II PEKERJAAN POLIKLINIK
1 Pas. Bata merah 1/2 bata cam 1:5 A.4.4.1.10 1.82 m2 135,927.33 247,387.74
2 Plesteran cam 1:5 tebal 15 mm A.4.4.2.5 3.64 m2 56,249.42 204,747.90
3 Pas. Keramik putih A.4.4.3.35b 1.82 m2 186,045.06 338,602.01
4 Pengecatan A.4.7.1.10 3.64 m2 19,981.41 72,732.32
JUMLAH 863,469.97
1
IX PEKERJAAN IPS
1 Galian tanah A.2.3.1.1 10.00 m3 19,981.41 199,814.07
2 urug pasir A.2.3.1.11 1.14 m3 261,578.70 298,199.72
3 Pas. Bata rollag A.4.4.1.4 6.00 m2 279,998.82 1,679,992.92
4 Pas. Beton sloof A.4.1.1.21 1.10 m3 256,663.02 282,329.32
5 Pas. Pembesian A.4.1.1.17 106.58 kg 14,204.12 1,513,874.58
6 Pas. Bekisting 2 x pakai A.4.1.1.21 5.80 m2 256,663.02 1,488,645.52
7 Rabat beton A.4.1.1.4 1.04 m3 1,024,148.98 1,065,114.94
8 Pas. Bata 1 : 5 A.4.4.1.10 43.00 m2 135,927.33 5,844,875.19
9 Plesteran A.4.4.2.5 86.00 m2 56,249.42 4,837,450.46
10 Acian A.4.4.2.27 99.00 m2 31,583.70 3,126,786.30
11 Pas. Pipa buangan A.5.1.1.31 4.00 m' 81,668.18 326,672.70
12 Pas. Atap galvalum A.4.7.1.4 24.00 m2 400,000.00 9,600,000.00
13 Pembersihan 1.00 Ls 74,167.19 74,167.19
JUMLAH 30,337,922.91
JUMLAH 88,600,000.00
Tulungagung, 2019
Dibuat oleh :
CV. UNGGUL ADIKARSA
YOYOK ANDRIANTO,ST
Direktur