bh 3,200.00
169 M163 Genteng Kodok Glazuur 1 bh bh 5,800.00
170 M164 Genteng Palentong Super/Besar 1 bh bh 10,500.00
171 M165 Bubung Genteng Palentong Kecil 1 bh bh 5,800.00
172 M166 Bubung Genteng Kodok Glazuur 1 bh bh 10,000.00
173 M167 Bubung Genteng Palentong Super/Besar 1 bh bh 11,000.00
174 M168 Genteng Aspal 1 Ibr Ibr 9,000.00
175 M169 Genteng Metal 1 lbr Ibr 140,000.00
176 M170 Atap Sirap 1 bh bh 3,900.00
177 M171 Bubung Genteng Aspal 1 bh bh 63,500.00
178 M172 Bubung Genteng Metal 1 bh bh 140,000.00
179 M173 Bubung Atap Sirap 1 bh bh 165,000.00
180 M173.a Plastik Aerator 1 bh bh 9,500.00
181 M174 Seng plat BJLS 30 L = 0.45 M 1 m¹ m¹ 48,000.00
182 M175 Seng plat BJLS 30 L = 0.60 M 1 m¹ m¹ 55,000.00
183 M176 Seng plat BJLS 30 L = 0.90 M 1 m¹ m¹ 70,000.00
184 M177 Seng plat BJLS 28 (90 x 180) cm 1 lbr Ibr 94,000.00
185 M178 Atap Seng Gelombang 1 Ibr Ibr 116,200.00
186 M179 Bubung Seng Gelombang 1 lbr Ibr 116,200.00
187 M180 Roof Light Fibreglass 1 m² m² 115,200.00
188 M181 Atap Polycarbonat 1 m² m² 280,000.00
189 M182 Asbes Gelombang (3.00 x 1.05) m x 4 mm 1 lbr lbr 145,000.00
190 M183 Asbes Gelombang (2.70 x 1.05) m x 4 mm 1 lbr lbr 130,000.00
191 M184 Asbes Gelombang (2.40 x 1.05) m x 4 mm 1 lbr lbr 115,000.00
192 M185 Asbes Gelombang (2.10 x 1.05) m x 4 mm 1 lbr lbr 102,000.00
193 M186 Asbes Gelombang (1.50 x 1.05) m x 4 mm 1 lbr lbr 81,000.00
194 M187 Asbes Gelombang (2.50 x 0.92) m x 5 mm 1 lbr lbr 145,000.00
195 M188 Asbes Gelombang (2.25 x 0.92) m x 5 mm 1 lbr lbr 127,000.00
196 M189 Asbes Gelombang (2.00 x 0.92) m x 5 mm 1 lbr lbr 113,000.00
197 M190 Asbes Gelombang (1.80 x 0.92) m x 5 mm 1 lbr lbr 90,000.00
198 M191 Asbes Gelombang (3.00 x 1.08) m x 6 mm 1 lbr lbr 180,000.00
199 M192 Asbes Gelombang (2.70 x 1.08) m x 6 mm 1 lbr lbr 172,500.00
200 M193 Asbes Gelombang (2.10 x 1.08) m x 6 mm 1 lbr lbr 128,000.00
201 M194 Asbes Gelombang (1.80 x 1.08) m x 6 mm 1 lbr lbr 120,000.00
202 M195 Bubung Stel Gelombang 0.92 m 1 Ibr lbr 65,000.00
203 M196 Bubung Stel Gelombang 1.05 m 1 lbr lbr 71,000.00
204 M197 Bubung Stel Gelombang 1.08 m 1 lbr lbr 71,500.00
205 M198 Bubung Paten 0.92 m 1 lbr lbr 60,000.00
206 M199 Bubung Paten 1.05 m 1 lbr lbr 59,000.00
207 M200 Bubung Paten 1.08 m 1 lbr lbr 64,000.00
208 M201 Bubung Stel Rata 0.92 m 1 Ibr lbr 70,400.00
209 M202 Bubung Stel Rata 1.05 m 1 lbr lbr 55,000.00
210 M203 Asbes (1,00 x 1,00) m x 6 mm 1 lbr lbr 27,600.00
211 M204 Asbes (1,00 x 1,00) m x 5 mm 1 Ibr lbr 26,000.00
212 M205 Asbes (1,00 x 1,00) m x 4 mm 1 lbr lbr 24,000.00
213 M206 Asbes (1,00 x 1,00) m x 3,5 mm 1 Ibr lbr 23,000.00
214 M207 Akustik (30 x 30) cm 1 Ibr lbr 32,000.00
215 M208 Akustik (30 x 60) cm 1 Ibr lbr 40,500.00
216 M209 Akustik (60 x 120) cm 1 lbr lbr 50,000.00
217 M210 Harplek 4 mm 1 m² m² 76,000.00
218 M211 List Gypsum 1 m' m' 27,400.00
219 M212 Soft Board 1 Ibr Ibr 100,500.00
220 M213 Gypsum Board 1 Ibr Ibr 101,000.00
221 M214 Fiber semen / kalsiboard 1 Ibr lbr 92,000.00
222 M215 Triplek 4 mm 1 Ibr lbr 90,000.00
223 M216 Multiplek 6 mm 1 Ibr lbr 110,000.00
224 M217 Multiplek 9 mm 1 Ibr lbr 175,000.00
225 M218 Multiplek 10 mm 1 Ibr lbr 180,000.00
226 M219 Multiplek 12 mm 1 Ibr lbr 235,000.00
227 M220 Multiplek 18 mm 1 Ibr lbr 345,000.00
228 M221 Plywood Lapis Aluminium 1 lbr lbr 115,000.00
229 M222 Plywood (30 x 60) cm x 4 mm 1 lbr lbr 114,000.00
230 M223 Plywood (30 x 60) cm x 6 mm 1 Ibr lbr 130,000.00
231 M224 Plywood (60 x 120) cm x 4 mm 1 Ibr lbr 130,000.00
232 M225 Plywood (60 x 120) cm x 6 mm 1 lbr lbr 172,000.00
233 M226 Plywood (120 x 240) cm x 4 mm 1 Ibr lbr 214,000.00
234 M227 Teakwood (30 x 60) cm x 4 mm 1 lbr lbr 59,000.00
235 M228 Teakwood (60 x 120) cm x 4 mm 1 lbr lbr 85,000.00
236 M229 Teakwood (120 x 240) cm x 4 mm 1 Ibr lbr 110,000.00
237 M230 Kloset Jongkok Porselin Kw. A 1 Unit Unit 210,000.00
238 M231 Kloset Duduk Porselin Kw. A 1 Unit Unit 2,114,000.00
239 M232 Kloset Jongkok Lux 1 Unit Unit 670,000.00
240 M233 Kloset Duduk Lux 1 Unit Unit 2,290,000.00
241 M234 Kloset Jongkok Teraso 1 bh bh 92,000.00
242 M235 Kran Air 1/2 " 1 bh bh 57,800.00
243 M236 Kran Air 3/4 " 1 bh bh 64,400.00
244 M237 Bak Mandi Teraso 1 bh bh 200,000.00
245 M238 Bak Mandi Fibre 1 bh bh 465,000.00
246 M239 Bak Mandi Plastik 1 bh bh 295,000.00
247 M240 Bak Mandi Porselin 1 bh bh 3,000,000.00
248 M241 Kran Bathub Panas dan dingin 1 bh bh 610,000.00
249 M242 Bak Cuci Firing Teraso 1 bh bh 293,900.00
250 M243 Bak Cuci Firing Stainless 1 bh bh 425,000.00
251 M244 Badkip Porselen 1 bh bh 1,900,500.00
252 M245 Urinoir Porselin 1 bh bh 1,500,000.00
253 M246 Urinoir Keramik 1 bh bh 1,550,000.00
254 M247 Wastafel Komplit (Kran + Sipon) Lux 1 Unit Unit 1,890,000.00
255 M248 Wastafel Komplit (Kran + Sipon) Kw. A 1 Unit Unit 620,000.00
256 M249 Tempat Sabun Keramik 1 bh bh 46,000.00
257 M250 Afor Stainless 1 bh bh 78,200.00
258 M251 Afor Plastic 1 bh bh 26,600.00
259 M252 Kaca Wastafel 1 bh bh 330,000.00
260 M253 Kunci Tanam Antik 1 bh bh 133,000.00
261 M254 Kunci Tanam 1 bh bh 150,000.00
262 M255 Kunci Pintu Kamar Mandi 1 bh bh 125,000.00
263 M256 Kunci Silinder 1 bh bh 200,000.00
264 M257 Engsel Pintu 1 bh bh 45,900.00
265 M258 Engsel Jendela 1 bh bh 33,500.00
266 M259 Hak Angin 1 bh bh 38,000.00
267 M260 Spring Knip 1 bh bh 32,500.00
268 M261 Kait Angin 1 bh bh 19,000.00
269 M262 Grendel Pintu 1 bh bh 30,100.00
270 M263 Grendel Jendela 1 bh bh 17,000.00
271 M264 Door Closer 1 bh bh 240,000.00
272 M265 Slot/Kunci Pintu 1 bh bh 190,000.00
273 M266 Door Holder 1 bh bh 170,000.00
274 M267 Door Stop 1 bh bh 50,000.00
275 M268 Rel Pintu Dorong 1 bh bh 185,700.00
276 M269 Kunci Lemari 1 bh bh 16,300.00
277 M270 Kaca Polos tebal 3 mm 1 m² m² 113,500.00
278 M271 Kaca Polos tebal 5 mm 1 m² m² 170,000.00
279 M272 Kaca Polos tebal 8 mm 1 m² m² 331,000.00
280 M273 Kaca Polos tebal 12 mm 1 m² m² 476,000.00
281 M274 Kaca Buram tebal 3 mm 1 m² m² 142,500.00
282 M275 Kaca Buram tebal 5 mm 1 m² m² 227,300.00
283 M276 Kaca Buram tebal 8 mm 1 m² m² 280,000.00
284 M277 Kaca Buram tebal 12 mm 1 m² m² 445,000.00
285 M278 Kaca Cermin tebal 5 mm 1 m² m² 208,500.00
286 M279 Kaca Cermin tebal 6 mm 1 m² m² 360,000.00
287 M280 Kaca Cermin tebal 8 mm 1 m² m² 490,000.00
288 M281 Kaca Rayben tebal 3 mm 1 m² m² 165,000.00
289 M282 Kaca Rayben tebal 5 mm 1 m² m² 248,000.00
290 M283 Kaca Rayben tebal 8 mm 1 m² m² 500,000.00
291 M284 Kaca Rayben tebal 12 mm 1 m² m² 850,000.00
292 M285 Jendela Nako + accessories 1 m² m² 325,000.00
293 M286 Glass Block 1 bh bh 33,000.00
294 M287 Painting Glass 1 m² m² 750,000.00
295 M288 Kaca "Wireglass" 5 mm 1 m² m² 830,000.00
296 M289 Kaca Patri 5 mm 1 m² m² 1,830,000.00
297 M290 Ubin pc abu-abu 40 x 40 cm 1 bh bh 3,700.00
298 M291 Ubin pc abu-abu 30 x 30 cm 1 bh bh 2,800.00
299 M292 Ubin pc abu-abu 20 x 20 cm 1 bh bh 1,850.00
300 M293 Ubin pc warna 40 x 40 cm 1 bh bh 4,700.00
301 M294 Ubin pc warna 30 x 30 cm 1 bh bh 2,900.00
302 M295 Ubin pc warna 20 x 20 cm 1 bh bh 2,000.00
303 M296 Ubin Terasso 40 x 40 cm 1 bh bh 5,800.00
304 M297 Ubin Terasso 30 x 30 cm 1 bh bh 4,100.00
305 M298 Ubin Granito 40 x 40 cm 1 bh bh 58,500.00
306 M299 Ubin Granito 30 x 30 cm 1 bh bh 32,000.00
M299a Keramik Cutting 40 x 40 cm 1 bh bh 57,000.00
M299b Keramik Cutting 30 x 30 cm 1 bh bh 51,700.00
M299c Keramik Cutting 60 x 60 cm 1 bh bh 99,000.00
M299d Keramik Cutting 40 x 40 cm 1 bh bh 74,000.00
307 M300 Plint ubin pc abu-abu 15 x 20 cm 1 bh bh 4,000.00
308 M301 Plint ubin pc abu-abu 10 x 30 cm 1 bh bh 4,500.00
309 M302 Plint ubin pc abu-abu 10 x 40 cm 1 bh bh 5,000.00
310 M303 Plint ubin pc warna 10 x 20 cm 1 bh bh 2,450.00
311 M304 Plint ubin pc warna 10 x 30 cm 1 bh bh 3,400.00
312 M305 Plint ubin pc warna 10 x 40 cm 1 bh bh 5,000.00
313 M306 Plint Ubin Terasso 10 x 30 cm 1 bh bh 5,800.00
314 M307 Plint Ubin Terasso 10 x 40 cm 1 bh bh 8,300.00
315 M308 Plint Ubin Granito 10 x 40 cm 1 bh bh 18,000.00
316 M309 Plint Ubin Granito 10 x 30 cm 1 bh bh 12,000.00
317 M310 Lantai keramik artistik 10 x 20 1 bh bh 12,000.00
318 M311 Lantai keramik artistik 10 x 10 1 bh bh 12,000.00
319 M312 Lantai keramik artistik 5 x 20 1 bh bh 12,000.00
320 M313 Plint keramik artistik 10 x 20 1 bh bh 24,000.00
321 M314 Plint keramik artistik 10 x 10 1 bh bh 24,000.00
322 M315 Plint keramik artistik 5 x 20 1 bh bh 24,000.00
323 M316 Internal cove 5 x 5 x 20 cm 1 bh bh 31,000.00
324 M316.a Bahan Teraso Cor 1 m³ m³ 293,000.00
325 M317 Keramik Lantai 40 x 40 cm putih 1 bh bh 18,000.00
326 M318 Keramik Lantai 40 x 40 cm warna/motif 1 bh bh 20,000.00
M318.a Keramik Lantai 5 x 40 cm warna/motif (potongan) 1 bh bh 6,600.00
327 M319 Keramik Lantai 30 x 30 cm putih 1 bh bh 5,800.00
328 M320 Keramik Lantai 30 x 30 cm warna/motif 1 bh bh 8,300.00
M320.a Keramik Lantai 5 x 30 cm warna/motif (potongan) 1 bh bh 6,600.00
329 M321 Keramik Lantai 20 x 20 cm putih 1 bh bh 2,000.00
330 M322 Keramik Lantai 20 x 20 cm warna/motif 1 bh bh 2,200.00
331 M323 Keramik Lantai KM 20 x 20 cm 1 bh bh 2,100.00
332 M324 Plint Keramik Lantai 10 x 20 cm 1 bh bh 9,100.00
333 M325 Plint Keramik Lantai 10 x 30 cm 1 bh bh 12,000.00
334 M326 Plint Keramik Lantai 10 x 40 cm 1 bh bh 22,000.00
335 M327 Keramik Dinding 20 x 25 cm 1 bh bh 5,800.00
336 M328 Keramik Dinding 20 x 20 cm 1 bh bh 4,100.00
337 M329 Porselin 15 x 15 cm putih 1 bh bh 1,350.00
338 M330 Porselin 15 x 15 cm warna 1 bh bh 1,350.00
339 M331 Porselin 10 x 20 cm warna 1 bh bh 1,350.00
340 M332 Porselin 20 x 20 cm warna 1 bh bh 2,800.00
341 M333 Gymflour 1 m² m² 320,000.00
342 M333.a Parquet 1 m² m² 300,000.00
343 M333.b Karpet 1 m² m² 104,500.00
344 M333.c Lantai marmer 100x100 cm 1 m² m² 550,000.00
345 M333.d Porselin 11 x 11 cm putih 1 m² m² 1,200.00
346 M333.e Porselin 11 x 11 cm warna 1 m² m² 1,600.00
347 M333.f Wall Paper 1 m² m² 85,000.00
348 M333.g Batu Ampyangan Granit 1 kg kg 9,900.00
349 M334 Pipa PVC tipe AW Ø 1/2" 1 m¹ m¹ 13,200.00
350 M335 Pipa PVC tipe AW Ø 3/4" 1 m¹ m¹ 19,500.00
351 M336 Pipa PVC tipe AW Ø 1" 1 m¹ m¹ 25,000.00
352 M337 Pipa PVC tipe AW Ø 1.5" 1 m¹ m¹ 34,000.00
353 M338 Pipa PVC tipe AW Ø 2" 1 m¹ m¹ 43,000.00
354 M339 Pipa PVC tipe AW Ø 2.5" 1 m¹ m¹ 56,000.00
355 M340 Pipa PVC tipe AW Ø 3 " 1 m¹ m¹ 77,500.00
356 M341 Pipa PVC tipe AW Ø 4 " 1 m¹ m¹ 120,000.00
357 M342 Pipa PVC tipe AW Ø 6 " 1 m¹ m¹ 210,000.00
358 M343 Pipa PVC tipe AW Ø 8 " 1 m¹ m¹ 280,000.00
359 M344 Pipa PVC tipe D Ø 1/2 " 1 m¹ m¹ 5,600.00
360 M345 Pipa PVC tipe D Ø 3/4 " 1 m¹ m¹ 8,500.00
361 M346 Pipa PVC tipe D Ø 1" 1 m¹ m¹ 11,200.00
362 M347 Pipa PVC tipe D Ø 1.5 " 1 m¹ m¹ 17,000.00
363 M348 Pipa PVC tipe D Ø 2 " 1 m¹ m¹ 17,000.00
364 M349 Pipa PVC tipe D Ø 2.5 " 1 m¹ m¹ 30,000.00
365 M350 Pipa PVC tipe D Ø 3 " 1 m¹ m¹ 42,000.00
366 M351 Pipa PVC tipe D Ø 4 " 1 m¹ m¹ 54,000.00
367 M352 Pipa PVC tipe C Ø 1/2 " 1 m¹ m¹ 4,300.00
368 M353 Pipa PVC tipe C Ø 3/4 " 1 m¹ m¹ 6,400.00
369 M354 Pipa PVC tipe C Ø 1" 1 m¹ m¹ 8,500.00
370 M355 Pipa PVC tipe C Ø 1.5 " 1 m¹ m¹ 11,250.00
371 M356 Pipa PVC tipe C Ø 2 " 1 m¹ m¹ 17,000.00
372 M357 Pipa PVC tipe C Ø 2.5 " 1 m¹ m¹ 22,000.00
373 M358 Pipa PVC tipe C Ø 3 " 1 m¹ m¹ 26,000.00
374 M359 Pipa PVC tipe C Ø 4 " 1 m¹ m¹ 33,000.00
375 M360 Shock PVC Ø 1/2 " 1 bh bh 4,200.00
376 M361 Shock PVC Ø 3/4 " 1 bh bh 4,000.00
377 M362 Shock PVC Ø 1 " 1 bh bh 5,400.00
378 M363 Shock PVC Ø 1.5 " 1 bh bh 6,600.00
379 M364 Shock PVC Ø 2 " 1 bh bh 11,000.00
380 M365 Shock PVC Ø 2.5 " 1 bh bh 16,000.00
381 M366 Shock PVC Ø 3 " 1 bh bh 17,200.00
382 M367 Shock PVC Ø 4 " 1 bh bh 21,000.00
383 M368 Knee PVC Ø 1/2 " 1 bh bh 3,000.00
384 M369 Knee PVC Ø 3/4 " 1 bh bh 4,600.00
385 M370 Knee PVC Ø 1 " 1 bh bh 5,200.00
386 M371 Knee PVC Ø 1.5 " 1 bh bh 10,000.00
387 M372 Knee PVC Ø 2 " 1 bh bh 13,000.00
388 M373 Knee PVC Ø 2.5 " 1 bh bh 17,000.00
389 M374 Knee PVC Ø 3 " 1 bh bh 19,000.00
390 M375 Knee PVC Ø 4 " 1 bh bh 24,000.00
391 M376 Pipa Galvanis Ø 1/2" tebal 1.8 mm 1 m¹ m¹ 58,000.00
392 M377 Pipa Galvanis Ø 3/4" tebal 1.8 mm 1 m¹ m¹ 75,000.00
393 M378 Pipa Galvanis Ø 1 ", tebal 2 mm 1 m¹ m¹ 101,000.00
394 M379 Pipa Galvanis Ø 1.5 ", tebal 2 mm 1 m¹ m¹ 130,000.00
395 M380 Pipa Galvanis Ø 2 ", tebal 2.3 mm 1 m¹ m¹ 215,000.00
396 M381 Pipa Galvanis Ø 2.5 ", tebal 2.5 mm 1 m¹ m¹ 300,000.00
397 M382 Pipa Galvanis Ø 3" tebal 2.5 mm 1 m¹ m¹ 320,000.00
398 M383 Pipa Galvanis Ø 4" tebal 2.8 mm 1 m¹ m¹ 427,000.00
399 M384 Shock Galvanis Ø 1/2 " 1 bh bh 4,300.00
400 M385 Shock Galvanis Ø 3/4 " 1 bh bh 5,800.00
401 M386 Shock Galvanis Ø 1 " 1 bh bh 11,400.00
402 M387 Shock Galvanis Ø 1.5 " 1 bh bh 13,400.00
403 M388 Shock Galvanis Ø 2 " 1 bh bh 31,800.00
404 M389 Shock Galvanis Ø 2.5 " 1 bh bh 50,000.00
405 M390 Shock Galvanis Ø 3 " 1 bh bh 77,000.00
406 M391 Shock Galvanis Ø 4 " 1 bh bh 200,000.00
407 M392 Knee Galvanis Ø 1/2 " 1 bh bh 5,600.00
408 M393 Knee Galvanis Ø 3/4 " 1 bh bh 8,300.00
409 M394 Knee Galvanis Ø 1 " 1 bh bh 10,300.00
410 M395 Knee Galvanis Ø 1.5 " 1 bh bh 23,400.00
411 M396 Knee Galvanis Ø 2 " 1 bh bh 39,000.00
412 M397 Knee Galvanis Ø 2.5 " 1 bh bh 70,000.00
413 M398 Knee Galvanis Ø 3 " 1 bh bh 110,000.00
414 M399 Knee Galvanis Ø 4 " 1 bh bh 135,000.00
415 M400 Pipa Screen PVC tipe AW Ø 6 " 1 m¹ m¹ 220,000.00
416 M400.a Pipa PVC tipe AW Ø 5 " 1 m¹ m¹ 200,000.00
417 M400.b Pipa Screen PVC tipe AW Ø 5 " 1 m¹ m¹ 180,000.00
418 M400.c Pipa PVC moof 6 m S - 12,5 Ø 2" 1 m¹ m¹ 43,000.00
419 M400.d Pipa PVC moof 6 m S - 12,5 Ø 2,5" 1 m¹ m¹ 60,000.00
420 M400.e Pipa PVC moof 6 m S - 12,5 Ø 3" 1 m¹ m¹ 85,000.00
421 M400.f Pipa PVC moof 6 m S - 12,5 Ø 4" 1 m¹ m¹ 130,000.00
422 M400.g Pipa PVC moof 6 m S - 12,5 Ø 6" 1 m¹ m¹ 280,000.00
423 M400.h Pipa PVC moof 6 m S - 12,5 Ø 8" 1 m¹ m¹ 459,000.00
424 M401 Kertas Gosok 1 Lbr Lbr 6,400.00
425 M402 Plamir Kayu 1 kg kg 30,000.00
426 M403 Plamir Tembok 1 kg kg 27,255.00
427 M404 Plamir Besi 1 Kg kg 75,000.00
428 M405 Dempul Jadi 1 kg kg 45,000.00
429 M406 Minyak Cat 1 Ltr Ltr 27,300.00
430 M407 Spiritus 1 Ltr Ltr 18,400.00
431 M408 Sirlak 1 kg kg 210,000.00
432 M409 Cat meni kayu 1 kg kg 48,000.00
433 M410 Cat meni besi 1 kg kg 50,500.00
434 M411 Cat Dasar Kayu 1 kg kg 66,000.00
435 M412 Cat Dasar Tembok 1 kg kg 42,000.00
436 M413 Cat Dasar Besi 1 kg kg 75,000.00
437 M414 Cat Kayu 1 kg kg 101,000.00
438 M415 Cat Tembok 1 kg kg 116,000.00
439 M415.a Cat Tembok Interior 1 kg kg 121,000.00
440 M415.b Cat Tembok Eksterior 1 kg kg 139,000.00
441 M416 Cat Besi 1 kg kg 102,000.00
442 M417 Cat Genting 1 kg kg 175,000.00
443 M418 Waterproofing 1 kg kg 205,000.00
444 M419 Vernis 1 Ltr Ltr 80,000.00
445 M420 Politur Jadi 1 Ltr Ltr 103,000.00
446 M421 Kuas 1 bh bh 27,000.00
447 M422 Lem Kayu 1 Ltr Ltr 56,000.00
448 M423 Lem Pipa PVC 1 kg kg 51,000.00
449 M424 Lem vinyl 1 kg kg 80,000.00
450 M425 Residu atau Teer 1 Ltr Ltr 43,000.00
451 M426 Teak oli 1 Ltr Ltr 6,000.00
452 M427 Kalkarium 1 kg kg 12,000.00
453 M428 Kapur Sirih 1 kg kg 11,000.00
454 M429 Soda api 1 kg kg 32,000.00
455 M430 Sabun 1 kg kg 51,900.00
456 M430.a Vinyl (30x30)cm 1 bh bh 53,400.00
457 M430.b Batu Apung 1 kg kg 53,000.00
458 M430.c Alang-Alang 1 ikat ikat 6,100.00
459 M431 Tandon Air PVC V = 0.5 m3 1 bh bh 980,000.00
460 M432 Tandon Air PVC V = 1.0 m3 1 bh bh 1,715,000.00
461 M433 Tandon Air Stainless V = 0.5 m3 1 bh bh 2,725,000.00
462 M434 Tandon Air Stainless V = 1.0 m3 1 bh bh 4,560,000.00
463 M435 Sumur Pompa Tangan Lengkap 1 Unit Unit 260,000.00
464 M436 Pompa Air 1 Unit Unit 1,050,000.00
465 M437 Kabel NYA 2.5 mm 1 m¹ m¹ 7,000.00
466 M438 Kabel NYA 4.0 mm 1 m¹ m¹ 11,000.00
467 M438a Kabel NYYHY 3x4 mm 1 m¹ m¹ 18,000.00
468 M438b Kabel NYYHY 3x1.5 mm 1 m¹ m¹ 11,000.00
469 M439 Stop Kontak 1 bh bh 37,100.00
470 M440 Saklar Broco Tunggal 1 bh bh 45,200.00
471 M440.a Saklar Broco Ganda 1 bh bh 51,000.00
472 M441 Las doof 1 bh bh 9,800.00
473 M442 Isolator 1 m¹ m¹ 12,000.00
474 M443 T dos PVC 1 bh bh 2,000.00
475 M444 Pipa PVC 5/8" 1 Ljr Ljr 9,500.00
476 M445 Fiting Flafond 1 bh bh 15,000.00
477 M446 Zekering Kast Lokal 1 Group 1 Unit Unit 90,000.00
478 M447 Zekering Kast Lokal 2 Group 1 Unit Unit 133,000.00
479 M448 Zekering Kast Lokal 3 Group 1 Unit Unit 180,000.00
480 M449 Lampu TL Komplit 20 Watt 1 bh bh 87,000.00
481 M450 Lampu TL Komplit 40 Watt 1 bh bh 138,300.00
482 M451 Lampu XL (Lilin) 5 Watt 1 bh bh 40,000.00
483 M452 Lampu XL (Lilin) 8 Watt 1 bh bh 42,500.00
484 M453 Lampu XL (Lilin) 14 Watt 1 bh bh 48,000.00
485 M454 Lampu XL (Lilin) 18 Watt 1 bh bh 52,000.00
486 M455 Lampu XL (Lilin) 23 Watt 1 bh bh 60,000.00
487 M456 Lampu Pijar 5 - 40 Watt 1 bh bh 25,000.00
488 M457 Lampu Pijar 50 -100 Watt 1 bh bh 41,000.00
489 M458 Tambah Daya 2200 Watt 1 Ls Ls 5,000,000.00
490 M459 Pasang Baru PLN 1 Ls Ls 6,918,200.00
491 M460 Pipa Arde 1 m¹ m¹ 471,000.00
492 M460.a Splits Dia 1 1 bh bh 345,000.00
493 M460.b Timah 1 kg kg 590,000.00
494 M460.c Kawat BC 1 m¹ m¹ 61,000.00
495 M460.d Klemp 1 bh bh 2,900.00
496 M461 Rumput Lamur 1 m² m² 19,000.00
497 M462 Rumput Manila 1 m² m² 19,000.00
498 M463 Semak Hias 1 m² m² 17,000.00
499 M464 Pohon Pelindung 1 btg btg 260,000.00
500 M464.a Gebalan rumput 1 m² m² 17,000.00
501 M465 Tali ijuk 1 kg kg 26,500.00
502 M466 ljuk 1 m³ m³ 235,000.00
503 M467 Waterstop Lebar 150 mm 1 m¹ m¹ 47,200.00
504 M468 Waterstop Lebar 200 mm 1 m¹ m¹ 85,100.00
505 M469 Waterstop Lebar 230 mm 1 m¹ m¹ 99,400.00
506 M470 Rumput Common Bermuda Grass 1 m² m² 19,000.00
507 M471 Pupuk 1 kg kg 4,000.00
508 M471a Obat Tanaman 1 ltr ltr 120,000.00
509 M472 Tali Plastik Ø 0.8 cm 1 m¹ m¹ 3,200.00
510 M473 Elektroda 1 kg kg 180,000.00
511 M474 Minyak bekisting 1 ltr Itr 3,900.00
512 M475 Formika (90 x 120) cm 1 lbr lbr 220,000.00
513 M476 Strorox 100 1 kg kg 123,100.00
514 M477 Formtie 1 bh bh 10,200.00
515 M478 Batacote 1 kg kg 9,200.00
516 M479 Rapidrant 1 Gln Gln 47,200.00
517 M480 Puzzdith - 100 XR 1 Ltr Itr 94,600.00
518 M481 Seal Tape / TBA 1 bh bh 4,500.00
519 M482 Bensin Industri 1 ltr Itr 10,000.00
520 M482.a Bensin Umum 1 Itr Itr 6,400.00
521 M483 Solar Industri 1 Itr Itr 10,250.00
522 M483.a Solar Umum 1 Itr Itr 10,000.00
523 M484 Minyak Pelumas 1 Itr Itr 65,000.00
524 M485 Grease 1 kg kg 47,000.00
525 M486 Air Bersih 1 Itr Itr 50.00
M487 Kuas 4" 1 bh bh 24,000.00

Malang,
KEPALA DINAS PEKERJAAN UMUM
KOTA MALANG

Ir. HADI SANTOSO


Pembina Utama Muda
NIP.19610615 198903 1 017
N 47,108.60
0.00 #REF!

KETERANGAN
228,571.43 Harga 2012
Input harga Harga 2012
Tanah dan Pasir M01d 1 88,800.00 86,269.20
M01b 2 132,000.00 128,238.00
3 220,000.00 127,000.00 123,380.50
M01a 4 139,600.00 135,621.40
5 13,500.00 9,800.00 9,520.70
6 130,000.00 68,400.00 66,450.60
M16 7 122,300.00 118,814.45
8 95,200.00 70,500.00 68,490.75
9 73,500.00 53,000.00 51,489.50
Batu,Bata & Beton Block 1 164,900.00 112,000.00 108,808.00
M06 2 139,900.00 135,912.85
M02 3 130,100.00 126,392.15
4 308,400.00 209,500.00 203,529.25
5 300,300.00 204,000.00 198,186.00
6 240,000.00 163,000.00 158,354.50
7 214,200.00 145,500.00 141,353.25
8 344,500.00 234,000.00 227,331.00
M91 9 193,266.04 187,757.96
M92 10 193,266.04 187,757.96
11 269,400.00 183,000.00 177,784.50
12 248,800.00 169,000.00 164,183.50
- 13 900.00 600.00 582.90
14 19,500.00 13,200.00 12,823.80
15 1,400.00 950.00 922.93
16 7,800.00 5,250.00 5,100.38
17 14,400.00 9,750.00 9,472.13
18 4,900.00 3,300.00 3,205.95
19 3,900.00 2,600.00 2,525.90
20 118,200.00 80,250.00 77,962.88
21 82,500.00 76,000.00 73,834.00
22 7,600.00 5,100.00 4,954.65
23 6,700.00 4,500.00 4,371.75
24 5,600.00 3,750.00 3,643.13
Per Meter isi 45 t=6cm 25 1,200.00 1,100.00 1,068.65
Per Meter isi 45 26 2,000.00 1,300.00 1,262.95
Per Meter isi 28 27 3,100.00 2,100.00 2,040.15
Per Meter isi 28 28 3,300.00 2,200.00 2,137.30
Per Meter isi 33 29 2,100.00 1,400.00 1,360.10
Per Meter isi 33 30 2,400.00 1,600.00 1,554.40
Semen M12. 1 1,350.00 1,311.53
2 6,400.00 4,300.00 4,177.45
3 4,000.00 2,700.00 2,623.05
4 15,000.00 8,250.00 8,014.88
5 12,900.00 8,750.00 8,500.63
6 2,105,000.00 1,430,000.00 1,389,245.00
7 1,700.00 1,000.00 971.50
8 290,800.00 197,500.00 191,871.25
Buis Beton 1 56,000.00 38,000.00 36,917.00
2 52,300.00 48,000.00 46,632.00
3 65,500.00 66,000.00 64,119.00
4 121,500.00 82,500.00 80,148.75
5 156,100.00 106,000.00 102,979.00
6 295,900.00 201,000.00 195,271.50
7 322,800.00 219,250.00 213,001.38
8 412,900.00 280,500.00 272,505.75
9 29,200.00 29,200.00 28,367.80
10 62,200.00 42,250.00 41,045.88
Kayu Borneo 1 12,997,500.00 8,830,000.00 8,578,345.00
Kayu Borneo 2 12,997,500.00 8,830,000.00 8,578,345.00
Kayu Borneo 3 12,997,500.00 8,830,000.00 8,578,345.00
Kayu Borneo 4 16,059,200.00 10,910,000.00 10,599,065.00
Kayu Borneo 5 16,442,000.00 11,170,000.00 10,851,655.00
Kayu Borneo 6 16,442,000.00 11,170,000.00 10,851,655.00
Kayu Meranti 7 7,563,000.00 5,138,000.00 4,991,567.00
Kayu Meranti 8 7,563,000.00 5,138,000.00 4,991,567.00
Kayu Meranti 9 8,481,500.00 5,762,000.00 5,597,783.00
Kayu Meranti 10 10,088,900.00 6,854,000.00 6,658,661.00
Kayu Meranti 11 10,165,500.00 6,906,000.00 6,709,179.00
Kayu Meranti 12 7,905,900.00 7,010,000.00 6,810,215.00
Kayu Kruing 13 9,093,900.00 6,178,000.00 6,001,927.00
Kayu Kruing 14 9,093,900.00 6,178,000.00 6,001,927.00
Kayu Kruing 15 9,553,100.00 6,490,000.00 6,305,035.00
Kayu Kruing 16 10,318,600.00 7,010,000.00 6,810,215.00
Kayu Kruing 17 10,318,600.00 7,010,000.00 6,810,215.00
Kayu Kruing 18 7,390,300.00 7,010,000.00 6,810,215.00
Kayu Kamper 19 13,763,000.00 9,350,000.00 9,083,525.00
Kayu Kamper 20 14,145,700.00 9,610,000.00 9,336,115.00
Kayu Kamper 21 14,528,400.00 9,870,000.00 9,588,705.00
Kayu Kamper 22 16,824,700.00 11,430,000.00 11,104,245.00
Kayu Kamper 23 17,207,400.00 11,690,000.00 11,356,835.00
Kayu Kamper 24 17,590,100.00 11,950,000.00 11,609,425.00
Kayu Lain-lain 25 5,037,100.00 3,422,000.00 3,324,473.00
M99 26 3,750,000.00 3,643,125.00
27 35,500.00 24,100.00 23,413.15
28 40,700.00 27,600.00 26,813.40
29 15,800.00 7,700.00 7,480.55
30 5,343,300.00 3,630,000.00 3,526,545.00
31 48,300.00 38,400.00 37,305.60
32 118,000.00 80,100.00 77,817.15
Kayu Jati Ex Malang 33 19,947,600.00 13,551,600.00 13,165,379.40
Kayu Jati Ex Malang 34 19,947,600.00 13,551,600.00 13,165,379.40
Kayu Jati Ex Malang 35 19,947,600.00 13,551,600.00 13,165,379.40
Kayu Jati Ex Malang 36 22,167,300.00 15,059,600.00 14,630,401.40
Kayu Jati Ex Malang 37 22,167,300.00 15,059,600.00 14,630,401.40
Kayu Jati Ex Malang 38 22,167,300.00 15,059,600.00 14,630,401.40
Kayu Jati Ex Madiun/Ngawi 39 23,560,400.00 16,006,000.00 15,549,829.00
Kayu Jati Ex Madiun/Ngawi 40 23,560,400.00 16,006,000.00 15,549,829.00
Kayu Jati Ex Madiun/Ngawi 41 23,560,400.00 16,006,000.00 15,549,829.00
Kayu Jati Ex Madiun/Ngawi 42 23,560,400.00 16,006,000.00 15,549,829.00
Kayu Jati Ex Madiun/Ngawi 43 23,560,400.00 16,006,000.00 15,549,829.00
Kayu Jati Ex Madiun/Ngawi 44 23,560,400.00 16,006,000.00 15,549,829.00
Kayu Jati Ex Bojonegoro 45 29,392,900.00 19,968,400.00 19,399,300.60
Kayu Jati Ex Bojonegoro 46 29,392,900.00 19,968,400.00 19,399,300.60
Kayu Jati Ex Bojonegoro 47 29,392,900.00 19,968,400.00 19,399,300.60
Kayu Jati Ex Bojonegoro 48 29,392,900.00 19,968,400.00 19,399,300.60
Kayu Jati Ex Bojonegoro 49 29,392,900.00 19,968,400.00 19,399,300.60
Kayu Jati Ex Bojonegoro 50 29,392,900.00 19,968,400.00 19,399,300.60
Besi dan Aluminium M13 1 9,750.00 9,472.13
M39b 2 14,300.00 13,892.45
3 14,300.00 13,892.45
4 14,600.00 9,900.00 9,617.85
5 14,600.00 9,900.00 9,617.85
M48 6 15,700.00 15,252.55
M46 7 15,700.00 15,252.55
8 25,400.00 17,200.00 16,709.80
9 25,400.00 17,200.00 16,709.80
10 25,400.00 17,200.00 16,709.80
11 25,800.00 17,500.00 17,001.25
12 44,800.00 30,400.00 29,533.60
13 1,108,400.00 753,000.00 731,539.50
14 3,047,800.00 2,070,500.00 2,011,490.75
15 2,493,700.00 1,694,100.00 1,645,818.15
16 1,847,200.00 1,254,900.00 1,219,135.35
17 923,700.00 627,500.00 609,616.25
18 1,062,200.00 721,600.00 701,034.40
19 484,900.00 329,400.00 320,012.10
20 620,600.00 421,600.00 409,584.40
21 134,000.00 91,000.00 88,406.50
22 160,800.00 109,200.00 106,087.80
23 461,800.00 313,700.00 304,759.55
24 514,900.00 349,800.00 339,830.70
25 151,400.00 102,800.00 99,870.20
26 147,800.00 100,400.00 97,538.60
27 46,100.00 31,300.00 30,407.95
28 60,400.00 41,000.00 39,831.50
29 65,600.00 44,500.00 43,231.75
30 97,600.00 66,300.00 64,410.45
M14 31 17,500.00 17,001.25
32 35,200.00 23,900.00 23,218.85
33 36,900.00 21,800.00 21,178.70
34 31,500.00 21,100.00 20,498.65
35 30,200.00 20,500.00 19,915.75
M18 36 22,000.00 21,373.00
37 37,900.00 25,700.00 24,967.55
38 900.00 600.00 582.90
39 1,400.00 900.00 874.35
40 1,100.00 700.00 680.05
41 700.00 450.00 437.18
42 28,900.00 19,600.00 19,041.40
43 4,900.00 3,300.00 3,205.95
44 57,900.00 39,300.00 38,179.95
45 25,800.00 17,500.00 17,001.25
46 30,100.00 29,200.00 28,367.80
47 25,800.00 17,500.00 17,001.25
48 16,800.00 11,400.00 11,075.10
49 829,500.00 563,500.00 547,440.25
50 165,400.00 112,300.00 109,099.45
51 160,800.00 109,200.00 106,087.80
Atap Genteng 1 1,800.00 1,200.00 1,165.80
2 2,000.00 1,300.00 1,262.95
3 2,100.00 1,500.00 1,457.25
4 2,600.00 1,700.00 1,651.55
5 3,800.00 2,100.00 2,040.15
6 6,200.00 4,200.00 4,080.30
7 18,000.00 14,100.00 13,698.15
8 3,100.00 2,100.00 2,040.15
9 3,700.00 2,500.00 2,428.75
10 4,700.00 4,700.00 4,566.05
11 5,100.00 5,100.00 4,954.65
12 7,200.00 5,700.00 5,537.55
13 11,700.00 7,900.00 7,674.85
14 3,400.00 2,300.00 2,234.45
15 3,400.00 2,300.00 2,234.45
16 6,700.00 4,500.00 4,371.75
17 6,100.00 4,100.00 3,983.15
18 10,800.00 7,300.00 7,091.95
19 11,500.00 7,800.00 7,577.70
20 9,900.00 6,700.00 6,509.05
21 148,300.00 100,700.00 97,830.05
22 2,400.00 1,600.00 1,554.40
23 66,400.00 45,100.00 43,814.65
24 148,300.00 100,700.00 97,830.05
25 179,500.00 121,900.00 118,425.85
26 10,200.00 6,900.00 6,703.35
Atap Seng / Asbes 1 52,900.00 35,900.00 34,876.85
2 60,300.00 40,900.00 39,734.35
3 75,700.00 51,400.00 49,935.10
4 103,200.00 70,100.00 68,102.15
5 126,600.00 86,000.00 83,549.00
6 116,200.00 78,900.00 76,651.35
7 115,200.00 78,200.00 75,971.30
8 205,300.00 114,200.00 110,945.30
9 158,600.00 107,700.00 104,630.55
10 146,500.00 99,500.00 96,664.25
11 126,800.00 86,100.00 83,646.15
12 112,400.00 76,300.00 74,125.45
13 85,300.00 57,900.00 56,249.85
14 161,100.00 109,400.00 106,282.10
15 139,400.00 94,700.00 92,001.05
16 123,500.00 83,900.00 81,508.85
17 94,000.00 63,800.00 61,981.70
18 198,600.00 134,900.00 131,055.35
19 190,400.00 129,300.00 125,614.95
20 140,800.00 95,600.00 92,875.40
21 113,200.00 76,900.00 74,708.35
22 70,400.00 47,800.00 46,437.70
23 74,800.00 50,800.00 49,352.20
24 75,300.00 51,100.00 49,643.65
25 65,400.00 44,400.00 43,134.60
26 64,800.00 44,000.00 42,746.00
27 69,800.00 47,400.00 46,049.10
28 70,400.00 47,800.00 46,437.70
29 59,800.00 40,600.00 39,442.90
30 27,600.00 18,700.00 18,167.05
31 26,000.00 17,600.00 17,098.40
32 25,100.00 17,000.00 16,515.50
33 24,200.00 16,400.00 15,932.60
34 22,100.00 15,000.00 14,572.50
35 40,500.00 27,500.00 26,716.25
36 53,000.00 36,000.00 34,974.00
37 79,700.00 54,100.00 52,558.15
38 30,100.00 20,400.00 19,818.60
39 106,200.00 72,100.00 70,045.15
40 113,200.00 76,900.00 74,708.35
Kayu Olahan 1 79,700.00 54,100.00 52,558.15
2 110,400.00 75,000.00 72,862.50
3 98,700.00 86,500.00 84,034.75
4 194,600.00 132,200.00 128,432.30
5 221,300.00 150,300.00 146,016.45
M73 6 185,000.00 179,727.50
7 380,400.00 258,400.00 251,035.60
8 95,300.00 90,100.00 87,532.15
9 12,400.00 7,300.00 7,091.95
10 15,100.00 10,200.00 9,909.30
11 35,100.00 23,800.00 23,121.70
12 41,600.00 28,200.00 27,396.30
13 141,200.00 95,900.00 93,166.85
14 13,200.00 7,800.00 7,577.70
15 40,800.00 27,700.00 26,910.55
16 137,400.00 93,300.00 90,640.95
Perlengkapan Kamar Mandi 1 235,300.00 159,800.00 155,245.70
2 2,304,400.00 1,565,500.00 1,520,883.25
3 313,200.00 313,000.00 304,079.50
4 2,396,700.00 1,628,200.00 1,581,796.30
5 92,000.00 62,500.00 60,718.75
6 57,800.00 39,200.00 38,082.80
7 64,400.00 43,700.00 42,454.55
8 208,800.00 141,800.00 137,758.70
9 506,800.00 344,300.00 334,487.45
10 318,900.00 216,600.00 210,426.90
11 3,226,300.00 2,191,800.00 2,129,333.70
12 653,200.00 443,700.00 431,054.55
13 293,900.00 219,000.00 212,758.50
14 459,600.00 312,200.00 303,302.30
15 1,602,900.00 939,300.00 912,529.95
16 1,613,000.00 1,095,800.00 1,064,569.70
17 1,659,100.00 1,127,100.00 1,094,977.65
18 2,028,000.00 1,377,700.00 1,338,435.55
19 669,900.00 455,100.00 442,129.65
20 46,000.00 31,200.00 30,310.80
21 78,200.00 53,100.00 51,586.65
22 26,600.00 15,500.00 15,058.25
23 105,700.00 62,500.00 60,718.75
Alat-Alat Penggantung 1 139,400.00 94,700.00 92,001.05
2 169,200.00 114,900.00 111,625.35
3 135,500.00 92,000.00 89,378.00
4 223,200.00 151,600.00 147,279.40
5 35,900.00 31,800.00 30,893.70
6 36,600.00 24,800.00 24,093.20
7 28,500.00 19,600.00 19,041.40
8 15,100.00 12,300.00 11,949.45
9 14,000.00 9,500.00 9,229.25
10 30,100.00 22,100.00 21,470.15
11 18,000.00 12,300.00 11,949.45
12 260,400.00 176,900.00 171,858.35
13 204,700.00 139,000.00 135,038.50
14 186,000.00 126,300.00 122,700.45
15 55,000.00 37,300.00 36,236.95
16 248,600.00 136,400.00 132,512.60
17 18,300.00 11,900.00 11,560.85
Kaca 1 123,400.00 83,800.00 81,411.70
2 187,300.00 127,200.00 123,574.80
3 362,200.00 246,000.00 238,989.00
4 502,600.00 341,400.00 331,670.10
5 142,500.00 96,800.00 94,041.20
6 227,300.00 154,400.00 149,999.60
7 304,300.00 206,700.00 200,809.05
8 499,300.00 339,200.00 329,532.80
9 208,500.00 200,000.00 194,300.00
10 376,600.00 255,800.00 248,509.70
11 513,200.00 348,600.00 338,664.90
12 184,300.00 125,200.00 121,631.80
13 270,300.00 183,600.00 178,367.40
14 553,400.00 375,900.00 365,186.85
15 883,700.00 600,300.00 583,191.45
16 361,100.00 245,300.00 238,308.95
17 35,200.00 23,900.00 23,218.85
18 822,400.00 558,700.00 542,777.05
19 923,000.00 627,000.00 609,130.50
20 2,012,800.00 1,367,400.00 1,328,429.10
Perlengkapan Lantai 1 3,900.00 2,300.00 2,234.45
2 3,000.00 1,750.00 1,700.13
3 2,000.00 1,150.00 1,117.23
4 5,000.00 2,900.00 2,817.35
5 3,100.00 1,800.00 1,748.70
6 2,100.00 1,200.00 1,165.80
7 6,100.00 4,100.00 3,983.15
8 4,300.00 2,900.00 2,817.35
9 62,600.00 37,000.00 35,945.50
10 33,500.00 19,800.00 19,235.70
11 60,400.00 41,000.00 39,831.50
12 51,700.00 35,100.00 34,099.65
13 103,700.00 70,400.00 68,393.60
14 77,600.00 52,700.00 51,198.05
15 4,300.00 2,900.00 2,817.35
16 4,800.00 3,200.00 3,108.80
17 5,200.00 3,500.00 3,400.25
18 2,700.00 1,800.00 1,748.70
19 3,400.00 2,300.00 2,234.45
20 5,200.00 3,500.00 3,400.25
21 6,100.00 4,100.00 3,983.15
22 8,700.00 5,900.00 5,731.85
23 18,900.00 12,800.00 12,435.20
24 12,900.00 8,700.00 8,452.05
25 12,900.00 8,700.00 8,452.05
26 12,900.00 8,700.00 8,452.05
27 12,900.00 8,700.00 8,452.05
28 25,700.00 17,400.00 16,904.10
29 25,700.00 17,400.00 16,904.10
30 25,700.00 17,400.00 16,904.10
31 34,200.00 23,200.00 22,538.80
32 307,800.00 182,100.00 176,910.15
33 18,900.00 12,800.00 12,435.20
34 22,600.00 15,300.00 14,863.95
35 6,600.00 5,900.00 5,731.85
36 4,800.00 3,700.00 3,594.55
37 8,700.00 5,900.00 5,731.85
38 6,600.00 5,900.00 5,731.85
39 2,000.00 1,400.00 1,360.10
40 2,200.00 1,800.00 1,748.70
41 2,100.00 2,000.00 1,943.00
42 9,100.00 4,700.00 4,566.05
43 12,900.00 8,700.00 8,452.05
44 24,000.00 16,300.00 15,835.45
45 6,100.00 4,100.00 3,983.15
46 4,300.00 2,900.00 2,817.35
47 1,400.00 950.00 922.93
48 1,400.00 950.00 922.93
49 1,400.00 900.00 874.35
50 3,000.00 2,000.00 1,943.00
51 340,200.00 231,100.00 224,513.65
52 332,000.00 225,500.00 219,073.25
53 104,500.00 56,400.00 54,792.60
54 580,700.00 394,500.00 383,256.75
55 1,300.00 850.00 825.78
56 1,700.00 1,100.00 1,068.65
57 54,600.00 54,600.00 53,043.90
58 9,900.00 6,700.00 6,509.05
Perpipaan 1 13,800.00 8,125.00 7,893.44
2 20,500.00 12,075.00 11,730.86
3 26,800.00 15,825.00 15,373.99
4 36,000.00 21,250.00 20,644.38
5 45,700.00 27,025.00 26,254.79
6 58,600.00 34,675.00 33,686.76
7 82,800.00 48,950.00 47,554.93
8 129,300.00 76,475.00 74,295.46
9 225,200.00 133,225.00 129,428.09
10 299,700.00 203,550.00 197,748.83
11 5,900.00 4,000.00 3,886.00
12 9,000.00 6,075.00 5,901.86
13 11,800.00 7,950.00 7,723.43
14 18,000.00 10,650.00 10,346.48
M24c 15 12,750.00 12,386.63
16 32,000.00 18,925.00 18,385.64
17 46,500.00 27,475.00 26,691.96
M24d 18 38,500.00 37,402.75
19 4,500.00 3,000.00 2,914.50
20 6,800.00 4,575.00 4,444.61
21 8,800.00 5,975.00 5,804.71
22 11,800.00 8,000.00 7,772.00
23 18,300.00 10,775.00 10,467.91
24 23,200.00 13,675.00 13,285.26
25 27,400.00 16,175.00 15,714.01
26 34,800.00 20,575.00 19,988.61
27 4,200.00 1,600.00 1,554.40
28 4,000.00 2,400.00 2,331.60
29 5,400.00 2,700.00 2,623.05
30 6,600.00 5,800.00 5,634.70
31 12,000.00 8,100.00 7,869.15
32 17,100.00 11,600.00 11,269.40
33 19,300.00 13,100.00 12,726.65
34 23,500.00 15,900.00 15,446.85
35 3,000.00 2,100.00 2,040.15
36 4,600.00 2,600.00 2,525.90
37 5,200.00 3,800.00 3,691.70
38 11,200.00 7,600.00 7,383.40
39 16,800.00 11,400.00 11,075.10
40 19,300.00 13,100.00 12,726.65
41 21,500.00 14,600.00 14,183.90
42 27,000.00 18,300.00 17,778.45
43 60,800.00 35,950.00 34,925.43
44 78,700.00 46,525.00 45,199.04
45 107,200.00 63,400.00 61,593.10
M24b 46 93,000.00 90,349.50
47 225,000.00 133,150.00 129,355.23
48 314,300.00 185,975.00 180,674.71
M24a 49 199,850.00 194,154.28
50 457,300.00 310,625.00 301,772.19
51 4,300.00 4,100.00 3,983.15
52 5,800.00 4,900.00 4,760.35
53 11,400.00 7,700.00 7,480.55
54 13,400.00 13,600.00 13,212.40
55 31,800.00 21,600.00 20,984.40
56 56,300.00 38,200.00 37,111.30
57 84,400.00 57,300.00 55,666.95
58 76,700.00 76,400.00 74,222.60
59 5,600.00 4,700.00 4,566.05
60 8,300.00 6,400.00 6,217.60
61 10,300.00 9,000.00 8,743.50
62 23,400.00 17,900.00 17,389.85
63 41,300.00 28,000.00 27,202.00
64 78,800.00 53,500.00 51,975.25
65 121,800.00 82,700.00 80,343.05
66 109,000.00 101,800.00 98,898.70
67 239,700.00 162,825.00 158,184.49
68 154,700.00 105,050.00 102,056.08
69 197,500.00 134,150.00 130,326.73
70 45,100.00 30,600.00 29,727.90
71 62,800.00 42,625.00 41,410.19
72 93,500.00 63,500.00 61,690.25
73 137,200.00 93,175.00 90,519.51
74 296,400.00 201,300.00 195,562.95
75 479,900.00 326,025.00 316,733.29
Plitur & Cat - 1 5,000.00 4,600.00 4,468.90
2 20,800.00 20,400.00 19,818.60
3 20,900.00 13,000.00 12,629.50
4 55,700.00 36,500.00 35,459.75
5 31,300.00 32,000.00 31,088.00
6 28,600.00 19,400.00 18,847.10
7 18,400.00 12,500.00 12,143.75
8 171,500.00 160,500.00 155,925.75
9 37,600.00 25,500.00 24,773.25
10 50,500.00 34,300.00 33,322.45
11 49,100.00 34,600.00 33,613.90
12 44,500.00 26,300.00 25,550.45
13 55,700.00 40,800.00 39,637.20
14 105,700.00 71,800.00 69,753.70
15 86,300.00 48,000.00 46,632.00
16 127,200.00 86,400.00 83,937.60
17 145,900.00 99,100.00 96,275.65
18 111,600.00 75,800.00 73,639.70
19 195,100.00 132,500.00 128,723.75
20 227,600.00 154,600.00 150,193.90
21 38,900.00 34,600.00 33,613.90
22 114,100.00 77,500.00 75,291.25
23 20,000.00 13,300.00 12,920.95
24 41,500.00 30,200.00 29,339.30
25 37,800.00 34,600.00 33,613.90
26 88,800.00 60,300.00 58,581.45
27 46,400.00 27,400.00 26,619.10
28 3,400.00 2300 2,234.45
29 12,900.00 8700 8,452.05
30 7,000.00 4700 4,566.05
31 35,200.00 23900 23,218.85
32 51,900.00 35200 34,196.80
33 35,500.00 24100 23,413.15
34 57,200.00 38800 37,694.20
35 6,100.00 4100 3,983.15
Peralatan Air Bersih 1 1,067,200.00 725000 704,337.50
2 1,898,700.00 1289900 1,253,137.85
3 2,967,700.00 2016100 1,958,641.15
4 4,969,600.00 3376100 3,279,881.15
5 291,800.00 198200 192,551.30
6 1,170,300.00 795000 772,342.50
Instalasi Listrik 1 5,300.00 4400 4,274.60
2 8,400.00 7200 6,994.80
3 19,600.00 13300 12,920.95
4 11,800.00 8000 7,772.00
5 39,800.00 27000 26,230.50
6 48,600.00 33000 32,059.50
7 55,700.00 37800 36,722.70
8 1,100.00 650 631.48
9 1,200.00 800 777.20
10 1,500.00 1050 1,020.08
11 7,600.00 7500 7,286.25
12 15,700.00 10600 10,297.90
13 99,700.00 67700 65,770.55
14 144,900.00 98400 95,595.60
15 199,100.00 135200 131,346.80
16 93,200.00 63300 61,495.95
17 138,300.00 93900 91,223.85
18 31,300.00 27600 26,813.40
19 31,900.00 31800 30,893.70
20 36,900.00 35900 34,876.85
21 56,900.00 38600 37,499.90
22 43,400.00 44000 42,746.00
23 26,700.00 18100 17,584.15
24 44,200.00 30000 29,145.00
25 5,461,100.00 3710000 3,604,265.00
26 6,918,200.00 4699900 4,565,952.85
27 162,800.00 110600 107,447.90
28 114,100.00 77500 75,291.25
29 645,700.00 438600 426,099.90
30 66,700.00 45300 44,008.95
31 3,100.00 2100 2,040.15
Lain - Lain 1 33,000.00 22400 21,761.60
2 28,200.00 19100 18,555.65
3 18,700.00 12700 12,338.05
4 284,600.00 193300 187,790.95
5 24,800.00 16800 16,321.20
6 28,200.00 19100 18,555.65
7 261,300.00 154600 150,193.90
8 47,200.00 32000 31,088.00
9 85,100.00 57800 56,152.70
10 99,400.00 67500 65,576.25
11 19,900.00 13500 13,115.25
12 4,000.00 2710 2,632.77
13 132,900.00 90250 87,677.88
14 3,700.00 2500 2,428.75
15 52,700.00 35800 34,779.70
16 4,000.00 2700 2,623.05
17 94,600.00 64200 62,370.30
18 123,100.00 83600 81,217.40
19 10,200.00 6900 6,703.35
20 9,200.00 6200 6,023.30
21 47,200.00 32000 31,088.00
22 94,600.00 64200 62,370.30
23 3,000.00 3000 2,914.50
M20 24 9250 8,986.38
M21 25 4,500.00 4500 4,371.75
26 10250 9,957.88
27 4,500.00 4500 4,371.75
M22 28 37500 36,431.25
29 25,800.00 17500 17,001.25
30 50.00 30 29.15
31 19,300.00 13300 12,920.95

LA DINAS PEKERJAAN UMUM


KOTA MALANG

Ir. HADI SANTOSO


Pembina Utama Muda
NIP.19610615 198903 1 017
17/33 4.24

Kenaikan
Rata-2 bln Septembe Rata-2 bln Oktober Rata-2 Survey + ProfUsed Pembulatan Kenaikan

186,940.15 34.00 124,100.00 178,537.05 178537.04697 178,600.00 44.76

14,425.30 34.00 14,425.30 14,425.30 14425.3030303 13,500.00 41.80


70,000.00 5.07 67,500.00 78,925.00 78925 79,000.00 18.89
0 -
103,773.86 34.00 62,000.00 95,154.20 95154.1977273 95,200.00 39.00
78,014.39 34.00 50,000.00 73,480.26 73480.2621212 73,500.00 42.75
164,860.61 34.00 164,860.61 164,860.61 164860.606061 164,900.00 51.55

120,500.00 (68.90) 121,000.00 138,621.00 308377.651515 308,400.00 51.53


120,500.00 (64.47) 120,500.00 120,500.00 300281.818182 300,300.00 51.52
239,931.06 34.00 239,931.06 239,931.06 239931.060606 240,000.00 51.56
214,171.59 34.00 214,171.59 214,171.59 214171.590909 214,200.00 51.54
123,000.00 (84.82) 123,000.00 141,204.00 344440.909091 344,500.00 51.54

115,000.00 (54.60) 115,000.00 132,020.00 269370.454545 269,400.00 51.53


248,762.88 34.00 248,762.88 248,762.88 248762.878788 248,800.00 51.54
426.00 (36.83) 435.00 494.21 883.181818182 900.00 54.40
19,430.00 34.00 755,000.00 19,430.00 19430 19,500.00 52.06
1,398.37 34.00 3,600.00 1,398.37 1398.37121212 1,400.00 51.69
3,700.00 (37.85) 3,710.00 4,253.34 7727.84090909 7,800.00 52.93
3,200.00 (196.00) 3,200.00 3,673.60 14351.7045455 14,400.00 52.03
4,857.50 34.00 4,857.50 4,857.50 4857.5 4,900.00 52.84
3,827.12 34.00 3,827.12 3,827.12 3827.12121212 3,900.00 54.40
59,700.00 (30.59) 60,020.00 68,719.28 118125.568182 118,200.00 51.61
71,900.00 (2.69) 71,800.00 82,483.80 82483.8 82,500.00 11.74
7,507.05 34.00 7,507.05 7,507.05 7507.04545455 7,600.00 53.39
6,623.86 34.00 6,623.86 6,623.86 6623.86363636 6,700.00 53.26
5,519.89 34.00 5,519.89 5,519.89 5519.88636364 5,600.00 53.71
971.11 (10.04) 971.11 1,114.84 1114.83555556 1,200.00 12.29
1,040.00 (21.44) 1,042.22 1,195.20 1913.56060606 2,000.00 58.36
1,267.14 (61.00) 1,267.14 1,454.68 3091.13636364 3,100.00 51.95
1,514.29 (41.14) 1,525.00 1,744.55 3238.33333333 3,300.00 54.40
1,090.91 (24.68) 1,090.91 1,252.36 2060.75757576 2,100.00 54.40
1,272.73 (22.13) 1,278.79 1,464.57 2355.15151515 2,400.00 54.40
-
2,790.00 (49.73) 2,800.00 3,208.66 6329.46969697 6,400.00 53.20
3,974.32 34.00 3,974.32 3,974.32 3974.31818182 4,000.00 52.49
13,000.00 38.35 13,000.00 14,924.00 14924 15,000.00 87.15
12,879.73 34.00 12,879.73 12,879.73 12879.7348485 12,900.00 51.75
352,500.00 (294.11) 352,600.00 404,727.40 2104916.66667 2,105,000.00 51.52
1,471.97 34.00 1,471.97 1,689.82 1689.82121212 1,700.00 74.99
290,714.02 34.00 290,714.02 290,714.02 290714.015152 290,800.00 51.56
31,200.00 (18.32) 31,300.00 35,875.00 55934.8484848 56,000.00 51.69
45,500.00 (2.49) 45,600.00 52,291.40 52291.4 52,300.00 12.15
56,900.00 (12.69) 57,200.00 65,493.40 65493.4 65,500.00 2.15
47,000.00 (70.53) 47,000.00 53,956.00 121437.5 121,500.00 51.59
85,000.00 (21.15) 85,000.00 97,580.00 156028.787879 156,100.00 51.58
86,600.00 (125.49) 86,400.00 99,302.00 295865.909091 295,900.00 51.53
100,500.00 (111.94) 100,400.00 115,316.60 322729.356061 322,800.00 51.55
125,900.00 (116.45) 125,900.00 144,533.20 412887.5 412,900.00 51.52
25,400.00 (11.68) 25,400.00 29,159.20 29159.2 29,200.00 2.93
34,800.00 (17.95) 35,000.00 40,065.20 62190.719697 62,200.00 51.54
3,500,000.00 (145.10) 3,500,000.00 4,018,000.00 12997492.4242 12,997,500.00 51.52
3,540,200.00 (142.31) 3,550,200.00 4,069,889.60 12997492.4242 12,997,500.00 51.52
3,693,500.00 (132.26) 3,645,125.00 4,212,370.75 12997492.4242 12,997,500.00 51.52
3,530,400.00 (200.22) 3,550,500.00 4,064,436.60 16059189.3939 16,059,200.00 51.52
95,000.00 (11,322.79) 95,000.00 109,060.00 16441901.5152 16,442,000.00 51.52
16,441,901.52 34.00 16,441,901.52 16,441,901.52 16441901.5152 16,442,000.00 51.52
3,534,100.00 (41.24) 3,544,100.00 4,062,886.80 7562980.30303 7,563,000.00 51.52
3,536,600.00 (41.14) 3,546,800.00 4,065,871.60 7562980.30303 7,563,000.00 51.52
3,440,100.00 (62.72) 3,450,100.00 3,954,974.80 8481489.39394 8,481,500.00 51.52
3,916,666.67 (70.01) 3,916,666.67 4,496,333.33 10088880.303 10,088,900.00 51.52
4,987,625.00 (34.52) 4,987,625.00 5,725,793.50 10165422.7273 10,165,500.00 51.52
6,886,666.67 1.11 6,886,666.67 7,905,893.33 7905893.33333 7,905,900.00 16.09
3,862,500.00 (55.39) 3,862,500.00 4,434,150.00 9093828.78788 9,093,900.00 51.52
3,875,000.00 (54.89) 3,875,500.00 4,448,787.00 9093828.78788 9,093,900.00 51.52
3,700,000.00 (70.41) 3,700,000.00 4,247,600.00 9553083.33333 9,553,100.00 51.52
4,150,000.00 (64.10) 4,150,000.00 4,764,200.00 10318507.5758 10,318,600.00 51.52
4,162,500.00 (63.61) 4,162,500.00 4,778,550.00 10318507.5758 10,318,600.00 51.52
6,437,500.00 (5.79) 6,437,500.00 7,390,250.00 7390250 7,390,300.00 8.52
13,762,916.67 34.00 13,762,916.67 13,762,916.67 13762916.6667 13,763,000.00 51.52
14,145,628.79 34.00 14,145,628.79 14,145,628.79 14145628.7879 14,145,700.00 51.52
14,528,340.91 34.00 14,528,340.91 14,528,340.91 14528340.9091 14,528,400.00 51.52
16,824,613.64 34.00 16,824,613.64 16,824,613.64 16824613.6364 16,824,700.00 51.52
17,207,325.76 34.00 17,207,325.76 17,207,325.76 17207325.7576 17,207,400.00 51.52
17,590,037.88 34.00 17,590,037.88 17,590,037.88 17590037.8788 17,590,100.00 51.52
5,037,080.30 34.00 5,037,080.30 5,037,080.30 5037080.30303 5,037,100.00 51.52
0 -
17,300.00 (35.34) 17,500.00 19,975.20 35474.469697 35,500.00 51.62
40,626.36 34.00 40,626.36 40,626.36 40626.3636364 40,700.00 51.79
13,700.00 45.40 13,800.00 15,785.00 15785 15,800.00 111.21
5,343,250.00 34.00 5,343,250.00 5,343,250.00 5343250 5,343,300.00 51.52
42,000.00 11.18 42,000.00 48,216.00 48216 48,300.00 29.47
117,904.77 34.00 117,904.77 117,904.77 117904.772727 118,000.00 51.64
19,947,544.55 34.00 19,947,544.55 19,947,544.55 19947544.5455 19,947,600.00 51.52
19,947,544.55 34.00 19,947,544.55 19,947,544.55 19947544.5455 19,947,600.00 51.52
19,947,544.55 34.00 19,947,544.55 19,947,544.55 19947544.5455 19,947,600.00 51.52
22,167,274.85 34.00 22,167,274.85 22,167,274.85 22167274.8485 22,167,300.00 51.52
22,167,274.85 34.00 22,167,274.85 22,167,274.85 22167274.8485 22,167,300.00 51.52
22,167,274.85 34.00 22,167,274.85 22,167,274.85 22167274.8485 22,167,300.00 51.52
23,560,346.97 34.00 23,560,346.97 23,560,346.97 23560346.9697 23,560,400.00 51.52
23,560,346.97 34.00 23,560,346.97 23,560,346.97 23560346.9697 23,560,400.00 51.52
23,560,346.97 34.00 23,560,346.97 23,560,346.97 23560346.9697 23,560,400.00 51.52
23,560,346.97 34.00 23,560,346.97 23,560,346.97 23560346.9697 23,560,400.00 51.52
23,560,346.97 34.00 23,560,346.97 23,560,346.97 23560346.9697 23,560,400.00 51.52
23,560,346.97 34.00 23,560,346.97 23,560,346.97 23560346.9697 23,560,400.00 51.52
29,392,879.70 34.00 29,392,879.70 29,392,879.70 29392879.697 29,392,900.00 51.52
29,392,879.70 34.00 29,392,879.70 29,392,879.70 29392879.697 29,392,900.00 51.52
29,392,879.70 34.00 29,392,879.70 29,392,879.70 29392879.697 29,392,900.00 51.52
29,392,879.70 34.00 29,392,879.70 29,392,879.70 29392879.697 29,392,900.00 51.52
29,392,879.70 34.00 29,392,879.70 29,392,879.70 29392879.697 29,392,900.00 51.52
29,392,879.70 34.00 29,392,879.70 29,392,879.70 29392879.697 29,392,900.00 51.52
0 -
0 -
0 -
14,572.50 34.00 14,572.50 14,572.50 14572.5 14,600.00 51.80
14,572.50 34.00 14,572.50 14,572.50 14572.5 14,600.00 51.80
0 - -
0 -
25,317.88 34.00 25,317.88 25,317.88 25317.8787879 25,400.00 52.01
25,317.88 34.00 25,317.88 25,317.88 25317.8787879 25,400.00 52.01
25,317.88 34.00 25,317.88 25,317.88 25317.8787879 25,400.00 52.01
25,759.47 34.00 25,759.47 25,759.47 25759.469697 25,800.00 51.75
44,747.88 34.00 44,747.88 44,747.88 44747.8787879 44,800.00 51.69
1,108,393.18 34.00 1,108,393.18 1,108,393.18 1108393.18182 1,108,400.00 51.52
3,047,713.26 34.00 3,047,713.26 3,047,713.26 3047713.25758 3,047,800.00 51.52
2,493,663.86 34.00 2,493,663.86 2,493,663.86 2493663.86364 2,493,700.00 51.52
1,847,174.77 34.00 1,847,174.77 1,847,174.77 1847174.77273 1,847,200.00 51.52
923,660.98 34.00 923,660.98 923,660.98 923660.984848 923,700.00 51.52
1,062,173.33 34.00 1,062,173.33 1,062,173.33 1062173.33333 1,062,200.00 51.52
484,866.82 34.00 484,866.82 484,866.82 484866.818182 484,900.00 51.53
620,582.42 34.00 620,582.42 620,582.42 620582.424242 620,600.00 51.52
133,949.24 34.00 133,949.24 133,949.24 133949.242424 134,000.00 51.57
160,739.09 34.00 160,739.09 160,739.09 160739.090909 160,800.00 51.57
461,756.89 34.00 461,756.89 461,756.89 461756.893939 461,800.00 51.53
514,895.00 34.00 514,895.00 514,895.00 514895 514,900.00 51.52
151,318.48 34.00 151,318.48 151,318.48 151318.484848 151,400.00 51.60
147,785.76 34.00 147,785.76 147,785.76 147785.757576 147,800.00 51.53
46,072.65 34.00 46,072.65 46,072.65 46072.6515152 46,100.00 51.61
60,350.76 34.00 60,350.76 60,350.76 60350.7575758 60,400.00 51.64
65,502.65 34.00 65,502.65 65,502.65 65502.6515152 65,600.00 51.74
97,591.59 34.00 97,591.59 97,591.59 97591.5909091 97,600.00 51.53
0 -
35,180.08 34.00 35,180.08 35,180.08 35180.0757576 35,200.00 51.60
32,088.94 34.00 32,088.94 36,838.10 36838.1024242 36,900.00 74.23
27,375.00 25.12 27,500.00 31,498.25 31498.25 31,500.00 53.67
16,000.00 (24.47) 16,000.00 18,368.00 30175.3787879 30,200.00 51.64
- -
21,000.00 (18.89) 21,000.00 24,108.00 37829.6212121 37,900.00 51.80
883.18 34.00 883.18 883.18 883.181818182 900.00 54.40
1,324.77 34.00 1,324.77 1,324.77 1324.77272727 1,400.00 60.12
1,030.38 34.00 1,030.38 1,030.38 1030.37878788 1,100.00 61.75
662.39 34.00 662.39 662.39 662.386363636 700.00 60.12
28,850.61 34.00 28,850.61 28,850.61 28850.6060606 28,900.00 51.77
4,857.50 34.00 4,857.50 4,857.50 4857.5 4,900.00 52.84
880.00 (4,238.63) 880.00 1,010.24 57848.4090909 57,900.00 51.65
25,759.47 34.00 25,759.47 25,759.47 25759.469697 25,800.00 51.75
26,100.00 (8.69) 26,300.00 30,077.60 30077.6 30,100.00 6.11
25,759.47 34.00 25,759.47 25,759.47 25759.469697 25,800.00 51.75
16,780.45 34.00 16,780.45 16,780.45 16780.4545455 16,800.00 51.69
126,080.00 (334.20) 126,040.00 144,716.88 829454.924242 829,500.00 51.52
165,302.20 34.00 165,302.20 165,302.20 165302.19697 165,400.00 51.60
160,739.09 34.00 160,739.09 160,739.09 160739.090909 160,800.00 51.57
875.00 (33.23) 862.50 997.33 1766.36363636 1,800.00 54.40
925.00 (36.54) 931.25 1,065.49 1913.56060606 2,000.00 58.36
1,770.00 17.67 1,750.00 2,020.48 2020.48 2,100.00 44.11
2,502.35 34.00 2,502.35 2,502.35 2502.34848485 2,600.00 57.43
3,275.00 37.71 3,275.00 3,759.70 3759.7 3,800.00 86.26
6,182.27 34.00 6,182.27 6,182.27 6182.27272727 6,200.00 51.95
15,500.00 11.62 15,700.00 17,908.80 17908.8 18,000.00 31.40
3,091.14 34.00 3,091.14 3,091.14 3091.13636364 3,100.00 51.95
3,679.92 34.00 3,679.92 3,679.92 3679.92424242 3,700.00 52.34
4,012.50 (13.80) 4,050.00 4,627.88 4627.875 4,700.00 2.93
4,387.50 (12.93) 4,387.50 5,036.85 5036.85 5,100.00 2.93
6,250.00 11.40 6,250.00 7,175.00 7175 7,200.00 30.02
11,628.56 34.00 11,628.56 11,628.56 11628.5606061 11,700.00 52.45
3,385.53 34.00 3,385.53 3,385.53 3385.53030303 3,400.00 52.16
3,385.53 34.00 3,385.53 3,385.53 3385.53030303 3,400.00 52.16
6,623.86 34.00 6,623.86 6,623.86 6623.86363636 6,700.00 53.26
6,035.08 34.00 6,035.08 6,035.08 6035.07575758 6,100.00 53.15
10,745.38 34.00 10,745.38 10,745.38 10745.3787879 10,800.00 52.29
11,481.36 34.00 11,481.36 11,481.36 11481.3636364 11,500.00 51.76
9,862.20 34.00 9,862.20 9,862.20 9862.1969697 9,900.00 52.10
148,227.35 34.00 148,227.35 148,227.35 148227.348485 148,300.00 51.59
2,355.15 34.00 2,355.15 2,355.15 2355.15151515 2,400.00 54.40
66,385.83 34.00 66,385.83 66,385.83 66385.8333333 66,400.00 51.55
148,227.35 34.00 148,227.35 148,227.35 148227.348485 148,300.00 51.59
179,433.11 34.00 179,433.11 179,433.11 179433.106061 179,500.00 51.57
10,156.59 34.00 10,156.59 10,156.59 10156.5909091 10,200.00 52.16
22,200.00 (57.10) 22,200.00 25,485.60 52843.7121212 52,900.00 51.68
26,120.00 (52.12) 26,120.00 29,985.76 60203.5606061 60,300.00 51.76
31,780.00 (57.13) 31,780.00 36,483.44 75659.2424242 75,700.00 51.60
54,600.00 (24.73) 54,700.00 62,738.20 103185.075758 103,200.00 51.54
48,140.00 (73.55) 48,240.00 55,322.12 126589.393939 126,600.00 51.53
116,138.41 34.00 116,138.41 116,138.41 116138.409091 116,200.00 51.60
115,108.03 34.00 115,108.03 115,108.03 115108.030303 115,200.00 51.64
205,248.81 45.95 205,248.81 205,248.81 205248.805 205,300.00 85.05
45,800.00 (128.45) 45,800.00 52,578.40 158531.136364 158,600.00 51.58
40,700.00 (137.50) 40,800.00 46,781.00 146460.984848 146,500.00 51.56
35,800.00 (133.65) 36,000.00 41,213.20 126736.590909 126,800.00 51.59
31,600.00 (134.57) 31,900.00 36,449.00 112311.287879 112,400.00 51.63
34,375.00 (63.64) 34,250.00 39,390.75 85227.0454545 85,300.00 51.64
161,033.48 34.00 161,033.48 161,033.48 161033.484848 161,100.00 51.58
139,395.53 34.00 139,395.53 139,395.53 139395.530303 139,400.00 51.52
123,498.26 34.00 123,498.26 123,498.26 123498.257576 123,500.00 51.52
93,911.67 34.00 93,911.67 93,911.67 93911.6666667 94,000.00 51.66
198,568.71 34.00 198,568.71 198,568.71 198568.712121 198,600.00 51.54
190,325.68 34.00 190,325.68 190,325.68 190325.681818 190,400.00 51.57
140,720.30 34.00 140,720.30 140,720.30 140720.30303 140,800.00 51.60
113,194.47 34.00 113,194.47 113,194.47 113194.469697 113,200.00 51.52
70,360.15 34.00 70,360.15 70,360.15 70360.1515152 70,400.00 51.60
74,776.06 34.00 74,776.06 74,776.06 74776.0606061 74,800.00 51.56
75,217.65 34.00 75,217.65 75,217.65 75217.6515152 75,300.00 51.68
65,355.45 34.00 65,355.45 65,355.45 65355.4545455 65,400.00 51.62
64,766.67 34.00 64,766.67 64,766.67 64766.6666667 64,800.00 51.59
69,771.36 34.00 69,771.36 69,771.36 69771.3636364 69,800.00 51.58
70,360.15 34.00 70,360.15 70,360.15 70360.1515152 70,400.00 51.60
59,761.97 34.00 59,761.97 59,761.97 59761.969697 59,800.00 51.61
27,525.83 34.00 27,525.83 27,525.83 27525.8333333 27,600.00 51.92
25,906.67 34.00 25,906.67 25,906.67 25906.6666667 26,000.00 52.06
25,023.48 34.00 25,023.48 25,023.48 25023.4848485 25,100.00 51.98
11,060.00 (44.06) 11,060.00 12,696.88 24140.3030303 24,200.00 51.89
22,079.55 34.00 22,079.55 22,079.55 22079.5454545 22,100.00 51.66
40,479.17 34.00 40,479.17 40,479.17 40479.1666667 40,500.00 51.59
52,990.91 34.00 52,990.91 52,990.91 52990.9090909 53,000.00 51.54
40,900.00 (28.50) 40,900.00 46,953.20 79633.5606061 79,700.00 51.64
12,300.00 (61.13) 12,400.00 14,177.80 30028.1818182 30,100.00 51.88
106,129.02 34.00 106,129.02 106,129.02 106129.015152 106,200.00 51.62
57,300.00 (30.38) 57,200.00 65,723.00 113194.469697 113,200.00 51.52
42,000.00 (25.14) 42,100.00 48,273.40 79633.5606061 79,700.00 51.64
48,280.00 (50.92) 48,380.00 55,482.84 110397.727273 110,400.00 51.52
85,960.00 2.24 85,920.00 98,659.12 98659.12 98,700.00 17.45
106,000.00 (21.16) 105,800.00 121,573.20 194594.393939 194,600.00 51.52
221,237.05 34.00 221,237.05 221,237.05 221237.045455 221,300.00 51.56
- -
217,800.00 (15.26) 217,800.00 250,034.40 380356.969697 380,400.00 51.53
83,166.67 (5.25) 82,833.33 95,284.00 95284 95,300.00 8.87
10,745.38 34.00 10,745.38 12,335.69 12335.6948485 12,400.00 74.85
15,014.09 34.00 15,014.09 15,014.09 15014.0909091 15,100.00 52.38
35,032.88 34.00 35,032.88 35,032.88 35032.8787879 35,100.00 51.81
41,509.55 34.00 41,509.55 41,509.55 41509.5454545 41,600.00 51.85
67,000.00 (39.06) 67,000.00 76,916.00 141161.893939 141,200.00 51.56
11,481.36 34.00 11,481.36 13,180.61 13180.6054545 13,200.00 74.20
40,773.56 34.00 40,773.56 40,773.56 40773.5606061 40,800.00 51.61
76,100.00 (19.11) 76,200.00 87,420.20 137334.772727 137,400.00 51.59
97,100.00 (59.88) 97,100.00 111,470.80 235220.757576 235,300.00 51.57
332,750.00 (357.06) 332,750.00 381,997.00 2304368.56061 2,304,400.00 51.52
272,875.00 (11.44) 272,750.00 313,188.75 313188.75 313,200.00 3.00
266,375.00 (493.82) 265,125.00 305,081.00 2396661.06061 2,396,700.00 51.52
91,998.11 34.00 91,998.11 91,998.11 91998.1060606 92,000.00 51.52
25,700.00 (48.18) 26,000.00 29,675.80 57701.2121212 57,800.00 51.77
30,600.00 (38.74) 30,600.00 35,128.80 64325.0757576 64,400.00 51.69
208,725.30 34.00 208,725.30 208,725.30 208725.30303 208,800.00 51.57
185,500.00 (80.32) 185,500.00 212,954.00 506799.166667 506,800.00 51.52
318,828.64 34.00 318,828.64 318,828.64 318828.636364 318,900.00 51.55
3,226,263.18 34.00 3,226,263.18 3,226,263.18 3226263.18182 3,226,300.00 51.52
346,700.00 (24.33) 346,600.00 397,954.20 653112.954545 653,200.00 51.54
257,000.00 17.21 255,000.00 293,888.00 293888 293,900.00 38.14
136,200.00 (122.69) 136,400.00 156,472.40 459548.939394 459,600.00 51.53
1,437,500.00 36.52 1,355,000.00 1,602,895.00 1602895 1,602,900.00 75.65
737,812.50 (44.29) 737,812.50 847,008.75 1612984.39394 1,613,000.00 51.52
698,875.00 (56.68) 698,875.00 802,308.50 1659057.04545 1,659,100.00 51.52
2,027,932.65 34.00 2,027,932.65 2,027,932.65 2027932.65152 2,028,000.00 51.52
350,250.00 (26.23) 350,500.00 402,230.50 669893.409091 669,900.00 51.52
21,675.00 (39.84) 21,675.00 24,882.90 45925.4545455 46,000.00 51.76
27,100.00 (90.36) 23,600.00 29,101.80 78161.5909091 78,200.00 51.59
11,600.00 (29.81) 34,600.00 26,518.80 26518.8 26,600.00 76.65
91,998.11 34.00 91,998.11 105,613.83 105613.825758 105,700.00 74.08
139,395.53 34.00 139,395.53 139,395.53 139395.530303 139,400.00 51.52
169,129.32 34.00 169,129.32 169,129.32 169129.318182 169,200.00 51.58
34,250.00 (160.96) 34,250.00 39,319.00 135421.212121 135,500.00 51.60
25,766.67 (471.59) 25,766.67 29,580.13 223150.606061 223,200.00 51.55
31,300.00 1.30 31,200.00 35,875.00 35875 35,900.00 16.20
20,100.00 (19.87) 20,250.00 23,160.90 36504.8484848 36,600.00 51.91
24,800.00 23.22 24,800.00 28,470.40 28470.4 28,500.00 49.67
13,125.00 8.96 13,125.00 15,067.50 15067.5 15,100.00 26.37
13,983.71 34.00 13,983.71 13,983.71 13983.7121212 14,000.00 51.69
26,100.00 17.74 26,200.00 30,020.20 30020.2 30,100.00 40.19
15,600.00 23.40 15,600.00 17,908.80 17908.8 18,000.00 50.63
95,625.00 (79.72) 95,625.00 109,777.50 260391.439394 260,400.00 51.52
93,200.00 (44.89) 93,300.00 107,051.00 204603.787879 204,700.00 51.59
185,909.77 34.00 185,909.77 185,909.77 185909.772727 186,000.00 51.59
20,166.67 (79.69) 20,166.67 23,151.33 54904.469697 55,000.00 51.78
216,600.00 38.82 216,400.00 248,542.00 248542 248,600.00 87.60
15,625.00 26.01 16,250.00 18,296.25 18296.25 18,300.00 58.29
123,351.06 34.00 123,351.06 123,351.06 123351.060606 123,400.00 51.58
187,234.55 34.00 187,234.55 187,234.55 187234.545455 187,300.00 51.57
362,104.55 34.00 362,104.55 362,104.55 362104.545455 362,200.00 51.56
502,530.45 34.00 502,530.45 502,530.45 502530.454545 502,600.00 51.54
142,486.67 34.00 142,486.67 142,486.67 142486.666667 142,500.00 51.53
227,272.12 34.00 227,272.12 227,272.12 227272.121212 227,300.00 51.53
304,256.14 34.00 304,256.14 304,256.14 304256.136364 304,300.00 51.54
499,292.12 34.00 499,292.12 499,292.12 499292.121212 499,300.00 51.52
294,393.94 34.00 294,393.94 294,393.94 294393.939394 294,400.00 51.52
376,529.85 34.00 376,529.85 376,529.85 376529.848485 376,600.00 51.54
513,128.64 34.00 513,128.64 513,128.64 513128.636364 513,200.00 51.54
75,740.00 (60.59) 75,700.00 86,926.56 184290.606061 184,300.00 51.52
92,060.00 (93.75) 92,100.00 105,707.84 270253.636364 270,300.00 51.54
553,313.41 34.00 553,313.41 553,313.41 553313.409091 553,400.00 51.54
883,623.41 34.00 883,623.41 883,623.41 883623.409091 883,700.00 51.53
361,074.17 34.00 361,074.17 361,074.17 361074.166667 361,100.00 51.53
18,200.00 (27.58) 18,300.00 20,951.00 35180.0757576 35,200.00 51.60
822,389.47 34.00 822,389.47 822,389.47 822389.469697 822,400.00 51.52
922,925.00 34.00 922,925.00 922,925.00 922925 923,000.00 51.53
2,012,771.36 34.00 2,012,771.36 2,012,771.36 2012771.36364 2,012,800.00 51.52
3,385.53 34.00 3,385.53 3,886.59 3886.58878788 3,900.00 74.54
2,575.95 34.00 2,575.95 2,957.19 2957.18712121 3,000.00 76.46
1,692.77 34.00 1,692.77 1,943.29 1943.29439394 2,000.00 79.01
4,268.71 34.00 4,268.71 4,900.48 4900.48151515 5,000.00 77.47
2,649.55 34.00 2,649.55 3,041.68 3041.67818182 3,100.00 77.27
1,766.36 34.00 1,766.36 2,027.79 2027.78545455 2,100.00 80.13
6,035.08 34.00 6,035.08 6,035.08 6035.07575758 6,100.00 53.15
4,268.71 34.00 4,268.71 4,268.71 4268.71212121 4,300.00 52.63
54,462.88 34.00 54,462.88 62,523.38 62523.3848485 62,600.00 74.15
29,145.00 34.00 29,145.00 33,458.46 33458.46 33,500.00 74.16
60,350.76 34.00 60,350.76 60,350.76 60350.7575758 60,400.00 51.64
51,666.14 34.00 51,666.14 51,666.14 51666.1363636 51,700.00 51.61
103,626.67 34.00 103,626.67 103,626.67 103626.666667 103,700.00 51.62
77,572.80 34.00 77,572.80 77,572.80 77572.8030303 77,600.00 51.57
4,268.71 34.00 4,268.71 4,268.71 4268.71212121 4,300.00 52.63
4,710.30 34.00 4,710.30 4,710.30 4710.3030303 4,800.00 54.40
5,151.89 34.00 5,151.89 5,151.89 5151.89393939 5,200.00 52.93
2,649.55 34.00 2,649.55 2,649.55 2649.54545455 2,700.00 54.40
3,385.53 34.00 3,385.53 3,385.53 3385.53030303 3,400.00 52.16
5,151.89 34.00 5,151.89 5,151.89 5151.89393939 5,200.00 52.93
6,035.08 34.00 6,035.08 6,035.08 6035.07575758 6,100.00 53.15
8,684.62 34.00 8,684.62 8,684.62 8684.62121212 8,700.00 51.78
18,841.21 34.00 18,841.21 18,841.21 18841.2121212 18,900.00 51.99
12,806.14 34.00 12,806.14 12,806.14 12806.1363636 12,900.00 52.63
12,806.14 34.00 12,806.14 12,806.14 12806.1363636 12,900.00 52.63
12,806.14 34.00 12,806.14 12,806.14 12806.1363636 12,900.00 52.63
12,806.14 34.00 12,806.14 12,806.14 12806.1363636 12,900.00 52.63
25,612.27 34.00 25,612.27 25,612.27 25612.2727273 25,700.00 52.03
25,612.27 34.00 25,612.27 25,612.27 25612.2727273 25,700.00 52.03
25,612.27 34.00 25,612.27 25,612.27 25612.2727273 25,700.00 52.03
34,149.70 34.00 34,149.70 34,149.70 34149.6969697 34,200.00 51.74
268,045.68 34.00 268,045.68 307,716.44 307716.442727 307,800.00 73.99
6,770.00 (83.68) 7,120.00 7,972.86 18841.2121212 18,900.00 51.99
8,390.00 (77.16) 8,290.00 9,574.32 22521.1363636 22,600.00 52.05
5,731.85 0.00 5,731.85 6,580.16 6580.1638 6,600.00 15.15
4,060.00 11.46 4,180.00 4,729.76 4729.76 4,800.00 33.54
4,390.00 (30.57) 4,430.00 5,062.68 8684.62121212 8,700.00 51.78
5,731.85 0.00 5,731.85 6,580.16 6580.1638 6,600.00 15.15
1,640.00 17.07 1,700.00 1,917.16 1917.16 2,000.00 47.05
1,820.00 3.92 1,840.00 2,100.84 2100.84 2,200.00 25.81
1,780.00 (9.16) 1,820.00 2,066.40 2066.4 2,100.00 8.08
7,800.00 41.46 7,900.00 9,011.80 9011.8 9,100.00 99.30
12,806.14 34.00 12,806.14 12,806.14 12806.1363636 12,900.00 52.63
23,993.11 34.00 23,993.11 23,993.11 23993.1060606 24,000.00 51.56
1,910.00 (108.54) 1,960.00 2,221.38 6035.07575758 6,100.00 53.15
1,600.00 (76.08) 1,600.00 1,836.80 4268.71212121 4,300.00 52.63
1,398.37 34.00 1,398.37 1,398.37 1398.37121212 1,400.00 51.69
1,398.37 34.00 1,398.37 1,398.37 1398.37121212 1,400.00 51.69
1,324.77 34.00 1,324.77 1,324.77 1324.77272727 1,400.00 60.12
2,943.94 34.00 2,943.94 2,943.94 2943.93939394 3,000.00 54.40
340,172.20 34.00 340,172.20 340,172.20 340172.19697 340,200.00 51.53
331,929.17 34.00 331,929.17 331,929.17 331929.166667 332,000.00 51.55
90,800.00 39.66 91,200.00 104,468.00 104468 104,500.00 90.72
580,692.05 34.00 580,692.05 580,692.05 580692.045455 580,700.00 51.52
1,251.17 34.00 1,251.17 1,251.17 1251.17424242 1,300.00 57.43
1,619.17 34.00 1,619.17 1,619.17 1619.16666667 1,700.00 59.08
47,440.00 (11.81) 47,640.00 54,575.92 54575.92 54,600.00 2.93
9,862.20 34.00 9,862.20 9,862.20 9862.1969697 9,900.00 52.10
11,959.75 34.00 11,959.75 13,729.80 13729.7973485 13,800.00 74.83
17,774.03 34.00 17,774.03 20,404.59 20404.5911364 20,500.00 74.75
23,293.92 34.00 23,293.92 26,741.42 26741.4206818 26,800.00 74.32
31,279.36 34.00 31,279.36 35,908.70 35908.7007576 36,000.00 74.38
39,779.98 34.00 39,779.98 45,667.42 45667.4182576 45,700.00 74.06
51,040.55 34.00 51,040.55 58,594.55 58594.5505303 58,600.00 73.96
72,052.92 34.00 72,052.92 82,716.75 82716.7483333 82,800.00 74.11
112,568.88 34.00 112,568.88 129,229.08 129229.077197 129,300.00 74.03
196,103.16 34.00 196,103.16 225,126.43 225126.430985 225,200.00 74.00
299,619.43 34.00 299,619.43 299,619.43 299619.431818 299,700.00 51.56
5,887.88 34.00 5,887.88 5,887.88 5887.87878788 5,900.00 51.83
8,942.22 34.00 8,942.22 8,942.22 8942.21590909 9,000.00 52.49
11,702.16 34.00 11,702.16 11,702.16 11702.1590909 11,800.00 52.78
15,676.48 34.00 15,676.48 17,996.60 17996.5959091 18,000.00 73.97
- -
27,857.03 34.00 27,857.03 31,979.87 31979.8664394 32,000.00 74.05
40,442.37 34.00 40,442.37 46,427.84 46427.837803 46,500.00 74.21
- -
4,415.91 34.00 4,415.91 4,415.91 4415.90909091 4,500.00 54.40
6,734.26 34.00 6,734.26 6,734.26 6734.26136364 6,800.00 52.99
8,795.02 34.00 8,795.02 8,795.02 8795.01893939 8,800.00 51.60
11,775.76 34.00 11,775.76 11,775.76 11775.7575758 11,800.00 51.83
15,860.47 34.00 15,860.47 18,207.82 18207.8235606 18,300.00 74.82
20,129.19 34.00 20,129.19 23,108.31 23108.3050758 23,200.00 74.63
23,809.11 34.00 23,809.11 27,332.86 27332.8581061 27,400.00 74.37
30,285.78 34.00 30,285.78 34,768.07 34768.0714394 34,800.00 74.10
3,600.00 56.82 3,600.00 4,132.80 4132.8 4,200.00 170.20
3,420.00 31.82 3,420.00 3,926.16 3926.16 4,000.00 71.56
4,600.00 42.98 4,700.00 5,338.20 5338.2 5,400.00 105.87
5,700.00 1.15 5,712.50 6,550.78 6550.775 6,600.00 17.13
3,300.00 (138.46) 3,300.00 3,788.40 11922.9545455 12,000.00 52.49
4,137.50 (172.37) 4,250.00 4,814.43 17074.8484848 17,100.00 51.74
5,012.50 (153.90) 5,137.50 5,826.10 19282.8030303 19,300.00 51.65
7,075.00 (118.33) 7,200.00 8,193.85 23404.3181818 23,500.00 52.13
2,520.00 19.04 2,620.00 2,950.36 2950.36 3,000.00 47.05
3,930.00 35.73 3,930.00 4,511.64 4511.64 4,600.00 82.11
4,460.00 17.23 4,460.00 5,120.08 5120.08 5,200.00 40.86
5,800.00 (27.30) 5,900.00 6,715.80 11186.969697 11,200.00 51.69
5,775.00 (91.78) 5,775.00 6,629.70 16780.4545455 16,800.00 51.69
5,925.00 (114.80) 5,925.00 6,801.90 19282.8030303 19,300.00 51.65
6,900.00 (105.56) 6,900.00 7,921.20 21490.7575758 21,500.00 51.58
10,625.00 (67.33) 10,625.00 12,197.50 26937.0454545 27,000.00 51.87
52,917.31 34.00 52,917.31 60,749.07 60749.0725758 60,800.00 74.09
68,483.39 34.00 68,483.39 78,618.93 78618.9318939 78,700.00 74.12
93,322.88 34.00 93,322.88 107,134.66 107134.664848 107,200.00 74.05
- -
195,992.77 34.00 195,992.77 224,999.69 224999.694394 225,000.00 73.94
273,749.56 34.00 273,749.56 314,264.50 314264.499924 314,300.00 73.96
0 - -
457,230.59 34.00 457,230.59 457,230.59 457230.587121 457,300.00 51.54
3,712.50 (7.29) 3,712.50 4,261.95 4261.95 4,300.00 7.95
5,000.00 4.79 5,000.00 5,740.00 5740 5,800.00 21.84
5,875.00 (27.33) 5,875.00 6,744.50 11334.1666667 11,400.00 52.40
11,625.00 (13.66) 11,625.00 13,345.50 13345.5 13,400.00 1.42
15,612.50 (34.41) 15,612.50 17,923.15 31794.5454545 31,800.00 51.54
30,250.00 (22.68) 30,250.00 34,727.00 56229.2424242 56,300.00 51.71
43,387.50 (28.30) 43,375.00 49,801.68 84343.8636364 84,400.00 51.62
67,162.50 (10.51) 66,412.50 76,672.05 76672.05 76,700.00 3.34
4,825.00 5.37 4,825.00 5,539.10 5539.1 5,600.00 22.64
7,100.00 12.43 7,225.00 8,222.55 8222.55 8,300.00 33.49
9,000.00 2.85 8,875.00 10,260.25 10260.25 10,300.00 17.80
20,125.00 13.59 20,500.00 23,318.75 23318.75 23,400.00 34.56
20,250.00 (34.33) 20,500.00 23,390.50 41215.1515152 41,300.00 51.83
37,500.00 (38.60) 9,375.00 26,906.25 78750.3787879 78,800.00 51.61
60,250.00 (33.35) 60,500.00 69,310.50 121731.893939 121,800.00 51.60
95,187.50 (3.90) 94,625.00 108,952.38 108952.375 109,000.00 10.21
239,673.47 34.00 239,673.47 239,673.47 239673.465909 239,700.00 51.53
154,630.42 34.00 154,630.42 154,630.42 154630.416667 154,700.00 51.58
197,464.73 34.00 197,464.73 197,464.73 197464.734848 197,500.00 51.54
45,042.27 34.00 45,042.27 45,042.27 45042.2727273 45,100.00 51.71
62,742.71 34.00 62,742.71 62,742.71 62742.7083333 62,800.00 51.65
93,470.08 34.00 93,470.08 93,470.08 93470.0757576 93,500.00 51.56
137,150.78 34.00 137,150.78 137,150.78 137150.776515 137,200.00 51.57
296,307.50 34.00 296,307.50 296,307.50 296307.5 296,400.00 51.56
479,898.92 34.00 479,898.92 479,898.92 479898.920455 479,900.00 51.52
3,860.00 (15.77) 4,760.00 4,947.88 4947.88 5,000.00 11.88
18,100.00 (9.50) 18,100.00 20,778.80 20778.8 20,800.00 4.95
18,150.00 30.42 18,150.00 20,836.20 20836.2 20,900.00 65.49
48,375.00 26.70 48,500.00 55,606.25 55606.25 55,700.00 57.08
27,200.00 (14.29) 27,200.00 31,225.60 31225.6 31,300.00 0.68
16,100.00 (17.06) 16,200.00 18,540.20 28556.2121212 28,600.00 51.75
9,462.50 (28.34) 9,462.50 10,862.95 18399.6212121 18,400.00 51.52
149,250.00 (4.47) 149,375.00 171,410.75 171410.75 171,500.00 9.99
19,000.00 (30.39) 18,800.00 21,697.20 37535.2272727 37,600.00 51.78
22,200.00 (50.10) 22,000.00 25,370.80 50488.5606061 50,500.00 51.55
42,700.00 21.28 42,700.00 49,019.60 49019.6 49,100.00 46.07
38,712.80 34.00 38,712.80 44,442.30 44442.2978788 44,500.00 74.17
48,450.00 18.19 48,550.00 55,678.00 55678 55,700.00 40.52
47,700.00 (46.23) 47,600.00 54,702.20 105687.424242 105,700.00 51.53
75,125.00 37.93 75,125.00 86,243.50 86243.5 86,300.00 85.07
18,400.00 (356.18) 18,700.00 21,295.40 127178.181818 127,200.00 51.54
70,900.00 (35.79) 70,700.00 81,278.40 145872.19697 145,900.00 51.54
48,200.00 (52.78) 48,200.00 55,333.60 111575.30303 111,600.00 51.55
26,100.00 (393.19) 26,100.00 29,962.80 195035.984848 195,100.00 51.56
46,500.00 (223.00) 46,500.00 53,382.00 227566.515152 227,600.00 51.54
33,875.00 0.77 33,875.00 38,888.50 38888.5 38,900.00 15.73
56,200.00 (33.97) 56,100.00 64,460.20 114077.651515 114,100.00 51.54
17,300.00 25.31 17,400.00 19,917.80 19917.8 20,000.00 54.79
36,140.00 18.82 36,000.00 41,408.36 41408.36 41,500.00 41.45
32,900.00 (2.17) 32,900.00 37,769.20 37769.2 37,800.00 12.45
88,759.77 34.00 88,759.77 88,759.77 88759.7727273 88,800.00 51.58
40,331.97 34.00 40,331.97 46,301.10 46301.1012121 46,400.00 74.31
3,385.53 34.00 3,385.53 3,385.53 3385.53030303 3,400.00 52.16
12,806.14 34.00 12,806.14 12,806.14 12806.1363636 12,900.00 52.63
6,918.26 34.00 6,918.26 6,918.26 6918.25757576 7,000.00 53.31
9,912.50 (134.24) 9,912.50 11,379.55 35180.0757576 35,200.00 51.60
51,813.33 34.00 51,813.33 51,813.33 51813.3333333 51,900.00 51.77
35,474.47 34.00 35,474.47 35,474.47 35474.469697 35,500.00 51.62
57,112.42 34.00 57,112.42 57,112.42 57112.4242424 57,200.00 51.75
6,035.08 34.00 6,035.08 6,035.08 6035.07575758 6,100.00 53.15
598,750.00 (17.63) 598,750.00 687,365.00 1067178.0303 1,067,200.00 51.52
950,250.00 (31.87) 948,875.00 1,090,097.75 1898693.71212 1,898,700.00 51.52
1,662,500.00 (17.81) 1,662,500.00 1,908,550.00 2967638.10606 2,967,700.00 51.52
4,969,516.89 34.00 4,969,516.89 4,969,516.89 4969516.89394 4,969,600.00 51.52
291,744.39 34.00 291,744.39 291,744.39 291744.393939 291,800.00 51.54
1,170,215.91 34.00 1,170,215.91 1,170,215.91 1170215.90909 1,170,300.00 51.53
4,610.00 7.28 4,610.00 5,292.28 5292.28 5,300.00 23.99
7,180.00 2.58 7,280.00 8,300.04 8300.04 8,400.00 20.09
19,577.20 34.00 19,577.20 19,577.20 19577.1969697 19,600.00 51.69
4,750.00 (63.62) 4,750.00 5,453.00 11775.7575758 11,800.00 51.83
12,600.00 (108.18) 12,700.00 14,522.20 39743.1818182 39,800.00 51.73
11,100.00 (188.82) 11,200.00 12,800.20 48575 48,600.00 51.59
16,100.00 (128.09) 16,400.00 18,655.00 55640.4545455 55,700.00 51.68
956.78 34.00 956.78 1,098.38 1098.38378788 1,100.00 74.20
662.50 (17.31) 650.00 753.38 1177.57575758 1,200.00 54.40
1,240.00 17.74 1,250.00 1,429.26 1429.26 1,500.00 47.05
6,580.00 (10.73) 6,580.00 7,553.84 7553.84 7,600.00 4.31
7,380.00 (39.54) 7,380.00 8,472.24 15602.8787879 15,700.00 52.46
99,652.35 34.00 99,652.35 99,652.35 99652.3484848 99,700.00 51.59
144,841.82 34.00 144,841.82 144,841.82 144841.818182 144,900.00 51.58
27,125.00 (384.23) 27,000.00 31,067.75 199010.30303 199,100.00 51.58
45,300.00 (35.75) 45,312.50 52,011.58 93175.6818182 93,200.00 51.55
71,750.00 (27.14) 73,000.00 83,086.50 138217.954545 138,300.00 51.61
27,200.00 1.42 27,300.00 31,283.00 31283 31,300.00 16.73
27,720.00 (11.45) 27,820.00 31,879.96 31879.96 31,900.00 3.26
32,000.00 (8.99) 32,200.00 36,850.80 36850.8 36,900.00 5.80
32,500.00 (15.38) 32,800.00 37,482.20 56818.030303 56,900.00 51.73
37,800.00 (13.08) 37,800.00 43,394.40 43394.4 43,400.00 1.53
3,900.00 (350.88) 3,980.00 4,523.12 26642.6515152 26,700.00 51.84
44,159.09 34.00 44,159.09 44,159.09 44159.0909091 44,200.00 51.66
5,461,007.58 34.00 5,461,007.58 5,461,007.58 5461007.57576 5,461,100.00 51.52
6,918,110.38 34.00 6,918,110.38 6,918,110.38 6918110.37879 6,918,200.00 51.52
162,799.85 34.00 162,799.85 162,799.85 162799.848485 162,800.00 51.52
114,077.65 34.00 114,077.65 114,077.65 114077.651515 114,100.00 51.54
265,000.00 (60.79) 265,000.00 265,000.00 645605.909091 645,700.00 51.54
66,680.23 34.00 66,680.23 66,680.23 66680.2272727 66,700.00 51.56
3,091.14 34.00 3,091.14 3,091.14 3091.13636364 3,100.00 51.95
32,972.12 34.00 32,972.12 32,972.12 32972.1212121 33,000.00 51.64
28,114.62 34.00 28,114.62 28,114.62 28114.6212121 28,200.00 51.98
18,694.02 34.00 18,694.02 18,694.02 18694.0151515 18,700.00 51.56
284,531.74 34.00 284,531.74 284,531.74 284531.742424 284,600.00 51.55
24,729.09 34.00 24,729.09 24,729.09 24729.0909091 24,800.00 51.95
5,250.00 (253.44) 5,250.00 5,250.00 28114.6212121 28,200.00 51.98
227,566.52 34.00 227,566.52 261,246.36 261246.359394 261,300.00 73.98
47,103.03 34.00 47,103.03 47,103.03 47103.030303 47,200.00 51.83
85,079.85 34.00 85,079.85 85,079.85 85079.8484848 85,100.00 51.55
99,357.95 34.00 99,357.95 99,357.95 99357.9545455 99,400.00 51.58
19,871.59 34.00 19,871.59 19,871.59 19871.5909091 19,900.00 51.73
3,989.04 34.00 3,989.04 3,989.04 3989.03787879 4,000.00 51.93
132,845.27 34.00 132,845.27 132,845.27 132845.265152 132,900.00 51.58
3,679.92 34.00 3,679.92 3,679.92 3679.92424242 3,700.00 52.34
52,696.52 34.00 52,696.52 52,696.52 52696.5151515 52,700.00 51.53
3,974.32 34.00 3,974.32 3,974.32 3974.31818182 4,000.00 52.49
94,500.45 34.00 94,500.45 94,500.45 94500.4545455 94,600.00 51.67
123,056.67 34.00 123,056.67 123,056.67 123056.666667 123,100.00 51.57
10,156.59 34.00 10,156.59 10,156.59 10156.5909091 10,200.00 52.16
9,126.21 34.00 9,126.21 9,126.21 9126.21212121 9,200.00 52.74
47,103.03 34.00 47,103.03 47,103.03 47103.030303 47,200.00 51.83
94,500.45 34.00 94,500.45 94,500.45 94500.4545455 94,600.00 51.67
2,500.00 (16.58) 2,600.00 2,927.40 2927.4 3,000.00 2.93
0 - -
0 - -
0 - -
0 - -
0 - -
25,759.47 34.00 25,759.47 25,759.47 25759.469697 25,800.00 51.75
44.16 34.00 44.16 44.16 44.1590909091 50.00 71.56
16,700.00 22.63 16,850.00 19,257.70 19257.7 19,300.00 49.37
KETERANGAN

Tanah dan Pasir

Batu,Bata & Beton Block

Per Meter isi 45 t=6cm


Per Meter isi 45
Per Meter isi 28
Per Meter isi 28
Per Meter isi 33
Per Meter isi 33
Semen
Buis Beton

Kayu Borneo
Kayu Borneo
Kayu Borneo
Kayu Borneo
Kayu Borneo
Kayu Borneo
Kayu Meranti
Kayu Meranti
Kayu Meranti
Kayu Meranti
Kayu Meranti
Kayu Meranti
Kayu Kruing
Kayu Kruing
Kayu Kruing
Kayu Kruing
Kayu Kruing
Kayu Kruing
Kayu Kamper
Kayu Kamper
Kayu Kamper
Kayu Kamper
Kayu Kamper
Kayu Kamper
Kayu Lain-lain
Kayu Jati Ex Malang
Kayu Jati Ex Malang
Kayu Jati Ex Malang
Kayu Jati Ex Malang
Kayu Jati Ex Malang
Kayu Jati Ex Malang
Kayu Jati Ex Madiun/Ngawi
Kayu Jati Ex Madiun/Ngawi
Kayu Jati Ex Madiun/Ngawi
Kayu Jati Ex Madiun/Ngawi
Kayu Jati Ex Madiun/Ngawi
Kayu Jati Ex Madiun/Ngawi
Kayu Jati Ex Bojonegoro
Kayu Jati Ex Bojonegoro
Kayu Jati Ex Bojonegoro
Kayu Jati Ex Bojonegoro
Kayu Jati Ex Bojonegoro
Kayu Jati Ex Bojonegoro
Besi dan Aluminium
Atap Genteng
Atap Seng / Asbes
Kayu Olahan

Perlengkapan Kamar Mandi

Alat-Alat Penggantung
Kaca

Perlengkapan Lantai
Perpipaan
Plitur & Cat
Peralatan Air Bersih

Instalasi Listrik
Lain - Lain
PRICE
Rp71,911
Rp695,425
Rp273,477
Rp465,137
Rp578,047
Rp967,023
Rp1,623,375
Rp847,946
Rp1,048,696
Rp1,279,112
Rp2,099,195
Rp2,860,029
Rp1,272,529
Rp442,320
Rp1,623,935
Rp817,435
Rp1,854,435
Rp905,435
Rp1,245,119
Rp522,473
Rp2,281,890
Rp1,189,285
Rp2,454,598
Rp1,017,827
Rp314,683
Rp63,665
Rp108,124
Rp76,217
Rp149,105
Rp148,672
Rp1,361,727
Rp1,367,843
Rp205,801
Rp907,567
Rp232,492
Rp263,114
Rp239,537
Rp153,722
Rp268,102
Rp107,765
Rp1,408
Rp586,723
Rp560,445
Rp1,679,981
Rp372,821
Rp10,810
Rp11,367
Rp11,281
Rp584,486
Rp549,168
Rp348,552
Rp1,738,894
Rp291,918
Rp10,590
Rp10,622
Rp17,168
Rp26,515
Rp10,574
Rp56,077
Rp68,986
Rp1,362,095
Rp3,861,749
Rp1,189,840
Rp1,189,840
Rp1,152,841
Rp1,144,601
Rp1,152,841
Rp1,144,547
Rp1,119,076
Rp1,109,763
Rp1,119,076
Rp1,109,763
Rp1,018,691
Rp1,005,034
Rp1,015,853
Rp1,005,034
Rp20,612
Rp10,678
Rp14,091
Rp2,717,788
Rp10,681,108
Rp2,582,374
Rp1,633,592
Rp1,735,680
Rp1,511,188
Rp1,379,418
Rp1,349,822
Rp1,348,798
Rp1,287,036
Rp1,033,917
Rp1,006,386
Rp1,012,414
Rp14,032
Rp26,199
Rp20,479
Rp20,809
Rp21,909
Rp39,963
Rp24,021
Rp24,009
Rp24,009
Rp41,339
Rp1,676
Rp1,148
Rp823,411
Rp774,660
Rp302,290
Rp1,375,165
Rp1,413,650
Rp390,913
Rp559,597
Rp478,605
Rp311,490
Rp556,275
Rp497,579
Rp318,532
Rp388,213
Rp2,825,335
#VALUE!
Rp2,497,165
Rp11,472
Rp91,703
Rp131,773
Rp250,734
Rp361,423
Rp717,385
Rp24,520
Rp23,720
Rp21,990
Rp242,612
Rp232,667
Rp800,969
Rp1,059,942
Rp885,069
Rp1,226,769
Rp130,621
Rp513,102
Rp239,998
Rp495,680
Rp122,837
Rp214,537
Rp125,932
Rp147,635
Rp323,785,620
Rp428,599
Rp538,669
Rp633,885
Rp275,271
Rp155,395
Rp284,149
Rp75,690
Rp90,879,084
Rp12,564,744
Rp13,800
Rp9,857
Rp12,321
Rp317,423
Rp667,321
Rp295,466
Rp775,638
Rp626,379
Rp425,895
Rp417,360
Rp669,334
Rp785,346
Rp265,573
Rp509,692
Rp49,095
Rp485,589
Rp206,513
Rp227,866
Rp35,898
Rp24,924
Rp1,563,890
Rp23,541
Rp74,140
Rp618,873
Rp763,838
Rp3,177,213
Rp67,858
Rp167,185
Rp2,354,695
Rp2,362,552
Rp2,169,095
Rp10,200
Rp2,386,927
Rp471,526
Rp114,857
Rp758,040
Rp427,992
Rp402,792
Rp70,200
Rp12,840
Rp17,970
Rp47,100
Rp57,780
Rp68,628
Rp62,688
Rp95,040
Rp75,780
Rp3,420
Rp20,640
Rp19,260
Rp34,200
Rp172,080
Rp481,028
Rp678,540
Rp169,260
Rp247,500
Rp131,340
Rp136,428
Rp119,632
Rp297,683
Rp41,749
Rp43,041
Rp871,990
Rp805,089
Rp758,726
Rp726,123
Rp681,454
Rp845,113
Rp900,999
Rp837,216
Rp366,587
Rp2,535,364
Rp893,305
Rp280,726
Rp262,944
Rp251,195
Rp244,781
Rp241,865
Rp275,074
Rp134,632
Rp126,341
Rp121,505
Rp118,459
Rp116,697
Rp113,445
Rp139,795
Rp135,463
Rp128,420
Rp333,583
Rp331,119
Rp265,533
Rp263,489
Rp202,377
Rp201,557
Rp462,992
Rp457,910
Rp219,267
Rp64,834
Rp55,625
Rp51,591
Rp48,878
Rp47,283
Rp46,029
Rp45,323
Rp44,617
Rp53,020
Rp53,236
Rp55,698
Rp52,383
Rp74,403
Rp59,868
Rp65,338
Rp63,280
Rp61,540
Rp71,236
Rp31,335
Rp42,960
Rp588,222
Rp423,222
Rp37,252
Rp46,599
Rp25,670
Rp27,565
Rp22,270,250
Rp18,336,450
Rp16,812,450
Rp11,556,450
Rp973,737
Rp772,537
Rp731,417
Rp541,137
Rp1,208,700
Rp1,007,500
Rp966,380
Rp776,100
Rp789,360
Rp668,640
Rp643,968
Rp529,800
Rp1,724,700
Rp1,402,780
Rp1,336,988
Rp1,032,540
Rp1,004,860
Rp879,110
Rp853,410
Rp734,485
Rp1,533,690
Rp1,231,890
Rp1,170,210
Rp884,790
Rp921,730
Rp795,980
Rp770,280
Rp651,355
Rp1,179,807
Rp1,054,057
Rp1,028,357
Rp909,432
Rp1,075,807
Rp964,357
Rp845,432
Rp21,567,300
Rp16,594,200
Rp15,197,200
Rp11,479,200
Rp10,379,200
Rp24,245,290
Rp18,820,090
Rp16,005,680
Rp9,790,680
Rp422,900
Rp300,528
Rp284,120
Rp202,950
Rp172,316
Rp422,900
Rp300,528
Rp284,120
Rp202,950
Rp172,316
Rp456,920
Rp323,730
Rp306,440
Rp218,295
Rp185,060
Rp335,614
Rp242,389
Rp227,209
Rp164,427
Rp140,584
Rp337,810
Rp250,800
Rp236,632
Rp178,035
Rp155,782
Rp244,418
Rp200,408
Rp193,194
Rp130,856
Rp129,290
Rp261,470
Rp206,140
Rp194,832
Rp131,340
Rp142,505
Rp559,885
Rp433,297
Rp397,737
Rp275,097
Rp685,845
Rp559,257
Rp523,697
Rp401,057
Rp791,278
Rp664,690
Rp629,130
Rp506,490
Rp349,945
Rp314,735
Rp979,584
Rp1,031,513
Rp1,071,984
Rp921,453
Rp1,120,208
Rp1,165,651
Rp1,200,556
Rp1,222,412
Rp1,259,914
Rp1,271,557
Rp1,350,937
Rp1,366,123
Rp1,442,197
Rp55,977
Rp96,936
Rp112,926
Rp14,026
Rp20,641
Rp43,978
Rp46,874
Rp313,784
Rp184,699
Rp344,919
Rp200,267
Rp503,755
Rp287,171
Rp513,446
Rp292,017
Rp627,755
Rp349,171
Rp529,437
Rp300,012
Rp441,290
Rp255,938
Rp132,132
Rp4,215,551
Rp5,989,388
Rp7,486,046
Rp10,034,363
Rp7,830,448
Rp6,868,791
Rp7,106,891
Rp78,319
Rp108,333
Rp107,013
Rp59,887
Rp62,387
Rp103,637
Rp108,637
Rp96,137
Rp77,800
Rp87,050
Rp95,550
Rp99,050
Rp111,550
Rp96,137
Rp161,137
Rp140,634
Rp95,960
Rp141,875
Rp169,234
Rp271,807
Rp92,050
Rp113,050
Rp107,050
Rp126,320
Rp200,984
Rp184,367
Rp112,909
Rp70,271
Rp74,121
Rp69,896
Rp71,316
Rp71,946
Rp92,585
Rp96,285
Rp87,321
Rp87,021
Rp145,296
Rp84,846
Rp82,016
Rp87,696
Rp176,016
Rp169,116
Rp166,591
Rp92,016
Rp90,816
Rp96,816
Rp97,456
Rp80,516
Rp94,932
Rp51,970
Rp216,452
Rp252,406
Rp60,147
Rp143,363
Rp335,748
Rp142,352
Rp258,406
Rp38,771
Rp37,011
Rp34,811
Rp33,711
Rp403,414
Rp251,320
Rp91,420
Rp677,620
Rp770,420
Rp211,420
Rp274,420
Rp358,620
Rp143,920
Rp556,670
Rp450,470
Rp83,360
Rp257,130
Rp292,756
Rp224,956
Rp213,916
Rp168,256
Rp150,916
Rp568,224
Rp438,274
Rp417,114
Rp329,599
Rp296,364
Rp722,232
Rp592,282
Rp571,122
Rp483,607
Rp450,372
Rp940,127
Rp787,577
Rp762,737
Rp660,002
Rp762,737
Rp53,309
Rp55,320
Rp49,590
Rp422,825
Rp356,450
Rp28,712
Rp40,467
Rp324,997
Rp566,897
Rp1,026,897
Rp2,420,729
Rp2,597,785
Rp1,763,857
Rp845,797
Rp2,131,037
Rp55,570
Rp412,297
Rp849,810
Rp1,336,770
Rp2,005,875
Rp12,306,516
Rp263,746
Rp351,129
Rp104,260
Rp196,721
Rp243,981
Rp293,647
Rp375,980
Rp548,600
Rp596,960
Rp711,320
Rp97,440
Rp235,181
Rp310,780
Rp462,811
Rp699,591
Rp90,923
Rp113,703
Rp148,543
Rp196,524
Rp310,424
Rp424,324
Rp462,324
Rp689,759
Rp26,746
Rp35,960
Rp44,004
Rp54,191
Rp70,287
Rp88,162
Rp123,309
Rp181,747
Rp313,880
Rp471,688
Rp15,631
Rp20,616
Rp24,801
Rp33,791
Rp36,024
Rp52,412
Rp74,497
Rp98,557
Rp13,956
Rp16,801
Rp20,319
Rp24,485
Rp34,537
Rp41,412
Rp52,497
Rp62,122
Rp452,576
Rp339,860
Rp67,483
Rp74,083
Rp87,770
Rp36,170
Rp237,930
Rp140,370
Rp192,026
Rp43,046
Rp43,046
Rp44,010
Rp27,576
Rp43,046
Rp1,241,593
Rp11,869
Rp3,075,104
Rp2,340,868
Rp503,136
Rp1,826,700
186,333.90
Rp1,095,815
Rp805,115
Rp877,387
Rp581,787
Rp121,842
Rp481,384
Rp588,572
Rp283,295
Rp299,045
Rp283,295
Rp299,045
Rp80,534
Rp94,734
Rp92,312
Rp474,097
Rp342,597
Rp780,634
Rp793,122
Rp994,387
Rp198,080
Rp153,848
Rp78,470
Rp295,139
Rp1,224,250
Rp1,335,895
Rp48,771
Rp3,286,542
Rp4,592,654
Rp188,152
Rp189,570
Rp163,535
Rp238,350
Rp208,384
Rp39,284
Rp59,692
Rp42,692
Rp43,892
Rp26,192
Rp57,140
Rp46,292
Rp28,192
Rp285,960
Rp215,960
Rp59,192
Rp240,852
Rp138,642
Rp200,792
Rp377,892
Rp537,392
Rp179,734
Rp273,014
Rp332,365
Rp513,865
Rp243,142
Rp409,792
Rp554,165
Rp195,292
Rp286,592
Rp565,165
Rp950,165
Rp926,792
Rp2,026,792
Rp50,092
Rp838,792
Rp79,240
Rp89,300
Rp107,013
Rp109,270
Rp117,487
Rp140,148
Rp116,563
Rp131,731
Rp465,964
Rp462,904
Rp456,019
Rp696,743
Rp387,065
Rp568,729
Rp961,444
Rp38,673
Rp32,373
Rp29,738
Rp31,083
Rp30,100
Rp31,348
Rp38,572
Rp40,093
Rp65,798
Rp60,458
Rp49,050
Rp785,183
Rp1,429,283
Rp1,429,283
Rp803,128
Rp1,441,828
Rp143,948
Rp271,598
Rp142,341
Rp281,200
Rp458,865
Rp437,865
Rp163,216
Rp186,042
Rp191,342
Rp188,692
Rp198,968
Rp228,643
Rp246,048
Rp259,908
Rp694,383
Rp64,978
Rp109,058
Rp125,188
Rp216,073
Rp258,523
Rp292,923
Rp216,073
Rp238,678
Rp226,748
Rp261,198
Rp260,628
Rp195,140
Rp684,355
Rp243,078
Rp223,040
Rp137,990
Rp762,514
Rp108,695
Rp123,675
Rp141,675
Rp141,875
Rp147,475
Rp126,675
Rp133,275
Rp205,207
Rp634,828
Rp524,828
Rp10,810
Rp11,805
Rp11,805
Rp11,805
Rp961,250
Rp10,186
Rp42,738
Rp57,178
Rp72,010
Rp15,501
Rp75,060
Rp21,554
Rp36,570
Rp43,063
Rp44,363
Rp49,043
Rp30,855
Rp6,135
Rp24,258
Rp20,433
Rp43,063
Rp21,860
Rp27,010
Rp61,923
Rp36,444
Rp154,365
Rp127,700
Rp79,778
Rp30,710
Rp215,125
Rp185,425
Rp229,025
Rp212,825
Rp228,825
Rp259,825
Rp311,125
Rp227,825
Rp230,325
Rp235,825
Rp239,825
Rp247,825
Rp185,678
Rp304,686
Rp427,599
Rp6,699,750
Rp3,993,000
Rp3,897,000
Rp367,883
Rp459,854
Rp551,825
Rp689,781
Rp919,708
Rp1,379,563
Rp1,839,417
Rp2,759,125
Rp18,389
Rp7,777,500
Rp306,569
Rp367,883
Rp459,854
Rp613,139
Rp788,321
Rp1,103,650
Rp1,839,417
Rp452,000
Rp452,000
Rp462,000
Rp417,600
Rp417,600
Rp397,600
Rp74,200
Rp43,200
Rp598,400
Rp1,128,359
Rp10,344,141
Rp16,828,282
Rp340,750
Rp67,277
Rp89,462
Rp127,672
Rp186,397
Rp390,530
Rp636,683
Rp165,435
Rp220,245
Rp278,970
Rp1,075,320
Rp1,020,990
Rp1,780,160
Rp2,798,738
Rp4,680,980
Rp723,920
Rp998,920
Rp130,660
Rp89,400
Rp172,246
Rp60,440
Rp71,596
Rp109,404
Rp109,272
Rp99,943
Rp108,751
Rp45,716
Rp18,426
Rp46,472
Rp187,508
Rp141,930
Rp792,264
Rp45,744
Rp45,171
Rp1,523,980
Rp1,031,513
Rp1,120,208
Rp424,672
Rp20,641
Rp14,026
Rp492,175
Rp75,614,000
Rp13,376,000
Rp8,635,000
Rp9,252,000
Rp11,396,000
Rp11,396,000
Rp29,140
Rp29,140
Rp38,300
Rp286,480
Rp328,214
Rp30,680
Rp19,612,000
Rp22,420
Rp109
Rp608
Rp311
Rp168
Rp368
Rp522,600
Rp108,020
Rp38,140
Rp175,984
Rp13,666
Rp287,849
Rp63,540,226
Rp346,984
Rp405,434
Rp768,384
Rp469,484
Rp94,163
Rp85,913
Rp78,069
Rp120,969
Rp138,569
Rp747,160
Rp1,165,135
Rp357,574
Rp288,274
Rp168,161
Rp217,661
Rp157,161
Rp205,561
Rp81,206
Rp106,506
Rp1,371,935
Rp445,663
Rp1,421,460
Rp2,207,960
Rp232,295
Rp12,374
Rp14,849
Rp2,581,550
Rp21,209
Rp13,883
Rp6,807,375
Rp596,425
Rp100,585
URAIAN
Galian untuk Drainase, Saluran dan Sal.Air
Pas.Batu dengan Mortar untuk saluran
RCP 400x2440 mm, Type RJ, Cls-2 AS
RCP 500x2440 mm, Type RJ, Cls-2 AS
RCP 600x2440 mm, Type RJ, Cls-2 AS
RCP 800x2440 mm, Type RJ, Cls-2 AS
RCP 1050x2440 mm, Type RJ, Cls-2 AS
Box Culvert monolit 400x400x1200 mm
Box Culvert monolit 500x500x1200 mm
Box Culvert monolit 600x600x1200 mm
Box Culvert monolit 800x800x1200 mm
Box Culvert monolit 1000x1000x1200 mm
Box U Persegi Beton Bertulang ukuran dalam 40 x 60 cm, tebal 8 cm (U 400/600-1200)
Tutup Box U Persegi Beton Bertulang ukuran 62 x 120 cm, tebal 10 cm (Cover 62x120x10)
Box U Persegi Beton Bertulang ukuran dalam 55 x 60 cm, tebal 10 cm (U 55/60 - 100)
Tutup Box U Persegi Beton Bertulang ukuran dalam 81 x 100 cm, tebal 15 cm (Cover 81x100x15)
Box U Persegi Beton Bertulang ukuran dalam 60 x 60 cm, tebal 10 cm (U 60/60-100,Crossing)
Tutup Box U Persegi Beton Bertulang ukuran 90 x 100 cm, tebal 15 cm (Cover 90x100x15)
Box U Persegi Beton Bertulang ukuran dalam 60 x 70 cm, tebal 10 cm (U 60/70-240)
Tutup Box U Persegi Beton Bertulang ukuran 80 x 240 cm, tebal 10 cm (Cover 80x240x10)
Box U Persegi Beton Bertulang ukuran dalam 90 x 80 cm, tebal 15 cm (U 90/80-240 Crossing)
Tutup Box U Persegi Beton Bertulang ukuran128 x 240 cm, tebal 15 cm (Cover 128x240x15 )
Box U Persegi Beton Bertulang ukuran dalam 80 x 100 cm, tebal 15 cm (U 80/100-240 Crossing)
Tutup Box U Persegi Beton Bertulang ukuran108 x 240 cm, tebal 15 cm (Cover 108x240x15 Crossing)
Timbunan Porous atau Bahan Penyaring (filter)
Anyaman Filter plastik
Pipa Berlubang banyak ( Perforated Pipe ) untuk pek.drainase bawah permukaan
Galian biasa (+pembuangan)
Galian Batu (+pembuangan)
Galian Struktur dengan kedalaman 0-2 m (+pembuangan)
Galian Struktur dengan kedalaman 2-4 m (+pembuangan)
Galian Struktur dengan kedalaman 4-6 m (+pembuangan)
Galian Perkerasan Beraspal dengan Cold Milling Machine
Galian Perkerasan Beraspal tanpa Cold Milling Machine
Timbunan biasa dari selain sumber galian
Timbunan pilihan
Timbunan pilihan di atas tanah Rawa (diukur diatas bak truk)
Timbunan Batu dengan Manual
Timbunan Batu dengan Derek
Timbunan Batu dengan Derek
Penyiapan badan jalan
Lapis pondasi agregat Kelas.A
Lapis pondasi agregat Kelas.B CBR Min 60%
Semen untuk Pondasi Semen Tanah
Lapis pondasi semen tanah
Agregat Penutup Burtu
Bahan Aspal untuk Pekerjaan Pelaburan
Lapis Resap Pengikat
Lapis Pondasi Agregat Kelas.A
Lapis Pondasi Agregat Kelas.B
Lapis Pondasi Agregat Kelas.C
Semen Untuk Pondasi Semen Tanah
Lapis Pondasi Tanah Semen
Lapis Resap Pengikat
Lapis Perekat
Agregat Penutup Burtu
Agregat Penutup Burda
Material Aspal untuk Pekerjaan Pelaburan
Latasir Kelas A (SS-A), (t = … cm)
Latasir Kelas B (SS-B), (t = … cm)
Lataston Lapis Aus (HRS-WC)
Lataston Lapis Aus Perata (HRS-WCL)
Lataston Lapis Pondasi (HRS-Base)
Lataston Lapis Pondasi Perata(HRS-Base L)
Laston Lapis Aus (AC-WC)
Laston Lapis Aus Modifikasi (AC-WC Mod)
Laston Lapis Aus Perata (AC-WC L)
Laston Lapis Aus Modifikasi Perata (AC-WCMod L)
Laston Lapis Antara (AC-BC)
Laston Lapis Antara (AC-BC) modifikasi
Laston Lapis Antara Perata (AC-BC L)
Laston Lapis Antara Modifikasi Perata (AC-BC Mod L)
Laston Lapis Pondasi (AC-Base)
Laston Lapis Pondasi Modifikasi (AC-Base Mod)
Laston Lapis Fondasi Perata (AC-Base L)
Laston Lapis Fondasi Modifikasi Perata (AC-Base Mod L)
Lasbutag
Latasbusir Kelas A
Latasbusir Kelas B
Bitumen Asbuton
Bitumen Bahan Peremaja
Campuran Beraspal Dingin Untuk Pelapisan
Lapis Permukaan Penetrasi Macadam (t=…..cm)
Lapis Fondasi atau Perata Penetrasi Macadam
Beton K500
Beton K400
Beton K350
Beton K300
Beton K250
Beton K175
Beton Siklop K175
Beton K125
Baja Tulangan U24 Polos
Baja Tulangan U32 Polos
Baja Tulangan U32 Ulir
Baja Tulangan U39 Ulir
Baja Tulangan U48 Ulir
Anyaman Kawat Yang Dilas (Welded Wire Mesh), Ø 6 - 15
Baja Struktur Titik leleh 2500 kg/cm2 penyediaan dan pemasangan
Baja Struktur Titik leleh 2800 kg/cm2 penyediaan dan pemasangan
Baja Struktur Titik leleh 3500 kg/cm2 penyediaan dan pemasangan
Baja Struktur
Pemasangan Jembatan Rangka Baja
Pengangkutan Bahan Jembatan
Pasangan Batu (+ Siar / Plesteran)
Pasangan Batu Kosong yang diisi Adukan
Pasangan Batu Kosong
Bronjong
Expansion Joint Tipe Asphaltic Plug
Sandaran (Railing)
Pembongkaran Beton
Pembongkaran Rangka Baja
Pembongkaran Balok Baja (Steel Stringers)
Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor
Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor
Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor
Waterbound Macadam untuk Pekerjaan Minor
Campuran Aspal Panas untuk Pekerjaan Minor
Penetrasi Macadam untuk Pekerjaan Minor
Campuran Aspal Dingin untuk Pekerjaan Minor
Residu Bitumen untuk Pekerjaan Minor
Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya
Pembersihan dan Pembongkaran Tanaman (diameter < 30 cm)
Pemotongan Pohon diameter 30 - 50 cm
Pemotongan Pohon diameter 50 - 75 cm
Pemotongan Pohon diameter > 75 cm
Stabilisasi dengan Tanaman
Semak / Perdu
Pohon
Marka Jalan Termoplastik
Marka Jalan Bukan Termoplastik
Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade
Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade
Rambu Jalan Tunggal dengan Pemantul High Intensity Grade
Rambu Jalan Ganda dengan Pemantul High Intensity Grade
Patok Pengarah
Patok Kilometer
Patok Hektometer
Rel Pengaman
Paku Jalan
Mata Kucing
Kerb Pracetak
Perkerasan Blok Beton pada Trotoar dan Median (Paving Stone)
Ram Besi Standar
Kayu Bekisting (+ Pembongkaran) Untuk Jembatan, H < 4 M
Kayu Bekisting (+ Pembongkaran) Untuk Jembatan, H 4 ~ 8 M
Kayu Bekisting (+ Pembongkaran) Untuk Jembatan, H > 8 M
Kayu Bekisting (+ Pembongkaran) Untuk Duiker
Kayu Bekisting (+ Pembongkaran) Untuk In Rate
Perletakan Elastomeric
Pipa Utilitas PVC Dia 4'
Pipa Utilitas PVC Dia 2'
Unit lampu penerangan jalan tunggal Type sodium 250 watt
Mandor
Pekerja Biasa
Tukang Batu, Tukang Kayu, dsb
Dump Truck, kapasitas 3-4 m³
Truk Bak Datar 3 - 4 ton
Truk Tangki 3000 - 4500 Liter
Bulldozer 100 - 150 PK
Motor Grader min 100 PK
Loader Roda Karet 1.0 - 1.6 M3
Loader Roda Berantai 75 - 100 PK
Alat Penggali (Excavator) 80 - 140 PK
Crane 10 - 15 Ton
Penggilas Roda Besi 6 - 9 Ton
Penggilas Bervibrasi 5 - 8 Ton
Pemadat Bervibrasi 1.5 - 3.0 PK
Penggilas Roda Karet 8 - 10 Ton
Kompresor 4000 - 6500 Ltr/mnt
Beton Pengaduk (Molen) 0.3 - 0.6 M3
Pompa Air 70 - 100 mm
Jack Hammer
Lapen
BURTU (+Material Aspal Untuk Pelaburan)
Telford 15/20
Pagar sementara dari kayu tinggi 2 m
Pagar sementara dari seng gelombang tinggi 2 m
Pagar sementara dari kawat duri tinggi 1.8 m
Pagar kawat jaring galvanis, tinggi 1,0 m
Pengukuran dan pemasangan bouwplank
Pembuatan kantor sementara, dengan lantai plesteran
Pembuatan gudang semen dan alat-alat
Pembuatan rumah jaga/konstruksi kayu
Membersihkan lapangan dan perataan
Pembuatan bedeng buruh
Pembuatan bak adukan ukuran (40 x 50 x 20) cm
Pembuatan jalan sementara
Bongkar pasang kayu kuda-kuda / kusen / loteng
Bongkaran beton bertulang
Bongkaran tembok bata merah
Bongkaran atap
Bongkaran lantai
Bongkaran plafon
Galian tanah biasa sedalam 1 m
Galian tanah biasa sedalam 2 m
Galian tanah biasa sedalam 3 m
Galian tanah keras sedalam 1 m
Galian tanah cadas sedalam 1 m
Galian tanah lumpur sedalam 1 m
Pekerjaan stripping tebing setinggi 1 m
Pembuangan tanah sejauh 30 m
Urugan kembali
Pemadatan tanah (per 20 cm)
Urugan pasir
Lapisan Pudel Campuran 1 Kp : 3 Ps : 7 TL
Lapisan Pudel Campuran 1 Kp : 5 TL
Pemasangan lapisan ijuk (tebal 10 cm)
Urugan sirtu padat untuk peninggian lantai bangunan
Urugan Tanah
Cut and fill
Galian tanah keras sedalam > 5 m
Galian tanah keras sedalam > 10 m
Pembuangan tanah sejauh > 1 km
Perataan Lahan
Pasang pondasi batu kali, 1 Pc : 3 Ps
Pasang pondasi batu kali, 1 Pc : 4 Ps
Pasang pondasi batu kali, 1 Pc : 5 Ps
Pasang pondasi batu kali, 1 Pc : 6 Ps
Pasang pondasi batu kali, 1 Pc : 8 Ps
Pasang pondasi batu kali, 1 Kp : 1 Sm : 2 Ps
Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps
Pasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 Ps
Pasang pondasi batu kosong (anstamping)
Pasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu kali
Pasang pondasi sumuran diameter 100 cm
Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps
Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps
Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps
Pasangan dinding hollowblock (HB. 20), Spesi 1 PC : 3 Ps
Pasangan dinding hollowblock (HB. 20), Spesi 1 PC : 4 Ps
Pasangan dinding hollowblock (HB. 15), spesi 1 PC : 3 Ps
Pasangan dinding hollowblock (HB. 15), spesi 1 PC : 4 Ps
Pasangan dinding hollowblock (HB. 10), Spesi 1 PC : 3 Ps
Pasangan dinding hollowblock (HB. 10), Spesi 1 PC : 4 Ps
Pasangan dinding roster/terawang (12 x 11 x 24) cm, Spesi 1 PC : 3 Ps
Pasangan dinding roster/terawang (12 x 11 x 24) cm, Spesi 1 PC : 4 Ps
Pasang bata berongga (5 x 11 x 24) cm, Spesi 1PC:3Ps
Plesteran 1 Pc : 1 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Ps, tebal 15 mm
Plesteran 1 Pc : 3 Ps, tebal 15 mm
Plesteran 1 Pc : 4 Ps, tebal 15 mm
Plesteran 1 Pc : 5 Ps, tebal 15 mm
Plesteran 1 Pc : 6 Ps, tebal 15 mm
Plesteran 1 Pc : 7 Ps, tebal 15 mm
Plesteran 1 Pc : 8 Ps, tebal 15 mm
Plesteran 1 Pc : 0.5 Kp : 3 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mm
Plesteran 1 Kp : 1 Sm : 1 Ps, tebal 15 mm
Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Ps, tebal 20 mm
Plesteran 1 Pc : 3 Ps, tebal 20 mm
Plesteran 1 Pc : 4 Ps, tebal 20 mm
Plesteran 1 Pc : 5 Ps, tebal 20 mm
Plesteran 1 Pc : 6 Ps, tebal 20 mm
Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mm
Berapen 1 Pc : 5 Ps, tebal 15 mm
Plesteran skoning 1 Pc : 2 Ps, Lebar 10 mm
Plesteran granito 1 Pc warna : 2 granito, tebal 10 mm
Plesteran Teraso, 1 Pc Warna : 2 Batu Teraso, tebal 10 mm
Plesteran Ciprat 1 Pc : 2 Ps,
Plesteran siar pasangan batu kali adukan 1 Pc : 2 Ps
Benangan
Acian
Pasang kusen pintu dan jendela kayu jati (kelas I)
Pasang kusen pintu dan jendela kayu kamper
Pasang kusen pintu dan jendela kayu borneo
Pasang kusen pintu dan jendela kayu meranti
Pasang pintu klamp kayu jati
Pasang pintu klamp kayu kamper
Pasang pintu klamp kayu borneo
Pasang pintu klamp kayu meranti
Pasang pintu panel kayu jati
Pasang pintu panel kayu kamper
Pasang pintu panel kayu borneo
Pasang pintu panel kayu meranti
Pasang pintu dan jendela kaca kayu jati
Pasang pintu dan jendela kaca kayu kamper
Pasang pintu dan jendela kaca kayu borneo
Pasang pintu dan jendela kaca kayu meranti
Pasang pintu dan jendela jalusi kayu jati
Pasang pintu dan jendela jalusi kayu kamper
Pasang pintu dan jendela jalusi kayu borneo
Pasang pintu dan jendela jalusi kayu meranti
Pasang pintu plywood rangkap, rangka kayu jati
Pasang pintu plywood rangkap, rangka kayu kamper
Pasang pintu plywood rangkap, rangka kayu borneo
Pasang pintu plywood rangkap, rangka kayu meranti
Pasang jalusi mati kusen kayu jati
Pasang jalusi mati kusen kayu kamper
Pasang jalusi mati kusen kayu borneo
Pasang jalusi mati kusen kayu meranti
Pasang pintu teakwood rangkap, rangka kayu jati
Pasang pintu teakwood rangkap, rangka kayu kamper
Pasang pintu teakwood rangkap, rangka kayu borneo
Pasang pintu teakwood rangkap, rangka kayu meranti
Pasang pintu plywood & formika, rangka kayu jati
Pasang pintu plywood & formika, rangka kayu kamper
Pasang pintu plywood & formika, rangka kayu borneo
Pasang pintu plywood & formika, rangka kayu meranti
Pasang pintu teakwood & formika, rangka kayu jati
Pasang pintu teakwood & formika, rangka kayu borneo (divernis)
Pasang pintu teakwood & formika, rangka kayu meranti (divernis)
Pasang konstruksi kuda-kuda kayu jati
Pasang konstruksi kuda-kuda kayu kamper
Pasang konstruksi kuda-kuda kayu borneo
Pasang konstruksi kuda-kuda kayu kruing
Pasang konstruksi kuda-kuda kayu meranti
Pasang konstruksi kuda-kuda ekspose kayu jati
Pasang konstruksi kuda-kuda ekspose kayu kamper
Pasang konstruksi gording kayu kamper
Pasang konstruksi gording kayu meranti
Pasang kaso + reng genteng biasa kayu jati
Pasang kaso + reng genteng biasa kayu kamper
Pasang kaso + reng genteng biasa kayu borneo
Pasang kaso + reng genteng biasa kayu kruing
Pasang kaso + reng genteng biasa kayu meranti
Pasang kaso + reng genteng karangpilang kayu jati
Pasang kaso + reng genteng karangpilang kayu kamper
Pasang kaso + reng genteng karangpilang kayu borneo
Pasang kaso + reng genteng karangpilang kayu kruing
Pasang kaso + reng genteng karangpilang kayu meranti
Pasang kaso + reng genteng beton kayu jati
Pasang kaso + reng genteng beton kayu kamper
Pasang kaso + reng genteng beton kayu borneo
Pasang kaso + reng genteng beton kayu kruing
Pasang kaso + reng genteng beton kayu meranti
Pasang kaso + reng atap sirap kayu jati
Pasang kaso + reng atap sirap kayu kamper
Pasang kaso + reng atap sirap kayu borneo
Pasang kaso + reng atap sirap kayu kruing
Pasang kaso + reng atap sirap kayu meranti
Pasang rangka langit-langit (0.5 x 1.0) m, kayu jati
Pasang rangka langit-langit (0.5 x 1.0) m, kayu kamper
Pasang rangka langit-langit (0.5 x 1.0) m, kayu borneo
Pasang rangka langit-langit (0.5 x 1.0) m, kayu kruing
Pasang rangka langit-langit (0.5 x 1.0) m, kayu meranti
Pasang lisplang ukuran (3 x 20) cm, kayu jati
Pasang lisplang ukuran (3 x 20) cm, kayu kamper
Pasang lisplang ukuran (3 x 20) cm, kayu borneo
Pasang lisplang ukuran (3 x 20) cm, kayu kruing
Pasang lisplang ukuran (3 x 20) cm, kayu meranti
Pasang lisplang ukuran (3 x 30) cm, kayu jati
Pasang lisplang ukuran (3 x 30) cm, kayu kamper
Pasang lisplang ukuran (3 x 30) cm, kayu borneo
Pasang lisplang ukuran (3 x 30) cm, kayu kruing
Pasang lisplang ukuran (3 x 30) cm, kayu meranti
Pasang rangka dinding pemisah kayu jati
Pasang rangka dinding pemisah kayu kamper
Pasang rangka dinding pemisah kayu borneo
Pasang rangka dinding pemisah kayu meranti
Pasang rangka dinding pemisah teakwood rangkap, rangka kayu jati
Pasang rangka dinding pemisah teakwood rangkap, rangka kayu kamper
Pasang rangka dinding pemisah teakwood rangkap, rangka kayu borneo
Pasang rangka dinding pemisah teakwood rangkap, rangka kayu meranti
Pasang rangka dinding pemisah plywood rangkap, rangka kayu jati
Pasang rangka dinding pemisah plywood rangkap, rangka kayu kamper
Pasang rangka dinding pemisah plywood rangkap, rangka kayu borneo
Pasang rangka dinding pemisah plywood rangkap, rangka kayu meranti
Pasang dinding lambriziring dari papan jati
Pasang dinding lambriziring dari papan kamper
Beton mutu fc'=7,4 Mpa (K100) slump (12 ± 2) cm, w/c = 0,87
Beton mutu fc'=9,8 Mpa (K125) slump (12 ± 2) cm, w/c = 0,78
Beton mutu fc'=12,2 Mpa (K150) slump (12 ± 2) cm, w/c = 0,72
Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
Beton mutu fc'=14,5 Mpa (K175) slump (12 ± 2) cm, w/c = 0,66
Beton mutu fc'=16,9 Mpa (K200) slump (12 ± 2) cm, w/c = 0,61
Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58
Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2) cm, w/c = 0,56
Beton mutu fc'=24,0 Mpa (K275) slump (12 ± 2) cm, w/c = 0,53
Beton mutu fc'=26,4 Mpa (K300) slump (12 ± 2) cm, w/c = 0,52
Beton mutu fc'=28,8 Mpa (K325) slump (12 ± 2) cm, w/c = 0,49
Beton mutu fc'=31,2 Mpa (K350) slump (12 ± 2) cm, w/c = 0,48
Beton kedap air dengan strorox - 100
Pasang PVC Waterstop lebar 150 mm
Pasang PVC Waterstop lebar 200 mm
Pasang PVC Waterstop lebar 230 mm - 320 mm
Pembesian dengan besi polos
Pembesian dengan besi ulir
Kabel prestressed polos/strands
Memasang 1 kg jaring kawat baja / wire mesh
Pasang bekisting untuk pondasi
Pasang bekisting untuk pondasi ( 2x pakai )
Pasang bekisting untuk sloof
Pasang bekisting untuk sloof ( 2x pakai )
Pasang bekisting untuk kolom
Pasang bekisting untuk kolom ( 2x pakai )
Pasang bekisting untuk balok
Pasang bekisting untuk balok ( 2x pakai )
Pasang bekisting untuk plat
Pasang bekisting untuk plat lantai ( 2x pakai )
Pasang bekisting untuk dinding
Pasang bekisting untuk dinding ( 2x pakai )
Pasang bekisting untuk tangga
Pasang bekisting untuk tangga ( 2x pakai )
Pasang jembatan untuk pengecoran
Pondasi beton bertulang (150 kg besi + bekisting)
Sloof beton bertulang (200 kg besi + bekisting)
Kolom beton bertulang (150 kg besi + bekisting)
Kolom beton bertulang (300 kg besi + bekisting)
Balok beton bertulang (200 kg besi + bekisting)
Dinding beton bertulang (150 kg besi + bekisting)
Dinding beton bertulang (200 kg besi + bekisting)
Kolom penguat beton bertulang (11 x 11) cm
Ring balok beton bertulang (10 x 15) cm
Sloof beton bertulang (10 x 15) cm
Pasang atap genteng biasa ex. Malang
Pasang atap genteng press ex.Trenggalek
Pasang atap genteng karangpilang ex. Malang
Pasang atap genteng karangpilang ex. Trenggalek
Pasang atap genteng karangpilang ex. Surabaya
Pasang bubung genteng biasa ex. Malang
Pasang bubung genteng press ex. Trenggalek
Pasang bubung genteng karangpilang ex. Malang
Pasang bubung genteng karangpilang ex. Trenggalek
Pasang bubung genteng karangpilang ex. Surabaya
Pasang atap genteng palentong kecil
Pasang atap genteng kodok glazuur
Pasang atap genteng palentong super / besar
Pasang atap genteng beton
Pasang atap genteng aspal
Pasang atap genteng metal
Pasang atap sirap
Pasang bubung genteng palentong kecil
Pasang bubung genteng kodok / glazuur
Pasang bubung genteng palentong super / besar
Pasang bubung genteng beton
Pasang bubung genteng aspal
Pasang bubung genteng metal
Pasang bubung atap sirap
Pasang atap asbes gelombang (3,00 x 1,05) m x 4 mm
Pasang atap asbes gelombang (2,70 x 1,05) m x 4 mm
Pasang atap asbes gelombang (2,40 x 1,05) m x 4 mm
Pasang atap asbes gelombang (2,10 x 1,05) m x 4 mm
Pasang atap asbes gelombang (1,50 x 1,05) m x 4 mm
Pasang atap asbes gelombang (2,50 x 0,92) m x 5 mm
Pasang atap asbes gelombang (2,25 x 0,92) m x 5 mm
Pasang atap asbes gelombang (2,00 x 0,92) m x 5 mm
Pasang atap asbes gelombang (1,80 x 0,92) m x 5 mm
Pasang atap asbes gelombang (3,00 x 1,08) m x 6 mm
Pasang atap asbes gelombang (2,70 x 1,08) m x 6 mm
Pasang atap asbes gelombang (2,10 x 1,08) m x 6 mm
Pasang atap asbes gelombang (1.80 x 1,08) m x 6 mm
Pasang bubung stel gelombang 0,92 m
Pasang bubung stel gelombang 1,05 m
Pasang bubung stel gelombang 1,08 m
Pasang nok paten 0,92 m
Pasang nok paten 1,05 m
Pasang nok paten 1,08 m
Pasang nok stel rata 0,92 m
Pasang nok stel rata 1,05 m
Pasang atap seng gelombang
Pasang bubung seng gelombang
Pasang atap aluminium
Pasang bubung atap aluminium
Pasang lapisan aluminium foil / sesalation
Pasang roof light fibreglass
Pasang atap polycarbonat
Pasang atap seng galvalum
Pasang bubung atap seng galvalum
Langit-langit asbes (1,0 x 1,0) m, tebal 6 mm
Langit-langit asbes (1,0 x 1,0) m, tebal 5 mm
Langit-langit asbes (1,0 x 1,0) m, tebal 4 mm
Langit-langit asbes (1,0 x 1,0) m, tebal 3,50 mm
Langit-langit akustik (30 x 30) cm
Langit-langit akustik (30 x 60) cm
Langit-langit akustik (60 x 120) cm
Langit-langit plywood (30 x 60) cm, tebal 4 mm
Langit-langit plywood (30 x 60) cm, tebal 6 mm
Langit-langit plywood (60 x 120) cm, tebal 4 mm
Langit-langit plywood (60 x 120) cm, tebal 6 mm
Langit-langit teakwood (30 x 60) cm, tebal 4 mm
Langit-langit teakwood (60 x 120) cm, tebal 4 mm
Langit-langit lat kayu jati
Langit-langit lat kayu kamper
Langit-langit soft board
Langit-langit akustik (60 x 120) cm + rangka aluminium
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu jati
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kamper
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu borneo
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kruing
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu meranti
Langit-langit plywood 4 mm + rangka kayu jati
Langit-langit plywood 4 mm + rangka kayu kamper
Langit-langit plywood 4 mm + rangka kayu borneo
Langit-langit plywood 4 mm + rangka kayu kruing
Langit-langit plywood 4 mm + rangka kayu meranti
Langit-langit akustik (30 x 60) cm + rangka kayu jati
Langit-langit akustik (30 x 60) cm + rangka kayu kamper
Langit-langit akustik (30 x 60) cm + rangka kayu borneo
Langit-langit akustik (30 x 60) cm + rangka kayu kruing
Langit-langit akustik (30 x 60) cm + rangka kayu meranti
Langit-langit akustik (30 x 30) cm + rangka kayu jati
Langit-langit akustik (30 x 30) cm + rangka kayu kamper
Langit-langit akustik (30 x 30) cm + rangka kayu borneo
Langit-langit akustik (30 x 30) cm + rangka kayu kruing
Langit-langit akustik (30 x 30) cm + rangka kayu meranti
Langit-langit gypsum board (120x240x9) mm, tebal 9 mm
Dinding kalsi board (fiber semen) (120x240x3.5) mm, tebal 3.5 mm
Langit-langit tripleks (120x240) cm, tebal 4 mm
Langit-langit lambriziring kayu jati, tebal 9 mm
Langit-langit lambriziring kayu kamper, tebal 9 mm
List langit-langit kayu profil
List langit-langit gypsum
Pasang kloset jongkok teraso
Pasang kloset jongkok porselin kw. A
Pasang kloset jongkok lux
Pasang kloset duduk porselin kw. A
Pasang kloset duduk lux
Pasang urinoir
Pasang wastafel kw. A
Pasang wastafel lux
Pasang tempat sabun keramik
Pasang bak mandi teraso volume 0.3 m3
Pasang bak mandi fibreglass volume 0.3 m3
Pasang bak mandi batu bata volume 0.3 m3
Pasang badkip porselen
Pasang bak beton volume 1.0 m3, head 2.5 m
Pasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm
Pasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
Pasang pipa beton, diameter 20 cm
Pasang pipa beton, diameter 30 cm
Pasang pipa beton, diameter 40 cm
Pasang pipa beton, diameter 50 cm
Pasang pipa beton, diameter 60 cm
Pasang pipa beton, diameter 80 cm
Pasang pipa beton, diameter 90 cm
Pasang pipa beton, diameter 100 cm
Pasang pipa beton U, diameter 20
Pasang pipa beton U, diameter 30
Pasang bak kontrol pasangan batu bata
Pasang bak kontrol pasangan batu bata
Pasang bak kontrol pasangan batu bata
Pasang pipa galvanis, diameter 1/2"
Pasang pipa galvanis, diameter 3/4"
Pasang pipa galvanis, diameter 1"
Pasang pipa galvanis, diameter 1 1/2"
Pasang pipa galvanis, diameter 2"
Pasang pipa galvanis, diameter 2 1/2"
Pasang pipa galvanis, diameter 3"
Pasang pipa galvanis, diameter 4"
Pasang pipa PVC tipe AW, diameter 1/2"
Pasang pipa PVC tipe AW, diameter 3/4"
Pasang pipa PVC tipe AW, diameter 1"
Pasang pipa PVC tipe AW, diameter 1 1/2"
Pasang pipa PVC tipe AW, diameter 2"
Pasang pipa PVC tipe AW, diameter 2.5"
Pasang pipa PVC tipe AW, diameter 3"
Pasang pipa PVC tipe AW, diameter 4"
Pasang pipa PVC tipe AW, diameter 6"
Pasang pipa PVC tipe AW, diameter 8"
Pasang pipa PVC tipe D, diameter 1/2"
Pasang pipa PVC tipe D, diameter 3/4"
Pasang pipa PVC tipe D, diameter 1"
Pasang pipa PVC tipe D, diameter 1 1/2"
Pasang pipa PVC tipe D, diameter 2"
Pasang pipa PVC tipe D, diameter 2.5"
Pasang pipa PVC tipe D, diameter 3"
Pasang pipa PVC tipe D, diameter 4"
Pasang pipa PVC tipe C, diameter 1/2"
Pasang pipa PVC tipe C, diameter 3/4"
Pasang pipa PVC tipe C, diameter 1"
Pasang pipa PVC tipe C, diameter 1 1/2"
Pasang pipa PVC tipe C, diameter 2"
Pasang pipa PVC tipe C, diameter 2.5"
Pasang pipa PVC tipe C, diameter 3"
Pasang pipa PVC tipe C, diameter 4"
Pasang bak cuci piring stainles steel
Pasang bak cuci piring teraso
Pasang kran diameter 1/2"
Pasang kran diameter 3/4"
Pasang Afor Stainless Steel
Pasang Afor Plastik
Pasang kaca wastafel
Pasang pipa screen PVC tipe AW, diameter 3"
Pasang pipa screen PVC tipe AW, diameter 4"
Pasang besi profil
Pasang rangka kuda-kuda baja WF
Pemasangan baut anker baja
Ikatan angin/Trekstang
Plendes
Pasang pintu plat baja tebal 2 mm rangkap, rangka baja siku
pengelasan dengan las listrik
Pasang pintu gulung besi (rolling door)
Pasang pintu lipat (folding door)
Pasang sunscream alluminium
Pasang Rolling door Aluminium
Pasang Kusen Alluminium Coklat
Pasang pintu Alluminium coklat
Pasang Jendela Kaca Aluminium Coklat
Pasang venetion blinds dan vertical blinds (tirai)
Pasang teralis besi (2 x 3) mm
Pasang kawat nyamuk
Pasang jendela nako & trails
Pasang pintu fiber KM
Pasang talang datar, seng bjls 30 L = 0.60 m
Pasang talang datar, seng bjls 30 L = 0.90 m
Pasang talang miring, seng bjls 30 L = 0.60 m
Pasang talang miring, seng bjls 30 L = 0.90 m
Pasang talang tegak pipa PVC f 3"
Pasang talang tegak pipa PVC f 4"
Pasang talang 1/2 lingkaran D-15 cm bjls 30, L = 45 cm
Pasang pagar BRC tinggi 1 m
Pasang tiang pagar BRC Dia 2" tinggi 1 m
Pasang pintu pagar BRC tinggi 1 m
Pasang pagar besi
Pasang pintu pagar besi
Pasang Atap Baja Ringan untuk Penutup Atap Genteng
Pasang Atap Baja Ringan untuk Penutup Atap Asbes Gelombang/galvalum
Pasang rangka Plafon Metal Furing
Pasang rangka partisi besi hollow
Pasang pagar besi hollow
Pasang pintu pagar besi hollow
Pasang Besi Wiremesh diameter 6 ukuran lubang 15x15 cm (M6)
Pasang Tutup Avoor dari Cor Besi Tuang, 60x80 cm
Pasang Tutup Bak Kontrol Cor Besi Tuang, 100x100 cm
Pasang kunci tanam antik
Pasang kunci tanam biasa
Pasang kunci tanam kamar mandi
Pasang kunci silinder
Pasang kunci selot
Pasang kunci lemari
Pasang engsel pintu
Pasang engsel jendela
Pasang grendel pintu
Pasang grendel jendela
Pasang hak angin
Pasang spring knip
Pasang kait angin
Pasang door closer
Pasang pegangan pintu/door holder
Pasang door stop
Pasang rel pintu dorong
Pasang kaca polos, tebal 3 mm
Pasang kaca polos, tebal 5 mm
Pasang kaca polos, tebal 8 mm
Pasang kaca polos, tebal 12 mm
Pasang kaca buram, tebal 3 mm
Pasang kaca buram, tebal 5 mm
Pasang kaca buram, tebal 8 mm
Pasang kaca buram, tebal 12 mm
Pasang kaca cermin, tebal 5 mm
Pasang kaca cermin, tebal 6 mm
Pasang kaca cermin, tebal 8 mm
Pasang kaca rayben, tebal 3 mm
Pasang kaca rayben, tebal 5 mm
Pasang kaca rayben, tebal 8 mm
Pasang kaca rayben, tebal 12 mm
Pasang kaca " wireglass", tebal 5 mm
Pasang kaca patri, tebal 5 mm
Pasang glass block
Pasang kaca painting glass
Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm
Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm
Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm
Pasang lantai ubin pc warna ukuran 40 x 40 cm
Pasang lantai ubin pc warna ukuran 30 x 30 cm
Pasang lantai ubin pc warna ukuran 20 x 20 cm
Pasang lantai ubin teraso ukuran 40 x 40 cm
Pasang lantai ubin teraso ukuran 30 x 30 cm
Pasang lantai ubin granito ukuran 40 x 40 cm
Pasang lantai ubin granito ukuran 30 x 30 cm
Pasang lantai ubin teralux kerang ukuran 40 x 40 cm
Pasang lantai ubin teralux kerang ukuran 30 x 30 cm
Pasang lantai Keramik cutting motif ukuran 60 x 60 cm
Pasang lantai ubin teralux marmer ukuran 40 x 40 cm
Pasang lantai ubin teralux marmer ukuran 30 x 30 cm
Pasang plint ubin pc abu-abu ukuran 15 x 20 cm
Pasang plint ubin pc abu-abu ukuran 10 x 30 cm
Pasang plint ubin pc abu-abu ukuran 10 x 40 cm
Pasang plint ubin pc warna ukuran 10 x 20 cm
Pasang plint ubin pc warna ukuran 10 x 30 cm
Pasang plint ubin pc warna ukuran 10 x 40 cm
Pasang plint ubin teraso ukuran 10 x 30 cm
Pasang plint ubin teraso ukuran 10 x 40 cm
Pasang plint ubin granito ukuran 10 x 40 cm
Pasang plint ubin granito ukuran 10 x 30 cm
Pasang teraso cor di tempat, tebal 3 cm
Pasang lantai keramik artistik 10 x 20 cm
Pasang lantai keramik artistik 10 x 10 cm
Pasang lantai keramik artistik 5 x 20 cm
Pasang dinding keramik artistik 10 x 20 cm
Pasang dinding keramik artistik 5 x 20 cm
Pasang plint keramik artistik 10 x 20 cm
Pasang plint keramik artistik 10 x 10 cm
Pasang plint keramik artistik 5 x 20 cm
Pasang internal cove artistik (5 x 5 x 20) cm
Pasang gymflour (lantai kayu)
Pasang lantai parquet
Pasang lantai karpet
Pasang lantai keramik ukuran 20 x 20 cm putih
Pasang lantai keramik ukuran 20 x 20 cm warna/motif
Pasang lantai keramik KM ukuran 20 x 20 cm
Pasang lantai keramik ukuran 30 x 30 cm putih
Pasang lantai keramik ukuran 30 x 30 cm warna/motif
Pasang lantai keramik ukuran 40 x 40 cm putih
Pasang lantai keramik ukuran 40 x 40 cm warna/motif
Pasang lantai marmer ukuran 100 x 100 cm
Pasang plint keramik lantai ukuran 10 x 20 cm
Pasang plint keramik lantai ukuran 10 x 30 cm
Pasang plint keramik lantai ukuran 10 x 40 cm
Pasang dinding porselin ukuran 15 x 15 cm, putih
Pasang dinding porselin ukuran 11 x 11 cm, putih
Pasang dinding porselin ukuran 11 x 11 cm, warna
Pasang dinding porselin ukuran 15 x 15 cm, warna
Pasang dinding porselin ukuran 10 x 20 cm, warna
Pasang dinding porselin ukuran 20 x 20 cm, warna
Pasang dinding keramik ukuran 20 x 20 cm
Pasang dinding keramik ukuran 20 x 25 cm
Pasang dinding batu tempel hitam
Pasang lantai vinyl ukuran (30x30)cm KL I
Pasang wallpaper, lebar 50 cm
Pasang dinding batu palimanan
Pasang dinding granito
Pasang dinding marmer ukuran 100 x 100 cm
Pasang dinding teraso
Pasang paving stone (blok) segi empat biasa
Pasang paving stone (blok) segi empat warna
Pasang paving stone (blok) Segi Enam biasa
Pasang paving stone (blok) Segi Enam Warna
Pasang paving stone (blok) Tiga Berlian biasa
Pasang paving stone (blok) Tiga Berlian warna
Pasang Batu Ampyangan Granit
Pasang lantai keramik 5 x 30 cm
Pasang lantai keramik 5 x 40 cm
Mengikis/mengerok permukaan cat lama
Mencuci bidang permukaan cat tembok lama
mengerok karat cat lama permukaan baja dengan cara manual
menyabun permukaan tembok lama
mengerok karat/cat lama permukaan baja dengan pancar pasir
Mendempul dan menggosok kayu
Pengecatan kayu lama
Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar,
Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar,
Pelaburan kayu dengan teak oil
Pelaburan kayu dengan politur
Pelaburan kayu dengan cat residu dan ter
Pelaburan kayu dengan vernis
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar,
Pengecatan tembok baru interior
Pengecatan tembok baru eksterior
Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Melabur tembok dengan kalkarium
Melabur tembok dengan kapur sirih
Melabur tembok lama dengan kapur sirih (untuk pemeliharaan)
Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar,
Pengecatan permukaan baja dengan meni besi
Pengecatan permukaan baja
Pengecatan permukaan baja dengan meni besi dan perancah
Pengecatan permukaan baja lapis seng (galbani) secara manual
Pengecatan permukaan baja lapis seng (galbani) secara manual
Pengecatan permukaan baja lapis seng (galbani) secara semprot
Pekerjaan waterproofing
Pengecatan Kerb
Pemasangan stop kontak
Pemasangan saklar tunggal
Pemasangan saklar ganda
Pemasangan titik lampu pijar 5 - 40 watt
Pemasangan titik lampu pijar 50 - 100 watt
Pemasangan titik lampu TL 20 Watt (komplit)
Pemasangan titik lampu TL 40 Watt (komplit)
Pemasangan titik lampu XL 5 Watt
Pemasangan titik lampu XL 8 Watt
Pemasangan titik lampu XL 14 Watt
Pemasangan titik lampu XL 18 Watt
Pemasangan titik lampu XL 23 Watt
Pemasangan sekering 1 group
Pemasangan sekering 2 group
Pemasangan sekering 3 group
Pemasangan penangkal petir
Penyetelan mesin bor dan buat bak sirkulasi
Geolistrik
Pemboran pilot hole Ø 8 3/4" kedalaman 0 - 25 m
Pemboran pilot hole Ø 8 3/4" kedalaman 25 - 50 m
Pemboran pilot hole Ø 8 3/4" kedalaman 50 - 75 m
Pemboran pilot hole Ø 8 3/4" kedalaman 75 - 100 m
Pemboran pilot hole Ø 8 3/4" kedalaman 100 - 125 m
Pemboran pilot hole Ø 8 3/4" kedalaman 125 - 175 m
Pemboran pilot hole Ø 8 3/4" kedalaman 175 - 225 m
Pemboran pilot hole Ø 8 3/4" kedalaman 225 - 275 m
Geofisikal, Elektrikal, Logging
Pumping test open hole
Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"
Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"
Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"
Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"
Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"
Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"
Pembesaran lubang (Reaming) lubang bor Ø 8 3/4" - Ø 12"
Pengadaan dan pemasangan pipa jambang PVC-AW Ø 150 mm
Pengadaan dan pemasangan pipa buta PVC-AW Ø 150 mm
Pengadaan dan pemasangan pipa screen PVC-AW Ø 150 mm
Pengadaan dan pemasangan pipa jambang PVC-AW Ø 125 mm
Pengadaan dan pemasangan pipa buta PVC-AW Ø 125 mm
Pengadaan dan pemasangan pipa screen PVC-AW Ø 125 mm
Pengadaan dan pemasangan pipa sounding PVC-AW Ø 2.50"
Pengadaan dan pemasangan pipa sounding SWL PVC-AW Ø 1"
Pengisian gravel pack Dia 5 mm - 10 mm
Beton Mortar 1 pc 1 ps
Pencucian sumur bor dengan kedalaman < 200 m
Pencucian sumur bor dengan kedalaman > 200 m
Pumping test dan test nonstop 24 jam
Pasang pipa PVC Moof 6 m S-12.5 Ø 2"
Pasang pipa PVC Moof 6 m S-12.5 Ø 2.5"
Pasang pipa PVC Moof 6 m S-12.5 Ø 3"
Pasang pipa PVC Moof 6 m S-12.5 Ø 4"
Pasang pipa PVC Moof 6 m S-12.5 Ø 6"
Pasang pipa PVC Moof 6 m S-12.5 Ø 8"
Pasang pipa Moof S-12.5 Ø 2" lintas jalan
Pasang pipa Moof S-12.5 Ø 3" lintas jalan
Pasang pipa PVC Moof S-12.5 Ø 4" lintas jalan
Pasang pompa air
Pasang tandon air PVC V = 0.50 m3
Pasang tandon air PVC V = 1.0 m3
Pasang tandon air stainless V = 0.5 m3
Pasang tandon air stainless V = 1.0 m3
Pengukuran bendung untuk MC
Pengukuran saluran untuk MC
Pengukuran bangunan untuk MC
Pendongkelan rumpun bambu
Pembuatan dan pembongkaran kisdam > 1 m
Galian tanah biasa diangkut > 1 m dibuang
Galian tanah biasa diangkut > 50 m dibuang
Galian tanah berbatu diangkut > 1 m dibuang
Galian tanah berbatu diangkut > 50 m dibuang
Galian tanah keras/cadas diangkut > 1 m dibuang
Galian tanah keras/cadas diangkut > 50 m dibuang
Galian tanah biasa langsung untuk timbunan / dibuang
Pemadatan tanah timbunan & dirapikan
Timbunan tanah kembali dipadatkan dan dirapikan (manual)
Timbunan tanah dari luar dipadatkan dan dirapikan (manual)
Bongkaran pasangan batu kali
Pasangan batu kali dengan spesi 1 pc ; 4 ps
Siaran dengan spesi 1 pc ; 2 ps
Plesteran tebal 1,5 cm dengan spesi 1 pc ; 3 ps
Bronjong kawat galvanis d = 2 mm (0.50 x 1.00 x 2.00)
Beton K-125
Beton K-175
Bekisting kayu termasuk pembongkaran
Besi Tulangan Ulir
Besi Tulangan Polos
Kisi-Kisi
Pintu Air Type A Plat
Pintu Air Type C - 2
Pintu Air Type C - 3
Pintu Air Type C - 3
Pintu Air Type C - 3
Pintu Air Type C - 5
Menanam rumput lamur
Menanam rumput manila
Menanam semak hias
Menanam pohon pelindung
Pengisian koral sumur resapan
Menanam gebalan rumput
Pasang papan kayu jembatan gantung, kayu kamper
Menanam Rumput Common Bermuda Grass
Penyiraman Rumput
Penyiangan / Pematunan Rumput
Pemotongan Rumput
Pemupukan
Pemberian Obat Tanaman
Pasang Mistar Gawang
Pasang Jala Gawang
Pembuatan Garis Lapangan
Pasang pipa besi Ø 1.5" untuk tangga dan pagar
Pasang besi polos untuk tangga
Pasang Pipa Udara GI Ø 2"
Pasang Pompa submersible Q = 3,5 l/det, H = 150 m
Pasang Flange Pipe Ø 3" - 0.35 m
Pasang Flange Pipe Ø 4" - 0.35 m
Pasang Flange Pipe Ø 4" - 1 m
Pasang All Flange Wall Pipe Ø 4" - 0.5 m
Pasang Bend Socket PVC Ø 2" 90
Pasang Bend Socket PVC Ø 2" x 45
Pasang Tee All Socket PVC Ø 2" x 2"
Pasang Tee All Socket PVC Ø 3" x 2"
Pasang Tee All Socket PVC Ø 3" x 3"
Pasang Flange Gate Valve Ø 2"
Pasang Flange Gate Valve Ø 3"
Pasang Bend All Flange GI Ø 3" x 90
Pasang Bend All Flange GI Ø 3" x 45
Pasang Flange Socket Ø 2"
Pasang Flange Socket Ø 3"
Pasang Flange Spigot Ø 2"
Pasang Flange Spigot Ø 3"
Pasang Straatport Ø 2"
Pasang Straatport Ø 3"
Pasang Flange Check Valve Ø 3"
Pasang Flange Air Valve Ø 1"
Pasang Flange Air Valve Ø 2"
Pasang Flange Water Meter Ø 3"
Pasang Manometer 10 bar
Pasang Dop PVC Ø 2"
Pasang Dop PVC Ø 3"
Uji Coba Instalasi Pipa
Pasang Kabel Pompa NYYHY 3 x 4 mm
Pasang Kabel Elektrode NYYHY 3 x 1.5 mm
Pasang Panel Pompa
Pasang Junction Box
Pasang Elektrode Pompa
SAT







































Ton



Ton


Liter
Liter



Ton

Liter
Liter


Liter


Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton



Ton
Ton











Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
















Liter


Buah
Buah
Buah


Buah


Buah
Buah
Buah
Buah
Buah
Buah
Buah

Buah
Buah








DM3


Buah
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam








m2
m2
m2
m2
m2
bh
m2
m3
m3
m3
m2
m2
m2
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3


















































m3
m3
m3
m3



































m3
m3
m3
m3
m3
m3
m3
m3
m3

















































m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3



kg
kg
kg
kg















m3
m3
m3
m3
m3
m3
m3



m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m2
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2




m1
m1
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1


bh
bh
bh
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
bh
bh
bh
bh
bh
bh
m2
m1
m1
kg
kg
kg
kg
kg

cm
m2
m2
m2
m2
m1
m2
m2
m2
m2
m2
m2
Unit
m1
m1
m1
m1
m1
m1
m1

bh










Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

















bh

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2





























Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Unit
Unit
Unit
Unit
Unit
Ls









Ls















m3
m3
Titik
Titik
Jam
m1
m1
m1
m1
m1
m1
m1
m1
m1
Unit
Unit
Unit
Unit
Unit
bh
km1
bh

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3


m3
m3
m3

kg
kg

Buah
Buah
Buah
Buah
Buah
Buah



btg
m3
m3
m3

m2
m2
m2
m2
m2
m1
m2
m2
m1
kg
m1
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
m1
m1
bh
bh
bh
- RENCANA ANGGARAN BIAYA
- PEMBANGUNAN GEDUNG UTSMAN BIN AFFAN
- UNIVERSITAS ISLAM MALANG

No. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN


- -
- -
A PEKERJAAN DASAR
I PEKERJAAN PERSIAPAN
1 Pembersihan lahan 1,890 m2 9,072
2 Pengukuran/uitset & bouplank 209 m1 44,054
3 Listrik kerja 1 ls 15,000,000
4 Air Kerja 1 ls 3,600,000
5 Direksikeet/tempat bahan 50 m2 866,791
6 Pagar pangaman 252 m1 190,769
- - - - -
II PEKERJAAN TANAH - - -
1 Galian tanah pondasi plat 504 m3 31,311
2 Galian tanah pondasi batu kali 244 m3 23,846
3 Galian tanah pondasi strouss/ D.60 CM 1,360 m3 73,976
4 Urungan tanah kembali 857 m3 11,431
5 Urungan pasir 56 m3 112,933
6 Urungan tanah peninggian lantai 674 m3 116,789
- - - - -
III PEKERJAAN PONDASI - - -
1 Pondasi batu kali 133 m3 587,186
2 Lantai kerja 18 m3 1,727,881
3 Lapisan pasir bawah lantai 254 m2 112,933
- - - - -
B PEKERJAAN BETON - - -
I LANTAI I - - -
1 Pondasi Stross d. 60 523 m3 2,332,616
2 Pelat Pondasi 200x200x80 beton K225 180 m3 3,086,824
3 Kolom pondasi 70/90 beton K225 56 m3 6,242,007
4 Kolom pondasi 70/70 beton K225 1 m3 6,242,007
5 Sloof 30/50 Beton K-225 86 m3 3,323,039
6 Kolom d. 60 beton / K.225 ( 2 bh ) 141 m3 6,242,007
7 Kolom 70/90 beton K225 4 m3 6,242,007
8 Dinding Lift 15 m3 829,508
9 Balok Anak 25/40 beton K 225 20 m3 5,083,182
10 Balok Anak 30/50 beton K.225 67 m3 5,083,182
11 Balok Induk 45/70 beton K-225 88 m3 5,691,670
12 Listplank beton t=10 cm beton K-225 7 m3 1,065,544
13 Plat Tangga Beton K225 9 m3 4,638,625
14 Balok Konsol 30/40 L=1.5m 5 m3 5,691,670
15 Plat Lantai Beton t=12 cm beton K225 187 m3 5,940,745
16 Kolom Praktis 15x15 beton K175 392 m1 53,258
17 Balok Latei 15/20 K.175 11 m3 2,254,997
- - - - -
II LANTAI II - - -
1 Kolom 70/90 beton K225 141 m3 6,242,007
2 Dinding Lift 13 m3 829,508
3 Balok Anak 25/40 beton K 225 20 m3 5,083,182
4 Balok Anak 30/50 beton K.225 67 m3 5,083,182
5 Balok Induk 45/70 beton K-225 88 m3 5,691,670
6 Listplank beton t=10 cm beton K-225 5 m3 1,065,544
7 Plat Tangga Beton K225 9 m3 4,638,625
8 Balok Konsol 30/40 L=1.5m 7 m3 5,691,670
9 Plat Lantai Beton t=12 cm beton K225 166 m3 5,940,745
10 Kolom Praktis 15x15 beton K175 392 m1 53,258
11 Balok Latei 15/20 K.175 11 m3 2,254,997
- - - - -
III LANTAI III - - -
1 Kolom 70/70 beton K225 110 m3 6,242,007
2 Dinding Lift 13 m3 829,508
3 Balok Anak 25/40 beton K 225 20 m3 5,083,182
4 Balok Anak 30/50 beton K.225 67 m3 5,083,182
5 Balok Induk 45/70 beton K-225 88 m3 5,691,670
6 Plat Tangga Beton K225 9 m3 4,638,625
7 Plat Lantai Beton t=12 cm beton K225 166 m3 4,638,625
8 Kolom praktis 15x15 k-175 392 m1 53,258
9 Balok lantai 15/20 k-175 11 m3 2,254,997
- - - - -
IV LANTAI IV - - -
1 Kolom 70/70 beton K225 110 m3 6,242,007
2 Dinding Lift 13 m3 829,508
3 Balok Anak 25/40 beton K 225 20 m3 5,083,182
4 Balok Anak 30/50 beton K.225 67 m3 5,083,182
5 Balok Induk 45/70 beton K-225 88 m3 5,691,670
6 Plat Tangga Beton K225 9 m3 4,638,625
7 Plat Lantai Beton t=12 cm beton K225 166 m3 4,638,625
8 Kolom praktis 15x15 k-175 392 m1 53,258
9 Balok lantai 15/20 k-175 11 m3 2,254,997
- - - - -
V PEKERJAAN BETON LANTAI V - - -
1 Kolom 70/70 beton K225 110 m3 6,242,007
2 Dinding Lift 13 m3 829,508
3 Balok Anak 25/40 beton K 225 20 m3 5,083,182
4 Balok Anak 30/50 beton K.225 67 m3 5,083,182
5 Balok Induk 45/70 beton K-225 88 m3 5,691,670
6 Plat Tangga Beton K225 9 m3 4,638,625
7 Plat Lantai Beton t=12 cm beton K225 166 m3 4,638,625
8 Kolom praktis 15x15 k-175 392 m1 53,258
9 Balok lantai 15/20 k-175 11 m3 2,254,997
- - - - -
VI PEKERJAAN BETON LANTAI VI/ATAP - - -
1 Kolom 70/70 beton K225 110 m3 6,242,007
2 Dinding Lift 13 m3 829,508
3 Balok Anak 25/40 beton K 225 20 m3 5,083,182
4 Balok Anak 30/50 beton K.225 67 m3 5,083,182
5 Balok Induk 45/70 beton K-225 88 m3 5,691,670
6 Plat Tangga Beton K225 9 m3 4,638,625
7 Plat Lantai Beton t=12 cm beton K225 166 m3 4,638,625
8 Kolom praktis 15x15 k-175 392 m1 53,258
9 Balok lantai 15/20 k-175 11 m3 2,254,997
- - - - -
C PEKERJAAN PASANGAN - - -
I LANTAI I - - -
1 Pas. Dinding Bata Merah 1:4 1,449 m2 114,073
2 Plesteran Dinding 2,710 m2 35,254
3 Plesteran Kolom 905 m2 44,515
4 Acian Dinding 2,710 m2 20,714
5 Benangan Sudut 1,304 m2 20,714
6 Benangan Kusen 1,588 m2 20,714
- - - - -
II LANTAI II - - -
1 Pas. Dinding Bata Merah 1:4 1,449 m2 114,073
2 Plesteran Dinding 2,710 m2 35,254
3 Plesteran Kolom 904 m2 44,515
4 Acian Dinding 2,710 m2 20,714
5 Benangan Sudut 1,304 m2 20,714
6 Benangan Kusen 1,588 m2 20,714
- - - - -
III LANTAI III - - -
1 Pas. Dinding Bata Merah 1:4 931 m2 114,073
2 Plesteran Dinding 1,862 m2 35,254
3 Plesteran Kolom 11,267 m2 44,515
4 Acian Dinding 3,129 m2 20,714
5 Benangan Sudut 1,664 m' 20,714
6 Benangan Kusen 1,169 m' 20,714
- - - - -
IV LANTAI IV - - -
1 Pas. Dinding Bata Merah 1:4 931 m2 114,073
2 Plesteran Dinding 1,862 m2 35,254
3 Plesteran Kolom 11,267 m2 44,515
4 Acian Dinding 3,129 m2 20,714
5 Benangan Sudut 1,664 m' 20,714
6 Benangan Kusen 1,169 m' 20,714
- - - - -
V LANTAI V - - -
1 Pas. Dinding Bata Merah 1:4 931 m2 114,073
2 Plesteran Dinding 1,862 m2 35,254
3 Plesteran Kolom 11,267 m2 44,515
4 Acian Dinding 3,129 m2 20,714
5 Benangan Sudut 1,664 m' 20,714
6 Benangan Kusen 1,169 m' 20,714
- - - - -
VI LANTAI VI - - -
1 Pas. Dinding Bata Merah 1:4 931 m2 114,073
2 Plesteran Dinding 1,862 m2 35,254
3 Plesteran Kolom 11,267 m2 44,515
4 Acian Dinding 3,129 m2 20,714
5 Benangan Sudut 1,664 m' 20,714
6 Benangan Kusen 1,169 m' 20,714
- - - - -
VII LANTAI VII - - -
1 pasangan dinding batu merah 1:4 1,111 m2 114,073
2 plesteran dinding 1:4 1,889 m2 35,254
3 plesteran kolom,balok 1,415 m2 44,515
4 acian 3,304 m2 20,714
5 benangan sudut 2,051 m' 20,714
6 benangan kosen 1,113 m' 20,714
- - - - -
D PEKERJAAN ATAP - - -
1 kuda kuda WF 36,409 kg 28,571
2 gording kanal C 15,603 kg 40,320
3 usuk & reng galvalum 1,300 m2 198,080
4 plat simpul &kopel 3,640 kg 24,804
5 angket dia 16cm &plat plendes 1,820 kg 43,046
6 trekstrang& ikatan angin 1,560 kg 27,576
7 mur baut 1 ls 1,284,080
8 kalsiplank 342 m' 35,409
9 pasang genteng keramik 1,300 m2 73,350
10 pasang bubungan 190 m' 56,407
- - - - -
E PEKERJAAN GRANIT DAN KERAMIK - - -
I LANTAI I - - -
1 Pasangan Tegel Granit 30x30 teras 148 m2 183,359
2 Pas. Tegel Keramik Essenza 60 x 60 1,278 m2 387,065
3 Pas. Tegel selasar Essenza 60 x 60 213 m2 270,945
4 Pas. Tegel Keramik Tangga 30x30 62 m2 119,621
5 Stepnosing Tangga 80 m2 46,981
6 Pas. Tegel Keramik 20/20 27 m2 120,669
7 Pas. Tegel Keramik 20/25 Dinding KM 194 m2 129,719
8 Tegel Plint 10 cm 813 m1 40,093
9 Tegel List KM 64 m1 31,348
10 Tegel dinding lift 44 m2 137,990
- - - - -
II LANTAI II - - -
1 Pasangan Tegel Granit 30x30 teras 148 m2 183,359
2 Pas. Tegel Keramik Essenza 60 x 60 1,278 m2 387,065
3 Pas. Tegel selasar Essenza 60 x 60 213 m2 270,945
4 Pas. Tegel Keramik Tangga 30x30 62 m2 119,621
5 Stepnosing Tangga 80 m2 46,981
6 Pas. Tegel Keramik 20/20 27 m2 120,669
7 Pas. Tegel Keramik 20/25 Dinding KM 194 m2 129,719
8 Tegel Plint 10 cm 813 m2 40,093
9 Tegel List KM 64 m2 31,348
10 Tegel dinding lift 44 m2 137,990
- - - - -
III LANTAI III - - -
1 PasanganTegel Keramik 60/60 Ezensa 1,348 m2 387,065
2 PasanganTegel Keramik tangga 30/30 62 m2 119,621
3 Stepnosing tangga 80 m2 46,981
4 Pas. Tegel Keramik 20/20 33 m2 120,669
5 Pas. Tegel Keramik 20/25 Dinding KM 194 m2 129,719
6 Tegel plint 10 cm 583 m2 40,093
7 Tegel List KM 64 m2 31,348
8 Tegel dinding lift 44 m2 137,990
- - - - -
IV LANTAI IV - - -
1 PasanganTegel Keramik 60/60 Ezensa 1,348 m2 387,065
2 PasanganTegel Keramik tangga 30/30 62 m2 119,621
3 Stepnosing tangga 80 m2 46,981
4 Pas. Tegel Keramik 20/20 33 m2 120,669
5 Pas. Tegel Keramik 20/25 Dinding KM 194 m2 129,719
6 Tegel plint 10 cm 583 m2 40,093
7 Tegel List KM 64 m2 31,348
8 Tegel dinding lift 44 m2 137,990
- - - - -
V LANTAI V - - -
1 PasanganTegel Keramik 60/60 Ezensa 1,348 m2 387,065
2 PasanganTegel Keramik tangga 30/30 62 m2 119,621
3 Stepnosing tangga 80 m2 46,981
4 Pas. Tegel Keramik 20/20 33 m2 120,669
5 Pas. Tegel Keramik 20/25 Dinding KM 194 m2 129,719
6 Tegel plint 10 cm 583 m2 40,093
7 Tegel List KM 64 m2 31,348
8 Tegel dinding lift 44 m2 137,990
- - - - -
VI LANTAI VI - - -
1 PasanganTegel Keramik 60/60 Ezensa 1,348 m2 387,065
2 PasanganTegel Keramik tangga 30/30 62 m2 119,621
3 Stepnosing tangga 80 m2 46,981
4 Pas. Tegel Keramik 20/20 33 m2 120,669
5 Pas. Tegel Keramik 20/25 Dinding KM 194 m2 129,719
6 Tegel plint 10 cm 583 m2 40,093
7 Tegel List KM 64 m2 31,348
8 Tegel dinding lift 44 m2 137,990
- - - - -
VII LANTAI VII - - -
1 pasangan tegel keramik 60/60 ezense 844 m2 387,065
2 tegel dinding lif 60/60 ezensa 44 m2 119,621
3 pasangan tegel keramik 30/30 62 m2 46,981
4 stepnosing tangga 80 m' 120,669
5 Pas. Tegel Keramik 20/20 27 m2 129,719
6 Pas. Tegel Keramik 20/25 Dinding KM 194 m2 40,093
7 tegel plint 10cm 813 m' 31,348
8 tegel list KM 64 m2 137,990
- - - - -
F PEKERJAAN PLAFOND - - -
I LANTAI I - - -
1 Rangka Plafond Galvalum 1,555 m2 78,470
2 Gypsum Board 1,555 m2 53,309
3 List Gypsum 843 m1 40,467
- - - - -
II LANTAI II - - -
1 Rangka Plafond Galvalum 1,555 m2 78,470
2 Gypsum Board 1,555 m2 53,309
3 List Gypsum 843 m1 40,467
- - - - -
III LANTAI III - - -
1 Rangka Plafond Galvalum 1,555 m2 78,470
2 Gypsum Board 1,555 m2 53,309
3 List Gypsum 843 m1 40,467
- - - - -
IV LANTAI IV - - -
1 Rangka Plafond Galvalum 1,555 m2 78,470
2 Gypsum Board 1,555 m2 53,309
3 List Gypsum 843 m1 40,467
- - - - -
V LANTAI V - - -
1 Rangka Plafond Galvalum 1,555 m2 78,470
2 Gypsum Board 1,555 m2 53,309
3 List Gypsum 843 m1 40,467
- - - - -
VI LANTAI VI - - -
1 Rangka Plafond Galvalum 1,555 m2 78,470
2 Gypsum Board 1,555 m2 53,309
3 List Gypsum 843 m1 40,467
- - - - -
VII LANTAI VII - - -
1 Rangka Plafond Galvalum 1,097 m2 78,470
2 Gypsum Board 1,097 m2 53,309
3 List Gypsum 843 m' 40,467
4 Pas.kalsiplank 290 m' 55,320
- - - - -
G PEKERJAAN KUSEN - - -
I LANTAI I - - -
1 Kusen Alumunium 1,192 m1 186,334
2 Daun Jendela Aluminium 52 bh 465,577
3 Pintu R. Kuliah 48 bh 1,145,880
4 Kaca 5mm 242 m2 138,848
5 Pintu KM Aluminium 13 bh 545,343
6 Pitu Outdoor 8 bh 523,555
7 Pintu Shaft 4 bh 593,883
8 Panel dan Pintu Otomatis 265x295 1 set 6,342,333
9 Panel dan Pintu Otomatis 560x295 2 set 9,453,333
- - - - -
II LANTAI II - - -
1 Kusen Alumunium 1,193 m1 186,334
2 Daun Jendela Aluminium 52 bh 465,577
3 Pintu R. Kuliah 40 bh 1,145,880
4 Kaca 5mm 242 m2 138,848
5 Pintu KM Aluminium 7 bh 545,343
6 Pitu Outdoor 8 bh 523,555
7 Pintu Shaft 4 bh 593,883
- - - - -
III LANTAI III - - -
1 Kusen alumunium 1,274 m' 186,334
2 Daun pintu R. Kuliah kaca 54 bh 1,145,880
3 Daun Jendela Aluminium 52 bh 465,577
4 Daun bovenlis alumunium 24 bh 200,098
5 Kaca polos 5cm 377 m2 138,848
6 Pintu KM Alumunium 11 bh 545,343
7 Pintu Outdoor 8 bh 523,555
8 Pintu shaft 4 bh 593,883
- - - - -
IV LANTAI IV - - -
1 Kusen alumunium 1,274 m' 186,334
2 Daun pintu R. Kuliah kaca 54 bh 1,145,880
3 Daun Jendela Aluminium 52 bh 465,577
4 Daun bovenlis alumunium 24 bh 200,098
5 Kaca polos 5cm 377 m2 138,848
6 Pintu KM Alumunium 11 bh 545,343
7 Pintu Outdoor 8 bh 523,555
8 Pintu shaft 4 bh 593,883
- - - - -
V LANTAI V - - -
1 Kusen alumunium 1,274 m' 186,334
2 Daun pintu R. Kuliah kaca 54 bh 1,145,880
3 Daun Jendela Aluminium 52 bh 465,577
4 Daun bovenlis alumunium 24 bh 200,098
5 Kaca polos 5cm 377 m2 138,848
6 Pintu KM Alumunium 11 bh 545,343
7 Pintu Outdoor 8 bh 523,555
8 Pintu shaft 4 bh 593,883
- - - - -
VI LANTAI VI - - -
1 Kusen alumunium 1,274 m' 186,334
2 Daun pintu R. Kuliah kaca 54 bh 1,145,880
3 Daun Jendela Aluminium 52 bh 465,577
4 Daun bovenlis alumunium 24 bh 200,098
5 Kaca polos 5cm 377 m2 138,848
6 Pintu KM Alumunium 11 bh 545,343
7 Pintu Outdoor 8 bh 523,555
8 Pintu shaft 4 bh 593,883
- - - - -
VII LANTAI VII - - -
1 Kusen alumunium 1,251 m' 186,334
2 Daun pintu R. Kuliah kaca 24 bh 1,145,880
3 Daun Jendela Aluminium 52 bh 465,577
4 pintu KM alumunium 8 bh 545,343
5 pintu Shaft 4 bh 593,883
6 kaca 5cm 255 m2 138,848
- - - - -
H PEKERJAAN SEKAT PARTISI - - -
I LANTAI 3 - - -
1 Partisi Gypsum 9mm 232 m2 295,139
2 List Gypsum 305 m1 40,467
3 List Bawah Aluminium Strip Brown 3" 305 m1 15,345
- - - - -
II LANTAI 4 - - -
1 Partisi Gypsum 9mm 278 m2 295,139
2 List Gypsum 377 m1 40,467
3 List Bawah Aluminium Strip Brown 3" 377 m1 15,345
- - - - -
III LANTAI 5 - - -
1 Partisi Gypsum 9mm 278 m2 295,139
2 List Gypsum 377 m1 40,467
3 List Bawah Aluminium Strip Brown 3" 377 m1 15,345
- - - - -
IV LANTAI 6 - - -
1 Partisi Gypsum 9mm 278 m2 295,139
2 List Gypsum 377 m1 40,467
3 List Bawah Aluminium Strip Brown 3" 377 m1 15,345
- - - - -
I PEKERJAAN PENGECATAN - - -
I LANTAI I - - -
1 Pengecatan dinding dalam/ DULUX 2,114 m2 63,536
2 Pengecatan dinding luar/ DULUX 728 m2 111,630
3 Pengecatan plafond/ CATYLAC 1,555 m2 56,375
- - - - -
II LANTAI II - - -
1 Pengecatan dinding dalam/ DULUX 2,114 m2 63,536
2 Pengecatan dinding luar/ DULUX 728 m2 111,630
3 Pengecatan plafond/ CATYLAC 1,534 m2 56,375
- - - - -
III LANTAI III - - -
1 Pengecatan dinding dalam/ DULUX 2,114 m2 63,536
2 Pengecatan dinding luar/ DULUX 728 m2 111,630
3 Pengecatan plafond/ CATYLAC 1,534 m2 56,375
- - - - -
IV LANTAI IV - - -
1 Pengecatan dinding dalam/ DULUX 2,114 m2 63,536
2 Pengecatan dinding luar/ DULUX 728 m2 111,630
3 Pengecatan plafond/ CATYLAC 1,534 m2 56,375
- - - - -
V LANTAI V - - -
1 Pengecatan dinding dalam/ DULUX 2,114 m2 63,536
2 Pengecatan dinding luar/ DULUX 728 m2 111,630
3 Pengecatan plafond/ CATYLAC 1,534 m2 56,375
- - - - -
VI LANTAI VI - - -
1 Pengecatan dinding dalam/ DULUX 2,114 m2 63,536
2 Pengecatan dinding luar/ DULUX 728 m2 111,630
3 Pengecatan plafond/ CATYLAC 1,534 m2 56,375
- - - - -
VII LANTAI VII - - -
1 Pengecatan dinding dalam/ DULUX 200 m2 63,536
2 Pengecatan dinding luar/ DULUX 1,638 m2 111,630
3 Pengecatan plafond/ CATYLAC 1,097 m2 56,375
4 pengecatan lisplank 171 m2 87,394
- - - - -
J PEKERJAAN INSTALASI LISTRIK - - -
I LANTAI I - - -
1 Instalasi Lampu 129 ttk 113,525
2 Instalasi Stop Kontak 51 ttk 45,540
3 Instalasi Stop Kontak LCD 8 ttk 45,540
4 Instalasi Stop Kontak AC 16 ttk 45,540
5 Pemasangan Saklar Engkel 2 ttk 104,951
6 Pemasangan Sklar Seri 25 ttk 104,951
7 Pemasangan Saklar Hotel 2 ttk 104,951
8 Pemasangan Stop Kontak LCD 8 ttk 45,540
9 Pemasangan Stop Kontak AC 16 ttk 45,540
10 Panel MDP 1 ttk 3,453,433
11 Panel SDP 1 ttk 2,072,060
12 Pemasangan Stop Kontak 51 ttk 45,540
13 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454,100
14 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302,733
15 Pemasangan Downlight, 18 W 52 ttk 70,664
16 Pemasangan Lampu Baret 40 W 1 ttk 240,547
17 Pemasangan Lampu Baret 20 W 3 ttk 160,365
18 Pemasangan AC / 1 PK/ Converter 24 set 265,770
19 Penyambungan Kabel Daya 1 ls 257,888
- - - - -
II LANTAI II - - -
1 Instalasi Lampu 129 ttk 113,525
2 Instalasi Stop Kontak 51 ttk 45,540
3 Instalasi Stop Kontak LCD 8 ttk 45,540
4 Instalasi Stop Kontak AC 16 ttk 45,540
5 Pemasangan Saklar Engkel 2 ttk 104,951
6 Pemasangan Sklar Seri 25 ttk 104,951
7 Pemasangan Saklar Hotel 2 ttk 104,951
8 Pemasangan Stop Kontak LCD 8 ttk 45,540
9 Pemasangan Stop Kontak AC 16 ttk 45,540
10 Panel SDP 1 ttk 2,072,060
11 Pemasangan Stop Kontak 51 ttk 45,540
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454,100
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302,733
14 Pemasangan Downlight, 18 W 52 ttk 70,664
15 Pemasangan Lampu Baret 20 W 1 ttk 160,365
16 Pemasangan AC/ 1 PK 24 set 265,770
- - - - -
III LANTAI III - - -
1 Instalasi Lampu 129 ttk 113,525
2 Instalasi Stop Kontak 51 ttk 45,540
3 Instalasi Stop Kontak LCD 8 ttk 45,540
4 Instalasi Stop Kontak AC 16 ttk 45,540
5 Pemasangan Saklar Engkel 2 ttk 104,951
6 Pemasangan Sklar Seri 25 ttk 104,951
7 Pemasangan Saklar Hotel 2 ttk 104,951
8 Pemasangan Stop Kontak LCD 8 ttk 45,540
9 Pemasangan Stop Kontak AC 16 ttk 45,540
10 Panel SDP 1 ttk 2,072,060
11 Pemasangan Stop Kontak 51 ttk 45,540
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454,100
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302,733
14 Pemasangan Downlight, 18 W 52 ttk 70,664
15 Pemasangan Lampu Baret 20 W 1 ttk 160,365
16 Pemasangan AC/ 1 PK 24 set 265,770
- - - - -
IV LANTAI IV - - -
1 Instalasi Lampu 129 ttk 113,525
2 Instalasi Stop Kontak 51 ttk 45,540
3 Instalasi Stop Kontak LCD 8 ttk 45,540
4 Instalasi Stop Kontak AC 16 ttk 45,540
5 Pemasangan Saklar Engkel 2 ttk 104,951
6 Pemasangan Sklar Seri 25 ttk 104,951
7 Pemasangan Saklar Hotel 2 ttk 104,951
8 Pemasangan Stop Kontak LCD 8 ttk 45,540
9 Pemasangan Stop Kontak AC 16 ttk 45,540
10 Panel SDP 1 ttk 2,072,060
11 Pemasangan Stop Kontak 51 ttk 45,540
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454,100
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302,733
14 Pemasangan Downlight, 18 W 52 ttk 70,664
15 Pemasangan Lampu Baret 20 W 1 ttk 160,365
16 Pemasangan AC/ 1 PK 48 set 265,770
- - - - -
V LANTAI V - - -
1 Instalasi Lampu 129 ttk 113,525
2 Instalasi Stop Kontak 51 ttk 45,540
3 Instalasi Stop Kontak LCD 8 ttk 45,540
4 Instalasi Stop Kontak AC 16 ttk 45,540
5 Pemasangan Saklar Engkel 2 ttk 104,951
6 Pemasangan Sklar Seri 25 ttk 104,951
7 Pemasangan Saklar Hotel 2 ttk 104,951
8 Pemasangan Stop Kontak LCD 8 ttk 45,540
9 Pemasangan Stop Kontak AC 16 ttk 45,540
10 Panel SDP 1 ttk 2,072,060
11 Pemasangan Stop Kontak 51 ttk 45,540
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454,100
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302,733
14 Pemasangan Downlight, 18 W 52 ttk 70,664
15 Pemasangan Lampu Baret 20 W 1 ttk 160,365
16 Pemasangan AC/ 1 PK 48 set 265,770
- - - - -
VI LANTAI VI - - -
1 Instalasi Lampu 129 ttk 113,525
2 Instalasi Stop Kontak 51 ttk 45,540
3 Instalasi Stop Kontak LCD 8 ttk 45,540
4 Instalasi Stop Kontak AC 16 ttk 45,540
5 Pemasangan Saklar Engkel 2 ttk 104,951
6 Pemasangan Sklar Seri 25 ttk 104,951
7 Pemasangan Saklar Hotel 2 ttk 104,951
8 Pemasangan Stop Kontak LCD 8 ttk 45,540
9 Pemasangan Stop Kontak AC 16 ttk 45,540
10 Panel SDP 1 ttk 2,072,060
11 Pemasangan Stop Kontak 51 ttk 45,540
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454,100
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302,733
14 Pemasangan Downlight, 18 W 52 ttk 70,664
15 Pemasangan Lampu Baret 20 W 1 ttk 160,365
16 Pemasangan AC/ 1 PK 48 set 265,770
- - - - -
VII LANTAI VII - - -
1 Instalasi Lampu 129 ttk 113,525
2 Instalasi Stop Kontak 51 ttk 45,540
3 Instalasi Stop Kontak LCD 8 ttk 45,540
4 Instalasi Stop Kontak AC 16 ttk 45,540
5 Pemasangan Saklar Engkel 2 ttk 104,951
6 Pemasangan Sklar Seri 25 ttk 104,951
7 Pemasangan Saklar Hotel 2 ttk 104,951
8 Pemasangan Stop Kontak LCD 8 ttk 45,540
9 Pemasangan Stop Kontak AC 16 ttk 45,540
10 Panel SDP 1 ttk 2,072,060
11 Pemasangan Stop Kontak 51 ttk 45,540
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454,100
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302,733
14 Pemasangan Downlight, 18 W 52 ttk 70,664
15 Pemasangan Lampu Baret 20 W 1 ttk 160,365
- - - - -
K PEKERJAAN SANITASI - - -
I LANTAI I - - -
1 Pemasangan Closet Duduk TOTO 6 bh 2,420,729
2 Pemasangan Urinoir 3 bh 1,763,857
3 Saluran terbuka U30 130 m1 14,232
4 Pipa Air (GIP) 3" (Talang Tegak) 192 m1 80,534
5 Pipa Air PVC 3" 40 m1 74,497
6 Pipa Air PVC 4" 40 m1 7,539
7 Pipa PVC Air Bersih 1 1/4" 12 m1 33,791
8 Pipa PVC Air Bersih 1" 30 m1 24,801
9 Pipa PVC Air Bersih 3/4" 18 m1 51,099
10 Pipa PVC Air Bersih 1/2" 24 m1 15,631
11 Pemasangan Wastafel TOTO 4 bh 845,797
12 Floordrain 9 bh 45,455
13 Kran dinding 1/2" 7 bh 67,483
14 Septictank 2 unit 6,320,825
15 Sumur Resapan 2 bh 1,450,427
16 Sumur Bor air bersih 20m 2 unit 1,671,376
17 Pompa Air Grunfos 2 bh 1,075,320
18 Groundtank 42 m3 384,039
19 Tandon Air Stainless 5000ltr 2 bh 11,740,358
- - - - -
II LANTAI II - - -
1 Pemasangan Closet Duduk TOTO 6 bh 2,420,729
2 Pemasangan Urinoir 3 bh 1,763,857
3 Pipa Air (GIP) 3" (Talang Tegak) 128 m1 80,534
4 Pipa Air PVC 3" 40 m1 74,497
5 Pipa Air PVC 4" 40 m1 7,539
6 Pipa PVC Air Bersih 1 1/4" 12 m1 33,791
7 Pipa PVC Air Bersih 1" 30 m1 24,801
8 Pipa PVC Air Bersih 3/4" 18 m1 51,099
9 Pipa PVC Air Bersih 1/2" 24 m1 15,631
10 Pemasangan Wastafel TOTO 4 bh 845,797
11 Floordrain 9 bh 45,455
12 Kran dinding 1/2" 7 bh 67,483
- - - - -
III LANTAI III - - -
1 Pemasangan Closet Duduk TOTO 6 bh 2,420,729
2 Pemasangan Urinoir 3 bh 1,763,857
3 Pipa Air (GIP) 3" (Talang Tegak) 128 m1 80,534
4 Pipa Air PVC 3" 40 m1 74,497
5 Pipa Air PVC 4" 40 m1 7,539
6 Pipa PVC Air Bersih 1 1/4" 12 m1 33,791
7 Pipa PVC Air Bersih 1" 30 m1 24,801
8 Pipa PVC Air Bersih 3/4" 18 m1 51,099
9 Pipa PVC Air Bersih 1/2" 24 m1 15,631
10 Pemasangan Wastafel TOTO 4 bh 845,797
11 Floordrain 9 bh 45,455
12 Kran dinding 1/2" 7 bh 67,483
- - - - -
IV LANTAI IV - - -
1 Pemasangan Closet Duduk TOTO 6 bh 2,420,729
2 Pemasangan Urinoir 3 bh 1,763,857
3 Pipa Air (GIP) 3" (Talang Tegak) 128 m1 80,534
4 Pipa Air PVC 3" 40 m1 74,497
5 Pipa Air PVC 4" 40 m1 7,539
6 Pipa PVC Air Bersih 1 1/4" 12 m1 33,791
7 Pipa PVC Air Bersih 1" 30 m1 24,801
8 Pipa PVC Air Bersih 3/4" 18 m1 51,099
9 Pipa PVC Air Bersih 1/2" 24 m1 15,631
10 Pemasangan Wastafel TOTO 4 bh 845,797
11 Floordrain 9 bh 45,455
12 Kran dinding 1/2" 7 bh 67,483
- - - - -
V LANTAI V - - -
1 Pemasangan Closet Duduk TOTO 6 bh 2,420,729
2 Pemasangan Urinoir 3 bh 1,763,857
3 Pipa Air (GIP) 3" (Talang Tegak) 128 m1 80,534
4 Pipa Air PVC 3" 40 m1 74,497
5 Pipa Air PVC 4" 40 m1 7,539
6 Pipa PVC Air Bersih 1 1/4" 12 m1 33,791
7 Pipa PVC Air Bersih 1" 30 m1 24,801
8 Pipa PVC Air Bersih 3/4" 18 m1 51,099
9 Pipa PVC Air Bersih 1/2" 24 m1 15,631
10 Pemasangan Wastafel TOTO 4 bh 845,797
11 Floordrain 9 bh 45,455
12 Kran dinding 1/2" 7 bh 67,483
- - - - -
VI LANTAI VI - - -
1 Pemasangan Closet Duduk TOTO 6 bh 2,420,729
2 Pemasangan Urinoir 3 bh 1,763,857
3 Pipa Air (GIP) 3" (Talang Tegak) 128 m1 80,534
4 Pipa Air PVC 3" 40 m1 74,497
5 Pipa Air PVC 4" 40 m1 7,539
6 Pipa PVC Air Bersih 1 1/4" 12 m1 33,791
7 Pipa PVC Air Bersih 1" 30 m1 24,801
8 Pipa PVC Air Bersih 3/4" 18 m1 51,099
9 Pipa PVC Air Bersih 1/2" 24 m1 15,631
10 Pemasangan Wastafel TOTO 4 bh 845,797
11 Floordrain 9 bh 45,455
12 Kran dinding 1/2" 7 bh 67,483
- - - - -
L PEKERJAAN LIFT - - -
1 Konstruksi Lift 1 Ls 40,777,666
2 Lift Mitsubishi 2 Bh 140,878,800
- - - - -
- - - - -
M PEKERJAAN LAIN LAIN - - -
1 Handrail Tangga Stainles 2" (lt. 1 s/d lt. 6) 416 m1 390,913
2 penangkal petir 1 unit 6,699,750
- - - - -
- - - - -
- - - - Jumlah
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
JUMLAH BOBOT mingg mingg mingg mingg mingg mingg
% 1 2 3 4 5 6

17,147,078 0.0455 0.0455


9,189,648 0.0244 0.0244
15,000,000 0.0398
3,600,000 0.0096
43,339,558 0.1150
48,073,753 0.1275
- -
- -
15,775,916 0.0419 0.0140 0.0140 0.0140
5,819,952 0.0154 0.0039 0.0039 0.0039 0.0039
100,606,925 0.2669
9,799,328 0.0260
6,318,626 0.0168
78,720,485 0.2088
- -
- -
77,995,925 0.2069
31,931,245 0.0847
28,630,886 0.0760
- -
- -
- -
1,220,238,252 3.2371
556,245,635 1.4756
352,361,270 0.9348
6,117,166 0.0162
285,914,239 0.7585
880,871,964 2.3368
24,468,666 0.0649
12,409,432 0.0329
99,477,874 0.2639
341,742,334 0.9066
498,248,773 1.3218
7,693,229 0.0204
41,005,444 0.1088
29,596,683 0.0785
1,108,661,884 2.9411
20,877,040 0.0554
25,098,117 0.0666
- -
- -
880,871,964 2.3368
10,451,795 0.0277
99,477,874 0.2639
341,742,334 0.9066
498,248,773 1.3218
5,327,721 0.0141
41,144,603 0.1091
39,841,688 0.1057
986,995,421 2.6183
20,877,040 0.0554
25,098,117 0.0666
- -
- -
685,122,639 1.8175
10,526,450 0.0279
99,477,874 0.2639
341,742,334 0.9066
498,248,773 1.3218
41,144,603 0.1091
770,661,144 2.0444
20,877,040 0.0554
25,098,117 0.0666
- -
- -
685,122,639 1.8175
10,526,450 0.0279
99,477,874 0.2639
341,742,334 0.9066
498,248,773 1.3218
41,144,603 0.1091
770,661,144 2.0444
20,877,040 0.0554
25,098,117 0.0666
- -
- -
685,122,639 1.8175
10,526,450 0.0279
99,477,874 0.2639
341,742,334 0.9066
498,248,773 1.3218
41,144,603 0.1091
770,661,144 2.0444
20,877,040 0.0554
25,098,117 0.0666
- -
- -
685,122,639 1.8175
10,526,450 0.0279
99,477,874 0.2639
341,742,334 0.9066
498,248,773 1.3218
41,144,603 0.1091
770,661,144 2.0444
20,877,040 0.0554
25,098,117 0.0666
- -
- -
- -
165,291,310 0.4385
95,538,898 0.2534
40,266,610 0.1068
56,135,683 0.1489
27,005,199 0.0716
32,885,981 0.0872
- -
- -
165,291,310 0.4385
95,538,898 0.2534
40,241,681 0.1068
56,135,683 0.1489
27,005,199 0.0716
32,885,981 0.0872
- -
- -
106,209,648 0.2818
65,648,267 0.1742
501,541,331 1.3305
64,812,892 0.1719
34,468,552 0.0914
24,206,701 0.0642
- -
- -
106,209,648 0.2818
65,648,267 0.1742
501,541,331 1.3305
64,812,892 0.1719
34,468,552 0.0914
24,206,701 0.0642
- -
- -
106,209,648 0.2818
65,648,267 0.1742
501,541,331 1.3305
64,812,892 0.1719
34,468,552 0.0914
24,206,701 0.0642
- -
- -
106,209,648 0.2818
65,648,267 0.1742
501,541,331 1.3305
64,812,892 0.1719
34,468,552 0.0914
24,206,701 0.0642
- -
- -
126,780,374 0.3363
66,608,592 0.1767
62,988,915 0.1671
68,447,833 0.1816
42,484,976 0.1127
23,050,844 0.0611
- -
- -
1,040,258,834 2.7596
629,098,042 1.6689
257,504,169 0.6831
90,286,560 0.2395
78,344,448 0.2078
43,027,457 0.1141
1,284,080 0.0034
12,116,960 0.0321
95,371,137 0.2530
10,717,368 0.0284
- -
- -
- -
27,173,798 0.0721
494,823,257 1.3127
57,711,317 0.1531
7,457,154 0.0198
3,772,542 0.0100
3,258,073 0.0086
25,113,539 0.0666
32,575,644 0.0864
2,006,278 0.0053
6,071,538 0.0161
- -
- -
27,173,798 0.0721
494,823,257 1.3127
57,711,317 0.1531
7,457,154 0.0198
3,772,542 0.0100
3,258,073 0.0086
25,113,539 0.0666
32,575,644 0.0864
2,006,278 0.0053
6,071,538 0.0161
- -
- -
521,762,946 1.3841
7,457,453 0.0198
3,772,542 0.0100
3,982,089 0.0106
25,113,539 0.0666
23,370,268 0.0620
2,006,278 0.0053
6,071,538 0.0161
- -
- -
521,762,946 1.3841
7,457,453 0.0198
3,772,542 0.0100
3,982,089 0.0106
25,113,539 0.0666
23,370,268 0.0620
2,006,278 0.0053
6,071,538 0.0161
- -
- -
521,762,946 1.3841
7,457,453 0.0198
3,772,542 0.0100
3,982,089 0.0106
25,113,539 0.0666
23,370,268 0.0620
2,006,278 0.0053
6,071,538 0.0161
- -
- -
521,762,946 1.3841
7,457,453 0.0198
3,772,542 0.0100
3,982,089 0.0106
25,113,539 0.0666
23,370,268 0.0620
2,006,278 0.0053
6,071,538 0.0161
- -
- -
326,585,672 0.8664
5,263,310 0.0140
2,928,771 0.0078
9,689,749 0.0257
3,502,405 0.0093
7,762,024 0.0206
25,470,331 0.0676
8,831,328 0.0234
- -
- -
- -
122,035,332 0.3237
82,905,091 0.2199
34,097,494 0.0905
- -
- -
122,035,332 0.3237
82,905,091 0.2199
34,097,494 0.0905
- -
- -
122,035,332 0.3237
82,905,091 0.2199
34,097,494 0.0905
- -
- -
122,035,332 0.3237
82,905,091 0.2199
34,097,494 0.0905
- -
- -
122,035,332 0.3237
82,905,091 0.2199
34,097,494 0.0905
- -
- -
122,035,332 0.3237
82,905,091 0.2199
34,097,494 0.0905
- -
- -
86,072,426 0.2283
58,473,576 0.1551
34,097,494 0.0905
16,042,800 0.0426
- -
- -
- -
222,110,009 0.5892
24,210,004 0.0642
55,002,240 0.1459
33,546,944 0.0890
7,089,459 0.0188
4,188,440 0.0111
2,375,532 0.0063
6,342,333 0.0168
18,906,666 0.0502
- -
- -
222,268,393 0.5896
24,210,004 0.0642
45,835,200 0.1216
33,546,944 0.0890
3,817,401 0.0101
4,188,440 0.0111
2,375,532 0.0063
- -
- -
237,445,289 0.6299
61,877,520 0.1642
24,210,004 0.0642
4,802,352 0.0127
52,331,623 0.1388
5,998,773 0.0159
4,188,440 0.0111
2,375,532 0.0063
- -
- -
237,445,289 0.6299
61,877,520 0.1642
24,210,004 0.0642
4,802,352 0.0127
52,331,623 0.1388
5,998,773 0.0159
4,188,440 0.0111
2,375,532 0.0063
- -
- -
237,445,289 0.6299
61,877,520 0.1642
24,210,004 0.0642
4,802,352 0.0127
52,331,623 0.1388
5,998,773 0.0159
4,188,440 0.0111
2,375,532 0.0063
- -
- -
237,445,289 0.6299
61,877,520 0.1642
24,210,004 0.0642
4,802,352 0.0127
52,331,623 0.1388
5,998,773 0.0159
4,188,440 0.0111
2,375,532 0.0063
- -
- -
233,140,976 0.6185
27,501,120 0.0730
24,210,004 0.0642
4,362,744 0.0116
2,375,532 0.0063
35,383,897 0.0939
- -
- -
- -
68,332,032 0.1813
12,326,248 0.0327
4,674,087 0.0124
- -
- -
81,998,438 0.2175
15,264,152 0.0405
5,788,134 0.0154
- -
- -
81,998,438 0.2175
15,264,152 0.0405
5,788,134 0.0154
- -
- -
81,998,438 0.2175
15,264,152 0.0405
5,788,134 0.0154
- -
- -
- -
134,314,351 0.3563
81,266,395 0.2156
87,673,652 0.2326
- -
- -
134,327,059 0.3563
81,266,395 0.2156
86,501,047 0.2295
- -
- -
134,327,059 0.3563
81,266,395 0.2156
86,501,047 0.2295
- -
- -
134,327,059 0.3563
81,266,395 0.2156
86,501,047 0.2295
- -
- -
134,327,059 0.3563
81,266,395 0.2156
86,501,047 0.2295
- -
- -
134,327,059 0.3563
81,266,395 0.2156
86,501,047 0.2295
- -
- -
12,728,731 0.0338
182,880,646 0.4851
61,836,878 0.1640
14,953,193 0.0397
- -
- -
- -
14,644,725 0.0388
2,322,540 0.0062
364,320 0.0010
728,640 0.0019
209,902 0.0006
2,623,775 0.0070
209,902 0.0006
364,320 0.0010
728,640 0.0019
3,453,433 0.0092
2,072,060 0.0055
2,322,540 0.0062
29,062,400 0.0771
2,724,600 0.0072
3,674,528 0.0097
240,547 0.0006
481,094 0.0013
6,378,480 0.0169
257,888 0.0007
- -
- -
14,644,725 0.0388
2,322,540 0.0062
364,320 0.0010
728,640 0.0019
209,902 0.0006
2,623,775 0.0070
209,902 0.0006
364,320 0.0010
728,640 0.0019
2,072,060 0.0055
2,322,540 0.0062
29,062,400 0.0771
2,724,600 0.0072
3,674,528 0.0097
160,365 0.0004
6,378,480 0.0169
- -
- -
14,644,725 0.0388
2,322,540 0.0062
364,320 0.0010
728,640 0.0019
209,902 0.0006
2,623,775 0.0070
209,902 0.0006
364,320 0.0010
728,640 0.0019
2,072,060 0.0055
2,322,540 0.0062
29,062,400 0.0771
2,724,600 0.0072
3,674,528 0.0097
160,365 0.0004
6,378,480 0.0169
- -
- -
14,644,725 0.0388
2,322,540 0.0062
364,320 0.0010
728,640 0.0019
209,902 0.0006
2,623,775 0.0070
209,902 0.0006
364,320 0.0010
728,640 0.0019
2,072,060 0.0055
2,322,540 0.0062
29,062,400 0.0771
2,724,600 0.0072
3,674,528 0.0097
160,365 0.0004
12,756,960 0.0338
- -
- -
14,644,725 0.0388
2,322,540 0.0062
364,320 0.0010
728,640 0.0019
209,902 0.0006
2,623,775 0.0070
209,902 0.0006
364,320 0.0010
728,640 0.0019
2,072,060 0.0055
2,322,540 0.0062
29,062,400 0.0771
2,724,600 0.0072
3,674,528 0.0097
160,365 0.0004
12,756,960 0.0338
- -
- -
14,644,725 0.0388
2,322,540 0.0062
364,320 0.0010
728,640 0.0019
209,902 0.0006
2,623,775 0.0070
209,902 0.0006
364,320 0.0010
728,640 0.0019
2,072,060 0.0055
2,322,540 0.0062
29,062,400 0.0771
2,724,600 0.0072
3,674,528 0.0097
160,365 0.0004
12,756,960 0.0338
- -
- -
14,644,725 0.0388
2,322,540 0.0062
364,320 0.0010
728,640 0.0019
209,902 0.0006
2,623,775 0.0070
209,902 0.0006
364,320 0.0010
728,640 0.0019
2,072,060 0.0055
2,322,540 0.0062
29,062,400 0.0771
2,724,600 0.0072
3,674,528 0.0097
160,365 0.0004
- -
- -
- -
14,524,374 0.0385
5,291,571 0.0140
1,850,160 0.0049
15,462,528 0.0410
2,979,876 0.0079
301,558 0.0008
405,494 0.0011
744,036 0.0020
919,783 0.0024
375,149 0.0010
3,383,188 0.0090
409,095 0.0011
472,378 0.0013
12,641,650 0.0335
2,900,854 0.0077
3,342,751 0.0089
2,150,640 0.0057
16,129,638 0.0428
23,480,716 0.0623
- -
- -
14,524,374 0.0385
5,291,571 0.0140
10,308,352 0.0273
2,979,876 0.0079
301,558 0.0008
405,494 0.0011
744,036 0.0020
919,783 0.0024
375,149 0.0010
3,383,188 0.0090
409,095 0.0011
472,378 0.0013
- -
- -
14,524,374 0.0385
5,291,571 0.0140
10,308,352 0.0273
2,979,876 0.0079
301,558 0.0008
405,494 0.0011
744,036 0.0020
919,783 0.0024
375,149 0.0010
3,383,188 0.0090
409,095 0.0011
472,378 0.0013
- -
- -
14,524,374 0.0385
5,291,571 0.0140
10,308,352 0.0273
2,979,876 0.0079
301,558 0.0008
405,494 0.0011
744,036 0.0020
919,783 0.0024
375,149 0.0010
3,383,188 0.0090
409,095 0.0011
472,378 0.0013
- -
- -
14,524,374 0.0385
5,291,571 0.0140
10,308,352 0.0273
2,979,876 0.0079
301,558 0.0008
405,494 0.0011
744,036 0.0020
919,783 0.0024
375,149 0.0010
3,383,188 0.0090
409,095 0.0011
472,378 0.0013
- -
- -
14,524,374 0.0385
5,291,571 0.0140
10,308,352 0.0273
2,979,876 0.0079
301,558 0.0008
405,494 0.0011
744,036 0.0020
919,783 0.0024
375,149 0.0010
3,383,188 0.0090
409,095 0.0011
472,378 0.0013
- -
- -
40,777,666 0.1082
281,757,600 0.7475
- -
- -
- -
162,619,600 0.4314
6,699,750 0.0178
-
-
37,695,696,291 100 Target 0.0699 0.0178 0.0178 0.0178 0.0039 -
- 0.0699 0.0877 0.1055 0.1233 0.1272 0.1272
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
mingg mingg mingg mingg mingg mingg mingg mingg mingg mingg
7 8 9 10 11 12 13 14 15 16
- - - - - - - - - -
0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272
mingg mingg mingg mingg mingg mingg mingg mingg mingg mingg
17 18 19 20 21 22 23 24 25 26
- - - - - - - - - -
0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272
mingg mingg mingg mingg mingg mingg mingg mingg mingg mingg
27 28 29 30 31 32 33 34 35 36
- - - - - - - - - -
0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272

0.1400

0.1200

0.1000

0.0800

0.0600

0.0400

0.0200

-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
mingg mingg mingg mingg mingg mingg mingg mingg mingg mingg
37 38 39 40 41 42 43 44 45 46
- - - - - - - - - -
0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272 0.1272

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
mingg mingg
47 48
- -
0.1272 0.1272

42 43 44 45 46
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG UTSMAN BIN AFFAN
UNIVERSITAS ISLAM MALANG

No. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN

15 Plat Lantai Beton t=12 cm beton K225 186.62 m3 10811899.9


1 Pondasi Stross d. 60 523.12 m3 3635330.7
9 Plat Lantai Beton t=12 cm beton K225 166.14 m3 10811899.9
6 Kolom d. 60 beton / K.225 ( 2 bh ) 141.12 m3 10485035.7
1 Kolom 70/90 beton K225 141.12 m3 10485035.7
7 Plat Lantai Beton t=12 cm beton K225 166.14 m3 7867013.5
7 Plat Lantai Beton t=12 cm beton K225 166.14 m3 7867013.5
7 Plat Lantai Beton t=12 cm beton K225 166.14 m3 7867013.5
7 Plat Lantai Beton t=12 cm beton K225 166.14 m3 7867013.5
1 kuda kuda WF 36409.13 kg 35350.02
1 Kolom 70/70 beton K225 109.76 m3 10485035.7
1 Kolom 70/70 beton K225 109.76 m3 10485035.7
1 Kolom 70/70 beton K225 109.76 m3 10485035.7
1 Kolom 70/70 beton K225 109.76 m3 10485035.7
2 Pelat Pondasi 200x200x80 beton K225 180.2 m3 5001947.2
11 Balok Induk 45/70 beton K-225 87.54 m3 9601269.9
5 Balok Induk 45/70 beton K-225 87.54 m3 9601269.9
5 Balok Induk 45/70 beton K-225 87.54 m3 9601269.9
5 Balok Induk 45/70 beton K-225 87.54 m3 9601269.9
5 Balok Induk 45/70 beton K-225 87.54 m3 9601269.9
5 Balok Induk 45/70 beton K-225 87.54 m3 9601269.9
3 Plesteran Kolom 11266.76 m2 56235.888
3 Plesteran Kolom 11266.76 m2 56235.888
3 Plesteran Kolom 11266.76 m2 56235.888
3 Plesteran Kolom 11266.76 m2 56235.888
2 gording kanal C 15602.63 kg 40320
10 Balok Anak 30/50 beton K.225 67.23 m3 8869643.2
4 Balok Anak 30/50 beton K.225 67.23 m3 8869643.2
4 Balok Anak 30/50 beton K.225 67.23 m3 8869643.2
4 Balok Anak 30/50 beton K.225 67.23 m3 8869643.2
4 Balok Anak 30/50 beton K.225 67.23 m3 8869643.2
4 Balok Anak 30/50 beton K.225 67.23 m3 8869643.2
3 Kolom pondasi 70/90 beton K225 56.45 m3 10485035.7
2 Lift Mitsubishi 2 Bh 277700000
1 PasanganTegel Keramik 60/60 Ezensa 1348 m2 387064.5
1 PasanganTegel Keramik 60/60 Ezensa 1348 m2 387064.5
1 PasanganTegel Keramik 60/60 Ezensa 1348 m2 387064.5
1 PasanganTegel Keramik 60/60 Ezensa 1348 m2 387064.5
2 Pas. Tegel Keramik Essenza 60 x 60 1278.4 m2 387064.5
2 Pas. Tegel Keramik Essenza 60 x 60 1278.4 m2 387064.5
5 Sloof 30/50 Beton K-225 86.04 m3 5353057.9
1 pasangan tegel keramik 60/60 ezense 843.75 m2 387064.5
2 Pengecatan dinding luar/ DULUX 1638.28 m2 171509.76
3 usuk & reng galvalum 1300 m2 198080.13
1 Kusen alumunium 1274.3 m' 186333.9
1 Kusen alumunium 1274.3 m' 186333.9
1 Kusen alumunium 1274.3 m' 186333.9
1 Kusen alumunium 1274.3 m' 186333.9
1 Kusen alumunium 1251.2 m' 186333.9
1 Pas. Dinding Bata Merah 1:4 1449 m2 153979.92
1 Pas. Dinding Bata Merah 1:4 1449 m2 153979.92
1 Kusen Alumunium 1192.85 m1 186333.9
1 Kusen Alumunium 1192 m1 186333.9
1 Pengecatan dinding dalam/ DULUX 2114.2 m2 96068.16
1 Pengecatan dinding dalam/ DULUX 2114.2 m2 96068.16
1 Pengecatan dinding dalam/ DULUX 2114.2 m2 96068.16
1 Pengecatan dinding dalam/ DULUX 2114.2 m2 96068.16
1 Pengecatan dinding dalam/ DULUX 2114.2 m2 96068.16
1 Pengecatan dinding dalam/ DULUX 2114 m2 96068.16
9 Balok Anak 25/40 beton K 225 19.57 m3 8869643.2
3 Balok Anak 25/40 beton K 225 19.57 m3 8869643.2
3 Balok Anak 25/40 beton K 225 19.57 m3 8869643.2
3 Balok Anak 25/40 beton K 225 19.57 m3 8869643.2
3 Balok Anak 25/40 beton K 225 19.57 m3 8869643.2
3 Balok Anak 25/40 beton K 225 19.57 m3 8869643.2
1 pasangan dinding batu merah 1:4 1111.4 m2 153979.92
1 Handrail Tangga Stainles 2" (lt. 1 s/d lt. 6) 416 m1 390912.5
4 plat simpul &kopel 3640 kg 39804
1 Pas. Dinding Bata Merah 1:4 931.07 m2 153979.92
1 Pas. Dinding Bata Merah 1:4 931.07 m2 153979.92
1 Pas. Dinding Bata Merah 1:4 931.07 m2 153979.92
1 Pas. Dinding Bata Merah 1:4 931.07 m2 153979.92
3 Pengecatan plafond/ CATYLAC 1555.18 m2 84836.16
3 Pengecatan plafond/ CATYLAC 1534.38 m2 84836.16
3 Pengecatan plafond/ CATYLAC 1534.38 m2 84836.16
3 Pengecatan plafond/ CATYLAC 1534.38 m2 84836.16
3 Pengecatan plafond/ CATYLAC 1534.38 m2 84836.16
3 Pengecatan plafond/ CATYLAC 1534.38 m2 84836.16
2 Pengecatan dinding luar/ DULUX 728 m2 171509.76
2 Pengecatan dinding luar/ DULUX 728 m2 171509.76
2 Pengecatan dinding luar/ DULUX 728 m2 171509.76
2 Pengecatan dinding luar/ DULUX 728 m2 171509.76
2 Pengecatan dinding luar/ DULUX 728 m2 171509.76
2 Pengecatan dinding luar/ DULUX 728 m2 171509.76
2 Plesteran Dinding 2710 m2 45367.632
2 Plesteran Dinding 2710 m2 45367.632
1 Rangka Plafond Galvalum 1555.18 m2 78470.23
1 Rangka Plafond Galvalum 1555.18 m2 78470.23
1 Rangka Plafond Galvalum 1555.18 m2 78470.23
1 Rangka Plafond Galvalum 1555.18 m2 78470.23
1 Rangka Plafond Galvalum 1555.18 m2 78470.23
1 Rangka Plafond Galvalum 1555.18 m2 78470.23
1 Pondasi batu kali 132.83 m3 892787.94
6 Urungan tanah peninggian lantai 674.04 m3 173865.6
3 Galian tanah pondasi strouss/ D.60 CM 1360 m3 82195.2
1 Konstruksi Lift 1 Ls 98777666
9 pasang genteng keramik 1300.22 m2 73350
3 Pengecatan plafond/ CATYLAC 1096.88 m2 84836.16
1 Rangka Plafond Galvalum 1096.88 m2 78470.23
2 plesteran dinding 1:4 1889.38 m2 45367.632
2 Plesteran Dinding 1862.14 m2 45367.632
2 Plesteran Dinding 1862.14 m2 45367.632
2 Plesteran Dinding 1862.14 m2 45367.632
2 Plesteran Dinding 1862.14 m2 45367.632
2 Gypsum Board 1555.18 m2 53309
2 Gypsum Board 1555.18 m2 53309
2 Gypsum Board 1555.18 m2 53309
2 Gypsum Board 1555.18 m2 53309
2 Gypsum Board 1555.18 m2 53309
2 Gypsum Board 1555.18 m2 53309
1 Partisi Gypsum 9mm 277.83 m2 295138.89
1 Partisi Gypsum 9mm 277.83 m2 295138.89
1 Partisi Gypsum 9mm 277.83 m2 295138.89
4 acian 3304.38 m2 24531.12
3 plesteran kolom,balok 1415 m2 56235.888
5 angket dia 16cm &plat plendes 1820 kg 43046.4
4 Acian Dinding 3128.9 m2 24531.12
4 Acian Dinding 3128.9 m2 24531.12
4 Acian Dinding 3128.9 m2 24531.12
4 Acian Dinding 3128.9 m2 24531.12
5 Direksikeet/tempat bahan 50 m2 1423219.6
6 Pagar pangaman 252 m1 277647.75
7 Plat Tangga Beton K225 8.87 m3 7867013.5
6 Plat Tangga Beton K225 8.87 m3 7867013.5
6 Plat Tangga Beton K225 8.87 m3 7867013.5
6 Plat Tangga Beton K225 8.87 m3 7867013.5
6 Plat Tangga Beton K225 8.87 m3 7867013.5
13 Plat Tangga Beton K225 8.84 m3 7867013.5
1 Partisi Gypsum 9mm 231.525 m2 295138.89
8 Balok Konsol 30/40 L=1.5m 7 m3 9601269.9
4 Acian Dinding 2710 m2 24531.12
4 Acian Dinding 2710 m2 24531.12
5 Kaca polos 5cm 376.9 m2 163350
5 Kaca polos 5cm 376.9 m2 163350
5 Kaca polos 5cm 376.9 m2 163350
5 Kaca polos 5cm 376.9 m2 163350
2 Gypsum Board 1096.88 m2 53309
3 Pas. Tegel selasar Essenza 60 x 60 213 m2 270945.15
3 Pas. Tegel selasar Essenza 60 x 60 213 m2 270945.15
3 Plesteran Kolom 904.56 m2 56235.888
3 Plesteran Kolom 904 m2 56235.888
5 benangan sudut 2051 m' 24531.12
14 Balok Konsol 30/40 L=1.5m 5.2 m3 9601269.9
3 Lapisan pasir bawah lantai 253.52 m2 178185.6
6 trekstrang& ikatan angin 1560.3 kg 27576.4
6 kaca 5cm 254.84 m2 163350
7 Kolom 70/90 beton K225 3.92 m3 10485035.7
5 Benangan Sudut 1664 m' 24531.12
5 Benangan Sudut 1664 m' 24531.12
5 Benangan Sudut 1664 m' 24531.12
5 Benangan Sudut 1664 m' 24531.12
2 Lantai kerja 18.48 m3 2186388
4 Kaca 5mm 241.61 m2 163350
4 Kaca 5mm 241.61 m2 163350
6 Benangan Kusen 1587.6 m2 24531.12
6 Benangan Kusen 1587.6 m2 24531.12
2 Daun pintu R. Kuliah kaca 54 bh 676877
2 Daun pintu R. Kuliah kaca 54 bh 676877
2 Daun pintu R. Kuliah kaca 54 bh 676877
2 Daun pintu R. Kuliah kaca 54 bh 676877
17 Balok Latei 15/20 K.175 11.13 m3 3254997
11 Balok Latei 15/20 K.175 11.13 m3 3254997
9 Balok lantai 15/20 k-175 11.13 m3 3254997
9 Balok lantai 15/20 k-175 11.13 m3 3254997
9 Balok lantai 15/20 k-175 11.13 m3 3254997
9 Balok lantai 15/20 k-175 11.13 m3 3254997
3 List Gypsum 842.6 m1 40467
3 List Gypsum 842.6 m1 40467
3 List Gypsum 842.6 m1 40467
3 List Gypsum 842.6 m1 40467
3 List Gypsum 842.6 m1 40467
3 List Gypsum 842.6 m1 40467
3 List Gypsum 842.6 m' 40467
19 Tandon Air Stainless 5000ltr 2 bh 16719655.400331
1 Pasangan Tegel Granit 30x30 teras 148.2 m2 221398.56
1 Pasangan Tegel Granit 30x30 teras 148.2 m2 221398.56
8 Tegel Plint 10 cm 812.5 m1 40093.1
8 Tegel Plint 10 cm 812.5 m2 40093.1
3 Pintu R. Kuliah 48 bh 676877
5 Benangan Sudut 1303.7 m2 24531.12
5 Benangan Sudut 1303.7 m2 24531.12
16 Kolom Praktis 15x15 beton K175 392 m1 80288.25
10 Kolom Praktis 15x15 beton K175 392 m1 80288.25
8 Kolom praktis 15x15 k-175 392 m1 80288.25
8 Kolom praktis 15x15 k-175 392 m1 80288.25
8 Kolom praktis 15x15 k-175 392 m1 80288.25
8 Kolom praktis 15x15 k-175 392 m1 80288.25
7 Pas. Tegel Keramik 20/25 Dinding KM 193.6 m2 158984.64
7 Pas. Tegel Keramik 20/25 Dinding KM 193.6 m2 158984.64
5 Pas. Tegel Keramik 20/25 Dinding KM 193.6 m2 158984.64
5 Pas. Tegel Keramik 20/25 Dinding KM 193.6 m2 158984.64
5 Pas. Tegel Keramik 20/25 Dinding KM 193.6 m2 158984.64
5 Pas. Tegel Keramik 20/25 Dinding KM 193.6 m2 158984.64
13 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454100
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454100
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454100
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454100
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454100
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454100
12 Pemasangan Lampu TL 2 x 40 W (RMI) 64 ttk 454100
6 Benangan Kusen 1168.6 m' 24531.12
6 Benangan Kusen 1168.6 m' 24531.12
6 Benangan Kusen 1168.6 m' 24531.12
6 Benangan Kusen 1168.6 m' 24531.12
6 benangan kosen 1112.8 m' 24531.12
3 Pintu R. Kuliah 40 bh 676877
7 tegel plint 10cm 812.5 m' 31348.1
6 Tegel plint 10 cm 582.9 m2 40093.1
6 Tegel plint 10 cm 582.9 m2 40093.1
6 Tegel plint 10 cm 582.9 m2 40093.1
6 Tegel plint 10 cm 582.9 m2 40093.1
9 Panel dan Pintu Otomatis 560x295 2 set 11453333
4 pengecatan lisplank 171.1 m2 133493.76
2 Daun Jendela Aluminium 52 bh 429878
2 Daun Jendela Aluminium 52 bh 429878
3 Daun Jendela Aluminium 52 bh 429878
3 Daun Jendela Aluminium 52 bh 429878
3 Daun Jendela Aluminium 52 bh 429878
3 Daun Jendela Aluminium 52 bh 429878
3 Daun Jendela Aluminium 52 bh 429878
3 Listrik kerja 1 ls 20000000
14 Septictank 2 unit 9738838.8
8 Dinding Lift 14.96 m3 1293003.9
1 Pengecatan dinding dalam/ DULUX 200.34 m2 96068.16
1 Pembersihan lahan 1890.11 m2 10080
1 Galian tanah pondasi plat 503.84 m3 34790.4
2 Pengukuran/uitset & bouplank 208.6 m1 83383.2
2 Dinding Lift 12.69 m3 1293003.9
2 Dinding Lift 12.69 m3 1293003.9
2 Dinding Lift 12.69 m3 1293003.9
2 Dinding Lift 12.69 m3 1293003.9
2 Dinding Lift 12.6 m3 1293003.9
2 Daun pintu R. Kuliah kaca 24 bh 676877
18 Groundtank 42 m3 384039
4 Pas.kalsiplank 290 m' 55320
4 Pipa Air (GIP) 3" (Talang Tegak) 192 m1 80534
2 List Gypsum 377.2 m1 40467
2 List Gypsum 377.2 m1 40467
2 List Gypsum 377.2 m1 40467
1 Instalasi Lampu 129 ttk 113525
1 Instalasi Lampu 129 ttk 113525
1 Instalasi Lampu 129 ttk 113525
1 Instalasi Lampu 129 ttk 113525
1 Instalasi Lampu 129 ttk 113525
1 Instalasi Lampu 129 ttk 113525
1 Instalasi Lampu 129 ttk 113525
1 Pemasangan Closet Duduk TOTO 6 bh 2420729
1 Pemasangan Closet Duduk TOTO 6 bh 2420729
1 Pemasangan Closet Duduk TOTO 6 bh 2420729
1 Pemasangan Closet Duduk TOTO 6 bh 2420729
1 Pemasangan Closet Duduk TOTO 6 bh 2420729
1 Pemasangan Closet Duduk TOTO 6 bh 2420729
16 Pemasangan AC/ 1 PK 48 set 265770
16 Pemasangan AC/ 1 PK 48 set 265770
16 Pemasangan AC/ 1 PK 48 set 265770
2 List Gypsum 304.6 m1 40467
8 kalsiplank 342.2 m' 35409
4 stepnosing tangga 80.3 m' 149078.592
12 Listplank beton t=10 cm beton K-225 7.22 m3 1591436.7
10 pasang bubungan 190 m' 59460
4 Urungan tanah kembali 857.28 m3 12700.8
3 Pipa Air (GIP) 3" (Talang Tegak) 128 m1 80534
3 Pipa Air (GIP) 3" (Talang Tegak) 128 m1 80534
3 Pipa Air (GIP) 3" (Talang Tegak) 128 m1 80534
3 Pipa Air (GIP) 3" (Talang Tegak) 128 m1 80534
3 Pipa Air (GIP) 3" (Talang Tegak) 128 m1 80534
4 Kolom pondasi 70/70 beton K225 0.98 m3 10485035.7
5 Urungan pasir 55.95 m3 178185.6
4 Daun bovenlis alumunium 24 bh 397755
4 Daun bovenlis alumunium 24 bh 397755
4 Daun bovenlis alumunium 24 bh 397755
4 Daun bovenlis alumunium 24 bh 397755
2 PasanganTegel Keramik tangga 30/30 62.3425 m2 147104.64
2 PasanganTegel Keramik tangga 30/30 62.3425 m2 147104.64
2 PasanganTegel Keramik tangga 30/30 62.3425 m2 147104.64
2 PasanganTegel Keramik tangga 30/30 62.3425 m2 147104.64
4 Pas. Tegel Keramik Tangga 30x30 62.34 m2 147104.64
4 Pas. Tegel Keramik Tangga 30x30 62.34 m2 147104.64
8 tegel list KM 64 m2 137989.5
6 Listplank beton t=10 cm beton K-225 5 m3 1591436.7
6 Pas. Tegel Keramik 20/25 Dinding KM 193.6 m2 40093.1
4 Air Kerja 1 ls 7600000
5 Pintu KM Aluminium 13 bh 545343
2 penangkal petir 1 unit 6699750
2 tegel dinding lif 60/60 ezensa 44 m2 147104.64
2 Galian tanah pondasi batu kali 244.06 m3 26496
18 Pemasangan AC / 1 PK/ Converter 24 set 265770
16 Pemasangan AC/ 1 PK 24 set 265770
16 Pemasangan AC/ 1 PK 24 set 265770
8 Panel dan Pintu Otomatis 265x295 1 set 6342333
10 Tegel dinding lift 44 m2 137989.5
10 Tegel dinding lift 44 m2 137989.5
8 Tegel dinding lift 44 m2 137989.5
8 Tegel dinding lift 44 m2 137989.5
8 Tegel dinding lift 44 m2 137989.5
8 Tegel dinding lift 44 m2 137989.5
6 Pintu KM Alumunium 11 bh 545343
6 Pintu KM Alumunium 11 bh 545343
6 Pintu KM Alumunium 11 bh 545343
6 Pintu KM Alumunium 11 bh 545343
3 List Bawah Aluminium Strip Brown 3" 377.2 m1 15345
3 List Bawah Aluminium Strip Brown 3" 377.2 m1 15345
3 List Bawah Aluminium Strip Brown 3" 377.2 m1 15345
2 Pemasangan Urinoir 3 bh 1763857
2 Pemasangan Urinoir 3 bh 1763857
2 Pemasangan Urinoir 3 bh 1763857
2 Pemasangan Urinoir 3 bh 1763857
2 Pemasangan Urinoir 3 bh 1763857
2 Pemasangan Urinoir 3 bh 1763857
6 Pitu Outdoor 8 bh 623555
6 Pitu Outdoor 8 bh 623555
7 Pintu Outdoor 8 bh 623555
7 Pintu Outdoor 8 bh 623555
7 Pintu Outdoor 8 bh 623555
7 Pintu Outdoor 8 bh 623555
4 Pas. Tegel Keramik 20/20 33 m2 149078.592
4 Pas. Tegel Keramik 20/20 33 m2 149078.592
4 Pas. Tegel Keramik 20/20 33 m2 149078.592
4 Pas. Tegel Keramik 20/20 33 m2 149078.592
3 List Bawah Aluminium Strip Brown 3" 304.6 m1 15345
5 Stepnosing Tangga 80.3 m2 54956.18592
5 Stepnosing Tangga 80.3 m2 54956.18592
3 Stepnosing tangga 80.3 m2 54956.18592
3 Stepnosing tangga 80.3 m2 54956.18592
3 Stepnosing tangga 80.3 m2 54956.18592
3 Stepnosing tangga 80.3 m2 54956.18592
4 pintu KM alumunium 8 bh 545343
5 Pas. Tegel Keramik 20/20 27 m2 158984.64
6 Pas. Tegel Keramik 20/20 27 m2 149078.592
6 Pas. Tegel Keramik 20/20 27 m2 149078.592
16 Sumur Bor air bersih 20m 2 unit 1926054
5 Pintu KM Aluminium 7 bh 545343
15 Pemasangan Downlight, 18 W 52 ttk 70664
14 Pemasangan Downlight, 18 W 52 ttk 70664
14 Pemasangan Downlight, 18 W 52 ttk 70664
14 Pemasangan Downlight, 18 W 52 ttk 70664
14 Pemasangan Downlight, 18 W 52 ttk 70664
14 Pemasangan Downlight, 18 W 52 ttk 70664
14 Pemasangan Downlight, 18 W 52 ttk 70664
10 Panel MDP 1 ttk 3453433
3 pasangan tegel keramik 30/30 62.34 m2 54956.18592
15 Sumur Resapan 2 bh 1699412.4
11 Pemasangan Wastafel TOTO 4 bh 845797
10 Pemasangan Wastafel TOTO 4 bh 845797
10 Pemasangan Wastafel TOTO 4 bh 845797
10 Pemasangan Wastafel TOTO 4 bh 845797
10 Pemasangan Wastafel TOTO 4 bh 845797
10 Pemasangan Wastafel TOTO 4 bh 845797
5 Pipa Air PVC 3" 40 m1 74496.9
4 Pipa Air PVC 3" 40 m1 74496.9
4 Pipa Air PVC 3" 40 m1 74496.9
4 Pipa Air PVC 3" 40 m1 74496.9
4 Pipa Air PVC 3" 40 m1 74496.9
4 Pipa Air PVC 3" 40 m1 74496.9
14 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302733.33333333
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302733.33333333
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302733.33333333
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302733.33333333
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302733.33333333
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302733.33333333
13 Pemasangan Lampu TL 2 x 20 W (RMI) 9 ttk 302733.33333333
6 Pemasangan Sklar Seri 25 ttk 104951
6 Pemasangan Sklar Seri 25 ttk 104951
6 Pemasangan Sklar Seri 25 ttk 104951
6 Pemasangan Sklar Seri 25 ttk 104951
6 Pemasangan Sklar Seri 25 ttk 104951
6 Pemasangan Sklar Seri 25 ttk 104951
6 Pemasangan Sklar Seri 25 ttk 104951
7 Pintu Shaft 4 bh 593883
7 Pintu Shaft 4 bh 593883
8 Pintu shaft 4 bh 593883
8 Pintu shaft 4 bh 593883
8 Pintu shaft 4 bh 593883
8 Pintu shaft 4 bh 593883
5 pintu Shaft 4 bh 593883
2 Instalasi Stop Kontak 51 ttk 45540
12 Pemasangan Stop Kontak 51 ttk 45540
2 Instalasi Stop Kontak 51 ttk 45540
11 Pemasangan Stop Kontak 51 ttk 45540
2 Instalasi Stop Kontak 51 ttk 45540
11 Pemasangan Stop Kontak 51 ttk 45540
2 Instalasi Stop Kontak 51 ttk 45540
11 Pemasangan Stop Kontak 51 ttk 45540
2 Instalasi Stop Kontak 51 ttk 45540
11 Pemasangan Stop Kontak 51 ttk 45540
2 Instalasi Stop Kontak 51 ttk 45540
11 Pemasangan Stop Kontak 51 ttk 45540
2 Instalasi Stop Kontak 51 ttk 45540
11 Pemasangan Stop Kontak 51 ttk 45540
17 Pompa Air Grunfos 2 bh 1075320
11 Panel SDP 1 ttk 2072059.8
10 Panel SDP 1 ttk 2072059.8
10 Panel SDP 1 ttk 2072059.8
10 Panel SDP 1 ttk 2072059.8
10 Panel SDP 1 ttk 2072059.8
10 Panel SDP 1 ttk 2072059.8
10 Panel SDP 1 ttk 2072059.8
9 Tegel List KM 64 m1 31348.1
9 Tegel List KM 64 m2 31348.1
7 Tegel List KM 64 m2 31348.1
7 Tegel List KM 64 m2 31348.1
7 Tegel List KM 64 m2 31348.1
7 Tegel List KM 64 m2 31348.1
3 Saluran terbuka U30 130 m1 14232
9 Pipa PVC Air Bersih 3/4" 18 m1 72121.752
8 Pipa PVC Air Bersih 3/4" 18 m1 72121.752
8 Pipa PVC Air Bersih 3/4" 18 m1 72121.752
8 Pipa PVC Air Bersih 3/4" 18 m1 72121.752
8 Pipa PVC Air Bersih 3/4" 18 m1 72121.752
8 Pipa PVC Air Bersih 3/4" 18 m1 72121.752
7 mur baut 1 ls 1284080
8 Pipa PVC Air Bersih 1" 30 m1 24801.2
7 Pipa PVC Air Bersih 1" 30 m1 24801.2
7 Pipa PVC Air Bersih 1" 30 m1 24801.2
7 Pipa PVC Air Bersih 1" 30 m1 24801.2
7 Pipa PVC Air Bersih 1" 30 m1 24801.2
7 Pipa PVC Air Bersih 1" 30 m1 24801.2
4 Instalasi Stop Kontak AC 16 ttk 45540
9 Pemasangan Stop Kontak AC 16 ttk 45540
4 Instalasi Stop Kontak AC 16 ttk 45540
9 Pemasangan Stop Kontak AC 16 ttk 45540
4 Instalasi Stop Kontak AC 16 ttk 45540
9 Pemasangan Stop Kontak AC 16 ttk 45540
4 Instalasi Stop Kontak AC 16 ttk 45540
9 Pemasangan Stop Kontak AC 16 ttk 45540
4 Instalasi Stop Kontak AC 16 ttk 45540
9 Pemasangan Stop Kontak AC 16 ttk 45540
4 Instalasi Stop Kontak AC 16 ttk 45540
9 Pemasangan Stop Kontak AC 16 ttk 45540
4 Instalasi Stop Kontak AC 16 ttk 45540
9 Pemasangan Stop Kontak AC 16 ttk 45540
17 Pemasangan Lampu Baret 20 W 3 ttk 160364.66666667
13 Kran dinding 1/2" 7 bh 67482.5
12 Kran dinding 1/2" 7 bh 67482.5
12 Kran dinding 1/2" 7 bh 67482.5
12 Kran dinding 1/2" 7 bh 67482.5
12 Kran dinding 1/2" 7 bh 67482.5
12 Kran dinding 1/2" 7 bh 67482.5
12 Floordrain 9 bh 45455
11 Floordrain 9 bh 45455
11 Floordrain 9 bh 45455
11 Floordrain 9 bh 45455
11 Floordrain 9 bh 45455
11 Floordrain 9 bh 45455
7 Pipa PVC Air Bersih 1 1/4" 12 m1 33791.2
6 Pipa PVC Air Bersih 1 1/4" 12 m1 33791.2
6 Pipa PVC Air Bersih 1 1/4" 12 m1 33791.2
6 Pipa PVC Air Bersih 1 1/4" 12 m1 33791.2
6 Pipa PVC Air Bersih 1 1/4" 12 m1 33791.2
6 Pipa PVC Air Bersih 1 1/4" 12 m1 33791.2
10 Pipa PVC Air Bersih 1/2" 24 m1 15631.2
9 Pipa PVC Air Bersih 1/2" 24 m1 15631.2
9 Pipa PVC Air Bersih 1/2" 24 m1 15631.2
9 Pipa PVC Air Bersih 1/2" 24 m1 15631.2
9 Pipa PVC Air Bersih 1/2" 24 m1 15631.2
9 Pipa PVC Air Bersih 1/2" 24 m1 15631.2
3 Instalasi Stop Kontak LCD 8 ttk 45540
8 Pemasangan Stop Kontak LCD 8 ttk 45540
3 Instalasi Stop Kontak LCD 8 ttk 45540
8 Pemasangan Stop Kontak LCD 8 ttk 45540
3 Instalasi Stop Kontak LCD 8 ttk 45540
8 Pemasangan Stop Kontak LCD 8 ttk 45540
3 Instalasi Stop Kontak LCD 8 ttk 45540
8 Pemasangan Stop Kontak LCD 8 ttk 45540
3 Instalasi Stop Kontak LCD 8 ttk 45540
8 Pemasangan Stop Kontak LCD 8 ttk 45540
3 Instalasi Stop Kontak LCD 8 ttk 45540
8 Pemasangan Stop Kontak LCD 8 ttk 45540
3 Instalasi Stop Kontak LCD 8 ttk 45540
8 Pemasangan Stop Kontak LCD 8 ttk 45540
6 Pipa Air PVC 4" 40 m1 8695.08
5 Pipa Air PVC 4" 40 m1 8695.08
5 Pipa Air PVC 4" 40 m1 8695.08
5 Pipa Air PVC 4" 40 m1 8695.08
5 Pipa Air PVC 4" 40 m1 8695.08
5 Pipa Air PVC 4" 40 m1 8695.08
19 Penyambungan Kabel Daya 1 ls 257888
16 Pemasangan Lampu Baret 40 W 1 ttk 240547
5 Pemasangan Saklar Engkel 2 ttk 104951
7 Pemasangan Saklar Hotel 2 ttk 104951
5 Pemasangan Saklar Engkel 2 ttk 104951
7 Pemasangan Saklar Hotel 2 ttk 104951
5 Pemasangan Saklar Engkel 2 ttk 104951
7 Pemasangan Saklar Hotel 2 ttk 104951
5 Pemasangan Saklar Engkel 2 ttk 104951
7 Pemasangan Saklar Hotel 2 ttk 104951
5 Pemasangan Saklar Engkel 2 ttk 104951
7 Pemasangan Saklar Hotel 2 ttk 104951
5 Pemasangan Saklar Engkel 2 ttk 104951
7 Pemasangan Saklar Hotel 2 ttk 104951
5 Pemasangan Saklar Engkel 2 ttk 104951
7 Pemasangan Saklar Hotel 2 ttk 104951
15 Pemasangan Lampu Baret 20 W 1 ttk 160364.66666667
15 Pemasangan Lampu Baret 20 W 1 ttk 160364.66666667
15 Pemasangan Lampu Baret 20 W 1 ttk 160364.66666667
15 Pemasangan Lampu Baret 20 W 1 ttk 160364.66666667
15 Pemasangan Lampu Baret 20 W 1 ttk 160364.66666667
15 Pemasangan Lampu Baret 20 W 1 ttk 160364.66666667
M Fajar Abrori
21401051013

JUMLAH

Rp2,017,716,759
Rp1,901,714,196
Rp1,796,289,049
Rp1,479,648,238
Rp1,479,648,238
Rp1,307,025,623
Rp1,307,025,623
Rp1,307,025,623
Rp1,307,025,623
Rp1,287,063,474
Rp1,150,837,518
Rp1,150,837,518
Rp1,150,837,518
Rp1,150,837,518
Rp901,350,885
Rp840,495,167
Rp840,495,167
Rp840,495,167
Rp840,495,167
Rp840,495,167
Rp840,495,167
Rp633,596,253
Rp633,596,253
Rp633,596,253
Rp633,596,253
Rp629,098,042
Rp596,306,112
Rp596,306,112
Rp596,306,112
Rp596,306,112
Rp596,306,112
Rp596,306,112
Rp591,880,265
Rp555,400,000
Rp521,762,946
Rp521,762,946
Rp521,762,946
Rp521,762,946
Rp494,823,257
Rp494,823,257
Rp460,577,102
Rp326,585,672
Rp280,981,010
Rp257,504,169
Rp237,445,289
Rp237,445,289
Rp237,445,289
Rp237,445,289
Rp233,140,976
Rp223,116,904
Rp223,116,904
Rp222,268,393
Rp222,110,009
Rp203,107,304
Rp203,107,304
Rp203,107,304
Rp203,107,304
Rp203,107,304
Rp203,088,090
Rp173,578,917
Rp173,578,917
Rp173,578,917
Rp173,578,917
Rp173,578,917
Rp173,578,917
Rp171,133,283
Rp162,619,600
Rp144,886,560
Rp143,366,084
Rp143,366,084
Rp143,366,084
Rp143,366,084
Rp131,935,499
Rp130,170,907
Rp130,170,907
Rp130,170,907
Rp130,170,907
Rp130,170,907
Rp124,859,105
Rp124,859,105
Rp124,859,105
Rp124,859,105
Rp124,859,105
Rp124,859,105
Rp122,946,283
Rp122,946,283
Rp122,035,332
Rp122,035,332
Rp122,035,332
Rp122,035,332
Rp122,035,332
Rp122,035,332
Rp118,589,022
Rp117,192,369
Rp111,785,472
Rp98,777,666
Rp95,371,137
Rp93,055,087
Rp86,072,426
Rp85,716,697
Rp84,480,882
Rp84,480,882
Rp84,480,882
Rp84,480,882
Rp82,905,091
Rp82,905,091
Rp82,905,091
Rp82,905,091
Rp82,905,091
Rp82,905,091
Rp81,998,438
Rp81,998,438
Rp81,998,438
Rp81,060,142
Rp79,573,782
Rp78,344,448
Rp76,755,421
Rp76,755,421
Rp76,755,421
Rp76,755,421
Rp71,160,980
Rp69,967,233
Rp69,780,410
Rp69,780,410
Rp69,780,410
Rp69,780,410
Rp69,780,410
Rp69,544,399
Rp68,332,032
Rp67,208,889
Rp66,479,335
Rp66,479,335
Rp61,566,615
Rp61,566,615
Rp61,566,615
Rp61,566,615
Rp58,473,576
Rp57,711,317
Rp57,711,317
Rp50,868,735
Rp50,837,243
Rp50,313,327
Rp49,926,603
Rp45,173,613
Rp43,027,457
Rp41,628,114
Rp41,101,340
Rp40,819,784
Rp40,819,784
Rp40,819,784
Rp40,819,784
Rp40,404,450
Rp39,466,994
Rp39,466,994
Rp38,945,606
Rp38,945,606
Rp36,551,358
Rp36,551,358
Rp36,551,358
Rp36,551,358
Rp36,228,117
Rp36,228,117
Rp36,228,117
Rp36,228,117
Rp36,228,117
Rp36,228,117
Rp34,097,494
Rp34,097,494
Rp34,097,494
Rp34,097,494
Rp34,097,494
Rp34,097,494
Rp34,097,494
Rp33,439,311
Rp32,811,267
Rp32,811,267
Rp32,575,644
Rp32,575,644
Rp32,490,096
Rp31,981,221
Rp31,981,221
Rp31,472,994
Rp31,472,994
Rp31,472,994
Rp31,472,994
Rp31,472,994
Rp31,472,994
Rp30,779,426
Rp30,779,426
Rp30,779,426
Rp30,779,426
Rp30,779,426
Rp30,779,426
Rp29,062,400
Rp29,062,400
Rp29,062,400
Rp29,062,400
Rp29,062,400
Rp29,062,400
Rp29,062,400
Rp28,667,067
Rp28,667,067
Rp28,667,067
Rp28,667,067
Rp27,298,230
Rp27,075,080
Rp25,470,331
Rp23,370,268
Rp23,370,268
Rp23,370,268
Rp23,370,268
Rp22,906,666
Rp22,840,782
Rp22,353,656
Rp22,353,656
Rp22,353,656
Rp22,353,656
Rp22,353,656
Rp22,353,656
Rp22,353,656
Rp20,000,000
Rp19,477,678
Rp19,343,338
Rp19,246,295
Rp19,052,309
Rp17,528,795
Rp17,393,736
Rp16,408,219
Rp16,408,219
Rp16,408,219
Rp16,408,219
Rp16,291,849
Rp16,245,048
Rp16,129,638
Rp16,042,800
Rp15,462,528
Rp15,264,152
Rp15,264,152
Rp15,264,152
Rp14,644,725
Rp14,644,725
Rp14,644,725
Rp14,644,725
Rp14,644,725
Rp14,644,725
Rp14,644,725
Rp14,524,374
Rp14,524,374
Rp14,524,374
Rp14,524,374
Rp14,524,374
Rp14,524,374
Rp12,756,960
Rp12,756,960
Rp12,756,960
Rp12,326,248
Rp12,116,960
Rp11,971,011
Rp11,490,173
Rp11,297,400
Rp10,888,142
Rp10,308,352
Rp10,308,352
Rp10,308,352
Rp10,308,352
Rp10,308,352
Rp10,275,335
Rp9,969,484
Rp9,546,120
Rp9,546,120
Rp9,546,120
Rp9,546,120
Rp9,170,871
Rp9,170,871
Rp9,170,871
Rp9,170,871
Rp9,170,503
Rp9,170,503
Rp8,831,328
Rp7,957,184
Rp7,762,024
Rp7,600,000
Rp7,089,459
Rp6,699,750
Rp6,472,604
Rp6,466,614
Rp6,378,480
Rp6,378,480
Rp6,378,480
Rp6,342,333
Rp6,071,538
Rp6,071,538
Rp6,071,538
Rp6,071,538
Rp6,071,538
Rp6,071,538
Rp5,998,773
Rp5,998,773
Rp5,998,773
Rp5,998,773
Rp5,788,134
Rp5,788,134
Rp5,788,134
Rp5,291,571
Rp5,291,571
Rp5,291,571
Rp5,291,571
Rp5,291,571
Rp5,291,571
Rp4,988,440
Rp4,988,440
Rp4,988,440
Rp4,988,440
Rp4,988,440
Rp4,988,440
Rp4,919,594
Rp4,919,594
Rp4,919,594
Rp4,919,594
Rp4,674,087
Rp4,412,982
Rp4,412,982
Rp4,412,982
Rp4,412,982
Rp4,412,982
Rp4,412,982
Rp4,362,744
Rp4,292,585
Rp4,025,122
Rp4,025,122
Rp3,852,108
Rp3,817,401
Rp3,674,528
Rp3,674,528
Rp3,674,528
Rp3,674,528
Rp3,674,528
Rp3,674,528
Rp3,674,528
Rp3,453,433
Rp3,425,969
Rp3,398,825
Rp3,383,188
Rp3,383,188
Rp3,383,188
Rp3,383,188
Rp3,383,188
Rp3,383,188
Rp2,979,876
Rp2,979,876
Rp2,979,876
Rp2,979,876
Rp2,979,876
Rp2,979,876
Rp2,724,600
Rp2,724,600
Rp2,724,600
Rp2,724,600
Rp2,724,600
Rp2,724,600
Rp2,724,600
Rp2,623,775
Rp2,623,775
Rp2,623,775
Rp2,623,775
Rp2,623,775
Rp2,623,775
Rp2,623,775
Rp2,375,532
Rp2,375,532
Rp2,375,532
Rp2,375,532
Rp2,375,532
Rp2,375,532
Rp2,375,532
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,322,540
Rp2,150,640
Rp2,072,060
Rp2,072,060
Rp2,072,060
Rp2,072,060
Rp2,072,060
Rp2,072,060
Rp2,072,060
Rp2,006,278
Rp2,006,278
Rp2,006,278
Rp2,006,278
Rp2,006,278
Rp2,006,278
Rp1,850,160
Rp1,298,192
Rp1,298,192
Rp1,298,192
Rp1,298,192
Rp1,298,192
Rp1,298,192
Rp1,284,080
Rp744,036
Rp744,036
Rp744,036
Rp744,036
Rp744,036
Rp744,036
Rp728,640
Rp728,640
Rp728,640
Rp728,640
Rp728,640
Rp728,640
Rp728,640
Rp728,640
Rp728,640
Rp728,640
Rp728,640
Rp728,640
Rp728,640
Rp728,640
Rp481,094
Rp472,378
Rp472,378
Rp472,378
Rp472,378
Rp472,378
Rp472,378
Rp409,095
Rp409,095
Rp409,095
Rp409,095
Rp409,095
Rp409,095
Rp405,494
Rp405,494
Rp405,494
Rp405,494
Rp405,494
Rp405,494
Rp375,149
Rp375,149
Rp375,149
Rp375,149
Rp375,149
Rp375,149
Rp364,320
Rp364,320
Rp364,320
Rp364,320
Rp364,320
Rp364,320
Rp364,320
Rp364,320
Rp364,320
Rp364,320
Rp364,320
Rp364,320
Rp364,320
Rp364,320
Rp347,803
Rp347,803
Rp347,803
Rp347,803
Rp347,803
Rp347,803
Rp257,888
Rp240,547
Rp209,902
Rp209,902
Rp209,902
Rp209,902
Rp209,902
Rp209,902
Rp209,902
Rp209,902
Rp209,902
Rp209,902
Rp209,902
Rp209,902
Rp209,902
Rp209,902
Rp160,365
Rp160,365
Rp160,365
Rp160,365
Rp160,365
Rp160,365

Anda mungkin juga menyukai