SUMMARY

PAKET PEKERJAAN MEKANIKAL dan ELEKTRIKAL


PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

TOTAL
NO URAIAN PEKERJAAN JUMLAH (Rp)
MATERIAL UPAH

PENJUMLAHAN

- PEMADAM KEBAKARAN - - -

- ELEKTRIKAL - - -

- ELEKTRONIK - - -

- MVAC - - -

- PLUMBING - - -

SUB TOTAL PEKERJAAN UTAMA - - -

ADDENDUM

- PERSIAPAN

- PEMADAM KEBAKARAN

- ELEKTRIKAL

- ELEKTRONIK

- MVAC

- STP

SUB TOTAL ADDENDUM - - -

TOTAL PEKERJAAN UTAMA + ADDENDUM - - -

PPN 10 % - - -

GRAND TOTAL - - -

PEMBULATAN - - -
SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

TOTAL
NO URAIAN PEKERJAAN JUMLAH (Rp)
MATERIAL UPAH

PENJUMLAHAN ELEKTRIKAL

I PEKERJAAN INDUK

- PLN DAN GENSET - - -

- PERALATAN UTAMA - - -

- KABEL FEEDER - - -

- LAMPU PENERANGAN & ACCESSORIS - - -

- GROUNDING - - -

- RACK KABEL - - -

- PENANGKAL PETIR - - -

SUB TOTAL PEKERJAAN INDUK - - -

II PEKERJAAN TAMBAH KURANG

- PLN DAN GENSET

- PERALATAN UTAMA

- KABEL FEEDER

- LAMPU PENERANGAN & ACCESSORIS

- GROUNDING

- RACK KABEL

- PENANGKAL PETIR

SUB TOTAL PEKERJAAN TAMKUR - - -

TOTAL KE PENJUMLAHAN ME - - -
SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN QTY SAT
MATERIAL UPAH MATERIAL UPAH

ELEKTRIKAL

Harga satuan pekerjaan sudah termasuk pengadaan dan


pemasangan material serta material bantu yang
diperlukan sehingga pekerjaan tersebut dinyatakan
tercapai dengan baik. Pekerjaan harus dilaksanakan
sesuai dengan spesifikasi teknis dan gambar.

Tambah Daya Dari PLN 16.500 VA Ke 555.000 VA


- Biaya Pasang (BP) KVA - - By NRC
- Uang Jaminan Langganan KVA - - By NRC
- (UJL)
Sertifikasi Laik Operasi (SLO) 538.50 KVA - -

Total Sambungan Daya - -

1 Pengadaan Genset Only Install 1.00 Unit - -


- Type : Open
- Kapasitas : 630 kVA
- Operasi : 3Ø, 4W, 1.500 rpm, 50 Hz

- P. PKG 1.00 Unit - -

2 Pekerjaan Exhaust Gas Buang 1.00 lot - -

Pengadaan dan pemasangan Pipa Gas Buang dengan


menggunakan BSP Medium Class lengkap dibungkus
jaketting alluminium sheet dan rockwool serta
material bantu lainnya
Sistem Gas Buang (Silencer)
Ducting Exhaust Radiator

3 Pekerjaan Fuel System 1.00 lot - -


Tangki bulanan kap. 3000 Liter

4 Pekerjaan Instalasi Pipa Bahan Bakar 1.00 lot - -


Pemipaan Bahan bakar solar dari tangki bulanan ke
tangki solar di Genset lengkap pipa Gip 1 '' dengan
valve , check valve , strainer , Grounding, fitting serta
material bantu lainnya

5 Pekerjaan Insulation 1.00 lot - -

Isolasi ruang genset dengan menggunakan rockwool


density 70 s/d 80 kg/m3 lengkap dengan glasscloth ,
wire mesh , spindle pin dan material bantu lainnya

6 Pekerjaan Exhaust 1.00 lot - -


Intake & Discard Sound Attenuator
Industrial Wall Exchaust FAN kap. 2500 CFM
Instalasi power Exchaust Fan

7 Pekerjaan Perijinan 1.00 lot - -


Perijinan Depnaker

Total Genset - -

3 PLN DAN GENSET


PENJUMLAHAN

- Total Sambungan Daya - -

- Total Genset - -

TOTAL PERALATAN UTAMA - -

4 PLN DAN GENSET


SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN QTY SAT
MATERIAL UPAH MATERIAL UPAH

ELEKTRIKAL

Harga satuan pekerjaan sudah termasuk pengadaan dan


pemasangan material serta material bantu yang
diperlukan sehingga pekerjaan tersebut dinyatakan
tercapai dengan baik. Pekerjaan harus dilaksanakan
sesuai dengan spesifikasi teknis dan gambar.

Panel Utama
- P. MVMDP 1.00 Unit - -
- P. LVMDP 1.00 Unit - -
- Cap. Bank 300 kVAR 1.00 Unit - -

Total Panel Utama - -

Trafo 1.00 Unit - -


- Type : Transformer Oil Immeresed
- Kapasitas : 630 kVA
- Operasi : 20/0,38Kv, 3Ø, 50 Hz

Total Trafo - -

PANEL LISTRIK

Pengadaan dan Pemasangan Panel Listrik lengkap

dengan kabel grounding s.d Shaft Elektrikal dan

peralatan bantu yang mendukung lainnya.

1 LANTAI BASEMENT
- DP.BSM 1.00 Unit - -
- DP. ELC 1.00 Unit - -
- DP. EMG 1.00 Unit - -
- DP. PL 1.00 Unit - -
- PK. Deep Well 1.00 Unit By Mekanikal
- PK. TP 1.00 Unit By Mekanikal
- PK. STP 1.00 Unit By Mekanikal
- PK. SP 01 1.00 Unit By Mekanikal
- PK. SP 02 1.00 Unit By Mekanikal
- PK. SP 03 1.00 Unit By Mekanikal
- PK. Jockey Pump 1.00 Unit By Mekanikal
- PK. Electrik Pump 1.00 Unit By Mekanikal
- PK. Diesel Pump 1.00 Unit By Mekanikal

2 LANTAI GROUND
- SDP. LT. 01 1.00 Unit - -
- DP. 01 1.00 Unit - -
- DP. ESC 1.00 Unit - -
- PP. ESC. 01 1.00 Unit By Escalator

3 LANTAI GROUND MEZZANINE


- DP. LT. 01 MEZZ 1.00 Unit - -
- PP. ESC 01 MEZZ 1.00 Unit By Escalator

6 LANTAI 2 & LANTAI 2 MEZZANINE


- DP. 02 1.00 Unit - -

5 Peralatan Utama
- PP. ESC 02 1.00 Unit By Escalator

7 LANTAI 3
- DP. 03 1.00 Unit - -
- PP. ESC 03 1.00 Unit By Escalator

8 LANTAI 3 MEZZANINE
- DP. 03 MEZZ 1.00 Unit - -
- PP. ESC 03 MEZZ 1.00 Unit By Escalator

9 LANTAI 4
- SDP. LT. 04 1.00 Unit - -
- DP. 04 1.00 Unit - -
- PP. ESC. 04 1.00 Unit By Escalator

10 LANTAI 4 MEZZANINE
- DP. 04 MEZZ 1.00 Unit - -
- PP. ESC 04 MEZZ 1.00 Unit By Escalator

11 LANTAI 5
- DP. 05 1.00 Unit - -

12 LANTAI 6
- DP. 06 1.00 Unit - -

13 LANTAI 7
- DP. 07 1.00 Unit - -

14 LANTAI 7 MEZZANINE
- DP. 07 MEZZ 1.00 Unit - -

15 LANTAI 8
- DP. 08 1.00 Unit - -

16 LANTAI Atap
- DP. LT. ATAP 1.00 Unit - -
- DP. EMG LT. ATAP 1.00 Unit - -
- P. TK ATAP 1.00 Unit - -
- PK. PF ATAP 1.00 Unit - -
- PB. LT. ATAP 1.00 Unit By Other
- PK. LIFT P1 ATAP 1.00 Unit By Lift
- PK. LIFT P2 ATAP 1.00 Unit By Lift
- PK. LIFT P3 ATAP 1.00 Unit By Lift
- PK. Booster Pump 1.00 Unit By Mekanikal

Sub Total Panel Listrik - -

PENJUMLAHAN

- Total Panel Utama - -

- Total Trafo - -

- Sub Total Panel Listrik - -

TOTAL PERALATAN UTAMA - -

6 Peralatan Utama
SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN QTY SAT
MATERIAL UPAH MATERIAL UPAH

ELEKTRIKAL

Harga satuan pekerjaan sudah termasuk pengadaan dan pemasangan material serta
material bantu yang diperlukan sehingga pekerjaan tersebut dinyatakan tercapai
dengan baik. Pekerjaan harus dilaksanakan sesuai dengan spesifikasi teknis dan
gambar.

KABEL FEEDER

Pengadaan dan pemasangan kabel feeder lengkap dengan terminasi, sambungan,


label dan semua peralatan bantu yang mendukung lainnya sesuai dengan spesifikasi
teknis dan gambar.

1 LANTAI BASEMENT
- dari DP. EMG ke P. ELEKTRONIKA FRC 1x (4 x 6 mm2) + BC 6 mm2 5.00 m - -
- dari DP. EMG ke PK. JOCKEY PUMP FRC 1x (4 x 6 mm2) + NYA 4 mm2 31.00 m - -
- dari DP. EMG ke PK. ELEKTRIK PUMP FRC 4x (1 x 185 mm2) + NYA 70 mm2 30.00 m - -
- dari DP. EMG ke PK. DIESEL PUMP FRC 3 x 2,5 mm2 30.00 m - -

- dari DP. PL ke PK. DW NYY 1x (4 x 4 mm2) + NYA 4 mm2 43.00 m - -


- dari DP. PL ke PK. TP NYY 1x (4 x 4 mm2) + NYA 4 mm2 8.00 m - -
- dari DP. PL ke PK. STP NYY 1x (4 x 4 mm2) + NYA 4 mm2 27.00 m - -
- dari DP. PL ke PK. SP 1 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 13.00 m - -
- dari DP. PL ke PK. SP 2 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 5.00 m - -
- dari DP. PL ke PK. SP 3 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -

- dari DP. BSM ke IU-BS.01 NYM 3 x 2,5 mm2 2.00 m - -


- dari DP. BSM ke IU-BS.02 NYM 3 x 2,5 mm2 2.00 m - -
- dari DP. BSM ke EF-BS.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 27.00 m - -
- dari DP. BSM ke EF-BS.STP.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 24.00 m - -
- dari DP. BSM ke EF-BS.P.01 NYY 1x (4 x 4 mm2) + NYA 4 mm2 36.00 m - -
+ NYY 1x (3 x 4 mm2) + NYA 4 mm2
- dari DP. BSM ke WF-BS.01 NYM 3 X 2,5 mm2 31.00 m - -

2 LANTAI GROUND
- dari SDP. LT. 01 ke DP. BSM NYY 1x (4 x 10 mm2) + BC 10 mm2 12.00 m - -
- dari SDP. LT. 01 ke DP. 01 NYY 1x (4 x 35 mm2) + BC 25 mm2 7.00 m - -
- dari SDP. LT. 01 ke DP. 01 MEZZ NYY 1x (4 x 6 mm2) + BC 6 mm2 8.00 m - -
- dari SDP. LT. 01 ke DP. 02 + MEZZ NYY 1x (4 x 35 mm2) + BC 25 mm2 16.00 m - -
- dari SDP. LT. 01 ke DP. 03 NYY 1x (4 x 35 mm2) + BC 25 mm2 16.00 m - -
- dari SDP. LT. 01 ke DP. 03 MEZZ NYY 1x (4 x 6 mm2) + BC 6 mm2 18.00 m - -

- dari PP. ESC ke PP. ESC 01 NYY 1x (4 x 4 mm2) + NYA 4 mm2 14.00 m - -
- dari PP. ESC ke PP. ESC 01 MEZZ NYY 1x (4 x 4 mm2) + NYA 4 mm2 29.00 m - -
- dari PP. ESC ke PP. ESC 02 NYY 1x (4 x 4 mm2) + NYA 4 mm2 32.00 m - -
- dari PP. ESC ke PP. ESC 02 MEZZ NYY 1x (4 x 4 mm2) + NYA 4 mm2 44.00 m - -
- dari PP. ESC ke PP. ESC 03 NYY 1x (4 x 4 mm2) + NYA 4 mm2 36.00 m - -
- dari PP. ESC ke PP. ESC 03 MEZZ NYY 1x (4 x 4 mm2) + NYA 4 mm2 39.00 m - -
- dari PP. ESC ke PP. ESC 04 NYY 1x (4 x 4 mm2) + NYA 4 mm2 41.00 m - -
- dari PP. ESC ke PP. ESC 04 MEZZ NYY 1x (4 x 4 mm2) + NYA 4 mm2 44.00 m - -

- dari DP. LT. 01 ke OU-GF.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 01 ke OU-GF.02 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 29.00 m - -
- dari DP. LT. 01 ke IU-GF.01 NYM 3 x 2,5 mm2 17.00 m - -
- dari DP. LT. 01 ke IU-GF.02 NYM 3 x 2,5 mm2 11.00 m - -
- dari DP. LT. 01 ke WF-GF.01 NYM 3 x 2,5 mm2 39.00 m - -

3 LANTAI GROUND MEZZANINE


- dari DP. LT. 01 MEZZ ke OU-GMZ.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 01 MEZZ ke OU-GMZ.02 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 01 MEZZ ke OU-GMZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 01 MEZZ ke OU-GMZ.01 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 01 MEZZ ke IU-GMZ.01 NYM 3 x 2,5 mm2 17.00 m - -
- dari DP. LT. 01 MEZZ ke IU-GMZ.02 NYM 3 x 2,5 mm2 11.00 m - -
- dari DP. LT. 01 MEZZ ke IU-GMZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 26.00 m - -
- dari DP. LT. 01 MEZZ ke IU-GMZ.01 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 12.00 m - -
- dari DP. LT. 01 MEZZ ke FAF-GMZ.01 NYM 3 x 2,5 mm2 25.00 m - -

4 LANTAI 2 & LANTAI 2 MEZZANINE


- dari PLN ke MVMDP NA2XSEBY 3 X 120 mm2 40.00 m - -

7 Kabel Feeder
- dari MVMDP ke TRAFO. NA2XSY 3X (1 x 120 mm2 ) 16.00 m - -

- dari TRAFO ke LVMDP NYY 8x (1 x 300 mm2) + NYA 120 mm2 16.00 m - -

- dari GENSET ke P. PKG NYY 8x (1 x 150 mm2) + NYA 70 mm2 12.00 m - -

- dari LVMDP ke DP. EMG NYY 4x (1 x 185 mm2) + BC 70 mm2 80.00 m - -


- dari LVMDP ke DP. PL NYY 1x (4 x 16 mm2) + BC 16 mm2 100.00 m - -
- dari LVMDP ke P. PKG NYY 8x (1 x 150 mm2) + NYA 70 mm2 34.00 m - -
- dari LVMDP ke PP. ESC NYY 1x (4 x 120 mm2) + BC 70 mm2 51.00 m - -
- dari LVMDP ke SDP-1. LT. 01 NYY 4x (1 x 240 mm2) + BC 120 mm2 52.00 m - -
- dari LVMDP ke SDP-2. LT. 04 NYY 4x (1 x 185 mm2) + BC 70 mm2 55.00 m - -
- dari LVMDP ke PP. EMG ATAP FRC 1x (4 x 6 mm2) + BC 6 mm2 68.00 m - -
- dari LVMDP ke DP. LT. ATAP NYY 1x (4 x 70 mm2) + BC 70 mm2 68.00 m - -

- dari DP. LT. 02 ke OU-2MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 33.00 m - -
- dari DP. LT. 02 ke OU-2MZ.02 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 32.00 m - -
- dari DP. LT. 02 ke IU-2MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 22.00 m - -
- dari DP. LT. 02 ke IU-2MZ.02 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 11.00 m - -
- dari DP. LT. 02 ke FAF-2MZ.01 NYM 3 x 2,5 mm2 30.00 m - -

5 LANTAI 3
- dari DP. LT. 03 ke OU-3.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 03 ke OU-3.02 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 03 ke IU-3.01 NYM 3 x 2,5 mm2 17.00 m - -
- dari DP. LT. 03 ke IU-3.02 NYM 3 x 2,5 mm2 11.00 m - -

6 LANTAI 3 MEZZANINE
- dari DP. LT. 03 MEZZ ke OU-3MZ.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 03 MEZZ ke OU-3MZ.02 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 03 MEZZ ke OU-3MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 03 MEZZ ke OU-3MZ.01 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 03 MEZZ ke IU-3MZ.01 NYM 3 x 2,5 mm2 17.00 m - -
- dari DP. LT. 03 MEZZ ke IU-3MZ.02 NYM 3 x 2,5 mm2 11.00 m - -
- dari DP. LT. 03 MEZZ ke IU-3MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 26.00 m - -
- dari DP. LT. 03 MEZZ ke IU-3MZ.01 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 12.00 m - -
- dari DP. LT. 03 MEZZ ke FAF-3MZ.01 NYM 3 x 2,5 mm2 25.00 m - -

7 LANTAI 4
- dari SDP. LT. 04 ke DP. 04 NYY 1x (4 x 35 mm2) + BC 25 mm2 5.00 m - -
- dari SDP. LT. 04 ke DP. 04 MEZZ NYY 1x (4 x 6 mm2) + BC 6 mm2 8.00 m - -
- dari SDP. LT. 04 ke DP. 05 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 15.00 m - -
- dari SDP. LT. 04 ke DP. 06 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 19.00 m - -
- dari SDP. LT. 04 ke DP. 07 NYY 1x (4 x 10 mm2) + BC 10 mm2 20.00 m - -
- dari SDP. LT. 04 ke DP. 07 MEZZ NYY 1x (4 x 10 mm2) + BC 10 mm2 22.00 m - -
- dari SDP. LT. 04 ke DP. 08 NYY 1x (4 x 16 mm2) + BC 16 mm2 26.00 m - -

- dari DP. LT. 04 ke OU-3.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 04 ke OU-3.02 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 04 ke IU-4.01 NYM 3 x 2,5 mm2 17.00 m - -
- dari DP. LT. 04 ke IU-4.02 NYM 3 x 2,5 mm2 11.00 m - -

8 LANTAI 4 MEZZANINE
- dari DP. LT. 04 MEZZ ke OU-3MZ.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 04 MEZZ ke OU-3MZ.02 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 04 MEZZ ke OU-3MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 04 MEZZ ke OU-3MZ.01 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 04 MEZZ ke IU-4MZ.01 NYM 3 x 2,5 mm2 17.00 m - -
- dari DP. LT. 04 MEZZ ke IU-4MZ.02 NYM 3 x 2,5 mm2 11.00 m - -
- dari DP. LT. 04 MEZZ ke IU-4MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 26.00 m - -
- dari DP. LT. 04 MEZZ ke IU-4MZ.01 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 12.00 m - -
- dari DP. LT. 04 MEZZ ke FAF-3MZ.01 NYM 3 x 2,5 mm2 25.00 m - -

9 LANTAI 5
- dari DP. LT. 05 ke EF-5.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 10.00 m - -
- dari DP. LT. 05 ke FAF-5.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 22.00 m - -

10 LANTAI 6
- dari DP. LT. 06 ke EF-6.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 10.00 m - -
- dari DP. LT. 06 ke FAF-6.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 22.00 m - -

11 LANTAI 7
- dari DP. LT. 07 ke IU-7.01 A NYM 3 x 2,5 mm2 19.00 m - -
- dari DP. LT. 07 ke IU-7.01 B NYM 3 x 2,5 mm2 16.00 m - -
- dari DP. LT. 07 ke IU-7.02 NYM 3 x 2,5 mm2 19.00 m - -
- dari DP. LT. 07 ke IU-7.03 NYM 3 x 2,5 mm2 14.00 m - -
- dari DP. LT. 07 ke IU-7.04 NYM 3 x 2,5 mm2 9.00 m - -
- dari DP. LT. 07 ke IU-7.05 NYM 3 x 2,5 mm2 10.00 m - -
- dari DP. LT. 07 ke IU-7.06 NYM 3 x 2,5 mm2 16.00 m - -

8 Kabel Feeder
- dari DP. LT. 07 ke IU-7.07 NYM 3 x 2,5 mm2 16.00 m - -
- dari DP. LT. 07 ke IU-7.08 NYM 3 x 2,5 mm2 20.00 m - -
- dari DP. LT. 07 ke EF-7.1 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 28.00 m - -

12 LANTAI 7 MEZZANINE
- dari DP. LT. 07 MEZZ ke IU-7MZ.01 NYM 3 x 2,5 mm2 23.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.02 NYM 3 x 2,5 mm2 21.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.03 NYM 3 x 2,5 mm2 13.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.04 NYM 3 x 2,5 mm2 10.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.05 NYM 3 x 2,5 mm2 12.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.06 NYM 3 x 2,5 mm2 16.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.07 NYM 3 x 2,5 mm2 16.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.08 A NYM 3 x 2,5 mm2 20.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.08 B NYM 3 x 2,5 mm2 14.00 m - -
- dari DP. LT. 07 MEZZ ke TEF-7MZ.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 10.00 m - -

13 LANTAI 8
- dari DP. LT. 08 ke IU-8.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 33.00 m - -
- dari DP. LT. 08 ke IU-8.02 NYM 3 x 2,5 mm2 29.00 m - -
- dari DP. LT. 08 ke IU-8.03 NYM 3 x 2,5 mm2 22.00 m - -
- dari DP. LT. 08 ke IU-8.04 A NYM 3 x 2,5 mm2 24.00 m - -
- dari DP. LT. 08 ke IU-8.04 B NYM 3 x 2,5 mm2 18.00 m - -
- dari DP. LT. 08 ke IU-8.05 NYM 3 x 2,5 mm2 12.00 m - -
- dari DP. LT. 08 ke IU-8.06 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 21.00 m - -
- dari DP. LT. 08 ke TEF-8.01 NYM 3 x 2,5 mm2 18.00 m - -
- dari DP. LT. 08 ke KEF-8.01 NYM 3 x 2,5 mm2 19.00 m - -

14 LANTAI ATAP
- dari PP. EMG ATAP ke P. TK ATAP FRC 1x (4 x 4 mm2) + NYA 4 mm2 10.00 m - -
- dari PP. EMG ATAP ke PK. PF ATAP FRC 1x (4 x 4 mm2) + NYA 4 mm2 9.00 m - -
- dari DP. LT. ATAP ke PB. LT. ATAP NYY 1x (4 x 6 mm2) + BC 6 mm2 9.00 m - -
- dari DP. LT. ATAP ke PP. LIFT P1 ATAP NYY 1x (4 x 6 mm2) + BC 6 mm2 9.00 m - -
- dari DP. LT. ATAP ke PP. LIFT P2 ATAP NYY 1x (4 x 6 mm2) + BC 6 mm2 8.00 m - -
- dari DP. LT. ATAP ke PP. LIFT P3 ATAP NYY 1x (4 x 6 mm2) + BC 6 mm2 5.00 m - -
- dari DP. LT. ATAP ke PC. BOOSTER PUMP NYY 1x (4 x 4 mm2) + NYA 4 mm2 33.00 m - -

- dari DP. LT. ATAP ke IU-A.01 NYM 3 x 2,5 mm2 22.00 m - -

Sub Total Kabel Feeder - -

PENJUMLAHAN

- Sub Total Kabel Feeder - -

TOTAL KABEL FEEDER - -

9 Kabel Feeder
0.8

4
24.8
24
24

34.4
6.4
21.6
10.4
4
24.8

1.6
1.6
21.6
19.2
28.8

24.8

9.6
5.6
6.4
12.8
12.8
14.4

11.2
23.2
25.6
35.2
28.8
31.2
32.8
35.2

24
23.2
13.6
8.8
31.2

24.8
24
24
24.8
13.6
8.8
20.8
9.6
20

32

10 Kabel Feeder
12.8

12.8

9.6

64
80
27.2
40.8
41.6
44
54.4
54.4

26.4
25.6
17.6
8.8
24

24.8
24
13.6
8.8

24.8
24
24
24.8
13.6
8.8
20.8
9.6
20

4
6.4
12
15.2
16
17.6
20.8

24.8
24
13.6
8.8

24.8
24
24
24.8
13.6
8.8
20.8
9.6
20

8
17.6

8
17.6

15.2
12.8
15.2
11.2
7.2
8
12.8

11 Kabel Feeder
12.8
16
22.4

18.4
16.8
10.4
8
9.6
12.8
12.8
16
11.2
8

26.4
23.2
17.6
19.2
14.4
9.6
16.8
14.4
15.2

8
7.2
7.2
7.2
6.4
4
26.4

17.6

12 Kabel Feeder
SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN QTY SAT
MATERIAL UPAH MATERIAL UPAH

ELEKTRIKAL

Harga satuan pekerjaan sudah termasuk pengadaan dan pemasangan


material serta material bantu yang diperlukan sehingga pekerjaan
tersebut dinyatakan tercapai dengan baik. Pekerjaan harus
dilaksanakan sesuai dengan spesifikasi teknis dan gambar.

A LAMPU PENERANGAN DAN ACCESSORIES

Pengadaan dan pemasangan lampu, saklar dan stop kontak lengkap

dengan armature, fixtures dan semua peralatan bantu yang

mendukung lainnya sesuai dengan spesifikasi teknis dan gambar.

1 LANTAI BASEMENT
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 1.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 13.00 bh - -
- Lampu TL 1 x 18 W Batten Type Surface Mounted 1.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 6.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 25.00 bh - -

- Saklar Hotel 1.00 bh - -


- Saklar Tunggal 7.00 bh - -
- Saklar Ganda 6.00 bh - -

- Stop Kontak 1 Phase 13.00 bh - -

2 LANTAI 1
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 6.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 27.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 16.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -

- Saklar Hotel 1.00 bh - -


- Saklar Tunggal 4.00 bh - -
- Saklar Ganda 4.00 bh - -

- Stop Kontak 1 Phase 27.00 bh - -

2 LANTAI 1 MEZZANINE
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 77.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -

- Saklar Tunggal 3.00 bh - -


- Saklar Ganda 1.00 bh - -

- Stop Kontak 1 Phase 12.00 bh - -

4 LANTAI 2
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 3.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 11.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -

- Saklar Tunggal 3.00 bh - -

- Stop Kontak 1 Phase 25.00 bh - -

5 LANTAI 2 MEZZANINE
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 79.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -

- grid Switch 6 gang 1.00 bh - -


- Saklar Tunggal 2.00 bh - -

13 Lampu Penerangan & Accessoris


- Stop Kontak 1 Phase 2.00 bh - -

6 LANTAI 3
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 31.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -

- Saklar Tunggal 3.00 bh - -


- Saklar Ganda 1.00 bh - -

- Stop Kontak 1 Phase 27.00 bh - -

7 LANTAI 3 MEZZANINE
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 79.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -

- Saklar Tunggal 3.00 bh - -


- Saklar Ganda 1.00 bh - -

- Stop Kontak 1 Phase 14.00 bh - -

8 LANTAI 4
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 31.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -

- Saklar Tunggal 3.00 bh - -


- Saklar Ganda 1.00 bh - -

- Stop Kontak 1 Phase 23.00 bh - -

9 LANTAI 4 MEZZANINE
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 76.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -

- Saklar Tunggal 3.00 bh - -


- Saklar Ganda 1.00 bh - -

- Stop Kontak 1 Phase 11.00 bh - -

10 LANTAI 5
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 38.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 3.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -

- grid Switch 4 gang 1.00 bh - -


- Saklar Hotel 1.00 bh - -
- Saklar Tunggal 2.00 bh - -

- Stop Kontak 1 Phase 2.00 bh - -

11 LANTAI 6
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 36.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 3.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -

- grid Switch 4 gang 1.00 bh - -


- Saklar Hotel 1.00 bh - -
- Saklar Tunggal 2.00 bh - -

- Stop Kontak 1 Phase 2.00 bh - -

12 LANTAI 7
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 28.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 21.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -

- Saklar Hotel 1.00 bh - -


- Saklar Tunggal 7.00 bh - -
- Saklar Ganda 8.00 bh - -

14 Lampu Penerangan & Accessoris


- Stop Kontak 1 Phase 19.00 bh - -

13 LANTAI 7 MEZZANINE
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 13.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 25.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 24.00 bh - -

- Saklar Tunggal 10.00 bh - -


- Saklar Ganda 4.00 bh - -

- Stop Kontak 1 Phase 17.00 bh - -

14 LANTAI 8
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu Taman 1 x 18 W 5.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 9.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 51.00 bh - -

- Saklar Hotel 2.00 bh - -


- Saklar Tunggal 12.00 bh - -
- Saklar Ganda 7.00 bh - -

- Stop Kontak 1 Phase 20.00 bh - -

15 LANTAI ATAP
- DownLight PLC 1 x 13 W Recessed Mounted 3.00 bh - -

- Saklar Tunggal 3.00 bh - -

- Stop Kontak 1 Phase 3.00 bh - -

Sub Total Lampu Penerangan dan Accessories - -

B INSTALASI LAMPU PENERANGAN DAN ACCESSORIES

Pengadaan dan pemasangan instalasi penerangan, saklar dan stop


kontak lengkap dengan kabel, PVC High Impact Conduit dan semua
peralatan bantu yang mendukung lainnya sesuai dengan spesifikasi
teknis dan gambar.

1 LANTAI BASEMENT
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 46.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 13.00 titik - -

2 LANTAI GROUND
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 52.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 27.00 titik - -

3 LANTAI GROUND MEZZANINE


- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 82.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 12.00 titik - -

4 LANTAI 2
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 19.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 25.00 titik - -

5 LANTAI 2 MEZZANINE
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 83.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 2.00 titik - -

6 LANTAI 3
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 36.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 27.00 titik - -

7 LANTAI 3 MEZZANINE
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 83.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 14.00 titik - -

8 LANTAI 4
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 36.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 23.00 titik - -

9 LANTAI 4 MEZZANINE
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 80.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 11.00 titik - -

15 Lampu Penerangan & Accessoris


10 LANTAI 5
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 46.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 2.00 titik - -

11 LANTAI 6
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 44.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 2.00 titik - -

12 LANTAI 7
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 52.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 19.00 titik - -
- Instalasi Exhaust Fan NYM 3 x 2,5 mm2 c/w conduit 2.00 titik - -

13 LANTAI 7 MEZZANINE
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 64.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 17.00 titik - -

14 LANTAI 8
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 67.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 20.00 titik - -
- Instalasi Exhaust Fan NYM 3 x 2,5 mm2 c/w conduit 5.00 titik - -

15 LANTAI ATAP
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 3.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 3.00 titik - -

Sub Total Instalasi Penerangan dan Accessories - -

PENJUMLAHAN

- Sub Total Lampu Penerangan dan Accessories - -

- Sub Total Instalasi Penerangan dan Accessories - -

TOTAL LAMPU PENERANGAN & ACCESSORIES - -

16 Lampu Penerangan & Accessoris


SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN QTY SAT
MATERIAL UPAH MATERIAL UPAH

ELEKTRIKAL

Harga satuan pekerjaan sudah termasuk pengadaan


dan pemasangan material serta material bantu yang
diperlukan sehingga pekerjaan tersebut dinyatakan
tercapai dengan baik. Pekerjaan harus dilaksanakan
sesuai dengan spesifikasi teknis dan gambar.

GROUNDING

Pengadaan dan pemasangan Grounding lengkap

dengan terminasi, bak kontrol, koneksi, support,

braket, fitting dan accessories lainnya.

- Grounding Netral Trafo 1.00 lot - -


Max Earth Resistence 1 ohm

- Grounding Body Trafo 1.00 lot - -


Max Earth Resistence 1 ohm

- Grounding Panel LVMDP 1.00 lot - -


Max Earth Resistence 1 ohm

- Grounding Body Genset 1.00 lot - -


Max Earth Resistence 1 ohm

- Grounding Elektronika 1.00 lot - -


Max Earth Resistence 1 ohm

Sub Total Grounding - -

PENJUMLAHAN

- Sub Total Grounding - -

TOTAL GROUNDING - -

17 Grounding
SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN QTY SAT
MATERIAL UPAH MATERIAL UPAH

ELEKTRIKAL

Harga satuan pekerjaan sudah termasuk


pengadaan dan pemasangan peralatan dan alat-
alat bantu yang diperlukan hingga dapat tercapai
dengan baik. Pekerjaan harus dilaksanakan sesuai
spesifikasi dan gambar teknis.

RACK KABEL

Pengadaan dan pemasangan rack kabel lengkap


koneksi, support, braket, fitting dan accessories
lainnya.

1 LANTAI BASEMENT
- Riser Ladder 800 x 100 mm2 2.00 m - -
- Kabel Ladder 300 x 100 mm2 34.00 m - -
- Kabel Ladder 200 x 100 mm2 20.00 m - -
- Kabel Tray 400 x 100 mm2 6.00 m - -
- Kabel Tray 300 x 100 mm2 20.00 m - -

2 LANTAI GROUND
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 15.00 m - -

3 LANTAI GROUND MEZZANINE


- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 35.00 m - -

4 LANTAI 2
- Riser Ladder 800 x 100 mm2 3.00 m - -

5 LANTAI 2 MEZZANINE
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Ladder 300 x 100 mm2 27.00 m - -
- Kabel Tray 400 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 35.00 m - -

6 LANTAI 3
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 2.00 m - -
- Kabel Tray 300 x 100 mm2 15.00 m - -

7 LANTAI 3 MEZZANINE
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 35.00 m - -

8 LANTAI 4
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 2.00 m - -
- Kabel Tray 300 x 100 mm2 15.00 m - -

9 LANTAI 4 MEZZANINE
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 35.00 m - -

10 LANTAI 5
- Riser Ladder 800 x 100 mm2 6.00 m - -
- Kabel Tray 400 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 22.00 m - -

18 Rack kabel ( Tray )


11 LANTAI 6
- Riser Ladder 800 x 100 mm2 6.00 m - -
- Kabel Tray 400 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 22.00 m - -

12 LANTAI 7
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 6.00 m - -
- Kabel Tray 300 x 100 mm2 32.00 m - -

13 LANTAI 7 MEZZANINE
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 6.00 m - -
- Kabel Tray 300 x 100 mm2 28.00 m - -

14 LANTAI 8
- Riser Ladder 800 x 100 mm2 4.00 m - -
- Kabel Tray 200 x 100 mm2 8.00 m - -

Sub Total Rak Kabel - -

PENJUMLAHAN

- Sub Total Rak Kabel - -

TOTAL RACK KABEL - -

19 Rack kabel ( Tray )


SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN QTY SAT
MATERIAL UPAH MATERIAL UPAH

ELEKTRIKAL

Harga satuan pekerjaan sudah termasuk


pengadaan dan pemasangan material serta
material bantu yang diperlukan sehingga
pekerjaan tersebut dinyatakan tercapai dengan
baik. Pekerjaan harus dilaksanakan sesuai
dengan spesifikasi teknis dan gambar.

I PENANGKAL PETIR

1 System Penangkal Petir Elektrostatik non Radio Set 46,809,300 1,007,000 - -


Aktif, Radius Proteksi 100 M, tiang penangkal
petir dan lengkap dengan pipa GIP Medium H =
M, berikut accessories lainnya sesuai dengan
spesifikasi teknis dan gambar.

2 Kabel Coaxial 3 x 35 mm2 M 872,300 178,100 - -

3 Lamp Obstrution set 5,627,900 141,200 - -

4 Grounding Point lengkap dengan copper rod, bak Lot 5,599,500 2,136,300 - -
kontrol, Max resistance < 2 Ohm, Earthing
Electrode dan accessorries lainnya sesuai dengan
spesifikasi teknis dan gambar.

Sub Total Penangkal Petir - -

PENJUMLAHAN

- Sub Total Penangkal Petir - -

TOTAL PENANGKAL PETIR - -

20 Penangkal Petir
SUMMARY
PAKET PEKERJAAN ELEKTRONIK
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

TOTAL
NO URAIAN PEKERJAAN JUMLAH (Rp.)
MATERIAL UPAH

PENJUMLAHAN PEKERJAAN INDUK

I FIRE ALARM SYSTEM - - -

II SOUND SYSTEM - - -

III MATV - - -

IV CCTV BY OTHER BY OTHER BY OTHER

V TELEPHONE BY OTHER BY OTHER BY OTHER

VI DATA BY OTHER BY OTHER BY OTHER

VII ACCESS CONTROL BY OTHER BY OTHER BY OTHER

VIII RACK KABEL - - -

SUB TOTAL PEKERJAAN INDUK - - -

PENJUMLAHAN PEKERJAAN TAMBAH KURANG

I FIRE ALARM SYSTEM

II SOUND SYSTEM

III MATV

IV CCTV

V TELEPHONE

VI DATA

VII ACCESS CONTROL

VIII BAS

IX RACK KABEL

SUB TOTAL PEKERJAAN TAMBAH KURANG - - -

TOTAL PEKERJAAN UTAMA + ADDENDUM - - -

132 SUMMARY EC
SUMMARY
PAKET PEKERJAAN ELEKTRONIK
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL UPAH

I FIRE ALARM SYSTEM

Harga satuan pekerjaan sudah termasuk pengadaan dan


pemasangan peralatan dan alat-alat bantu yang
diperlukan hingga dapat tercapai dengan baik. Pekerjaan
harus dilaksanakan sesuai spesifikasi dan gambar teknis.

A PERALATAN UTAMA

A.1 LANTAI BASEMENT


- MCP-FA Adress 2 LOOP max 254 Address 1.00 Unit - -
- UPS 1 KVA c/w 1.00 Set - -
Surge Arrester
Rectifier
Batteray 2 Jam Nicad Type Rechargeble

- MDF - FA 1.00 Unit - -


- TBFA - BS 1.00 Unit - -
- Fixed Temperature Heat Detector 1.00 Buah - -
- Rate Of Rise Heat Temperature Detector 6.00 Buah - -
- Photo Electric Smoke Detector 7.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 2.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.2 LANTAI GROUND


- Annuciator (Recepsionis) 1.00 Unit - -
- TBFA - GR 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 5.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.3 LANTAI GROUND MEZZANINE


- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 6.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.4 LANTAI 2
- TBFA - L2 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -

22 FAS
- Photo Electric Smoke Detector 3.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.5 LANTAI 2 MEZZANINE


- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 6.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.6 LANTAI 3
- TBFA - L3 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 4.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.7 LANTAI 3 MEZZANINE


- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 6.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.8 LANTAI 4
- TBFA - L4 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 4.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.9 LANTAI 4 MEZZANINE


- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 6.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -

23 FAS
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.10 LANTAI 5
- TBFA - L5 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 6.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.11 LANTAI 6
- TBFA - L6 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 6.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.12 LANTAI 7
- TBFA - L7 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 14.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 2.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.13 LANTAI 7 MEZZANINE


- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector ( 3W ) 16.00 Buah - -
- Remot Indicator Lamp 7.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 2.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

A.14 LANTAI 8
- TBFA - L8 1.00 Unit - -
- Fixed Temperature Heat Detector 1.00 Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector ( 3W ) 12.00 Buah - -
- Remot Indicator Lamp 4.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 2.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal

24 FAS
A.15 LANTAI ATAP
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 2.00 Buah - -
- Break Glass Alarm (Manual Call Point) Buah - -
- Alarm Bell Buah - -
- Visual Notification Appliance (Strobe) Buah - -
- Fireman's Intercom Jack Buah - -
- End Off Line 1.00 Buah - -

Sub Total Peralatan Utama - -

B INSTALASI
B.1 LANTAI BASEMENT
- Instasi Ruang Central FA c/w : 1.00 Lot - -
Grounding, Accessories dan material bantu sehingga
sistem berjalan sesuai dengan sepesifikasi teknis.

- MCPFA ke PDTR 1.00 Lot - -


FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- MCPFA ke PABX 1.00 Lot - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- MCPFA ke Sound System 1.00 Lot - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- MCPFA ke Pressure Fan 1.00 Lot - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- MCPFA ke PKG 1.00 Lot - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- MCPFA ke Hydrant Pump Monitoring 1.00 Lot - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- MCPFA ke Lift Control 1.00 Lot - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm

- MCP-FA ke TBFA - BS
FRC 2 x 2,5 mm2 18.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 18.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 18.00 M - -
in PVC High Impact Conduit Ø 20 mm

- MCP-FA ke TBFA - 8
FRC 2 x 2,5 mm2 55.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 55.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 55.00 M - -
in PVC High Impact Conduit Ø 20 mm

- Instalasi Detector Point 14.00 Titik - -


NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -


FRC 2 x 1,5 mm2

25 FAS
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.2 LANTAI GROUND


- MCP-FA ke Annuciator (R. Kontrol)
FRC TWISTED SHIELDED 1 PAIR AWG 16 50.00 M - -
FRC 2 x 2,5 mm2 50.00 M - -
in PVC High Impact Conduit Ø 20 mm

- TBFA - BS ke TBFA - GR
FRC 2 x 2,5 mm2 8.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 8.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 8.00 M - -
in PVC High Impact Conduit Ø 20 mm

- Instalasi Detector Point 5.00 Titik - -


NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.3 LANTAI GROUND MEZZANINE


- Instalasi Detector Point 6.00 Titik - -
NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

26 FAS
- Instalasi Alarm Bell 1.00 Titik - -
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.4 LANTAI 2
- TBFA - GR ke TBFA - 2
FRC 2 x 2,5 mm2 9.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 9.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 9.00 M - -
in PVC High Impact Conduit Ø 20 mm

- Instalasi Detector Point 3.00 Titik - -


NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.5 LANTAI 2 MEZZANINE


- Instalasi Detector Point 6.00 Titik - -
NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -

27 FAS
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.6 LANTAI 3
- TBFA - 2 ke TBFA - 3
FRC 2 x 2,5 mm2 9.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 9.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 9.00 M - -
in PVC High Impact Conduit Ø 20 mm

- Instalasi Detector Point 4.00 Titik - -


NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.7 LANTAI 3 MEZZANINE


- Instalasi Detector Point 6.00 Titik - -
NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

28 FAS
- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.8 LANTAI 4
- TBFA - 3 ke TBFA - 4
FRC 2 x 2,5 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm

- Instalasi Detector Point 4.00 Titik - -


NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.9 LANTAI 4 MEZZANINE


- Instalasi Detector Point 6.00 Titik - -
NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -

29 FAS
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.10 LANTAI 5
- TBFA - 4 ke TBFA - 5
FRC 2 x 2,5 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm

- Instalasi Detector Point 6.00 Titik - -


NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.11 LANTAI 6
- TBFA - 5 ke TBFA - 6
FRC 2 x 2,5 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm

- Instalasi Detector Point 6.00 Titik - -


NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

30 FAS
- Instalasi Alarm Bell 1.00 Titik - -
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.12 LANTAI 7
- TBFA - 6 ke TBFA - 7
FRC 2 x 2,5 mm2 8.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 8.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 8.00 M - -
in PVC High Impact Conduit Ø 20 mm

- Instalasi Detector Point 14.00 Titik - -


NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.13 LANTAI 7 MEZZANINE


- Instalasi Detector Point 16.00 Titik - -
NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Remot Indicator Lamp 7.00 Titik - -


NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -

31 FAS
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.14 LANTAI 8
- TBFA - 7 ke TBFA - 8
FRC 2 x 2,5 mm2 12.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 12.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 12.00 M - -
in PVC High Impact Conduit Ø 20 mm

- Instalasi Detector Point 13.00 Titik - -


NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Remot Indicator Lamp 4.00 Titik - -


NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

- Instalasi Break Glass Alarm (Manual Call Point) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Flow Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Sprinkler Tamper Switch 1.00 Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

B.15 LANTAI ATAP


- Instalasi Detector Point 2.00 Titik - -
NYA 2 x (1x1,5 mm2)
in PVC High Impact Conduit Ø 20 mm

32 FAS
- Instalasi Break Glass Alarm (Manual Call Point) - Titik - -
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Alarm Bell - Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Visual Notification Appliance (Strobe) - Titik - -


FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

- Instalasi Fireman's Intercom Jack 1.00 Titik - -


ITC 2 x 2 x 0,6 mm2
in PVC High Impact Conduit Ø 20 mm

Sub Total Instalasi - -

C PENJUMLAHAN

C.1 PERALATAN UTAMA

- Sub Total Peralatan Utama - -

C.2 INSTALASI

- Sub Total Instalasi - -

Sub Total Instalasi Fire Alarm System - -

33 FAS
SUMMARY
PAKET PEKERJAAN ELEKTRONIK
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL UPAH

III TATA SUARA

Harga satuan pekerjaan sudah termasuk pengadaan dan


pemasangan peralatan dan alat-alat bantu yang diperlukan
hingga dapat tercapai dengan baik. Pekerjaan harus
dilaksanakan sesuai spesifikasi dan gambar teknis.

A PERALATAN UTAMA

A.1 LANTAI BASEMENT


- R.Sentral Tata Suara c/w :
- Paging Mic (Recepcionist) 1.00 Unit - -
- Mixer Pre Amp 1.00 Unit - -
- CD/ MMC/ USB Palyer w/ Tuner 1.00 Unit - -
- Equalizer 1.00 Unit - -
- Power Amplifier 2 x 240 W 1.00 Unit - -
- Sirine Module Sound Source Massanger 1.00 Unit - -
- Digital Voice Evacuation with Emergency Switch 1.00 Unit - -

- Remote Mic (Car Call) 1.00 Unit - -


- Mixer Pre Amp 1.00 Unit - -
- Power Amplifier 1 x 240 W 1.00 Unit - -
- Speaker Selector 20 Zone 1.00 Unit - -
- Cabinet Rack w/ accessories 1.00 Unit - -

- UPS 10 KVA c/w 1.00 Set - -


Surge Arrester
Rectifier
Batteray 2 Jam Nicad Type Rechargeble

- MDF-SS (20'') 1.00 Unit - -


- JBSS - BS (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) Bh - -
- Ceiling Speaker 3 W 11.00 Bh - -
- Coloumn Speaker 10 W 3.00 Bh - -
- Horn Speaker 15 W Bh - -

A.2 LANTAI GROUND


- JBSS - GR (5") 1.00 Unit - -
- Wall Speaker 3 W 1.00 Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 4.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -

A.3 LANTAI GROUND MEZZANINE


- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) Bh - -
- Ceiling Speaker 3 W 8.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -

A.4 LANTAI 2
- JBSS - 2 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 1.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -

A.5 LANTAI 2 MEZZANINE


- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) Bh - -
- Ceiling Speaker 3 W 10.00 Bh - -
- Coloumn Speaker 10 W Bh - -
34 SS
- Horn Speaker 15 W Bh - -

A.6 LANTAI 3
- JBSS - 3 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 4.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -

A.7 LANTAI 3 MEZZANINE


- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) Bh - -
- Ceiling Speaker 3 W 10.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -

A.8 LANTAI 4
- JBSS - 4 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 4.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -

A.9 LANTAI 4 MEZZANINE


- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) Bh - -
- Ceiling Speaker 3 W 10.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -

A.10 LANTAI 5
- JBSS - 5 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 10.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -

A.11 LANTAI 6
- JBSS - 6 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) Bh - -
- Ceiling Speaker 3 W 10.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -

A.12 LANTAI 7
- JBSS - 7 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 15.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -
- Volume Control Bh - -

A.13 LANTAI 7 MEZZANINE


- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) Bh - -
- Ceiling Speaker 3 W 18.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -
- Volume Control Bh - -

A.14 LANTAI 8
- JBSS - 7 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 15.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -
- Volume Control Bh - -

A.15 LANTAI ATAP


35 SS
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) Bh - -
- Ceiling Speaker 3 W 2.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -

Sub Total Peralatan Sound System - -

B INSTALASI

B.1 LANTAI BASEMENT


- Instasi Ruang Sentral Tata Suara c/w : 1.00 Lot - -
Grounding, Accessories dan material bantu sehingga
sistem berjalan sesuai dengan sepesifikasi teknis.

- MDF - SS ke JBSS - BS 21.00 M - -


FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 11.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker 3.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI GROUND
- MDF - SS ke JBSS - GR 26.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker 1.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 4.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI GROUND MEZZANINE


- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 8.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI 2
- MDF - SS ke JBSS - 2 31.00 M - -
36 SS
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 1.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI 2 MEZZANINE
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 10.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI 3
- MDF - SS ke JBSS - 3 38.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 4.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI 3 MEZZANINE
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 10.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI 4
- MDF - SS ke JBSS - 4 41.00 M - -
FRC 2 x 2,5 mm2
37 SS
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 4.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI 4 MEZZANINE
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 10.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI 5
- MDF - SS ke JBSS - 5 45.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 10.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI 6
- MDF - SS ke JBSS - 6 48.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 10.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI 7
38 SS
- MDF - SS ke JBSS - 7 55.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 15.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Volume Control - Titik - -
NYMHY 3 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI 7 MEZZANINE
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 18.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Volume Control - Titik - -
NYMHY 3 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI 8
- MDF - SS ke JBSS - 8 65.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 15.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Volume Control - Titik - -
NYMHY 3 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

LANTAI ATAP
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 2.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
39 SS
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm

Sub Total Instalasi Lt Sound System - -

C PENJUMLAHAN

C.1 PERALATAN UTAMA

- Sub Total Peralatan Sound System - -

C.2 INSTALASI

- Sub Total Instalasi Lt Sound System - -

Sub Total Instalasi Sound System - -

40 SS
SUMMARY
PAKET PEKERJAAN ELEKTRONIK
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL UPAH

IV MATV

Harga satuan pekerjaan sudah termasuk pengadaan dan


pemasangan peralatan dan alat-alat bantu yang diperlukan
hingga dapat tercapai dengan baik. Pekerjaan harus
dilaksanakan sesuai spesifikasi dan gambar teknis.

A PERALATAN UTAMA

A.1 LANTAI BASEMENT


- Head End c/w : 1.00 set - -
- Receiver
- RF Modular
- Combiner 4 way
- Power Devider
- Switch Multiflexer
- Encoder c/w Demodulator
- Encoder c/w Decoder

A.2 LANTAI 7 MEZZANINE


- JB-MATV-7 Mezz 1.00 unit - -
- - JB-TV-7 Mezz 1.00 unit - -
- Splitter 2 way 1.00 bh - -
- Directional Coupler 2 tap 1.00 bh - -
- Directional Coupler 4 tap 1.00 bh - -
- Outlet MATV 5.00 bh - -

A.3 LANTAI 8
- - JB-TV-8 1.00 unit - -
- Splitter 2 way 1.00 bh - -
- Directional Coupler 2 tap 1.00 bh - -
- Directional Coupler 4 tap 1.00 bh - -
- Outlet MATV 6.00 bh - -

A.4 LANTAI ATAP


Parabola Atenna Asiasat 3 1.00 unit - -
Antenna UHF 2.00 unit - -

Sub Total Peralatan Utama MATV - -

B INSTALASI

B.1 LANTAI BASEMENT


- dari Head End ke Antenna Module Parabola 70.00 M - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm

- dari Head End ke Antenna Antenna 135.00 M - -


Kabel RG 11
in PVC High Impact Conduit Ø 20 mm

B.2 LANTAI 7 MEZZANINE


- JB-MATV-7 Mezz ke JB-TV-7 Mezz 5.00 M - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm
- Instalasi Splitter 2 way 1.00 Titik - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm
- Instalasi Directional Coupler 2 tap 1.00 Titik - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm
- Instalasi Directional Coupler 4 tap 1.00 Titik - -
Kabel RG 11

41 MATV
in PVC High Impact Conduit Ø 20 mm
- Instalasi Outlet MATV 5.00 Titik - -
Kabel RG 6
in PVC High Impact Conduit Ø 20 mm

B.3 LANTAI 8
- JB-MATV-7 Mezz ke JB-TV-8 9.00 M - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm
- Instalasi Splitter 2 way 1.00 Titik - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm
- Instalasi Directional Coupler 2 tap 1.00 Titik - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm
- Instalasi Directional Coupler 4 tap 1.00 Titik - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm
- Instalasi Outlet MATV 6.00 Titik - -
Kabel RG 6
in PVC High Impact Conduit Ø 20 mm

Sub Total Instalasi MATV - -

C PENJUMLAHAN

C.1 PERALATAN UTAMA

- Sub Total Peralatan Utama MATV - -

C.2 INSTALASI

- Sub Total Instalasi MATV - -

Sub Total Instalasi MATV - -

42 MATV
SUMMARY
PAKET PEKERJAAN ELEKTRONIK
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL UPAH

VII RACK KABEL

Harga satuan pekerjaan sudah termasuk pengadaan dan


pemasangan peralatan dan alat-alat bantu yang
diperlukan hingga dapat tercapai dengan baik. Pekerjaan
harus dilaksanakan sesuai spesifikasi dan gambar teknis.

A PERALATAN UTAMA

A.1 LANTAI BASEMENT


- Riser Ladder 600 x 100 mm2 2.00 m - -
- Kabel Tray 300 x 100 mm2 6.00 m - -
- Kabel Tray 200 x 100 mm2 21.00 m - -

A.2 LANTAI GROUND


- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 3.00 m - -
- Kabel Tray 200 x 100 mm2 17.00 m - -

A.3 LANTAI GROUND MEZZANINE


- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 5.00 m - -
- Kabel Tray 200 x 100 mm2 36.00 m - -

A.4 LANTAI 2
- Riser Ladder 600 x 100 mm2 3.00 m - -

A.5 LANTAI 2 MEZZANINE


- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 5.00 m - -
- Kabel Tray 200 x 100 mm2 36.00 m - -

A.6 LANTAI 3
- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 2.00 m - -
- Kabel Tray 200 x 100 mm2 17.00 m - -

A.7 LANTAI 3 MEZZANINE


- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 5.00 m - -
- Kabel Tray 200 x 100 mm2 36.00 m - -

A.8 LANTAI 4
- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 2.00 m - -
- Kabel Tray 200 x 100 mm2 16.00 m - -

A.9 LANTAI 4 MEZZANINE


- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 5.00 m - -
- Kabel Tray 200 x 100 mm2 36.00 m - -

A.10 LANTAI 5
- Riser Ladder 600 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 5.00 m - -
- Kabel Tray 200 x 100 mm2 22.00 m - -

A.11 LANTAI 6
- Riser Ladder 600 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 5.00 m - -
- Kabel Tray 200 x 100 mm2 22.00 m - -

A.12 LANTAI 7

43 Rack Tray EC
- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 5.00 m - -
- Kabel Tray 200 x 100 mm2 28.00 m - -

A.13 LANTAI 7 MEZZANINE


- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 5.00 m - -
- Kabel Tray 200 x 100 mm2 28.00 m - -

A.14 LANTAI 8
- Riser Ladder 600 x 100 mm2 4.00 m - -
- Kabel Tray 300 x 100 mm2 4.00 m - -
- Kabel Tray 200 x 100 mm2 28.00 m - -

Sub Total Peralatan Rak Kabel - -

B PENJUMLAHAN

B.1 PERALATAN UTAMA

- Sub Total Peralatan Rak Kabel - -

TOTAL RACK KABEL - -

44 Rack Tray EC
SUMMARY
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN

SUMMARY
TOTAL
NO. URAIAN JUMLAH (Rp)
MATERIAL UPAH

PENJUMLAHAN

1 DEEPWELL - - -

TOTAL PEKERJAAN INDUK - - -

ADDENDUM

1 DEEPWELL

TOTAL PEKERJAAN TAMBAH KURANG - - -

KE PENJUMLAHAN ME - - -
BILL OF QUANTITY
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
PEKERJAAN : EQUIPMENT POMPA
HARGA SATUAN TOTAL
NO URAIAN VOL SAT
MATERIAL UPAH MATERIAL

I EQUIPMENT

Pengadaan dan pemasangan peralatan di bawah ini sesuai dengan

spesifikasi lengkap dengan steel braket, support, klem dan

accessories.

A SISTEM AIR BERSIH

4 Deepwell c/w pompa 250 meter 1.00 lot -


dan aksessories

5 Sand filter 1.00 unit -


Type Manual Backwash
Material FRP
Cap. 9 m3/jam

6 Carbon filter 1.00 unit -


Type Manual Backwash
Material FRP
Cap. 9 m3/jam

Sub Total DEEP WELL -

PENJUMLAHAN

A Sub Total DEEP WELL -

Ke Penjumlahan Plumbing -

46 DEEP WELL
TOTAL
UPAH

47 DEEP WELL
SUMMARY
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN

SUMMARY
TOTAL
NO. URAIAN JUMLAH (Rp)
MATERIAL UPAH

PENJUMLAHAN

1 EQUIPMENT - - -

2 PEMIPAAN AIR HUJAN - - -

3 PEMIPAAN AIR BERSIH - - -

4 PEMIPAAN AIR KOTOR, BEKAS dan VENT - - -

5 PEMIPAAN KITCHEN - - -

6 ACCESSORIES - - -

TOTAL PEKERJAAN INDUK - - -

ADDENDUM

1 EQUIPMENT

2 PEMIPAAN AIR HUJAN

3 PEMIPAAN AIR BERSIH

4 PEMIPAAN AIR KOTOR, BEKAS dan VENT

5 PEMIPAAN KITCHEN

6 ACCESSORIES

TOTAL PEKERJAAN TAMBAH KURANG - - -

KE PENJUMLAHAN ME - - -
BILL OF QUANTITY
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
PEKERJAAN : EQUIPMENT POMPA
HARGA SATUAN TOTAL
NO URAIAN VOL SAT
MATERIAL UPAH MATERIAL

I EQUIPMENT

Pengadaan dan pemasangan peralatan di bawah ini sesuai dengan

spesifikasi lengkap dengan steel braket, support, klem dan

accessories.

A SISTEM AIR BERSIH

1 Transfer Pump
Kode : PUMP 01 2.00 unit -
Type : Centrifugal
Kapasitas : 100 LPM, 7 BAR
Jumlah : 1 duty, 1 standby
Lokasi : Ruang Pompa

2 Booster Pump
Kode : PUMP 02 1.00 set -
Type : Centrifugal c/w VSD
Kapasitas : 155 LPM, 2 BAR
Jumlah : paralel alternate
Lokasi : Roof
1 Set : 2 pompa

3 Roof Tank
Kode : TN.102 1.00 Lot -
Kapasitas : 20 m3
Type : FRP
Lokasi : Roof

4 Electric Water Heater : Kap 80 Liter 1.00 unit -

5 Electric Water Heater : Kap 50 Liter 3.00 unit -

Sub Total Peralatan Utama Sistem Air Bersih -

C SISTEM AIR HUJAN, AIR BEKAS & AIR KOTOR

1 Sump pit Pump


Kode : SP PUMP 01 2.00 unit -
Type : submersible + QDC
Kapasitas : @100 LPM, 1,5 BAR
Jumlah : paralel alternate
Lokasi : Basement
1 Set :

2 Sump pit Pump


Kode : SP PUMP 02 2.00 unit -
Type : submersible + QDC
Kapasitas : @100 LPM, 1,5 BAR
Jumlah : paralel alternate
Lokasi : Ruang pompa
1 Set :

3 Sewage pump
Kode : SP PUMP 03 2.00 unit -
Type : submersible + QDC
Kapasitas : @200 LPM, 2,5 BAR
Jumlah : paralel alternate
Lokasi : Grease trap pit
1 Set :

49 EQUIP
4 STP 1.00 Lot -
Kap : 10 M3 type Biotech

5 Grease Trap : Kap 100 Liter (kitchen) 1.00 unit -

6 Grease Trap : Kap 50 Liter (pantry) 2.00 unit -

7 Grease Trap : Kap 30 Liter (mess dan Bedroom) 7.00 unit -

Sub Total Peralatan Utama Sistem Air Hujan, Bekas & Kotor -

PENJUMLAHAN

A Sub Total Peralatan Utama Sistem Air Bersih -

B Sub Total Peralatan Utama Sistem Air Hujan, Bekas & Kotor -

Ke Penjumlahan Plumbing -

50 EQUIP
TOTAL
UPAH

51 EQUIP
-

52 EQUIP
BILL OF QUANTITY
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN

PEKERJAAN : PIPA AIR HUJAN


HARGA SATUAN TOTAL
NO URAIAN VOL SAT
MATERIAL UPAH MATERIAL UPAH

PEMIPAAN SISTEM AIR HUJAN & DRAIN

Pengadaan dan pemasangan Pipa, sesuai


dengan spesifikasi , pada penempatan tertentu
mempergunakan sambungan solvent cement,
lengkap dengan hanger, siupport, klem dan
accessories lainnnya.

A LANTAI BASEMENT
1 Pipa Air Hujan PVC AW
- dia : 100 mm 16.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

B LANTAI 1
1 Pipa Air Hujan PVC AW
- dia : 200 mm 60.00 M - -
- dia : 150 mm 9.00 M - -
- dia : 100 mm 45.00 M - -
- dia : 80 mm 15.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes


-Elbow GIP 80mm c/w Pipa GIP 2m 1.00 Set - -
, Flange GIP(2bh), Flange PVC (2bh)
-Elbow GIP 100mm c/w Pipa GIP 2m 4.00 Set - -
, Flange GIP(2bh), Flange PVC (2bh)
-Elbow GIP 200mm c/w Pipa GIP 2m 1.00 Set - -
, Flange GIP(2bh), Flange PVC (2bh), Reducer

C LANTAI 1 MEZZANINE
1 Pipa Air Hujan PVC AW
- dia : 150 mm 4.00 M - -
- dia : 100 mm 15.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

D LANTAI 2
1 Pipa Air Hujan PVC AW
- dia : 150 mm 5.00 M - -
- dia : 100 mm 15.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

D LANTAI 2 MEZZANINE
1 Pipa Air Hujan PVC AW
- dia : 150 mm 5.00 M - -
- dia : 100 mm 15.00 M - -

53 RW
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

E LANTAI 3
1 Pipa Air Hujan PVC AW
- dia : 150 mm 35.00 M - -
- dia : 100 mm 20.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

F LANTAI 3 MEZZANINE
1 Pipa Air Hujan PVC AW
- dia : 100 mm 15.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

G LANTAI 4
1 Pipa Air Hujan PVC AW
- dia : 100 mm 15.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

H LANTAI 4 MEZZNINE
1 Pipa Air Hujan PVC AW
- dia : 100 mm 15.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

I LANTAI 5
1 Pipa Air Hujan PVC AW
- dia : 100 mm 27.00 M - -
- dia : 80 mm 5.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

J LANTAI 6
1 Pipa Air Hujan PVC AW
- dia : 100 mm 28.00 M - -
- dia : 80 mm 5.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

I LANTAI 7
1 Pipa Air Hujan PVC AW
- dia : 100 mm 28.00 M - -
- dia : 80 mm 5.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

J LANTAI 7 MEZZANINE

54 RW
1 Pipa Air Hujan PVC AW
- dia : 100 mm 28.00 M - -
- dia : 80 mm 5.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

K LANTAI 8
1 Pipa Air Hujan PVC AW
- dia : 100 mm 16.00 M - -
- dia : 80 mm 18.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

L LANTAI ATAP
1 Pipa Air Hujan PVC AW
- dia : 100 mm 18.00 M - -
- dia : 80 mm 4.00 M - -
- dia : 65 mm 2.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

Total Pemipaan Sistem Air Hujan - -

55 RW
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
PEKERJAAN : PIPA AIR BERSIH
HARGA SATUAN
NO URAIAN VOL SAT
MATERIAL

PEMIPAAN SISTEM AIR BERSIH

Pengadaan dan pemasangan pipa Sesuai spesifikasi,


pada penempatan tertentu mempergunakan sambungan
solvent cement, lengkap dengan hanger, support, klem
dan accessories lainnya.

A LANTAI BASEMENT
Ruang Pompa
1 Pipa Air Bersih PPR PN 20
- dia : 15 mm 10.00 M
- dia : 50 mm 8.00 M
- dia : 65 mm 9.00 M
- dia 100 mm 10.00 M

Header GIP @3m


- dia : 80 mm 1.00 bh
Header GIP @ 1.5 m
- dia : 80 mm 1.00 bh

2 Fitting dan Accessories 1.00 Lot

Di Luar Ruang Pompa


1 Pipa Air Bersih PPR PN 20
- dia : 15 mm 28.00 M
- dia : 20 mm 31.00 M
- dia : 25 mm 9.00 M
- dia : 32 mm 5.00 M
- dia : 40 mm 28.00 M
- dia : 50 mm 28.00 M

Pipa Riser Air Bersih PPR PN 20


- dia : 50 mm (Booster) 12.00 M
- dia : 50 mm (Transfer) 50.00 M
- dia : 65 mm (Gravitasi) 50.00 M

2 Fitting dan Accessories 1.00 Lot

56 AB
B LANTAI 1

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 12.00 M

2 Fitting dan Accessories 1.00 Lot

C LANTAI 1 MEZZANINE

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 12.00 M

2 Fitting dan Accessories 1.00 Lot

D LANTAI 2

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 12.00 M

2 Fitting dan Accessories 1.00 Lot

D LANTAI 2 MEZZANINE

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 12.00 M

2 Fitting dan Accessories 1.00 Lot

E LANTAI 3

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 12.00 M

2 Fitting dan Accessories 1.00 Lot

F LANTAI 3 MEZZZANINE

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 12.00 M

2 Fitting dan Accessories 1.00 Lot

G LANTAI 4

57 AB
1 Pipa Air Bersih PPR PN 20
- dia : 15 mm 12.00 M

2 Fitting dan Accessories 1.00 Lot

H LANTAI 4 MEZZANINE

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 12.00 M

2 Fitting dan Accessories 1.00 Lot

I LANTAI 5

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 13.00 M

2 Fitting dan Accessories 1.00 Lot

J LANTAI 6

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 13.00 M

2 Fitting dan Accessories 1.00 Lot

K LANTAI 7

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 9.00 M
- dia : 20 mm 15.00 M
- dia : 25 mm 12.00 M

2 Fitting dan Accessories 1.00 Lot

L LANTAI 7 MEZZANINE

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 51.00 M
- dia : 20 mm 21.00 M
- dia : 25 mm 8.00 M
- dia : 40 mm 16.00 M
- dia : 50 mm 4.00 M

2 Fitting dan Accessories 1.00 Lot

58 AB
M LANTAI 8

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 52.00 M
- dia : 20 mm 26.00 M
- dia : 25 mm 21.00 M
- dia : 40 mm 18.00 M
- dia : 50 mm 12.00 M

2 Pipa Air Panas PPR PN 20


- dia : 15 mm 28.00 M
- dia : 20 mm 21.00 M

3 Fitting dan Accessories 1.00 Lot

N LANTAI ATAP

1 Pipa Air Bersih PPR PN 20


- dia : 15 mm 12.00 M
- dia : 50 mm 27.00 M
- dia : 65 mm 37.00 M
- dia : 80 mm 2.00 M

2 Fitting dan Accessories 1.00 Lot

Pemipaan Sistem Air Bersih

59 AB
HARGA SATUAN TOTAL
UPAH MATERIAL UPAH

- -
- -
- -
- -

- -

- -

Include pipes Include pipes

- -
- -
- -
- -
- -
- -

- -
- -
- -

Include pipes Include pipes

60 AB
- -

Include pipes Include pipes

- -

Include pipes Include pipes

- -

Include pipes Include pipes

- -

Include pipes Include pipes

- -

Include pipes Include pipes

- -

Include pipes Include pipes

61 AB
- -

Include pipes Include pipes

- -

Include pipes Include pipes

- -

Include pipes Include pipes

- -

Include pipes Include pipes

- -
- -
- -

Include pipes Include pipes

- -
- -
- -
- -
- -

Include pipes Include pipes

62 AB
- -
- -
- -
- -
- -

- -
- -

Include pipes Include pipes

- -
- -
- -
- -

Include pipes Include pipes

- -

63 AB
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
PEKERJAAN : PIPA AIR KOTOR, BEKAS, VENT
HARGA SATUAN TOTAL
NO URAIAN VOL SAT
MATERIAL UPAH MATERIAL UPAH

PEMIPAAN SISTEM AIR KOTOR, AIR BEKAS, VENT

Pengadaan dan pemasangan Pipa Air Kotor dan


Bekas (pipa PVC AW klass 10 kg/cm²) dan Pipa Vent
(Pipa PVC Klass D) , sesuai dengan spesifikasi , pada
penempatan tertentu mempergunakan sambungan
solvent cement, lengkap dengan hanger, support, klem
dan accessories lainnnya.

A LANTAI BASEMENT

1 Pipa Air Kotor, Bekas PVC AW


- dia : 50 mm 52.00 M - -
- dia : 65 mm 60.00 M - -
- dia : 80 mm 83.00 M - -
- dia 100 mm 37.00 M - -
- dia 150 mm 90.00 M - -

Pipa Riser Air Kotor, Bekas PVC AW


- dia 150 mm 100.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

3 Pipa Vent PVC D


- dia : 32 mm 109.00 M - -
- dia : 40 mm 38.00 M - -
- dia : 50 mm 47.00 M - -

Pipa Riser Vent PVC D


- dia : 65 mm 48.00 M - -

4 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

5 Corring & grouting 30.00 titik - -

K LANTAI 7

1 Pipa Air Kotor, Bekas PVC AW


- dia : 50 mm 25.00 M - -
- dia : 65 mm 17.00 M - -
- dia : 80 mm 15.00 M - -
- dia 100 mm 28.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

3 Pipa Vent PVC D


- dia : 32 mm 48.00 M - -
- dia : 40 mm 17.00 M - -

4 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

L LANTAI 7 MEZZANINE

1 Pipa Air Kotor, Bekas PVC AW


- dia : 50 mm 60.00 M - -
- dia : 65 mm 35.00 M - -
- dia : 80 mm 39.00 M - -

64 PKBV
- dia 100 mm 31.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

3 Pipa Vent PVC D


- dia : 32 mm 35.00 M - -
- dia : 40 mm 22.00 M - -
- dia : 50 mm 25.00 M - -

4 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

M LANTAI 8

1 Pipa Air Kotor, Bekas PVC AW


- dia : 50 mm 70.00 M - -
- dia : 65 mm 35.00 M - -
- dia : 80 mm 45.00 M - -
- dia 100 mm 60.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

3 Pipa Vent PVC D


- dia : 32 mm 45.00 M - -
- dia : 40 mm 35.00 M - -
- dia : 50 mm 20.00 M - -

4 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

Pemipaan Sistem Air Kotor - -

65 PKBV
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
PEKERJAAN : PIPA AIR KITCHEN
HARGA SATUAN TOTAL
NO URAIAN VOL SAT
MATERIAL UPAH MATERIAL UPAH

PEMIPAAN SISTEM KITCHEN

Pengadaan dan pemasangan pipa Untuk Sistem (Air


Kitchen) sesuai dengan spesifikasi , pada
penempatan tertentu lengkap dengan hanger, support,
klem dan accessories lainnnya.

A LANTAI BASEMENT

1 Pipa Kitchen PVC AW


- dia 150 mm 41.00 M - -

1 Riser Pipa Kitchen PVC AW


- dia 150 mm 48.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

M LANTAI 8

1 Pipa Kitchen PVC AW


- dia 150 mm 10.00 M - -
- dia : 65 mm 12.00 M - -

2 Fitting dan Accessories 1.00 Lot Include pipes Include pipes

Pemipaan Sistem Air Kitchen - -

66 P.KITCHEN
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN

PEKERJAAN : VALVE - VALVE & ACCESSORIES


HARGA SATUAN TOTAL
NO URAIAN VOL SAT
MATERIAL UPAH MATERIAL UPAH

II ACCESSORIES & VALVE

Pengadaan dan pemasangan valve atau


instrument sesuai dengan spesifikasi design dan
pabrik pembuat.

A LANTAI BASEMENT

1 SISTEM AIR BERSIH

RUANG POMPA
Gate Valve
- dia. : 15 mm 3.00 Bh - -
- dia. 50 mm 3.00 Bh - -
- dia. 65 mm 4.00 Bh - -

Floating Valve
- dia. 100 mm 2.00 Bh - -

Flexible Joint
- dia. : 65 mm 2.00 Bh - -
- dia. : 50 mm 2.00 Bh - -

Strainer
- dia. : 65 mm 2.00 Bh - -

Check Valve
- dia. : 50 mm 2.00 Bh - -

Level Switch 1.00 Set - -

Meteran Air Pam


- dia. : 100 mm 1.00 Bh By PDAM By PDAM

Foot Valve
- dia. : 65 mm 2.00 Bh - -

Pressure Indikator 2.00 Bh - -

Di Luar Ruang Pompa


Gate Valve
- dia. : 15 mm 1.00 Bh - -
- dia. : 20 mm 1.00 Bh - -
- dia. : 25 mm 1.00 Bh - -
- dia. : 32 mm 1.00 Bh - -
- dia. : 40 mm 1.00 Bh - -
- dia. 50 mm 1.00 Bh - -

PRV Set : terdiri dari


PRV (1bh), Strainer (1bh), Orifice (1bh),
Butterfly Valve (3bh), PG (2bh),
- dia. 65 mm 1.00 Set - -

2 SISTEM AIR KOTOR

Floor Clean Out


- dia. : 50 mm 1.00 Bh - -
- dia. : 80 mm 1.00 Bh - -
- dia. 100 mm 3.00 Bh - -

67 ACC
Floor Drain
- dia. : 50 mm 9.00 Bh - -

Check Valve
- dia. : 80 mm 2.00 Bh - -

Butterfly Valve
- dia. : 100 mm 1.00 Bh - -

3 SISTEM AIR HUJAN

Check Valve
- dia. : 80 mm 4.00 Bh - -

Butterfly Valve
- dia. : 100 mm 2.00 Bh - -

B LANTAI 1

1 Gate Valve
- dia. : 15 mm 2.00 Bh - -

2 SISTEM AIR HUJAN

Floor Drain
- dia. : 100 mm 1.00 Bh - -

Roof Drain
- dia. : 65 mm 1.00 Bh - -

Clean Out
- dia. : 200 mm 1.00 Bh - -

C LANTAI 1 MEZZANINE

1 Gate Valve
- dia. : 15 mm 2.00 Bh - -

2 SISTEM AIR HUJAN

Roof Drain
- dia. : 50 mm 1.00 Bh - -

D LANTAI 2

1 Gate Valve
- dia. : 15 mm 2.00 Bh - -

3 SISTEM AIR HUJAN

Roof Drain
- dia. : 50 mm 1.00 Bh - -

E LANTAI 3

1 Gate Valve
- dia. : 15 mm 2.00 Bh - -

PRV Set : terdiri dari


PRV (1bh), Strainer (1bh), Orifice (1bh),
Butterfly Valve (3bh), PG (2bh),
- dia. 65 mm 1.00 Set - -

2 SISTEM AIR HUJAN

Roof Drain
- dia. : 65 mm 1.00 Bh - -
- dia. : 100 mm 6.00 Bh - -

68 ACC
F LANTAI 3 MEZZZANINE

1 Gate Valve
- dia. : 15 mm 2.00 Bh - -

2 SISTEM AIR HUJAN

Roof Drain
- dia. : 65 mm 1.00 Bh - -

G LANTAI 4

1 Gate Valve
- dia. : 15 mm 2.00 Bh - -

2 SISTEM AIR HUJAN

Roof Drain
- dia. : 65 mm 1.00 Bh - -

H LANTAI 4 MEZZANINE

1 Gate Valve
- dia. : 15 mm 2.00 Bh - -

2 SISTEM AIR HUJAN

Roof Drain
- dia. : 65 mm 1.00 Bh - -

I LANTAI 5

1 Gate Valve
- dia. : 15 mm 2.00 Bh - -

2 SISTEM AIR HUJAN

Roof Drain
- dia. : 65 mm 1.00 Bh - -

J LANTAI 6

1 Gate Valve
- dia. : 15 mm 2.00 Bh - -

2 SISTEM AIR HUJAN

Roof Drain
- dia. : 65 mm 1.00 Bh - -

K LANTAI 7

1 Gate Valve
- dia. : 15 mm 1.00 Bh - -
- dia. : 25 mm 2.00 Bh - -

2 SISTEM AIR KOTOR

Clean Out
- dia. : 80 mm 1.00 Bh - -
- dia. 100 mm 1.00 Bh - -

Floor Drain
- dia. : 50 mm 1.00 Bh - -

3 SISTEM AIR HUJAN

Roof Drain

69 ACC
- dia. : 65 mm 1.00 Bh - -

4 SISTEM KITCHEN DRAIN


Clean Out
- dia. : 150 mm 2.00 Bh - -

L LANTAI 7 MEZZANINE

1 Gate Valve
- dia. : 15 mm 5.00 Bh - -
- dia. : 25 mm 4.00 Bh - -
- dia. 50 mm 1.00 Bh - -

2 SISTEM AIR KOTOR

Clean Out
- dia. : 80 mm 2.00 Bh - -
- dia. 100 mm 1.00 Bh - -

Floor Drain
- dia. : 50 mm 4.00 Bh - -

3 SISTEM AIR HUJAN

Roof Drain
- dia. : 65 mm 1.00 Bh - -

M LANTAI 8

1 Gate Valve
- dia. : 15 mm 1.00 Bh - -
- dia. : 20 mm 11.00 Bh - -
- dia. : 25 mm 8.00 Bh - -
- dia. 50 mm 2.00 Bh - -

2 SISTEM AIR KOTOR

Clean Out
- dia. : 80 mm 3.00 Bh - -
- dia. 100 mm 4.00 Bh - -

Floor Drain
- dia. : 50 mm 12.00 Bh - -

Venting
- dia. : 150 mm 1.00 Bh - -

3 SISTEM AIR HUJAN

Roof Drain
- dia. : 65 mm 1.00 Bh - -
- dia. : 80 mm 5.00 Bh - -
N LANTAI ATAP

1 Gate Valve
- dia. : 15 mm 2.00 Bh - -
- dia. 50 mm 5.00 Bh - -
- dia. 80 mm 4.00 Bh - -

Flexible Joint
- dia. : 80 mm 2.00 Bh - -
- dia. : 50 mm 2.00 Bh - -

Strainer
- dia. : 80 mm 2.00 Bh - -

Check Valve
- dia. : 50 mm 3.00 Bh - -

70 ACC
2 SISTEM AIR KOTOR
Vent cap
- dia. : 150 mm 1.00 Bh - -

3 SISTEM AIR HUJAN

Roof Drain
- dia. : 65 mm 1.00 Bh - -
- dia. : 100 mm 5.00 Bh - -

Vent Cup
- dia. : 80 mm 1.00 Bh - -
- dia. : 100 mm 5.00 Bh - -

4 SISTEM DRAIN KITCHEN


Vent cap
- dia. : 150 mm 1.00 Bh - -

Pemipaan Sistem ACC - -

71 ACC
SUMMARY
PAKET PEKERJAAN PEMADAM KEBAKARAN
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN

HARGA SATUAN
NO. URAIAN TOTAL
MATERIAL UPAH

PENJUMLAHAN PEMADAM KEBAKARAN

PEKERJAAN INDUK

1 EQUIPMENT - - -

2 PEMIPAAN SPRINKLER - - -

3 PEMIPAAN HYDRANT - - -

4 PEMIPAAN SPRINKLER DRAIN - - -

5 VALVE & ACCESSORIES - - -

SUB TOTAL PEKERJAAN INDUK - - -

PEKERJAAN TAMBAH KURANG

1 EQUIPMENT

2 PEMIPAAN SPRINKLER

3 PEMIPAAN HYDRANT

4 PEMIPAAN SPRINKLER DRAIN

5 VALVE & ACCESSORIES

SUB TOTAL PEKERJAAN TAMBAH KURANG - - -

TOTAL KE PENJUMLAHAN ME - - -

132 SUM PK
BILL OF QUANTITY
PAKET PEKERJAAN PEMADAM KEBAKARAN
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN

EQUIPMENT
HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL UPAH

A EQUIPMENT

Pengadaan dan pemasangan peralatan utama


sistem hydrant lengkap dengan dudukan lengkap
dengan steel braket, antivibration spring dan semua
aksesori yang dibutuhkan lengkap seperti yang
terdapat pada gambar dan sesuai spesifikasi teknis.

1 LANTAI BASEMENT

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 4.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lantai Basement - -

2 LANTAI 1

1 DIESEL PUMP 1.00 Set - -


Kode : DFP
Type : horizontal split case
Kapasitas : 750 GPM, 12 BAR
Jumlah : 1
Lokasi : Ruang Pompa

2 Electric Pump 1.00 Set - -


Kode : EFP
Type : horizontal split case
Kapasitas : 750 GPM, 12 BAR
Jumlah : 1
Lokasi : Ruang Pompa

3 Jockey Pump 1.00 Set - -


Kode : PUMP 01
Type : VERTICAL INLINE
Kapasitas : 10 GPM, 13 BAR
Jumlah : 1
Lokasi : Ruang Pompa

5 Siamesse Connection 1.00 Unit - -

Pilar Hydrant 1.00 Unit - -

6 Indoor Hydrant Box (IHB) 1.00 Unit - -

6 Outdoor Hydrant Box (IHB) 1.00 Unit - -

7 Portable Fire Extinguisher (PFE) Dry Powder 6.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lantai 1 - -

3 LANTAI 1 Mezzanine

73 EQUIPMENT
1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 4.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lt. 1 Mezzanine - -

4 LANTAI 2

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 4.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lt. 2 - -

4 LANTAI 2 Mezzanine

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 2.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lt. 2 Mezzanine - -

5 LANTAI 3

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 4.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lantai 3 - -

6 LANTAI 3 Mezzanine

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 2.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lantai 3 Mezzanine - -

7 LANTAI 4

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 4.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lantai 4 - -

8 LANTAI 4 Mezzanine

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 2.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lantai 4 Mezzanine - -

74 EQUIPMENT
9 LANTAI 5

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 4.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lantai 5 - -

10 LANTAI 6

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 4.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lantai 6 - -

11 LANTAI 7

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 6.00 Unit - -


Kap : 3 kg

2 Portable Fire Extinguisher (PFE) CO2 1.00 Unit - -


Kap : 5 kg (SERVER)

Sub Total Peralatan Utama Lantai 7 - -

12 LANTAI 7 Mezzanine

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 4.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lantai 7 Mezzanine - -

13 LANTAI 8

1 Indoor Hydrant Box (IHB) 1.00 Unit - -

1 Indoor Hydrant Box type outdoor 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 3.00 Unit - -


Kap : 3 kg
2 Portable Fire Extinguisher (PFE) CO2 1.00 Unit - -
Kap : 5 kg (KITCHEN)

Sub Total Peralatan Utama Lantai 8 - -

14 LANTAI Atap

1 Indoor Hydrant Box type outdoor 1.00 Unit - -

2 Portable Fire Extinguisher (PFE) Dry Powder 1.00 Unit - -


Kap : 3 kg

Sub Total Peralatan Utama Lantai Atap - -

75 EQUIPMENT
SUMMARY

1 Sub Total Peralatan Utama Lantai Basement - -

2 Sub Total Peralatan Utama Lantai 1 - -

3 Sub Total Peralatan Utama Lt. 1 Mezzanine - -

4 Sub Total Peralatan Utama Lt. 2 - -

4 Sub Total Peralatan Utama Lt. 2 Mezzanine - -

5 Sub Total Peralatan Utama Lantai 3 - -

6 Sub Total Peralatan Utama Lantai 3 Mezzanine - -

7 Sub Total Peralatan Utama Lantai 4 - -

8 Sub Total Peralatan Utama Lantai 4 Mezzanine - -

9 Sub Total Peralatan Utama Lantai 5 - -

10 Sub Total Peralatan Utama Lantai 6 - -

11 Sub Total Peralatan Utama Lantai 7 - -

12 Sub Total Peralatan Utama Lantai 7 Mezzanine - -

13 Sub Total Peralatan Utama Lantai 8 - -

14 Sub Total Peralatan Utama Lantai Atap - -

ke Penjumlahan Pemadam Kebakaran - -

76 EQUIPMENT
BILL OF QUANTITY
PAKET PEKERJAAN PEMADAM KEBAKARAN
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN

PEMIPAAN SPRINKLER
HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL

II PEMIPAAN SPRINKLER

Pengadaan dan pemasangan pipa black steel sch.


40 untuk header dan riser sedangkan pipa
pecabangan setelah PRV menggunakan Pipa
class Medium , dengan sambungan ulir atau
flange atau pengelasan lengkap dan termasuk
klem, braket, penunjang, penggantung material
penyambung dan segala macam material
pembantu yang diperlukan seperti terdapat pada
1 LANTAI dan
gambar BASEMENT
spesifikasi teknis.

1 Pipa Splinkler
- dia. : 25 mm 1,000.00 M -
- dia. : 32 mm 24.00 M -
- dia. : 40 mm 18.00 M -
- dia. : 80 mm 25.00 M -
- dia. : 150 mm 18.00 M -

Riser
- dia. : 150 mm 4.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Peralatan Utama Lantai Basement -

2 LANTAI 1

1 Pipa Splinkler
- dia. : 25 mm 31.00 M -
- dia. : 50 mm 14.00 M -
- dia. : 65 mm 9.00 M -

Riser
- dia. : 150 mm 3.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Peralatan Utama Lantai 1 -

3 LANTAI 1 Mezzanine

1 Pipa Splinkler
- dia. : 25 mm 28.00 M -
- dia. : 50 mm 15.00 M -
- dia. : 65 mm 9.00 M -

Riser
- dia. : 150 mm 3.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Peralatan Utama Lt. 1 Mezzanine -

4 LANTAI 2

77 PEMIPAAN SPLINKLER
1 Pipa Splinkler
- dia. : 25 mm 28.00 M -
- dia. : 50 mm 15.00 M -
- dia. : 65 mm 9.00 M -

Riser
- dia. : 150 mm 3.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Peralatan Utama Lt. 2 -

4 LANTAI 2 MEZZANINE

1 Pipa Splinkler
- dia. : 25 mm 90.00 M -
- dia. : 32 mm 10.00 M -
- dia. : 40 mm 18.00 M -
- dia. : 50 mm 2.00 M -
- dia. : 65 mm 15.00 M -
- dia. : 80 mm 9.00 M -

Riser
- dia. : 150 mm 3.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Peralatan Utama Lt. 2 Mezzanine -

5 LANTAI 3

1 Pipa Splinkler
- dia. : 25 mm 28.00 M -
- dia. : 50 mm 14.00 M -
- dia. : 65 mm 9.00 M -

Riser
- dia. : 150 mm 3.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Peralatan Utama Lantai 3 -

6 LANTAI 3 Mezzanine

1 Pipa Splinkler
- dia. : 25 mm 90.00 M -
- dia. : 32 mm 10.00 M -
- dia. : 40 mm 18.00 M -
- dia. : 50 mm 2.00 M -
- dia. : 65 mm 15.00 M -
- dia. : 80 mm 9.00 M -

Riser
- dia. : 150 mm 3.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Peralatan Utama Lantai 3 Mezzanine -

78 PEMIPAAN SPLINKLER
7 LANTAI 4

1 Pipa Splinkler
- dia. : 25 mm 28.00 M -
- dia. : 50 mm 12.00 M -
- dia. : 65 mm 9.00 M -

Riser
- dia. : 150 mm 3.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Peralatan Utama Lantai 4 -

8 LANTAI 4 Mezzanine

1 Pipa Splinkler
- dia. : 25 mm 88.00 M -
- dia. : 32 mm 10.00 M -
- dia. : 40 mm 12.00 M -
- dia. : 50 mm 10.00 M -
- dia. : 65 mm 15.00 M -
- dia. : 80 mm 9.00 M -

Riser
- dia. : 150 mm 3.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Instalasi Sprinkler Lantai 4 Mezzanine -

9 LANTAI 5

1 Pipa Splinkler
- dia. : 25 mm 121.00 M -
- dia. : 32 mm 10.00 M -
- dia. : 40 mm 12.00 M -
- dia. : 50 mm 10.00 M -
- dia. : 65 mm 15.00 M -
- dia. : 80 mm 9.00 M -

Riser
- dia. : 150 mm 6.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Instalasi Sprinkler Lantai 5 -

10 LANTAI 6

1 Pipa Splinkler
- dia. : 25 mm 121.00 M -
- dia. : 32 mm 10.00 M -
- dia. : 40 mm 12.00 M -
- dia. : 50 mm 10.00 M -
- dia. : 65 mm 15.00 M -
- dia. : 80 mm 9.00 M -

Riser

79 PEMIPAAN SPLINKLER
- dia. : 150 mm 6.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Instalasi Sprinkler Lantai 6 -

11 LANTAI 7

1 Pipa Splinkler
- dia. : 25 mm 92.00 M -
- dia. : 32 mm 2.00 M -
- dia. : 40 mm 6.00 M -
- dia. : 50 mm 6.00 M -
- dia. : 65 mm 13.00 M -
- dia. : 80 mm 10.00 M -

Riser
- dia. : 150 mm 3.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Instalasi Sprinkler Lantai 7 -

12 LANTAI 7 Mezzanine

1 Pipa Splinkler
- dia. : 25 mm 10.00 M -
- dia. : 32 mm 12.00 M -
- dia. : 40 mm 4.00 M -
- dia. : 50 mm 10.00 M -
- dia. : 65 mm 16.00 M -
- dia. : 80 mm 12.00 M -

Riser
- dia. : 150 mm 3.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Instalasi Sprinkler Lantai 7 Mezzanine -

13 LANTAI 8

1 Pipa Splinkler
- dia. : 25 mm 76.00 M -
- dia. : 32 mm 8.00 M -
- dia. : 40 mm 4.00 M -
- dia. : 50 mm 8.00 M -
- dia. : 65 mm 8.00 M -
- dia. : 80 mm 11.00 M -

Riser
- dia. : 150 mm 4.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Instalasi Sprinkler Lantai 8 -

14 LANTAI ATAP

80 PEMIPAAN SPLINKLER
1 Pipa Splinkler
- dia. : 25 mm 2.00 M -

Riser
- dia. : 150 mm 4.00 M -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe

Sub Total Instalasi Sprinkler Lantai Atap -

SUMMARY

1 Sub Total Peralatan Utama Lantai Basement -

2 Sub Total Peralatan Utama Lantai 1 -

3 Sub Total Peralatan Utama Lt. 1 Mezzanine -

4 Sub Total Peralatan Utama Lt. 2 -

4 Sub Total Peralatan Utama Lt. 2 Mezzanine -

5 Sub Total Peralatan Utama Lantai 3 -

6 Sub Total Peralatan Utama Lantai 3 Mezzanine -

7 Sub Total Peralatan Utama Lantai 4 -

8 Sub Total Instalasi Sprinkler Lantai 4 Mezzanine -

9 Sub Total Instalasi Sprinkler Lantai 5 -

10 Sub Total Instalasi Sprinkler Lantai 6 -

11 Sub Total Instalasi Sprinkler Lantai 7 -

12 Sub Total Instalasi Sprinkler Lantai 7 Mezzanine -

13 Sub Total Instalasi Sprinkler Lantai 8 -

14 Sub Total Instalasi Sprinkler Lantai Atap -

ke Penjumlahan Pemadam Kebakaran -

81 PEMIPAAN SPLINKLER
TOTAL
UPAH

-
-
-
-
-

Include pipe

-
-
-

Include pipe

-
-
-

Include pipe

82 PEMIPAAN SPLINKLER
-
-
-

Include pipe

-
-
-
-
-
-

Include pipe

-
-
-

Include pipe

-
-
-
-
-
-

Include pipe

83 PEMIPAAN SPLINKLER
-
-
-

Include pipe

-
-
-
-
-
-

Include pipe

-
-
-
-
-
-

Include pipe

-
-
-
-
-
-

84 PEMIPAAN SPLINKLER
-

Include pipe

-
-
-
-
-
-

Include pipe

-
-
-
-
-
-

Include pipe

-
-
-
-
-
-

Include pipe

85 PEMIPAAN SPLINKLER
-

Include pipe

86 PEMIPAAN SPLINKLER
BILL OF QUANTITY
PAKET PEKERJAAN PEMADAM KEBAKARAN
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN

PEMIPAAN HYDRANT
HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL UPAH

III PEMIPAAN HYDRANT

Pengadaan dan pemasangan pipa black steel sch. 40


untuk header dan riser sedangkan pipa pecabangan
setelah PRV menggunakan Pipa class Medium , dengan
sambungan ulir atau flange atau pengelasan lengkap
dan termasuk klem, braket, penunjang, penggantung
material penyambung dan segala macam material
pembantu yang diperlukan seperti terdapat pada
gambar dan spesifikasi teknis.

1 BASEMENT 1

1 Pipa Hydrant
- dia. : 65 mm 20.00 M - -
- dia. : 100 mm 31.00 M - -
- dia. : 150 mm 18.00 M - -

Riser
- dia. : 100 mm 4.00 M - -
- dia. : 150 mm 4.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Hydrant Lantai Basement - -

2 LANTAI 1

1 Pipa Hydrant
- dia. : 65 mm 6.00 M - -
- dia. : 80 mm 15.00 M - -
- dia. : 100 mm 27.00 M - -
- dia. : 150 mm ( BS Medium sleeve) 12.00 M - -

Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Hydrant Lantai 1 - -

3 LANTAI 1 Mezzanine

1 Pipa Hydrant
- dia. : 65 mm 6.00 M - -
- dia. : 80 mm 10.00 M - -

Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Hydrant Lantai 1 Mezzanine - -

4 LANTAI 2

1 Pipa Hydrant

87 PEMIPAAN HYDRANT
1 Pipa Hydrant
- dia. : 65 mm 6.00 M - -

88 PEMIPAAN HYDRANT
- dia. : 80 mm 10.00 M - -

Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Peralatan Utama Lantai 2 - -

4 LANTAI 2 MEZZANINE

1 Pipa Splinkler
- dia. : 65 mm 11.00 M - -
- dia. : 80 mm 10.00 M - -

Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Peralatan Utama Lt. 2 Mezzanine - -

5 LANTAI 3

1 Pipa Hydrant
- dia. : 65 mm 6.00 M - -
- dia. : 80 mm 10.00 M - -

Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Peralatan Utama Lantai 3 - -

6 LANTAI 3 Mezzanine

1 Pipa Hydrant
- dia. : 65 mm 11.00 M - -
- dia. : 80 mm 10.00 M - -

Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Hydrant Lantai 3 Mezzanine - -

7 LANTAI 4

1 Pipa Hydrant
- dia. : 65 mm 6.00 M - -
- dia. : 80 mm 10.00 M - -

Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

89 PEMIPAAN HYDRANT
Sub Total Instalasi Hydrant Lantai 4 - -

8 LANTAI 4 Mezzanine

1 Pipa Hydrant
- dia. : 65 mm 11.00 M - -
- dia. : 80 mm 10.00 M - -

Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Hydrant Lantai 4 Mezzanine - -

9 LANTAI 5

1 Pipa Hydrant
- dia. : 65 mm 12.00 M - -
- dia. : 80 mm 10.00 M - -

Riser
- dia. : 100 mm 5.00 M - -
- dia. : 150 mm 5.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Hydrant Lantai 5 - -

10 LANTAI 6

1 Pipa Hydrant
- dia. : 65 mm 12.00 M - -
- dia. : 80 mm 10.00 M - -

Riser
- dia. : 100 mm 5.00 M - -
- dia. : 150 mm 5.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Hydrant Lantai 6 - -

11 LANTAI 7

1 Pipa Hydrant
- dia. : 65 mm 5.00 M - -
- dia. : 80 mm 10.00 M - -

Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Hydrant Lantai 7 - -

12 LANTAI 7 Mezzanine

1 Pipa Hydrant
- dia. : 65 mm 12.00 M - -

90 PEMIPAAN HYDRANT
- dia. : 80 mm 8.00 M - -

Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Hydrant Lantai 7 Mezzanine - -

13 LANTAI 8

1 Pipa Hydrant
- dia. : 65 mm 12.00 M - -
- dia. : 80 mm 4.00 M - -

Riser
- dia. : 100 mm 4.00 M - -
- dia. : 150 mm 4.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Hydrant Lantai 8 - -

14 LANTAI ATAP

1 Pipa Hydrant
- dia. : 65 mm 7.00 M - -

Riser
- dia. : 65 mm 4.00 M - -
- dia. : 150 mm 4.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Hydrant Lantai Atap - -

SUMMARY

1 Sub Total Instalasi Hydrant Lantai Basement - -

2 Sub Total Instalasi Hydrant Lantai 1 - -

3 Sub Total Instalasi Hydrant Lantai 1 Mezzanine - -

4 Sub Total Peralatan Utama Lantai 2 - -

4 Sub Total Peralatan Utama Lt. 2 Mezzanine - -

5 Sub Total Peralatan Utama Lantai 3 - -

6 Sub Total Instalasi Hydrant Lantai 3 Mezzanine - -

7 Sub Total Instalasi Hydrant Lantai 4 - -

8 Sub Total Instalasi Hydrant Lantai 4 Mezzanine - -

9 Sub Total Instalasi Hydrant Lantai 5 - -

10 Sub Total Instalasi Hydrant Lantai 6 - -

11 Sub Total Instalasi Hydrant Lantai 7 - -

12 Sub Total Instalasi Hydrant Lantai 7 Mezzanine - -

91 PEMIPAAN HYDRANT
13 Sub Total Instalasi Hydrant Lantai 8 - -

14 Sub Total Instalasi Hydrant Lantai Atap - -

ke Penjumlahan Pemadam Kebakaran - -

92 PEMIPAAN HYDRANT
BILL OF QUANTITY
PAKET PEKERJAAN PEMADAM KEBAKARAN
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN

PEMIPAAN SPRINKLER DRAIN


HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL UPAH

IV PEMIPAAN SPRINKLER DRAIN

Pengadaan dan pemasangan pipa black steel Medium


1387, dengan sambungan ulir atau flange atau pengelasan
lengkap dan termasuk klem, braket, penunjang,
penggantung material penyambung dan segala macam
material pembantu yang diperlukan seperti terdapat pada
gambar dan spesifikasi teknis.

1 LANTAI BASEMENT 1

1 Pipa Sprinkler Drain


- dia. : 25 mm 20.00 M - -

Riser
- dia. : 50 mm 4.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Sprinkler Drain Lantai Basement 1 - -

2 LANTAI 1

1 Pipa Sprinkler Drain


- dia. : 25 mm 25.00 M - -

Riser
- dia. : 50 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Sprinkler Drain Lantai 1 - -

3 LANTAI 1 Mezzanine

1 Pipa Sprinkler Drain


- dia. : 25 mm 25.00 M - -

Riser
- dia. : 50 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Peralatan Utama LANTAI 1 Mezzanine - -

4 LANTAI 2

1 Pipa Sprinkler Drain


- dia. : 25 mm 25.00 M - -

Riser
- dia. : 50 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Peralatan Utama LANTAI 2 - -

4 LANTAI 2 MEZZANINE

93 PEMIPAAN SPRIN DRAIN


1 Pipa Sprinkler Drain

94 PEMIPAAN SPRIN DRAIN


- dia. : 25 mm 25.00 M - -

Riser
- dia. : 50 mm 3.00 M - -

2 Fitting - fitting & Material Bantu Lot Include pipe Include pipe

Sub Total Peralatan Utama LANTAI 2 Mezzanine - -

5 LANTAI 3

1 Pipa Sprinkler Drain


- dia. : 25 mm 25.00 M - -

Riser
- dia. : 50 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Peralatan Utama Lt. 3 - -

6 LANTAI 3 Mezzanine

1 Pipa Sprinkler Drain


- dia. : 25 mm 25.00 M - -

Riser
- dia. : 50 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Sprinkler Drain Lantai 3 Mezzanine - -

7 LANTAI 4

1 Pipa Sprinkler Drain


- dia. : 25 mm 25.00 M - -

Riser
- dia. : 50 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Sprinkler Drain Lantai 4 - -

8 LANTAI 4 Mezzanine

1 Pipa Sprinkler Drain


- dia. : 25 mm 25.00 M - -

Riser
- dia. : 50 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Sprinkler Drain Lantai 4 Mezzanine - -

9 LANTAI 5

95 PEMIPAAN SPRIN DRAIN


1 Pipa Sprinkler Drain
- dia. : 25 mm 25.00 M - -

Riser
- dia. : 50 mm 6.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Sprinkler Drain Lantai 5 - -

10 LANTAI 6

1 Pipa Sprinkler Drain


- dia. : 25 mm 35.00 M - -

Riser
- dia. : 50 mm 6.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Sprinkler Drain Lantai 6 - -

11 LANTAI 7

1 Pipa Sprinkler Drain


- dia. : 25 mm 40.00 M - -

Riser
- dia. : 50 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Sprinkler Drain Lantai 7 - -

12 LANTAI 7 Mezzanine

1 Pipa Sprinkler Drain


- dia. : 25 mm 40.00 M - -

Riser
- dia. : 50 mm 3.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

Sub Total Instalasi Sprinkler Drain Lantai 7 Mezzanine - -

13 LANTAI 8

1 Pipa Sprinkler Drain


- dia. : 25 mm 20.00 M - -

Riser
- dia. : 50 mm 4.00 M - -

2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe

96 PEMIPAAN SPRIN DRAIN


Sub Total Instalasi Sprinkler Drain Lantai 8 - -

SUMMARY

1 Sub Total Instalasi Sprinkler Drain Lantai Basement 1 - -

2 Sub Total Instalasi Sprinkler Drain Lantai 1 - -

3 Sub Total Peralatan Utama LANTAI 1 Mezzanine - -

4 Sub Total Peralatan Utama LANTAI 2 - -

4 Sub Total Peralatan Utama LANTAI 2 Mezzanine - -

5 Sub Total Peralatan Utama Lt. 3 - -

6 Sub Total Instalasi Sprinkler Drain Lantai 3 Mezzanine - -

7 Sub Total Instalasi Sprinkler Drain Lantai 4 - -

8 Sub Total Instalasi Sprinkler Drain Lantai 4 Mezzanine - -

9 Sub Total Instalasi Sprinkler Drain Lantai 5 - -

10 Sub Total Instalasi Sprinkler Drain Lantai 6 - -

11 Sub Total Instalasi Sprinkler Drain Lantai 7 - -

12 Sub Total Instalasi Sprinkler Drain Lantai 7 Mezzanine - -

13 Sub Total Instalasi Sprinkler Drain Lantai 8 - -

- -

97 PEMIPAAN SPRIN DRAIN


BILL OF QUANTITY
PAKET PEKERJAAN PEMADAM KEBAKARAN
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN

ACCESSORIES
HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL UPAH

V VALVE & ACCESSORIES

Pengadaan dan pemasangan valve atau


instrument termasuk penyambungan ke pipa
lengkap dengan semua alat bantu yang diperlukan
seperti terdapat pada gambar dan sesuai dengan
spesifikasi teknik.

1 LANTAI BASEMENT

Gate Valve
- dia : 150 mm 3.00 Bh - -
: 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 80 mm 1.00 Set - -

MCV
- dia : 150 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 8.00 Bh - -
- Type Upright 30.00 Bh - -

RUANG POMPA
Gate Valve
- dia : 150 mm 11.00 Bh - -
100 mm 1.00 Bh - -
50 mm 2.00 Bh - -
25 mm 2.00 Bh - -

Check Valve
- dia : 150 mm 2.00 Bh - -
50 mm 1.00 Bh - -

Safety Valve
- dia : 100 mm 1.00 Bh - -

Strainer
- dia : 150 mm 2.00 Bh - -
50 mm 1.00 Bh - -

Flow meter
- dia : 150 mm 1.00 Set - -

Foot valve anti vortex


- dia : 150 mm 2.00 Bh - -

Header BS Sch.40 dia. 200 mm @4m 2.00 Set - -


Pressure Gauge 6.00 bh - -
Pressure Switch 3.00 bh - -

Sub Total Accessories Lantai Basement - -

2 LANTAI 1

98 ACCESSORIES
Gate Valve
- dia : 100 mm 2.00 Bh - -
25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

Check Valve
- dia : 100 mm 1.00 Bh - -

BCV
- dia : 65 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 12.00 Bh - -

Sub Total Accessories Lantai 1 - -

3 LANTAI 1 Mezzanine

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 65 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 12.00 Bh - -

Sub Total Peralatan Utama LANTAI 1 mezzanine - -

4 LANTAI 2

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 65 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 12.00 Bh - -

Sub Total Peralatan Utama LANTAI 2 - -

3 LANTAI 2 Mezzanine

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 80 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 33.00 Bh - -

99 ACCESSORIES
Sub Total Peralatan Utama LANTAI 2 mezzanine - -

5 LANTAI 3

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 65 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 12.00 Bh - -

Sub Total Peralatan Utama Lantai 3 - -

6 LANTAI 3 Mezzanine

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 80 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 34.00 Bh - -

Sub Total Accessories Lantai 3 Mezzanine - -

7 LANTAI 4

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 65 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 12.00 Bh - -

Sub Total Accessories Lantai 4 - -

8 LANTAI 4 Mezzanine

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 80 mm 1.00 Set - -

100 ACCESSORIES
Sprinkler Head :
- Type Pendent 33.00 Bh - -

Sub Total Accessories Lantai 4 Mezzanine - -

9 LANTAI 5

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 80 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 34.00 Bh - -

Sub Total Accessories Lantai 5 - -

10 LANTAI 6

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 80 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 36.00 Bh - -

Sub Total Accessories Lantai 6 - -

11 LANTAI 7

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 80 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 37.00 Bh - -

Sub Total Accessories Lantai 7 - -

12 LANTAI 7 Mezzanine

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve

101 ACCESSORIES
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 80 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 41.00 Bh - -

Sub Total Accessories Lantai 7 Mezzanine - -

13 LANTAI 8

Gate Valve
- dia : 25 mm 1.00 Bh - -

Landing Valve
- dia : 65 mm 1.00 Bh - -

BCV
- dia : 80 mm 1.00 Set - -

Sprinkler Head :
- Type Pendent 26.00 Bh - -

Sub Total Accessories Lantai 8 - -

35 LANTAI ATAP

Gate Valve
- dia : 65 mm 1.00 Bh - -

AAV
- dia : 25 mm 3.00 Set - -

Sub Total Accessories Lantai Atap - -

SUMMARY

1 Sub Total Accessories Lantai Basement - -

2 Sub Total Accessories Lantai 1 - -

3 Sub Total Peralatan Utama LANTAI 1 mezzanine - -

4 Sub Total Peralatan Utama LANTAI 2 - -

4 Sub Total Peralatan Utama LANTAI 2 mezzanine - -

5 Sub Total Peralatan Utama Lantai 3 - -

6 Sub Total Accessories Lantai 3 Mezzanine - -

7 Sub Total Accessories Lantai 4 - -

8 Sub Total Accessories Lantai 4 Mezzanine - -

9 Sub Total Accessories Lantai 5 - -

102 ACCESSORIES
10 Sub Total Accessories Lantai 6 - -

11 Sub Total Accessories Lantai 7 - -

12 Sub Total Accessories Lantai 7 Mezzanine - -

13 Sub Total Accessories Lantai 8 - -

14 Sub Total Accessories Lantai Atap - -

- -

103 ACCESSORIES
SUMMARY
PAKET PEKERJAAN PENGADAAN DAN PEMASANGAN AIR CONDITIONING (AC)
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN

HARGA TOTAL
NO URAIAN PEKERJAAN JUMLAH (Rp)
MATERIAL UPAH

PEK. INDUK

PENJUMLAHAN

- Unit AC - - -

- FAN - - -

- Diffuser , Grille dan Accessoris - - -

- Instalasi Pemipaan - - -

- Instalasi Ducting - - -

SUB TOTAL PEKERJAAN UTAMA - - -

PEK. TAMBAH - KURANG

PENJUMLAHAN

- Unit AC

- FAN

- Diffuser , Grille dan Accessoris

- Instalasi Pemipaan

- Instalasi Ducting

SUB TOTAL PEKERJAAN TAMBAH KURANG - - -

TOTAL PEKERJAAN UTAMA + ADDENDUM - - -

132 SUM AC
BILL OF QUANTITY
PAKET PEKERJAAN PENGADAAN DAN PEMASANGAN AIR CONDITIONING (AC)
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN

HARGA SATUAN TOTAL


NO URAIAN PEKERJAAN SAT. VOL.
MATERIAL UPAH MATERIAL

I PERALATAN UTAMA

A TIPE SPLIT UNIT

Pengadaan dan pemasangan peralatan dibawah


ini lengkap dengan accessories seperti
Thermostat, serta penggunaan freon 410 dan
semua material bantu yang diperlukan sesuai
dengan spesifikasi teknis dan gambar dan sudah
termasuk perijinan-perijinan.

I LANTAI BASSEMENT

1 SPL/OU BS-01
- Total Capacity : 12,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 Cfm
- Type : Wall Mounted
- Power : 1,230 W
- Lokasi : R. tunggu Sopir

2 SPL/OU BS-02
- Total Capacity : 9,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : R. Server

II LANTAI GROUND

1 SPL/OU GF-01 & 02


- Total Capacity : 50,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 1,200 CFM
- Type : Cassette
- Power : 4,800 W
- Lokasi : Store

III LANTAI GROUND MEZZANINE

1 SPL/OU GMZ-01 & 02


- Total Capacity : 50,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 1,200 CFM
- Type : Cassette
- Power : 4,800 W
- Lokasi : Store

2 SPL/OU GMZ-02A ~ 02D


- Total Capacity : 150,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 2,500 CFM
- Type : Split Duct
- Power : 16,000 W
- Lokasi : Store

IV LANTAI 2 MEZZANINE

1 SPL/OU-02MZ 01A ~ 01B


- Total Capacity : 150,000 BTU/H Unit 2.00 SBO SBO

105132 Unit AC
- Supply Air : 2,500 CFM
- Type : Split Duct
- Power : 16,000 W
- Lokasi : Store

IV LANTAI 3

1 SPL/OU 3-01 & 02


- Total Capacity : 50,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 1,200 CFM
- Type : Cassette
- Power : 4,800 W
- Lokasi : Store

V LANTAI 3 MEZZANINE

1 SPL/OU 3-01 & 02 (MZ)


- Total Capacity : 50,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 1,200 CFM
- Type : Cassette
- Power : 4,800 W
- Lokasi : Store

2 SPL/OU-03MZ 02A ~ 02B


- Total Capacity : 150,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 2,500 CFM
- Type : Split Duct
- Power : 16,000 W
- Lokasi : Store

VII LANTAI 4

1 SPL/OU 4-01 & 02


- Total Capacity : 50,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 1,200 CFM
- Type : Cassette
- Power : 4,800 W
- Lokasi : Store

VIII LANTAI 4 Mezzanine

1 SPL/OU 4-01 & 02 (MZ)


- Total Capacity : 50,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 1,200 CFM
- Type : Cassette
- Power : 4,800 W
- Lokasi : Store

2 SPL/OU-04MZ 02A ~ 02B


- Total Capacity : 150,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 2,500 CFM
- Type : Split Duct
- Power : 16,000 W
- Lokasi : Store

XI LANTAI 7

1 SPL/OU 7-01A & B


- Total Capacity : 16,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 450 CFM
- Type : Wall Mounted
- Power : 1,690 W
- Lokasi : LOGISTIK

106132 Unit AC
2 SPL/OU 7-02
- Total Capacity : 9,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : CCO

3 SPL/OU 7-03
- Total Capacity : 9,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : R. Server

4 SPL/OU 7-04
- Total Capacity : 16,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 450 CFM
- Type : Wall Mounted
- Power : 1,690 W
- Lokasi : R. Waiting

5 SPL/OU 7-05
- Total Capacity : 16,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 450 CFM
- Type : Wall Mounted
- Power : 1,690 W
- Lokasi : R. Office

6 SPL/OU 7-06
- Total Capacity : 12,600 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 1,230 W
- Lokasi : R. Office

7 SPL/OU 7-07 A & B


- Total Capacity : 12,600 BTU/H Unit 2.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 1,230 W
- Lokasi : Meeting Room

XII LANTAI 7 Mezzanine

1 SPL/OU 7MZ-01 & 02


- Total Capacity : 16,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 450 CFM
- Type : Wall Mounted
- Power : 1,690 W
- Lokasi : R. Mess

2 SPL/OU 7MZ-03 ~ 06
- Total Capacity : 9,200 BTU/H Unit 4.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : R. Mess

3 SPL/OU 7MZ-07
- Total Capacity : 16,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 450 CFM
- Type : Wall Mounted

107132 Unit AC
- Power : 1,690 W
- Lokasi : R. Mess

4 SPL/OU 7MZ-08A & 08B


- Total Capacity : 16,000 BTU/H Unit 2.00 SBO SBO
- Supply Air : 450 CFM
- Type : Wall Mounted
- Power : 1,690 W
- Lokasi : R. Mess

XIII LANTAI 8

1 SPL/OU 8-01
- Total Capacity : 30,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 1,000 CFM
- Type : Ceiling Duct
- Power : 4,000 W
- Lokasi : Master Bedroom

2 SPL/OU 8-02
- Total Capacity : 18,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 500 CFM
- Type : Wall Mounted
- Power : 1895 W
- Lokasi : WIC

3 SPL/OU 8-03, 04A & 4B


- Total Capacity : 18,000 BTU/H Unit 3.00 SBO SBO
- Supply Air : 500 CFM
- Type : Wall Mounted
- Power : 1895 W
- Lokasi : BEDROOM

3 SPL/OU 8-05
- Total Capacity : 9,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : BEDROOM

4 SPL/OU-08.06
- Total Capacity : 60,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 2,000 CFM
- Type : Split Duct
- Power : 7,000 W
- Lokasi : Living Room

XIV LANTAI ATAP

1 SPL/OU A-01
- Total Capacity : 9,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : Mesin Lift

TOTAL UNIT AC SPLIT -

108132 Unit AC
PENJUMLAHAN

- TOTAL UNIT AC SPLIT -

Ke Penjumlahan AC -

109132 Unit AC
TOTAL
UPAH

110132 Unit AC
-

111132 Unit AC
-

112132 Unit AC
-

113132 Unit AC
-

114132 Unit AC
BILL OF QUATITY
PAKET PEKERJAAN PENGADAAN DAN PEMASANGAN AIR CONDITIONING (AC)
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN

PEKERJAAN : FAN
HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN QTY VOL.
MATERIAL UPAH MATERIAL UPAH

VENTILATION AIR CONDITIONING

I PERALATAN UTAMA

Pengadaan dan pemasangan peralatan di bawah ini lengkap


dengan accessories dan semua material bantu yang
diperlukan sesuai dengan spesifikasi teknis dan gambar.

I LANTAI BASEMENT

1 WF-BS.01 1.00 Unit - -


- Kapasitas : 1,000 CFM
- FAN Type : Wall Fan
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : R. Service

2 WF-BS.02 1.00 Unit - -


- Kapasitas : 1,200 CFM
- FAN Type : Wall Fan
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : Pump Room

3 EF-BS.01 1.00 Unit - -


- Kapasitas : 4,000 CFM
- FAN Type : Axial Fan
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : Parking

4 CF-BS.01 1.00 Unit - -


- Kapasitas : 100 CFM
- FAN Type : Ceiling Fan
- Static Press : In. wg
- Data Listrik :
- Fungsi : Supplay
- Lokasi : Toilet

5 TEF-BS.01 1.00 Unit - -


- Kapasitas : 500 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exhaust
- Lokasi : Toilet public

II LANTAI GROUND FLOOR MEZZANINE

1 FAF-GMZ.01 1.00 Unit - -


- Kapasitas : 1,700 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust

115 FAN
- Lokasi : Store

VI LANTAI 3 Mezzanine

1 FAF-3MZ.01 1.00 Unit - -


- Kapasitas : 1,700 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : Store

VIII LANTAI 4 Mezzanine

1 FAF-4MZ.01 1.00 Unit - -


- Kapasitas : 1,700 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : Store

IX LANTAI 5

1 FAF-5.01 1.00 Unit - -


- Kapasitas : 11,500 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : Warehouse

2 EF-5.01 1.00 Unit - -


- Kapasitas : 13,500 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : Warehouse

IX LANTAI 6

1 FAF-5.01 1.00 Unit - -


- Kapasitas : 11,500 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : Warehouse

2 EF-5.01 1.00 Unit - -


- Kapasitas : 13,500 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : Warehouse

XI LANTAI 7

1 CF-7.01 & 02 2.00 Unit - -


- Kapasitas : 100 CFM
- FAN Type : Ceiling Fan

116 FAN
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : toilet

2 TEF-7.01 1.00 Unit - -


- Kapasitas : 1,100 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : Storage

XII LANTAI 7 Mezzanine

1 TEF-7MZ.02 1.00 Unit - -


- Kapasitas : 400 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : toilet

XIII LANTAI 8

1 CF-8.01 & 02 2.00 Unit - -


- Kapasitas : 100 CFM
- FAN Type : Ceiling Fan
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : toilet

2 TEF-8.01 1.00 Unit - -


- Kapasitas : 800 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : toilet

3 CF-8.03 & 04 2.00 Unit - -


- Kapasitas : 100 CFM
- FAN Type : Ceiling Fan
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : toilet

4 CF-8.05 1.00 Unit - -


- Kapasitas : 100 CFM
- FAN Type : Ceiling Fan
- Static Press : In. wg
- Data Listrik :
- Fungsi : Supplay
- Lokasi : toilet

5 KEF-8.01 1.00 Unit - -


- Kapasitas : 500 CFM
- FAN Type : Axial
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exhaust
- Lokasi : Kitchen

XIV LANTAI ROOF

117 FAN
6 Pressurized Fan 1.00 unit - -
- Kapasitas : 23,500 CFM
- FAN Type : Axial direct
- Static Press : 65 mm. wg
- Data Listrik :
- Fungsi : Pressurized fan
- Lokasi : Roof

Sub Total Peralatan FAN - -

PENJUMLAHAN

- Sub Total Peralatan FAN - -

Ke Penjumlahan FAN - -

118 FAN
BILL OF QUANTITY
PAKET PEKERJAAN PENGADAAN DAN PEMASANGAN AIR CONDITIONING (AC)
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN

PEKERJAAN : DIFUSSER DAN GRILLE


HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN SAT QTY
MATERIAL UPAH MATERIAL UPAH

VENTILATION & AIR CONDITIONING

I DIFFUSER, GRILLE, VOLUME DUMPER


Pengadaan dan pemasangan diffuser, grille, volume dumper,
lengkap dengan hanger, support, klem dan accessories lainnya
yang dibutuhkan.

A LANTAI BASEMENT

1 Exhaust Air Grille ( EAG )


600 x 300 mm Bh 7.00 - -
150 x 150 mm Bh 5.00 - -

2 Exhaust Air Louvre ( EAL )


2500 x 400 mm Bh 1.00 - -
200 x 150 mm Bh 1.00 - -

Flexible SAD
Dia : 100 mm M 6.00 - -

B LANTAI 1
1 Fresh Air Louvre ( FAL )
300 x 150 mm Bh 1.00 - -

C LANTAI 1 Mezzanine

1 Fresh Air Louvre ( FAL )


1000 x 400 mm Bh 1.00 - -
300 x 150 mm Bh 1.00 - -

2 Supply Air Grille


200 x 200 mm Bh 28.00 - -

3 Plenum Box
- AC Kap. : 150000 btu/h Set 2.00 - -

4 Drain Pan
- AC Kap. : 150000 btu/h Set 2.00 - -

5 Flexible SAD isolasi


Dia : 200 mm M 28.00 - -

6 Return Air Grille


1000 x 300 mm Bh 2.00 - -

7 Volume Damper Set 6.00 - -

D LANTAI 2 Mezzanine

1 Supply Air Grille


200 x 200 mm Bh 32.00 - -

2 Plenum Box
- AC Kap. : 150000 btu/h Set 2.00 - -

3 Drain Pain
- AC Kap. : 150000 btu/h Set 2.00 - -

4 Flexible SAD isolasi

119 Diffuser, Grille


Dia : 200 mm M 32.00 - -

5 Return Air Grille


1000 x 300 mm Bh 2.00 - -

F LANTAI 3 Mezzanine

1 Fresh Air Louvre ( FAL )


1000 x 400 mm Bh 1.00 - -

2 Supply Air Grille


200 x 200 mm Bh 28.00 - -

3 Plenum Box
- AC Kap. : 150000 btu/h Set 2.00 - -

4 Drain Pain
- AC Kap. : 150000 btu/h Set 2.00 - -

5 Flexible SAD isolasi


Dia : 200 mm M 28.00 - -
- -
6 Return Air Grille
1000 x 300 mm Bh 2.00 - -

7 Volume Damper Set 6.00 - -

G LANTAI 4

1 Fresh Air Louvre ( FAL )


300 x 150 mm Bh 1.00 - -

H LANTAI 4 Mezzanine

1 Fresh Air Louvre ( FAL )


1000 x 400 mm Bh 1.00 - -

2 Supply Air Grille


200 x 200 mm Bh 28.00 - -

3 Plenum Box
- AC Kap. : 150000 btu/h Set 2.00 - -

4 Drain Pain
- AC Kap. : 150000 btu/h Set 2.00 - -

5 Flexible SAD isolasi


Dia : 200 mm M 28.00 - -
- -
6 Return Air Grille
1000 x 300 mm Bh 2.00 - -

7 Volume Damper Set 6.00 - -

I LANTAI 5

1 Fresh Air Louvre ( FAL )


2000 x 300 mm Bh 1.00 - -

2 Exhaust Air Louvre ( EAL )


2000 x 300 mm Bh 1.00 - -

3 Fresh Air Grille


350 x 350 mm Bh 18.00 - -

4 Exhaust Air Grille


400 x 400 mm Bh 18.00 - -

120 Diffuser, Grille


5 Flexible SAD non isolasi
Dia : 350 mm M 18.00 - -
300 mm M 18.00 - -

J LANTAI 6

1 Fresh Air Louvre ( FAL )


2000 x 300 mm Bh 1.00 - -

2 Exhaust Air Louvre ( EAL )


2000 x 300 mm Bh 1.00 - -

3 Fresh Air Grille


350 x 350 mm Bh 18.00 - -

4 Exhaust Air Grille


400 x 400 mm Bh 18.00 - -

5 Flexible SAD non isolasi


Dia : 350 mm M 18.00 - -
300 mm M 18.00 - -
K LANTAI 7

1 Exhaust Air Louvre ( EAL )


500 x 300 mm Bh 1.00 - -
300 x 150 mm Bh 1.00 - -

2 Supply Air Grille


250 x 250 mm Bh 4.00 - -
200 x 200 mm Bh 4.00 - -

3 Flexible SAD non isolasi


Dia : 200 mm M 4.00 - -
150 mm M 2.00 - -

L LANTAI 7 Mezzanine

1 Exhaust Air Louvre ( EAL )


400 x 150 mm Bh 1.00 - -

2 Exhaust Air Grille ( EAG )


200 x 200 mm Bh 8.00 - -

M LANTAI 8

1 Exhaust Air Louvre ( EAL )


1000 x 300 mm Bh 1.00 - -
500 x 150 mm Bh 1.00 - -
400 x 150 mm Bh 2.00 - -

2 Exhaust Air Grille ( EAG )


200 x 200 mm Bh 6.00 - -

3 Fresh Air Grille ( FAL )


500 x 150 mm Bh 1.00 - -

4 Supply Air Grille (SAG)


1000 x 150 mm Bh 13.00 - -

5 Return Air Grille (RAG)


1000 x 150 mm Bh 8.00 - -

6 Plenum Box
- AC Kap. : 60000 btu/h Set 1.00 - -
30000 btu/h Set 1.00 - -

121 Diffuser, Grille


6 Drain Pain
- AC Kap. : 60000 btu/h Set 1.00 - -
30000 btu/h Set 1.00 - -

7 Flexible SAD isolasi


Dia : 250 mm M 13.00 - -
150 mm M 6.00 - -

8 Volume Damper Bh 16.00 - -

M LANTAI ATAP

1 Pressure Air Grille ( PAR )


600 x 400 mm Bh 12.00

Sub Total Peralatan Diffuser,Grille - -

PENJUMLAHAN

- Sub Total Peralatan Diffuser,Grille - -

Ke Penjumlahan VAC - -

122 Diffuser, Grille


BILL OF QUANTITY
PAKET PEKERJAAN PENGADAAN DAN PEMASANGAN AIR CONDITIONING (AC)
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN

PEKERJAAN : INSTALASI PEMIPAAN


HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN SAT QTY
MATERIAL UPAH MATERIAL UPAH

INSTALASI PEMIPAAN

A.1 INSTALASI PEMIPAAN AIR CONDITIONING (AC)


UNIT SPLIT

Pengadaan dan pemasangan Pipa Cooper Rod, lengkap


dengan isolasi sesuai dengan spesifikasi teknis dan gambar,
pada penempatan tertentu menggunakan sambungan flanged
dan screwed dilengkapi dengan hanger, support, klem,
penambahan freon dan accessories lainnya.untuk (pipa
refrigerant menggunakan R410a)

A.2 Instalasi Pemipaan Drain AC

Pengadaan dan pemasangan Pipa PVC AW, sesuai dengan


spesifikasi teknis dan gambar , lengkap dengan isolasi,hanger,
support, klem dan accessories lainnya.

I LANTAI BASEMENT

1 Pemipaan Indoor Unit ke Outdoor Unit


SPL/OU BS-01 Ref. 1/4" Liquid + 1/2" gas m 4.00 - -
SPL/OU BS-02 Ref. 1/4" Liquid + 3/8" gas m 10.00 - -
12.00
2 Kabel Control Indoor Unit ke Outdoor Unit m 17.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 20 mm m 12.00 - -

4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

II LANTAI 1

1 Pemipaan Indoor Unit ke Outdoor Unit


SPL/OU GF-01 & 02 Ref. 3/8" Liquid + 3/4" gas m 36.00 - -

2 Kabel Control Indoor Unit ke Outdoor Unit m 36.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 20 mm m 38.00 - -

4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

III LANTAI 1 Mezzanine

1 Pemipaan Indoor Unit ke Outdoor Unit


SPL/OU GMZ-01 & 02 Ref. 3/8" Liquid + 3/4" gas m 38.00 - -
SPL/OU GMZ-02A ~ 02D Ref. 1/2" Liquid + 1" gas m 80.00 - -

2 Kabel Control Indoor Unit ke Outdoor Unit m 121.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 25 mm m 121.00 - -

4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

IV LANTAI 2 Mezzanine

123 Instalasi Pemipaan


1 Pemipaan Indoor Unit ke Outdoor Unit
SPL/OU-02MZ 01A ~ 01B Ref. 5/8" Liquid + 1 1/8" gas m 71.00 - -

2 Kabel Control Indoor Unit ke Outdoor Unit m 71.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 25 mm m 40.00 - -

4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

V LANTAI 3

1 Pemipaan Indoor Unit ke Outdoor Unit


SPL/OU 3-01 & 02 Ref. 3/8" Liquid + 3/4" gas m 36.00 - -

2 Kabel Control Indoor Unit ke Outdoor Unit m 36.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 25 mm m 36.00 - -

4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

VI LANTAI 3 Mezzanine

1 Pemipaan Indoor Unit ke Outdoor Unit


SPL/OU 3-01 & 02 (MZ) Ref. 3/8" Liquid + 3/4" gas m 35.00 - -
SPL/OU-03MZ 02A ~ 02B Ref. 1/2" Liquid + 1" gas m 80.00 - -

2 Kabel Control Indoor Unit ke Outdoor Unit m 80.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 20 mm m 34.00 - -
- dia : 25 mm m 42.00 - -

4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

VII LANTAI 4

1 Pemipaan Indoor Unit ke Outdoor Unit


SPL/OU 4-01 & 02 Ref. 3/8" Liquid + 3/4" gas m 35.00 - -

2 Kabel Control Indoor Unit ke Outdoor Unit m 35.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 20 mm m 35.00 - -

4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

VIII LANTAI 4 Mezzanine

1 Pemipaan Indoor Unit ke Outdoor Unit


SPL/OU 4-01 & 02 (MZ) Ref. 3/8" Liquid + 3/4" gas m 35.00 - -
SPL/OU-04MZ 02A ~ 02B Ref. 1/2" Liquid + 1" gas m 80.00 - -

2 Kabel Control Indoor Unit ke Outdoor Unit m 121.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 20 mm m 35.00 - -
- dia : 25 mm m 80.00 - -

124 Instalasi Pemipaan


4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

XI LANTAI 7

1 Pemipaan Indoor Unit ke Outdoor Unit


SPL/OU 7-01A & B Ref. 1/4" Liquid + 1/2" gas m 31.00 - -
SPL/OU 7-02 Ref. 1/4" Liquid + 3/8" gas m 18.00 - -
SPL/OU 7-03 Ref. 1/4" Liquid + 3/8" gas m 9.00 - -
SPL/OU 7-04 Ref. 1/4" Liquid + 1/2" gas m 11.00 - -
SPL/OU 7-05 Ref. 1/4" Liquid + 1/2" gas m 17.00 - -
SPL/OU 7-06 Ref. 1/4" Liquid + 1/2" gas m 11.00 - -
SPL/OU 7-07 A & B Ref. 1/4" Liquid + 1/2" gas m 20.00 - -

2 Kabel Control Indoor Unit ke Outdoor Unit m 121.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 20 mm m 121.00 - -

4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

XII LANTAI 7 Mezzanine

1 Pemipaan Indoor Unit ke Outdoor Unit


SPL/OU 7MZ-01 & 02 Ref. 1/4" Liquid + 1/2" gas m 23.00 - -
SPL/OU 7MZ-03 ~ 06 Ref. 1/4" Liquid + 3/8" gas m 35.00 - -
SPL/OU 7MZ-07 Ref. 1/4" Liquid + 1/2" gas m 11.00 - -
SPL/OU 7MZ-08A & 08B Ref. 1/4" Liquid + 1/2" gas m 35.00 - -

2 Kabel Control Indoor Unit ke Outdoor Unit m 121.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 20 mm m 121.00 - -

4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

XIII LANTAI 8

1 Pemipaan Indoor Unit ke Outdoor Unit


SPL/OU 8-01 Ref. 3/8" Liquid + 5/8" gas m 18.00 - -
SPL/OU 8-02 Ref. 1/4" Liquid + 1/2" gas m 11.00 - -
SPL/OU 8-03 Ref. 1/4" Liquid + 1/2" gas m 12.00 - -
SPL/OU 8-04A Ref. 1/4" Liquid + 1/2" gas m 12.00 - -
SPL/OU 8-04B Ref. 1/4" Liquid + 1/2" gas m 11.00 - -
SPL/OU 8-05 Ref. 1/4" Liquid + 3/8" gas m 11.00 - -
SPL/OU 8-06 Ref. 1/2" Liquid + 3/4" gas m 10.00 - -

2 Kabel Control Indoor Unit ke Outdoor Unit m 98.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 20 mm m 98.00 - -

4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

XIV LANTAI ATAP

1 Pemipaan Indoor Unit ke Outdoor Unit


SPL/OU A-01 Ref. 1/4" Liquid + 3/8" gas m 6.00 - -

2 Kabel Control Indoor Unit ke Outdoor Unit m 6.00 - -

3 Pipa Drain AC ( PVC AW )


- dia : 20 mm m 6.00 - -

125 Instalasi Pemipaan


4 Fitting dan Accessories Lot 1.00 Include pipes Include pipes

Sub Total Instalasi Pipa UNIT AC SPLIT - -

PENJUMLAHAN

- Sub Total Instalasi Pipa UNIT AC SPLIT - -

- -

126 Instalasi Pemipaan


HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN SAT QTY
MATERIAL UPAH MATERIAL UPAH

VENTILATION & AIR CONDITIONING

INSTALASI DUCTING

A Lantai Basement

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- BJLS 60 m² 24.80 - -
- BJLS 80 m² 35.20 - -

- PVC D dia.150 mm m 5.60 - -


- PVC D dia.100 mm m 9.60 - -

B Lantai 1

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- PVC D dia.150 mm m 18.40 - -

C Lantai 1 Mezzanine

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- BJLS 50 m² 3.20 - -
- BJLS 60 m² 26.40 - -
- BJLS 80 m² 14.40 - -

2 Ducting Supply & Return (PU)


Pengadaan dan pemasangan ducting PU, sesuai dengan

spesifikasi teknis dan gambar, lengkap dengan hanger,

support, klem dan accessories lainnya yang dibutuhkan.


- PU m² 287.20 - -

D Lantai 2 Mezzanine

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- BJLS 80 m² 14.40 - -

2 Ducting Supply & Return (PU)


Pengadaan dan pemasangan ducting PU, sesuai dengan

spesifikasi teknis dan gambar, lengkap dengan hanger,

support, klem dan accessories lainnya yang dibutuhkan.


- PU m² 82.40 - -

127 Instalasi Ducting


E Lantai 3

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- PVC D dia.150 mm m 19.20 - -

F Lantai 3 Mezzanine

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- BJLS 50 m² 3.20 - -
- BJLS 60 m² 24.00 - -
- BJLS 80 m² 14.40 - -

2 Ducting Supply & Return (PU)


Pengadaan dan pemasangan ducting PU, sesuai dengan

spesifikasi teknis dan gambar, lengkap dengan hanger,

support, klem dan accessories lainnya yang dibutuhkan.


- PU m² 287.20 - -

G Lantai 4

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- PVC D dia.150 mm m 16.80 - -

H Lantai 4 Mezzanine

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- BJLS 50 m² 3.20 - -
- BJLS 60 m² 24.00 - -
- BJLS 80 m² 14.40 - -

2 Ducting Supply & Return (PU)


Pengadaan dan pemasangan ducting PU, sesuai dengan

spesifikasi teknis dan gambar, lengkap dengan hanger,

support, klem dan accessories lainnya yang dibutuhkan.


- PU m² 287.20 - -

I Lantai 5

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- BJLS 100 m² - -

J Lantai 6

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.

128 Instalasi Ducting


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- BJLS 100 m² 143.20 - -

K Lantai 7

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- PVC D dia.100 mm m 4.80 - -
- BJLS 50 m² 39.20 - -

L Lantai 7 Mezzanine

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- BJLS 50 m² 7.20 - -

M Lantai 8

1 Ducting Exhaust & Fres Air - Tanpa Isolasi


Pengadaan dan pemasangan ducting tanpa isolasi sesuai
dengan spesifikasi teknis, lengkap dengan hanger,
support, klem dan accessorie yang dibutuhkan lainnya.
- PVC D dia.100 mm m 16.80 - -
- BJLS 50 m² 16.00 - -
- BJLS 60 m² 24.00 - -

2 Ducting Supply & Return (PU)


Pengadaan dan pemasangan ducting PU, sesuai dengan

spesifikasi teknis dan gambar, lengkap dengan hanger,

support, klem dan accessories lainnya yang dibutuhkan.


- PU m² 31.20 - -

Sub Total Instalasi Ducting - -

PENJUMLAHAN

- Sub Total Instalasi Ducting - -

Ke Penjumlahan VAC - -

129 Instalasi Ducting


-
-

-
-

-
-
-

130 Instalasi Ducting


-

-
-
-

-
-
-

131 Instalasi Ducting


-

-
-

-
-
-

132 Instalasi Ducting

Anda mungkin juga menyukai