Kurva S
Kurva S
I II III IV V VI VII
JULI AGUSTUS SEPTEMBER
Bobot
No Item Pekerjaan Sat Volume 24/07/19 29/07/19 05/08/19 12/08/19 19/08/19 26/08/19 02/09/19
Kontrak
s/d s/d s/d s/d s/d s/d s/d
28/07/19 04/08/19 11/08/19 18/08/19 25/08/19 01/09/19 08/09/19
5 12 19 26 33 40 47
1 Pengukuran Kembali dan stake out Ls 1 0.76 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.07
0.95 0.95 0.95 1.90 1.90 1.90 3.79 3.79 1.90 0.95
0.17 0.17
0.20 0.20
0.10
Jannus Simanjuntak
Direktur Utama
PENAWARAN 144.63%
0.00%
115.57% rap
PAGU
KET.
-
100%
-
-
-
-
75%
-
-
-
50%
-
25%