REKAPITULASI

RENCANA ANGGARAN BIAYA (RAB) - PEKERJAAN MEKANIKAL ELEKTRIKAL

Pekerjaan :
Lokasi :
Tahun Anggaran : 2019

2.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

2.2.A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART 1,284,895,099.61

A.1. PEKERJAAN INSTALASI PLAMBING 413,072,685.03


I INSTALASI AIR BERSIH Rp 236,794,266.89
II INSTALASI AIR KOTOR & AIR BEKAS Rp 107,259,120.72
III INSTALASI AIR HUJAN Rp 55,868,371.23
IV INSTALASI VENT Rp 13,150,926.18

A.2. PEKERJAAN INSTALASI ELEKTRIKAL 871,822,414.58


I PEKERJAAN PANEL Rp 304,262,180.43
II PEKERJAAN INSTALASI KABEL FEEDER Rp 139,596,673.35
III PEKERJAAN KABEL LADDER (RAK KABEL) Rp 51,914,262.95
IV PEKERJAAN ARMATUR LAMPU, SAKLAR & STOP KONTAK Rp 136,325,764.15
V PEKERJAAN INSTALASI FINAL Rp 196,940,198.25
VI PEKERJAAN SISTEM PENTANAHAN Rp 12,380,872.95
VII PEKERJAAN PENANGKAL PETIR Rp 30,402,462.50

2.2.B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART 1,596,043,532.43

B.1. PEKERJAAN PEMADAM KEBAKARAN 68,969,051.01


I INSTALASI PEMIPAAN HYDRANT Rp 68,969,051.01
B.2. PEKERJAAN INSTALASI ELEKTRONIK 85,147,077.59
I PEKERJAAN SYSTEM TV Rp 28,626,227.37
II PEKERJAAN FIRE ALARM Rp 56,520,850.22
B.3. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN) 1,441,927,403.83
I PEKERJAAN INSTALASI PLAMBING Rp 682,748,831.50
II PEKERJAAN PEMADAM KEBAKARAN Rp 548,210,312.73
III PENYAMBUNGAN DAYA PLN Rp 192,000,000.00
IV PEKERJAAN INSTALASI KABEL FEEDER Rp 18,968,259.60

SUB TOTAL : 2,880,938,632.03