Anda di halaman 1dari 36

Project Title

Document Number
Pembangunan Flowline
BRG 35 136211-81-PL-03-ED-005

Author’s Organization

Engineering Team

Penelaahan Desain

Pembangunan Flowline
BRG 35

Approval Sheet

Name Title Signature

Astri Pujianto Asset 2 General Manager

Muhammad Amin Asset 2 Surface Facilities Manager

Iva Kurnia Mahardi Engineering Assistant Manager

Revision Status

Rev. Date By Check Approved Issue Purpose Remarks

0 ANS/ADV IKS IVA Issued for Construction


B ANS/ADV IKS IVA Issued for Approval
A ANS/ADV IKS IVA Issued for Review
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

DAFTAR ISI

DAFTAR ISI ............................................................................................................................... 2

DAFTAR GAMBAR .................................................................................................................. 3

DAFTAR TABEL ....................................................................................................................... 4

BAB I PENDAHULUAN ........................................................................................................ 5

1. Latar Belakang .......................................................................................................... 5


2. Ruang Lingkup Pekerjaan ......................................................................................... 7
3. Tujuan ....................................................................................................................... 7
4. Data Penelahaan Desain ............................................................................................ 7
BAB II HASIL PENELAAHAN DESIGN ............................................................................... 8

1. Pemenuhan Regulasi dan Keselamatan ..................................................................... 8


A. Regulasi Pengusahaan .......................................................................................... 8
B. Regulasi Keselamatan .......................................................................................... 8
2. Manajemen Risiko .................................................................................................... 9
3. Penggunaan Standar ................................................................................................ 10
4. Dokumen Lingkungan ............................................................................................. 11
5. Spesifikasi Teknis ................................................................................................... 11
6. Penerapan Kaidah Keteknikan ................................................................................ 11
A. Filosofi & Parameter Desain .............................................................................. 11
B. Teknologi yang Digunakan ................................................................................ 12
C. Sistem & Prosedur .............................................................................................. 12
D. Quality Assurance .............................................................................................. 13
E. Skema Operasi dan Serah Terima ...................................................................... 13
7. Pemanfaatan Barang, Jasa, Teknologi dan Kemampuan Rekayasa Rancang
Bangun Dalam Negeri ............................................................................................. 13
BAB III KESIMPULAN ......................................................................................................... 15

LAMPIRAN I .................................................................................................................. 16
LAMPIRAN II ................................................................................................................ 19
LAMPIRAN III ............................................................................................................... 22
LAMPIRAN IV ............................................................................................................... 27

2 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

DAFTAR GAMBAR

Gambar 1. Forecast Gas Delivery Struktur Beringin A ....................................................................5

Gambar 2. Layout lapangan Beringin ................................................................................................6

Gambar 3. Layout Flowline BRG 35 to SP BRG A ...........................................................................6

3 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

DAFTAR TABEL

Tabel 1. Dokumen engineering ................................................................................................ 9

Tabel 2. Standar/Kode yang digunakan................................................................................ 10

Tabel 3. Spesifikasi Flowline .................................................................................................. 11

Tabel 4. Prosedur konstruksi dan instalasi........................................................................... 12

Tabel 5. Dokumen terkait Quality Assurance ....................................................................... 13

Tabel 7. Komitmen TKDN ..................................................................................................... 14

4 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

BAB I
PENDAHULUAN

1. Latar Belakang
Sesuai dengan persetujuan POFD lapangan Beringin (BRG) A akan dikembangkan dengan
target produksi 20 mmscfd. Lapangan Beringin A merupakan wilayah kerja Field Prabumulih
yang terletak kurang lebih 30 m dari kota Prabumulih.
Dengan target Produksi Gas dari lapangan Beringin A sebesar 20 mmscfd belum tersedia
fasilitas untuk mengalirkan produksi gas dari sumur ke stasiun pengumpul sehingga diperlukan
pembangunan pipa flowline dari sumur BRG 35 ke SP Beringin A yang kemudian akan di kirim
ke SP Beringin D untuk kemudian dijual ke konsumen di Sumatera Selatan. Berikut adalah
forecast gas delivery struktur Beringin A ditunjukkan pada gambar 1.

Gambar 1. Forecast Gas Delivery Struktur Beringin A

Titik koordinat sumur BRG 35 pada X: 415188.00 dan Y: 9586114.00, titik koordinat SP
Beringin A (BRG A) pada X: 415705.49 dan Y: 9546434.05. Berdasarkan layout pemasangan
Flowline dari sumur BRG 35 ke SP BRG A, didapatkan panjang Flowline 635 meter dengan
diameter pipa 4 inch dan ketebalan 0.337 inch/ schedule 80 (sesuai dengan hasil perhitungan/
engineering calculation)

5 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

Gambar 2. Layout lapangan Beringin

Gambar 3. Layout Flowline BRG 35 to SP BRG A

6 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

Sesuai dengan rencana pembangunan Flowline dari sumur BRG 35 ke SP Beringin A terbagi
menjadi pipa underground dan aboveground hanya pada ujung flowline sebelum tie-in ke
header flowline sesuai dengan ROW PT. Pertamina EP Asset 2, dengan lingkungan
perkebunan di sekitar ROW pipa sehingga secara design dikelompokkan menjadi class 2 dan
safety factornya adalah 0.6.

2. Ruang Lingkup Pekerjaan


Lingkup pekerjaan untuk proyek ini mencakup Flowline gas 4” sepanjang 635 m dari Sumur
BRG 35-SP BRG A Field Prabumulih, yang seluruhnya berada di darat. Panjang pipa akhir
akan ditentukan selama studi rute pipa.
Batas-batas untuk Flowline gas adalah block valve 4” di Sumur BRG 35 sampai dengan titik
tie-in pada block valve 4” di SP BRG A.

3. Tujuan
Tujuan dari penelahaan desain ini adalah untuk dilakukannya review dan laporan ke Ditjen
Migas sesuai dengan Peraturan Menteri ESDM No. 14 th 2014 mengenai Pemeriksaan
keselamatan Instalasi dan Peralatan pada Kegiatan Usaha Minyak dan Gas Bumi, yang
menyatakan bahwa fasilitas yang didesain oleh Pertamina EP Asset 2 sudah memenuhi
Peraturan atau Regulasi Migas Indonesia dan telah dirancang sesuai dengan standard, code dan
spesifikasi yang berlaku.

4. Data Penelahaan Desain


Data data dan dokumen referensi untuk penelahaan desain sudah tercakup pada dokumen
engineering yang sudah dilaksanakan oleh Pertamina EP Asset 2 sebagai pemilik proyek.

7 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

BAB II
HASIL PENELAAHAN DESAIN

1. Pemenuhan Regulasi dan Keselamatan

A. Regulasi Pengusahaan

Untuk menunjang proyek pembangunan Flowline gas sepanjang 635 m dari Sumur BRG 35
– SP BRG A Field Prabumulih, Pertamina EP Asset 2 mengacu kepada regulasi sesuai
dengan Undang-Undang, Peraturan Ditjen Migas, Peraturan Pemerintah, Peraturan
Kementrian Lingkungan Hidup serta Peraturan Kementrian Perhubungan yang berlaku
diantaranya :
a. UU No 22 Tahun 2001 tentang Minyak dan Gas Bumi
b. UU No 32 Tahun 2009 Tentang Perlindungan dan Pengelolaan Lingkungan Hidup.
c. Peraturan Pemerintah No 35 Tahun 2004 tentang kegiatan Hulu Minyak dan Gas Bumi
sebagaimana telah diubah dengan Peraturan Pemerintah No 55 Tahun 2009.
d. Peraturan Presiden Republik Indonesia No. 9 Tahun 2013 tentang Penyelenggaraan
Pengelolaan Kegiatan Usaha Hulu Minyak dan Gas Bumi.
e. Keputusan Menteri Pertambangan dan Energi No 300.K/34/N.PE/1997 tentang
Keselamatan Kerja Pipa Penyalur Minyak dan Gas Bumi.
f. Kontrak Kerjasama KKKS Pertamina EP dengan BP Migas (SKK Migas) tanggal 13
September Tahun 2005.
g. Peraturan Menteri Perindustrian Republik Indonesia Nomor 16/M-IND/PER/2/2011
tentang Ketentuan dan Tata Cara Penghitungan Tingkat Komponen dalam Negeri.
h. Peraturan Menteri Energi dan Sumber Daya Mineral Republik Indonesia Nomor 15
tahun 2013 tentang Penggunaan Produk dalam Negeri pada Kegiatan Usaha Hulu
Minyak dan Gas Bumi.

B. Regulasi Keselamatan

Regulasi Keselamatan mengacu pada Permen No 14 Tahun 2014 Mengenai Pemeriksaan


Keselamatan Instalasi dan Peralatan Pada Kegiatan Usaha Minyak dan Gas Bumi, dan
untuk melakukan desain serta sertifikasi kelayakan mengacu pada :
a. Keputusan Menteri Pertambangan dan Energi No 300.K/34/N.PE/1997 tentang
Keselamatan Kerja Pipa Penyalur Minyak dan Gas Bumi.
b. Dokumen engineering yang telah disetujui dan akan diimplementasikan dalam proyek
ini (terlihat pada item No 3 Penggunaan Standard)

8 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

2. Manajemen Risiko
Identikasi Bahaya, Penilaian Risiko, Mitigasi Risiko, Detail Keselamatan Proses, Dokumen
Lingkungan telah dilakukan analisa terhadap risiko-risiko terkait pekerjaan dan operasi serta
lingkungan hidup dan telah dibuatkan dalam dokumen-dokumen risk matrix dan AMDAL pada
fase engineering dengan dokumen-dokumen seperti di bawah ini :
 Dokumen engineering

Tabel 1. Dokumen engineering

No Document Number Document Name

Pipe Sizing and Wall Thickness Calculation


1
136211-81-PL-03-CS-005 Flowline Gas BRG 35- SP BRG A

2
136211-81-PL-02-DS-005 Flowline Gas BRG 35 – SP BRG A Datasheet

5 BRG-PIP-DWG-011 Isomectric Satellite Manifold Beringin A

6 BRG-PIP-DWG-012 Piping Plan Satellite Manifold Beringin A

7 BRG-PIP-DWG-013 Piping Section Satellite Manifold Beringin A

4 BRG-PIP-DWG-015 Piping Plan 4” sch 80 Flowline BRG 35

9 BRG-PIP-DWG-018 Isometric 4” sch 80 Flowline BRG 35

10 BRG-PIP-DWG-021 Section & Detail 4” sch 80 Flowline BRG 35

 Dokumen AMDAL

Dokumen terkait dengan Lingkungan adalah sesuai dengan dokumen AMDAL yang
dimiliki Pertamina EP Asset 2 dengan nomor 02.74.10 Tahun 2014.

9 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

3. Penggunaan Standar
Dalam mendesain Flowline mengacu pada dokumen engineering dan standar seperti pada table
di bawah ini:

Tabel 2. Standar/Kode yang digunakan

 ASME B31.8 : Gas Transmission & Distribution Piping


Pipe Line
Systems

 API STD.1104 : Standard for Welding Pipeline and


Welding
Related Facilities

 API 5L : Specification for Line Pipe

 API 6D : Specification for Pipeline Valve

 API Std 604 : Metal Ball Valves-Flanged, Threaded and


Welding End

 API Std 600 : Steel Gate Valves-Falnged and Butt-welding


Ends, Bolted Bonnets

 ASTM A106 : Standard Specification for Seamless Carbon


Steel Pipe for High-Temperature Service

 ASTM A234 : Standard Specification for Piping Fittings of


Wrought Carbon Steel and Alloy Steel for Moderate and
High Temperature Service

Material  ASTM A105 : Standard Specification for Carbon Steel


Forgings for Piping Applications

 ASTM A193 : Standard Specification for Alloy Steel and


Stainless Steel Bolting for High Temperature or High
Pressure Service and Other Special Purpose Applications

 ASTM A194 : Standard Specification for Carbon and


Alloy Steel Nuts for Bolts for High Pressure or High
Temperature Service

 ASMEB16.5 : Pipe Flanges and Flanged Fittings

 ASMEB16.20 : Metalic Gasket for Pipe Flange-Ring Joint,


Spriral Wound and Jacketed

 ASMEB36.10M : Welded and Seamless Wrought Butt


Welding Fitting

10 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

 ASME B-16.21 : Non-metallic Flat Gaskets for Pipe


Flanges

4. Dokumen Lingkungan
Dokumen terkait dengan Lingkungan adalah sesuai dengan dokumen AMDAL yang dimiliki
Pertamina EP Asset 2 Prabumulih Field dengan nomor 02.74.10 Tahun 2014.

5. Spesifikasi Teknis
Spesifikasi teknis Flowline yang digunakan seperti pada table 3 di bawah ini:

Tabel 3. Spesifikasi Flowline

Panjang Diameter Tekanan Operasi


No Flowline Gas
(m) (inch) (psi)

Flowline Gas BRG


1 635 4 (schedule 80) 683
35 – SP BRG A

6. Penerapan Kaidah Keteknikan

A. Filosofi & Parameter Desain

Tujuan dari proyek ini adalah pembangunan Flowline untuk mengalirkan fluida gas sampai
ke konsumen.

Parameter operasi untuk mendesain Flowline gas yaitu:

 Flow rate gas 6.7 MMSCFD

 Design pressure 1024 psi

Umur layan desain minimum dalam mendesain Flowline adalah 20 tahun, perhitungan
service life dalam dokumen 136211-81-PL-03-CS-005 untuk Flowline, jika pemeliharaan
dilakukan dengan baik.

Untuk proteksi keselamatan menggunakan block valve di sumur BRG 35 dan SP BRG A.

11 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

B. Teknologi yang Digunakan

Metode instalasi pipa menggunakan teknologi yang dapat dijelaskan secara singkat seperti
berikut ini:

a. Pengelasan pipa untuk Flowline menggunakan proses pengelasan SMAW (shielded


metal arc welding).

b. Penggalian untuk road crossing menggunakan proses penggalian secara manual dan
menggunakan alat berat excavator dengan metode open cut atau dengan pengeboran
horizontal menggunakan alat Auger Boring.

c. Coating pipa menggunakan coating tape dan cathodic protection menggunakan


sacrificial anode (magnesium) untuk pipa di bawah tanah serta cat enamel untuk pipa di
atas tanah.

d. Instalasi Pipeline menggunakan cara lay down di atas pipe sleeper dengan safe span
sepanjang 6 meter. Untuk road crossing menggunakan casing protector dengan
centralizer.

C. Sistem & Prosedur

Sistem dan prosedur kerja mencakup dokumen-dokumen prosedur instalasi Flowline yang
akan dilaksanakan dalam proyek ini, dokumen-dokumen tersebut mencakup diantaranya :

Tabel 4. Prosedur konstruksi dan instalasi

No Document Number Document Name

1 B-023/EP5000/2010-S0 QA/QC HSE Konstruksi Pipa Penyalur

2 004/SOP_KJDM/XII/2017 Pipeline Installation Procedure

3 003/SOP_KJDM/XII/2017 Holiday Test Procedure

4 001/SOP_KJDM/XII/2017 Hydrotest Procedure

5 001/SOP_KJDM/XII/2017 Pigging Procedure

6 002/SOP_KJDM/XII/2017 Purging and Tie-in Procedure

7 SOP-CP-KJDM-XII-2016 SOP Chatodic Protection

12 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

D. Quality Assurance

Untuk memastikan bahawa pekerjaan yang dilaksanakan sesuai dengan regulasi Migas,
spesifikasi, standard dan code maka dalam pekerjaan ini telah disusun dokumen-dokumen
terkait Quality Assurance diantaranya :

Tabel 5. Dokumen terkait Quality Assurance

No Document Number Document Name

 006/WPS/PEP/API 1104-B/11

 006/PQR/PEP/API 1104-B/11 WPS PQR For Pipeline (API 1104,


1
SMAW)
 007/WPS/PEP/API 1104-B/11

 007/PQR/PEP/API 1104-B/11

2 001/ITP_KJDM/XII/2017 Inspection and Test Plan

E. Skema Operasi dan Serah Terima


Serah terima kepada pihak Operasi akan dilakukan setelah semua peralatan telah diuji
dengan layak dan sesuai dengan persyaratan dalam spesifikasi atau prosedur pengetesan.

7. Pemanfaatan Barang, Jasa, Teknologi dan Kemampuan Rekayasa Rancang Bangun


Dalam Negeri

Untuk mencapai TKDN maka Pertamina EP Asset 2 sebagai pemilik proyek akan berkomitmen
pada saat proses pengadaan barang jasa yang akan mengutamakan kemampuan dalam negeri
diantaranya :

1. Bekerjasama dengan Perusahaan Lokal / Indonesia untuk menyerap tenaga kerja dengan
kewarganegaraan Indonesia.

2. Mengutamakan pembelian material dari dalam Negeri seperti pipa yang sudah dapat
diproduksi di dalam Negeri.

Dasar penentuan target pencapaian mempertimbangkan peraturan serta aspek sebagai berikut:

- Peraturan Menteri Perindustrian Republik Indonesia Nomor 16/M-IND/PER/2/2011 tentang


Ketentuan dan Tata Cara Penghitungan Tingkat Komponen dalam Negeri.

- Peraturan Menteri Energi dan Sumber Daya Mineral Republik Indonesia Nomor 15 tahun
2013 tentang Penggunaan Produk dalam Negeri pada Kegiatan Usaha Hulu Minyak dan
Gas Bumi.

13 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

- Pedoman Tata Kerja SKK Migas Nomor: PTK-007/SKMA0000/2017/S0 (Revisi-04).

Berdasarkan rencana pembangunan Flowline gas sepanjang 635 m dari Sumur BRG 35 – SP
BRG A Field Prabumulih, total pembelanjaan dan pengadaan target persentase Tingkat
Komponen Dalam Negeri (TKDN) yang telah ditetapkan disajikan dalam Tabel berikut ini:

Tabel 6. Komitmen TKDN

Presentasi TKDN Batasan

No TKDN Minimal
Material dan
TKDN
Jasa

Pembangunan Flowline gas sepanjang 635 m dari


1 100 % 100 % *
Sumur BRG 35 – SP BRG A Field Prabumulih

* Material pipa disupply dari PT. Pertamina EP Asset 2

14 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

BAB III
KESIMPULAN

Pertamina EP Asset 2 telah memenuhi kajian penelahaan disain sesuai dengan Peraturan atau
Regulasi Migas Peraturan Menteri ESDM No. 14 tahun 2014 mengenai Pemeriksaan keselamatan
Instalasi dan Peralatan pada Kegiatan Usaha Minyak dan Gas Bumi dan telah dirancang sesuai
dengan standar, kode dan spesifikasi yang berlaku.

Pertamina EP Asset 2 telah memaparkan dokumen-dokumen terkait dengan persyaratan penelahaan


yaitu dokumen HSE, AMDAL dan dokumen yang terkait dengan kaidah keteknikan (engineering).

15 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

LAMPIRAN I

16 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

17 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

18 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

LAMPIRAN II

19 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

20 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

21 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

LAMPIRAN III

22 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

23 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

24 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

25 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

26 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

LAMPIRAN IV

27 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

28 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

29 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

30 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

31 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

32 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

33 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

34 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

35 PERTAMINA EP ASSET 2
PENELAHAAN DESIGN PEMBANGUNAN FLOWLINE GAS
SEPANJANG 635 M DARI BRG 35-SP BRG A FIELD PRABUMULIH

36 PERTAMINA EP ASSET 2

Anda mungkin juga menyukai