BQ Mep Hartono - Sub
BQ Mep Hartono - Sub
TOTAL
NO URAIAN PEKERJAAN JUMLAH (Rp)
MATERIAL UPAH
PENJUMLAHAN
- PEMADAM KEBAKARAN - - -
- ELEKTRIKAL - - -
- ELEKTRONIK - - -
- MVAC - - -
- PLUMBING - - -
ADDENDUM
- PERSIAPAN
- PEMADAM KEBAKARAN
- ELEKTRIKAL
- ELEKTRONIK
- MVAC
- STP
PPN 10 % - - -
GRAND TOTAL - - -
PEMBULATAN - - -
SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA
TOTAL
NO URAIAN PEKERJAAN JUMLAH (Rp)
MATERIAL UPAH
PENJUMLAHAN ELEKTRIKAL
I PEKERJAAN INDUK
- PERALATAN UTAMA - - -
- KABEL FEEDER - - -
- GROUNDING - - -
- RACK KABEL - - -
- PENANGKAL PETIR - - -
- PERALATAN UTAMA
- KABEL FEEDER
- GROUNDING
- RACK KABEL
- PENANGKAL PETIR
TOTAL KE PENJUMLAHAN ME - - -
SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA
ELEKTRIKAL
Total Genset - -
- Total Genset - -
ELEKTRIKAL
Panel Utama
- P. MVMDP 1.00 Unit - -
- P. LVMDP 1.00 Unit - -
- Cap. Bank 300 kVAR 1.00 Unit - -
Total Trafo - -
PANEL LISTRIK
1 LANTAI BASEMENT
- DP.BSM 1.00 Unit - -
- DP. ELC 1.00 Unit - -
- DP. EMG 1.00 Unit - -
- DP. PL 1.00 Unit - -
- PK. Deep Well 1.00 Unit By Mekanikal
- PK. TP 1.00 Unit By Mekanikal
- PK. STP 1.00 Unit By Mekanikal
- PK. SP 01 1.00 Unit By Mekanikal
- PK. SP 02 1.00 Unit By Mekanikal
- PK. SP 03 1.00 Unit By Mekanikal
- PK. Jockey Pump 1.00 Unit By Mekanikal
- PK. Electrik Pump 1.00 Unit By Mekanikal
- PK. Diesel Pump 1.00 Unit By Mekanikal
2 LANTAI GROUND
- SDP. LT. 01 1.00 Unit - -
- DP. 01 1.00 Unit - -
- DP. ESC 1.00 Unit - -
- PP. ESC. 01 1.00 Unit By Escalator
5 Peralatan Utama
- PP. ESC 02 1.00 Unit By Escalator
7 LANTAI 3
- DP. 03 1.00 Unit - -
- PP. ESC 03 1.00 Unit By Escalator
8 LANTAI 3 MEZZANINE
- DP. 03 MEZZ 1.00 Unit - -
- PP. ESC 03 MEZZ 1.00 Unit By Escalator
9 LANTAI 4
- SDP. LT. 04 1.00 Unit - -
- DP. 04 1.00 Unit - -
- PP. ESC. 04 1.00 Unit By Escalator
10 LANTAI 4 MEZZANINE
- DP. 04 MEZZ 1.00 Unit - -
- PP. ESC 04 MEZZ 1.00 Unit By Escalator
11 LANTAI 5
- DP. 05 1.00 Unit - -
12 LANTAI 6
- DP. 06 1.00 Unit - -
13 LANTAI 7
- DP. 07 1.00 Unit - -
14 LANTAI 7 MEZZANINE
- DP. 07 MEZZ 1.00 Unit - -
15 LANTAI 8
- DP. 08 1.00 Unit - -
16 LANTAI Atap
- DP. LT. ATAP 1.00 Unit - -
- DP. EMG LT. ATAP 1.00 Unit - -
- P. TK ATAP 1.00 Unit - -
- PK. PF ATAP 1.00 Unit - -
- PB. LT. ATAP 1.00 Unit By Other
- PK. LIFT P1 ATAP 1.00 Unit By Lift
- PK. LIFT P2 ATAP 1.00 Unit By Lift
- PK. LIFT P3 ATAP 1.00 Unit By Lift
- PK. Booster Pump 1.00 Unit By Mekanikal
PENJUMLAHAN
- Total Trafo - -
6 Peralatan Utama
SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA
ELEKTRIKAL
Harga satuan pekerjaan sudah termasuk pengadaan dan pemasangan material serta
material bantu yang diperlukan sehingga pekerjaan tersebut dinyatakan tercapai
dengan baik. Pekerjaan harus dilaksanakan sesuai dengan spesifikasi teknis dan
gambar.
KABEL FEEDER
1 LANTAI BASEMENT
- dari DP. EMG ke P. ELEKTRONIKA FRC 1x (4 x 6 mm2) + BC 6 mm2 5.00 m - -
- dari DP. EMG ke PK. JOCKEY PUMP FRC 1x (4 x 6 mm2) + NYA 4 mm2 31.00 m - -
- dari DP. EMG ke PK. ELEKTRIK PUMP FRC 4x (1 x 185 mm2) + NYA 70 mm2 30.00 m - -
- dari DP. EMG ke PK. DIESEL PUMP FRC 3 x 2,5 mm2 30.00 m - -
2 LANTAI GROUND
- dari SDP. LT. 01 ke DP. BSM NYY 1x (4 x 10 mm2) + BC 10 mm2 12.00 m - -
- dari SDP. LT. 01 ke DP. 01 NYY 1x (4 x 35 mm2) + BC 25 mm2 7.00 m - -
- dari SDP. LT. 01 ke DP. 01 MEZZ NYY 1x (4 x 6 mm2) + BC 6 mm2 8.00 m - -
- dari SDP. LT. 01 ke DP. 02 + MEZZ NYY 1x (4 x 35 mm2) + BC 25 mm2 16.00 m - -
- dari SDP. LT. 01 ke DP. 03 NYY 1x (4 x 35 mm2) + BC 25 mm2 16.00 m - -
- dari SDP. LT. 01 ke DP. 03 MEZZ NYY 1x (4 x 6 mm2) + BC 6 mm2 18.00 m - -
- dari PP. ESC ke PP. ESC 01 NYY 1x (4 x 4 mm2) + NYA 4 mm2 14.00 m - -
- dari PP. ESC ke PP. ESC 01 MEZZ NYY 1x (4 x 4 mm2) + NYA 4 mm2 29.00 m - -
- dari PP. ESC ke PP. ESC 02 NYY 1x (4 x 4 mm2) + NYA 4 mm2 32.00 m - -
- dari PP. ESC ke PP. ESC 02 MEZZ NYY 1x (4 x 4 mm2) + NYA 4 mm2 44.00 m - -
- dari PP. ESC ke PP. ESC 03 NYY 1x (4 x 4 mm2) + NYA 4 mm2 36.00 m - -
- dari PP. ESC ke PP. ESC 03 MEZZ NYY 1x (4 x 4 mm2) + NYA 4 mm2 39.00 m - -
- dari PP. ESC ke PP. ESC 04 NYY 1x (4 x 4 mm2) + NYA 4 mm2 41.00 m - -
- dari PP. ESC ke PP. ESC 04 MEZZ NYY 1x (4 x 4 mm2) + NYA 4 mm2 44.00 m - -
- dari DP. LT. 01 ke OU-GF.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 01 ke OU-GF.02 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 29.00 m - -
- dari DP. LT. 01 ke IU-GF.01 NYM 3 x 2,5 mm2 17.00 m - -
- dari DP. LT. 01 ke IU-GF.02 NYM 3 x 2,5 mm2 11.00 m - -
- dari DP. LT. 01 ke WF-GF.01 NYM 3 x 2,5 mm2 39.00 m - -
7 Kabel Feeder
- dari MVMDP ke TRAFO. NA2XSY 3X (1 x 120 mm2 ) 16.00 m - -
- dari TRAFO ke LVMDP NYY 8x (1 x 300 mm2) + NYA 120 mm2 16.00 m - -
- dari DP. LT. 02 ke OU-2MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 33.00 m - -
- dari DP. LT. 02 ke OU-2MZ.02 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 32.00 m - -
- dari DP. LT. 02 ke IU-2MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 22.00 m - -
- dari DP. LT. 02 ke IU-2MZ.02 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 11.00 m - -
- dari DP. LT. 02 ke FAF-2MZ.01 NYM 3 x 2,5 mm2 30.00 m - -
5 LANTAI 3
- dari DP. LT. 03 ke OU-3.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 03 ke OU-3.02 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 03 ke IU-3.01 NYM 3 x 2,5 mm2 17.00 m - -
- dari DP. LT. 03 ke IU-3.02 NYM 3 x 2,5 mm2 11.00 m - -
6 LANTAI 3 MEZZANINE
- dari DP. LT. 03 MEZZ ke OU-3MZ.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 03 MEZZ ke OU-3MZ.02 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 03 MEZZ ke OU-3MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 03 MEZZ ke OU-3MZ.01 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 03 MEZZ ke IU-3MZ.01 NYM 3 x 2,5 mm2 17.00 m - -
- dari DP. LT. 03 MEZZ ke IU-3MZ.02 NYM 3 x 2,5 mm2 11.00 m - -
- dari DP. LT. 03 MEZZ ke IU-3MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 26.00 m - -
- dari DP. LT. 03 MEZZ ke IU-3MZ.01 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 12.00 m - -
- dari DP. LT. 03 MEZZ ke FAF-3MZ.01 NYM 3 x 2,5 mm2 25.00 m - -
7 LANTAI 4
- dari SDP. LT. 04 ke DP. 04 NYY 1x (4 x 35 mm2) + BC 25 mm2 5.00 m - -
- dari SDP. LT. 04 ke DP. 04 MEZZ NYY 1x (4 x 6 mm2) + BC 6 mm2 8.00 m - -
- dari SDP. LT. 04 ke DP. 05 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 15.00 m - -
- dari SDP. LT. 04 ke DP. 06 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 19.00 m - -
- dari SDP. LT. 04 ke DP. 07 NYY 1x (4 x 10 mm2) + BC 10 mm2 20.00 m - -
- dari SDP. LT. 04 ke DP. 07 MEZZ NYY 1x (4 x 10 mm2) + BC 10 mm2 22.00 m - -
- dari SDP. LT. 04 ke DP. 08 NYY 1x (4 x 16 mm2) + BC 16 mm2 26.00 m - -
- dari DP. LT. 04 ke OU-3.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 04 ke OU-3.02 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 04 ke IU-4.01 NYM 3 x 2,5 mm2 17.00 m - -
- dari DP. LT. 04 ke IU-4.02 NYM 3 x 2,5 mm2 11.00 m - -
8 LANTAI 4 MEZZANINE
- dari DP. LT. 04 MEZZ ke OU-3MZ.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 04 MEZZ ke OU-3MZ.02 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 04 MEZZ ke OU-3MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 30.00 m - -
- dari DP. LT. 04 MEZZ ke OU-3MZ.01 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 31.00 m - -
- dari DP. LT. 04 MEZZ ke IU-4MZ.01 NYM 3 x 2,5 mm2 17.00 m - -
- dari DP. LT. 04 MEZZ ke IU-4MZ.02 NYM 3 x 2,5 mm2 11.00 m - -
- dari DP. LT. 04 MEZZ ke IU-4MZ.01 A NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 26.00 m - -
- dari DP. LT. 04 MEZZ ke IU-4MZ.01 B NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 12.00 m - -
- dari DP. LT. 04 MEZZ ke FAF-3MZ.01 NYM 3 x 2,5 mm2 25.00 m - -
9 LANTAI 5
- dari DP. LT. 05 ke EF-5.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 10.00 m - -
- dari DP. LT. 05 ke FAF-5.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 22.00 m - -
10 LANTAI 6
- dari DP. LT. 06 ke EF-6.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 10.00 m - -
- dari DP. LT. 06 ke FAF-6.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 22.00 m - -
11 LANTAI 7
- dari DP. LT. 07 ke IU-7.01 A NYM 3 x 2,5 mm2 19.00 m - -
- dari DP. LT. 07 ke IU-7.01 B NYM 3 x 2,5 mm2 16.00 m - -
- dari DP. LT. 07 ke IU-7.02 NYM 3 x 2,5 mm2 19.00 m - -
- dari DP. LT. 07 ke IU-7.03 NYM 3 x 2,5 mm2 14.00 m - -
- dari DP. LT. 07 ke IU-7.04 NYM 3 x 2,5 mm2 9.00 m - -
- dari DP. LT. 07 ke IU-7.05 NYM 3 x 2,5 mm2 10.00 m - -
- dari DP. LT. 07 ke IU-7.06 NYM 3 x 2,5 mm2 16.00 m - -
8 Kabel Feeder
- dari DP. LT. 07 ke IU-7.07 NYM 3 x 2,5 mm2 16.00 m - -
- dari DP. LT. 07 ke IU-7.08 NYM 3 x 2,5 mm2 20.00 m - -
- dari DP. LT. 07 ke EF-7.1 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 28.00 m - -
12 LANTAI 7 MEZZANINE
- dari DP. LT. 07 MEZZ ke IU-7MZ.01 NYM 3 x 2,5 mm2 23.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.02 NYM 3 x 2,5 mm2 21.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.03 NYM 3 x 2,5 mm2 13.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.04 NYM 3 x 2,5 mm2 10.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.05 NYM 3 x 2,5 mm2 12.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.06 NYM 3 x 2,5 mm2 16.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.07 NYM 3 x 2,5 mm2 16.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.08 A NYM 3 x 2,5 mm2 20.00 m - -
- dari DP. LT. 07 MEZZ ke IU-7MZ.08 B NYM 3 x 2,5 mm2 14.00 m - -
- dari DP. LT. 07 MEZZ ke TEF-7MZ.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 10.00 m - -
13 LANTAI 8
- dari DP. LT. 08 ke IU-8.01 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 33.00 m - -
- dari DP. LT. 08 ke IU-8.02 NYM 3 x 2,5 mm2 29.00 m - -
- dari DP. LT. 08 ke IU-8.03 NYM 3 x 2,5 mm2 22.00 m - -
- dari DP. LT. 08 ke IU-8.04 A NYM 3 x 2,5 mm2 24.00 m - -
- dari DP. LT. 08 ke IU-8.04 B NYM 3 x 2,5 mm2 18.00 m - -
- dari DP. LT. 08 ke IU-8.05 NYM 3 x 2,5 mm2 12.00 m - -
- dari DP. LT. 08 ke IU-8.06 NYY 1x (4 x 2,5 mm2) + NYA 2,5 mm2 21.00 m - -
- dari DP. LT. 08 ke TEF-8.01 NYM 3 x 2,5 mm2 18.00 m - -
- dari DP. LT. 08 ke KEF-8.01 NYM 3 x 2,5 mm2 19.00 m - -
14 LANTAI ATAP
- dari PP. EMG ATAP ke P. TK ATAP FRC 1x (4 x 4 mm2) + NYA 4 mm2 10.00 m - -
- dari PP. EMG ATAP ke PK. PF ATAP FRC 1x (4 x 4 mm2) + NYA 4 mm2 9.00 m - -
- dari DP. LT. ATAP ke PB. LT. ATAP NYY 1x (4 x 6 mm2) + BC 6 mm2 9.00 m - -
- dari DP. LT. ATAP ke PP. LIFT P1 ATAP NYY 1x (4 x 6 mm2) + BC 6 mm2 9.00 m - -
- dari DP. LT. ATAP ke PP. LIFT P2 ATAP NYY 1x (4 x 6 mm2) + BC 6 mm2 8.00 m - -
- dari DP. LT. ATAP ke PP. LIFT P3 ATAP NYY 1x (4 x 6 mm2) + BC 6 mm2 5.00 m - -
- dari DP. LT. ATAP ke PC. BOOSTER PUMP NYY 1x (4 x 4 mm2) + NYA 4 mm2 33.00 m - -
PENJUMLAHAN
9 Kabel Feeder
0.8
4
24.8
24
24
34.4
6.4
21.6
10.4
4
24.8
1.6
1.6
21.6
19.2
28.8
24.8
9.6
5.6
6.4
12.8
12.8
14.4
11.2
23.2
25.6
35.2
28.8
31.2
32.8
35.2
24
23.2
13.6
8.8
31.2
24.8
24
24
24.8
13.6
8.8
20.8
9.6
20
32
10 Kabel Feeder
12.8
12.8
9.6
64
80
27.2
40.8
41.6
44
54.4
54.4
26.4
25.6
17.6
8.8
24
24.8
24
13.6
8.8
24.8
24
24
24.8
13.6
8.8
20.8
9.6
20
4
6.4
12
15.2
16
17.6
20.8
24.8
24
13.6
8.8
24.8
24
24
24.8
13.6
8.8
20.8
9.6
20
8
17.6
8
17.6
15.2
12.8
15.2
11.2
7.2
8
12.8
11 Kabel Feeder
12.8
16
22.4
18.4
16.8
10.4
8
9.6
12.8
12.8
16
11.2
8
26.4
23.2
17.6
19.2
14.4
9.6
16.8
14.4
15.2
8
7.2
7.2
7.2
6.4
4
26.4
17.6
12 Kabel Feeder
SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA
ELEKTRIKAL
1 LANTAI BASEMENT
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 1.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 13.00 bh - -
- Lampu TL 1 x 18 W Batten Type Surface Mounted 1.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 6.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 25.00 bh - -
2 LANTAI 1
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 6.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 27.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 16.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -
2 LANTAI 1 MEZZANINE
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 77.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -
4 LANTAI 2
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 3.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 11.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -
5 LANTAI 2 MEZZANINE
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 79.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
6 LANTAI 3
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 31.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -
7 LANTAI 3 MEZZANINE
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 79.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
8 LANTAI 4
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 31.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -
9 LANTAI 4 MEZZANINE
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 76.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
10 LANTAI 5
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 38.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 3.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -
11 LANTAI 6
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 36.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 3.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 2.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -
12 LANTAI 7
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 28.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 21.00 bh - -
- Exit Lamp 8 W Double Side 1.00 bh - -
13 LANTAI 7 MEZZANINE
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu TL 1 x 36 W Batten Type Surface Mounted 13.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 25.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 24.00 bh - -
14 LANTAI 8
- Lampu TL 2 x 36 W M5 Type Recessed Mounted 2.00 bh - -
- Lampu Taman 1 x 18 W 5.00 bh - -
- DownLight PLC 1 x 13 W Recessed Mounted 9.00 bh - -
- DownLight PLC 1 x 10 W Recessed Mounted 51.00 bh - -
15 LANTAI ATAP
- DownLight PLC 1 x 13 W Recessed Mounted 3.00 bh - -
1 LANTAI BASEMENT
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 46.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 13.00 titik - -
2 LANTAI GROUND
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 52.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 27.00 titik - -
4 LANTAI 2
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 19.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 25.00 titik - -
5 LANTAI 2 MEZZANINE
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 83.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 2.00 titik - -
6 LANTAI 3
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 36.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 27.00 titik - -
7 LANTAI 3 MEZZANINE
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 83.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 14.00 titik - -
8 LANTAI 4
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 36.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 23.00 titik - -
9 LANTAI 4 MEZZANINE
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 80.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 11.00 titik - -
11 LANTAI 6
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 44.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 2.00 titik - -
12 LANTAI 7
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 52.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 19.00 titik - -
- Instalasi Exhaust Fan NYM 3 x 2,5 mm2 c/w conduit 2.00 titik - -
13 LANTAI 7 MEZZANINE
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 64.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 17.00 titik - -
14 LANTAI 8
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 67.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 20.00 titik - -
- Instalasi Exhaust Fan NYM 3 x 2,5 mm2 c/w conduit 5.00 titik - -
15 LANTAI ATAP
- Instalasi Penerangan NYM 3 x 2,5 mm2 c/w conduit 3.00 titik - -
- Instalasi Stop Kontak 1 phase NYM 3 x 2,5 mm2 c/w conduit 3.00 titik - -
PENJUMLAHAN
ELEKTRIKAL
GROUNDING
PENJUMLAHAN
TOTAL GROUNDING - -
17 Grounding
SUMMARY
PAKET PEKERJAAN ELEKTRIKAL
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA
ELEKTRIKAL
RACK KABEL
1 LANTAI BASEMENT
- Riser Ladder 800 x 100 mm2 2.00 m - -
- Kabel Ladder 300 x 100 mm2 34.00 m - -
- Kabel Ladder 200 x 100 mm2 20.00 m - -
- Kabel Tray 400 x 100 mm2 6.00 m - -
- Kabel Tray 300 x 100 mm2 20.00 m - -
2 LANTAI GROUND
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 15.00 m - -
4 LANTAI 2
- Riser Ladder 800 x 100 mm2 3.00 m - -
5 LANTAI 2 MEZZANINE
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Ladder 300 x 100 mm2 27.00 m - -
- Kabel Tray 400 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 35.00 m - -
6 LANTAI 3
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 2.00 m - -
- Kabel Tray 300 x 100 mm2 15.00 m - -
7 LANTAI 3 MEZZANINE
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 35.00 m - -
8 LANTAI 4
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 2.00 m - -
- Kabel Tray 300 x 100 mm2 15.00 m - -
9 LANTAI 4 MEZZANINE
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 35.00 m - -
10 LANTAI 5
- Riser Ladder 800 x 100 mm2 6.00 m - -
- Kabel Tray 400 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 22.00 m - -
12 LANTAI 7
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 6.00 m - -
- Kabel Tray 300 x 100 mm2 32.00 m - -
13 LANTAI 7 MEZZANINE
- Riser Ladder 800 x 100 mm2 3.00 m - -
- Kabel Tray 400 x 100 mm2 6.00 m - -
- Kabel Tray 300 x 100 mm2 28.00 m - -
14 LANTAI 8
- Riser Ladder 800 x 100 mm2 4.00 m - -
- Kabel Tray 200 x 100 mm2 8.00 m - -
PENJUMLAHAN
ELEKTRIKAL
I PENANGKAL PETIR
4 Grounding Point lengkap dengan copper rod, bak Lot 5,599,500 2,136,300 - -
kontrol, Max resistance < 2 Ohm, Earthing
Electrode dan accessorries lainnya sesuai dengan
spesifikasi teknis dan gambar.
PENJUMLAHAN
20 Penangkal Petir
SUMMARY
PAKET PEKERJAAN ELEKTRONIK
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA
TOTAL
NO URAIAN PEKERJAAN JUMLAH (Rp.)
MATERIAL UPAH
II SOUND SYSTEM - - -
III MATV - - -
II SOUND SYSTEM
III MATV
IV CCTV
V TELEPHONE
VI DATA
VIII BAS
IX RACK KABEL
132 SUMMARY EC
SUMMARY
PAKET PEKERJAAN ELEKTRONIK
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA
A PERALATAN UTAMA
A.4 LANTAI 2
- TBFA - L2 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
22 FAS
- Photo Electric Smoke Detector 3.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
A.6 LANTAI 3
- TBFA - L3 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 4.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
A.8 LANTAI 4
- TBFA - L4 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 4.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
23 FAS
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
A.10 LANTAI 5
- TBFA - L5 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 6.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
A.11 LANTAI 6
- TBFA - L6 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 6.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 1.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
A.12 LANTAI 7
- TBFA - L7 1.00 Unit - -
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 14.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 2.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
A.14 LANTAI 8
- TBFA - L8 1.00 Unit - -
- Fixed Temperature Heat Detector 1.00 Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector ( 3W ) 12.00 Buah - -
- Remot Indicator Lamp 4.00 Buah - -
- Break Glass Alarm (Manual Call Point) 1.00 Buah - -
- Alarm Bell 1.00 Buah - -
- Visual Notification Appliance (Strobe) 1.00 Buah - -
- Fireman's Intercom Jack 1.00 Buah - -
- End Off Line 2.00 Buah - -
- Sprinkler Flow Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
- Sprinkler Tamper Switch (By Sprinkler Contractor) 1.00 Buah By Mekanikal
24 FAS
A.15 LANTAI ATAP
- Fixed Temperature Heat Detector Buah - -
- Rate Of Rise Heat Temperature Detector Buah - -
- Photo Electric Smoke Detector 2.00 Buah - -
- Break Glass Alarm (Manual Call Point) Buah - -
- Alarm Bell Buah - -
- Visual Notification Appliance (Strobe) Buah - -
- Fireman's Intercom Jack Buah - -
- End Off Line 1.00 Buah - -
B INSTALASI
B.1 LANTAI BASEMENT
- Instasi Ruang Central FA c/w : 1.00 Lot - -
Grounding, Accessories dan material bantu sehingga
sistem berjalan sesuai dengan sepesifikasi teknis.
- MCP-FA ke TBFA - BS
FRC 2 x 2,5 mm2 18.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 18.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 18.00 M - -
in PVC High Impact Conduit Ø 20 mm
- MCP-FA ke TBFA - 8
FRC 2 x 2,5 mm2 55.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 55.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 55.00 M - -
in PVC High Impact Conduit Ø 20 mm
25 FAS
in PVC High Impact Conduit Ø 20 mm
- TBFA - BS ke TBFA - GR
FRC 2 x 2,5 mm2 8.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 8.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 8.00 M - -
in PVC High Impact Conduit Ø 20 mm
26 FAS
- Instalasi Alarm Bell 1.00 Titik - -
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
B.4 LANTAI 2
- TBFA - GR ke TBFA - 2
FRC 2 x 2,5 mm2 9.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 9.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 9.00 M - -
in PVC High Impact Conduit Ø 20 mm
27 FAS
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
B.6 LANTAI 3
- TBFA - 2 ke TBFA - 3
FRC 2 x 2,5 mm2 9.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 9.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 9.00 M - -
in PVC High Impact Conduit Ø 20 mm
28 FAS
- Instalasi Visual Notification Appliance (Strobe) 1.00 Titik - -
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
B.8 LANTAI 4
- TBFA - 3 ke TBFA - 4
FRC 2 x 2,5 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
29 FAS
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
B.10 LANTAI 5
- TBFA - 4 ke TBFA - 5
FRC 2 x 2,5 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
B.11 LANTAI 6
- TBFA - 5 ke TBFA - 6
FRC 2 x 2,5 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 10.00 M - -
in PVC High Impact Conduit Ø 20 mm
30 FAS
- Instalasi Alarm Bell 1.00 Titik - -
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
B.12 LANTAI 7
- TBFA - 6 ke TBFA - 7
FRC 2 x 2,5 mm2 8.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 8.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 8.00 M - -
in PVC High Impact Conduit Ø 20 mm
31 FAS
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
B.14 LANTAI 8
- TBFA - 7 ke TBFA - 8
FRC 2 x 2,5 mm2 12.00 M - -
in PVC High Impact Conduit Ø 20 mm
FRC TWISTED SHIELDED 1 PAIR AWG 16 12.00 M - -
in PVC High Impact Conduit Ø 20 mm
ITC 2 x 2 x 0,6 mm2 12.00 M - -
in PVC High Impact Conduit Ø 20 mm
32 FAS
- Instalasi Break Glass Alarm (Manual Call Point) - Titik - -
FRC 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
C PENJUMLAHAN
C.2 INSTALASI
33 FAS
SUMMARY
PAKET PEKERJAAN ELEKTRONIK
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA
A PERALATAN UTAMA
A.4 LANTAI 2
- JBSS - 2 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 1.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -
A.6 LANTAI 3
- JBSS - 3 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 4.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -
A.8 LANTAI 4
- JBSS - 4 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 4.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -
A.10 LANTAI 5
- JBSS - 5 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 10.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -
A.11 LANTAI 6
- JBSS - 6 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) Bh - -
- Ceiling Speaker 3 W 10.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -
A.12 LANTAI 7
- JBSS - 7 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 15.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -
- Volume Control Bh - -
A.14 LANTAI 8
- JBSS - 7 (5") 1.00 Unit - -
- Wall Speaker 3 W Bh - -
- Wall Speaker 3 W (For Emergency) 1.00 Bh - -
- Ceiling Speaker 3 W 15.00 Bh - -
- Coloumn Speaker 10 W Bh - -
- Horn Speaker 15 W Bh - -
- Volume Control Bh - -
B INSTALASI
LANTAI GROUND
- MDF - SS ke JBSS - GR 26.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker 1.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 4.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI 2
- MDF - SS ke JBSS - 2 31.00 M - -
36 SS
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 1.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI 2 MEZZANINE
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 10.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI 3
- MDF - SS ke JBSS - 3 38.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 4.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI 3 MEZZANINE
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 10.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI 4
- MDF - SS ke JBSS - 4 41.00 M - -
FRC 2 x 2,5 mm2
37 SS
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 4.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI 4 MEZZANINE
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 10.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI 5
- MDF - SS ke JBSS - 5 45.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 10.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI 6
- MDF - SS ke JBSS - 6 48.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 10.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI 7
38 SS
- MDF - SS ke JBSS - 7 55.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 15.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Volume Control - Titik - -
NYMHY 3 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI 7 MEZZANINE
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 18.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Volume Control - Titik - -
NYMHY 3 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI 8
- MDF - SS ke JBSS - 8 65.00 M - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) 1.00 Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 15.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Volume Control - Titik - -
NYMHY 3 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
LANTAI ATAP
- Instalasi Wall Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Wall Speaker (For Emergency) - Titik - -
FRC 2 x 2,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Ceiling Speaker 2.00 Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
39 SS
- Instalasi Coloumn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
- Instalasi Horn Speaker - Titik - -
NYMHY 2 x 1,5 mm2
in PVC High Impact Conduit Ø 20 mm
C PENJUMLAHAN
C.2 INSTALASI
40 SS
SUMMARY
PAKET PEKERJAAN ELEKTRONIK
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA
IV MATV
A PERALATAN UTAMA
A.3 LANTAI 8
- - JB-TV-8 1.00 unit - -
- Splitter 2 way 1.00 bh - -
- Directional Coupler 2 tap 1.00 bh - -
- Directional Coupler 4 tap 1.00 bh - -
- Outlet MATV 6.00 bh - -
B INSTALASI
41 MATV
in PVC High Impact Conduit Ø 20 mm
- Instalasi Outlet MATV 5.00 Titik - -
Kabel RG 6
in PVC High Impact Conduit Ø 20 mm
B.3 LANTAI 8
- JB-MATV-7 Mezz ke JB-TV-8 9.00 M - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm
- Instalasi Splitter 2 way 1.00 Titik - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm
- Instalasi Directional Coupler 2 tap 1.00 Titik - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm
- Instalasi Directional Coupler 4 tap 1.00 Titik - -
Kabel RG 11
in PVC High Impact Conduit Ø 20 mm
- Instalasi Outlet MATV 6.00 Titik - -
Kabel RG 6
in PVC High Impact Conduit Ø 20 mm
C PENJUMLAHAN
C.2 INSTALASI
42 MATV
SUMMARY
PAKET PEKERJAAN ELEKTRONIK
PROYEK PEMBANGUNAN GEDUNG HARTONO ELEKTRONIK
JAKARTA
A PERALATAN UTAMA
A.4 LANTAI 2
- Riser Ladder 600 x 100 mm2 3.00 m - -
A.6 LANTAI 3
- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 2.00 m - -
- Kabel Tray 200 x 100 mm2 17.00 m - -
A.8 LANTAI 4
- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 2.00 m - -
- Kabel Tray 200 x 100 mm2 16.00 m - -
A.10 LANTAI 5
- Riser Ladder 600 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 5.00 m - -
- Kabel Tray 200 x 100 mm2 22.00 m - -
A.11 LANTAI 6
- Riser Ladder 600 x 100 mm2 5.00 m - -
- Kabel Tray 300 x 100 mm2 5.00 m - -
- Kabel Tray 200 x 100 mm2 22.00 m - -
A.12 LANTAI 7
43 Rack Tray EC
- Riser Ladder 600 x 100 mm2 3.00 m - -
- Kabel Tray 300 x 100 mm2 5.00 m - -
- Kabel Tray 200 x 100 mm2 28.00 m - -
A.14 LANTAI 8
- Riser Ladder 600 x 100 mm2 4.00 m - -
- Kabel Tray 300 x 100 mm2 4.00 m - -
- Kabel Tray 200 x 100 mm2 28.00 m - -
B PENJUMLAHAN
44 Rack Tray EC
SUMMARY
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
SUMMARY
TOTAL
NO. URAIAN JUMLAH (Rp)
MATERIAL UPAH
PENJUMLAHAN
1 DEEPWELL - - -
ADDENDUM
1 DEEPWELL
KE PENJUMLAHAN ME - - -
BILL OF QUANTITY
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
PEKERJAAN : EQUIPMENT POMPA
HARGA SATUAN TOTAL
NO URAIAN VOL SAT
MATERIAL UPAH MATERIAL
I EQUIPMENT
accessories.
PENJUMLAHAN
Ke Penjumlahan Plumbing -
46 DEEP WELL
TOTAL
UPAH
47 DEEP WELL
SUMMARY
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
SUMMARY
TOTAL
NO. URAIAN JUMLAH (Rp)
MATERIAL UPAH
PENJUMLAHAN
1 EQUIPMENT - - -
5 PEMIPAAN KITCHEN - - -
6 ACCESSORIES - - -
ADDENDUM
1 EQUIPMENT
5 PEMIPAAN KITCHEN
6 ACCESSORIES
KE PENJUMLAHAN ME - - -
BILL OF QUANTITY
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
PEKERJAAN : EQUIPMENT POMPA
HARGA SATUAN TOTAL
NO URAIAN VOL SAT
MATERIAL UPAH MATERIAL
I EQUIPMENT
accessories.
1 Transfer Pump
Kode : PUMP 01 2.00 unit -
Type : Centrifugal
Kapasitas : 100 LPM, 7 BAR
Jumlah : 1 duty, 1 standby
Lokasi : Ruang Pompa
2 Booster Pump
Kode : PUMP 02 1.00 set -
Type : Centrifugal c/w VSD
Kapasitas : 155 LPM, 2 BAR
Jumlah : paralel alternate
Lokasi : Roof
1 Set : 2 pompa
3 Roof Tank
Kode : TN.102 1.00 Lot -
Kapasitas : 20 m3
Type : FRP
Lokasi : Roof
3 Sewage pump
Kode : SP PUMP 03 2.00 unit -
Type : submersible + QDC
Kapasitas : @200 LPM, 2,5 BAR
Jumlah : paralel alternate
Lokasi : Grease trap pit
1 Set :
49 EQUIP
4 STP 1.00 Lot -
Kap : 10 M3 type Biotech
Sub Total Peralatan Utama Sistem Air Hujan, Bekas & Kotor -
PENJUMLAHAN
B Sub Total Peralatan Utama Sistem Air Hujan, Bekas & Kotor -
Ke Penjumlahan Plumbing -
50 EQUIP
TOTAL
UPAH
51 EQUIP
-
52 EQUIP
BILL OF QUANTITY
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
A LANTAI BASEMENT
1 Pipa Air Hujan PVC AW
- dia : 100 mm 16.00 M - -
B LANTAI 1
1 Pipa Air Hujan PVC AW
- dia : 200 mm 60.00 M - -
- dia : 150 mm 9.00 M - -
- dia : 100 mm 45.00 M - -
- dia : 80 mm 15.00 M - -
- dia : 65 mm 2.00 M - -
C LANTAI 1 MEZZANINE
1 Pipa Air Hujan PVC AW
- dia : 150 mm 4.00 M - -
- dia : 100 mm 15.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -
D LANTAI 2
1 Pipa Air Hujan PVC AW
- dia : 150 mm 5.00 M - -
- dia : 100 mm 15.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -
D LANTAI 2 MEZZANINE
1 Pipa Air Hujan PVC AW
- dia : 150 mm 5.00 M - -
- dia : 100 mm 15.00 M - -
53 RW
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -
E LANTAI 3
1 Pipa Air Hujan PVC AW
- dia : 150 mm 35.00 M - -
- dia : 100 mm 20.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -
F LANTAI 3 MEZZANINE
1 Pipa Air Hujan PVC AW
- dia : 100 mm 15.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -
G LANTAI 4
1 Pipa Air Hujan PVC AW
- dia : 100 mm 15.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -
H LANTAI 4 MEZZNINE
1 Pipa Air Hujan PVC AW
- dia : 100 mm 15.00 M - -
- dia : 80 mm 3.00 M - -
- dia : 65 mm 2.00 M - -
I LANTAI 5
1 Pipa Air Hujan PVC AW
- dia : 100 mm 27.00 M - -
- dia : 80 mm 5.00 M - -
- dia : 65 mm 2.00 M - -
J LANTAI 6
1 Pipa Air Hujan PVC AW
- dia : 100 mm 28.00 M - -
- dia : 80 mm 5.00 M - -
- dia : 65 mm 2.00 M - -
I LANTAI 7
1 Pipa Air Hujan PVC AW
- dia : 100 mm 28.00 M - -
- dia : 80 mm 5.00 M - -
- dia : 65 mm 2.00 M - -
J LANTAI 7 MEZZANINE
54 RW
1 Pipa Air Hujan PVC AW
- dia : 100 mm 28.00 M - -
- dia : 80 mm 5.00 M - -
- dia : 65 mm 2.00 M - -
K LANTAI 8
1 Pipa Air Hujan PVC AW
- dia : 100 mm 16.00 M - -
- dia : 80 mm 18.00 M - -
- dia : 65 mm 2.00 M - -
L LANTAI ATAP
1 Pipa Air Hujan PVC AW
- dia : 100 mm 18.00 M - -
- dia : 80 mm 4.00 M - -
- dia : 65 mm 2.00 M - -
55 RW
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
PEKERJAAN : PIPA AIR BERSIH
HARGA SATUAN
NO URAIAN VOL SAT
MATERIAL
A LANTAI BASEMENT
Ruang Pompa
1 Pipa Air Bersih PPR PN 20
- dia : 15 mm 10.00 M
- dia : 50 mm 8.00 M
- dia : 65 mm 9.00 M
- dia 100 mm 10.00 M
56 AB
B LANTAI 1
C LANTAI 1 MEZZANINE
D LANTAI 2
D LANTAI 2 MEZZANINE
E LANTAI 3
F LANTAI 3 MEZZZANINE
G LANTAI 4
57 AB
1 Pipa Air Bersih PPR PN 20
- dia : 15 mm 12.00 M
H LANTAI 4 MEZZANINE
I LANTAI 5
J LANTAI 6
K LANTAI 7
L LANTAI 7 MEZZANINE
58 AB
M LANTAI 8
N LANTAI ATAP
59 AB
HARGA SATUAN TOTAL
UPAH MATERIAL UPAH
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
60 AB
- -
- -
- -
- -
- -
- -
61 AB
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
62 AB
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
63 AB
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
PEKERJAAN : PIPA AIR KOTOR, BEKAS, VENT
HARGA SATUAN TOTAL
NO URAIAN VOL SAT
MATERIAL UPAH MATERIAL UPAH
A LANTAI BASEMENT
K LANTAI 7
L LANTAI 7 MEZZANINE
64 PKBV
- dia 100 mm 31.00 M - -
M LANTAI 8
65 PKBV
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
PEKERJAAN : PIPA AIR KITCHEN
HARGA SATUAN TOTAL
NO URAIAN VOL SAT
MATERIAL UPAH MATERIAL UPAH
A LANTAI BASEMENT
M LANTAI 8
66 P.KITCHEN
PAKET PEKERJAAN PLUMBING
PROYEK HARTONO ELEKTRONIK
JAKARTA SELATAN
A LANTAI BASEMENT
RUANG POMPA
Gate Valve
- dia. : 15 mm 3.00 Bh - -
- dia. 50 mm 3.00 Bh - -
- dia. 65 mm 4.00 Bh - -
Floating Valve
- dia. 100 mm 2.00 Bh - -
Flexible Joint
- dia. : 65 mm 2.00 Bh - -
- dia. : 50 mm 2.00 Bh - -
Strainer
- dia. : 65 mm 2.00 Bh - -
Check Valve
- dia. : 50 mm 2.00 Bh - -
Foot Valve
- dia. : 65 mm 2.00 Bh - -
67 ACC
Floor Drain
- dia. : 50 mm 9.00 Bh - -
Check Valve
- dia. : 80 mm 2.00 Bh - -
Butterfly Valve
- dia. : 100 mm 1.00 Bh - -
Check Valve
- dia. : 80 mm 4.00 Bh - -
Butterfly Valve
- dia. : 100 mm 2.00 Bh - -
B LANTAI 1
1 Gate Valve
- dia. : 15 mm 2.00 Bh - -
Floor Drain
- dia. : 100 mm 1.00 Bh - -
Roof Drain
- dia. : 65 mm 1.00 Bh - -
Clean Out
- dia. : 200 mm 1.00 Bh - -
C LANTAI 1 MEZZANINE
1 Gate Valve
- dia. : 15 mm 2.00 Bh - -
Roof Drain
- dia. : 50 mm 1.00 Bh - -
D LANTAI 2
1 Gate Valve
- dia. : 15 mm 2.00 Bh - -
Roof Drain
- dia. : 50 mm 1.00 Bh - -
E LANTAI 3
1 Gate Valve
- dia. : 15 mm 2.00 Bh - -
Roof Drain
- dia. : 65 mm 1.00 Bh - -
- dia. : 100 mm 6.00 Bh - -
68 ACC
F LANTAI 3 MEZZZANINE
1 Gate Valve
- dia. : 15 mm 2.00 Bh - -
Roof Drain
- dia. : 65 mm 1.00 Bh - -
G LANTAI 4
1 Gate Valve
- dia. : 15 mm 2.00 Bh - -
Roof Drain
- dia. : 65 mm 1.00 Bh - -
H LANTAI 4 MEZZANINE
1 Gate Valve
- dia. : 15 mm 2.00 Bh - -
Roof Drain
- dia. : 65 mm 1.00 Bh - -
I LANTAI 5
1 Gate Valve
- dia. : 15 mm 2.00 Bh - -
Roof Drain
- dia. : 65 mm 1.00 Bh - -
J LANTAI 6
1 Gate Valve
- dia. : 15 mm 2.00 Bh - -
Roof Drain
- dia. : 65 mm 1.00 Bh - -
K LANTAI 7
1 Gate Valve
- dia. : 15 mm 1.00 Bh - -
- dia. : 25 mm 2.00 Bh - -
Clean Out
- dia. : 80 mm 1.00 Bh - -
- dia. 100 mm 1.00 Bh - -
Floor Drain
- dia. : 50 mm 1.00 Bh - -
Roof Drain
69 ACC
- dia. : 65 mm 1.00 Bh - -
L LANTAI 7 MEZZANINE
1 Gate Valve
- dia. : 15 mm 5.00 Bh - -
- dia. : 25 mm 4.00 Bh - -
- dia. 50 mm 1.00 Bh - -
Clean Out
- dia. : 80 mm 2.00 Bh - -
- dia. 100 mm 1.00 Bh - -
Floor Drain
- dia. : 50 mm 4.00 Bh - -
Roof Drain
- dia. : 65 mm 1.00 Bh - -
M LANTAI 8
1 Gate Valve
- dia. : 15 mm 1.00 Bh - -
- dia. : 20 mm 11.00 Bh - -
- dia. : 25 mm 8.00 Bh - -
- dia. 50 mm 2.00 Bh - -
Clean Out
- dia. : 80 mm 3.00 Bh - -
- dia. 100 mm 4.00 Bh - -
Floor Drain
- dia. : 50 mm 12.00 Bh - -
Venting
- dia. : 150 mm 1.00 Bh - -
Roof Drain
- dia. : 65 mm 1.00 Bh - -
- dia. : 80 mm 5.00 Bh - -
N LANTAI ATAP
1 Gate Valve
- dia. : 15 mm 2.00 Bh - -
- dia. 50 mm 5.00 Bh - -
- dia. 80 mm 4.00 Bh - -
Flexible Joint
- dia. : 80 mm 2.00 Bh - -
- dia. : 50 mm 2.00 Bh - -
Strainer
- dia. : 80 mm 2.00 Bh - -
Check Valve
- dia. : 50 mm 3.00 Bh - -
70 ACC
2 SISTEM AIR KOTOR
Vent cap
- dia. : 150 mm 1.00 Bh - -
Roof Drain
- dia. : 65 mm 1.00 Bh - -
- dia. : 100 mm 5.00 Bh - -
Vent Cup
- dia. : 80 mm 1.00 Bh - -
- dia. : 100 mm 5.00 Bh - -
71 ACC
SUMMARY
PAKET PEKERJAAN PEMADAM KEBAKARAN
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN
HARGA SATUAN
NO. URAIAN TOTAL
MATERIAL UPAH
PEKERJAAN INDUK
1 EQUIPMENT - - -
2 PEMIPAAN SPRINKLER - - -
3 PEMIPAAN HYDRANT - - -
1 EQUIPMENT
2 PEMIPAAN SPRINKLER
3 PEMIPAAN HYDRANT
TOTAL KE PENJUMLAHAN ME - - -
132 SUM PK
BILL OF QUANTITY
PAKET PEKERJAAN PEMADAM KEBAKARAN
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN
EQUIPMENT
HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL UPAH
A EQUIPMENT
1 LANTAI BASEMENT
2 LANTAI 1
3 LANTAI 1 Mezzanine
73 EQUIPMENT
1 Indoor Hydrant Box (IHB) 1.00 Unit - -
4 LANTAI 2
4 LANTAI 2 Mezzanine
5 LANTAI 3
6 LANTAI 3 Mezzanine
7 LANTAI 4
8 LANTAI 4 Mezzanine
74 EQUIPMENT
9 LANTAI 5
10 LANTAI 6
11 LANTAI 7
12 LANTAI 7 Mezzanine
13 LANTAI 8
14 LANTAI Atap
75 EQUIPMENT
SUMMARY
76 EQUIPMENT
BILL OF QUANTITY
PAKET PEKERJAAN PEMADAM KEBAKARAN
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN
PEMIPAAN SPRINKLER
HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL
II PEMIPAAN SPRINKLER
1 Pipa Splinkler
- dia. : 25 mm 1,000.00 M -
- dia. : 32 mm 24.00 M -
- dia. : 40 mm 18.00 M -
- dia. : 80 mm 25.00 M -
- dia. : 150 mm 18.00 M -
Riser
- dia. : 150 mm 4.00 M -
2 LANTAI 1
1 Pipa Splinkler
- dia. : 25 mm 31.00 M -
- dia. : 50 mm 14.00 M -
- dia. : 65 mm 9.00 M -
Riser
- dia. : 150 mm 3.00 M -
3 LANTAI 1 Mezzanine
1 Pipa Splinkler
- dia. : 25 mm 28.00 M -
- dia. : 50 mm 15.00 M -
- dia. : 65 mm 9.00 M -
Riser
- dia. : 150 mm 3.00 M -
4 LANTAI 2
77 PEMIPAAN SPLINKLER
1 Pipa Splinkler
- dia. : 25 mm 28.00 M -
- dia. : 50 mm 15.00 M -
- dia. : 65 mm 9.00 M -
Riser
- dia. : 150 mm 3.00 M -
4 LANTAI 2 MEZZANINE
1 Pipa Splinkler
- dia. : 25 mm 90.00 M -
- dia. : 32 mm 10.00 M -
- dia. : 40 mm 18.00 M -
- dia. : 50 mm 2.00 M -
- dia. : 65 mm 15.00 M -
- dia. : 80 mm 9.00 M -
Riser
- dia. : 150 mm 3.00 M -
5 LANTAI 3
1 Pipa Splinkler
- dia. : 25 mm 28.00 M -
- dia. : 50 mm 14.00 M -
- dia. : 65 mm 9.00 M -
Riser
- dia. : 150 mm 3.00 M -
6 LANTAI 3 Mezzanine
1 Pipa Splinkler
- dia. : 25 mm 90.00 M -
- dia. : 32 mm 10.00 M -
- dia. : 40 mm 18.00 M -
- dia. : 50 mm 2.00 M -
- dia. : 65 mm 15.00 M -
- dia. : 80 mm 9.00 M -
Riser
- dia. : 150 mm 3.00 M -
78 PEMIPAAN SPLINKLER
7 LANTAI 4
1 Pipa Splinkler
- dia. : 25 mm 28.00 M -
- dia. : 50 mm 12.00 M -
- dia. : 65 mm 9.00 M -
Riser
- dia. : 150 mm 3.00 M -
8 LANTAI 4 Mezzanine
1 Pipa Splinkler
- dia. : 25 mm 88.00 M -
- dia. : 32 mm 10.00 M -
- dia. : 40 mm 12.00 M -
- dia. : 50 mm 10.00 M -
- dia. : 65 mm 15.00 M -
- dia. : 80 mm 9.00 M -
Riser
- dia. : 150 mm 3.00 M -
9 LANTAI 5
1 Pipa Splinkler
- dia. : 25 mm 121.00 M -
- dia. : 32 mm 10.00 M -
- dia. : 40 mm 12.00 M -
- dia. : 50 mm 10.00 M -
- dia. : 65 mm 15.00 M -
- dia. : 80 mm 9.00 M -
Riser
- dia. : 150 mm 6.00 M -
10 LANTAI 6
1 Pipa Splinkler
- dia. : 25 mm 121.00 M -
- dia. : 32 mm 10.00 M -
- dia. : 40 mm 12.00 M -
- dia. : 50 mm 10.00 M -
- dia. : 65 mm 15.00 M -
- dia. : 80 mm 9.00 M -
Riser
79 PEMIPAAN SPLINKLER
- dia. : 150 mm 6.00 M -
11 LANTAI 7
1 Pipa Splinkler
- dia. : 25 mm 92.00 M -
- dia. : 32 mm 2.00 M -
- dia. : 40 mm 6.00 M -
- dia. : 50 mm 6.00 M -
- dia. : 65 mm 13.00 M -
- dia. : 80 mm 10.00 M -
Riser
- dia. : 150 mm 3.00 M -
12 LANTAI 7 Mezzanine
1 Pipa Splinkler
- dia. : 25 mm 10.00 M -
- dia. : 32 mm 12.00 M -
- dia. : 40 mm 4.00 M -
- dia. : 50 mm 10.00 M -
- dia. : 65 mm 16.00 M -
- dia. : 80 mm 12.00 M -
Riser
- dia. : 150 mm 3.00 M -
13 LANTAI 8
1 Pipa Splinkler
- dia. : 25 mm 76.00 M -
- dia. : 32 mm 8.00 M -
- dia. : 40 mm 4.00 M -
- dia. : 50 mm 8.00 M -
- dia. : 65 mm 8.00 M -
- dia. : 80 mm 11.00 M -
Riser
- dia. : 150 mm 4.00 M -
14 LANTAI ATAP
80 PEMIPAAN SPLINKLER
1 Pipa Splinkler
- dia. : 25 mm 2.00 M -
Riser
- dia. : 150 mm 4.00 M -
SUMMARY
81 PEMIPAAN SPLINKLER
TOTAL
UPAH
-
-
-
-
-
Include pipe
-
-
-
Include pipe
-
-
-
Include pipe
82 PEMIPAAN SPLINKLER
-
-
-
Include pipe
-
-
-
-
-
-
Include pipe
-
-
-
Include pipe
-
-
-
-
-
-
Include pipe
83 PEMIPAAN SPLINKLER
-
-
-
Include pipe
-
-
-
-
-
-
Include pipe
-
-
-
-
-
-
Include pipe
-
-
-
-
-
-
84 PEMIPAAN SPLINKLER
-
Include pipe
-
-
-
-
-
-
Include pipe
-
-
-
-
-
-
Include pipe
-
-
-
-
-
-
Include pipe
85 PEMIPAAN SPLINKLER
-
Include pipe
86 PEMIPAAN SPLINKLER
BILL OF QUANTITY
PAKET PEKERJAAN PEMADAM KEBAKARAN
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN
PEMIPAAN HYDRANT
HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL UPAH
1 BASEMENT 1
1 Pipa Hydrant
- dia. : 65 mm 20.00 M - -
- dia. : 100 mm 31.00 M - -
- dia. : 150 mm 18.00 M - -
Riser
- dia. : 100 mm 4.00 M - -
- dia. : 150 mm 4.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
2 LANTAI 1
1 Pipa Hydrant
- dia. : 65 mm 6.00 M - -
- dia. : 80 mm 15.00 M - -
- dia. : 100 mm 27.00 M - -
- dia. : 150 mm ( BS Medium sleeve) 12.00 M - -
Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
3 LANTAI 1 Mezzanine
1 Pipa Hydrant
- dia. : 65 mm 6.00 M - -
- dia. : 80 mm 10.00 M - -
Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
4 LANTAI 2
1 Pipa Hydrant
87 PEMIPAAN HYDRANT
1 Pipa Hydrant
- dia. : 65 mm 6.00 M - -
88 PEMIPAAN HYDRANT
- dia. : 80 mm 10.00 M - -
Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
4 LANTAI 2 MEZZANINE
1 Pipa Splinkler
- dia. : 65 mm 11.00 M - -
- dia. : 80 mm 10.00 M - -
Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
5 LANTAI 3
1 Pipa Hydrant
- dia. : 65 mm 6.00 M - -
- dia. : 80 mm 10.00 M - -
Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
6 LANTAI 3 Mezzanine
1 Pipa Hydrant
- dia. : 65 mm 11.00 M - -
- dia. : 80 mm 10.00 M - -
Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
7 LANTAI 4
1 Pipa Hydrant
- dia. : 65 mm 6.00 M - -
- dia. : 80 mm 10.00 M - -
Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
89 PEMIPAAN HYDRANT
Sub Total Instalasi Hydrant Lantai 4 - -
8 LANTAI 4 Mezzanine
1 Pipa Hydrant
- dia. : 65 mm 11.00 M - -
- dia. : 80 mm 10.00 M - -
Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
9 LANTAI 5
1 Pipa Hydrant
- dia. : 65 mm 12.00 M - -
- dia. : 80 mm 10.00 M - -
Riser
- dia. : 100 mm 5.00 M - -
- dia. : 150 mm 5.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
10 LANTAI 6
1 Pipa Hydrant
- dia. : 65 mm 12.00 M - -
- dia. : 80 mm 10.00 M - -
Riser
- dia. : 100 mm 5.00 M - -
- dia. : 150 mm 5.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
11 LANTAI 7
1 Pipa Hydrant
- dia. : 65 mm 5.00 M - -
- dia. : 80 mm 10.00 M - -
Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
12 LANTAI 7 Mezzanine
1 Pipa Hydrant
- dia. : 65 mm 12.00 M - -
90 PEMIPAAN HYDRANT
- dia. : 80 mm 8.00 M - -
Riser
- dia. : 100 mm 3.00 M - -
- dia. : 150 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
13 LANTAI 8
1 Pipa Hydrant
- dia. : 65 mm 12.00 M - -
- dia. : 80 mm 4.00 M - -
Riser
- dia. : 100 mm 4.00 M - -
- dia. : 150 mm 4.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
14 LANTAI ATAP
1 Pipa Hydrant
- dia. : 65 mm 7.00 M - -
Riser
- dia. : 65 mm 4.00 M - -
- dia. : 150 mm 4.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
SUMMARY
91 PEMIPAAN HYDRANT
13 Sub Total Instalasi Hydrant Lantai 8 - -
92 PEMIPAAN HYDRANT
BILL OF QUANTITY
PAKET PEKERJAAN PEMADAM KEBAKARAN
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN
1 LANTAI BASEMENT 1
Riser
- dia. : 50 mm 4.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
2 LANTAI 1
Riser
- dia. : 50 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
3 LANTAI 1 Mezzanine
Riser
- dia. : 50 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
4 LANTAI 2
Riser
- dia. : 50 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
4 LANTAI 2 MEZZANINE
Riser
- dia. : 50 mm 3.00 M - -
2 Fitting - fitting & Material Bantu Lot Include pipe Include pipe
5 LANTAI 3
Riser
- dia. : 50 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
6 LANTAI 3 Mezzanine
Riser
- dia. : 50 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
7 LANTAI 4
Riser
- dia. : 50 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
8 LANTAI 4 Mezzanine
Riser
- dia. : 50 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
9 LANTAI 5
Riser
- dia. : 50 mm 6.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
10 LANTAI 6
Riser
- dia. : 50 mm 6.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
11 LANTAI 7
Riser
- dia. : 50 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
12 LANTAI 7 Mezzanine
Riser
- dia. : 50 mm 3.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
13 LANTAI 8
Riser
- dia. : 50 mm 4.00 M - -
2 Fitting - fitting & Material Bantu 1.00 Lot Include pipe Include pipe
SUMMARY
- -
ACCESSORIES
HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN QTY UNIT
MATERIAL UPAH MATERIAL UPAH
1 LANTAI BASEMENT
Gate Valve
- dia : 150 mm 3.00 Bh - -
: 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 80 mm 1.00 Set - -
MCV
- dia : 150 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 8.00 Bh - -
- Type Upright 30.00 Bh - -
RUANG POMPA
Gate Valve
- dia : 150 mm 11.00 Bh - -
100 mm 1.00 Bh - -
50 mm 2.00 Bh - -
25 mm 2.00 Bh - -
Check Valve
- dia : 150 mm 2.00 Bh - -
50 mm 1.00 Bh - -
Safety Valve
- dia : 100 mm 1.00 Bh - -
Strainer
- dia : 150 mm 2.00 Bh - -
50 mm 1.00 Bh - -
Flow meter
- dia : 150 mm 1.00 Set - -
2 LANTAI 1
98 ACCESSORIES
Gate Valve
- dia : 100 mm 2.00 Bh - -
25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
Check Valve
- dia : 100 mm 1.00 Bh - -
BCV
- dia : 65 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 12.00 Bh - -
3 LANTAI 1 Mezzanine
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 65 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 12.00 Bh - -
4 LANTAI 2
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 65 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 12.00 Bh - -
3 LANTAI 2 Mezzanine
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 80 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 33.00 Bh - -
99 ACCESSORIES
Sub Total Peralatan Utama LANTAI 2 mezzanine - -
5 LANTAI 3
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 65 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 12.00 Bh - -
6 LANTAI 3 Mezzanine
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 80 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 34.00 Bh - -
7 LANTAI 4
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 65 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 12.00 Bh - -
8 LANTAI 4 Mezzanine
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 80 mm 1.00 Set - -
100 ACCESSORIES
Sprinkler Head :
- Type Pendent 33.00 Bh - -
9 LANTAI 5
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 80 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 34.00 Bh - -
10 LANTAI 6
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 80 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 36.00 Bh - -
11 LANTAI 7
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 80 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 37.00 Bh - -
12 LANTAI 7 Mezzanine
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
101 ACCESSORIES
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 80 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 41.00 Bh - -
13 LANTAI 8
Gate Valve
- dia : 25 mm 1.00 Bh - -
Landing Valve
- dia : 65 mm 1.00 Bh - -
BCV
- dia : 80 mm 1.00 Set - -
Sprinkler Head :
- Type Pendent 26.00 Bh - -
35 LANTAI ATAP
Gate Valve
- dia : 65 mm 1.00 Bh - -
AAV
- dia : 25 mm 3.00 Set - -
SUMMARY
102 ACCESSORIES
10 Sub Total Accessories Lantai 6 - -
- -
103 ACCESSORIES
SUMMARY
PAKET PEKERJAAN PENGADAAN DAN PEMASANGAN AIR CONDITIONING (AC)
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN
HARGA TOTAL
NO URAIAN PEKERJAAN JUMLAH (Rp)
MATERIAL UPAH
PEK. INDUK
PENJUMLAHAN
- Unit AC - - -
- FAN - - -
- Instalasi Pemipaan - - -
- Instalasi Ducting - - -
PENJUMLAHAN
- Unit AC
- FAN
- Instalasi Pemipaan
- Instalasi Ducting
132 SUM AC
BILL OF QUANTITY
PAKET PEKERJAAN PENGADAAN DAN PEMASANGAN AIR CONDITIONING (AC)
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN
I PERALATAN UTAMA
I LANTAI BASSEMENT
1 SPL/OU BS-01
- Total Capacity : 12,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 Cfm
- Type : Wall Mounted
- Power : 1,230 W
- Lokasi : R. tunggu Sopir
2 SPL/OU BS-02
- Total Capacity : 9,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : R. Server
II LANTAI GROUND
IV LANTAI 2 MEZZANINE
105132 Unit AC
- Supply Air : 2,500 CFM
- Type : Split Duct
- Power : 16,000 W
- Lokasi : Store
IV LANTAI 3
V LANTAI 3 MEZZANINE
VII LANTAI 4
XI LANTAI 7
106132 Unit AC
2 SPL/OU 7-02
- Total Capacity : 9,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : CCO
3 SPL/OU 7-03
- Total Capacity : 9,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : R. Server
4 SPL/OU 7-04
- Total Capacity : 16,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 450 CFM
- Type : Wall Mounted
- Power : 1,690 W
- Lokasi : R. Waiting
5 SPL/OU 7-05
- Total Capacity : 16,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 450 CFM
- Type : Wall Mounted
- Power : 1,690 W
- Lokasi : R. Office
6 SPL/OU 7-06
- Total Capacity : 12,600 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 1,230 W
- Lokasi : R. Office
2 SPL/OU 7MZ-03 ~ 06
- Total Capacity : 9,200 BTU/H Unit 4.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : R. Mess
3 SPL/OU 7MZ-07
- Total Capacity : 16,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 450 CFM
- Type : Wall Mounted
107132 Unit AC
- Power : 1,690 W
- Lokasi : R. Mess
XIII LANTAI 8
1 SPL/OU 8-01
- Total Capacity : 30,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 1,000 CFM
- Type : Ceiling Duct
- Power : 4,000 W
- Lokasi : Master Bedroom
2 SPL/OU 8-02
- Total Capacity : 18,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 500 CFM
- Type : Wall Mounted
- Power : 1895 W
- Lokasi : WIC
3 SPL/OU 8-05
- Total Capacity : 9,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : BEDROOM
4 SPL/OU-08.06
- Total Capacity : 60,000 BTU/H Unit 1.00 SBO SBO
- Supply Air : 2,000 CFM
- Type : Split Duct
- Power : 7,000 W
- Lokasi : Living Room
1 SPL/OU A-01
- Total Capacity : 9,200 BTU/H Unit 1.00 SBO SBO
- Supply Air : 323 CFM
- Type : Wall Mounted
- Power : 920 W
- Lokasi : Mesin Lift
108132 Unit AC
PENJUMLAHAN
Ke Penjumlahan AC -
109132 Unit AC
TOTAL
UPAH
110132 Unit AC
-
111132 Unit AC
-
112132 Unit AC
-
113132 Unit AC
-
114132 Unit AC
BILL OF QUATITY
PAKET PEKERJAAN PENGADAAN DAN PEMASANGAN AIR CONDITIONING (AC)
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN
PEKERJAAN : FAN
HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN QTY VOL.
MATERIAL UPAH MATERIAL UPAH
I PERALATAN UTAMA
I LANTAI BASEMENT
115 FAN
- Lokasi : Store
VI LANTAI 3 Mezzanine
IX LANTAI 5
IX LANTAI 6
XI LANTAI 7
116 FAN
- Static Press : In. wg
- Data Listrik :
- Fungsi : Exaust
- Lokasi : toilet
XIII LANTAI 8
117 FAN
6 Pressurized Fan 1.00 unit - -
- Kapasitas : 23,500 CFM
- FAN Type : Axial direct
- Static Press : 65 mm. wg
- Data Listrik :
- Fungsi : Pressurized fan
- Lokasi : Roof
PENJUMLAHAN
Ke Penjumlahan FAN - -
118 FAN
BILL OF QUANTITY
PAKET PEKERJAAN PENGADAAN DAN PEMASANGAN AIR CONDITIONING (AC)
PROYEK PEMBANGUNAN HARTONO ELEKTRONIK
JAKARTA SELATAN
A LANTAI BASEMENT
Flexible SAD
Dia : 100 mm M 6.00 - -
B LANTAI 1
1 Fresh Air Louvre ( FAL )
300 x 150 mm Bh 1.00 - -
C LANTAI 1 Mezzanine
3 Plenum Box
- AC Kap. : 150000 btu/h Set 2.00 - -
4 Drain Pan
- AC Kap. : 150000 btu/h Set 2.00 - -
D LANTAI 2 Mezzanine
2 Plenum Box
- AC Kap. : 150000 btu/h Set 2.00 - -
3 Drain Pain
- AC Kap. : 150000 btu/h Set 2.00 - -
F LANTAI 3 Mezzanine
3 Plenum Box
- AC Kap. : 150000 btu/h Set 2.00 - -
4 Drain Pain
- AC Kap. : 150000 btu/h Set 2.00 - -
G LANTAI 4
H LANTAI 4 Mezzanine
3 Plenum Box
- AC Kap. : 150000 btu/h Set 2.00 - -
4 Drain Pain
- AC Kap. : 150000 btu/h Set 2.00 - -
I LANTAI 5
J LANTAI 6
L LANTAI 7 Mezzanine
M LANTAI 8
6 Plenum Box
- AC Kap. : 60000 btu/h Set 1.00 - -
30000 btu/h Set 1.00 - -
M LANTAI ATAP
PENJUMLAHAN
Ke Penjumlahan VAC - -
INSTALASI PEMIPAAN
I LANTAI BASEMENT
II LANTAI 1
IV LANTAI 2 Mezzanine
V LANTAI 3
VI LANTAI 3 Mezzanine
VII LANTAI 4
XI LANTAI 7
XIII LANTAI 8
PENJUMLAHAN
- -
INSTALASI DUCTING
A Lantai Basement
B Lantai 1
C Lantai 1 Mezzanine
D Lantai 2 Mezzanine
F Lantai 3 Mezzanine
G Lantai 4
H Lantai 4 Mezzanine
I Lantai 5
J Lantai 6
K Lantai 7
L Lantai 7 Mezzanine
M Lantai 8
PENJUMLAHAN
Ke Penjumlahan VAC - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-