PERHITUNGAN PLAT
RUKO JAKARTA
PEMBEBANAN
qu = 1.2 DL + 1.6 LL
t= 12 cm d= 10 cm
BEBAN SENDIRI PLAT T= 12 MM 288 KG/M²
BERAT PENUTUP LANTAI + PLESTERAN 75 KG/M²
BERAT PLAFON 20 KG/M²
BEBAN HIDUP 250 KG/M²
qu = 859.6 KG/M²
8.596 KN/M²
KODE RASIO lx ly MOMEN / koefisien Mu ρ min ρ max m ρ TABLE 5.1.bρ perlu Astl mm² tulangan perlu
B ly/lx 1.50 4.00 mlx 62 119.91 0.0025 0.0323 119.9142 0.0005 0.0025 250 Ø6 - 200 mlx
2.67 mly 14 27.08 0.0025 0.0323 27.0774 0.0005 0.0025 250 Ø6 - 200 mly
mtx 83 160.53 0.0025 0.0323 160.5303 0.0010 0.0025 250 Ø6 - 200 mtx
mty 51 98.64 0.0025 0.0323 98.6391 0.0005 0.0025 250 Ø6 - 200 mty
KODE RASIO lx ly MOMEN / koefisien Mu ρ min ρ max m ρ TABLE 5.1.bρ perlu Astl mm² tulangan perlu
C ly/lx 2.50 4.00 mlx 49 94.77 0.0025 0.0323 94.7709 0.0005 0.0025 250 Ø6 - 200 mlx
1.60 mly 15 29.01 0.0025 0.0323 29.0115 0.0005 0.0025 250 Ø6 - 200 mly
mtx 78 150.86 0.0025 0.0323 150.8598 0.0010 0.0025 250 Ø6 - 200 mtx
mty 54 104.44 0.0025 0.0323 104.4414 0.0005 0.0025 250 Ø6 - 200 mty
PEMBEBANAN
PERATURAN PEMBEBANAN INDONESIA UNTUK GEDUNG 1983
PPIUG - 1983
KOMBINASI PEMBEBANAN
25 502.40 1,130.40 2,009.60 3,140.00 4,521.60 5,306.60 8,038.40 11,335.40 15,197.60 19,625.00 32,153.60
50 251.20 565.20 1,004.80 1,570.00 2,260.80 2,653.30 4,019.20 5,667.70 7,598.80 9,812.50 16,076.80
75 167.47 376.80 669.87 1,046.67 1,507.20 1,768.87 2,679.47 3,778.47 5,065.87 6,541.67 10,717.87
100 125.60 282.60 502.40 785.00 1,130.40 1,326.65 2,009.60 2,833.85 3,799.40 4,906.25 8,038.40
125 100.48 226.08 401.92 628.00 904.32 1,061.32 1,607.68 2,267.08 3,039.52 3,925.00 6,430.72
150 83.73 188.40 334.93 523.33 753.60 884.43 1,339.73 1,889.23 2,532.93 3,270.83 5,358.93
175 71.77 161.49 287.09 448.57 645.94 758.09 1,148.34 1,619.34 2,171.09 2,803.57 4,593.37
200 62.80 141.30 251.20 392.50 565.20 663.33 1,004.80 1,416.93 1,899.70 2,453.13 4,019.20
225 55.82 125.60 223.29 348.89 502.40 589.62 893.16 1,259.49 1,688.62 2,180.56 3,572.62
250 50.24 113.04 200.96 314.00 452.16 530.66 803.84 1,133.54 1,519.76 1,962.50 3,215.36
275 45.67 102.76 182.69 285.45 411.05 482.42 730.76 1,030.49 1,381.60 1,784.09 2,923.05
300 41.87 94.20 167.47 261.67 376.80 442.22 669.87 944.62 1,266.47 1,635.42 2,679.47
325 38.65 86.95 154.58 241.54 347.82 408.20 618.34 871.95 1,169.05 1,509.62 2,473.35
350 35.89 80.74 143.54 224.29 322.97 379.04 574.17 809.67 1,085.54 1,401.79 2,296.69
375 33.49 75.36 133.97 209.33 301.44 353.77 535.89 755.69 1,013.17 1,308.33 2,143.57
400 31.40 70.65 125.60 196.25 282.60 331.66 502.40 708.46 949.85 1,226.56 2,009.60
425 29.55 66.49 118.21 184.71 265.98 312.15 472.85 666.79 893.98 1,154.41 1,891.39
450 27.91 62.80 111.64 174.44 251.20 294.81 446.58 629.74 844.31 1,090.28 1,786.31
475 26.44 59.49 105.77 165.26 237.98 279.29 423.07 596.60 799.87 1,032.89 1,692.29
500 25.12 56.52 100.48 157.00 226.08 265.33 401.92 566.77 759.88 981.25 1,607.68
525 23.92 53.83 95.70 149.52 215.31 252.70 382.78 539.78 723.70 934.52 1,531.12
550 22.84 51.38 91.35 142.73 205.53 241.21 365.38 515.25 690.80 892.05 1,461.53
575 21.84 49.15 87.37 136.52 196.59 230.72 349.50 492.84 660.77 853.26 1,397.98
600 20.93 47.10 83.73 130.83 188.40 221.11 334.93 472.31 633.23 817.71 1,339.73
REFERENSI
1 PERATURAN BETON INDONESIA 1971 (PBI-71)
2 TATA CARA PERHITUNGAN STRUKTUR BETON UNTUK BANGUNAN GEDUNG 1991
( SK SNI T-15 1991-03) DEPARTEMEN PEKERJAAN UMUM, BANDUNG
3 ANALISIS DAN PERANCANGAN STRUKTUR FRAME SAP 200 VERSI 7.42
4 PEDOMAN PERENCANAAN KETAHANAN GEMPA UNUTK RUMAH DAN GEDUNG 1987
( SKBI-1.353. ) DEPARTEMEN PEKERJAAN UMUM, BANDUNG
5 PERATURAN PEMBEBANAN INDONESIA UNTUK GEDUNG 1983
HASIL PENYELIDIKAN
PT. TARUMANEGARA BUMI YASA
PROYEK GEDUNG SESKOAL
TANGGAL FEBRUARI 2004
Qu TIANG = A X QC + O X fs
3 5
S-1 / KG 42,933.33 - -
BEBAN HIDUP
ASRAMA 250.00 kg/m²
L(M)
BEBAN MATI
LANTAI + PENUTUP + PLAFON 358.00 kg/m²
BEBAN
BATA 250.00 kg/m²
BEBAN
ATAP 50.00 kg/m²
L(M)
WL1 4.00 200.00
BEBAN ANGIN
40.00 KG/M2