HASIL PERHITUNGAN CUT & FILL AREA PERGUDANGAN PT.

KALAMUR

I. Lokasi Alternatif I
Volume Galian = 411.503,48 m³.
Volume Timbunan = 369.522,90 m³.
Sisa Galian = 42.380 m³.

II. Lokasi Alternatif II


Volume Galian = 569.364,85 m³.
Volume Timbunan = 573.821,05 m³.
Sisa Galian = - 4.456,20 m³.

III. Lokasi Alternatif III


Volume Galian = 952.057,17 m³.
Volume Timbunan = 494.069,22 m³.
Sisa Galian = 457.967,95 m³.