Anda di halaman 1dari 5

LAMPIRAN II

REALISASI BELANJA MODAL DAN REALISASI BELANJA BARANG/JASA PADA SKPD TA. 2017
1. BELANJA MODAL
NAMA SKPD :

JENIS JANGKA WAKTU REALISASI (%)


NO. REKANANAN NO / TGL KONTRAK NILAI PAGU NILAI KONTRAK
PEKERJAAN
MULAI SELESAI FISIK KEUANGAN % NILAI
1 2 3 4 7 5 6 7 8 9 11 12

Pengadaan Toko Foto 094/20/PK


1 Printer Indah M-LBL/V/ 15/5/2017 6,000,000 6,000,000 15/5/2017 13/6/2017 100% 6,000,000 100% 6,000,000
Epson
Penyedian Ereke 2017
Peralatan
094/15/PK
2 Perlindunga UD.Velin 2/5/2017 7,500,000 7,500,000 2/5/2017 31/5/2017 100% 7,500,000 100% 7,500,000
M-LBL/V/
n (Terali
2017
Besi)
Pengadaan 440/001/S
Gedung CV.Dedep PK/PKM-
3 ### 54,500,000 ### 3/15/2017 6/3/2017 100% ### 100% ###
garasi/pool Pratama LBL/IV/20
permanen 17
094/090.a
CV.Lauta
Pengadaan /NP/Pusk.
4 n Maju 8/1/2017 10,000,000 ### 8/1/2017 9/1/2017 100% ### 100% ###
KWH Listrik LMBL/VIII/
Elektirkal
2017
027/290.
Pengadaan Toko Foto
D/PKM-
5 Laptop dan Indah ### 19,000,000 ### 11/1/2017 11/6/2017 100% ### 100% ###
LBL/XI/20
Printer Ereke
17

Harap di isi dengan semua kontrak baik anggaran belanja barang, belanja modal, kontrak yang melalui pelelalangan ataupun kontrak penunjukan langsung
LAMPIRKAN :
1. BERITA ACARA SERAH TERIMA BARANG DARI REKANAN KE SEKRETARIAT DPRD
2. KONTRAK
3. NOTA PESANAN
4. BERITA ACARA PEMBAYARAN
MODAL DAN REALISASI BELANJA BARANG/JASA PADA SKPD TA. 2017

SP2D BAST I (PHO) BAST II (FHO)


KET
NO. TGL JUMLAH (Rp) NO. TGL NO. TGL
10 11 12 13 14 15 16 17

01133/1.02.01.05/SP2D/2017
6/8/17 6,000,000 Pek. Selesai

01132/1.02.01.05/SP2D/2017
6/8/17 7,500,000 Pek. Selesai

05091/1.02.01.05/SP2D/2017
12/22/17 54,500,000 Pek. Selesai

03375/1.02.01.05/SP
10/18/17 10,000,000 Pek. Selesai
2D/2017

- - 19,000,000 Pek. Selesai


2. BELANJA BARANG/JASA
SKPD:
Belanja Langsung

Belanja Sewa Belanja


Belanja Perawatan Belanja Cetak Belanja Sewa Belanja Sewa Belanja
Belanja Bahan Belanja Belanja Jasa Belanja Premi Belanja Sewa Perlengkapan Pakaian
No. Uraian Kendaraan dan Rumah/Gedung Sarana Makan dan
Pakai Habis Bahan/Material Kantor Asuransi Alat Berat dan Peralatan Dinas dan
Bermotor Penggadaan /Gudang/Parkir Mobilitas Minum
Kantor Atributnya

5.2.2.01 5.2.2.02 5.2.2.03 5.2.2.04 5.2.2.05 5.2.2.06 5.2.2.07 5.2.2.08 5.2.2.09 5.2.2.10 5.2.2.11 5.2.2.12
1 2 3 4 5 6 7 8 9 10 12 13 14 15
1 Anggaran
2 Realisasi
Belanja Kursus,
Belanja Tambahkan
Belanja Belanja Pakaian Belanja Pelatihan, Belanja Belanja Belanja
Beasiswa Belanja juga belanja
Pakaian Khusus dan Hari- Perjalanan Sosialisasi dan Perjalanan Pemulangan Jasa Jumlah
Pendidikan Pemeliharaan lain jika belum
Kerja hari tertentu Dinas Bimbingan Teknis Pindah Tugas Pegawai Konsultansi
PNS ada
PNS

5.2.2.13 5.2.2.14 5.2.2.15 5.2.2.16 5.2.2.17 5.2.2.18 5.2.2.19 5.2.2.20 5.2.2.21


16 17 18 19 20 21 22 23 24 25
-
-

Anda mungkin juga menyukai