NO URAIAN PEKERJAAN
A
Kode Rekening 5.2.3.26.21 Belanja Modal Pengadaan Konstruksi/ Pembelian Taman
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
III PEKERJAAN TAMAN
IV PEKERJAAAN PERPUSTAKAAN
V PEKERJAAN MUSHOLA
VI PEKERJAAN TOILET
VII PEKERJAAN PENTAAAN DANAU
VIII PEKERJAAN JALAN SETAPAK DAN AREA PARKIR
IX PEKERJAAN TUGU HUTAN KOTA BAMBU MUNJUL
X PEKERJAAN INSTALASI AIR BERSIH
XI PEKERJAAN RUMAH BURUNG
JUMLAH (A)
JUMLAH (B) = A X 10%
JUMLAH (C) = A + B
B Kode Rekening 5.2.2.03.03 Belanja Listrik
I PEKERJAAN SAMBUNGAN LISTRIK (D)
TOTAL HARGA = C + D
DIBULATKAN
MUHTAR
Direktur
Rincian Kegiatan : Pembangunan RTH
inistratif Jakarta Timur
aman
n Taman
79.327.602,90 46,168,664.89
323.564.171,33 #VALUE!
12.978.213,08 #VALUE!
274.864.555,07 #VALUE!
193.765.922,06 #VALUE!
46.856.780,80 #VALUE!
815.863.607,29 #VALUE!
1.001.483.619,43 #VALUE!
81.986.276,81 #VALUE!
23.614.931,78 #VALUE!
77.531.846,78
#VALUE!
-
2.931.837.527,34 #VALUE!
293.183.752,73
3.225.021.280,08
8.596.500,00
3.233.617.780,08
3.233.617.000,00
NO URAIAN PEKERJAAN SAT VOL
V PEKERJAAN MUSHOLA
a Pekerjaan Persiapan
Pek. Pasangan Bouplank1 M Pengukuran Dan Pemasangan Bowplank (Untuk m1 32,00
Pembangunan
b Pekerjaan Galian Urugan
Gedung)
1 M3 Pekerjaan Galian Tanah Biasa Sedalam 1 Meter m3 0,43
c Pekerjaan Pasangan
1 1 M3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc 3 Pp) m3 4,08
2 Kayu Rimba Campuran Basah Spesifikasi Balok Uk. 8X12X400 Cm Gelagar Bawah m3 0,93
3 Kayu Rimba Campuran Basah Spesifikasi Balok Uk. 8X12X400 Cm Tiang m3 0,80
4 1 M2 Pekerjaan Pasangan Lantai Papan Kayu Jati m2 48,50
5 1 M2 Pekerjaan Pasang Dinding Lambrisering Dari Papan Kayu Kelas I m2 80,00
6 1 M2 Pembuatan Pagar Sementara Dari Kayu (Pagar Kayu Ornamen Betawi) m2 0,21
7 1 M2 Pekerjaan Pemasangan Batu Bata Merah Tbl 1/2 Bata (1 Pc 2 Ps) m2 6,00
8 1 M2 Pekerjaan Plesteran 1 Pc 2 Ps Tebal 15 Mm m2 12,00
9 1 M2 Pekerjaan Acian m2 12,00
10 1 M2 Pemasangan Paving Block m2 10,00
d Pekerjaan Atap
1 1 M2 Pekerjaan Pasang Rangka Atap Genteng Keramik m2 52,90
2 1 M2 Pekerjaan Pasang Atap Genteng Keramik m2 52,90
3 1 M Pekerjaan Pasang Nok Genteng Keramik m1 7,00
4 1 M2 Pekerjaan Pasang Rangka Plafond m2 137,00
5 1 M Pekerjaan Pasang List Plafond Kayu Profil m1 84,00
6 1 M Pekerjaan Pasang Listplank Profil Grc Motif m1 20,00
e Pekerjaan Kusen
1 1 M3 Pekerjaan Kusen Pintu/Jendela Kayu Kelas II (Pek. Kusen Kayu P1) m3 1,00
2 1 M3 Pekerjaan Kusen Pintu/Jendela Kayu Kelas II (Pek. Kusen Kayu P2) m3 3,00
3 1 M3 Pekerjaan Kusen Pintu/Jendela Kayu Kelas II (Pek. Kusen Kayu J1) m3 3,00
f Pekerjaan Instalasi Listrik
1 Box MCB Spesifikasi 3 Group unit 1,00
2 Pas. Mcb spesifikasi standara pin 3 phase 10A bh 1,00
3 1 Titik Pemasangan Instalasi Lampu Kabel NYM 2 x 1,5 mm2 titik 8,00
4 1 Titik Pemasangan Saklar Ganda 1 Way titik 3,00
5 1 Titik Pemasangan Saklar Tunggal 1 Way titik 2,00
6 Lampu Led Spesifikasi 18 W bh 8,00
7 Stopkontak bh 4,00
g Pekerjaan Penyelesaian
1 M2 Pekerjaan Pelaburan Bidang Kayu Dengan Pelitur m2 128,50
h Pekerjaan Instalasi Air
1 1 M Pekerjaan Pasang Pipa Pvc Type Aw Dia. 2 m1 18,00
2 1 M Pekerjaan Pasang Pipa Pvc Type Aw Dia. 1 1/2 m1 17,00
3 1 M Pekerjaan Pasang Pipa Pvc Type Aw Dia. 1 m1 15,00
4 Tee dia. 2 x 2 x 2 bh 3,00
5 Elbow 1-1/2 Spesifikasi Type AW bh 3,00
6 Elbow 1 Spesifikasi Type AW bh 3,00
7 Kran Air Tembok Spesifikasi 0.5 Inch bh 6,00
i Pekerjaan Penyelesaian
1 1 M2 Pekerjaan Pengecatan Interior Tembok Baru Dinding m2 0,21
2 1 M2 Pekerjaan Pengecatan Plafond m2 3,00
3 1 M2 Pekerjaan Pengecatan Bidang Kayu Baru 2 Lapis Cat Penutup m2 28,00
VI PEKERJAAN TOILET
Pekerjaan Toilet Umum dan Pos Jaga
1 Pekerjaan Persiapan
Pek. Pasangan Bouplank1 M Pengukuran Dan Pemasangan Bowplank (Untuk m1 10,50
Pembangunan
2 Pekerjaan
Gedung) Tanah
1 M3 Pekerjaan Galian Tanah Biasa Sedalam 1 Meter m3 3,78
1 M3 Pekerjaan Pengurugan Kembali Galian Tanah Biasa Sedalam 1 M m3 1,26
3 Pekerjaan Pondasi
1 M3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc 4 Pp) m3 2,62
4 Pekerjaan Beton
1 M3 Membuat Sloof Beton Bertulang (200 Kg Besi+Bekisting)15/20 m3 0,31
1 M3 Membuat Kolom Beton Bertulang (300 Kg Besi+Bekisting)15/20 m3 0,43
1 M3 Membuat Balok Beton Bertulang (200 Kg Besi+Bekisting) 15/20 m3 0,31
5 Pekerjaan Pasangan
1 M2 Pekerjaan Pemasangan Batu Bata Merah Tbl 1/2 Bata (1 Pc 2 Ps) m2 28,50
1 M2 Pekerjaan Plesteran 1 Pc 2 Ps Tebal 15 Mm m2 57,00
1 M2 Pekerjaan Acian m2 57,00
NO URAIAN PEKERJAAN SAT VOL
6 Pekerjaan Lantai
1 M2 Pekerjaan Pasangan Lantai Keramik Ukuran 30X30 Cm m2 1,50
7 Pekerjaan Plafond
1 M2 Pekerjaan Pasang Plafond Gypsum Board Tebal 9 Mm m2 4,50
1 M2 Pasang Rangka Plafond Besi Hollow m2 4,50
Pek. Pasang List Profil Gypsum m 11,00
8 Pekerjaan Atap
1 M2 Pekerjaan Pasang Rangka Atap Genteng Keramik m2 5,23
1 M2 Pekerjaan Pasang Atap Genteng Keramik m2 5,23
1 M Pekerjaan Pasang Nok Genteng Keramik m1 3,00
1 M Pekerjaan Pasang Listplank Profil Grc Motif m1 14,50
9 Pekerjaan Instalasi Listrik
1 Titik Pemasangan Instalasi Lampu Kabel NYM 2 x 1,5 mm2 titik 3,00
1 Titik Pemasangan Saklar Tunggal 1 Way titik 3,00
Lampu Led Spesifikasi 18 W bh 3,00
1 M2 Pekerjaan Pengecatan Exterior Tembok Baru (Cat Dinding ) m2 57,00
10 Pekerjaan Istalasi Air
SEPTIC TANK BIO - MASTER Spesifikasi Model BCF-6s Capacity 1,5 m3/day Tank unit 1,00
Volume
1,80 (m3) No Of tank 1 Unit Diameter Tank 1,28 m (dia) X 1,5 m (T) Inlet/Outlet
Pipe 100 (mm) Type Tangki Cylinder
Closet Duduk Spesifikasi Cw630J (Setara Toto) bh 2,00
1 M Pekerjaan Pasang Pipa Pvc Type Aw Dia. 2 m1 20,00
1 M Pekerjaan Pasang Pipa Pvc Type Aw Dia. 1 1/2 m1 25,00
1 M Pekerjaan Pasang Pipa Pvc Type Aw Dia. 1 m1 10,00
Tee dia. 2 x 2 x 2 m1 3,00
Elbow 1-1/2 Spesifikasi Type AW m1 3,00
Elbow 1 Spesifikasi Type AW m1 3,00
Kran Air Tembok Spesifikasi 0.5 Inch m1 3,00
RAPL 60%
DIKURANGI PPH 3%
#VALUE!
-
-
96.617,03 3.091.744,96 #VALUE!
-
80.488,39 34.610,01 #VALUE!
-
859.973,25 3.508.690,86 #VALUE!
3.648.018,00 3.392.656,74 #VALUE!
3.648.018,00 2.918.414,40 #VALUE!
687.898,50 33.363.077,25 #VALUE!
353.404,60 28.272.368,00 #VALUE!
402.741,31 84.575,68 #VALUE!
131.364,77 788.188,62 #VALUE!
68.993,91 827.926,92 #VALUE!
38.871,36 466.456,32 #VALUE!
120.946,21 1.209.462,10 #VALUE!
-
160.519,41 8.491.476,79 #VALUE!
141.095,37 7.463.945,07 #VALUE!
173.230,73 1.212.615,11 #VALUE!
137.052,70 18.776.219,90 #VALUE!
24.615,24 2.067.680,16 #VALUE!
261.703,85 5.234.077,00 #VALUE!
-
8.529.574,46 8.529.574,46 #VALUE!
8.529.574,46 25.588.723,38 #VALUE!
8.529.574,46 25.588.723,38 #VALUE!
-
85.262,40 85.262,40 #VALUE!
178.560,00 178.560,00 #VALUE!
151.068,45 1.208.547,60 #VALUE!
49.564,50 148.693,50 #VALUE!
40.867,14 81.734,28 #VALUE!
128.064,72 1.024.517,76 #VALUE!
20.058,24 80.232,96 #VALUE!
-
39.505,51 5.076.458,04 #VALUE!
-
54.416,27 979.492,86 #VALUE!
32.909,10 559.454,70 #VALUE!
27.432,63 411.489,45 #VALUE!
36.255,12 108.765,36 #VALUE!
8.392,32 25.176,96 #VALUE!
3.481,92 10.445,76 #VALUE!
270.000,00 1.620.000,00 #VALUE!
-
22.292,81 4.681,49 #VALUE!
25.753,28 77.259,84 #VALUE!
41.926,50 1.173.942,00 #VALUE!
193.765.922,06 #VALUE!
-
-
-
96.617,03 1.014.478,82 #VALUE!
-
80.488,39 304.246,11 #VALUE!
26.824,88 33.799,35 #VALUE!
-
821.525,82 2.152.397,65 #VALUE!
-
4.605.116,32 1.427.586,06 #VALUE!
7.855.550,73 3.377.886,81 #VALUE!
6.239.172,81 1.934.143,57 #VALUE!
-
131.364,77 3.743.895,95 #VALUE!
68.993,91 3.932.652,87 #VALUE!
38.871,36 2.215.667,52 #VALUE!
HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) #VALUE!
-
224.671,57 337.007,36 #VALUE!
-
41.629,19 187.331,36 #VALUE!
136.049,88 612.224,46 #VALUE!
88.809,72 976.906,92 #VALUE!
-
160.519,41 839.516,51 #VALUE!
141.095,37 737.928,79 #VALUE!
173.230,80 519.692,40 #VALUE!
261.703,85 3.794.705,83 #VALUE!
-
151.068,45 453.205,35 #VALUE!
40.867,14 122.601,42 #VALUE!
128.064,72 384.194,16 #VALUE!
47.165,71 2.688.445,47 #VALUE!
-
5.014.448,40 5.014.448,40 #VALUE!
3.471.541,20 6.943.082,40 #VALUE!
54.416,27 1.088.325,40 #VALUE!
32.909,10 822.727,50 #VALUE!
27.432,63 274.326,30 #VALUE!
36.255,12 108.765,36 #VALUE!
8.392,32 25.176,96 #VALUE!
3.481,92 10.445,76 #VALUE!
259.656,00 778.968,00 #VALUE!
46.856.780,80 #VALUE!
-
-
80.488,39 11.000.348,26 #VALUE!
994.132,50 389.620.409,40 #VALUE!
68.993,91 5.388.424,37 #VALUE!
38.871,36 3.035.853,22 #VALUE!
64.259,74 21.443.475,24 #VALUE!
-
6.239.172,81 15.972.282,39 #VALUE!
6.239.172,81 1.497.401,47 #VALUE!
6.030.964,51 14.112.456,95 #VALUE!
687.898,50 13.414.020,75 #VALUE!
52.782,34 2.971.117,92 #VALUE!
-
906.805,75 462.470,93 #VALUE!
37.200,00 1.277.076,00 #VALUE!
400.000,00 800.000,00 #VALUE!
-
994.132,50 69.658.864,28 #VALUE!
6.239.172,81 16.471.416,22 #VALUE!
6.030.964,51 47.765.238,92 #VALUE!
958.651,88 63.271.024,08 #VALUE!
52.782,34 2.322.422,96 #VALUE!
-
994.132,50 18.997.872,08 #VALUE!
6.239.172,81 1.497.401,47 #VALUE!
6.030.964,51 13.026.883,34 #VALUE!
687.898,50 12.382.173,00 #VALUE!
52.782,34 1.266.776,16 #VALUE!
-
252.662,40 6.063.897,60 #VALUE!
-
-
110.497,67 3.314.930,10 #VALUE!
80.488,39 141.659,57 #VALUE!
26.824,88 13.948,94 #VALUE!
HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) #VALUE!
-
994.132,50 1.560.788,03 #VALUE!
4.605.116,32 5.111.679,12 #VALUE!
7.855.550,73 3.377.886,81 #VALUE!
402.862,27 3.021.467,03 #VALUE!
23.145,84 2.041.463,09 #VALUE!
3.648.018,00 2.663.053,14 #VALUE!
958.651,88 35.470.119,56 #VALUE!
8.837.356,25 6.716.390,75 #VALUE!
141.095,37 6.137.648,60 #VALUE!
261.703,85 9.683.042,45 #VALUE!
39.505,51 2.890.223,11 #VALUE!
815.863.607,29 #VALUE!
-
151.891,49 138.646.552,07 #VALUE!
152.817,60 77.203.451,52 #VALUE!
140.300,64 159.802.428,96 #VALUE!
22.580,62 10.287.730,47 #VALUE!
260.400,00 66.894.156,00 #VALUE!
219.108,00 28.142.231,52 #VALUE!
1.434.894,31 239.584.302,94 #VALUE!
218.710,55 280.922.765,95 #VALUE!
JUMLAH 1.001.483.619,43 #VALUE!
-
-
80.488,39 4.290.031,19 #VALUE!
26.824,88 428.929,83 #VALUE!
-
821.525,82 22.329.071,79 #VALUE!
-
4.605.116,32 7.322.134,95 #VALUE!
131.364,78 7.001.742,77 #VALUE!
68.993,91 7.354.750,81 #VALUE!
38.871,36 4.143.686,98 #VALUE!
828.343,22 3.843.512,54 #VALUE!
252.662,40 2.577.156,48 #VALUE!
850.000,00 17.000.000,00 #VALUE!
47.165,71 5.695.259,48 #VALUE!
JUMLAH 81.986.276,81 #VALUE!
-
-
196.416,00 5.892.480,00 #VALUE!
5.238.132,00 5.238.132,00 #VALUE!
3.682.800,00 3.682.800,00 #VALUE!
54.416,27 1.904.569,45 #VALUE!
27.432,63 685.815,75 #VALUE!
-
80.488,39 69.220,02 #VALUE!
3.764.041,94 1.053.931,74 #VALUE!
7.855.550,73 1.178.332,61 #VALUE!
-
11.695,68 3.353.268,41 #VALUE!
12.573,60 556.381,80 #VALUE!
JUMLAH 23.614.931,78 #VALUE!
-
-
80.488,39 201.220,98 #VALUE!
26.824,88 20.118,66 #VALUE!
-
821.525,82 1.182.997,18 #VALUE!
7.855.550,73 3.142.220,29 #VALUE!
-
4.605.116,32 10.223.358,23 #VALUE!
578.593,92 16.779.223,68 #VALUE!
296.260,80 12.146.692,80 #VALUE!
HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) #VALUE!
202.740,00 11.961.660,00 #VALUE!
71.721,60 7.631.178,24 #VALUE!
140.379,84 7.720.891,20 #VALUE!
-
112.990,54 1.288.092,16 #VALUE!
27.891,74 430.927,38 #VALUE!
27.891,74 293.142,19 #VALUE!
40.341,00 217.841,40 #VALUE!
40.341,00 4.292.282,40 #VALUE!
JUMLAH 77.531.846,78 #VALUE!
-
-
78,00 429.000,00 #VALUE!
90,00 495.000,00 #VALUE!
1.030,00 5.665.000,00 #VALUE!
25,00 137.500,00 #VALUE!
340,00 1.870.000,00 #VALUE!
JUMLAH 8.596.500,00 #VALUE!